ITEM TITLE: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA ACCEPTING BIDS AND AWARDING THE
CONTRACT FOR THE "SIDEWALK REPLACEMENT AT
VARIOUS LOCATIONS IN THE CITY OF CHULA VISTA,
CALIFORNIA FISCAL YEAR 2008/2009 JY0650" PROJECT TO
OL YMPIC ENGINEERING CONSTRUCTION IN THE AMOUNT
OF $49,886.25, WAIVING COUNCIL POLICY 574-01, AND
AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO
EXPEND ALL AVAILABLE FUND R THE PROJECT
SUBMITTED BY: DIRECTOR OF PUBLIC WORK
REVIEWED BY: ASSISTANT CITY MANAGER
CITY MANAGER
4/5THS VOTE: YES 0 NO [g]
SUMMARY
On December 24, 2008, the City received sealed bids for the "Sidewalk Replacement at Various
Locations in the City of Chula Vista, California Fiscal Year 2008/2009 JY0650" project. The
project was included in the budget to remove and replace curbs, gutters, sidewalks, and
driveways displaced by differential settling, tree roots, etc., on various City streets.
ENVIRONMENTAL REVIEW
The Environmental Review Coordinator has reviewed the proposed project for compliance with
the California Environmental Quality Act (CEQA) and has detern1ined that the project qualifies
for a Class 1 Categorical Exemption pursuant to Section 15301 (Existing Facilities) of the State
CEQA Guidelines because the proposed removal and replacement of existing damaged curbs,
gutters, sidewalks and driveways involves negligible or no expansion of an existing use. Thus,
no further environmental review is necessary.
RECOMMENDATION
Council adopt the resolution.
BOARDS/COMMISSION RECOMMENDATION
Not applicable.
.3 -,I
1/27/09, lteml
Page 2 of 4
DISCUSSION
On December 24, 2008, the City received sealed bids for the "Sidewalk Replacement at Various
Locations in the City of Chula Vista, California Fiscal Year 2008/2009 JY0650" project. The
work consists of the removal and replacement of displaced curbs, gutters, sidewalks, curb inlets,
and driveways. The work includes excavation and grading, PCC sidewalks, driveways, curbs,
gutters, asphalt concrete pavement, removal and disposal of existing improvements, traffic
control, protection and restoration of existing improvements, other miscellaneous work, and all
labor, material, equipment, and transportation necessary for the project. The annual Public
Works Street Maintenance budget includes funds for this project. This contract covers the FY
2008-2009 maintenance budget. Engineering staff prepared plats and specifications, and
advertised the project.
The City received bids from twenty (20) contractors as follows:
CONTRACTOR BID
1 Olympic Engineering Construction, Lemon Grove, CA $49,886.25
2 PAL General Engineering, San Diego, CA $63,349.00
3 Fares Construction & Engineering, San Diego, CA $63,442.00
4 C & B Concrete, Redlands, CA $75,976.00
5 Fox Construction, San Diego, CA $77,200.00
6 Palm Engineering, San Diego, CA $78,214.00
7 Team C Construction, EI Cajon, CA $81,710.50
8 A. B. Hashmi, Oceanside, CA $82,082.00
9 RMV Construction, Inc., San Diego, CA $83, 101.00
10 Kock-Armstrong, Lakeside, CA $87,458.80
II Portillo Concrete, Inc., Lemon Grove, CA $91,455.00
12 Scheidel Contracting & Engineering Inc., EI Cajon, CA $92,343.50
13 Tri-Group Construction & Development Inc., Poway, CA $93,936.00
14 West Coast Structures, Inc., dba Westem Structures, Riverside, CA $103,410.31
15 Victor Concrete, Riverside, CA $103,869.50
16 NPG CoqJoration, Perris, CA $104,806.50
17 New Century Construction, Inc., Lakeside, CA $116,191.00
18 Heffler Construction, National City, CA $124,665.00
19 MJC Construction, Bonita, CA $125,399.00
20 American Concrete, San Marcos, CA $159,170.75
The low bid by Olympic Engineering Construction is below the Engineer's estimate of
$93,218.00 by $43,331.75 or 46%. Olympic Engineering Construction is a new sole ownership
3~-2.
