HomeMy WebLinkAbout2008/03/11 Item 3
ORDINANCE NO. G AND ADOPilON
ECOND REJ\DIN
ORDINANCE OF THE CITY OF CHUL~ VISTA ACCEPTING
THE WESTERN TRANSPORTATION DEVELOPMENT IMPACT
FEE REPORT (TF-358) PREPARED BY STAFF AND
ESTABLISHING A WESTERN TRANSPORTATION
DEVELOPMENT IMPACT FEE PROGRAM TO MITIGATE
TRANSPORTATION IMPACTS WITHIN WESTERN CHULA
VISTA EXCLUDING PROJECTS - 1-5-17, STM-36l, RAS-15, BP-5,
1-805-2, RAS-17, BP-4, BP-2, AND OR-4
WHEREAS, the adoption of the City's General plan indicated that future growth was going to
occur in the City west ofI-805; and
WHEREAS, the traffic studies for the City's General Plan and the Urban Core Specific Plan
show the City's transportation network will be impacted by new development within the western
portion of the City unless new transportation facilities are added to accommodate the new
development; and
WHEREAS, since January 1987, the City has had a program in place for the collection of a
transportation development impact fee for the financing of street improvements in the area east of
Interstate 805.
WHEREAS, the Engineer's Report establishes that the transportation facilities necessitated by
development within the western portion of the City comprise an integrated network; and
WHEREAS, the Western Transportation Development Impact Fee is solely based upon that
portion of the project costs which are attributable to new development; and
WHEREAS, on March 4, 2008, the City Council of the City of Chula Vista held a duly noticed
public hearing at which oral or written presentations regarding the Western Transportation
Development Impact Fee could be made; and
WHEREAS, pursuant to the Municipal Code and California Government Code Sections 66000,
et. seq., the City Council has accepted a report entitled "Engineer's Report for the Western
Transportation Development Impact Fee" ("Engineer's Report") dated February, 2008 that analyzed
the Western Transportation Development Impact Fee necessary to fund transportation facilities needed
to serve future development within the western portion of the City; and
WHEREAS, the City's Environmental Review Coordinator has reviewed the proposed activity
for compliance with the California Environmental Quality Act (CEQA) and has determined that the
activity is not a "Project" as defined under Section 15378 of the State CEQA Guidelines; therefore,
pursuant to Section l5060(c)(3) of the State CEQA Guidelines the activity is not subject to CEQA; and
WHEREAS, the City Council of the City of Chula Vista is placing this ordinance on its first
reading which will establish a development impact fee per equivalent dwelling unit (EDU) to finance
transportation facilities within the western portion of the City of Chula Vista; and
ORD#1
3-1
WHEREAS, pursuant to Govemment Code Section 660l7(a), the fees proposed by this
ordinance will not become effective until sixty (60) days after its first reading; and
NOW, THEREFORE BE IT ORDAINED, that the City Council of the City of Chula Vista
does hereby adopt Chapter 3.55 of the Chula Vista Municipal Code relating to transportation
development impact fees to pay for various transportation facilities located on the westside of the City
as follows:
SECTION 1: Findings
The City Council finds, after consideration of the evidence presented to it induding the "Engineer's
Report for the Western Transportation Development Impact Fee" dated February, 2008, that the
creation of a transportation development impact fee is necessary in order to assure that there are
sufficient funds available to finance the transportation facilities necessary to serve development west
ofI-805; and
The City Council finds that new development within the western portion of the City of Chula Vista
should be required to mitigate the burden created by development through the construction of
transportation facilities; and
The City Council finds, based on the evidence presented at the public hearing, and consistent with the
City's General Plan, and the various reports and information received by the City Council in the
ordinary course of its business, that the imposition of traffic impact fees on all development within the
western portion of the City of Chula Vista for which building permits have not been issued is
necessary in order to protect the public health, safety and welfare by providing for the public
transportation facilities to assure effective implementation of the City's General Plan; and
The City Council finds that the amount of the proposed fees levied by this ordinance does not exceed
the estimated cost of providing the transportation facilities.
SECTION 2: Chapter 3.55 of the Chula Vista Municipal Code is hereby adopted and shall read as
follows:
3.55.010 General intent.
The City's General Plan Land Use and Transportation Element requires that adequate public facilities
be available to accommodate increased population created by new development within the City of
Chula Vista.
The City Council has determined that new development will create adverse impacts on the City's
existing public transportation facilities which must be mitigated by the financing and construction of
certain public transportation facilities which are the subject of this chapter. New development
contributes to the cumulative burden on these public transportation facilities in direct relationship to
the amount of vehicular traffic and population generated by the development or the gross acreage of
the commercial or industrial land in the development.
The City Council has determined that a reasonable means of financing the public transportation
facilities is to charge a fee on all developments within the western portion of the City. imposition of
the Western Transportation Development Impact Fee on all new development for which building
3-2
ORD# 1
permits have not yet been issued is necessary in order to protect the public health, safety and welfare,
thereby ensuring effective implementation of the City's General Plan.
3.55.020 Definitions.
For the purposes of this chapter, the following words or phrases shall be construed as defined herein,
unless from the context it appears that a different meaning is intended.
A. "Building permit" means a permit required by and issued pursuant to the
Uniform Building Code.
B. "City Engineer" means the City Engineer, the City Engineer's designee or the
City Manager's designee.
C. "Density" means dwelling units per gross acre identified for each planning
area shown on the approved tentative map or approved tentative parcel map or
as determined by the City Manager's designee.
D. "Developer" means the owner or developer of a development.
E. "Development permit" means any discretionary permit, entitlement or
approval for a development project issued under any zoning or subdivision
ordinance of the City.
F. "Development project" or "development" means any activity described as the
following:
I. Any new residential dwelling unit developed on vacant land;
2. Any new commerciaVoffice or industrial development constructed on vacant land;
3. Any expansions to established developments or new developments on nonvacant land in
those land use categories listed in subsections (F)( I) and (2) of this section, if the result
is a net increase in dwelling units. The fee shall be based solely on this net dwelling unit
increase;
4. Any new or expanding special land use project;
5. Any special purpose project developed on vacant land or nonvacant land, or expanded
within a pre-existing site, if the result is a net increase in dwelling units. The fee shall
be based solely on this net dwelling unit increase;
6. Any other development project not listed above but described in Section 65927 and
65928 of the State Government Code.
"Community purpose facility" means a facility which serves one of the following purposes:
I. Social service activities, including such services as Boy Scouts and Girl Scouts, Boys
and Girls Club, Alcoholics Anonymous and services for the homeless;
2. Public schools;
3. Private schools;
4. Day care;
5. Senior care and recreation;
6. Worship, spiritual growth and development.
H. "Western portion of the City of Chula Vista" generally means that area of the
City located between the City boundary on the west, Interstate 805 on the east,
the City boundary on the north and the City's boundary on the south, as shown
on the map entitled "Figure I" of the Engineering study.
1. "Engineering study" and "Engineer's Report" means the Engineer's Report for
the Western Transportation Development Impact Fee dated February, 2008
and prepared by City staff on file in the Office of the City Clerk.
J. "Regional Arterial System" (RAS) RAS roadways are generally described as
those facilities that act as a critical link in providing direct connections
between communities ensuring system continuity and congestion relief in high
3-3
ORD# 1
volume corridors. They are roadways that are listed in the most recent edition
of SANDAG' s Regional Transportation Plan
K. "Special land use" means any nonresidential, non-commercial/office or
nonindustrial development project (e.g., Olympic Training Center, hospitals,
utilities), or non-special purpose project.
L. "Special purpose project" means any for-profit community purpose facility
(e.g., day care).
3.55.030 Public transportation facilities to be fmanced bv the fee.
A. The public transportation facilities ("facilities") which are the subject matter of the fee, are
listed below as detailed in subsection C of this section and in the Engineer's Report on file in
the Office of the City Clerk.
B. The City Council may modify or amend the list of projects in order to maintain compliance
with the circulation element of the City's General Plan.
C. The facilities are as follows:
I. (1-5-1) I-5/E Street NB off-ramp restriping add lane
2. (1-5-2) I-5/E Street/Bay Blvd SB off-ramp restriping add lane
3. (1-5-3) 1-5INB ramp widening at E, H, J, Ind., Palomar & Main Sts
4. (1-5-4) E Street bridge widening over 1-5
5. (1-5-5) F Street bridge widening over 1-5
6. (1-5-6) 1-5/H Street NB off-ramp restriping add lane
7. (1-5-7) 1-5/H Street SB off-ramp restriping add lane
8. (1-5-8) H Street bridge widening over 1-5
9. (1-5-9) I-5/J Street NB off-ramp restriping add lane
10. (1-5-10) I-5/J Street undercrossing widening add EB-NB
11. (1-5-11) L Street bridge widening over 1-5 (S/W for peds)
12. (1-5-12) I-5/Bay Blvd (south ofL St.) SB on/off ramps traffic signal
13. (1-5-13) 1-5/Industrial Blvd NB on/off ramps traffic signal
14. (1-5-14) I-5/Palomar Street bridge widening
15. (1-5-15) 1-5/Main Street NB on/off ramps traffic signal
16. (1-5-16) I-5/Main Street bridge widening
3-4
ORD# 1
Interstate-80S Improvements
17. (I-80S-I) NB on-ramp widening & metering at Bonita, East H St (EB-NB), Telegraph
Canyon Road (Project I-80S-I is 100% funded in 2006 RTIP with State funds.)
State Route 54 Improvements
18. (SR-54-1) SR-54 WB off-ramp restripe at Broadway
19. (SR-54-2) SR-54 EB off-ramp at N. Fourth Avenue - add ramp lane
Regional Arterial System (RAS) Projects
20. (RAS-I) Bonita Road from First Avenue to I-80S
21. (RAS-2) Broadway from C Street to south of Main Street (City Limits)
22. (RAS-3) E Street improvements - First Ave to Bonita RoadIE. Flower St
23. (RAS-4) E Street improvements, 1-5 to 300' east ofNB ramp
24. (RAS-5) E Street LRT grade separation (underpass LRT option)
25. (RAS-6) H Street LRT grade separation (underpass LRT option)
26. (RAS-7) H Street at Broadway EB queue jumper lane & traffic signal modifications
27. (RAS-8) H Street 14'-wide median & street light improvements
28. (RAS-9) H Street widening to 6-lanes from Interstate-5 to Broadway
29. (RAS-IO) H Street improvements from Second Ave to Hilltop Drive
(RAS-II) East H St. north side improvements from Hilltop Dr. to 1-805
(RAS-12) L Street/Bay Blvd traffic signal & add turn lanes
(RAS-13) L Street improvements south side west ofIndustrial Blvd
(RAS-14) Telegraph Canyon Road at I-80S south side sidewalk
(RAS-16) Palomar Street improvements from 1-5 to I-80S
(RAS-18) H St/4th Ave add WB-NB & EB-SB right turn lanes
(RAS-19) H St/4th Ave add WB-NB & EB-SB right turn lanes
3-5
ORD# 1
General Plan Impacts and Mitigations
(GP-l) E. St. from Marina Parkway to 1-5
(GP-2) Marina Parkway from ESt. to J St.
(GP-3) L St. from Hilltop Drive to 1-805
Parkway (GP-4) Main St. from 1-5 to Broadway
(GP-5) Main St. from Broadway to Hilltop Dr.
(GP-6) Third Avenue from L St. to Palomar St.
(GP-7) H St. from Marina Parkway to 1-5
(GP-8) J St. from Marina Parkway to 1-5
Bicycle & Pedestrian Facilities Improvements (21 % WTDIF share per GPU)
(BP-l) Bayshore Bikeway (bike path) between E Street & F Streets
(BP-3) Industrial Blvd improvements & bike lanes from L St. to Main Street
(BP-6) Develop bicycle paths & pedestrian access to Third Avenue
Midbayfront Local Coastal Program Roadways
(Mid-I) E Street restripe to add EB-NB dual left turn to NB 1-5 on-ramp.
(Mid-2) 1-5/E St. SB off-ramp widening to add fourth lane
(Mid-3) Bay Blvd 15' widening along Westerly Curb Line at ESt. approach for ISB/3NB
(Mid-4) 1-5/E St. NB widen off-ramp to add 3rd lane for Right Turn only lane
(Mid-5) E St revisions to median and North Curb Line east ofI-5 to add 3rd WB lane.
(Mid-6) Marina Parkway 4-1ane from E St. to J St.
(Mid-7) E St./Woodlawn Ave EB-SB RT lane plus a Traffic Signal
(Mid-8) E St. at Broadway add WB & EB LT lane + WB & EB RT only lane
plus a Traffic Signal & No R/W costs.
(Mid-9) F St/Broadway restriping to provide EB-SB & WB-NB RT lane
(Mid-l 0) H Street widening at Broadway for WB Thm & EB Thru & RT only.
3-6
ORD# 1
Other Roadways
(OR-I) N. 4th AvenuelBrisbane Ave traffic signal modifications
(OR-2) Second Avenue/D Street all-way stop installation
3.55.040 Territorv to which fee applicable.
The area of the City of Chula Vista to which the fee herein established shall be applicable is the
territorial limits of the western portion of the City ofChula Vista ("territory") as defined above, as they
may from time to time be amended.
3.55.050 Establishment of a fee.
A development impact fee ("fee") is hereby established to pay for the facilities within the territory. The
fee shall be paid upon the issuance of building permits for each development project within the western
portion of the City of Chula Vista. The WTDIF fee in the amounts set forth in CVMC 3.55.030 is
hereby established to pay for transportation improvements and facilities within the westem portion of
the City of Chula Vista.
3.55.060 Determination of fees bv land use catel!orv.
A. For purposes of this fee, single-family dwelling units shall include single-
family detached homes and detached condominiums; multifamily dwelling
units shall include attached condominiums, townhouses, duplexes, triplexes,
and apartments. The density of the development type shall be based on the
number of dwelling units per gross acre for single-family or multifamily
residential and shall be based upon the densities identified on the approved
tentative map or approved tentative parcel map entitling the development
unless otherwise approved in writing by the City Manager's designee.
B. Commercial/office and industrial development projects shall be charged on a
per acre or per square footage basis. For purposes of this fee, gross acreage
and lor square footage as it applies to the commercial, industrial and office
development types, means all land area that the City Manager's designee
deems necessary within the boundary of the parcel or parcels of the
development project for which building permits are being requested.
C. The fee multiplied by the total number of dwelling units, square footage or
acres within a given development project represents a developer's fair share
("fair share") for that development project.
3.55.070 Time to determine amount due.
The fee for each development shall be calculated at the time of building permit issuance and shall be
the amount as indicated at that time, and not when the tentative map or fmal map were granted or
applied for, or when the building permit plan check was conducted, or when application was made for
the building permit. No building permit shall be issued unless the development impact fee is paid. The
fees shall be deposited into a WTDIF fund, which is hereby created, and shall be expended only for the
purposes set forth in this chapter. The Director of Finance is authorized to establish various accounts
within the fund for the various improvements and facilities identified in this chapter and to periodically
make expenditures from the fund for the purposes set forth herein in accordance with the facilities
phasing plan or capital improvement plan adopted by the City Council. The City Council finds that
collection of the fees established by this chapter at the time of the building permit is necessary to
3-7
ORD# 1
ensure that funds will be available for the construction of facilities concurrent with the need for those
facilities and to ensure certainty in the capital facilities budgeting for the western part of the City.
3.55.080 Purpose and use of fee.
The fees collected shall be used by the City for the following purposes as determined by the City
Council:
1. To pay for the construction of facilities by the City, or to reimburse
the City for facilities installed by the City with funds from other
sources.
2. To reimburse developers who have been required by
CYMC3.55.150 A to install improvements that are major streets
and are listed in CYMC 3.55.030.
3. To reimburse developers who have been permitted to install
improvements pursuant to CYMC 3.55.150 B.
3.55.090 Amount of fee.
A. The fee shall be the amounts as set forth below in Table 1. The fee shall be adjusted on July 1
of each year beginning in 2009. The annual inflation adjustment will be 2 % or based on
Caltrans highway construction cost index, whichever is higher. The program collects 2% of the
total improvement cost estimate for staff administration and an additional 1 % for SANDAG
Administrative costs.
B. Adjustments of the fee based upon the annual inflation adjustment or the Caltrans Highway
Construction Cost Index shall be automatic and shall not require further action by the City
Council. The WTDIF may also be reviewed and amended by the City Council as necessary
based on changes in the type, size, location or cost of the facilities to be financed by the fee;
changes in land use designation in the City's General Plan; and upon other sound engineering,
financing and planning information.
3-8
ORD# 1
Pro nosed TDIF Fee ner EDU: I $3,243.00
Land Use Classification I ED Us I TDIF Rate
RESIDENTIAL
Residential (LOW) 0-6 dwelling units ner acre I ner EDU $3,2431 DU
Residential (MED) 6.1 To 20 dwelling units per acre .8per EDU $2,594 I DU
Residential (HIGH) Over 20 dwellin~ units per acre .6 per EDU $1,9461 DU
Mobile Home .5 per EDU $1,622 I DU
COMMERCIAL
Contain 1-5 major dept. stores & usually have
more than 50 tenants. Typically larger than 40
Regional Commercial acres. 20 EDUI Acre $64,860 I Acre
Smaller in that size than regionaL Contain junior
Dept. Store or variety Store,( i.e. Target Center
with other commercial stores)as a major tenant
and have IS to 50 other tenants. Smaller in size,
Community Commercial 8-20 acres. 28 EDU/Acre $90,804 I Acre
Less than 10 acres. Includes supermarket and
Neighborhood Commercial drug store. Mav include office spaces. 48 EDU/Acre $155,664 I Acre
Neighborhood Commercial Same as above but in Square Foota.ge 4.8 EDU/KSF $15,664/KSF
Commercial activities found along major streets,
not in a planned center with limited on-site
Street Front Commercial narkincr. 16EDU/Acre $51,888/Acre
Retail Commercial Specialty Retail/Strip Commercial 16EDU/Acre $51,888/KSF
Usually located Dear transportation facilities.
Structures are usually large and cover majority of
the parceL Examples are clothing and supply,
Wholesale Trade also includes swap meet areas. 24EDU/Acre $77,832 I Acre
OFFICE
High Rise Office More than 100,000 S.F. and 6+ Stories 60 EDUI Acre $194,580 I Acre
Low Rise Office < 6 Stories 30EDU/Acre $97,290/Acre
Low Rise Office (in thousands < 6 Stories
of square feet) 2EDU/KSF $6,486 I KSF
Medical Office Medical and Dental Facilities SOEDU/Acre $162,1501 Acre
LODGING
Low Rise HoteVMotel < 4 Stories 20 EDUI Acre $64,860 I Acre
Low Rise Hotel or Motel < 4 Stories I EDU/Room $3,243 I Room
High Rise Hotel >~4 Stories 30 /EDUI Acre $97,290/Acre
INDUSTRY
Shipbuilding, airframe, and aircraft
manufacturing. Usually located next to
transportation facilities and commercial areas.
Heavy Industry Parcels are tvnically 20-50 Acre. l2EDU/Acre $38,916/Acre
Usually large buildings located near freeways,
Warehouse IStorage industrial or strin commercial areas. 6 EDUI Acre $19,458/Acre
Office/industrial uses clustered into a center. The
primary uses are industrial by may include high
percentages of other uses in service or retail
Industrial Park activities. 9 EDU/ Acre $29,187/Acre
All other industrial uses and manufacturing not
I, ight Industrial included in categories above. 20 EDU/ Acre $64,860 I Acre
Table 1
PROPOSED WTDIF FEE PER LAND USE CLASSIFICATION
3-9 ORD#1
3.55.100 Development projects exempt from the fee.
A. Development projects by public agencies shall be exempt from the provisions of the fee if those
projects are designed to provide the public service for which the agency is charged ("public
purpose").
B. Community purpose facilities which are not operated for profit ("nonprofit community purpose
facilities") are also exempt inasmuch as these institutions provide benefit to the community as a
whole, including all land use categories which are the subject matter of the fee. The City
Council hereby determines that it is appropriate to spread any impact such nonprofit
community purpose facilities might have to the other land use categories subject to the fee. In
the event that a court determines that the exemption herein extended to community purpose
facilities shall for any reason be invalid, the City Council hereby allocates the nonprofit
community purpose facilities' fair share to the City of Chula Vista and not to any of the land
use categories which are the subject matter of the development impact land use categories.
