Loading...
HomeMy WebLinkAbout2008/04/15 Item 3 CITY COUNCIL AGENDA STATEMENT ~v~ CllY OF '~CHUlA VISTA " 4/15/08, Item :7 SUBMITTED BY: REVIEWED BY: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE "SEWER REHABILITATION PROGRAM- PHASE 1, FY 05/06 & FY 06/07 & FY 07/08 VARIOUS LOCATIONS IN THE CITY OF CHULA VISTA, CALIFORNIA (SW-240A)" PROJECT; AUTHORIZINO THli: TRANSFER OF AVAILABLE SEWER FACILITY REPLACEMENT FUNDS FROM THE EXISTING 2006/07 & 2007/08 SEWER REHABILITATION PROGRAM INTO THE PROJECT AND AUTHORIZING STAFF TO INCREASE QUANTITIES TO EXPEND ALL AVAILABLE FUNDS FOR THIS PROJECT DIRECTOR OF ENG E RING AND GENERAL SERVICE~o- CITY MANAGER ASSIST ANT CITY MA A ER S 7 4/5THS VOTE: YES [3J NO 0 ITEM TITLE: SUMMARY On March 5, 2008, the Director of Engineering and General Services received seven (7) sealed bids for the "Sewer Rehabilitation Program - Phase 1, FY 05/06 to FY 07/08 various locations in the City of Chula Vista (SW-240A)" project. The project will replace existing broken sewer mains and laterals, repair cracked sewer lines, and replace asphalt concrete pavement in various locations throughout the City of Chula Vista. ENVIRONMENTAL REVIEW The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act and has determined that the project qualifies for a Class 1 categorical exemption pursuant to Section 15301 of the State CEQA Guidelines. Thus, no further environmental review is necessary. RECOMMENDATION Council adopt resolution. BOARDS/COMMISSION RECOMMENDATION Not applicable. 3-1 4/15/08, Iteml Page 2 of 4 DISCUSSION Based on the results of compiled data inspections, including those performed with a closed circuit television camera, the rehabilitation of existing sewer lines was recommended. A number of access areas identified by the Public Works Department require replacement. Certain sections of pipe are cracked and need to be replaced, repaired or relined to prevent groundwater infiltration or leaching ofraw sewage into the ground. The general scope of the project involves the replacement of existing broken sewer mains and laterals, the installation of pipe lining to repair cracked sewer lines, the replacement of sewer access holes, trenching, and asphalt concrete pavement. The project will include all labor, material, equipment, tools, transportation, mobilization, control of sewage flows, installation of root barrier, traffic control, removal and disposal of existing improvements, protection and restoration of existing improvements, and other miscellaneous work necessary for the proj ect. The locations and types of work to be done are detailed in Tables A through C (Attachment 1). On February 15, 2008, Engineering and General Services staff advertised the "Sewer Rehabilitation Program - Phase 1 FY 05/06 to FY 07/08 various locations in the City of Chula Vista (SW-240A)" project. The apparent low bidders were contingent upon a base bid and three additional alternate bids (Alternate lA - Location at Lost Creek Road, Alternate 2A - Location at Telegraph Canyon Road, and Alternate IB - Use of Top Hat Lateral) (Attachment 2). Alternate IB utilizes top hat laterals which permanently seal the lateral connection to keep roots out. It also stops infiltration of ground water, which can cause overloading of treatment plants and ex-filtration of sewer water into the ground. This system is a specialty liner designed to seal connections on lined pipe less than 24 inches in diameter. It is a fiberglass laminate fully impregnated with an ultra violet curing resin which is installed using equipment that inflates and pushes the liner into the connection, leaving a 2- to 3-inch brim in the main pipe. Installed from inside the main pipeline after lateral reopening, it provides a watertight seal at the connection. The actual line has a shape simular to a top hat, hence the industry terminology "top hat". However, due to the current market for the use of lateral top hats, staff determined to reserve the use of lateral top hats as a means of sewer rehabilitation for a later time or when the manufacturing of the lateral top hats provide more positive benefits. Tonight's action will award the contract contingent upon the submitted base bid and two alternate bids (Alternate lA and Alternate 2A) totaling $457,325. ALTIB CONTRACTOR BASE BID (not ALT 1A ALT2A TOTAL recommen:~d at this time KTA Construction, Inc. - EI Cajon, CA $385,258.00 $340,600.00 $15,467.00 $56,600.00 $457,325.00 Burtech Pipeline, Inc. - Encinitas, CA $470,327.50 $570.500.00 $14,185.00 $88,600.00 $573,112.50 Erreca's, Inc. - Lakeside, CA $551,928.50 $256,100.00 $20,998.00 $82,242.00 $655,168.50 3-2 4/15/08, Item~ Page 3 of 4 ALT1E CONTRACTOR BASE BID (not ALT lA ALT2A TOTAL recommended at this time) $52,260.00 MJC Construction - Chula Vista, CA $679,837.50 (mathmaticaJ $17,790.00 $52,500.00 $750,307.50 error) Bonita Pipeline, Inc. - National City, CA $682,615.95 $471,564.60 $28,858.82 $44,092.76 $755,567.53 Weir Construction Corp. - Escondida, $867,479.60 $474,164.60 $28,860.82 $44,092.76 $755,608,71 CA The low bid by KTA Construction, Inc, of $457,325 is $142,675 (40%) below the Engineer's estimate of $758,369. The Engineer's estimate was based on average prices for similar types of work completed during the last two years. Staff verified the references provided by the contractor; their work record has been satisfactory. After reviewing the low bid, staff recommends awarding a $457,325 contract to KTA Construction, Inc. ofEl Cajon, California. The locations of the proposed work are located throughout the City. Eighty-five percent (85%) of the repairs are located within the west side of Chula Vista and the remaining fifteen (15%) percent are located in the east side ofI-805 Freeway (Attachment 3). Approval of this resolution will authorize an inter-project transfer and authorize City staff to expend all available funds and increase the value of the contract as necessary due to unforeseen circumstances. Unforeseen circumstances may cause an increase in quantities beyond what was anticipated during the preparation of the project specifications. Due to the age of the City streets in the western part of the City, "unforeseen circumstances" may occur during the removal of the existing sewer mains and excavation occurring within the street. Field conditions could also differ from the proposed improvement plans and specifications. As a result, additional material may be required to rehabilitate the proj ect site, which could lead to possible "Change Orders" to the contract. This is a typical situation with all sewer rehabilitation projects built in this area. According to City Council Policy No. 574-01, if a change order exceeds the cumulative contract change order aggregate amount allowable to be approved by the Director of Public Works Operations, City Council approval is required. Under said City Council Policy the amount