HomeMy WebLinkAbout2008/11/18 Additional Information MEMO ~ ~ ft-. ~~ ~ """"----....... ClIT OF CHULA VISTA DATE: November 18, 2008 TO: The Honorable Mayor and City Council Scott Tulloch, Interim City Manager 'S ) ~ / ',"oh,,,' Hooki",_ O""OW of ieo,'o"" 'Og~ ~ Request for Federal Funds - Economic Stimulus Package VIA: FROM: SUBJECT: In an effort to "jump-start" the economy, there have been repeated reports from Washington and Sacramento of a possible Economic Stimulus Package focused on job creation through the implementation of public infrastructure projects across the nation and the State, The Economic Stimulus program provides economic relief in a downturn economy and an opportunity to implement tangible improvements that add to the value and long-term sustaipability of public infrastructure systems, The goal of the Economic Stimulus Package is to quickly invest federal, state and local funds on public infrastructure projects, which will stimulate economic growth, as well as improve. preserve, and/or restore aging public infrastructure. f In an efl'0I1 to expedite and coordinate public infrastructure needs within the region, SANDAG asked each of its member cities to submit a list of infrastructure projects that could be ready for construction immediately, within six months, and within one year. SANDAG initially requested that local agencies identify local streets and roads, transit, and highway projects for submittal to our regional Congressionitl representatives, These lists were due to SANDAG on Friday, November 7th The abbreviated time frame within which City staff was required to respond to the call for projects did not allow for the standard practice of making a formal presentation to the Mayor and City Council prior to submitting the list In an el'I'011 to avoid being len off SANDAG' s list, City staff reviewed the infrastructure projects that had been previously presented to, and approved by, the Mayor and City Council in workshops earlier this year and submitted those projects to the SANDAG working group. Over $280 Million in local road and street and transit projects, along with nearly $50 Million in regional highway projects within the City's boundaries, were submitted to SANDAGtby the Engineering Department As a result 01' feedback from member cities, SANDAG expanded the request for economic stimulus projects to include sewer, storm water, and other public works projects, such as improvements to recreation, library, fire and other public facilities -- this supplemental call for projects was due to SANDAG by Friday, November 14,2008. A Citywide list 01' these types of public infrastructure projects was developed based upon input from City departments and a review of the City's Capital Improvement Program -- storm drain projects were not included in this supplemental list because a nnmber of high priority storm drain projects were already included in the initial November 7, 2008 submittal for local streets and roads. This supplemental list added S 190 Million in new requests for Economic Stin1l11us Package funding. - The following table provides a summary of funding for public infrastructure project requests submitted by category: Economic Stimulus Submittal Local Streets and Roads Transit Highways Sewer Other Public Works (including facilities) Estimated Infrastructure Funding Requirement Millions $ 276.00 $ 5.50 $ 49.50 $ 20.25 $169.13 $ 520.38 Copies of the lists of public infrastructure projects submitted to SANDAG arc attached to this memo for your reference. As you will note, the projects submittal does not include public projects that cannot feasibility be completed within the established criteria of being ready for construction immediately, within six months, and/or one year. Detailed project sheets including project descriptions and location maps are being developed for each submittal and will be made available for viewing. We anticipate