C. Development projects which are additions or expansions to existing dwelling units or
businesses, except special land use projects, shall be exempt if the addition or expansion does
not result in a net increase in dwelling units or commercial/industrial acreage.
3.55.110 Authority for accountine: and expenditures.
A. The fees collected shall be deposited into a Western Transportation Development Impact Fee
financing fund ("WTDIF fee fund," or "fund"), which is hereby created and shall be expended
only for the purposes set forth in this chapter.
B. The director of finance is authorized to establish a single fund for the various facilities
identified in this chapter and to periodically make expenditures from the fund for the purposes
set forth herein.
3.55.120 Findill!!s.
The City Council finds that:
A. Collection of the fee established by this chapter at the time of the building permit issuance is
necessary to provide funds for the transportation facilities identified in CVMC 3.55.030 and to
ensure certainty in the capital facilities budgeting for growth impacted public transportation
facilities; and
B. The purpose of the Fees hereby enacted prevents new development from reducing the quality
and availability of public transportation infrastructure facilities provided to residents of the City
by requiring new development to contribute to the cost of additional capital transportation
infrastructure improvements needed to meet the growth generated by such development; and
C. The revenue from the fees hereby enacted will be used to construct public facilities and
infrastructure and pay for other capital expenditures needed to serve new development as
identified in the Engineer's Report dated February, 2008; and
D. Based on analysis presented in the Engineer's Report there is a reasonable relationship between
I. The use of the fees and the types of development projects on which they are imposed and
2. The need for facilities and the types of development projects on which the fees are imposed.
3. The amount of the fee and the cost of the public facility or portion of the public facility
attributable to the development on which the fee is imposed.
3-10
ORD# 1
3.55.130 Fee additional to other fees and charges.
This fee is in addition to the requirements imposed by other City laws, policies or regulations relating
to the construction or the financing of the construction of public improvements within subdivisions or
developments
3.55.150 Developer construction of transportation facilities.
A. Whenever a developer of a development project would be required by application of City law
or policy, as a condition of approval of a development permit to construct or finance the
construction of a portion of a transportation facility identified in Section 3.55.030 the City
Council may impose an additional requirement that the developer install the improvements
with supplemental size, length or capacity in order to ensure efficient and timely construction
of the transportation facilities network. If such a requirement is imposed, the City Council
shall, in its discretion, enter into a reimbursement agreement with the developer, or give a
credit against the fee otherwise levied by this chapter on the development project, or some
combination thereof.
B. Whenever a developer requests reimbursement, or a credit against fees, for work to be done or
paid for by the developer under subsection (A) of this section, the request shall be submitted in
writing to the City Manager's designee.
1. The request shall contain a description of the project with a detailed cost estimate
which itemizes those costs of the construction attributable to the transportation facility
project and excludes any work attributable to a specific subdivision project. The
estimate is preliminary and the amount of reimbursement or credit against fees is
subject to final determination by the City Manager's designee. Additional information
shall be provided to the City by the developer upon request of the City.
2. Such reimbursement or credit against fees shall be subject to the following conditions:
a. Requirements of Developer.
i. Preparation of plans and specifications for approval by the City;
ii. Secure and dedicate any right-of-way required for the transportation facility
project;
iii. Secure all required permits and environmental clearances necessary for the
transportation facility project;
iv. Provision of performance bonds (where the developer intends to utilize provisions
for immediate credit, the performance bond shall be for 100 percent of the value of the
transportation facility project);
v. Payment of all City fees and costs.
b. The City will not be responsible for any of the costs of constructing the
transportation facility project. The developer shall advance all necessary funds to construct the
transportation facility proj ect.
c. The developer shall secure at least three qualified bids for work to be done and shall
award the construction contract to the lowest qualified bidder. The developer may combine the
construction of the transportation facility project with other development-related work and
award one construction contract for the combined work based on a clearly identified process
for determining the low bidder, all as approved by the City Manager's designee. Should the
construction contract be awarded to a qualified bidder who did not submit the lowest bid for
the transportation facility project portion of the contract, the developer will only receive
transportation development impact fee credit based on the lowest bid for the transportation
facility portion of the contract. Any claims for additional payment for extra work or charges
shall be justified, shall be documented to the satisfaction of the City Manager's designee and
3-11
ORD# 1
shall only be reimbursed at the prices for similar work included in the lowest bid for the
transportation facility portion of the contract.
d. Upon complying with the conditions set forth in subsections (B)(l) and (B)(2)( a) of
this section as determined by the City and upon approval of the estimated cost by the City
Manager's designee, the developer shall be entitled to immediate credit for 50 percent of the
estimated cost of the construction attributable to the transportation facility project. Once the
developer has received valid bids for the project which comply with subsection (B)(2)(c) of
this section, entered into binding contracts for the construction of the project, and met the
conditions set forth in subsections (B)(l) and (B)(2)(a) of this section as determined by the
City, all of which have been approved by the City Manager's designee, the amount of the
immediate credit shall be increased to 75 percent of the bid amount attributable to the
transportation facility project. The immediate credits shall be applied to the developer's
obligation to pay transportation development impact fees for building permits issued after the
establishment of the credit. The developer shall specify these building permits to which the
credit is to be applied at the time the developer submits the building permit applications.
e. If the developer uses all of the immediate credit before final completion of the
transportation facility project, then the developer may defer payment of development impact
fees for other building permits by providing to the City liquid security such as cash .or an
irrevocable letter of credit, but not bonds or set-aside letters, in an amount equal to the
remaining amount of the estimated cost of the transportation facility project.
f. When all work has been completed to the satisfaction of the City, the developer shall
submit verification of payments made for the construction of the transportation facility project
to the City. The City Manager's designee shall make the final determination on expenditures
which are eligible for credit or cash reimbursement.
g. After final determination of eligible expenditures has been made by the City
Manager's designee and the developer has complied with the conditions set forth in subsection
(B) of this section, the final amount of transportation development impact fee credits shall be
determined by the City Manager's designee. The developer shall receive credit against the
deferred fee obligation in an amount equal to the difference between the final expenditure
determination and the amount of the 75 percent immediate credit used, if any. The City shall
notify the developer of the final deferred fee obligation, and of the amount of the applicable
credit. If the amount of the applicable credit is less than the deferred fee obligation, then the
developer shall have 30 days to pay the deferred fee. If the deferred fees are not paid within the
3D-day period, the City may make a demand against the liquid security and apply the proceeds
to the fee obligation.
h. At the time building permits are issued for the developer's project, the City will
incrementally apply credit which the developer has accrued in lieu of collecting the required
transportation development impact fees. The amount of the credit to be applied to each
building permit shall be based upon the fee schedule in effect at the time of the building permit
issuance. The City Manager's designee shall convert such credit to an EDU basis for
residential development and/or a gross acre basis for commercial or industrial development for
purposes of determining the amount of credit to be applied to each building permit.
i. If the total eligible construction cost for the transportation facility project is more than
the total transportation development impact fees which will be required for the developer's
project, then the amount in excess of development impact fees will be paid in cash when funds
are available as determined by the City Manager; a reimbursement agreement will be executed;
or the developer may waive reimbursement and use the excess as credit against future
transportation development impact fee obligations. The City may, in its discretion, enter into
an agreement with the developer to convert excess credit into EDU and/or gross acre credits for
3-12
ORD# 1
use against future development impact fee obligations at the fee rate in effect on the date of the
agreement.
j. The requirements of this subsection (B) of this section may, in the City's discretion,
be modified through an agreement between the developer and the City and approved by City
Council.
C. Whenever a transportation development impact fee credit is generated by
constructing a transportation facility using assessment district or community
facilities district fmancing, the credit shall only be applied to the
transportation development impact fee obligations within that district.
3.55.160 Procedure for fee waiver or reduction.
A. Any developer who, because of the nature or type of uses proposed for a
development project, contends that application of the fee imposed by this
chapter is unconstitutional, or unrelated to mitigation of the traffic needs or
burdens of the development, may apply to the City Council for a waiver,
reduction, or deferral of the fee. A development which is designed and
intended as a temporary use (10 years or less) and which is conducted in
facilities which are, by their nature, short-term interim facilities such as a
portable or modular building (including mobile homes, trailers, etc.) may
qualify for a waiver, reduction, or deferral. In addition, a deferral may be
granted on the basis of demonstrated economic hardship on the condition that:
(l) the use offers a significant public benefit; (2) the amount deferred bears
interest at a fair market rate so as to constitute an approximate value
equivalent to a cash payment; and (3) the amount deferred is adequately
secured by agreement with the applicant. Unless the requirement for timely
filing is waived by the City, the application shall be made in writing and filed
with the City Clerk not later than 10 days after notice of the public hearing on
the development permit application or the project is given, or if no
development permit is required, at the time of the filing of the building permit
application. The application shall state in detail the factual basis for the claim
of waiver or reduction.
B. The City Council shall consider the application at a public hearing on same,
notice of which need not be published other than by description on the agenda
of the meeting at which the public hearing is held. Said public hearing should
be held within 60 days after its filing. The decision of the City Council shall
be fmal. If a deferral, reduction or waiver is granted, it should be granted
pursuant to an agreement with the applicant, and the property owner, if
different from the applicant, providing that any change in use within the
project shall subject the development to payment of the full fee. The procedure
provided by this section is additional to any other procedure authorized by law
for protesting or challenging the fee imposed by this chapter.
3.55.170 Exemptions.
Development projects by public agencies shall be exempt from the provisions of this fee. Exempt
development uses with the following characteristics or activities as a principal use of land, generally
described as "community purpose facility" as defined above in CYMC Section 3.55.020.
3-13
ORD# 1
3.55.180 Assessment districts.
If any assessment or special taxing district is established for any or all of the facilities listed in Section
3.55.030 the owner or developer of a project may apply to the City Council for a credit against the fee
in an amount equal to the development's attributable portion of the cost of the authorized
improvements as determined by the City Manager's designee, plus incidental costs normally occurring
with a construction project, but excluding costs associated with assessment district proceedings or
financing.
3.55.190 Economic incentive credit.
The City Council may authorize the City to participate in the financing of transportation facility
projects or portions of transportation facility projects as defmed in Section 3.55.030 at the time of the
appropriation of funds by City Council for the construction of an eligible transportation facility, the
City shall be eligible to receive a credit known hereafter as an economic incentive credit. Such
economic incentive credit may be applied to development impact fee obligations for those projects
which the City Council determines, in its sole discretion, to be beneficial to the City. The use of the
economic incentive credit may be subject to conditions which shall be set forth in a written agreement
between the developer of the project and the City and approved by City Council.
The City may receive economic incentive credit only for those eligible projects identified in Section
3.55.030 for amounts of funding not identified in the fmancial and engineering study "Western
Transportation Development Impact Fee" report dated February 2008.
3.55.195 Fund loans.
A.
B.
Loans by the City. The City may loan funds to the fund to pay for
facilities should the fund have insufficient funds to cover the cost of
said facility. Said loans, if granted, shall be approved upon the adoption
of the annual City budget or upon resolution of the City Council and
shall carry interest rates as set by the City Council for each fiscal year.
A schedule for repayment of said loans shall be established at the time
they are made and approved by the Council, with a maximum term not
to exceed the life of the fund.
Developer Loans. A developer may loan funds to the City as outlined
in CVMC 3.55.150. The City may repay said developer loans with
interest, under the terms listed in subsection (A) of this section.
3.55.200 Effective date.
This chapter shall become effective
SECTION 3: Effective Date
This Ordinance shall become effective 60 days after its second reading and adoption.
Presented by
Approved as to form by
~ - "Y"Ptt9 ~
City Attorney
Jack GriffIn
Engineering and General Services Director
3-14
ORDINANCE NO. SECOND READING AND ADOPTION
ORDINANCE OF THE CITY OF CHULA VISTA ACCEPTING
THE WESTERN TRANSPORTATION DEVELOPMENT IMPACT
FEE REPORT (TF-358) PREPARED BY STAFF AND
ESTABLISHING A WESTERN TRANSPORTATION
DEVELOPMENT IMPACT FEE PROGRAM TO MITIGATE
TRANSPORTATION IMPACTS WITHIN WESTERN CHULA
VISTA INCLUDING PROJECTS - 1-5-17, STM-361, RAS-15 AND
BP-5
WHEREAS, the adoption of the City's General plan indicated that future growth was going to
occur in the City west ofI-805; and
WHEREAS, the traffic studies for the City's General Plan and the Urban Core Specific Plan
show the City's transportation network will be impacted by new development within the western
portion of the City unless new transportation facilities are added to accommodate the new
development; and
WHEREAS, since January 1987, the City has had a program in place for the collection of a
transportation development impact fee for the fmancing of street improvements in the area east of
Interstate 805.
WHEREAS, the Engineer's Report establishes that the transportation facilities necessitated by
development within the western portion of the City comprise an integrated network; and
WHEREAS, the Western Transportation Development Impact Fee is solely based upon that
portion of the project costs which are attributable to new development; and
WHEREAS, on March 4, 2008, the City Council of the City of Chula Vista held a duly noticed
public hearing at which oral or written presentations regarding the Western Transportation
Development Impact Fee could be made; and
WHEREAS, pursuant to the Municipal Code and California Government Code Sections 66000,
et. seq., the City Council has accepted a report entitled "Engineer's Report for the Western
Transportation Development Impact Fee" ("Engineer's Report") dated February, 2008 that analyzed
the Western Transportation Development Impact Fee necessary to fund transportation facilities needed
to serve future development within the western portion of the City; and
WHEREAS, the City's Environmental Review Coordinator has reviewed the proposed activity
for compliance with the California Environmental Quality Act (CEQA) and has determined that the
activity is not a "Project" as defined under Section 15378 of the State CEQA Guidelines; therefore,
pursuant to Section l5060(c)(3) of the State CEQA Guidelines the activity is not subject to CEQA; and
WHEREAS, the City Council of the City of Chula Vista is placing this ordinance on its first
reading which will establish a development impact fee per equivalent dwelling unit (EDU) to finance
transportation facilities within the western portion of the City of Chula Vista; and
ORD # 2
3-15
WHEREAS, pursuant to Government Code Section 66017(a), the fees proposed by this
ordinance will not become effective until sixty (60) days after its first reading; and
NOW, THEREFORE BE IT ORDAINED, that the City Council of the City of Chula Vista
does hereby adopt Chapter 3.55 of the Chula Vista Municipal Code relating to transportation
development impact fees to pay for various transportation facilities located on the westside of the City
as follows:
SECTION 1: Findings
The City Council finds, after consideration of the evidence presented to it including the "Engineer's
Report for the Western Transportation Development Impact Fee" dated February, 2008, that the
creation of a transportation development impact fee is necessary in order to assure that there are
sufficient funds available to finance the transportation facilities necessary to serve development west
ofI-805; and
The City Council fmds that new development within the western portion of the City of Chula Vista
should be required to mitigate the burden created by development through the construction of
transportation facilities; and
The City Council finds, based on the evidence presented at the public hearing, and consistent with the
City's General Plan, and the various reports and information received by the City Council in the
ordinary course of its business, that the imposition of traffic impact fees on all development within the
western portion of the City of Chula Vista for which building permits have not been issued is
necessary in order to protect the public health, safety and welfare by providing for the public
transportation facilities to assure effective implementation of the City's General Plan; and
The City Council finds that the amount of the proposed fees levied by this ordinance does not exceed
the estimated cost of providing the transportation facilities.
SECTION 2: Chapter 3.55 of the Chula Vista Municipal Code is hereby adopted and shall read as
follows:
3.55.010 General intent.
The City's General Plan Land Use and Transportation Element requires that adequate public facilities
be available to accommodate increased population created by new development within the City of
Chula Vista.
The City Council has determined that new development will create adverse impacts on the City's
existing public transportation facilities which must be mitigated by the financing and construction of
certain public transportation facilities which are the subject of this chapter. New development
contributes to the cumulative burden on these public transportation facilities in direct relationship to
the amount of vehicular traffic and population generated by the development or the gross acreage of
the commercial or industrial land in the development.
The City Council has determined that a reasonable means of financing the public transportation
facilities is to charge a fee on all developments within the western portion of the City. imposition of
the Western Transportation Development Impact Fee on all new development for which building
3-16
ORD # 2
permits have not yet been issued is necessary in order to protect the public health, safety and welfare,
thereby ensuring effective implementation of the City's General Plan.
3.55.020 Definitions.
For the purposes of this chapter, the following words or phrases shall be construed as defined herein,
unless from the context it appears that a different meaning is intended.
A. "Building permit" means a permit required by and issued pursuant to the
Uniform Building Code.
B. "City Engineer" means the City Engineer, the City Engineer's designee or the
City Manager's designee.
C. "Density" means dwelling units per gross acre identified for each planning
area shown on the approved tentative map or approved tentative parcel map or
as determined by the City Manager's designee.
D. "Developer" means the owner or developer of a development.
E. "Development permit" means any discretionary permit, entitlement or
approval for a development project issued under any zoning or subdivision
ordinance of the City.
F. "Development project" or "development" means any activity described as the
following:
I. Any new residential dwelling unit developed on vacant land;
2. Any new commercial/office or industrial development constructed on vacant land;
3. Any expansions to established developments or new developments on nonvacant land in
those land use categories listed in subsections (F)(1) and (2) of this section, if the result
is a net increase in dwelling units. The fee shall be based solely on this net dwelling unit
increase;
4. Any new or expanding special land use project;
5. Any special purpose project developed on vacant land or nonvacant land, or expanded
within a pre-existing site, if the result is a net increase in dwelling units. The fee shall
be based solely on this net dwelling unit increase;
6. Any other development project not listed above but described in Section 65927 and
65928 ofthe State Government Code.
"Community purpose facility" means a facility which serves one of the following purposes:
I. Social service activities, including such services as Boy Scouts and Girl Scouts, Boys
and Girls Club, Alcoholics Anonymous and services for the homeless;
2. Public schools;
3. Private schools;
4. Day care;
5. Senior care and recreation;
6. Worship, spiritual growth and development.
H. "Western portion of the City of Chula Vista" generally means that area of the
City located between the City boundary on the west, Interstate 805 on the east,
the City boundary on the north and the City's boundary on the south, as shown
on the map entitled "Figure I" of the Engineering study.
I. "Engineering study" and "Engineer's Report" means the Engineer's Report for
the Western Transportation Development Impact Fee dated February, 2008
and prepared by City staff on file in the Office of the City Clerk.
J. "Regional Arterial System" (RAS) RAS roadways are generally described as
those facilities that act as a critical link in providing direct connections
between communities ensuring system continuity and congestion relief in high
3-17
ORD # 2
volume corridors. They are roadways that are listed in the most recent edition
of SANDAG's Regional Transportation Plan
K. "Special land use" means any nomesidential, non-commercial/office or
nonindustrial development project (e.g., Olympic Training Center, hospitals,
utilities), or non-special purpose project.
1. "Special purpose project" means any for-profit community purpose facility
(e.g., day care).
3.55.030 Public transportation facilities to be fmanced bv the fee.
A. The public transportation facilities ("facilities") which are the subj ect matter of the fee, are
listed below as detailed in subsection C of this section and in the Engineer's Report on file in
the Office of the City Clerk.
B. The City Council may modify or amend the list of projects in order to maintain compliance
with the circulation element of the City's General Plan.
e. The facilities are as follows:
I. (1-5-1) 1-5/E Street NB off-ramp restriping add lane
2. (1-5-2) 1-5/E Street/Bay Blvd SB off-ramp restriping add lane
3. (1-5-3) 1-5/NB ramp widening at E, H, J, Ind., Palomar & Main Sts (21 %)
4. (1-5-4) E Street bridge widening over 1-5 (250' X 20' X $350/sf)
5. (1-5-5) F Street bridge widening over 1-5 (250' X 20' X $3501sf
6. (1-5-6) 1-5/H Street NB off-ramp restriping add lane
7. (1-5-7) 1-5/H Street SB off-ramp restriping add lane
8. (1-5-8) H Street bridge widening over 1-5 (200'X40'X$350/sf)
9. (1-5-9) 1-51J Street NB off-ramp restriping add lane
10. (1-5-10) 1-5/J Street undercrossing widening add EB-NB (175x20X$350)
II. (1-5-11) L Street bridge widening overI-5 (S/W for peds 300' X 12')(21 %)
12. (1-5-12) 1-5/Bay Blvd (south ofL St.) SB on/off ramps traffic signal
13. (1-5-13) 1-5/lndustrial Blvd NB on/off ramps traffic signal
14. (1-5-14) 1-5/Palomar Street bridge widening (2751fX 501fX $350/sf)
15. (1-5-15) 1-5/Main Street NB onlofframps traffic signal (CV share $120k)
16. (1-5-16) 1-5/Main Street bridge widening (2751fX 201fX $350/sf)
17. (/-5-17) /-5 HOV & Managed Lanesfrom SR905 to SR54 (63.4% in OJ
18. STM 361
3-18
ORD # 2
a. 1-5 Multi-Modal Corridor Study (80% Fed. DEMO funds)
b. (SANDAG cost estimate is $4.3M & CV share TBD.)
