Loading...
HomeMy WebLinkAbout1991/06/18 Item 31 COUNCIL AGENDA STATEMENT Item Meeting Date 3:1 6/18/91 ITEM TITLE: Public Hearing: a) Consideration of Water Conservation Plan and Air Quality Improvement Plan for Rancho del Rey SPAs II and III; b) Consideration of Rancho del Rey sectional Planning Area III Design Guidelines c) PCS-90-02: Request to subdivide 404.9 acres known as Rancho del Rey sectional Planning Area III, Chula vista Tract No. 90-02 located between East "H" Street and Telegraph Canyon Road, immediately south of Rancho del Rey SPA I; Rancho del Rey Partnership Resolution Recertifying that the Final EIR-89-l0 for Rancho del Rey SPA III has been prepared in compliance with CEQA, the State CEQA Guidelines and the environmental review procedure of the city of Chula vista Approving the Water Conservation Plan for Rancho del Rey SPAs II and III with amendments per Attachment 1 Resolution Resolution Approving the Air Quality Improvement Plan for Rancho del Rey SPAs II and III Resolution Approving the Design Guidelines for Rancho del Rey SPA III Resolution Approving the tentative subdivision map for Rancho del Rey SPA III Resolution Amending the CEQA Findings for EIR-89-l0, Rancho del Rey SPA III Resolution Amending the Mitigation Program for EIR-89-l0, Rancho III Director of Planning pt City Manager g (4/sths Vote: Yes _ No -1L) Monitoring del Rey SPA SUBMITTED BY: REVIEWED BY: 3/-1 Page 2, Item Meeting Date 6/18/91 The applicant, Rancho del Rey Partnership, has submitted a tentative map for the Sectional Planning Area (SPA) III Plan to subdivide approximately 405 acres into residential lots, open space areas, a school lot, a park, and a community purpose facility lot. The project is bounded on the north by East "H" Street and Rancho del Rey SPA I, on the south by Telegraph Canyon Road, on the west generally by Paseo Ladera and existing development, and on the east generally by Buena vista Way (Exhibit 1 attached). Included for your consideration are the Air Quality Improvement and Water Conservation Plans prepared for Rancho del Rey SPAs II and III as directed by city Council, the tentative maps for the three phases of SPA III, and the Design Guidelines. The Design Guidelines were presented for informational purposes at the time of SPA Plan review and are presented at this time for adoption. Rancho del Rey SPA III is the final sectional Planning Area for the EI Rancho del Rey Specific Plan. The SPA I plan was approved in 1987 and is now under construction. The SPA II plan was approved in 1989 and is also under construction. Rancho del Rey SPA III was approved in January, 1991. Your Council previously certified EIR-89-10 and the associated mitigation monitoring program in its consideration of the sectional Planning Area Plan for Rancho del Rey SPA III. Additional mitigation measures are proposed with the air and water plans. Therefore, amendments to the CEQA Findings and the Mitigation Monitoring Program are required. A more complete discussion of these environmental documents is contained in the Discussion section below. RECOMMENDATION 1. Recertify that the Final EIR-89-10 for Rancho del Rey SPA III has been prepared in compliance with CEQA, the State CEQA Guidelines and the environmental review procedure of the city of Chula Vista; 2. Adopt a resolution approving the Water Conservation Plan for Rancho del Rey SPAs II and III with the following amendments: Amendment No. 1 Table 1-2 on page 3; Amendment No. 2 Pages 31 and 32 (Amendments are contained in Attachment 1 to this report); 3. Adopt a resolution approving the Air Quality Improvement Plan for Rancho del Rey SPAs II and III; 4. Adopt a resolution approving the Design Guidelines prepared for Rancho del Rey SPA III; 3/- ~ Page 3, Item Meeting Date 6/18/91 5. Based on the Findings and Conditions in the attached draft city council Resolution, approve the tentative subdivision map for Rancho del Rey SPA III; 6. Adopt a resolution amending the CEQA Findings for EIR-89-10, Rancho del Rey SPA III; and 7. Adopt a resolution amending the Mitigation Monitoring Program for EIR-89-10, Rancho del Rey SPA III. BOARDS/COMMISSIONS RECOMMENDATIONS On March 31, 1991, the Parks & Recreation Commission approved the concept park plan. On May 6, 1991, the Resource Conservation commission reviewed the tentative map and had no comment. On May 8, 1991, and on May 22, 1991, the city Planning commission, held public hearings to consider the air and water plans, the design guidelines and the tentative map. On May 22nd the commission unanimously recertified EIR-89-10, and recommended approval of the design guidelines and provisional approval of the tentative map for Rancho del Rey SPA III. While the Commission reviewed and considered both the Air Quality Improvement Plan and the Water conservation Plan, no action was taken. The provisional tentative map approval is based on both the air and water plans, and the subsequently amended CEQA Findings and Mitigation Monitoring Program, being approved by the City Council. DISCUSSION Rancho del Rev Sectional Plannino Area (SPA) III Plan The Rancho del Rey SPA III Plan is included as Exhibit 2 attached. The plan is intended to show the general location of all proposed uses and the general circulation system. It details that within the 405 acres of SPA III, there are proposed a maximum of 1,380 dwelling units (314 single family conventional units at 2-4 and 4-6 dwelling units per acre; 250 single family cottage units at 4-6 and 6-8 dwelling units per acre; 228 townhouse units at 8-12 dwelling units per acre; and 588 specialty housing units at 4-6, 6-8 and 8- 12 dwelling units per acre). Also included in the plan is a 26.1 acre junior high school site, a 10.8 acre park site, a 1.9 acre community purpose facility site and 148.3 acres of open space. This SPA plan was approved with conditions at the city Council hearing of January 15, 1991. (A more complete analysis of the subdivision lot designations is found in Section D. ANALYSIS, following this Discussion section.) 3/- '3 Paqe 4, :Item Meetinq Date 6/18/91 Subdivision Structure and Desiqn Rancho del Rey SPA III is planned to be a residential community with a diversity of housing types which will become available to families and individuals with various income levels and housing needs. Eighty-six acres of Specialty Housing is located in the northern portion of the plan, immediately south of East "H" Street. A variety of housing types will be included in the development of this area as a retirement community. Precise plan approval will further detail specific requirements and provisions for this lot. The single family units in SPA III are generally located in the center of the plan and have been designed to relate to existing adjacent single family units. The area located in the southeastern portion of the plan will interface with existing multi family development to the east and with the park and open space systems to the south and west. The open space system in Rancho del Rey SPA III includes over 148 acres consisting mostly of canyon and slopes covered in coastal sage scrub. Trail and pedestrian path systems will be provided along East "H" Street, in the south leg of Rice Canyon, along Paseo Ranchero and in the open space areas north of Telegraph Canyon Road. These trails and pedestrian paths result in an added recreational benefit for the area. Gradinq The EI Rancho del Rey Specific Plan set the limit for developable areas and open space areas. In addition, the Specific Plan included a series of findings acknowledging that development of the project site under the adopted Specific Plan would require substantial landform alteration. At the time of SPA Plan approval, alternative grading concepts that alleviated amounts of grading in open space areas and reduced heights of cut and fill slopes were presented and made part of project approval. Development areas are located on the higher elevations or plateaus, while the canyons and slopes remain primarily in open space with some recreational uses such as trails. The Rancho del Rey SPA III Plan calls for a balanced cut and fill grading program of approximately 4.0 million cubic yards. Typical cuts and fills will range between 10 and 20 feet. Many slopes will be retained in a natural state in the open space areas. Those graded slopes that encroach the open space areas will be revegetated with native species. Grading shown on the tentative maps is consistent with the alternative grading concept plan and maintains the areas set for development and open space by the Specific Plan. A condition is recommended for tentative map approval that requires grading proposals to be reviewed by the City Engineer for consideration of balanced cut and fill, utilization of appropriate soil types, 3/- Y Page 5, Item Meeting Date 6/18/91 effective landscaping and revegetation where applicable. Grading is to occur in separate phases unless a single phase operation is approved with the grading plan. An area of potential concern is the grading and drainage occurring on lots 71, 72 and 89 of Phase 2, unit 1. In these areas, the subdivision must meet and interface with existing development and grading will need to be accommodated on site. In order to provide the largest possible pad area and avoid a difficult terrain situation of open drainage channels on residential lots, staff prefers that the grading and drainage plans detailing these lots provide for spot drainage interceptors to catch the water and carry it underground. This may require retaining walls and further grade analysis. A recommended condition of approval requires that no negative grading or drainage impacts occur to the off site properties adjacent to these lots. Circulation Access to the subdivision is provided by Paseo Ranchero from either East "H" street to the north, Telegraph Canyon Road to the south, or via East "J" street from the west. The EI Rancho del Rey Specific Plan designates Telegraph Canyon Road and East "H" Street as prime arterials, Paseo Ranchero as a 4 lane collector and East "J" street as a 2 lane residential collector. The proposed tentative map and improvements for these streets are consistent with the SPA Plan, Specific Plan, and General Plan designations. Conditions of SPA approval and the Public Facilities Financing Plan (PFFP) require development of SPA III to be consistent with any adopted Eastern Chula vista Transportation Phasing Plan. This is also made a condition of tentative map approval. The PFFP also requires completion of East "J" Street to connect with existing improvements to the west. An item of concern raised at the City Council hearing on the SPA regarded the level of service at the intersection of Pas eo del Rey and East "H" street. It was determined that a right turn lane would be required should conditions warrant the addition. However, given the open space canyon slope that is located immediately adjacent to the right-of-way and the substandard street width already established, there may be substantial impact associated with the addition of the turn lane. A condition of tentative map approval provides that the developer enter into an agreement to provide a right turn lane at the intersection of Paseo del Rey and East "H" Street, to the satisfaction of the City Engineer, should it be determined to be necessary. ~/-S Page 6, :Item Meeting Date 6/18/91 The Metropolitan Transit and Development Board (MTDB) has provided comment on the transit alternatives provided by Rancho