HomeMy WebLinkAbout2009/07/14 Item 9CITY COUNCIL AGENDA STATEMENT ~~~~~ c1TVOF '"~` CHULA VISTA 7/14/09, Item ITEM TITLE: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING CONTRACT FOR THE "PAVEMENT REHABILITATION PROGRAM FY 07/08 TYPE II RUBBERIZED'. EMULSION AGGREGATE SLURRY (REAS) (STL335E)" PROJECT TO PAVEMENT COATINGS COMPANY IN THE AMOUNT OF $548,439, AUTHORIZING AN INTER-PROJECT TRANSFER IN THE AMOUNT OF $200,000 FROM THE "PAVEMENT REHAB PROGRAM, FY 06/07 (STL340) TO STL335, AND AUTHORIZING THE EXPENDI OF ALL AVAILABLE FUNDS IN THE PROJECT SUBMITTED BY: DIRECTOR OF PUBLIC WORKS REVIEWED BY: CITY MANAGE ASSISTANT CITY NAGER 4/STHS VOTE: YES ® NO ^ SUMMARY On June 10, 2009, the Director of Public Works received sealed bids for the "Pavement Rehabilitation Program FY07/08 Type II Rubberized Emulsion Aggregate Slurry (REAS) (STL335E)" project. This_ project consists of the application of Rubberized Emulsion Aggregate Slurry (REAS) seal coat to various streets in the City, in which removal and replacement of failed asphalt concrete pavement (dig-outs) was performed by another contractor (Frank & Sons, Inc. of Chula Vista), under a separate contract. The proposed action would award the REAS contract to Pavement Coatings Company and authorize the Director of Public Works to expend all available funds to maximize the number of streets in which this type of pavement maintenance work would be performed. The additional streets to receive the REAS surface treatment would be selected from a list of streets in which additional dig-outs have been completed by Frank & Sons, Inc. at the time REAS work commences. ENVIRONMENTAL REVIEW The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project qualifies for a Class 1(c) categorical exemption pursuant to Section 15301, Existing Facilities, of the State CEQA Guidelines. Thus, no further environmental review is necessary. 9-1 7/14/09, Item Page 2 of 3 RECOMMENDATION Council adopt the resolution. BOARDS/COMMISSION RECOMMENDATION Not applicable. DISCUSSION The FY07/08 CIP Budget includes a program to rehabilitate and preserve deteriorating pavement throughout the city. The Public Works Department, through the Pavement Management System, developed a priority list of streets to be included in the program. The goal of the program is to extend the serviceability of the streets through the removal and replacement of deteriorated sections of streets (dig-outs) and the subsequent application of various types of surface treatments, including asphalt concrete overlays, chip seals, and REAS sealcoats. This project will also include the application of herbicide (weed removal), striping and pavement markings, traffic control, and other miscellaneous work, and all labor, material, equipment, and transportation necessazy to successfully complete the project. Attachment 1 shows a primary list of streets to receive the REAS surface treatment. On June 10, 2009, the Director of Public Works received two (2) bids for the "Pavement Rehabilitation Program FY07/08 Type II Rubberized Emulsion Aggregate Slurry (REAS) (STL335E)" project. The following bids were received: CONTRACTOR BID AMOUNT 1. Pavement Coatings Co. -Cypress, CA $548,439.00 2. American Asphalt South, Inc.