would be $51,300. However, approval of tonight's resolution will increase the Director of Public Works Operations' authority to approve change orders as necessary up to the contingency amount of $91,465. If this money is not used during construction, the unexpended funds will be redistributed back to the appropriate original funding source. DECISION MAKER CONFLICT Staff has reviewed the property holdings of the City Council and has found no property holdings within 500 feet of the boundaries of the property which is the subject of this action 3-3 4/15/08, Item 3 Page 4 of 4 FISCAL IMPACT Wage Statement The contractors who bid on this project were not required to pay prevailing wages to persons employed by them for the work performed under this project. No special minority or women- owned business requirements were necessary as part of the bid. However, a "Notice to Contractors" was sent to various trade publications in order to encourage disadvantaged businesses to bid on the project. Disclosure Statement Attached is a copy of the Contractor's Disclosure Statement (Attachment 4). Funding Sufficient Sewer Facility Replacement funds were previously appropriated as part of the FY 2005/06, FY 2006/07 and FY 2007/08 Capitallmprovement Program (CIP) budgets for sewer rehabilitation projects. It is proposed that these funds be combined and transferred into the "Sewer Rehabilitation Program - Phase I FY 05/06 to FY 07/08 various locations in the City of Chula Vista (SW-240A)" project to perform the required work. FUNDS REQUIRED FOR CONSTRUCTION A. Contract Amount B. Contingencies (approximately 20%) C. Staff Costs: Design Staff (12%) Construction Inspection (18%) $457,325 $91,465 TOTAL $54,879 $83,321 $ 686,990 FUNDS AVAILABLE FOR CONSTRUCTION Inter-Project Transfers to SW240A: A. Sewer Facility Replacement funds FY 2005/2006 (SW239) B. Sewer Facility Replacement funds FY 2007/2008 (SW250) Available Balance: C. Sewer Facility Re lacement funds FY 2006/2007 (SW240) $70,276 $593,002 TOTAL $23,712 $ 686,990 Upon completion of the project, the improvements will reqUlre only routine City sewer maintenance. ATTACHMENTS 1. Table A through Table C of work to be done 2. Bid Summary Sheet, Alternative lA, Alternative 2A, and Alternative lB 3. Plats of work locations to be done 4. Disclosure Statement from KT A Construction, Inc. Prepared by: Roberto Yano, Engineering and General Services M:\General Services\GS Administration\Council Agenda\SW240\SW240A Phase 1 \sW240A A 113 Sewer Rehab Program FY 05-08 rev4.ml.doc 3-4 w I U1 TABLE A (SEWER REHABILIATION PROGRAM, FY '05/'06, FY '06/'07, FY '07/'08 SW-240) SEWER SEGMENTS TO BE REPLACED/LATERAL CONNECTIONS TO BE REPAIRED, PROTRUDING LATERALS TO BE CUT AND JOINTS LATERALS TO BE WRAPPED WITH ROOT BARRIER P T T LATERAL WYE- NUMBER LATERAL WYE- P L SIZE FOOTAGE 0 A CONNECTIONS OF CONNECTIONS I A LOCATION OF TO BE FROM M DEPT P TOBE SECTIONS TO BE RE- DESCRIPTIONS P T PIP REPLACED M,H. # ,H H(ft) E WRAPPED TOBE OPENED AFTER E S E (It) W/ROOT REPAIRED RE-LINING # # BARRIER Spot Repair 185' @: 28' - 78'; 95'- 3 105', 110' - 132', 140'-164', 170'- 701 8" 6 I 215',224' - 228', 396'- 400', 455'- I I SECOND VCP 185' 3859 6 7 8 IS 10 37 465',497' - 503', 525' - 531'; 15 A VENUE 2 Lateral Repairs; 37-Lateral Re- O open; 265'-Root Barrier; 605'.Re- linin!? I Spot Repair 72' @: 3'-18', 54'.60', 199 I 65'.72', 85'-91', 109'-124', 136'- 2 2 SECOND 8" 72' 1691 8 7 9 6 9 8 142', 159'-165', 188'-194', 212'- VCP 2 218'; 257' LEFT TO SURVEY, 6- AVE 3 9 Lateral Repairs; 8-Lateral Re-open; llO'.Root Barrier; 325'-Re-line 4 Spot Repair 82' @: 7'-45'; 650 EAST 8" 0 I 77'-83', 112'-118', lJ3' -139', 3 3 MANOR VCP 82' 3969 3 8 8 9 7 10 195'-201',276'-286',296'-306'; 9- DRIVE I Lateral Repairs; to-Lateral Re-open; 2 127'.Root Barrier; 315'-Re-lining 940 5 I Spot Repair 42' @:38'-44'; 8" 5 81'-87; 111'-120'; 146'-152',218'- 4 4 GUATAY 42' 5578 6 9 3 6 II 227",282'-288'; 3-Lateral Repairs; AVE VCP 8 3 II-Lateral Re-open; 58' Root 2 Barrier; 356' -Re-lining )> ~ o .I s:: m z -l 1- W I a> TABLE A (SEWER REHABILIATION PROGRAM, FY '05/'06, FY '06/'07, FY '07/'08 SW-240) SEWER SEGMENTS TO BE REPLACED/LATERAL CONNECTIONS TO BE REPAIRED, PROTRUDING LATERALS TO BE CUT AND JOINTS LATERALS TO BE WRAPPED WITH ROOT BARRIER P T T LATERAL WYE- NUMBER LATERAL WYE- P L SIZE FOOTAGE 0 A CONNECTIONS OF CONNECTIONS I A LOCATION OF TO BE FROM M DEPT P TO BE SECTIONS TO BE RE- DESCRIPTIONS P T PIP REPLACED M,H, # ,H H (ft) E WRAPPED TO BE OPENED AFTER E S E (ft) W/ROOT REPAIRED RE-LINING # # BARRIER SpotRepair-150'@:4'-22', 97'-106', 110'-131', 162'-172', 175'-181 " S 203'-209', 218'-224', 231'-237', 310 8" 4 D 243'-249', 265'-271', 218'-287', 5 5 ROOSEVEL PVC 150' 5496 9 6 V 14 17 28 298'-310' 343'-350', 360'-366', TST S 386'-392', 403'-412', 429'-440'; 7 14-Lateral repair; 28-Lateral re- open, 220' -Root Barrier; 440' -Re- lining 6 SpotRepair-76'@:46'-52', 100'- 15\ EAST 8" 1 D 109', 151'-175', 217'-226', 249'- 6 6 ORLANDO VCP 76' 6133 3 8 V 9 6 10 265', 280'-292'; 9-Lateral repair; ST S IO-Lateral fe-open, 12t'-Root 7 Barrier; 330' -Re-lining Spot Repair 66'@:20'-26',68'-74', 9 D 88'-94',97'-103', 119'-125', 198'- 7 7 46 MINOT 8" 66' 934 3 8 V 12 9 0 207',-211'-217', 228'-234', 285'- AVE VCP 300'; 12'-Lateral repair; Q'-Lateral 5 S fe-open, 126'.Root Barrier; D'.Re- lining 5 2 505 "F" 8" 3 Spot Repair 20' @: 0' - 20'; 8 8 STREET VCP 20' 5328 2 9 2 0 1 0 0' -Lateral repair; 0' -Lateral fe-open 3 20' -Root Barrier; 0' -Re-Iining 9 lJ,) I -.j TABLE A (SEWER REHABILIATION PROGRAM, FY '05/'06, FY '06/'07, FY '07/'08 SW-240) SEWER SEGMENTS TO BE REPLACEDILATERAL CONNECTIONS TO BE REPAIRED, PROTRUDING LATERALS TO BE CUT AND JOINTS LATERALS TO BE WRAPPED WITH ROOT BARRIER P T T LATERAL WYE - NUMBER LATERAL WYE - P L SIZE FOOTAGE 0 A CONNECTIONS OF CONNECTIONS I A LOCATION OF TOBE FROM M DEPT P TO BE SECTIONS TO BE RE- DESCRIPTIONS P T PIP REPLACED M.H. # .H H(ft) E WRAPPED TOBE OPENED AFTER E 5 E (ft) W/ROOT REPAIRED RE-LINING # # BARRIER 6 1 Spot Repairs 36' @: 66'-72'; 16320CALA 8" 9 79'-85'; 132'-138'; 149'-155'; 9 9 A VENUE VCP 36' 6892 I 8 6 6 6 7 212'-218'; 280'~286'; 6-Lateral 6 Repairs; 66'-Root Barrier; 7-Lateral 0 Re-open; 308' -Re-lining 6 I Spot Repairs 42'@:43'-49', 86'- 1648 OCALA 8" 9 92',109'-1\5',156'-162',179'- 10 9 AVENUE VCP 42' 6910 0 8 6 7 7 7 185',273'-243',316'-322'; 6 7-Lateral Repairs; 42'.Root Barrier; 9 7-Lateral Re-open; 348'-Re-lining 3 Spot Repairs 158'@: 50'.77',84'. 574 D 90',105'-114',122'-162',168'- 11 10 GARRETT 8" 158' 331 2 8 V 4 10 7 208',222'-238',248'-254',288'- VCP 2 294', 298'-310';4-Lateral Repairs; AVE 7 S 178' -Root Barrier; 7-Lateral Re- open; 322' -Re-lining 1293 6 D Spot Repairs 114'@4'.34',46'. 