Loading...
HomeMy WebLinkAboutReso 2007-299 RESOLUTION NO. 2007-299 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ADOPTING THE MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND REPORTING PROGRAM IS-07-015; APPROVING AMENDMENTS TO THE CITY'S GENERAL PLAN, THE EASTLAKE II GENERAL DEVELOPMENT PLAN, THE EASTLAKE BUSINESS CENTER II SUPPLEMENTAL SECTIONAL PLANNING AREA PLAN, PUBLIC FACILITIES FINANCING PLAN AND ASSOCIATED REGULATORY DOCUMENTS FOR 44 ACRES AT THE NORTHEAST, NORTHWEST AND SOUTHWEST CORNERS OF FENTON STREET AND SHOWROOM PLACE WITHIN THE EASTLAKE BUSINESS CENTER 1. RECITALS A. Project Site WHEREAS, the areas of land which are the subject of this Resolution are diagrammatically represented in Exhibit "A" attached to and incorporated into this Resolution, and commonly known as EastLake Business Center II, and for the purpose of general description herein consists of 44 acres subdivided into 3 separate properties: (I) Area A consists of 16.7 acres located at the eastern portion of the Business Center, at the northeast comer of Fenton Street and Showroom Place and contains the existing (Phase I) 234,000 EastLake Design District; (2) Area B consists of 17.7 acres located at the northwest comer of Fenton Street and Showroom Place. Area B is currently vacant; and, (3) Area C, located south of Fenton Street, consists of9.6 acres and is currently vacant (Project Site); and B. Project; Application for Discretionary Approvals WHEREAS, a duly verified application was filed with the City of Chula Vista Planning and Building Department on September II, 2006, by IRE Development (Applicant), requesting amendments to the City's General Plan, the EastLake II General Development Plan, the EastLake Business Center II Supplemental SPA Plan, the Planned Community District Regulations and associated regulatory documents, including design guidelines, Public Facilities Financing Plan, Air Quality Improvement Plan and Water Conservation Plan for the Project Site (Project); and Resolution No. 2007-299 Page 2 C. Prior Discretionary Approvals WHEREAS, development of the Project Site has been the subject matter of various entitlements and agreements, including: (I) amended EastLake II General Development Plan (GDP) approved by City Council Resolution No. 2005-288 on August 23, 2005; (2) Business Center II Supplemental SPA approved by City Council Resolution No. 19666 on November 16,1999; and, (3) amended EastLake II Planned Community District Regulations approved by City Council Ordinance No. 3018 on September 13,2005; and D. Environmental Determination WHEREAS, the Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has conducted an Initial Study, IS-07-015 in accordance with the California Environmental Quality Act. Based upon the results of the Initial Study, the Environmental Review Coordinator has determined that the project could result in significant effects on the environment. However, revisions to the project made by or agreed to by the applicant would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur; therefore, the Environmental Review Coordinator has prepared a Mitigated Negative Declaration,IS-07-015. E. Planning Commission Record of Application WHEREAS, the Planning Commission set the time and place for a hearing on the Project, and notice of the hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the City, and its mailing to property owners within 500 ft. of the exterior boundary of the Project Site at least ten (J 0) days prior to the hearing; and WHEREAS, the Planning Commission held an advertised public hearing on the Project on November 28, 2007, and voted 5-0-1-1 to forward a recommendation to the City Council on the Project; and WHEREAS, the proceedings and all evidence introduced before the Planning Commission at the public hearing on the Project held on November 28, 2007, and the minutes and resolution resulting therefrom, are incorporated into the record of this proceedings; and F. City Council Record of Application WHEREAS, the City Clerk set the time and place for the hearing on the Project application and notices of said hearings, together with its purposes given by its publication in a newspaper of general circulation in the city, and its mailing to property owners within 500 ft. of the exterior boundaries of the Project Site at least ten (10) days prior to the hearing; and --.. Resolution No. 2007-299 Page 3 WHEREAS, the duly called and noticed pubic hearing on the Project was held before the City Council of the City of Chula Vista on December 18, 2007, in the Council Chambers in the City Hall, Chula Vista Civic Center, 276 Fourth Avenue, at 6:00 p.m. to receive the recommendations of the Planning Commission, and to hear public testimony with regard to the same. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that it finds, determines, and resolves as follows: II. CERTIFICATION OF COMPLIANCE WITH CEQA The City Council finds that, in the exercise of their independent review and judgment, the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (lS-07 -015), in the form presented, has been prepared in accordance with requirements of the California Environmental Quality Act and the Environmental Review Procedures of the City of Chula Vista and adopts Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-07-015). III. APPROVAL OF GENERAL PLAN AMENDMENT The City Council approves the amendments to the Chula Vista General Plan Land Use Diagram text and statistics is as set forth and diagrammatically represented in Exhibit "B," to change the land use designation of 16.7 acres at the northeast corner of Fenton Street and Showroom Place from Light Industrial to Commercial Retail. The change of 16.7 acres from Light Industrial to Commercial Retail is shown in updated Table 5-6 of the Land Use Element and Transportation Element of the General Plan, as shown in Exhibit "B-1." IV. GENERAL PLAN INTERNAL CONSISTENCY The City Council finds and determines that the General Plan is internally consistent and shall remain internally consistent following the amendments in this Resolution. V. GENERAL DEVELOPMENT PLAN FINDINGS THE PROPOSED AMENDMENTS TO THE GENERAL DEVELOPMENT PLAN CONFORM WITH THE PROVISIONS OF THE CHULA VISTA GENERAL PLAN, AS AMENDED. The proposed amendments to the EastLake II General Development Plan reflect the land uses that are consistent with the City's General Plan as proposed to be amended. VI. APPROVAL OF GENERAL DEVELOPMENT PLAN AMENDMENT In light of the findings above, the City Council approves the amendment to EastLake II General Development Plan in the form presented to the City Council and on file in the office of the City Clerk. Resolution No. 2007-299 Page 4 VII. SPA FINDINGS/ APPROVAL A. THE SECTIONAL PLANNING AREA (SPA) PLAN, AS AMENDED, IS IN CONFORMITY WITH THE EASTLAKE II GENERAL DEVELOPMENT PLAN AND THE CHULA VISTA GENERAL PLAN. The proposed amendments to the EastLake Business Center II SPA Plan reflect the land uses that are consistent with the EastLake II General Development Plan and the City ofChula Vista General Plan as proposed to be amended. B. THE SECTIONAL PLANNING AREA (SPA) PLAN, AS AMENDED, WILL PROMOTE THE ORDERLY SEQUENTIALIZED DEVELOPMENT OF THE INVOLVED SECTIONAL PLANNING AREAS. The requested amendments to the EastLake Business Center II SPA plan includes a Supplemental Public Facilities Financing Plan that outlines the required infrastructure to serve the Project, the timing of installation and the financing mechanisms to promote the orderly sequentialized development of the Project. C. THE EASTLAKE SECTIONAL PLANNING AREA (SPA) PLANS, AS AMENDED, WILL NOT ADVERSELY AFFECT ADJACENT LAND USE, RESIDENTIAL ENJOYMENT, CIRCULATION OR ENVIRONMENTAL QUALITY. The proposed land use text and statistical amendments to the SPA, and development standards will not adversely affect the circulation system and overall land use pattern as previously envisioned in the EastLake II General Development Plan. A Mitigated Negative Declaration (IS-07-015) and accompanying Mitigation Monitoring Program was prepared for the Project. Mitigation measures have been included related to aesthetics/visual quality, air quality, paleontological, hydrology and water quality, noise, and traffic. Thus, the requested amendments to the SPA will not adversely affect the adjacent land uses, residential enjoyment, circulation or environmental quality of the surrounding uses. D. IN THE CASE OF PROPOSED INDUSTRIAL AND RESEARCH USES, THAT SUCH DEVELOPMENT WILL BE APPROPRIATE IN AREA, LOCATION, AND OVERALL DESIGN AND DEVELOPMENT STANDARDS ARE SUCH AS TO CREATE A RESEARCH OR INDUSTRIAL ENVIRONMENT OF SUSTAINED DESIRABILITY AND STABILITY; AND, THAT SUCH DEVELOPMENT WILL MEET PERFORMANCE STANDARDS ESTABLISHED BY THIS TITLE. The orientation and configuration of the 16.7 acres is substantially more suitable for commercial retail rather than light industrial land use and more compatible with the EastLake Design District which currently occupies the site. ~ Resolution No. 2007-299 Page 5 Thus, changing the previously adopted land use designation from Light Industrial to Commercial Retail is appropriate, and would be compatible with surrounding land uses. This added acreage will contribute substantially to achieve the city's economic development goals and objectives. E. THE STREETS AND THOROUGHFARES ARE SUITABLE AND ADEQUATE TO CARRY THE ANTICIPATED TRAFFIC THEREON. The potential impacts to traffic and circulation have been thoroughly analyzed based upon the proposed project resulting in specific requirements that must be complied with at the time of development within the project area. This includes payment of in-lieu fees to pay fair share of cumulative impacts to the off-site intersection located at the intersection of the V ons Driveway and Otay Lakes Road and the construction of a traffic signal at the intersection of Fenton Street and Showroom Place. F. ANY PROPOSED COMMERCIAL DEVELOPMENT CAN BE JUSTIFIED ECONOMICALLY AT THE LOCATION(S) PROPOSED AND WILL PROVIDE ADEQUATE COMMERCIAL FACILITIES OF THE TYPES NEEDED AT SUCH PROPOSED LOCATION(S). The proposed amendments increase the acreage designated Commercial Retail to allow for additional complementary retail establishments to be located within the existing Eastlake Design District in an effort to increase the economic viability of the District and to provide additional services, including restaurants and other similar uses, which complement the existing home improvement district. G. THE AREA SURROUNDING SAID DEVELOPMENT CAN BE PLANNED AND ZONED IN COORDINATION AND SUBSTANTIAL COMPATIBILITY WITH SAID DEVELOPMENT. The proposed amendments are consistent with the previously approved plans and regulations applicable to surrounding sites and therefore the proposed amendments can be planned and zoned in coordination and substantial compatibility with said development. VIII. APPROVAL OF SPA AMENDMENTS In light of the findings above, the City Council approves the EastLake Business Center II SPA amendments as presented in Exhibit "C" subject to the conditions set forth below: 1. Implement all environmental impact mitigation measures identified in Mitigated Negative Declaration IS 07-015 and Mitigation Monitoring Program for this project. Resolution No. 2007-299 Page 6 2. Install all public facilities in accordance with the EastLake Business Center Supplemental Public Facilities Plan 2007 Amendment or as required to meet the Growth Management Threshold standards adopted by the City. The City Engineer may modify the sequence of improvement construction should conditions change to warrant such a revision. 3. Implement the Federal and State mandated conservation measures outlined in the Water Conservation Plan for EastLake Business Center II Supplemental SPA Plan and 2007 Addendum. 4. Prior to approval of building permits for each phase of the Project, the Applicant shall demonstrate that air quality control measures outlined in the EastLake Business Center II Supplemental Air Quality Improvement Plan and 2007 Addendum pertaining to the design, construction and operational phases of the project have been incorporated in the project design. 5. Prior to the 30th day after the Ordinance becomes effective, the Applicant shall submit to the Planning and Building Department twenty (20) copies and a CD of amended EastLake II GDP, EastLake Business Center II SPA, EastLake II Planned Community District Regulations (PC District Regulations), Design Guidelines, Air Quality Improvement Plan, Water Conservation Plan and EastLake Business Center Supplemental Public Facilities Financing Plan 2007 Amendment. Specific document format, table of contents, and titles shall be as determined by City Staff. 6. Prior to the 30th day after the Ordinance becomes effective, the Applicant shall clean-up the SPA document by deleting all strike out, underlines, and shading. Where the document contains both an existing and proposed exhibit, the previous existing exhibit should be removed and substituted. In addition, the following text, document format, map and statistical changes shall be incorporated into the document: SP A P1Hn I. Following Page 1-10, add sections [1.2.1.6.2 through 11.2.1.6.5 back into the document 2. Change pagination on Pages 1-10 through 1-12. PC' Didnr.t Rp.gl1l~ti()n~ 3. On Page I-II, change BC-4 designation from Core Professional District to Core District 4. On Page IV-I, incorporate BC-4 into the definition of Business Center Core District 5. Page IV-7 regarding new footnote 5(A), add the following language: "as measured from the Property Line (except along Otay Lakes Road measured from top of slope, irregardless of where property line is located" 6. Page VIII-2 regarding order footnotes: make new footnote for furniture store parking as footnote 2. -~ Resolution No. 2007-299 Page 7 f)p.~ign (jl1;np.l;np.~ 7. Following Page IV-18, the next page should be numbered V-I with consistent page numbering to follow. Remove duplicated pages. IX. PFFP FINDINGS/APPROV AL A. THE AMENDMENT TO THE EXISITNG PFFP COMPLIES WITH SECTIONS 19.09.050 THROUGH 19.09.100, REQUIREMENTS FOR PUBLIC FACILITIES FINANCING PLAN. The amendment to the EastLake Business Center II Supplemental PFFP has been prepared according to the contents and details outlined in the Municipal Code. It has been submitted to and reviewed by the Director of Planning and Building. The Planning Commission has reviewed the proposed amendments and recommends adoption by the City Council. Public facilities needed to serve the project were identified and will be guaranteed by conditions of approval, implementation of required mitigation measures identified in Mitigated Negative Declaration IS-07- 015, payment of Development Impact (OIF) fees at the building permit stage, and/or utilizing Community Facilities to finance or maintain the public facility. B. THE PROPOSED PFFP AMENDMENT IS CONSISTENT WITH THE OVERALL GOALS AND POLICIES OF THE CITY'S GENERAL PLAN, GROWTH MANAGEMENT PROGRAM, THE AMENDED EASTLAKE II GENERAL DEVELOPMENT PLAN AND THE AMENDED EASTLAKE BUSINESS CENTER II SPA PLAN. The EastLake II General Development Plan and EastLake Business Center II SPA outline the necessary public facilities required to meet its land use and circulation objectives of the General Plan. The amendment to the existing PFFP outlines detailed plans for the provision of these public facilities as they relate to the proposed Project. The amended PFFP identifies required OIF fees that must be paid to help defray costs of facilities that will benefit the project. The estimated fees required by this project are $2,627,009 for Transportation Facilities and $2,850,622 for other applicable Facilities. While net fiscal impact of the Project on public facilities is negative in 2007 ($91,800 Loss) and 2008 ($57,400 Loss), the fiscal impact becomes positive in 2009 ($306,500) and positive at build out ($345,000). C. THE AMENDMENT TO THE EXSITING PFFP ENSURES THAT THE DEVELOPMENT OF THE PROJECT WILL NOT ADVERSELY AFFECT THE CITY'S QUALITY OF LIFE STANDARDS. Resolution No. 2007-299 Page 8 As required by the City's Growth Management Ordinance, the PFFP amendment analyzes the impact of the project on public facilities and services and identifies the required public facilities and services needed to serve the project to maintain consistency with the City's Quality of Life Threshold Standards. The PFFP describes in detail the cost, financing mechanisms and timing for constructing public facilities required to ensure that development occurs only when the necessary public facilities exist or are provided concurrent with the demands of the new development. Certain facility improvements have been identified as project impacts based upon Mitigated Negative Declaration (lS-07-015) and accompanying Mitigation Monitoring Program. These include the requirements for the construction of a signal at the intersection of Fenton and Showroom Place prior to development of Area B. Other required mitigation measures are related to aesthetics/visual quality, air quality, paleontological, hydrology and water quality, noise, and traffic. Implementation of these mitigation measures along with payment of required DIF fees will ensure the Project will maintain consistency with the City's Quality of Life Standards. In light of the findings above, the City Council approves the EastLake Business Center II Supplemental Public Facilities Financing Amendment as presented in Exhibit "D." X. APROV AL OF AMENDMENTS TO ASSOCIATED REGULATORY DOCUMENTS The City Council approves the amendments to the associated regulatory documents including the Design Guidelines for EastLake Business Center II Supplemental SPA as shown in Exhibit "C." XI. APPROVAL OF ADDENDUMS TO ASSOCIATED REGULATORY DOCUMENTS The City Council approves 2007 addendums to the Air Quality Improvement Plan and Water Conservation Plan for EastLake Business Center II Supplemental SPA Plan as shown in Exhibit "C." XIII. CONSEQUENCE OF FAILURE OF CONDITIONS If any of the forgoing conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, and any of such conditions fail to be so implemented and maintained according to the their terms, the City shall have the right to revoke or modifY all approvals herein granted, deny or further condition issuance of future building permits, deny, revoke or further condition all certificates of occupancy issued under the authority of approvals herein granted, instituted and prosecute litigate or compel their compliance or seek damages for their violations. No vested rights are gained by Applicant or successor in interest by the City approval of this Resolution. Resolution No. 2007-299 Page 9 XN. INVALIDITY; AUTOMATIC REVOCATION It is the intention of the City Council that its adoption of this Resolution is dependent upon enforceability of each and every term, provision, and condition herein stated; and that in the event that anyone or more terms, provisions or conditions are determined by the Court of competent jurisdiction to be invalid, illegal or unenforceable, if the city so determines in its sole discretion, this resolution shall be deemed to be revoked and no further in force or in effect. Approved as to form by ~f~~\\ Ann Moore City Attorney PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 18th day of December 2007 by the following vote: AYES: Councilmembers: Castaneda, McCann, Ramirez, Rindone, and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: None ATTEST: ~/)fU,(R.. / /r;,/'~ Susan Bigelow, MMC, City Clerk t STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certifY that the foregoing Resolution No. 2007-299 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 18th day of December 2007. Executed this 18th day of December 2007. ;~ 12,4,"~ f Susan Bigelow, MMC, City Clerk BOSWEU. RD BOSWEU. RD B '< ~ ! . " I " -; l ? tv o o " , tv ',() ',() t!j ~ ~ l-3 ce l~", PrOCli ' or Valley Rd RLM (Residential Low Medium) Change land Use from Limited Industrial (Il) to Commercial Retail (CR) ~ N o o --.J , N '-D '-D ~eS ~o 0\'3'1 \..'3 , j dl RLM' (Residential Low Medium) Resolution No. 2007-299 Page 12 LAND USE AND TRANSPORTATION ELEMENT CHAPTER 5 T;\JJLE 5-6 GENERAL PLAN LAND USE DISTRIBUTION IN 2030 BY PLANNING AREA (ACRES) Total East General Plan Land Use General Bay- North- South- East Unincorp. U ni ncorp. Designation Plan front west west Chula 5weet- Otay Area Vista water Ranch Subareas 5 ubarea 5 ubarea RESIDENTIAL Low 6,972 64 1,555 2,453' 2,900 Low Medium 8,200 1,354 1,401 4,927 307 211 Medium 1,201 187 288 622 32 72 Medium High 734 143 113 381 97 High 417 17 124 253 23 Urban Core 84 84 COMMERCIAL Jl~1J '9'1I.i1a]: 121 115 202 'j;irr51~' 32 Visitor 75 44 11 2 18 Professional & Admin. 160 21 61 7 59 12 l\fiXEDUSE Mixed Use Residential 727 174 98 405 SO Mixed Use Commercial 110 37 58 15 Mixed Use Transit F QCUS A rea 122 83 39 INDUSTRI AL Uit!Ili.iea:r:~ ~f;Z.73 86 116 384 ~JiL8.Z Regional Technology Park '" 200 200 General I ndustrial 218 218 PUBLIC, QUAS PUBLIC AND OPEN SPACE PubliclQuasi-Publ ic 3,021 27 225 321 2,028 381 39 Parks and Recreation 931 60 73 106 573 88 31 ODen SOOCe 6,303 23 215 617 3,886 1,099 463 Open SOOCe Preserve 17,910 362 18 97 5,200 2,008 10,225 Open 5pace- 367 44 323 Active Recreation Water 2,672 1,498 9 1,165 SPECIAL H..~ AREA Eastern Urban Center 240 240 Resort 275 45 230 Town Center '" 169 169 OTHER1 4,553 98 866 829 2,291 408 61 TOTAL ACRES 58,422 2,620 3,994 4,815 24,620 6,829 15,544 1- The unincorporated pJrtion of the Northwest Planning Area (87 acres of Residential Low) is included in the Unincorporated Sweetwater Subarea column only. 2- Streets, freeways, utility right-of-ways .Please see Page LUT-285 for Final Action Deferral Areas infonnation EXHIBIT B-1 Page LUT-59 ~I~ ""'''' OUAVIS1)\ """---------- --' Resolution No. 2007-299 Page 13 A ++c\.cd, men t C IRE- EastLake Design Distriet and Corporate Center AMENDMENTS December 11, 2007 City Council Package Resolution No. 2007-299 Page 14 TABLE OF CONTENTS 1. General Plan 2. General Development Plan 3. Sectional Planning Area 4. PC District Regulations (adopted and o.+tcc.hed -to Oc-dl'()Q.oc.e. ') 5. Design Guidelines 6.. Air Quality Improvement Plan 7. Water Conservation Plan (Note: All proposed revisions are shown ioshading andredlin~strikeout format. Wording to be addedissh~wnin'\iJi'derlliiHmH1iilaffi~; wording to be deleted is shown in sW~!I~~:Bl;HM!JiBg.] Resolution No. 2007-299 Page 15 GP IJ~ Resolution No. 2007-299 lj ~ ~ Page 16 ~J E ~ ~ "" . !J ll. J II I . II! I - 1111 " ~ =' II . Ii I,!l!l!lij .+. l"j ::. ~'t-II:L '. , ~ iIll1I11I 'a i I c: . I . i 111111111 .3 c: ~ I'.. . Iflpl - ill:!! Ii L III Ii - "I""j ...~< l! '1"1,1" II I. I ~'i!hTJ . ~ I c: ~ Illll " . !Ha~ CD ~ ,I !III I hl'h . rleu~I!E 111'1 filii! l1ii,11 II I --- . I~ I tlh Iii !l Ildl oult! 0 1..0 . ( I" I . I N ill,1H i ~ III Ij 11111/1 i I .1..1 D I III I iii III II, ! "I . . III ~ 1..1 ! i !II . I H! J J ;: < ~pnn 3 t ! I' I ! ~ I' dlrl I ".... i ......III...zea! 1 i lJ! ! . t . ~ ~~ i i ~ . Resolution No. 2007-299 Page 17 GDP Resolution No. 2007-299 Page 18 GENERAL DEVELOPMENT PLAN EASTLAKE II INCLUDES 11ffi FOLLOWING SPAs: EASTLAKE I, EASTLAKE II (EASTLAKE GREENS &TRAILS), SALT CREEK I, BUSINESS CENTER II AND VILLAGE CENTER NORTH Adopted November 16, 1999 by Resolution No. 19666 Amended August 23, 2005 by Resolution No. 2005-288 Prepared by: Cintl Land Planning 2932 Poinsettia Drive San Diego, CA 92106 Contact: Gary P. Cinti emaiJ: gary@cintLcom (619) 223-7408 Alrien'ded~',";; 1007 Bv ResolUtloD'N6:2007"xXX io01AmehdrrlentPn:ufu-edbv: RBReonsu1ting 9755 C!airemonfMesa'Bolllevard. Suite 100 San Diel!o. tA.92124 Contact: Dan. Werv. AI CP (858) 614.5081 dwervlU1rbf.com [Note: All oroposed revisions are shown in shadin!! and redline/strikeoul format. Wordin\! to he added is shown in under line and shadinl!: wording to be deleted is shown in StrilteBllt 8:llE1 sfiooiA!:.l Resolution No. 2007-299 Page] 9 SECTION 1.1 GENERAL DEVELOPMENT PLAN (GDP) TABLE OF CONTENTS SECTION PAGE 1.1.1 Introduction & Background ................................................................1.1.1-1 1.1.1.1 Introduction................... ........... ............ .......... ............................................. ........1 .1.1-1 1.1.1.2 Background .........................................................................................................1.1.1-1 1.1.2 Record of Amendments ........................................................................1.1.2-1 1.1.2.1 The 1994 General Development Plan Amendment ............................................I.l.2-1 L1.2.2 The 1995 Amendment.........................................................................................1.1.2-1 1.1.2.3 The 1998 Amendment.........................................................................................1.1.2-1 1.1.2.4 The 1999 Amendment.........................................................................................1.1.2-2 1.1.2.5 The 2002 Amendment..... ....................................................................................1.1.2-2 1.1.2.6 2003 Amendments ..............................................................................................1.1.2-2 1.1.2.6.1 Land Swap Amendment (CPFIRM)............................................................1.1.2-2 1.1.2.6.2 Village Center East (Kohls) ........................................................................1.1.2-3 1.1.2.7 The 2005 Amendments .......................................................................................1.1.2-3 1.1.2.7.1 Eastlake Design District..............................................................................1.1.2-3 1.1.2.7.2 Eastlake Walk ............................................................................................. 1.1.2-3 1.1.3 Goals & Objectives ...............................................................................1.1.3-1 1.1.3.1 Purpose & Intent ...................................................................................................... 3-1 1.1.3.2 General Goals: ......................................................................................................... 3-1 1.1.3.3 Residential Goals: ...... ........................... ................. ................ .......... ........................ 3-1 1.1.3.4 Commercial & Industrial Goals: .............................................................................. 3-2 1.1.3.5 Open Space, Parks & Recreation Goals:.................................................................. 3-2 1.1.3.6 Public Facilities, Circulation & Infrastructure Goals: .............................................3-3 1.1.3.7 Plan Administration Goals:......................................................................................3-4 1.1.3.8 Economic Goals: ......................................................................................................3-5 1.1.4 Pu rpose & Scope ......................................................................................... 4-1 1.1.5 Definitions..................................................................................................... 5-1 1.1.5.1 General... ............................ ........................... ........................................ ...................5-1 1.1.5.2 Additional Definitions ............................................................................................. 5-1 1.1.6 Regional Context......................................................................................... 6-1 1.1.. 7 Site Characteristics ...................................................................................... 7-1 Resolution No. 2007-299 Page 20 1.1.8. General Development Plan ....................................................................... 8-1 1.1.8.1 Land Use ...,....... .......... ....... .......................... ........ ....................... .................. ........... 8-1 1.1.8.2 Planned Community District Regulations ...............................................................8-1 1.1.8.3 Plan Summary ........................................... ...............................................................8-1 1.1.9 Plan Summary I Statistics .........................................................................9-1 1.1.9.1 1.1.9.2 Statistical Summary ............... ......... ............ ................... ........................... ...............9-1 Density Transfer.......... ................ ....... .......... ........ ............. ............ ...... ........... ..... ..... 9-1 1.1.10 Conformance with the General Plan ..................................................10-1 1.1.10.1 Introduction...... ............ ............. ........ .......... ...... ............. ........................ ......... ....... 10-1 1.1.10.2 Background & History ........................................................................................... 10-1 Ll.10.3 Conformance with the General Plan Elements ......................................................1 0-2 1.1.10.3.1 Land Use Element.......................................................................................... 10-2 1.1.10.3.2 Circulation Element ....................................................................................... 10-3 1.1.10.3.3 Parks & Recreation and Conservation/Open Space Elements....................... 10-3 1.1.10.3.4 Public Facilities Element ..............................................................................10-4 1.1.10.3.5 Housing Element............................................................................................10-4 1.1.10.3.6 Safety Element .............. ......... ............ ...................... ...................................... 10-4 1.1.10.3.7 Noise Element........... ............................ ... ...... ..................... ...... .......... ........... 10-5 1.1.11 Implementation........................................................................................ 11-1 1.1.11.1 Growth ManagementIPhasing................................................................................11-1 1.1.11.2 Community Facilities & Improvements................................................................. 11-1 1.1.11.3 Community Purpose Facilities............................................................................... I 1-2 1.1.11.3.1 Purpose & Intent ............................................................................................11-2 1.1.11.3.2 Proposed CPF Master Plan ............................................................................11-2 1.1.11.3.3 Proposed CPF Sites........................................................................................11-3 1.1.11.4 Development Agreement ....................................................................................... 11-5 1.1.11.5 Subsequent Review ................................................................................................ 11-6 1.1.12 Administrative & Legislative Procedures.......................................... 12-1 ii Resolution No. 2007-299 Page 21 LIST OF TABLES TABLE Table A Table B Table C Table D PAGE Land Use Balance ...........................................................................................1.1.6-1 GDP Land Use Statistics.................................................................................1.1.9-2 GDP Residential Density ................................................................................ 1.1.9-3 Community Purpose Facility Acres for EastLake ........................................1.1.11-3 LIST OF EXHmITS EXIDBIT PAGE I Vicinity Map ................................................................................................... 1.1.1-2 2 General Development Plan Boundaries ..........................................................1.1.1-3 3 Adopted SPA Boundaries ...............................................................................1.1.1-4 4 General Development Plan Map..................................................................... I. J .8-2 5 Master Plan of Community Purpose Facilities .............................................1.1.11-5 iii Resolution No. 2007-299 Page 22 1.1.1 Introduction & Background 1.1.1.1 Introduction The EastLake II General Development Plan (GDP) provides a policy bridge between the Chula Vista General Plan and the detailed planning provided in Sectional Planning Area (SPA) Plans for the EastLake II area (see Vicinity Map, Exhibit I). This GDP establishes Land Use Districts and defines intensity of development permitted in each district. This GDP is the second in a series of planning documents and programs that will guide the development of the EastLake II area. The first being the Chula Vista General Plan. Following the adoption of the General Plan and GDP, individual SPA Plans will further detail the planning policies and programs that will administer and regulate development. The GDP and the SPA Plans are required components of Planned Community (PC) Zoning and have been established in accordance with Sections 65450 through 65553 of the State of California Government Code and Sections 19.07.010 through 19.07.030 of the City of Chula Vista Municipal Code and apply to the property outlined by the General Development Plan boundary shown on Exhibit 2. 1.1.1.2 Background The General Development Plan for EastLake I, which includes approximately forty percent of the property, was established as the EastLake I General Development Plan in August 1982. SPA's (neighborhoods) developed in EastLake I GDP area include EastLake Shores, EastLake Hills, Salt Creek I, Village Center North, and the EastLake Business Center I and II. Refer to Exhibits 2 and). The EastLake Village Center North Supplemental SPA, includes Commercial , Office Professional and Business Center. The component of the Village Center south of Otay Lakes Road is included in the EastLake II SPA (Trails and Greens Neighborhoods) and is limited to Commercial uses. The second major increment of the EastLake Community was the planning of the EastLake Greens and EastLake Trails neighborhoods, located east of the proposed alignment of SR-125, between Otay Lakes Road, and Olympic Parkway. This second phase was merged with the EastLake I GDP and the two areas are now known as the EastLake II GDP. 08/23/05 Amended llill07 1.1.1.1 General Development PI., ..J Resolution No. 2007-299 Page 23 Vicinity Map San Miguel Ranch ~ EastLake II \..~.p I HUIs and Stlores ~. ? Salt C...k ~~d' 4.... .."'" o~ EastLaka U I' Greens & Trails Olay Ranch II II II II ... E'ASTLAKE A PlIl.1<NW COMMONIIY BY EASl\AICI 0EVEl.0I'MlNl co Cil~j L.ond pav,tng --- ~ r'\.Ji 1o....J ,,.,"" Exhibit 1 0&/23/05 Amended J l/1!01 1.1.1.2 General Development Plan I Resolution No. 2007-299 Page 24 General Development Plan Boundaries ('-'. J " EastLake II GDP EastLake'" GDP ~EASTLAKE I A~~br'" t_LllkI'C""'y Cinh Land P01nIng ---""'- ~ ~l..J 5102 Exhibit 2 08123105 Amended 1111/07 1.1.1-3 General Development Plan Resolution No. 2007-299 Page 25 Adopted SPA Boundaries EaatLake VUlIIge Center North supplemental SPA I I Salt Creek Spa \j'iI -,.. EastLake I SPA Shor&s Neighborhood HiJ1s Neigllborhaod Business cent.... I & 11 ViSage c.nl8r Norlh 1J',\o,~'l EastLake II SPA Greens NeighborhoOd Trails Neighborhood Land Swap Ale. Cinfi land I'\orlIW)g ['\....1-1 CJ 71Z3102 Exhibit 3 ~EASTlAKE A ,....ai......iIJ ~1'kc I.ndAR c-,..,. !.l.1-4 General Development Plan \ 08/23/05 Amdldedilll !01 Resolution No. 2007-299 Page 26 1.1.2 Record of Amendments 1.1.2.1 All of the original EastLake property has been annexed to the City. After that annexation, EastLake made an exchange of property with the Otay Ranch involving parcels known as the Land Swap Property. This amendment incorporated a portion of the Land Swap (22.7 acres) into the EastLake Greens SPA for annexation to the City of Chula Vista. The balance of the Land Swap Property is to be the subject of a future action. In addition, the EastLake Greens SPA was originally proposed to contain five parcels for higher density housing. These parcels were given an interim density designation in the SPA approval process. This amendment revises these interim designations to permanent designations to maintain the overall community character. The 1994 General Development Plan Amendment 1.1.2.2 This amendment relocated one public and one private park in the southern part of EastLake Greens to create more useable park sites. As a result of these park relocations, one residential parcel was eliminated and a public/quasi-public site was enlarged. These changes reduced the residential density in EastLake Greens by 133 units. Density transfers and boundary adjustments were made as a result of these changes. One density transfer of significance was the conversion of a parcel south of the EastLake High School from its 'Interim Designation" to a permanent designation of Medium-High, which is consistent with the General Plan for this parcel. No changes to existing conditions were proposed in the northern portion of EastLake Greens, EastLake Trails or EastLake I Planning Areas. The 1995 Amendment 1.1.2.3 The amendment consisted of modifying and rearranging the EastLake Trails land uses and incorporating 133.5 acres (Northern and Southern 'Land Swap' Parcels) to the EastLake II GDP, EastLake Greens SPA and associated regulatory documents. The following paragraphs describe the amendment in more detail. The Northern 'Land Swap" Parcel - The Northern 'Land Swap' parcel is designated for Professional and Administrative Commercial in the General Plan, and the same land use designation in the EastLake II GDP, (EastLake Greens Neighborhood). The Southern "Land Swap' Parcel _ The Southern 'Land Swap' parcel is bisected by the extension of EastLake Parkway creating two parcels. These two parcels are zoned PC and, under the City's General Plan, have been designated Retail Commercial and Medium-High density residential. The parcel west of EastLake Parkway was designated Freeway Commercial, allowing large retail operations such as Home Depot, K-Mart. etc. The parcel east of EastLake Parkway was merged with an 8.5 acre, Low-Medium density residential parcel, targeted for 45 dwellings, and a 6.3 acre Future Urban parcel located directly south. The combined parcels will produce a 65 acre parcel with capacity for 750 dwelling units. The 1998 Amendment 0&/23/05 Amended 11/1107 I.1.2-1 General Development Plan 1 Resolution No. 2007-299 Page 27 EastLake Trails Neighborhood B Under the previously adopted EastLake II GDP, the EastLake Trails was a 393.7 acre residential SPA designed to accommodate 1,260 dwelling units with densities ranging from Low (0-3 dulac) to Medium-High Density (11-18 dulac). Retail Commercial, Public/Quasi-public, Parks and Open Space land uses complement the residential land uses. The amendment featured basically the same land uses, except for the Retail Commercial and Medium-High residential which were deleted. The neW SPA establishes Low Density (0-3 du/ac), Low-Medium (3-6 du/ac) and Medium (6-11 dulac) density residential land use districts, in addition to support land uses such as: Community Purpose Facilities, Parks and Open Space, and Public/Quasi-public sites. 1.1.2.4 The 1999 Amendment expanded the EastLake II GDP area to include the EastLake Business Center II SPA which was previously within the EastLake 1II GDP. The phasing of development and land use similarity made it more appropriate to include this SPA, comprised entirely of employment uses within this GDP rather than the overwhelmingly single family residential EastLake 1Il GDP. A supplemental SPA Plan for the business center expansion area was approved concurrently with the GDP amendment. The 1999 Amendment 1.1.2.5 This amendmenC4nvolved the refmement of uses within the 'Village Center North" area. The retail commercial area north of Otay Lakes Road was amended from 36.9 acres to 38.1 acres. An additional 13.6 acres of Professional and Administrative uses and 16.4 acres of Research & limited Manufacturing are proposed. These additional areas were the result of the deletion of a large Public/Quasi-public use. The amendment was triggered when the large hospita1Jmedical center complex previously intended to be developed within the Public/Quasi-public parcel north of the retail commercial area was not pursued by the medical services sponsor. The amendment resulted in an expansion of the area designated for retail commercial uses and designation of Research and Limited Manufacturing (employment) uses on the remainder of the parcel located between EastLake Parkway and SR-125. A Supplemental SPA Plan, Village Center North, and related documents was processed concurrently with this GDP amendment for the areas with new land use designations. The 2002 Amendment 1.1.2.6 2003 Amendments 1.1.2.6.1 Land Swap Amendment (CPF/RM) Ordinance No. 2905 (to amend PC District RegulatiOns) Adopted 411 512003 Resolution No. 2003-140 (to amend GP/GDPlSPA and text language regarding CPF sites) adopted 4/8/2003 This amendment involved the elimination of the CPF Site southwest of the SDG&E easement in the EastLake Greens Neighborhood (Land Swap Area) of the EastLake II SPA, and a project- wide update of the existing and proposed CPF sites. The Master Plan of CPF Sites and the text describing CPF sites was updated to reflect this amendment and current City standards. 1.1.2-2 General Development Plan 08/23/05 A.11ienderll1/f107 Resolution No. 2007-299 Page 28 1.1.2.6.2 Village Center East (Kohls) Ordinance 2925 (to amend PC Land Use District Mapfrom VC-2 to VC-4 and new land uses for VC-4) adopted 7/8/2003 Resolution 2003-293 (to amend the CP. CDP. and VC North Supplemental SPA) This amendment was a project specific amendment that allowed a specific department store to be permitted east of EastLake Parkway and north of Otay Lakes Road. This project has noW been built. 1.1.2.7 The 200S Amendments Ll.2.U;. Eastlake Design District (ReDealeiizOoil Ordinance No. 2999 (to amend PC District Regulations to change Land Use District Map to add "overlay zone' and add text specific for the Design District - adopted April 5. 2005) Resolution 2005-102 (to add sign guidelines for the &stLake Design District for the Design Guidelines Section of the SPA) This amendment was sponsored by International Real Estate to create the EastLake Design District. 1.1.2.7.2 Eastlake Walk Ordinance No. 3018 (to change the PC Land Use District Mapfrom BC-3 to VC-la and to add new land uses for VC-l a District). adopted September 2005 Resolution 2005-288 (to change CDP designation from IR to CRY This amendment was sponsored by Sudberry Properties to create the EastLake Walk commercial project. 1.1.2.8 The 2001Arrten'dlrlelits ResolurCI12007:xxx. amend thi-l'~GDI'fmd SPA deSi acrestrom Industrial t6CoiltmerCiall: 6r'di~e Nd.XXxx tki/oeafof OPilintlnde.Nil2999iIrui Resolliii{}ii260S~j 02. 'dl7j~;ldlhePt Re~ltiti(}';'sand ~sil!1f GuidiUneioftlle .$J>A); I.l.2-3 Ckncral Development PIIlJ\ \ 08123/05 Amended 11/1/07 --~ Resolution No. 2007-299 Page 29 I.l.2-4 General Development Plan \ 0&/23/05 Amended 1111/07 Resolution No. 2007-299 Page 30 1.1.3 Goals & Objectives 1.1.3.1 This section provides goals and objectives intended to guide the development of EastLake II from inception through project completion. The attainment of some goals can only be measured during later phases of the planning process. And, the attainment of many goals anticipate actions by both the public and private sectors working together. One purpose of listing these goals and objectives is to guide the preparation of this General Development Plan. A further purpose is to use them during subsequent planning phases (e.g., SPA plan, PFFP, design guidelines, etc.) to maintain consistency, assist in resolving issues and defining programs. Purpose & Intent 1.1.3.2 General Goals: . To maintain and complete development of EastLake as an identifiable 'community" within the City of Chula Vista; a community comprising distinct neighborhoods which provide human scale physical and social environment. . To provide for adequate schools, parks and recreation facilities, "community purpose facilities' and other public/quasi-public uses. . Conceptually size and locate land and facilities required for dedication to public or quasi-public purposes based on maximum residential development established with the General Development Plan, while providing standards and guidelines to refme sizes and locations as more detailed plans are prepared. . Establish implementation phasing that provides or assures provision of public facilities concurrent with residential development, recognizing that residential development phases and public facility increments often do not coincide exactly. . Adopt a balanced and dynamic community development plan with efficiently organized elements. . Organize and design the individual elements of the plan for public and private efficiency. . Recognize implementation and marketing factors in the allocation and phasing of land uses in the General Development Plan and create an implementation process that is consistent with those factors. . Accommodate changing demographic patterns and cultural diversity in the plan. 1.1.3.3 Residential Goals: . To promote reasonably priced new home opportunities, economic stability and the enhancement of property values. . Identify the private costs of public policies for housing and development and balance them with the intended benefits to the community, recognizing these costs are paid by new home buyers. 08/23/05 Amended 1 \/1/07 1.1.3-1 General Development PI, Resolution No. 2007-299 Page 31 . Encourage emerging housing concepts and provide a variety of housing types suitable for a range of potential residents. . Provide for a range of intensity and product type consistent with each residential land use designation. . Adopt development standards that encourage design innovation in housing and site planning concepts that are consistent with quality residential development. 1.1.3.4 Commercial & Industrial Goals: . Encourage commercial and industrial facilities that enhance the economIc viability and image ofthe City ofChula Vista and EastLake. . Provide for development of commercial and employment uses that enhance public and private economic interests. . Create strong linkage between the City of Chula Vista, EastLake, and the Olympic Training Center. . Encourage facilities that support emerging industries and shopping trends. . Provide for a range of intensity and uses consistent with each commercial and industrial land use designation. . Adopt development standards that include a level of flexibility that can accommodate new uses and structures to attract emerging industries and shopping trends. . Provide parcel sizes, amenities, and infrastructure to serve the needs of emerging industries and commercial users. . Promote employment opportunities, particularly in professional and high tech industries. . Create specific incentive programs (public/private partnership) to attract professional and stable industries with emerging and long range employment opportunities for the residents of Chula Vista. . To use the most current water quality and watershed protection principles in the planning and design of commercial and industrial developments whenever possible. 1.1.3.5 Open Space, Parks & Recreation Goals: . Provide adequate parkland and recreational facilities to meet the needs of new EastLake residents when needed. . Conceptually size and locate land and facilities required for park dedication purposes based on maximum residential development established with the General Development Plan, while providing standards and guidelines to refine sizes and locations as more detailed plans are prepared. 08123/05 Amended 11 i1i01 1.1.3-2 General Development Plan I Resolution No. 2007-299 Page 32 . Recognize that a range of types and sizes of parks is an integral component of a quality living environment. Within that range, establish quantified standards that define 'parkland' and 'park improvements' for park credit purposes during the implementation process. . Create an implementation process that provides or assures provision of public facilities concurrent with residential development, recognizing that residential development phases and public park increments often do not coincide exactly. . Incorporate new parks into the City's system as soon as these parks are ready to serve an increasing resident population. . Encourage efficiency and cost savings in park acquisition/maintenance through cooperation and integration among public, private, and quasi-public interests. . F or facilities intended to serve more than the local resident population, establish maintenance district boundaries, or other means, so that costs for park and open space maintenance are consistent with the area intended to be served or beReihtedbenetited. . Implement the Chula Vista Greenbelt within EastLake consistent with the Chula Vista General Plan. o Maximize the utility and benefits of the Salt Creek Corridor consistent with natural resource protection. . Protect areas within Salt Creek with significant biological resource. o Locate facilities and amenities within the Salt Creek Corridor that promote recreational and educational experiences outside areas of significant biological resources. o Use parks and open space to reinforce community structure, design and safety. o Design and integrate parks and open space areas into the community fabric to maximize their benefits and enhance community cohesiveness. o Integrate trails and paths into the overall circulation system to provide alternative circulation routes. o Include a comprehensive brush management plan for open space areas in SPA Plans. 1.1.3.6 Public Facilities, Circulation & InfrastrUcture Goals: o Provide a balanced community transportation system consistent with the City's Circulation Element. . Implement, as needed, community circulation improvements required to serve new development within EastLake. o Contribute to regional facility improvements in proportion to project traffic impacts consistent with the City's Threshold Standards. o Encourage practical non-vehicular circulation. 1.1.3-3 General Development Plan \ 08/23/05 Amended 1111/07 - .-----.-, Resolution No. 2007-299 Page 33 . Connect neighborhoods and community facilities with pedestrian traillbicycle route facilities. . Plan for future public transit facilities and transportation demand measures; such as, park-and-ride facilities, vanpools, shuttle services, and telecommunications (for home office). . Encourage public facilities and infrastructure that are appropriate to individual circumstances. . Review specific instances where aesthetic or environmental benefits may warrant an exception to standards for public facilities or infrastrUcture. . Determine the need and requirements for public and quasi-public facilities within EastLake II. . Explore the development of integrated telecommunications systems within the EastLake community, which would enhance communications between home, work, schools, and other community services. . Continue to enhance the quality of the EastLake community through excellence in public and private education facilities, which serve all residents. . Evaluate and phase the availability of adequate public facilities to satisfy the City's Threshold Standards. . Provide opportunities for "community purpose facilities," such as, churches, child care facilities, community meeting areas, and private educational services and recreational facilities. 1.1.3.7 Plan Administration Goals: . Promote the coordination and communication between public agencies, community groupS, the developer and builders. o Provide effective development plan administration, implementing an adopted community structure, which promotes efficient and timely economic growth and development. o Create an administrative process tbat allows for density transfers and other refinements in SPA Plans, providing tbey are consistent with the established community structure and do not create significant adverse environmental, public service or infrastrUcture impacts. o Provide an implementation process that allows for change and refinement within established parameters, to preclude the burden of a formal amendment process for revisions that are consistent with the framework and intent or the plan. o Create efficient processing procedures for all phases of plan implementation. o Establish, within the implementing document, processing times for each level of plan review, appeal, amendment, or other routine application wbere these are not otherwise covered by City ordinance. 1.1.3-4 General Development Plan \ 08/23/05 Amended 11/1/tl7 Resolution No. 2007-299 Page 34 . Create a process that allows efficient conveyance of large parcels where no added entitlement or construction is involved in the subdivision. . Balance the subdivision dedication of public facilities and other development exactions with the fiscal impacts to development. . Create an implementation process which links the financing required for subsidy and exaction costs in early stages of development with the timing and amount of development revenues and consistency with the City's Threshold Standards. . Encourage efficiency in the environmental review process. 1.1.3.8 Economic Goals: . Promote the economic vitality of both public and private interests. . Incorporate positive economic results or incentives to both public and private interests at each phase of implementation. . promote planning that positively positions Chula Vista and EastLake in the context of State and regional competitive forces. . Establish minimum economic performance goals. . Define in the Public Facility Financing Plan any required exaction so that the cost and timing of the exaction can be budgeted. 1.1.3-5 General Development Plan \ 08123/05 Amended 11/1107 , ------' Resolution No. 2007-299 Page 35 1.1.4 Purpose & Scope This General Development Plan (GDP)establishes development parameters for the EastLake II General Development Plan Area, which is illustrated in Exhibits 2 and 4. The GDP addresses the distribution of land uses, circulation pattern, defines the overall community structure and establishes development densities. The purpose of the plan is as follows: . Assure a high quality of development, consistent with the objectives of the developer, City of Chula Vista, and community. . Provide for orderly planning and long range develDpment of the project to ensure community compatibility. . Preserve open space and natural amenities on the property whenever possible. . Establish a planning and development framework to allow diverse land uses to exist in harmony within the planned community and surrounding developments. The GDP establishes land use districts for the site and defines in broad terms the type and intensity of development permitted in each district. The Enviromnentallmpact Report prepared in conjunction with the General Development Plan and subsequent amendments, fulfills the environmental review requirements for any proposed development as long as the development is in conformance with the GDP. The GDP is implemented through the adopted Sectional planning Area (SPA) Plan, which is more detailed. Therefore, the GDP is designed to function as a policy bridge between the City's General Plan and the SPA Plan. The EastLake II General Development Plan is established in accordance with Sections 65450 through 65553 of the State of California Government Code (Specific Plans) and Sections 19.07.010 through 19.07.030 of the City of Chula Vista Municipal Code, and applies to the property outlined by the General Development Plan Map, included as Exhibit 4. 1.\.4-1 General Development Plan \ 0&/23/05 Amended 11/1/07 Resolution No. 2007-299 Page 36 . 1.1.5 Definitions 1.1.5.1 The defmitions of all terms used in this document shall have the same meaning as used in the adopted Chula Vista General Plan and Municipal Code, unless otherwise specifically defined herein. General 1.1.5.2 Additional Definitions Land Swap Area This is the land area added to the EastLake Community from an exchange of land with . the adjacent property owner. It is comprised of two parcels west of the previously adopted EastLake II SPA (Greens Neighborhood) area, more specifically defined as: Northern Land Swap Parcel A triangular parcel formed by Otay Lakes Road to the northwest, SR-125 to the east, and the boundary between the Otay Ranch to the southwest. Southern Land Swap Parcel This parcel is bounded by SR-125 to the west, Olympic Parkway to the south, and to the north and east by the southwestern boundaries of the original EastLake Greens Neighborhood (generally along the SDG&E easement). Planned Community of EastLake: The planned community of EastLake refers to the combined area of EastLake II and EastLake Ill, as depicted in Exhibit 2 herein. Village Center North The portion of the Village Center located north of Otay Lakes Road, including the planning areas identified as VC-I, VC-2, VC-4, and E-IO in the EastLake Village Center North Supplemental SPA. U.5-1 General Development Plan \ 08/23/05 Amended 1111/07 __J Resolution No. 2007-299 Page 37 1.1.6 Regional Context The Eastern Territories identified in the Chula Vista General Plan are primarily comprised of several large planned communities. The planned community of EastLake was the first of these significant developments to be planned and implemented as a comprehensive planned Community. It has evolved into twO major implementation components, known as EastLake 11 and EastLake Ill, which combined represent the total EastLake project. It has always been envisioned as a complete community which included a full range of community components, providing opportUnities to live, work, shop, and play within one master planned community. To compare EastLake II to the other three largest planned communities, the following table provides the percentage allocation of land to uses comprising the live, work, shop, and play concept. Table A Land Use Balance Planned Community EastLakC {l~ Rancho del Rey6 Otay Ranch7 Livel WorlC ShopJ 48:3% ~ro.7o/Q ~.s% 52% 1.4% 4.6% 35% 3% 3.9% Play' n.5% 3.2% 2% 5. 6. 7. Includes all residential land uses as a percentage of the total project area. Includes all industrial, office & administrative land uses as a percentage of the total project area. Includes all commercial land uses as a percentage of the total project area. Includes all park and recreation uses as a percentage of the total project area. EastLake Il:lncludes a\1 of EastLake II GDP. Rancho del Rey: Includes all areas in the adopted El Rancho del Rey Specific Plan. Otay Ranch: Includes the Urban Villages (Otay Valley Parcel) in the adopted Otay Ranch GDP. Note: The statistics in the above table are as of the adoption of this GOP and may change from time to time as projects are amended. Live, Work: \. 2. 3. 4. Shop: Play: 1.