- Fontana, CA $556,070.00 The low bid submitted by Pavement Coatings Co. of Cypress, CA is below the Engineer's estimate of $662,378 by $113,939 (17.2% below the Engineer's estimate); much of this difference can be attributed to high degree of competition currently within the construction market. Design staff has verified the references provided by the contractor and has found their work to be satisfactory. Pavement Coatings Co. has also satisfactorily completed past projects for the City. The Contractor's License No. 303609 is current and active. If approved, the proposed resolution would also (1) authorize that additional streets selected from a list of streets in which dig-outs have been completed by Frank & Sons, Inc. receive the REAS surface treatment, and (2) increase the Director of Public Works' cumulative change order authority specified in City Council Policy No. 574-O1 and authorize the Director of Public Works to expend all available funds in the project without further City Council action in order to complete as many streets as possible. Disclosure Statement Attachment 2 is a copy of the Contractor's Disclosure Statement. Wage Statement The source of funding for this project is TransNet. Contractors bidding this project are not required to pay prevailing wages to persons employed by them for the work under this project. 9-2 7/14/09, Item Page 3 of 3 Disadvantaged businesses were encouraged to bid through the sending of the Notice to Contractors to various trade publications. DECISION MAKER CONFLICT Staff has reviewed the decision contemplated by this action and has determined that the decision concerns repairs, replacement, or maintenance of existing streets or similar facilities and, therefore, there is not a material financial effect of the decision on the property holdings of the City Council Members pursuant to California Code of Regulations sections 18704.2(b)(2) and 18705.2(b)(1). FISCAL IMPACT There is no impact to the General Fund as there aze sufficient funds necessary to complete the project. FUNDS REQUIRED FOR CONSTRUCTION A. Contract Amount $548,439 B. Contingencies (Approx. 25%) $136,561 C. Staff Time & Testing Costs 1. Construction Inspection (Approx. 8%) $ 55,000 2. Design/Construction Management (Approx. 5%) $ 35,000 3. Planning/Environmental/Traffic/Public Works (Approx. 1.5%) $ 10,000 4. Soil & Material Testing (Approx. 3.5%) $ 25,000 TOTAL FUNDS REQUIItED FOR CONSTRUCTION $810,000 A. STL335 (TransNet) $610,000 B. Inter-Project Transfer from STL340 (TransNet) $200,000 ~~ TOTAL FUNDS AVAILABLE FOR CONSTRUCTION $810,000 Sufficient TransNet funds will be available in the STL335 project account to complete the work upon the inter-project transfer of TransNet funds from the STL340 project accormt. ONGOING FISCAL IMPACT Upon completion of the project, the improvements will require only routine City street maintenance. ATTACHMENTS 1. List of streets included in project 2. Contractor's Disclosure Statement Prepared by: Roberto Juan, Associate Engineer, Public Works Department M:\Engineer\P.GENDA\CAS2009\07-14-09\STL335E AI33 (Final) Pavement Rehab (REAS).doc 9-3 p,TTAC;-{MINT ~ PAVEMENT REHABILITATION PROGRAM FY07/08 (STL335) # STREET LOCATION BEGIN END LENGTH (FT) WIDTH (FT) C-DS (SF) AREA (SF) REAS PAVEMENT REHAB STL335E PHASE 1 -LEFT OVER FR OM STL340D. PHASE 2 -NORTH OF L S TREET WEST OF 1$05 14 ALPINE AV N ALPINE~IINOT AV 5 ALPINE-MINOT AV 980.00 33.00 32,340.00 15 ALPINE AV NALPINE-MINOT AV SALPINE-MINOT AV 1,175.00 33.00 38,775.00 