HomeMy WebLinkAbout2007/11/13 Item 5 CITY COUNCIL AGENDA STATEMENT ITEM TITLE: SUBMITTED BY: REVIEWED BY: 11/13/07, Item 5 RESOLUTION ACCEPTING BIDS AND AWARDING CONTRACT FOR THE "TRAFFIC CALMING IMPROVEMENTS NAPLES STREET BY HARBORS IDE ELEMENTARY SCHOOL (TF-347)" PROJECT TO LEKOS ELECTRIC, INC. IN THE AMOUNT OF $80,640, AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE FUNDS IN THE J;'ROJECT DIRECTOR OF ENGINEERING AND GENERAL SERVICES ~~ . CITY MANAGER AJ/J.k- ASSISTANT CITY ~JA(iER sr-- 4/5THS VOTE: YES 0 NO [gj BACKGROUND On September 26, 2007, the City Engineer received sealed bids for the "Traffic Calming Improvements, Naples Street by Harborside Elementary School (TF-347)" project. The work proposed by this project aims to improve pedestrian safety at the mid-block crossing in front of Harborside Elementary and at the trolley track crossing west of the school as well as slow down traffic traveling along Naples Street. The traffic calming measures proposed include in-roadway crosswalk lights, median islands to provide a pedestrian refuge, speed limit feedback signs, and various other signs and striping changes to accommodate the new improvements as well as improve the safety mid-block crossing. ENVIRONMENTAL REVIEW The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project qualifies for a Class 1 categorical exemption pursuant to Section 15301 (Existing Facility) of the State CEQA Guidelines because it involves installation of various traffic calming devices (crosswalk striping, speed signs, etc.) within an existing street. Thus, no further environmental review is necessary. RECOMMENDATION Council approve the resolution accepting bids and awarding the contract for the "Traffic Calming Improvements, Naples Street by Harborside Elementary School (TF-347)" project to Lekos Electric, Inc. of El Cajon, CA in the amount of $80,640.00 and authorizing the expenditure of all available funds in the project. 5-1 11/13/07, Item2- Page 2 of 4 BOARDS/COMMISSION RECOMMENDATION Not applicable. DISCUSSION Naples Street, between Broadway and Industrial Blvd., has been a location Traffic Engineering has monitored for some time due to pedestrian safety and speeding concerns voiced by residents of the area as well as Harborside Elementary School staff. To address the areas of concern, a Capital Improvement Project was created with the fiscal year 2006-07 Capital Improvement Program budget titled "School Crosswalk - ColoradolNaples by Harborside Elementary." The original project proposed improvements to the existing mid-block pedestrian crossing in front of Harborside Elementary as well as sidewalk improvements along Naples Street and Colorado Avenue. Since the project was originally created, City staff applied for, and successfully received, $288,800 in grant funding for the project. As a result, on February 6, 2007, the City Council adopted two resolutions: . Resolution 2007-032 accepted California State Funds under the Safe Routes to School Program in the amount of $288,800 and appropriated the same amount from the State Grant Fund as well as an additional $10,000 from developer deposit revenue towards the Harborside Elementary School Traffic Calming Project. . Resolution 2007-033 established a new CIP, "Harborside Elementary School Traffic Calming" (TF-347) project, appropriated a total of $338,800 from various fuods to cover the cost of the improvements and the City's required grant fuoding match. As indicated in the previous February 6, 2007 agenda statement, the scope of work for the project (further detailed in the attached grant application) focuses on improving the pedestrian school route to Harborside Elementary by enhancing the mid-block crosswalk on Naples Street directly in front of the school as well as install approximately 450 feet of new sidewalk on the west side of Colorado A venue. However, since receiving the grant, the northwest comer of the Naples Street / Colorado Avenue intersection was redeveloped and the needed sidewalk was installed. City staff has coordinated with the State and amended our scope of work for the project removing the line item for sidewalk improvements. As a result of the elimination of sidewalk improvements from the project, staff was able to further enhance the mid-block crosswalk in front of Harborside Elementary. The final design for the project now includes the following features, including several that will be the first of their kind in the City ofChula Vista: . Raised medians to provide a pedestrian refuge for the mid-block crosswalk in front of Harborside Elementary as well as slow cars down through the area . In-roadway crosswalk lighting making the