del Rey SPA III (Attachment 2). While the design of the project creates neighborhoods and is sensitive to natural topography, the circuitous streets and cul-de-sacs are not as easily adapted to transit operation as much as the traditional interconnecting grid system of streets. MTDB recommendations and recommendations from the Air Quality Improvement Plan include pedestrian pathways through ends of cul-de-sacs that would connect to adjacent streets, adequate public rights-of-way at intersections along major arterials for future bus stops, and park and ride facilities where feasible to encourage car pooling. These have been incorporated into the conditions of approval. Low and Moderate Income Housinq The Housing Element requires that subdivisions of over 50 dwelling units provide 5% of the total project unit count as affordable units for low-income families and 5% of the total project unit count for moderate-income families. In August, 1990, the city council approved an agreement concerning this requirement and how it will be met in the Rancho del Rey specific Plan area. The agreement states that Rancho del Rey has satisfied in full the moderate income housing requirement of 322 units by the construction of multi-family units in the Rancho del Rey specific Plan area. The goal for low income units has been partially met. The agreement also states that the additional 23 (minimum) low income units will be provided in SPA III if a reasonable area for such units is available. If no such site is available in SPA III, it was agreed that an alternate site within the City may be approved. A condition has been placed on tentative map approval that prior to first final map approval, the applicant shall present a schedule demonstrating how compliance with the low income housing requirement will be met. Specialtv Housinq Area The specialty Housing Area, shown on the tentative map as Phase 1, will be developed as a retirement community, creating a village atmosphere for residents in a variety of housing types. The precise design of the development is unknown at this time. However, the conceptual grading plan, made a part of SPA Plan approval, provides the basic footprint of the pad and slope areas and the circulation. The Design Guidelines discuss the desired concepts to be used in developing the site. SPA Plan approval and recommended tentative map conditions of approval require the adoption of a Precise Plan prior to development of the parcel. Another recommended condition requires an agreement be entered into by the developer that the parcel be developed specifically for senior housing. ~/-~ .page 7, Item Meeting Date 6/18/91 At the meeting of January 15, 1991, council expressed concern that there be guarantees in place regarding the development of this land for senior use. specific details of financial arrangements are more properly handled in a development agreement, which is currently being prepared by the developer and staff. The requirement for Precise Plan approval will provide the City adequate review of the density, circulation, open space and interface of the retirement community with the surrounding areas. In addition, a condition has been included that requires an agreement be entered into by the developer and the city, prior to recordation of final map, that the parcel will be developed specifically for senior housing. Communitv Purpose Facilities The Community Purpose Facility Task Force was created by the city council to study the need for community facilities in the City of Chula vista. The Task Force has made specific recommendations to the City council for a minimum acreage requirement of 1.39 acres of Community Purpose Facility land per 1,000 persons. This minimum acreage requirement was recently adopted as a City standard. An analysis of the projected population for SPAs I, II and III combined, based on unit types, yields that 16.12 acres of community purpose facility land is required. Actual acreage provided within the boundaries of SPAs I, II and III, including the 1.1 net acre site proposed in SPA III, totals 11.2 acres. The deficit of approximately 4.92 acres may be made up by considering an out parcel immediately adjacent to SPA III at the southeast corner of Pas eo Ranchero and East "H" Street. This property, owned by the Rancho del Rey Partnership, is currently in negotiations for sale to a church community. Condi tions of tentative map approval include the requirement that compliance with the Community Purpose Facility Ordinance be demonstrated prior to first final map approval. The applicant is proceeding with a SPA amendment and appropriate rezoning to designate the 4.92 acres for Community Purpose land use. Park Dedication The Tentative Maps for Rancho del Rey SPA III provide for a 10.80 acre (gross) neighborhood park located on the south side of East "J" Street adjacent to the junior high school. This is consistent with the approved SPA Plan for the project. The Park Land Dedication Ordinance (PLDO) requires 12.5 acres of park land based on projected population and current PLDO application. After sUbtracting the area with slopes greater than 5:1, the net useable acreage of the neighborhood park is 10.25. In addi tion to requiring fees and/or additional improvements to make up the shortage of park land, joint use of recreational facilities located '3/-7 Page 8, Item Meeting Date 6/18/91 on the park and school grounds will serve the recreational needs of the community. The design of both the park and school have taken joint use of facilities into consideration. Facilities located on the school grounds to be available for public use include tennis courts, basketball courts, hard courts and ball fields. Facilities on the park property include tot lots, a par course, soccer fields and picnic areas. The park plan was approved by the Parks commission on March 21st. In addition to the 10 acre park, SPA III incorporates the trail system previously described. Water Conservation Plan and Air Qualitv Improvement Plan The city council directed that a Water Conservation Plan and Air Quality Improvement Plan be prepared for Rancho del Rey SPAs II and III pursuant to the General Plan and the Growth Management policies. Water The purpose of the Water Conservation Plan is to respond to the long term need to conserve water in new development. The conservation plan is intended to be implemented over the life of the project and to establish standards for future residents. Since the immediate water crisis has eased, the two water districts serving the Chula vista area have adopted less stringent water cutbacks than what was anticipated at the time of SPA Plan approval. The Water Conservation Plan prepared for SPAs II and III and included with this report, states that with water conservation measures implemented on-site, projected water use for all areas of SPAs II and III, including the park and school, is 400,000 gallons of water per day. The water conservation measures outlined in the Water Conservation Plan for SPAs II and III include on-site measures (efficient fixtures and devices in the units, efficient landscaping and irrigation, public awareness and education programs) and a commitment to participate in any off-site mitigation program adopted by the city. Such a program would be designed to require new development to off-set all or a portion of their new water demand by funding or providing new water conservation improvements in older areas where efficient plumbing or irrigation fixtures were not installed. Fees collected could also be spent on studying or acquiring new or improved sources of water (e. g., expanded water reclamation, desalinization, etc.). The applicant shall comply with a City-approved water use offset policy. Said policy may require one or more of the following: 1. Compliance with a regional water use offset program, to be administered by the San Diego County Water Authority. 3( - fr Page 9, Item Meeting Date 6/18/91 2. Compliance with a locally administered water use offset program; 3. Implementation of specific water use offset measures for this project, if neither a regional or locally-administered water use offset program is in place prior to issuance of building permits for any portion of this project. In the event that a City-approved water offset policy is not in effect at the time building permits are issued, the requirements of this plan shall be met through implementation of specific water offset measures for this project, with the level of offsets and specific measures to be approved by the City. At their hearing on May 22, 1991, the Planning Commission expressed concern that this project be held to a water policy enacted on a regional or City-wide basis. Since Chula vista is acting as a forerunner in the water conservation program, they expressed the desire that the City work with the water districts operating in the city as well as with other jurisdictions to encourage a County-wide program. Air Qualitv As discussed in the Air Quality Improvement Plan included with this report, the most significant air quality improvement measures are those policies and regulations established at the broadest geographic level, i. e. State or Federal. However, measures implemented on a City or project level can have a positive impact. The Air Quality Improvement Plan prepared for Rancho del Rey SPAs II and III includes mitigation measures suggested by the developer and those recommended by the consultant reviewing the plan, Stevens/Garland and Associates. These include pedestrian and bicycle paths, jobs/housing balance, access to regional travel systems, access to transit, educational programs to increase awareness, and the provision of park-n-ride facilities. Local and regional air quality regulations including the Air Pollution Control District program are being drafted that will supersede existing standards. SPA III is being reviewed in advance of these programs. In addition, it is an in-fill project, being surrounded by existing and approved development. The circulation network and land use plan, which relate to existing topography and surrounding land uses, were previously approved by the SPA. For these reasons, a major re-design of the project to incorporate a more transit oriented design is not feasible. However, the Air Quality Improvement Plan recommended several improvement measures with the project including a park-n-ride facility to help limit individual car trips by encouraging car pooling and bus ridership. In addition, SPA III will be subject to on-going monitoring 31-1 Page 10, Item Meeting Date 6/18/91 programs inherent in the city's Transportation Phasing Plan and Growth Management Program. The Chula vista Transit study, recently adopted in concept by the city council, has identified the need for a park-n-ride facility near the intersection of East "H" street and Paseo Ranchero. The location of a facility near this intersection would accommodate population generated by the Rancho del Rey development. One factor in siting a successful park-n-ride facility is maintaining a sense of security and ease of access. In addition, establishing the facility early on, with initial development, allows the facility to become a part of the community and helps establish car pooling habits at the outset. possible alternatives near this intersection include the future library site, the church anticipated at the southeast corner of Paseo Ranchero and East H street, and the pilgrim Lutheran Church to the