Interstate-80S Improvements
19. (I-80S-I) NB on-ramp widening & metering at Bonita, East H St (EB-NB),
Telegraph Canyon Road (Project 1-805-1 is 100% funded in 2006 RTIP with State
funds.)
State Route 54 Improvements
20. (SR-54-1) SR-54 WE off-ramp restripe at Broadway
21. (SR-54-2) SR-54 EB off-ramp at N. Fourth Avenue - add ramp lane
Regional Arterial System (RAS) Projects
22. (RAS-I) Bonita Road from First Avenue to I-80S
23. (RAS-2) Broadway from C Street to south of Main Street (City Limits)
24. (RAS-3) E Street improvements - First Ave to Bonita RoadIE. Flower St
25. (RASA) E Street improvements, 1-5 to 300' east ofNB ramp
26. (RAS-5) E Street LRT grade separation (underpass LRT option)
27. (RAS-6) H Street LRT grade separation (underpass LRT option)
28. (RAS-7) H Street at Broadway EB queue jumper lane & traffic signal modifications
29. (RAS-8) H Street 14' -wide median & street light improvements (same as RAS-9)
30. (RAS-9) H Street widening to 6-lanes from Interstate-5 to Broadway
31. (RAS-IO) H Street improvements from Second Ave to Hilltop Drive
32. (RAS-II) East H St. north side improvements from Hilltop Dr. to 1-805
33. (RAS-12) L Street/Bay Blvd traffic signal & add turn lanes
34. (RAS-13) L Street improvements south side west ofIndustrial Blvd
35. (RAS-14) Telegraph Canyon Road at 1-805 south side sidewalk
36. (RAS-15) Orange Avenue/rom Palomar Street to Hilltop Drive
37. (RAS-16) Palomar Street improvements from 1-5 to 1-805
38. (RAS-18) H Stl4th Ave add WE-NB & EB-SB right turn lanes
3-19
QRD # 2
39. (RAS-19) H St/4th Ave add WB-NB & EB-SB right turn lanes
General Plan Impacts and Mitigations
40. (GP-I) E. St. from Marina to 1-5
41. (GP-2) Marina Parkway from E-J St.
42. (GP-3) L St. from Hilltop to 1-805
43. (GP-4) Main St. from 1-5 to Broadway
44. (GP-5) Main St. from Broadway to Hilltop Dr.
45. (GP-6) Third Avenue from L St. to Palomar St.
46. (GP-7) H St. from Marina to 1-5
47. (GP-8) J St. from Marina to 1-5
Bicycle & Pedestrian Facilities Improvements (21 % WTDIF share per GPU)
48. (BP-I) Bayshore Bikeway (bike path) between E Street & F Streets
49. (BP-3) Industrial Blvd improvements & bike lanes from L St. to Main Street
50. (BP-5) Orange Ave. bike lanes from Palomar Sf. to Hilltop Drive
51. (BP-6) Develop bicycle paths & pedestrian access to Third Avenue
Midbayfront Local Coastal Program Roadways
52. (Mid-I) E Street restripe to add EB-NB dual left turn to NB 1-5 on-ramp.
53. (Mid-2) 1-5/E St. SB off-ramp widening to add fourth lane
54. (Mid-3) Bay Blvd 15' widening along Westerly Curb Line at E St. approach for
ISB/3NB
55. (Mid-4) 1-5/E St. NB widen off-ramp to add 3rd lane for Right Turn only lane
56. (Mid-5) E St revisions to median and North Curb Line east of 1-5 to add 3rd WB
lane.
57. (Mid-6) Marina Parkway 4-lane from ESt. to J St.
58. (Mid-7) E St./Woodlawn Ave EB-SB RT lane plus a Traffic Signal)
59. (Mid-8) E St. at Broadway add WB & EB LT lane + WB & EB RT only lane. plus
a Traffic Signal & No R/W costs.
60. (Mid-9) F St/Broadway restriping to provide EB-SB & WB-NB RT lane
3-20
ORO # 2
61. (Mid-l 0) H Street widening at Broadway for WB Thru & EB Thru & RT only.
Other Roadways
62. (OR-I) N. 4th AvenueIBrisbane Ave traffic signal modifications
63. (OR-2) Second Avenue/D Street all-way stop installation
3.55.040 Territory to which fee aoolicable.
The area of the City of Chula Vista to which the fee herein established shall be applicable is the
territorial limits of the western portion of the City of Chula Vista ("territory") as defined above, as they
may from time to time be amended.
3.55.050 Establishment of a fee.
A development impact fee ("fee") is hereby established to pay for the facilities within the territory. The
fee shall be paid upon the issuance of building permits for each development project within the western
portion of the City of Chula Vista. The WTDIF fee in the amounts set forth in CVMC 3.55.030 is
hereby established to pay for transportation improvements and facilities within the western portion of
the City ofChula Vista.
3.55.060 Determination of fees bv land use catel!:Ory.
A. For purposes of this fee, single-family dwelling units shall include single-
family detached homes and detached condominiums; multifamily dwelling
units shall include attached condominiums, townhouses, duplexes, triplexes,
and apartments. The density of the development type shall be based on the
number of dwelling units per gross acre for single-family or multifamily
residential and shall be based upon the densities identified on the approved
tentative map or approved tentative parcel map entitling the development
unless otherwise approved in writing by the City Manager's designee.
B. Commercial/office and industrial development projects shall be charged on a
per acre or per square footage basis. For purposes of this fee, gross acreage
and lor square footage as it applies to the commercial, industrial and office
development types, means all land area that the City Manager's designee
deems necessary within the boundary of the parcel or parcels of the
development project for which building permits are being requested.
C. The fee multiplied by the total number of dwelling units, square footage or
acres within a given development project represents a developer's fair share
("fair share") for that development project.
3.55.070 Time to determine amount due.
The fee for each development shall be calculated at the time of building permit issuance and shall be
the amount as indicated at that time, and not when the tentative map or final map were granted or
applied for, or when the building permit plan check was conducted, or when application was made for
the building permit. No building permit shall be issued unless the development impact fee is paid. The
fees shall be deposited into a WTDIF fund, which is hereby created, and shall be expended only for the
purposes set forth in this chapter. The Director of Finance is authorized to establish various accounts
within the fund for the various improvements and facilities identified in this chapter and to periodically
make expenditures from the fund for the purposes set forth herein in accordance with the facilities
phasing plan or capital improvement plan adopted by the City Council. The City Council finds that
3-21
ORD # 2
collection of the fees established by this chapter at the time of the building permit is necessary to
ensure that funds will be available for the construction of facilities concurrent with the need for those
facilities and to ensure certainty in the capital facilities budgeting for the western part of the City.
3-22
ORD # 2
3.55.080 PUllJose and use of fee.
The fees collected shall be used by the City for the following purposes as determined by the City
Council:
1. To pay for the construction of facilities by the City, or to reimburse
the City for facilities installed by the City with funds from other
sources.
2. To reimburse developers who have been required by
CVMC3.55.l50 A to install improvements that are major streets
and are listed in CVMC 3.55.030.
3. To reimburse developers who have been permitted to install
improvements pursuant to CVMC 3.55.150 B.
3.55.090 Amount offee.
A. The fee shall be the amounts as set forth below in Table 1. The fee shall be adjusted on July 1
of each year beginning in 2009. The annual inflation adjustment will be 2 % or based on
Caltrans highway construction cost index, whichever is higher. The program collects 2% of the
total improvement cost estimate for staff administration and an additional 1 % for SANDAG
Administrative costs.
B. Adjustments of the fee based upon the annual inflation adjustment or the Caltrans Highway
Construction Cost Index shall be automatic and shall not require further action by the City
Council. The WTDIF may also be reviewed and amended by the City Council as necessary
based on changes in the type, size, location or cost of the facilities to be financed by the fee;
changes in land use designation in the City's General Plan; and upon other sound engineering,
financing and planning information.
3-23
ORD#2
Pronosed TDIF Fee ner EDU: I $3,243.00
. '. ..... EDUs
Land Use Classification TDIF Rate
RESIDENTIAL
Residential (LOW) 0-6 dwelling units per acre 1 per EDU $3,2431 D U
Residential (MED) 6.1 To 20 dwelling units per acre .8perEDU $2,5941 DU
Residential (IDGH) Over 20 dwelling units per acre .6 per EDU $1,9461 DU
Mobile Home .5 per EDU $1,6221 DU
COMMERCIAL
Contain 1-5 major dept. stores & usually have
more than 50 tenants. Typically larger than 40
Regional Commercial acres. 20 EDUI Acre $64,860 I Acre
Smaller in that size than regional. Contain junior
Dept. Store or variety Store,e i.e. Target Center
with other commercial stores)as a major tenant
and have IS to 50 other tenants. Smaller in size,
Community Commercial 8-20 acres. 28 EDUI Acre $90,8041 Acre
Neighborhood Commercial Less than 10 acres. Includes supermarket and
drug store. Mav include office SDaces. 48 EDUI Acre $155,6641 Acre
Neiahborhood Commercial Same as above but in Sauare Footage 4.8EDU/KSF $15,664/KSF
Commercial activities found along major streets,
not in a planned center with limited on-site
Street Front Commercial parking. l6EDU/Acre $51,888/Acre
Retail Commercial Soecialty Retail/Strio Commercial 16EDU/Acre $51,888/KSF
Usually located near transportation facilities.
Structures are usually large and cover majority of
~e parcel. Examples are clothing and supply,
Wholesale Trade also includes swan meet areas. 24EDU/Acre $77,832/Acre
OFFICE
High Rise Office More than 100,000 S.F. and 6+ Stories 60 EDUI Acre $194,580 I Acre
Low Rise Office < 6 Stories 30 EDUI Acre $97,290/Acre
!Low Rise Office (in thousands < 6 Stories
of sou are feet) 2 EDU/KSF $6,4861 KSF
Medical Office Medical and Dental Facilities 50 EDUI Acre $162,1501 Acre
LODGING
Low Rise HatellMotel < 4 Stories 20 EDUI Acre $64,860 I Acre
Law Rise Hotel or Motel < 4 Stories 1 EDU/Room $3,2431 Room
Hloh Rise Hotel >=4 Stories 30 IEDUI Acre $97,290 I Acre
INDUSTRY
Shipbuilding, airframe, and aircraft
manufacturing. Usually located next to
transportation facilities and commercial areas.
Heavy Industry Parcels are typically 20-50 Acre. 12 EDU/Acre $38,916/Acre
Usually large buildings located near freeways,
Warehouse IStorage industrial or strio commercial areas. 6EDU/Acre $19,4581 Acre
Office/industrial uses clustered into a center. The
primary uses are industrial by may include high
percentages of other uses in service or retail
Industrial Park activities. 9EDUlAcre $29,187/Acre
Light Industrial All other industrial uses and manufacturing not
included in categories above. 20 EDU/Acre $64,860 I Acre
Table 1
PROPOSED WTDIF FEE PER LAND USE CLASSIFICA TION
3-24 ORD#2
3.55.100 Development proiects exempt from the fee.
A. Development proj ects by public agencies shall be exempt from the provisions of the fee if those
projects are designed to provide the public service for which the agency is charged ("public
purpose").
B. Community purpose facilities which are not operated for profit ("nonprofit community purpose
facilities") are also exempt inasmuch as these institutions provide benefit to the community as a
whole, including all land use categories which are the subject matter of the fee. The City
Council hereby determines that it is appropriate to spread any impact such nonprofit
community purpose facilities might have to the other land use categories subject to the fee. In
the event that a court determines that the exemption herein extended to community purpose
facilities shall for any reason be invalid, the City Council hereby allocates the nonprofit
community purpose facilities' fair share to the City of Chula Vista and not to any of the land
use categories which are the subject matter of the development impact land use categories.
C. Development projects which are additions or expansions to existing dwelling units or
businesses, except special land use projects, shall be exempt if the addition or expansion does
not result in a net increase in dwelling units or commercial/industrial acreage.
3.55.110 Authority for accountinl!: and expenditures.
A. The fees collected shall be deposited into a Western Transportation Development Impact Fee
fmancing fund ("WTDIF fee fund," or "fund"), which is hereby created and shall be expended
only for the purposes set forth in this chapter.
B. The director of finance is authorized to establish a single fund for the various facilities
identified in this chapter and to periodically make expenditures from the fund for the purposes
set forth herein.
3.55.120 Findinl!:s.
The City Council finds that:
A. Collection of the fee established by this chapter at the time of the building permit issuance is
necessary to provide funds for the transportation facilities identified in CVMC 3.55.030 and to
ensure certainty in the capital facilities budgeting for growth impacted public transportation
facilities; and
B. The purpose of the Fees hereby enacted prevents new development from reducing the quality
and availability of public transportation infrastructure facilities provided to residents of the City
by requiring new development to contribute to the cost of additional capital transportation
infrastructure improvements needed to meet the growth generated by such development; and
C. The revenue from the fees hereby enacted will be used to construct public facilities and
infrastructure and pay for other capital expenditures needed to serve new development as
identified in the Engineer's Report dated February, 2008; and
D. Based on analysis presented in the Engineer's Report there is a reasonable relationship between
1. The use of the fees and the types of development projects on which they are imposed and
2. The need for facilities and the types of development projects on which the fees are imposed.
3. The amount of the fee and the cost of the public facility or portion of the public facility
attributable to the development on which the fee is imposed.
3-25
ORD # 2
3.55.130 Fee additional to other fees and chan!:es.
This fee is in addition to the requirements imposed by other City laws, policies or regulations relating
to the construction or the financing of the construction of public improvements within subdivisions or
developments
3.55.150 Developer construction of transportation facilities.
A. Whenever a developer of a development project would be required by application of City law
or policy, as a condition of approval of a development permit to construct or finance the
construction of a portion of a transportation facility identified in Section 3.55.030 the City
Council may impose an additional requirement that the developer install the improvements
with supplemental size, length or capacity in order to ensure efficient and timely construction
of the transportation facilities network. If such a requirement is imposed, the City Council
shall, in its discretion, enter into a reimbursement agreement with the developer, or give a
credit against the fee otherwise levied by this chapter on the development project, or some
combination thereof.
B. Whenever a developer requests reimbursement, or a credit against fees, for work to be done or
paid for by the developer under subsection (A) of this section, the request shall be submitted in
writing to the City Manager's designee.
1. The request shall contain a description of the project with a detailed cost estimate
which itemizes those costs of the construction attributable to the transportation facility
project and excludes any work attributable to a specific subdivision project. The
estimate is preliminary and the amount of reimbursement or credit against fees is
subject to final determination by the City Manager's designee. Additional information
shall be provided to the City by the developer upon request of the City.
2. Such reimbursement or credit against fees shall be subject to the following conditions:
a. Requirements of Developer.
i. Preparation of plans and specifications for approval by the City;
ii. Secure and dedicate any right-of-way required for the transportation facility
project;
iii. Secure all required permits and environmental clearances necessary for the
transportation facility project;
iv. Provision of performance bonds (where the developer intends to utilize provisions
for immediate credit, the performance bond shall be for 100 percent of the value of the
transportation facility project);
v. Payment of all City fees and costs.
b. The City will not be responsible for any of the costs of constructing the
transportation facility project. The developer shall advance all necessary funds to construct the
transportation facility project.
c. The developer shall secure at least three qualified bids for work to be done and shall
award the construction contract to the lowest qualified bidder. The developer may combine the
construction of the transportation facility project with other development-related work and
award one construction contract for the combined work based on a clearly identified process
for determining the low bidder, all as approved by the City Manager's designee. Should the
construction contract be awarded to a qualified bidder who did not submit the lowest bid for
the transportation facility project portion of the contract, the developer will only receive
transportation development impact fee credit based on the lowest bid for the transportation
facility portion of the contract. Any claims for additional payment for extra work or charges
shall be justified, shall be documented to the satisfaction of the City Manager's designee and
3-26
ORD # 2
shall only be reimbursed at the prices for similar work included in the lowest bid for the
transportation facility portion of the contract.
d. Upon complying with the conditions set forth in subsections (B)(l) and (B)(2)(a) of
this section as determined by the City and upon approval of the estimated cost by the City
Manager's designee, the developer shall be entitled to immediate credit for 50 percent of the
estimated cost of the construction attributable to the transportation facility project. Once the
developer has received valid bids for the project which comply with subsection (B)(2)(c) of
this section, entered into binding contracts for the construction of the project, and met the
conditions set forth in subsections (B)(l) and (B)(2)(a) of this section as determined by the
City, all of which have been approved by the City Manager's designee, the amount of the
immediate credit shall be increased to 75 percent of the bid amount attributable to the
transportation facility project. The immediate credits shall be applied to the developer's
obligation to pay transportation development impact fees for building permits issued after the
establishment of the credit. The developer shall specifY these building permits to which the
credit is to be applied at the time the developer submits the building permit applications.
e. If the developer uses all of the immediate credit before final completion of the
transportation facility project, then the developer may defer payment of development impact
fees for other building permits by providing to the City liquid security such as cash or an
irrevocable letter of credit, but not bonds or set-aside letters, in an amount equal to the
remaining amount of the estimated cost of the transportation facility project.
f. When all work has been completed to the satisfaction of the City, the developer shall
submit verification of payments made for the construction of the transportation facility project
to the City. The City Manager's designee shall make the final determination on expenditures
which are eligible for credit or cash reimbursement.
g. After final determination of eligible expenditures has been made by the City
Manager's designee and the developer has complied with the conditions set forth in subsection
(B) of this section, the final amount of transportation development impact fee credits shall be
determined by the City Manager's designee. The developer shall receive credit against the
deferred fee obligation in an amount equal to the difference between the final expenditure
determination and the amount of the 75 percent immediate credit used, if any. The City shall
notifY the developer of the final deferred fee obligation, and of the amount of the applicable
credit. If the amount of the applicable credit is less than the deferred fee obligation, then the
developer shall have 30 days to pay the deferred fee. If the deferred fees are not paid within the
30-day period, the City may make a demand against the liquid security and apply the proceeds
to the fee obligation.
h. At the time building permits are issued for the developer's project, the City will
incrementally apply credit which the developer has accrued in lieu of collecting the required
transportation development impact fees. The amount of the credit to be applied to each
building permit shall be based upon the fee schedule in effect at the time of the building permit
issuance. The City Manager's designee shall convert such credit to an EDU basis for
residential development and/or a gross acre basis for commercial or industrial development for
purposes of determining the amount of credit to be applied to each building permit.
i. If the total eligible construction cost for the transportation facility project is more than
the total transportation development impact fees which will be required for the developer's
project, then the amount in excess of development impact fees will be paid in cash when funds
are available as determined by the City Manager; a reimbursement agreement will be executed;
or the developer may waive reimbursement and use the excess as credit against future
transportation development impact fee obligations. The City may, in its discretion, enter into
an agreement with the developer to convert excess credit into EDU and/or gross acre credits for
3-27
ORD # 2
use against future development impact fee obligations at the fee rate in effect on the date of the
agreement.
j. The requirements of this subsection (B) of this section may, in the City's discretion,
be modified through an agreement between the developer and the City and approved by City
Council.
C. Whenever a transportation development impact fee credit is generated by
constructing a transportation facility using assessment district or community
facilities district fmancing, the credit shall only be applied to the
transportation development impact fee obligations within that district.
3.55.160 Procedure for fee waiver or reduction.
A. Any developer who, because of the nature or type of uses proposed for a
development project, contends that application of the fee imposed by this
chapter is unconstitutional, or unrelated to mitigation of the traffic needs or
burdens of the development, may apply to the City Council for a waiver,
reduction, or deferral of the fee. A development which is designed and
intended as a temporary use (10 years or less) and which is conducted in
facilities which are, by their nature, short-term interim facilities such as a
portable or modular building (including mobile homes, trailers, etc.) may
qualify for a waiver, reduction, or deferral. In addition, a deferral may be
granted on the basis of demonstrated economic hardship on the condition that:
(1) the use offers a significant public benefit; (2) the amount deferred bears
interest at a fair market rate so as to constitute an approximate value
equivalent to a cash payment; and (3) the amount deferred is adequately
secured by agreement with the applicant. Unless the requirement for timely
filing is waived by the City, the application shall be made in writing and filed
with the City Clerk not later than 10 days after notice of the public hearing on
the development permit application or the proj ect is given, or if no
development permit is required, at the time of the filing of the building permit
application. The application shall state in detail the factual basis for the claim
of waiver or reduction.