\.6-1 General Development Plan \ 08123/05 AlrtendOd lliJ!07 Resolution No. 2007-299 Page 38 1.1.7 Site Characteristics The EastLake II General Development Plan consists of approximately 2,300 acres at the eastern edge of the City's incorporation boundary. Otay Lakes Road bisects the planned community from east to west dividing the GDP into two major areas. The area to the north, which includes the EastLake Hills, EastLake Shores, and Salt Creek I residential neighborhoods and the Business and Village Centers, is known as EastLake I SPA. The area south of Otay Lake Road includes, from west to east, the EastLake Greens and EastLake Trails Neighborhoods. (See Exhibit 3). All surrounding properties are either developed, under development or planned for development. The GDP area is bounded to the north by the Salt Creek Ranch and Rancho San Miguel planned communities; to the west by Otay Ranch Village Five and a subdivision known as Telegraph Canyon Estates; to the east by the EastLake III General Development Plan area; and to the south by Otay Ranch Village Eleven, south of Olympic Parkway. The project site is generally comprised of gently rolling topography with the Salt Creek corridor forming the predominate geographic feature. The rounded features of the site reflect the years of plowing and discing associated with its historical dry farming use. Localized views to Salt Creek and adjacent hillsides available from hillside locations. The range in elevation is approximately ISO feet from the creek bed to hilltop. Salt Creek is also the significant natural resource on the site. The southernmost portion has been identified as an environmentally sensitive area because of its biological and wildlife habitat value, and aesthetic value. The original EastLake ElR (EIR 81-03) biological survey of the area identified sensitive resources within Salt Creek and in the southernmost portions of the site. No significant archaeological or cultural resources have been identified in several surveys of the project site. Cllrrently, most adjacent properties have been developed. I.1 ,7-1 General Development Plan \ 08/23/05 Aniemk!l11fl/07 Resolution No. 2007-299 Page 39 1.1.8.1 The General Development Plan designates a wide range of residential densities, residential support uses, commercial and employment uses. Residential support uses are found within the Public/Quasi-Public (PQ) category. These uses include schools, utility sites. and other community facilities. A significant amount of employment uses (professional and Administrative, and Research and Limited Manufacturing) is designated in the nortb-central portion of the plan area. Commercial areas are designated adjacent to the planned SR-125 interchanges at Otay Lakes Road and Olympic Parkway. See Exhibit 4, the General Development Plan Map. Additional land use detail and statistics are included in the Sectional Planning Area (SPA) Plan as the Site Utilization Plan. The purpose of this plan is to provide a more specific level of detail of uses included as broad categories in the General Development Plan. General Development Plan Land Use 1.1.8 1.1.8.2 With respect to development standards and use regulations, the Planned Community (PC) District Regulations provide detailed standards that are applicable to each parcel of land. These Planned Community District Regulations, as a component of the General Development Plan for the EastLake II (expanded EastLake I) provide the primary development regulations for all four SPA Plans within the GDP area. Within the Planned community District Regulations, the Land Use Districts ex.hibit, provides the geographic distribution of the various land use districts. Planned Community District Regulations 1.1.8.3 The project consists of five residential neighborhoods: EastLake Hills, EastLake Shores, EastLake Greens, EastLake Trails, and Salt Creek 1. The project includes sites for necessary public facilities including a high school, two community parks and three elementary school sites to be shared with EastLake III. Detailed development policies, standards and programs are provided in SPA Plans to assure well-planned, quality development, conservation of important onsite resources and provision of adequate and timely public services and facility improvements to serve the project. Plan Summary r 1.\.8-1 General Development Plan \ 08123/05 Amended 1l11l()7 " IR ~xisting\ General Developmel1 PI~i ::s Z ? tv o o -..] , tv 'D 'D eR R"'-"" 'c F_C...... p,. PtOlJAd...... lit R","LN.~ ot 0p0Il1\*1 PQ ~_. .. .._I.R""- ......~- ...-_R........ PIOjo<I T.... .;'. .~~:.:~:j? \ IR IR ., L Ul4DUIlI ~ ,"",10-3-1 LM L...-,(3ot-l M _(10"-> Ill" ~ll..a_l " 1IP1..21+_1 __RotWoM .su 3.0 ..u .. 2.0.. aA .1203 It.. .U z,l.$ - ,"2" .. '" 2t.7 :lOta 2UI 210 - 7". /. .' , ./~. ,....l~~ ; try '-.<-. .~. 80.3 50.7 :It.a 23\.0 2\5.\ 1ta.I 212.2 22'.9 1226.3 2281.7 '.\ 7l1S ~ PQ ~~ , . ,/. \~ ... .._~ v ..,CF'F.. ~..""'Uft()__",.JorIll<*"s rai~fi-il~'1I -=._~. Clrt;i l.al<I ~ r=t=fi 8/23105 Corrected 10/23/07 L lIMlW_1 L'" \,ooOMOd. (lot_I '" ...-It-,,_l "'" ~ll.,._1 " 1tIh(1.274_1 __""'*""" .."" .... .... . 0" _'" ;;./"~. ~ Ger "ra' Oevelop.ment PI" <> ~ .j>.- -~ o' =' Z !J N o o ...... , N '" '" [ \,AND U8' 187.. 3.0 "' .".2'" 2,.1 2'U 8A 20" 15U '''' 2'" ~2.0.3~ lOSZA U 1'" /' .../ // /.~,/ .1 .$ \ ,;fJY .", l.......;. II.... ~ -oof.l- 91.0 F_~ 10.1 prolJAdmln. 29.0 _"\.ld.~ ~21'.3 0pMl Spoc. 215.1 ,~u~-~. 1"J _""_- ZG.2 _0.._ 22'~ ....-_...-.. 1221.3 .....1.... 2281.1 3.1 7'" ......CfI'F$lH. ___1ClUft4UM~"....*tNflf JEASfiAKEI . _l.ft.-d communitY by The EastLake Company ,. Clr.~ Ut1tI PlOf1I'~ n;:E\~ 8123/0 (Revised 10ml! Resolution No. 2007-299 Page 42 .1.1.9 Plan Summary I Statistics 1.1.9.1 The statistics on the following pages, in Table B Land Use and Table C Residential Densities, are based on the overall General Development Plan and detailed by SPA Plan area. In the event that the statistics on these tables vary, due to density transfers or refinements. from any adopted SPA Site Utilization Plan map the SPA Plan shall prevail. Statistical Summary 1.1.9.2 In order to promote flexibility in residential densities, the transfer of dwelling units from one residential category to another within any SPA may be approved as a part of the SPA plan approval process. Notwithstanding this provision, the clustering provisions of the General Plan Update shall be utilized to maintain the community character inherent in the density categories established by this General Development Plan. Transfers of density shall be based on evidence that the proposed transfer would substantially improve the spatial or functional relationships of the involved SPA, or would materially increase the quality of land use. circulation or conservation pattern thereof. Transfers of density into the low density category should not result in a reduction in lot size requirements. Transfer of units from one parcel to another within the same SPA may be processed administratively if: I. the proposed unit count for all parcels remains within the range (s) indicated on the Site Utilization Plan; 2. the proposed product types are consistent with those listed for each parcel on the Site Utilization Plan; and. 3. the GDP and SPA total number of dwelling units is not exceeded. Modification which are not consistent with all these criteria shan require a formal SPA amendment. Should such a transfer be approved. applicable statistics and the General Development Plan Map shall be revised as an administrative matter without the necessity of a formal plan amendment. Density Transfer !.l.9.\ General Development Plan \ 08/23105 Amended \111107 ~_--J Resolution No. 2007-299 Page 43 Land Use Category NEIGHBORHOOD AREA TOTALS Hills Shores Salt Creek Greens Trails Business 1 Center' RESIDENTIAL Low (0-3 dulac) 109.4 0 43.6 34.4 10.4 0 197.8 Low-Medium (3-6 dulac) 35.3 36.4 0 183.9 195.6 0 451.2 Medium (6-11 dulac) 0 66.3 0 156.1 18.4 0 240.8 Medium-High (11-18 0 24.3 28.5 99.5 0 0 152.3 dulac) High (lS-27 dulac) 0 lO.3 0 0 0 0 10.3 Sub-total 144.7 137.3 72.1 473.9 224.4 0 1052.4 NON_RESIDENTIAL Relail C<:>l11lIlercial 0 0 0 19.6 0 31l.1 llIli) 97.0 Freeway Commercial 0 0 0 50.7 0 0 SO.7 Professional & 0 0 0 29.0 0 0 29.0 Administrative Reseaich & I..lauted 0 0 0 0 0 245.1 ~ Marlufacturlng 214.3 Open Space 93.6 54.8 18.9 37.9 5.3 4.6 215.1 PubliclQuasi-public 10.0 0 0 85.3 17.8 0 113.1 parks & Recreation 2.4 21.4 0 197.8 51.5 9.1 282.2 Major Circulation . . . 105.0 16.0 .. 224.9 Future Urban 0 0 0 0 0 0 0 SUb-to/Cd I06.Q' 762' 1&:9' sn.o 113'.7 310.5' ~ 1226.3 ~ TOTAL 250.7' 213.5' 9\.0' 994.9 338.1 310.5' 2281.7 Table B GDP Land Use Statistics (acres) . Acreage not allocated 1 Includes Village Center North uses. 2 Excludes Major Circulation 1.1.9-2 General Development Plan \ 08/23/05 Amended 11/1107 Resolution No. 2007-299 Page 44 Residential Category NEIGHBORHOODS AREA TOTAL S Hills Shores Salt Creek 1 Greens Trails Low (0-3 dulac) 291 0 169 94 31 585 Low-Medium (3-6 dulac) 163 186 0 872 926 2147 Medium (6-11 dulac) 0 663 0 1170 186 2019 Medium-High (11-18 0 426 381 1307 0 2114 dulac ) High (18-27 dulac) 0 250 0 0 0 250 Total 454 1525 550 3443 1143 7115 Average Density (dulac) 3.1 11.1 7.6 7.3 5.1 6.8 population (@2.88/du) 1308 4392 1584 9916 3292 20491 Table C GDP Residential Density (dwelling units) 1.1.9-3 General Development Plan \ 08123/05 Amended 11/1/07 ------' Resolution No. 2007-299 Page 45 1.1.10 Conformance with the General plan 0.10.1 Introduction This section describes the conformance of the project with the Chula Vista General plan; the history of the project to various General Plan updates. and; the relationship of the project to the specific elements of the General Plan. Implementation of this GDP shall be consistent with the requirements of the General Plan. Specific implementation and phasing strategies have been, and will be, provided in the various SPA Plans which comprise EastLake II GDP planning Area. 0.10.2 Background & History When the planning of EastLake began in 1979 the General Plan for the Eastern Territories had not been developed to its current state, since development of a new community on the scale of EastLake had not been conceived prior to that time. Individual development proposals were incrementally added as amendments to the General Plan. The approval of EastLake 1. which included the now existing communities of EastLake Shores, EastLake Hills. and the first phase of the EastLake Business Center, was one of these incremental general plan amendments adopted in 1982. The submittal of plans for the next phase of EastLake community planning. EastLake Greens and EastLake Trails, occurred prior to the comprehensive General Plan update, but was not adopted until \989. This planning was reflected in the General Plan and adopted as the EastLake II GDP. The categories were broad interpretations of the specific planning being proposed for these neighborhoods. The EastLake Greens neighborhood submittal included a SPA Plan concurrently with the General Plan and GDP. The EastLake Trails neighborhood only included the concurrent processing of the EastLake II GDP. The next update of the General Plan in EastLake occurred when the EastLake III GDP area was approved, bringing the Olympic Training Center to Chula Vista in 1990. A GDP was adopted and reflected in a concurrent General Plan amendment. The most recent major amendment to the General Plan for the EastLake community occurred in 2005 as a city-wide General Plan Update (GPU). which changed the land use designation in a portion of Village Center north from Industrial to commercial. This GPU amendment included the 2005 amendment to this General Development Plan. The General 'pianw~airi~t\d~a ih 2d07.to'~tliSsi '~]6j~a:EtellteateYioUsI~eveio "'e&.'as \ thbEastLakeDesin Disttict'teaiUril1 t'umit""~'dihbmedesr bu~inesses'fr "'lridJStrlal to C mmercial to bemr' flectthece 'land e~lt~a1J1:of'ero""'; The General Plan amendments and updates for EastLake reflect a consistent process of evolution since its original conception as a new community. All have been amendments adopted concurrently with more detailed development proposals. The current proposed amendment to the General Plan for the EastLake Trails neighborhood is the most recent example of this process. This concurrent planning process has maintained an ongoing consistency between the General Plan and the GDPs and SPAs. \.I.l()"l General Development Plan \ 08123/05 e..mendedll/l/07 Resolution No. 2007-299 Page 46 1.1.10.3 Conformance with the General Plan Elements 1.1.10.3.1 Land Use Element EastLake n General Development Plan consists of approximately 2,300 acres. The individual neighborhoods of the EastLake II GDP consist of the Salt Creek I, Hills, Shores, Business Center I and It GreenslLand Swap and the Trails. The Salt Creek I neighborhood is located north and south of East 'H' Street, east of the future SR-125 freeway alignment. The General Plan designates this neighborhood Medium-High Residential (11-18 dulac). The GDP land use designation and maximum number of dwelling units allowed on this site is about 7.6 dulae which is below the General Plan permitted density. The Hills neighborhood located north of "H" Street is designated Low Residential (0-3 dulac), Low-Medium (3-6 dulac) and Open Space with an elementary school. The GDP consists of single family residential and open space uses consistent with the land use pattern established by the General Plan. The EastLake Elementary School and park are located as indicated on the General Plan Land Use Plan. The neighborhood overall density is approximately 3.0 dulac, which is at the lower end of the General Plan designation. The Shores neighborhood located south of "H" Street is designated a wide range of residential densities including Low-Medium (3-6 dulac) , Medium (6-11 dulac), Medium-High (11-18 dulac), and High (18-27 dulac). The GDP land use is consistent with the various densities arranged around the private lake which is shown on the General Plan as Public/Quasi-Public and Water. There is also a small portion of open space reflecting the canyons to the southwest of the residential neighborhoods. The overall neighborhood density is approximately II du lac, which is at the low end of the General Plan density range for this area. The Village Center is located north of Otay Lakes Road and is designated Retail Commercial in the GDP. The Village Center is consistent with the General Plan and is intended to be developed as a Commercial-Retail plus a minor area of Research & Limited Manufacturing.. The adjacent area on the east side of EastLake Parkway is designated professional and Administrative and is designated in the GDP for professional and administrative uses. The first phase of the EastLake Business Center is located in EastLake II General Development Plan and is designated Research and Limited Manufacturing on the General Plan. This area is planned to accommodate a broad range of business and industrial uses in the GDP to provide local employment opportunities to the community. ~e Business Center nis'I" catt!fw'tbfu . 'if ~ake'UGeneral beyelomentPlanand is desi nated Research and Limited Manufactlirinand RetailCommercial.1bis area is lannedto ac'C'"" 'ciaate ifbroad fahi:of indllstiia~d fetai1'\ises aonwithooinlern6n "commercial useS; The Greens neighborhood is designated for a wide range of residential, retail commercial and public uses on the General Plan. The GDP designates the area at the southwest comer of Otay Lakes Road and EastLake Parkway as retail commercial to provide for a community shopping center. The residential uses vary, including. Low-Medium (3-6 dulac) Medium (6-11 dulac). and Medium-High (11-18 dulac). The overall neighborhood density is about 7.2 dulac, which is well within the average density of the General Plan. 1.1.10.2 General Development Plan I 0&/23/05 Amended IIll/07 Resolution No. 2007-299 Page 47 The public uses on the General Plan designate an area for a high school, community park, elementarY school, neighborhood park, water utility reservoir, and freeway commercial. The southern portion of the "Land Swap" includes Medium-High Residential and Freeway Commercial. The northern portion of the "Land Swap" includes professional and administrative area on Otay Lakes Road. The GDP is consistent with the pattem of land uses designated on the General Plan. The focal point of the Greens neighborhood is the EastLake Golf Course which is integrated within the residential neighborhood. Residential densities are varied throughout the GDP as permitted by the General Plan with the overall density within the acceptable range. The Trails neighborhood is designated Low-Medium (3-6 duJac), with open space, elementary school, neighborhood park, and a small neighborhood commercial center at the comer of Otay Lakes Road and Hunte Parkway. The commercial center is no longer included in the GDP and will be eliminated. The GDP adjusts the location of the elementary school, which is permissible by the General Plan, and designated the Salt Creek Open Space Corridor as a community park which will serve both the EastLake II General Development Plan, but also the EastLake 1lI General Development Plan area. The proposed density of 5.1 duJac is consistent with the General plan density range. 1.1,10.3.2 Circulation Element The General Plan Circulation Element designates four major road facilities to serve the EastLake II General Development Plan. SR 125 is planned as a major freeway/toll road providing regional access to the area by connecting the Otay Mesa Border Crossing to freeways to the north such as SR-54, and 1-8. The GDP provides the future right of way needed for SR-125. The General Plan also designates three Prime Arterial roadways providing east west access to the area from 1-805: "H" Street, Otay Lakes Road and Olympic Parkway. Each of these roads requires a right of way to accommodate 4 lanes of traffic with raised medians. EastLake Parkway and Hunte Parkway are shown as major roads (4 lanes) and several local streets are designated as collector roads. All General Plan roads are shown on the GDP and adequate provisions are included to accommodate traffic generated by the development. 1.1.10.3.3 Parks & Recreation and Conservation/Open Space Elements The General Plan designates a community park on EastLake Parkway adjacent to the high school and two neighborhood parks in the Greens and Trails neighborhoods. There are also major open space corridors shown along the north side of the Hills which reflects steep topography and also along Salt Creek in the Trails neighborhood. The Hills open space is treated as natural open space in the GDP, however, the Salt Creek Open Space is planned for a combination of community park, mitigation areas for habitat protection and a private homeowner's swim complex and fishing lake. This combination of public and private park and open space uses is consistent with the General Plan Open Space land use category. The neighborhood parks are located within the Greens and the Trails neighborhoods and the GDP supplements these park facilities with a number of private park facilities which include swimming pools, basketball courts, tennis courts, picnic facilities, community meeting facilities and tot lots located within the residential neighborhoods. The Trails neighborhood park will be incorporated into te the Salt Creek Community Park, which actually provides more park land than shown on the General Plan for EastLake II GDP. 1.1.10-3 General Development Plan \ 0&/23105 A'mended i 111107 Resolution No. 2007-299 Page 48 1.1.10.3.4 Public Facilities Element The Puhlic Facilities Element provides policy guidance for all development projects. It addresses water, sewer, drainage, hazardous waste disposal, schools and lihraries. The EastLake II General Development Plan implementation documents will provide detailed plans for the provision of public facilities in accordance with adopted Master Plans and the City's Quality of Life Threshold Standards. This GDP must prepare a comprehensive Public Facilities Financing Plan for each neighborhood to identify the public facilities to be provided by the developer to serve the development. Water plans for each neighborhood are approved by the Otay Municipal Water District and required facilities must be financed by the developer. Sewer plans are required to conform to the City's Sewer Master Plan and facilities such as transmission mains and pump stations are made conditions of tentative maps. Drainage facilities are designed on the basis of master drainage plans and financed and made conditions of the development. Hazardous wastes must be disposed of in accordance with State requirements of the Department of Health Services and the County HazardouS Materials Management Division. The only facility in Chula Vista is located at the Otay Landfill. Master plans for both the elementary school district and the high school district provide the site locations for schools designated on the General Plan. The GDP includes these school sites on the land use map and the Public Facilities Financing Plans provide the phasing and financing implementation necessary to constrUct schools in accordance with the school districts enrollments. 1.1.10.3.5 Housing Element The Housing Element requires that all major projects shall constrUct 5% low income housing and 5% moderate income housing consistent with the HUD guidelines based on size and family incomes. The GDP addressed this requirement and lays out the framework for an Affordable Housing Agreement which implements the General Plan policy for each neighborhood. The EastLake II General Development Plan provides for 5% low income housing and 5% moderate income housing in accordance with the General Plan. 1.1.10.3.6 Safety Element The City of Chula Vista provides for public safety and seismic protection through a variety of mechanisms addressed in the GDP and implementation programs. Fire stations are located in the GDP based on travel times to respond in case of fire or medical emergencies. Water supplies are engineered to accommodate peak demand periods. Streets are designed with adequate widths and safe routes for emergency vehicles. Building codes ensure the safety of buildings and seismic studies of fault lines to identify appropriate setbacks and other safeguards in the event of an earthquake. New development planned in this GDP is in conformance with all of the life and property protections contained in the General Plan and implementing building codes and fire codes. l. \.1 0-4 General Development Plan \ 08/23105 Amehded 1111107 Resolution No. 2007-299 Page 49 1.1.10.3.7 Noise Element The Noise Element requires that the City apply noise protection standards which recognize the right of every citizen to live and work in a safe environment without excessive noise. Noise studies are carried out in conjunction with the environmental impact report requirements for GDP's to identify setbacks or noise buffers for sensitive areas within the development. These measures are carried out in the development of the project. There are no identified major noise generators located within the GDP and the development is consistent with the policies of the General Plan. 1.1.10.5 General Development Plan \ 0&/23/05 Ami:ndod 11 ill07 Resolution No. 2007-299 Page 50 1.1.11 Implementation 1.1.11.1 Growth ManagementlPhasing This GDP will be used by the City and the developer to ensure that development occurs in an orderly fashion and that public facilities are provided concurrent with need while, at the same time, providing flexibility to allow the developer to respond to changing market conditions. The conceptual phasing information has been and will be presented in SPA Plan to be developed primarily for the purposes of determining preliminary circulation and public facility requirements. The objective of these phasing plans is that public facilities will be provided concurrent with need and in accordance with the threshold standards established by the City of Chula Vista. 1.1.11.2 Community Facilities & Improvements Specific community facility requirements will be identified for each SPA Plan. The following standards have been established for community facilities. . Circulation: Development within EastLake II shall comply with the City's Level of Service "C" requirement for the operation of circulation element roads. A transportation phasing plan consistent with the City's Growth Management Element shall be incorporated into the SPA Plans to ensure that level of service standards are met. . Water: A detailed water master plan shall be prepared in conjunction with each SPA Plan. The water master plan shall be subject to review and approval by the Otay Water District. . Sewer: A detailed sewer master plan shall be prepared in conjunction with each SPA Plan. The sewer master plan shall include consideration of reclaimed water and shall be subject to review and approval by the City ofChula Vista. . Drainage: A conceptual drainage plan shall be included in each SPA Plan. The conceptual drainage plan shall, in particular, address drainage areas in Salt Creek. Drainage plans for individual developments shall be prepared to the satisfaction of the City Engineer. . Fire and Police: Each SPA Plan shall define specific facility requirements for fire and police protection to the satisfaction of the Chula Vista police and Fire Departments. . Schools: School facility requirements shall be defmed in EastLake II GDP and each subsequent SPA Plan to the satisfaction of the Chula Vista Elementary School District and the Sweetwater Union High School District. Three elementary school sites and one high school site are provided within the EastLake II GDP area. As of this most current GDP amendment, all sites have been implemented. 1.1.11-1 General Development Plan \ 08123/05 Amended 1111/07 Resolution No. 2007-299 Page 51 1.1.11.3 Community purpose Facilities 1.1.11.3.1 purpose & Intent Chapter 19.48. P-C . Planned Community Zone, requires that all land in the PC zone provide a minimum of 1.39 acres of land per 1,000 persons for community purpose facilities (CPF), such as: a) Boy Scouts, Girl ScoutS, and similar organizations; b) social and human service activities, such as Alcoholics Anonymous; c) services for the homeless; d) services for military personnel during the holidays; e) senior care and recreation; f) Worship, spiritual growth and development, and teaching of traditional family values; g) non-profit or for profit day care facilities that are ancillary to any ofthe above or as a primary use. For profit facilities as, primary use are subject to further requirements and additional criteria as outlined in Section 19.48.025 (f); h) private schools that are ancillary to any of the above; i) interim uses, subject to the findings outlined in 19.48.025(E); and j) recreational facilities, such as ball fields for non-profit organizations serving the local community, subject to the requirements outlined in 19.48.040CB)(6)(d). However, where recreational ball fields are desired as a conditional use in Community purpose Facilities land use districts, a "CPF Master Plan", showing the specific boundaries of the master plan and existing and proposed distribution of CPF uses within a SPA, GDP or overa\1 Planned Community shall be considered and approved by the Director of Planning and incorporated as part of the Planned Community'S General Development Plan(s). In addition, recreational ball fields shall not utilize more than 35% of the overa\1 SPA, GDP or Planned Community CPF acreage required, and no park credit may be granted for community purpose ball fields. The total acreage required may be reduced by the City council in certain circumstances such as when shared parking facilities are available with other facilities. 1.1.11.3.2 Proposed CPF Master Plan The CPF Master Plan boundaries encompass EastLake Greens (including the "Land Swap' Parcels), EastLake Trails, EastLake Business Center II, EastLake VistaS and EastLake Woods (see Exhibit 5). Four sites are distributed throughout the remaining SPAs insuring that each future CPF site will serve a different neighborhood. In addition, the sites are located along major road to enhance accessibly to the facility by community residents. Based upon the anticipated development statistics for the CPF Master Plan area, the overall combined CPF acreage required and proposed is as follows: 1.1.11-2 General Development Plan \ 08/23/05 ArtlehdCd j lillO'! Resolution No. 2007-299 Page 52 Table D Community Purpose Facility Acres for EastLake Note: A concurrent amendment to the EastLake III GDP is in process. It will. if adopted. include an amendment to this table and the text that follows. EastLake EastLake EastLake Total II. n* III Greens Trails (adopted Neieb.. Neie;b. G1>P'I Dwelling Units 3443 1143 2061 6647 CPF acldu 0.004003 0.004003 0.004003 - - CPF ReQuired (ac) \3.8 4.6 8.3 26.6 CPF Provided (ac) 15.8 4.6 10.8 31.1 . EastLake I (North of Otay Lakes Road) is excluded from this table. . * Includes proposed Land Swap amendment. 1.1.11.3.3 proposed CPF Sites The CPF Master Plan provide a total of 31.1 acres in four different sites. Exhibit 5. identifies the proposed CPF sites which are described in more detail below. Site 1 (Existing): Located in EastLake Greens. a portion of this 15.8 acre site (12.2 acres) has been conveyed to a religious institution for use as a place of worship. The remaining portion of the site 3.6 acres is currently available for acquisition and use for community purpose facilities and is further described below. Site 1 (Future): Located in EastLake Greens on the east side of EastLake Parkway, south of the SDG&E power easement. This 3.6 acre site is currently available for acquisition and use for community purpose facilities. Site 2: This CPF site is located within the Trails neighborhood and is proposed to conditionally permit little league ball fields for non-profit organizations serving the local community. The development of the site (4.6 acres) would be subject to the requirements outlined in the EastLake 11 Planned Community District Regulations and Section 19.4S.040(B)(6)(d) of the Chula Vista Municipal Code. Site 3: This site is located in the Vistas neighborhood of EastLake III GDP and consists of 10.S acres. The future Vistas SPA plan will refine the exact location and acreage this site The sites identified on this Master Plan are. or will be. designated in the Planned Community District Regulations as "CPF" to insure their continued availability pursuant to city requirements. With the exception of CPF site Nos. 2 and 4, which will include little league ball fields as a conditional use permit. the above mentioned CPF sites could accommodate by conditional use permit the following land uses: . Boy Scouts. Girl Scouts. and other similar organizations; Ll.ll-3 General Development Plan \ 08123105 Amel1ded 11 il/O? Resolution No. 2007-299 Page 53 . Senior care and recreation; . Worship, spiritual growth and development. and teaching of traditional family values; . For profit and non-profit day care facilities that are ancillary to any of the above; . Private schools that are ancillary to any of the above; . Interim uses, subject to the findings outlined in Section 19.48.025(E) of the Chula Vista Municipal Code; . Recreational ball fields not to exceed 35% of the overall CPF acreage requirement for the CPF Master Plan. 1.1.11-4 General Development Plan \ 08/23/05 Amended !l!l/O; Resolution No. 2007-299 Page 54 CPF L.ocatlons O E.ast\.Jlke Greens ...- . EestLa.... Gr...... IF-I . EasOk. Trolls . Easll.aluoV..... !>wolll - - .. AcI'''' PriiJowl'.' Master Plan of Community purpose Facilities ~II lODP -, 8 , . T_ f16CT ,. ~. T..n. lWgb. no AS A. EastLake UI . WoodS _ko'_ EBstlAke III . Vistas .4 EASTlAKE III /4. -'"" -""" trt"" -...........- Clnli land ~ i~--J-' 4-4-01 Exhibit 4 0&123/05 Atnended 11/1107 1.1.11-5 General Development Plan \ Resolution No. 2007-299 Page 55 ( 1.1.11.4 Development Agreement A development agreement currently exists for development in EastLake n. The purpose of the agreement was to ensure that the developer will participate in the constrUction and financing of public facilities and to ensure that the land use entitlements provided for in this GDP are achieved. This agreement was entered into by all parties prior to the issuance of any permits for development within the plan area and shall bind future landowners/developers who acquire interests in the property. Amendments of mutual benefit may be made from time to time to insure its vitality. 1.1.11.5 Subsequent Review The EastLake II GDP will be implemented, pursuant to the Chula Vista Municipal Code, through the subsequent adoption of a series of plans and programs, which are summarized below: . SPA Plans EastLake Jl will be comprised of several SP A Plans. The areas north of Otay Lakes road have been implemented as the EastLake I and Salt Creek I SPA Plans. The area south of Otay Lakes Road and west of Hunte Parkway is being implemented as the EastLake 11 SPA (Trails and Greens Neighborhoods) Plan. The area south of Otay Lakes Road and east of Hunte Parkway will be implemented as the EastLake II SPA (Trails and Greens Neighborhoods). (Refer to Exhibit 3 for location of these SPA Plan areas.) . Other Related planniDglReview Programs All areas for future development in the EastLake II GDP will be subject to the adopted provisions of the following supplemental planning documents: I. Planned Community District Regulations; 2. Design Guidelines; 3. Public Facility Financing Plans; 4. Affordable Housing Programs; 5. Air Quality Improvement plans; 6. Water Conservation Plans; 7. Development Agreements; 8. Salt Creek Park Master Plan; 9. Precise plans for non-residential development; 10. Conditional Use Permits where required; 11. Site Plan and Architectural Review; and, 12. Tentative Tract Maps 1.1.11-6 General Development Plan \ 08123/05 Anlendedl 11I/07 Resolution No. 2007-299 Page 56 I.l.12 The administration and legislative procedures applicable to the EastLake II GDP are those specified in Chapter \ 9.48, P-C- Planned Community Zone, in the Chula Vista Municipal Code, with Sections 19.48.070 and 10.48.080 having specific applicability. Administrative & Legislative Procedures H:\PDA T A \2.5102850\Admin\reportS\A.mcndments\GDP\EDIT - GD? 10-23-01 Revisions.doc 10123120074:28 PM 1.1.12-1 General Development Plan \ 08123105 Atntnended \ 1 J 1 107 ~ Resolution No. 2007-299 Page 57 SPA Resolution No. 2007-299 Page 58 Supplemental Sectional Pla~ning Area (SP A) Plan for EastLake Business Center II Adopted November 16, 1999 by Resolution No. 19666 Amended April 5, 2005 by Resolution 2005-102 Prepared by: einU Land Planning 2932 poinsettia Drive San Diego. California 92106 (619)223-7408 Contact: Gary Cinti emai\: gary@cinti.com Amended . 2007 Bv ResolutilJD No. 2007-XXX 2007 Amendment preoared by: RBFC~nsultin2 9755 Clairemont Mesa B6u1civartt suite 100 San DiCsio. CA 92124 Contact: Dan Werv. AICP (858) 614-5081 dWf'O'VCalIbf.com Resolution No. 2007-299 Page 59 SECTION II.2 SECTIONAL PLANNING AREA (SPA) PLAN T ABLE OF CONTENTS n.2.t INTRODUCTION II.2.1.l Background, Scope and purpose of the Plan 1-1 II.2.l.2 Record of Amendments 1-3 II.2.1J Location and Regional Setting 1-6 II.2.1.4 Community Structure 1-6 II.2.1.5 Legal Significance/EIR 1-8 U.2.1.6 SP A Plan Consistency with Approved GDPfPC Zone District 1-8 Il.2.1.7 Related Documents 1-12 n.2.2 DEVELOPMENT CONCEPT II.2.2.1 Design Influences II-I II.2.2.2 Land Use Pattern II-I U.2.2J Administrative AdjustmentsfDensity Transfer II-I n.2.3 CIRCULATION II.2.3.I Introduction Ill-l II.2J.2 Project Access Ill-I Il.2.3.3 Project Circulation NetWork Ill-I II.2.3.4 Street Standards IIl-3 II.2.3.5 phasing of Road Improvements III-3 1I.2.3.6 Transit Planning Principles III-3 II.2.3.7 Trails, Edges and Buffers III-3 n.2.4 GRADING II.2.4.I Introduction IV-l II.2.4.2 Grading Concept IV-l II.2.4.3 Grading Requirements IV-l 1I.2.5 PARKS, RECREATION and OPEN SPACE II.2.5.I Introduction V-I II.2.S.2 Open Space V-I II.2.5.3 Landscape Concept V-l 1I.2.6 DEVELOPMENT PHASING VIol 11.2.7 PUBLIC FACILITIES II.2.7.1 Introduction VII-l 11.2.7 .2 Potable Water Supply VII-l II.2.7.3 potable Water Demand VII-l II.2.7.4 Reclaimed Water Supply and Master Plan VII-3 11.2.7.5 Sewer Service VII-3 11.2.7.6 Storm and Drainage System VII-6 .. Sup,,]""'......1 Silc';rmal Plann;n" Area (SP A) Amended 1111107 Resolution No. 2007-299 Page 60 1l.2.7.7 11.2.7.8 lI.2.7.9 n.2.7.1 0 n.2.7.11 1I.2.7.12 n.2.7.13 II.l.8 APPENDIX Table A Exhibit 1 Exhibit 1 Exhibit 3 Exhibit 4 Exhibit 5! ExbibitSb Exhibit 6 Exhibit 7 Exhibit 8 Exhibit 9 Exhibit 10 Exhibit 11 Exhibit 12 Exhibit 13 Exhibit 14 Urban Run-off Roads Schools Child Care Facilities Police and Fire Services Library Services Community purpose Facilities (CPF) Vl1-6 Vl1-6 VIl-8 VII-8 VlI-9 VII-9 VlI-9 VIII-I LIST OF TABLES GDP and SPA Plan Statistics..................................................l-8 LIST OF EXHIBITS Vicinity Map .................... ........................................... ............1-4 EastLake SPA Boundaries ......................................................1.5 community StrUcture..............................................................l.7 General Development Plan .....................................................1-9 EXlstinlZ Site Utilization Plan..............'''''''''''''''''''''''''''''''''' 1-10 probosCdSite ut.i1i2:ati.6n Plan.:............................................I-11 Circulation Plan ...................................................................1I1-2 Trails, Edges & Buffers .......................................................1Il-5 Grading Plan ........................................................................ IV-3 General Landscape Plan........................................................ V-3 Conceptual Phasing Plan...................................................... VI-2 Water System ................ .............. .................... .... ................ VII-2 Reclaimed Water System .................................................... VIl-4 Sewer Plan ..........................................................................VlI.5 Storm Water ................ .......................................................VIl-7 Arii"i>M&il1fl/liif; <~\~~k'~'1'i\',,~~~:j,~'%';Eiif~;(f.;'t~,~;:\:?$Ii~~ ~onal pl.;;",tlv Area (SPA) .J Resolution No. 2007-299 Page 61 I1.2.t INTRODUCTION n.2.t.t Background, Scope and Purpose of the Plan EastLake Business Center 1I is an expansion of the original EastLake Business Center established in the EastLake 1 . SPA approval in 1985 and will complete the anticipated employment/industrial and SUD1)ortinl!: complimentarv commercial uses to be developed within the Planned Community of EastLake. It continues the eastward development pattern established with the prior neighborhoods. (Refer to Exhibit 2.) As an increment to the overall EastLake community, EastLake Business Center 1I Supplemental SP A is, to a large extent, an extension of the existing development both in design and planning policy/regulations. Because it is a relatively minor addition, it is being planned as "supplement" to the existing EastLake 1 SPA. This SPA plan relies upon established policies, programs and regulations to a greater extent than other EastLake SPAs. It also provides more implementation flexibility to avoid the necessity of formal plan amendments for minor plan adjustments. This Supplementary Sectional Planning Area (SP A) Plan defines the development parameters for the EastLake Business Center 1I development increment, including the land use designation, design criteria, basic circulation pattern, and infrastrUcture requirements. Additionally, the character and form of the business center will be implemented through a series of guidelines and development standards prescribed in the EastLake 11 Planned community District Regulations, EastLake Business Center 11 Design Guidelines and other associated regulatory documents. The purpose of the Supplemental SPA Plan, as with all EastLake SPAs, is to: A. Assure a high quality of development, consistent with City and community goals and objectives. B. Create an economically viable plan that can be realistically implemented within current and projected economic conditions. C. Provide for orderly planning and long-range development of the project to ensure community compatibility. D. Facilitate adequate provision for community facilities, such as transportation, water, flood control, and sewage disposal; and, provide adequate assurance to the Developer that approved development will be allowed in a timely and economically viable manner. E. Preserve open space and natural amenities on the property where appropriate and possible. F. Establish a planning and development framework which will allow diverse land uses to exist in harmony within the community. The SPA plan, once approved, is the implementation tool of the General Development Plan. It establishes design criteria for the site and defines precisely the type and amount of development permitted. It establishes the City's standards for that development including open space provisions and major improvements to be constrUcted by the developer. p.mended 1111107 !:1 SUDO)~m1 Sectional P)l\DI!i!)2 Area (SPA) Resolution No. 2007-299 Page 62 The Planned Community District Regulations adopted as part of this SPA serve as an important tool through which the City will review and evaluate schematic, preliminary and final drawings of each individual project to be built in the Planned community. This Supplemental SPA Plan as a requirement and site-specific implementing document for the City of Chula Vista PC Zone, supersedes the .standard" requirements of the City Zoning Ordinance. In the case of a conflict between the provisions of the SPA plan and other regulations or policies, the SPA Plan provisions shall apply. If a topic is not addressed by this SPA Plan, then appropriate City regulations shall apply. Document Orl!anization The EastLake Business Center II Supplemental SPA plan contains six documents or components approach: 1) SPA Plan; 2) Planned Community District Regulations; 3) Design Guidelines; 4) Public Facilities Financing Plan; 5) Air Quality Improvement Plan; and 6) Water Conservation Plan. A development agreement section has also been incorporated as a companion to this document. The purpose of these documents is as follows: Suonlemental SPA Plan The purpose of the SPA plan is to define, in more detail than the City's General Plan and EastLake II General Development Plan (GDP), the development parameters for the Business Center II project area, including the land use, urban design criteria, circulation pattern, open space concept and infrastructure requirements to support the project and overaJl community. Planned Community District Rel!Ulations The Planned community District Regulations, which are adopted by Ordinance pursuant to title 19 of the Chula Vista Municipal Code, and are intended to implement the Chula Vista General Plan, EastLake II General Development Plan and EastLake Business Center II Supplemental SPA Plan, establish land use districts and standards to classify, regulate, restrict and separate the use of land, building and structures, and regulate and limit the type, height and bulk of buildings and structures in the various land use districts. These standards are established to protect the public health, safety and general welfare of the citizens of Chula Vista; to safeguard and enhance the appearance and quality of development of EastLake I and II, and to provide the social, physical and economic advantages resulting from comprehensive and orderly planned use ofland resources. Desil!ll Guidelines This document is a manual to guide the building and landscape design within the Business Center II SPA to ensure that the quality of the adopted urban design and architectural concept established for the overaJl EastLake Planned community are maintained. Public Facilities Financinl! Plan The Public Facilities Financing Plan (PFFP) is a requirement and implements the City of Chula Vista Growth Management program and Ordinance. The intent of this document is to ensure that the phased development of the project is consistent with the overaJl goals and policies of the City's General Plan, Growth Management Program and the EastLake Am"nnM 11/1/07. . . , ...... ';~r~e ,. 1:2 r "7-"_ .": ~_' .. Sum:)lem~t.al~nnalP1Annin2Area (SPA) Resolution No. 2007-299 Page 63 n General Development Plan document, and to ensure that the development of the project wiu not adversely impact the City's Quality of Life Standards. Air Quality Imorovement Plan The purpose of the Air Quality Improvement Plan for the EastLake Business Center II SP A is to respond to the Growth Management policies of the City of Chula Vista and those policies and regulations established at the broadest geographic level (State and Federal) in order to minimize air quality impacts during and after construction of projects within the SPA, and to comply w1th the air quality standards and policies of the San Diego County APCD. Water Conservation plan The purpose of this document is also to respond to the Growth Management policies of the City of Chula Vista, which are intended to address the long term need to conserve water in new developments; short term emergency measures; and establish standards for water conservation. n.2.1.2 Record of Amendments (To be inserted upon amendment) 1::3 SUDtll...nental soctional pl.nnin2 ~ rsp A) Amended 11/1/01 Resolution No. 2007-299 Page 64 Vicinity Map San Miguel Ranch .....~ ~~.... a-~~ ~~~ ~rallS " ~~~rll Otay Ranch " U U " ~ E"ASTLAKE C\m.n~ ~~\.....A r't..::1"'~,,-,e-" A PlANNED COMMUNITY BY u,51V.ICE ~ co. Edlibit I ),rnendedllll107 .L-4. QnnnlemP.ntB.l sP.Ctinnal P1Annin~ Area (SP A~ ~ Resolution No. 2007-299 Page 65 General Development Plan Boundaries jEASTlAKE I . pIP'" ........\ly b! no. E:oorLakt CompO, Cirm Land P\{JnI'llng I~"*'~~I ~ ".1&.80 Exhibit 2 }.s sl1nnl.......P.ntal Sectional pl~nn;n2 ,Area (SPA) Amended 11/1/07 Resolution No. 2007-299 Page 66 1I.2.1.3 Location and Regional Setting The EastLake Business Center 11 Supplemental SPA is located in the eastern portion of the Chula Vista City limits. The site is located immediately east of the existing Business Center I components of the EastLake I SPA, on the north side of Otay Lakes Road approximately 8 miles east of the Chula Vista Civic Center. Exhibit 1 illustrates the location of EastLake Business Center n in relationship_w~ithin the overall EastLake community. The location of the EastLake Business Center n SPA within the overall EastLake Planned Community is depicted in Exhibit 2. The entire community has been zoned "Planen~ Community" (PC) and designated for a range of uxban uses defined in two General Development Plans (GDPs) identified as the EastLake 11 GDP (includes the Eastlake I SPA) and the EastLake mGDP. The EastLake Business Center II Supplemental SPA planning area is defined by a major circulation route, Otay Lakes Road on the south, the planned community of Rolling Hills Ranch boundary on the north, existing EastLake Business Center I on the west and the EastLake Woods neighborhood to the east. 1I.2.1.4 Community StrUcture The primary community strUcture/design issues for the expansion area are appropriate edge conditions: scenic edge at Otay Lakes Road; buffer edges at the east and north; and, a blending edge on the west adjoining the existing Business Center. The new entry from Otay Lakes Road will also help define/reinforce the identity and location of the Business Center as a whole in the EastLake Community. Exhibit 3, Community StrUcture, indicated the following described elements: Blending Edge This identifies the primary entry to Business Center II. Fenton Street will contain a median at this location and additional landscaping and signing will be used to further enhance this intersection's importance. The theme trees along this corridor will continue through Business Center n,_trXcept their location will be exterior of the contiguous sidewalk in an additional landscape zone. There are buffer edges along the northern and eastern boundaries. The buffer along the eastern edge will be primarily dense landscaping at the top of slope within the future SPA to the east. Along the northern edge special setbacks and landscaping is proposed. Refer to the PC District Regulations and Design Guidelines. The blending edge identifies the concept to blend the existing landscape along the cornmon borders between Business Center I & n. Business Center Entry Thematic Corridor Bufer and Blending Edges ~unn\e""",lll1secticmol p\Ann;n2 Area (SF A) A""",<I...d1l11107 ~ Resolution No. 2007-299 Page 67 Community Structure Business Center /I Supplemental SPA --J _M ... - ....... . . '.:', '" @. ... \ ~ ,-, , . , , . , . , , . :' " " " :: .' " .: " .. " EesfLake Greens SPA II Business Center Entry .... Thematic Corridor ~ Scenic Highway Edge ~ Buffer Edge .. ... Blending Edge -@. Existing Scobey Park ~~ loS-ill JEASTlAKE , A plaDDed oo......DII)' by ne EutLW CoIllpIJlY Exhibit 3 AI!!etlded 1111107 107 SuDtlletl1en1!!! sectiooal pl.nn;". Area ISP Ai Resolution No. 2007-299 Page 68 Il.2.1.S Legal SignificancefElR Adoption of the EastLake Business Center 1I Supplemental SPA Plan and the supporting documents will establish the official development policy of the City of Chula Vista for EastLake Business Center II. All future discretionary permits will need to be consistent with the SPA Plan to be approved. The project is also subject to the requirements of the California Environmental Quality Act (CEQA). The provisions of CEQA will be implemented by the City as a part of the approval process for this SPA plan package. All mitigation measures identified and incorporated into the project as a part of the CEQA process shall be implemented through this SP A plan or other appropriate component of the SPA plan package. Implementation of mitigation requirements will be reviewed as defined in the mitigation monitoring program prepared for the project. Il.2.1.6 SPA Plan Consistency with APproved GDPIPC Zone District The Business Center II Supplemental SPA Plan is designed to implement the Adopted EastLake II General Development Plan (as amended). Comparison of the proposed General Development Plan (Exhibit 4) and the Site Utilization Plan (Exhibit 5) shows the relationship of land use and acreages between the policy plan and the more refined and detailed SPA Plan. The proposed development statistics are listed in Table A (below). Table A GDP (SPA area only) and SPA Plan Statistics LAND USE GDP Statistics (AC) SP A Plan (AC) Residential NA NA Research~ Limited Manufacturing .wM-84 ~4 Cife\llati~Retail Olmmei'cial 4-.* 16.7 +# 16.7 - - CircMlationTQ.'f_~ U~ 7.4*WSrt- TOTALS 104;8 lOS.l *Includes % of Otay Lakes Road in its statistics. I1.2.1.6.1 Land Use Element The land use designations shown on the EastLake II General Development Plan for the Business Center 11 Supplemental SPA Plan area (108.1 acres) consists of Research & Limited ManufacturiniRetail. commercial and Circulation. Additional intemal circulation is also depicted. The Supplemental SPA Plan reflects the same land use pattern with respect to land use type. Amended 1 tl1l07 .1:8 . l)urm1..mental Sectinnal Pl_nn;"!! ~ (Sf A) IR ",ell";l QI Develop', .ent PICW ~ '" '" iB 0,- 'D~ o' ::> Z ? tv o o ..., , tv 'D 'D .' .;....., /;.."i' ~- ;..; \ ~ IR IR IR M [ LAllDUd L L"" \0-3 ..,.., L M L..,.-d.I3-t-' WI ..-(to"-) M" ~II.I._I " ...,.(1.21+_' __R""'" ,,7.& 3.0 616 .iI.2'" 2,.1 2.0...11 20" 152.3 IU 211' ~ 2113 ~ 10$211 U 1'" / // ,'. ,/. ," (\# ~ . .<:: .......... _~ _ 97.0 F_~ SQ.l plClIJl\lImIlI, 29.0 __.\.Id.~ ~2,",3 0p00__ 21S.1 NoUI'Q t~~. 113.1 _._- ;111.2 _c;lot_ 224.9 ___..-"'" 1228.3 ......,.... 7281.1 3.1 7111 .....CflFMt AtW"UJ'lf'*'~IftI#.fIt~ I_lAKE'U A planned communitY bY The EPtUk8 CompanY f MH ~( '~~~._~. '-.; . ',' I \ ."". \ If;:; '. , I , \ . i-."l ~~~I Clr.~ \.<1lC! f'IOOOln! n=t\~ 8/23/(1 [Revised 10123~ EXISTING Site Utilization Plan Business Center II Supplemental SPA Renno Hill RaIICf'J n_J.- t,',",,','< ", ,-- ....... Ad. " ~:.~~ ......,. ~:. ~ '" \ \ .-J .- G...... ....... 25.3 75.' 10G.7 3,3 '.1 101.1 I=~::.I 1;,8 58,2 71.0 ~ \ I I ~~( E-11 -~-- ~-~~ -. E.dsIMlt/ E..Lah~' ~ \ p~~ I ~EmpIoyment Part< ~EmploymenlPorl< sub-lD1ol ~Ota}llakes RoIlCI L--IFenlon Street Total undUU .~,.,.""'".~-_I.".........-,.......I..... ,..,.,"'"' .._AClU...~II..... ..,....,..,.". ~ ~~;l~:9\ , ._<.~1:' p . ...... ~ (\~-,"'''' -1, , " '/;'" ).,J,:: ,. ~\""~-:::?-- \ . '-y" ~" SPA Key Map ~;,:;;~~;'!H!'.h~ r......rl~ ~ ,...... 0. c;onc.pw.I""" ~iDn IIQt iI'l CtcIMIlClIft ..,.- o ar." ~ rsq.s rt:Wed1f\~)'MfIl""" ."iIIieJ ~fASTLAKE A ......tel eoIII...n~' b).ne Eafl.lU C..pall)' Exh ibit 5a I>.m..MM t 111/07 "'/ .' ' '1:10 ' -SuDl:ll~fI!tl.tB1Seetibri.al plannin~ Area (SP A) --. PROPOSED Site Utilization Plan Business Center 11 Supplemental SPA ~ " , c. . t --J 7 ," ~< ~ J Chlinged ,.~.l.' from \ ," ,.". '0' ~ ~ E-" q '\ \ f,aJcirlg CW. - ,:,;::., ,;,~" \ \ ~~~.~ I) ~.- 1:=1:::=.1 ~ E.11 ,Employment P.rX 25,3 1V.8 . ,... ~ , ~~,...t.."lP!P~"l"DtJ'lrl.-- _ _ - J'II..... - _'1.,~ ---.. rAddmonolVC.51 : 't':~: r .[:'~'!~:-:':'__. --' -.- ~5;7f" - - ~5!......: u -tDta 100. 71.0 ~Olay Lakes Road 3.3 L--IF"enton Streel "'.1 Totall 108.1 E-,2 \~ P.rcel No, 'i__Nool--' .::......_:..........___..s-...&"'""'"" ~r,tou.,od_k*._M~.,....-~--.. ~. ' -,,/"--:"1'.- .... ro,. .. - .- "\ C~'i}",~' Itf'"O:" ~'s . /"''eJ ~_t..:..-;t..:ri7'_ ~----:.::\; ','/,')'/" """~-',' l.;"'''''' \:k-~\ .... ",: ii;\..~.:,- , l1 ... \.' -.... ..,... . .....~-:...~ " SPA Key Map '\ " O~,:.1.1Il'/f';Wm.Ic..-~1lOI1n0t/:dfll0l'.IlaliSllCl O~rSpKt'S/~K:~#r'Ie~"..".~ .1"""- r=,-~ ""1"'" . .K,.l.~..J ....... ..4tASTLAKE .4. p~nDKI t:'Cnnlllllftll~ ~-Th~r....IL.akr-C...pI.~. Exhibit 5b IReviseO 11101107 j Amended 11/1107 1:11 !';~tllemental Sectionall'l.nnin. Area (SF A) Resolution No. 2007-299 Page 70 Il.2.1.7 Related Documents The EastLake Business Center II Supplemental SPA contains six documents or components approach: 1) SPA Plan; 2) Planned Community District Regulations; 3) Design Guidelines; 4) Public Facilities Financing Plan; 5) Air Quality Improvement Plan; and 6) Water Conservation Plan. A development agreement section has also been incorporated as a companion to this document. Prior to the preparation of this plan, the Chula Vista General Plan and EastLake II General Development Plan established the broad policy level standards and requirements for planning the EastLake Business Center II. The GDP also quantified the development intended within the SP A and established the CP Zoning implementation procesS. All of the other documents which are components of the SPA plan package (design guidelines, public facility financing plan, etc.) are prepared concurrently and based on this SPA plan. Project CEQA documents are also prepared concurrently to document potential environmental impacts and identify mitigation measures to reduce or eliminate such impacts. Subsequent to the approval of all the SPA level documents, subdivision maps and improvement plans will be prepared. These will provide the necessary details to actually construct the project described by the SPA level documents. These plans, the construction process and ultimate uses/activities within the SPA are required to be consistent with the applicable provisions of this Supplemental SPA Plan and related documents. AlX!~ 11/1/0'1 . ";,,,~?:-.,;, ., 1:.12::. .:::".....t.,tricnta\ SeCtional pl.""inR Are!! (SF A) Resolution No. 2007-299 Page 71 11.2.2 DEVELOPMENT CONCEPT Il.2.2.1 Design Influences 1be primary influences in developing the EastLake Business Center II Supplemental SPA Plan were the Chula Vista General Plan and EastLake II General Development Plan, the EastLake I SP A Plan and adjacent existing and planned development to the north, west and south, and the natural landform characteristics of the site. 1be primary design influences for the project are depicted in Exhibit 3. Site Characteristics and Visual Context 1be project site is generally comprised of gently rolling topography toward the Salt Creek Greenbelt corridor off-site to the east. 1be rounded features of the site reflect the years of plowing and discing associated with its historical dry farming use. Localized views to Salt Creek and adjacent hillsides are available from hillside locations. 1be range in elevation is approximately 50 feet from the hilltops to SPA boundary. 1bere are manufactured slopes along the western boundary. Northerly and easterly and existing and future residential developments. 1be residential proposed to the east will be significantly below Business Center II. To the north the Business Center is slightly above the residential development and, except for a few residential lots along the northeastern boundary, is separated by open space lots. Surrounding Land Uses Existing development adjacent to the EastLake Business Center II SPA includes Otay Lakes Road on the south. 1bis arterial roadway is not only the major circulation route serving the site, but it also contains major sewer, water and storm drain systems to which the project must connect. Residential properties to the north are currently developed or under development, as noted earlier in the planned community of Rolling Hills Ranch. The residential to the east has been planned for Low-Medium Density Residential in the adopted EastLake III General Development Plan as part of the Woods neighborhood. To the south across Otay Lakes Road is the existing development known as EastLake Greens. 1be Chula Vista General Plan and adopted General Development Plans have designated the Business Center II area as a planned business center prior to the implementation of any adjacent residential development. Il.2.2.2 Land Use Pattern 1be EastLake Business Center II Supplemental SPA is designed entirely as an employmentllight industrial park with supporting and comDlimentary colIunercial (see Site Utilization Plan Exhibit 5) which extends the permitted uses eastward from the existing Business Center. Il.2.2.3 Administrative AdjustmentslDensity Transfer 1be SPA plan provides guidance for future development at the subdivision and improvement plan level, and is the basic reference for determining permitted land uses and required public facilities. 1bese are illustrated in the Site Utilization Plan, Exhibit 5, which is the key map for this SP A Plan. Amended 1111107 n-l SmmlenlP.T11Jll seetiorial plAnning Area (SpA) Resolution No. 2007-299 Page 72 Even though the SPA Plan contains specific guidance for development, it is not intended to be used in a manner which predetermines the development solution for each and every parcel. It is intended to be used as a basic guide which reflects the City's intent for determining the intensity, design and desired character of use for the property. The development parcel and interior circulation arrangement indicated on the Site Utilization Plan is conceptual. Minor modifications to these configurations may occur as a part of the tentative tract map approval procesS. Modifications to the SPA Plan exhibits and text, to reflect adjustments based on an approved tentative tract map, shall be accomplished without a formal SPA amendment. AineMed l11l107 -: ;{t-:I?:$ :-,:~:.::.;.:;~,)~~t;;~} ,~:-,/ ~}, Il- 2 ., suDOl_ental Sec--t1nnal Flonn;no Area (SF A) Resolution No. 2007-299 Page 73 Il.2.3 CIRCULA nON n.2.3.1 Introduction The EastLake Business Center II Circulation Plan is almost completely an extension of the existing circulation routes within the EastLake I and includes both vehicular and non-vehicular circulation routes. The plan provides for the basic internal circulation systems to serve the proposed development areas. The circulation plan is also consistent with the community-wide network established by the EastLake II General Development Plan and in accordance with the City of Chula Vista General Plan. The SPA Plan Public Facilities Financing Plan (see Chapter II, Section II.S Public Facilities Financing Plan) details a transportation phasing plan with specific improvements and timing of circulation improvements to maintain the levels of service established in the City's Threshold Standards in the City's Growth Management Element of the General Plan. Specific project access points, and internal circulation, including bicycle, pedestrian. hiking and road crossings will be determined by the City Engineer during the tentative tract map process. Variations to the concepts herein may occur where safety or efficiency can be enhanced. n.2.3.2 Project Access Primary access to the project will be provided from Otay Lakes Road. secondary access is provided through the extension of Fenton Street from the existing Business Center which also connects to Otay Lakes Road via Lane Avenue and EastLake Parkway. Regional access is provided from the west by 1-805 via Telegraph Canyon RoadlOtay Lakes Road. The future construction of SR-12S immediately west of the EastLake Greens SPA win provide additional north-south regional access. Currently, Otay Lakes Road exists at the southern project edge, having been constructed in conjunction with previous EastLake Greens SP A development. Otay Lakes Road extends to the east, past the project site and beyond Otay Lakes, as a two lane road. 1l.2.3.3 Project Circulation Network The internal circulation network is conceptually shown on the Circulation/Street Sections Plan (Exhibit 6). The internal circulation concept is to provide an efficient traffic conduit through the site while providing adequate access for all potential development sites. The public street systern shown may be supplemented internal circulation systems, particularly on larger development sites. The need for intersection signalization and/or limits on turning movements shall be made by the City Engineer based on anticipated volumes and safety needs. ID.l Suoolem""tal Sectional Pl.nnin2 ~ (SP Al Amended 1111107 Resolution No, 2007-299 Page 74 Circulation Plan Business Center 1/ Supplemental SPA _oj - \ -----T\\\- l -... '..:' '", "\\ 1\ \ .,' ::. \ ~ J,....,. c\;,: c,*c \. ;E1a:~": ~ ,......Ion ) _. )\ S14CtflSPA l~tL~B ,.. ,.. / \\)' _"="~ faslLake 11/ GDP ! ~ ' fasILakeGn>etl$SPA ~ / ~ 1/ ".. <-- - \ - I / . ^ \s,lll, \ '..' \ 12' \ '2'"\ ..' i';7l8' I "1'1" ..