1/27/09, Iteml
Page 3 of 4
entity which acquired a General Engineering Contractor license in July 08,2008. The owner has
approximately nine years of experience doing engineering work before he started his
construction business. The Contractor has provided references from three contractors whom he
worked for as Project Engineer in the construction of driveways, curbs, pedestrian ramps, gutter
and sidewalks. Staff received excellent references on the owner. Staff further reviewed the low
bid and recommends awarding the contract to Olympic Engineering Construction of Lemon
Grove, CA, for $49,886.25.
Staff received a late bid submittal from D & L Wheeler Enterprises, Yucaipa, Califomia on
January 5, 2009. This is the 21st bid submittal of the JY-0650 project and will not be considered
in the ranking.
Attachment 1 shows the specific work to be done at each location and approximate quantities of
sidewalk, curb, gutter, and driveway to be installed. Additional locations are shown in Appendix
"A-I." Should funds remain in the project, locations on this list may be added based on the
contract unit prices. Approximately 14% of proposed work is in the Montgomery area, 67%
west ofI-805, but not in Montgomery, and 19% east ofI-805.
Tonight's resolution also authorizes the expenditure of the available contingencies for the
project. According to City Council Policy No. 574-01, if a change order exceeds the cumulative
contract change order aggregate amount allowable to be approved by the Director of Public
Works Operations, City Council approval is required. However, approval of tonight's resolution
will increase the Director of Public Works Operations' authority to approve change orders as
necessary up to the total contingency amount and funds available in the project. Authorization to
expand the scope and expend all available funds will allow staff to remove and replace as much
damaged concrete as possible on the lists using the available funds in the project. In accordance
to City Council Policy No. 574-01, the Director of Public Works will be authorized to approve
lO%, an amount of $4,988.62 in change orders. Thus, approval of tonight's resolution will
increase the Director of Public Works authority to approve change orders as necessary up to the
contingency amount of$50, 113.75 and expend all of the appropriated funds for the project.
The authorization to expend all available contingencies and increase the value of the contract as
necessary will avoid delay in construction due to unforeseen circumstances. Unforeseen
circumstances (i.e. poor subgrade, utility conflicts, increase of quantities, etc.) may cause an
increase in quantities beyond what was anticipated during the preparation of the project
specifications. Further, it will allow the construction of improvements at locations listed in
Appendix "A" and "A-l."
Disclosure Statement
Attachment 2 is a copy of the Contractor's Disclosure Statement.
Wage Statement
The source of funding for this project is Gas Tax Funds. Contractors bidding this project were
not required to pay prevailing wages to persons employed by them for the work under this
project. Disadvantaged businesses were encouraged to bid through the sending of the Notice to
Contractors to various trade publications.
3-d
1/27/09, Item-2L-
Page 4 of 4
DECISION MAKER CONFLICT
Staff has reviewed the decision contemplated by this action and has determined that pursuant to
Califorina Govemment Code Section 1090, no conflict exists. Staff has also reviewed the
property holdings of the City Council and has found no property holdings within 500 feet of the
boundaries of the propeliies which are the subject of this action.
FISCAL IMPACT
FUNDS REQUIRED FOR CONSTRUCTION
A. Contract Amount $49,886.25
B. Contingencies (with additional locations) $50,113.75
TOT AL FUNDS REQUIRED FOR CONSTRUCTION $100,000.00
FUNDS A V AILABLE FOR CONSTRUCTION
A. Street Maintenance Budget (16731-640 I) $100,000.00
TOT AL FUNDS A V AILABLE FOR CONSTRUCTION $100,000.00
The General Fund will offset staff costs for design and inspections, estimated at $20,000.00. The
contract amount of $49,886.25 plus the contingencies and remaining funds in the project results
in a total construction cost of $100,000.00 which is budgeted in the Street Maintenance budget
which is composed of Gas Tax funds.
Upon completion of the project, the improvements will reqUIre only routine City street
mai ntenance.