B. The City Council shall consider the application at a public hearing on same,
notice of which need not be published other than by description on the agenda
of the meeting at which the public hearing is held. Said public hearing should
be held within 60 days after its filing. The decision of the City Council shall
be final. If a deferral, reduction or waiver is granted, it should be granted
pursuant to an agreement with the applicant, and the property owner, if
different from the applicant, providing that any change in use within the
project shall subject the development to payment of the full fee. The procedure
provided by this section is additional to any other procedure authorized by law
for protesting or challenging the fee imposed by this chapter.
3.55.170 Exemptions.
Development projects by public agencies shall be exempt from the provisions of this fee. Exempt
development uses with the following characteristics or activities as a principal use of land, generally
described as "community purpose facility" as defmed above in CYMC Section 3.55.020.
3-28
ORD # 2
3.55.180 Assessment districts.
If any assessment or special taxing district is established for any or all of the facilities listed in Section
3.55.030 the owner or developer of a project may apply to the City Council for a credit against the fee
in an amount equal to the development's attributable portion of the cost of the authorized
improvements as determined by the City Manager's designee, plus incidental costs normally occurring
with a construction project, but excluding costs associated with assessment district proceedings or
financing.
3.55.190 Economic incentive credit.
The City Council may authorize the City to participate in the financing of transportation facility
projects or portions of transportation facility projects as defined in Section 3.55.030 at the time of the
appropriation of funds by City Council for the construction of an eligible transportation facility, the
City shall be eligible to receive a credit known hereafter as an economic incentive credit. Such
economic incentive credit may be applied to development impact fee obligations for those projects
which the City Council determines, in its sole discretion, to be beneficial to the City. The use of the
economic incentive credit may be subject to conditions which shall be set forth in a written agreement
between the developer of the project and the City and approved by City Council.
The City may receive economic incentive credit only for those eligible projects identified in Section
3.55.030 for amounts of funding not identified in the financial and engineering study "Western
Transportation Development Impact Fee" report dated February 2008.
3.55.195 Fund loans.
A.
B.
Loans by the City. The City may loan funds to the fund to pay for
facilities should the fund have insufficient funds to cover the cost of
said facility. Said loans, if granted, shall be approved upon the adoption
of the annual City budget or upon resolution of the City Council and
shall carry interest rates as set by the City Council for each fiscal year.
A schedule for repayment of said loans shall be established at the time
they are made and approved by the Council, with a maximum term not
to exceed the life of the fund.
Developer Loans. A developer may loan funds to the City as outlined
in CVMC 3.55.150. The City may repay said developer loans with
interest, under the terms listed in subsection (A) of this section.
3.55.200 Effective date.
This chapter shall become effective
SECTION 3: Effective Date
This Ordinance shall become effective 60 days after its second reading and adoption.
Presented by
Approved as to form by
CA-~
Ann Moore
City Attorney
Jack Griffin
Engineering and General Services Director
3-29
5e.COl'm READING AND ADOP1\ON
ORDINANCE OF THE CITY OF CHULA VISTA ACCEPTING
THE WESTERN TRANSPORTATION DEVELOPMENT IMPACT
FEE REPORT (TF-358) PREPARED BY STAFF AND
ESTABLISHING A WESTERN TRANSPORTATION
DEVELOPMENT IMPACT FEE PROGRAM TO MITIGATE
TRANSPORTATION IMPACTS WITHIN WESTERN CHULA
VISTA INCLUDING PROJECTS - 1-805-2, RAS-17 AND BP-4
ORDINANCE NO.
WHEREAS, the adoption of the City's General plan indicated that future growth was going to
occur in the City west ofI-805; and
WHEREAS, the traffic studies for the City's General Plan and the Urban Core Specific Plan
show the City's transportation network will be impacted by new development within the western
portion of the City unless new transportation facilities are added to accommodate the new
development; and
WHEREAS, since January 1987, the City has had a program in place for the collection of a
transportation development impact fee for the financing of street improvements in the area east of
Interstate 805.
WHEREAS, the Engineer's Report establishes that the transportation facilities necessitated by
development within the western portion of the City comprise an integrated network; and
WHEREAS, the Western Transportation Development Impact Fee is solely based upon that
portion of the project costs which are attributable to new development; and
WHEREAS, on March 4, 2008, the City Council of the City of Chula Vista held a duly noticed
public hearing at which oral or written presentations regarding the Western Transportation
Development Impact Fee could be made; and
WHEREAS, pursuant to the Municipal Code and California Government Code Sections 66000,
et. seq., the City Council has accepted a report entitled "Engineer's Report for the Western
Transportation Development Impact Fee" ("Engineer's Report") dated February, 2008 that analyzed
the Western Transportation Development Impact Fee necessary to fund transportation facilities needed
to serve future development within the western portion of the City; and
WHEREAS, the City's Environmental Review Coordinator has reviewed the proposed activity
for compliance with the California Environmental Quality Act (CEQA) and has determined that the
activity is not a "Project" as defined under Section 15378 of the State CEQA Guidelines; therefore,
pursuant to Section l5060(c)(3) of the State CEQA Guidelines the activity is not subject to CEQA; and
WHEREAS, the City Council of the City of Chula Vista is placing this ordinance on its first
reading which will establish a development impact fee per equivalent dwelling unit (EDU) to finance
transportation facilities within the western portion of the City of Chula Vista; and
ORD # 3
3-30
WHEREAS, pursuant to Government Code Section 66017(a), the fees proposed by this
ordinance will not become effective until sixty (60) days after its first reading; and
NOW, THEREFORE BE IT ORDAINED, that the City Council of the City of Chula Vista
does hereby adopt Chapter 3.55 of the Chula Vista Municipal Code relating to transportation
development impact fees to pay for various transportation facilities located on the westside of the City
as follows:
SECTION 1: Findings
The City Council finds, after consideration of the evidence presented to it including the "Engineer's
Report for the Western Transportation Development Impact Fee" dated February, 2008, that the
creation of a transportation development impact fee is necessary in order to assure that there are
sufficient funds available to [mance the transportation facilities necessary to serve development west
ofI -805; and
The City Council finds that new development within the western portion of the City of Chula Vista
should be required to mitigate the burden created by development through the construction of
transportation facilities; and
The City Council finds, based on the evidence presented at the public hearing, and consistent with the
City's General Plan, and the various reports and information received by the City Council in the
ordinary course of its business, that the imposition of traffic impact fees on all development within the
western portion of the City of Chula Vista for which building permits have not been issued is
necessary in order to protect the public health, safety and welfare by providing for the public
transportation facilities to assure effective implementation of the City's General Plan; and
The City Council [mds that the amount of the proposed fees levied by this ordinance does not exceed
the estimated cost of providing the transportation facilities.
SECTION 2: Chapter 3.55 of the Chula Vista Municipal Code is hereby adopted and shall read as
follows:
3.55.010 General intent.
The City's General Plan Land Use and Transportation Element requires that adequate public facilities
be available to accommodate increased population created by new development within the City of
ChuIa Vista.
The City Council has determined that new development will create adverse impacts on the City's
existing public transportation facilities which must be mitigated by the financing and construction of
certain public transportation facilities which are the subject of this chapter. New development
contributes to the cumulative burden on these public transportation facilities in direct relationship to
the amount of vehicular traffic and population generated by the development or the gross acreage of
the commercial or industrial land in the development.
The City Council has determined that a reasonable means of financing the public transportation
facilities is to charge a fee on all developments within the western portion of the City. imposition of
the Western Transportation Development Impact Fee on all new development for which building
3-31
ORD # 3
permits have not yet been issued is necessary in order to protect the public health, safety and welfare,
thereby ensuring effective implementation of the City's General Plan.
3.55.020 Definitions.
For the purposes of this chapter, the following words or phrases shall be construed as defined herein,
unless from the context it appears that a different meaning is intended.
A. "Building permit" means a permit required by and issued pursuant to the
Uniform Building Code.
B. "City Engineer" means the City Engineer, the City Engineer's designee or the
City Manager's designee.
C. "Density" means dwelling units per gross acre identified for each planning
area shown on the approved tentative map or approved tentative parcel map or
as determined by the City Manager's designee.
D. "Developer" means the owner or developer of a development.
E. "Development permit" means any discretionary permit, entitlement or
approval for a development project issued under any zoning or subdivision
ordinance of the City.
F. "Development project" or "development" means any activity described as the
following:
I. Any new residential dwelling unit developed on vacant land;
2. Any new commercial/office or industrial development constructed on vacant land;
3. Any expansions to established developments or new developments on nonvacant land in
those land use categories listed in subsections (F)(1) and (2) of this section, if the result
is a net increase in dwelling units. The fee shall be based solely on this net dwelling unit
increase;
4. Any new or expanding special land use project;
5. Any special purpose project developed on vacant land or nonvacant land, or expanded
within a pre-existing site, if the result is a net increase in dwelling units. The fee shall
be based solely on this net dwelling unit increase;
6. Any other development project not listed above but described in Section 65927 and
65928 of the State Government Code.
"Community purpose facility" means a facility which serves one of the following purposes:
I. Social service activities, including such services as Boy Scouts and Girl Scouts, Boys
and Girls Club, Alcoholics Anonymous and services for the homeless;
2. Public schools;
3. Private schools;
4. Day care;
5. Senior care and recreation;
6. Worship, spiritual growth and development.
H. "Western portion of the City of Chula Vista" generally means that area of the
City located between the City boundary on the west, Interstate 805 on the east,
the City boundary on the north and the City's boundary on the south, as shown
on the map entitled "Figure I" of the Engineering study.
1. "Engineering study" and "Engineer's Report" means the Engineer's Report for
the Western Transportation Development Impact Fee dated February, 2008
and prepared by City staff on file in the Office of the City Clerk.
J. "Regional Arterial System" (RAS) RAS roadways are generally described as
those facilities that act as a critical link in providing direct connections
between communities ensuring system continuity and congestion relief in high
3-32
ORD # 3
vohune corridors. They are roadways that are listed in the most recent edition
of SANDAG's Regional Transportation Plan
K. "Special land use" means any nonresidential, non-commercial/office or
nonindustrial development project (e.g., Olympic Training Center, hospitals,
utilities), or non-special purpose proj ecl.
1. "Special purpose project" means any for-profit community purpose facility
(e.g., day care).
3.55.030 Public transportation facilities to be fmanced bv the fee.
A. The public transportation facilities ("facilities") which are the subject matter of the fee, are
listed below as detailed in subsection C of this section and in the Engineer's Report on file in
the Office of the City Clerk.
B. The City Council may modify or amend the list of projects in order to maintain compliance
with the circulation element of the City's General Plan.
C. The facilities are as follows:
I. (1-5-1) 1-5/E Street NB off-ramp restriping add lane
2. (1-5-2) I-5/E Street/Bay Blvd SB off-ramp restriping add lane
3. (1-5-3) I-5/NB ramp widening at E, H, J, Ind., Palomar & Main Sts (21 %)
4. (1-5-4) E Street bridge widening over 1-5 (250' X 20' X $350/sf)
5. (1-5-5) F Street bridge widening over 1-5 (250' X 20' X $350/sf
6. (1-5-6) I-5IR Street NB off-ramp restriping add lane
7. (1-5-7) 1-5/H Street SB off-ramp restriping add lane
8. (1-5-8) H Street bridge widening over 1-5 (200'X40'X$350/sf)
9. (1-5-9) 1-5/J Street NB off-ramp restriping add lane
10. (1-5-10) 1-5/J Street undercrossing widening add EB-NB (175x20X$350)
II. (1-5-11) L Street bridge widening over 1-5 (S/W for peds 300' X 12')(21 %)
12. (1-5-12) 1-5/Bay Blvd (south ofL Sl.) SB on/off ramps traffic signal
13. (1-5-13) I-5/1ndustrial Blvd NB on/off ramps traffic signal
14. (1-5-14) 1-5/Pa10mar Street bridge widening (2751fX 50lfX $350/sf)
15. (1-5-15) 1-5/Main Street NB on/off ramps traffic signal (CV share $120k)
16. (1-5-16) 1-5/Main Street bridge widening (2751fX 20lfX $350/sf)
17. (I-5-17) 1-5 HOV & Managed Lanesfrom SR905 toSR54 (63.4% in CJ)
18. STM 361
3-33
ORD # 3
a. 1-5 Multi-Modal Corridor Study (80% Fed. DEMO funds)
b. (SANDAG cost estimate is $4.3M & CV share TBD.)
Interstate-80S Improvements
19. (I-805-1) NB on-ramp widening & metering at Bonita, East H St (EB-NB),
Telegraph Canyon Road (Project 1-805-1 is 100% funded in 2006 RTIP with State
funds.)
20. (I-805-2) Main St. undercrossing widening for EB-NB left turn lane
State Route 54 Improvements
21. (SR-54-l) SR-54 WB off-ramp restripe at Broadway
22. (SR-54-2) SR-54 EB off-ramp at N. Fourth Avenue - add ramp lane
Regional Arterial System (RAS) Projects
23. (RAS-l) Bonita Road from First Avenue to I-80S
24. (RAS-2) Broadway from C Street to south of Main Street (City Limits)
25. (RAS-3) E Street improvements - First Ave to Bonita RoadIE. Flower St
26. (RAS-4) E Street improvements, 1-5 to 300' east ofNB ramp
27. (RAS-5) E Street LRT grade separation (underpass LRT option)
28. (RAS-6) H Street LRT grade separation (underpass LRT option)
29. (RAS-7) H Street at Broadway EB queue jumper lane & traffic signal modifications
30. (RAS-8) H Street l4'-wide median & street light improvements (same as RAS-9)
31. (RAS-9) H Street widening to 6-lanes from Interstate-5 to Broadway
32. (RAS-lO) H Street improvements from Second Ave to Hilltop Drive
33. (RAS-ll) East H St. north side improvements from Hilltop Dr. to I-80S
34. (RAS-12) L Street/Bay Blvd traffic signal & add turn lanes
35. (RAS-13) L Street improvements south side west ofIndustrial Blvd
36. (RAS-14) Telegraph Canyon Road at I-80S south side sidewalk
37. (RAS-15) Orange A venue from Palomar Street to Hilltop Drive
38. (RAS-16) Palomar Street improvements from 1-5 to I-80S
3-34
ORD # 3
39. (RAS-17) Main St improvements from 1-5 to I-80S (See GPU Table 5.10-6)
40. (RAS-18) H St/4th Ave add WB-NB & EB-SB right turn lanes
41. (RAS-19) H StJ4th Ave add WB-NB & EB-SB right turn lanes
General Plan Impacts and Mitigations
42. (GP-l) E. St. from Marina to 1-5
43. (GP-2) Marina Parkway from E-J St.
44. (GP-3) L St. from Hilltop to 1-805
45. (GP-4) Main St. from 1-5 to Broadway
46. (GP-5) Main St. from Broadway to Hilltop Dr.
47. (GP-6) Third Avenue from L St. to Palomar St.
48. (GP-7) H St. from Marina to 1-5
49. (GP-8) J St. from Marina to 1-5
Bicycle & Pedestrian Facilities Improvements (21 % WTD1F share per GPU)
50. (BP-l) Bayshore Bikeway (bike path) between E Street & F Streets
51. (BP-3) Industrial Blvd improvements & bike lanes from L St. to Main Street
52. (BP-4) Main Street bike lanes from Industrial Blvd & I-80S
53. (BP-5) Orange A ve. bike lanes from Palomar St. to Hilltop Drive
54. (BP-6) Develop bicycle paths & pedestrian access to Third Avenue
Midbayfront Local Coastal Program Roadways
55. (Mid-I) E Street restripe to add EB-NB dual left turn to NB 1-5 on-ramp.
56. (Mid-2) I-5/E St. SB off-ramp widening to add fourth lane
57. (Mid-3) Bay Blvd 15' widening along Westerly Curb Line at E St. approach for
ISB/3NB
58. (Mid-4) I-5/E St. NB widen off-ramp to add 3rd lane for Right Turn only lane
59. (Mid-5) E St revisions to median and North Curb Line east of 1-5 to add 3rd WB
lane.
60. (Mid-6) Marina Parkway 4-lane from ESt. to J St.
3-35
ORD # 3
61. (Mid-7) E St./Woodlawn Ave EB-SB RT lane plus a Traffic Signal)
62. (Mid-8) E St. at Broadway add WB & EB LT lane + WB & EB RT only lane. plus
a Traffic Signal & No RlW costs.
63. (Mid-9) F StlBroadway restriping to provide EB-SB & WB-NB RT lane
64. (Mid-IO) H Street widening at Broadway for WB Thru & EB Thru & RT only.
Other Roadways
65. (OR-I) N. 4th AvenueIBrisbane Ave traffic signal modifications
66. (OR-2) Second Avenue/D Street all-way stop installation
3.55.040 Territorv to which fee aoolicable.
The area of the City of Chula Vista to which the fee herein established shall be applicable is the
territorial limits of the western portion of the City ofChula Vista ("territory") as defined above, as they
may from time to time be amended.
3.55.050 Establishment of a fee.
A development impact fee ("fee") is hereby established to pay for the facilities within the territory. The
fee shall be paid upon the issuance of building permits for each development project within the western
portion of the City of Chula Vista. The WTDIF fee in the amounts set forth in CVMC 3.55.030 is
hereby established to pay for transportation improvements and facilities within the western portion of
the City of Chula Vista.
3.55.060 Determination offees by land use cateeorv.
A. For purposes of this fee, single-family dwelling units shall include single-
family detached homes and detached condominiums; multifamily dwelling
units shall include attached condominiums, townhouses, duplexes, triplexes,
and apartments. The density of the development type shall be based on the
number of dwelling units per gross acre for single-family or multifamily
residential and shall be based upon the densities identified on the approved
tentative map or approved tentative parcel map entitling the development
unless otherwise approved in writing by the City Manager's designee.
B. Commercial/office and industrial development projects shall be charged on a
per acre or per square footage basis. For purposes of this fee, gross acreage
and lor square footage as it applies to the commercial, industrial and office
development types, means all land area that the City Manager's designee
deems necessary within the boundary of the parcel or parcels of the
development project for which building permits are being requested.
C. The fee multiplied by the total number of dwelling units, square footage or
acres within a given development project represents a developer's fair share
("fair share") for that development proj ect.
3.55.070 Time to determine amount due.
The fee for each development shall be calculated at the time of building permit issuance and shall be
the amount as indicated at that time, and not when the tentative map or final map were granted or
applied for, or when the building permit plan check was conducted, or when application was made for
3-36
ORD # 3
the building permit. No building permit shall be issued unless the development impact fee is paid. The
fees shall be deposited into a WTDIF fund, which is hereby created, and shall be expended only for the
purposes set forth in this chapter. The Director of Finance is authorized to establish various accounts
within the fund for the various improvements and facilities identified in this chapter and to periodically
make expenditures from the fund for the purposes set forth herein in accordance with the facilities
phasing plan or capital improvement plan adopted by the City Council. The City Council finds that
collection of the fees established by this chapter at the time of the building permit is necessary to
ensure that funds will be available for the construction of facilities concurrent with the need for those
facilities and to ensure certainty in the capital facilities budgeting for the western part of the City.
3.55.080 Purpose and use of fee.
The fees collected shall be used by the City for the following purposes as determined by the City
Council:
1. To pay for the construction offacilities by the City, or to reimburse
the City for facilities installed by the City with funds from other
sources.
2. To reimburse developers who have been required by
CYMC3.55.l50 A to install improvements that are major streets
and are listed in CYMC 3.55.030.
3. To reimburse developers who have been permitted to install
improvements pursuant to CYMC 3.55.150 B.
3.55.090 Amount of fee.
A. The fee shall be the amounts as set forth below in Table 1. The fee shall be adjusted on July I
of each year beginning in 2009. The annual inflation adjustment will be 2 % or based on
Caltrans highway construction cost index, whichever is higher. The program collects 2% of the
total improvement cost estimate for staff administration and an additional 1 % for SANDAG
Administrative costs.