-.-+~- . ~ _+-__--- _,__ ___~:..--------~ 134' Otay Lakes Road (existing) l'2't :~ 28' U' "::. \ A - 84' Industrial Street ._' tl with Median . .- ,- '" 8"ROW .0 B _ 72' Indust. Street with Thematic Corridor .. \.... U' t'" '01 .,', - ..,- "' . . - ,.... ':...l~ \r::I::\..T ~~ 4 \ 2S' l 28' 72'ROW .k -, ~ iu' ',' :a,I" If'l _ ," c _ 72' Industrial Street ~ Notes: (1) = Street Tree Easement (2) .6' Bike lane Cn1' Lend PlOnnnQ -_..~-- n"'" F\...fi ~ ~ 10-"'''' ~EASTLAKE Arilendiid 11:1007 ,', ,-=.:"> ,:-, .._"'-....' - IIl-2 " ~m;;,l;,mentar Sectionall'l~nn;nQ Area (SF A) Resolution No. 2007-299 Page 75 1I.2.3.4 Street Standards Street standards for the arterial roads at the periphery of the SPA have been established in the Circulation Element of the Chula Vista General Plan and previous project development approvals. Internal streets will be constructed to meet City engineering standards. The Circulation/Street Section plan (Exhibit 6) indicates the proposed street sections. The final improvement designs, including any deviations from design standards, will be determined as a part of the subdivision approval process. Il.2.3.S Phasing of Road Improvements The phasing of community development concurrent with provision of adequate road capacity and access improvements is fully described in the Public Facilities and Financing Plan (Chapter n, Section 11.5 of the SPA Plan package). These improvements have been phased and designed to maintain an adequate level of service in the circulation system serving the EastLake Business Center II project area and surrounding community throughout the development process. The provision of adequate internal circulation improvements is expected to be controlled via subdivision map conditions. 1l.2.3.6 Transit Planning Principles Transit stops will be strategically located near vehicular and pedestrian main access points through evaluations with the City's transit coordinator. Sites will be planned based on the following principles, which may be used in determining appropriate final locations: 1. Where there are numeroUS major pedestrian generators, access to stopS for transit vehicles moving in both directions is facilitated by locating transit stops near intersections with striped crosswalks. 2. Transit stops should be located and walkways designed to provide access as directly as possible without impacting residential privacy. 3. At intersection points of two or more transit routes, stops should be located to minimize walking distance between transfer stops. 4. Transit vehicle conflicts with automobile traffic can be reduced by locating bus turnouts at the far side of intersections in order to permit right-turning vehicles to continue movement. 5. Transit stops should be provided with adequate walkway lighting and well- designed shelters. 6. Walkway ramps should be provided at transit stops to ensure accessibility to the handicapped and must be designed to be A.D.A. compliant. 1I.2.3.7 Trails, Edges and Buffers Thematic corridor Link The EastLake community Trail (Thematic Corridor) which extends from EastLake Hills through the developed portion of the EastLake Planned community to its current terminus at the end of Fenton Street, will also be extended with the street extension. This is a special landscaped trail ID-3 SuDtllemontal Sectitlnal plonnin2 ~ (SPA) Amended 11/1107 Resolution No. 2007-299 Page 76 for pedestrians connects the major community destinations within EastLake. The Thematic Corridor also includes an on-street bicycle lane. Refer to Exhibits 6 and 7. Scenic Highwav Edge Existing Otay Lakes Road is designated as a scenic highway. The treatment of this scenic highway shall reflect the landscape treatment that currently exists along it's southern boundary within the Greens SPA. This highway includes a meandering walk and an on-street bicycle trail. Refer to Exhibit 7. Residential Edge The northern residential edge abutting the Rolling Hills Ranch SPA will have increased building setbacks and require dense landscaping along the upper portion of slope banks and within a ten foot landscape setback within the abutting lots. There shall be a requirement, prior to the issuance of the first building permit for any lot abutting Rolling Hills Ranch, that a Master Landscape Plan be approved by the Director of Planning for the slopes abutting Business Center II and Rolling Hills Ranch. This plan shall be offered to the Rolling Hills Ranch developers for comment and may include provisions for off-site tree planting to reduce the visual impact of Business Center II buildings as viewed from the adjacent homes. Refer to the Design Guidelines for location and criteria for this Master Landscape Plan. Refer to Exhibit 7. The eastern residential edge is significantly higher than expected residential development in EastLake 11I GDP, but will also require dense landscaping along the' upper portion of the Business Center lots and downslope. Refer to the Design Guidelines for additional detail. Refer to Exhibit 7. Amendecll1/1/07 111-4;" ; sunolemental Sectional pI.nnin. Ar!:a (SPA) Resolution No. 2007-299 Page 77 Trails, Edges & Buffers Business Center II Supplemental SPA ---j -- 111'.. ............. i-7" Boswell Rd. I . I ..' :", II \\', \i ~,~ :' "',.. :: ,," \ \ \\ ~~ ! I. I EastLake 1/1 GDP . . . ~ ~ EastLake Greens SPA Thematic Corridor Link (l~'uH' ptIde.trlM waIIe.nd on-.strHt' biIf. ,.".) Scenic Highway Edge/Buffer {Jrx;lud.' IfJNndetinfl walle and on.."" b/_ lane} Residential Edge (,nd_ 'l*'loI_roJop""~PO _"""'/ SPA Key Map ~ EASTLAKE c"," Lend Planning -_......-~ ~L~ ~ Amended 1 111107 TII-S Smml=tental SectiOnal PI.nnin2 Area (SPA) Resolution No. 2007-299 Page 78 Il.2.4 GRADING Il.2.4.1 Introduction The Land Use Element of the Chula Vista General Plan states that the mesas, hilltops and gently rolling topography offer the best sites for development. Steeply sloped hillsides and valleys can serve as open space/greenbelt resources, linking the developed areas which they intersect. For the EastLake Business Center II Supplemental SPA, no on-site areas have been identified as such a greenbelt resource. Development sites within the SPA should be graded to blend with and create an aesthetically pleasing development site consistent with current or proposed grading of adjacent areas and the Otay Lakes Road scenic corridor. II.2.4.2 Grading Concept The SPA level grading plan for the EastLake Business Center II is intended to provide a preliminary grading concept, identifying slope bank locations and necessary maintenance provi- sions. The preliminary grading design is as indicated on the Grading Concept, Exhibit 8. The grading concept is based on the following objectives: . Consistency with existing or proposed grading on adjacent properties. . Creating efficient man-made landforms that visually respond to natural terrain characteristics where practical. . Creating and maintaining on and off-site views. . Creating useable building areas and landscape edges. . Separating potential non-residential and residential use conflicts. . Creating, where possible, barriers or physical separation from traffic noise sources. II.2.4.3 Grading Requirements Final grading design to implement the SPA grading concept should incorporate the following: . General Standards: Grading within EastLake Business Center II shall be subject to Chapter 15.04 _ Excavation, Grading and Fills of the City of Chula Vista Municipal Code and Subdivision Manual. . Grading Design: Graded areas should be contoured to blend with natural landform characteristics. Rounding both vertical and horizontal intersections of graded planes; obscuring slope drainage strUctures with a variety of plant material massing; incorporating the use of variable slope ratios for larger slope banks; use of landscape planting for erosion control and to obscure man-made banks; and, other similar techniques should be used. Artificially appearing slope banks with rigid angular characteristics should be avoided. . Cut and Fill Slope ConstrUction: Slope banks in excess of four feet in height should be constrUcted at a gradient of 2 to 1 (horizontal to vertical) or flatter unless otherwise approved by the City Engineer. Minor interior slopes between lots up to \.5:1 may be approved by the City Engineer. Amended 11/1107 .. \:IV-1 !;UD1)l",""",iiiJ SOctioriB!Plonnin" Area (SP A) Resolution No. 2007-299 Page 79 . Erosion Mitigation: Based on actual field conditions encountered, the erosion potential of slopes should be reduced with berms at the tops of aU slopes, paved interceptor ditches and terrace drains and vegetation. Vegetation should consist of drought-tolerant native or naturalized species, requiring little or minimal irrigation, deep rooted and well suited to the on-site soils. Spray-on applications and cOlltings, combined with jute or hemp mesh can be effective methods for stabillzing soils. Final plans should be based on coordinated input from a licensed landscape architect. . Maintenance: The application for any grading permit should provide assurance acceptable to the City Engineer that landscaped slope banks and medians will have adequate maintenance to ensure continued viability of landscaping. Generally, except for private lots, slope banks which exceed ten feet in height should be maintained by a homeowners' or property owners' association. Aroended 11/1/07 IV-2 Suoolemetltal.Sectiona1 plt:tnn;n2 Area:lSPA) Resolution No. 2007-299 Page 80 Grading Plan ---j __ Ad. i j ...' C , F ',70 EastLake /11 GDP Slope Bank Elevation C F Area of Cut Area of Fill Balanced Grading Quantity = Approx. 1.92 mil. cu. yds This plan Is conceptual and may be relined without amend.ment by tha Tentatl~e Tract Map & Grading Plans. ~fASTLAKE I A planed commuDlty by The EutLne Company Clnn Lend P1ae ~d AriiendedlUi/07 IV-3 . ". Slioolemental Sectional Pl.nnln2 Area (SPA) Resolution No. 2007-299 Page 81 1I.2.5 PARKS, RECREATION and OPEN SPACE Il.Z.5.1 Introduction The EastLake Business Center II Supplemental SPA Plan does not include any park land nOT does it include any residential uses which would generate a public park demand. As noted previously, there is a private park within the existing Business Center which provides park and recreation opportunities to employees of companies located within the Business Center (1 and II). Il.Z.5.Z Open Space While generally accepted standards have been established for the provision of acreage and the function of a hierarchy of parks, the "need' for open space is more difficult to quantify. Usually the need, amount and location of open space is determined by the natural environmental conditions of the land and facility related needs such as detention basins, future road rights-of-way, and buffer space between unrelated land uses, etc. Steep slopes and sloping lands with unstable geologic conditions are obvious candidates for open space, as are noise buffer areas along major traffic ways. Open space areas within EastLake Business Center II may be provided for buffer areas where required along Otay Lakes Road and where buffering is required to minimize the potential for land use conflicts. Alternatively, structural separations such as berm, walls or fences may be used or combined with landscaped open space. Open space lots and acres will be shown on the tentative tract map. Maintenance of all open space lots and medians shall be by a homeowners association or as otherwise approved by the City Engineer. n.Z.5,3 Landscape Concept The General Landscape Plan, Exhibit 9, provides a general design framework which allows latitude and flexibility while maintaining the overall goals and objectives of the community. The intent of the landscape concept is to reinforce the development pattem established by the Site Utilization Plan. This pattern consists of the predominate employment development areas served by a simple circulationflandscape corridor. Plant selection will follow that of the existing Business Center to perpetuate distinct identities and visual continuity throughout the Business Center as a whole. In addition, the thematic corridor and major thoroughfare have identified dominant trees and landscape designs which will be continued. Additional elements in the Landscape Concept include: . Arterial _ Scenic corridor: Otay Lakes Road is an eXlstmg arterial scenic highway. The landscape improvements existing on the south side of this road were developed with the EastLake Greens SPA. The landscape improvements on the north side, to be developed with this SPA, shall reflect the character and quality of those existing improvements to the south. . District Entry: An entry sign and enhanced planting will be located at the intersection of Otay Lakes Road and Fenton Street. The design character shall be similar to the similar entry treatment at the intersection of Otay Lakes Road and Lane Avenue. V-I SUDD1~1al Sectional PIll11ninl! Area (SP A) Amended 1111/07 Resolution No. 2007-299 Page 82 . Thematic Corridor: The existing Thematic Corridor along Fenton Street shall continue easterly to Otay Lake Road. Since this corridor does not connect to a dominant neighborhood feature in Business Center II it will be a transition as a continuation of the dominant tree theme in the corridor, but with a contiguous sidewalk. . Residential Interface Buffer: The Business Center pads are above adjacent existing and future residential development to the north and east. In both locations a dense landscape buffer will be provided along the upper portions of the slope. Along the northern boundary with Rolling Hills Ranch an additional building setback is provided. A solid fence shall be required adjacent to all residential parcels. Refer also to Section II.2.3.7, Trials Edges and Buffers, and the Design Guidelines. All development in the EastLake Business Center II shall be in compliance with the Chula Vista Landscape Manual, adopted by Resolution No. 17735 in November 1994. Amended 11/1/07 V-2 Suntllemental Sectional pl.nninQ Area (SPA) Resolution No. 2007-299 Page 83 General Landscape Plan Business Center /I Supplemental SPA --J :.:-- . I J '" ". t~ : ~ '. " j ~ " " ': " " :' -.. Bus. Ctr. I SPA EIISILaJ<e Greens SPA Arterial - Scenic Corridor District Entry Thematic Corridor Residential Interface Buffer - .. Note. , O"A of all lOts 10 be landscaped o~n !i.pace ~EASTlAKE Exhibit 9 CtI!Il.lrd~ r;....rlbJ Amended 1111107 V-3 ~um>lcme!!tal Sectional Plannine Area (SP A) Resolution No. 2007-299 Page 84 11.2.6 Four phases of development are envisioned based on the need to balance grading and infrastructure improvements. The development of individual building sites will commence as the market dictates. Build-out of all building sites may occur over a several year period, as has been experienced within the existing Business Center 1. The proposed phasing indicated herein, on Exhibit 13, is more specifically defined by the Public Facilities Financing Plan and the Business Center II Master Tentative Map conditions of approval, which shall prevail in the event of conflict. DEVELOPMENT PHASING Amended 11/1/07 VI-I SunnlementalSectional PlSllnn;no Area (SP A) Resolution No, 2007-299 Page 85 Phasing Business Center 11 Supplemental SPA --J F .-1" PhaS:~ I ~,: ~ .. \ i r--~t-.. \\ ' ~ j ~L_ Phas'.,IIB\ .' PhaS$:1A-r-'"'I\ " ~ "I ,I ) I Phase 16 I EastLake Gt8fItlS SPA ~ fASTLAKE A planned community by The Eo.rLake Compooy :;. .'lend PlOnnlng i-.;:;L~I rT' II ' ~lr.....~ 10-8-099 Amended 11/1/07 Vl-2 s1lDDlemental Secti.onil.plsmninll.Area (SPA) Resolution No. 2007-299 Page 86 n.2.7 PUBLIC FACILITIES n.2.7.1 Introduction The inclusion of public facilities issues is a distinguishing feature of SPA Plans. This portion of the plan outlines the public facilities which enable the community to function properly. The companion Public Facilities and Financing Plan (Section II.5 of the EastLake Business Center II Supplemental SPA Plan) describes the "backbone" facilities in more detail and assigns the responsibility for construction and financing of all required facilities. The facilities described in the SPA Plan have been identified and capacities determined based upon projected land uses and their distribution, as shown on the Site Utilization Plan (Exhibit 5). 1l.2.7.2 Potable Water Supply The EastLake Planned Community, including the EastLake Business Center II SPA, is located within the boundaries of the Otay Water District (O\\TD), which is responsible for providing local water service. OWD is a member of the County Water Authority and the Metropolitan Water District of Southern California. The anticipated water supply system is depicted in Exhibit II. This concept will be revised in consultation with the water district and detailed on the subdivision conditions and improvements plans. The phasing and financing requirements are provided in the Public Facilities Financing Plan (Section ll.5 of the SPA Plan package). n.2.7.3 Potable Water Demand Domestic water demand for EastLake Business Center II will be estimated as a part of the water master plan to be approved by the OWD. An analysis of available water supply will also be completed to assure that sufficient supplies are planned to be available as demand is generated by the project. Water "will serve" acknowledgments from the Water District will be required by the City during the subdivision map process. -.'" . Vll-I su.nnlemfmtiilSl'!Ctinnal.Plannin".~ (SF A) Amended 11/1/07 Resolution No. 2007-299 Page 87 Water System --- _Rd. .- . ' ._w \ 20- J ,.. 2<T .~~ EsstLBke Greens SPA _ _ _ - Existing 980 Zone On Site . Connection to Existing System ..4EASTLAKE I A pllllbe<! COmmllDlty by ne EIStLake Comp.bY Exhibit 11 C.ht! Land ~ n:;ti[S s..'2-SIi bIneoded 1111/07 Vll-2 "Sunolemen'ts! SeCtional plfmriiml Area (SP'A) Resolution No. 2007-299 Page 88 11.2.7.4 Based on current District policies regarding new subdivision development, landscape irrigation for parks, schools, greenbelts, road medians, and multi-family residential is required to utilize, where available, recycled water. The project is located in the OWD Central Service Area which currently receives recycled water from the District's 1.3 MGD capacity Ralph W. Chapman Recycling Facility. The existing reclaimed water distribution system serves EastLake Greens and connections to the system to serve the EastLake Business Center II SPA should be planned. Potential demand within the SPA will be estimated as a part of a Reclaimed Water Master Plan for the EastLake Business Center II Supplemental SPA to be approved by the OWD and the City of Chula Vista. A conceptual plan to distribute reclaimed water within the project is depicted on the Reclaimed Water plan (Exhibit 12). Reclaimed water requirements for the project will be coordinated by the Water District and the City. The phased construction of reclaimed water facilities, based on the District approved master plan, will be incorporated into the Public Facilities Financing Plan and/or subdivision map conditions to assure timely provision of required facilities. 1I.2.7.5 Sewer Service Reclaimed Water Supply and Master Plan The EastLake Business Center II Supplemental SPA is primarily located in the Telegraph Canyon drainage basin. A small portion of the site is within the Salt Creek drainage basin. The portion of the site within the Salt Creek basin may be approved by the City Engineer for diversion to the Telegraph Canyon sewer system. If not approved, Exhibit 12 indicates the alternative for connection to the Salt Creek sewer system. Extension of trunk sewer facilities to serve the Salt Creek basin by gravity flow are planned as a part of the Otay Ranch project. Currently, no facilities exist near the project site in the Salt Creek basin. Because of this, interim pumping of project flows to facilities in the Telegraph Canyon Gravity Sewer Basin is anticipated. The trunk facilities in the Telegraph Canyon Basin currently convey pumped flows from EastLake Greens, Trails, and the Olympic Training Center, and will accommodate interim flows from Salt Creek Ranch and EastLake III. The City has established a flow monitoring program and financing plan for the Telegraph Canyon Basin to assure facilities can continue to accommodate pumped flows. The EastLake Business Center II Supplemental SPA will be required to participate in this program and development phasing may be constrained by sewer capacity. EastLake Business Center II Supplemental will also participate in the Salt Creek Gravity Basin Sewer Plan established by the City. Sewer generation and facility requirements for the project will be determined in a Sewer Master Plan to be prepared for and approved by the City. The phased construction of sewer facilities and/or participation regional improvement programs, based on the approved master plan, will be incorporated into the Public Facilities Financing Plan and/or subdivision map conditions to assure timely provision of required facilities. A plan for sewer collection within the project is depicted on the Sewer Plan (Exhibit 13). Amended 1111107 VIl.3r1.~;' _,-n,;;" ~t;Ml,.;mfmtalSectinn81Pl.nni'nll ~ (SPA.) Resolution No. 2007-299 Page 89 Reclaimed Water System . Bus. Ctr. , SPA ----"" --- B_Rd. .- . ' i . 20" 1 ... eastlaka Greens SPA __...._ Existing 950 Recycled Zone Proposed On Site e Connection to Existing System ~EASTLAKE I A plaDDed community by The EutLake Compauy Exhibit 12 e",. land I'klmhO --m ~U 8-12-99 VI1-4 Sunnlemental Sectional P!"""in2 Area (SPA) Amended 1111/07 ---jt; ----r----- i . Iloo_ Rd. . t \ t \'. S"wcJ sewer'\\ . _.~__ I / ........- xisting 15" Resolution No. 2007-299 Page 90 t ". . existing S" existing 1 " ~ Bus. ctr. I SPA Sewer Plan Elmirration of this Irrk 10 1M .xi.,ng _wer'M in salt ONk s;ubJltcl to 1lPf"'OI/(i/ by ely EngiMer. Telegraph Canyon Drainage Basin Sal' Cmek Drainage Basin E.;sti'1g'T~ Pump Station ... Proposed Sewer <__ Existing Sewer Nom: ThiI plan ts concepbJa' and ~t to IIlttnement. Reer \) adopted TentetWe Tract MIiP br more preclle detf;ils .nd requirementL Cirm Land Planning -_..~-- n-' ~L... 10-&-99 .~fASTLAKE A plano"" community by Tho Ea.,Lakc Company t-niended uM)1 . ,..: Vll-5. ,/C!.........l~tal SNmolmlP1tinmnQ Area {SPA) Resolution No. 2007-299 Page 91 II.2.7.6 Storm and Drainage System Conceptually, the on-site runoff from developed areas in the EastLake Business Center II Supplemental SPA will be collected by an on-site system and eventually discharged into the Telegraph Canyon and Salt Creek drainage basins. No significant diversion of run-off is anticipated. Anticipated flows will be calculated and a Storm Drain Master Plan will be prepared for and approved by the City. There will be a detention basin in Salt Creek north of Olympic Parkway, which is designed to serve development in EastLake III as well as EastLake II. No significant conflicts between storm drain facilities and recreation use of the Salt Creek corridor are anticipated. The phased constrUction of storm drain facilities, based on the city-approved master plan, will be incorporated into the Public Facilities Financing Plan and/or subdivision map conditions to assure timely provision of required facilities. A conceptual Storm Water Plan for the project is depicted in Exhibit 14. II.2.7.7 Urban Run-off The Upper and Lower Otay Lakes are operated by the City of San Diego as domestic water reservoirs. These reservoirs must be protected from urban run-off to maintain water quality for domestic use. The EastLake Business Center II SPA does not drain into the watersheds for these reservoirs. Salt Creek is a USGS blueline stream, which designates it as "waters of the United States" under the Clean Water Act (CW A). All development in excesS of five acres which drains to waters of the United States must incorporate urban run-off planning, which, for EastLake Business Center II, will be detailed at the Tentative Tract Map level. The proposed development shall comply with all applicable Federal, State, and local regulations. II.I.7.S Roads Roads included in this SPA proposal are addressed in Chapter II.2.3 Circulation of this SPA Plan. The Public Facilities Financing Plan (Section n.5 of the SP A Plan package) details their phasing and financing. VII-6 snm>lemental Sectional P1.nnin2 ~ (SP A) Amended 11/1/07 Resolution No. 2007-299 Page 92 Storm Water ---j -- i J .- -.-1 ~ " xisting 18" RCP Existillll 30" RCP Exist. 24" RCP EastLake Greens SPA \ ~~.. ..... ~" Teiegrapt'l Clin)'O:n Slit! C,"" Drain. Baaln Otalnage Butn RCP ~. Flow Direction o Storm Drain Inlet . Connection to Existing System (outiet) ( Outlet ~EASTLAKE clnn Land Plo~ ............-- ~:4 Amertd..n U/l/07 VIp. St.mDt..;m~tal Sectional plAnn;nCl Area (SF A) Resolution No. 2007-299 Pa2e 93 11.2.T.9 Schools The EastLake Business Center II SPA includes only etriblovmentllilZht industrial nark with supporting and comnlimentarV commercialempleymeBt uses. It neither includes a school site nor does it directly create demand for new or additional school facilities which are associated with new residential development. EastLake Business Center 11 is located within the Sweetwater Union High School District (grades 7-12) and the Chula Vista Elementary School District (grades K-6). The Board of Trustees of the Sweetwater Union School District and the Board of Education of the Chula Vista Elementary School District have each formed Community Facilities (Mello-Roos) Districts for the purpose of financing school facilities within the EastLake community through the use of special taxes and the issuance of bonds. Since the SPA is located within the overall community, these special taxes will be applied to the Business Center II property. Adult school services are provided in the evening at local school district facilities. Southwestern College, located approximately 1 mile west of EastLake, provides community college services to local residents. Neither of these services are expected to be affected by development of the Business Center expansion. 11.2.7.10 Child Care Facilities The city adopted the Child Care Element of the Chula Vista General Plan in March, 1995. The purpose of the Child Care Element is "to provide comprehensive policy direction for the provision of adequate child care facilities necessary to serve existing and future developed areas in the City in a coordinated and effective manner." EastLake Business Center 11 SPA, and the EastLake planned Community as a whole, may have a mix of child care providers, such as school, church, non-profit or commercial facilities. Child care facilities may be located within private homes, commercial centers, offices, government and industrial complexes, and/or adjacent to public and private schools when appropriate. Family day care homes and facility-based child care centers are discussed below. Home-based child care includes small family day care homes (SFDCH) that serve up to_8 children and large family day care homes (LFDCH) that serve 9-14 children. The Chula Vista Municipal Code allowS the establishment ofSFDCHs and LFDCHs within the R-l Zone as well as the RE and RS land use districts of the PC Zone found throughout the EastLake Community. A conditional use permit is required for all family day care homes within R-2 and R-3 Zones. Consistent with Chula Vista zoning, SFDCHs could potentially be located within all residential zones in the EastLake Community. Since the State of California has family day care home licensing responsibility, all family day care homes within the residential areas of EastLake would be required to comply with both state and local regulations. The City of Chula Vista has established specific requirements for operating a large family day care home, which have been incorporated in the planned community District Regulations adopted for EastLake II (see Section II.3, Planned community District Regulations). Facility- based child care may be conducted by non-profit quasi-public organizations or commercial providers. These facilities may be located on a variety of non-residential parcels (including PQ and CPF sites). Further, day care and nursery schools will be permitted within the Business Center itself, subject to Administrative Review (see PC District Regulations). Vll-8 SUDtlll=ental Sectional PI.nnin2An:!!CSPA) Amended 1111/07 Resolution No. 2007-299 Page 94 The State has adopted regulations related to licensing, application procedures, administrative actions, enforcement provisions, continuing requirements and physical environment for child day care and day care centers. All child care facilities within the SPA will need to comply with state, as well as local regulations. 1I.2.7.11 police and Fire Services Both police and fire services are provided by the City of Chula Vista. Police services are provided from the central police facility in central Chula Vista. Two fire stations are in close proximity to the project site. One, a temporary facility, is located in the EastLake Business Center, immediately adjacent to the project site. The station will be relocated to a new permanent site as the City's Fire Master Plan is implemented. The final location of the new permanent site has yet to be determined. It is anticipated that the site will be in close proximity to EastLake Business Center. A second station is located approximately 5 minutes away on Otay Lakes Road, south of East "R" Street. This station is planned to be relocated to the Rancho del Rey community to the west of EastLake. n.2.7.12 Library Services Library services are provided by the City of Chula Vista. The City operates a central library, which is located at 4th and "F" Streets in central Chula Vista, to serve the entire community. Growth in eastern Chula Vista raises questions as to how library service is to be provided within the Eastern Territories and in what locations. smaller branch libraries or a large facility to serve the area east of I-80S merit consideration. A Library Service Master Plan has been completed which suggests a branch library in the eastern area of the City should be considered. Rancho del Rey reserves a site for a City library along East "R" Street. In addition, the EastLake Village Center Master Tentative Map reserves a I acre site for a library within EastLake 1. Currently, the city operates a shared facility on the EastLake Righ School campus which provides neighborhood library services. Again, library services are generally associated with increased residential development and, as a non-residential project, the Business Center expansion is not expected to affect library services. n.2.7.13 community purpose Facilities (CPF) community purpose Facilities are required in the City of Chula Vista at the rate of 1.39 acres per 1000 persons to be addressed with each SPA Plan. Since the proposed project does not affect the population in the project area, it does not affect the CPF plans adopted for the EastLake community as a whole. Alnelltl..! 11/1107 ;....---VII-9 . *. ..Smm1emMta1 Sectional ph""ninll ~ (SPA Resolution No. 2007-299 Page 95 1I.2.8 APPENDIX H:\PDA T 11.1251 02S50IAdmin'<epDl1SIAm-tsISP A \EDIT SP A 10.2~.o7 .do<: 10123120074:56 PM - - hm""ded 11/1/07 VIII. I ~utltlle=Dta1 Sectinnal pl.""iD2 Area (SPA) Resolution No. 2007-299 Page 96 DESIGN GUIDELINES Resolution No. 2007-299 Page 97 Design Guidelines for EastLake Business Center II Supplemental SPA Approved November 16, 1999 by Resolution No.19666 Amended April 5,2005 by Resolution No. 2999-102 Amended _ . 2007 Bv Resolution :No: 2007"xx'x 2007--AInendmentPreDaredbYi. RnF Consulti1l.~ 9755 Claiieroont Mesli~ouleV8rd; SuitelOO San.DiellO. CA 92124 ContaCt:-OIl11:W" erv,.AlCP (SSS) 614-5081 dwP.rvla>.rbf.OOln prepared by: Cinti Land Planning 2932 poinsettia Drive San Diego, California 92106 (619) 223-7408 Contact: GarY Cinti emai1: g.rvililcinti.coJIl Resolution No. 2007-299 Page 98 1l.4.1 n.4.2 U.4.3 SECTION Il.4 DESIGN GUIDELINES TABLE OF CONTENTS Pa!p:e Introduction Il.4.l.l purpose 1-1 Design Review Process 11.4.2.llntroduction 11.4.2.2 Design Review by Master Developer 11.4.2.3 City of Chula Vista Design Review 11.4.2.4 Zoning Administrator Design Review n.4.2.5 Design Review committee 11.4.2.6 Appeals 11-1 11-1 11-3 11-3 11-3 11-3 Business Center Design Guidelines 11.4.3.1 Site Planning _Planned Community District Regulations -Site planning _Building Heights _Circulation & Parking _Service & Storage Areas -community Fencing _Combined Wall and Fence Guidelines _Fences and Walls _Utilities, Antennae and Flagpoles _Grading Standards Ul-I Ul-9 11.4.3.2 Architecture _Building Massing _Building Entries .Colors and Materials _ T ex tures _Equipment Screening _Building Materials _ArtISculpture Ul-IO 11.4.3.3 Lighting _Safety/Security Lighting _ArchitecturalfLandscape Lighting 10-8-99 Revised 11-01-07 ~I Resolution No. 2007-299 Page 99 Pa~ Ill-lI U.4.3.4 Sign Program _Approval & Submittal _General Standards _Maintenance _illumination _Hardware _Prohibited Sign Types and Components -Sign Criteria Summary -Sign Types and Descriptions no4.3.5 Prohibited Sign Types and Components 1l.4.3.6 Sign Criteria Summary for Business Center II 4.3.7 Sign Criteria for Design District overlay Ill-l2 III-B 111-29 Il.4.4 Landscape Design Il.404.1 purpose llo404.2 Landscape Concept llo4.4.3 Landscaping Requirements IlAo4A Street Landscaping 11.404.5 SlopelErosion Control 1l.4A.6 Landscape and Irrigation Standards llAA.7 Landscape Maintenance lIAA.8 Special Master Landscape Plan lV-I IV-I IV-6 IV-lO IV.lO IV-II IV-I3 IV-l8 Il.4.5 Individual Lot Design Criteria U.4.5.llndividual Lot Criteria Uo4.5.2 Organization of the Criteria V-I V-l ii 10-8-99 Revised 1\-01-07 Resolution No. 2007-299 Page 100 LIST OF EXHmITS ~ Exhibit I Site Planning Exhibit 2 Parking Standards Exhibit 3 Fencing Types Exhibit 4 combination Wall & Fence Exhibit 5 Building Mounted Sign Exhibit 6 Mounted Sign Letters Exhibit 7 Mounted Sign Letter Size Exhibit 8 Freestanding Monument Sign Exhibit 9 Signing Site Distance Exhibit 10 Sign Panels Exhibit 11 Sign Panels Exhibit 12 Entry Window Graphics Exhibit 13 Building Address Numbers Exhibit 14 construction/Leasing Sign Exhibit 15 Vehicle Direction Sign III-2 III-4 III-6 III-7 III-l3 UI-14 III-IS III-l? 1I1-18 IIl-20 III-21 I11-23 IlI-25 IlI-27 1I1-28 Exhibit DD-a Sign Locations by Type IlI-31 Exhibit DD-b District Identification Monument - Sign Type "A" III-32 Exhibit DD-c District Entry Monument - Sign Type "B" IIl-33 Exhibit DD-d Tenant Identification Sign - Sign Type "C" Ul-34 Exhibit DD-e Project Directional Sign - Sign Type "D" III-35 Exhibit DD-f Building Signs IlI-36 Exhibit 16 Scenic Highway Sketch Exhibit 17 Entry Monument Sketch lV-2 IV-3 iii 10-8-99 Revised 11-01-07 Resolution No. 2007-299 Page 101 Exhibit 18 Thematic Corridor IV-4 IV-S Exhibit 19 General Landscape Plan Exhibit 20 Business Center Trees Exhibit 21 Landscape Intensity Exhibit 22 Plant Material Matrix Exhibit 23 Scope of Special Master Landscape plan Exhibit 24 Building Envelopes - Lots 1-6 Exhibit 25 Building Architecture - Lots 1-6 Exhibit 26 Building Envelopes - Lots 7-9 Exhibit 27 Building Architecture - Lots 7-9 Exhibit 28 Building Envelopes - Lots 12-16 Exhibit 29 Building Architecture - Lots 12-16 Exhibit 30 Key Map - Lot 1 Exhibit 31 Key Map - Lot 2 Exhibit 32 Key Map - Lot 3 Exhibit 33 Key Map - Lot 4 Exhibit 34 Key Map - Lot 5 Exhibit 35 Key Map - Lot 6 Exhibit 36 Key Map - Lot 7 Exhibit 37 Key Map - Lot 8 Exhibit 38 Key Map - Lot 9 Exhibit 39 Key Map - Lot 10 Exhibit 40 Key Map - Lot 11 Exhibit 41 Key Map - Lot 12 Exhibit 42 Key Map - Lot 13 Exhibit 43 Key Map - Lot 14 IV-7 IV-9 IV-I 4-17 IV-18 V-2 V-3 V-4 V-4 V-s V-6 V-7 V-8 V-9 YolO V-II V-U V-13 V-14 V-IS V-16 V-17 V-I8 V-19 V-20 iv 10-8-99 Revised 11-01-07 Resolution No. 2007-299 Page 102 Exhibit 45 Key Map - Lot 15 Key Map - Lot 16 V-21 V-22 Exhibit 44 v 10-8-99 Revised 11-01-07 Resolution No. 2007-299 Page 103 Il.4.1Introduction 1I.4.1.1 This document is a manual to guide the design of site plans, architecture, and landscape architecture within the EastLake Business Center II Supplemental Sectional Planning Area (SP A) of the EastLake Planned Community. It illustrates the master developer's philosophy and commitment to a high quality, planned development program. This manual includes design concepts to guide specific areas of consideration, but more importantly it establishes design context within which each element is important to the success of the entire program. Thus, the purpose of this manual is to ensure that all development within EastLake Business Center II will maintain a high standard of design through consistency with these published standards to which all project designers are expected to refer. The standards of these guidelines are consistent with those established for previous development phases of the EastLake Planned Community. While it is the intention of the master developer to allow as much freedom as possible for creative design expression at the parcel and individual project levels, it is sometimes mandatory to precisely control the design of areas critical to the success of the overall community; locations where only a limited number of solutions are acceptable. These situations are emphasized in these guidelines. These guidelines are intended to encourage tasteful, imaginative site planning and building design while retaining a sense of homogeneity within the Business Center (I & II) as a whole. Special emphasis has been placed upon methods that tend to reduce visual impacts of larger scale buildings and that balance the elements of strUcture, landscaping and paving. Purpose I-I 10-8-99 Resolution No. 2007-299 Page 104 11.4.2 DESIGN REVIEW PROCESS II.4.2.1 Introduction The design review process includes two integrated procedures: I) design review and approval by the master developer; and, 2) design review and approval by the City of Chula Vista. Essentially the process requires the builder to formulate the design for his parcel review it with the master developer and obtain its approval prior to formal design review application with the City. Refer to the City of Chula Vista's Design Review process and procedures for additional detail. II.4.2.2 Design Review by Master Developer In order to ensure that these Business Center Design Guidelines are adhered to and maintained, specific review and approval and enforcement procedures have been established. Initial construction and development plans will be considered by the EastLake Company Design Review Committee (ECDRC). Additional, future improvements will be evaluated by the Architectural Review Committee of the EastLake Business Center Owners' Association. These review committees will assure the integrity of the business park by reviewing and approving all development proposals within the EastLake Business Center. The committees will consider the level of conformance to the intent and specific requirements of these guidelines and the adopted CC&R's, in addition to all applicable statutes, codes, ordinances, or regulations of controlling governmental jurisdictions. All applicants shall submit four sets of accurate and complete plans to the appropriate review committee for each plan submission stage. Each set shall include the necessary architectural site plans, floor plans, exterior elevations or perspectives, and schematic grading and landscaping plans to fully describe the proposed improvements. In order to facilitate design coordination between individual buildings, all architectura1 and landscape plans for other Business Center projects will be available for review through the committees. Any changes or modifications to approved plans proposed during the initial construction period shall be submitted to the EastLake COmpany for review and approval prior to submittal to City or incorporation in building or site improvements. Submittal Reauirements for Master Developer Review Schematic Master Plan Submittal A Schematic Master Plan will be required only when ultimate site development occurs in phases. Information shall include but is not limited to: Gross and net acreage of lots Building footprints and coverage Number of stories and approximate square footage of buildings Location of circulation roads and parking areas Conceptual landscape design Conceptual grading and drainage 10-8-99 IT-! Resolution No. 2007-299 Page 105 Phasing Plan indicating the phasing of the ultimate Master Plan development illustrating the extent of development at the completion of each phase Preliminary Plan Submittal A Preliminary Plan shall be submitted to the ECDRC, and obtain approval, prior to sub- mission of plans to the City of Chula Vista. The Preliminary Plan, detailing specific information about the site planning and architecture of the project shall be submitted and approved by the ECDRC prior to submittal of construction documents to ECDRC. Submittal shall include but is not limited to: 1. 10-8-99 2. Site Plan a. Gross and net acreage of lots b. Building footprints and setbacks c. Total building floor area d. Site covenage (non-landscaped areallot area) e. Building coverage (footprint areallot area) Parking and Circulation a. Location of interior circulation and parking areas (designate guest) b. Dimensions of typical parking stalls and parking aisles c. Parking table (required vs. provided) d. pedestrian circulation e. Location/design of trash enclosures Grading and Drainage Plan a. Existing contours and grades b. Proposed finish grades, slopes and building pad elevations c. Site drainage structures and systems Landscape Plan a. Plant materials, sizes and locations b. Walkways and paved areas (specify type of materials) c. Description of irrigation system Architecture a. Schematic floor plans b. Schematic building elevations with materials and colors c. Street elevation(s) d. Color and material board Signage Plan a. Sign copy and placement 3. 4. 5. 6. II-2 Resolution No. 2007-299 Page 106 b. Elevations and sections c. Colors and materials d. Lighting details Construction Documents All applicants are required to submit two copies of the construction documents to the ECDRC as well as the City of Chula Vista, for approval, in order to demonstrate the precise construction details for implementing the approved Preliminary Plan. Il.4.2.3 City of Chula Vista Design Review Process The requirements of the City are fairly typical and are further detailed below, but each builder should contact the City for current, specific requirements. As noted above, the approval from the master developer should be obtained prior to fonnal review by the City. Il.4.2.4 Zoning Administrator Design Review The Zoning Administrator is authorized to consider and approve, disapprove or modify applications on several subjects as provided in Section 19.14.030 of the Chula Vista Zoning Code. Il.4.2.5 Design Review Committee The Design Review Committee (DRC) shall review all projects. The DRC shall base their findings on the City's Design Manuals and these Design Guidelines. Refer to Sections 19.14.581 through 19.14.600 of the City's Zoning Ordinance for additional information. II.4.2.6 Appeals An appeal to the Planning Commission on a decision of the Design Review Committee may be filed within ten days after the decision as provided for in Section 19.14.583 of the City's Zoning Ordinance. 10-8-99 JI-3 Resolution No. 2007-299 Page 107 Design ReviewApproval by Master Developer l',elimiu'V Design ~I..ting v,ith The EootL.1<e Company . ., D8V8lopar Review of EadL.k. Company Il1d City l..llidAliDMI I. (lr..inilru.p.fi:' . .. '. Review Preliminary Desl~n Concept i viiI" no ElSSlL.kll Currlp.nv J tii. "," 'ilJlii'lI~""" Rewi!.e and Prepare F.nlllll Ptlns for no EastLakc Company Doolsn Review Col1lmitlcc . Submk Plo.... f., App,oval by Tho Eactl.ako Company l)Adgn HAU'ifIW {:nlhlTllrte:.., ~. . . . . Approval" SllIIlIpillG of PllIns by I n. E~lhk.. Cump."., D""'~" Rovi_ Cur."'il..... ~ P,.nu,i"ary City Roview ,with no EostLa'" Company & Dovelopo, . ell, Design R~I.wl'rotttiS 8.g1u 10-8-99 1l-4 The EastLake Company Design Review Process Informal City Revi&w Formal City Design Review Committee Proensing Resolution No. 2007-299 Page 108 11.4.3 BUSINESS CENTER DESIGN GUIDELINES II.4.3.1 Site Planning Planned Community District RelZUlations Development standards for each land use area (i.e., pennitted land uses, lot coverage, height and bulk requirements, signs, etc.) are established in the EastLake PC District Regulations which should be referenced for specific property development standards. The following design guidelines supplement those requirements. Notwithstanding these guidelines, compliance with the planned community district regulations and other regulations of the City of Chula Vista or other authorized agencies shall take precedence. Any aspect of development not addressed in the EastLake Business Center II Supplemental SPA Plan, EastLake II PC District Regulations, or these guidelines shall be governed by the City of Chula Vista regulations. Site Planning The location and "footprint" of a structure on its lots is as important as the "design" ( appearance) of the building. Because of the variety of lot sizes and uses, special attention must be paid to the location of each structure. Office and commercial buildings should be arranged to make efficient use of the site. All site plans shall observe the setback standards described in the specific parcel criteria herein. The following guidelines are intended to supplement the EastLake I SPA Plan and PC Regulations and, if followed, should guarantee the development of a business park whose occupants will have maximum opportunity for creative site planning and building design while ensuring that the overall business park is homogenous and well maintained. 1. Coverage: Maximum building coverage shall not exceed 60% of the net lot area on any lot. 2. Setbacks: a. All setbacks shall be measured from the property line which, on a street frontage, is the same as the street right-of-way line. 10-8-99 III-I Resolution No. 2007-299 Page 109 Creale enclaves of building s and co un- yaras; vary site topography and street scenes. Avoid rigid. repetitive, and monoto- nOlls site layouts. Exhibit 1 10-8-99 Site Planning DO THIS --------- NOT THIS I11-2 Resolution No. 2007-299 Page 11 0 b. Landscape Setbacks: All landscape setbacks shall be improved, predominantly with plant materials. Other improvements shall be limited to service and access driveways, walkways, fences, walls and planters. I) Front yard landscape setbacks: All front yard landscape setbacks shall be 20 feet minimum. Where a lot abuts two public streets, the Site Plan may designate a front yard and a comer side yard. The landscape setback for a comer side yard shall be 10 feet minimum. Unless otherwise approved on the Site Plan, the longest street frontage shall be considered the front yard. 2) Side and rear yard landscape setbacks shall be 6 feet minimum, except for comer side yards noted above. 3) Rear yard setbacks for lots abutting residential neighborhoods shall be 10 feet from top of slope. Building Heights The maximum height of structures within the business park shall not exceed two stories, or 35 feet, whichever is less. A provision that allows certain interior lots to be considered for buildings above 35' is provided in the PC District Regulations. 10-8-99 ID-3 Resolution No. 2007-299 Page III Circulation and Parking a. Textured and/or enhanced paving may be used to accent driveways and building entries or other significant areas. d. All parking stalls shall be clearly outlined by stripes on the surface of the parking facility. Standard car size parking spaces shall have a minimum size of 9 feet by 17.5 feet (with 1.5 foot overhang at front curb). Compact car size parking spaces shall have a minimum size of 8 feet in width and 13.5 feet in depth (with 1.5 foot overhang at front curb). Compact car parking spaces may comprise a maximum of 25% of the total parking space requirement providing said spaces are controlled or appropriately marked to ensure their utilization by compact cars. Two-way private driveways shall have a minimum width of 24 feet for per- pendicular parking. All parking facilities shall be lighted in accordance with current City standards. Lighting standards shall not be greater than 18 feet in height. 10% of parking areas shall be landscaped. e. f. g. h. 1. 10-8.99 i ,J t~ .... ~ Standard Car Parlcing Space tI' t~ , ~ Compact ear Parking Space 81 J- ~ (}:\J- ::.0 "... "". ./lC/1/Y.) IJ."~ ~f kfI, ~ 1lI-4 Resolution No. 2007-299 Page 112 Landscaping One eight foot wide landscape node shall be provided between every ten linear parking spaces, for parking visible from streets. Variation in spacing is permitted in order to allow landscape design to respond to each building and site plan. Design flexibility should be used to create the appropriate balance (subject to approval) between landscape, hardscape, site improvements and buildings. All tree wells shall include a 12" poured concrete pad (in addition to the 6" curb) on every edge adjoining a parking space to provide a step-out area for vehicle occupants. Service and Storaee Areas a. All outdoor storage and sales yards shall be completely enclosed, screened from public view by landscaping, wall, or fence, not less than eight feet in height, constructed of material complementary to the building materials. Outdoor storage includes material involved in fabrication, as well as, the parking of all company owned or operated motor vehicles with the exception of regular passenger vehicles. No chain link fences will be permitted without special approval of the ECDRC. b. No storage shall be permitted between the street and the building. c. No loading shall be allowed which would be visible from Otay Lakes Road or adjacent residential lots. d. Streetside loading shall be allowed provided the loading dock is screened from all adjacent streets. e. All outdoor refuse collection areas shall be completely enclosed and screened from view by a wall or fence constructed of materials which are complementary to the building materials. All such areas shall have concrete floors and loading pads, and shall be of sufficient size to contain all business generated refuse. f. No refuse collection areas shall be permitted between street and the building. Community Fencing One of the most dominant visual elements of a community is its fencing. It is essential for this element to be aesthetically pleasing and provide continuity in design to unify the various architectural styles within individual neighborhoods into a single community theme. Although community fencing is not expected to be a significant element of the Business Center II project, if it is used the following guidelines should be observed, particularly along residential edges. Fences and walls can serve many functions including security, identity, enclosure, privacy, etc. However care must be exercised in the design of fencing in order to avoid long, boring or awkward sections of fencing. It is intended that the available fencing types be combined to attract interest and provide variety. Using a combination of open 10-8-99 lII-S ..............-- Resolution No. 2007-299 Page 113 and solid styles, changing angles and directions is encouraged. Long straight runs of a single fence style is monotonous and inappropriate. The elevations ofthe EastLake Planned Community fencing program are sketched below. These are to be used for all fencing indicted on the community Fencing Plan. Refer to Exhibit 3a on page 6a. The pilaster serves as the unifying design element among the different fence types and will establish the theme for community fencing. Each type of fence serves a particular purpose. The sound wall is a masonry wall intended to provide noise mitigation and privacy. The solid theme wall is used where visual privacy is needed, but protection from the noise of arterial highways is not important. This wall uses a pilaster similar to the sound wall, but may use fence boards between. An open wall is used where a pbysical barrier is needed, but a view needs to be preserved. Within EastLake, wrought iron fencing between the theme pilasters is proposed as the open wall. Pilasters should be provided at each property line intersection or at a typical spacing of approximately 200 feet. Fencing Types ~.""TI\~rc:"' ~u.. f,\'..'......Vl.... ..../it.'I /1 . . . .L 200' Mi>!xirrlu!!I l' i' Pla!fM~G'l~.t'\D.t;~fK).." i "",_plI(Wr~~"""""""" ~'-"~'~'~""'.'~' d'E:' .. :.:' ". ~. . i" .," ~ ...~ SOUD WALt. PIt:r.<<~~d """",,,'If ,.,.~,..~..Otld':;rM:X::r' OPEN WALL l/i""~l; '~~. '" . .'. ..I~ -, 1" '.' ~'''i' J , SLUMPSTONE WALL (sea' l;"mm,","'1~ h1lG.Ll11' PJ.M.I 1 I STAGGERED WALL DETAil M.'Sgr.-r "",,\' ....n:-l'C .MI;."'!I:."r.- m..lr;;.:"'rr.':;f 10-8-99 JII-6 Resolution No. 2007-299 Page 114 Exterior fences should be designed and placed according to the following guidelines: 1. Walls should be made of a textured surface material that is compatible with the design of the neighborhood area. 2. The monotony of a long wall should be broken by visual relief through periodically recessing the wall or constructing pilasters. 3. Landscaping, such as trees, shrubs or vines, should be used to soften the appearance of the walL 4. Walls which serve as a subdivision exterior boundary should be up to six feet in height from the highest finished grade. 5. Walls used as rear or side yard walls should be constructed up to six feet height depending upon the conditions that exist. 6. Combined solid fencing, walls and open fencing may be used to create interest. Masonry walls are required only where necessary for noise attenuation. 7. Fencing design should avoid long continuous runs. Jogging the fence line to avoid monotony is encouraged. 8. Landscape planting should be used to supplement and soften fencing and obscuring long lengths of fence with vines and shrubs is encouraged. Combined Wall and Fence Guidelines The combining of a conventional fence on top of a retaining wall can result in combined wall height that is not desirable. The combining of walls is generally discouraged. Where necessary, it shall be within the combined limits indicated in the sketch to the below. Combined Wall and Fence ,- I . ......nhlI' ..... Exhibit 4 10-8-99 III-? -;: - -_..--'--~- Resolution No. 2007-299 Page 115 Fences and Walls a. No fence or wall exceeding three feet in height shall be constructed within 20 feet of the front (streetside) property line. b. Walls and fences between buildings and the front property line are not allowed. c. All fences and walls shall be an integral part of the building design concept and shall be constructed of materials that are complementary to the building materials. Textures and colors shall also be complementary. Utilities. Antennae and Flal!Doles a. All exterior on-site utilities (gas, water and sewer lines; drainage systems; electrical, telephone and communications wires and equipment, etc.) shall be placed underground or properly screened. b. On-site underground utilities shall be located so as to minimize disruption during maintenance and repair. c. No antenna or transmission or reception device which can be viewed from ground level is permitted without specific approval of the ECDRC or EastLake's Architectural Review Committee, as appropriate. d. Temporary overhead power and telephone lines shall be permitted during construction. e. A maximum of three flagpoles may be permitted per lot. Any such flagpoles shall be subject to the 35 foot maximum height limitation. Grading Standards Rather than create one large pad, the grading concept for the EastLake Business Center II should provide separate pads for almost every lot. This reduces grading quantity and height oflarge slopes, and produces smaller slopes which are more easily revegetated and less obtrusive visually. Parcel grading should respect existing terrain and take into account surrounding topography. Attention to thoughtful grading practices can do much to enhance the aesthetic quality of EastLake Business Center. Grading within EastLake Business Center is subject to Chapter 15.04 of the Chula Vista Municipal Code. The following items are intended as guidelines to direct site grading: a. Site grading should complement and reinforce the overall architectural and landscape design character. b. Finish grading in all landscaped areas should assure positive drainage away from building floors and footings. c. All buildings should be equipped with adequate roof drains, downspouts or other drainage conveyances. All drain exits should deposit into storm drains or onto hard surfaces. No roof drainage should be deposited into landscaped areas. 10-8-99 I1I-8 Resolution No. 2007-299 Page 116 11.4.3.2 It is the objective of these guidelines to create a business park which is well planned and which is compatible with the street scene. Each building, though expressing its own individuality shall also be an integral part of the complete Business Center and must be designed accordingly. Buildin\! Massing a. All buildings are to be functional and contemporary. b. Large-scale, uninterrupted walls facing a street shall be visually reduced to human scale by: Mature landscaping/mounding Clustering small-scale elements such as planter walls around the major form Creation of horizontal shadow line Landscaping terraces Offset building planes and recessed areas c. Radical theme structures which draw unnecessary attention to the building shall not be acceptable. d. Structures should be designed to create transitions in form and scale between large buildings and adjacent smaller buildings. Buildin\! Entries a. Facilities entrance drive shall be readily observable. b. Entry points to the building shall be incorporated into the design. The main entry shall be readily identifiable and accessible. Textures a. Simple and uniform texture patterns are encouraged to enhance the architecture of buildings. b. Building should be designed with materials to complement landscaping materials. Eauiument Screening a. All roof-mounted equipment shall be hidden from view with parapet walls or screening. Screens shall be attractive in appearance and reflect or complement the architecture and color of the building. Mechanical equipment shall not extend above the enclosing wall or screen. b. All exterior mechanical equipment which is visible from the upper floors of adjacent buildings shall be kept to a minimum, shall be installed in an orderly, Architecture 10-8-99 JII-9 Resolution No. 2007-299 Page 117 compact manner, and shall be painted a color to blend with the adjacent background. c. Exterior mounted electrical equipment shall be mounted in a location where it is screened from public view. Building Materials a. Materials shall be low maintenance. b. Materials shall complement existing materials within the development. c. Use of glass is encouraged. e. Pre-engineered metal buildings are not permitted. Art/Sculpture Any art or sculpture placed within EastLake Business Center must be included in the original plans approved for the project or subsequently approved by the ECDRC. 11.4.3.3 Lighting Safetv/Securitv Li cllting I. Lighting shall be indirect and subtle. Overhead pole mounted down lighting is encouraged. Light standards shall not exceed 18 feet in height. 2. Exterior pole lighting shall be High Pressure Sodium (HPS). 3. Lighting levels should emphasize walking areas so as to clearly identify the pedestrian walkway and direction oftraveJ. 