8" 1 82',85'-109',120'-126',192'-198', 12 II JOSSELYN VCP 114' 6140 4 6 V 8 7 10 211'-217',269' -281'; 8-Laler AVE S Repairs, 154'-Root Barrier, 10- I Lateral Reopen, 310' Re-lining 1246 6 D Spot Repair 90' @ 6'-12',57'-63', 13 JOSSELYN 8" 90' 6141 I 6 V 5 6 6 105'-1\5',123'-133',140'-176', 11 VCP 4 194'-216'; 5-Lateral Repairs, 115' AVE 8 S Root Barrier, 218' Relining w I 00 TABLE A (SEWER REHABILIA nON PROGRAM, FY '05/'06, FY '06/'07, FY '07/'08 SW-240) SEWER SEGMENTS TO BE REPLACED/LATERAL CONNECTIONS TO BE REPAIRED, PROTRUDING LATERALS TO BE CUT AND JOINTS LATERALS TO BE WRAPPED WITH ROOT BARRIER P T T LATERAL WYE- NUMBER LATERAL WYE- P L SIZE FOOTAGE 0 A CONNECTIONS OF CONNECTIONS I A LOCATION OF TO BE FROM M DEPT P TO BE SECTIONS TO BE RE- DESCRIPTIONS P T PIP REPLACED M.H. # .H H(It) E WRAPPED TO BE OPENED AFTER E S E (It) W/ROOT REPAIRED RE-L1NING # # BARRIER APPROX. TOTAL FOOTAGE REPAIR (8") 1,133 ft TOTAL LATERAL TO BE REPAIRED 100 APPROX. TOTAL 3,876 ft TOTAL LATERALS TO BE RE-OPENED 141 RE-LINE w I CD TABLE B (SEWER REHABILITATION PROGRAM, FY '05/'06, FY '06/'07, FY '07'/08, SW-240) SEWER PIPES TO BE LINED / LATERALS TO BE RE-OPENED P T P L FOOTAGE TO A 2002 I A LOCATION SIZE OF BE LINED FROM TO DEPTH P THOMAS LATERALS TO BE RE-OPENED P T PIPE (It) M.H. # M.H.# (It) E BROS. E PAGE S # I I 749 SECOND 8"VCP 605 3859 3660 7 182 1330, C-I 37 AVENUE 2 2 221 SECOND 8"VCP 325 1823 1691 7 199 1310, B-5 8 AVENUE 650 EAST 3 3 MANOR 8"VCP 315 3969 4032 10 199 1330, A-I 10 DRIVE 4 4 940 GUATAY 8"VCP 356 5578 55827 6.5 193 1330, E-I II A VENUE 310 5 5 ROOSEVELT 8"VCP 440 5496 5497 6 DVS 1310, B-7 28 STREET 152 EAST 6 6 ORLANDO 8"VCP 330 6133 6137 6.5 193 1330, F-3 10 STREET (.0) I ..... o TABLE B (SEWER REHABILITATION PROGRAM, FY '05/'06, FY '06/'07, FY '07'/08, SW-240) SEWER PIPES TO BE LINED / LATERALS TO BE RE-OPENED P T P L FOOTAGE TO A 2002 I A LOCATION SIZE OF BE LINED FROM TO DEPTH P THOMAS LATERALS TO BE RE-OPENED P T PIPE (ft) M.H. # M.H.# (ft) E BROS. E PAGE S # 9 9 16480CALA 8"VCP 348 6910 6909 8 166 130, H-5 7 A VENUE 9 10 16320CALA 8"VCP 308 6892 6910 8 166 1330, H-5 7 A VENUE 10 11 574 GARRETI 8"VCP 322 3311 3227 7 DVS 1310, B-7 7 A VENUE 1293 11 12 JOSSELYN 8"VCP 310 6140 6141 5 DVS 1310, F-3 10 A VENUE 1246 11 13 JOSSELYN 8"VCP 218 6141 6148 5 DVS 1310, F-3 6 AVENUE APPROXIMATE TOTAL 3,876 FT FOOTAGE 8-INCH TOTAL LATERAL TO BE RE-OPENED 141 c,) I ~ ~ TABLE C (SEWER REHAB. PHASE I, SW-240) IF FUNDS ARE AVAILABLE, ADDITIONAL SPOT REPAIRS I SEWER PIPES TO BE LINED I LATERALS TO BE RE-OPENED P T P L FOOTAGE TO A THOMAS I A LOCATION SIZE OF BE LINED FROM TO DEPTH P BROS. LATERALS TO BE RE-OPENED; P T PIPE (It) M.H. # M.H.# (It) E PAGE SPOT REPAIR E S # 1 9' Spot Repair@:, 35' .44'; 14A lA LOST CREEK 8" 140 12325 12326 12 DVS 1310, B-6 8" SEWER GOES DOWN AN ROAD EMBANKMENT WITH INFILLTRATION REPAIR NEEDED 0 TELEGRAPH 12' Spot Repair@: 55'.6]', 15A 2A CANYON 15" 600 4154 4168 15 179 1331,A-I 214'.220' ROAD INFILLTRATlON REPAIR (HIGH TRAFFIC VOLUME) APPROXIMATE LINEAR APPROXIMATE LINEAR APPROXIMATE LINEAR FEET 140' FEET 600' FEET O' RE-LINING (S" VCP): RE-LINING (15" VCP): RE-LINING (24" VCP): (.0) I ~ "" BID PROPOSAL To the Honorable Mayor and City Council of the City of Chula Vista. The undersigned aclmowledges that he/she has carefully exnmined the pInts nnd specificntions for: SEWERREHADILITATIONPROGRAM-PHASE 1, FY '05/'06 & FY '06/'07 & FY '07/'08 V ARlOUS LOCATIONS IN TIlE CITY OF CIruLA VISTA, CALIFORNIA (SW-240) and that he/she has examined the locntion of the proposed work and has rend the accompnnying instructions to bidders, and hereby proposes to furnish all materials, nnd do all the work required to complete the said work in accordance with said plats, specifications, nnd Specinl Provisions for the unit price or lump sum set forth in the following schedule. The Contracto~ has ninety (90) working dnys to complete the project. The City retains the right to modifY or reduce the project scope nnd the City shall retain the right to climinnte individual bid items from the low bidder's proposal prior to or nfter the awnrd of the contrnct for nny reason. There will be no ndjustments in compensntion ns pemlitted in Section 3-2 of the Standnrd Specifications. Should the City modifY the scope of the project, the contract will still be nwarded to the lowest responsible bidder for the grand totnl of all the bid items listed in the proposal. Part A (Pipe #1; Plat 1) 749 SECOND AVENUE MH # 3859 TO MH # 3660 8"VCP Item Deseription Qty Unit Unit Price in Words Unit Cost in Fignres Removnl and Disposal of I Lump ~ 1. Existing Improvements Sum {p1!;JU Trench Shori!lg 138 Lineal I~ 2. Feet ):-. ~ .:<> () I s: m z -l Total tfil ~ /3J ~ 5 Item Desedption Qty Unit Unit Pdce ill Words Ullit Cost ill Total Figures Television Taped Inspection Lineal IA-~ ~}3cJ ~{)S. 8tJ 3. of Existing Conditions 605 Feet I ,,~ (CCTV) Repair of 8- Inch Sewer Lineal ~ ~~ 4. Main with Deep Lift 138 .... / ~3.2D.fX) Feet 1-40- As halt Concrete Pavement Repair of Sewer Lateral's Sj 7 t,/J. /)0 5. WYE I TEE-Connection to 16 Each 7:J(po '" the Sewer Main Install Sewer Lateral Pipe Lineal '" t)37S./YJ 6. from WYE I TEE 85 Of Connection to Existin Feet 15 - (.oJ Furnish and Install Root Lineal ~~ ~~ ~ 030.EO I 7. 206 ~~ ~ Barrier Feet -' (.oJ 8. Pipe Lining of 8-Ineh Sewer 605 " Lineal 1:' jt/9Lf1J.frJ a.- Main Feet z.(5 - Re-opening of Existing ~o<dJ).LD 9. Lateral WYE I TEE- 37 Each -"1 Connections (PO Traffic Conlrol & Lump ~o. vl/O S (1) lV 10. Protection and Restoration I "':. of Existing Improvements Sum So,) . SUBTOTAL PART A: sJ!lftfW , 6 Part n (Pipe #2; Plat 2) 220 SECOND AVE MH 111823 to MH #1691 8"VCP (.0) I .... .j:> Item Description Qty Unit Unit Price in Words Unit Cost in Total Figures 1. Removal and Disposal of 1 Lump .;f~~~t~ t'iXJ. [)o Existing Improvements Sum &(JO~ 2. Trench Shoring 72 Lineal ~~ ~>>O 702. 'tfJ Feet / ,,~ Television Taped Lineal f)u~ ',4> ,3.).5: CO 3. Inspection of Existing 325 Feet 10",- Conditions lCCTY) Repair of 8-Inch Sewer Lincal IJ)u ---fl.. . j, j n ~ / b/ ()JO /JO 4. Main with Deep Lift 72 Feet H~ ~ Asphalt Concrete Pavement /ii'YJ Repair of Sewer Lateral's ~ '-1',. iJJ."f ~ A.,"'" />/~ .,,(/SdD. (}O 5. WYE / TEE-Connection to 7 Each .... the Sewer Main _ 'e ~~ ~GO ~ Install Sewer Lateral Pipe '. Lineal ----..1..-11 . riJJMw; .~~ o? &c:?S': lJJ 6. from WYE / TEE 35 71""' 7f., n ~ oN Connection to Existing Feet I 75'~ Furnish and InstaIl Root Lineal I--r-.. "'~ .If) c5 5tJ.W 7. 110 1.w ~<.t;. Barrier Feet b I . 8. Pipe Lilling of 8-Inch 325 Lineal ( ~h.- IJ';H --UnA/!.., I ~a:> ce /W.Eo Sewer Main '0 y: .... Feet / Zg, ~ Re.opening of Existing :\.'-./ ..J_~ ,dlJ,A/J.. ~. 