B. Adjustments of the fee based upon the annual inflation adjustment or the Caltrans Highway
Construction Cost Index shall be automatic and shall not require further action by the City
Council. The WTDIF may also be reviewed and amended by the City Council as necessary
based on changes in the type, size, location or cost of the facilities to be financed by the fee;
changes in land use designation in the City's General Plan; and upon other sound engineering,
financing and planning information.
3-37
ORD # 3
Proposed TDIF Fee per EDU: r $3,243.00
~' "_'" -,',c_, ..'.:.,.....':,..._"."..,._"~.,<.., < ,,:~,_, .:....;.., :'.- I I
Land UseClassific'ation , , .. EDUs ' TDIF Rate
RESIDENTIAL
!Residential (LOW) 0-6 dwellin" units per acre 1 per EDU $3,243 I DU
Residential (MED) 6,1 To 20 dwellincr units per acre ,8 per EDU $2,594 I D U
Residential (HIGH) Over 20 dwellino units per acre ,6perEDU $1,9461 DU
Mobile Home ,Sper EDU $1,622 I DU
COMMERCIAL
Contain 1-5 major dept. stores & usually have
",ore than 50 tenants. Typically larger than 40
Re"ional Commercial acres. 20EDU/Acre $64,860 I Acre
Smaller in that size than regional. Contain junior
Dept. Store or variety Store,( i.e. Target Center
with other commercial stores)as a major tenant
and have 15 to 50 other tenants. Smaller in size,
Community Commercial 8-20 acres. 28EDU/Acre $90,804 I Acre
Neirnborhood Commercial cess than 10 acres. Includes supermarket and
drn~ store. Mav include office spaces. 48 EDU/Acre $155,664/Acre
Neighborhood Commercial Same as above but in Souare Foota"e 4.8 EDU/KSF $15,664/KSF
Commercial activities found along major streets,
not in a planned center with limited on-site
Street Front Commercial arkin~. 16 EDU/Acre $51,888 I Acre
Retail Commercial Specialty Retail/Strip Commercial 16 EDU/Acre $51,888/KSF
Usually located near transportation facilities.
Structures are usually large and cover majority of
the parcel. Examples are clothing and supply,
Wholesale Trade also includes swan meet areas. 24EDU/Acre $77 ,832 I Acre
OFFICE
Hi~h Rise Office More than 100,000 S.F. and 6+ Stories 60 EDUI Acre $194,580 I Acre
Low Rise Office < 6 Stories 30EDU/Acre $97,290 I Acre
ILOW Rise Office (in thousands < 6 Stories
of square feet) 2EDU/KSF $6,486 I KSF
Medical Office Medical and Dental Facilities 50EDU/Acre $162,1501 Acre
LODGING
ow Rise Hotel/Motel < 4 Stories 20 EDU/ Acre $64,860 I Acre
Low Rise Hotel or Motel < 4 Stories 1 EDU/Room $3,243 I Room
Hi~h Rise Hotel >~4 Stories 30/EDU/Acre $97,290 I Acre
INDUSTRY
Shipbuilding, airframe, and aircraft
manufacturing. Usually located next to
Itransportation facilities and commercial areas.
Heavy Industry Parcels are typically 20-50 Acre. 12EDU/Acre $38,916 I Acre
Usually large buildings located near freeways,
Warehouse IStorage industrial or strin commercial areas. 6EDU/Acre $19,458/Acre
Office/industrial uses clustered into a center. The
primary uses are industrial by may include high
percentages of other uses in service Of retail
Industrial Park activities. 9EDU/Acre $29,187/Acre
All other industrial uses and manufacturing not
Light Industrial included in categories above. 20 EDU/ Acre $64,860 I Acre
Table 1
PROPOSED WTDIF FEE PER LAND
USE CLASSIFICA TION
3-38
ORD # 3
3.55.100 Development proiects exempt from the fee.
A. Development projects by public agencies shall be exempt from the provisions of the fee if those
projects are designed to provide the public service for which the agency is charged ("public
purpose").
B. Community purpose facilities which are not operated for profit ("nonprofit community purpose
facilities") are also exempt inasmuch as these institutions provide benefit to the community as a
whole, including all land use categories which are the subject matter of the fee. The City
Council hereby determines that it is appropriate to spread any impact such nonprofit
community purpose facilities might have to the other land use categories subject to the fee. In
the event that a court determines that the exemption herein extended to community purpose
facilities shall for any reason be invalid, the City Council hereby allocates the nonprofit
community purpose facilities' fair share to the City of Chula Vista and not to any of the land
use categories which are the subject matter of the development impact land use categories.
C. Development projects which are additions or expansions to existing dwelling units or
businesses, except special land use projects, shall be exempt if the addition or expansion does
not result in a net increase in dwelling units or commercial/industrial acreage.
3.55.110 Authority for accountinl! and exoenditures.
A. The fees collected shall be deposited into a Western Transportation Development Impact Fee
financing fund ("WTDIF fee fund," or "fund"), which is hereby created and shall be expended
only for the purposes set forth in this chapter.
B. The director of finance is authorized to establish a single fund for the various facilities
identified in this chapter and to periodically make expenditures from the fund for the purposes
set forth herein.
3.55.120 Findinl!s.
The City Council finds that:
A. Collection of the fee established by this chapter at the time of the building permit issuance is
necessary to provide funds for the transportation facilities identified in CVMC 3.55.030 and to
ensure certainty in the capital facilities budgeting for growth impacted public transportation
facilities; and
B. The purpose of the Fees hereby enacted prevents new development from reducing the quality
and availability of public transportation infrastructure facilities provided to residents of the City
by requiring new development to contribute to the cost of additional capital transportation
infrastructure improvements needed to meet the growth generated by such development; and
C. The revenue from the fees hereby enacted will be used to construct public facilities and
infrastructure and pay for other capital expenditures needed to serve new development as
identified in the Engineer's Report dated February, 2008; and
D. Based on analysis presented in the Engineer's Report there is a reasonable relationship between
I. The use of the fees and the types of development projects on which they are imposed and
2. The need for facilities and the types of development projects on which the fees are imposed.
3. The amount of the fee and the cost of the public facility or portion of the public facility
attributable to the development on which the fee is imposed.
3-39
ORD # 3
3.55.130 Fee additional to other fees and charl!es.
This fee is in addition to the requirements imposed by other City laws, policies or regulations relating
to the construction or the fmancing of the construction of public improvements within subdivisions or
developments
3.55.150 Developer construction of transportation facilities.
A. Whenever a developer of a development project would be required by application of City law
or policy, as a condition of approval of a development permit to construct or [mance the
construction of a portion of a transportation facility identified in Section 3.55.030 the City
Council may impose an additional requirement that the developer install the improvements
with supplemental size, length or capacity in order to ensure efficient and timely construction
of the transportation facilities network. If such a requirement is imposed, the City Council
shall, in its discretion, enter into a reimbursement agreement with the developer, or give a
credit against the fee otherwise levied by this chapter on the development project, or some
combination thereof.
B.Whenever a developer requests reimbursement, or a credit against fees, for work to be done or
paid for by the developer under subsection (A) of this section, the request shall be submitted in
writing to the City Manager's designee.
1. The request shall contain a description of the project with a detailed cost estimate
which itemizes those costs of the construction attributable to the transportation facility
project and excludes any work attributable to a specific subdivision project. The
estimate is preliminary and the amount of reimbursement or credit against fees is
subject to final determination by the City Manager's designee. Additional information
shall be provided to the City by the developer upon request of the City.
2. Such reimbursement or credit against fees shall be subject to the following conditions:
a. Requirements of Developer.
i. Preparation of plans and specifications for approval by the City;
ii. Secure and dedicate any right-of-way required for the transportation facility
project;
iii. Secure all required permits and environmental clearances necessary for the
transportation facility project;
iv. Provision of performance bonds (where the developer intends to utilize provisions
for immediate credit, the performance bond shall be for 100 percent of the value of the
transportation facility project);
v. Payment of all City fees and costs.
b. The City will not be responsible for any of the costs of constructing the
transportation facility project. The developer shall advance all necessary funds to construct the
transportation facility project.
c. The developer shall secure at least three qualified bids for work to be done and shall
award the construction contract to the lowest qualified bidder. The developer may combine the
construction of the transportation facility project with other development-related work and
award one construction contract for the combined work based on a clearly identified process
for determining the low bidder, all as approved by the City Manager's designee. Should the
construction contract be awarded to a qualified bidder who did not submit the lowest bid for
the transportation facility project portion of the contract, the developer will only receive
transportation development impact fee credit based on the lowest bid for the transportation
facility portion of the contract. Any claims for additional payment for extra work or charges
shall be justified, shall be documented to the satisfaction of the City Manager's designee and
3-40
ORD # 3
shall only be reimbursed at the prices for similar work included in the lowest bid for the
transportation facility portion of the contract.
d. Upon complying with the conditions set forth in subsections (B)(1) and (B)(2)( a) of
this section as determined by the City and upon approval of the estimated cost by the City
Manager's designee, the developer shall be entitled to immediate credit for 50 percent of the
estimated cost of the construction attributable to the transportation facility project. Once the
developer has received valid bids for the project which comply with subsection (B)(2)( c) of
this section, entered into binding contracts for the construction of the project, and met the
conditions set forth in subsections (B)(l) and (B)(2)(a) of this section as determined by the
City, all of which have been approved by the City Manager's designee, the amount of the
immediate credit shall be increased to 75 percent of the bid amount attributable to the
transportation facility project. The immediate credits shall be applied to the developer's
obligation to pay transportation development impact fees for building permits issued after the
establishment of the credit. The developer shall specify these building permits to which the
credit is to be applied at the time the developer submits the building permit applications.
e. If the developer uses all of the immediate credit before final completion of the
transportation facility project, then the developer may defer payment of development impact
fees for other building permits by providing to the City liquid security such as cash or an
irrevocable letter of credit, but not bonds or set-aside letters, in an amount equal to the
remaining amount of the estimated cost of the transportation facility project.
f. When all work has been completed to the satisfaction of the City, the developer shall
submit verification of payments made for the construction of the transportation facility project
to the City. The City Manager's designee shall make the final determination on expenditures
which are eligible for credit or cash reimbursement.
g. After final determination of eligible expenditures has been made by the City
Manager's designee and the developer has complied with the conditions set forth in subsection
(B) of this section, the final amount of transportation development impact fee credits shall be
determined by the City Manager's designee. The developer shall receive credit against the
deferred fee obligation in an amount equal to the difference between the final expenditure
determination and the amount of the 75 percent immediate credit used, if any. The City shall
notify the developer of the final deferred fee obligation, and of the amount of the applicable
credit. If the amount of the applicable credit is less than the deferred fee obligation, then the
developer shall have 30 days to pay the deferred fee. If the deferred fees are not paid within the
3D-day period, the City may make a demand against the liquid security and apply the proceeds
to the fee obligation.
h. At the time building permits are issued for the developer's project, the City will
incrementally apply credit which the developer has accrued in lieu of collecting the required
transportation development impact fees. The amount of the credit to be applied to each
building permit shall be based upon the fee schedule in effect at the time of the building permit
issuance. The City Manager's designee shall convert such credit to an EDU basis for
residential development and/or a gross acre basis for commercial or industrial development for
purposes of determining the amount of credit to be applied to each building permit.
i. If the total eligible construction cost for the transportation facility project is more than
the total transportation development impact fees which will be required for the developer's
project, then the amount in excess of development impact fees will be paid in cash when funds
are available as determined by the City Manager; a reimbursement agreement will be executed;
or the developer may waive reimbursement and use the excess as credit against future
transportation development impact fee obligations. The City may, in its discretion, enter into
an agreement with the developer to convert excess credit into EDU and/or gross acre credits for
3-41
ORD # 3
use against future development impact fee obligations at the fee rate in effect on the date of the
agreement.
j. The requirements of this subsection (B) of this section may, in the City's discretion,
be modified through an agreement between the developer and the City and approved by City
Council.
C. Whenever a transportation development impact fee credit is generated by
constructing a transportation facility using assessment district or community
facilities district fmancing, the credit shall only be applied to the
transportation development impact fee obligations within that district.
3.55.160 Procedure for fee waiver or reduction.
A. Any developer who, because of the nature or type of uses proposed for a
development project, contends that application of the fee imposed by this
chapter is unconstitutional, or unrelated to mitigation of the traffic needs or
burdens of the development, may apply to the City Council for a waiver,
reduction, or deferral of the fee. A development which is designed and
intended as a temporary use (10 years or less) and which is conducted in
facilities which are, by their nature, short -term interim facilities such as a
portable or modular building (including mobile homes, trailers, etc.) may
qualify for a waiver, reduction, or deferral. In addition, a deferral may be
granted on the basis of demonstrated economic hardship on the condition that:
(1) the use offers a significant public benefit; (2) the amount deferred bears
interest at a fair market rate so as to constitute an approximate value
equivalent to a cash payment; and (3) the amount deferred is adequately
secured by agreement with the applicant. Unless the requirement for timely
filing is waived by the City, the application shall be made in writing and filed
with the City Clerk not later than 10 days after notice of the public hearing on
the development permit application or the project is given, or if no
development permit is required, at the time of the filing of the building permit
application. The application shall state in detail the factual basis for the claim
of waiver or reduction.
B. The City Council shall consider the application at a public hearing on same,
notice of which need not be published other than by description on the agenda
of the meeting at which the public hearing is held. Said public hearing should
be held within 60 days after its filing. The decision of the City Council shall
be final. If a deferral, reduction or waiver is granted, it should be granted
pursuant to an agreement with the applicant, and the property owner, if
different from the applicant, providing that any change in use within the
project shall subject the development to payment of the full fee. The procedure
provided by this section is additional to any other procedure authorized by law
for protesting or challenging the fee imposed by this chapter.
3.55.170 Exemvtions.
Development projects by public agencies shall be exempt from the provisions of this fee. Exempt
development uses with the following characteristics or activities as a principal use of land, generally
described as "community purpose facility" as defmed above in CYMC Section 3.55.020.
3-42
ORD#3
3.55.180 Assessment districts.
If any assessment or special taxing district is established for any or all of the facilities listed in Section
3.55.030 the owner or developer of a project may apply to the City Council for a credit against the fee
in an amount equal to the development's attributable portion of the cost of the authorized
improvements as determined by the City Manager's designee, plus incidental costs normally occurring
with a construction proj ect, but excluding costs associated with assessment district proceedings or
fmancing.
3.55.190 Economic incentive credit.
The City Council may authorize the City to participate in the financing of transportation facility
projects or portions of transportation facility projects as defined in Section 3.55.030 at the time of the
appropriation of funds by City Council for the construction of an eligible transportation facility, the
City shall be eligible to receive a credit known hereafter as an economic incentive credit. Such
economic incentive credit may be applied to development impact fee obligations for those projects
which the City Council determines, in its sole discretion, to be beneficial to the City. The use of the
economic incentive credit may be subject to conditions which shall be set forth in a written agreement
between the developer of the project and the City and approved by City Council.
The City may receive economic incentive credit only for those eligible projects identified in Section
3.55.030 for amounts of funding not identified in the financial and engineering study "Western
Transportation Development Impact Fee" report dated February 2008.
3.55.195 Fund loans.
A.
B.
Loans by the City. The City may loan funds to the fund to pay for
facilities should the fund have insufficient funds to cover the cost of
said facility. Said loans, if granted, shall be approved upon the adoption
of the annual City budget or upon resolution of the City Council and
shall carry interest rates as set by the City Council for each fiscal year.
A schedule for repayment of said loans shall be established at the time
they are made and approved by the Council, with a maximum term not
to exceed the life of the fund.
Developer Loans. A developer may loan funds to the City as outlined
in CVMC 3.55.150. The City may repay said developer loans with
interest, under the terms listed in subsection (A) of this section.
3.55.200 Effective date.
This chapter shall become effective
SECTION 3: Effective Date
This Ordinance shall become effective 60 days after its second reading and adoption.
Presented by
Approved as to form by
Jack Griffin
Engineering and General Services Director
3-43
ORDINANCE NO. SeCOND REf>..oING AND ADOP110N
ORDINANCE OF THE CITY OF CHULA VISTA ACCEPTING
THE WESTERN TRANSPORTATION DEVELOPMENT IMPACT
FEE REPORT (TF-358) PREPARED BY STAFF AND
ESTABLISHING A WESTERN TRANSPORTATION
DEVELOPMENT IMPACT FEE PROGRAM TO MITIGATE
TRANSPORTATION IMPACTS WITHIN WESTERN CHULA
VISTA INCLUDING PROJECT BP-2
WHEREAS, the adoption of the City's General plan indicated that future growth was going to
occur in the City west ofI-805; and
WHEREAS, the traffic studies for the City's General Plan and the Urban Core Specific Plan
show the City's transportation network will be impacted by new development within the western
portion of the City unless new transportation facilities are added to accommodate the new
development; and
WHEREAS, since January 1987, the City has had a program in place for the collection of a
transportation development impact fee for the fmancing of street improvements in the area east of
Interstate 805.
WHEREAS, the Engineer's Report establishes that the transportation facilities necessitated by
development within the western portion of the City comprise an integrated network; and
WHEREAS, the Western Transportation Development Impact Fee is solely based upon that
portion of the project costs which are attributable to new development; and
WHEREAS, on March 4, 2008, the City Council of the City of Chula Vista held a duly noticed
public hearing at which oral or written presentations regarding the Western Transportation
Development Impact Fee could be made; and
WHEREAS, pursuant to the Municipal Code and California Government Code Sections 66000,
et. seq., the City Council has accepted a report entitled "Engineer's Report for the Western
Transportation Development Impact Fee" ("Engineer's Report") dated February, 2008 that analyzed
the Western Transportation Development Impact Fee necessary to fund transportation facilities needed
to serve future development within the western portion of the City; and
WHEREAS, the City's Environmental Review Coordinator has reviewed the proposed activity
for compliance with the California Environmental Quality Act (CEQA) and has determined that the
activity is not a "Project" as defined under Section 15378 of the State CEQA Guidelines; therefore,
pursuant to Section 15060(c)(3) of the State CEQA Guidelines the activity is not subject to CEQA; and
WHEREAS, the City Council of the City of Chula Vista is placing this ordinance on its first
reading which will establish a development impact fee per equivalent dwelling unit (EDU) to finance
transportation facilities within the western portion of the City of Chula Vista; and
ORD#4
3-44
WHEREAS, pursuant to Government Code Section 660l7(a), the fees proposed by this
ordinance will not become effective until sixty (60) days after its first reading; and
NOW, THEREFORE BE IT ORDAINED, that the City Council of the City of Chula Vista
does hereby adopt Chapter 3.55 of the Chula Vista Municipal Code relating to transportation
development impact fees to pay for various transportation facilities located on the westside of the City
as follows:
SECTION 1: Findings
The City Council finds, after consideration of the evidence presented to it including the "Engineer's
Report for the Western Transportation Development Impact Fee" dated February, 2008, that the
creation of a transportation development impact fee is necessary in order to assure that there are
sufficient funds available to finance the transportation facilities necessary to serve development west
ofI-805;and
The City Council finds that new development within the western portion of the City of Chula Vista
should be required to mitigate the burden created by development through the construction of
transportation facilities; and
The City Council finds, based on the evidence presented at the public hearing, and consistent with the
City's General Plan, and the various reports and information received by the City Council in the
ordinary course of its business, that the imposition of traffic impact fees on all development within the
western portion of the City of Chula Vista for which building permits have not been issued is
necessary in order to protect the public health, safety and welfare by providing for the public
transportation facilities to assure effective implementation of the City's General Plan; and
The City Council finds that the amount of the proposed fees levied by this ordinance does not exceed
the estimated cost of providing the transportation facilities.
SECTION 2: Chapter 3.55 of the Chula Vista Municipal Code is hereby adopted and shall read as
follows:
3.55.010 General intent.
The City's General Plan Land Use and Transportation Element requires that adequate public facilities
be available to accommodate increased population created by new development within the City of
Chula Vista.
The City Council has determined that new development will create adverse impacts on the City's
existing public transportation facilities which must be mitigated by the financing and construction of
certain public transportation facilities which are the subject of this chapter. New development
contributes to the cumulative burden on these public transportation facilities in direct relationship to
the amount of vehicular traffic and population generated by the development or the gross acreage of
the commercial or industrial land in the development.
The City Council has determined that a reasonable means of fmancing the public transportation
facilities is to charge a fee on all developments within the western portion of the City. imposition of
the Western Transportation Development Impact Fee on all new development for which building
3-45
ORD#4
permits have not yet been issued is necessary in order to protect the public health, safety and welfare,
thereby ensuring effective implementation of the City's General Plan.