4. Parking areas, access drives, and internal vehicular circulation areas shall have sufficient illumination for safety and security. Lighting fixtures shall be a zero cutoff. The parking lot illumination level shall achieve a uniformity ration of 3 to 1 (average to minimum) with a maintained average of I foot candle and a minimum of 0.3 foot candle. 5. Outdoor pedestrian use areas (courtyards, entry ways, walkways, etc.) shall have sufficient illumination for safety and security. Primary pedestrian use area light- ing should achieve a uniformity ratio of 3.5 to 1 average illumination of 0.60 foot candles and a minimum of 0.18 foot candles. 6. Service area lighting shall be contained within the service yard boundaries and enclosure walls. No light spillover is allowed. Architectural/Landscaping Li cllting I. Lighting shall be indirect, such as soffit lighting, or incorporate a full cutoff shield type fixture. 2. Architectural overhead down lighting, or interior illumination which spills outside is encouraged. Said lighting should articulate and animate the building design. 10-8-99 Ill-IO Resolution No. 2007-299 Page 118 3. Exterior illumination to enhance building identity should respect and reinforce the architectural treatment of the building. Patterns of light and fixture concealment should be considered to avoid glare and intrusion onto adjacent properties. 4. Landscaping lighting shall be subtle, indirect and should accentuate rather than overpower landscape features. 5. Special lighting may be introduced at gateways and other key entries to indicate entrances and identity. 11.4.3.4 Sign Program The purpose of these sign guidelines is to provide the means for adequate identification of buildings and businesses by regulating and controlling the design, location and maintenance of all tenant signs within EastLake Business Center II. In addition, the sign program is intended to convey information to motorists and pedestrians that will simplifY and clarifY their movement throughout the project. The intent is to establish specific standards for all exterior signage that will ensure continuity, consistency and harmony with the architecture. Each user/tenant is expected to establish and maintain an "integrated" concept in the design of their signage. Signs and finishes shall be harmonious with the general character of the user/tenant's building. Auuroval and Submittal All signs shall be subject to the approval of the City Zoning Administrator prior to installation. All proposed exterior signs for each facility shall be submitted to the ECDRC as part of the Preliminary Plan submittal and shall be consistent with this sign pro- gram. Sufficient renderings indicating size, location, design, color, lighting and materials shall be submitted to the ECDRC for their review. General Standards Signs shall be subtle, tasteful, imaginative, and an integral part of the building design concept. Signs shall be for identification or instruction only; no advertising is allowed. Signs shall require regular maintenance. Maintenance All signs shall be maintained in a neat and orderly fashion. Periodic inspections shall be made by the EastLake Business Center Owners' Association. Prompt correction of any deficiencies shall be made by the entity responsible for the maintenance of said sign(s). 10-8-99 ID-II ~-----.~ --.J Resolution No. 2007-299 Page 119 Illumination Signs and logos visible from the exterior of any building may be internally iIluminated, but no signs shall be devised or constructed so as to rotate, gyrate, blink or move in any animated manner. Hardware All attachments, devices, wiring, clips, transformers, lamps, tubes and other mechanisms required for all signs shall be concealed. II.4.3.5 Prohibited Sign Types and Components Moving or rotating. Moving or flashing lights. Exposed ballast boxes or transformers. Box or cabinet-type sign with transparent, translucent or luminous plastic background panels. Internally illuminated letters with transparent, translucent or luminous plastic face. Luminous vacuum formed plastic letters. Cloth, paper or cardboard signs on exterior surfaces of the tenant building or lot. Signs employing noise-making devices and components. Signs with no returns and exposed fastenings. Rooftop signs. Post and panel-type signs (except temporary signs). No sign, notice or other lettering shall be exhibited or affixed on any part of any building except as specifically approved in writing by the EastLake Company. 10-8-99 1lI-12 Resolution No. 2007-299 Page 120 Il.4.3.6 Sign Criteria Summary for Business Center Specific sign types will be permitted only with designated building types, as described in the Sign Criteria Summary matrix on the following page. Building type shall be determined by the EastLake Company, which decision is final. Listed below are the building type definitions utilized in the matrix. I i . - ~. ... / I I f. RM'rrR )NGl . i ; , ! , ! j I i '" I I , i i i i - .. .,. ~ I , ! t ~.. I . j i '. j' , I ; , , t , / , , I , i I , I , -'-- . I , 1 ; , i I j ; I I . , L. .1. -- f . ,....,--.- I . . -.. L 2'1.n'" I Exhibit 5 Building Mounted Signs Only one tenant name per building permitted, utilizing metal reverse channel numbers. Example illustrates the maximum height permitted for all cap letterforms. Note: Refer to Section 11.4.3. 7 for SignCriteria within the Design District Overlay area 10-8-99 Ill.13 Resolution No, 2007-299 Page 121 Mounted Signs Fabricated letters have open backs (reverse channel) and may be either non-illuminated, illuminated, exterior illuminated, back-lit, etc. Font style shall be selected which permit readability without the need to oversize. ./ t::--- I \ -, "'- -........... " a:-....' "\ \ . \ ) I . I ....J-:=:~./ ~/ ..J'~-'" .......;." "- ~' "'" \ \ \ I \ I r \ / t ) '-.J, '\ I, ~4J --- y \ . )/ --- ""- ,~- Exhibit 6 10-8-99 ill-J4 Resolution No. 2007-299 Page 122 Buildin2 Mounted Sil!l1S Maximum height for upper and lower case letterforrns is 2'-7" from the top of ascending letters to the bottom of descending letters. Maximum height for aU uppercase letterforms is 2'-0". ~~t~HCl-:.lJ.]L~ :.etter I" . I 2.1...1" , I L Llacend:"l1q L~'..: .,.w l 2: 1 _(III ~ Sy:abo1 ~ ~ 21_7.' l Exhibit 7 10-8-99 ID-lS ~. Resolution No. 2007-299 Page 123 b. Sign Type 2 applies to all building types. 1) Sign type 2 shaH be limited to identifying one major tenant or to identifying a specific area, e.g., Gateway. 2) The copy shaH be limited to the tenants' names and building address only. 3) The maximum height of all monument signs is 5'-0". 4) The maximum length of all monument signs is 10'-0". 5) The base or side supports of the sign shaH incorporate a design element that will "architecturaHy tie" it to the tenant building (Figure 4). 6) All graphics and identifying marks shall be within the limitations of the sign face panel (Figure 4). 7) All sign background colors are to be neutral shades. Primary colors may be used for tenant names and/or logos; however, colors must be compatible with corporate colors and corporate identity. 8) Ifmonument signs are to be illuminated, only ground lighting is permitted. 9) Signs are not to be placed in sight distance triangle (Figure 5). 10) One Sign Type 2 is allowed only at each building vehicular access point. If on a comer lot, one additional Sign Type 2 is permitted at the comer. A maximum of two signs of this type are permitted per project. 10-8-99 Ill-16 Resolution No. 2007-299 Page 124 Example of Freestanding Monument Sign Graphics and letterfonns not to extend beyond sign face. Spot lighting may be done by recessed, incandescent, adjustable angle fixtures. Internally illuminated signs are not pennitted. Sign materials must be compatible with building materials. ! Ih.... nA'Il: ..-- t "'<I....... ~-~"" ., ,". . . :..... '.;.',. ...... '. f ". ", .... ',' . .. ," .' . .' ,', .. .' , , . .... " . .. .., ..... - . Exhibit 8 10-8-99 III-17 Resolution No. 2007-299 Page 125 Site Distance Triangle Determination of traffic safety site triangle for City of Chu!a Vista and EastLake Business Center. Setbacks: BC.! Zone: Front S,B.: 20'; Side S.B.: 20' BC.2 Zone: Front S.8.: 25'; Side S.B.: 20' 1 .;) ! :1.'~ ";'1'~ 'i-=4:r: ,..____J ~ . . ~fLr" i. "\ , ' , " /" ." / I t.. ';'>'I.VIl~>>', / I .-'(~ .-- /. ~ ~~ 4 .. I , . 'i"~ ..~, I ',~ I ,/ ,;., I," \ //~~<' .'i'!V )>~~~- 'J /"/ "k~ :.",:~....-i ,\"< '" ...I~l..-:'/ ~ J .. ~-~ / l '". " " .' 'I/"- - ~ ,.... '. '~..(. 1/ '" """' .. \. /L'""" ,r'~""''T"T _lri~ t..-:'l:."'.I..... "-,. '~. '< I / "-t:: <J~l' 1',,;(\J~~ "" " . .... ~. " " ; - ;' t ."".~ _y" ~~~~ "'16- /.t } " . .;u. ..;..t ~ 1 (oj :t' ~ . .1 g. 4"; . -, i Exhibit 9 10.8-99 III. I 8 Resolution No. 2007-299 Page 126 c. Sign Type 3 - Building Panel Signs Sign Type 3 applies to Building Types A, D, E and G. I) Sign Type 3 shall be limited to the identification of various tenants, each having their own building entrance. There is a limit of one sign per tenant regardless of the number of entries a tenant may have. For building type "G", either Sign Type 3 or Sign Type 4 may be utilized but not both; selection must be approved by ECDRC. 2) Signs to be positioned over tenant entry, centered if possible. 3) Signs to consist of an aluminum panel 10'-0" long, 2'-6" high, set 4" from surface (Figure 6). 4) Maximum allowable area for graphics - 10'-0"long by 2'-0" high (Figure 6). 6) 7) 8) Tenants may use their own logotype or symbol and colors; however, colors must be compatible with corporate colors and corporate identity. Background color on all Type 3 signs to be cool grey (PMS 441). All Type 3 signs are non-illuminated. No decorative elements such as borders are allowed. 5) 10-8-99 1I1-19 Resolution No. 2007-299 Page 127 Building Mounted Panel Signs Dotted line indicates the maximum allowable area for graphics - 10'-0" long by 2'-0" wide. Graphics not to extend beyond this area. :8. o. I. r t-.--..... ._-.' t .. .- 'Kln-g---P-rotliicts! , . ... ---- ------- ------- "1 10' U" I ; ~1. I I .~ ~. ~.. 12" j. . I ",',':T,tcr J..~::r.- r.~n~~~ 9rA~~~~~ OM ~I~B ~aDQ ~r~k~~~u~j c~10r: ~~~l G~~ r~~ 441 '.- --... --T-r-' -. l ~. \ 101 _Ij. AJ~~lnu~ cr ~c~y~~~ P~~Gl (~w~nL~~ ~~s~i N:,III illurnla~t"'" ".olln:",:i n~ il":-d..,,,rt:" Exhibit 1 0 10-8-99 IlI-20 Resolution No. 2007-299 Page 128 Building Mounted Panel Signs Centered over entry doors. ! , >. l Exhibit 11 10-8-99 ~. .. ....l'~ ~ I III-21 " i .~ Resolution No. 2007-299 Page 129 d. Sign Type 4 - Entry Window Graphics Sign Type 4 addresses the general standards for all graphics placed on glass entry windows. Sign Type 4 is limited to buildings with more than 2 entries. Sign Type 4 specifically applies to Building Type G (note option listed under Sign Type 3). I) Sign Type 4 shall be limited to the name of the tenant and tenant's business hours. 3) Sign Type 4 may be placed either on entry door or windows to the left or right of entry door (Figure 8). Type style to be used is ITC Avant Garde Demibold, upper and lower case, 2" cap height for tenant name and ITC Avant Garde, upper and lower case, I" cap height for business hours, unless a different Type style is integral with a trademark and/or logotype. position is flush left (Figure 8). Material is to be white vinyl die cut letters placed directly on glass. No other colors or materials are allowed. 2) 4) 10-8-99 IlI-22 Resolution No. 2007-299 Page 130 Entrv Window Graohics ,. .. , I I ... .. , , , I 'il_i" I J.. , Kye 4'" Hours -1 ~~ 8:00am 1,,, L'l!I::tlll '~dm~ ~'Jl1':"=-C:::'~ .'lOUT;> i::'lfornz:t.i\J':1 B~~~~e~~ ~Q~r~ ~~torna~~~~ Exhibit 12 10-8-99 I11-23 _.~.- ~ Resolution No. 2007-299 Page 131 e. Sign Type 5 - Building Address and Suite Numbers Sign Type 5 addresses the general standards for all buildings in EastLake Business Center. Sign Type 5 applies to all building types. Addresses 1) Sign Type 5a shall be limited to the identification of the building address number. 2) 18" height ITC Avant Garde Dernibold. 3) Precision cut aluminum or bronze, opaque black or white acrylic numbers. 4) Numbers to be applied to the appropriate building face visible from the street. 5) Non-illuminated. Building Suite Numbers I) Sign Type 5b shall be limited to building suite number identification. 2) Suite number must be displayed at both front and rear entrances. 3) 2" height ITC Avant Garde Demibold, black or white acrylic or vinyl die cut numbers. 4) 5) Numbers to be applied above or to the right of the appropriate entrance. Non-illuminated. 10-8-99 ill-24 Resolution No. 2007-299 Page 132 Buildinl!: Address Numbers 1223 _. ...n. ..... _. ...... _ .... __...... . I i , . , ~----_. .....'":'-.. r-.....-. .--.-. n .' i I I I- . ! 1 S".}!:. t.e ~:uobF.r.::l Exhibit 13 10-8-99 ID-25 -..........---- . I \ 1 Resolution No. 2007-299 Page 133 f. Sign Type 6 - Construction/Leasing Sign Sign Type 6 addresses the general standards for temporary leasing and construction information, and applies to all building types. 1) Sign Type 6 shall be limited to one per building. 2) Overall size: 10'-0" high, 4'-0" wide (Figure 10). 3) Colors: PMS 44IC light grey, PMS 447 dark grey (Figure 10). 10-8-99 III-26 Resolution No. 2007-299 Page 134 Construction/Leasing Sign Figure 10. Sign Type 6: Conltruetlonll..ling Sign Exhibit 14 10-8-99 """,,,--.-- ,. MOO hee .nd back wI 1.."" ero,"s bl"l.dnolJ Color: l"MS ...41 Ught ~r"y I b.lckqrovnd) Co!orl PMS ...1 Dark 'V I"ey (backq round I Color: i"",$ "C, 1.ight. ~rf'y I t.ypll! I ......... OOI..Il~ l..s r;.r PostS I il '- ~ ([J'U:'"""t'....n...~~ ,. IlI-27 2"" Rcnderinv or bullcUI'l9 ...... )')- Broker and leaaiRIjI intor1llo&'tion 2' ).. Const.rue~loft in{onMt!on ,. Resolution No. 2007-299 Page 13 5 g. Sign Type 7 - Vehicular Directional Sign Sign Type 7 addresses the general standards for vehicular directional infonnation and may apply to all building types. I) Copy should be limited to tenant, suite or address and any necessary directional arrows. 2) Overall size: 2'-6" wide, 5'-0" high; copy area: 2'-6" by 2'-6". 3) Colors, materials and typefaces shall compliment existing signs and building architecture. 4) The ECDRC must approve appropriate application ofany of these criteria. Such decision shall be binding and final. Vehicular Directional SilOl )' .... '.' :,. (':'1', ...r~~ ;j" t:1' <~"'.:, ~ I I i I I I I L.. Exhibit 15 10-8-99 1II-28 Resolution No. 2007-299 Page 136 II 4.3.7 Sign Criteria for Design District Overlay D The purpose of this section is to address some specific signs for the Design District, as established in the EastLake II Planned Community District Regulations. Signs not address in this section will be subject to the overall sign requirements for EastLlIke Business Center II or the Chula Vista Municipal Code as applicable. Standards for signs, that are not specified herein, shall be subject the Business Center II sign regulations. The Design District will attract business and consumers of home improvement products and services. In order to identify the location and efficiently guide the users to their destination four types of signs are provided for herein. Additional, less dominant, signs will be provided as part of the overall Design Review. Exceptions to the sign standards herein may be approved by the Zoning Administrator, subject to approval of the following findings: That the sign is consistent with the general quality and character of the EastLlIke Business Center II Planned Community; That the sign provides a benefit to the viability of the Design District; That the sign provides a benefit to the customers of the Design District; And, That the sign is compatible with the character of the other signs in the Design District and its surroundings. Sign Locations: Exhibit DD-a, Sign Locations by Type, indicates the conceptual locations of the four freestanding sign types. The exact locations will be established by approval during Design Review. Additional typical tenant signs on the buildings are shown on ExhibitDD-f, which are components of the overall building design, subject to Design Review. District Identification Monument - Sign Type "A": This sign is located at the base of the slope bank at the intersection of Otay LlIkes Road and Fenton Street. It is intended to identify the district and the major tenants along this arterial highway. This maximum dimensions and criteria are illustrated on Exhibit DD-b Max. Size: Base- 30.0' W x 5.0' H; Vertical element - 15.0' W x 25.0' H Tenant Panels: (8) 2.5' H xlO.O' W each Illumination: Intemally illuminated District Entry Monument - Sign Type "B": This sign identifies the entry to the Home Improvement District at the intersection of Fenton Street and Showroom Place to efficiently guide customers to the district. The criteria for this sign is illustrated on Exhibit DD-c. Max. Size: 40.0' W x 9.0' H Illumination: Internally illuminated 10-8.99 IIl-29 01......-_._ Resolution No. 2007-299 Page 137 Tenant Identification Sign - Sign Type "C": This sign directs customers along Showroom Place by indicating the location best entry to use for identified tenants. The criteria for this sign is illustrated on Exhibit DO-d. Max. Size: 6.0' W x 7.0' H Illumination: Externally illuminated Project Directional Sign - Sign Type "D": After entering the district from an entry drive, this sign further directs a customer to the specific tenant location. The criteria for this sign is illustrated on Exhibit DO-e. Max. Size: 2.5' W x 5.0' H Illumination: Non-illuminated Tenant Sign on Tower Element (Refer to Exhibit DD-f). These are for the tower element in the buildings and identifY the primary tenant locations. Max. Size: 20.0' W x 9' H Il1umination: Internally illuminated. General Tenant Sign on Buildings (Refer to Exhibit DO-f). These are for individual tenants storefronts within buildings. Max. Size: 70% of storefront width. Il1umination: Internally illuminated. 10-8-99 m-30 Resolution No. 2007-299 Page 138 11.4.4 LAND~CAPE DESIGN 11.4.4.1 Purpose The purpose of the General Landscape Concept is to establish the overall landscape treatment of the project. Various entities will be responsible for the planning and implementation of land- scape improvements; therefore, this plan will provide the guidance necessary to achieve a visually compatible landscape. . The concept will provide a general design framework which allows latitude and flexibility to each individual project while maintaining the overall goals and objectives of the community. The landscape character of EastLake Business Center II will be created by the use of pre-selected dominant plant materials and a selective plant palette. These plant materials have been coordinated with other EastLake districts in accordance with the general landscape plan. Landscape will reinforce the design patterns established by the land use plan. Since the Business Center II project is an extension of the existing Business Center I development, the landscape materials and patterns will be an extension of those previously established. Generally, trees and landscape intensity zones will be used to establish distinct identity, visual continuity, order and contrast. 11.4.4.2 Landscape Concept The landscaping of the EastLake Business Center will create a serene, park-like setting for high quality employment uses. Landscaped parkways, attractive entries, a central park facility and coordinated site and slope plantings will create a distinctive controlled environment of visually pleasing landscaping. The basic landscape character will be created by the use of pre-selected, dominant accent and parcel trees. These trees have been coordinated with the overall landscaping of the EastLake Community so that the EastLake Business Center maintains its own distinctive identity. The General Landscape Plan, Exhibit 9, provides a general design framework which allows latitude and flexibility while maintaining the overall goals and objectives of the community. The intent of the landscape concept is to reinforce the development pattern established by the Site Utilization Plan. This pattern consists of the predominate employment development areas served by a simple circulation/landscape corridor. Plant selection will follow that of the existing Business Center to perpetuate distinct identities and visual continuity throughout the Business Center as a whole. In addition, the thematic corridor and major thoroughfare have identified dominant trees and landscape designs which will be continued. 10-8-99 N-I ~- __.----...J Resolution No. 2007-299 Page 139 Additional elements in the Landscape Concept include: . Arterial - Scenic Conidor: Otay Lakes Road is an existing arterial scenic highway. The landscape improvements existing on the south side of this road were developed with the EastLake Greens SPA. The landscape improvements on the north side, to be developed with this SPA, shall reflect the character and quality of those existing improvements to the south. Buildings shall be setback 75' from back of sidewalk along this conidor. Scenic Highway ,. .,~? .,J " -'. <:'..-<. -' . \,.1 V'-i?-""",// .. .J-~ ':k'~~~~~'li ~~;.if- .... ~\)'...'t.- .,.,...........- '" ,r.' .,......... t' . ~..... S'" 1 -.....-,..of ';' ~':: _C' "l) r' ")"., ,~~';j;rj,~ ' ~- '" ' . . . ,..~. ~ -'-.....,',.'. I .' .' . "~.'" ~_....' ~ ..-' " .., .-<--~ :".>.. .:J\,j ';'~;' .1....:" "'.r ;;kl" '=.f:~.'-".'~ ~.";~ ~ ",j - \J.~';.1i. :,~ ~ )4- ..... ~~ .' -:'.-".1 1.. ( j .;,:., ~~.t': ~". ~~ ~ ......~rf,c /YitifJi?<:: I-,J'_ I -"~J~Y~~ .~'.' ,',. .(1' , ....~;,.~-:::.-:.:::5~......r..... .. .~ ........... tr ~"'".- ..~-~.,....._> - f>. _ ~ --~~"'~:"~' ~_~ ;..-~~ " ,....... _~"'r':-' ., #' ,..} __ . .. .# -?~~.;::-.. . ':oS -~. ..-'"\: .~:A~- '#~-...~ (,100'"..," .I ,.-' .. ~!itt-;"'7'" .r . . ,-- r "" ~. .'. ''.l-..... ,-\,-~. ~..>/':).o~ .,/'f-~''''~-:='~~~~.::':- ;..;.~~-~.J"""t.<~ " . '//:' ....~."'.:.~..: oJ. ~-e~.;::,'''''';,;,:-":~",,::.!''' AIi"t?. . ;~;;~~:.~:~:$ ~~;:. \,,;, ~-, ) '-"'-- ...{-/>" .'" r ..,;";to'" if....... ~......;.. .~ --:. ---...- .,.,..... '''l\., .~~"'-..":iJ./"'.- &=....;.;-.- .-.;:-- '. ....,. ~~-' ~~J---""''''-_.''''~~~ ...~..:;-5 . ._'~~ ........~ ~; ~~~~. ~..~ ~~ ~-~~ ;~~~'~"~-- - -~'-'. .. '--.~-~--~- -~~.... -.-.. Meandering Walk. -, ~~- . -=- E v.Jbi: ~ t,- 10-8-99 1V-2 Resolution No. 2007-299 Page 140 . District Entry: An entry sign and enhanced planting will be located at the intersection of Otay Lakes Road and Fenton Street. The design character shall be similar to the similar entry treatment at the intersection of Otay Lakes Road and Lane Avenue. Entry Monument --. - - -............. -. -:::::~.._""'._" " .~-=-.... -". -- , ", -- '. '- -'. ""'--...- Exhibit 17 1 0-8-99 IV-3 ~n Resolution No. 2007-299 Page 141 Thematic Corridor: The existing Thematic Corridor along Fenton Street shall continue easterly to Otay Lake Road. Since this corridor does not connect to a dominant neighborhood feature in Business Center II it wilJ be a transition as a continuation of the dominant tree theme in the corridor, but with a contiguous sidewalk. Thematic Corridor R.... oIl'",*,' Tmc 8' t,.lind _It I I I !45!5-5: I t5$EI~! . , 11(if : 20' Fenton Street Exhibit 18 Residential Interface Buffer: The Business Center pads are above adjacent existing and future residential development to the north and east. In both locations a dense landscape buffer will be provided along the upper portions of the slope. Along the northern boundary with Rolling Hills Ranch an additional building setback is provided. A solid fence shall be required adjacent to all residential parcels. Refer also to Section II.4.4.8, herein for Special Landscape Master Plan criteria. 10-8-99 N-4 Resolution No. 2007-299 Page 142 General Landscape Plan Business Center II Supplemental SPA --j -- _~_"'~''''''''''~ . .. ... '" ..' .- . . , ' , : , , . , , , :' ; ~ .' " " " " ,; . i J EB$lLake Greens SPA Arterial - Scenic Corridor District Entry Thematic Corridor ....... .. Residential Interface Buffer Note. 10'4 Of all lots to be landscaped open space C1nft LanlS ~ ~ 10-8-99 IV-S Resolution No. 2007-299 Page 143 11.4.4.3 Landscaping Requirements The landscape concept of each specific site should be simple, with an emphasis on massing of plant materials rather than sporadic, intermittent planting. Rolling berms and drought tolerant trees, shrubs, and ground covers should be used to create a heavily landscaped setting and to visually soften parking lots and other objectionable views. Preselected dominant and accent trees should be utilized on the street frontages. A limited number of different plant materials should be used. Each tree selected, for example, should fulfill a specific role in the landscape (i.e., entry tree, parking lot tree, etc.). Lawn shall be kept to a minimum. I. All development in the EastLake Business Center II shall be in compliance with the Chula Vista Landscape Manual, adopted by Resolution No. 17735 in November 1994. 2. All landscaping shall be in conformance with the principles of the General Landscape Plan. Landscape plans must be approved by the ECDRC. 3. Plant materials with invasive and shallow root systems and/or which create litter which would stain paving or automobiles, or create a safety hazard should be avoided. 4. A general soil amendment program should be a part of the landscaping operation. This should include soil tests by an approved agricultural soil laboratory to determine corrective procedures. 5. Parking lots, service or storage areas, trash enclosures, etc., should be visually screened. A 42 inch high landscape berm, wall, plant materials, or any combination thereof, shall be used to screen parking lots from streets. 6. Off-site landscaping. Irrigation and landscaping at the street frontage should include the area between the property line and the street sidewalk. These improvements and their ongoing maintenance is the responsibility of the property owner, unless it is part of a "cornmon landscape area". The "cornmon landscape area" shall be the responsibility of the EastLake Business Center Association. 7. Site developer must plan to incorporate existing landscaped areas into their overall landscape design and irrigation system. 8. The use of landscape related walls, planters, sculpture, enriched paving, etc. is encouraged. The inclusion of such features may alleviate deficiencies in other components of the overall landscape plan, subject to the determination of the ECDRC and the City Landscape Architect. 9. Root barriers, special irrigation and adequate setbacks from improvements shall be provided for trees that can damage public improvements. The trees designated for the Business Center are: Dominant trees - Platanus acerifolia and Pinus eldarica Accent tree - Erythnia corralloidies Parcel tree - select from the approved list 10-8-99 N-6 Resolution No. 2007-299 Page 144 Dominai'll Tree London Plane Trre PllJr.nU$ Ilc.rjfo/~ Exhibit 20 10-8.99 Dominant Tree Mondell Pine Pinus eJd.n~~ IV-7 Accent Tree Naked Coral Tree E'~ ctY,Jloid~s Resolution No. 2007-299 Page 145 Trees shall be utilized in the following ratios: On external streets (Otay Lakes Road): 80% Dominant trees 20% Accent trees On internal streets: 50% Dominant trees 25% Accent trees 25% Parcel trees On Thematic Corridor: Populus species To create a balanced landscape environment sensitive to maintenance and conservation concerns, specific landscape intensity classifications have been established (refer to Landscape Intensity Plan). These indicate the type of planting at a specific location or area. The classifications are made based on maintenance and watering requirements. All landscape materials shaH be tolerant of reclaimed water used for irrigation. I. Native Areas - These are existing vegetated areas undisturbed by construction operations. Natural rainfall only is required for irrigation. Periodic cleanup and grubbing of seasonal growth may be required. 2. Naturalized Areas - These are newly planted areas provided with temporary irrigation systems. Once plants become established, they shall be capable of surviving with no artificial irrigation. 3. Droul!ht-Tolerant Areas - These are newly planted areas provided with permanent irrigation systems. Water demand will be low, requiring substantially less irrigation than omamental areas. 4. Ornamental Areas - These are areas and corridors with a high degree of visual impact. Plant materials will require regular maintenance and watering. 5. Manicured Areas - These are omamental areas that require "special" attention due to their significance (e.g., entries). These areas shall be kept to a minimum. Plant Materials Matrix The plant materials matrix, located at the end of this section, includes a partial list of trees, shrubs, and ground covers suitable for use in the various landscape intensity classifications. Other plant materials may be utilized with approval of the ECDRC and the City. 10-8-99 IV-8 Resolution No. 2007-299 Page 146 Landscape Intensity ....-. . .. ... --J ~ .-J &o.wI1J Rei. ~.. ~. .~. .0 :- .~ :- .: :e .:.. .: :- -i :- .' .. .: :. .'~ .. '. .. .0. ,.~. ~ja .. \. ~.. '"' '. ~ ~. e\' .. ~. .: :. .,;- ,. eastLake Greens SPA ~ ~ ~ @ ~ Ornamental Areas (Drought Tolerant) Manicured Areas Naturalized Areas ...... Potential Ornamental Areas ... .. Scenic Highway Edge ~E4STLAKE em lend ~ -~m r.,.,.r:i_"-..J ,....... A planned community b" The EastLake Company Exhibil21 10-8-99 N-9 lIoIl........^~~._._~_.._ Resolution No. 2007-299 Page 147 11.4.4.4 Street Landscaping The major external street related to EastLake Business Center II is Otay Lakes Road. It is designated "Scenic Highway" by the City. Much of the landscape for this street was installed with previous development in the EastLake Community. Due to the significance of this street, specific landscape standards have been prepared: 1. Medians - median planting consisting of pre-selected trees and shrub beds shaU be utilized. 2. Parkways - adjacent parkways shall be planted generously with ornamental and drought tolerant plantings. A combination of landscaped berms and/or plant materials shaU be utilized to visually block parking areas and any other objection- able views. 3. Slope areas - slope areas will increase the visibility of the landscaping from this street because of the elevation of the Business Center above the street, two important goals are achieved: The view of parking lots wiU be greatly reduced. The prominence of attractive buildings can be highlighted. 11.4.4.5 SlopelErosion Control The general intent of the slope erosion control program is to protect newly created slopes or denuded areas from erosion or unsightliness. Dust abatement is also a concern. AU slope erosion control planting shall conform to the requirements of the City of Chula Vista Landscape Manual and the City Landscape Architect. Generally, five types of erosion control planting may exist subject to the direction and approval of the City Landscape Architect: Type 1 -These are permanent slope areas where permanent automatic irrigation systems, trees, shrubs and ground covers are required. Type 2 - These are permanent individual homeowner lot slopes where permanent manual irrigation systems, trees, shrubs andlor ground covers are required. Tvoe 3 _ These are permanent slope areas to be naturalized. One-gallon and larger trees and shrubs with hydroseeded ground cover will be required. Irrigation requirements wiU be at the direction of the City LAfPD. Type 4 _ These are fire retardant slopes where fire retardant plant materials are used between structures and native or naturalized slopes. 10-8-99 IV-IO Resolution No. 2007-299 Page 148 11.4.4.6 Landscape and Irrigation Standards Standards have been established for the planning of irrigation systems and landscaping. Some of these are municipal standards, while others are specific to the EastLake Community. The City of Chula Vista has specific standards in its Landscape Manual which must be met be all projects. Additionally, the Planning Department may have specific standards related to each individual project. The EastLake Company has specific standards in those common areas where the EastLake Community Association will assume eventual maintenance responsibility. Landscape Standards Streetscape and common area landscape shall be planted to the following minimum standards: Ground covers shall be used to eventually cover the entire planting area (flattened material at the appropriate spacing or hydroseed with City and Master Developer approval). Spreading shrubs shall be used to eventually cover a minimum of fifty percent (50%) of the area at mature growth. Shrub and ground covers shall be selected subject to approval. Tree plantings shall consist of the designated dominant, accent and other approved trees (subject to City and Master Developer approval). All trees will be staked in accordance with the City Standard detail. Type, size and installation of trees in the City right-of-way are subject to City approval. Agricultural suitability tests shall be completed for each landscape project. Soil amendment and leaching recommendations by an independent laboratory shall be implemented. Irrigation Standards All irrigation systems shall conform to the City of Chula Vista Landscape Manual and EastLake Irrigation Design Manual. Irrigation systems shall be designed to allow separate areas of maintenance responsibility. For example, separate systems and meters for: - EastLake Community Association _ Private homeowners' or business owners' association - Private entity - Governmental agency - Open space maintenance assessment district - Private individual -Other 10-8-99 IV-II ~~ .... Resolution No. 2007-299 Page 149 Open space maintenance district irrigation shall be coordinated with the City of Chula Vista Open Space coordinator (Parks and Recreation Department). The system shaH conform to standard equipment and installation techniques. Equipment shall be located and installed to minimize negative visual impact. Low precipitation sprinkler heads should be utilized for optimum coverage and maximum water conservation. All irrigation systems shall be fully automatic with the exception of individual homeowner properties. Site Soecific Guide]ines The landscape concept of each specific site should be simple, with an emphasis on massing of plant materials rather than sporadic, intermittent planting. Rolling berms and drought tolerant trees, shrubs, and ground covers should be used to create a heavily landscaped setting and to visually soften parking lots and other objectionable views. Preselected dominant and accent trees should be utilized on the street frontages. A limited number of different plant materials should be used. Each tree selected, for example, should fu]fill a specific role in the landscape (i.e., entry tree, parking lot tree, etc.). Lawn shall be kept to a minimum. ] . All landscaping shall be in conformance with the principles of the General Landscape Plan. Landscape plans must be approved by the ECDRC. 2. Plant materials with invasive and shallow root systems and/or which create litter which would stain paving or automobiles, or create a safety hazard should be avoided. 10-8-99 3. A general soil amendment program should be a part of the landscaping operation. This should include soil tests by an approved agricultural soil laboratory to determine corrective procedures. Parking lots, service or storage areas, trash enclosures, etc., should be visually screened. A 42 inch high landscape berm, wall, plant materials, or any combination thereof, shall be used to screen parking lots from streets. Off-site landscaping. Irrigation and landscaping at the street frontage should include the area between the property line and the street sidewalk. These improvements and their ongoing maintenance is the responsibility of the property owner, unless it is part of a "common landscape area". The "common landscape area" shall be the responsibility of the EastLake Business Center Association. Buyer must plan to incorporate existing landscaped areas into their overall landscape design and irrigation system. The use of landscape related walls, planters, sculpture, enriched paving, etc. is encouraged. The inclusion of such features may alleviate deficiencies in other components of the overall landscape plan, subject to the determination of the ECDRC and the City Landscape Architect. 4. 5. 6. 7. IV-12 Resolution No. 2007-299 Page 150 11.4.4.7 Landscape Maintenance All landscape maintenance shall conform to the City Landscape Manual, community requirements and project CC&R's. Maintenance is divided into the following categories of responsibility: - Individual property ownership - Neighborhood association - Community association . Governmental agency - Maintenance assessment district In general, the overall appearance of the landscape shall be neat, healthy and free of weeds and debris. All new construction of multi-family, commercial, industrial, planned unit development and unclassified uses shall be landscaped in accordance with a City approved landscape plan, subject to City inspection of adequate maintenance levels. 10-8-99 IV-13 Resolution No. 2007-299 Page 151 Exhibit 22 EASTLAKE BUSINESS CENTER II PLANT MATERIALS MATRIX by LANDSCAPE INTENSITY ZONE (Partial List) , ...--... ~ I .!l ~ 1l ~ C> ] I- ~ " I & " ~ 1 '" -. . ~ Plant Namc" . nul.";c,,l (Common) . .5 ~ .. :.i 7' .... TREES Albizzillj\llibrisslll (Type \'aries) .< x Ap/\ni. !1eXllosa (l'cPPClJUillrT_) x x AThuws 1I1l<Xlo (Sl1l\wlx:rry free) x " x x A..""ll.'lTUm Tt>mauzoffianum ((jJ~n J'alm) x " J:lau!tinill h)"ke1lUJI (Hol}ll KOJ\~ Orchid Tree) x " 1( C:uli>tellJull vimin"li. (Wecpw.ll Bottlebr...h) x 1: . Cupanloptis 2l',,,",,nJi,,jdcs {Omol'-"ood Tr.~) x . l'riobotryajaponic.u (I.[)qualj x . El}1hIil'.l\ "'-"truJll>iilic~ (Nllkcd emal nee) x . t::IIC,\Iy~tus llJ>O=ics (E'Jcalypllls) x x .t ficus rubi~iM'" (R.-,Is!! LeaH ig;, x x ~UCtll pi1l"vi I"..JiIl (AlIsunli811 WilIl1w) x x Jacaranda """lir"li. (J"clIlallda,\ " " Koclre~ria rwnicufa'" (Cllille..lc rlllZlIe Tree) x X L<:pcO!pel1llllln 1l1C,i!;11111:D (1I.'Js:ralia<l T"" TTCI':) X X Liquidambal' ;,Iyr""in". (Amcrl~tul Swe..l;1uml lr x L~'ouclhQmn...' r.nriburltius (l.':lUlinn lronwoodj X .. Mcl.il~ucu quinquc~r"ia (Cajepm Tree) x l\. ~telalellCo~ nc:sophHo1 (J'jn)\ Me llllcuCfl) X x Phoecix rcclinato1 (SellCltaJ Oak Palm) x x Pinus bmria (CaJ.l'1btiWl Pine) X x Pirn's ~iCJl.Si; (CILlJouy Ishlll" Pillf') X x Pinus ::JdarJca (Mnndc::ll Pine) X x Pinus haleperu:is (AIerI'" Pin:) x , PiUlls plllea (IUlliwl Sl<>ll~ Pin;;) x " " Pinus rotteyUllA (r"m:)' J'ine) " x PiBlncia chiJlCll~l~ (( :hi no" pi .Ill<:b::) X lr Plalanu., lJC..;lblil\ (London Plalle Trec::) x It J'''f'1111J~ species (Poplar) x .< ~ Querclls liex (Holly O~) " x Qtll'J'C:lS ~jrolta (CCilSt Lh't Uak) .. , JUtus I Qr,CCN (African SQRla.~) . x S"hin1'll molic (C..lifomia 1'''I'!""r) . x x 1 0-8-99 IV-14 Resolution No. 2007-299 Page 152 Exhibit 22 (cont'd) EASTLAKE BUSINESS CENTER II PLANT MA TERlALS MATRIX by LANDSCAPE INTENSITY ZONE ~ i 1 2 "" ~ 11 2 ~ ; ~ 'i .il E l! '" jj ~ . " .1: Plant ."III1I1e.\ - Rotunical (Commoll) ;;: 0 . ;;: '" ... SHRUBS Ac~ja spec:ie.s (Ac.t.ci!.i) x Ag'p"n:hu~ afric.lIIl\l8 (Lit). oftbe "ile) K X AIr;>tost3l1hylt>R ~eiC8 (~I\a) ~ x C~UiaJldr~ lw.....lii (Tr'.niciad l'larne TT<<<::} x x CCNl.:.,hu., ,,,,,,,ie, {Wild Lilac) " ~ CiSTUS S?cci.., (Rcd:rosc) x '^ :< Cop:05Lua kirk Ii (Copro;;:n;;) X x x CCltOIl~~tt:r ,'pecic. r.CotoOUGler) X x nononoea vi."",.. (Hr.'pst.oo Ou~h! X X r..c:hilllll tl\sul~lium (l-ridc :Jot' ~'fa:lt;T1\) X X F..,,>>Uollia specie' (Escell.:."j,,) x x Fcijo3 sellClwl~nIl ,PiOOllpple OI1U\',,! x X :< H OlllClOCaJ Ii., h~'hri(ls (nAY LiI >) x K X Hr:tt"'.)'o:nelt'~ ur"nulif(l:l:ft (I'oYOla) x X x r .IInta:-.., sped". (f .f1nlllllll) x .. r .CJl~"'pCI1lIl"" """r~rllltn (Ne.... 7",wbmd Tell Tr,,;) x x K'mdiul. ~om~~(jcH (Ht",""'cnly Bll.rnooo) .. X Kcnulll OlClL.,<l...,. (Cll....'ttder) x " x I'hotiui3 fl'a..,di (l'hclilliai " x f'iLlospornm llpccics {Mcoek <Jr.u.nv.o) " x X ~ ?lumbap.o Duricu1at3 (CllPe l'lumbago} It J'OOO<mpU8 spcc.ics (Yew pi",,) x X l'runu.< l)'t>uii (Cauli"" Chony) x " I'~n;c' lllUl.lltwn 1l0l,,:t (T>wlIrf Pomeo\nLll~J x Rt'phic.lepill in:li"" (Ind:~ J1awthomi .0: " Rhamllus oj"u.>Il'ltl$ (lta.hJ.r. nuck\h"m) x l< R~...IS :n(e~r"lia (L\m:o.Ul& n.rry) x x TCC<Hlll1 GBf'eusis (Cape. 11<':It:)'.'lI"klc) , x " VihumuID species {Vihumum) x XY]OJlIU. Cl1JI!:?t:loi:IUm (Xylt'su1Zl) , X 10-8-99 IV.15 .~-'-.--~--._-- Resolution No, 2007-299 Page 153 Exhibit 22 (con'd) EASTLAKE BUSINESS CENTER II PLANT MATERIALS MATRIX by LANDSCAPE INTENSITY ZONE S! l:: .. .!! . l ,<> ~ ." ~ " 0- S ;; ~ 1l: "! 0 .~ " i '" E E .. rlam N"",,,,, - noLloni""J (r.ummnTl) ," :;: <:; ::l ;>; ... GROUl\1> COVER Acacj a ,-e&1Jel'l~ (Pt~!'tro.te ,\c nci il) )( Atcl.oth"".. ""Icndul.. Cr...!", Weed) )( x X .o\'C!o,lul''')'Il" sl"'de~ x x X El~ccharis pilul.,.i. 'Twitl l'e..b' (Dwarf Coyote Bush) x x x CcmothU5 sp~ie& (Wild LiJ",,) x x CCJastiwn l.i.nn~nLI~~ (~rmw:n ~urrJ71':r) x ~ l'nll!.llJ1C c.hil<lcr",x (OTILlml~T11.>l.l SlrHwbcl1)') X x Gazanin 31''''';''' CO.....ll1lj "l " x x , Uedem nel;,. (EngJisb Jvy) " " Ice )'lLant5 ("M ".) x X x x Lantana spe~ies [I.unlunl1 ~I " X Lim()l~iuJ!l p"""ji (!hai;cc) . x " "- MYOpOruttl pan'il"Jium (rrmlrtlle MyojlOnlID) "- " X OphiDpoQ.oll j~'''m"um (Mundo GTllSS) x x Pc1arllomum pdlllll.um (1v)' (Jeran;ur.,) x "- Pote'ltilla verr," (SpriTlg r.iTl'll.ldnil) X X RCSIl1JI.til\U;, o1Ii.~inutis 'Proi>lnllus' (Pm~trare R~=!'lry) X x X !iantoJit'.n vir.1l (Sllltolir.a) x x x Verbetm h)'1>ricJ~ (Vvrbcll.1J X X ViTI"" mayor "no minor (pcdwinkk) x x 10-8-99 IV-16 Resolution No. 2007-299 Page 154 Exhibit 22 (cont'd) EASTLAKE BUSINESS CENTER IT PLANT MATERIALS MATRIX by LANDSCAPE INTENSITY WNE ~ 1 Ii JoI i ~ Planl Nanl~S . Bota,,;<....! (C.ummr.'lll) :I g VI:';I;S B"ugai1wiJlea '~J'lecle~ (H'lll~~in".illc&) x " CiSSllS ~p."i,," (\.i ""\I") " x Fi"us 1'C:l'ens (r.l;mhing rig) x Hib~tJa 1m",]",." (<111io=" Gold Vioo) x x Pur!bCL10CWUS lJicWlpklaLa (Rr>!tlJnlvy) X " Trdchc}ospcrnn.un Ja.!i1T1:n();L1~s (Sf:.r J:l:SJli.j1J~J x " Wi,,!e'ti.. sinensis (Chi"e.. Wi"w,.i,,) .. x 1 ." i .. .,. N i ~ 11 .. ~ i ~ ! IS "- Yo X 10-8-99 IV-I? ~. x Resolution No. 2007-299 Page 155 11.4.4.8 Special Master Landscape Plan The northern portion of Business Center II abuts Rolling Hills Ranch. To minimize the visual impacts of development in Business Center II, as viewed from the adjacent homes, a special master landscaping plan is required. This special master landscaping plan shall be approved by the Director of Planning prior to the issuance of the first building permit for Lots 2, 3, I 2, or 13. This plan shall be offered to the Rolling Hills Ranch developers for comment and may include provisions for off-site tree planting to supplement the tree planting within Business Center II. Criteria for preparation and approval of the special master landscape plan shall be: The plan shall be designed to reduce the visual impact of buildings by planting trees that provide screening. The container size of the trees to be planted shall that which would produce the most screening over a five year period for the tree species, up to 24" box maximum. Spacing of trees shall not constrain full maturity branching. The trees shall be maintained by the respective property owners association. The emphasis on the location of the special tree shall be at the top of slope or in locations that best serve to screen the Business Center II buildings. The scope of the plan area shall be as indicated in the exhibit below. ./ /1 I e-- , . ......,....,,, I ~' , ',. " U1nd.cape "Ian AIM. , \ 1 . \ L. .~.__~ c J. I -1 . \C,"- .~ I ) -:---r=']]J - . \', A: < ---;., \ \ . , \ \ '. \ \ 1\, ' " ., \ I \ ' -.' .--- ,,' 1...:.'. j. )\l~--_~ ----::::...,.. . Exhibit 23 10-8-99 IV-18 Resolution No. 2007-299 Page 156 11.4.5 INDIVIDUAL LOT DESIGN CRITERIA 11.4.5.1 Individual Lot Design Criteria The descriptions and lot criteria described in this section are intended to provide specific guidance for each lot. They have been prepared using general criteria and standards provided in various documents in the Business Center II SPA, Design Guidelines, and Planned Community District Regulations. These criteria and specifications are subject to change and refinement in conjunction with the tract map approval process. 11.4.5.2 Organization of the Criteria This section presents issues relating to building envelopes and building architecture in groups of lots based on geographic areas, as follows: Lots I to 6 Lots 7 to 9 Lots 10 to 16 Following these geographical groups are individual pages for each lot defining lot specific issues and criteria. 10-8-99 V-I ~. Resolution No. 2007-299 Page 157 Building Envelope ( ROLLING HILLS RANCH) . r' =l . F : 1 '.., ~~~10V:~~ "... 'We.' ':;f~' }. ..' " ( (i" .,~ I '. . '\ .~.. ~ - 'o~-- -. 101 r-~""""". l l .~ I I 120' If. j I f 'J I '.' .. ... '.' I~'-" ..0'.... ...../ \. ,,- ..... . '. , ~J Building EnVelope LQt1 : . . I . Setback along the North Side of Fenton Street must include EastLake Thematic Corridor Criteria Building Coverage may not exceed 60% of Lot Area Exhibit 24 10-8-99 V-2 '("J~::" "m.~ ~~. ~."t""~"". 11 : FP.rj[~Jlr ...j : I<;~~;~I I:2T\~~kf-~~3', : 20' .,'.;.... II "--.1';0'- -. : ~;o'l .--- ....., 20/ ~j1ding' no' Envelope ~. 1"bUI: ~;... j 1a- i- -'r--.JQ;$:~~~, t ""'''d' m 20' ....." Ing 11 I EL~~ell l_ ___..II 10' I r-,....,...---.., ;.,. . . ,10 t..... I 20' .n~l'di"9 .... .' .Ettif!Jo~ . I L'.. ' ..Lo.'t. 6".J I .. . ". ". I' '.' . I ---..; -.:.;,:-'.. . ,- .-J I . - Resolution No. 2007-299 Page 158 I I' / I H I'] " , , y , . i . Building Height may be Considered tD be Increased (see P.C. Regulations) Building Architecture (ROLLING HILLS RANCH) . ............ ~ ... J............ I ........................... I i ; Lot 3 : 35'or I 2 Story I I Max. I I I , Lot 2 35'or 2 Story Max. Lot4 35' Height may be Increased' Lot 1 35' Height "..,ybe increased" LotS 35' Height may be Increased' --r- I I I I I I , I I I Lot 6 35'or 2 Story Max. ... Building Elevations Facing Residential Areas must be Archilecturaly Treated Exhibit 25 10-8-99 ~-_._--- V-3 Resolution No. 2007-299 Page 159 (hibit 26 Duilding Envelope Exhibit 27 Building Architecture i ;.>_....J:.;. ,,' i ~O' ' \\ JF' I " LDtI . L1, ~~ \, : \,..~" \" j, '--., ' J #'!.ffl' -. 1\ I j' \ -- - I I' ; -. -~. I II \;,"~. - I ,! '",\,\ J L-.. ' .. ~ 1"'-' "t_ I! H \. '.\.~ .IC'" 110'. 14ftG'. -'" Lj,/=-'__i~ .~._.~- --..~:~=:2::_ f f -_.~-.::-'P ::.'=~_. ;'.,... ..- J,' f:; , " I I: i Lor7 I' ;' :!5' 'r"~Mi-).&1 !'i. '., "",U,", : '.'. \ I , \'.A I i \\ \, 1 , ':'. " 1.- - i \::l~ ~~----- ~-'- -:---J I '---- ---. -------., -.....,...., ' --. ........../. -.~ ./ '\;:\ Lot; ~\\. \ J,!,' ,\.:\ '="')'\ "',. .,: ".'f) _ ----_J;/ ,. '-.. ---------~~, Loll >S' . ....puMly8e h"....d "Setback along the North Side of Otay Lakes Road must include Scenic Highway Criteria (75? Building Coverage may not exceed 60% of lot area. "35' Building Height may be increased per P.C. Regulations Section 1V.2.A.8, and as noted below. For commercial and industrial bulldinas areater than 35 feet in helaht. the Desian Review Committee shall consider the followina soeclal desian obiectives: 1.' Ensure hiah aualitvahd fullY, finished . architecture, on elevations facina adioinina residential develooment and orooerlies eaual fothatOftheother sides otthe buildlna. 2," Provide enhanCed "scieeniriaWiilUncreased-siieand/or . amount of buffer landscaoina and/or sereernria,W'aila, 3, .f tvlainlah1'jc5iimoaratileaCcesS1i'tolrani'tanffaiITat-the''ilerlmefer jot line based on' a 35' buildina helaht'aHhe fulilimumsettlaeks; a:" tvlalnlaihaoomoarable'hiidhftO'Se!back IH:S\ raoo:'tSee lV;2;'A'6lthe Planned' Communltv IPCl District Reaulatibils\ b. Maintain a compa~t?leffali8de arealmaximum bulldlna width X base heiaht of 35 feet) for elevatlo~facina;'resiaeniiB1 develoonieiltS '.f or . "dioinina residential lots. This may be accomollshed llvreducinqth'l~ta"buildiilaWidthas the heiahl of the buildina increases so thattHelotal faCade arearemainsiouahlvthe same. EXamole~.' 35' heial]t ~100~wldthcbetweerl'sid.ifvard setbacks = bulldina area of 3.500 sQuare feel. A 70' tall buildinci would have a taroet width of aooroximatelv 50 feet wida{]O~ x SO' = 3.SOO".sauarefeell. 10-8-99 Revised 11/01/07 V-4 Resolution No. 2007-299 Page 160 Exhibit 28 Building Envelope Building Coverage may not exceed 60% of Lot Area ( ROLLING HILLS RANCH ) 10' Landscape Setback Thematic Community VVarl '0' Landscaping & Buildir'lg Setback ~, 10' Landscaping & Build ing Setback -~~ 16-8.1}~ Revised 1'-1-07 Where bulldin9~ arMt~rth3n 35'in helaht are oermltted. the minimum ....... s.."backs sha II be increased as set forth in Section IV.2.A ofthe PC District Rl!!t(lul~tion!; and as set forth in Exhibit 29. Buildina Architecture. 10-8-99 Revised I] 10] 107 v-s ........-- Resolution No. 2007-299 Page 161 Exhibit 29 Building Architecture ( ROLLING HILLS RANCH) 4 I I --.D ............... lot 12 35' Height May Be Incl?ased" Thematic Community Willi 0" -, ~~~ ----- <::':"- ------.:-~ :..... ....,:.<'. ...................... '- ..BuUdin. Elevations faein. residential ~ must _be 'arcbjtec~y::,"<:r~t~t.--l~A":,~I.~~F SubStantial h),lildin2 ,'1irie'i:2~" :Yariilhle Ei#f~~~~$:~i~'f:1 resiilciltian\.CiiihDomooa to the ri~e8Stt t:BbiIdiiiir~:_:tielrml!:tn:la~_~_-~:i~~.-7:oc;r--;.p~cl ReiiU1liii(lhsi.s&tiol5.l'v!1:K!~~'lltif6U6WS! 10.8-99 Revised 11101/07 V-6 For'commercial and industrial buildinas areater thim 35 feet in heiah!. the Desian Review . Committee shall consider the foflowinc soeclaldeslcn obiectives: 1. Ensure hiah 9ualitv and fullv finished architecture on elevations facina adioininaresidenlial : develooment and orooertles eaual to that of the other sides of the buildina. 2.' Provide enhanced screeninc via increased size and/or amount of buffer limdscaoinaand/or screenino walls. :F.Ntalntain c:Or11oarable access to licht ancFair'al the oerimeter lot line based ona35~ buildina hetaht at the minimum setbacks. ai 'Maintain acomoarable heiohl to setback IH:S\ ratio. ISee Section IV.2,A of the . Planned Communitv IPCrDistrict Reaulatlonsr b. Maintain a comoarable facade area (maximum buildino width X base h~iaht of 35 feet) for elevations faclna residenlialdevelooments or adiolnirio residential lots. Thi~ may be accomolished. bv . reducinc the total buildina width as the heioht of theb4ildinq .inoreesesso that the total'facade area remains rouoh/v the same. Examola: 3S' heioht X 100' width between side vard setbacks '" buDd/no area of 3.500 sauare feet. A 70" taN buildino would have ,'. a taroet width of aooroximatelv SO fest wide (70' X 5O':=3.500~,souar8 fest). Resolution No. 2007-299 Page 162 Land Use:1,and Llse District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 ....... Lot I Design Issues Summary Manufacturing Park/BC-I Screening on site storage and parking only Blend v.ith existing Business Center I. Thematic Corridor along southern boundary. Blended edge with Business Center I and Thematic Corridor Within first phase and will establish precedent for Business Center 11. View from residential neighborhood in the Greens j 1 '~''''__r-':::'''....... : I ,/ I ~ . .....--..... -..,...:............. t......'"-</C'::.':.-.1 ,____..r-.., ~--__. . .----.- --- , , , , , .. , Key Map Exhibit 30 V.7 Resolution No. 2007-299 Page 163 Land Use/Land Use District: Fencing: Landscaping: Edges: Special Conditions: JO.8.99 Lot2 Design Issues Summary Manufacturing ParkIBC-1 Mandatory Solid wall at top of Slope along north boundary. Screening on site storage and parking. Dense landscape screening required along north boundary abutting Rolling Hills Ranch on pad and slope. Blend eastern landscape with existing Business Center I. Northern residential edge requires sensitivity to vi;;ual impact on residential use. Additional 10' setback (20' total) along northern border. Architectural treatment on north facing elevation. J 1 \.'..._) ::...'...... : J ...'/' , '--- ...,.:.....-- !-.......J' ':""'---:::::'1 --.--'"~ -----~...\.. , I , , , , , , ~- , ~~ , , , -- Exhibit 3 I V-8 --- \ , , Key Map Resolution No. 2007-299 Page] 64 Land Use/Land Use District: Fencing: Landscaping: Edges: Special Conditions: 10.&.99 1Illr........L.~~ Lot 3 Design Issues Summary Manufactwing ParklBC-l Mandatory Solid wall at top of Slope along north boundary. Screening on site storage and parking. Dense landscape screening required along north boundary abutting Rolling Hills Ranch on pad and slope. Northern residential edge requires sensitivity 10 visual impact on residential use. Additional 10' setback (20' total) along northern border. Architecturallreatment on north facing elevation. J ] \\ ""... , /1 ''''':..-=;-~'''''..;.......-_--' L........;,/'" C::::.::::J -----~ ---_..- '.. r--- '. , . " : -- ; , , " " ~ I I I \ , , , , '...---- Key Map Exhibit 32 V-9 Resolution No. 2007-299 Page 165 Land U seiLand Use Di strict: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Lot 4 Design Issues Summary Manufacturing Park/BC-l Screening on site storage and parking only. No special conditions for landscaping. Surrounded by Business Center uses. Increase height potential. j J \\ \,.... ' ,/. \...._......_..... If f,'r.....,' -..__ ~-... L......-< ~I __~_#rf'". ...___~..~ ,,---- '. , , " -.... , I I , , , , \ '- -- 1 \. ~ , , I \ \ \ \ , \..---- Exhibit 333 Y-IO ,. .-- -'. " , ! ----' Key Map Resolution No. 2007-299 Page 166 Land UselLand Use District: Fencing: Landscaping: Edges: Special Conditions: 10.8.99 .....M LotS Design Issues Summary Manufacturing Park/Be-! Screening on site storage and parking only. No special conditions for landscaping. Surrounded by Business Center lL'leS. Increased building height potential. }I ] -- Exhibit 34 ()--- , , / , , , , , ; l .......~.. --- . I I , , , .. , Y-ll \\ ""... I ,,' I "'..._............... ) I ,;./,..........' ;.:-- ,..,..r..-...---:. _'::-:~".o(. -':::__.1 .-- --- .' Key Map Resolution No. 2007-299 Page 167 Land UseILand Use District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Lot 6 Design Issues Summary Manufacturing ParkIBC-1 Screening for on-site storage and parking only. Thematic Corridor along southern boundary Surrounded by business center uses. Increased building height potential. J 1 " ............ . /} ""~;~"'-_-1 L--',/c:.:.--) ____~..., "'~--___"'<L - f~-"'-' , , , , " .-- ~-- , '--.. .-- I I \ , , , i i ----, , , J , Key Map Exhibit 35 Y.12 Resolution No. 2007-299 Page 168 Land UselLand Use District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 ~~- Lot 7 Design Issues Summary Manufacturing Park/BC-I Screening on-site storage and parking. Southern boundary requires Scenic Highway landscaping. Western edge to blend with established Business Center I. Southern edge is Scenic Highway. Northern and eastern edges relate to Business Center II uses. Southern exposure to Scenic Highway and residential development in the Greens SPA requires sensitivity to visual impacts. Increased building height potential. j J \\ ......., I ;oJ I .......-...-.._ If ."/f'... \ '--- J---.::....... ,---...-< ~) ~__.J"' ____.. (~--_..~- , , , , ( .-- "'. Key Map Exhibit 36 Y-I3 Resolution No. 2007-299 Page 169 Lot 8 Design Issues Summary Land Use/Land Use District: Manufacturing ParkJBC-4 Fencing: Screening for on-site storage and parking. Landscaping: Southern boundary requires Scenic Highway landscaping. Edges: Southern edge is Scenic Highway. Northern, western, and eastern edges relate to Business Center 11 uses. Special Conditions: Southern exposure to Scenic Highway and residential development in the Greens SPA requires sensitivity to visual impacts. Increased building height potential. J 1 \,,\ ...__..,~:.:......... \1 .,' ( '...__ ~.,....--_-, L_" /r......_...' _~__.J'-... ---____, "'<... ......._-~ ,-- --- -- , , . , , , ( Key Map Exhibit 37 10-8-99 Revised II/OliO? V-14 Resolution No. 2007-299 Page 170 Lot 9 Design Issues Summary Land Use/Land Use District: Manufacturing Park/BC-I Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Revised 11101/07 Screening on-site storage and parking. Southern boundary requires Scenic Highway landscaping. Southern edge is Scenic Highway. Northern, western, and eastern edges relate to Business Center 11 uses. Southern exposure to Scenic Highway and residential development in the Greens SPA requires sensitivity to visual impacts. Exposure at Business Center II entry requires high quality architectural design. Increased building height potential. j ] \ \. ......." , ~" "...__........... If ,,',-..... , "--- ....r.. ..:..:.-..... L-_......{/ ,,-.::.-':::'/ ~-_..- - -----.. ,------ , . , . .-- ,. , , I , : t .-- ........-... , , I I , , , . , \ ---- ----- 1 \ ~\...~... Key Map Exhibit 38 V-15 Resolution No. 2007-299 Page 171 Lot 10 Design Issues Summary Land Use/Land Use District: Manufacturing ParklBC-4 Fencing: Landscaping: Screening on-site storage and parking. Southern boundary requires Scenic Highway landscaping. Edges: Southern edge is Scenic Highway. Northern, western, and eastern edges relate to Business Center II uses. Special Conditions: Southern exposure to Scenic Highway and residential development in the Greens SPA requires sensitivity to visual impacts. Exposure at Business Center II entry requires high quality landmark building design. Increased building height potential. j 1 \ \ \...... \ ~/ I ,....._'_..._ I r .;'"/('" 1 ......-- _ ..'r'--.......- t..-......-( ",-:::"--" J ","-_...r-.; -____-" - -- ,.---- , , , , , ( .-- . , , '- '- ~- , I I , , \ \ , ---- ---- Key Map Exhibit 39 I ()"8-99 Revised 11/01/07 V.16 Resolution No. 2007-299 Page 172 Lot 11 Design Issues Summary Land UselLand Use District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Revised 11/01/07 j 1 -- . I . , : . \ ~~ ~, 1 \ Manufacturing ParkIBC-4 Screening for on-site storage and parking. No special requirements. Surrounded by Business Center uses. Increased building height potential. \, )', I /, .......""-_.. _....... If .;,/__ . ..-.... --.,...:.......-..... L.......-< L ....-... I .----_/''''' ------- ~ - ,----- , . , ) ( .-- --- Key Map Exhibit 40 V-17 Resolution No. 2007-299 Page 173 Lot 12 Design Issues Summary Land Use/Land Use District: Manufacturing ParkIBC-4 Fencing: Mandatory Solid wall at top of slope along north bOWldary. Screening on site storage and parking. Landscaping: Dense landscape screening required along north boundary abutting Rolling Hills Ranch on pad and slope. Edges: Northern residential edge requires sensitivity to visual impact on residential use. Special Conditions: Additional 10' setback (20' total) along northern border. Architectural treatment on north facing elevation. Increased building height potential. j 1 \\ ", , ,', '.................::;-..:;..---.J L_//'r...~_~' """'----~--'""...; ..._---_...-"\., ....._--~ --- , i -~-- '. , , , f --- I '- " ~ , , I \ \ \ --------- Key Map Exhibit 41 10-8-99 Revised 11101107 V-18 Resolution No. 2007-299 Page 174 Lot 13 Design Issues Summary Land Use/Land Use District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Revised I 1/0 J 107 Manufacturing Park/BC-4 Mandatory Solid wall at top of slope along northern and eastern boundary. Screening on site storage and parking. Dense landscape screening required along northern and eastern boundary, abutting residential use, on pad and slope. Northern and eastern residential edge requires sensitivity to visual impact on residential use. Additional I 0' setback (20' total) along northern border. Architectural treatment on north facing elevation. Increased building height potential. J 1 \\ \'~ , ,'1 ... '-_.-..... I r ",__ , '-- >--':.-"'- L~"'~'" ~"':.-'" I _--,,"v --___.."\... - ,__r_" , , , , , { .-- ........' -.. , , , , , , , l ~, ~, ~ . , I \ , , , , , -------- Key Map Exhibit 42 V-19 Resolution No. 2007-299 Page 175 Land Use/Land Use District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Revised 11/01/07 J ] ,...., -. I ~ Lot 14 Design Issues Summary Manufacturing Park! VC-S Mandatory Solid wall at top of slope along eastern boundary. Screening on site storage and parking. Dense landscape screening required along eastern boundary, abutting residential use, on pad and slope. Eastern residential edge requires sensitivity to visual impact on residential use. 10' dense landscape along eastern boundary. \\. >"" I /J .... "'--"~-~"'... I! /'/r"'- ' '-- '7'-..::--.