9. Lateral WYE / TEE- 8 Each 1/ "T ~ ~ ~fO. [t) Connections 7S- Traffic Control & Lump 1-; . --1'.01/. .J ~ ~.):) Sf):J. /X) 10. Protection and Restoration 1 5OJ"'<. of Existing Improvements Sum J " SUBTOTAL PART B: 7 co2b, 97~. ED / M :IGeneral ServiceslDesignlSW240lSW240SpecsPhase 1_ Rev9I.doc Part C (Pipe #3; Plat 3) 650 EAST MANOR DRIVE ME tI 3969 to MH # 4032 S"VCP Item Description Qty Unit Unit Price in Words Unit Cost in Total Fignres l. Removal and Disposal of I Lump 't~ {pbO~ I W, ()::J Existing Improvements Sum 2. Trench Shoring 82 Lineal ~ /~ !J .l)tJ Feet Television Taped Inspection Linear ~ 3/4ZL> 3. of Existing Conditions 314 Feet ""::' CCTV Repair of 8-Ineh Sewer Lineal 'ft) I!; 4Ro. ED 4. Main with Deep Lift 82 Feet I1O~ As halt Conerete Pavement Repair of.~ewer Lateral's JtJ w 5. WYE / TEE -Conneetion to 9 Each 7ft> ':;bO"<- ~ oJL/I).[:lJ I ~ the Sewer Main (TI Install Sewer Lateral Pipe ~1}? Lineal o? 7W.lXJ 6. from WYE / TEE 45 '. '" Connection to Existin Feet (PO - I 7. Furnish and Install Root 127 Lineal ~lO /;; Jr {YJ Barrier Feet <-'-' 5- 8. Pipe Lining of 8" Sewer 314 Lineal t:pEfJ ~ 7W.C:O Main .' Feet W~ Re-opening of Existing ~f1).fO , 9. Lateral Wye/Tee 8 Each 7.5'-'<- Connection . Traffic Control & Lump S1?Bo 10. Protection and Restoration I of Existing 1m ravements Sum ?-oJ SUBTOTAL PART C: ~J? 9-'15 [0 / 8 M :\General Services\Design\SW240\SW240SpeesPhase 1_ Rev9I.doe Part D (pipe #4; Plat 4) 940 GUATAY AVENUE MH II 5578 10 MIl # 5582 8"VCP w I ~ Description Qty Unit Unit Price in Words Unit Cost in Total Item Figures 1. Removal and Disposal of I Lump ( ~/>~~~A) &(JX)- &/))./)0 Existing Improvements Sum 7- 7 2. Trench Shoring 42 Lineal 1/1JJiJ JIl. I, ~b:) J"t- 1/.1 fV . Feel Television Taped Inspection Lineal ~ 8JA70 3. of Ex is ling Conditions 356 Feet ~ 35'10. LD (CCTV) / Repair of 8-Inch Sewer Lineal IJu ~~j.n .dJf:j cS; 2f/D1XJ 4. Main with Deep Lift 42 ~ Asphal t C;oncrete Pavement Feet 1) ;, I-1D Repair of Sewer La leral' s ~,tk ~ jA~J ::::1- ~ !){JO.!b 5. WYE / TEE-Conneclion to 3 Each .... the Sewer Main ?J.9IJau~f)1J :, t, il '. Install Sewer Lateral Pipe Lineal \ ..J, h, 7f.J--cjr-v ~ "'" !; )eJ,.r.80 6. from WYE / TEE 15 Feet ~. ~ 8b~&? 75 ~ Connection to Existing ~ '/< Furnish and Install Root Lineal -/,~. , /lQJJlJnl.A ~tv .... d 9tJ.lJtJ 7. Barrier 58 Fect /,- '<' 6 . '/11M-< -t '/ '-Y ,....Jd/1 lu>"2.8 8. Pipe Lining of 8- Inch Sewer 356 Lineal. 99iRf. /XJ Main Feet' ,7, Z.S"'" Re-opening of Existing ---J:.~ .,::;t. cE., ^ ..Jh A /1 , ~J:J' ,R~&:J 9. Lateral WYE / TEE - II Each j/ (/ IJ 75"< Connections Traffic Control & Lump tz;. y~~~ SW. [tJ 10. Protection and Restoration I of Existing Improvements Sum { . ?"(oJ '" en SUBTOTAL PART D : 9 ~/6&b. !JJ / M :IGeneral ServiceslDesignlSW240\SW240SpecsPhnse 1_ Rev9 I .doc Unit Unit Price ill Words Unit Cost in Total Item Description Qty Fignres 1. Removal and Disposal of 1 Lump ~~ ~ !pm. f}:J Existing Improvements Sum 0.;) 2. , Trench Shoriog 150 Lineal ~f)i) (g). f}o Feet "::- Television Taped Inspection Lineal ~M )j 1/J.lP 3. of Existing Conditions 440 Feet /~ (CCTV) Repair of8-Inch Sewer Lineal u> 4. Main with Deep Lift 150 Feet ) ZJtjt). !Jo As halt Concrete Pavement c..> Repair of Sewer Lateral's <>' .,s;ZJLjIJ.fJo I 5. WYE / TEE-Connection to 14 Each - ~ '1;,foJ ..... the Sewer Main Install Sewer Lateral Pipe Lineal ..., 0;..:1 S!J /)0 6. from WYE / TEE 70 - Connection to Existin Feet ::; Furnish and Install Root Lineal .... i /fYJ.!)J 7. 220 - Barrier Feet 5 8. Pipe Lining of 8-lnch Sewer 440 Lineal Main Feet '" 9 ..3;2j) . [i) V3 - Re-opening of Existing c-2;/ l}O.UO 9. Lateral WYE / TEE- 28 Each uJ Connections 7.5 - Traffic Control & Lump ~ 10. Protection and Restoration Sum .::;'7':>> ~ slJO !)o of Existing Improvements SU8TOTAL PART E : 4cfsaJ.CD / 10 M: IGeneral ServicesIDesignISW240\SW240SpecsPbasel_Rev91.doc Part E (Pipe #5; Plat 5) 31 0 ROOSEVELT STREET MH # 5496 to MIl # 5497 B"Vep Part F (Pipe #6; Plat 6) 152 E. ORLANDO STREET M1I # 6133 to MH # 6137 8"VCP Item Description Qty Unit Unit Price in Words Unit Cost in Total Fignres 1. Removal and Disposal of 1 Lump '" ~ tfJ. 2tJ Existing 1m rovements Sum (JO - 2. Trench Shoring 76 Lineal &~ 7~.Lo Feet "::" Television Taped Inspection Lineal t2n-~ >>;fA") 3. of Existing Conditions 330 Feet / <>~ 330. itJ (CCTV Repair of 8-Inch Sewer Lineal {[kL ~ 4. Main with Deep Lift 76 Feet /-10"':. /[)t~.to As halt Concrete Pavement ao (.0) Repair of Sewer Lateral's I 5. WYE I TEE-Connection to 9 Each <>:. 3, oZ4IJ. !P ~ bO (Xl the Sewer Main Install Sewer Lateral Pipe Lineal 6. from WYE I TEE 45 Feet ~ ~3 7$:[:0 Cnnnection to Existin .:;- 7. Furnish and Install Root 121 Lineal (p()S &J Barrier Feet ~"" ::> 8. Pipe Lining of 8-Inch Sewer 330 Lineal ,,~ c;? c24!J. tlJ Main Feet 23 - Re-opening of Existing 7SD.{:o 9. Lateral WYE I TEE- 10 Each ~- Connections Traffic Control & Lump .s [;t). [}tJ 10. Protection and Restoration Stirn ')(:)cJ ~ of Existing Improvements SUBTOTAL PART F: c2~ 3Sh.ltJ 11 M: \General Services\Design\SW240\SW240SpeesPhase 1_ Rev91.doe Part G (Pipe #7; Plat 7) 46 MINOT AVENUE MH # 934 to MH # 935 8"VCP Item Description Qty Unit Unit Price in Words 1. Removal and Disposal of 1 Lump Existin 1m rovements Sum 2. Trench Shoring 66 Lineal /fk~ .~~ Feet Television Taped Inspection Lineal 1!Ju~ fX%iJo 3. of Existing Conditions 323 Feet CCTV Repair of 8-Inch Sewer Lineal 4. Main wit\! Deep Lift 66 Feet to) As halt Coricrete Pavement t Repair of Sewer Lateral's --' <0 5. WYE / TEE-Connection to 12 Each the Sewer Main Install Sewer Lateral Pipe Lineal 6. from WYE / TEE 60 Feet Connection to Existin 7. Furnish and Install Root 126 Lineal Barrier Feet Traffic Control & Lump 8. Protection and Restoration of Existing Improvements Sum Unit Cost in Total Figures ~ ZtJ. 80 00 - "'~ ~Io.m "'" 3~3. ()D - / '" 9~.[b o - ~ 4; ~.!>> 3 0- ... -I; sftJ. do . -) - ..., 1taJ. f)o 5- ..?'"(:;oU<- s-~fb SUBTOTAL PART G: 021). /7 9., /)D / 12 M :\General Services\Design\SW240\SW240SpecsPhase I_Rev9I .doc Part H (Pipe #8; Plat 8) 505 F Street MH # 5328 to MH # 5329 8"VCP Item Description Qty Unit Unit Price in Words Unit Cost in Total Figures t. Removal and Disposal of Lump s[i). f)O Existin 1m rovements Sum 0-00 ";: 2. Trench Shoring 20 Lineal /fJv- ~ ~ao olD. !)o Feet. / "'~ Television Taped Inspection Lineal ~ ~<b 3. of Existing Conditions 20 c.XJ .ft; (CCTV Feet IV".- Repair of.8-1och Sewer Lineal d.) g[)O.fb (.0) 4. Main with Deep Lift 20 I Feet }};1~ ..v N As halt Concrete Pavement / c.J - 0 p~ 7. Furnish and Install Root 20 Lineal / ltJ. fJj Barrier Feet ~~ .:> - Traffic Control & Lump 8. Protection and Restoration 6iYJ. !)J of Existing Improvements Sum 5'0;) ~ SUBTOTAL PART II: 3; 91-1) fjt) 13 M :\General Services\Design\SW240\SW240SpecsPhase 1_ Rev91.doc Part I (Pipe #9; Plat 9) 1648 OCALA AVENUE MH # 6910 to MH # 6909 8"VCP Item Description 1. Removal and Disposal of Existin 1m rovements 2. Trench Shoring Television Taped Inspection 3. of Existing Conditions (CCTV Repair of 8-Inch Sewer 4. Main with Deep Lift As halt Concrete Pavement Repair of. Sewer Lateral's (.0) 5. WYE / TEE:Connection to I the Sewer Main "" ~ Install Sewer Lateral Pipe 6. from WYE / TEE Connection to Existin 7. Furnish and Install Root Barrier 8. Pipe Lining of 8-1nch Sewer Main Re-opening of Existing 9. Lateral WYE / TEE - Connections Traffic Control & 10. Protection and Restoration of Existing Improvements Qty 76 330 76 45 121 330 Unit Lump Sum Lineal Feet Lineal Feet Lineal Feet 7 Each Unit Price in Words ///)(J /ffl) ;ft17fbO Unit Cost in Total Figures LV (f?O - I v-':' J~ 1) !;1/IJ. fj) <Y. d SoW./):) ?;;t.O ' ~ ~37.s. !Jo 5 5"'- IPO..s.lfJ Ub 9,eYj/). [fJ Zb- --~ t 7SfXJ ~ ~ ..... ?a:.