HomeMy WebLinkAbout2008/11/18 Additional Information
MEMO
~ ~ ft-.
~~
~
""""----.......
ClIT OF
CHULA VISTA
DATE:
November 18, 2008
TO:
The Honorable Mayor and City Council
Scott Tulloch, Interim City Manager 'S ) ~ /
',"oh,,,' Hooki",_ O""OW of ieo,'o"" 'Og~ ~
Request for Federal Funds - Economic Stimulus Package
VIA:
FROM:
SUBJECT:
In an effort to "jump-start" the economy, there have been repeated reports from Washington and Sacramento of a
possible Economic Stimulus Package focused on job creation through the implementation of public infrastructure
projects across the nation and the State, The Economic Stimulus program provides economic relief in a downturn
economy and an opportunity to implement tangible improvements that add to the value and long-term
sustaipability of public infrastructure systems, The goal of the Economic Stimulus Package is to quickly invest
federal, state and local funds on public infrastructure projects, which will stimulate economic growth, as well as
improve. preserve, and/or restore aging public infrastructure. f
In an efl'0I1 to expedite and coordinate public infrastructure needs within the region, SANDAG asked each of its
member cities to submit a list of infrastructure projects that could be ready for construction immediately, within
six months, and within one year. SANDAG initially requested that local agencies identify local streets and roads,
transit, and highway projects for submittal to our regional Congressionitl representatives, These lists were due to
SANDAG on Friday, November 7th The abbreviated time frame within which City staff was required to respond
to the call for projects did not allow for the standard practice of making a formal presentation to the Mayor and
City Council prior to submitting the list
In an el'I'011 to avoid being len off SANDAG' s list, City staff reviewed the infrastructure projects that had been
previously presented to, and approved by, the Mayor and City Council in workshops earlier this year and
submitted those projects to the SANDAG working group. Over $280 Million in local road and street and transit
projects, along with nearly $50 Million in regional highway projects within the City's boundaries, were submitted
to SANDAGtby the Engineering Department
As a result 01' feedback from member cities, SANDAG expanded the request for economic stimulus projects to
include sewer, storm water, and other public works projects, such as improvements to recreation, library, fire and
other public facilities -- this supplemental call for projects was due to SANDAG by Friday, November 14,2008.
A Citywide list 01' these types of public infrastructure projects was developed based upon input from City
departments and a review of the City's Capital Improvement Program -- storm drain projects were not included in
this supplemental list because a nnmber of high priority storm drain projects were already included in the initial
November 7, 2008 submittal for local streets and roads. This supplemental list added S 190 Million in new
requests for Economic Stin1l11us Package funding.
-
The following table provides a summary of funding for public infrastructure project requests submitted by
category:
Economic Stimulus Submittal
Local Streets and Roads
Transit
Highways
Sewer
Other Public Works (including facilities)
Estimated Infrastructure Funding
Requirement
Millions
$ 276.00
$ 5.50
$ 49.50
$ 20.25
$169.13
$ 520.38
Copies of the lists of public infrastructure projects submitted to SANDAG arc attached to this memo for your
reference. As you will note, the projects submittal does not include public projects that cannot feasibility be
completed within the established criteria of being ready for construction immediately, within six months, and/or
one year. Detailed project sheets including project descriptions and location maps are being developed for each
submittal and will be made available for viewing. We anticipate this list and prioritization is "work in progress"
and will be further refined based on criteria and agency funding allocations.
The League of California Cities and the U.S. Conference of Mayors requested, and were provided, the project lists
developed by City staff.
Should you have any questions about items on this list, please contact me at (619) 409-5873 or Iraesema
Quilantan at 409-5976.