- ,,-..._-< -"::':..:> ---_.-""." ---- ~ .-..--... ...-- , , , , ( , I I , , , \ '--.., r- , I C \ \ \ \ \ , --------- Key Map Exhibit 43 V-20 Resolution No. 2007-299 Page 176 Land Use/Land Use District: Fencing: Landscaping: Edges: Special Conditions: 10-8-99 Revised 11/01/07 j 1 .-- . \. Lot 15 Design Issues Summary Manufacturing Park/VC-S Mandatory Solid wall at top of slope along eastern boundary. Screening on site storage and parking. Dense landscape screening required along eastern boundary, abutting residential use, on pad and slope. Eastern residential edge requires sensitivity to visual impact on residential use. 10' dense landscape along eastern boundary. ~~,......_>..:...... \ r "./r / -... _ ~...... I. ... /r....._-', -.::_."....r..._--~=:.."('- --I f----- , \ .-- . I , ; / ; , I '. . , . I , \ . , , , \ . . , , , ---- . ( , I , , , , , I ......" , - . , ( , , . " l _ _.---- --- , , , ----' Key Map Exhibit 44 V-21 Resolution No. 2007-299 Page 177 Lot 16 Design Issues Summary Land Use/Land Use District: Manufacturing Park/VC-S Fencing: Mandatory Solid wall at top of slope along eastern boundary. Screening on site storage and parking. Landscaping: Dense landscape screening required along eastern boundary, abutting residential use, on pad and slope. Thematic Corridor along western boundary. Scenic Highway along southern boundary. Edges: Eastern and southern residential edges require sensitivity to visual impact on residential use. Special Conditions: Southern exposure to Scenic Highway and residential development in the Greens SPA requires sensitivity to visual impacts. Exposure at Business Center II entry requires high quality architectural design. j ] \'-..._......::......... }r .../1 '-- ..~..:':.--- L...-:.(/c.:.--") ______-"""-.1 .._____..... _ --- - , I I \ \ \ \ , , , --.------ , . , / , , , I \ , \ , \ , \ , , \ \ --- , , , I , " -~- , '- -- 1 ~ Key Map Exhibit 4S 10-8-99 Revised 11/01/07 V-22 Resolution No. 2007-299 Page 178 AQIP ~ Resolution No. 2007-299 Page 179 Air Quality Improvement Plan for EastLake Business Center II Supplemental SPA Plan Addendum November 2007 Addendum Adopted , 2007 by Resolution No. 2007-XXX Project Sponsor: IRE Development 821 Kuhn Drive, Suite 100 Chula Vista, CA 91914 (619) 661-6681 Contact: Alan Huffman Prepared by: REF Consulting 9755 Clairemont Mesa Boulevard, Suite 100 San Diego, CA 92124 Contact: Dan Wery, AICP (858) 614-5081 dwery@rbf.com Resolution No. 2007-299 Page 180 EASTLAKE BUSINESS CENTER SPA AMENDMENT - NOVEMBER 2007 Project Description: The applicant, IRE ("Applicant") development, is prosing to introduce commercial retail uses within the existing Eastlake Design District and is requesting a land use designation change from Light Industrial to Commercial Retail in order to complement the existing furniture and home improvement businesses presently in the District. The Applicant is also proposing certain modifications to the property development standards to accommodate up to five story buildings (up to 76 ft. high), special parking ratios for furniture stores and restaurants and professional and medical office uses, including medical clinics. Certain specialty retail uses related to home improvement are currently allowed under a previously approved Master Use Permit. However, these and other retail uses as well as developmental and operational flexibilities are proposed to be incorporated into the EastLake II Planned Community District Regulations. More specifically, an amendment to the City of Chula Vista General Plan (GP A) was filed to change the land use designation of approximately 16.7 previously developed acres at the northeast comer of Fenton Street and Showroom Place (851-891 Showroom Place) Within the Eastlake Business Center II project, hereafter referred to as Area "A" (see figureJ:0 from Limited Industrial to Commercial Retail. Concurrent amendments to the Eastlake II General Development Plan (GDP), Supplemental Sectional Planning Area (SPA) Plan for Eastlake Business Center II and associated regulatory documents are proposed for Area A above and parcels identified as Lot 2 of Map 13971 and Lots 5-8 of Map 14395, herein after referred to as Area B (see Figure~ and 2430 Fenton Street, herein after referred to as Area C. The GDP and the Eastlake Business Center II Supplemental SPA amendment consist of changing the land use designation of Area A from BC-I, Business Center Manufacturing Park District with Design District Overlay zone to a new commercial land use district and Area B from BC-I with Design District Overall to BC-4 (Business Center Core District). Also included are certain modifications to the adopted property development regulations in order to accommodate greater design and land use flexibility. The purpose of this Air Quality Improvement Plan for the EastLake Business Center II Supplemental Sectional Planning Area (SPA) is to respond to the Growth Management Policies of the City of Chula Vista. The most significant air quality improvement measures are those policies and regulations established at the broadest geographic level, i.e., State and Federal. However, there are measures that can be applied on a City or project level which can have a positive impact. This addendum presents an overview of these issues, and identifies mitigation/improvement measures in the following general categories, which can be implemented at the local level. a. Pedestrian and Bicvcle Paths: The adopted EastLake II General Development Plan, and subsequent SPA Plans, adopted by the City have emphasized the use of an extensive trail system, connecting activity centers, to enable non-vehicular travel. Although an employment park use is not a typical pedestrian destination, the Business Center II project is integrated with the existing EastLake Village and Business Centers in the central portion of the community. The clustering of "activity uses" (high school, community park, and retail) and employment at a central location within the 11/19/07 11.7-1 Addendum to Air Quality Improvement Plan Resolution No. 2007-299 Page 181 community encourages the use of non-vehicular modes of travel to these destinations. Bicycle and pedestrian trails, including the EastLake Thematic Corridor will be extended to the proj ect. b. Land Use Mix: The EastLake II General Development Plan, adopted by the City, includes job opportunities, recreation, education, retail and service commercial, and public facilities within the community. Full implementation of the community plan would minimize the length and number of automobile trips because of the range of opportunities and services available within the community. The Business Center II project will balance residential increments in the EastLake community with additional employment uses. c. Access to Regional Svstems: The LOS requirements applied to development within the EastLake Business Center II SPA will encourage free-flow travel, which reduces air emissions. Connections to regional vehicular circulation, public transit and pedestrianlbicycle trail systems are integrated into the project. d. Transit Access: The community circulation plan includes provisions for public transit facilities. Transit stops are anticipated along arterials at key intersections, where desired by the transit provider. The clustering of transit destinations (e.g., schools, shopping, and employment) encourages the use of public transit and simplifies routing and scheduling. e. Site Designjplanning Guidance: This plan identifies the desirability and importance of consideration of transit and pedestrianlbicycle building orientation in subsequent implementing steps such as tentative map approval, site planning and design review. Inclusion of these design factors will support and enhance the alternative circulation systems provided at the neighborhood and community levels. [ Park-and-Ride Facilities: The provision of a Park-and-Ride facility in proximity to the project is anticipated. Construction of such a facility is required in the EastLake Village Center, located just west of the project site. Such a Park-and-Ride facility could also provide a staging area for carpools, vanpools, and transit vehicles. This facility should be incorporated into a city-wide system of similar facilities coordinated with public transit routes, including future light rail corridors. &, Telecommuting: The Master Developer is also working with the cable TV provider to include high speed electronic communications connections through the cable TV system. The Master Developer is committed to ensuring that new development are not "technologically obsolete" but include necessary community infrastructure to take advantage of anticipated electronic communication improvements. h. Construction Mitigation: The dust emissions generated during project grading will be mitigated by a series of specific mitigation measures identified in this plan. The mitigation measures are expected to reduce project construction emissions to a less than significant level. h Implementation/Monitoring: In addition, this development will be subject to the ongoing monitoring programs inherent in the City's Transportation Phasing Plan and Growth Management Program. These programs will continue to be addressed during subsequent implementing actions associated with the project. 11/19/07 11.7-2 Addendum to Air Quality Improvement Plan Resolution No. 2007-299 Page 182 These local mitigation measures may have a small impact on Air Quality in quantifiable terms, but their enhancement of future transit options, alternative transportation modes within the neighborhood and community, and public awareness should have a greater long term public benefit. Impact Reduction Measures: This section of the AQIP amendment demonstrates how the EastLake Business Center SPA Amendment - 2007 addresses key design issues, at the SPA Plan level, which are directed toward reducing air pollution impacts. The design issues addressed below would be incorporated as conditions of approval for the Project: a. Street/Circulation Design with PedestrianlBicvcle Orientation The Project does not alter the original air quality improvement plan implementation measures, such as: trail system, pedestrian connection among centers, bicycle lanes and other components to promote non-vehicular transportation. Instead, the Project would be required to incorporate pedestrian connections to the existing pedestrianlbicycle route connections and bicycle racks to promote the use of non- motorized modes of transportations. b. HousingfEmolovrnent Densitv Near Transit The project provides and allows for additional employment within close proximity of area housing, allowing for a reduction of vehicle miles traveled for those able to work and live in the East Lake community. c. Land Use MixIProximitv The Proj ect introduces a hotel facility with full range of amenities to serve the needs of corporate offices and other businesses in the area. This mixed-use approach will result in less customers and executives visiting the site traveling west to seek overnight accommodations restaurant facilities. d. Site Design with Transit Orieotation The proposed and permitted future buildings will increase the concentration of employment in the immediate area which may encourage and support the use of transit services, thereby reducing total vehicle miles traveled. Placement of buildings and building entrances, particularly larger buildings, can encourage transit or alternative transportation modes. The SPA Plan does not specify building locations. Hence, this issue can be addressed in the Tentative Map and site Plan/Design Review processes when greater project detail is available. e. Limited Commercial Use The EastLake Business Center II Supplemental SPA includes an existing l6.7-acre commercial site. This limited amount of commercial use, which comprises less than 20% of the Business Center II, consists of complementary retail and commercial uses that attract patrons to multiple stores per visit. The uses on this project site are also accessible by those who work in the Business Center II and those who ride mass transit. This will reduce total vehicle miles traveled by providing an alternative to 11119/07 11.7-3 Addendum to Air Quality Improvement Plan Resolution No. 2007-299 Page 183 such trips that would only likely be done by private automobile. This will encourage local service and convenience trips from office and hotel employees and visitors. [ Bicycle Route Integration with Transit & Emplovment Bike lanes are designated on Fenton Street within the project area. On other internal streets, bicyclists will be readily able to share the road with motor vehicles due to the low volumes and limited speeds allowed. Project bicycle routes connect to regional systems as indicated in the Circulation Element of the General Plan and provide access to all regional destinations including the park-and-ride facility, and nearby commercial centers and residential areas. The project will include connecting sidewalks to the established walks, and paths and transit facilities. &. Energy Efficient Landscaping The project will include landscaping of the parking lots, perimeter grounds, as well as near the proposed buildings to provide shade and reduce heat gain and energy usage for both vehicles and buildings. h. Alternative Fuels/Telecenter The project is provided with high-speed telecommunications services to facilitate both on-site and off-site communications allowing for reduced commutation. The project is proposed to include Class-A office and professional buildings and Hotel with conferencing facilities. These facilities will be maintained with the latest industry standards for communications. h Overall Sustainabilitv ofProiect The project fits into the overall community plan and achieves the objectives of providing both a job-housing balance as well as a job-housing match whereby the high-quality buildings and professional jobs will enable employees to live and work within the EastLake community, thereby improving overall efficiency, community, quality oflife and sustainability. L Commitment to Chula Vista Greenstar Program The developer of the subject project may commit to the first option in Chula Vista's AQIP Guidelines and may participate in the Greenstar Building Efficiency Program. The majority (50% or greater) of the structures may be designed to exceed the California 2001 Title 24, Part 6, Energy Efficiency Standards (CA 9110, effective 6/1/01) Title 24 by 10%. Because energy conservation technology and programs are constantly maturing, the specific program will be identified with application for building permits. The particular building efficiency program to be used (potentially including a custom building program) and the buildings to be constructed under the program, shall be identified on the building permit application and approved prior to issuance of a building permit. Energy calculations demonstrating program compliance will be included with the Building Permit application. ] 1/19/07 11.7-4 Addendum to Air Quality Improvement Plan Resolution No. 2007-299 Page 184 Construction Phase: Even though the creation of dust is limited to the construction phase of a project and is thus "temporary," a large development could significantly contribute to adverse air quality impacts. As mitigation for these potential impacts, dust control during grading operations will be regulated in accordance with the rules and regulations of the San Diego APCD. At the time tentative maps are approved for the project, the following measures would be required to reduce fugitive dust impacts and emissions impacts from construction equipment: a. Clearing/Grading . All unpaved construction areas shall be sprinkled with water or other acceptable San Diego APCD dust control agents during dust-generating activities to reduce dust emissions. b. Disturbed Areas . On-site stockpiles of excavated material shall be covered or watered. . Disturbed areas shall be hydroseeded, landscaped, or developed as quickly as possible and as directed by the City to reduce dust generation. c. Track-Out Control . On dry days, dirt and debris spilled onto paved surfaces shall be swept up immediately to reduce re-suspension of particulate matter caused by vehicle movement. Approach routes to construction sites shall be cleaned daily of construction-related dirt in dry weather. d. Dirt Hauling . Trucks hauling dirt and debris shall be properly covered to reduce windblown dust and spills. e. High Wind Operations . Additional watering or acceptable APCD dust control agents shall be applied during dry weather or windy days until dust emissions are not visible. L Off-Road Eauipment . Enforce a 20 mile-per-hour speed limit on unpaved surfaces. . Heavy-duty construction equipment with modified combustion/fuel injection systems for emissions control shall be utilized during grading and construction activities. Catalytic reduction for gasoline-powered equipment shall be used. Also, equip construction equipment with prechamber diesel engines (or equivalent) together with proper maintenance and operation to reduce emissions of nitrogen oxide, to the extent available and feasible. . Use low pollutant-emitting construction equipment. . Use electrical construction equipment, to the extent feasible. 11/19/07 II.7-5 Addendum to Air Quality Improvement Plan Resolution No. 2007-299 Page 185 . The simultaneous operations of multiple construction equipment units shall be minimized (i.e., phase construction to minimize impacts). Incorporation of all these measures, combined with the fact that construction is a one- time short-term activity, will reduce potentially significant air quality impacts to below a level of significance. 11/19/07 II.7-6 Addendum to Air Quality Improvement Plan Resolution No. 2007-299 Page 186 11.7.1 IMPLEMENTATION MEASURES Most of the above cited Impact Reduction Measures are included in the EastLake Business Center II Supplemental SPA Plan and will be implemented through SPA approval or the tentative map process. However, some will be implemented at a later approval phase such as Design Review. These are identified below. Table 3 Impact Reduction Measure Implementation Stage Street/Circulation Design Land Use Mix & HousinglEmployment - (done at GDP level) Transit Facilities Site DesignlBuilding Siting (prelim.) PedestrianlBicycle Orientation Transit-Oriented Building Siting Bicycle Routes GradinglFugitive Dust Control Site Design wi PedestrianlBicycle Transit-Oriented Building Siting Energy Efficient Landscaping Alternative Fuels/Telecenter (electronic communication capabilities) 11.7.2 REFERENCES Air Quality Improvement Plan for EastLake Business Center II Supplemental SPA Plan, Adopted November 16, 1999 by Resolution No. 19666. H:\PDATA\25102850\DATA OUT\November 15, 2007\AQIP_ll_19_07.doc 11/19/07 11.7-7 Addendum to Air Quality Improvement Plan BOSWEll. RD BOSWEll RD B " ~ I ~ /' FEN10H eT ---- ---- Resolution No. 2007-299 Page 188 WCP Resolution No. 2007-299 Page 189 Water Conservation Plan for EastLake Business Center II Supplemental SPA Plan Addendum November 2007 Amendment Adopted , 2007 by Resolution No. 2007-XXX Project Sponsor. IRE Development 821 Kuhn Drive, Suite 100 Chula Vista, CA 91914 (619) 661-6681 Contact: Alan Huffman 2007 Addendum Prepared by: RBF Consulting 9755 Clairernont Mesa Boulevard, Suite 100 San Diego, CA 92124 Contact: Dan Wery, AICP (858) 614-5081 dwery@rbf.com Resolution No. 2007-299 Page 190 EASTLAKE BUSINESS CENTER SPA AMENDMENT - NOVEMBER 2007 Introduction: The approach to Water Conservation Plan Addendum is intended to be comprehensive and implemented throughout the life of the Project. Water conservation during construction and after occupancy, as well as the installation of water conserving landscaping, appliances and fixtures are addressed in this Addendum. Efforts to educate and increase awareness of the need to conserve water should be disseminated to future owners/tenants by the Applicant. The following are Water Conservation goals established in the adopted EastLake Business Center II Supplemental SPA Water Conservation Plan: 1. To conserve water during and after construction of the projects within the EastLake Business Center II Supplemental SPA. 2. To comply with the water conservation standards and policies of the City of Chula Vista and Otay Water District. 3. To create a comprehensive framework for the design, implementation and maintenance of water conserving measures, both indoor and outdoor. 4. To be economically efficient and cost effective. Proiect Description: The applicant, IRE ("Applicant") development, is prosing to introduce commercial retail uses within the existing Eastlake Design District and is requesting a land use designation change from Light Industrial to Commercial Retail in order to complement the existing furniture and home improvement businesses presently in the District. The Applicant is also proposing certain modifications to the property development standards to accommodate up to five story buildings (up to 76 ft. high), special parking ratios for furniture stores and restaurants and professional and medical office uses, including medical clinics. Certain specialty retail uses related to home improvement are currently allowed under a previously approved Master Use Permit. However, these and other retail uses as well as developmental and operational flexibilities are proposed to be incorporated into the EastLake II Planned Community District Regulations. More specifically, an amendment to the City ofChula Vista General Plan (GPA) was filed to change the land use designation of approximately 16.7 previously developed acres at the northeast comer of Fenton Street and Showroom Place (851-891 Showroom Place) Within the Eastlake Business Center II project, hereafter referred to as Area "A" (see figure-> from Limited Industrial to Commercial Retail. Concurrent amendments to the Eastlake II General Development Plan (GDP), Supplemental Sectional Planning Area (SPA) Plan for Eastlake Business Center II and associated regulatory documents are proposed for Area A above and parcels identified as Lot 2 of Map 13971 and Lots 5-8 of Map 14395, herein after referred to as Area B (see Figure~ and 2430 Fenton Street, herein after referred to as Area C. The GDP and the Eastlake Business Center II Supplemental SPA amendment consist of changing the land use designation of Area A from BC-1, Business Center Manufacturing Park District with Design District Overlay zone to a new commercial land use district and 1 Resolution No. 2007-299 Page 191 Area B from BC-1 with Design District Overall to BC-4 (Business Center Core District). Also included are certain modifications to the adopted property development regulations in order to accommodate greater design and land use flexibility. Water SUDDlv: EastLake Business Center II Supplemental SPA is located within the OWO's Central Service Area. The Project would receive its water supply from the Otay Water District's Central System. The OWD also provides recycled water to the Project area. The District owns and operates the Ralph W. Chapman Water Recycling Facility located near the intersection of Singer Land and Highway 94. This plant produces up to 1.3 million gallons of recycled water for non-potable water uses such as irrigation of golf courses, school playing fields, public parks, and public landscaping. Additional recycled water supply will be available from the City of San Diego's proposed 6 million gallons per day (MGD) capacity South Bay Water Reclamation Plant, which will be located in the Tijuana River Valley at Monument and Dairy Mart Roads near the Mexican border. Supply of recycled water for the Project would be coordinated by the Otay Water District and the City of Chula Vista. The phased construction of potable and recycled water facilities, based on the District-approved master plans, have been installed per public facilities Financing Plan and subdivision map conditions for the overall Business Center II area. Water Consumption: This section presents information on the anticipated increase in water demand as a result of the Eastlake Business center SPA Amendment. Table 2, below, shows the current water consumption within the SPA, and projected water consumption after Project built out. The total projected average water consumption at built out, without conservation measures, is approximately 0.1 OS million gallons per day (MGD). A difference of _MGD. The focus of this Addendum is to describe conservation measures for reducing the projected 0.10SMGD potable water use within the industrial project. Table 2 EastLake Business Center II Supplemental SPA Project Water Use Land Use Acres Consumption Ratel Water Use (MGD) Industrial 84.0 1.0 afy/acre O.Q7S Commercial" 16.7 2.0 afy/acre 0.030 Total 100.7 1.17 afy/acre 0.105 'ayf = acre-foot per year; I acre-foot = 326,000 gallons . Consumption and savings rates rate taken from Section II.?? of the EastLake I Supplemental Water Conservation Plan for EastLake Village Center North Supplemental SPA (July 23,2002) 2 Resolution No. 2007-299 Page 192 Water Conservation Measures: Implementing water conservation measures before a project is constructed provides an opportunity to include measures, which might not otherwise be practical. Unlike a residential project where there are a variety of indoor fixtures and appliances, which can be selected for water conservation, industrial and commercial developments are fairly limited in options. Indoors: Industrial and commercial water demand includes indoor water used by businesses and service providers. Historically, eighty percent of industrial water is used indoors, primarily for industrial processes. The adoption of state and federal laws has required that water efficient equipment and process be implemented in these activities, comparable to the low flow fixture requirements for new residential development. Implementation of these requirements will result in conservation savings of twelve to fifteen percent, according to the Department of Water Resources. The existing l6.7-acre commercial site, which is built-out, includes water conservation measures and has the same conservation savings. Applying this estimate to the Business Center II project, yields an estimated conservation amount of 0.010 MOD [0.105 MOD x .8 (indoors) x .12 (conservation factor)]. Outdoors: LandscapelIrrigation - Industrial water demand includes irrigation water used on industrial sites. Outdoor irrigation is estimated to comprise twenty percent of industrial water use which is calculated to be 0.015 MOD in the Business Center II project. The Commercial water demand for irrigation water is estimated to comprise 20% of commercial water use which is calculated to be 0.006 MGD. The Commercial portion of EastLake Business Center II is already built out and was constructed in conformance with the industrial zoning. Therefore, the amendments proposed to accommodate a larger mix of uses on the commercial site will not result in a change to outdoor water use. With the installation of an efficient and properly maintained irrigation system, a decrease in the area planted with cool-season turf and use of low-water requiring plants, a thirty percent reduction in irrigation water requirements can be expected. Applying this estimate to the Business Center II project, yields an estimated conservation amount of 0.006 MOD [0.105 MGD x .2 (outdoors) x .30 (conservation factor)]. Water Use Durin!! Construction: Water conservation measures can also be implemented during the construction/grading process. The three primary uses are: dust abatement; soil compaction; and, street washing. Since the imposition of Stage 2 water conservation requirements by the Otay Water District, water conservation has been incorporated in EastLake construction activities, as appropriate. Water use has been limited to that necessary for proper soil compaction; soiled streets have been swept instead of washed. Recycled water could be used for these grading activities, when it is available. 3 Resolution No. 2007-299 Page ~~e use of native/naturalized plant materials on graded slopes in open space will reduce the need for irrigation in the future. Open space slopes within the EastLake Business Center II Supplemental SPA will be planted with drought tolerant plant materials to reduce the need for irrigation and maintenance. Implementation Measures: In addition to the implementation measures outlined in the previously adopted EastLake Business Center II Supplemental SPA, the Applicant of the subject Project has committed to following the water conservation measures: . Indoor water conservation measures: o Hot-Water Pipe Insulation: Install insulation on all hot water pipes in all common areas and all tenant-developed areas. o Pressure Reducing Valves: Provide pressure reducing valves at all meters, set to deliver water at no higher than 60 psi. . At least one outdoor water conservation measure and at least one additional water conservation measure from either the indoor or outdoor categories. o Outdoor Water Conservation Measures . Water Efficient Irrigation System - Use of rain sensors and soil moisture measuring devices for scheduling and controlling all landscape irrigation programs in commercial, industrial and business centers including tenant areas. . Evapotranspiration (ET) Controllers - Timed, fixed irrigation scheduling based on estimates of actual plant evapotranspiration rates. Radio signal from a central control station or satellite transmits information to the controllers to operate the sprinklers for the appropriate length of time. . Water-Efficient Landscaping - Use of native vegetation and drought tolerant plant materials, avoiding grass and turf to the extent practical and use of irrigation systems and controllers as required by the Chula Vista Landscape Manual Use. In addition, the use of drip irrigation where possible and restriction of sprinkler irrigation as recommended by the water purveyors. . Recycled Water - Expand use of recycled water beyond areas mandated by the water purveyor to those areas where landscaping is within a reasonable reach of recycled water pipelines, to the extent that such use is acceptable to regulatory authorities. . Outdoor Garden Sales - All tenants with outdoor garden sales areas to install micro-irrigation systems (trickle or drip irrigation) and provide water conservation educational materials for consumers. o Indoor Water Conservation Measures . Dual-Flush Toilets - Install dual-flush (ULFT) toilets in public restrooms including gas station restrooms. 4 Resolution No. 2007-299 Page 194 . Waterless Urinals - Install waterless urinals in public restrooms (men's rooms) including gas station restrooms. Pre-Rinse Sprayer on Sinks - Install automatic shut-off sprayer for pre-rinsing dishes with a maximum flow rate of 1.6 gpm in all restaurant and fast-food uni ts. . . High-Efficiency Dishwashers - Install high-efficiency dishwashers in restaurant buildings. . Air-Cooled Ice Machines - Install air-cooled ice machines instead of water- cooled machines in restaurants. . Conductivity Meters - Install conductivity meters on cooling towers to regulate cycling of cooling water and chemicals. o Optional Water Conservation Measures . Sub-meter all individual tenants in buildings. . Provide educational materials and guidance to tenants. Implementation Timinl! All implementation measures listed above shall be incorporated in the building plans and installed as part of the individual projects prior to issuance of certificate of occupancy. H;\PDA TA\2.5102BSO\DA T^ OU1\November 15. 2001\WlterCoNcJ'VItton_1l_lS_07 DO fDd.doc 5 Resolution No. 2007-299 Page 195 G,blbi--+ 1) DRAFT THE EASTLAKE BUSINESS CENTER II SUPPLEMENTAL PUBLIC FACILITIES FINANCING PLAN AMENDMENT Approved by: Chula Vista City Council November 16, 1999 Resolution No. 19666 Prepared by: bu." l "Oft,~ October 27, 1999 Amended November 19. 2007 Resolution No. 2007-299 Page 196 TABLE OF CONTENTS EXECUTIVE SUMMARY ...........................................................................................................4 5.1 INTRODUCTION ............................................................................................................ 9-10 5.1.1. Background... ............... ............... ..... .......... ............................................................ 9-10 5.1.2. Purpose ..................................................................................................................9-11 5.1.3. Assumptions ........................................................................................................ -Ul-.11 5.1.4. Threshold Standards ............................................................................................ -H-14 5.2 DEVELOPMENT SUMMARy..................................................................................... ~16 5.2.1. Development Phasing .......................................................................................... ~16 5.3 PUBLIC FACILITIES THRESHOLD STANDARDS AND INFRASTRUCTURE ~22 5.3.1. Traffic .................................................................................................................. W-~ 5.3 .2. Police ........ ..... ................ ..................................... ............................ ............ ......... ~l!!. 5.3.3. Fire and Emergency Medical Services ................................................................ 3G 41 .5.3.4. Schools................................................................................................................. ~2 5.3.5. Libraries............................................................................................................... ~2 5.3.6. Parks and Recreation ........................................................................................... ~2 5.3.7. Water ................................................................................................................... ~6 5.3.8. Sewer ................................................................................................................... ~ ~ 5.3.9. Drainage............................................................................................................... ~ I 5.3.10. Air Quality ........................................................................................................... ~8 5.3.11. Fiscal.................................................................................................................... # 70 5.3 .12. Civic Center ..........................................................:.............................................. ~ 11. 5.3.13 Corporation yard................................................................................................. ~ll 5.3.14. Other Public Facilities ......................................................................................... &* 77 5.3.15. Public Facilities Finance...................................................................................... 63-78 APPENDIX A - FISCAL IMP ACT ANALySIS....................................................................... -m-A-1 APPENDIX B - WATER WILL SERVE LETTER (OMWDl ............................................. B-1 APPENDIX C - FIRE FLOW CALCULATIONS (OMWDl................................................ C-1 Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit Exhibit I 2 3 H ~~ 4-Q *"1 6! +-2 8-lQ 9-11 -Ul-11 LIST OF EXHIBITS Vicinity Map ................................................................................................... 7 Topographic Map ............................................................................................ 8 Proiect Location .............................................................................................. 9 SPA Boundaries ............................................................................................ ~.Ii ~ Phasing Plan .........................................................................................-l-+-12 Pro.POsed General Development Plan............................................................ ~ 20 Pronosed Site Utilization Plan ......................................................................~ 21 Circulation Plan............................................................................................. ~ II Potable Water ................................................................................................ 4G-~ Recycled Water ............................................................................................. 4+ ~ Sewer........... ......... ................................ ..... ............................................ ........ 41' 60 Storm Water .................................................................................................. ~ fl 2 EastLaItc Business c.....- n Supplemental PFFP Amendment Resolution No. 2007-299 Page 197 Table Table Table Teele Table TaBle Tallie Teele Table Table Table Table Table Table Table Table Table Table Table Tallie Table Table Table Table Table Table Table Table Table Teele Table Table Teele Table Table Table LIST OF TABLES 5-1 1999 Suonlemental PFFP Land Uses..............:....................................H 17 5-1A Prooosed2007 Suoolemental PFFP Amendment Land Uses..............H 17 5-2 1999 Supplemental PFFP Phasing Summary ......................................l4ll 5 3 TrlHlSJ3aflatiaft & IateriRl. Pre 123 DlF Fee5........................................23 S 1 Pollee Fee5 ..........................................................m..............................2& 5 5 Fire,t,EMS Fee far BlI5iBeSS Ceater II...................................................31 5 e BastLake Triae AgreeRl.eat J;:DU BallIlJee ...........................................3 4 5 7 EDU's for W&ter Usage .......................................................................35 5-3 Existine: Sel!:ment OOerations...............................................................23 5-4 Existine: Intersection Ooerations..........................................................25 5-5 Trio Generation for Area A & B..........................................................28 5-6 Trip Generation for Area C..................................................................29 5-7 Estimated TranSPOrtation DIF Fees for Area B & C ...........................33 5-7A Traffic Sie:nal Fees for Area B & C.....................................................34 5-8 Police Fee...... ........... ...... .......... ...................... ............................ ......... .40 5-9 Fire Station Inventory ..........................................................................42 5-9 A FirelEMS - Emere:lmcv Resoonse Times since 1994..........................43 5-10 Fire/EMS Fee for Business Center II Area B & C...............................44 5..e.1.l EastLake Triad Agreement EDU Balance ...........................................34 47 S 7 EDU's far \\'&ter Usage.......................................................................3S 5-& 12 1999 Average Annual Day Water Demand Projection........................~ 48 5-&.ll 2000 Average Annual Day Water Demand Projection........................~ 48 5-9 14 1999 Maximum Day Water Demand Projection .................................;6 49 5-M li 1999 Fire Flow Criteria........................................................................;6 49 5-1+ 16 1999 Short-Term Pumping Capacity Balance .....................................~ 2.Q 5~ 17 1999 Projected Recycled Water Dernands...........................................3+ 50 5~ 18 2007 Projected Recycled Water Dernands...........................................3+.a 5-H-19 1999 Projected Peak Recycled Water Demands ..................................3+ 2.l 5 14 Civie Faeilities lM'eIltaPY....................................................................57 5 15 Future Faeilltie5 ............................;......................................................57 5-20 Net Fiscal Imoact.................................................................................71 5-1-e 21 Civic Center Fee far BlI5iftess Ceftter II ..............................................~ 74 S 17 CelJlamtieB Yaffi Faeilities..................................................................59 5-+1 22 Corporation Yard Fee fer BlI5iftess Center II ......................................~ 76 549 23 Public Facilities Fees fer 0tIier Puelie Faeilities.................................62 78 5-2-9 24 BlI5iness CeIl.ter II Summary of Facilities for Area B & C..................69 86 3 Ea<tLaIro Business Ccol<r II Supplcrm:nllll PFFP Amendment Resolution No. 2007-299 Page l?iECUTIVE SUMMARY This supplemental Public Facilities Financing Plan (pFFP) to the EastLake SPA Plan Amendment PFFP (dated June 30,1992) addresses the public facility needs associated with the EastLake I SPA Plan Amendment to include the EastLake Business Center II project. The supplement as amended. has been prepared under the requirements of the City of ChuIa Vista's Growth Management Program and Implementation Ordinance Number 2448. Further, this supplement is a hybrid meant to bridge the gap between current version of the EastLake SPA Plan Amendment PFFP and the city's current guidelines. The preparation of an Amendment to the supplemental PFFP is required in conjunction with the preparation of the IJBeft8eE1 suoolemental Sectional Planning Area (SPA) Plan for EastLake Business Center II. This supplemental PFFP. as amended. ensures that the future development of the Business Center II project is consistent with the overall goals and policies of the City's General Plan, Growth Management Program, the Amended EastLake II General Development Plan (GDP) and the Amended EastLake I SPA Plan. Further, the suoolemental PFFP. as amended. ensures that the development of the project will not adversely impact the City's Quality of Life Standards. Lastly, this supplemental PFFP. as amended. meets the policy objectives of the EastLake II GDP. In 1999. =I=!he 104.7 acre EastLake Business Center II Jlftl.ieet will be was deleted from the EastLake III General Development Plan (GDP) and annexed to the EastLake II GDP and the EastLake I SPA Plan. 'The ,,--{ nl~e BlI5iBess Ceflter II planniBg area eBeempB!lS6S Bppfelamately 1 Q1. 7 grtlss _ (76 Bet ~ ....<ithia the Ci.y af CImla Visla The EastLake Business Center II development is bordered by the EastLake Business Center I to the west, the Rolling Hills Ranch subdivision to the north, Otay Lakes Road to the south, and the future EastLake Woods residential development to the east The pf6jeet wHl eansist eHeer 8evelepIBeftt phases. The ae'leIepmem afPhase IA aR6 IB is eupeete8 16 oommeftee immediately tipea eppf6.1f1:1 efthe filllll map. The ae',e!epmeftt ef Phases 21. aR6 2B vAil be linkeel te !he HllIfI(et aem1lB8 aR6 the elllftple!ieB ef eeftaiB 1HmspeflaasB aMi Se:'.'Vef' iu..t'&~ -;emen1s. In 2007. a new Droiect was filed to chanl!e or modify the uses on aDDroximatelV 45 acres within the EastLake Business Center II SPA Plan. The Drooosed chane:es and modifications are as follows: . A chane:e in the land use desi lmHtion of aooroximatelv 16.7 Dreviouslv develooed acres at 851-891 Showroom Place (hereafter referTed as Area "An) from Limited Industrial to Commercial Retail. This includes amendments to the General Pian. existin2 General Develooment Plan (GDP) and Suoolemental Sectional plHnnin" Area (SPA) Plan to reflect the land use chane:e. . A chane:e in land use district desie:nation for Lot 2 of MaD 13971 and Lots 5-8 of MaD 14395 (herein after referred to as Area B) and 2430 Fenton Street (hereinafter referred to as Area C) from BC-I to BC-4. This chan2e would permit hotels and medical clinics with a Conditional Use Permit and increase the buildin2 heie:ht to 76 feet. 4 EastLIIkI: BIISiness Center D SupplcmenLll PFFP Amendment Resolution No. 2007-299 Paiie I 'j( five stON hotel and four staN office buildinl! are orooosed on Area C and are included in the PFFP analvsis in addition to the aforementioned chanl!e in land use for Area A. A. Public Facility Cost and Fee Summary The following discussion identifies and summarizes the various facility costs associated with development of 1he EastLake Business Center II project The facilities and the buildinl!s on Area A acres have been constructed lIIiE! their east are ideMified iB detail in 8ee!i8ft 5.3 afthis Sll.pplemefltal Pf.FP. Development Imnact Fees (Om have been DlIid fur Area A but not Area B and C. Each subsection ineieses a fee6lBHlea6ea linImeiflg a1temeti-ye fer of this SuoDlemental PFFP Amendment updates existinl! facilities and the threshold facilities based upon current City practices and policies. However, where another financing mechanism may be shown at a later date to be more effective, the City may implement such other mechanisms in accordance with City policies. m lIfIditiell, T-a13le .5 20 summari2es the pWllie facility phasing anti 6SSBeiated eesls ";;ithin a taI:11e fefftlB:t. Transportation DIF Fees geBeflItea by and Traffic Sil!Il3i Fees for the EastLake Business Center IT Area A project tetaI aPflfeuimately !:H),494,750 have been DlIid when buildinl! permits were issued based on the previous Industrial land use desi=tion and an earlier fee schedule. Fees gellefllted fer Pre SR 123 faeilities are afllll'lllillnately 1:2,132,500 while the tmfiie Tmffie signal fees are appl'lllHmately $115,830. New fees are aoolicable to Area Band C. Area B fees will be oaid in the future and Area C fees will be DlIid when buildinl! oermits are issued for the hotel and office. Backbone sewer and water improvements ".vill be were funded, in part, through the payment of DIF fees and capacity fees established for these purposes. On-site facilities will be funded by the Developer. The tetaI eests fer the EastLake Business Center II project Capital Improvement Plan (CIP) Potable Water and Recycled Water facilities .....iIl Be ~ determined by 1he Otay Water District (OWD) and constructed. f,eeeRliBg 16 the own paliey }la. 26, OV.'D ".viD pre'~ae reimBlHlleIfteftt fer eellSlroetiell aM aesigB eests asseeiete6 '..lith aevelapmellt af these impm"yemea.ts. The tetal east fer Wastewater backbone SYstem for the EastLake Business Center IT project is IIJlJll'llIae.~-ly t342,656. Mast ef the .Ilfejeet site is \\'ithin the Tek.,...,;!. CBR)'6ft Gfwlity Sewer BasiB DIF. f. peltiell afthe site, lIfljlralBmately 20% Eall ill Phase ~), is .....itlrift the Salt Creek Sewer BE. has been constructed. The EastLake Business Center IT project will not have an impact on the schools, parks and libraries and therefare ',viII did not generate fees. Police, fire and emergency medical services, civic center, corporation yard, and other public facilities will Be have been funded from revenues generated from the payment of Public Facilities Development Impact Fees lPFDIF) at the time building permits were issued for Area A i!l5Ullftee. These fee reVemle5 tetaI al"l",tlllimately &;919,500. New fees are applicable to Area B and C. Area B fees will beDllid in 1he future and Area C fees will be DlIid when buildinl! permits are issued for the hotel and office. The net fiscal imoact from the amendment is negative in 2007 ($91.800 Loss) and 2008 ($57.400 Loss) but becomes pOSitive in 2009 ($306.500) and positive at buildout ($345.000). 5 EastI..ake BUSmcs5 Ccn1er n Supplcmcmal PFFP Amendment Resolution No. 2007-299 Page 2~ Public Facility Thresholds City Council Resolution Number 13346 identified eleven different public facilities and services with related threshold standards and implementation measures. The following is a summary of the threshold compliance by the EastLake Business Center II proj~ amended: . Based upon the traffic analysis prepared for the EastLake Trails project (Linscott, Law & Greenspan /LL&G). September 7, 1999) and the Traffic Imoact Analvsis for EastLake Desil!Il District bv LL&G dated SeDtember 10. 2007. threshold compliance is projected ta be maintained with implementatian af the improvements identified therein IIfIll with the p~'HIeRt af tmB5Jlllftlltiall DW fees or the constructian of street improvements also identified therein. The EastT .'Ee B1:I!lmess Ceftter II JlI'ajeet sh&ll be eaRllilieBeEi fa pay Tl'lIIlSflo!tatiell DW Pees, laterim PI'e ER l2S DIP Fees IIfIEi Tmft.'ie 8igflol Fees at the m1e m eft"eet at tile tiBie buikIing PemHt5 IH'e iSSIleEi. · The Otay Water District's Water Resource Master Plan and the Sub-Area Master Plan (SAMP) identify water facilities to be constructed that will provide the necessary water service to meet OWD criteria The Developer shall request and deliver to the City a service availability letter from the Otay Water District prior to eaell Ibal HlBJl new buildinl! construction. 11\ aliEiitiall the Developer 'will. pra;ide ,'Jatar imJ'lR>,.emeflts aeeoMing fa own BJlJ'lfllveEi 8AMP. . Pro,~Eie Reeyelee water impro'leHIBllt5 aeeafEiing 18 the SAMP. Recycled water reEjUireHIeiHll for the project will be eeol'liinlltee has been constructed and aDDTOved by the Otay Water District and the City of Chula Vista The phased construction of recycled water facilities, was based on the SAMP, will be iBeaf'pBfldeEi iftta tile ealltlitians af app.,,;eI fef a future SIlbdi'AsioB ffiBJl. . The sewer facilities ta accommodate sewer .flows from the EastLake Business Center II project have been identified and constructed ocr the Suoolemental PFFP. :rfte eeBstfueB9B eflle"N S~:.~ lines RftISt Be phaseel-"vith. t:Be eeI15B=ueBes ef .m~e, h.e.:;~Jer, this walllEi lIat apJIly fa the llfgt'llll? af BlIistiBg feeilities. ;\5 saeh, the faeilities identiBee in this SIlflIllemefltal PFFP shall. be I'8~Ei af the DevelafJar eitftar lIS eBR!ltFueteEi faeilities af thFellgh the Pll)'ffteftt affees. . The City will monitor Fire Department responses to emergency fire and medical calIs and report the results to the Growth Management Oversight Commission (GMOC) on an annual basis. · The City will monitor police responses to calls far service in both the Police Emergency (priority ane) and Urgent (priority two) categories and report the results to the GMOC on an annual basis. · The City continues to provide a development forecast to the APCD in conformance with the threshold standard. A separate Air Quality Improvement Plan is provided as part of the SPA dacument. · Civic Center facilities and Corporate Yard facilities "J.ill be have been fimded through the collection of the public facilities fees at the rate in effect at the time building pencils 8ft! were issued. 6 EastLIIIa: Business Center n SupplcmaJtoJ PFFP Amendmcnl Resolution No. 2007-299 Page 201 Vicinity Map ........ , o Exhibitl 7 EastUke Business C<Dl<r II Supplemc:n1al PFFP Amendment Resolution No. 2007-299 Page 202 ~-~ ~". '-;i)J'i~~~~1 ~ \ ~ . 'J. ~/ ~ ',,," /IE~J V, -"I t....-'. ~. ' .. ~ \ "fa . -- --- I ~ PROJECT LOCATION , .. , ~ ~)))1I A~/]IL ~:-..~ -:.-_. \, ~~ "'/)~r11l''-'l ~~..::~''''' ~ ( 5:V r ievl l\.\~ I/o ~ , '~ ..~ (, ~~t;:Y" '--=' ~ \ ~ ~ --"-.; '7,1: 'Jwr--i ~0 ..os ~ ~\L \ ~~<~~ ~.-I, ~ }I \\,;;; t" .. '(~ ~ :::v G Irl\.~ ";,~ ~< .~ ":-.\..::1'::7. I" -:;.:; ..J::>~ )1~1 .. l.!t: "'il! '(~~ ,.; ,.. IC",. ,'-- ~~ . .< ~b '~.:i1k ' ~~~&~ r2\~;:'~' ~Bl'~;~ \~Ir___ ~'l I"~:J ""'; \'&~ D . .... ~- 77~~ ''''31.~ -)>~ ~_~~ rq~: ~~~,~'~ ~ ~ , )iiZ___.. .Jj) ~~~-l) t i) ~ ~ /. , (J"S: '7, C<! '" '>.: 'I( ~~U '-l ,~~ Sl ~~C~ c~2>;~ ~~- SJJ~ ~ ( ,\ ~A~ . ....j ~ ~c.\";7---;:"'~, ~~? ~ ~~ ~ '" ::A'!_j/J;:;'J I~ ~~~ {,,\ \\..~:" (II ~~ li~.~ . It, :-..... Q)' ~~J ~ ,u ~~/dr---&~ '. I' \: j{ r.:--f (, .....-::::. \', ... '1 i!Ioo. " _ Topographic Map Scale: 1" = ZOOO' Exhibit 2 Mop Sourte: San Diego County 2000' RcgicmaIIlue Mop Soria. Jomul Quad 8 EastLoIa: Busintss Center n Supplememal PFFP Amendment Resolution No. 2007-299 Page 203 :::lESt:U JIJ LJ -.... Project Location Supplemental PFFP Amendment ~~ ~ I~ The Droiect area includes aDDroximatelv 45 acres of EastLake Business Center II within three areas. Area A is the subiect of a land use change from Light Industrial to Commercial RetaiL Area B and C is the su~;ect ofthe EastLake Business II SPA Amendment to modify the Planned Community (PC) District Regulations. Areas A. B and C have been analYZed as Dart of this SUDDlemental PFFP Amendment. Exhibit 3 9 Eastl.oko BusilIess CenIl:r n Suppl<mcntal PFFP Amendment Resolution No. 2007-299 Page 2g~. INTRODUcnON: lbis document is a SIIjlllleRlllBt to the IIflllfo'/ea BB5tLa!(e I EP A PIIIfI l\m.llRameet amends the supplemental Public Facilities Finance Plan (dated JlH1e 30,1995 October 27. 1999). The amendment addresses the conversion of aporoximatelv 16.7 acres of Limited Industrial to Commercial Retail land within the EastLake Business Center II development and a new Lil!:ht Industrial Land Use desilmation for the remainder of the Droiect site. The proiect site consists of aDoroximatelv 43.7 acres located on the northside of Otay Lakes Road and west of Hunte Parkway. The proiect site contains three distinct areas (See Exhibit 3), Area A contains the existinlZ Eastlake DesilZD District which consists of the aforementioned 16.7 acres. Area B consists of relativelv flat vacant buildinlZ oads. Area C is vacant land located next to Otay Lakes Road. The supplement. as amended. addresses the public facility needs associated with the EastLake II SPA Plan Business Center II project. Further, the supplemental PFFP. as amended. identifies each improvement needed to service the Business Center II property, the phasing and the appropriate funding sources. The implementing actions covered by the Public Facilities and Financing Plan are: . Use of Public Financing Mechanisms where applicable . Construction of major streets, sewer, water and drainage facilities . Internal subdivision improvements pursuant to the Subdivision Map Act . Provision of other public facilities . Maintenance of certain facilities such as open space areas and street medians. 5.1.1 BACKGROUND: The EastLake Business Center II is an expansion of the original EastLake Business Center established in the EastLake I SPA approval in 1985. It wiH continue~ the eastward deyelopmeI!t of the original plan and complete~ the lIfttieipBtea planned employment/industrial uses to ee Stl'/elolle8 within the planned community of EastLake. The first three residential neighborhoods and the commercial and industrial districts were approved in the EastLake I SPA. The Business Center II wiH extended development eastward, north ofOtay Lakes Road, towards the ftffiIfe EastLake Woods neighborhood. . Amendment History February 19. 1985: The Chula Vista City Council adopted the EastLake I SPA and PFFP. June 30. 1992: The Chula Vista City Council adopted the EastLake I SPA Amendment inc1udinlZ an amended PFFP. The amended PFFP uPdated and re.placed the orilZinal 1985 PFFP and addressed the construction of a Kaiser Permanente Medical Center. November 24. 1999: The Chula Vista City Council adopted the EastLake II GDP Amendment and the EastLake I SPA Amendment. This action included the EastLake Business Center Il Supolemental PFFP to reflect the incorooration of 108 acres of 10 &stI...ake Business Center n SupplClllCl1Il11 PFFP Am",dmcnt Resolution No. 2007-299 Page 20tlesearch and Limited Manufacturinll (Business Center II expansion) into the EastLake I Public Facilities Finance Plan. The Suoolemental PFFP is a seoarate document. which is intended to suoolement the oneinal EastLake I PFFP. identifies additional public facilities needed for the EastLake Business Center 11 proiect and ensured that the nhased development is consistent with the overalll!oals and nolicies of the City's General Plan. Growth Manal!ement Prol!ram. and the EastLake II General Development Plan. September 17. 2007: The EastLake Business Center II SUPDlemental PFFP Amendment was submitted to the City of Chula Vista to address the conversion of approximately 16.7 developed acres (Area A) at 851-891 Showroom Place from Limited Industrial to Commercial Retail. The amendment would allow additional commercial retail uses to compliment. the existiDl! tenant mix. Concurrent amendments to the Eastlake II General Develooment Plan (GDP). Suoolemental Sectional Planninll Area (SPA) Plan for Eastlake Business Center II and associated rel!Ulatory docwnents are DroDosed for Area A and Darcels identified as Lot 2 of MaD 13971 and Lots 5-8 of MaD 14395 (Area B) and 2430 Fenton Street (Area C). The GDP and SPA Amendment consist of changinll the land use desil!Dation of Area A from BC-1 (Business Center Manufacturinll Park District) with Desil!D District Overlay to a new commercial evC-5) land use district and Area Band C from BC-l (with Area B currently includinll the Desil!D District Overlav) to BC-4 (Business Center Core District). Also rescind the Dreviouslv adoDted Desil!D District Overlay Zone and include certain modifications to the adopted Dropertv deve10Dment rel!Ulations in order to accommodate =ter desil!D and land use flexibility includiDl! increasinll the buildinll heil!ht to 76 feet for Area B and C. 5.1.2 PURPOSE: The J!ns=pese sf jHs aee\ilBeBt is te 91:lPI'Iem.ent the apj3fe"'eG BastLalre I PFFP (eated JUBe 3<1, 1992. This supplement. as amended. addresses public facility needs associated with the conversion of approximate Iv 16.7 acres of previous Iv developed industrial land to Commercial Retail (also known as the Desil!D District) and the introduction of a new Lil!bt Industrial Land Use desil!Dation within the EastLake Business Center II project. The new Lillht Industrial Land Use desil!Dation will chaDl!e Area B and C from BC-l to BC- 4. This chanlle would oermit hotels and medical clinics with a Conditional Use Pennit and increase the buildinll hei2ht to 76 feet. Additionallv. a five story hotel and four stOry office buildine are Drooosed on Area C and are included in this analysis. Regarding required public facilities needs, the supplemental PFFP. as amended. identifies a preliminary cost estimate for each improvement installation, phasing and appropriate funding sources. The purpose of all PFFP's in the City of Chula Vista is to implement the City's Growth Management Program and to meet the General Plan goals and objectives, specifically those of the Growth Management Element. The Growth Management Program ensures that development occurs only when the necessary public facilities and services exist or are provided concurrent with the demands of new development. The Growth Management Program requires that a PFFP be prepared for every new development 11 EastLaIa: BusiDcss Centor II SupplcmmtaJ PFFP_' Resolution No. 2007-299 Page ~~ject, which requires either SPA Plan or tentative map approval. Similarly, amendments to a suoolernental SPA Plan require an amendment er iB !his ease a suJlIllemeflt to the supplemental PFFP. The PFFP is intended to be a dynamic and flexible document. The goal of the Financing Plan is to assure adequate levels of service are achieved for all public facilities impacted by the project. It is understood that assumed growth projections and related public facility needs are subject to a number of external factors, such as the state of the economy, the City's future land use approval decisions, etc. It is also understood that the funding sources specified herein may change due to financing programs available in the future or requirements of either state or federal law. It is intended that revisions to cost estimates and funding programs be handled as administrative revisions, whereas revisions to the facilities-driven growth phases are to be accomplished through an update process via an amendment to or a supplement to the PFFP. 5.1.3 ASSUMPTIONS There are a number of key assumptions implicit to this supplemental PFFP. as amended. The assumptions play a major part in determining public facility needs, the timing of those needs and the staging of growth corresponding to the various facilities. Key land use and phasing assumptions can be summarized as follows: A. The proposed +999 EastLake I SPA Plan hmeftElmeftt Business Center II Supolemental SPA Plan Amendment is limited to~ the af-Jlel[atieR ef IQ4.7 _s ef R-eseareft aRa Limitea MlmIIfaetl!r'.ng, lERewll as 6astLake Bll5iRess CeBler II, te the B!I!ltLake I SPA Phm llellflsenes (See Blffiibit 3). I. An amendment to the Citv of Chula Vista General Plan (oP A) to cbanl!e the land use desil!nation of aporoximatelv 16.7 oreviouslv develooed acres at the northeast comer of Fenton Street and Showroom Place (851-891 Showroom Place) within the Eastlake Business Center (Area "A") from Limited Industrial to Commercial Retail. The GP A amendment would allow additional commercial retail tvoes of uses to complement the existinl! tenant mix. 2. Concurrent amendments to the Eastlake II GDP. supplemental SPA Plan and associated rel!u1atorv documents are also orooosed for Area A. B and C. The GDP and SPA Amendment consist of reoealin2 the existinl! Desil!n District Overlav from Area A and B. The amendment would cbanl!e the land use desil!nation of Area A from BC-l (Business Center Manufacturinl! Park District) to a new commercial NC-5) land use district and Area B from BC-l to BC-4 (Business Center Core District), Also included are certain modifications to the adopted orooertv develooment relZUlations in order to accommodate ereater desil!n and land use flexibilitv. includinl! an increase in buildinl! heil!bt from 35 to 60 feet UP to a maximum of 76 feet for Area B and C. 12 EastLake Il....... Q:IIb:r n Supplcmental PFFP_ Resolution No. 2007-299 Page 207 3. The proiect proooses the reneal of previously adopted Master Use Permit PCC-05-070 for Area A and B and the aDtlroyal of new conditional use permit and desillJ1 reyiew for a proposed hotel and office buildiml: on Area C. 4. The new conditional use permit application reauests permlSSlon to establish and ooerate an approximately 148.024 sauare foot. five-story hotel with 156 rooms and approximately 9.000 sauare feet of conference rooms and other amenities on Area C. The hotel will also provide a restaurant for its wests and a total of 163 parkin!!: spaces. 