>- -.5l1J. [JO Lineal Feet Lineal Feet Lineal Feet 9 Each SUBTOTAL PART I : d,~ SIP!. [f) / M: \General Services\Desiga\SW240\SW240SpecsPhnsc 1_ Rcv91.doc 14 Lump Sum Part J (Pipe #10; Plat 9) 1632 OCALA AVENUE MH # 6892 to MH # 6910 8"VCP Item Description 1. Removal and Disposal of Existin 1m rovements 2. Trench Shoring Television Taped Inspection 3. of Existing Conditions (CCTV Repair of 8-Inch Sewer 4. Main with Deep Lift As halt Concrete Pavement (,) Repair of Sewer Lateral's I 5. WYE I TEE-Connection to '" the Sewer Main '" Install Sewer Lateral Pipe 6. from WYE I TEE Connection to Existing 7. Furnish and Install Root Banier 8. Pipe Lining of 8-Inch Sewer Main Re-opening of Existing 9. Lateral WYE/TEE- Connections Traffic Control & 10. Protection and Restoration of Existing Improvements Qty 76 330 76 45 121 330 6 Unit Unit Pdce in Words Unit Cost in Total Fignres Lump ~~ '" m.lb Sum Lineal '/~ 7~.ZtJ Feet ~ Lineal J3D. !Jo Feet ljJ / ~ Lineal Feet /-'1.0"0 ~ bJ/iJ. Lv Each =7 /IPD. [XJ ~ ~ '?C.o - Lineal 3. 37S.[X) Feet ~ ~- Lineal kos: CD Feet ti"~- Lineal ~ d2I/IJ. E/) Feet ""- Each <.v .,S,<S: to 5' - Lump ~ sf)J. !}o Sum ~ ~ 6CV' SUBTOTAL PART J ; ~i, DSI tD / 15 7 M :\General Serviees\Design\SW240\SW240SpecsPhasel_ Rev91.doc Part K (Pipe #11; Plat 10) 574 GARRETT AVENUE MH # 3311 to MH # 3227 8"VCP Item Description Qty Unit Unit Price in Words Unit Cost in Total FigUl'es 1. Removal and Disposal of 1 Lump ~ ~~ ~ tm, !1J Exislin 1m rovements Sum o ' 2. Trench Shoring 158 Lineal ~ft) Is-REf) Feet .,o- J ' Television Taped Inspection Lineal %~ 3. of Existing Conditions 322 Jd~-m CCTV Feet "'~ Repair of 8-Inch Sewer Lineal 4. Main with Deep Lift 158 Feet v:. 02) jJ).lJo As halt Concrete Pavement 0 w Repair of Sewer Lateral's d; S.;W.UO I 5. WYE I TEE-Connection to 7 Each '" N the Sewer Main ':? c) w Install Sewer Lateral Pipe Lineal i eSfjt). rJo 6. from WYE I TEE 20 Feet w Connection to Existin ~ . ? 7. Furnish and Install Root 178 Lineal f93/3fJ Barrier Feet ~ r ' ..s 8. Pipe Lining of 8-Inch Sewer 322 Lineal ~ Main Feet w- D '!P. f:t) Re-opening of Existing I;;:) 9. Lateral WYE I TEE - 8 Each -""- & [j). [tJ Connections ) Traffic Control & Lump 10. Protection and Restoration .stJJ. &J of Existing Improvements Sum 5"00 -< SUBTOTAL PART K: 08 dd.b - zj) / 16 M: IGeneral ServiceslDesignlSW240lSW240SpecsPhase 1_ Rev91.doc Part L (Pipe #12; Plat 11) 1293 JOSSELYN AVENUE MH # 61140 to MH #6141 8"VCP Item Description Qty Unit Unit Price in Words Ulli! Cost ill Total Figures L Removal and Disposal of 1 Lump ~ ~()r) ....- !f)/}() Existin 1m rovements Sum 00 - 2. Trench Shoring 114 Lineal ~ 117?!XJ Feet "'~ Television Taped Inspection Lineal ~~ 3. of Existing Conditions 310 Feet r:- 0/[J. 8tJ CCTV) Repair of 8- Inch Sewer Lineal IS; 9cf,IJ.bJ 4. Main with Deep Lift 114 Feet .... As halt C;oncrete Pavement 0' c..> Repair of Sewer Lateral's c0 f cPr). /)) I 5. WYE / TEE-Connection to 8 Each ..., '" .j:> the Sewer Main ;&<) - Install Sewer Lateral Pipe Lineal 6. from WYE / TEE 40 Feet ,."' ~lt1J.ZO Connection to Existin ') 7. Fumish and Install Root 154 Lineal 770. ft) Barrier Feet ~ J 8. Pipe Lining of 8-Inch Sewer 310 Lineal /ilP ~ tfIJ.1b ~- Main Feet z.s - Re-opening of Existing dJt4Jill. . ~J.? 7SD.to 9. Lateral WYE / TEE- 10 Each '" - ~ Connections .) Traffic Control & Lump ~~ 10. Protection and Restoration r.SttJ.U0 of Existing Improvements Sum fJ) ~ou:. SUBTOTAL PARTL: 33, sb1-- ZO / 17 M: IGeneral ServiceslDesignlSW240lSW240SpecsPhasc 1_ Rcv9I.doc Part M (Pipe #13; Plat 11) 1246 JOSSELYN AVENUE MH#6141 toMH#6148 8"VCP Item Description Qty Unit Unit Price in Words I. Removal and Disposal of I Lump Existin 1m rovements Sum 2. Trench Shoring 90 Lineal 11k~ , ;8lJ Feet Television Taped Inspection Lineal I!k- ~ ~8D 3. of Existing Conditions 218 CCTVl Feet Repair of 8-lnch Sewer Lineal 4. Main with Deep Lift 90 Feet As halt Concrete Pavement (,) Repair of Sewer Lateral's I 5. WYE I TEE-Connection to 5 Each N the Sewer Main U1 Install Sewer Lateral Pipe Lineal ir 6. fTom WYE I TEE 25 Feet Connection to Existin 7. Furnish and Install Root 115 Lineal ~~ ~Jd Barrier Feet 8. Pipe Lining of 8-Inch Sewer 218 Lineal Main Feet Re-opening of Existing 9. Lateral WYE I TEE - 6 Each Connections Traffic ContTol & Lump 10. Protection and Restoration of Existing Improvements Sum SUBTOTAL PART M : 18 Unit Cost in Total Figures ~ flJ .80 I <P~ 9~.!:o / ""- c2! II.;P <.0,:. /oJ; tPfP.[f) 0 '" /![t).f):J o ' fJSto ~ S7S. ty) 5 - 23~- t /Di-W .....- .lj.SD. tn -S '" j"'L>> - 0fj).lYJ d'!; &~. ro M:\General Services\Design\SW240\SW240SpecsPhasel_ Rev91.doc ALTERNATE BID LOCATION (Pipe UIAj Plat lA) LOST CREEK ROAD MH 1112325 to MH 1112326 8"VCP Item Description Qty Unit I. Removal and Disposal of I Lump Existing Improvements Sum 2. Trench Shoring 21 Lineal Feet TeJevision Taped Inspection . Lineal 3. ofExistjng Conditions 140 Feet (CCTV) Repair of 8-Inch Sewer Main Lineal 4. with Deep Lift Asphalt 21 Feet Concrete Pavement c..> I Repair of Sewer Later!' s I Each N WyelTee Connection en Install Sewer Lateral Pipe '. Lineal from the Main Sewer Pipe 5 Feet 5. Furnish and Install Root 115 Lineal Barrier Feet 6. Pipe Lining of 8-Inch Sewer 140 Lineal Main .' Feet Re-opening of Existing 7. Lateral WYE / TEE- I Each Connections Traffic Control & Protection Lump 8. and Restoration of Existing 1 Sum Improvements M: IGenera! Services\DesignlSW240lSW240SpecsPhase I_Rev91.doc Unit Price in Words {)O,[jJ ~~80 ~~?V ~~ ~ !Jf)EiJ . SUBTOTAL PART lA : 19 Unit Cost in Figures Total z"-:" ~ oI/-;W. to .!?o~ 3/ lEo.to c...:> '" (p[j), t:b &u"O - ~ tAS.!:D 25 . 0"~ 'tJ. Cb ~ /j [tt). !p SO - SOD "" 0ttl. [J) .... !; r:f1). fjo r!?0c:> - IS; 4t 7 l:o / ALTERNATE BID LOCATION (Pipe 112A; Plat 2A): TELEGRAPH CANYON ROAD MH # 4154 to MIl # 4168 lS"VCP W I '" ...... Unit Price in Words Unit Cost in Total Item Description Qty Unit Figures 1. Removal and Disposal of I Lump +-- fl. ~ . },.) ~.I}IJ./. ~u: /'''00 "":- &ttJ. tb Existing Improvements Sum Trench Shoring 12 Lineal 2- ~..~ ~~ ~EtJ. fJJ 2. Feet ..." So Television Taped Inspection J? AI ~l}:) Lineal :/j.' II,. ~ 3. of Existing Conditions 600 I; jJ ftJ. (JJ (CCTYl Feet ,,:>""" Repair of 15-Inch Sewer ~ \..f!e ..tJA~ Lineal bJ rJ-tJ. fJJ 4. Maio with D,eep Lift 12 Feet ~ ~80 Asphalt Concrete Pavement 5Cl?~ Furnish and Install Root Lineal --;;: A. 111_1.~ ~iV !fl W. fb 7. 