c: Leah Browder, Deputy City Manager
Colleen Carnevale, Government Relations Liaison
Kirk Ammerman, Principal Civil Engineer
Frank Rivera, Principal Civil Enginccr
Home on CityWide 2000:\Engineer.\Economic Stimulus\Economic Stimulus Info Item.doc
Agency Name:
Local Streets and Roads
List of Projects
City of Chula Vista. Local Streets and Roads
11/18/2008
Project Description Construction Costs
Ready to 1 North Broadway Basin Storm Drain & Street Improvements along $4.0M
.advertise Broadway Corridor from 0 St. to N'ly City of Chula Vista Limits*
2 Glenhaven Street Improvements between 1 st Ave. & West End $1.5M
3 CMP Replacement/Rehab within RAS & Local Streets Citywide* $10M
4 Pavement Overlay on Various City RAS and Local Streets Citvwide* $20M
5 Tree Plantina & Establishment in Parkwavs Citvwide $2.5M
6 Unimproved Allev Pavinq Proqram Citywide !Desiqn-Build) $10M
7 ADA Ramps within Various RAS & Local Streets (Desiqn-Build)* $5M
Subtotal $53M
Advertise 1 Otay Lakes Rd. & E H St. WideninQ, Tel. Cvn. Rd. to RidQeback Rd.* $7M
within 2 H St. CMP Storm Drain Proiect between 1 st & 2nd Avenues* $3M
6 Months 3 Naples St. Imorovements between 3rd & Alpine Avenues $1.5M
4 Pavement Reconstruction/Overlay on RAS & Local Streets Citywide* $20M
5 CMP Replacement/Rehab within RAS & Local Streets Citvwide* $10M
6 Bonita Rd. @ Allen School Box Culvert Construction* $1M
7 ADA Ramps within RAS & Local Streets Citvwide !Desiqn-Build)* $2.5M
8 Full Street Improvements - Safe Routes to School $35M
9 Install Missina Sidewalk Citywide within RAS & Local Streets* $15M
Subtotal $95M
Advertise 1 Oxford St. Imorovements between 3rd & 1st Avenues $2.5M
within 2 2nd Ave. Improvements between Naples & Palomar Streets $2.5M
12 Months 3 Elm Ave. Improvements between Naples & Oxford Streets $1.5M
4 Pavement Reconstruction on Local Streets Citvwide $15M
5 3rd Ave. & L St. Storm Drain Construction (Tel. Cyn. Channel)* $10M
6 1st Ave. to K St. Storm Drain Construction (Tel. Cvn. Channel) $6.5M
7 ADA Ramps within Various RAS & Local Streets !DesiQn-Build)* $5M
9 Full Street Improvements - Safe Routes to School $65M
10 Install Missina Sidewalk Citywide within RAS & Local Streets* $10M
11 Broadwav Widenina/Reconstruction, Main Street to S'lv City Limits* $2.5M
12 Hilltop Dr. from East I St. to Shasta St. Drainaae Improvements $2.5M
Subtotal $128M
* RAS Regional Arterial System
J:IEngineerISANDAG\Agency Project List
Transit
List of Projects
Agency Name: City of Chula Vista - Transit Projects
11/18/2008
I
Project Description Construction Costs
Ready to 1 Citywide Bus Shelters (50 Priority Locations) $1M
advertise
Subtotal
$1M
Advertise 1 Lower Trolley Line for Grade Separation @ H St & E St. SANDAG
within 2 South Bay Expressway Caltrans
6 Months 3 Transit Center Improvements @ Southwestern College $1M
Subtotal
Advertise 1 Install 6" HP Gas in Main Street, Oleander to Maxwell, and in Maxwell to $3.5M
within Serve Chula Vista Transit, Public Works, Sweetwater Union High School
12 Months District CNG Fleets, and Others
Subtotal
$3.5M
Highways
List of Projects
Agency Name: '-'ltV OT ,-,nula ViSta - Highways Projects
11/18/2008
,
Project Description Construction Costs
Ready to
advertise
Subtotal
Advertise
within
6 Months
Subtotal
Advertise 1 SR-125/Rock Mountain Road Interchange (Design/Build) $27M
within 2 1-805 Southbound Off-Ramp Improvements, Tel. Cyn. Rd. Caltrans - $15M
12 Months 3 1-805/Main SI. Undercrossing Widening $7.5M
Subtotal
$49.5M
Local Agency SewerlWater
List of Projects
11/18/2008
.