northeast. The Transit Coordinator will be meeting with the applicant to determine the exact location and design. The developer is being required to agree to improve a park-n-ride facility to the satisfaction of the city Transit Coordinator. In the future, park-n-ride facilities may be more adequately addressed in the Public Facilities Financing Plan stage of a development. Desiqn Guidelines The Design Guidelines are an integral part of the Rancho del Rey SPA III Plan and development. They are intended to establish minimum standards for the design and architectural character of project. They are provided to ensure that the quality and fundamental concepts established at the master planning stage are maintained in the final phase of detailed planning and design. The Design Guidelines were considered in their draft form to evaluate the plan layout, lot configuration and open space treatments found in the tentative map. The majority of the Design Guidelines encompasses landscape design. Landscape zones are proposed which promote drought tolerant/naturalized landscaping as the predominant landscape theme. Other features of the landscape design program include slope erosion control, natural open space enhancement, irrigation standards, fuel modification landscaping, landscaping and the interface between residential areas and public areas. Revision sheets for the revised Design Guidelines have been included with this report and would replace those presently in your SPA III binder. ReCvclinq Facilities Concern has opportunities Currently, the been expressed that provisions for recycling be addressed with the approval of subdivisions. City Conservation coordinator is working on programs "31-/0 Page 11, Item Meeting Date 6/18/91 for recycling but has not implemented specific requirements. Laidlaw .Waste system, the waste collector for the City, provides residential curbside pick up of recycled materials when the units become occupied and service established. The applicant's Product Development Committee is considering areas for recycling bin storage within the single family units to further encourage the program. provisions for recycling in the multi-unit areas will also be pursued with the assistance of the city Conservation Coordinator and addressed with Precise Plan review. Environmental A. Recertify the Final EIR-89-10 The city Attorney determined that the "tentative subdivision map" for the above cited project is considered a "project" under the California Environmental Quality Act and as such, environmental review is required. As the Final Supplemental Environmental Impact Report EIR-89-10 for Rancho del Rey SPA III was certified by the Planning Commission at its meeting on November 14, 1990, and was certified by council on January 15, 1991, and as the tentative map and SPA Plan for RDR III are basically considered identical, the City Attorney has determined that the recertification of EIR-89-10 should occur prior to the tentative subdivision map being adopted. For your information, the executive summary of EIR-89-10 which you reviewed and certified is attached. B. Amended CEQA Findings for EIR-89-10 subsequent to Council's adoption of the CEQA findings for EIR- 89-10 on Rancho del Rey SPA III, and in accordance with Council's conditional approval of the RDR SPA III Plan, the applicant submitted and the city reviewed studies of ways to reduce net water usage of the proposed project and suggested methods to improve air quality within the project. Based on these studies, the CEQA findings have been modified, and the revised findings are attached. Air Quality was previously considered a significant impact at a cumulative level and is still significant at the cumulative level. Water use was previously considered insignificant at a project level and at a cumulative level. Water is still considered an insignificant impact at a project level and significant at a cumulative level. 3/-1/ Page 12, Item Meeting Date 6/18/91 c. Amended Mitigation Monitoring Program A mitigation monitoring program for EIR-89-10, Rancho del Rey SPA III, was adppted by the City Planning commission on November 14, 1990, and by the City Council on January 15, 1991. Amendments have been made to the monitoring program. Water use has been reduced and additional measures have been added to further mitigate negative impacts to air quality. In order to assure that these the mitigation monitoring accordingly. items are in fact implemented, program has been amended ANALYSIS The proposal is consistent with the Chula vista General Plan and the adopted El Rancho del Rey Specific Plan and Rancho del Rey sectional Planning Area III Plan. In addition, SPA III is in compliance with the Chula Vista Growth Management Program as it is included in the Development Phasing Forecast, (or the 5 to 7 year program), and can be approved pursuant to the adoption of air quality improvement and water conservation plans. The Rancho del Rey SPA III Plan is included as Exhibit 2 attached. The plan is intended to show the general location of all proposed uses and the general circulation system. The actual tentative maps detail that within the 405 acres of SPA III, there are proposed a maximum of 1,380 dwelling units (289 single family conventional units at 2-4 and 4-6 dwelling units per acre; 242 single family cottage units at 4-6 and 6-8 dwelling units per acre; town house units at 8-12 dwelling units per acre; and specialty housing units at 4-6, 6-8 and 8-12 dwelling units per acre). Also included in the development is a 26.1 acre junior high school site, a 10.8 acre park site, a 1.9 acre community purpose facility site and 148.3 acres of open space. This SPA plan was approved with conditions at the city Council hearing of January 15, 1991. According to the Chula vista Municipal Code, the purpose of the SPA Plan in a PC Planned community zone is to provide for the orderly pre-planning of large tracts of land containing a variety of land uses which are under unified ownership or development control. The Rancho del Rey SPA III site utilization Plan contains seven residential planning areas divided into three development phases: the specialty housing area is in phase one, the area west of Paseo Ranchero is in phase two and the area east of Paseo Ranchero is in phase three. The tentative map submitted for SPA III is consistent with these development areas and phases. A lot summary of the tentative map is as follows: fI-I"- Phase unit SPA III Lot Desig. No. 1 R-7 1-3 A-D 2 1 R-3 1-135 A-B 1-85 A 1-10 1 1-21 A-B 2 R-4 3 R-1 CF-1 R-1 4 3 1 R-2 1-144 A-B 1-157 A-B 1 A-B 1 1 A 2 R-5 3 R-6 4 S-1 P-1 Page 13, Item Meeting Date 6/18/91 Area (AC) No. Proposed Use Gross/Net Lots 90.6 / - 3 67.3 / - 4 30.5 / - 135 8.3 / - 2 13.9 / - 85 0.4 / - 1 2.8 / - 10 1.7/1.11 5.3 / - 21 40.9 / - 2 29.1 / - 144 8.9 / - 2 21.8 / - 157 1.1 / - 2 18.3/16.6 1 15.7 / - 2 26.1/23.4 1 11.3/10.0 1 1.2 / - 2 Multi-family res. Open Space sngl family res. Open space Sngl family res. open Space Sngl family res. Community Fac. sngl family res. Open Space Sngl family res. Open Space Sngle family res. open space MUlti-family res. Open Space Junior High Park Open Space The Planning Department has concluded that the proposed map is consistent with the EI Rancho del Rey SPA III plan and, therefore, we are recommending approval subject to the conditions and findings listed herein. FISCAL IMPACT: Not applicable. (RDR3CC.RPT) 31-13 .' / ,,/' , ,', ,'. ,,- , . -,: , ',1 .~ ,~ I '",- "'1 !. SPA BOUNDARIES '. , \";: :\ ,.\ , " .'-, ", '(. '(' ,\. " .~ ,~; OTIIY LI\ 1\ -.. I.... ~ ROAD \ ,.,- (j - .' ~'. ,\ ..\ I \ , i .' ."- ~~ . ,'- .. . '1l1t.eGIlI\ . .- . - " PllCot '. IVyON " ",O<'\l) o. , . 1~J!9d!2~r~yB!;y :.l1;!4/lili ~~~~ .',.'-- !-.- r...... ~ iI 4....... I' ...... . U . ....,.. ,,;0 n."'......, __1- ~-~'!!~~ U' _o~__ . .~ . .- oruo :II"'~l --,- ,~~ ===~,.,... ==-= ~_. _~~l --ft~~ o.Ul":lOtl - .- - ~~- ~ ~- OUt .. ... ,"4 .. ,W UI' .. 'U' ... .. ... ... ... ... ... ... '" 'H' ...... .ou .....1 ... I ... :::: I I -;;;~T ;0U- ~.. -....--.--... I ==-::.:=-:.: :::::.:.:.-:-..::.:: -.. ::~~' :'..:-=.: ::=.-:.:-=-~.:.-.=: ..-- .,........................ 11J1 t:XHIBIT 1 anti & A:su.~ L~'" !., "" C a3 J: - - - co Q) ~ <( C) c .- c c co a: o .- 't:: '0 Q) 0- en ~; ;:- ~~/ ~~'.;~:''''''' \ """:.;'.... -........-.....,;......,;; ~\.,u$.\..\.\'" 2 \ ...' '<.n~:-_.~,.^;...;c/':':uJ~' '. C.'~./'h-.'.'.:o...'_.,.<tj.";.. _' /^ , "1',"') "- ''''" ~'.. '..... t" , " '. " ,"'... "'r'I'I!~~....., -'v.. _ '"_., '"... '<'--:'''<-'''''.J('f",,<,.;~:v.._ 7-;:.I.~, . ... 'T~'-JI'.~~/"<""',....f C^' \ ~~ ..' ---. ~/"''-'''' :=- "- en ,..':.....~."\c:::~,.-:;-:.,._ ""~\~:o;..".,.r ...-"~----- 0 \-., I."i''''' '.~_ v 0 , \ ';'co<.\\,~\;/ : \~DV , VV '\'''- " '.--,~,~~~ " ; '" ""';~, .--. ., , , ;'~~~1~~('h~;/ ~, , -;;~'''-;'Jc{n~J-J;: r.no u. .....( .... '-I' -, \ \~r. n....... '(/J \ .i ~("~"~ \~ C;t:..\ I 'r",. ~\ -.. "t::...:',I,...-"!c.-;'\c.-: u:. '\~""J.r,:~1 .......,t.....(/) \ \ . ..t.~...~ \.- t.1-w..... \ \ ~~'l'"-)....,\.......:;t~~>". ~ \\ \ ',1 ,i: c.:.. '_. .. ....._~~ \ ....:-.- '~-=- ) '?tv //"\ \ \\ \ , \\ '...... \ \ ~,~\ \ , \\\ ~\ , \~. ;;f. il "V) \-}; . . J't ==11 I, [' (jj !\ , I: ''--I i"-l I I' !j" I: I I -_-.J 1 '1 r--7 II I: : (~) /! / I' . /1 / / l , lien . I, oj. I , , ::1 / i I: , 'I I .. ~ ~ << :; 'i ~ ~ .. i i '< ; ! ~ : <: 00 :! ". h =: :i t ~ :iil ~: '! ; " a . . . -: ~ ; o _.g i ~ ~ ~ ~ ~ s. ; : ~ - j : ~ 1 ~ ! ~ c i <i: e...l., ~ -; :; : ~ ~ ~ i .;: uu J: en en o , j , , en ) 0, , / , , / , , / , , / . , I '~. l....~,j/ I . ,I -'I 0: , . " " . , ~ . ~ 0 . ~ ~ ~ o ~ N . " UII ~:I oil ~ ~ ~ ~ : I ~ I ~ ~I . . -:1)(1)' ~W. o ~" :r (,J~ 0., I ~ 1 , N " . =i: ~ ~ ~ !. ~ ~ 0 " " ~ ~ . ~ I U I ~ , -w U~ w_ ~ -, ~Q' ZU s.u ~;Jl 0<, Q. <~ 'f . " 1 e :0 .. . 'l' : "- 'N 3 "- ~ .. ~ :4 j j . t . . . . . ~ ~ ~ . .:t ;; , . . . . . ~ ~ 5 u ~ ~ " j . ~ ;; . ~ j I . a: z" I~~: '31-b~~ ;; , . . ~ , . u C. ~ " ; i ~ . ~ . u . I .:t ;; . ! . . ~ .3 . ~ e . . , . ~ . . ~ . ~ e . . .. ~ ;; U C. ~ " !> ;; u ".. ~s e. 0, ". e" . . f" ~j~ U.. ~ N I- iD :E X w r1 ~ ~ , eU ~ ~&: lai ~ ~j a~ ~- . RESOLUTION NO. IltRI~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA RECERTIFYING THAT THE FINAL EIR-89-l0 FOR RANCHO DEL REY SPA III HAS BEEN PREPARED IN COMPLIANCE WITH CEQA ,THE STATE CEQA GUIDELINES AND THE ENVIRONMENTAL REVIEW PROCEDURE OF THE CITY OF CHULA VISTA The City Council of the City of Chula Vista does hereby resolve as follows: WHEREAS, Rancho del Rey SPA III is the final Sectional Planning Area for the El Rancho del Rey Specific Plan which was approved in January, 1991; and WHEREAS, on May 22, 1991, the planning Commission unanimously recertified EIR-89-l0 and recommended approval of the design guidelines and provisional approval of the tentative map for Rancho del Rey SPA III. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby recertify that the Final EIR-89-l0 for Rancho del Rey SPA III has been prepared in compliance wi th CEQA, the state CEQA Guidelines and the environmental review procedures of the City of Chula Vista. Robert A. Leiter, Director of Planning 8968a Bruce M. Boo aa d, Cl Y Attorney Presented by 3/-ICt RESOLUTION NO.