3.55.020 Definitions.
For the purposes of this chapter, the following words or phrases shall be construed as defined herein,
unless from the context it appears that a different meaning is intended.
A. "Building permit" means a permit required by and issued pursuant to the
Uniform Building Code.
B. "City Engineer" means the City Engineer, the City Engineer's designee or the
City Manager's designee.
C. "Density" means dwelling units per gross acre identified for each planning
area shown on the approved tentative map or approved tentative parcel map or
as determined by the City Manager's designee.
D. "Developer" means the owner or developer of a development.
E. "Development permit" means any discretionary permit, entitlement or
approval for a development project issued under any zoning or subdivision
ordinance of the City.
F. "Development project" or "development" means any activity described as the
following:
1. Any new residential dwelling unit developed on vacant land;
2. Any new commercial/office or industrial development constructed on vacant land;
3. Any expansions to established developments or new developments on nonvacant land in
those land use categories listed in subsections (F)(1) and (2) of this section, if the result
is a net increase in dwelling units. The fee shall be based solely on this net dwelling unit
Increase;
4. Any new or expanding special land use project;
5. Any special purpose project developed on vacant land or nonvacant land, or expanded
within a pre-existing site, if the result is a net increase in dwelling units. The fee shall
be based solely on this net dwelling unit increase;
6. Any other development project not listed above but described in Section 65927 and
65928 of the State Government Code.
"Community purpose facility" means a facility which serves one of the following purposes:
I. Social service activities, including such services as Boy Scouts and Girl Scouts, Boys
and Girls Club, Alcoholics Anonymous and services for the homeless;
2. Public schools;
3. Private schools;
4. Day care;
5. Senior care and recreation;
6. Worship, spiritual growth and development.
H. "Western portion of the City ofChula Vista" generally means that area of the
City located between the City boundary on the west, Interstate 805 on the east,
the City boundary on the north and the City's boundary on the south, as shown
on the map entitled "Figure I" of the Engineering study.
I. "Engineering study" and "Engineer's Report" means the Engineer's Report for
the Western Transportation Development Impact Fee dated February, 2008
and prepared by City staff on file in the Office of the City Clerk.
J. "Regional Arterial System" (RAS) RAS roadways are generally described as
those facilities that act as a critical link in providing direct connections
between communities ensuring system continuity and congestion relief in high
3-46
ORD # 4
volume corridors. They are roadways that are listed in the most recent edition
of SANDAG' s Regional Transportation Plan
K. "Special land use" means any nomesidential, non-commercial/office or
nonindustrial development project (e.g., Olympic Training Center, hospitals,
utilities), or non-special purpose project.
L. "Special purpose project" means any for-profit community purpose facility
(e.g., day care).
3.55.030 Public transportation facilities to be financed bv the fee.
A. The public transportation facilities ("facilities") which are the subj ect matter of the fee, are
listed below as detailed in subsection C of this section and in the Engineer's Report on file in
the Office of the City Clerk.
B. The City Council may modify or amend the list of projects in order to maintain compliance
with the circulation element of the City's General Plan.
C. The facilities are as follows:
I. (1-5-1) I-5/E Street NB off-ramp restriping add lane
2. (I-5-2) I-5IE Street/Bay Blvd SB off-ramp restriping add lane
3. (1-5-3) I-5INB ramp widening at E, H, J, Ind., Palomar & Main Sts (21 %)
4. (1-5-4) E Street bridge widening over 1-5 (250' X 20' X $350/sf)
5. (I-5-5) F Street bridge widening over 1-5 (250' X 20' X $350/sf
6. (1-5-6) I-5/H Street NB off-ramp restriping add lane
7. (I-5-7) I-5/H Street SB off-ramp restriping add lane
8. (I-5-8) H Street bridge widening over 1-5 (200'X40'X$350/sf)
9. (1-5-9) I-5IJ Street NB off-ramp restriping add lane
10. (1-5-10) I-5/J Street undercrossing widening add EB-NB (l75x20X$350)
II. (1-5-11) L Street bridge widening over 1-5 (S/W for peds 300' X 12')(21 %)
12. (1-5-12) I-5/Bay Blvd (south ofL St.) SB on/off ramps traffic signal
13. (1-5-13) I-5/Industrial Blvd NB on/off ramps traffic signal
14. (1-5-14) I-5/Palomar Street bridge widening (2751fX 50lfX $350/sf)
15. (I-5-15) I-5/Main Street NB on/off ramps traffic signal (CY share $120k)
16. (1-5-16) I-5/Main Street bridge widening (2751fX 20IfX $350/sf)
17. (/-5-17)/-5 HOV & Managed LanesfromSR905to SR54 (63.4% in Cf?
18. STM 361
~-
3-47
ORD # 4
a. 1-5 Multi-Modal Corridor Study (80% Fed. DEMO funds)
b. (SANDAG cost estimate is $4.3M & CV share TBD.)
Interstate-80S Improvements
19. (I-805-1) NB on-ramp widening & metering at Bonita, East H St (EB-NB),
Telegraph Canyon Road (project 1-805-1 is 100% funded in 2006 RTIP with State
funds. )
20. (1-805-2) Main St. undercrossing widening for EB-NB left turn lane
State Route 54 Improvements
21. (SR-54-1) SR-54 WB off-ramp restripe at Broadway
22. (SR-54-2) SR-54 EB off-ramp at N. Fourth Avenue - add ramp lane
Regional Arterial System (RAS) Projects
23. (RAS-l) Bonita Road from First Avenue to 1-805
24. (RAS-2) Broadway from C Street to south of Main Street (City Limits)
25. (RAS-3) E Street improvements - First Ave to Bonita RoadiE. Flower St
26. (RAS-4) E Street improvements, 1-5 to 300' east ofNB ramp
27. (RAS-5) E Street LRT grade separation (underpass LRT option)
28. (RAS-6) H Street LRT grade separation (underpass LRT option)
29. (RAS-7) H Street at Broadway EB queue jumper lane & traffic signal modifications
30. (RAS-8) H Street 14' -wide median & street light improvements (same as RAS-9)
31. (RAS-9) H Street widening to 6-lanes from Interstate-5 to Broadway
32. (RAS-IO) H Street improvements from Second Ave to Hilltop Drive
33. (RAS-ll) East H S1. north side improvements from Hilltop Dr. to 1-805
34. (RAS-12) L Street/Bay Blvd traffic signal & add turn lanes
35. (RAS-B) L Street improvements south side west of Industrial Blvd
36. (RAS-l4) Telegraph Canyon Road at 1-805 south side sidewalk
37. (RAS-15) Orange A venue from Palomar Street to Hilltop Drive
38. (RAS-16) Palomar Street improvements from 1-5 to 1-805
3-48
ORD#4
39. (RAS-17) Main St. improvements from /-5 to /-805 (See GPU Table 5.10-6)
40. (RAS-18) H St/4th Ave add WB-NB & EB-SB right turn lanes
41. (RAS-19) H St/4th Ave add WB-NB & EB-SB right turn lanes
General Plan Impacts and Mitigations
42. (GP-I) E. S1. from Marina to 1-5
43. (GP-2) Marina Parkway from E-J S1.
44. (GP-3) L S1. from Hilltop to 1-805
45. (GP-4) Main S1. from 1-5 to Broadway
46. (GP-5) Main S1. from Broadway to Hilltop Dr.
47. (GP-6) Third Avenue from L S1. to Palomar S1.
48. (GP-7) H S1. from Marina to 1-5
49. (GP-8) J S1. from Marina to 1-5
Bicycle & Pedestrian Facilities Improvements (21 % WTDIF share per GPU)
50. (BP-l) Bayshore Bikeway (bike path) between E Street & F Streets
51. (BP-2) F Street sidewalklbike lane improvements from /-5 to Fourth A venue
52. (BP-3) Industrial Blvd improvements & bike lanes from L S1. to Main Street
53. (BP-4) Main Street bike lanes from Industrial Blvd & I-80S
54. (BP-5) Orange A ve. bike lanes from Palomar St. to Hilltop Drive
55. (BP-6) Develop bicycle paths & pedestrian access to Third Avenue
Midbayfront Local Coastal Program Roadways
56. (Mid-I) E Street restripe to add EB-NB dual left turn to NB 1-5 on-ramp.
57. (Mid-2) I-5/E St. SB off-ramp widening to add fourth lane
58. (Mid-3) Bay Blvd 15' widening along Westerly Curb Line at E S1. approach for
1 SB/3NB
59. (Mid-4) I-5/E S1. NB widen off-ramp to add 3rd lane for Right Turn only lane
60. (Mid-5) E St revisions to median and North Curb Line east of 1-5 to add 3rd WB
lane.
3-49
ORD#4
61. (Mid-6) Marina Parkway 4-lane from ESt. to J S1.
62. (Mid-7) E S1.!Woodlawn Ave EB-SB RT lane plus a Traffic Signal)
63. (Mid-8) E S1. at Broadway add WB & EB LT lane + WB & EB RT only lane. plus
a Traffic Signal & No R!W costs.
64. (Mid-9) F St/Broadway restriping to provide EB-SB & WB-NB RT lane
65. (Mid-l 0) H Street widening at Broadway for WB Thru & EB Thru & RT only.
Other Roadways
66. (OR-I) N. 4th AvenueIBrisbane Ave traffic signal modifications
67. (OR-2) Second Avenue/D Street all-way stop installation
3.55.040 Territorv to which fee aoolicable.
The area of the City of Chula Vista to which the fee herein established shall be applicable is the
territorial limits of the western portion of the City of Chula Vista ("territory") as defined above, as they
may from time to time be amended.
3.55.050 Establishment of a fee.
A development impact fee ("fee") is hereby established to pay for the facilities within the territory. The
fee shall be paid upon the issuance of building permits for each development proj ect within the western
portion of the City of Chula Vista. The WTDIF fee in the amounts set forth in CVMC 3.55.030 is
hereby established to pay for transportation improvements and facilities within the western portion of
the City ofChula Vista.
3.55.060 Determination of fees bv land use cate20rv.
A. For purposes of this fee, single-family dwelling units shall include single-
family detached homes and detached condominiums; multifamily dwelling
units shall include attached condominiums, townhouses, duplexes, triplexes,
and apartments. The density of the development type shall be based on the
number of dwelling units per gross acre for single-family or multifamily
residential and shall be based upon the densities identified on the approved
tentative map or approved tentative parcel map entitling the development
unless otherwise approved in writing by the City Manager's designee.
B. Commercial/office and industrial development projects shall be charged on a
per acre or per square footage basis. For purposes of this fee, gross acreage
and lor square footage as it applies to the commercial, industrial and office
development types, means all land area that the City Manager's designee
deems necessary within the boundary of the parcel or parcels of the
development project for which building permits are being requested.
C. The fee multiplied by the total number of dwelling units, square footage or
acres within a given development project represents a developer's fair share
("fair share") for that development project.
3.55.070 Time to determine amount due.
3-50
ORD # 4
The fee for each development shall be calculated at the time of building permit issuance and shall be
the amount as indicated at that time, and not when the tentative map or final map were granted or
applied for, or when the building permit plan check was conducted, or when application was made for
the building permit. No building permit shall be issued unless the development impact fee is paid. The
fees shall be deposited into a WTDIF fund, which is hereby created, and shall be expended only for the
purposes set forth in this chapter. The Director of Finance is authorized to establish various accounts
within the fund for the various improvements and facilities identified in this chapter and to periodically
make expenditures from the fund for the purposes set forth herein in accordance with the facilities
phasing plan or capital improvement plan adopted by the City Council. The City Council finds that
collection of the fees established by this chapter at the time of the building permit is necessary to
ensure that funds will be available for the construction of facilities concurrent with the need for those
facilities and to ensure certainty in the capital facilities budgeting for the western part of the City.
3.55.080 Purpose and use of fee.
The fees collected shall be used by the City for the following purposes as determined by the City
Council:
1. To pay for the construction of facilities by the City, or to reimburse
the City for facilities installed by the City with funds from other
sources.
2. To reimburse developers who have been required by
CYMC3.55.150 A to install improvements that are major streets
and are listed in CYMC 3.55.030.
3. To reimburse developers who have been permitted to install
improvements pursuant to CYMC 3.55.150 B.
3.55.090 Amouut of fee.
A. The fee shall be the amounts as set forth below in Table I. The fee shall be adjusted on July I
of each year beginning in 2009. The annual inflation adjustment will be 2 % or based on
Caltrans highway construction cost index, whichever is higher. The program collects 2% of the
total improvement cost estimate for staff administration and an additional I % for SANDAG
Administrative costs.
B. Adjustments of the fee based upon the annual inflation adjustment or the Caltrans Highway
Construction Cost Index shall be automatic and shall not require further action by the City
Council. The WTDIF may also be reviewed and amended by the City Council as necessary
based on changes in the type, size, location or cost of the facilities to be financed by the fee;
changes in land use designation in the City's General Plan; and upon other sound engineering,
financing and planning information.
3-51
ORD # 4
Proposed TDIF Fee per EDU: I $3,243.00
Land Use Classification EDUs TDIF Rate
RESIDENTIAL
Residential (LOW) 0-6 dwelling units per acre I per EDU $3,243 I DU
Residential (MED) 6.1 To 20 dwelling units Der acre .8perEDU $2,5941 DU
Residential (HIGH) Over 20 dwelling units ner acre .6 per EDU $1,9461 DU
Mobile Home .5 per EDU $1,622 I DU
COMMERCIAL
Contain 1-5 major dep!. stores & usually have
more than 50 tenants. Typically larger than 40
Regional Commercial acres. 20 EDU/Acre $64,860 I Acre
Smaller in that size than regional. Contain junior
Dep!. Store or variety Store,( i.e. Target Center
with other commercial stores)as a major tenant
and have 15 to 50 other tenants. Smaller in size,
Community Commercial 8-20 acres. 28 EDU/Acre $90,804 I Acre
Less than 10 acres. Includes supermarket and
Nei<iliborhood Commercial drug store. Mav include office SDaces. 48 EDUI Acre $155,664 I Acre
Neighborhood Commercial Same as above but in Square Footage 4.8 EDU/KSF $15,664/KSF
Commercial activities found along major streets,
not in a planned center with limited on-site
Street Front Commercial Darking. 16 EDU/Acre $51,888 I Acre
Retail Commercial SDecialty RetaiVStrin Commercial 16 EDU/Acre $51,888/KSF
Usually located near transportation facilities.
Structures are usually large and cover majority of
the parcel. Examples are clothing and supply,
Wbolesale Trade also includes swan meet areas. 24 EDU/Acre $77,832/Acre
OFFICE
High Rise Office More than 100,000 S.F. and 6+ Stories 60 EDUI Acre $194,580 I Acre
Low Rise Office < 6 Stories 30 EDU/Acre $97,290/Acre
Low Rise Office (in thousands < 6 Stories
of square feet) 2 EDU/KSF $6,486 I KSF
Medical Office Medical and Dental Facilities 50 EDU/Acre $162,150 I Acre
LODGING
Low Rise HotellMotel < 4 Stories 20EDU/Acre $64,860 I Acre
Low Rise Hotel or Motel < 4 Stories I EDU/Room $3,243 I Room
High Rise Hotel >~4 Stories 30/EDU/Acre $97,290/Acre
INDUSTRY
Shipbuilding, airframe, and aircraft
manufacturing. Usually located next to
transportation facilities and commercial areas.
Heavy Industry Parcels are typically 20-50 Acre. 12EDU/Acre $38,916/Acre
Usually large buildings located near freeways,
Warehouse IStorage industrial or strip commercial areas. 6 EDUI Acre $19,458/Acre
Office/industrial uses clustered into a center. The
primary uses are industrial by may include high
percentages of other uses in service or retail
Industrial Park activities. 9EDU/Acre $29,187 I Acre
All other industrial uses and manufacturing not
Light Industrial included in categories above. 20 EDUI Acre $64,860 I Acre
Table 1
PROPOSED WTDIF FEE PER LAND USE CLASSIFICATION
3-52 ORD#4
3.55.100 Development proiects exempt from the fee.
A. Development projects by public agencies shall be exempt from the provisions of the fee if those
projects are designed to provide the public service for which the agency is charged ("public
purpose").
B. Community purpose facilities which are not operated for profit ("nonprofit community purpose
facilities") are also exempt inasmuch as these institutions provide benefit to the community as a
whole, including all land use categories which are the subject matter of the fee. The City
Council hereby determines that it is appropriate to spread any impact such nonprofit
community purpose facilities might have to the other land use categories subject to the fee. In
the event that a court determines that the exemption herein extended to community purpose
facilities shall for any reason be invalid, the City Council hereby allocates the nonprofit
community purpose facilities' fair share to the City of Chula Vista and not to any of the land
use categories which are the subject matter of the development impact land use categories.
C. Development projects which are additions or expansions to existing dwelling units or
businesses, except special land use projects, shall be exempt if the addition or expansion does
not result in a net increase in dwelling units or commercial/industrial acreage.
3.55.110 Authority for accounting and eXDenditures.
A. The fees collected shall be deposited into a Western Transportation Development Impact Fee
financing fund ("WTDIF fee fund," or "fund"), which is hereby created and shall be expended
only for the purposes set forth in this chapter.
B. The director of finance is authorized to establish a single fund for the various facilities
identified in this chapter and to periodically make expenditures from the fund for the purposes
set forth herein.
3.55.120 Findings.
The City Council [mds that:
A. Collection of the fee established by this chapter at the time of the building permit issuance is
necessary to provide funds for the transportation facilities identified in CVMC 3.55.030 and to
ensure certainty in the capital facilities budgeting for growth impacted public transportation
facilities; and
B. The purpose of the Fees hereby enacted prevents new development from reducing the quality
and availability of public transportation infrastructure facilities provided to residents of the City
by requiring new development to contribute to the cost of additional capital transportation
infrastructure improvements needed to meet the growth generated by such development; and
C. The revenue from the fees hereby enacted will be used to construct public facilities and
infrastructure and pay for other capital expenditures needed to serve new development as
identified in the Engineer's Report dated February, 2008; and
D. Based on analysis presented in the Engineer's Report there is a reasonable relationship between
I. The use of the fees and the types of development projects on which they are imposed and
2. The need for facilities and the types of development projects on which the fees are imposed.
3. The amount of the fee and the cost of the public facility or portion of the public facility
attributable to the development on which the fee is imposed.
3-53
ORO#4
3.55.130 Fee additional to other fees and charges.
This fee is in addition to the requirements imposed by other City laws, policies or regulations relating
to the construction or the financing of the construction of public improvements within subdivisions or
developments
3.55.150 Developer construction of transportation facilities.
A. Whenever a developer of a development project would be required by application of City law
or policy, as a condition of approval of a development permit to construct or finance the
construction of a portion of a transportation facility identified in Section 3.55.030 the City
Council may impose an additional requirement that the developer install the improvements
with supplemental size, length or capacity in order to ensure efficient and timely construction
of the transportation facilities network. If such a requirement is imposed, the City Council
shall, in its discretion, enter into a reimbursement agreement with the developer, or give a
credit against the fee otherwise levied by this chapter on the development project, or some
combination thereof.
B. Whenever a developer requests reimbursement, or a credit against fees, for work to be done or
paid for by the developer under subsection (A) of this section, the request shall be submitted in
writing to the City Manager's designee.
1. The request shall contain a description of the project with a detailed cost estimate
which itemizes those costs of the construction attributable to the transportation facility
project and excludes any work attributable to a specific subdivision project. The
estimate is preliminary and the amount of reimbursement or credit against fees is
subject to final determination by the City Manager's designee. Additional information
shall be provided to the City by the developer upon request of the City.