60 /t4-- '7 Barrier Feet ~ /0 - Pipe Lining of 15-Inch Lineal t r--.-.1. .u:1 ,:.. ~ ~t/J - ~ an.fb 8. 600 .~ '15~ Sewer Main . Feet 1/ v '7, '( Traffic Control & Lump {J;2voV~ =1 [f:t).W 10. Protection and Restoration I Sum dJJ~ ~Jo of Existing Improvements "'- ~ SUBTOTAL PART 2A : \ 50/ kW. to 20 M :IGeneral ServiceslDesignlSW240lSW240SpecsPhase t _ Rev9I.doc ALTERNATE BID ITEM (lB.): It shall be noted that tills bid item may not be nsed in the construction of the project and, if so, no compensation will be allowed for this bid item. Yonr bid package will be non-responsive and incomplete withont a snhmitted bid for the ALTERNATE BID ITEM (lA). The Grand Total Base Bid mnst inclnde this ALTERNATE BID ITEM (lA). Item Description Qty Unit Unit Price in Words Unit Cost in Total Figu res (,) I N OPTIONAL: SADDLE ex> 1. CONNECTION WITH 260 EA CONCRETE ~ (pm.fD ENCASEMENT 3(po "" 2. LATERAL TOP HAT CIPP 260 EA 9,O~ ~ W.ltJ SUBTOTAL ALTERNATE BID ITEM (lB): 3410 !o f:lJ . 'to , 21 M:\General Services\Design\SW240\SW240SpccsPhase 1_ Rev9I.doc W I N CD FINAL GRAND (BASE BID) TOTAL: PART A + PART B + PART C + PART D + PART E + PART F + PART G + PART II + PART I + PART J + + PART K + PART L + PART M + ALTERNATE BID LOCATIONS (IA) + ALTERNATE BID LOCATION (2A) + ALTERNATE BID ITEM (lB) 797; 9dS tv . CONTRACTOllS MUST SUBMITT A SUBTOTAL FOR EACH STREET ADDRESS AND A BASE BID TOTAL OF ALL STREET ADDRESS COMBINED WITH THE ALTERNATE BID ITEM (IA) FOR THE FINAL GRAND (BASE BID) TOTAL. YOUR BID PACKAGE WILL BE NON-RESPONSIVE AND INCOMPLETE WITHOUT A SUBMITTED SUBTOTAL FOR EACH STREET ADDRESS AND A SUM OF ALL THE STREET ADDRESS WITH ALTERNATE BID ITEM (IA) FOR A FINAL GRAND (BASE BID) TOTAL CONTRACT COST. The City retains tbe rigbt to modify or reduce tbe project scope and tbe City sball retain tbe rigbt to eliminate individnal bid items from the low bidder's proposal prior to or after tbe award of tbe contract for any reason. Tbere will be no adjustments in compensation as permitted in Section 3-2 of tbe Standard Specifications. Sbould tbe City modify tbe scope of tbe project, tbe contract will still be awarded to tbe lowest responsible bidder for tbe FINAL GRAND (BASE BID) TOTAL of all tbe bid items listed in tbe proposal. 22 M: \General Services\Design\SW2401SW240SpecsPhasel_Rev9! .doc The undersigned further agrees that in case of default in executing the required Contract, with necessary bonds, within ten (10) working days after having received notice that the Contract is ready for signature, the proceeds of the check or bond accompanying his/her bid shall become the property of the City of Chula Vista. Licensed in accordance with License Expiration Date / ~ I Signature of bidder: Act providing for the registration of Contractors, License No. 'J,9:5z..~1 '" contrac?'s State License Classification . A' ..... ..' ..' IIII..J (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individuals, co-partners composing the firm. If a corporation, also names of President, Secretary, Treasurer and manager thereof. and affix the Corporate Seal thereto.) IL,A . (' C> ),Jl.;',cu L,.'-"C>..v (Business Name) ~ -UJI.. . 192-0 C'" A/\n:.. L( c.:;-. t:f ICJoj Dated: ::, -.5 ,200$ ,r:L (p.~f'J, LA. ~2-"'"t..o (Business Address) (p I q - 5102.- 071 &-1 (phone Number) TAX IDENTIFICATION NUMBER 9 -5' . :? -12-':;2.--17 23 M:IGeneral ServicesIDesign ISW240lSW240SpecsPhase 1_ Rev9I.doc 3-30 ATTACHMENT _ 3 I ~ h SECOND AVE SPOT REPAIRS (MHI 3859 10 MHI J550) SECTION LOCA nON LENGTH LA TERAL DESCRJPlIONS 28.0' 78.0' 50.0' :J ROOTS. AND LATeRAL omCT 95.0' - 105.0' 10.0' '", ROOTS. AND LATERAL DEFECT 110.0' - 132.0' 22.0' 1- ROOTS AND LA 1ERAL DEFECT 140.0' - 164.0' 24.0' 2 ROOTS AND LATERAL DEFECT 170.0' - 215.0' 45.0 2 ROOrs AND LATERAL DEffCT 224.0' - 280.0' 5.0 1 ROOTS. AND LA TERAL DEFECT 396.0 400.0 6.0 1, ROO AND LATERAL DEFECT 455.0' 465.0 10.0' 2 ROOTS. AND l.A7ERAL DEFECT 497.0' - 503.0' 6.0 1" ROOTS AND LA 1E'RAL DEFeCT 525.0' 5Jl.0' 5.0' 1 ROOTS AN LA AL oucer ....... .;.. <C IJ) '" o o o;::.z. -:l:.O -> '6',;;;" en <C >'A <0 ::------\ '" % DRAWN BY: PO TEN G. SAN PEDRO DA TE: SHEET Dl 01 11 08 OF 11 SHTS. rJn.E: CITY OF CHULA VISTA SEWER REHABILlA T10N (SW240) PREPARED BY: paTEN G. SAN PEDRO APPROVED BY: ROBERTO YAND 3-31 \\ ~ ~\ ~ ~\~ Q~ \\ V"l ~~\l\ r" ~ ~~ M r ~~ JJ _ -r - ~~ ~~G: t"\ -;::::;--- ~ ~ V"l~~E~ E~ -;::::;--- ~E ~ 0> .". -;::::;--- ~ G ~ W~~~ ~" vep SWR - 325' *SECOND A V ~ <J:) <J:) SPOT REPAIRS ("'Hf 1691 10 "'HI 1823) SECTION LOCA nON LENGTH LA TERAL DESCRIP7IDNS 3.0' 18.0' 15.0' 1 ROOTS. AND DEFECnve: LATERAL 54.0' 60.0' 5.0' 1 ROOTS. AND DEFECTTVf: LATERAl.. 65.0' 72.0' 6.0' I ROOts. AND OUOCTlve LA7EFIAL 85.0' - 91.0' 6.0' 0 ROOTS IN JOINTS 109.0' - 124.0' 15.0' 2 ROOTS. ANa OUOCTlve LA 7EFIAL 136.0' - 142.0' 6.0' 0 ROars tN JOINTS 159.0' - 165,0' 5.0' 1 ROOTS. AND DEFECTIVE: LATERAL 188.0' - 194.0' 6.0' 0 ROOTS IN JOINTS 212.0' - 218.0' 5.0' 0 ROOTS IN JOINTS 257.0' SURvey A8ANDONEO -\ ~ z o ")> ^ V"l ")> <. DRAWN BY, POTEN G. SAN PEDRO DA TE: SHEET 02 01-17-0B OF 11 SHTS. nTLE: CITY OF CHULA VISTA SEWER REHABILlA TION (SW240 PREPARED BY, POTEN G. SAN PEDRO APPROVED BY: ROBERTO YANO 3-32 ------...../ DRAWN BY: paTEN G. SAN PEDRO DA fE: SHEET OJ 01-11-08 OF 11 SHTS. TITLE: 11 .D'- 11110' <<.0' - tfs'o'-:tOUY 6.0" :>>& . _ Q' I t1' 'SDG&E un\TY :mljlN WORK~uEA \ \--- CS M~ ~~ "" J sf ~ .---::: ~ ..--;::::; ~Jk\ \\ CITY OF CHULA VISTA SEWER REHABIUA TlON (SW240) PREPARED BY: POTEN G. SAN PEDRO APPROVED BY: ROBERTO YAND 3-33 .-- I ~ 8" vep SWR - 356' *GUA TA Y AVE SPOT REPAIRS (MHj 5578 to MHj 5582) SEcnON LOCA 710N LENGTH LA TERM DESCRIPTIONS 38.0' 44.0' 6.0' 0 ROOTS IN 1/IE' JOINTS 81.0' 8Z0' 6.0' 1 ROOTS AND LA 7ERAL DEFECT 111.0' 120.0' 9,0' 1 CRACK. AND LATERAL DEFECT 146.0' 152.0' 6.0' 1 ROO AND LA7ERAL DEFECT 218.0' - 227.0' 9.0' 0 ROOTS IN JOINTS CRACKS 82.0' - 88.0' 6.0' 0 ROO AND LA W1AL DE'FE'CT ~ 'Z- ~ '1J ~ 1"\ ~ *SDG&E UTILITY WITHIN WORK AREA INK~T --- C ~ ~ 7/n.E: PREPARED BY: POTEN G. SAN PEDRO APPROVED BY: ROBERTO YANO ORA WN BY: PO TEN G. SAN PEDRO OA TE: SHEET 04 01-11-0B OF 11 SHTS. CITY OF CHULA VISTA SEWER REHABILlATION (SW240) 3-34 vEL1 51 '7 1<005;5497 3.,. MH jf G .....-::;:::::; E'iEL1 51""'-::;:::::; I<OO~ G~ 1 ~ 1EI<AL5 " 101AL LA ~ vEL1 51 I< DOSE ~5496 310 MH jf .....-::;:::::; G SPOT REPAIRS (MHI 5496 to MHI 5497) *ROOSEVEL T ST SECl10N LOCA 710N LENG7H 4.0' - 22.0' 140' 97.0' - 106.0' 9.0' 170.0' 7.JJ.O' 21.0' 162.0' - 172.0' ro.o' 175..0' - 781.0 6.(J' 21UO' - 209.0' 6.0 274 - 224. 