this list and prioritization is "work in progress" and will be further refined based on criteria and agency funding allocations. The League of California Cities and the U.S. Conference of Mayors requested, and were provided, the project lists developed by City staff. Should you have any questions about items on this list, please contact me at (619) 409-5873 or Iraesema Quilantan at 409-5976. c: Leah Browder, Deputy City Manager Colleen Carnevale, Government Relations Liaison Kirk Ammerman, Principal Civil Engineer Frank Rivera, Principal Civil Enginccr Home on CityWide 2000:\Engineer.\Economic Stimulus\Economic Stimulus Info Item.doc Agency Name: Local Streets and Roads List of Projects City of Chula Vista. Local Streets and Roads 11/18/2008 Project Description Construction Costs Ready to 1 North Broadway Basin Storm Drain & Street Improvements along $4.0M .advertise Broadway Corridor from 0 St. to N'ly City of Chula Vista Limits* 2 Glenhaven Street Improvements between 1 st Ave. & West End $1.5M 3 CMP Replacement/Rehab within RAS & Local Streets Citywide* $10M 4 Pavement Overlay on Various City RAS and Local Streets Citvwide* $20M 5 Tree Plantina & Establishment in Parkwavs Citvwide $2.5M 6 Unimproved Allev Pavinq Proqram Citywide !Desiqn-Build) $10M 7 ADA Ramps within Various RAS & Local Streets (Desiqn-Build)* $5M Subtotal $53M Advertise 1 Otay Lakes Rd. & E H St. WideninQ, Tel. Cvn. Rd. to RidQeback Rd.* $7M within 2 H St. CMP Storm Drain Proiect between 1 st & 2nd Avenues* $3M 6 Months 3 Naples St. Imorovements between 3rd & Alpine Avenues $1.5M 4 Pavement Reconstruction/Overlay on RAS & Local Streets Citywide* $20M 5 CMP Replacement/Rehab within RAS & Local Streets Citvwide* $10M 6 Bonita Rd. @ Allen School Box Culvert Construction* $1M 7 ADA Ramps within RAS & Local Streets Citvwide !Desiqn-Build)* $2.5M 8 Full Street Improvements - Safe Routes to School $35M 9 Install Missina Sidewalk Citywide within RAS & Local Streets* $15M Subtotal $95M Advertise 1 Oxford St. Imorovements between 3rd & 1st Avenues $2.5M within 2 2nd Ave. Improvements between Naples & Palomar Streets $2.5M 12 Months 3 Elm Ave. Improvements between Naples & Oxford Streets $1.5M 4 Pavement Reconstruction on Local Streets Citvwide $15M 5 3rd Ave. & L St. Storm Drain Construction (Tel. Cyn. Channel)* $10M 6 1st Ave. to K St. Storm Drain Construction (Tel. Cvn. Channel) $6.5M 7 ADA Ramps within Various RAS & Local Streets !DesiQn-Build)* $5M 9 Full Street Improvements - Safe Routes to School $65M 10 Install Missina Sidewalk Citywide within RAS & Local Streets* $10M 11 Broadwav Widenina/Reconstruction, Main Street to S'lv City Limits* $2.5M 12 Hilltop Dr. from East I St. to Shasta St. Drainaae Improvements $2.5M Subtotal $128M * RAS Regional Arterial System J:IEngineerISANDAG\Agency Project List Transit List of Projects Agency Name: City of Chula Vista - Transit Projects 11/18/2008 I Project Description Construction Costs Ready to 1 Citywide Bus Shelters (50 Priority Locations) $1M advertise Subtotal $1M Advertise 1 Lower Trolley Line for Grade Separation @ H St & E St. SANDAG within 2 South Bay Expressway Caltrans 6 Months 3 Transit Center Improvements @ Southwestern College $1M Subtotal Advertise 1 Install 6" HP Gas in Main Street, Oleander to Maxwell, and in Maxwell to $3.5M within Serve Chula Vista Transit, Public Works, Sweetwater Union High School 12 Months District CNG Fleets, and Others Subtotal $3.5M Highways List of Projects Agency Name: '-'ltV OT ,-,nula ViSta - Highways Projects 11/18/2008 , Project Description Construction Costs Ready to advertise Subtotal Advertise within 6 Months Subtotal Advertise 1 SR-125/Rock Mountain Road Interchange (Design/Build) $27M within 2 1-805 Southbound Off-Ramp Improvements, Tel. Cyn. Rd. Caltrans - $15M 12 Months 3 1-805/Main SI. Undercrossing Widening $7.5M Subtotal $49.5M Local Agency SewerlWater List of Projects 11/18/2008 . Agency