5. A desi!!:n review application was also filed for the construction of an approximatelv 122.071 square foot. four-story Class A office buildin!!: providinl! approximatelv 433 parkin!!: spaces in Area C of the EastLake Business Center (2430 Fenton Street). B. Land use allocation and intensity of development will be regulated by the EastLake Planned Community (PC) General Development Plan, PC District Regulations, and the Supplemental SPA Plan for EastLake Business Center II I SPA PIM, as amended. c. The prepasea I'fGjeet eeD5ists sf a 70,999 sEfI:1:[ife feet eOfJ3erate ames aM a 29,999 square feet ".vafeae1ise 8ft 1 9 eeres (lme\"/fl. 8B the Le"litea Prejeet) and an atIditieBlll 98 aeres of gellefal illdastriall:lses. Q-C. Future development will be implemented in phases generally consistent with the information utilized in the City's Transportation Phasing Plan. Develapmellt of Phase5 I A and 1 B eaFlsist af appreuimlltely 42 grass Beres (iftelllEiiRg Jlualia 5iree~. This 42 aeres iftelllees the 19 !lere Leyitaa JlfEljeet JlklB 32 adelitie!llli aeres efthe teml104.7 aere that eallla he hllilt ana aeetifliea hElfaftl leaelHHg a signifieant thftlGbala iHlJlBet. AJlpreJEimately 17 aeres (gress acreage meltllliRg Jlahlie stf6ets) sf Phase 2-\ eM he Bllilt ',\i1eR Olympie PIlfIl?\vay is el[tefteee ta Htmte Park"ltIY. The remaining 8JlJlrel!imately 4 S. 7 aeres (glBSS acreage iRelllaiag Jlllhlie Slf'eets) iaeluaiBg Phase 2B ean he hllilt whllll. OI)'fflJlie Parlfl'~' is enteaaea te Wlleste RaBa er the eeBstmetiaa afSR 125. E. The J9rejeet eeBsiGts af 8Jll"rel[Haately Hl1.7 gress aef6S, apJlrel[imately 97 !lere5 eneluses the pHeBe streets and. 8I3J3feJrimately 7~.g Bet ae-fes iHel1:lEies fJaaties let 8feRS eBiy: 13 EastLaIa: Business Cent..- n Supp1emental PFFP Amendment Resolution No. 2007-299 Page 5?f.4. THRESHOLD STANDARDS: City Council Resolution No. 13346 approved eleven public facilities and services with related threshold standards and implementation measures, which were listed in a policy statement dated November 17, 1987 and have subsequently been refined based on recommendations-from the Growth Management Oversight Commission (GMOC). The eleven public facilities and services with related threshold standards are: . Traffic . Police . Fire/EMS . Schools . Libraries . Parks and Recreation . Water . Sewer . Drainage . Air Quality . Fiscal During the development of the Growth Management Program two new facilities were added to the list offacilities to be analyzed: . Civic Facilities . Corporation Yard Threshold standards are used to identify when new or upgraded public facilities are needed to mitigate the impacts of new development. Building permits will not be issued unless compliance with these standaTds can be met. These threshold standards have been prepared to guarantee that public facilities or infrastructure improvements will keep pace with the demands of growth. The 2005 General Plan Uodate includes a Growth Manal!ement Element that orovides a framework for continuinl! the evolution of the City's Growth Management Prol!ram. A revised Growth Manal!ement Ordinance and Growth Manal!ement Prol!ram Guidelines is olanned for City Council review and adootion in 2007. 14 Ea:st1Akc Business Center n Supplcmcnlal PFFP Am",dmcnt .--' Resolution No. 2007-299 Page 209 SPA Boundaries .... ..- .~ .,' -,', . ..... . ... ....... . ':'''-',::.' Exhibit 4 ~EASTlAKE A pllul!d --..tlr I:ry nw 1asIlA_ C-,..,. Ginti Land Planning r;::;m ~ 15 EastLake Business Center n Supplcmtntal PFFP Amcndmmt Resolution No. 2007-299 Page 25l DEVELOPMENT SUMMARY 1999 SUDDlemental PFFP Summarv The EastLake Company proposes to develop the EastLake Business Center II project prior to the completion of the overall EastLake III General Development Plan (GDP) and Sectional Planning Area (SPA) planning program. To do this, The EastLake Company proposes to delete the EastLake Business Center II site from the EastLake III GDP and annex it to the EastLake II GDP and the EastLake I SPA Plan. The land use designations shown in the EastLake II GDP for the Business Center II Supplemental SPA Plan area consists of Research & Limited Manufacturing and Circulation. This project is designed to implement the EastLake II General Development Plan (as amended). CamjlaHSSIl. sf the Pflljlssed Geoeml DeveloJlm8llt Plan (EJEhillit illllll.6 ill) IlIl.d the 8ite Utiliil8tieo PlWl (Enhillit Sa) shs'....s the I'elaasosbiJl sf land llSe aae _Iige's 19et\':eell. the peliey plan and tJ:le mere refiRed and aetailea SPA Plan. 2007 SUDDlemental PFFP Amendment Summary IRE Develooment oroooses to redeveloo aporoximatelv 16.7 oreviouslv develooed acres at 851-891 Showroom Place (Area A) from Limited Industrial to Commercial RetaiL This redevelooment will involve commercial uses of the existinl!: buildinl!:S. IRE also DrODOSeS to develoo areas B and C with new uses consistent with the Drooosed GP A. GDP and SPA Amendment. The Suoplemental PFFP Amendment addresses GPA to chanl!e the land use desil!:lllltion of Area A from Limited Industrial to COlnrnercial Retail. Concurrent amendments to the Eastlake II GDP. Eastlake Business Center II SupJ'lemental SF A Plan and associated rel!:U!atorv documents are also orooosed for Area A. B and C. The GDP and SPA amendment consist of chanl!:inl! the land use desil!:lllltion of Area A from BC-I (Business Center ManufacturiDll Park District) with Desil!D District Overlav to a new commercial rvC-5) land use district: and Area B and C from BC-I (with area B currently includinl!: a Desil!:D District Overlay) to BC-4 (Business Center Core District). Also included are certain modifications to the adooted orouertv develooment rel!ulations in order to accommodate I!:reIlter desil!D and land use flexibility. includinl!: an increase in building heil!:bt from 35 to 60 feet un to a maximum of76 feet for Areas B and C. More soecificallv for Area C. the oroiect further oroooses reDeal of the oreviouslv adopted Master Use Permit PCC-05-070 for Area A and B and aonroval of conditional use uermit and desil!:D review for a new 156 room. 5-storv. hotel and a newanDroximatelv 122.000 SQuare foot 4-storv. office buildiDll. 5.2.1. DEVELOPMENT PHASING: 1999 Supplemental PFFP Summary Proposed land use within the EastLake Business Center II will was Drooosed to be exclusively industrial designations. The subdivision is was proposed to be developed as summarized in Table 5-1 belsw: and illustrated in Exhibit 7. 16 EastLakc Business Center II Supplemcntal PFFP Amendmont Resolution No. 2007-299 Page 211 TABLE 5-1 PROPOSED 1999 SUPPLEMENTAL PFFP LAND USES Gross Net Acreage Net Acreage Phasing Land Use Pad Areas Acreage wlout Streets OnlY 1A Research & Limited Mfg. 15.2 13.1 9.5 ]B Research & Limited Mf.,.. 32.8 29.9 22.5 2A Research & Limited Mfll. 18.1 17.5 12.0 2B Research & Limited Mfg. 38.6 36.5 30.8 Total 104.7 97.0 74.8 Acreage's provided by Hunsaker & Associates, 10/15/99. The 1999 project will was to be built in four phases (see Exhibit 5). Phase 1A will include!:! construction of the entrances to the project from Fenton Street, portions of the Fenton Street extension and StFeet ""." Harold Place. and development of Lot I and 6. Phase IB will-consisted of the completion of the Fenton Street extension and development of Lot 7 through 10. Phase 2A will include;l completion of Street ":\" Harold Place and development of lot 2 -through 4. Phase 2B construction will include!:! the construction of8treet "B" Showroom Place and development of lot 5,11 through 16. Any changes in the phasing will needed to be approved by either the City Engineer or the Director of Planning and Building. 2007 SUDDlemental PFFP Amendment: There is no olanned Dhasing for Area A. All of the streets and Dublic utilities have been constructed for the EastLake Business Center II oroiect. A summary of the EastLake Business Center II proiect phasing is Drovided in the followinll table. TABLE S-IA PROPOSED 2007 SUPPLEMENTAL PFFP AMENDMENT LAND USES Land Use Gross Acreal!'e* Net Acreal!'e Net Acreal!'e Pad wlout Streets* Areas Onlv Research & Limited Mfl!. 84.0 84.0 58.1 Commercial Retail 16.7 16.7 16.7 Circulation 4.1 104.8 100.7 74.8 . Acres!!e's orovided bv RBFConsultin!!. 17 EastLak. Busa- CelIter n supplemental PFFP Amendment Table 5-2 1999 SUPPLEMENTAL PFFP PHASING SUMMARY '"t:I:>;:I P> '" (JQ V> '" 0 N- -g N -. o ::; Z o Facility Facility Description Pbase Pbase Phase Phase Timing Financing Method ~ lA 1B 2A 28 S Trame 4-Way Stop@lLane & Fenton SI. X Concurrent wi Building Permit Fee Program ~ Olvmoic Pkwy to Hunte Pkwy X Concurrent wi Building Permit Fee Program ~ Olvmoic Pkwy to Wueste Rd. X Concurrent wi Building Permit Fee Program Traffic Signal & median mod. @ X Concurrent wi Building Permit Fee Program Fenton/Olav Lakes lmorovements to Lane & Fenton SI. X Concurrent wi Building Permit Fee Program Pay DIF Fees X X X X .. Fee Program Potable Service A vail Letter from own to X X X X Concurrent wi Final Map N/A City Water Water Improvements per own & SAM! X X X X Concurrent wi Final Map Fees and Exactions own CIP Fees X X X X Concurrent wi Final Map Fees and ExBctions Recyded Improvements per own & SAMP X X X X Concurrent wi Final Map Capacit)' Fees and Exactions Water Sewer Connection to Tele. (;yo. Trunk Sewer X Concurrent wi Building Permit Fee Program Connection to Salt Creek Trunk Sewer X Concurrent wi Building Permit Fee Program Pay Fees X X X X .. Fee Program Storm Connect to Tele Cyn Drainage X Per Ordinance Subdivision exaction Drain System Connect to Salt Creek e System X Per Ordinance Subdivision exaction Schools No specific facility N/A N/A N/A N/A Concurrent wi Final Mao CFD Park5 Park dedication & construction N/A N/A N/A N/A Pav (Q) Building Permit Fee Program Library Pav PFDIF Fee N/A N/A N/A N/A Pave Building Permit Fee Program Fire & EMS Pav PFDIF Fee X X X X Pay ( ~ Building Permit Fee Program . Pollee Pay PFDIF Fee X X X X Pave Building Permit Fee Program Civic Pav PFDIF Fee X X X X Pav Building Permit Fee Program Coro. Yud Pay PFDIF Fee X X X X Pay I Building Permit Fee Program Other Pay PFDIF Fee X X X X Pay ( Building Permit Fee Pro~ 18 EutLakc Bu"' . Center n Supplemental PF mdmcnt L Resolution No. 2007-299 Page 213 1999 Phasing Business Center II Supplemental SPA --j I I __'Phase 2A I I ._ I . I ~ . I : : I -- i r--~t-... \\ J ) 1L_Phase 28 ~..' has~11AT-1 .~ Phase 1 B EastLaIce G,.". SPA Exhibit 5 ..4 EASTLAKE A pIoI.MC1 eo......1Iy by TIle EIIStI"~~ Com,..,. Cr', Land Pb. .og -...........-- ~ r1-l'lL~ l~llIl 19 EastLalcc Business C<lrtcr II SupplClllClltal PFFP AmcndmelIt PROPOSED General Development Plan ,:~~ '1/ IR l \~.\;// " . ... \.. . ~.' ".;,f ....- .~ 1-...- LM ~......., . .........."..... ....~..t.....,.., " ..<'M1.... -- ,..,.. ... .II", .... ..... O. tSU fI_~ I'" 'U 1iiiA ... .. .l41 .... .... no --.<<i ,-j .. -- .... er.. .. _c- oo, .... -- a.o . .............~ .....tt4.J .. -- 2tl.1 .. ,~. ~ '1IllIlllt' tlU . -.- au -- ..... .....NrRA J11 mu -,... .,.1 '.1 ".. .. --~ ., '__,C""S*f~~~""Ct...."'_'"'_""'" :'-EliSfiAKE'11 A........._..._-....~.. C"'lond~ Ft:nLJ 1112_ I--,on-I Exhibit 6 , EutLake Businer Supp......tal PFFP A .. "0;>::1 '" <> ()Q on <> 0 ~S .f:::o. o' i:l Z ? tv o o --.J , tv '0 '0 "n ""'. Resolution No. 2007-299 Page 215 ~-~~..""''''''''''........ E._EuLM<<G_._ ~ / / I P~;' I Land Un I::: 1:'..":..:.1 ~~) / ~EmPIOymenlP.rI< 2S.3 lQ.B " ^ < .~!i.m.pIi>~'U"D'J"lI!_ __... J;e.Z _ _ _. "'1~ _ _ _. tAddlUonorVc..5~ : ~u~T _~~~~:-:=r... --...... .-~~f" ~.. _;~:_.. _.: ~Otay L.akes Rg,lId 3.3 L---.JFenton street 4.1 Tot81 108.1 PROPOSED Site Utilization Plan Business Center /I Supplemental SPA RoIIirtg Htltslll= __oj --i--- ..._ Ad .~'.c~I4DrI. s.-....._..........'"_Io<~....... ~c.oa_'*l_3_N........,.._.....~............ ~ ConceDl<4l/tllt.'IIl.G' Crn:uII1ioJl nt1M1 CuclHJit1tI.~. lliI D~a.c.~&liir'ld.ldMjrl~"I,,-*~ ~FASTLAKE A pIaIt_rct totn lInunity b)" Tlae- EMlldkl' C...__ ,l__ =:rir'l"' ; ,... ..._~"'" ,..... Exhibit 5 IR"-111011D71 Exhibit 7 21 EoslLoI<< Bus..... CeIIla- D Supplam:Dto1 PFFP "~dm_ Resolution No. 2007-299 Page2s3 PUBLIC FACILITIES THRESHOLD STANDARDS AND INFRASTRUCTURE REQUIREMENTS 5.3.1. TRAFFIC 5.3.1.1. CITY THRESHOW STANDARDS: City-wide: Maintain Level of Service (LOS) 'C' or better as measured by observed average travel speed on all signalized arterial segments except that during peak hours a LOS 'D' can occur for no more than two hours of the day. West of Interstate 805: Those signalized intersections which do not meet the standard above, may continue to operate at their current (year 1991) LOS, but shall not worsen. 5.3.1.2. EXISTING CONDITIONS: The supplemental circulation component of the EastLake Business Center IT project is based on a comprehensive Traffic Impact Analysis report that was prepared by Linscott, Law & Greenspan (LL&G), October 13, 1999. The SuuDlemental PFFP amendment circulation is based on the Traffic ImDact Analvsis. EastLake Desi2l1 District bv LL&G. dated SeDtember 10. 2007 (herein referred to as the LL&G traffic analvsis). The analysis within both of the LL&G traffic analvsis ~ determined the appropriate size and phasing of circulation improvements. Olay Lakes Reatl end LIlftll f.-lelllle pre'Ada the pfimery oeeess te the prej eet. Olay Lakes Reatl is elassifietl as a Sill Lene Prime fatefial. Teday, Olay Lakes Reatl is a four lane street, "vi. enftBfieeEl mtefgeeasa gesmetfy at ];ast 'H' Street, J9F6\idiBg BeAB seut:k aesess eetv;eeft Ranita R~ad and Telegmph Canyen R-eas, at vAHeh peiBt it ~ te the east. :\t the ifttefSeeaoD with Telegmph CenyeD ~ae.'La Media Reaa, Otay Lakas Reatl trensitiaDs iDle a SHL LaB:e Prima :"RaHal, IIftd eveDtael.ly iBte a Class 2 Celleeter (Rye lanes) east efHlmte P(lfle'.vay. Lane AVelllIe is elassiiied as II Class I Celleetar Street. It e1:lRefHlj' J!Fevides eae lane in mea aireetisB ana is step eeftkelletl at Qmy Lakes R-eaa. A. ExistiD2 S62DIents . Otav Lakes Road orovides east-west access to the site. Olav Lakes Road is classified as a Six-Lane Maior west of Paseo del Rev. and as II Six-Lane Prime Arterial from Paseo del Rev to the SR 125 alil!JlIllent in the City of ChuJa Vista Circulation Plan. Between SR 125 and Eastlake Parlcwav. Olav Lakes Road is classified as II Seven-Lane Prime Arterial with four lanes westbound and three lanes eastbound. East of Eastlake Parkway to Hunte Parkwav. it is a Six-Lane Prime Arterial. transitionimz to a two-lane collector. east of Hunte Parkwav. Olay Lakes Road is cum:ntlv built to its ultimate classification. Bike lanes exist on both sides of the road and bus stoos are located intermittentlv alone Olav Lakes Road. . EastJake Parkway is classified as a Four-Lane Maior Street in the City ofChula VISta Circulation Plan. between north of Olav Lakes Road to South of SDG&F 22 EaslLake Business Center [[ Supplcmcnlll PFFP Amendment Reso]ution No. 2007-299 Page 2] 7 easement and as a Six-Lane Maior Road south of the SDG&E easement in Eastlake Greens. Currentlv. it orovides four lanes (two lanes in each direction). Bike lanes exist on either side of the road and curbside oarlcinl! is orohibited. . Fenton Street is classified as a Class I Collector in the City of Chula Vista CircuIation Plan. Currently. the mid-section of this roadway has two throul!h lanes (one lane in each direction) and a center two-wav-]eft-tlnn lane. Just east of EastIake Parkway and iust north of Olav Lakes Road. this roadway is four lanes wide with a median and is built 10 Class I Collector standards.. with four-lanes. two in each direction. . Lane Avenue is classified as a Class I Collector in the City of Chula Vista Circulation Plan. Currentlv. it Drovides four throul!h lanes (two lanes in each direction). Bike lanes exist on either side of the road and curbside oarkim! is orohibited. . Showroom Place is a 40-foot wide unclassified two-]ane cul-de-sac orovidinl! access to Areas A & B of the oroiect site. . SR 125 is a north I south six-lane toll facility connectinl! SR-54 and the SR-90S Route to the International US I Mexico border. throU2h the City of Chula Vista. This facility is currentlv under construction and is expected to be ODell 10 traffic bv the end of 2007. TABLE 5-3 EXISTING SEGMENT OPERATIONS Sel!ment . Existinl! Roadwav LOSC Existin.. Class · Capacity b Volume LOS Olav Lakes Road SR 125 Ramos to Vons Dwv 7-Ln Prime Arterial ~ ~ .Ii V ons Dwv to EastJa15e Pkwv 7-Ln Prime Arterial ~ lliQQ A Eastlake Pkwv to Lane Ave 6-Ln Prime Arterial 50.000 2UQQ A Lane Ave to 6-Ln Prime Arterial ~ .l1J..!lQ. .A Eastlake Parkway - Fenton St to Olav Lakes Rd 4.Ln Maior Street dM!ll! 2.UQQ .A Olav Lakes Rd to Clubhouse Dr 6-Ln Prime Arterial ~ 1UQQ .A Fenton Street' EastJake Pkwv to Lane Ave Class I Collector 22.000 7.200 A Lane Ave to Harold PI Class I Collector 22.000 UQQ ..A Harold PI to Olav Lakes 11 d Class I Collector 22 000 1900 A St1JD'rI!" T T kG tTaffic analvsis Footnotes' a. Road~v Classification net Citv ofChula Vista Circulation Element and currentlv existinll b. Table B-1. City of Chula Vista Roadwav C1macity Standards. A ver..e Dailv Vehicle Trios, c. Fenton Street is cla..~fied lIS a Class I Collector in the City of Chula Vista Circulation Plan CUJTeJltlv. the mid-!\eCI.ion of this roadwav has two throQ2h lanes (one lane in each direction) and a center two-wav-lefl-turn lane Just east of Esstlakc Parlcwav and iust north of Otav Lakes Road.. Fenton Street is four lanes wide with a median and i!C built to Class I Collector mmdards.. with four-lanes. two in each direction. For the numose of c8lClllatin~ the onerations. the canacitv of a Class I Collector is assumed. 23 EastLakc Business Center IT Supplcmcatal PFFP Amcndmcot Resolution No. 2007-299 Page Lffie L1&O traffic analysis of existinl!: conditions includes the assessment of the study area street selZlI1ents and intersections. Table 5-3 shows that under existinl!: conditions the daily street selZlI1ent LOS of the studv area sel!Illents are calculated to ooerate at LOS B or better. Table 5-4 shows that under cxistinl!: conditions the oeak hour intersection LOS all ofthc study area intersections are calculated to ooccatc at LOS D or better. The L1&G tfllfiie Mal ysis I15sssaee the fells'Mag k-ey iffiSl'Seetieas ift tlte pFe j eet Mea: . TelegmpR CaRYSR RslIlIII E9S Sel!tRaelHls ~s . TelegFllflR C~'eR Rsa8,'1 EllS NeJ'tftaellBa Ramps . Telegt'lijlR Canysa Reas,'Haleerest Drive . Teleg-Rll'ft CanyeB ReaSlCfest Dfi..:e/OleBnser l.. -.~eBtie . Telegt'lijlR CanyeR Rea8lOtay halEes R-eall . Otay Lakes Rea8,'EastLake Perlwlay . Otey Lekes R-eeM.ane A yelllle . Otay lakes Reaa/FefltsB 8wet Both of the LL&O traffic analvses assessed the followinl!: kev intersections in the oroiect area: . Otav Lakes Road / SR 125 SB Ramos . Otay Lakes Road / SR 125 NB Ramos . Otay Lakes Road / V ons Drivewav . Otay Lakes Road / Eastlake Parkway . Otay Lakes Road / Lane Avenue · Olav Lakes Road / Fenton Street . Fenton Street / Eastlake Parkwav . Fenton Street / Lane Avenue . East "H" Street / Lane Avenue . Fenton Street / Showroom Place . Fenton Street / Harold Place The LL&G repeR iBEiiealss thet tlte afefelllellaelles Itey iBtef!leetieas lIFe lltiffeBtly Spel'lltiftg at LOS C s1:lfiag the AM er PM pealt ae1:l1'S v.itlt the ellseptieR efthe Telegt'lijlil. CllftYEla ReatW E9S NefthilellBs RsHips mtefgeetiea (LOS F, ..\M ana PM Ileak RelH'S). Flfi'lfter, tlte LIme ;'&6IIae ans Otay l.alEes R-ees ifttefseetiea eIlI'fefttly epel'lliies at LOS C ar better "1,;111 the Elxeeptiea af the seathaetllls left RIfB R1aVtllllellt sllfillg the AM peak RS~ (LOS D). Hew6"..er, tms mteFSeetiea 'lIill ae sigBali~EI ay the seeella qtill1'ter eftlte year 20011 BREI is aeBEles lly the Reiling IIills JlfEl.ieet. The aforementioned City GrS\',*..I! M8IIagemSllt Thresholds Standards require that LOS C or better operations at an intersection except that LOS D is acceptable during peak periods (for a total of two hours). However, the City of Chula Vista does not have criteria that specifically addresses the situation if the existing intersection LOS is LOS E or LOS F. 24 EastLoke Business Center D Supplemenlll PFFP Amendmenl -~~ Resolution No. 2007-299 Page 219 Intersection Traffic Peak Existine: Control Hour Delav · LOSb I Olav Lakes Rd I SR 125 SB Ramos Si$n!! aM . . fM . , 2. Olav Lakes Rd I SR 125 NB Ramos SionaJ AM . . fM , , 3. Olav Lakes Rd I Vons Drivewav Si$n!! AM 28.3 .r; I'.M ill! .Q 4 Olav Lakes Rd I Eastlake Pkwv SWlI! aM ru .r; I'.M m .r; 5. Olav Lakes Rd I Lane Ave fugool aM ID .r; - I'.M 24.6 .r; 6 Olav Lakes Rd I Fenton St .fu&!IIl AM II .A - I'.M 2.Z A 7 Fenton St I Eastlake Pkwv SiI!l!l AM ~ .r; - I'.M m ..c. 8 Fenton Sf I Lane Ave SiI!lBl AM 2M ..c. - I'.M n..c; .r; 9 East oW SII Lane Ave SWW AM ~ J2 - PM ;!!2 ..c. 10 Fenton St I Showroom PI ~ AM 2..Q .A - PM 2.Z .A 11 Fenton SII Harold PI ~ AM .!2.l Ii - PM ~ J:; . TABLE 5-4 EXISTING INTERSECflON OPERATIONS SOUTCt!- I 1.&0 traffic lmalV!:is FootIlOID: a. Averu:e delav exnres!led in 2CODds ner vehicle b. Lev~1 of service c:. This intertectinn drIeS not exist d. TW~C _ Tw~ Wav Stem r'.nntmlled inten:l!:ction Minor m-eet left turn delav is renorted. SIGNALIZED UNSIGNALIZED DELA Y/LOS 1HRESHOLDS DELAY/LOS THRESHOlDS DoIay 0.0 < 10.0 10.110 20.0 20.1 to 3:5.0 3:5.1 to S:5.0 5S.11O 80.0 > 80.1 LOS A B C D E F DoIay LOS 0.0 < 10.0 A 10.110 15.0 B IS.J 10 2.$.0 C 2S.I to 35.0 D 35.1 to SO.O E > SO.l F Source: U.&G 25 EostLoke Business CcntI:r D Supplemental PFFP Amendmenl Resolution No. 2007-299 Page Z?Il.3. TRAme FACILITY & ADEQUACY ANALYSIS: 1999 SUDDlemental PFFP The prellesed prejeet eeflSists ef EastLake Business Center II Suoolemental PFFP addressed a 70,000 square foot corporate office and a 20,000 square foot warehouse on 10 acres (known as the Leviton Project) and an additional 98 acres of general industrial uses. The number of trips estimated to be generated by the project are based on traffic generation rates published by SANDAG in the Brief Guide of Vehicular Traffic Generation Rates, July, 1998 for corporate offices (7 daily trips/I,OOO square feet) and warehousing uses (5 daily trips/I,OOO square feet). For the remaining 98 acres, an average of the corporate office rate and warehousing rate on a per acre basis was utilized. This rate was calculated to be 85 daily trips per acre by LL&G. 2007 SUDolemental PFFP Amendment The EastLake Business Center II Suoolemental PFPP Amendment addresses a land use chan!!e of oreviouslv develooed 16.7 acres of Research & Limited Manufacturin!! to Commercial Retail (Area A. see Exhibit 3), The document also addresses the concurrent amendments to the Eastlake II GDP. SPA Plan and associated rel!Ulatorv documents that are affect Area A. B and C). The amendment trio !!eneration was estimated bv LL&G based on the Brief Guide of Vehicular Traffic Generation Rates for the San Die!!o Rel!ion. Aoril 2002. bv SANDAG. Table 5-5 summarizes the existin!! and amendment trio !!eneration with the oroposed land uses. Currently. Area A is calculated to !!enerate a total ADT of 1.110 ADT with 44 trios durin!! the AM oeak hour (31 inbound and 13 outbound) and 100 trios durin!! the PM oeak hour (50 inbound and 50 outbound), The land use chan!!e will !!enerate a net 3.900 ADT with 139 trios durin!! the AM oeak hour (! 10 inbound and 29 outbound) and 355 trios durin!! the PM oeak hour () 89 inbound and 166 outbound) Area B site land uses were calculated to !!enerate a total of 5.440 ADT with 163 trios durin!! the AM oeak hour (98 inbound and 65 outbound) and 448 trios durin!! the PM oeak hour (224 inbound and 224 outbound), The traffic study calculated the traffic for Areas A & B to be a net of 9.340 ADT with 302 trios durin!! the AM oeak hour (208 inbound and 94 outbound) and 803 trios durin!! the PM oeak hour (413 inbound and 390 outbound), with the oass bv reduction. A. Project Buildout: 1999 SuoolementaI PFFP A buildout analysis was included in the LL&G Traffic Impact Analysis (dated October 13, 1999). The analysis indicates that all intersections in the project area are calculated to operate at LOS D or better with the addition of the project traffic with the exception of the Telegraph Canyon Road/I-805 Northbound Ramps intersection. The buildout analysis also indicates that all studied street segments in the project area will operate at LOS D or better. 26 EastLake Business Cadcr U Suppk:mcn1al PFFP Amendment .~ Resolution No. 2007-299 Page 221 2007 SUDDlemental PFFP Amendment The Suoolemental PFFP amendment focuses on the land use chanl!e of Area A from Limited Industrial to Commercial Retail. However. from a traffic oersoective there are two oroiects orooosed on Fenton Street between Harold Place and Olay Lakes Road. The first is the Eastlake Desilm District (Area A and B) and the second is the Eastlake Corporate Center (Area 0. Individual Traffic hnoact Analysis reoorts have been llreoared for each of the two oroiects by LL&G (Traffic hnoact Analysis. EastLake Design District by LL&G. dated AulnlSt 7. 2007 and Traffic hnoact AnalYSis. EastLake Coroorate Center by LL&G. dated AulnlSt 9. 2007. Exhibit 3 deuicts the locations of these llroiects. As seen in Exhibit 3. A and B dellict the Eastlake Desilm District and C deuicts the location of the Eastlake Corporate Center. The traffic section of the SUlllllernental PFFP amendment includes both llroiects for analysis llurooseS. Followinl! are brief descriptions of each oroiect. 1. Eastlake Desi2D District The East1ake Desilm District (Area A) is located in the northeastern QUadrant of the OlaY Lakes Road I Fenton Street intersection in eastern Chula Vista The only access to the site is from Fenton Street via Showroom Place. north of OlaY Lakes Road. The Eastlake Desilm District currently consists mostly of furniture stores. Area A consists of 231.566 SQuare Feet (SF) buildinl! area of which 189.697 SF is currently occuoied by finniture stores. It is now olanned to modify the land uses in Area A of the nroiect and nrovide 125.100 SF furniture retail. 39.350 SF office. 39350 SF Suecialtv Retail / Strio Commercial and 27.800 SF Restaurant for a total of231.566 SF. Area B is presently yacant and even thoul!b no site-soecific nroiect is nrooosed. the traffic irnoact reuort analvzed a worst~ scenario (see Table 5-5), which included soecialtv retail uses. Subseauent changes to the aoolicant's DTODOsal have resulted in Area B beinJ1: DTODOsed for BC-4 industrial land uses instead. BC-4 uses are industrial in nature and haye less daily trill generation ootential then soecialtv retail. which were analyzed in the traffic study. The City Engineering Deuartrnent has determined that this change will not result in any additional daily trill generation. However. conditional uses may reauire additional traffic analysis not contemDlated in the LL& G Traffic Analysis. 2. Eastlake Corporate Center The Dlanned Eastlake Coroorate Center (Area C) is located on the south side of Fenton Street at its intersection with Harold Place I Hitachi Place in the City of Chula Vista. Two access driyewavs will be nrovided. one via the existing Hitachi Driyeway on Fenton Street ol>DOSite Harold Place and the second east of Harold Place. Two buildinlzs are Drooosed to be constructed. a 155-room hotel with an annroximate 9.000 sauare foot convention I meeting rooms and an annroximate 120.000 sauare foot office building. 27 EastLake Business ee_ II SupplemOlltal PFFP An,",lIlmClll >-7 DailY Trio End. fADn AM Peak Hoar PM 'oak Hour ? Land UIe OuantitV Rale' ADT ..1 Volume 1m II '0 tS rt 1 V.I...e ~ B!!! III:Out SoUt 1 In lOut 1 Total II. 0 n I I In lOut I Tu ,A. 'c.. Uie " 'c_ , "44 I 90/. I SO' 'SO 1 ~ ~ ~'F' . Des I ~ 1 6 IKSF 11.110 I 4% 170 ' 30 I 311 \3 1 'T r........~..... ' ': co" I 119. ,', I,' '- ' "I 1.110 I '- I ,....;; I 311 131' 441 -I,' -I I 100 , 1,1.,.., ",," '--, , ,'-. , ' , AlBA", ' - - - - - Furniture Retail fS4%1 ill.1l!Q S.!': ~ LKSf 7S0 lli 1Q ; Jll 21 l1 Jll m ~ - N II H ~ Office (17%1 12.ill llf 20 LKSf 12J! 14% 112 ; 1J! 1QQ 11 ill llli ~ ; M 21 U ill S""eiaJtv Retail I Strio Commereial 07%1 !2.llQ S.!': I~ IKSF 1m ill ~ - ~ 2t 19 11 ~ ~ ; SO ~ M ill '112'M.\ 27.766 SF iKSE 2780 1% 17 II 28 : lii Su a e 231.566 SF !.- 166 !O 216 281 ~ !35 ="AL~"f ~.Arl~;~Rod~~I~n " -880 ,2S -8 -32 -42 -80 ~ :fit: 42 , ' -ffi- iI 116 11 - ~ 19 - ' - 166 AoLI ',' " " -_ ~illF 6JOO ill 60' - - ill 7i 122 1.ll% SO - .m 310 320 MO ~alIvR.tail'~iald 160000 S.!': : 40 , ue In . , Dailv and AM and 30% PM) , -960 -17 -12 -29 .% -96 -192 ~ lid II... With P...bv a.dnetl.. I 5.440 98 65 163 124 114 448 , &:B",', I" "I , " 9.340 1108 94 302 413 390 803 ,,'_.n" ;,.'. ..,,',,'1' " ': , '-'",- , -c' , , , - , Fumitun: Retail ill.llm S.!': ~ L.KS.!': ill. ill ~ ; 40 l! l1 II m ~ - ~ II H M ~ ~ m: ~ L.KS.!': 12!! 14% 112 ; 10 1QQ 11 ill 1lli 20 ; M 21 U ill. General Retail ~ &: 40 u.sF. ll'l!! ill 60 ; !!I 28 12 47 m ~ - SO 11 71 ill Rr....nrant I~'~ ~ ~~, 2.780 lli ~ ; ~ Itl ~ ~ 8% 1Jl ; 30 ill ~ m Snr,dal..;R"a;l/ Slrin r.nmmerd,l MOO: ill - 40 1D% SO N 320 640 Reduction lMixcd~Uses: FurnitureJ.R.ctaiIJ)lp.".,1n11nt _ IS%) c: :II!! - - - :H :B. :ll - - - -42 :1l :8!! . ,tp...hv' . RetaiI-]S%DailvandAM-d,n'/oPM1' -960 :j7 -]2 -29 -96 -96 -]92 Subtotal p~-.d Proieet With Mixed-II,. and p...hv Redudl.n. 10450 233 107 340 463 440 903 TABLE 5-5 TRIP GENERATION FOR AREA A & B '"010 & D5 " 0 IV- IVg IV ~. o ::; Footnolu: .. BrlefGuIde of VehlClllar Traffic Ge""ratlon /In"" for the San Dtuo Reflion. SANDAG. ADriI 2002 b. Currentlv occ:uoiod and aeneralio. traffic c. A mWvl-Ufl:: pmriinn of l~% is JIftI~ due to the aIIV'! vdUcle oatronimo both the fumitmc and the restaurant or both the rcsbwr8nt and retail. etc. and is 1YV'I~dP.nt with the oarkina:.wvsis. d. Worst~ 1IfY!rW'in. The ...1iNlllt has IIRI'eed to Be"" uses inGlaoowt of~JlJtv Ft'bIil BC-4 uses have Jess daiIv trio ~ nnlP:ntiJllI than 1InPI"i.1tv retail which WfJe anIw.ed in Ihc traffic studv.. e. A a.....bv reduction of I S% for dailv lraIIic and AM ""sk hour traffic and 30% for PM oeak hour lraIIic i. atllllicd In the Community SboDDin. Ccnll:r oortion of !be oroiect. DC:< ITE (Institute ofTpnDVlrtJltionEnRincersl trio ReDerat:ion rates 3 EastLatc BUlin/a' II Supplemental PFFP I. 1JIeIIt L TABLE 5-6 TRIP GENERATION FOR AREA C '-oi';:l ", (1) (JO en (1) 0 tv- tv~ t..J _. Dailv TriD Ends "' AM Peak Hour PM Peak Hour Z (ADT 0 Land Use Ouantitv In:Out Volume In:Out Volume tv Rate · ADT Rate Rate 0 Solit In Out Total Solit In Out Total:;:! \0 \0 Office 120.000 SF 20 IKSF 2.400 14% 90 10 302 34 336 13% 20 80 62 250 312 Hotel 155 Rooms 10 IRm 1.550 6% 60 40 56 37 93 8% 60 40 74 50 124 -,., " 'i'>;'.'" " I, " ' ' , , , (.Totar .' ..,:::'0 3.950 , - 358 '71 429 - - 136 300 436 "", , ,'=,,'. - - - ~ L BriefGvkk of Vehicular Troffic Generation RIlle. for the San Die"" &~Ion. SANDAG. Anril2002 29 EI.ltLake Busmas Centel n SupplemenlBl PFFP Amald..-t Resolution No. 2007-299 Page 224 The Fewlts ef the LL&G 1IBIII)'sis inaieate that llflPFelamately 4 2 gres~ aeleS Ethe 19 &ere Le"/itsa prejeet I 30 addiaenal aeres) sf the 8J!1f:lfe)[intate 101.7 aeres eeula ee eHiIt eef6le reaehiftg a sigeiiieal!t tbreshela impaet. The gress aereage iBeluEles Btrsee, slepes eEl pad &re85. The elftensieft ef Olympie PMk\ve)' te PlISee Raneilere -....IIS fetifla t6 partially, ellt Het fully. mitigate the JlI'ejeet impaets. OIIee Olymjlie Parkway elfteHes te Pll5ee Rimehere, 59 gress BeRs eeals be built befsR II sigRifiaal!t iHl.paet '.vaHla be eale1=dated. CeHst;ueeeft eft the remaiftiag 15.7 Beres is le!ltfietea lifitil Olympia Parkway is elftensea :frem Pasee RaneaeFe te Vhieste ReBEl 8f 8R 125 is eeftlJ'leted. B. Adequacy Analysis: The el.i1TeRt Ll&G Bftalysis deter.miBea he'w mUSH sf die site sews he de",elel'e8 eefepe a sigflifie&ftt imfJaet eeel::l!Tea te the eif6\llatieR Bef\~.STk. LL&G's initial IISsesSffi8llt ,VlI5 that the I 895.' Telegrtlph ClIflyeft Rella iHterehaHge, aHa I'artieuler the BsFtheel:lftd f8mJ:ls is the eSBstm:lBt in the eiMllatisB system iB Fegal'8s 1e the prepese6 JlI'ejeet. The Telegrtlph CllIlYeft R-eae/Nefthbelifis I 89S l'llIBJls ifltef!leetieft are eUjleetea t6 lljle1'llte at LOg F allfiBg the AM fleak peri6a in the Yeat 2999 'Nitheat the Jlrejest. LL&G lIaaea Jlrejest tmftie '..ellHRes te the iflterehaHge l:Ifttil the twe seesBs signifieant eriteria thresheld ..../85 Feaekee. ,LL&G's ea:lealatisfts she";: tllat 42 gress aeres (the 19 aere Levit6ft pmjest I 32 adliitienal Beres) efthe 19S aefeS ee1:lls he BaHt hefefe reaehing a sigBifieant impaet (greater than t\'\~ seeeRs del&)" iftefell5~ at tHe I 895 TelegraJlh C~e8 Raaa iHtefeJlllftge. The LL&G Traffic Analysis determined that the proiect at buildout has sil!I'lificant impacts at the followiOlz: . Inteneetions Otay Lakes Road I V ons Driveway (Cumulative Imoact) Showroom Place I Fenton Street (Direct Impact) These impacts can be mitill:ated by imolementation of the followiOlz measures: . Intenections Otav Lakes Road I V ons Drivewav: Dualleft-tum lanes. one shared throueh I rieht lane should be provided in the northbound approach and the existinll: sie:nal phasing should be modified to provide north I south protected phasinll:. LOS E conditions are calculated prior to the addition of proiect traffic. The proiect traffic is estimated to contribute towards worseninll: the existing condition. This impact has been nreviouslv identified and these mitill:ation measures have been previouslv recommended for the Eastlake Villall:e Walk and Eastlake 30 EastLIke Business Center n Supplemeatal PFFP Amaldmcnt _____________ _...L... Resolution No. 2007-299 Page 225 Villa!!e Center Projects. These miti!!ation measures have not vet been imolemented. It is recommended that these imorovements be included in the next CIP. Showroom Place / Fenton Street: Install a traffic sil!Dal when warrants are satisfied (exoected to be needed uoon imolementation of Area B). Provide one shared throul!h I ri!!ht-tum lane and one left-turn lane on southbound (outbound) Showroom Place. Provide one left-turn lane and one ril!ht-turn lane on northbound Fenton Street with ril!ht-tum overlao phasin!!. The LL&G Traffic Analvsis also concluded that an overall decrease in peak hour traffic would occur on the Otav Lakes Road street sel!ment. from SR 125 to EastIake Parkway. based on a comDarison of the oroPOsed oroiect to the approved industrial land uses. The prooosed proiect trip I!eneration was compared bv LL&G to the amount of traffic that would be !!enerated bv the existin!! zonin!! site land uses. LL&G determined that the proposed oroiect is calculated to generate a net increase of 3.250 ADT. but 518 fewer trios durinl! the AM peak hour (452 fewer inbound trips and 66 fewer outbound trios) and 39 additional triDS durin!! the PM oeak hour (290 additional inbound trios and 251 fewer outbound trios). The lesser number of trios in the oeak hour volumes is due to the modified land uses since each land use has different trio I!eneration characteristics. Therefore. the oroiect is calculated to not sil!Dificantlv imoact the Otav Lakes Road sel!ffient. 1. Eastlake Desil!D District Analvsis of intersections and sel!Tllents were conducted for the followinl! timeframes: Existin!!Scenario I - Near-Term Without Proiect <Existing + Growth + Cumulative Proiects) . Scenario 2 - Near-Term with Area A (Proiect Phase n . Scenario 3 - Mid-Term (Near-Term without Proiect) . Scenario 4 - Mid-Term With Project Area B (Phase II) . Scenario 5 - Year 2030 Without Proiect Scenario 6 - Year 2030 With Proiect 2. Eastlake Corporate Center Analvsis of intersections and sel!ffients were conducted for the folIowiDll timeframes: . Existinl! . Scenario 1 - Near-Term Without Project <Bxistin!! + Growth + Cumulative Proiects) . Scenario 2 - Near-Term with Proiect . Scenario 3 - Year 2030 31 EastI...ak:e Business Center n Supplemental PFFP Amendment Resolution No. 2007-299 Page 2S~.1.4. MAss TRANSIT: The mass transit requirements were identified and required as part of the original EastLake I PFFP in 1985. All of the provisions identified in the adopted EastLake I PFFP and subsequent amendments sball remain in effect as a requirement of this Supplemental PFFP. as amended. at buildout. 5.3.1.5. TRANSPORTATION FACILITY REQUIREMENTS: An analysis of Telegraph Canyon Road using the City's Transportation Management Plan (TMP) methodology sbows that Telegrapb Canyon Road can accommodate project traffic, especially since the project will add the majority of its generated traffic in the counterflow direction on Telegraph Canyon Road. However, there is a "point" constraint on Telegraph Canyon Road, the 1-805 northbound ramps intersection which LL&G believes should be evaluated to provide a worst case analysis. This analysis showed that a maximum of 42 gross acres could be developed before a significant impact (two second increase in delay) would be calculated at this location assuming no new network is provided in the eastern Territories. The extension of Olympic Parkway from Brandywine Avenue to Paseo Ranchero was found to partially, but not fully, mitigate the project impacts. Once Olympic Parkway extends to Paseo Ranchero, 59 gross acres could be built before a significant impact would be calculated. For the remaining 45.7 acres, the applicant must wait for Olympic Parkway to be extended from Paseo Ranchero to Wueste Road or SR 125 is constructed. These limitations are no 100lzer in effect since Olvmoic Parkwav has been extended from Paseo Ranchero to Wueste Road and SR 125 is eminent. 5.3.1.6. FINANCING TRAFFIC IMPROVEMENTS: A. Transportation Development Impact Fees (TDIF): OIl Deeemller 1, 1993, !he Cffilla Vista City Celmllil ~s Ofttinanee 2589 amendiJig 0reinIIBee 22S 1. 'The pllfIlese ef the eFElinsftee is te eellect se'l'e161lment impllet fees (DlF) for the eenstnleti9ft ef eirealllli9ft e1emeat 1far.sy01t&ti8B faeililies 16 aee_eelate iBerellSed tmme r,eBe:IlH! d By fteVl se'l"e1epmeRt in the easl1.'fR teffiteries. The fee is $2,399 per Mlllti FamiJ.:y swelling lI!lit an6 $99,9511 per gfflSS aere eft"eetP.<e Janllary 1,1995. .:\:1se etfeeti",e JaalHlF}' 1, 1995 is 8B in1erim J'fe 8R 125 de:r:elepment im.J38et fee (DRiinaftee 2579) in tile BfRelH1t ef $819 per eEl.lli.VllIeftt lW/eDiRg IlIIi.t (lIDU) 16 implemeftt tile Jlfe SR 125 5lfBteg). lIS sefiBeel ill tile sWay entitleS "lBterim State ReIlte 12a Faeili~' Feasibility Stl:Iay" "~-!l May 1993. The East. -lee Bl:ISiRess Cester R Jlftljeet is witlliB tile Ilellfttlaftes Elf the T~el'lfllieB DIF Jlftlgram lIIIli IIRl subject 16 !he JlIlymeBt ef!he fees at tile !'lites ill eft"eet at tile time builEling Jl_uM:. are issuea The];)IF 9ft!inanee, ftewever, dees alIew for tile issuaftee Elf eredit ill }jell Elf fees ',vbeB 8ft eligiBle fiIeility is eenslfIlete6 By the plejeet. If the tete! eligible eell5lmcti9ft eest IIHi8IlBts 16 1B6!e thaft !he tetaI Rlllaireel DIF fees lIS is 32 EastLokc Business Ccntor IT Supplemental PFFP Amendmcn1 Resolution No. 2007-299 Page 227 iReieated helew, 1fte w....flef.({)e'I'e1ellef' "lAY be gF1eR eroaits tewmd future lMlaiHg peurnts e\lt5ide efthe 8Pl. are&. The TI'IIIl5flllf1aliaB DIF heginning JamlllFY I, 1995 is $3,998 per EDD. tML Rew siftgle family detaefteEliFNe!l.iog is eeBSideftld eRe EDU fOr the pmpeses efthis fee. A sffigle family attaeheEliFl.'e!liBg is g.IlIIDU's. .\ lIIlit '.vid1in a multi famiiJ swelling is eensideFod (Hi hoo'S. CemmereiallOtliee is sbargeEI at the 1'llte sf 2S.Q lIDU's Iler gRltlS aere eflaflll. The Iatefim Pre ER 125 DIF begiB."1iRg .Jimllafy I, 1995 is $&29 per EOD. The same EDD mtes EIJ'Jlly te the mtefim Pre SR 125 DIF Il5 fer the TrlIfl8!lElftlHieR DIF. Area A. the 16.7 acre proiect area. has been built out and no additional row is reauired. row will be reauired for Area B and C at the time buildinll: pennits are reauested. See estimated row for Area B and C. . lawPi. Pre SR 12S DW LaHti Use Aere5 EDIT's ~ .998/ T....spertatie. SlJ2.lW SRU5 +&tel Elm ~ EDlI Faetor ~ JRtitlsa=ial -HIS w.. 25IGress $19, 191,759 2S/GFeBS t2,1~2,SQQ S12,M7,2SCl Aef'e Aef'e ~ TABLE S 3 TRI_'lSPORT AnON & INTERIM PRE 125 DlF FEES Land Use Ac:real!e TransDortation Fee' Der !!ll!! Industrial Acre Industrial 27.36 $86.218 $2.358.924 TABLE 5-7 ESTIMATED TRANSPORTATION DIF FEES FOR AREA B & C B. Traffic: Signal Fee: FIrtufe elevel8Jllftl'l'R ell the BastLake Bll5iftess Cooter II pmjeet 'Hi.R be required 16 pay Trafiie SigHal Fees pur5l1l1flt te ClHtIa ,,-ism CetmeiI. Peliey }!e. 475 Ill. The fee is ealen I-'aa at $13.00 per vchiele 1ri!l g_tea per aay fer ',"afiew; !aHd _ oategElfies. BIl5ed UJleR the LlAG I'eJl6ft the fees fer EastLake Bll5iness CeHter II prejeet IIftl estimatell at '1IS,Sag (8,919 1\DT). Area A: The 16.7 acre proiect area. has been built out and no additional Traffic Sj""al Fees are required. Area B: The AoolicantlDevelooer shall be reauired to enter into an ae:reement with the city to desilZIl and construct a traffic silmaI at the intersection of Showroom Place and Fenton Street. In addition. Traffic Sil!llal Fees will be reauired for Area B at the time buildinl! nermits are issued. Area C: Traffic Silmal Fees are retluired fur Area C at the issuance ofbuildirn! oennits. I Table based on Ci\v ofChula Vista Fonn 5509. dated 9t2St2007. Actual fee maY be differenL oJease verify With lbe CitY of Chula Vista at the time ofbuildin2 oermit 33 EastLake Business Center n Supplcmenlal PFFP Amendment Resolution No. 2007-299 Page 228 Land Use A!:g Am: Traffic Simal Feel Total Industrial B 5.440 $28.55 $155.312 Industrial C 3950 $28.55 $112773 9.390 5268.085 TABLE S-7A TRAFFIC SINGALFEES FOR AREA B & C 5.3.1. 7. THRESHOLD COMPLIANCE: Threshold compliance will continue to be monitored through the annual intersection monitoring program and the Eastern Chula Vista Transportation Phasing Plan updates. 8asel! apeB the BllStla([oi! 8l15iBeSS Center H Tmffie Impaet Analysis Elated Oeleeer 13, 1999, The Suoolemental PFFP Amendment circulation is based on the Traffic Imoact Analvsis. EastLake Desil!l'l District bv LL&G. dated Aul!USt 7. 2007 and the Traffic Imoact Analvsis. EastLake Coroorate Center bv LL&G dated Aul!USt 9. 2007. threshe16 Threshold compliance is projected to be maintained with implementation of the improvements that were identified above to have a significant impact and with the oavment of transoortation imoact fees or the construction of street improvements identified herein. The EastLake Business Center II oroject s!lall Be was built in four phases. Phase IA will includeQ construction of entrances to the project from Fenton Street, portions of the Fenton Street extension and Street "A" Harold Place. and the development of Lots 1 and 6 (orilZinal TM nwnberstlocated at the northwest and northeast comer of Fen ton and Harold Place. Phase 18 wiH consisted of the completion of the Fenton Street extension and development of Lots 7 through 10 (oril!inal 1M lot nwnbers 7-9 included Area C and lot 10 included a oart of Area ID. Phase 2A will included the completion of fi:1feet "A" Harold Place and development of the remaminl! frontal!e lots. CLots 2 through 5). Lots frontinl! on Harold Place have been built out. Phase 2B construction will include4 the construction of Street "8" Showroom Place and development of the remaining Lots 11 through 16 (Jots 11-13 included AreaB except for lot 10 and lots 14-16 included Area At Pfill!les If. ana 18 ,JtII eensist of BJlIlIIOOBmately 12 grass _. "The TFlIfiie f.."IllIysis ifteiea!es that lIJl to 12 BIlfl!5 Egress aereage iReiHdiBg ptlblie Slleets) of the Jlf6jeet eetild be OOik yAdieut elleeetiing City Threshe16 ~tlmallllls. Phase II.. DevelaplBetlt: PBooe If. will iBellIEIe eenslmetillB ef allE.anees to the projeet hMl Featea ~ Jlofliens o[~ FE!ftlaa 8tfeet elfte115iaa IlIl.d fi:treet "f.", IIlIt! de...elofllfll!ftt 0[1015 1_ Il. 1..\ Requited IlBp~'emeutsr 1. Install aIJ. -;laY step at tfte Hrtelse.eaan sf Lane }:leRlie BB6 FeBtef1 SWeet prier te appre;al of the first Gmding Plan. 2 Table based on Cilv ofChula Vista FOnD 5509. dated 9/2512007. Actual fee mav be different. "lease verifY with the City ofChula Vista at the time ofbuildin2 DCI'I1lit 34 EulLak. Businm CeII10r II Supplemattal PFFP AmendmaIl Resolution No. 2007-299 Page 22!J.. CElB!iWet "er City DesigB SlaftEIanIs er g__Jtee 1fte eanstnJetieB, agree Ie eeflStNet aHa eenstrnet a eaJ de Me, te the satisfaetisn sf 1ft! City Engineer, at the easterly h..u.Wlus eCBaswell Reaa prier ta .........8\.a! aCthe fust FiDa! MllJl. 3. Pay Tl'IHl5Jlel'tliBeR DIF, iBterim Pt"e 8R 125 DW ana Trame Signal Fee. Phase 19 Develel'meBt: Phase IB .;Jill e8f15ist of the eBmpletiSR ef the FeBtea Klfleeteu.tensisa, e8f15tn:1etiea af a "amaH efSIfeet "B," aBEi dcve1epmeBt afLets 7 thfel:lgR HI. 19 RequiretlltBl'l'OvemeRtln 1. Censlnlet JlIlI' City Design &tlmEIefds er guaBlBlee the eaBSlflletien, agree ta eenstfl!et aad eelJ5tnlet the mBlHIIB medifieatiBII. at 1he intef"..eetiaR ef F BBteR 8treet1Otay Lakes R~1lll !'fier Ie aWfElval afthe FiBaI MllJl. 2. Install a fully Iletb'lltea 1ftIftie signal, inelueiiBg imereellflElet ',vii.ng aflti jlI!!l re"e as E1otCH1":"1ed By 1he City EftgiBeer, at tile inteF.leetieB ef FeBteB Sireet lIBEl Otay Lal<es Read !'fier te f.flj'.lsvaI ef1he Final MIIp. 3. Pay Tl'IHl5JlsflaBaH DlF, iBterim Pre 8R 125 DW ana Trame SigFIa! Fee. Ptise 21. Develel'meBtl Pflase 2/'. '.vill inehIfIe eelBflletieB eH:1reet "A" and ee>.'eleJlffieat efLats 2 tbreugh 4. 21. R-ellllireEI ImpAl'l'emeBBI 1. Csnsl..-uet per City Design StaREIaFes or gwmmtae the eEl!l9lmetien, agpce ta eenstfl!et aad eeIlSlf\iet euI E1e sees fer Slfeet f. at tile tetmiB\JS at'Street f. aad, prier Ie IIWIlWa! ef1he FiBaI Map. 2. GuamBtee the iBsIBIlfttien, agree ta iflStall aBEi install all ell site FooteR Slfeet impreveffiellls, iRekIEIing 1ifIElergfellRe imjll'e\ emeats, tmffie signal staRtlllftls willi hmtit1aries, as EletenltileEI 'fly the City BBgiBeer, far the inter.leetieB ef Lime /\ voouel FE!Il.teB Street Hem the w~s1eIly StlBElivisieB bBllflElmy ta Street f. prier te apprevel ef tile oo.le!ljleBaiBg fiBal HlIIJl. 3. Pay TF6Il5fli..t..haH DIF, IBterim Pre SR 12$ DW ana Trame SigBal Fee. l>!e E1e>.'BleJlffiE!ll.t (issalIIlee efbWldiBg Pemll.t!B B~'BBElIl eembiBeEI taW at'59 (8uiIEI em) gRlSS BereS BBee Oi'ympie Parlwmy Hem 1 895 te Hunte PaR<WBY is eelBJlletea lIfte aeeeptee by tll.e Q!y, Pllue 29 DenlepmeBt: Phase 2B B!Ift Be beiIt after OIympie Parltway Ham Pasee RiHlefteI'e ta Wueste Rellll is eemJl!ete8 er the 8BIflJllelieB ef 1he eBBSlmetiBB ef ER 125. PlJ85e 2B ee!l5tRtetiBII. -NiJl iBebEle eeHIJl!etiell. ef SIfeet "B" and E1B'\'Blepment at'1he .llfflainiftg Lets wmeb. ineIIIEIes $ aBEi 11 1Mlagll Hi. 2:& Required lmpre.;emeBis: 1. Censtrnet per Citj. Desiga StandaMs SF guanmtee the eefl5HUetie~ agree te eeI15lr1iet aM eeIlSlf\iet eIII E1e n's fer StRlet B at the t..._~ ef Etfeet B lIBEl, prier ta a.......87a1 ef1he FiBaI Map. 2. Pay TlUIl5pel'tatieR])IF, IBterim Pt"e SR 12$ DWana Tmftie Signal Fee. 35 EastLake Business Center n Supplemental PFFP Amendment Resolution No. 2007-299 Page 2ARy ehaBges in the J3hasiBg 'Nilllleeel te Be _.........e ,eEl. by ei!her the City 8agineer ef Direeler ef Plantii!lg &lid BWIdiBg. I. Area A: In the near-term with development of Area A. all selZlIlents are calculated to ooemte at a LOS C or better. The selZlIlent of East1ake Parkway between Fenton Street and Olav Lakes Road is calculated to opemte at an LOS D. 2. Area B: The Aoolicant/Develooer shall be reauired to enter into an agreement to desilID.. construct and secure a fullv actuated traffic silmll1 includilll1. interconnect wirine.. mast arms. sil!Jllll heads and associated eauioment unden1.round improvements. standards and lwninaries miar to comoletinll develooment of Area B at the intersection of Showroom Place and Fenton Street or as determined and aoproved by the City Enllineer. The AoolicantIDevelooer shall bond for the sil1.l1lll improvement miar to the issuance of the first buildinll oermit for Area B. The bond shall be in an amount eoual to 200% of the enllineer's estimate for develooment of Area B. If sil!Jllll olans are submitted mior to the first buildinl1. oennit for Area B with an aooroved encineer's cost estimate. then the bond may be reduced to as low as I ()()o1o of the estimated cost. The AlWlicant!DevelOper shall also orovide one shared throul1.hlril1.ht-turn lane and one left- turn lane on southbound (outbound) Showroom Place. The Aoolicant!Develooer shall also orovide one left-turn lane and one right-turn lane on northbound Fenton Street with ril1.ht-turn overlao ohasinl1.. Area B will be used for BC-4 uses instead of soecialty retail. BC-4 uses are industrial in nature and have less daily trio l1.eneration ootential than soecialty retail uses. which were analyzed in the traffic study. The Citv EnPineerinl1. Deoartment has determined that this chanl1.e will not result in any additional daily trio Ileneration. Prior to the issuance of the first buildinll oermit for Area B the Aoolicant/Develooer sha!l nav the reauired TOW and Traffic Sil!Illl! Fees. 3. Area C: Prior to the issuance of the first builc!inll oennit for Area C the Aoolicant!Develooer sha!l nav the reauired amount of TOW as confirmed bv the Citv of Chula Vista City Er1Pineer to cover its share of the cost of improvements at the intersection of Olav Lakes RdNons Drivewav. as described in the Proiect's Traffic hnoact AnalYSis (Sentember 10. 2007), Fenton Street / Hitachi Place / Harold Place: Prior to occupanCY oennits for Area C. the Aoolicant!Develqper shall orovide one left-turn lane and one throllllh / ril1.ht tum lane on all aooroaches. with Two-Wav STOP Control in the North / South direction or as determined and alJllrDved bv the City Enllineer. Provide additional strioinll and traffic control on Hitachi Place (Main Drivewav) as shown in the LL&G Traffic Analvsis. Prior to the issuance of the first buildinl1. oermit for Area C the Aoolicant!Develooer sha!l nav the reauired TOW and Traffic Sil!Jllll Fees. 36 EastLake Businas Ca1Ier D Supplemental PFFP Amendment -' Resolution No, 2007-299 Page 231 Circulation Plan Business Center II Supplemental SPA ---j --~-------------------- ..... Ad. I ::- !; i J to-It- Bus, etr, I SPA ... " ~ -: . c--+- c , . . B ; ~ \, II " .. c~C " " " f.: ....~ ',' ~-- A -, Ees/Lake Gruens SPA ]A A ... . .. .. .. ... . - &c' ROW c-- ...- ~ J "L ::"'a., 2lI' 72' ROW I J....-11..1 . I U ~I U. _ ...- , . -' - .k -} 72'ROW , , ~ fASTLAKE-1 A pllllUleel comJllDal1y by ne EatLake Compaa, A / A - 84' Industrial Street with Median B - 72' Indust. St. with Thematic Corridor C - 72' Industrial Street 37 Cin~ Land~ .............- n-l'l ~ U-II Exhibit 8 EaslLake Business Center D Supplcmcmal PFFP Amendment Resolution No. 2007-299 Page ~.i2. POLICE 5.3.2.1 CITY THRESHOLD STANDARDS: Police Services are provided by the City of Chula Vista Police Department. The purpose of the Threshold Standard is to maintain or improve the current level of police services throughout the City by ensuring that adequate levels of staff, equipment and training are provided. A. Emergency Response {Prioritv D: properly equipped and staffed police units shall respond to 84 ~ percent of "Priority One" emergency calls within seven (7} minutes and maintain an average response time to all "Priority One" emergency calls of ~ five minutes and thirty seconds (5.5 minutes) or less (measured annuallv). B. Url!ent Resoonse {Prioritv In: DroDerlv eauiDocd and staffed Dolice units shall respond to ~ 57 percent of "Priority Two Urgent" calls within seven t71 minutes and maintain an average response time to all "Priority Two" calls of ~ '+ minutes and thirty seconds (7.5 minutes) or less (measured annuallv). 5.3.2.2. EXISTING CONDITIONS: Police protection for the EastLake II project is provided by the Chula Vista Police Department (CVPD). The CVPD is headauartered in its new facilitv located at m 315 Fourth Avenue in Chula Vista. Currently, CVPD maintains a staff of +W aDDroximatelv 258 sworn officers and ~ aDDroximatelv 98 civilian/support personnel. The deoartment is recruitinl! new officers and has aDoroximatelv 15 officers in traininl! either in the field or in the academv. The EastLake Business Center II project is easHlfwithin police patrol beat 32, which is served by one patrol car 24 hours per day. 5.3.2.3. ADEQUACY ANALYSIS: Based upon the Growth Management Oversight Commission -l997 2007 Annual Report dated ,A.Jlti11998 Aul!USt 2007. both measures for Priority I Calls for Service (CFS) were met, while arny aRe ef1l1e twe lftell5W'e5 fer Pt'ietity I CFS 'l.'ftSlftet. For Priority I CFS, the Police Department responded to ~82.3% of the calls within an average of ~ 4.85 minutes. The Prioritv II CFS has not been met for several vears. For Prioritv II CFS. the deoartment responded to 40010 of the calls within an averal!e of 12.5 minutes. The GMOC ~ submitted recommendations for continued improvement of the response to priority II CFS, Included in the recommendations is a call for City Council Sllppert efthe Peliee Depar.meBt'5 effarts 16 aae~ly staff ElBa fund the eelBpletieB ef a leag rilflge slfatllgie plan to direct the City Manal!er to have the Police Deoartment OreDare and imDlement an action Dlan addressinl! the deoartments oerformance in meetinl! the threshold for Priority II calls, It was further recommended that the Dlan be comoleted in 2008 so that orOlZI"CSS in develoDment and imolementation can be reflected in the deoartment's next renort to the GMOC. 38 EastLoIce Business Caw:r n supplcmonlll1 PFFP Amendment Resolution No. 2007-299 Pa~1.i~4. POLICE FACILITY REQUIREMENTS: The development of the Business Center II project. as amended. will incrementally increase the demand fOT police services. The develepRlenl eflke ~eet lias the P61e.;ba1 efimjlaet ef 175 eEjlIivaleRt lhvelling lHlit5 (EDU) .....tiel!. will inercase iRe Jleptilatiell. by -\-,...J;cimately 1128 peIll811.5 (3.QQ7 pmeII.5 per dwelling 1lfIit). f.eeertliftg 16 City sta!lEiaftls, this J'lBpu\aaBft will lBE!uire lIB additienal 2.11 eftieeP.l (1.38 eftillel'Sll,IlQll eitiDens) phiS IlJ'lIlfel8mately 2.8 SIiflJ'l8f'l staff 16 R1aintaiB eanaftt levels ef peliee serviee. In additiBfl, ap}3ftlllimately 111.5 ~ feet of peliee faeilities ....-kl be reljuiFeEI t6 h_ the aEldhi8IUII 2.0 OffiOOfS (122.25 SE}lIiIfe feet per effj6e~. Since the anoroval of the EastLake Business Center II oroiect in 1999. the CWD has had a nearly 30% increase in officer staffir1l!.. The denartment is orooerlv eouiooed and staffed to meet Priority I thresholds. however in orevious years. the number of actual on-dutv staff was substantially lower than the number of authorized and/or employed oatrol officers: it aooeared that orioritv II thresholds were not met as a result of the. low actual owutv staffin!! levels. The Denartment lias recently reached full authorized staffinI! and exoects a full comolement of trained Datrol officers to be worlcin!! in the field. In addition. the new headauarters facility at 315 Fourth Avenue is exoected to be adeouate throul!h the build-out of eastern Chula Vista. Althoul!h the overall number of calls fOT service. as well as the number of Prioritv II calls have not increased durin!! the oast reoortin!! oeriod.. Prioritv II CFS to the deoartrnent's larI!est l!eol!l1lDhical beat - beat 32 - increased 9"10 since the last reoortin!! oeriod. The deoartment oroiects that additional staff mav be necessarY for at least one additional beat in the Eastern oart of the City. 5.3.1.5. DEVELOPMENT PHASING The EastLake Business Center II parcels are within the Priority I response time that meets the Threshold Standards. 5.3.1.6. FINANCING POLICE FACILITIES In January, 1991 the City of Chula Vista City Council adopted Ordinance No. 2320 establishing a Development Impact Fee to pay for various public facilities within the City of Chula Vista. The fooilities are lBE!lIired 16 SUPJ'lBfl future ElevelepRlBBt withiR the City aftEl the fee seheEittie has beell. aElBjlteil in aeeeffiaftee ....oith Ge"leI'lIRIeIlt Celie SeetiSfl 66llQQ. The p10fl8se6 HeW fee is t2,618,OO per equF,'ftIeIlt dwelling 1lfIit. The Public Facilities Develomnent Impact Fee (pFDIFl is adiusted every October I- pursuant to Ordinance 3050. which was adoDted bv the City Council on November 7. 2006. The current fee fOT commercial (includilll! office) development is $25.874/acre and industrial develooment is $8.173/acre. This amount is subiect to chmu!e as it is amended from time to time. Area A is built out and will not be oblil!ated to DaV PFDIF fees. Area B and C will DaV PFDIF fees at the time buildin!! oennits are obtained. At the current fee rate. the estimated oblil!ation for Area B and C at buildout is $41.724.00 (see Table 5_8)3. . 3 Fee based on Form 5509 dated 9(2.5(2.007. Actual fee mav be different. DI.... verify with the City of Chula Vista at the time ofbuildinl! nennil. 39 EastLake Business Cent" II Supp_ta1 PFFP Amendment Resolution No. 2007-299 Page 2lie pameR sf Yie fee attributaBle te the peliee seMees iR the pfElflesed pregf&ffi is !:73S,(JWU. The BastLllke BllSiReSS CMtel'II I'rojeet is \vitfiiR the bellnsaries efthe Publie Faeilities DW Pragffllll aria, thefElfefe, the JlfEljeet ...AlI be suiljeet te tfie l'lIyftIeHt sf the fee at the fate iB e:f:feet at the time l":IildiBg pel a~its are iSS\:lea. At the elIffe8.t fee rate, the B85t T Rlre BlI5illess CeJlter II SlIpJllemeJltal SPA PllIft ebligeasll iii ellilEloot is $319,125.9G TABLES 4 POLICE FEE FOR BUSINESS CENTER II Peliee Fee @ PeUe! Fee fer' DevelepBleRt Phase ElJY's East1 - lie BlI5iBaI $73SJEDY eellter R EsstLshe HusiBeBS ~ 531\l,12! ~19,11! Cell.er II EDD's hB5eEl 8B 5 s~J.'elli8g Hfli1s J'er gFeas aere miRl::Is Inihlis streets. Development Acrea2e Police Feel Police Fee for Area Industrial Acre Area B & C AreaB&C 27.36 $1.525 $41.724 TABLE 5-8 POLICE FEE 5.3.1.7. THRESHOLD COMPLIANCE AND RECOMMENDA TJONS The City will continue to monitor police responses to calls for service in both the Emergency (priority one) and Urgent (priority two) categories and report the results to the GMOC on an annual basis. IB. adElitisB, the fellawieg requifElmellts shall ee adElfessed: Compliance will be has been satisfied with the payment of Public Facilities Fees. The I'feflSsed project will ee was required to pay public facilities fees for police services based on eEllli...alellt lIwelliBg 1mits ey Ele"/elsfllfleHt pftll5e at the rate in effect the time building permits life were issued. Rernaininl! unbuilt lots in Area B and C will nav current DIF fees at the time buiIdinl! oennits are issued. Currently, the police department is addressing the threshold standard for deficiency by flFel'arJlg a ISBg I'llIlge reauestinl! fundinl! for a 5-vear strategic plan lIftd a l'eliee faeil~ RlllSteF l'lllft. The strategic plan will evaluate service levels, staff levels, methods of development, and any other factors related to service delivery. This will alsa iBelude en C'lallllltioo of the e!ltablished thresheld, "l..Jtiell may Beee te be adjlistea. The flllblie faeilify m85ter plan ".