6.0 231.0 - 237.0 6.0' 243.0' - 249.0' 6.0 265.0' - 271.0' 6.0' 2810' - 287.0' 6.0' 29B.f)' - 310.0' 12.0' .J4.J. . - 350.0' 6.0 .360.0' - 366.0' 6.0' .386..0' - .392.0' 6.0' 4O.J.0' - ",,2.Q' 9.0' 429,0 - 440.0 no' LA 1ERAL OCSCRIP1JONS 2 AND 'CT ROOTS IN rn JOINTS J DO AND LA7!:RAL ONCT 2 ROOTS. AN LA TERAL 0 CT o ROO c JOINTS o R TS IN n-I JOINTS o 7S IN THE JOiNTS .2 ROO AND LA mc'AL DEFECT o ROOTS IN TH JOINTS o ROOTS iN THE JOINTS o ROOTS IN , ROOTS. AND LA 7E'RAL DEFECT 1 ROOTS IN TME JOINT & LA 7E1i'AL t ROO N 1H << LA7!71'A " ROOrs IN 'THE JOINT ct' A ~ r ROO AND ~L DEFFCr 2 ROOTS. AN LA1'ERA 0 CT *SDG&E U77UTlES WITHIN WORK AREA -<\ ~ ::0 --\ "'- \~ DRAWN BY: paTEN G. SAN PEDRO DA TF:: SHEET 05 01-11-08 OF 11 SHTS TIlLE H 51 CITY OF CHULA VISTA SEWER REHABILlATION (SW240) PREPARED BY: paTEN G. SAN PEDRO APPROVED BY: ROBERTO YANO 3-35 ''"!::RAL5 - L LA' IOIA :::::--::::: ::::::--::: G ~ ANDO \ 0 51-----=::: 1 E. oRL UOR~ ~H #6137 \ ! ~ YJv\p\A 51 E OL 8" VCP SWR - 330' *E ORLANDO ST SPOT REPAIRS (MH# 5133 fo MH# 5737) SEcnaN LOCA 710N WiG7H LA TCRAL DESCRtPl10NS 45.0' - 52.0' 6.0' 1 LATF:RAL DEFECT '00,0' - 109.0' 9.0' 2 ROOTS. AND LATERAL DEFECT 151.0' - 175.0' 24.0' 2 CRACl<S AND LATERAL DEFECT 17.0' - 228.0' 9.0' 2 ROOTS AND LAJeRAL Df:FECT 249.0' - 265.0' 16.0' a ROOTS IN JOlNTS. CRACKS 280.0' - 292.0' 12.0' 2 ROOTS AND LATffiAL DUECT ~\ lJ) '" ^' ")> -\ P"\ ")> < *SDG&E U77UTY WITHIN WORK AREA G-- ~ -----=::: ~ ORLANDO 151 E#'6133 MH \~ Cl lJ) ~~ G) . I E PALOMAR ~ -----=::: ---:: G ---:: -----=::: -----=::: \ G -----=::: ~ DRAWN BY: POTEN G. SAN PEDRO DA TE: SHEET 06 01-11-08 OF 11 SHTS. TITLE: PREPARE{) BY: POTEN G. SAN PEDRO APPROveD 8 Y: ROBERTO YANO CITY OF CHULA VISTA SEWER REHABILlA T10N (SW240) 3-36 *M/NOT A V SPOT REPAIRS (MHI 9J5 10 MHI 9J4) SECTION LOCA TlON LCNCTH LA TERAL DeSCRIPTIONS 20.0' - 26.0' 6.0' , ROO AND LAlCRAL DeFECT 68.0' - 74..0' 8.0' 1 ROO AND LA TCRAL DEFECT 88.0' 94.0' 6.0' 1 ROOTS AND LA :AL DF:FECT 97.0' 103.0' 6.0' 1 ROOTS, AND LA TeRAL DUECT 119.0' - 125.0' 6.0' 1 ROOTS. AND LA 7mAL DEFECT 198.0' - 207.0' 9.0' 2 ROOTS. AND LA :AL DEFECT 211.0' 217.0' 6.0' 1 ROO AND LATE1i'AL DEFeCT 22&0' - 234.0' 6.0' 1 ROD AND LA JEl;'AL €FFCT 285.0' - 300.0' 15.0' .3 ROOTS. AND LATERAL DEFECT I ~ *SDG&:E UTlUTY WITHIN WORK AREA ~ a "-i \~ DRAWN BY: paTEN G. SAN PEDRO DAlE. SHEET 07 01-11-08 OF 11 SHTS. 17n.E: CITY OF CHULA VISTA SEWER REHABILlA T10N (SW240) PREPARED Br.. paTEN G. SAN PEDRO APPROVED Br.. ROBERTO YANO 3-37 SPOT REPAIRS (MH# 5328 to MH# 5329) SECTION LOCA TlON LENG111 . LA TERAL DESCRIPTIONS 0.0' - 20.0' 20.0' 0 REPLACE CAST IRON MAIN F ST 0:>.. ';Cl o z. V) -:2:: ';Cl ""1J ""1J \TI #5326 M\1 r 51 ~ 51 CE:N1t:R DRAWN BY: POTEN G. SAN PEDRO DA fE: SHEET 08 01-11-08 OF 11 SHTS. TITLE: CITY OF CHULA VISTA SEWER REHABILlA TION (SW240) PREPARED BY: POTEN G. SAN PEDRO APPROVED BY: ROBERTO YANO 3-38 \ 1632 OCALA MH #6892 ;::::--- TAifA TA CT C:l )1 r r >- M ::0 >- r-- U) ~ TESOTA CT c ::.--- ~G 1648 OCALA I" MH #6910 ex, a '" ~ \=:i ~ -< ::0 ):,. ~ r-- >- M ::0 >- r-- U) co DRAWN BY: POTEN G. SAN PEDRO DA TE: SHEET 09 01-11 08 OF 11 SHTS. TITLE: I ~ SPOT REPAIRS (MHI 6892 10 MHI 6910) SEcnON LOCAnON LENGTH LA1E:RAL DCSCRIPnONS 66.0' 72.0' 6.0' 1 ROO AND LA TERAL DEFeCT 79.0' - 85.0' B.D' 1 ROOTS. AND LATERAL DEFeCT 732.0' 738.0' 6.0' 1 00 AND LA7ERAL DEFECT 149.0' - 155.0' 6.0' t ROOTS. AND LATERAL DEFECT 22.0' - 218.0' 6.0' 1 ROOTS. AND LATERAL DE:FECT 280.0' 285.0' 6.0' ROO AND LATERAL DEITCT SDG&E WITHIN WORK AREA OCALA A V SPOT RCPAIRS (MHI 6970 /0 MHI 6909) SeCTION LOCAl1ON LENGTH LA7FRAL DESCRfPnONS 43.0' - 49.0' 6.0' 1 ROOTS AND LATERAL DEFECT 85.0 - 92.0' 6.0' 1 ROOTS. AND LATE:RAL DEFECT 109.0' 115.0' 6.0' 1 ROOTS. AND LATE:RA DEFECT r56.0' - 162.0' 6.0' 1 ROOTS. AND LA1CRAL DEFECT '79,0' 185.r:r 6.0' 1 ROOTS. AND LATERAL GEneT 273.0' 243.0' 6.0' 1 ROOTS. AND ATERAL DEFFCT 3160' - 322.0' 6.0' 1 00 AND LATERAL DEFECT ~ ...... '-' ~ ~ <: ~ :::,. 'l; f5 ~ i:5 c5 CITY OF CHULA VISTA SEWER REHABILlA T10N (SW240) TANBARK ST G E =------. MAIN ST ,I PREPARED BY: POTEN G. SAN PEDRO APPROVf:D BY: ROBERTO YANO 3-39 ~H51 -\ ":I:. =jj CJ ")> < $\ $'r\1'-$\1'- ~r 8" vep SWR - 322' *GARRETT AVE I ~ G"'l ")> Al Al '" -\ -\ "> < SPOT REPAiRS ("'HI 3311 TO "'HI 3227) 5EcnON LOCA nON lENGTH LA TERAL DESCRIPTIONS 50.0' - 77.0' 7.0' 0 Room IN ]HE JOiNTS 84.0' 90. a' 5.0' , ROOTS. AND LA7ERAL DfFECT 105.0' - 714.0' 9,0' 1 ROO AND LATERAL DEFECT '22.0' 16.0' 40.0' 1 ROOTS. AND LA1CRAL DfFCCT 168.0' - 2 .0' 40.0' 1 ROOTS. AND LA7FRAL DEFECT 222.0' - 228.0' 6.0' 0 ROOTS IN THE JOINTS 232.0' 238.0' 6.0' , ROOTS AND LATCRAL DEFFCT 248..0' 254.0' 6.0' 0 ROOrs iN THE JOiNTS 288.0' - 94.0' 5,0' 0 ROOTS IN THE JOfNTS 298.0' - 3ro.o' 12.0' 0 ROOrs IN THE JOINTS *SDG&E WITHIN WORK AREA 1. $\ ------ c:c I.J\ -..\ + 'is:. (;):s:. ">- Alv; Alv; '" ~ -\ ~ -\ "> < DRAWN BY: paTEN G. SAN PEDRO DATE: SHEET 10 01 11 08 OF 11 SHTS. TITLE: CITY OF CHULA VISTA SEWER REHABILlA TION (SW240) PREPARED BY: POTEN G. SAN PEDRO APPROVED BY: ROBERTO YANO 3-40 j s~ ---- G"---=::: "xo\<.() ~ ~~ G0 /\\'<a, ~ 0">1,1\ ~GV \~ ~y. \\ ~ JOSSEL YN A VE ~ SOG&:E WITHIN WORK AREA SPOT REPAIRS (MH, 61.fB 10 IIHI 61"") SEC'nON LOCATTON LENt17H U7mAL DESCRJP7lONS 6.0' - 12.0' 6. . , ROO AND l.A7al.4L DEFECT 57. . _ 6:s.0' 6.0' 0 ROOTS IN "THe Jt:iNTS '0'-11' faD' 2 ROO DLA 'CT 1no' - 1J.l.D' 10.0' 0 ROOTS IN THe 'N '40.0' _ 175.0' 0" TS IN J()I, CRAO<S 194 O' _ 16J)' 0' , ROO AND LA1ER'A 0 T I TRANQUlL~ ~ ~ "" ;::.~ ~ :J:.~ ""'0> 0> <- -:;.~ ~ <>>1,1\ '" '::. "Z. .". ~;, ~ -0" << nn 1,1\1,1\ ~~ ,," \ \ .". ':i '=6 ~<. ~. - ;S.;S. ~~ JOSSEL YN A VE ~ SOG&:E WITHIN WORK AREA SPOT REPAiRS (JIHI 6J40 (D MH/ 6141) SEC71DN LOCA,71ON LENGTH LAl'ERAL OESCRtP'OONS 4.0' _ (J' 30.0' ROOTS IN JOIN LAl'E1W. DEFFCT 46.0' _ o' 36.rr ROOTS IN JOIN LA DEFn:T 85.0' - , o' n.D' ROOTS IN JOIN LA 7E1\'AL DEFEa 120.0' - '26.0' 6.0' ROO AND 192.0' - '9ao' 6.0' 21UJ' - 17.0' 6.0' 69.0'- . 0' ~\\ ORA WN BY: POTEN G. SAN PEDRO OA TE: SHEET 11 01-11-08 OF 11 SHT5. lITLE: CITY OF CHULA VISTA SEWER REHABILlA T10N (SW240) PREPARED BY: POTEN G. SAN PEDRO APPROVED BY: ROBERTO YANO 3-41 , -I , '--../ C r '" z '" < ;;; '" <: ". '" '" '" '" r l'1 n ". z -< ~ '" Cl Z -; <: -< -' ~ >- '" <t U 1 OLYMPI 0 K\ AY 7 SP{Jrfl!:iJAIR{MH/ /2.J2S ~ WIlmS} &CIIOHl.OC U/oT;;H NO.LAIERAl. " 'RJP1Iaf uQ'_ ~t.a. 6" () /NA'.lfR"'~'RE>Xi1 lh'CMASGU.cE$lC8 p...!:Z I,]tJ. J-6 DRAWN BY: POTEN G. SAN PEDRO DATE: SHIIT IA 01-22-08 OF 2A SH7S. nTLE: CITY OF CHULA VISTA SEWER REHABILlA T10N (SW240) 3-42 PREPARED BY: POTEN G. SAN PEDRO APPROVED BY: R08ERTO YANO '<-l-/ fJ " 0: 7 SPar fiSWR {lIH1 '2m - JIlfll2.]2S1 SCCNCH ux:. /LNc;rn NO. UolIRAL (]#'..sr:fij!I;;CW .ui1-i7.rr fr 0 ;;mu.r.lAT/Q'lf/Er.l1R 214.l1'-2JO.Q' of Q JtOf1U..THATJrJIREi'MR t J IHOUAS ct1!DE:;cae p,1ct 1J31, -'-I \'S. l't'oIEit W\1ll - ",00' ~J.ol. U'5~ TELEGRAPH CANYON RO Hl'l~ '1\69 --- DRAWN BY: POTEN G. SAN PEDRO DA TE: SHEET 2A 01-22-0B OF 2A SHTS. TITLE: CITY OF CHULA VISTA SEWER REHABILlA TION (SW240) 3-43 "CBELLFLOIJER cr J> '" i! BAR.N Owl Cr STRA"~ r:;;.urc "CC~~ --------- PREPARED BY.' POTE:N G. SAN PEDRO APPROvrD BY.' ROBERTO YANO ACHMENT 1- CITY OF CHULA VISTA DISCLOSURE STATEMENT Pursuant to COWlcil Policy 101-01, prior to any action upon matters that will require discretionary action by the COWlcil, Planning Commission and all other official bodies of the City, a statement of disclosure of certain ownership or financial interests, payments, or campaign contributions for a City of Chula Vista election must be filed. The following infonnation must be disclosed: 1. List the names of all persons having a financial interest in the property that is the subject of the ~lication or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier. ~ L J-.