18 CASITA$CT FIRST AV CDS 403.00 27.00 10,881.00 17 CLAIRE AV E H ST E WHITNEY ST 693.00 38.00 28,334.00 18 COLORADO AV J ST K ST 7,321.00 33.00 43,593.00 19 DST CORTE MARIA AV HILLTOP DR Bfi2.00 27.00 77,874.00 20 DST FIRST AV CORTE MARIA AV 782.00 27.00 20,571.00 21 DATE AV I ST CDS 332.00 33.00 10,956.00 22 DAVIDSON ST DEL MAR AV SECOND AV 662.00 35.00 23,170.00 23 DEL MAR AV J ST KEARNEV ST 658.00 27.00 17,786.00 24 FIG AV DAVIDSON ST END OF STREET 321.00 43.00 13,803.00 25 FIG AV EST DAVIDSON ST 883.00 36.00 23,868.00 26 E FLOWER ST BONITA ST HILLTOP DR 1,560.00 37.00 57,720.00 27 GUAVA AV NCDS HALSEY S7 427.00 33.00 14,091.00 26 GUAVA AV HALSEV ST SCDS 453.00 27.00 12,231.00 29 JEFFERSON AV SIERRA WY L ST 676.00 33.00 22,308.00 30 KIMBALL TE WCDS THIRD AV Sfi1.00 27.00 15,147.00 37 LANDI$ AV EST DAVIDSON ST fi74.00 37.00 24,938.00 32 MURRHI'-ST $E69N8d~V 6DS fi09.00 33.00 0.00 33 OAKLAWN AV KST LST 1,328.00 34.00 45,084.00 34 OTIS ST SMITH AVE FIFTH AV 678.00 34.00 23,052.00 35 EAST PARK LN DAVIDSDN ST F ST 660.00 21.00 13,880.00 36 SEA VALE ST DEL MAR AV SECOND AVE 660.00 40.00 26,400.00 37 SIERRA WY FOURTH AV E CDS 623.00 33.00 20,559.00 555,324.00 PHASE 3 -SOUTH OF L STREET WEST OF 1-805 44 ALPINE AV NAPLES ST EMERSON ST 6fi0.00 22.00 14,520.00 45 ANITA ST 413' E/0 FRONTAGE RD INDUSTRIAL BL 413.00 21.00 6,673.00 46 BISHOP 5T FIRST AV TOBIAS DR 861.00 33.00 21,873.00 47 OEL MONTE AV ZENITH ST MAIN ST 381.00 34.00 12,954.00 48 EMERSON ST WCDS FOURTH AV 373.00 34.00 12,682.00 49 FAIVRE ST W. CDS JACOUA ST 582.00 22.00 12,804.00 53 GENTRY WY TOBIAS DR E CDS 405.00 27.00 70,935.00 54 HELIX AV E NAPLES ST E EMERSON ST fi70.00 33.00 22,110.00 55 HELIX WV E RIENSTRA ST RIVERA PL 262.00 33.00 6,fi46.00 56 JOSSELYN AV E OXFORD ST E ONEIDA ST 587.00 33.00 19,371.00 57 LEANNA ST HELIX AV E CDS 565.00 33.00 16,645.00 58 MADISON AV K 5T SIERRA WY 652.00 33.00 21,516.00 59 OAK CT WCDS NACION AV 785.00 33.00 6,105.00 fi0 PEARLWOOD ST SPRUCE ST MOUNTAIN VIEW LN 549.00 33.00 16,117.00 61 PEARLWOOD ST MOUNTAIN VIEW LN NACION AV 275.00 33.00 9,075.00 fit PROSPECT CT TOBIAS OR N COS 491.00 33.00 16,203.00 83 DDINTARD ST SECOND AV FIRST AV 1318.00 47.00 61,946.00 64 OUINTARO ST FIRST AV TOBIAS DR 662.00 38.00 25,156.00 65 RIGS AV OTAV VALLEY RD SEND 880.00 27.00 23,220.00 68 STELLA ST BAY BL FRONTAGE RD W 530.00 32.00 16,960.00 67 SYCAMORE DR LOTUS DR ORANGE DR 177.00 30.00 5,310.00 fib TOBIAS DR GENTRY WY ORLANDO CT 478.00 36.00 17,208.00 89 ZENITH ST FOURTH AV FRESNO AV 722.00 38.00 27 436.00 70 EMERSON ST HILLTOP DR WCDS 370.00 33.00 2,600.00 15,010.00 71 VISTA WV NAPLES ST EMERSON ST 600.00 33.00 19,800.00 446 215.00 ATTACHMENTI 9-4 PAVEMENT REHABILITATION PROGRAM FY07/08 (STL335) # STREET LOCATION LENGTH FT WIDTH FT C-D-S SF AREA SF BEGIN END ) ( ( ) ) ( ( ) PHASE 4 -SOUTH OF TEL EGRAPH CANYON ROA D EAST OF I-805 80 BERLAND WV WILLOWCREST WY LORI LN 1,813.00 33.00 38,829.00 81 ENERGY WY NIRVANA AV ECDS 2,169.00 50.00 108,650.00 82 LA SENDA WY E J ST BUEN TIEMPO RD 1,355.00 33.00 44,715.00 63 LAGUNA POINT CT WCDS PT BARROW DR 248.00 19.00 4,712.00 B4 MALIBU POINT CT N CDS PT BARROW DR 228.00 19.00 4,332.00 B5 MORRO POINT DR POINT CAIMAN CT POINT LA JOLLA DR 188.00 29.00 5,452.00 88 NIRVANA AV ENERGY WY MAIN ST 1,778.00 69.00 87,024.00 87 OCALA AV TAMARACK ST TANBARK ST 1,172.00 33.00 38,876.00 88 OLNE AV TALLOW CT TAMARACK ST 450.00 