~.;11 8atlress t8e pessihility sf re)eeatmg tlie eatTeRt l'eliee faeility te a maPe eeBt:F&Ileeatief.l. 40 ElIstl.ab: Business Cenla" D Supplemental PFFP AmaKlmcnt Resolution No. 2007-299 Pa~l.~ FIRE AND EMERGENCY MEDICAL 5.3.3.1. THRESHOLD STANDARD: Fire and Emergency Medical Services are provided by the City of Chula Vista Fire Department (CVFD). Emerllencv Medical Services (EMS) is provided on a contract basis with American Medical Resoonse (AMR). The City also has county wide mutual aid agreements with surrounding agencies should the need arise for their assistance. The purpose of the Threshold Standard and the monitoring of response times is to maintain and improve the current level of fire protection and emefgeaey meaieal sef'Viees (EMSj in the City. Fire/EMS facilities are provided for in the 1997 Fire Station Master Plan, E1ateEl Mareh 23, 1989 as amended. The Master Plan indicates that response time is primarily determined by the number and location offire stations. The Fire Station Master Plan evaluates the planning area's fire coverage needs, and recommends IlH eight a nine f2:Lstation network at buildout to maintain compliance with the threshold standard (see Table 5-5). Emergency response: Properly equipped and staffed fire and medical units shall respond to calls throughout the City within seven (7) minutes in ~ 80 percent (current service to be verified) of the cases (measured annually). 5.3.3.2. EXISTING CONDITIONS: Clll'feHtly, tfle City efClIlIIa Vista Fire Dejl...t.-...eet (CVFD) J3rsviaes t'NS fire faeilities 16 serve the BIIiltLak-e area. These ,,",va faeilities are Fire Statisa ~le. 11seateEl at 861 Otay Lakes Reaa llB6 lfiteAm FHe SmtisD }ls. 6 Iseatea at 97S Lane AVeBue. Fire Statisn ~Ie. 1I'fs-:iaes haelmp ane slippeN 16 lMeftBi 1>Je. 6. City staff reeently eSHlflletea the 1998 Fifll Statisn Master PlllH UJ3l1ate WIDell is r8j3ofteEl te atieql:Hltely adEifess future fire neeEls. The 1:IJlElate may ee eSflsiaereEl fer atieJ3tien ey the City CS1:Ifleil in the Belli" future. There are currentlv eillht (8) city stations and one (1) fire orotection district station serving the City of Chula Vista. The existinF: and future stations are listed below: 41 ElIsIl..H Business Center II Supplemental PFFP Amendment Resolution No, 2007-299 Page 236 TABLE 5-9 FIRE STATION INVENTORY CHULA VISTA EXISTING FACILITIES !alio # I & Fi Preventi B u tali n #2 la' nll3 S 'on#4+FireT ' in Tow tali #5 t om lion Stion taR h tati #8 oods Fir tation COUNTY FIRE PROTECTION DISTRICT FACILITY' Bo 'talSu side Fi tecti n Di LOCATION 447 "F" Street East" " Stree ]410 ran OP Ran 0 39 xfl 605 Mi el Rd 640 taV ' 1180 W 400nlt d S tion # to be r nstru tati 310xflrdS ED COST ESTIMATE' 200 000 N blis ed PLANNED CHULA VISTA FACILITIES ornER CAPITAL IMPROVEMENTS Pu lie C mun; ns Publi Saf< Communica' ns 8 B En' s Dis the ter C" ide tern "es 612 0 one E ab' hed o 5.3.3.3. ADEQUACY ANALYSIS: T..Y6 fife staaens are in elese preximify te the pF6jeet ::lite. Oae, a t~efBI'Y faeility, is leeated iR the EastLake BU5iRe~s CeBtef, immediately edjlleeat te the pre,jeet site. The statioo ':.ilI Be releeatea t8 a Bev: j'alRi8fteftt site 85 the City's Fife !4aster Plan. is implemeated. The !iBalleeatien efthe B~"ll'eHi1tlfieRt site Bas yet 18 he eeteP.miBea. It is anaeipatea Ylat 1fte site ...-All he iB alese ~Rm:imity t8 E85tl..ake BliSiaess Cefttef. ~\ seeeRs stalieR is lee&tetl BJlPfEllfimately 5 miRlites eway eR Otey Lakes Reae, SEllHh Elf Bast "II" Street. This stalieR is flllHHled Ie Be releeeled Ie the R_ehe del Rey eemmunity te tile \vest efBastLake. The Blisifless CaRter II Jlftljeet is ..vithiB the enistiRg Fire aHtI EMS Faeility reDpElllSe tillles that meet tIie ~esilelEl ~taBdarEls. The CVFD currentlv serves the EastLake Business Center II area. The closest CVFD stations to the oroiect site are: . Fire Station #8. the "Woods Fire Station" located at 1180 Woods Drive (this station would resoond first). . Fire Station #6. located at 605 Mt. Milruel Road. · The City of Chula Vista has an Automatic Aid A=ent with Bonita/Sunnvside and the cities of National Citv. Imnerial B,.Ar.h Coronado and San Dielm. , Cost Estimates are aDDToximate fil>UTeS and subiect to refinement bv the City of Chula Vista. 42 EastLake Business Ccmcr n Suppl<l11Cllllll PFFP Amendmart Resolution No. 2007-299 Pag~ 237 Fire Station #7. located at 1640 Rancho Venetia Road. Otav Ranch VilllU!e 2. . Fire Station #4. located at Paseo Ranchero. Rancho Del Rev The Fire/EMS resoonse time threshold was met for calendar vear 2006. This is the second vear in a row that the CVFD met the threshold even with a substantial increase in the number of reDorted emenzencv calls. Disoatch time imoroved silmificantlv with full operation of its disoatch center. TABLE 5-9A FIRElEMS - EMERGENCY RESPONSE TIMES SINCE 1994 Years Call Volume % of All Call ResDoDse Within 7:00 MiDutes CY 2006 10390 85.2% CY 2005 9.907 81.6% FY 2003-04 8.420 72.9% FY 2002-03 8088 75.5% FY 2001-02 7.626 69.7% FY 2000-0 I IJ28 80.8% FY 1999-00 6654 79.7% CY 1999 6344 77.2% CY 1998 4..1 19 81.9"10 CY 1997 6.275 82.4% CY 1996 6.1 03 79.4% CY 1995 5.885 80.0% CY 1994 5,701 81.7% Source. GMOC 2007 Annual Renort 5.3.3.4. FIRE & EMS F ACIUTY REQUIREMENTS: f.nRelI:!ltian af Business Cemer II iRte ElIStLaI,e II ana its saesequem ae'leleJlHleftt wellia Bet ehaage the Bees fef fiFe sendee in tke area as pfevie\:lsly &ftaly~eEl iB the BastLake IIIIOl)'ftlflie TflliaiBg Cerner EIR ECity af Cffitia Vista 19911). The Chula Vista Fire Department currently meets the standard threshold for fire protection for the EastLake II area. The station nearest to the EastLake Business Center II project is Fire Station #8. This station is within the EastLake Woods neighborhood aooroximatelv less than a mile from the oroiect area. lBtefim Fife SmaeH }le. 6, laeatea at 973 LIlBe Avefttle in Btisiaess Cellter 1, weHla 'Be the Jlfimary stat:iaH ta serve Btismess Cemer H. In the lE1Bg refill, Fife Sma en }la. 6 will 'Be releeatea ie East "J.{" Street ElBa Sll!l Migliel RaaEi ana Fire StatieR }la. g '.,ill be eenstruetea fer the Salt Creek Raneh -:.hell EastLake Tfllils is full)' aeyelaJlca. 43 EastLoke Businas Cad<r II Supplemcntll PFFP _I Resolution No. 2007-299 Page ~?1.3.6. FINANCING FIRE & EMS FACILITIES: In January 1991, the Chula Vista City Council adopted Ordinance No. 2320 establishing a Development Impact Fee to pay for nine categories of public facilities within the City of Chula Vista. The facilities are required to support future development within the City and the fee schedule has been adopted in accordance with Government Code Section 66000. "The fees "-,;ere HJlsllteEl BY asepBe8 ef OfEliflllflee }le. 2551 e8 AJlriI 27, 1993. The pfElpeseEl 86';; fee is $2,61 g J9er eEjwvalelit E1welliBg llflit. The Public Facilities Develonment Imoact Fee CPFDIF) is adiusted everv October Is1 oursuant to Ordinance 3050. which was adooted by the City Council on November 7. 2006. The current fee for commercial (includinl! office) deyelooment is $25.1 81/acre and industrial deyelooment is $8.173/acre. This amount is subiect to chanl!e as it is amended from time to time. Area A is built out and will not be oblil!ated to nay PFDIF fees. Area B and C will nav PFDIF fees at the time buildinl! permits are obtained. At the current fee rate. the estimated oblil!ation for Area Band Cat buildout is $16.470.00 (see Table 5-10)6. The peltieR efthe pfElpeses fee attRbl!tlll:lle fer Fire MS EMS is $2lB/EDU Dew,elepIBeRt Fife Fee @ Fife & EMS Fee EDU's $293/BDU Per Fer BusiBess Phase CeRter II Business Center II ~ $96, 125 $96,125 TABLE 6 6 FIRtilEMS FEE FeR BIlSINESS CENTER n FDlJ's eBBes 8B ! d'.veUing lIBits per gress BeFe minus puelie stFeet6. DeveloDment Area Acreal!e Fire & EMS Feel Police Fee for Industrial Acre AreaB&C AreaB&C 27.36 $602 $16.470 TABLES-IO FIRE & EMS FEE FOR BUSINESS CENTER II Area B & C By prior agreement, the EastLake Development Company established a credit in the amount of $616,153.00 by establishing the temporary fire station io the EastLake Busioess Center. In recognition of the cost of this facility, the City has been providing credits towards the payment of the fire component of the Public Facilities DIF amount. .\s ef Septemeer 39, 1999, the remaiBiftg _E1it balBBee 'NlI5 $335,5&1.79 (per Bell BeefttiIIl, City ef Cffillll Vista). It is iBteHseEI that the are eelBpBBeHt ef the PFDIF ealetilated iB taBle 5 5 aeol';e ,;;ill furlter retktee this eFeait 'ealmee, if &ftY. The Jlftljeet -:1i1J be SHbjeet te the J'lBYftItlftt ef the fee at the fllte iB. eWeet at the time pemHts &Fe is5tieEl. .4A die etift'eBt fee f8.te, the E8:Stlake BusiBess CeIlter II eldigaBsB at bwldeut is $96,125. · Fee based on FOIlll 5509 dated 9/2Sn.007. Actual fee mav be different. nlease verify with the City of Chula Vista at the time ofbuildin2 nennit. 44 EastLakc Business Cemor n Supplemental PFFP Amondmcal Resolution No. 2007-299 PagS3~.7. THRESHOLD COMPUANCE ACCOMMODATION: The City will continue to monitor fire department responses to emergency fire and medical calls and report the results to the GMOC on an annual basis. Remaininl!: unbuilt lots in Area B and C will DaV current DIF fees or apolv available credits at the time building pennits are issued. lR &ElEiiHeB, the falle..viag reqliiremeBts shall be adEireGseEi. The BllsiRess CeRlier II ".vill "be eElBeliti_Ei t8 PB)' Jlli"blie faeilities fees at the Rite iB effect at the tilBe i'nlileliRg pefIIlits lIf'e iSSlleEi. The!le fire eaBelitiaftS are alsa EieGeri"bee in the Piilllie Faeilities FiBeneiag PlllIls (PFFP) far the Ba9tLake II 8P f., ';;hieD eeseribes p\;!"blie faeilities fees fer fire anti eRlergeBsy meaieal sen'iees eases 6ft eijl:1:h.aleat d'.velliBg \mits by Eie'lelapmeBt pDlISe. IBellisiaB afthe J'lf6jeet ift the PFFP wallie allew acceptable fire p:reteetien. respense times ia the area atel:lilas1::It. 5.3.4. SCHOOLS The proposed project will not generate an increase in dwelling units or population in the project area. Therefore, the Prim: annexation of the business park into EastLake II. the conversion of 16.7 acres of industrial land to commercial use for Area A. the chanl!e in land use district desil!nation for Area B and C. and the proposed five stOry hotel and four stOry office buildinl! on Area C will not result in a need for new or altered school facilities or services. 5.3.5. LmRARIES: The proposed project will not generate an increase in dwelling units or population in the project area Therefore, the annexation of the business park into EastLake II and the conversion of 16.7 acres of industrial land to commercial use for Area A. the chanl!e in land use district desil!nation for Area B and C. and the proposed five story hotel and four stOry office buildinl! on Area C will not result in a need for Library services. 5.3.6. PARKS AND RECtmATlON: The proposed project will not generate an increase in dwelling units or population in the project area Therefore, the annexation of the business park into EastLake II and the conversion of 16.7 acres of industrial land to commercial use for Area A. the chanl!e in land use district desil!nation for Area B and C. and the oroPOsed five story hotel and four stOry office buildinl! on Area C will not result in a need for new parks or park services. 45 EastLaJc. Business Cmlc:r n Supplemental PFFP Amendment Resolution No. 2007-299 Page 240 5.3.7 WATER 5.3.7.1 CITVTHRESHOLD STANDARDS: A. Potable Water: Objectives and thresholds for water quality and availability have been determined by the City of Chula Vista. To ensure that water quality standards are not decreased during development and that adequate storage and construction of facilities occurs concurrently with growth, the City of Chula Vista requires a service availability letter from the water district for each project. A 12- to 18-month development forecast from the City and the County Water Authority (CWA) to the Otay Water District (OWO), requesting information on water availability, current capacity, storage capacity, and quality is also required. The Growth Management Oversight Committee (GMOC) reviews impacts to water availability and quality on an annual basis, after reviewing the water district's response letters. The GMOC then presents its reports to the City Council ofChula Vista with its determination. B. Recycled Water: Currently, the City of Chula Vista does not have threshold standards for Recycled water quality and availability. 5.3.7.2. EXISTING CONDITIONS: A. Potable Water: The approximate 104.7 gross acre (74.8 net acres) EastLake Business Center II is located within the OWO Central Service Area and is incorporated in Improvement District (1.D.) 27. Pursuant to the Triad Agreement, that was entered into between the EastLake Company and OWO on May 31, 1989, all parcels within the EastLake Business Center II are required to annex into OWO's Improvement District (I.D.) 22 prior to approval of plans or water service being available. The Triad Agreement established a capacity fee per EDU for the majority of the EastLake development that is intended to fund construction of regional storage facilities. As shown in Table 5-6 11, the Triad Agreement includes 9,355 EDU's for the EastLake development. Of this amount, EastLake has constructed 2,731 EDU's in the Greens subdivision and is currently developing 1,481 planned EDU's in the Trails subdivision. Additionally, EastLake has relinquished 1,450 EDU's back to OWO. Per the agreement, all of the planned Business Center II, totaling 648 EDU's, will be counted against the total EastLake EDU allocation in the Triad Agreement and will be required to pay capacity fees as specified in the agreement. 46 EastLakc Business Ccntor II S_\cmaltal PFFP Amendmen' -.-..-- ,. Resolution No. 2007-299 Page 241 TABLE S-4t 11 EASTLAKE TRIAD AGREEMENT EDU BALANCE Existing and Business Total Approved Center II" Relinquished" Subtotal Allocation Remaining Develonment 4,212 648 1,450 6,310 9,355 3,045 . EDU's based on conversion factor for commercial development equal to 6 EDU's per gross acre as given in the Triad Agreement Per July 2, 1996 letter from EastLake Development Company to Otay Water District .. Potable water is provided to the Central Service Area by the San Diego County Water Authority via the Second San Diego Aqueduct. Water is delivered at Aqueduct cormections No. 10 and No. 12 (former cormections No.4 and No.9) and is conveyed by gravity to OWD's emergency/operating reservoirs at a grade of 624 feet. Water is then pumped from the 624 Zone to the 711 and 980 Zones. The Central Area Pump Station located at the Patzig 624 Reservoir site, pumps water to the 711 distribution system and storage reservoirs. The 980 Zone is supplied by the EastLake Pump Station, which lifts water from the 711 Zone distribution system to the 980 Zone distribution system and storage reservoirs. There are two existing reservoirs in the 980 Zone system, designated as the 980-1 and 980-2 Reservoirs. The reservoirs are located within the Otay Water District Use Area situated north of the Rolling Hills Ranch development. The reservoirs have a capacity of five million gallons (MG) each for a total of 10 MG. Potable water Sail be is delivered to the EastLake Business Center I1 through existing transmission mains in Lane Avenue and Otay Lakes Road. The prspsseEl on-site distribution system wiH connect~ to the 20-inch 980 Zone main in Otay Lakes Road and the 16-inch main in Fenton Street. Connections to both existing transmission mains eIIIl be made lIS paFt sf Phase 1/. EIe'lele}lmeftt, pre';iEliftg provides redundant sources of supply to the project. B. Recycled Water: Recycled water supply is currently available to the EastLake area from the 1.3 million gallon per day (mgd) capacity Ralph W. Chapman Water Recycling Facility located near the intersection of Singer Lane and Highway 94. Recycled water is delivered to storage ponds located in OWO Use Area situated north of Proctor Valley Road. The ponds operate with a high water level of approximately 950 feet. The EastLake Business Center II wiH receive~ recycled water from the existing 20-inch 950 Zone transmission main in Otay Lakes Road. Supplemental recycled water supply 'nill be iLavailable from the City of San Diego's plfllU\eEl 7 is mgd capacity South Bay Water Reclamation Plant, which has lIIi IIfttidflateEl e8ffi}lletieB Elate efyeM 2QQl. was comoleted in 2002. The plant .....il! be is located in the Tijuana River Valley near the Mexican border. Construction of the suoolv-link oroiect oioeline bel!an in October 2005 and was completed in the SoriDlr of 2007. Deliveries to 47 EastLako Business Center n Supplemental PFFP Amendment Resolution No. 2007-299 Page 2(l)Wo will be pumped up 16 tae pI_eEl throul!h the sutltllv-link pipeline to the 680 Zone Recycled Reservoir tEHle located in EastLake Greens. . own will. RIFle has the option of pumping recycled water from the 680 Zone reservoir to supply 950 Zone demands. 5.3.7.4 WATER FACILITY REQUIREMENTS A. Potable Water: Water demands for the EastLake Business Center II were projected using Wlit water demand factors in the EifBft Sub-Area Master Plan (Iflaft SAMP) for the EastLake Business Center IT project by John Powell & Associates, August 1999. An Otay Water District approved SAMP 'Nill he ill required prior to processing water improvement plans. Water demands for the development were projected using Wlit water demand factors from own's Water Resources Master Plan (Master Plan). Pre]'leseElland Land use within the Business Center IT '.vill he el[eIti5i..'ely is oredominately industrial with some limited commercial designations. The Jl61aBIe YJBter 8em!lllEl is SUIllIlllIriz,eEl in tile fellewiBg table (fa&le S 7). TABLE S 7!! EDU's FeR WATER USAGE 1- I:;:: I ::: I Bqah'sleBt P'::elliBg lJaits (EDU's) BB:gea 8ft eeJl.efSisR fae1:er sf' BDU's per gress aM 85 speeifiea in Triad AgpeelBeftt EDU's 64&G Table 5-8 12 presents the unit water demand factors and projected average annual day (AAD) water demands for the 1999 SuoolementaI PFFP development. Table 5-13 nresents the redUced unit water demand factors (from OMWD) and reduced proiected AAD water demands for the 2007 PFFP Amendment Land Use Gross Area (acre) Unit Demand (gdp/ac) AAD Demand (gdp) Industrial 104.7 1,250 135,000 TABLE 5-3-12 1999 SUPPLEMENTAL PFFP AVERAGE ANNUAL DAY W ATERDEMAND PROJECTION Land Use Gross Area (acre) Unit Demand (2dn/ac) AAD Demand (2dn) Industrial 84.0 893 75.012 Commercial 16.7 1.785 29.810 Total 104.7 ---- 104.810 TABLE 5-13 2007 SUPPLEMENTAL PFFP AMENDMENT AVERAGE ANNUAL DAY WATER DEMAND PROJECTION 48 EastLIkc Busu- Center n suppl_ PFFP AmcndmcDt Resolution No. 2007-299 Pag~tie 5-9 14 provides the peaking factor used and the projected MD demand for the 1999 development. TABLE 5-914 1999 SUPPLEMENTALPFFP MAXIMUM DAY WATER DEMAND PROJECTION Business Center II Ultimate Zone AAD Demand AAD Demand* d d 135,000 9,780,000 1.8 Business Center II MD Demand (gdp) 243,000 MD Peaking Factor** Entire ultimate 980 Zone demand from Table 4.4 of the J 995 Otay Water District (OWD) Master Plan .. Based on ultimate Zooe AAD demand . The own has indicated that they have adeouate potable water service and lonl.!-tenn water storalre to accommodate the proposed amendment to the PFFP (see Aonendix B - letter to Ben Guerreo. City of Chula Vista. from David Charles. Otav Water District. dated Mav 14. 2007). Fire Flow Requirements Fire flow requirements for the Business Center II were based on requirements used for similar commerciaVindustrial development within OWD's Central Service Area as given in recent SAMPs in 1999. Table 5-141.2 gives the ftre flow requirements that was used in the Draft SAMP for the EastLake Business Center II. Land Use Fire Flow (gpm) Duration (houn) Residual Pressure (usi) Industrial 3,500 3 20 TABLE5-W IS 1999 SUPPLEMENTAL PFFP FiRE FLow CRITERIA The own has indicated that thev have adeauate ftre flow to accommodate the proposed amendment to the PFFP (see Aooendix C - letter to Ben Guerreo. City of Chula Vista., from Olav Water District Enl.!ineerinl!. dated June 14.2007), Table 54+ 16 projects the short-term storage requirements for the 980 Zone by adding storage requirements for Rolling Hills Ranch, EastLake Trails, and the EastLake 49 EastUke Business Center n Supp_tal PFFP Amendment Resolution No. 2007-299 Page 244 Develo ment Existing (1) RoIling HiJls Ranch (2) EastLake Trails (3) EastLake Business Center II TOTAL Existing Storage Stora e Deficienc 1) Per 1995 OWD Water Master Plan 2) Sub-Area Master Plan of Potable and Recycled Water fur Salt Creek Ranch, Wilson Engineering. April 1997 3) Sub-Area Water Master Plan for EastLake Trails, John Powell & Associates, September 1998 Table S-H-16 1999 SUPPLEMENTAL PFFP CENTRAL SERVICE AREA 980 ZoNE SHORT TERM OPERATIONAL STORAGE BALANCE Re uired Stora e G 5.58 2.87 1.11 0.32 9.88 10.0 None Recommended On-Site Distribution System The fee_eHaee existinl! on-site distribution system is shown in Exhibit '+ 2. Pipeline sizes were based on hydraulic calculations at the connections to the on-site system. The proposed system design would yield a minimum on-site residual pressure of approximately 65 psi. Analysis of Proposed Facilities The necessary area-wide water improvements (i.e., transmission mains, pump stations, reservoirs, etc.) to serve the Business Center II project have been physically constructed or financially committed. Sufficient water capacity and infrastructure exist to serve the Business Center II project. B. Recycled Water: Within the EastLake Business Center II, recycled water will be used to irrigate a landscaped areas, including lawns, planted borders, and road slopes and medians. Based on unit demand factors given in the Master Plan, average annual day recycled water demands were computed for the ]999 project, which are presented in Table 5~ ]7. Table 5-18 Oresenls the reduced unit recvcled water demand factors (from OMWD) and reduced oroiected AAD recYCled water demands for the 2007 PFFP Amendment. TABLES-n17 1999 SUPPLEMENTAL PFFP PROJECTED RECYCLED WATER DEMANDS Percent Irrigated Unit AAD Land Use Area (ae) Demand Demand Irrigated Area (ae) (2dD/ac) (2dD) Industrial 104.7 10 10.8 2,230 24,084 50 E8stLaIce Business Center n Supplcmenlal PFFP Amcndmonl _. .--.J Resolution No. 2007-299 Page 245 Percent Irrie:ated !I!!!! AAD Land Use Area (ae) Demand Demand Irrie:ated Area (ae) ("dn/ac\ (e:dn) Industrial 84.0 ~ 4.2 2.155 9.051 Commercial 16.7 10 1.7 2.155 3.664 Total 104.7 5.9 12.715 TABLES-IS 2007 SUPPLEMENTAL PFFP AMENDMENT PROJECTED RECYCLED WATER DEMANDS Maximwn day and peak hour (PH) recycled water demands were computed using peaking factors given in the Master PIan. Peak demands are summarized in Table 5-B 19. ADD Demand d 24,084 TABLE 5-H 19 1999 SUPPLEMENTAL PFFP PROJECTED PEAK RECYCLED WATER DEMANDS MD Demand MD Demand PH Demand Peak Factor d Peak Factor 2.6 62,618 7.8 PH Demand d 130 5.3.7.5. FACIUTYPHASING: A. Potable Water: The project will ae was constructed b\IHt in four phases. Phase lA will includeg construction of the entrances to the project from Fenton Street, portions of the Fenton Street extension and Street "A" Harold Place. and the development of Lots I and 6 (located at the northwest and northeast comers of Fenton and Harold Place). Phase IB will consisted of the completion of the Fenton Street extension and the development of Lots 7 through 10 (included Area C and a portion of Area B). Phase 2A will included the completion of Stfeet "f." Harold Place and the development of Lots 2 through 4 (lots fronting on Harold Place are built out). Phase 2B construction will included the completion of gtreet "B" Showroom Place and the development of Lot 5 (fronts on Harold Place). II through 16 (Area A and B fronting on Showroom Place). Supply of potable water to the EastLake Business Center II wiH ae iLfumished from District reservoirs and pwnp stations and conveyed to the site by gravity through existing District transmission mains. Based eft pllHlBed gmllBll ele'lIltief15 '.vithiB the Bll5mess Ceftter, service Service to the site v;ill ae iLProvided from the existing 980 Pressure Zone. B. Recycled Water: The development of the EastLake Business Center 11 is lIflsefinea at this time site improvements has been completed. Please see discussion of Phasing under Potable Water above. 51 EastLake Business Calla' n Supplemental PFFP Amendment Resolution No. 2007-299 Page 2~~. 7.6. FINANCING WATER F ACIUTIES: A. Potable Water: There are two methods of financing and construction of potable water facilities for the EastLake Business Center II. These methods are as follows: I. Capacity Fees: OWD's Capital Improvement Program (CIP) provides for the design and construction of facilities by OWD. Through this program, OWD collects an appropriate share of the cost from Developers via the collection of capacity fees from water meter purchases. The capacity fees are collected upon the sale of water meters after building permit issuance according to OWD's fee schedule in effect at the time of sale. CIP projects typically include supply facilities, pumping facilities, operational storage, terminal storage, transmission mains. Specific CIP projects, if required, are identified in OWO's approved SAMP. 2. Exaction: The Developer designs and constructs facilities that serve their development only. Upon completion, the facilities are dedicated to OWD. According to OWD's policy No. 26, OWD will provide reimbursement for construction and design costs associated with development of these improvements. B. Recycled Water: OWD will useg the capacity fees and exaction methods for the financing and construction of CIP Recycled water facilities for The EastLake Business Center II. 5.3.7.7. THRESHOLD COMPLIANCE: A. Potable Water: The Otay Water District's Water Resource Master Plan and the SAMP identify water facilities to be constructed that will provide the necessary water service to meet OWO criteria The facilities identified in the aforementioned plans life reEj\Ii.red te he were constructed as a part of the Drior development of the EastLake Business Center II project. The Developer shall request and deliver to the City a service availability letter from the Otay Water District prior to each final map. Provide water improvements according to a district approved Sub-Area Water Master Plan for the EastLake Business Center II project. B. Recycled Water: Provide Recycled water improvements according to a district approved Sub-Area Water Master Plan for The EastLake Business Center II project. Recycled water requirements for the project will be coordinated by the OWD and the City of Chula Vista. The phased construction of recycled water facilities, based on the approved SAMP, will be incorporated into the conditions of approval for a future subdivision map. These conditions will assure the timely provision of required facilities. 52 EastLake Busi.... Cen.... n Supplemental PFFP Amendmcllt ,. ~ Resolution No. 2007-299 Page 247 1:1 ,7~ ". 'i . I! J~'- , i1 ~A. '1 \.: if " .s ~.; J~ ! ,... , . Jj ~i't;\, . . .: $ No SCALE LEGEND . _ _ - EXISTING 980 ZDNE PHASE 1 PHASE 2 PHASE 3 "-r ,,', ,:;,:~,.;'_!J~;~.:";;~'~;;" ..<:::::,j/.,---, f:.: . :. ,\.1 ~ \ \ .#.~). ..,.... '. .f " . " .'.:?:'.?f>~~>".;~ {~?';;~~j.~:.~.:: .:./:j~(.";'::-;; .~"~ ,~,~~~~,~1j. .~' ~:.~.." \_,"1' _ j ~~~"!'_ .~..~'~:.~ ~,:~~,.,j.:~~~.~~'~';:'f~:~~' ..~. :~:::'}~"'.~?;~,;~'::.~. 5,_ I. "~k. ~ ~ ,.. RD o N ~ ~ I - ~. , )'~~ ~ . ~ / i ~ : EASTLAKE BUSINESS CENTER II SUEl-AREA WATER MASTER PLAN POTABLE WATER SYSTEM Exhibit 9 POIIELL P:\131\O:lOIDt8wIng&\131lXlOPOT.cdr Auguol6. 11199 53 EastLako Business Cada' n Suppl_ PFFP AmeDdmmt Resolution No. 2007-299 Page 248 W NO SCI\l.E LEGEND . - - - EXISTING eo ZONE PROPOSED ON-SITE . ~ . ,of? ~ . . it,..,...,; '$/' "" '" ..,.~'i!J'<" 'i"1 "'/.~ '., - :~:-..:~~f:. '~.~\,~~~tf:~,~~~;j~::': - ':".. " .' .~ ~'::&f,;. '.- ,', . 1",,'''' . ::~t...;. .:~.: h"'~'i,:;ltt;;....~,"..~~. ..~~,? Ii:' .~. . "'~ ',' ." . , " .:...'~~ j .~-~:;~.o:!.'..;.p... ~...:... ;. ,1-;.:, ....~ ~~..'..... . ..' . ::1 "".\1 """'..,,'~ ", ...<.,'~}~~/I.' ."'~.l.i" .~~~ tt..; - ~ .'" ," '. . 'I j: I',:". .:;::'':,. :",;:,~..:~.:......-t".....;'-;....~~..:.r~: '...".s.. .J . .~'.",: ,~ ' .~ ~...,~. ~~....._~.....: ..... :.l"~'''' .~... " ".. ',. '.u' ...~" . ~. .t ' .1.(~..:.:~l.;1.~~~.~f:..~ .J).:.~;.~...~.~~~..~ . Ii" '.I';''.;~' 7'" ." ...;' T~ t. :....t:;'. '~;. .~.';.~.~:. ,~,:; .~:' ~: fr~(>-~":;':.: .,~~ :;f. ;,,' 'j "_ "~:~.i:.;.. ~-! _.. ". "Y..i;.....~":!..\;:/ ,.~..,;.. 'J.-';' .....l,:1 :..-....:r;.. ..~'l.r"i-':~:'.'t....,.';"~,II. ~..;.-..;:..:~.....~: .~..'.....r':E.~.""'~"".::.~"'... '..7.~1..'":" ...~::-' ....... '~":<':';~~:l" RD rtJ:t: ,. i \, ", \ \ '" .' ! ~ I ~ . I w . i .~ , ,. , '. I...,., . !to o,.,....,iJol<ES CONNEC11ON EASTLAKE BUSINESS CENTER II SUB-AREA WATER MASTER PLAN RECYCLED WATER SYSTEM Exhibit 10 NOTE: PHASING OF PIPElINES WILL COINC1OE WITH PHASING OF POTAIIlE WATER PIPELINES AS SHOWN ON FIGURE 3.2. POIIELL P:\1311D3Cl1Draw1ng113103llRW.cdr Auguat e, I. 54 EostLab B1IIiDeu Cam n Suppl<:moml1 PFFP ,lm_,,- Resolution No. 2007-299 Pagg3:tr. SEWER 5.3.8.1. CITY THRESHOLD STANDARDS: Sewage flows and volumes shall not exceed City Engineering Standards as set forth in the Subdivision Manual, adopted by City Council Resolution, as amended. The City annually provides the San Diego Metropolitan Sewer Authority ("Authority") with a 12- 18 month development forecast and requests confirmation that the projection is within the City's purchased capacity rights and an evaluation of their ability to accommodate the forecast and continuing growth, or the City Engineering Department staff gathers the necessary data. The information provided to the GMOC includes the following: . Amount of current capacity now used or committed. . Ability of affected facilities to absorb forecast growth. . Evaluation of funding and site availability for projected new facilities. . Other relevant information. . The gftlvr.h fareeast Ma .-\1:1tfterity respel15e letters shall he pre"'/ielea te the G~fOC fur iBelu.si8B in its r:e"';iew. 5.3.8.2. EXISTING CONDITIONS: The EastLake Business Center II project is designated and planned for Research & Limited Manufacturing uses. This Suoolemental PFFP Amendment addresses the removal of 16.7 acres of Research & Limited Manufacturinll and convertinll it into Commercial Retail. If aooroved. approximatelv 84.0 acres of Research & Limited Manufacturinl! will remain. The project site consists of approximately 104.-7 ~ss acres. which includes aDDroximatelv 4.1 acres of streets. with the pads having a net acreage of approximately 74.8 acres. Sewer service is the responsibility of the City of Chula Vista for the project. The City of San Diel!o Metro provides sewer treatment services for the City of Chula Vista and 14 other Darticioatinl!: al!encies in accordance with the terms ora multi-allencv alll'eement (Metro Ae:reement). The City ofChula Vista holds capacity rights of 19.843 mgd in the San Diego Metropolitan Sewerage System (Metro). The City's current average wastewater flow into the Metro system is H-:S9 aDDroxirnatelv 18.723 mgd (preliminary Sev,'er Repoft for Salt Creek BY Dudek & f.ssaeiates, September 1999) (GMOC 2007 Annual Report. bv the City of Chula Vista dated Aul!Ust 2007). Cftula Viste. has lIjI!'f6lfimately 7.23 RIgEl remaiBing ll'\'llilable eaJlaeity in the Metre Se'Ne!'. The Metro system currentlv has adeauate seweral!e treatment caoacity to serve the rellion until atlDfOximatelv 2025 when new treatment facilities are exoected to become operational. The City of Chula Vista. however. mav reach its contractual caoacity limits sooner than 2025. The Metro system treats its sewage at the Point Lorna Sewage Treatment Plant. The EastLake Business Center II project is located mostly within the Telegraph Canyon Gravity Sewer Basin and partially within the Salt Creek Sewer Basin. The City of Chula Vista requires that the sewer system be designed such that no diversion occurs. However, 55 EastUke Business CcnIOr n Supplcmcntall'FFP AmencIntart Reso]ution No. 2007-299 Page;1~ City Engineer may approve permanent diversion of certain lots provided specific conditions are met (see Section 5.3.8.3.E.) Most of the pF6flesea development, lots I through 12 (approximately 81.5 gross acres), eIIfl drain~ by gravity into the Telegraph Canyon Trunk Sewer located in Otay Lakes Road. This portion of the project lllIR Be is served by the existing IS-inch gravity trunk sewer in Otay Lakes Road that extends to a point east of Lane Avenue. A 12-inch gravity sewer line has been installed in Lane Avenue that connects into the sewer line in Otay Lakes Road. The 14-inch force mains from the Otay Lakes Road Sewer Lift Station discharge into the Telegraph Canyon Trunk Sewer east of Lane Avenue. Exhibit 9 provides a map showing the locations of existing facilities. A portion of the development, lots 13-16 (approximately 26.5 gross acres) on the easterly side of the project, lies within the Salt Creek Sewer Basin. This pemel!. ef the ae'l-elepfftellt ....ill Be Feftllirea to e6ftslfUet a gpavity sewer liM te the gait Creek Intel-septer. As 81!. a1temative, lets 13 Hi of the However. the site imnrovements for this area have been constructed and has been se':elel'fft8flt may connected to the Telegraph Canyon Trunk Sewer if the E1e'NBstreBlB ifftJlaet lllIR Be B881B'lltely eyallllltes ana mitigatetl. 5.3.8.3, FACILITY REQUIREMENTS: Wilson Engineering completed an Overview of Sewer Service for the EastLake Business Center II project dated October 5, 1999. The facility requirements are were based upon the findings of the aforementioned Wilson Engineering report and the City of Chula Vista Engineering Department Lots ] through ~ 1Q...of the EastLake Business Center II project eBB Be are served by gravity sewer lines that will collect flow and convey it westerly in Fenton Street to the existing 12,inch gravity sewer line in Lane A venue. All prel'esea 8-inch on-site gravity sewer lines are adequate prevised they life and constructed to minimum City of Chula Vista standards. Exhibit 9 provides the reeeHlHleaaes an illustration of the on-site sewer facilities. f.ltllllugh s8'....age flows ffem lets 13 tbfetlt;R Hi eeula Be eew/eyes to the TelegpapR C~.eft TP1H1lt 8er,,".w BY gm";ity, tBe City sees aet allevl the tHVefl9ieB sf :f1e~;J9 Hem efle se7:er boom. te 8fletker. 8e-J."er serviee te tkese lets ".\ill he ,re"Adea et1:fter ey eSnsL"1:leBBg a gravity se7Jer line that aIIS1VS tiHs ae~le]eJHBeBt 16 ]:,e selVed ~y the Salt C_k 1m-ereeptef il!. the future 61 BY eellBeetil!.g to the Telegpaph CllftYOB gH'.>ity eelleetiol!. system. 1ft the later ease the D8'ielel'er will Be reftlliFea to evaluate the impaet5 that this ael'/elepmeet has 8ft the ae-;m-sa-eam reaeftes sf the Telegmph CanyeR InlereBflter. All sewage discharged into the Telegraph Canyon Trunk Sewer shall meet the standards established by the Metropolitan Wastewater Department of the City of San Diego. All industrial establishments are required to obtain an Industrial User Discharge Permit or 56 EastLIIb: Business Ccntr:r n suppJementol PFFl' Amendment ~---- .-- -- ---- - - .' Resolution No. 2007-299 Pag~Jer from the Industrial Wastewater Control Program of the City of San Diego. The sewer service charges for this development will be assessed based on the quantity and quality of emuent that will be generated from the site. A. Design Criteria and Sewage Flow Projections The design criteria used for the Telegraph Canyon Gravity Sewer Basin is from the City of Chula Vista Subdivision Manual. B. Sewage Generation The sewage generation factors used to project average day sewage flows from the EastLake Business Center II is 2,500 gallons per day per acre. C. Gravity Sewers All gravity sewers within the project shall be designed to convey peak wet weather flow. For new pipes with a diameter of 12 inches and smaller, the sewers shall be designed to convey this flow when flowing half full. For new pipes with a diameter larger than 12 inches. the sewers shall be designed to convey peak wet weather flow when flowing three fourths full by depth. D. Projected Sewer Flows Based on the sewage generation factor presented previously and 74.8 net acres of proposed industrial development on the approximate 104.1 ~acre site, the projected average sewage flow for the EastLake Business Center II is ~ .231 mgd and Re the projected peak wet weather flow is ~ .461 mgd7. E. Diversi8B 81 Se"'.ver FI&W5 If the Deyelejler Jlfepeses te diveR flews Hem the Salt Creek Sewer BasiR te the Telegmph CanyeR Ell'l:er BasiR ill the de'/elejlHl6Rt ef Lets 12 Ill, the Develejler shall eeB6liet a sll'....er sm8y. This stud)' shall Be suemitted te anti aflJlfEl'led BY the City ERgiHeer prier te the deyel6pmellt ee these lets. The stlidy ffiUst d6IB6R~l>,ite te the satisfaetioR ae the City EBgiBeer, that there is adeqll8te ellJlaeity ill the Telegmph ConyeR G1'll'iity Sewer LiRe. Shauld the stlidy det~",lkiae, that additienel1iJlgFlldes life Heeded Ie mitigate flew gefte1'llted jffim Lets 12 Ill, the De'ieleper shall pay fer alllijlgmEle eests BeyeRd these eests already id6f1tified iR the "Telegt'8jlfl ~'eR Sewer 8taEly BY WilIElaB Asseeiates, Elated 1992." The DeveleJler shall pay its fair share ee the 8JlpreJlfiate De'ieleJlmeB-t lmpllet Fee(s), as detefllliBed BY the City EBgmeer. 1 Proiected sewera2e flows from the Sewer Caoacitv Study for EastLake Desi!!ll District by K&S EIU!ineerin2 dated July 27. 2007. 57 EaslLak. Business Center II Supplemental PFFP Amc:ndmeJJt Resolution No. 2007-299 Page 25;3.8.4. F ACIUTY PHASING Phases lA, IB, 2A and 2B Left! III 12 ef Phase 28 eBB be !!3Lsewered te throu2h the Telegraph Canyon Gravity Trunk Sewer. Lets 13 Hi sf PRase 2B III'e witIHB the Salt Creek Sewer 8asili. The sewer system. sftall be aesigfleEl sueh that Be EIi'.'ersieB is alle'.veEI. 8e..,_ aivefSieB Hem Salt Creek Se'lIer BasiB te TelegHlJ3R 8ev:er BasiB fer Lets 13 III ef Phase 28 IIiflY be eeftsiElereti IIftt! aflPf6'.-ed by the City BngiBeer if the fellewiag itema are reselved te tile satiSfeetiSB sf the City Engineer: . CeBEhiet a sewer sWdy as dewlIftifte8 Ily tile City BBgifteer, eftlle e&tire leRgtR eftlle affeeted se':_ lilie eTeleglllflh C~'ef.l Gf6'/ity Sewer Lilie) te aemeftoh_te, te the satisfaeasn ef1:ke City EngiBeer, tAat tftere is aaeEitlate eapaeifr iflthat h85in. . Fay fer all lIflgRNIe eesft! lleyeM these eests alFea~y identified iB the "Telegt'8!'lR CIlfl)'eB 8ewer Study Ily Willdllfl Associates, date8 1992." . Par fair SBare ef tile al'l'fflllRate De'ieleflmeBt IlftIlaet FeeeD), as datefmifteti Ily tile City BBgiaeer. . :BSSN en the se7.'E!f stHEly ana 85 aeemea Beeessary l:1y the City eBgiBeef', 1:IJ'gFade, all se'.\,er liRe segmems isentifies. in said study as exeeediag City 8esige. aRteria far aeeep:HlBle se~Nef ~es:k f:le\'IS. 5.3.8.5. FINANCING SEWER F ACJLlTJES: To fund the necessary future improvements to the Telegraph Canyon Trunk Sewer, development impact fees have been established by the City ofChula Vista. The July 31, 1992, Telegraph Canyon Sewer Basin & Improvement and Financing Plan was prepared for the City of Chula Vista by Willdan Associates to establish a fee to fund future improvements to the Telegraph Canyon Interceptor System. This fee is required to be paid by all future developments within the Telegraph Canyon Gravity Sewer Basin to fund improvements required to serve ultimate development within the basin. City of Chula Vista Ordinance Number 2533 established the fee to be paid for future development within the Telegraph Canyon Gravity Sewer Basin that connect into the existing system. The efigiaalmetftod of ealeullltiag tile sewer DIF was Ily lISiBg a faeter of 19 EOU'sh!ere. Usifig the The current fee ~ $21(i59 $3.478/EOU, tile OW fer lets 1 i2.!f.....litllffi the Telegt'8!'lR ClIB'}-OB Sa'Net" 8asiB ia eatimllted Bt $1113,728. However, the actual sewer OIF will be calculated on the number of fixture units and is subject periodic adjustments. The number of fixture units for the EastLake Business Center II will be determined during the building permit process. f. "sf!iOft eftfie Ilfejeet (Left! 13 Hi) Yes ...JithiR the 8a1t Creek 8e--J:er Basia. If a sewer system sefVmg lsft! 13 III is aesigtle8 to fIe'l' iBte the 8a1t Cfeek Ee--....er BasiB, it ':lilllle feElllired te "aAieiptKe iB the Salt Creek Gfttvity S6'~r BlISm OW. Oft Oeeemller ll, 1991, the Chula Vi. City Cel:H'leil edepted DfEii_ee Ntimller 2617 '.vhieli estaeliwd the fee te Ile "aiel fer future E1e\'eleplfteftt '.vitbin the 8a1t Cfeek Gm'Aty 8e--:1ef BasiB. 58 EastLake Business Center II Supplememol PFFP Amendment ,. .J Resalutian Na. 2007-299 Pal\5~ii ~e elH'feBt fee, 3:2&1.99fH)U, the DIF for Lo~ 13 Hi within tBe Salt Creek Gmvity Se\ver Basin is estimates at $60,20&. IIevle~;er, the aeRlel Se"lJeT DIF .".;ill eale1:l1ated 8ft the Rl:1:IBBef ef fixture writs, the eHffeM fee iB effxeet, eel \vill be detelT.Riaea E1ming the !:Jlli18iag f._...oit proeess. SIHlSeli\leRt to the aforemeRtionea 1992 Telegl'llflh CBH)'on 8e',ver BasiR &. lmpre'..emeftt aHa Yin!IHeiflg PIBH, WillEl!IH &. Assoei&tes prepared !IH amended sma,. te address the imllllets of pllHll"ed flows Prom other bllsiI15 aHa to avvelol" II HBllReing plaB to eonsmtet the iml"m-,emeRts neeessitatea by these I"lIffijled flows. The Telegraph CIIflYOB PlHHl"ea Flews DIY is $560.Q~DU. The DIY fer Lets 13 16 within the Salt Cl'eelc Gravity SeYler Basin is estimated at U I &,729. 8imilar to the Salt Creek Gfa-/ity Sewer Basin DIY, the Iletual pllHl}!lea sv'.ver DIY will be ealelllatea on the _!:Jer of HlI!lIfe lIIlits, the e\:1ffeHt fee i-n effeet, ana -,\?ill Be aetermiRee1 aHfiBg the hailaiBg peffflit preeess. The BastLaI<e Business CeRter 11 pre-jest .....iII be su~est to HlOst if not all ef the Ilferemefttionea DIF fees, sinee the diversion eollld be tl'ellted lil,e }!lefffial'leflt pllffiped flows. The total fves to be paid shall be d6flefldeftt ll.pOB the fifIaI sewer system }!llan. 5.3.8.6. THRESHOLD COMPLIANCE: The sewer facilities to accammadate sewer flaws from the EastLake Business Center II praject have been identified. Generally, the City will nat allaw the design capacity af trunk sewers ta be exceeded. If the flows from the project are anticipated to exceed the design capacity af downstream sewers, the City cauld require the canstructian af relief lines. In same cases, the City may allaw the design capacity but nat the hydraulic capacity of sewer lines ta be exceeded at peak flaw before relief facilities are required. The EastLake Business Center II project shall pay fees pursuant to City of Chula Vista ordinance. ar pl'6,/iae 1NBk se''ver iffijlreyemems, as neeaed. The development of Phases 1.'\., I B lIfta 21. are net antieipated to the EastLake Business Center II oroiect will nat exceed City Sewer Threshald Standards. The Mal ffilljl fer the av..-elepmeRt sf Phase 2B shaH be ElesigBea SHell tflat as se....'1er dF.yersisB is 8118....:00, heT..ve\!&r, Se\-ler di-l-epsisa Hem Salt Creel, 86'.\'er Basin te TelegrllJlh Sewer Basin fer Lets 13 16 sf Phase 28 m~ be eeBSiaefeB ana BPl*9vea BY the City EBgifteer if the af9LemeB~6Bea items Rem 8eetiea 5 J .&.1. are I'esol>J6d to tfie s!ltisfaetion of the Cit). Ertgineer. Sewer fees will be calculated based an the number af fixture units far the EastLake Business Center II oraiect. Sewer fees will be determined durinl!: the buildinl!: oermit orocess. The Metra system currently has adeQuate sewerage treatment caoacitv ta serve the relZian until aooroximatelv 2025 when new treatment facilities are exoected ta became operational. The Cjtv af Chula Vista. hawever. may reach its contractual caoacitv limits saoner than 2025. The develooer shall Dav caDacitv fees at buildinl!: permit issuance. Deve1aoment shall nat occur withaut adeQuate sewer caoacitv as determined bv the City Encineer. Building oermits will nat be issued jf the City EnlZineer has determined that adeauate sewer caoacitv daes nat exist. All develaoment must comolv with the Municipal Code. soecificallv M.C. Sections 19.09.010 (A) 6 and 13.14.030. 59 ~ Business Center n Supplemental PFFP Amendment Resolution No. 2007-299 Page 254 Sewer Plan ---r------- i' ___ --T .. \ \,' \ . ) / \ \ ~ ~ ~ ~ ~\ \ . \ \ \ , , I I . . I . . I I I I I I f J ~ existing 8" existing 1 " ....--- .- ........ xlsting is'' Bus. Ctr. f SPA existing is'' ..t..~ ... Proposed Sewer E-.gT""-l' "'- 510_ <-- Existing Sewer _ _ pion Ioc:o_.....nd ~1D....._._<t. Flo"'Io~ T_ T'......... 10''''''",_ -.....~ ~E4STLAKE A planal COIIImllBIty by ne EatLake C....paDY Exhihit 11 Cin1il.a1d~ --- r..-,rj, j 'N-IIl 60 EoslLol<e Business ee.- n Supplcmcntol PFFP Amendment -.J Resolution No. 2007-299 Pag!l.3~. DRAINAGE 5.3.9.1. EXISTING CITY THRESHOLD STANDARDS: Objectives and thresholds for hydrology have been detennined by the City of Chula Vista. The Growth Management Oversight Committee (GMOC) shall ann~ly review impacts to hydrology on an annual basis to determine its ability to meet the City's goals and objectives. 5.3.9.2. EXISTING CONDITIONS: A Hydrology Study was performed by Hunsaker & Associates, August 31, 1999, to evaluate the pre-development and post-development flows discharging from the site. According to the Study, approximately 80% ofthe surface waters on site drains south and west to the Telegraph Canyon Drainage Basin while the remaining 20% drains south and east to into the Salt Creek Drainage Basin. Currently, runoff is conveyed directly to San Diego Bay through the city of Chula Vista. The project site currently discharges to several outlet locations generally located on the perimeter of the proposed development. Existing drainage improvements in the vicinity of the Business Center II development include an existing 48" and 24" reinforced concrete pipe (RCP) storm drain pipes within Otay Lakes Road. The 48" pipe drains towards the west and is part of the Telegraph Canyon basin. The 24" pipe drains towards the southeast and is part of the Salt Creek basin. In addition, there is an existing 36" RCP storm drain in Boswell Road and an existing 18" RCP storm drain in Fenton Street within the adjacent Business Center I development. Both the Boswell Road and Fenton Street systems drain into the Telegraph Canyon basin system site. 5.3.9.3. DRAINAGE F ACIUTY REQUIREMENTS: Diversion of drainage from one basin to another basin is prohibited. The project shall drain that portion of the site that is within the Telegraph Canyon Drainage Basin (Lots 1 through 12) to existing drainage facilities within Otay Lakes Road and Boswell Road. That portion of the project within the Salt Creek Drainage Basin (Lots 13-16) shall drain to existing drainage facilities within Otay Lakes Road and Hunte Parkway. Exhibit 10 illustrates the proposed project drainage facilities. 61 EatLake Business Cenlor D SUJll'Iemental PFFP Amendment Resolution No. 2007-299 Pa!lf9W' SUPPLEMENTAL PFFP - Storm Drain Facilities: According to the prepeSe6 TetHati...e Map existinll olans the following storm drain facilities are prepese6 have been constructed: . Phase lA, Lots 1 and 6, shall drain to a public stonn drain pipe within the proposed Street A. This drain is Jlf6J3eseEl t6 be connected to a public stonn drain pipe to be located within Fenton Street and drains towards the west. At the subdivision boundary the pipe is directed south, exits the right of way of Fenton Street, and flows south across Lot K to Otay Lakes Road. This pipe connects to the 48" public stonn drain pipe located within Otay Lakes Road (Telegraph Canyon Drainage Basin). All fiffiife 611 site stonn drain pipes and facilities will require City Engineer approval. . Phase lB, Lots 7 through 10, shall drain to a public stonn drain pipe that is Jlf6J3eseEl te-8e constructed within Street B and Fenton Street. This pipe will convey~ runoff towards the west and eventually into the 48" public stonn drain pipe located within Otay Lakes Road. . Phase 2A, Lots 2 through 4, shall drain to a public stonn drain pipe to be located within Street A that drains towards the north. This flow is directed into a stann drain pipe that flows west across Lot 1 and Lot B to an existing 42" public stonn drain pipe located within Boswell Street (Telegraph Canyon Drainage Basin). . Phase 2B includes Lots 5, 11 through 16. Lot 5 will drai~ to the proposed stonn drain within Street A that flows north and west towards Boswell Street. Lots 11 and 12 will drain towards a stann drain system within Street B that connects to a pipe within Fenton Street and eventually flows into the 48" public stonn drain pipe located within Otay Lakes Road (Telegraph Canyon Drainage Basin). Lots 13, 14, 15 and 16 will Bet ElraiB t6WlIi'dS Street B ftlther they will drain towards the east into the Salt Creek Drainage Basin. . The project plans for new development shall demonstrate to the City Engineer that the proposed stonn drain system can adequately serve eaeh J3f6J38Se6 J3hase the oroiect. In accordance with the City of Chula Vista Subdivision Manual, the project shall provide on-site detention basins and sediment basins. as necessary. Detention basins shall limit flow rates to pre-development flow rates. Sedimentation basins shall provide adequate storage of sufficient duration to trap transported sediment. The location of proposed detention basins and sedimentation basins shall be delineated on the Grading Plans. All detention basins and sedimentation basins shall be designed to City Standards and to the satisfaction of the City Engineer. The City of Chula Vista Subdivision Manual requires on-site erosion protection. Erosion protection shall be delineated on Erosion Control Plans that accompany the Grading Plans. All erosion control shall be designed to City Standards and to the satisfaction of the City Engineer. 62 EastLaIce Business Ccnltr n Supplcmcntll PFFP Am_ .~ Resolution No. 2007-299 Pag'2~1 Amendment - Water Oualit)' The l'rsjeet shell esmply 7.ith all J3Fe-~'isieRs efthe }Jatienal PelIutant BlimiBatis:R 8ystem OWDB8) 8Bd the Clean Walei' Pt=egfllfB dHriRg aU "hftSes af a.e-/eleJ3ffieBt. Urban runoff discharged from municipal storm water conveyance systems has been identified bv local. relrionaJ. and national research orOI!l'lllllS as one of the orinciDaJ causes of water Quality problems in most urban areas. The Municioal Storm Water Pollutant DischBrl!.e Elimination System lNPDES) Permit (Municioal Permin. issued on Februarv 21. 2001 (Order No. 2001-01), and renewed on Januarv 24.2007 (Order No. R9-2007-0001)' to the City of Chula Vista. the County of San Diego. the Port of San Diego. and 17 other cities in the region bv the San Diego Regional Water Ouality Control Board (SDRWOCB). reQuires the development and implementation of storm water rel!.Ulations addressine: storm water pOllution issues in development plannine: and construction associated with private and public development proiects. The City reauires that sufficient information and analysis on how the proiect will meet the water Quality reouirements shall be provided as part of the Tentative MaD and/or Site Plan review process. In this manner. the tvoe. location. cost.. and maintenance characteristics of the selected Best Manae:ement Practices BMPs will be e:iven consideration during the proiect planning and desil!D. Therefore. the City reouires that orior to aporoval of anY Tentative Map and/or Site Plan for the proiect. whichever occurs first. the applicant shall obtain the approval of the City Ene:ineer of a Water Oualitv Technical RepOrt containine: snecific information and analysis on how the proiect will meet the reauirements of the City of Chula Vista Storm Water and Discharge Control Ordinance and the NPDES Municipal Permit (includine: the Final Model SUSMP for the San Diego Resrion). During the construction phase. the Proiect will be subiect to the reauirements of the General Construction Permit. The proiect will meet the reQuirements of the General Construction Permit bv implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) and incoroorating a combination of onsite source control. Low Impact Development (LID) BMPs and treatment control BMPs for the control of sediment and non-visible pOllutants. The site inspection reauirements and site-specific Storm Water Samplinsz and Analysis Stratee:v (SWSAS) reauired in the SWPPP will provide recommendations for storm water testing to evaluate the effectiveness of the BMPs. Adiustments to the BMPs will be made as necessary to maintain or improve their effectiveness. For undevelooed lots within the proiect area the use of LID BMPs can be effective in minimiziDlz the impact Qf urban runoff. LID BMPs help preserve and restore the natural hvdrolol!:ic cycle of the site allowinsz for filtration and infiltration which can l!:reatlv reduce the volume. peak flow rate. velocity. and pollutant loads of urban runoff. The completed proiect will incoroorate a Post-Construction Storm Water Operation and Manal!:ement Plan as a reQuirement for termination of coverage under the General Construction Permit. The completed proiect will also require treatment of runoff that 63 EastLakc Business Ccnt<r II supplemental PFFP Amendment Resolution No. 2007-299 Page 2a&urs durin2 the initial sta2e of a stonn event based on the numeric Sizin2 criteria established in the Municipal Pennit adopted bv the SDRWOCB on February 21. 2001. The comoleted oroiect will incoroorate a treatment train of non-structural and structural BMPs that mav include but are not limited to: Dropertv owner education. stenciled inlets. street and parkin!!: lot sweeoin2. landscapin2. biofilters. filtration devices. hvdrodvnamic seoarators. and/or drainalle inserts to meet the aoplicable reauirements of the General Construction Permit. the Municioal Permit. and the Model SUSMP. Biofilters. I!r8SS swales or smos. are flow-based site desil!ll BMPs that are desil!lled to remove sediment. heavy metals. and oil and lZre8Se from areas such oarkinl/: lots. Filtration devices are flow-based structural BMPs desil!lled to remove the following pollutants' sediment. nutrients. heavy metals. omanic comoounds. trash and debris. OXV2en demandinl!: substances. bacteria. oil. and !!rease. Hvdrodvnamic seoarators are flow-based structural BMPs desirned to remove sediment trash. and debris. Drainage inserts are flow-based structural BMPs desil!lled to remove trash and debris. Downstream erosion or increased runoff resultinll from the construction of this oroiect is bein!!: addressed bv detention basins that are orooosed in POllID Canvon. Wolf Canvon and Otav Vallev Road downstream of DroJlOsed storm drain outfalls. 5.3.9.4. FINANCING DRAINAGE FACILITIES: A. On-site facilities: City policy requires that all master planned developments provide for the conveyance of storm waters throughout the project to City Engineering standards. As such, the Developer will be required to construct those facilities through the subdivision exaction process. B. Maintenance of On-site facilities: Storm drain facilities not located within the right of way of a public street or easement dedicated to the City of Chula Vista shall be private and maintained by the property owners. These facilities include graded swales, concrete swales, drainage inlets, pipes headwalls, sedimentation basins, detention basins, etc. C. Off-site facilities: One or more temporary detention basins may be required fornthat portion of the site that drains towards Salt Creek and shall be constructed by the Developer. D. Maintenance of Off-site facilities: Stonn drain facilities constructed to convey, collect, detain or retain runoff from the project, that are not located within the right of way of a public street or easement dedicated to the City of Chula Vista, shall be private and maintained by the property owners. These facilities include graded swales, concrete swales, drainage inlets, pipes headwalls, sedimentation basins, detention basins, etc. 64 EastLake BusiDc:ss Ccnla n Supp1anelltal PFFP Amcndmcnt --~ Resolution No. 2007-299 Pall..e.2.5.9.5. ~ 3.9 THRESHOLD COMPliANCE: 1999 SUPPLEMENTAL PFFP The site shall be responsible for the conveyance of storm water flows in accordance with acceptable City standards, policies and requirements. The City Engineering Division shall review all plans to ensure compliance with City Engineering Standards. The Developer shall provide runoff detention basin and/or other facilities approved by the City Engineer to reduce the quantity of runoff from the development to an amount equal to or less than the present lOO-year frequency runoff and demonstrate the adequacy of existing facilities to the satisfaction of the City Engineer. The Developer shall provide sedimentation basins with adequate storage and sufficient duration to trap transported sediment. All sedimentation basin shall be designed to City Standards and to the satisfaction of the City Engineer. The Developer shall provide on-site erosion protection. All erosion control shall be designed to City standards and to the satisfaction of the City Engineer. The proposed development shall comply with all applicable regulations established by the United States Environmental Protection Agency (USEPA) as set forth in the NPDES permit requirements for urban runoff and storm water discharge and any regulations adopted by the City of Chula Vista pursuant to the NPDES regulations or requirements. Further, the applicant shall file a notice of intent with the State Water Resources Control Board to obtain coverage under the NPDES General Permit for Storm Water Discharges Associated with Construction Activity and shall implement a Storm Water Pollution Prevention Plan (SWPPP) concurrent with the commencement of grading activities. The Swppp shall include both construction and post construction pollution prevention and pollution control measures and shall identify funding mechanisms for post construction control measures. 2007 Amendment A. The EastLake Business Center II Proiect shall be resoonsible for the convevance of storm water flows in accordance with acce"table City standards. oolicies and reauirements. The City EDI!ineering Division shall review all "laos to ensure comoliance with City Enl!ineering Standards. B. The Develooer shall desil!O. install and maintain on-site erosion orotection. All oermanent or temoorarv erosion control shall be desil!Oed to City standards and to the satisfaction of the City En{!ineer. C. The orooosed develooment shall comolv with all aoolicable rel!uiations established bv the United States Environmental Protection Agencv (USEPA) as set forth in the NPDES oerrnit recnrirements fur urban runoff and storm water discharl!e and any regulations adonted bv the City of Chula Vista "ursuant to the NPDES rel!uiations or reauirements. Further. the anolicant shall file a notice of intent with the State Water Resources Control Board to obtain coverage under the NPDES General Permit for 65 EaslI..ak:e Business Cc:ntc:r n Supplcmental PFFP Amendment Resolution No. 2007-299 Page 260 ~nn Water Dischames Associated with Construction Activity and shall implement a SWPPP concurrent with the commencement of l!1'8dim! activities. The SWPPP shall include both construction and nost construction nollution prevention and pollution control BMPs and shall identifv fundinl!: mechanisms for nost construction control BMPs. D. Prior to aporoval of l!1'8dinl!!construction plans for EastLake Business Center II. the AooIicant shall obtain either (a) General Construction Activity Stonn Water Permit (NPDES Permit No. CASOI08758) from the SWRCB or (1)) a municioal oennit from the City of Chula Vista that is in effect at the time of issuance of constructionllrradinl! oennits. Such oennits are reauired for soecific (or a series of related) construction activities. which exceed five acres in size and include provisions to eliminate or reduce off-site discharl!es throul!h imolementation of the SWPPP. Soecific SWPPP provisions include reauirements for erosion and sediment control. as well as monitorinl! reauirements both durin!! and after construction. Pollution control measures also reauire the use of best available technolol!V. best conventional oollutant control technolo~. and/or best manaeement mactices to nrevent or reduce pollutant discharl!e (oursuant to SWRCB definitions and direction). The SWPPP also includes soecified vehicle fuelinl! and maintenance orocedures and hazardous materials storaee areas to oreclude the discharee of hazardous materials used durine construction (e. e.. fuels. lubricants. and solvents) and snecific measures to preclude soills or contain hazardous materials. incIudinl! proper handlinl!: and disposal techniaues and use of temoorarv imoervious liners to prevent soil and water contamination. E. Prior to aooroval of eradinl!!construction olans for F.a-tLake Business Center II. the Aoolicant shall demonstrate to the satisfaction of the City Eneineer compliance with all of the applicable orovisions of the Municioal Code. Model SUSMP for the San Diel!o Rel!ion. and the City of Chula Vista SUSMP as mav be adooted in the future. The Aoolicant shall incomorate into the oroiect olanning and desil!n effective oost-construction BMPs and provide all necessarv studies. and reports demonstratine compliance with the aoolicable rel!:ulations and standards. All BMPs incIudin!! LID BMPs shall be identified and imolemented that soecifically orevent oollution of stonn drain systems from the oarkin!! lots. and trash collection areas. F. Prior to aporoval of buildine oermits for EastLake Business Center II (as determined by the City Eneineer). the Aoolicant shall submit and obtain aooroval from the City Enl!:ineer of a maintenance orol!ram for the oroposed oost- construction BMPs. The maintenance orol!ram shall include. but Dot be limited to: 1) a manual describin!! the maintenance activities of said facilities. 