-.I J} J'W1VG1-!.~..J -jl A-=\ lO'<<.J;- IL'\.A. r:u.:. z:" . 2. If any person' identified pursuant to (I) above is a corporation or partnership, list the names of all individuals with a $2000 investment in the business (corporation/partnership) entity. ?^--'-' \. N. ,;~ ^ 'L/.l-l W.J ')l MI. B^-^-, ~.) L. Ih...o'U-\,,~ v'rf::-u..;-- 3. If any person' identified pursuant to (I) above is a non-profit organization or trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. 4. Please identify every person, including any agents, employees, consultants, or independent contractors you have assigned to represent you before the City in this matter. j\......-' I.. i'-I. 1/7t'.A,^"-A..J.'-"", F'''~ ~ h...ull"lA-<"-' ,Grw .s.uJ';-. , 5. Has any person' associated with this contract had any financial dealings with an official" of the City ofChula Vista as it relates to this c.antract within the past,l2 months? Yes_No.$- 30 M: \General Services\Design\SW240\SW240SpecsPhase 1_ Rev9I. doc 3-44 If Yes, briefly descnbe the nature oithe financial interest the official** may have in this contract. 6. Have you made a contribution of more than $250 within the past twelve (12) months to a current member of the Chula Vista City Council? No":j. Yes _liyes, which Council member? 7. Have you provided more than $340 (or an item of equivalent value) to an official" of the City ofChula Vista in the past twelve (12) months? (This includes being a source of income, money to retire a legal debt, gift, loan, etc.) Yes _ No + liYes, which official'. and what was the nature of item provided? Date: ':::.'<:',0:::' c IJ) )/111/ Signature of Contractor! Applicant p;V"1 ," 'W'C' . '] /'..-V l H, )J rlA.J 1\ '1A-J vA> Print or type name of Contractor! Applicant . Person is defined as: any individual, firm, co-partnership, joint venture, assOCiatiOn, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality, district, or other political subdivision, -or any other group or combination acting as a unit. ." Official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member of a board, commission, or committee of the City, employee, or staff members. . 31 M: \Geoeral Services\Desigo \SW240\SW240SpecsPhasel_ Rev9I.doc 3-45 RESOLUTION NO. 2008- RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE "SEWER REHABILITATION PROGRAM-PHASE 1, FY 05/06 & FY 06/07 & FY 07/08 VARIOUS LOCATIONS IN THE CITY OF CHULA VISTA, CALIFORNIA (SW-240A)" PROJECT; AUTHORIZING THE TRANSFER OF AVAILABLE SEWER FACILITY REPLACEMENT FUNDS INTO THE PROJECT FROM THE EXISTING 2006/07 & 2007/08 SEWER REHABILITATION PROGRAM, AND AUTHORIZING STAFF TO INCREASE QUANTITIES TO EXPEND ALL AVAILABLE FUNDS FOR THIS PROJECT WHEREAS, on March 5, 2008, the Director of Engineering and General Services received seven (7) sealed bids for the "Sewer Rehabilitation Program - Phase 1, FY 05/06 to FY 07/08 various locations in the City ofChula Vista (SW-240A)" project; and WHEREAS, the project will rehabilitate existing broken sewer mains and laterals, repair cracked sewer lines and replace asphalt concrete pavement in various locations throughout the City of Chula Vista; and WHEREAS, the project will include all labor, material, equipment, tools, transportation, mobilization, control of sewage flow, installation of root barrier, traffic control, removal and disposal of existing improvements, protection and restoration of existing improvements, and other miscellaneous work necessary for the project; and WHEREAS, bids were contingent upon a base bid and three additional alternate bids (Alternate IA - Location at Lost Creek Road, Alternate 2A - Location at Telegraph Canyon Road, and Alternate 1B - Use of Top Hat Lateral); and WHEREAS, due to the current market for the use of lateral top hats, staff determined to reserve the use of lateral top hats as a means of sewer rehabilitation for a later time or when the manufacturing of the lateral top hats provide more profitable benefits; and WHEREAS, tonight's action will award the contract contingent upon the submitted base bid and two alternate bids (Alternate IA and Alternate 2A) totaling $457,325; and ALTIE CONTRACTOR BASE BID (not ALT1A ALT2A TOTAL recommended at this time) KTA Construction, Inc. - El Cajon, CA $385,258.00 $340.600.00 $15,467.00 $56,600.00 $457,325.00 Burtech Pipeline, Inc. - Encinitas, CA $470,327.50 $570,500.00 $14,185.00 $88,600.00 $573,112.50 Erreca's, Inc. - Lakeside, CA $551,928.50 $256.100.00 $20,998.00 $82,242.00 $655,168.50 H:\ENGINEER\RESOS\Resos2008\04-1S.08\SW240A Sewer Rehab Program FY 05.08 Resorg~~ 6 Resolution No. 2008- Page 2 ALT1E CONTRACTOR BASE BID (not ALTIA ALT2A TOTAL recommended at this time) $52,260.00 MJC Construction - Chula Vista, CA $679,837.50 (mathmaticaJ $17,790.00 $52,500.00 $750,307.50 error) Bonita Pipeline, Inc. - National City, CA $682,615.95 $471,564.60 $28,858.82 $44,092.76 $755,567.53 Weir Construction Corp. - Escondido, $867,479.60 $474,164.60 $28,860.82 $44,092.76 $755,608.71 CA WHEREAS, the low bid by KTA Construction, Inc. of $457,325 is $142,675 (40 percent) below the Engineer's estimate of$758,369; and WHEREAS, tonight's resolution will increase the Director of Public Works Operations' authority to approve change orders as necessary up to the contingency amount of$91,465; and WHEREAS, staff has reviewed the bid and is recommending awarding the contract to KTA Construction, Inc. ofEl Cajon, California; and WHEREAS, this project concentrated on sewers that were mainly west of the I-80S freeway, having 85 percent located in the west side of Chula Vista and the remaining 15 percent located on the east side of the I-80S freeway and no locations are located within Montgomery Area at this time. NOW, THERFORE BE IT RESOLVED, that the City Council of the City Chula Vista does accept bids and award a contract for the "Sewer Rehabilitation Program - Phase I, FY 05/06 & FY 05/07 & FY 07/08 various locations in the City of Chula Vista (SW -240A)" project authorizing the transfer of available Sewer Facility Replacement Funds into the project from the existing 2006/07 & 2007/08 Sewer Rehabilitation Program, and authorizing staff to increase quantities to expend all available funds for this project. Presented by: Approved as to form by: Jack Griffin Director of Engineering and General Services ~CA,,~~~~~\i Ann Moore ' City Attorney H:\ENGINEER\RESOS\ResoslOO8\04-IS.08\SW240A Sewer Rehab Program FY 05-08 Reso3L2'4 7