33.00 14,850.00 89 POIN7 DOME CT N CDS POINT BARROW DR 242.00 79.00 4,598.00 90 POINT HUENEME CT N CDS POINT BARROW DR 23g,pp ig,pp 4,522.00 91 POINT LA JOLLA DR BRANDVWINE AV MORRO POINT DR 1,103.00 30.00 - 33,090.00 92 SEAL POINT CT NW CDS TORTUGA POINT DR 320.00 20.00 8,400.00 93 THRUSH ST ROBIN PL OLEANDER AV 485.00 33.00 16,005.00 9d VIA CURVADA BUEN TIEMPO DR LA SENDA WY 583.00 38.00 22,154.00 93 FINCH PL N CDS THRUSH ST 190.00 33.00 4,658.00 10,926.00 96 OCALA AV ENAPLEB ST EAST OXFORD ST 7,125.00 33.00 37,125.00 502 860.00 PHASE 5 -NORTH OF TELEGRAPH CANYON ROA D EAST OF 1.805 1 ALLEN SCHOOL IN SURREY LN OTAV LAKES RO 871.00 27.00 18,117.00 2 BRISTOL CT WCDS HAMPTON CT 852.00 33.00 28,116.00 3 CABERNET DR N CDS GAMAY TE fi67.00 33.00 22,071.00 4 CMNO ELEVADO CALLE LA MIRADA CMNO CERRO GRANDE 790.00 33.00 26,070.00 5 CMNO ELEVADO e`401 CMNO ELEVADO SCDS 2,921.00 33.00 98,393.00 B COUNTRY TRAILS CT COUNTRY VISTAS LN SCDS 186.00 34.00 5,6M.00 7 DIAMOND CT E NAPLES ST DIAMOND DR 284.00 33.00 9,372.00 B ETON CT ITHACA ST SW CDS 891.00 33.00 29,403.00 9 GREENWOOD PL CMNO ELEVADO ECDS 1,348.00 37.00 49,876.00 10 HALE PL FENTON ST SCDS 343.00 49.00 16,807.00 11 HAMDEN DR WCDS NEW HAVEN DR 1,089.00 33.00 35,277.00 12 HIDDEN VISTA DR TERRA NOVA DR SMOKY CL 1,858.00 39.00 72,384.00 13 ITHACA ST SCRIPPS AV RUTGERS AV 1,285.00 33.00 42,405.00 14 LAKESHORE DR CREEKWOOD WY EASTLAKE OR 1,720.00 40.00 68,800.00 15 MILLER DR EASTLAKE PW BOSWELL CT 952.00 81.00 58,072.00 i6 GTAY LAKES RD WUESTE RO NORTH CITY LIMITS 1,244.00 27.00 33,588.00 17 PORT ASHLEY HILLSIDE DR PORT CARDIFF 337.00 33.00 11,121.00 78 PORT STIRLING PORT CARDIFF SCDS 388.00 33.00 12,144.00 79 RUE CHATEAU RUE AVALLON N CDS 1,334.00 33.00 44,022.00 20 SAN JUAN PL N CDS MACKENZIE CREEK RD 281.00 33.00 8,813.00 21 SANDY CREEK DR NCDS COUNTRY VISTA LN 588.00 33.00 19,338.00 22 TULANE AV GOTHAM ST HARVARD ST 275.00 33.00 9,075.00 23 WAGONWHEEL WY ECDS SURREY DR 547.00 34.00 18,598.00 24 WATERTOWN LN HAMDEN DR NEW HAVEN DR 789.00 . 33.00 25,377.00 25 WHITE NORSE CT WCDS CANYON RIDGE DR 136.00 34.00 6,824.00 28 WILLOW ST SWEETWATER RD BONITA RD 1,073.00 55.00 59,015.00 824 262.00 ` " ~ ~ - TOTAL 2,328;66l.DO'. M:\General Servkes\DesignWl Projects\STL\STL335\STL335B Proposed SuAxe Treatment List.>as ATTACHMENT 1 9-5 ATTACHIVAENT 2 CITY OF CHULA VISTA DISCLOSURE STATEMENT Pursuant to Council Policy 101-01, prior to any action upon matters that will require discretionary action by the Council, Planning Commission and al] other official bodies of the City, a statement of disclosure of certain ownership or fmancial interests, payments, or campaign contributions for a City of Chu]a Vista election must be filed. The following information must be disclosed: List the names of all persons having a fmancial interest in the property that is the subject of the application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier. N/A 2. If any person* identified pursuant to (1) above is a corporation or partnership, list the names of all individuals with a $2000 investment in the business (corporation partnership) entity. N/A 3. If any person* identified pursuant to (1) above is anon-profit organization or trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. N/A 4. Please identify every person, including any agents, employees, consultants, or independent contractors you have assigned to represent you before the City in this matter. N/A 5. Has any person* associated with this contract had any financial dealings with an official** o~ the City of Chula Vista as it relates to this contract within the past 12 months? Yes No_ 14 M:\Grneral Services\Design\All Projects\STL\STL335E REAS\STL3 ~'P1~ Pavement Rehab Specs end ContracLdoc If Yes, briefly describe the nature of the financial interest the official* * may have in this contract. 