crosswalk more visible. The technology being implemented by this project is slightly different to that seen along the 300 block of Third Avenue and should result in much less maintenance issues for City staff . Radar feedback signs to tell drivers how fast they are traveling and remind them of the speed limit. This will be the first installation of such technology in the City of Chula Vista. . Overhead flashing beacons alerting drivers of the pedestrian crosswalk. This will be the first installation of such technology in the City of Chula Vista. . Pedestrian crossing signs at the trolley track crossing west of Harbors ide Elementary 5-2 11/13/07, Item5- Page 3 of 4 Having finalized the design, City staff advertised the project on August 24, 2007, and received four bids on September 26, 2007. The following table is a summary of the bids received: CONTRACTOR BID AMOUNT l. Lekos Electric, Inc. - El Cajon, CA $80,640.00 2. HMS Construction, Inc. - San Marcos, CA $90,328.00 3. Zondiros Corporation - San Marcos, CA $149,600.00 4. T & M Electric, Inc.- Santee, CA $1,013.745.00 The low bid submitted by Lekos Electric, Inc. ofEl Cajon, CA is below the Engineer's estimate of $131 ,600.00 by $50,960.00. Lekos Electric, Incorporated has recently installed a traffic signal project in the City with satisfactory performance. The bid submitted by T & M Electric has some discrepancies with their unit prices on some of their bid items resulting in a total bid amount of approximately $1 million; a bid significantly higher than any other bid received and strictly due to said discrepancies. Disclosure Statement Attachment 3 is a copy of Disclosure Statement for the lowest bidder, Lekos Electric. Wage Statement The source of funding for this project is State Grant funds. Contractors bidding this project were required to pay the State of California prevailing wages to persons employed by them for the work under this project. DECISION MAKER CONFLICT Staff has reviewed the property holdings of the City Council Members and has found no property holdings within 500 feet of the boundaries of the property which is the subject of this action. FISCAL IMPACT The project's original grant application listed the project's total cost as $338,800.00. The application requested grant reimbursement of up to $288,800.00 with the City of Chula Vista paying the remaining $50,000 as matching funds required by the grant. Because the 450 ft. of sidewalk initially proposed as part of the project has since been constructed by a private developer, the cost of the project is now significantly less than what was originally estimated. The City will only be reimbursed for the remaining improvements as well as advertising expenses and staff time (straight costs only - not full cost recovery), but is still obligated to provide $50,000 in matching funds. Staff therefore anticipates a reimbursement amount equal to the total cost for the project minus the $50,000 City match. This match will be funded using $10,000 in developer deposits and $40,000 of traffic signal fees (see tables). Staff will process the first reimbursement invoice to Caltrans after the award of the proj ect per the program supplemental agreement special covenants number seven. According to Council Policy No. 574-01, change orders exceeding 10% of any contract under $100,000 must receive Council approval first. However, approval of tonight's resolution will increase the Director of Public Work's authority to approve change orders up to the contingency amount of $16,128 (20%), an increase of $8,064. This additional authority is being requested 5-3 11/13/07, Item .s Page 4 of 4 because several of the improvements being implemented, as previously mentioned in this report, are new to the City of Chula Vista and its staff and as a result, minor, unforeseen circumstances may arise during the construction of these improvements. Normally, staff would be able to react to changing circumstances in the field and make any necessary funding requests to City Council in an appropriate timeframe. However, this proj ect, being directly in front of an elementary school, has a targeted construction period that coincides with Harborside Elementary School's winter break so as little disturbance to the school as possible is seen. The combination of the new technology being implemented and the tight construction timeframe for this project resulted in the 20% contingency recommendation so that, should issues arise, they can be' dealt with quickly and the project can remain on schedule. FUNDS REQUIRED FOR CONSTRUCTION A. Contract Amount $80,640.00 B. Contingencies (20%) $16,128.00 C. Anticipated Staff Time