ATTACHMENTS
1. Appendices "A" and "A-1"
2. Contractor's Disclosure Statement
Prepared by: BOllshra Salem, Sr. Civil Engineer, Engineering Department
M :\General Scrviccs\Design\AII Projects\.IY\.IY0650\GTSW09 A ward Agcnda 01-09 mlcm-REV.doc
3-'rf
ATTACHMENT
I
APPENDIX" A"
SIDEWALK REPLACEMENT FY2008-2009 JY0650
cr:~r=li rl ii -II fl, g
I____L_____ un ______L~_L_~__J ~_~__ Lt-1 ~
''''''''-'''''''1''.''''" m , 236!Third Avenue 'I 288
543 irst Avenue (On Shasta S
, 3 i 63 "L" Street
r".-4""''t'''.,,,,,,,,,,,.,, "'''' , 625 i Minot Avenue
[:'3:~::J:':::='" ...","'" ,." ",-'""" 13~; : ~e~~:;r;:e~ venue _"'''__'''1'''''''''''''_'''"'_"
t.:t1==:='~~1t1~~~~==:I~:::=t3j=:~~:-_l.-:-
773.77758T:7'87rCh~'~~h'A~~~~~'" 300
"""""""'-""'""""''''-''''''''3'801"i.Str~'~t''''''"''''''''''''-"."",. E
......1.}""""I....."""..""....".."" "'" ..,""".,,,,,,,....~.~~lL~,'!~,~,~",,.",.,,,,,,,,,,,..,,"",,,,,,,,,,,,,,,.."",.." "..",."",, ,!L",,,,,,..
1 14 i 63 i Shasta Street
r-'i"s-"j"''''''''''''''''''''''''''''.''''''''''''''''''i 8 8 8 i Nirvana Avenue
[I~.:'I~:~":':,::"::':','.:,::::::,:':'.::'=:~I~2! Blackwood Road
I 17 i 1009)J Street E E
[~I::[:=,:':,:,::"'.',::,'::,,::,::.,:,':::~~...,,.,.:?~},!l~~"~.~.!E~~!.S._",..",.,,,_..",..,.......,,,..,,,,,..,.L.,."""""'''._.,
i 19 i 4921 Elm Avenue i
f"'2-0-r"'-7"'''--'''.''''620''; 6i5"P~;~'lo e Drive
, Comer of i G Street & 5th Avenue
88; ueen Anne Drive
. I 190!Cuyamaca Avenue
'it-.""....."_..:'''''..''.,..''''''''-'.'~.'L't''''''''''''',...._'k....''''''.,,,,,-..,~,~.'t'M"',""'..,~.,.~~,,,,,,,,,,,,,,,..,,,,,,,,,,,,...,,,,,""'1'''''''~''''''~',
t"'i~"+'."."""'"'''' ...,."..,..........!~~~t9.-~~~1~-~!~~t"'"._.,.,
l~=~~~~~,L::::=",:,.,:,:',::":::::::~.':::,::.~.IIzr~~I~i~,~:"~!i~~:t':~::::.,:'::~~'..."""",._..,,"'.,,,"',E
l 27 i 1397!Monserate Ave.lQuintard side i
f"""'....."..,,,..,'" """"....-............ '..'."..".."..--............""".........."'..''''.......''"......'''..........'''.."..."""...."....................."""",,....
, 28 ! 1283jMelrose Avenue i 1
r:jE":I:..::::'::.:'::,::....':'=:=="::=I~~TQiI:~;[~..',$i~i!~,::.::,='::.::.::..:,:.....:":,::,=~:'~:.:=,:::,J~:,:..:::,::..'::':,:1,::,::,)"'..,,,,,.",,,,....__....,,."....,_....-........._..."'"
, 30 i 1207'Melrose Avenue !! 88
225! Leanna Court ! 22
1
1295 j Third Avenue
. ."T'........r""-.-'..,.-'..~.A~~~~e
160 Reinstra Street
. ....",...U.9.U ef(e.!:!!~~,A.Y..~_~.~.,
108 I Jefferson Avenue
948 i Broadway
636iSierra Wa
i-' ,,,_.. ;""" ".'" .".,.. ,""". ".L39~.LM.?_I!~e.~'!t~...~~e..I!.~~.. .."."'. .".. ,. ..,.. ! "'''''''_'''_''.. ,.L",.,~9..",,,,,,. "..,.- ,., ,,,,,,. ., .."....,_..,.._.+-_...~L --L__,..",......t-.-
L~.L J............... ....___...}.22?j"M.~~.~.!:~~~",Avenue ;: 1 i ! +.._"........L,.,_,_,"....,..c,.,.._.