Agency
Name:
City of Chula Vista - Local Sewer Projects
Project Description . Construction Costs
Ready to 1
2
Advertise 3
Advertise 1 Sewer Replacement - Priority 1 Projects $3.60M
within 6 2 Sewer Rehabilitation - Priority 1 Projects $5.38M
Months 3
Subtotal
1 Sewer Capacity Enhancement - Prioritv 1 Proiects $5.52M
Advertise 2 Sewer Caoacitv Enhancement - Priority 2 Proiects $1.70M
within 12 3 J StreeUMarina Parkway Sewaae Lift Staae Station Rehabilitation $2M
Months 4 Sewaae Lift Station Rehabilitation Projects $2.05M
Subtotal
$8.98M
Subtotal
$11.27M
Other Public Works
List of Projects
11/18/2008
,
Agency
Name:
City of Chula Vista - Other Public Works Projects
. , . Project Description Construction Costs
Ready to 1 All Season's NeiQhborhood Park Construction $3M
Loma Verde Recreation Center Renovation/Upgrades, including Children's $2M
Advertise 2 Front Safetv Area, Rear Patio Area for Communitv Events
3 Rohr Park Upgrades - Irrigation Improvements, Restrooms, Picnic Shelters $1.15M
& Trash Enclosure
4 Greg Rogers Park Upgrades - Irrigation Improvements and Storage, Picnic $0.9M
Shelter, and Restroom Construction
5 Park Irrigation Systems Upgrades/Modernization, Citywide $0.5M
6 Memorial Park Arbor & Water Feature Restoration $0.35M
7 Norman Park Senior Center Equipment & Community Meeting Space & $0.85M
Office Space Repair/ Replacement
8 Convert Multi-Purpose Fields from Grass to Artificial Turf in Various Parks, $25M
Citywide
9 Interim Emergency Operations Center (EOC) Upgrades $0.3M
10 Fire Station NO.4 Training Facility - Upgrade Existing Facilities $0.2M
11 Rancho Del Rey Library - Construct 30,000 SF Facility $20M
12 Chula Vista Animal Shelter Upgrades - Energy Retrofits and Expansion & $1.2M
Improvement of Animal Holding Areas
13 Third Avenue Village Promenade Improvements $3.3M
Advertise 1 Chula Vista Nature Center Permanent SewerlWater Lines $0.93M
within 2 Rohr Manor Historical BuildinQ Repair $1.5M
6 Months 3 Lauderbach Recreation Center Repair/Replacement. $3M
4 Park Restroom Replacement, City wide. $0.5M
5 Women's Club Historical BuildinQ Upgrades & ReDairs $2M
6 ADA Ramp Construction in Various City Parks $1M
7 Ballfield Liahtina UpQrades - Install Musco Green LiQhtinQ at 6 Sites $4.3M
Subtotal
$58.75M
Other Public Works
List of Projects
11/18/2008
~
8 Lauderback Recreation Center Parking Lot Expansion, including Property $13M
Acquisition
9 Relocate and Construct New Fire Station NO.5 (3-Bay Facility) $12M
10 Expand Fire Station Training Facility for "Real Time" Training $5M
11 Civic Center Library Renovation & Upgrade of Building Systems to Current $15M
Energy Standards and Public Needs
12 South Chula Vista Library - Patron Comfort Retrofits & Upgrade Building $3M
Systems to Current Energy Standards
13 Open Space Brush Clearance, Citywide $5.0M
14 Rohr Park Jogging Trail Renovation $O.5M
15 GPS Mapping of Trail Markers to Produce Maps for Trailhead Kiosks and $O.25M
Public Website
16 City Trails - Renovations & Improvements $O.5M
17 Walking/Running Trail Renovation & Improvement in Various Parks $O.1M
18 Park Parking Lot Repaving, Citywide $O.5M
19 Loma Verde Stairway Renovation for ADA Accessibility $O.25M
20 Rienstra Sports Park - Erosion Control Improvements $O.1M
21 Parks Concrete Sidewalk Renovation, Citywide $O.2M
22 Park Restrooms Construction/Renovation, Citvwide $O.3M
23 Park Trash/Recyclinq Enclosures, Citywide $O.25M
Subtotal
$69.18M
Advertise 1 Eucalyptus Park - Add Ballfields/Restore Picnic Shelters & Restroom $1.5M
2 Sunset View Park - Doq Park Construction $O.5M
within 12 3 Chula Vista Nature Center - Parking Lot Relocation, Incl. Acquisition $2.0M
Months 4 Chula Vista Visitor Center Renovation $O.2M
Reconstruct Fire Station NO.1 as a 3-Bay, 2-Story Facility with a $17M
5 Permanent Emergency Operations Center (EOC), including Equipment,
Furnishings, and Communications
6 Construct Reqional Fire Traininq Facility $20M
Subtotal
$41.2M