Including: $65,000 Construction Inspection Design/Construction Management Survey Work Planning/EnvironmentalfTraffic/LandscapelPublic Works TOTAL FUNDS ANTICIPATED FOR DESIGN AND CONSTRUCTION $161,768.00 FUNDS AVAILABLE FOR CONSTRUCTION A. State Grant Fund (Approximate amount to be reimbursed by Safe Route $111,768.00 to School Grant Program - SR2SL 5203 (023)) B. Developer's Deposit; Account Number DEI952 (KIMCO/Costco $10,000.00 remaining funds; a portion of the City's matching funds) C. Traffic Signal Fee Fund (A portion of the City's matching funds) $40,000.00 TOTAL FUNDS AVAILABLE FOR CONSTRUCTION $161,768.00 Upon completion of the project, the improvements will require only routine City street maintenance and minimal electricity costs for the flashing pedestrian lights. ATTACHMENTS I. Program Supplement Agreement No, C43 2. Resolutions 2007-032 and 2007-033 3. Contractor's Disclosure Statement Prepared by: Mari Malong, Assistant Engineer, Engineering and G eneral Services Dept. M:\Engineer\AGENDA \CAS2007\11-13-07\TF347awardagenda.doc 5-4 ATTACHMENT I rile;.: 0735 -ID-\F34-7 PROGRAM SUPPLEMENT NO. C43 to ADMINISTERING AGENCY -STATE AGREEMENT FOR STATE FUNDED PROJECTS NO. 000203 Date : August 04,2006 Location: II-SD-O-CIN proj ect Number: SR2SL-5203(023) E .A. Number :11-956438 Locode , 5203 This PROGRAM SUPPLEMENT, effective 1.1'-\ /IJD, hereby incorporates into the Administering Agency - State Agreement No. 000203 for State Fun4ed Projects which was entered into between the ADMINlSTERING AGENCY and the STATE with an effective date of 07/25/03 and is subject to all the terms and conditions thereof. This PROGRAM SUPPLEMENT is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. I C\ d,~ 0 approved by the ADMINlSTERING AGENCY on !P .11-'\1 (See copy attached). The ADMINlSTERING AGENCY lilrther stipulates that as a condition to the payment by the State of any funds derived from sources noted below encumbered to this project, it accepts and will comply with the Special Covenants and Remarks set forth on the following pages. PROJECT LOCATION: Naples St at Colorado Ave. near Interstate 5 TYPE OF WORK: enhance crosswalk, installing missing pedestrian facilities and calming veh Estimated Cost State Funds Matohing 'Funds STATE 8288,800.00 LOCAL OTHER 8338,800.00 850,000.00 80.00 80.00 CITY OF CIIULA VISTA By ~~ I L / '''1/06. STATE OF CALIFORNIA Depar~t ~f Transportation , lu.7L-~ ~ By :--;/ (jV6hief, Office of Project Xmplementation . Division of Local Assistanoe ./.' ]...... Date '1, '2--007 I Date Title CrT'7 E.J..-G.2,., ~ Chapter udgeted funds are available for this encumbrance: r bexeby certify upon my Accounting Officer Date ~~D'7-0(O 8288,800.00 Prcg::u:1 Fund ScurCEI ""OUNT 38 2005 2660-102-042 2005-2006 20.30.010.535 c 262040 042-T 288,800.00 Program Supplem.eut OO-D203-C43- SERIAL Page 1. of 5 5-5 Il-SD-O-CHV 08/04/2006 SR2SL-5203(023) SPECIAL COVENANTS OR REMARKS ~. The ADMINISTERING AGENCY will reimburse the STATE for the ADMINISTERING AGENCY share of costs for work requested to be performed by the STATE. 2. All obligations of STATE under the terms of this Agreement are subject to the appropriation of resources by the Legislature and the encumbrance of funds under this Agreement. Funding and reimbursement are available only upon the passage of the State Budget Act containing these STATE funds. 3. ~. This Program Supplement Agreement (PSA) is intended for Safe Route to School (SR2S) Program funded with State-only funding. Separate agreements are needed if PROJECT is also funded with any other STATE administered State or Federal funds. 2. The PROJECT will be administered in accordance with the SR2S Program Guidelines (LPP 02-01 effective March ~1, 2002), as approved and amended, and the PROJECT Application. 3. This PSA allows reimbursement of eligible PROJECT expenditures to the ADMINISTERING AGENCY for which State funds are allocated. The effective State allocation date establishes eligibility for the ADMINISTERING AGENCY to start reimbursable work and seek reimbursement of funds. Any work done prior to the effective allocation date is not eligible for reimbursement from the SR2S funds. 4. The. STATE and ADMINISTERING AGENCY agree that SR2S funds available for reimbursement to the ADMINISTERING AGENCY by the STATE will be limited to the amount allocated and encumbered by the STATE. Any additional funds made available by future allocations will be encumbered on this PROJECT by use of a STATE approved Allocation Letter and Finance Letter. 5. The ADMINISTERING AGENCY agrees to submit to the STATE, Exhibit 24-B "Project Status Report" as required by the SR2S Program Guidelines. 