J 42 : 171jProspect Street E 80 .L...,...."..--t,.".,.1i..:-+_..-
i._.~~".L_.~=__".~~.._-L._.-=-=~~~CT 2:~,~~~~2"~ 463 I
I 36 j
r"."'37"...I....."'....."......,''",.,-'''.....,,'
t.".3'8'.1'"""
HOME ON CITYWIDE 2000 MlGENERAL SERVICESlDESIGNlJY0650
10.31.2008 MLCM
:i~
rI:J.rI:J
~. (;'
~.~.
~"I.;)
.-.
..... .
a
.~
.~
u
56
36
60 15
,...,,,,,.."',.....,,..,."',, ...."".....-..".'.-.'..'7''''..........-..'''''+.........-..-''''''..''.-.'''...,,-..,.-
170.. . I I 24
20
30
108
",_.L_",~' ,
I
34 ! '
"""""."...,.-..t-..'"'i"6...."'t"-.-
..,-"".."".....,.,- -""-"".'."'--r"."""""7
"...1.",.__,
.....,""''',.'",..,..,''''',......,..,'''....,..J,..........,,,.,,''~g..."""""1'-'."'"'.'''''..-''' ...,.........,.,...._.... ...,'_~~.,_~" ,___ 4 "~L..,} ,..J
! I .. I 1 14 I......!
',,'..,...._..''''''''.,.......... ..,.,.....='::=,:::., ,,=':~-l"o.=lS ,.j
_'"_'''''''__'''"j''''..''''''.''''.''.''''' i
"1-
.3~5
. -APPENDIX "A"
t
+-t--H
I \\5
I 1,
~
1,11805
VICINITY MAP
NO SCALE
(j) LOCATIONS
(SEE LIST IN
APPENDIX "A")
MLCM
DA TE: SHEET 1
11-03-08 OF 2 SHTS.
CITY OF CHULA VISTA
SIDEWALK REPLACEMENT FY2007-08
3-/?
PROJECT FILE # JY-0650
PREPARED BY:
Q.\SDSKPRDJ\JY06S\DRAV\2007-o8\JY065Dplllt.dwQ 11/03/2008 00.3&37 AM PST
., ORA WN BY: nTLE:
MLCM
APPRO VEO BY:
as 'RY
CITY OF CHULA VISTA
SIDEWALK REPLACEMENT FY2007-08
3-7
BIRCH
RD
\"'"
"Y
~
'9.
"Y
~
<-
i
i
.
--..,----.-
VICINITY MAP
NO SCALE
Q'\SDSKPRDJ\JY065\DRA'J\2007-08\JY065Dplo.t.dwg 11/03/2008 08.38137 AM PST
DRAWN BY:
TI TLE:
MLCM
DA TE: SHEET 2
11-03-08 OF 2 SHTS.
APPENDIX II A"
At. 1:4
RO
(j) LOCATIONS
(SEE LIST IN
APPENDIX "A")
PROJECT FILE # JY-0650
PREPARED BY:
MLCM
APPRO VED BY.'
as 'RY
APPENDIX IA_1"
SIDEWALK REPLACEMENT FY2008-2009 JY0650
SUPPLEMENTAL LIST -If funds are available, these locations may be added to the scope of work.
I~=='--'-=~='=-"-'~'"'-'--~'=-~'~F" f~-r=-
I I ii' ___ ... i 0 . I ,.e-
. I' ' I I... rJ:J 1:= I ' ....
I I I ! ~ ~ ~,8 ~; ~~ I ~ ~." 'I
! ~O. I STREET NO. I ADDRESS ' I ~ I a: ~ ~ I ~ ! ~ ~ I ~ . ~31'
I. Ii.... rJ:J - ~ := 'I a: ~, ~= rJ:J '
~! i Ii I Cl I ~ II) c.i ~ I Cl u I u' ,~'.l
I. I Y U I : ': I, ;J
F~'~"'r""""-"'.""'-".~'H ~l!~'X~~~~.~...m."__......~.,_.......m""t"._."",.-"I"'"+6g._,+".._,,,..__.,,,.+,,,,,.,,,}Q~.,,_..+-,".}~.?_._.L,,....,~Q..""-r--:-..-.;-.I
HH-....-..-5H~t;i~~~~~n-~'~~,t--I.t~-{-- '-.---r--~ . i. _&L~j
i 74 l 130lJefferson Avenue ! I 1 I I 18
! 7:5--j .. . 13:3IJeff~~s~nAven~e --. - .. t. -'"1" '100"" "'. ....(n..__ .-." .. .. ......'. +'-.--.