6. ** Have you made a contribution of more than $250 within the past twelve (12) months to a current member of the Chula Vista City Council? No ~ Yes _ If yes, which Council member? Have you provided more than $340 (or an item of equivalent value) to an official* * of the City of Chula Vista in the past twe]ve (12) months? (This includes being a source of income, money to retire a legal debt, gift, loan, etc.) Yes _ No X If Yes, which official* * and what was the nature of item provided? Date: l~ _~G'~~ Signata~e Qf',(;o~tr~t~yr~gplicant LpJr(a(GJiLr1i@ntCJ tJ Print or type name of Contractor/Applicant Person is defined as: any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality, district, or other political subdivision, -or any other group or combination acting as a unit. Official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member of a boazd, commission, or committee of the City, employee, or staff members. 15 M:\Grnernl Services\Desi~W] Projects\STL\STI335E REAS~STL33A5 Pavcmrnt Rchab Specs and ContracCdoc RESOLUTION NO. 2009- RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING CONTRACT FOR THE "PAVEMENT REHABILITATION PROGRAM FY 07/08 TYPE II RUBBERIZED EMULSION AGGREGATE SLURRY (REAS) (STL335E)" PROJECT TO PAVEMENT COATINGS COMPANY IN THE AMOUNT OF $548,439, AUTHORIZING AN INTER-PROJECT TRANSFER IN THE AMOUNT OF $200,000 FROM THE "PAVEMENT REHAB PROGRAM, FY 06/07 (STL340)" TO (STL335), AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE FUNDS IN THE PROJECT WHEREAS, City staff prepazed specifications for the "Pavement Rehabilitation Program FY07/08 Type II Rubberized Emulsion Aggregate Slurry (REAS) (STL335E)" and advertised the project on May 22, 2009; and WHEREAS, on June 10, 2009, the Director of Public Works received two (2) sealed bids for the project as follows: CONTRACTOR BID AMOUNT 1. Pavement Coatings Co. -Cypress, CA $548,439.00 2. American Asphalt South, Inc.- Fontana, CA $556,070.00 WHEREAS, the low bid by Pavement Coatings Co. of Cypress, CA is below the Engineer's estimate of $662,378 by $113,939 or 17.2%; and WHEREAS, staff has verified the references provided by the contractor and the contractor has performed previous work for the City of Chula Vista and their work has been satisfactory; and WHEREAS, City Council authorizes the Director of Public Works Operations' authority to approve change orders as necessary up to the total funding available. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and award contract for the "Pavement Rehabilitation Program FY 07/08 Type II Rubberized Emulsion Aggregate Slurry (REAS) (STL335E)" Project to Pavement Coatings Company in the amount of $548,439, authorize aninter-project transfer in the amount of $200,000 from the "Pavement Rehab Program, FY 06/07 (STL340)" to (STL335), and authorize the expenditure of all available funds in the project. Presented by Richazd A. Hopkins Director of Public Works 9-8