6. The ADMINISTERING AGENCY agrees to encumber the funds under agreement and award the construction contract by June 30th of the fiscal year in which funds are programmed. For projects unable to meet this deadline, the ADMINISTERING AGENCY may request, in Program Supplement 00-0203-C43- SERIAL Page 2 of 5 5-6 1 J-SD-O-CHV 08/04/2006 SR2SL-5203(023) SPECIAL COVENANTS OR REMARKS writing, a time Engineer (DLAE). one year, may be the new deadline extension from the District Local Assistance A one-time extension, for a maximum period of granted by the DLAE. Projects unable to meet may be dropped from the program. 7. The ADMINISTERING AGENCY agrees to provide contract award information to the STATE when submitting first invoice for this PROJECT. Attachment I of this PSA may be used for providing the necessary contract award information. 8. The ADMINISTERING AGENCY agrees to submit the "Report of Expenditures" to the DLAE within six (6) months after the project completion in accordance with Section 17.5 of the Local Assistance Procedures Manual (LAPM). 9. The ADMINISTERING AGENCY agrees to follow all relevant State laws and requirements including the ,California Environmental Quality Act (CEQA). 4. Any State and Federal funds that may have been 'encumbered for this project are only available for disbursement for a period of five (5) years and seven (7) years, respectively, from the: start of the fiscal year(s) that those funds were appropriated within the State Budget Act. All project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested and is approved by the California Department of Finance per Government Code Section 16304. The exact date of each fund reversion will be reflected in the approved finance letter(s) issued for this project. Notwithstanding the unliquidated sums of project specific State and Federal funding remaining and available to fund project work, any invoice for reimbursement that is not submitted to the Department on or before 60 days after that applicable fixed fund reversion date will not be paid from that fiscal year's encumbered funds because all of these unexpended funds will be irrevocably reverted by the Department's Division of Accounting on that date. Pursuant to a directive from the State Controller's Office and Progr~ Suppkeme~tOO-0203-C43- SBRIAL Page 3 of 5 5-7 T Il-SD-O-CHV 08/0412006 SR2SL-5203(023) SPECIAL COVENANTS OR REMARKS the Department of Finance, the last date to submit invoices for reimbursed work in each fiscal year is May 15th in order for payment to be made out of those then current appropriations. Project work performed and invoiced after May 15th will be reimbursed only out of available funding that might be encumbered in the subsequent fiscal year, and then only when those funds are actually allocated and encumbered as authorized by the California Transportation Commission and the Department's Accounting Office. 5. Billing Cycle ADMINISTERING AGENCY agrees to submit invoices in arrears for reimbursement of participating PROJECT costs at least once every six months commencing after the funds are encumbered for each phase by the execution of this PROJECT PROGRAM SUPPLEMENT or by STATE's future approval of an applicable Finance Letter. The total of all invoiced amounts claimed, plus any required matching funds, must not exceed the actual total cost allowable under this PROGP~ SUPPLEMENT for all authorized and completed PROJECT. engineering work, right of way acquisition, and construction. If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY shall submit a written explanation (with target billing date and target billing amount) of the absence of PROJECT activity. Should ADMINSTERING AGENCY fail to invoice for participating PROJECT costs incurred (including a written explanation when no invoice is submitted) within one year of the issuance of the PROJECT authorization to proceed by STATE or from the next invoice due date following the last PROJECT invoice, STATE may de-obligate and reassign to another party any unexpended Federal funds without notice to ADMINSTERING AGENCY. STATE may also not process any future request for authorization to proceed submitted by the ADMINSTERING AGENCY. Final Billing ADMINISTERING AGENCY agrees that it shall submit the Final Invoice and Final Detail Estimate within 180 days of PROJECT completion. ADMINISTERING AGENCY's failure to submit these Program SupplementOO-0203-C43- SERIAL Page 4 of 5 5-8 J I-SD-O-CHV 08/04/2006 SR2SL-5203(023) SPECIAL COVENANTS OR REMARKS documents will result in sanctions imposed upon ADMINISTERING AGENCY by STATE in accordance with Chapter 17.6, "Consequences For lion-Compliance", of the Local Assistance Procedures Manual. De-obligate Federal Funds for Construction Phase ADMINISTERING AGENCY agrees that if the estimated PROJECT construction cost is less than the obligated amount for construction by more than $50,000, that excess amount of federal funds initially obligated is subject to de-obligation by STATE once the project has been awarded by ADMINSTERING AGENCY. Program SupplementOO-02C3-C43w SERZAL Page 5 of 5 5-9 .