~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE WATER CONSERVATION PLAN FOR RANCHO DEL REY SECTIONAL PLANNING AREAS (SPA) II AND III WHEREAS, a duly verified Water Conservation Plan was filed with the Planning Department of the City of Chula vista on January 8, 1991 by Rancho del Rey Partnership, and WHEREAS, said Plan reviewed the proposed water usage of the project and conservation measures to mitigate the water use impacts associated with the development, and WHEREAS, the Planning Commission held an advertised public hearing on associated tentative subdivision map PCS-90-02 on May 8, 1991, and continued to May 22, 1991, and WHEREAS, the city Council set the time and place for a hearing on associated tentative subdivision map (PCS-90-02) and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held advertised, namely 7: 00 p.m., June Chambers, 276 Fourth Avenue, before hearing was thereafter closed, and at the time and place as 18, 1991, in the Council the City Council and said WHEREAS, the City council found that the Water Conservation Plan is exempt from CEQA pursuant to Section 15262 of the State CEQA Guidelines. NOW THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL finds as follows: 1. The Water Conservation Plan as modified to attached amendments is in compliance with Management Program adopted April 23, 1991; and contain the the Growth 2. The Water Conservation Plan as modified to contain attached amendments is in compliance with Ordinance 2248, Growth Management Implementation Ordinance adopted April 1991; and the the 23, 3. The Water Conservation Plan as modified to contain the attached amendments is in compliance with Condition No. 20 on Rancho del Rey Sectional Planning Area Plan III (Council Resolution No. 15993, dated March 5, 1991). 3/- 17 BE IT FURTHER RESOLVED THAT THE Water Conservation Plan, as modified, for Rancho del Rey SPAs II and III is approved. That a copy of this resolution be transmitted to the owners of the property. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 18th day of June, 1991, by the following vote, to- wit: AYES: NOES: ABSENT: ABSTENTIONS: Robert A. Leiter Director of Planning form b Presented by Bruce M. Boog City Attorney 2 5/-;<6 AMENDMENT NO. 1 Table 1-2, page 3 Rancho del Rey SPA II and SPA III Water Conservation Measures On-site Measures (This section remains the same.) Off-site Measures Full Ilartieipation in a City aIlflrO"leel .;ater eonDervationjlllitiqation proqralll desiqneel to eff Det additional vater elemand aDDociated '.litR Rffi; cORstruetion tRreliqh the retro fit of elder, leDD efficieRt \/ateL fil1tureD eff site, aRd/or fURdiRq fOL RC\l DUIlplies er DoureeD of \mter. The applicant shall complv with a citv-approved water use offset policv. Said policv mav reauire one or more of the followina: ~ compliance with a reaional water use offset proaram. to be administered bv the San Dieao Countv Water Authoritv. ~ Compliance with a locallv administered water use offset proaram (such proaram mav be administered bv the citv. water district. or a combination of both): ~ Implementation of specific water use offset measures for this proiect. if neither a reaional or local lv-administered water use offset proaram is in place prior to issuance of buildina permits for anv portion of this proiect. In the event that a Citv-approved water offset policv is not in effect at the time buildina permits are issued. the reauirements of this plan shall be met throuah implementation of specific water offset measures for this proiect. with the level of offsets and specific measures to be approved bv the citv. 3 '3/-1':; AMENDMENT NO. 2 Page 31, continuing onto page 32: D. Offsite Mitigation Measures Because of the crisis created by the multi-year drought in California and the extreme short term water rationing/use restrictions adopted to respond to the situation, new attention is being given to formulating new policies which will conserve water and allow for long term growth. As noted in the preceding sections, although the SPA II and SPA III projects implement a variety of water conserving practices, the construction and occupation of these projects will result in an increased demand for water. The drought has demonstrated that water is a finite resource and that current supplies cannot reliably support current demands and continued growth. However, growth is a major component of both the State's, and especially, the local San Diego area economy. In order to accommodate growth, while long term water supplies are evaluated and implemented, new programs to more efficiently use the available water are being proposed. An initial area of focus is the retro-fit of plumbing fixtures and landscape irrigation in existing development. According to statistics compiled by the Construction Industry Federation (CIF) , retro-fitting the shower and toilet fixtures in approximately 2.8 older homes would save the amount of interior-use water required by one new home (additional older homes would be required to off-set outdoor water use at the new home). Thus a mitigation program which collected fees to complete such conversions, or directly required equivalent conversions, could allow a limited amount of new development to occur without creating a net increase in water demand. Comparable water savings could also be achieved by retro- fitting irrigation systems of schools, parks, golf courses, etc., where significant conservation of irrigation water could be achieved. This type of water consumption off-set program has been conceptually approved by the San Diego County Water Authority. Additional studies to determine the exact specifications, scope and implementation process are now under way. In order to avoid conflicting regulations and to maximize fairness, such a program would need to implemented on a wide basis, preferably county-wide. The City and local water district would provide input in the 4 3/- :?o would need to implemented on a wide basis, preferably county-wide. The city and local water district would provide input in the establishment of the large scale program and would probably provide local implementation. As indicated earlier, the approval of the Rancho del Rey SPA III Plan was conditioned to require a Water Conservation Plan which reduced any impacts to the local water supply to an "insignificant" level, as determined by the city Council. This is the first and, so far, the only project to be so conditioned. ~t the time the oOflditien \lac draftee, it ~:as iRtcYllyctCa. to rcftuirc a zcre net iRerc~sc or ee~lctc \:atcr eeRoa~tiefl eff cct,bceauac He program, adopteel pelicy 01" citl"\:ielc criteria euioteel to Be uoeel ao a Dtand:lra. IIe\:c~,;E;.r, ae1di tianal Jlroj ceto rCEIucot ap13ro"'lalo and/ sr :l broael Based miti~atieR/oonservatieR pro~ram io eleveleped, "iRtJi~Rificant" i!) elrpecteel te Be aefiReel ao filII implemeRtation of on oite eeRocr~atieR mcazurCD ana full participatioR in :lR eff oite miti~atioR pr8~ram eRelorseel BY the city. The 8rA II aRd erA III project!) .;ill fally comply .:ith the reqllirellleRts of a City approved aRel/or sponsoreel .:ater c8RservatioRjmitigatioR program. To meet this reauirement. the applicant shall complY with a city-approved water use offset policy. Said policy may reauire one or more of the followina: ~ Compliance with a reaional water use offset proaram. to be administered bv the San Dieao County Water Authoritv. ~ Compliance with a local Iv administered water use offset proaram (such proaram may be administered bv the city. water district. or a combination of both): ~ Implementation of specific water use offset measures for this proiect. if neither a reaional or locally-administered water use offset proaram is in place prior to issuance of buildina permits for anY portion of this proiect. In the event that a City-approved water offset policy is not in effect at the time buildina permits are issued. the reauirements of this plan shall be met throuah implementation of specific water offset measures for this proiect. with the level of offsets and specific measures to be approved bY the city. 5 '3/- ~I RESOLUTION NO. ~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE AIR QUALITY IMPROVEMENT PLAN FOR RANCHO DEL REY SECTIONAL PLANNING AREAS (SPA) II AND III WHEREAS, a duly verified Air Quality Improvement Plan was filed with the Planning Department of the City of Chula vista on January 28, 1991 by Rancho del Rey Partnership, and WHEREAS, said Plan reviewed the impacts to air quality anticipated by the project and measures to mitigate the impacts associated with the development, and WHEREAS, the Planning commission held an advertised public hearing on associated tentative subdivision map PCS-90-02 on May 8, 1991 and continued to May 22, 1991, and WHEREAS, the City Council set the time and place for a hearing on associated tentative subdivision map (PCS-90-02) and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held advertised, namely 7:00 p.m., June Chambers, 276 Fourth Avenue, before hearing was thereafter closed, and at the time and place as 18, 1991, in the Council the city Council and said WHEREAS, the City Council found that the Air Improvement Plan is exempt from CEQA pursuant to Section the State CEQA Guidelines. Quality 15262 of NOW THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL finds as follows: 1. The Air Quality Improvement Plan as submitted is in compliance wi th the Growth Management Program adopted Apr i I 23, 1991; and 2. The Air Quality Improvement Plan as submitted is in compliance with Ordinance 2248, the Growth Management Implementation Ordinance adopted April 23, 1991. BE IT FURTHER RESOLVED THAT THE Air Quality Improvement Plan for Rancho del Rey SPAs II and III is approved. That a copy of this resolution be transmitted to the owners of the property. 1 "3/- ~t PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 18th day of June, 1991, by the following vote, to- wit: AYES: NOES: ABSENT: ABSTENTIONS: Presented by Robert A. Leiter Director of Planning 2 1/-.23 RESOLUTION NO.~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING DESIGN GUIDELINES FOR RANCHO DEL REY SPA III The City Council of the City of Chula vista does hereby resolve as follows: WHEREAS, the Design Guidelines are an integral part of the Rancho del Rey SPA III Plan and development which are intended to establish minimum standards for the design and architectural character of the project; and quali ty planning planning WHEREAS, said Guidelines are provided to ensure that the and fundamental concepts established at the master stage are maintained in the final phase of detailed and design; and WHEREAS, the Design Guidelines were considered in their draft form to evaluate the plan layout, lot configuration and open space treatments found in the tentative map; and WHEREAS, the majority of the Design Guidelines encompass landscape design with landscape zones proposed which promote drought tolerant/naturalized landscaping as the predominant landscape theme as well as slope erosion control, natural open space enhancement, irrigation standards, fuel modification landscaping, landscaping and the interface between residential areas and public areas; and WHEREAS, the El Rancho del Plan; and the Design Guidelines are in conformance with Rey Specific Plan and the Chula vista General WHEREAS, the Design Guidelines will promote the orderly development of the involved sectional planning area and ensure a consistent quality of development in keeping with the fundamental concepts established for the approved SPA. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula vista does hereby approve the Design Guidelines for Rancho del Rey SPA III and does hereby impose them, among others, as conditions of development. Presented by d, City Attorney Robert A. Leiter, Director of planning 8973a 3/- ~1I RESOLUTION NO. ~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE TENTATIVE SUBDIVISION MAP FOR RANCHO DEL REY SECTIONAL PLANNING AREA (SPA) III, CHULA VISTA TRACT 90-02 WHEREAS, a duly verified application for a tentative subdivision map was filed with the Planning Department of the City of Chula vista on November 8, 1989 by Rancho del Rey Partnership, and WHEREAS, said application requested the subdivision of approximately 405 acres into residential lots, open space areas, a school lot, park and community purpose facility lot, and WHEREAS, the Planning commission held an advertised public hearing on said project on May 8, 1991, and continued to May 22, 1991, and WHEREAS, the City Council set the time and place for a hearing on said tentative subdivision map application and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held advertised, namely 7:00 p.m., June Chambers, 276 Fourth Avenue, before hearing was thereafter closed, and at the time and place as 18, 1991, in the Council the city Council and said WHEREAS, the city Council recertified EIR-89-10, with Statement of Overriding considerations, and associated Mitigation Monitoring Program for Rancho del Rey SPA III. NOW THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL finds as follows: Pursuant to section 66473.5 of the Subdivision Map Act, the tentative subdivision map for Rancho del Rey sectional Planning Area (SPA) III, Chula vista Tract no. 90-02, is found to be in conformance with the various elements of the city's General Plan based on the following: 1. The site is physically suitable for residential development and the proposal conforms to all standards established by the City for such projects. 1 '3/- 4'$ 2. The design of the subdivision will not affect the existing improvements -- streets, sewers, etc. -- which have been designed to avoid any serious problems. 3. The project is in substantial conformance with the Chula vista General Plan Element as follows: a. Land Use - The project is consistent with the General Plan, EI Rancho del Rey Specific Plan and the SPA III Plan which designates the property PC - Planned Community, with a variety of land uses and residential densities. b. Circulation - All of the on-site and off-site public streets required to serve the subdivision are consistent with the circulation element of Chula vista General Plan and the circulation proposed within the El Rancho del Rey Specific Plan. Those facilities will either be constructed or in-lieu fees paid in accordance with the Rancho del Rey SPA III Public Facilities Financing Plan. c. Housing - A low and moderate housing program with an established goal of 5% low and 5% moderate will be implemented subject to the approval of the City's Housing Coordinator. Computation of the satisfaction of this condition will include the entire El Rancho del Rey Specific Planning Area. d. Conservation and Open Space - The project provides 148.3 acres of open space, 36% of the total 404.9 acres. Grading has been limited on hillsides and grading plan approval will require the revegetation of slopes in natural vegetation. Approval of EIR- 89-10 included the adoption of a mitigation monitoring program outlining the mitigation measures required for project impacts on geology, soils, biology, air, water, cultural resources, land form, transportation and utility sources. e. Parks and Recreation The project will be responsible for the improvement of the 10 acre net neighborhood park and payment of PAD fees or additional improvements as approved by the Director Parks and Recreation. In addition, a trail system will be implemented through the south leg of Rice canyon, connecting with other open space areas. f. Seismic Safety - The Rancho del Rey site is crossed by the La Nacion Fault Zone which has one prominent fault, running north to south, with other potential traces. The mitigation monitoring program adopted 2 '31-~6 with EIR-89-10 provides for measures to be taken to mitigate the impacts of development in association with the fault zone. g. Safety - The site will be wi thin the threshold response times for fire and police services. The project will increase the need for additional personnel, however, the City is planning to meet that need with additional revenues provided by this project. h. Public Facilities Element This project is obligated in the conditions of approval to provide all on-site and off-site facilities necessary to serve this project. In addition to that, there are other regional facilities which this project ( together with SPAs I and II) is contributing to, including a public library site, fire station site, and fire training facility site. The subdivision is also contributing to the otay Water District's improvement requirements to provide terminal water storage for this project as well as other major projects in the eastern territories. h. Noise - The units will be required to meet the standards of the UBC with regard to acceptable interior noise levels. i. Scenic Highway - The project does not affect this element of the General Plan. j. Bicycle Routes - Bicycle paths are provided along Telegraph Canyon Road, East "H" Street and Paseo Ranchero Road as shown in the Circulation Element. k. Public Buildings - No public buildings are planned for the site. The project shall be subject to RCT and DIF fees. 4. Pursuant to section 66412.2 of the Subdivision Map Act, the Council certifies that it has considered the effect of this approval on the housing needs of the region and has balanced those needs against the public service needs of the residents of the City and the available fiscal and environmental resources. The development will provide for a variety of housing types from single family detached homes to attached single family and senior housing. In addition, the addressment to providing a percentage of low and moderate priced housing is in keeping with regional goals. 3 31 - i'f; ).1 5. The configuration, orientation and topography of the site partially allows for the optimum siting of lots for passive or natural heating and cooling opportunities. BE IT FURTHER RESOLVED THAT THE TENTATIVE SUBDIVISION MAP for Rancho del Rey SPA III, Chula vista Tract 90-02, is approved subject to the following conditions: General/Preliminarv 1. The Public Facilities Financing Plan shall be followed with improvements installed in accordance with said plan or as required to meet threshold standards adopted by the city of Chula vista. In addition, the sequence in which improvements are constructed shall correspond to any future East Chula vista Transportation Phasing Plan adopted by the city. The City Engineer and Planning Director may at their discretion, modify the sequence of improvement construction should conditions change to warrant such a revision. 2. All mitigation necessary to avoid significant effects itemized in the Mitigation Monitoring Program for Environmental Impact Report EIR-89-10 as required prior to Final Map approval, are hereby incorporated as conditions of approval. The Director of Planning may modify the sequence of mitigation at his discretion should changes warrant such a revision. 3. The developer shall comply with the community Purpose Facility Ordinance. The areas proposed to show compliance with said ordinance shall be provided prior to approval of the first final map. Areas of consideration for qualification must be within the areas of SPAs I, II or III. Amendment to the El Rancho del Rey Specific Plan and sectional Plan Areas may be necessary to accomplish compliance. 4. Prior to final map approval for Phase 1, a Precise Plan shall be approved by the city council detailing the development of the Specialty Housing project. The precise plan shall include but is not limited to: detailing the density of the various portions of the project; identifying the amount of recreational and open space facilities; detailing the financial arrangements available to proposed tenants; identifying the age limits and any income requirements of tenants; and showing the percent of the project for sale or rent. Streets. Riqhts-of-Wav and Improvements 5. Prior to any final map approval for Phase 2 or 3 or any unit thereof, the developer shall obtain all necessary right-of-way 4 3/-~9 for the construction of the unimproved off site portion of East "J" street west of Paseo Ladera, from River Ash Drive to Red Oak Place. 6. The developer shall construct the unimproved off site portion of East IIJII street west of Pas eo Ladera, from River Ash Drive to Red Oak Place, to a Class II Collector standard, except that the 5 foot sidewalk may be asphalt concrete instead of portland cement concrete. The construction of these improvements shall be guaranteed prior to final map approval for Phases 2 or 3 or any unit thereof. The subdivider may request the formation of a reimbursement district for these off-site improvements in accordance with section 15.50 of the Municipal Code. 7. The developer shall request the vacation of that portion of paseo Marguerita as necessary to accomplish the design as shown on the tentative map. said vacation shall be accomplished prior to the approval of the final map for Phase 2, unit 3. 8. The off site portion of East "J" street adj acent to Buena vista Way shall be granted in fee to the City for Open Space, public utilities and other public uses. The grant of this property shall be completed prior to approval of a final map for Phase 3, unit 3. The developer shall enter into an agreement to not oppose the inclusion of this property in Open Space District # 20 (zone 7) prior to approval of any final map for Rancho del Rey SPA III. The developer shall be responsible for the costs associated with annexing this property to Open Space District # 20. 9. The developer shall be responsible for the construction of off site improvements at the westerly end of Paseo del Norte in the Casa del Rey subdivision. The construction of these improvements shall be guaranteed prior to approval of the final map for Phase 2, Unit 2. A cash deposit was previously deposited with the city to pay the cost of this work. The amount deposited is available to the developer for construction of these improvements. 10. Prior to final map approval for Phase 1, the developer shall dedicate additional right-of-way along the frontage of the property on East "H" street to provide a 20 foot parkway (existing curbline to property line). 11. The developer shall be responsible for construction of a sidewalk/recreational pathway along the entire frontage of subject property on East "H" Street from Paseo Ranchero westerly to Paseo del Rey to the satisfaction of the city Engineer, Director of Planning and the Director of Parks and 5 3/-~9 Recreation. The construction of these improvements shall be guaranteed prior to final map approval for Phase 1. 12. The developer shall be responsible for construction of an expanded 8 to 10 foot wide sidewalk/recreational pathway along the western side of paseo Ranchero, to connect the trail systems in the south leg of Rice canyon and in the Telegraph Canyon Road open space area. These improvements shall be installed in conjunction with the construction phases of Pas eo Ranchero specified in the Public Facilities Financing Plan. 13. The developer shall be responsible for the construction of wider sidewalks at transit stops, subject to the approval of the city Engineer. 