· ....... r -... "... .........1.. .---..-.' .-. ," ... ..,. . " . . ,.."..., .. 'I' .""..! ...", -_.J. ... ..,_....+ '''...-.....,. -I ....,..-.--. '''-'"-' """ -1--...,
~. ,,~j.. 'j'"'' '"" ......,,, "... """"ii~ l-j~~f~~:;: ,~.:;~~~. "' ".m. . "' , ".. ..... ".. ". '+".. - ,,". "j' . . ..., i ~~ -- ,,,.,~.,, ."". _.....---1- ..".....-..." _... t, -" --..."".+.. ... - -"-+-'-1
I ',,'",p I" . .... ...,.. -- ^' ~.. ..... .. 1 ... ""--f" .. .1...... ". 'l" . ... -""r'--'--'l
- _~~...L_,,_ -.. .... --}iii IN~~~~~~Y,-1 :~~~~." ,,,,...., ,.-.-.. ..... .t '..... ."" ( ." ""'~~" "''''''-1'''''''''--'- ."'''', .1 ".. ."... ""..."," ,. " ".---.. ,,,...... +- ......-__ ,___ ..~. 1
i', " I SUPPLEMENTAL TOTALS .. I 4,1591 236 ! 133 353 350 5
:.~ ...A_~~~<<n=......".,.",__~~~""""~==:=>~*,,~~,,,",,~~~=
1.
HOME ON CITYWIDE 2000 MlGENERAL SERVICES/DESIGNlJY0650
10-31-2008 MLCM
3 ---f
ATTACHMENT 'J/
City of Chula Vista Disclosure Statement
Pursuant to Council Policy 101-01, prior to any action upon matters that will require discretionary action
by the Council, Planning Commission and all other official bodies of the City, a statement of disc10sure of
certain ownership or financial interests, payments, or campaign contributions for a City of Chula Vista
election must be filed. The following information must be disclosed:
1. List the names of all persons having a financial interest in the property that is the subject of the
application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier.
N\f\
2. If any person * identified pursuant to (I) above is a corporation or partnership, list the names of all
individuals with a $2000 investment in the business (corporation/partnership) entity.
N\i\
3. If any person* identified pursuant to (I) above is a non-profit organization or trust, list the names
of any person serving as director of the non-profit organization or as trustee or beneficiary or
trustor of the trust. I
6V1A-
4. Please identify every person, including any agents, employees, consultants, or independent
contractors you have assigned to represent you before the City in this matter.
~ II}
5. Has any person* associated with this contract had any financial dealings with an official** oftlle
City ofChula Vista as it relates to this contract within the past 12 months? Yes_ No~
N \ 1'\-
14
M:\General Services\Design\1Y0650\JY0650-Specs.doc
..2 --7
If Yes, briefly describe the nature of the financial interest the official** may have in this contract.
6. Have you made a contribution of more than $250 within the past twelve (12) months to a current
member of the Chula Vista City Council? No _ Yes 't- If yes, which Council member?
-Ll\ ()r
7. Have you provided more than $3.40 (or an item of equivalent value) to an official** of the City
of Chula Vista in the past twelve (12) months? (This includes being a source of income, money to
retire a legal debt, gift, loan, etc.) Yes _ No L-
~' AhiCh official** and what was the nature of item provided?
Date:---1LllJ) 0 "-lJ
/i~!t;~k/1~
Signature of ContrictorJ Applicant
GQl)'ktVO k~:1()1J"\
Print or type n e of Contractor/ Apphcant
*
Person is defined as: any individual, firm, co-partnership, joint venture, association, social
club, fraternal organization, corporation, estate, trust,' receiver, syndicate, any other county,'
city, municipality, district, or other political subdivision, -or any other group or combination
acting as a unit.
**
Official includes, but is not limited to: Mayor, Council member, Planning Commissioner,
Member of a board, commission, or committee of the City, employee, or staff members!