--."'-.... , RESOLUTION NO. 19290 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE DESIGNATION OFTHE DEPUTY PUBLIC WORKS DIRECTOR/CITY ENGINEER AS THE POSITION AUTHORIZED TO EXECUTE. FOR AND IN BEHALF OF THE CITY OF CHULA VISTA ALL .PROGRAM SUPPLEMENT" AGREEMENTS AND RELATED DOCUMENTS, APPLICATIONS AND REOUESTS FOR REIMBURSEMENTS FOR THE PURPOSE OF OBTAINING CERTAIN FEDERAL FINANCIAL ASSISTANCE IN ACCORDANCE WITH THE ADMINISTERING AGENCY - STATE MASTER AGREEMENT FOR FEDERAL AID PROJECTS NO. 11- 5203 WHEREAS, on June 17, 1997. the Chula Vista City Council approved the Administering Agency-State Master Agreement for Federal Aid Projects No. 11-5203: and WHEREAS. the Master Agreement provides the basis for all the transactions required through the State before Federal Aid funds can be released to the City: and WHEREAS, this resolution will authorize the DepvtY Public Works Director/City Engineer to execute for and in behalf of the City of Chula Vista all "Program Supplement'; agreements and related documents, applications and requests for reimbursement for the purpose of obtaining certain federal financial assistance in accordance with said Master Agreement for Federal Aid Projects. NOW, THEREFORE, BE IT RESOLVED that the CitY Council of the City of Chula Vista does hereby approve the designation of the Deputy Public Works Director/City Engineer as the position authorized to execute for and in behalf of the City of Chula Vista all 'Program Supplement" agreements and related documents, applications and requests for reimbursement for the purpose of obtaining certain federal financial assistence in accordance with the Administering Agency-State Master Agreement for Federal Aid Projects No. 11-5203. Presented by Approved as to form by .. ~MhIJ(,(z)1.-':C1 ) ._l''tJohn,{' Lippitt . :.' Publfc Works Director (~~~O J'6l:lf1 M. Kaheny , / /ty Attorney , J 5-10 Resolution 19290 Page 2 PASSED. APPROVED, and ADOPTED by the City Council of the City of Chule Vista. California, this 8~ day of December. 1998. by the fonowing vote: AYES: Councilmembers: NAYS: Councilmembers: ABSENT: Councilmembers: ABSTAIN: Councilmembers: .o.T!EST: ~ C (2~iJd 8a....rl'f.A. ;t\u~helet, CIty Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO CITY OF CHULA VISTA Davis, Moot, Padilla, Salas and Harron None None None JJA./-f ~. or, /b:h TIIA Shirley Honoff. Mayor I. Beverly A. Authelet, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No.1 9290 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista CitY Council held on the 8~ day of December, 1998. Executed this B'" day aT December, 1998. ~ C ;;Ldd. fdl Beverly A. AutheJet, City Clerk 5-11 'r ., ATTACHMEN1..-L RESOLUTION NO. 2007-032 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING CALIFORNIA STATE FUNDS UNDER THE SAFE ROUTES TO SCHOOL PROGRAM IN THE AMOUNT OF $288,800 FOR THE "HARBORS IDE ELEMENTARY SCHOOL TRAFFIC CALMING PROJECT' WHEREAS, the California Department of Transportation (CalTrans) establishes and administers the Safe Routes to School (SR2S) Program to fund the construction of bicycle and pedestrian safety and traffic calming projects; and WHEREAS, the City of Chula Vista applied for grant funding through the SR2S program to improve pedestrian facilities adjacent to Harborside Elementary School; and WHEREAS, the City of Chula Vista received word on July 28, 2006, that the grant application had been approved. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista appropriates $288,800 from the State Grant Fund based upon revenue from the Safe Routes to School Program, and $10,000 based upon developer deposit revenue to the Harborside Elementary School Traffic Calming Project (TF-347). Presented by Approved as to form by ~.%?