14. The final design of Paseo Ranchero shall include eight foot wide landscape easement buffers as requi:5'ed by the street Design Standards or be adjoined by an open space lot at least eight feet wide with slopes no greater than 5:1, except in the following areas where the final design shall be subject to the approval of the Planning Director, Landscape Architect and city Engineer: a. Adjacent to the lots fronting on Cabo Calabazo, Calle Candelero and Punto Miraleste where a special slope and retaining wall design will be implemented; b. Along the Junior High School site; c. Along the existing Ladera Villas and Mission Verde subdivisions where existing conditions shall remain; and d. Adjacent to the out-parcel owned by the Chula vista School District. 15. The final design of East "J" Street shall include 5.5 foot wide landscape easement buffers as required by the Street Design Standards or be adjoined by an open space lot at least 5.5 feet wide with 5: 1 maximum side slopes, except in the following locations where the final design shall be subject to the approval of the Planning Director, Landscape Architect and City Engineer: a. Along the park site; b. Along the two corner lots at the intersection of East "J" Street and Camino Miel (lots 82 and 97 of Phase 2, Unit 1) and the southeast corner lot of East "J" Street and Cabo Capote (lot 85 of Phase 2, Unit 2); c. Adjacent to the out-parcel owned by the Chula vista School District; and 6 "31 -III d. Along the existing Bel Aire Ridge subdivision where existing conditions shall remain. 16. All retaining walls which interface with the public street system shall be constructed to match the Ranch Rancho del Rey SPA III Design Guideline standards for exterior walls. 17. The developer shall be responsible for construction of full street improvements for all public and private streets shown on the Tentative Map within the subdivision boundary; and for the construction of off-site improvements to construct Paseo Ranchero, East "J" Street and Paseo Ladera as shown on the Tentative Map, to the satisfaction of the City Engineer. Said improvements shall include, but not be limited to, asphalt concrete pavement, base, concrete curb, gutter and sidewalk, sewer and water utilities, drainage facilities, street lights, signs, fire hydrants and transitions to existing improvements. Street intersection spacing as shown on the tentative map is hereby approved. 18. All the streets shown on the Tentative Map within the subdivision boundary, except private streets, shall be dedicated for public use. Design of said streets shall meet all City standards. 19. A temporary turnaround conforming to city standards shall be provided at the end of streets having a length greater than 150 feet, measured from the center line of the nearest intersecting street to the center of the cul-de-sac, except as approved by the city Engineer. 20. Cul-de-sacs and knuckles shall be designed and built in accordance with City standards unless otherwise approved by the City Engineer. Lot Confiquration 21. Frontage on all lots shall be a minimum of 35 feet at the right-Of-way line except as approved by the City Engineer. This condition does not apply to flag lots, as defined in the Municipal Code. 22. Lot lines shall be located at the top of slopes except as approved by the city Engineer. When adjacent to open space lots, property lines shall be located a minimum 2.5 feet from the top of slope. 23. The preparation of final maps and plans for the locations listed below shall be carried out in accordance with the 7 31 - 3/; ~. following criteria unless otherwise approved by the City Engineer and Director of Planning: a. Provide a minimum 50 feet from the corner of Pas eo Ranchero and East "J" street to lots 6 and 7, Phase 3, unit 2, to provide additional buffer and transition area at the corner. b. Provide a pedestrian throughway between lots 130 and 131, Phase 3, unit 2, from Camino Calabazo to east "J" street across from the school and park sites. c. Lot 128 of Phase 2, unit I, shall be widened to a minimum 50 foot width to accommodate a combined slope and maximum 5 foot retaining wall. This is to avoid a "tunnel" effect created at side lot lines. d. Lots 3 and 5, Phase 2, unit 3 shall foot high retaining walls, and/or retaining walls and crib walls. utilize maximum 5 a combination of e. Provide a different name for each of the portions of Palazzo Court located to the east and west of East "J" street and the portions of Dorado Way located to the east and west of Camino Miel. street Trees/Open Space 24. The developer shall grant to the City street tree planting and maintenance easements along all public streets as shown on the Tentative Map. The width of said easements shall be as outlined in the city's street Design Standards POlicy. 25. The developer shall be responsible for street trees in accordance with Section 18.28.10 of the Chula vista Municipal Code. The use of cones shall be included where necessary to reduce the impact of root systems disrupting adjacent sidewalks and rights-of-way. 26. All open space lots adjacent to public rights-of-way shall maintain a width so as to provide 10 feet of landscaping treatment behind the back of sidewalk. 27. Maintenance of all facilities and improvements within open space areas covered by home owners associations shall be covered by CC&Rs to be submitted and approved by the Planning Department prior to approval of the associated final map. 28. Prior to the approval of any final map, the developer shall request in writing that maintenance of all facilities and improvements within the open space area associated with such 8 3/ - ~J- map shall be the responsibility of the Rancho del Rey Open Space Maintenance District. 29. Prior to approval of the first final map, a comprehensive landscape plan shall be submitted for review and approval of the City Landscape Architect and Director of Parks and Recreation. Prior to approval of each final map, comprehensive, detailed landscape and irrigation plans, erosion control plans and detailed water management guidelines for all landscape irrigation shall be submitted in accordance with the Chula vista Landscape Manual for the associated landscaping in that final map. These detailed landscape and irrigation plans shall be for the review and approval of the City Landscape Architect and Director of Parks and Recreation. The landscaping format within the project shall be to emphasize native, drought tolerant plant material. Exceptions can be made for areas where reclaimed water is exclusively used. The comprehensive landscape plans shall address: a. Slope enhancement and landscape treatment for the slope in Open Space Lot A, Phase 3, unit 3, beneath the Junior High School lot. The plan shall address and provide for mature size plant material, boulder work-and/or buttress work on the slope. b. A naturalized revegetation program for areas in open space lots, which may include irrigation. of grading temporary c. The disturbed "native" areas within Telegraph Canyon Road open space corridor. This area shall include tree groupings or tree groves. These plantings shall be treated as random plantings and shall be identified in at least six areas along the corridor with each location providing plantings of 50 to 100 trees. The exact number of trees and locations are to be approved by the Planning Department and Department of Parks and Recreation. The intent of these grove areas is to provide a consistency with existing grove areas in the open space corridor west of the Rancho del Rey SPA III area. 30. Prior to approval of the first final map, details showing the location and design of the trail system and a sign program shall be submitted to and approved by the Directors of Planning and Parks and Recreation. The trail system in the open space lots shall be a minimum 6 feet wide within an 8 foot horizontal clear space and a 10 foot vertical clear space. The associated sign program shall identify the trail network in the open space areas and connecting along Paseo Ranchero, to the satisfaction of the Directors of Planning and Parks and Recreation. 9 3/-31 31. Prior final map approval for Phase 3, unit 3 and Phase 4, unit 2 as shown on the Tentative Map, cross sections shall be submitted to and approved by the Director of Planning and City Engineer illustrating the interface where the trail is located adjacent to the drainage ditch along Telegraph Canyon Road. The fencing of the drainage channel shall be aesthetically pleasing incorporating the use of plantings, equestrian type fencing and vinyl clad fencing. These cross sections and decorative fencing program may be included with the comprehensive landscape plan. Fence gates shall be provided at locations approved by the City Engineer to allow maintenance of the drainage channel. Parks 32. The developer shall be obligated for 12.5 acres of parkland as described in the approved SPA Plan, including land, and/or fees, and/or additional improvements, in accordance with the Parkland Dedication Ordinance. The actual final acreage will relate to the number of units approved with the final maps. 33. The park located in Phase 3, unit 4 shall be a minimum 10 net useable acres. Design and development of the park shall be subject to the approval of the city's Director of Parks and Recreation and shall conform with the park master plan to be adopted by the city Council. 34. An adequate buffer and separation of 50 feet shall be provided between the residential lots at the eastern end of Palazzo Court and the existing park facilities, to the satisfaction of the Director of Parks and Recreation. Solution may include but is not limited to relocating an existing tennis court or lot redesign. 35. A minimum 20 foot wide access corridor shall be maintained at the end of Paseo Palazzo where the cul-de-sac abuts the existing park. Said area shall be made part of the park. Detail and design of the access shall be submitted to and approved by the Departments of Planning and Parks and Recreation prior to final map approval for Phase 3, unit 1. Gradinq/Drainaqe 36. An erosion and sedimentation control plan shall be prepared as part of the grading plans. 37. Specific methods of handling storm drainage are subject to detailed approval by the city Engineer at the time of submission of improvement and grading plans. Design shall be accomplished on the basis of the requirements of the Subdivision Manual and the Grading Ordinance (No. 1797 as amended). The developer shall submit calculations to 10 ~) - "5/f demonstrate compliance with all drainage requirements of the Subdivision Manual. 38. Grading proposals shall be reviewed and approved by the City Engineer and Director of Planning for consideration of balanced cut and fill, utilization of appropriate soil types, effective landscaping and revegetation where applicable. Grading shall occur in separate phases unless a single phase operation is approved with the grading plan. 39. A letter of permission for grading shall be obtained from SDG&E prior to any grading within or adjacent to an SDG&E easement or which would affect access thereto. 40. The developer shall make a reasonable effort to obtain permission to grade the slopes along Buena vista Way at the former intersection of East IlJIl Street. If permission to grade said slope is not reasonably attainable as determined by the city Engineer, the regrading of these slopes shall not be required. The provisions of this condition shall be complied with prior to approval of the final map for Phase 3, unit 3. 