2) an estimate of the cost of such maintenance activities. and 3) a fundinl! mechanism for financin!! the maintenance oro=. In addition. the Developer shall enter into a Maintenance Al!reement with the City to ensure the maintenance and ooeration of said facilities. 66 EastLoke Bus..... ecm.r II Supplcmcntal PFFP Amendment Resolution No. 2007-299 Page 261 Storm Water i J ,- .t~ ~ " Exist. 24" RCP EastLaIce Greens SPA ~ Flow Direction o Stonn Drain Inlet . Connection to Existing System (Outlet) ( Outlet EXlllBIT 12 ~EASTLAKE Cr& Land ~ ~~ 67 EastLakc: Business Center D Supplcmcnlll PFFP Am_ Resolution No. 2007-299 Page 29~.10. AIR QUALITY 5.3.10.1. CITY THRESHOLD STANDARDS: The City annually provides the San Diego Air Pollution Control District (APCD) with a 12 to 18 month development forecast and request an evaluation of its impact on current and future air quality management programs, along with recent air quality data. The growth forecast and APCD response letters must be provided to the GMOC for inclusion in its review. 5.3.10.2. EXISTING CONDITIONS: The EastLake Business Center II project is within the San Diego Air Basin ("Basin"). The existing air quality for the Chula Vista area is monitored by the State Air Resources Board at a monitoring station approximately five miles west of the project area. Air quality is usually expressed as the number of days in which the air pollution levels exceed state standards set by the California Air Resources Board (CARB) and federal standards set by the EP A. Of special concern to CARB and the EP A are the pollutants ozone, carbon monoxide, particulates, nitrogen dioxide, sulfur dioxide and lead. Ozone is the major primary pollutant in the Basin. The Basin is designated by the state and the feds as a "serious" non-attainment area for ozone. In 1994, San Diego exceeded the state standard for ozone on 79 days. No violations of the state standard for carbon monoxide have been recorded since 1991. The Basin is in compliance for particulates and the pollutants nitrogen dioxide, sulfur dioxide and lead. 5.3.10.2. AIR QUALITY IMPROVEMENT PLAN: An Air Quality Improvement Plan is required by the city for all major development projects (50 dwelling units or greater, or commercial and industrial projects with 50 EDU's of water demand or greater). This plan is required at the Sectional Planning Area (SPA) Plan level, or equivalent for projects which are not processed through a Planned Community Zone. The EastLake Business Center II Air Quality Improvement Plan, as amended, was prepared by Jay Kneip Land Planning (August 9, 1999) and amended AUl!USt 23. 2007. According to the EastLake Business Center II Air Quality Improvement Plan, as amended. the future development of the EastLake Business Center II project will be consistent with Regional Air Quality Strategy (RAQS) in the Basin. However, in conformance with the threshold standard, the City will annually provide the San Diego Air Pollution Control District (APCD) with a 12-18 month development forecast. The City will also request an evaluation of its impact on current and future air quality 68 EastLoke BusiDas CcIl10r n Supplcmental PFFP Amendment Resolution No. 2007-299 Pa!iBt~~gement programs, along with recent air quality data. The growth forecast and APCD response letters must be provided to the GMOC for inclusion in its annual review. 5.3.10.2. THRESHOLD COMPLIANCE: The City continues to provide a development forecast to the APCD in conformance with the threshold standard. See EastLake Business Center II Air Quality Improvement Plan in the SPA plan. 69 EastLake Business Cal.... n Supplemenlll PFFP AmeIIdment Resolution No. 2007-299 Page ~1.11. FISCAL: 5.3.11.1. THRESHOLD STANDARD: A. The GMOC shall be provided with an annual fiscal impact report which provides an evaluation of the impacts of growth on the City, both in tenns of operations and capital improvements. This report should evaluate actuaJ growth over the previous 12-month period, as well as projected growth over the next 12-18 month period, and 3-5 year period. B. The GMOC shall be pl'Ovided with an annual "economic monitoring report" which provides an analysis of economic development activity and indicators over the next previous 12-month period, as well as projected growth over the next 12-18 month period, and 3-5 year period. 5.3.11.2. F ACILlllES MAsTER PLAN: A fiscal impact analysis amendment prepared by CIC Research, Inc., (see Appendix A) identifies the estimated fiscal impact that the EastLake Business Center IT pmjeet, as amendment. will have on the operation and maintenance budgets of the City of Chula Vista (genc:ml fund). The Business Center IT project will transfell:d approximately 104.7 acres of Research and Limited Manufacturing designated land from the EastLake ill GDP to the EastLake IT GDP. Information pertaining to the scope of development was derived from BastLalEe Camj3lmy city staff. The Business Center IT pmjeet amendment will, Jlf6 ;iae change approximately 14.8 16.7 net acres of Research and Limited Manufactwing to Commercial Retail: create a 4.6 acre hotel site: create a 5.0 acre office site and retain 18.7 acres of Research and Limited Manufacturinsz. The CIC analysis of revenues and expenditures did not include DIF fees. The analysis focused on the city's genc:ml fund account for city services. Estimated revenues were from property taxes (secured and unsecured), property transfer tax, sales tax, franchise tax, TOT, business licenses, utility taxes, etc. Esrim"tP1! expenditures were from police, fire, administration, public works and planning. All vaIaes are in 1999 sellars. Ne SIlBual Btij1:lSb.ReBt5 te 1e\'eB\leS er seats \11.~ uti~. The e9timale!l Bt1ftlI8i tle"o'J5 ef ee!lts aBEI RW_ are primarily relateEl te the estima!e!I JlfBjeet abOOfptiell. lIJlll 5lfeet HIlIiBtenliBee sehedules. AimtiaI Fe'\'eBIIes mnge hOOi $81,300 Hi the tifst year ef 6B'/e1llJlffiE'1l.t (2009) te $317,900 at SWIll BIIt (2W2~. Blf)3en6HuFeS lllfIge ffeIfI $11,732 m. year llfte te $177,213 at b1:lil.d BIIt. The Bet liseal iffiJlII61 ifeRl develejlm.g the BlI5iBess CORter II !lrejeet is jlesittve in year eBB ($3(j,(j~ llBfi.~ JlesHF.'e te Build elR ($139,800). The methodology used bv CYC for the amendment is essentially the same as the orevious fiscal imoact analYsis. Two basic methodololries were utilized in estimatinl! oublic lll!encv revenues and exoenditures: the case studv and the averaee costIrevenue method. The case studv method was used to estimate secured orooertv tax the transient OCCl1tlIII1CV tax ITOTI for the hotel site and some of the estimated sales taxes from the hotel/motel site. The aVeraJ!e cost!revenue method develoDS DeI' unit/acre costs and revenues based on the associated costs/revenues allocated to that land use in the City of Chula Vista. The cost factors used were developed bv ERA for the updated 2007 City of Chula Vista Fiscal Model. 70 EaslLake Business Center n Supplemenlll PFFPAmcndmcnt ~ Resolution No. 2007-299 Pa!!C~5estimated that the fiscal revenues will IlIllI!e from $146.000 in the first vear of develooment (20071 to $731300 at build-out (2010), Fiscal exnenditures raIll!e from $237.800 in 2007 to $386300 at build-out. The net fiscal imnact from the Eastlake Business Center II Amendment is nel!ative in 2007 ($91.800 loss) and 2008 ($57.400 loss) but becomes DOsitive in 2009 ($306.500) and is positive at build out ($345.000). The IlII'I!e positive imtlact in the final vears is due to the hotel develooment R evenu' SO""""" Revenu ousonds) 2007 2008 2009 2010 Secured Tax 525.5 535.0 ~78.7 $89.3 Unseoured ax s.Y S9.2 S15.6 S18.3 Pro~'" Tran.fer Tav ~ iU ID lid Sale. &. U" Tax ~33.4 567.8 ;75.3 Franchi.e Tax ~33.; ~46.2 S77.9 ;91.6 TOT Tax 50.0 50.0 S 25.8 5 25.8 Utilitv Tax $32.3 S44.0 74.4 t87.5 Bu.inesi I i,onse 513.3 $152 24.7 26.8 Mi......n.nenus Revenues ~6.6 ~7.6 S 12.3 134 TOTAL REVENUES !t146.0 5191.7 $680.1 S731.3 Ex~djture ~ources Ex"""diM"" On Thousands", i: 2008 2009 2010 Lepislativ. & Anmini<tra'ive ~07 ~11 $L1 Develonmont and M.inten.n.e S....,,;.es 580. 584.1 ~1\0.6 !l>1l5.n Police SII46 5120.1 5191.4 1:IQ7.6 Fire $42.4 $ 4.3 570.5 S726 Cultura] an" Leisu;:;. !!;n.n 0.0 SO.O 50.0 Non- en,.1 $0.0 0.0 !l>0.0 $OJ! TOTAL EXPENDITURES 5237.8 10249.1 S373.6 S386.3 Not on Thou.,.nd.) 2007 ~ ~ 20.10 TOTALR=S ~O 1:iil1.7 0.1 Jfirr . F'X TURES 8 !l>249.1 -~373.6 6.3 NET FISCAL IMPACT ~l.ln (1057.4\ !t3lJ(j.5 S345.0 TABLE 5-20 NET FISCAL IMPACT Source: CIC R~h lnc November 2007 5.3.11.3. THRESHOLD COMPUANCE: An analysis of the fiscal impacts of the Business Center IT Amendment JlffJjeet aevelepment was prepared by CIC Research, Inc. The analysis conclUded that the ultimate buildout of the project will have a $139,800 per year geater positive long-term fiscal impact on the City. The results of the analysis will be included in the next annual fiscal and economic report prepared for the GMOC. 71 EastLake Business Center II SllJllllcmcntal PFFP Amcndll1Clll Resolution No. 2007-299 Page ~~.12. CIVIC CENTER: 5.3.12.1. CITY THRESHOLD STANDARDS: There is no adopted threshold standards for these facilities. The facility infonnation is being provided in this report to aid in establishing operational benchmarks which will determine construction phasing of the Civic Center. These facilities are funded through the collection of the DIF fees in effect at the time building permits are issued. 5.3.12.2. EXISTING CONDITIONS: CIYle F ACIl..ITIES INYEtlTORY TARLE S 14 Eltistiu Civic CCRtcr fueilities Cp.'ie Center PrevieliS CEnHlty Heoltil Cllftter Fllftlre Ptielie ~1erks In~eetieRS Di-:isisR TetaI ParkiRg Lets Square Feet 111,91Q sJ. 3,12Q s.f. 1.299 s.f. 1111,2119 s.f. 333 SJlBees In Julv of 2001. the final master plan for the renovations to the Civic Center was approved bv City Council. Rebuilding the Civic Center will cost approximately $50 million. which will Primarily be funded by deyelooment fees (89"10). The Civic Center Redevelooment is currently underway and exoected to be comoleted in three chases by 2009. Recently. the new City Hall Redeveloomenl or Phase One of the Civic Center Comolex. was completed. Phase Two was the remodeling of the old Police Station for a temoorarv home for the Planning. Building and En!!ineering Denartments. Phase Three was the re- buildim! of the Public Services Building, the nermanent home for the Plannin!!. Building and Engineering Departments. The final phase is the construction of a new fire station headauarters on the current Ken Lee Building site and oarkin!! lot exoansion for the complex. 6.3.12.3. F AefLIn' REQl::JIRE~fEN'J'S: The fe1l8v~':~g taBle sHIIlHimres the Ci7ie Ceater fneility Fel\Hif'emeats: 72 EastLaIo: Business CcnIcr n Suppl_ PFFP Am<ndmont J Resolution No. 2007-299 Page 267 FUTURE F ACIUTIES TABLE S 15 n ,;.. T ~ 5,ng s.f. 4 S, 425 s.I. I S,ggg s.f. 55,goo 5.f. ES'I'IMAt"EB CaST t2,293,3gg $3,\)23,590 $3,923,699 $1,339990 $1,9gg,QQ9 $2,&n,9QG $&3,69G $22':1,lg9 $1 &9,99G $698,599 $65 259 ~ A r Sm;; 25,7€i5sJ.6 49,€i15 s.f. 28,925 s.f. 6,9G9 5.f. ,..., n~r F1.:JTURE F laCll.lTIES CesT , " ... 7. Demeliasn ~~;- , , 12. MII5ter PllIfI TOTAL 5.3.12.4-;1. ADEQUACY ANALYSIS: The need for the Civic Center cannot be easily related to population figures or acres of commercial and industrial land which will be developed in the future. The facilities, according to the master plan, are currently inadequate because of the lack of space. This inadequacy will worsen as employee numbers and their workloads increase in response to demands for services, which are generated by new development. Expansion of the Civic Center Complex is currently underway. This exoansion includes soace planninl!. desil!D. and construction that is exoected to keen oace with demand for additional work soace. The City Hall facilities have been renovated and now include a new state of the art Council Chambers. Consistent with the Master Plan. the expansions and renovations include the conversion of the old Police Station to additional office space. the re-buildinl! of the Public Services Buildinl! and a new Fire Station Headouarters Buildinl!. The City is m6.1iftg aheaa te impleHIeflt P8ase # I ef the Ci'l-ie Ceater Master PIllB. by aequiriRg additieRallRRd te the '.vest ef the eldstiRg Chie Ceater Ior the propesea JlllflBRg garage. I Seme sf the size figures FepreseMs a eemeinatiea sf femeselea enifiing sCfWR metage ana Rewly eSBm:aeted SfIUBI'B footage. The eSlHpleted ey/is f.e.eilities ";JiR teal 11$',]29 SEIHer! feet .lid! 62S p~.ng spaee!r. 73 Eastl.akc Business Cader II SupplClllClltBl PFFP Amendment Resolution No. 2007-299 Page 29~.12.~.FACIUTY FINANCING: In January ] 991, the ChHla 'Vista City CelUleil ad8J:ltea OPE1i:ABftee }Je. 2329 estaBlishing a De'leleflHleHt Imp&et Fee te pay fur niBe elltegeRes ef Jll:Ielie facilities 'Nithia the City ef Clmla Vista. The faeilities IH'B 1elf1:liFeEI te Sl!flpBFt mtUfe aB'.'e1eflHleat ....ithin the City ami the el:II'fent fee sehelhile 8:S aSellted ia aeeBfllanee -Nidi Geyefflftl.eftt Cede 8eetiea 66999. The Jlrepeseel fee is ~2,61 g per e€Jui:;alent elv..elliBg lHiit. The pemeR efthe flfBllesed fee atuib1H&llle fer the Civie CeRter is !:1&llfEDU. The Public Facilities Develooment Imoact Fee CPFDIF) was uodated bv the Chula Vista City Council on November 19. 2002 bv adootion of Ordinance 2887. The PFDIF is adiusted every October ]'t oursuant to Ordinance 3050. which was adooted bv the City Council on November 7. 2006. The current fee for commercial (includinl! office) develooment is $25.874/acre and industrial develooment is $8.173/acre. The PFDIF amount is subiect to chanl!e as it is amended from time to time. Area A is built out and will not be oblil!ated to pay PFDIF fees. Area B and C will pay PFDIF fees at the time buildinl! oermits are obtained. At the current fee rate. the estimated oblil!ation for Area B and C at buildout is $62.463.00 (see Table 5-20)9. The EastLalte B1I5iRess Ceftter II prejeet will be SlIbjeet te the JlB)'ffieBt ef the fee at the fate Hi effeet at the time efhwldiag p_".....Ns &fe issliea. De'.'e1epHleftt BDU's Civie Fee@ Chie CeRter Fee $ 18MIDU EastLeke Busiftess Ceater n ~ $228,900 $228,990 TJdlbE S 16 CJ\1C FEE FaR RlJSINESS CErJTERII DeveloDment Civic ~ Acres FeeJIndustrial Civic Center Fee Acre AreaB&C 27.36 $2,283 $62,463 TABLE 5-21 CIVIC CENTER FEE 5.3.12.-6-~. THRESHOLD COMPUANCE AND RECOMMENDATIONS: Civic Center facilities '.vill be have been funded through the collection of the public facilities fees at the rate in effect at the time building permits life were issued. Remaininl! unbuilt lots in Area B and C will oav current DIF fees at the time buildinl! nermits are issued. , Actual fee may be different, please verify with the City of Cbula Vista at the time of building permit 74 EutLake Business Center U supplememal PFFP Amcndmcot -~---- ...-~~---~-_.._. -' Resolution No. 2007-299 Pa!!5.3~. CORPORATION YARD: 5.3.13.1. CITY THRESHoLD STANDARDS: There is no adopted threshold standards for these facilities. The facility information is being provided in this report to aid in the establishing operational benchmarks which will determine construction phasing of the Corporation Yard. These facilities are funded through the collection of the DIF fees in effect at the time building permits are issued. 5.3.13.2. EXISTING CONDITIONS: The eafJ'8raaSR yare is e\:H'fe:atly epemting eeyeas eapaeity. }Je'N ae'l.'elepmsftt, ~;;ith its resultant illet=e85e in required mainteaanee serviees, epeates a Beed fer a l&rger eeflgeFlllien yaRi. The new yard ffillY Be leeat-ed east ef I g9S Beeaase ef the fPiailailility ef eefttflllly lecaled large pareels. The City ef Clmla Vista Cefl'lemte Yare Master Plan pl'6vides a detailed assessment ef ilie needed facility, lecation and cests. Table 5 17 pF8viaes El swnmary efthe eests fer the jlf6l'ssea }lev; Ce~emte Yar.a Faeility. CORPORATION YARll FACILITY TABLE S 17 Fata" Facilities I. }lew Baildiags 2. R-ene"illled BwlEHBgs 3. Bus WashIFaell9landiCNG , etJuipment 4. Sitev.'Elrk ana demBlitieB Subtetal 5. Site aeElHlsiaeB 6. CeB3lfaetiell. CeBtingcney (@ 5%) 7. faehilectlBllgineer Fces (@ 9%) 8. CenSlt1ieaell. MlHiIIj!;BmBnt 9. Seils R-eperts, Matefillls Testing lIBd Insjleeaen 10. Peffflit5 ] Q. F\:lPBiture 12. TeleeelftfBlIfJieatiens/Data System Subtetal TOTAL CBst ESBBlate $9,352,799 $2,291,6Q9 $2,128,299 $2.892.999 SlCi,S77,.!lOO $8,839,999 $828,999 :$1, 492,999 $497,309 $249,999 $165,890 :$829,199 $399.900 U3,183,100 !:29,7CiO,CiOO The new 25-= Coroorate Yard Facility was nreviouslv an SDG&E eauioment and reoair facilitv. The ci~ has renovated and added new imorovements for the maintenance and reoair of city owned eouioment. This facility consists of a renovated buildinl! that serves as the administration buildi.ru! for the Coroorate Yam. Existinl! shoo buildinl!s have been renovated and new shoos have been added as well as a new maintenance buildinl!. The Coroorate Yard iocludes oarkinl! for emolovees. city vehicles and eauioment In addition. the new facility iocludes a Bus Wash/Fuel Island/CNG and associated eauipment 5.3.13.3. FACIUTY REQUIREMENTS: The need for the CoIp01'8.te Yard cannot be easily related to population figures or acres of commercial and industrial land, which w.ill be developed io the future. The growth io 75 EaslUke Business Center n Supplernemal PFFP Amendment Resolution No. 2007-299 Page ~uIation, increase in street miles and the expansion of developed areas in Chula Vista, requires more equipment for maintenance as well as more space for storage and the administration of increased numbers of employees. The need for a larger Corporation Yani can be specifically related to new development. 5.3.13.4. FINANCING FACILI1Y: IR 1aBtiaFy 1991, the CI'llIle Vista CKy CElIIftfliI e69Jlte6 0rdinaBee }Ie. 232Q estalllislHBg e De'/el9Jlmenl lffipeet Fee te I*1Y far BiBe e&legeBes efpt:Jblie faeHHies vAthtB the City efCftala Vista. The feeilHies are ~ te SUW8ft fumre 8e~lel6pmeat yJilhift the City enS the fee sehedale hIlS Beeflll<'-pted in lIeeBft!anee ..vith G6\'emmeat Celie Seeaell 66QOO. The fees were 1I!lBmeB By edeptiell ef OrdinImee }Ie. 2SS 1 ell April 27, 1993. The !*6J3eged fee is !:2,6Ig per equi\'a1eat Bwelliftg lIIIit. The pefliell efthe Pftll3e~ed fee atlfibU1llBle fer Cefjl8flltieft Yam Feeilities is S386/IIDU. The Public Facilities DeveloDment Impact Fee CPFDlF) was uodated bv the Chula Vista City Council on November 19. 2002 bv adoDtion of Ordinance 2g87. The PFDIF is adiusted every October 1st Dursuant to Ordinance 3050. which was adoDted bv the City Council on November 19. 2007. The current fee fur commercial (incJudinll office) develoDment is $25.8741acre and industrial development is $8.173/acre. The PFDIF amount is subiect to chanee as it is amended from time to time. Area A is built out and will not be oblieated to nay PFDIF' fees. Area B and C will pay PFDIF fees at the time building nermits are obtained. At the current fee rate. the estimated oblillation fur Area B and C at buildout is $88.099.00 (see Table 5_21)10. The BastLake BusiRess CeBter II Jlf&jeet .....iR Be SliBjeet te tIte Jlll)'ffteat eftlte fee at the mte iR circe! ~ tIte time ef BllilElillg ~.A lIFe issaeB TMlldl S 18 CeRPeJU TE Y ARB FEE FeR BHSINESS CENTER II D I l I EDD's I ce~'~8f~B~F~ee @ I COI~.;~~~Fee I ;:;.. . ':~ . F"~~' . ~~~~~~::s.. 4+5 .. $183';50 .. Ug3,~5Q . Develoument Am! COrD. Yard Feel Com. Yard Fee Area In.dustrial Acre AreaB&C 27.36 $3.220 $88.099 TABLE 5-22 CORPORATE YARD FEE 5.3.13.5. THRESHOLD COMPLIANCE: Civic Center and Corporate Yarc! facilities wiII-iJe have been funded through the collection of the public fiIcilities fees at the rate in effect at the time building permits are were issued. Remaininl! unbuilt lots in Area B and C will D8V current DIF fees at the time buildine nermits are issued. 10 Actual fee may be different, please verify with the City of Chula Vista at the time of building permit. 76 EastLok. BllSiness Cen1er lJ Supplemenlll PFFP Amendment ..; Resolution No. 2007-299 Pag~?:?l4. OTHER PUBLIC FACILITIES 5.3.14.1. THRESHOLD STANDARD: There is no adopted threshold standard for these facilities which are part of the Public; Facilities Development Impact Fee Program and include Administration. GIS, MaiBfimne Computer Systems. Tell!flheRe Eystem Uflgfllde Telecommunications. and Records Management. The information regarding these capital items is being provided in this section of the PFFP to aid the City and the Developer in calculating the PFDIF fees to be paid by the Business Center II project, as amended. The pHhlie faeilities ideBtified aeeYe Me deGeribed iB the l'efleFt eRtitled De',oeloplllen! ~Tmpset ..."C'ee foy P'fihJ.ie Paei!ities dated ).1:11=1] 2Q, 1993, lmo~:.Jfl as aesHmeBt mt:IBher C093 ~ 5.3.14.2. ExISTING CONDITIONS: The City continues to collect funds from building permit Issuance in the Eastern Territories for deposit to the accounts associated with other public facilities. These facilities include administration, records, management, telecommunications, computer systems and GIS. 5.3.14.3. FINANCING OTHER PuBLIC FACILITIES: This information is being provided to aid the City and the Developer in calculating the level of funds to be received from the payment of fees associated with this "Other Public Facilities" category. In Janliary 1991, the Cfil:lla Vista City Cellfleil adepted OFtiinanee }!e. 23211 establishing a De'/elElflHleBt Impact Fee ts pay fsr yarieas ptiblie faBilities withiR the City ef Chula YiGt!l. The facilities Me ref!Uired te SliJllla!t aevelapffieBt "vithiH the City amI the fee sehedl!le has beel!. adapted iB aseerffimee 'JJitIl GS'.'tlffilBeBt Cede SeeBeR 66QOQ. The !lrepese6 fee is $2,61 g per el}lli'..weBt dwelliRg licit. The eelflj'leBeBt sf the fee attriblitable te "Other Publie Faeilities" as Elesel'ibed aIleye is $176.1111 !ler BOO. The Public Facilities Develooment !moact Fee (PFDIF) was undated bv the Chula Vista City Council on November 19. 2002 bv adootion of Ordinance 2887. The PFDIF is adiusted every October 1st Dursuant to Ordinance 3050. which was adoDted by the City Council on November 19. 2006. The current fee for commercial (includinl! office) development is $25.874/acre and industrial deyelooment is $8. 173/acre. The PFDIF amount is subiect to chanl!e as it is amended from time to time. Area A is built out and will not be oblil!ated to DaV PFDIF fees. Area B and C will Day PFDlF fees at the time building permits are obtained. 77 Eastlak< Business Center n Supplemental PFFP Amendment Resolution No. 2007-299 Page 2fhe Business Center II proiect is within the boundaries of the DUbHc facilities DlF prol!:ram and. therefore. the tlI'Oiect will be subiect to the oavment of the fee at the rate in effect at the time buildinl!: oennits are issued. At the current fee rate. the estimated obli"""on for Area Band C at buildout is $14.857.00 (see Table 5-22)11 TABU 5 19 PliBLlC FACILITIES FEES FaR OTHER PUBLIC FAClhlTIES . ~..I '''''''1. _~~~FM .1 Bellm ~ ~rejeet .. 4f5 .. U3,eOO . DeveloDment Acres Other Public Facilitv Other Public Facilities Fee Area FeelIndustrial Acre AreaB&C 27.36 $543 $14.857 TABLE 5-23 PUBLIC FACILITIES FEES 5.3.14.4 THRESHOLD COMPLIANCE AND RECOMMENDA nONS: Other Public Facilities -.viR Be have been funded through the collection of the public facilities fees at the rnte in effect at the time building pennits IIftl were issued. Remainirnz unbuilt lots in Area B and C will nav current DIF fees at the time buildinl!: oermits are issued. II Actual fee may be different, please verify with the City of Chula Vista at the time of building permit. 78 EasILIIke Business Ccntor II Supplemental PFFP Amendment Resolution No. 2007-299 Pag'5~?fs. PUBLIC FACILITIES FINANCE 5.3.15.1 OVERVIEW: All development within the City of Chula Vista must be in compliance with the City's Growth Management Program. The appropriate public facility financing mechanisms are required and approved by the City to fund the acquisition, construction and maintenance of public facilities. New facilities will be required to support the planned development of the Business Center II project. The public facilities are generally provided or financed in one or more of the following ways: Subdivision Exaction, Development Impact Fee and Debt Financing. It is anticipated that all three methods will be utilized for the Business Center II project to construct and finance public facilities. 5.3.15.2. SUBDMSION EXACTION: Developer constructed and financed as a condition of project approval. Tentative Map Conditions: Public improvements for the Business Center II project. as amended. will be were constructed simultaneously with related subdivisions. 1brough the use of the Subdivision Map Act, it is the responsibility of the Developer to provide fef the local street and utility improvements. The use of subdivision conditions and exactions, where appropriate, will ensure that the construction of facilities is timed with actual development. When appropriate, however, the city may impose the use of other public facilities financing mechanisms to finance the public improvements. 5.3.15.3. DEVEWPMENT IMPACT FEE (DIF): Funded through the coIlection of an impact fee. Constructed by the public agency or Developer constructed with a reimbursement or credit against specific fees. Development Impact Fee Programs Development Impact Fees (DIF) are acceptable methods to contribute to the financing of capital improvements within the city of Chula Vista. The EastLake Business Center II project is subject to fees established to help defray costs of facilities which will benefit the B1:IGmess Ceater II project. These fees ine! ude but may not be limited to: A. Bestem CR. '.'isla Transportation Develooment Impact Fee (TDIF): Etreet DIl" established Established to provide financing for circulation element road projects of regional significance. in the 1lFe8 east sf I &QS. 79 EastLakc Business Center II Supplcmcn1al PFFP Amendment Resolution No. 2007-299 Page 274 B. Public Facilities Development Impact Fee (PFDIF): Pl:Iblie Pacilities DIF estaBlished Established to collect funds for civic center facilities, police {BeilNy reftlodeliBg, corporation yard releeatian, libraries, fire suppression system, geographical infonnation system, mainframe computer, telephone system upgrade and a records management system. C. Park ft..eEiwsitieB BBEI De7/elel'fBetlt Fees: P ,AD fee estahlisheEl 18 PitY fer tke aeEllHsitien ana tie~/el8J'lBeat sf Be..~" park faeiliaes. B C. Traffic Signal Fees: To pay for traffic signals associated with circulation element streets. E D. Telegraph Canyon Gravity Sewer Basin DIF: Fee established to pay for sewer basin improvements due to increased flows from future development. P Telegfllpft ClHiytla Pumped Se'Ner DIP: Pee estaelishe6 16 pay fur syotem lipgraElcB ~~-JidHn tHe TelegrafJB C8flysn ge\~:er BasiH. t8 aeeemmeElate !lO'NS gellerated emsise efthe ll115in. G Telegmph C~ea Bll5ia DIP: Fee estalJlished to pay fer dmiaage Ilasia iftlJll'6'lemeffis. H. Interim ER 125 DIF: Fee established 16 pay fer eerl8i.B tfenSpBfIlltieB faeiJ.mes iR the eastem area sf Cl=nda Vista te FeHeye !f8.flie eeBgesaeB prierte eeBiHflIetisB efSR 125. I E. Otay Water District Fees: OWD may require annexation to an existing improvement district or creation of some other finance mechanism that may result in specific fees being modified. 5.3.15.4. DEBT F:INANCE PROGRAMS: The City of Chula Vista has a history of using assessment districts to finance a number of street improvements, as well as sewer and drainage facilities. The Otay Municipal Water District has used such improvement districts for water system improvements. Both school districts have implemented Mello-Roos Community Facility Districts to finance school facilities. 80 EastLab: Business Ccmer n Suppl_ PFFP AmeDdmcnI . ~ Resolution No. 2007-299 Pagi~ 7 ~ssessment Districts Special assessment districts may be proposed for acquiring, constructing and/or maintaining certain public improvements under the Municipal Improvement Act of 1913 and the Improvement Bond Act of 1915. The City has suspended the use of the Lighting and Landscape Act of 1972 for new open space district fonnation due to tbe passage of Proposition 218. The administration of the special assessment district is the responsibility of the public agency. B. Community Facilities District (CFD) On January 13, 1998, the City Council adopted the "City ofChula Vista statement of goals and policies regarding the establishment of Community Facilities Districts" (CFD). The approval of this document ratified the use ofCFD's as a public financing mechanism for: . The construction and/or acquisition of public infrastructure, and . The financing of authorized public services, including services provided by open space districts. On April 28, 1998, the City Council enacted the "Chula Vista Community Facilities District Ordinance." lbis ordinance adopted the Mello-Roos Act with modifications to accomplish the following: . Incorporate all maintenance activities authorized by the "Landscaping & Lighting Act of 1972" (1972 Act) and . Include maintenance activities not listed in the "Mello-Roos Act" or the "1972 Act." Special assessment financing may be appropriate when the value or benefit of the public facility can be assigned to specific properties. Assessments are levied in specific amounts against each individual property on the basis of relative benefit. Special assessments may be used for both publicly dedicated on-site and off-site improvements. B C. Mello-Roos Community Facilities Act of 1982 The Mello-Roos Community Facilities Act of 1982 authorizes fonnation of community facilities districts which impose special taxes to provide financing for certain public facilities or services. Facilities which can be provided under the Act include the purchase, construction, expansion, or rehabilitation of: Local park, recreation, or parkway facilities; Elementary and secondary school sites and structures; Libraries; and, any other governmental facilities that legislative bodies are authorized to construct, own or operate. In addition, the City has enacted an ordinance that adopted the Mello-Roos Act with modifications to accomplish the maintenance of facilities. 81 EostLako Business Cenu:r D Supplemental PFFP AmClldmeat Resolution No. 2007-299 Page 25~.15.5. OTHER METHODS USED TO FINANCE FACILITIES: General Fund: The City of Chula Vista's general fund serves to pay for many public services throughout the City. Those facilities and services identified as being funded by general fund sources represent those that will benefit not only the residents of the proposed project, but also Chula Vista residents throughout the City. In most cases, other financing mechanisms are available to initially construct or provide the facility or service, then general fund moneys would only be expected to fund the maintenance costs once the facility is accepted by the City. State and Federal Funding Although rarely available to fund an entire project, Federal and State financial and technical assistance programs have been available to public agencies, in particular the public school districts. The City was reeently awarded a $6 million State Grant to construct the Montgomery/Otay Library. Dedications Dedication of sites by Developers for public capital facilities is a cornmon financing tool used by many cities. In the case of the EastLake Business Center II project, the project will dedicate public streets. Developer Reimbursement Agreements Certain facilities that are off-site of the EastLake Business Center II project and/or provide regional benefits may be constructed in conjunction with the development of the project. In such instances, developer reimbursement agreements may be executed to provide for a future payback to the Developer for the additional cost of these facilities. Future developments are required to pay back their fair share of the costs for the shared facility when development occurs. Special Agreements/Development Agreement This category includes special development programs for financing special arrangements between the City and the Developer such as credits against fees, waiver of fees, or charges for the construction of specific facilities. A development agreement can play an essential role in the implementation of the Public Facilities Financing Plan. The Public Facilities Financing Plan clearly details all public facility responsibilities and assures that the construction of all necessary public 82 EastLake Business Ccntc:r n SuppJemen1lll PFFP Amenclmcnt Resolution No. 2007-299 Paan~tJvements will be appropriately phased with actual development, while the development agreement identifies the obligations and requirements of both parties. 5.3.15.6. Cumulative Debt The City of Chula Vista has an established policy limiting the maximum debt to be placed on a residential dwelling unit to an additional one percent above the property tax. This policy was restated in the adopted Growth Management Program. Like many other cities,' ChuIa Vista has long understood that it is not the only agency which can utilize public finance mechanisms and, therefore, can not always guarantee that the total debt will remain at or below a maximum of 2 percent. The City needs to coordinate its debt finance programs with the other special districts which provide service to the residents of Chula Vista to ensure that the cumulative debt does not become excessive. Coordination is also necessary to guarantee all public facilities needed to support a development can be financed and constructed as needed. This project does not include any Assessment Districts. All required supporting infrastructure is being paid by the Developer. 5.3.15.7. LIFECYCLE COST Section 19.09.060 Analysis subsection F(2) of the Growth Management Ordinance requires the following: .....The inventory shall include Life Cycle Cost ("LCC") projections for each element in 19.09.060(E) ... as they pertain to City fiscal responsibility. The LCC projections shall be for estimated life cycle for each element analyzed. The model used shall be able to identify and estimate initial and recurring life cycle costs... Background Life Cycle Costing (LCe) is a method of calculating the total cost of asset ownership over the life span of the asset. Initial costs and all Subsequent expected costs of significance are included in the LCC analysis as well as disposal value and any other quantifiable benefits to be derived as a result of owning the asset. Operating and maintenance costs over the life of an asset often times far exceed initial costs and must be factored into the decision process. LCC analysis should not be used in each and every purchase of an asset. The process itself carries a cost and therefore can add to the cost of the asset. LCC analysis can be justified only in those cases in which the cost of the analysis can be more than offset by the savings derived through the purchase of the asset. 83 EastLote Business Ccntc< U Supplemental PFFP Amcndma11 Resolution No. 2007-299 Page 2fl&r major factors which may influence the economic feasibility of applying LCC arlalysis ~: 1. Energy Intensiveness - LCC should be considered when the anticipated energy costs of the purchase are expected to be large throughout its life. 2. Life Expectancy - For assets with long lives (i.e., greater than five years), costs other than purchase price take on added importance. For assets with short lives, the initial costs become a more important factor. 3. Efficiency - The efficiency of operation and maintenance can have significant impact on overall costs. LCC is beneficial when savings can be achieved through reduction of maintenance costs. 4. Investment Cost - As a general rule, the larger the investment the more important LCC analysis becomes. Applications for LCC Analysis The City of Chula Vista currently utilizes LCC analysis in determining the most cost effective purchase of capital equipment as well as in the determination of replacement costs for a variety of rolling stock. The use of LCC techniques takes place in the preparation of the City's Five Year Capital Improvement Budget (CIP) as well as in the Capital Outlay sections of the annual Operating Budget. There are no project facilities that are not covered by LCC arlalysis. In these existing processes, the City should require the use of LCC analysis prior to or concurrent with the design of public facilities required by new development. Such a requirement will assist in the determination of the most cost effective selection of public facilities. 84 EIslLoke B...u- Caller U Supplcmtnlll PfFP Amendment -' ~::';;;.lj r IUH J · g , fl!l!! (ifill 11111111 I:- I:- D .J " " J J J t ~lill 1;1:lill' ~ I~~I ~ J.~ ..~I~ . . .~I~I~ . a i ".1 L r.... .i ~ I~: f II ~ ~Ii: I li...1 11I1I !I - " .!lE ..., ~ Ii &~ -: C: =... "'''' ~- -":I d Ii ~ Ii .:!- !t " ... V) oc ummarv 0 stImate ees an ael lties or Area B 0 Facility Facility Fee Estimate13 DIF Pro2ram Timin2 Fundin2 Souree Finanein~ Descriotlon MethodS TransDOrtation $2.3S8.924 TransDortation Facilities Concurrent wi Buildin" DIF consU Fee Pro~ TransDortation Facilities in Eastern Territories Permit exaction 'D Traffic Si"nal 5268.08S" Traffic Sional Fee (527.70\ .. DIF exaction Fee Prolll'8lll Subtotal !'O2 627 009 Potable Water 980 Zone To be Determined by City DIF fees do not aoolv Concurrent wi Final Map OWO CIP Fees Caoacitv Fees OWO to the own and Exactions Recvcle Water 9S0 Zone To be Determined bv City OIF fees do not aDoly Concurrent wi Final MID OWO CIP Fees Caoacitv Fees OWO to the own and Exactions Sewer Telel!r3oh Cvn. Unknown Telel!f8Dh Cvn. Gravitv Concurrent wi Buildin" CIPlDevelooment Fee Prolll'8lll Gravitv~ Sewer Sewer Basin D1F Permit Orain8l!e Connect to exist. Unknown No Draina"e D1F Per Ordinance Develo....r funrlpn Subdivision exaction so Schools No ..,ecitic facilitv N/A OIl' not renuired for schools Concurrent wi Final Mon Mello-Roos CFD CFO Parks Park dedication & N/A Park Acouisition & Pav ral BId" Permit PAD Fees Fee Prol!ram construction Develonment rp AD\ Fees LiimiiV Pav PFDlF Fee N/A Public Facilities DIP Pay (iiJ Bldo Permit N/A Fee Pro....am I Fire & EMS p"" PFDIF Fee 516470 Public Facilities DIF Pau tn\ Bldo Permit ~02lAC- Fee Prol!T3l1l Police Pau PPOIF Fee t4 I 724 Pnblic Facilities OIF p.v (iiJ Bldo Permit 5 1.52S1 AC Fee pro.....m Civic Pay PFOIF Fee 62.463 PuW"aciliUe- DIF Pa'; B Ido Permit $2.283AC Fee COTnnrate Yard Pay PFOIF Fee 588.099 Public Facilities DIP Pavl Bldo Permit ~ 22n1AC Fee Pro""arn Other Pay e 5148S7 Publjr F.cHj'ies DIP Pau Bldo Permit t~41/Ar Fee PrOl!rarn Total !'O2 850 622 Table 5-24 EastLake Business Center II SUDDlemental PFFP Amendment S fE" dF dF T" ~ &C "tl:>;;J ~ ~ (1) 0 N- oo~ 00. ::l Z " This is an estimated fee. The actual fee will be calculated at the time of Dermit issuance. .. Fees based on the worst case (see Tables SoS and S-61. The actual fee will be calculated at the time ofDermit issuance. 86 ElstLake Bus' ~.nter n Supplement.1 PFI m1ment l_ Resolution No. 2007-299 Page 281 APPENDIX A EASTLAKE BUSINESS CENTER II FISCALIMPACf ANALYSIS AMENDMENT BY CIC RESEARCH A-I EastLake Business Center II Supplemental PFFP Amendment Appendix A Resolution No. 2007-299 Page 282 A MEN D MEN T T 0 F I seA L IMP ACT R E P 0 R T The purpose to this amendment is to determine the fiscal impact of the new land use designations for the remaining 45 acres of the Eastlake Industrial Center. The land use is changing from industrial to 16.7 acres of commercial retail, 5 acres of office, and 4.6 acres ofhoteUmotel. There will be 18.7 acres of industrial land remaining from the original 45 acres. A brief description of the methodology of the study and a summary of the results are presented in this report. Detailed tables of the fiscal impact analysis are immediately following this summary report. Methodology The methodology is essentially the same as the previous fiscal impact analysis. Two basic methodologies were utilized in estimating public agency revenues and expenditures; the case study and the average cost/revenue method. The case study method is based on specific characteristics of the project from which revenues can be estimated. The case study method was used to estimate secured property tax the transient occupancy tax (TOT) for the hoteUmotel site and some of the estimated sales taxes from the hoteUmotel site. The average cost/revenue method develops per unit/acre costs and revenues based on the associated costs/revenues allocated to that land use in the City of Chula Vista. This method was used for all costs and the remainder of the revenue categories. The cost factors used were developed by ERA for the updated 2007 City of Chula Vista Fiscal Model. Summary of Results The following table presents the results of the fiscal impact associated with the Eastlake commercial development. Fiscal revenues range from $146,000 in the first year of development (2007) to $731,300 at build-out (2010). Fiscal expenditures range from $237,800 in 2007 to $386,300 at build-out. The net fiscal impact from developing the Eastlake II Annexation is negative in 2007 ($91,800 loss) and 2008 ($57,400 loss) but becomes positive in 2009 ($306,500) and is positive at build out ($345,000). The large positive impact in the final years is due to the hoteUmotel development. A-2 EastLake Business Center II Supplemental PFFP Amendment Appendix A Resolution No. 2007-299 Page 283 EASTLAKE BUSINESS CENTER II AMENDMENT NET FISCAL IMPACT Revenue Sources Revenues (In Thousands) 2007 2008 2009 $25.5 $35.0 $78.7 $6.8 $9.2 $15.6 $0.9 $1.2 $2.9 $26.7 $33.4 $67.8 $33.9 $46.2 $77.9 $0.0 $0.0 $325.8 $32.3 $44.0 $74.4 $13.3 $15.2 $24.7 $6.6 $7.6 $12.3 $146.0 $191. 7 $680.1 Secured Property Tax Unsecured Property Tax Property Transfer Tax Sales & Use Tax Franchise Tax TOT Tax Utility Tax Business License Miscellaneous Revenues TOTAL REVENUES Expenditure Sources Expenditures (In Thousands) 2007 2008 2009 $0.6 $0.7 $1.1 $80.2 $84.1 $110.6 $114.6 $120.1 $191.4 $42.4 $44.3 $70.5 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $237.8 $249.1 $373.6 Legislative & Administrative Development and Maintenance Services Police Fire Cultural and Leisure Non-Departmental TOTAL EXPENDITURES 2010 $89.3 $18.3 $3.3 $75.3 $91.6 $325.8 $87.5 $26.8 $13.4 $731.3 2010 $1.1 $115.0 $197.6 $72.6 $0.0 $0.0 $386.3 Net (In Thousands) 2007 2008 2009 2010 $146.0 $191.7 $680.1 $731.3 $237.8 $249.1 $373.6 $386.3 ($91.8) ($57.4) $306.5 $345.0 Source: ere Research. Inc. November 2007 TOTAL REVENUES TOTAL EXPENDITURES NET FISCAL IMPACT A-3 EastLake Business Center II Supplemental PFFP Amendment Appendix A Resolution No. 2007-299 Page 284 EASTLAKE BUSSINESS CENTER IT AMENDMENT FISCAL IMPACT DETAILED TABLES Table 1 ABSORPTION SCHEDULE BY LAND USE Land Use PerUnitl Net Acre Value (OOO's) Cumulative Developed and Occupied Units/Net Acres 2007 2008 2009 2010 Total Total Industrial Acres Total Commercial Retail Acres Total Commercial Office Acres Total Commercial Hotel Acres Total Acres $1,456 $1,409 $3,317 $3,261 0,0 16.7 0,0 0,0 16.7 6.0 16.7 0.0 0.0 22.7 Table 2 ASSESSED VALUE Land Use PerUnitl Net Acre Value (OOO's) $1,456 $1,409 $3,317 $3,261 $8,736 $23,530 $0 $0 $32,266 12.0 16.7 5.0 4.6 28.7 18.7 16.7 5.0 4.6 45.0 Cumulative Assessed Value(OOO's) 2007 2008 2009 2010 Total Industrial Acres Total Commercial Retail Acres Total Commencial Office Acres Total Commencial Hotel Acres Total Acrel $0 $23,530 $0 $0 $23,530 Table 3 Secured Property Tax Revenue (000s) 2006 Budget For Secured Property Tax $19,193,563 Secured Property Tax Revenue (OOOs) 2007 2008 2009 SECURED PROPERTY TAX REVENUES $17,472 $23,530 $16,585 $15,001 $72,568 $27,227 $23,530 $16,585 $15,001 $82,343 2010 Total Assessed Values Tax Rate Total Chula Vista Share" $23,530 $235 $26,5 $32,266 $323 $35.0 1.0% 10,1144% $72,588 $726 $78.7 $82,343 $623 $89.3 18.7 16.7 5.0 4.6 45.0 " Derived from discussions with the County Assessors Office, the City receives 10.1144 % of the 1% property tax coliected on the subject property 2006 Budget For Unsecured Property Tax Table 4 Unsecured Property Tax Revenue (OOO's) $640,000 UNSECURED PROPERTY TAX Tax Per Acre 2008 2010 2007 TOlallndustrial Acres Total Commencial Retail Acres Total Commercial Office Acres Total Commercial Hotel Aeres Total Unsecured Property Tax $405 $405 $405 $405 $0.0 $6.8 $0.0 SO.O $6,8 $2.4 $6.8 $0.0 SO.O $9.2 2009 $4.9 S6.8 $2.0 S1.9 $15.6 $7.6 $6.8 $2.0 $1.9 $18,3 A-4 EastLake Business Center II Supplemental PFFP Amendment Appendix A -' Resolution No. 2007-299 Page 285 Table 5 ESTIMATED PROPERTY TRANSFER TAX REVENUES 2006 Budget For Property Transfer Tax IndustriallCommeltial Resale Ratio (14 years) Product T otallndustrial Acres Total Commercial Retail Acres Total Commercial Office Aaes Total Commercial Hotel Acres Total Property Transfer Tax Sales Taxes From New Demand Sales Taxes Collected 2006 Estimated Non-Local Demana % Estimated Local Demand Local Demand Breakdown Residential Commercial (induding Office and HOlel) Industrial Other (Govemment. Schools, ete) Total Local Demand Commercial (induding Office and Hotel) Industrial Per Acre Commercial (including Office end Hoter) Industrial $2,407,777 0.00003929 Tax Per Acre $59 $54 $140 $130 Property Transfer Tax (00Ds) 2007 2008 2009 $0,0 $0.3 $0,7 $0.9 $0.9 $0.9 $0,0 $0.0 $0.7 $0.0 50.0 $0.6 $0,9 $1,2 $2.9 2010 $1.1 $0.9 50.7 50.6 53.3 Table 6 ESTIMATED SALES TAX REVENUES $ 26,788,000 280% $ 19,287,360 75% 10% 5% 10% $ , ,928,736 $ 964 ,368 $ 1,598 $ 1,112 Additional Salea Tax From HotellMolel Guests' Avg. Dairy Spending Per Capita HotellMotel VISitor ~ Excluding LodQing Expe~ . . HotellMotel- Excluding Lodging Expense And Adjusted By Lodging Rate Estimated Percentage of Expenditures Taxa~ in Chula Vista Number of Rooms Estimated Occupancy Rate Taxable Sales Tax Rate 10 City of Chula Vista Estimated Annual Sales Taxes From EastJake HoteJIMotel Per Acre Estimate Of Sa~s Taxes Generated By Visitors 2006 Budget For Sales Tax land Use Total industrial Aaes Total Commercial Retail Acres Total Commercial Office Aaes Total Commercial Hotel Aaes Tom' 8.1.. To: $26,788,000 Sales Tax Per UnltlAae $1,112 $1,598 $1,598 $4,301 5 94.51 $ 91.60 37% 150 87% $ 1,243,248 1% 5 12,432 $ 2,703 City of Chula VOlta'. Share of Sales Tax (OODs) 2007 2006 2009 2010 $0.0 $6.7 $13.3 $20.8 $26.7 $25.7 $25.7 $25.7 $0.0 50.0 58.0 $8.0 $0.0 50.0 519.8 519.8 $2&.7 $33.. $&7.B $75.3 'Visitor spending is based on CiC Researcl1'. "2006 San Die90 VosIlor Survey" conducted for San Diego CONYIS A-5 EastLake Business Center II Supplemental PFFP Amendment Appendix A Resolution No. 2007-299 Page 286 Table 7 ESTIMATED FRANCHISE FEES 2006 Budget For Franchise Fees $6,700,000 Per Aae Land Use Total Industrial Acres Total Commercial Retail Acres Total Commercial Office Acres Total Commercial Holel Acres Total Franchise Fees $2,047 $2,027 $2,027 $2,027 Franchise Fee Revenue (000'5) 2007 2008 2009 SO.O $12.3 $24.6 $33.9 $33.9 $33.9 $0.0 $0.0 $10.1 $0.0 $0.0 $9.3 $33.9 546,2 $n.9 2010 $38.3 $33.9 $10.1 $9.3 $91.6 Table 8 ESTIMATED TRANSIENT OCCUPANCY TAX Number of rooms 150 Estimated Room Rate' $ 85 Occupancy Rate' 70% Number of Days 365 Yearly Room Sales $ 3,257,625 T.O. Tax Rate 10% Estimated T.O. Tax $ 325.763 Per Acre $ 70,818 2006 Budget For Transient Occupancy Tax $2,410.301 Transient Occupancy Tax (OOO's) Land Use Total Hotel Acres Total Transient Occupancy Tax TOT per UniVNel Acre $70,818 2007 $0.0 $0.0 2008 $0.0 $0.0 20D9 $325.8 $325.8 2010 $325.8 $325.8 . Estima1ed room rate and occupancy rate was based on Sm~h Travel Research, AnnuaI200s, which reporled the following: Occupancy Rate: South and East 50 County 69%: 50 County Mldprloe 70%: SO County 150 Room 75% Room Rate: South and East SO County $64; 50 County Midprlce $91; SO County 150 Room $131 Estimates reflect a conservative approach to forecasting room rates and occupancy rate. A-6 EastLake Business Center II Supplemental PFFP Amendment Appendix A ~ Resolution No. 2007-299 Page 287 Table 9 ESTIMATED UTILITY TAX , 99912000 Budget For Utility Tax $6.400,000 Utility Tax Revenue (000's) Total Industrial Acres Total Commercial Reta~ Acres Total Commercial Office Acres Total Commercial Hotel Acres Total Utility Tax Tax per UnitlNet Acre 2007 200B 2009 20'0 $1,955 $0.0 $1'.7 S23.5 S36.6 S',936 S32.3 $32.3 S32.3 $32.3 S',936 $0.0 SO.O $9.7 $9.7 S',936 SO.O SO.O SB.9 SB.9 S32.3 $44.0 S74.4 SB7.5 Table '0 ESTIMATED BUSINESS LICENSE REVENUE 2006 Budget For Business license Tax $, .229.948 Land Use Average Business License Fee Per Acre Business License Fe.. (OOO's) 2007 200B 2009 20'0 Total Industrial Acres Total Commerdal Retail Acres Total Commercial Office Acres Total Commercial Hotel Aaes Total Business Ucense Tax S3'2 S795 $795 $795 SO.O S'3.3 SO.O SO.O $13.3 SI.9 S'3.3 $0.0 $0.0 S'5.2 S3.7 S13.3 $4.0 $3.7 S24.7 S5.8 $'3.3 $4.0 $3.7 $25.8 Table " ESTIMATED MISCELLANEOUS REVENUES Allocation of Budget Per Per Per Total House Comm. Ind. Budael Residential Commercial Industrial !.!nJl ~ Acre $108,877 $'06,677 $1.46 S16.800,OOO $16,eOO,000 $225.'6 $3.858,091 $3.375,830 S366,5'9 $' '5,743 $45.25 $303.74 $133.42 $279,645 5279,645 $3.75 $411,565 $308,674 $4.'''' $574,183 5430,637 $' 09,095 $25,B38 $5.77 $90.41 $29.78 $900.000 $900,000 $'2.06 $22.932.161 $22.203,463 $475,6'3 $141,58' $297.61 $394.15 $'63.20 Per Unit/Acre 2006 Budget Animal license & Bicycle Licenses Motor Vehicle Licenses Gas Tax Law Enforcement Fines Other FlOeS Parking Citations Charges for Current Services R.ecreation Proaram Total Misc. Revenue Land Use Per Unit/Acre Miscehaneous R.evenue (OOO's) 2007 2008 2009 $0.0 $1.0 $2.0 $6.6 $0.6 $6.6 $0.0 $0.0 $2.0 $0.0 $0.0 $, .8 $6.6 $7.6 $'2.3 Total Industrial Acres Total Commercial Retail Acres Total Commercial Office Acres Totill Commercial Hotel Acres Total Miscellaneous Revenues $'63 $394 $394 $394 20'0 $3.1 $6.6 $2.0 $1.8 $13.4 A-7 EastLake Business Center IT Supplemental PFFP Amendment Appendix A Resolution No. 2007-299 Page 288 legislative & Administrative Table 12 ESTIMATED LEGISLATIVE AND ADMINISTRATIVE EXPENDITURES Estimated Cost (OOO's) 2008 2009 2007 Total Indusbial Acres $ 9,84 per acre $0.000 $0.060 $0.120 Total Commercial Retail Acres S 37.30 per acre $0.520 $0.520 $0.520 Total Commercial Office Acres $ 40.28 per acre $0.000 $0.000 $0.200 Total Commercial Hotel Acres S 23.84 per acre $0.000 $0.000 $0.110 Total Leglslativ. & Admlnlstrativ. $0.520 $0.580 $1.050 2010 $0.180 $0.520 $0.200 $0.110 $1.110 Table 13 ESTIMATED DEVELOPMENT AND MAINTENANCE SERVICES EXPENDITURES Estimated Cost (OOO's) Development and Maintenance Services 2007 2008 2009 2010 Totallndusbial Acres $ 650.98 per acre Total Commercial Retail Acres $ 4,802.27 per acre Tola' Commercial Office Acres $ 3,099,43 per acre Total Commercial Hotel Acrell $ 1.541.40 per acre Total Development and Maintenance Service. $0.000 $80.200 $0.000 $0.000 $80.200 $3.910 $80.200 $0.000 $0.000 $84.110 $7.810 $80.200 $15.500 $7.090 $110.600 Police Table 14 ESTIMATED POLICE SERVICES EXPENDITURES Estimated Cost (OOO's) 2007 2008 2009 $12.170 $80.200 $15.500 $7.090 $114.950 2010 Totallnduatrial Acres Total Commercial Retail Acres Total Commercial Office Acres Total Commercial Hotel Acres Total Police $ 918.58 per acre $0.000 $5.500 $11.000 $ 6,860.31 per acre $114.570 $114.570 $114.570 $ 6,860.31 per acre $0.000 $0.000 $34.300 $ 6,660.31 per acre $0.000 $0.000 $31.560 $114.570 $120.070 $191.430 A-8 EastLake Business Center II Supplemental PFFP Amendment Appendix A $17.140 $114.570 $34.300 $31 .560 $197.570 c Resolution No. 2007-299 Page 289 Fire Table 15 ESTIMATED FIRE SERVICES EXPENDITURES Estimated Cost (ODD's) 2007 2008 2009 2010 Total Industrial Acres Total Commercial Retail Acres Total Commercial Office Acres Total Commercial Hotel Acres Total Fire S 313.56 per acre $0.000 $1.880 $3.760 $ 2,538.77 per acre $42.400 $42.400 $42.400 $ 2,538.77 per acre $0.000 $0.000 $12.690 $ 2,538.77 per acre $0.000 $0.000 $11.680 $42.400 $44.280 S70.530 Table 16 ESTIMATED CULTURAL AND LEISURE EXPENDITURES Estima1ed Cost (OOO's) 2007 2008 2009 Cultural and Leisure $5.00 $42.401 $12.69' $11.681 $72.63' 2010 Total Industrial Acres Total Commercial Retail Acres Total Commercial Office Acres Total Commercial Hotel Acres Total Cultural and Leisure S per acre SO.OOO SO.ooo SO.OOO $ per acre $0.000 $0.000 $0.000 $ per acre $0.000 $0.000 $0.000 $ per acre $0.000 $0.000 $0.000 $0.000 SO.OOO $0.000 Table 17 ESTIMATED OTHER NON-DEPARTMENTAL EXPENDITURES Estimated Cost (OOO's) 2008 2009 SO.OOO $0.000 $0.000 SO.OOO $0.000 $0.000 $0.000 SO.OOO $0.000 $0.000 Non-Departmental Tolallndusbial Acres Total Commercial Retail Acres Tolal Commercial Office Aer.s Total Commercial Hotel Acres Tolal Non.Deparbnenlal $ $ $ S per acre per acre per acre per acre A-9 2007 $0.000 $0.000 SO,OOO $0.000 SO.OOO EastLakc Business Cent<r II Supplemental PFFP Amendment Appendix A $0.000 $0.000 $0.000 $0.000 $0.000 2010 $0.000 $0.000 SO.OOO $0.000 $0.000 Resolution No. 2007-299 Page 290 TABLE 18 NET FISCAL IMPACT Revenue Sources Revenues (In Thousands) 2007 2008 2009 $25.5 $35.0 $78.7 $6.8 $9.2 $15.6 $0.9 $1.2 $2.9 $26.7 $33.4 $67.8 $33.9 $46.2 $77.9 $0.0 $0.0 $325.8 $32.3 $44.0 $74.4 $13.3 $15.2 $24.7 $6.6 $7.6 $12.3 $146.0 $191.7 5680.1 Secured Property Tax Unsecured Property Tax Property Transfer Tax Sales & Use Tax Franchise Tax TOT Tax Utility,Tax Business License Miscellaneous Revenues TOTAL REVENUES Expenditure Sources 2010 $89.3 $18.3 $3.3 $75.3 $91.6 $325.8 $87.5 $26.8 $13.4 $731.3 Expenditures (In Thousands) 2007 2008 2009 2010 $0.6 $0.7 $1.1 $1.1 $80.2 $84.1 $110.6 $115.0 $114.6 $120.1 $191.4 $197.6 $42.4 $44.3 $70.5 $72.6 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $237.8 $249.1 5373.6 5386.3 Legislative & Administrative Development and Maintenance Services Police Fire Cultural and Leisure Non-Departmental TOTAL EXPENDITURES Net (In Thousands) 2007 2008 2009 2010 $146.0 $191.7 $680.1 $731.3 $237.8 $249.1 $373.6 $386.3 ($91.8) (557.4) 5306.5 5345.0 Source: CIC Research. Inc. November 2007 TOTAL REVENUES TOTAL EXPENDITURES NET FISCAL IMPACT A-IO EastLake Business Center II Supplemental PFFP Amendment Appendix A Resolution No. 2007-299 Page 291 APPENDIX B WATER WILL SERVE LEITER (OMWD) B-} EastLake Business Center II Supplemenlal PFFP Amendment Appendix B Resolution No. 2007-299 Page 292 .. , . .. ", "., . ....._- .." o ......"Dr,liooled to CoI"nU~nils gWUllN:! Mr. Ben Guerrero Environmental Projects Manager .Chuta Vista Planning Department 276 Fourth Ave MSP-100 Chuta Vista, CA 91910 2S5ol~SI'AlNGS 8Ol.A..EYARD. IP'INGWtoUlY,C"lJI'ClI'IJU,'IIl1a.JOlW TElB'HCNE:670-2222,APEACODE'1' _~.gcw . Project No.; P1438-000001 \@~~reilV~I\Ql\ Activity: 3111 ku JUI-I 1 9 2067 i PLI>,NNING SUBJECT: WILL SERVE LETTER FOR HIGH RISE BUILDINGS IN THE EASTLAKE BUSINESS DISTRICT Dear Mr. Guerrero: This letter is in response to a request made by you for Otay Water District to provide a letter indicating that the project will be provided adequate potable water service and long-tenm water storage facilities. (7) Tbhe OtaYfWaterdDistri~cthasThthed tenmil.nallon~I-ltebrm wal~r dstoragke callPacify 10 servd~tri~cte .~ a ove re er,mee proJe. e eve oper WI e require ma e a necessary IS deposits to cover engineering and inspection costs. In addition, fire flow calculation for the business district is attached with a separate letter. Any additional fees will be collected upon the sale of water meter(s) for this project. Usually the meter purchase(s) occur in advance of Ihe properties being dedicated to the . . City: With this in mind, O\8y Wat"r District has .no objection to . the recondation of the "fInal map". Should you have any further concern, please call me at (619) 670-2243. . Sincerely, . rr~TTR DISTRICT ? 1/JvMZ- T~ David T. Charies . Public Services Manager .DTC:jrf 'J "J PLeASE NOTE: . This approval or<<v.llabllity Is subjl'Ct tll IIlII Otay W.1er Cistrlct tIIqulfwmenl,s in effKt <<t the time of .ppUcaUon for service. ~TTEMllM...LIER'otEUIClG1\WURVEI.ET'fat!AnLAKl:~SDISTI1:lCT"'l_" B-2 EastLake Business Center II Suppiemental PFFP Amendment Appendix B Resolution No. 2007-299 Page 293 APPENDIX C FIRE FLOW CALCULA nONS c.! EastLake Business Cenler II Supplemental PFFP Amendment Appendix C Resolution No. 2007-299 Page 2~4 ..' . 4.__...._ ..._. . '-'._"'__"-J"~ ) .3Dr.dicn(en fo.Con'lmunily .Q,fl;llUiCC" 25.5olSWllEE'TWA1VlSPAlNGS8OIJLf\IllI:IO,Sf'RWGVAI.UY,CAL.FClf'VlM"IJS.alOt ~:&1Oomt,AAEI\CODE&1' _.~.gov June I~. 2007 i'[D)~~~O~~,~! IlJill JUN 1 9 2007 i I L PLANI'~ W.O. PI438-OO300DO Activity: 3104 Benjamin Guerrero Environmental Projects Manager ChulA Vista Planning Department 276 Fourth Ave MSP -1 00 Chul. ViSle, CA 91910 SUBJECT: Fire flow caJculations for Eastlake Business District Mr, Glien-eTO. .. ) h. , c. d. e. Fire flow calculations for the subject site were performed by District staff using MWH Soft. lne.. H20 map water. Version 6.0. under the following assumptiom:: The water level in the storage facility at Ihc time of a fire is at the minimum o))erBtionalleve) that typically occurs during peak-bour demand conditions. The prescnoed two-hOUT fire duration coincides with a maximum day demand condition. Into and out of the pressure :zone where a fiZ"ll is occurring. all Agency booster pumps DTe otTo Areas outside the fire circumference in the same pressure zone maintain I. minimum pressure of 20 PSI. Current static presSUI"C ~ on hydraulic grade line calculations is: 123 PSI The results are as follows: STAncPRESS~: ,'-:.', RESIDUAL PRESSURE: 88.6 PSI-(SY.stu" demand only at marimum day condition) PSI (Syslem and fire /I""' demand of 2,$00 gQllonl pw minute) GPM GPM 104.5 FLOW @ 40 PSI: . FLOW @ 20 PSI: 619S 7311 A hydrant system curve is also attached for your reference. Sincerely, THE OTAY WATER DISTRiCT ENGINEERiNG PUBUC SERYlCES ) r:llWltofVt"..tto- ~"J\F''''E n.ow l.CTTEI. LCS1IAlrE /JUS/HUS DIST~'CTH-/4-f7. C-2 EastLake Business Center II Supplemental pm Amendment Appendix C ~ Resolution No. 2007-299 Page 295 ~- c\ . ....'-J , -' ., " . ..~) -----.. .---.-----, ~..-_.-----.-.r--.-.-..-----,.------------ ~ ....-....-.--------.--...---.---.--..... '" ~ ..c o o ci:i o ........_..._."_............. -ro' "<t to '" ~ !: .Q U !: ::> .., ~ .2 ~ ::> (,) ..--_..--._~ .----0'____.------- C <ll ~ '0 >, :c '_______._.___". ---------':'--!------------- ~ , " ~ ~ ':} Qsd) .JnssOJd IOnp!s... I [ '._..._ n.___ _ ___ C-3 t\ ~ ~ u: " :0 ~ .!!! . 'n; ~ E Q. .9 EastLake Business Cent..- II Supplemental PFFP Amendment Appendix C