15
M:\Gencral Services\Design \JY0650\JY0650-Specs.doc
.3 -'/ tJ
RESOLUTION NO. 2009-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA ACCEPTING BIDS AND AWARDING THE
CONTRACT FOR THE "SIDEWALK REPLACEMENT AT
VARIOUS LOCATIONS IN THE CITY OF CHULA VISTA,
CALIFORNIA FISCAL YEAR 2008/2009 JY0650" PROJECT
TO OL YMPIC ENGINEERING CONSTRUCTION IN THE
AMOUNT OF $49,886.25, WAIVING COUNCIL POLICY 574-
01, AND AUTHORIZING THE DIRECTOR OF PUBLIC
WORKS TO EXPEND ALL AVAILABLE FUNDS FOR THE
PROJECT
WHEREAS, on December 24, 2008, the City received sealed bids for the "Sidewalk
Replacement at Various Locations in the City of Chula Vista, California FY 2008-2009
JY0650" project; and
WHEREAS, the City received bids from twenty (20) contractors as follows:
CONTRACTOR BID
1 Olympic Engineering Construction, Lemon Grove, CA $49,886.25
2 PAL General Engineering, San Diego, CA $63,349.00
3 Fares Construction & Engineering, San Diego, CA $63,442.00
4 C & B Concrete, Redlands, CA $75,976.00
5 Fox Construction, San Diego, CA $77,200.00
6 Palm Engineering, San Diego, CA $78,214.00
7 Team C Construction, El Cajon, CA $81,710.50
8 A. B. Hashmi, Oceanside, CA $82,082.00
9 RMV Construction, Inc., San Diego, CA $83,] 0] .00
10 Kock-Armstrong, Lakeside, CA $87,458.80
11 Portillo Concrete, Inc., Lemon Grove, CA $9] ,455.00
12 Scheidel Contracting & Engineering Inc., El Cajon, CA $92,343.50
13 Tri-Group Construction & Development Inc., Poway, CA $93,936.00
14 West Coast Structures, Inc., dba Western Structures, Riverside, CA $103,410.31
15 Victor Concrete, Riverside, CA $103,869.50
16 NPG Corporation, Perris, CA $104,806.50
17 New Century Construction, Inc., Lakeside, CA $116,191.00
18 Heffler Construction, National City, CA $124,665.00
19 MJC Construction, Bonita, CA $125,399.00
20 American Concrete, San Marcos, CA $159,170.75
H:\ENGINEER\RESOS\Resos2DD9\OI-27-D9\GTSWD9 Reso for Award mlcmREV.doc
.,3-/1
Resolution No. 2009-
Page 2
WHEREAS, the low bid by Olympic Engineering Construction for $49,886.25 is below
the Engineer's estimate of $93,218.00 by $43,331.75, or 46 percent; and
WHEREAS, although Olympic Engineering Construction is a new sole ownership entity,
while working as a project manager, the owner has managed satisfactorily in the completion of
construction projects which include driveways, curbs, pedestrian ramps, gutter and sidewalks per
staff interviews with references; and
WHEREAS, there is currently $100,000 in the Street Maintenance budget (16731-6401)
which is composed of Gas Tax funds to fund this project; and
WHEREAS, the General Fund will offset staff costs for design and inspections, estimated
at $20,000.00; and
WHEREAS, pursuant to Council Policy 574-01, the City Council shall consider all
change orders involving changes in the scope of the project, increases of contract amounts
greater than 10 % for contracts up to $100,000, or aspects concerning the public health, safety, or
welfare; and
WHEREAS, staff recommends that the City Council waive the Council Policy 574-01 to
give the Director of Public Works the authority to approve change orders as necessary to expand
the scope of the Project and expend all the funds available for the Project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista
as follows:
1. That it accepts bids and awards the contract for the "Sidewalk Replacement at
Various Locations in the City of Chula Vista, California Fiscal Year 2008/2009
JY0650" project to Olympic Engineering Construction in the amount of $49,886.25.
2. That it waives Council Policy 571-01 and authorizes the Director of Public Works to
expand the scope of the Project and expend all available funds for the Project.
Richard A. Hopkins
Director of Public Works
art C. Midfeld
City Attorney
Presented by
H:\ENGINEERIRESOS\Resos2009\OI-27-09\GTSW09 Reso for Award mlcmREV.doc
...3/I~