41. Prior to approval of any final map for single family residential use, the developer shall submit a list of proposed lots indicating whether the structure will be located on fill, cut or a transition between two situations. 42. Lots shall be so graded as to drain to the street or an approved drainage system. Drainage shall not be permitted to flow over slopes. Lots 71, 72 and 89 of Phase 2 Unit 1 shall be designed so that there will be no negative grading or drainage impacts to the adjacent off-site properties. 43. Graded access shall be provided to all public storm drain structures including inlet and outlet structures. Paved access shall be provided to drainage structures located in the rear yard of any residential lot or as approved by the city Engineer. 44. The use of boulders in minor drainage basins and energy dissipators in the canyon and open space areas in the manner approved by the City Engineer and Planning Director, is encouraged to allow water to be captured and to allow trees to grow naturally. Sewer 45. The developer shall be responsible for performing sewage flow metering to monitor three segments of main identified in the Rick Engineering report dated September 5, 1990 as sections QR, X1X2 and KL. Metering shall be accomplished at the locations determined by the city Engineer. Metering shall be 11 3/-3$ accomplished prior to the issuance of any building permit for SPA III and be repeated at intervals directed by the city Engineer. Should any of these segments have metered flows which fill more than 80% of the pipe diameter, the applicant shall construct parallel facilities as determined by the city Engineer. The developer shall enter into an agreement with the City prior to first final map approval providing for all items indicated above. 46. An improved access road with a minimum width of 12 feet shall be provided to all sanitary sewer manholes. The roadway shall be designed for an H-20 wheel load or other loading as approved by the City Engineer. 47. The developer shall obtain permission from the city to deposit sewage in a foreign basin. The developer shall enter into an agreement with the City relative to the diversion of sewage prior to final map approval for any phase or unit thereof proposing said diversion. 48. The developer shall be responsible for the removal of the existing sewer pump stations (Mission Verde and Candlewood). Prior to approval of any final map entailing said removal, the owner and the city shall enter into an agreement to establish the scope of work and the amount to be reimbursed by the City to the subdivider for performing said work. The developer may also request the formation of a special sewer service area to provide for the cost of connection of the area currently being served by the Candlewood pump station to the permanent gravity sewer system. Unless otherwise approved by the city Engineer, the scope of work at both sites shall be limited to the removal and disposal of equipment, grading, landscaping and construction of new sewerlines and manholes required for connection to the proposed Rancho del Rey sewer system. Any upsizing of Rancho del Rey Sewer lines due solely to the flow generated by the Mission Verde and Candlewood areas shall also be included. Reclaimed Water 49. Prior to approval of the associated final map, the developer shall provide on-site infrastructure to accept and to use reclaimed water when it is available, along Paseo Ranchero from Telegraph Canyon Road to East "H" Street and along East "J" Street from Paseo Ranchero to the park site, per the adopted Public Facilities Financing Plan. 50. Any costs incurred from retrofitting the reclaimed water system, when reclaimed water becomes available, shall be paid by the developer. Monies for this shall be held by the City, through a deposit set up by the developer. The amount shall 12 3/-36 be determined by the developer, approved by the City and in place prior to approval of each associated final map. Fire 51. Fire hydrants will be required per standards. Hydrant spacing is 500 feet 300 feet for mUlti-family dwellings. the Fire Department for single family and 52. Maximum hydrant pressure shall not exceed 150 psi. 53. Fire hydrants and roadway access (per City Fire Marshall approval) shall be installed, tested and operational prior to any combustible materials placed on-site. Aqreements/Covenants 54. Prior to final map approval for Phase 1, unit 1, the developer shall enter into an agreement with the City to guarantee the development of the parcel specifically for senior housing. 55. Prior to the approval of the first final map, the developer shall enter into an agreement to provide a right turn lane at the intersection of Pas eo del Rey and East "H" street, to the satisfaction of the City Engineer, if the threshold standards for this intersection as expressed in the then current Growth Management Ordinance are exceeded at any time during the development of this project. 56. Prior to approval of the first final map, the developer shall enter into an agreement to provide a park-n-ride facility near the intersection of East "H" street and Paseo Ranchero to include 50 parking spaces, 10 bicycle lockers, lighting, trash receptacles and circulation striping to the satisfaction of the City Transit Coordinator. In addition, a transit stop, to include a bench, shelter and trash receptacle, shall be provided on the north side of East "H" street. A plan of said improvements and the timing thereof shall be submitted and approved by the City Transit Coordinator. 57. Prior to approval of each final map, copies of proposed CC&Rs for the subdivision shall be submitted to and approved by the city Planning Department. 58. Prior to approval of the first final map, the developer shall provide a schedule, subject to the approval of the Planning Director and city Housing Coordinator, for the development of low income housing as defined in the agreement executed between the city and Rancho del Rey Partnership per city Council Resolution No. 15751 dated August 7, 1990. 13 ~/-~17 59. Prior to the approval of any final map for the subject subdivision or any unit thereof, the developer shall obtain all off-site right-of-way necessary for the installation of required improvements for that unit. The developer shall also provide easements for all on-site and off-site public storm drains, sewers and other public utilities prior to approval of the final map. Easements shall be a minimum width of 6 feet greater than pipe size, but in no case less than 10 feet. 60. The developer shall notify the city at least 60 days prior to consideration of the final map by city if off-site right-of- way cannot be obtained as required by the Conditions of approval. (Only off-site right-of-way or easements affected by Section 66462.5 of the Subdivision Map Act are covered by this condition. After said notification, the developer shall: a. Pay the full cost of acquiring off-site right-of-way or easements required by the Conditions of Approval of the tentative Map. b. Deposit with the city the estimated cost of acquiring said right-of-way or easements. Said estimate to be approved by the City Engineer. c. Have all easements and/or right-of-way documents and plats prepared and appraisals complete which are necessary to commence condemnation proceedings. d. If the developer so requests, the city may use its powers to acquire right-of-way, easements or licenses needed for off-site improvements or work related to the Tentative Map. The developers shall pay all costs, both direct and indirect incurred in said acquisition. The requirements of a, b, and c above shall be accomplished prior to the approval of the Final Map. All off-site requirements which fall under the purview of section 66462.5 of the State Subdivision Map Act will be waived in accordance with that section of the Act if the City does not comply with the 120 day limitation specified in that section. 61. Prior to approval of each final map, the developer shall enter into an agreement with the city to include the subdivisions in the Mello Roos public facilities district or an acceptable alternative financing program, subject to the approval of both the Chula vista Elementary and Sweetwater High School Districts. 14 3/-~ 62. Prior to approval of each final map, the developer shall enter into an agreement with the City wherein he agrees to comply with that version of the Growth Management Ordinance in effect at the time a building permit is issued. Such compliance includes but is not limited to the then current East Chula vista Transportation Phasing Plan and the adopted Air Quality Improvement Plan and Water Conservation Plan for Rancho del Rey SPA III. 63. Prior to final map approval for any phase or unit thereof, the developer shall enter into an agreement with the City whereby: a. The developer agrees that the City may withhold building permits for any units in the subject subdivision if any one of the following occurs: 1. Regional development threshold limits set by the then current adopted East Chula vista Transportation Phasing Plan have been reached. 2. Traffic volumes, level of service, public utilities and/or services exceed the threshold standards in the then effective Growth Management Ordinance. b. The developer agrees that the city may withhold occupancy permits for any of the phases of development identified in the Public Facilities Financing Plan (PFFP) for Rancho del Rey SPA III if the required public facilities, as identified in the PFFP or as amended by the Annual Monitoring Program have not been completed. 64. Prior to approval of each final map, the developer shall agree to not protest the formation of a district for the maintenance of landscaped medians and parkways along streets within and adjacent to the subject property. 65. Prior to approval of each final map, the developer shall enter into an agreement with the City wherein he holds the City harmless for any liability for erosion, siltation or increased flow of drainage resulting from this project. 66. The developer shall enter into an agreement with the City whereby the developer agrees to participate in the monitoring of existing and future sewage flows in the Telegraph Canyon Trunk Sewer and the financing of the preparation of the Basin Plan and, pursuant to any adopted Basin Plan, agree to participate in the financing of improvements set forth therein, in an equitable manner. Said agreement shall be executed by the developer prior to final map approval for any phase or unit proposing to discharge sewage into the Telegraph Canyon Trunk Sewer. 15 ~)-3' 67. The developer shall permit all franchised cable television companies ("Cable Company") equal opportunity to place conduit to and provide cable television service for each lot within the subdivision. The developer shall enter into an agreement with all participating Cable Companies which shall provide, in part, that upon receiving written notice from the city that said Cable Company is in violation of the terms and conditions of the franchise granted to said Cable company, or any other terms and conditions regulating said Cable Company in the City of Chula vista, as same may from time to time be amended, developer shall suspend Cable Company's access to said conduit until city otherwise notifies developer. Said agreement shall be approved by the City Attorney prior to final map approval. Fees/Pavments 68. The subject property is within the boundaries of Open Space District #20 (Zone 7), Open space District #10 (Phase II) and Assessment District #87-1. Prior to final map approval or other grant of approval for any phase or unit thereof, the developer shall pay all costs associated with: a) detachment of subject property from Open Space District #10 (Phase II); and b) reapportionment of assessments for Open Space District #20 (Zone 7) and Assessment District #87-1 as a result of subdivision of lands within the project boundary. 