-R~ Scott Tulloch City Engineer <t""\)"~~{'~ . Ann Moore \ City Attorney 5-12 Resolution No. 2007-032 Page 2 PASSED, APPROVED, and ADOPTED by the City Council of the City ofChula Vista, California, this 6th day of February 2007 by the following vote: AYES: Councilmembers: Castaneda, McCann, Ramirez, Rindone, and Cox NAYS: I Councilmembers: None ABSENT: Councilmembers: None Cheryl~y~ ATIEST: -~UtL../~ 0 Susan Bigelow, MMe, City erk lOr- STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certilY that the foregoing Resolution No. 2007-032 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 6th day of February 2007. Executed this 6th day of February 2007. ~116 ,-t ~~......J~ Susan Bigelow, MMC, City Cle 5-13 RESOLUTION NO. 2007-033 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ESTABLISHING A NEW CAPITAL IMPROVEMENT PROJECT "HARBORSIDE ELEMENTARY SCHOOL TRAFFIC CALMING" (TF-347), AND APPROPRIATING FUNDS OF $288,800 IN STATE FUNDS, $40,000 IN TRAFFIC SIGNAL FUNDS FOR CITY'S COST SHARE, AND $10,000 IN DEVELOPER'S REMAINING FUNDS WHEREAS, the California Department of Transportation (CalTrans) establishes and administers the Safe Routes to School (SR2S) Program to fund the construction of bicycle and pedestrian safety and traffic calming proj ects; and WHEREAS, the City of Chula Vista applied for grant funding through the SR2S program to improve pedestrian facilities adjacent to Harborside Elementary School; and WHEREAS, the City of ChuIa Vista received word on July 28, 2006, that the grant application had been approved; and WHEREAS, the City of Chula Vista has accepted the SR2S Program grant funds in the amount of $288,800 to be applied towards the Harborside Elementary School Traffic Calming Project; and WHEREAS, in compliance with the grant application, the City is obligated to provide $50,000 of matching funds to be applied towards the Project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista hereby establishes a new Capital Improvement Project titled "Harborside Elementary School Traffic Calming" (TF-347). BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista appropriates $288,800 from the State Grant Fund (Account Number 73651) to be applied towards the Harborside Elementary School Traffic Calming Project (TF-347). BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista appropriates $40,000 from the available balance of the Traffic Signal Fund to the Harborside Elementary School Traffic Calming project (TF-347). BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista appropriates $10,000 in funds deposited with the City resulting from a development obligation (Account Number DE1952) to be applied towards the City's cost sharing obligation for the Harborside Elementary School Traffic Calming Project (TF-347). 5-14 Resolution No. 2007-033 Page 2 Presented by Approved as to form by ;:;2c:--~?? e Scott Tulloch City Engineer ~1"~~ Ann Moore ' City Attorney PASSED, APPROVED, and ADOPTED by the City Council of the City ofChula Vista, California, this 6th day of February 2007 by the following vote: AYES: Councilmembers: Castaneda, McCann, Ramirez, Rindone, and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: None aLt~ Cheryl Cox, May A TIEST: - ~~ - ~11&l ~ Susan Bigelow, MMC, ity Cle STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2007-033 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 6th day of February 2007. Executed this 6th day of February 2007. - - ~I, 16,-- ~, ls'J ~ Susan Bigelow, MMC, City Clerk 5-15 ATIACHMENT _3 CITY OF CH1JLA VISTA DISCLOSURE STATEMENT Pursuant to Council Policy 101-01, prior to any action upon matters that will require discretionary action by the Council, Planning Commission and all other official bodies of the City, a statement of disclosure of certain ownership or financial interests, payments, or campaign contributions for a City of Chula Vista ejection must be filed. The following information must be disclosed: 1. List the names of all persons having a financial interest in the property that is the subject of the application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier. NIp" 2. If any person * identified pursuant to (I) above is a corporation or partnership, list the names of all individuals with a $2000 investment in the business (corporation/partnership) entity. }lIp- 3. If any person* identified pursuant to (1) above is a non-profit organization or trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. l'li!1 I I I I 'I ! I ! .:1 ~ :; 4. . Please identify every person, inCluding any agents, employees, consultants, or independent contractors you have assigned to represent you before the City in this matter. ~/A 5. Has any person. associated with this contract had any financial dealings with an official.. of the City ofChula Vista as it relates to this contract within the past 12 months? Yes_No~ NO 14 IICitywide2000lhomelEngineerl TRAFFIClACAD DwgslST ANDARD DWGS (ACAD)ICIP PROJECTSITF-347HarborsideITF- 347Specs.doc 5-16 I I If Yes, briefly describe the nature of the financial interest the official" may have in this conlract. t--IIA I I I 6. Have you made a contribution of more than $25.P'within the past twelve (12) months to a current member of the Chula Vista City Council? No ~ Yes _ If yes, which Council member? 