Name: City of Chula Vista - Local Sewer Projects Project Description . Construction Costs Ready to 1 2 Advertise 3 Advertise 1 Sewer Replacement - Priority 1 Projects $3.60M within 6 2 Sewer Rehabilitation - Priority 1 Projects $5.38M Months 3 Subtotal 1 Sewer Capacity Enhancement - Prioritv 1 Proiects $5.52M Advertise 2 Sewer Caoacitv Enhancement - Priority 2 Proiects $1.70M within 12 3 J StreeUMarina Parkway Sewaae Lift Staae Station Rehabilitation $2M Months 4 Sewaae Lift Station Rehabilitation Projects $2.05M Subtotal $8.98M Subtotal $11.27M Other Public Works List of Projects 11/18/2008 , Agency Name: City of Chula Vista - Other Public Works Projects . , . Project Description Construction Costs Ready to 1 All Season's NeiQhborhood Park Construction $3M Loma Verde Recreation Center Renovation/Upgrades, including Children's $2M Advertise 2 Front Safetv Area, Rear Patio Area for Communitv Events 3 Rohr Park Upgrades - Irrigation Improvements, Restrooms, Picnic Shelters $1.15M & Trash Enclosure 4 Greg Rogers Park Upgrades - Irrigation Improvements and Storage, Picnic $0.9M Shelter, and Restroom Construction 5 Park Irrigation Systems Upgrades/Modernization, Citywide $0.5M 6 Memorial Park Arbor & Water Feature Restoration $0.35M 7 Norman Park Senior Center Equipment & Community Meeting Space & $0.85M Office Space Repair/ Replacement 8 Convert Multi-Purpose Fields from Grass to Artificial Turf in Various Parks, $25M Citywide 9 Interim Emergency Operations Center (EOC) Upgrades $0.3M 10 Fire Station NO.4 Training Facility - Upgrade Existing Facilities $0.2M 11 Rancho Del Rey Library - Construct 30,000 SF Facility $20M 12 Chula Vista Animal Shelter Upgrades - Energy Retrofits and Expansion & $1.2M Improvement of Animal Holding Areas 13 Third Avenue Village Promenade Improvements $3.3M Advertise 1 Chula Vista Nature Center Permanent SewerlWater Lines $0.93M within 2 Rohr Manor Historical BuildinQ Repair $1.5M 6 Months 3 Lauderbach Recreation Center Repair/Replacement. $3M 4 Park Restroom Replacement, City wide. $0.5M 5 Women's Club Historical BuildinQ Upgrades & ReDairs $2M 6 ADA Ramp Construction in Various City Parks $1M 7 Ballfield Liahtina UpQrades - Install Musco Green LiQhtinQ at 6 Sites $4.3M Subtotal $58.75M Other Public Works List of Projects 11/18/2008 ~ 8 Lauderback Recreation Center Parking Lot Expansion, including Property $13M Acquisition 9 Relocate and Construct New Fire Station NO.5 (3-Bay Facility) $12M 10 Expand Fire Station Training Facility for "Real Time" Training $5M 11 Civic Center Library Renovation & Upgrade of Building Systems to Current $15M Energy Standards and Public Needs 12 South Chula Vista Library - Patron Comfort Retrofits & Upgrade Building $3M Systems to Current Energy Standards 13 Open Space Brush Clearance, Citywide $5.0M 14 Rohr Park Jogging Trail Renovation $O.5M 15 GPS Mapping of Trail Markers to Produce Maps for Trailhead Kiosks and $O.25M Public Website 16 City Trails - Renovations & Improvements $O.5M 17 Walking/Running Trail Renovation & Improvement in Various Parks $O.1M 18 Park Parking Lot Repaving, Citywide $O.5M 19 Loma Verde Stairway Renovation for ADA Accessibility $O.25M 20 Rienstra Sports Park - Erosion Control Improvements $O.1M 21 Parks Concrete Sidewalk Renovation, Citywide $O.2M 22 Park Restrooms Construction/Renovation, Citvwide $O.3M 23 Park Trash/Recyclinq Enclosures, Citywide $O.25M Subtotal $69.18M Advertise 1 Eucalyptus Park - Add Ballfields/Restore Picnic Shelters & Restroom $1.5M 2 Sunset View Park - Doq Park Construction $O.5M within 12 3 Chula Vista Nature Center - Parking Lot Relocation, Incl. Acquisition $2.0M Months 4 Chula Vista Visitor Center Renovation $O.2M Reconstruct Fire Station NO.1 as a 3-Bay, 2-Story Facility with a $17M 5 Permanent Emergency Operations Center (EOC), including Equipment, Furnishings, and Communications 6 Construct Reqional Fire Traininq Facility $20M Subtotal $41.2M