2. Such reimbursement or credit against fees shall be subject to the following conditions:
a. Requirements of Developer.
i. Preparation of plans and specifications for approval by the City;
ii. Secure and dedicate any right-of-way required for the transportation facility
proj ect;
iii. Secure all required permits and environmental clearances necessary for the
transportation facility project;
iv. Provision of performance bonds (where the developer intends to utilize provisions
for immediate credit, the performance bond shall be for 100 percent of the value of the
transportation facility project);
v. Payment of all City fees and costs.
b. The City will not be responsible for any of the costs of constructing the
transportation facility project. The developer shall advance all necessary funds to construct the
transportation facility project.
c. The developer shall secure at least three qualified bids for work to be done and shall
award the construction contract to the lowest qualified bidder. The developer may combine the
construction of the transportation facility project with other development-related work and
award one construction contract for the combined work based on a clearly identified process
for determining the low bidder, all as approved by the City Manager's designee. Should the
construction contract be awarded to a qualified bidder who did not submit the lowest bid for
the transportation facility project portion of the contract, the developer will only receive
transportation development impact fee credit based on the lowest bid for the transportation
facility portion of the contract. Any claims for additional payment for extra work or charges
shall be justified, shall be documented to the satisfaction of the City Manager's designee and
3-54
ORD#4
shall only be reimbursed at the prices for similar work included in the lowest bid for the
transportation facility portion ofthe contract.
d. Upon complying with the conditions set forth in subsections (B)(l) and (B)(2)(a) of
this section as determined by the City and upon approval of the estimated cost by the City
Manager's designee, the developer shall be entitled to immediate credit for 50 percent of the
estimated cost of the construction attributable to the transportation facility project. Once the
developer has received valid bids for the project which comply with subsection (B)(2)( c) of
this section, entered into binding contracts for the construction of the project, and met the
conditions set forth in subsections (B)(I) and (B)(2)(a) of this section as determined by the
City, all of which have been approved by the City Manager's designee, the amount of the
immediate credit shall be increased to 75 percent of the bid amount attributable to the
transportation facility project. The immediate credits shall be applied to the developer's
obligation to pay transportation development impact fees for building permits issued after the
establishment of the credit. The developer shall specify these building permits to which the
credit is to be applied at the time the developer submits the building permit applications.
e. If the developer uses all of the immediate credit before final completion of the
transportation facility project, then the developer may defer payment of development impact
fees for other building permits by providing to the City liquid security such as cash or an
irrevocable letter of credit, but not bonds or set-aside letters, in an amount equal to the
remaining amount of the estimated cost of the transportation facility project.
f. When all work has been completed to the satisfaction of the City, the developer shall
submit verification of payments made for the construction of the transportation facility proj ect
to the City. The City Manager's designee shall make the final determination on expenditures
which are eligible for credit or cash reimbursement.
g. After final determination of eligible expenditures has been made by the City
Manager's designee and the developer has complied with the conditions set forth in subsection
(B) of this section, the final amount of transportation development impact fee credits shall be
determined by the City Manager's designee. The developer shall receive credit against the
deferred fee obligation in an amount equal to the difference between the final expenditure
determination and the amount of the 75 percent immediate credit used, if any. The City shall
notify the developer of the final deferred fee obligation, and of the amount of the applicable
credit. If the amount of the applicable credit is less than the deferred fee obligation, then the
developer shall have 30 days to pay the deferred fee. If the deferred fees are not paid within the
30-day period, the City may make a demand against the liquid security and apply the proceeds
to the fee obligation.
h. At the time building permits are issued for the developer's project, the City will
incrementally apply credit which the developer has accrued in lieu of collecting the required
. transportation development impact fees. The amount of the credit to be applied to each
building permit shall be based upon the fee schedule in effect at the time of the building permit
issuance. The City Manager's designee shall convert such credit to an EDU basis for
residential development and/or a gross acre basis for commercial or industrial development for
purposes of determining the amount of credit to be applied to each building permit.
i. If the total eligible construction cost for the transportation facility project is more than
the total transportation development impact fees which will be required for the developer's
project, then the amount in excess of development impact fees will be paid in cash when funds
are available as determined by the City Manager; a reimbursement agreement will be executed;
or the developer may waive reimbursement and use the excess as credit against future
transportation development impact fee obligations. The City may, in its discretion, enter into
an agreement with the developer to convert excess credit into EDU and/or gross acre credits for
3-55
QRD # 4
use against future development impact fee obligations at the fee rate in effect on the date of the
agreement.
j. The requirements of this subsection (B) of this section may, in the City's discretion,
be modified through an agreement between the developer and the City and approved by City
Council.
C. Whenever a transportation development impact fee credit is generated by
constructing a transportation facility using assessment district or community
facilities district fmancing, the credit shall only be applied to the
transportation development impact fee obligations within that district.
3.55.160 Procedure for fee waiver or reduction.
A. Any developer who, because of the nature or type of uses proposed for a
development project, contends that application of the fee imposed by this
chapter is unconstitutional, or unrelated to mitigation of the traffic needs or
burdens of the development, may apply to the City Council for a waiver,
reduction, or deferral of the fee. A development which is designed and
intended as a temporary use (10 years or less) and which is conducted in
facilities which are, by their nature, short-term interim facilities such as a
portable or modular building (including mobile homes, trailers, etc.) may
qualify for a waiver, reduction, or deferral. In addition, a deferral may be
granted on the basis of demonstrated economic hardship on the condition that:
(I) the use offers a significant public benefit; (2) the amount deferred bears
interest at a fair market rate so as to constitute an approximate value
equivalent to a cash payment; and (3) the amount deferred is adequately
secured by agreement with the applicant. Unless the requirement for timely
filing is waived by the City, the application shall be made in writing and filed
with the City Clerk not later than 10 days after notice of the public hearing on
the development permit application or the project is given, or if no
development permit is required, at the time of the filing of the building permit
application. The application shall state in detail the factual basis for the claim
of waiver or reduction.
B. The City Council shall consider the application at a public hearing on same,
notice of which need not be published other than by description on the agenda
of the meeting at which the public hearing is held. Said public hearing should
be held within 60 days after its filing. The decision of the City Council shall
be fmal. If a deferral, reduction or waiver is granted, it should be granted
pursuant to an agreement with the applicant, and the property owner, if
different from the applicant, providing that any change in use within the
project shall subject the development to payment ofthe full fee. The procedure
provided by this section is additional to any other procedure authorized by law
for protesting or challenging the fee imposed by this chapter.
3.55.170 Exemptions.
Development projects by public agencies shall be exempt from the provisions of this fee. Exempt
development uses with the following characteristics or activities as a principal use of land, generally
described as "community purpose facility" as defined above in CVMC Section 3.55.020.
3-56
ORD # 4
3.55.180 Assessment districts.
If any assessment or special taxing district is established for any or all of the facilities listed in Section
3.55.030 the owner or developer of a project may apply to the City Council for a credit against the fee
in an amount equal to the development's attributable portion of the cost of the authorized
improvements as determined by the City Manager's designee, plus incidental costs normally occurring
with a construction project, but excluding costs associated with assessment district proceedings or
financing.
3.55.190 Economic incentive credit.
The City Council may authorize the City to participate in the financing of transportation facility
projects or portions of transportation facility projects as defined in Section 3.55.030 at the time of the
appropriation of funds by City Council for the construction of an eligible transportation facility, the
City shall be eligible to receive a credit known hereafter as an economic incentive credit. Such
economic incentive credit may be applied to development impact fee obligations for those projects
which the City Council determines, in its sole discretion, to be beneficial to the City. The use of the
economic incentive credit may be subject to conditions which shall be set forth in a written agreement
between the developer of the project and the City and approved by City Council.
The City may receive economic incentive credit only for those eligible projects identified in Section
3.55.030 for amounts of funding not identified in the fmancial and engineering study "Western
Transportation Development Impact Fee" report dated February 2008.
3.55.195 Fund loans.
A.
B.
Loans by the City. The City may loan funds to the fund to pay for
facilities should the fund have insufficient funds to cover the cost of
said facility. Said loans, if granted, shall be approved upon the adoption
of the annual City budget or upon resolution of the City Council and
shall carry interest rates as set by the City Council for each fiscal year.
A schedule for repayment of said loans shall be established at the time
they are made and approved by the Council, with a maximum term not
to exceed the life of the fund.
Developer Loans. A developer may loan funds to the City as outlined
in CVMC 3.55.150. The City may repay said developer loans with
interest, under the terms listed in subsection (A) ofthis section.
3.55.200 Effective date.
This chapter shall become effective
SECTION 3: Effective Date
This Ordinance shall become effective 60 days after its second reading and adoption.
APpro~orm~
Ann Moore
City Attorney
Presented by
Jack Griffin
Engineering and General Services Director
3-57
ORDINANCE NO. ~IG F\NO F\OOPiION
NO REF\Oh,<
ORDINANCE OF THE CITY OF CHUL~E\1?sTA ACCEPTING
TIffi WESTERN TRANSPORTATION DEVELOPMENT IMPACT
FEE REPORT (TF-358) PREPARED BY STAFF AND
ESTABLISHING A WESTERN TRANSPORTATION
DEVELOPMENT IMPACT FEE PROGRAM TO MITIGATE
TRANSPORTATION IMPACTS WITHIN WESTERN CHULA
VISTA INCLUDING PROJECT OR-4
WHEREAS, the adoption of the City's General plan indicated that future growth was going to
occur in the City west of! -805; and
WHEREAS, the traffic studies for the City's General Plan and the Urban Core Specific Plan
show the City's transportation network will be impacted by new development within the western
portion of the City unless new transportation facilities are added to accommodate the new
development; and
WHEREAS, since January 1987, the City has had a program in place for the collection of a
transportation development impact fee for the financing of street improvements in the area east of
Interstate 805.
WHEREAS, the Engineer's Report establishes that the transportation facilities necessitated by
development within the western portion ofthe City comprise an integrated network; and
WHEREAS, the Western Transportation Development Impact Fee is solely based upon that
portion of the project costs which are attributable to new development; and
WHEREAS, on March 4, 2008, the City Council of the City of Chula Vista held a duly noticed
public hearing at which oral or written presentations regarding the Western Transportation
Development Impact Fee could be made; and
WHEREAS, pursuant to the Municipal Code and California Government Code Sections 66000,
et. seq., the City Council has accepted a report entitled "Engineer's Report for the Western
Transportation Development Impact Fee" ("Engineer's Report") dated February, 2008 that analyzed
the Western Transportation Development Impact Fee necessary to fund transportation facilities needed
to serve future development within the western portion of the City; and
WHEREAS, the City's Environmental Review Coordinator has reviewed the proposed activity
for compliance with the California Environmental Quality Act (CEQA) and has determined that the
activity is not a "Project" as defmed under Section 15378 of the State CEQA Guidelines; therefore,
pursuant to Section 15060(c)(3) of the State CEQA Guidelines the activity is not subject to CEQA; and
WHEREAS, the City Council of the City of Chula Vista is placing this ordinance on its first
reading which will establish a development impact fee per equivalent dwelling unit (EDU) to finance
transportation facilities within the western portion of the City of Chula Vista; and
ORD # 5
3-58
WHEREAS, pursuant to Govemment Code Section 660l7(a), the fees proposed by this
ordinance will not become effective until sixty (60) days after its first reading; and
NOW, THEREFORE BE IT ORDAINED, that the City Council of the City of Chula Vista
does hereby adopt Chapter 3.55 of the Chula Vista Municipal Code relating to transportation
development impact fees to pay for various transportation facilities located on the westside of the City
as follows:
SECTION 1: Findings
The City Council finds, after consideration of the evidence presented to it including the "Engineer's
Report for the Western Transportation Development Impact Fee" dated February, 2008, that the
creation of a transportation development impact fee is necessary in order to assure that there are
sufficient funds available to finance the transportation facilities necessary to serve development west
ofI-805; and
The City Council finds that new development within the western portion of the City of Chula Vista
should be required to mitigate the burden created by development through the construction of
transportation facilities; and
The City Council finds, based on the evidence presented at the public hearing, and consistent with the
City's General Plan, and the various reports and information received by the City Council in the
ordinary course of its business, that the imposition of traffic impact fees on all development within the
western portion of the City of Chula Vista for which building permits have not been issued is
necessary in order to protect the public health, safety and welfare by providing for the public
transportation facilities to assure effective implementation of the City's General Plan; and
The City Council finds that the amount of the proposed fees levied by this ordinance does not exceed
the estimated cost of providing the transportation facilities.
SECTION 2: Chapter 3.55 of the Chula Vista Municipal Code is hereby adopted and shall read as
follows:
3.55.010 General intent.
The City's General Plan Land Use and Transportation Element requires that adequate public facilities
be available to accommodate increased population created by new development within the City of
Chula Vista.
The City Council has determined that new development will create adverse impacts on the City's
existing public transportation facilities which must be mitigated by the financing and construction of
certain public transportation facilities which are the subject of this chapter. New development
contributes to the cumulative burden on these public transportation facilities in direct relationship to
the amount of vehicular traffic and population generated by the development or the gross acreage of
the commercial or industrial land in the development.
The City Council has determined that a reasonable means of financing the public transportation
facilities is to charge a fee on all developments within the western portion of the City. imposition of
the Western Transportation Development Impact Fee on all new development for which building
3-59
ORD # 5
permits have not yet been issued is necessary in order to protect the public health, safety and welfare,
thereby ensuring effective implementation of the City's General Plan.
3.55.020 Definitions.
For the purposes of this chapter, the following words or phrases shall be construed as defined herein,
unless from the context it appears that a different meaning is intended.
A. "Building permit" means a permit required by and issued pursuant to the
Uniform Building Code.
B. "City Engineer" means the City Engineer, the City Engineer's designee or the
City Manager's designee.
C. "Density" means dwelling units per gross acre identified for each planning
area shown on the approved tentative map or approved tentative parcel map or
as determined by the City Manager's designee.
D. "Developer" means the owner or developer of a development.
E. "Development permit" means any discretionary permit, entitlement or
approval for a development project issued under any zoning or subdivision
ordinance of the City.
F. "Development project" or "development" means any activity described as the
following:
1. Any new residential dwelling unit developed on vacant land;
2. Any new commercial/office or industrial development constructed on vacant land;
3. Any expansions to established developments or new developments on nonvacant land in
those land use categories listed in subsections (F)(I) and (2) of this section, if the result
is a net increase in dwelling units. The fee shall be based solely on this net dwelling unit
mcrease;
4. Any new or expanding special land use project;
5. Any special purpose project developed on vacant land or nonvacant land, or expanded
within a pre-existing site, if the result is a net increase in dwelling units. The fee shall
be based solely on this net dwelling unit increase;
6. Any other development project not listed above but described in Section 65927 and
65928 of the State Government Code.
"Community purpose facility" means a facility which serves one of the following purposes:
1. Social service activities, including such services as Boy Scouts and Girl Scouts, Boys
and Girls Club, Alcoholics Anonymous and services for the homeless;
2. Public schools;
3. Private schools;
4. Day care;
5. Senior care and recreation;
6. Worship, spiritual growth and development.
H. "Western portion of the City ofChula Vista" generally means that area of the
City located between the City boundary on the west, Interstate 805 on the east,
the City boundary on the north and the City's boundary on the south, as shown
on the map entitled "Figure 1" of the Engineering study.
1. "Engineering study" and "Engineer's Report" means the Engineer's Report for
the Western Transportation Development Impact Fee dated February, 2008
and prepared by City staff on file in the Office of the City Clerk.
1. "Regional Arterial System" (RAS) RAS roadways are generally described as
those facilities that act as a critical link in providing direct connections
between communities ensuring system continuity and congestion relief in high
3-60
ORO# 5
volume corridors. They are roadways that are listed in the most recent edition
of SANDAG's Regional Transportation Plan
K. "Special land use" means any nonresidential, non-commercial/office or
nonindustrial development project (e.g., Olympic Training Center, hospitals,
utilities), or non-special purpose project.
1. "Special purpose project" means any for-profit community purpose facility
(e.g., day care).
3.55.030 Public transportation facilities to be financed bv the fee.
A. The public transportation facilities ("facilities") which are the subject matter of the fee, are
listed below as detailed in subsection C of this section and in the Engineer's Report on file in
the Office of the City Clerk.
B. The City Council may modify or amend the list of projects in order to maintain compliance
with the circulation element of the City's General Plan.
C. The facilities are as follows:
1. (1-5-1) I-5/E Street NB off-ramp restriping add lane
2. (1-5-2) 1-5/E Street/Bay Blvd SB off-ramp restriping add lane
3. (1-5-3) I-5/NB ramp widening at E, H, J, Ind., Palomar & Main Sts (21 %)
4. (1-5-4) E Street bridge widening over 1-5 (250' X 20' X $350/sf)
5. (1-5-5) F Street bridge widening over 1-5 (250' X 20' X $350/sf
6. (1-5-6) I-5/H Street NB off-ramp restriping add lane
7. (1-5-7) I-5/H Street SB off-ramp restriping add lane
8. (1-5-8) H Street bridge widening over 1-5 (200'X40'X$350/sf)
9. (1-5-9) I-5/J Street NB off-ramp restriping add lane
10. (1-5-10) I-5/J Street undercrossing widening add EB-NB (I75x20X$350)
11. (1-5-11) L Street bridge widening overI-5 (S/W for peds 300' X 12')(21 %)
12. (1-5-12) 1-5/Bay Blvd (south ofL 8t.) SB on/off ramps traffic signal
13. (1-5-13) I-5/1ndustrial Blvd NB on/off ramps traffic signal
14. (1-5-14) I-5/Palomar Street bridge widening (2751fX 501fX $350/sf)
15. (1-5-15) I-5/Main StreetNB on/off ramps traffic signal (CV share $120k)
16. (1-5-16) I-5/Main Street bridge widening (2751fX 20lfX $350/sf)
17. (/-5-17)/-5 HOV & Managed Lanes/rom SR905 to SR54 (63.4% in OJ
18. STM 361
3-61
ORD # 5
a. 1-5 Multi-Modal Corridor Study (80% Fed. DEMO funds)
b. (SANDAG cost estimate is $4.3M & CV share TBD.)
Interstate-80S Improvements
19. (1-805-1) NB on-ramp widening & metering at Bonita, East H St (EB-NB),
Telegraph Canyon Road (Project 1-805-1 is 100% funded in 2006 RTIP with State
funds. )
20. (I-80S-1) Main St. undercrossing widening for EB-NB left turn lane
State Route 54 Improvements
21. (SR-54-1) SR-54 WB off-ramp restripe at Broadway
22. (SR-54-2) SR-54 EB off-ramp at N. Fourth Avenue - add ramp lane
Regional Arterial System (RAS) Projects
23. (RAS-I) Bonita Road from First Avenue to 1-805
24. (RAS-2) Broadway from C Street to south of Main Street (City Limits)
25. (RAS-3) E Street improvements - First Ave to Bonita RoadIE. Flower St
26. (RASA) E Street improvements, 1-5 to 300' east ofNB ramp
27. (RAS-5) E Street LRT grade separation (underpass LRT option)
28. (RAS-6) H Street LRT grade separation (underpass LRT option)
29. (RAS-7) H Street at Broadway EB queue jumper lane & traffic signal modifications
30. (RAS-8) H Street 14'-wide median & street light improvements (same as RAS-9)
31. (RAS-9) H Street widening to 6-lanes from Interstate-5 to Broadway
32. (RAS-IO) H Street improvements from Second Ave to Hilltop Drive
33. (RAS-II) East H S1. north side improvements from Hilltop Dr. to 1-805
34. (RAS-12) L Street/Bay Blvd traffic signal & add turn lanes
35. (RAS-13) L Street improvements south side west ofIndustrial Blvd
36. (RAS-14) Telegraph Canyon Road at 1-805 south side sidewalk
37. (RAS-IS) Orange A venue from Palomar Street to Hilltop Drive
38. (RAS-16) Palomar Street improvements from 1-5 to 1-805
3-62
ORD # 5
39. (RAS-17) Main St. improvements from 1-5 to I-80S (See CPU Table 5.10-6)
40. (RAS-18) H St/4th Ave add WB-NB & EB-SB right turn lanes
41. (RAS-19) H S1I4th Ave add WB-NB & EB-SB right turn lanes
General Plan Impacts and Mitigations
42. (GP-I) E. St. from Marina to 1-5
43. (GP-2) Marina Parkway from E-J S1.
44. (GP-3) L S1. from Hilltop to 1-805
45. (GP-4) Main S1. from 1-5 to Broadway
46. (GP-5) Main S1. from Broadway to Hilltop Dr.
47. (GP-6) Third Avenue from L S1. to Palomar S1.
48. (GP-7) H S1. from Marina to 1-5
49. (GP-8) J S1. from Marina to 1-5
Bicycle & Pedestrian Facilities Improvements (21 % WTDIF share per GPU)
50. (BP-I) Bayshore Bikeway (bike path) between E Street & F Streets
51. (BP-2) F Street sidewalklbike lane improvements from 1-5 to Fourth A venue
52. (BP-3) Industrial Blvd improvements & bike lanes from L S1. to Main Street
53. (BP-4) Main Street bike lanes from Industrial Blvd & I-80S
54. (BP-5) Orange A ve. bike lanes from Palomar St. to Hilltop Drive
55. (BP-6) Develop bicycle paths & pedestrian access to Third Avenue
Midbayfront Local Coastal Program Roadways
56. (Mid-I) E Street restripe to add EB-NB dual left turn to NB 1-5 on-ramp.