7. Have you provided more than $340 (or an item of equivalent value) to an official** of the City ofChula Vista in the past twelve (12) months? (T\)is includes being a source of income, money to retire a legal debt, gift, loan, etc.) Yes _ No ~ I I If Yes, which official** and what was the nature of item provided? I I Date: !)-;).5-07 ~~~ I Signature of Contractor! Applicant I iER.E5,cr E.. L-~ K t1.5 Print or type name of Contractorl Applicant I * Person is defined as: any individual, firm, co-parmership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality, district, or other political subdivision, -or any other group or combination acting as a unit. I ** Official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member of a board, commission, or committee of the City, employee, or staff members. . I I . . 15 IICitywide2000\homelEngineerITRAFFIC\ACAD DwgslST ANDARD DWGS (ACAD)\ClP PROlECTS\TF-347HarborsideITF- 347Specs.doc . 5-17 RESOLUTION NO. 2007-_ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND A WARDING CONTRACT FOR THE "TRAFFIC CALMING IMPROVEMENTS NAPLES STREET BY HARBORSIDE ELEMENTARY SCHOOL (TF-347)" PROJECT TO LEKOS ELECTRIC, INC. IN THE AMOUNT OF $80,640 AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE FUNDS IN THE PROJECT WHEREAS, on September 26,2007, the City Engineer received four (4) sealed bids for the "Traffic Calming Improvements Naples Street by Harborside Elementary School (TF-347)" project; and WHEREAS, the Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project qualifies for a Class I Categorical Exemption pursuant to Section 15301 (Existing Facilities) of the State CEQA Guidelines because it involves installation of various traffic calming devices (crosswalk striping, speed signs, etc.) within an existing street. Thus, no further environmental review is necessary; and WHEREAS, the City received bids from four (4) contractors as follows: CONTRACTOR BID AMOUNT 1. Lekos Electric, Inc. - EI Cajon, CA $80,640.00 2. HMS Construction, Inc. - San Marcos, CA $90,328.00 3. Zondiros Cornoration - San Marcos, CA $149,600.00 4. T & M Electric, Inc.- Santee, CA $1,013.745.00 WHEREAS, the low bid submitted by Lekos Electric, Inc. of EI Cajon, CA is below the Engineer's estimate of $131,600.00 by $50,960.00. Lekos Electric, Incorporated has recently installed a traffic signal project in the City with satisfactory performance. The bid submitted by T & M Electric has some discrepancies with their unit prices on some of their bid items resulting in a total bid amount of approximately $1 million; a bid significantly higher than any other bid received and strictly due to said discrepancies; and WHEREAS, the total cost of the design and construction of this project is estimated at $161,768, which includes a $16,128 contingency and approximately $65,000 in staff time. WHEREAS, the source of funding for this project is from a State Grant and a required City match in the amounts of $111,768 (SR2SL 5203 (023)) estimated and up to $50,000 ($10,000 Developer's deposit (Account # DE-1952) and $40,000 (Traffic Signal Fees)), respectively; and WHEREAS, the state grant will be provided to the City on a reimbursement basis. Staff will process the first reimbursement invoice to Caltrans after the award of the project per the program supplemental agreement special covenants number seven; and 5-18 WHEREAS, contractors bidding this project were required to pay the State of California prevailing wages to persons employed by them for the work under this project; and WHEREAS, Staff requests that City Council waive the limitations related to change orders identified in City Council Policy 574-01 to permit the Director of Public Works to approve change orders as necessary up to the contract contingency amount; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and award the contract for the "Traffic Calrning Improvements Naples Street by Harborside Elemetary School (TF-347)" project to Lekos Electric, Inc. in the amount of $80,640.00, authorize the expenditure from funds SR2SL 5203 (023), Developer's Deposit Account # DE-1952, and Traffic Signal Fees, in the amounts $111,768, $10,000, and $40,000, respectively; and BE IT FURTHER RESOLVED that the City Council of the City Of Chula Vista does hereby waive the requirements of City Council Policy 574-01 to permit the Director of Public Works to approve change orders as necessary up to the contract contingency amount. Jack Griffin Director of Engineering and General Services Presented by K:\ENGINEERIRESOSlResos2007\1l-13-2007\TF347 Reso for Award.doc 5-19