57. (Mid-2) I-5/E S1. SB off-ramp widening to add fourth lane
58. (Mid-3) Bay Blvd 15' widening along Westerly Curb Line at E S1. approach for
I SB/3NB
59. (Mid-4) I-5/E S1. NB widen off-ramp to add 3rd lane for Right Turn only lane
60. (Mid-5) E St revisions to median and North Curb Line east of 1-5 to add 3rd WB
lane.
3-63
ORD # 5
61. (Mid-6) Marina Parkway 4-lane from E St. to J St.
62. (Mid-7) E St./Woodlawn Ave EB-SB RT lane plus a Traffic Signal)
63. (Mid-8) E St. at Broadway add WE & EB LT lane + WE & EB RT only lane. plus
a Traffic Signal & No RJW costs.
64. (Mid-9) F StIBroadway restriping to provide EB-SB & WE-NB RT lane
65. (Mid-lO) H Street widening at Broadway for WE Thru & EB Thru & RT only.
Other Roadways
66. (OR-l) N. 4th AvenueIBrisbane Ave traffic signal modifications
67. (OR-2) Second Avenue/D Street all-way stop installation
68. (OR-4) Traffic Management Center (30% TDIF/30% WTDIF/40% TSFund)
3.55.040 Territorv to which fee applicable.
The area of the City of Chula Vista to which the fee herein established shall be applicable is the
territorial limits of the western portion of the City of Chula Vista ("territory") as defined above, as they
may from time to time be amended.
3.55.050 Establishment of a fee.
A development impact fee ("fee") is hereby established to pay for the facilities within the territory. The
fee shall be paid upon the issuance of building permits for each development project within the western
portion of the City of Chula Vista. The WTDIF fee in the amounts set forth in CVMC 3.55.030 is
hereby established to pay for transportation improvements and facilities within the western portion of
the City of Chula Vista.
3.55.060 Determination of fees bv land use catel!orv.
A. For purposes of this fee, single-family dwelling units shall include single-
family detached homes and detached condominiums; multifamily dwelling
units shall include attached condominiums, townhouses, duplexes, triplexes,
and apartments. The density of the development type shall be based on the
number of dwelling units per gross acre for single-family or multifamily
residential and shall be based upon the densities identified on the approved
tentative map or approved tentative parcel map entitling the development
unless otherwise approved in writing by the City Manager's designee.
B. Commercial/office and industrial development projects shall be charged on a
per acre or per square footage basis. For purposes of this fee, gross acreage
and lor square footage as it applies to the commercial, industrial and office
development types, means all land area that the City Manager's designee
deems necessary within the boundary of the parcel or parcels of the
development project for which building permits are being requested.
C. The fee multiplied by the total number of dwelling units, square footage or
acres within a given development project represents a developer's fair share
("fair share") for that development proj ect.
3-64
ORD#5
3.55.070 Time to determine amount due.
The fee for each development shall be calculated at the time of building permit issuance and shall be
the amount as indicated at that time, and not when the tentative map or final map were granted or
applied for, or when the building permit plan check was conducted, or when application was made for
the building permit. No building permit shall be issued unless the development impact fee is paid. The
fees shall be deposited into a WTDIF fund, which is hereby created, and shall be expended only for the
purposes set forth in this chapter. The Director of Finance is authorized to establish various accounts
within the fund for the various improvements and facilities identified in this chapter and to periodically
make expenditures from the fund for the purposes set forth herein in accordance with the facilities
phasing plan or capital improvement plan adopted by the City Council. The City Council finds that
collection of the fees established by this chapter at the time of the building permit is necessary to
ensure that funds will be available for the construction of facilities concurrent with the need for those
facilities and to ensure certainty in the capital facilities budgeting for the western part of the City.
3.55.080 Purpose and use of fee.
The fees collected shall be used by the City for the following purposes as determined by the City
Council:
I. To pay for the construction of facilities by the City, or to reimburse
the City for facilities installed by the City with funds from other
sources.
2. To reimburse developers who have been required by
CYMC3.55.150 A to install improvements that are major streets
and are listed in CYMC 3.55.030.
3. To reimburse developers who have been permitted to install
improvements pursuant to CYMC 3.55.150 B.
3.55.090 Amount offee.
A. The fee shall be the amounts as set forth below in Table I. The fee shall be adjusted on July I
of each year beginning in 2009. The annual inflation adjustment will be 2 % or based on
Caltrans highway construction cost index, whichever is higher. The program collects 2% of the
total improvement cost estimate for staff administration and an additional I % for SANDAG
Administrative costs.
B. Adjustments of the fee based upon the annual inflation adjustment or the Caltrans Highway
Construction Cost Index shall be automatic and shall not require further action by the City
Council. The WTDIF may also be reviewed and amended by the City Council as necessary
based on changes in the type, size, location or cost of the facilities to be financed by the fee;
changes in land use designation in the City's General Plan; and upon other sound engineering,
financing and planning information.
3-65
ORD#5
Proposed TDIF Fee Der EDU: I $3,243.00
Land Use Classification EDUs TDIF Rate
RESIDENTIAL
Residential (LOW) 0-6 dwelling units per acre I per EDU $3,2431 DU
Residential (MED) 6.1 To 20 dwellin. units per acre .8 per EDU $2,594 I DU
Residential (HIGH) Over 20 dwelling units per acre .6 per EDU $1,9461 DU
Mobile Home .5 per EDU $1,622 I DU
COMMERCIAL
Contain 1-5 major dept. stores & usually have
more than 50 tenants. Typically larger than 40
Regional Commercial acres. 20 EDUI Acre $64,860 I Acre
Smaller in that size than regional. Contain junior
Dept. Store or variety Store;( i.e. Target Center
with other commercial stores)as a major tenant
and have 15 to 50 other tenants. Smaller in size,
Community Commercial 8-20 acres. 28 EDUI Acre $90,804 I Acre
Neighborhood Commercial Less than 10 acres. Includes supermarket and
dru. store. Mav include office spaces. 48 EDUlAcre $155,664 I Acre
Neighborhood Commercial Same as above but in Square Footage 4.8 EDU/KSF $15,664IKSF
Commercial activities found along major streets,
not in a planned center with limited on-site
Street Front Commercial arkincr. 16 EDUlAcre $51,888 I Acre
Retail Commercial Snecialty Retail/Strip Commercial 16 EDUI Acre $51,888IKSF
Usually located near transportation facilities.
Structures are usually large and cover majority of
the parcel. Examples are clothing and supply,
Wholesale Trade also includes swan meet areas. 24 EDUI Acre $77,832IAcre
OFFICE
High Rise Office More than 100,000 S.F. and 6+ Stories 60 EDUI Acre $194,580 I Acre
Low Rise Office < 6 Stories 30 EDUlAcre $97,290 I Acre
Low Rise Office (in thousands < 6 Stories
of square feet) 2 EDU/KSF $6,4861 KSF
Medical Office Medical and Dental Facilities 50 EDUlAcre $162,1501 Acre
LODGING
Low Rise HotellMotel < 4 Stories 20 EDUI Acre $64,860 I Acre
Low Rise Hotel or Motel < 4 Stories I EDU/Room $3,243 I Room
High Rise Hotel >~4 Stories 30/EDUIAcre $97,290IAcre
INDUSTRY
Shipbuilding, airframe, and aircraft
manufacturing. Usually located next to
transportation facilities and commercial areas.
Heavv Industry Parcels are tvoicallv 20-50 Acre. 12 EDUI Acre $38,9161 Acre
Usually large buildings located near freeways,
Warehouse IStorage industrial or strin commercial areas. 6 EDUlAcre $19,458 I Acre
Officelindustrial uses clustered into a center. The
primary uses are industrial by may include high
percentages of other uses in service or retail
Industrial Park activities. 9 EDUI Acre $29,187IAcre
Light Industrial All other industrial uses and manufacturing not
included in categories above. 20 EDUI Acre $64,860 I Acre
Table 1
PROPOSED WTDIF FEE PER LAND USE CLASSIFICATION
3-66
ORD # 5
3.55.100 Development proiects exempt from the fee.
A. Development projects by public agencies shall be exempt from the provisions of the fee if those
projects are designed to provide the public service for which the agency is charged ("public
purpose").
B. Community purpose facilities which are not operated for profit ("nonprofit community purpose
facilities") are also exempt inasmuch as these institutions provide benefit to the community as a
whole, including all land use categories which are the subject matter of the fee. The City
Council hereby determines that it is appropriate to spread any impact such nonprofit
community purpose facilities might have to the other land use categories subject to the fee. In
the event that a court determines that the exemption herein extended to community purpose
facilities shall for any reason be invalid, the City Council hereby allocates the nonprofit
community purpose facilities' fair share to the City of Chula Vista and not to any of the land
use categories which are the subject matter of the development impact land use categories.
C. Development proj ects which are additions or expansions to existing dwelling units or
businesses, except special land use projects, shall be exempt if the addition or expansion does
not result in a net increase in dwelling units or commercial/industrial acreage.
3.55.110 Authority for accounting and expenditures.
. A. The fees collected shall be deposited into a Western Transportation Development Impact Fee
financing fund ("WTDIF fee fund," or "fund"), which is hereby created and shall be expended
only for the purposes set forth in this chapter.
B. The director of finance is authorized to establish a single fund for the various facilities
identified in this chapter and to periodically make expenditures from the fund for the purposes
set forth herein.
3.55.120 Findings.
The City Council finds that:
A. Collection of the fee established by this chapter at the time of the building permit issuance is
necessary to provide funds for the transportation facilities identified in CVMC 3.55.030 and to
ensure certainty in the capital facilities budgeting for growth impacted public transportation
facilities; and
B. The purpose of the Fees hereby enacted prevents new development from reducing the quality
and availability of public transportation infrastructure facilities provided to residents of the City
by requiring new development to contribute to the cost of additional capital transportation
infrastructure improvements needed to meet the growth generated by such development; and
C. The revenue from the fees hereby enacted will be used to construct public facilities and
infrastructure and pay for other capital expenditures needed to serve new development as
identified in the Engineer's Report dated February, 2008; and
D. Based on analysis presented in the Engineer's Report there is a reasonable relationship between
I. The use of the fees and the types of development projects on which they are imposed and
2. The need for facilities and the types of development projects on which the fees are imposed.
3. The amount of the fee and the cost of the public facility or portion of the public facility
attributable to the development on which the fee is imposed.
3-67
ORD # 5
3.55.130 Fee additional to other fees and charges.
This fee is in addition to the requirements imposed by other City laws, policies or regulations relating
to the construction or the financing of the construction of public improvements within subdivisions or
developments
3.55.150 Developer construction of transportation facilities.
A. Whenever a developer of a development project would be required by application of City law
or policy, as a condition of approval of a development permit to construct or finance the
construction of a portion of a transportation facility identified in Section 3.55.030 the City
Council may impose an additional requirement that the developer install the improvements
with supplemental size, length or capacity in order to ensure efficient and timely construction
of the transportation facilities network. If such a requirement is imposed, the City Council
shall, in its discretion, enter into a reimbursement agreement with the developer, or give a
credit against the fee otherwise levied by this chapter on the development project, or some
combination thereof.
B. Whenever a developer requests reimbursement, or a credit against fees, for work to be done or
paid for by the developer under subsection (A) of this section, the request shall be submitted in
writing to the City Manager's designee.
1. The request shall contain a description of the project with a detailed cost estimate
which itemizes those costs of the construction attributable to the transportation facility
project and excludes any work attributable to a specific subdivision project. The
estimate is preliminary and the amount of reimbursement or credit against fees is
subject to final determination by the City Manager's designee. Additional information
shall be provided to the City by the developer upon request of the City.
2. Such reimbursement or credit against fees shall be subject to the following conditions:
a. Requirements of Developer.
i. Preparation of plans and specifications for approval by the City;
ii. Secure and dedicate any right-of-way required for the transportation facility
project;
iii. Secure all required permits and environmental clearances necessary for the
transportation facility proj ect;
iv. Provision of performance bonds (where the developer intends to utilize provisions
for immediate credit, the performance bond shall be for 100 percent of the value of the
transportation facility project);
v. Payment of all City fees and costs.
b. The City will not be responsible for any of the costs of constructing the
transportation facility project. The developer shall advance all necessary funds to construct the
transportation facility project.
c. The developer shall secure at least three qualified bids for work to be done and shall
award the construction contract to the lowest qualified bidder. The developer may combine the
construction of the transportation facility project with other development-related work and
award one construction contract for the combined work based on a clearly identified process
for determining the low bidder, all as approved by the City Manager's designee. Should the
construction contract be awarded to a qualified bidder who did not submit the lowest bid for
the transportation facility proj ect portion of the contract, the developer will only receive
transportation development impact fee credit based on the lowest bid for the transportation
facility portion of the contract. Any claims for additional payment for extra work or charges
shall be justified, shall be documented to the satisfaction of the City Manager's designee and
3-68
ORD # 5
shall only be reimbursed at the prices for similar work included in the lowest bid for the
transportation facility portion of the contract.
d. Upon complying with the conditions set forth in subsections (B)(l) and (B)(2)(a) of
this section as determined by the City and upon approval of the estimated cost by the City
Manager's designee, the developer shall be entitled to immediate credit for 50 percent of the
estimated cost of the construction attributable to the transportation facility project. Once the
developer has received valid bids for the project which comply with subsection (B)(2)( c) of
this section, entered into binding contracts for the construction of the project, and met the
conditions set forth in subsections (B)(l) and (B)(2)(a) of this section as determined by the
City, all of which have been approved by the City Manager's designee, the amount of the
immediate credit shall be increased to 75 percent of the bid amount attributable to the
transportation facility project. The immediate credits shall be applied to the developer's
obligation to pay transportation development impact fees for building permits issued after the
establishment of the credit. The developer shall specify these building permits to which the
credit is to be applied at the time the developer submits the building permit applications.
e. If the developer uses all of the immediate credit before final completion of the
transportation facility project, then the developer may defer payment of development impact
fees for other building permits by providing to the City liquid security such as cash or an
irrevocable letter of credit, but not bonds or set-aside letters, in an amount equal to the
remaining amount of the estimated cost of the transportation facility project.
f. When all work has been completed to the satisfaction of the City, the developer shall
submit verification of payments made for the construction of the transportation facility project
to the City. The City Manager's designee shall make the final determination on expenditures
which are eligible for credit or cash reimbursement.
g. After final determination of eligible expenditures has been made by the City
Manager's designee and the developer has complied with the conditions set forth in subsection
(B) of this section, the final amount of transportation development impact fee credits shall be
determined by the City Manager's designee. The developer shall receive credit against the
deferred fee obligation in an amount equal to the difference between the final expenditure
determination and the amount of the 75 percent immediate credit used, if any. The City shall
notify the developer of the final deferred fee obligation, and of the amount of the applicable
credit. If the amount of the applicable credit is less than the deferred fee obligation, then the
developer shall have 30 days to pay the deferred fee. If the deferred fees are not paid within the
30-day period, the City may make a demand against the liquid security and apply the proceeds
to the fee obligation.
h. At the time building permits are issued for the developer's project, the City will
incrementally apply credit which the developer has accrued in lieu of collecting the required
transportation development impact fees. The amount of the credit to be applied to each
building permit shall be based upon the fee schedule in effect at the time of the building permit
issuance. The City Manager's designee shall convert such credit to an EDU basis for
residential development and/or a gross acre basis for commercial or industrial development for
purposes of determining the amount of credit to be applied to each building permit.
i. If the total eligible construction cost for the transportation facility project is more than
the total transportation development impact fees which will be required for the developer's
project, then the amount in excess of development impact fees will be paid in cash when funds
are available as determined by the City Manager; a reimbursement agreement will be executed;
or the developer may waive reimbursement and use the excess as credit against future
transportation development impact fee obligations. The City may, in its discretion, enter into
an agreement with the developer to convert excess credit into EDU and/or gross acre credits for
3-69
ORD # 5
use against future development impact fee obligations at the fee rate in effect on the date of the
agreement.
j. The requirements of this subsection (B) of this section may, in the City's discretion,
be modified through an agreement between the developer and the City and approved by City
Council.
C. Whenever a transportation development impact fee credit is generated by
constructing a transportation facility using assessment district or community
facilities district financing, the credit shall only be applied to the
transportation development impact fee obligations within that district.
3.55.160 Procedure for fee waiver or reduction.
A. Any developer who, because of the nature or type of uses proposed for a
development project, contends that application of the fee imposed by this
chapter is unconstitutional, or unrelated to mitigation of the traffic needs or
burdens of the development, may apply to the City Council for a waiver,
reduction, or deferral of the fee. A development which is designed and
intended as a temporary use (10 years or less) and which is conducted in
facilities which are, by their nature, short-term interim facilities such as a
portable or modular building (including mobile homes, trailers, etc.) may
qualify for a waiver, reduction, or deferral. In addition, a deferral may be
granted on the basis of demonstrated economic hardship on the condition that:
(1) the use offers a significant public benefit; (2) the amount deferred bears
interest at a fair market rate so as to constitute an approximate value
equivalent to a cash payment; and (3) the amount deferred is adequately
secured by agreement with the applicant. Unless the requirement for timely
filing is waived by the City, the application shall be made in writing and filed
with the City Clerk not later than 10 days after notice of the public hearing on
the development permit application or the project is given, or if no
development permit is required, at the time of the filing of the building permit
application. The application shall state in detail the factual basis for the claim
of waiver or reduction.
B. The City Council shall consider the application at a public hearing on same,
notice of which need not be published other than by description on the agenda
of the meeting at which the public hearing is held. Said public hearing should
be held within 60 days after its filing. The decision of the City Council shall
be final. If a deferral, reduction or waiver is granted, it should be granted
pursuant .to an agreement with the applicant, and the property owner, if
different from the applicant, providing that any change in use within the
project shall subject the development to payment of the full fee. The procedure
provided by this section is additional to any other procedure authorized by law
for protesting or challenging the fee imposed by this chapter.
3.55.170 Exemptions.
Development projects by public agencies shall be exempt from the provisions of this fee. Exempt
development uses with the following characteristics or activities as a principal use of land, generally
described as "community purpose facility" as defined above in CVMC Section 3.55.020.
3-70
ORD # 5
3.55.180 Assessment districts.
If any assessment or special taxing district is established for any or all of the facilities listed in Section
3.55.030 the owner or developer of a project may apply to the City Council for a credit against the fee
in an amount equal to the development's attributable portion of the cost of the authorized
improvements as determined by the City Manager's designee, plus incidental costs normally occurring
with a construction proj ect, but excluding costs associated with assessment district proceedings or
financing.
3.55.190 Economic incentive credit.
The City Council may authorize the City to participate in the financing of transportation facility
projects or portions of transportation facility projects as defined in Section 3.55.030 at the time of the
appropriation of funds by City Council for the construction of an eligible transportation facility, the
City shall be eligible to receive a credit known hereafter as an economic incentive credit. Such
economic incentive credit may be applied to development impact fee obligations for those projects
which the City Council determines, in its sole discretion, to be beneficial to the City. The use of the
economic incentive credit may be subject to conditions which shall be set forth in a written agreement
between the developer of the project and the City and approved by City Council.
The City may receive economic incentive credit only for those eligible projects identified in Section
3.55.030 for amounts of funding not identified in the financial and engineering study "Western
Transportation Development Impact Fee" report dated February 2008.
3.55.195 Fund loans.
A.
B.
Loans by the City. The City may loan funds to the fund to pay for
facilities should the fund have insufficient funds to cover the cost of
said facility. Said loans, if granted, shall be approved upon the adoption
of the annual City budget or upon resolution of the City Council and
shall carry interest rates as set by the City Council for each fiscal year.
A schedule for repayment of said loans shall be established at the time
they are made and approved by the Council, with a maximum term not
to exceed the life of the fund.
Developer Loans. A developer may loan funds to the City as outlined
in CVMC 3.55.150. The City may repay said developer loans with
interest, under the terms listed in subsection (A) of this section.
3.55.200 Effective date.
This chapter shall become effective
SECTION 3: Effective Date
This Ordinance shall become effective 60 days after its second reading and adoption.
Presented by
Approved as to form by
UL- YYlA-~
Ann Moore
City Attorney
Jack Griffin
Engineering and General Services Director
3-71