69. The developer shall pay: a. Spring Valley Sewer Trunk connection fees ($130jacre) prior to final map approval for any phase or unit thereof contributing flow to the spring Valley Trunk Sewer. b. Telegraph Canyon drainage fees in accordance with Ordinance 2384. 70. PAD fees shall be waived or modified as provided in the adopted Public Facilities Financing Plan for Rancho del Rey. RCT fees and DIF fees shall be paid in accordance with the applicable regulations. PAD fees shall be guaranteed until such time as the city waives said fees. Miscellaneous 71. The boundary of California System the subdivision shall Zone VI (1983). be tied to the 72. Prior to final map approval for any unit, the developer shall submit a copy of said final map in a digital format such as 16 3/-~1f1) --'- (DXF) graphic file. This Computer Aided Design (CAD) copy of the final map shall be based on accurate coordinate geometry calculations and shall be submitted on 5 1/2 HD floppy disk prior to recordation of the final map. 73. The developer may file a master final map which provides for the sale of super block lots corresponding to the units and phasing or combination of units and phasing thereof, shown on the tentative map. If said super block lots do not show individual lots depicted on the approved tentative map, a subsequent final map shall be filed for any lot which will be further subdivided. The city Engineer may condition approval of such a final map to require necessary plans to provide infrastructure necessary top meet city threshold policies and to conform to the approved Public Facilities Financing Plan. All super block lots created shall have access to a dedicated pUblic street. Bonds in the amounts determined by the City Engineer shall be posted prior to approval of a master final map. Said master final map shall not be considered the first final map as indicated in other conditions of approval unless said map contains single or multiple family lots shown on the tentative map. Code Requirements 74. The developer shall comply with all relevant Federal, State and Local regulations, including the Clean Water Act. The developer shall be responsible for providing all required testing and documentation to demonstrate said compliance as required by the City Engineer. 75. The developer shall comply with all applicable sections of the Chula vista Municipal Code as they exist at the time of issuance of the building permit. Preparation of the final map and all plans shall be in accordance with the provisions of the Subdivision Map Act and the City of Chula vista Subdivision Map Act and the city of Chula vista Subdivision Ordinances and Subdivision Manual. 76. Applicant shall comply with, remain in compliance with, and implement, the terms, conditions and prOV1S10nS of the Sectional Planning Area Plan, and such Water Conservation Plan, the Air Quality Plan and the Public Facilities Financing Plan approved by the Council ("Plans") as are applicable to the property which is the subject matter of this Tentative Map, prior to approval of the Final Map, or shall have entered into an agreement with the city, providing the city with such security and or assurance (including recordation of covenants 17 -g 1- JftJ'I1 (including recordation of covenants running with the land) and implementation procedures as the city may require, assuring that, after approval of the Final Map, the Applicant shall continue to comply with, remain in compliance with, and implement such Plans. That a copy of this resolution be transmitted to the owners of the property. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 18th day of June, 1991, by the following vote, to- wit: AYES: NOES: ABSENT: ABSTENTIONS: Presented by Approved as to form by Robert A. Leiter Director of Planning Bruce M. Boogaard City Attorney (RDR3TMCC.RES) 18 3/- ttt. RESOLUTION NO.~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA AMENDING THE CEQA FINDINGS FOR EIR-89-10, RANCHO DEL REY SPA III The City Council of the City of Chula vista does hereby resolve as follows: WHEREAS, subsequent to the city Council's adoption of the CEQA Findings for EIR-89-10 on Rancho del Rey SPA III, and in accordance with Council's conditional approval of the RDR SPA III Plan, new studies were required to evaluate ways to reduce net water waste and improve air quality within the project; and WHEREAS, the Water and Air Plans specify measures to be incorporated into the project that provide for better water and air quality. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby amend the CEQA Findings for EIR-89-10, Rancho del Rey SPA III, to include the Water and Air Plans. Presented by ~to ity Attorney Robert A. Leiter, Director of Planning 8969a ~ J- lfj RESOLUTION NO.~ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA AMENDING THE MITIGATION MONITORING PROGRAM FOR EIR-89-10, RANCHO DEL REY SPA III The City Council of the City of Chula vista does hereby resolve as follows: WHEREAS, a Mitigation Monitoring Program for EIR-89-10, Rancho del Rey SPA III, was adopted by the City Planning Commission on November 14, 1990 and by the City Council on January 15, 1991; and WHEREAS, amendments have been made to the Monitoring Program since water use has been reduced and additional measures have been added to further mitigate negative impacts to water quality; and WHEREAS, implemen ted, the accordingly. in order to assure that these are Mi tiga tion Moni tor ing Program has been in fact amended NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby amend the Mitigation Monitoring Program for EIR-89-10, Rancho del Rey SPA III. Robert A. Leiter, Director of Planning 8970a J o fO':O Presented by , Clty Attorney 31-~~1' S." .',.:.l... ..;'''':'1'h" '~f'=-/ :",.,E~ :.J;:-:~$ 7.';.Lj DATED CASE !,~ I," 'In v: -~ - i. . ~- ..-, , .'" - '::':': :::c'=:'~ TI] P.02 6915171 G/I,h '~, (, ~ ..,_:.~ - N C _~::E CITY OF C~'H \/Y:.:;TA , , ....... '_"A,Llf':"'it-fN rft. ;;',."'.3,, TIiAT A PUB'.l'; HEA.;.!;'"G wILl. BE HELD BY THE ,": - ct,'f'''' ,~f :r:J..~~ ,i.st;'1; california, fot' the ! ; ~ J/? L'0t '/"",':J.'ta ,.-,....." ,0,.1' --, ....,:,~,'f.,.,~"'~., ~,..t.""';'''~~l'on ma', ;. ~~.,~,; .....'- ,;"" {., ,,~-.:; '- '.J. '"C ~'~ ... ,""-:1..,\.....1. ~ ..l.-.::t. ,.t-' :r.. d::..-;t t,'\.l.-;,;t::" a ,'-'J.'::' <:"','H-rr~"'ti.L~nl.ty dE):s~gn :!:,'i!r~r::',t:,,:, d~,-,~ ?~. ~)~; r T,I pro,; e.ct, .,'). ,';tw'>?!':?7: i:<,i;;~::' ... ~3t,.t"e{:~t ::tnd r .,.}- ;~; .~ r. -2: ~ .2:,,');'1' '. ;-,'.':'t;:: ;;'~ f', :::'; (~.:.;: l';; ; '-,":>',...,. ':-:... 403 acres ~'j ,.,\. inq area for ~-.e ighbcrhOQd ~;<, f<.:.c';~lity ,;;..' i. ~. ~::. ,.~ rt',' p,:-:! rt ~ f,,~~Ji0B ietails ~,':. _:~~ tentati.ve: ,_ ~ "0 :. ~y l::-:,:j; ...: >::-~.-t:l'~I.)'m~ j,(-r-" e l,;,:,pillcn t ~!;, / -2,;..< ::;hQ.:"l, ,':i <::~,~~':,:~1!',., -..':'. ; ""':5. """;:;, .... ~. - . .. ", J.- i~+.'_~ ,;; ~.t;...' ': ~ ': r.~!; 11. r .,,;,:'c~e .'l::'() f thf" -:,<,:;",-,:2;~' ,:1.. ::GD":'-:; ;, :1~~~; 'C" - i. ,:.::::i0n r:.G~~ ., ':1.,,, ~ .,io" ''< .~ i ,_ ' :.: \~. r<' :.A.;\~t-; L'1:". ~-j i;i !:' <:,4 , "; C t f i. ::>.,;;... t ne '~,,~ ~'-'i.;:r-:-:,h A,' ':': ;',.,- '-,' ~l...:,b;,j t.c~d ',:::; t LIf; ::-aCi2 . ",,-... ....~' 100 r,~ the he~~lnq !.t~.; :.'f t': ,~~ ". '. ... ~ , '..,.-- ',1 :,:",,-;:... i.:,'~n';G th~~ <:'~'. ty L'~'~; {:::';'~'': '. ';':'71 Clj) thl.~;; , . . .~ ~ C::):.J-;:'t, ;~:::,t ... ...tsd t~-, ~',;-, ~s.tt-; or .scm~,'~or:'~ ellC,(' ,:~',is~~ ~.~ ~":~ ;,?pu.b.li{~' [)Harl.\l'..j ~.ce!, 01' in ';"'t:"_-:. tT:,'??'; {::C::;I:' r ,s.;~:,;::,.).:.l-~ '-ICt~ d~liveredtc: L prior" to ttle pc.b2. j,.;__: h~;:L~,i.'n '-i_ v~~"NC WILL BE HELD BY r}Ui ~,:1':~l, at~ 6:00 p~m. in th",> E-ul1,::1..nl.': 276 Fourth Ave:nls, ~~ bc GG3rd rnDY appear~ (:j' '7'1 COfJNCI L '~Tuesday ! ':::. ,~,(E.:i 1 C1~a.r!lCi~~:t:s t Pub 1 i (; d.C 'Aj"r>i(.'h time any pe~so~;. ",-. >-'i.~ ~." ". p" ~~',~)' ~ .;.S<";ji- C:\ ..\ "(,' p~,::S ~~i .'J- D 2 3/-'1'" xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx , _ (';_~ xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ", xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx c.' _ C5J.': ,J xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx , _1 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 0'; k xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx C. # ') xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ""~ -~ xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ~ ~ xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx o. ""'-"- 6400501900 CENTERRE BANK OF KANSAS CITY T R C/O LA PETITE ACADEMY P 0 80X 26610 KANSAS CITY MO 64196 6400502700 OTAY MUNICIPAL .ATER DISTRICT UNKNO~N ADDRESS '"-: 6401910200 BERMUDEZ CARLOS M/~ARIA G ~ C C/O INTERNATIONAL REAL ESTATE 579 TELEGRAPH CYN RD CHULA VISTA CA 92010 6401910600 REINHOLTZ JAMES F/BONNIE J I I _ , ~..l!!!"" ".. I -. CHULA VISTA CA 92010 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX ~ XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX ., xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx l xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx .1 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 640C502000 CITY OF CHULA C/O CITY R 270 F AVE C VISTA CA 91910 .. I 6400301500 PARDEE CONSTRUCTION CO 108BO .ILSHIRE eLVD #1400 LOS ANGELES CA 90024 . . 0401910300 EMPIZO MAXI~INO V/SHIRLEY M I .._~V' _ _ . .. CHULA VISTA CA 92010 . . 0401910700 D~RRANT iARALD K L I _ _ . n CHULA VISTA CA 92010 . . 0401911100 ELENA VILLANI SEBASTIAN i - , ,,__ CHULA VISTA CA 92012 (' () r ')( ~tSlmO~~BLO Z1SANDOVAL C.'OA , () C' III no__ ..- " , CHULA VISTA CA 92010 o.ro , Of: II c. ~ (16401911400 C. 0 C: .. EY~UYA ROY j'~A L 0.,,'-1 CHULI VISTA CA 92010 'OE:.._ 6401911800 ANCIRA OSiAR M t 11. _ .....~"" CHULA VISTA CA 92010 31 - "IS . . 6401911500 SHAHTOUT EMILE/HALA ~_. .-- --' ~..... CHULA VISTA CA 92010 . . 6401911900 TALAVERA CHRISTOPHER C/GAIL Y .. CHULA VISTA CA 92010 . . (' ~ r.. -:r c., _1 . ~n J c., ....J on k. c.." ~(~ ~ o. (,. ~ . LABL 00101 PCS-90-02 RES: SFO;"RANCHO DEL REY SPA] XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) . XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) . 6400500800 eENNETT S~SA~ M , _ _".' v CHULA VISTA CA 92010 . t~ CITY LA VISTA C/O CITY M . 276 FOURTH AVE CHULA VISTA CA 91910 . ",;: . . 6401910400 <ELLEY THOMAS C/CAROLE A CHULA VISTA CA 92010 . . (' ~ r ,-.,c c.'- 0 . c o t: . i~.~ (} r 0.: . . ,. o-.~ n - ~ .: )I - a. JL.l . .. . ~. 6401910800 HENOR~~ ROBERT . . ~. ...- CHULA VISTA CA ClOIANA 0 920~ 6401911200 ~X/AIOA G S ~ 6401911600 FUTRELL DONALD </CONNIE L .l. CHULA VISTA CA 92010 31-L/fo xxxxxxxxxxxxxxxxxxxxxxxxxxxx XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX xxxxxxxxxxxxxxxxxxxxxxxxxxxx XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX xxxxxxxxxxxxxxxxxxxxxxxxxxxx. XXXXXXXXXXXXXXXXXXXXXXXXXXXX 6400501800 EVANGELICAL FREE CHURCH OF C' LA VISTA 795 EAST J ST CHULA VISTA CA 92010 640050260C RANCHO DEL REY PARTNERSHIF C/O MC MILLIN DEVELOPMENT 2727 HOOVER AVE NATIONAL CITY CA 92050 6401910100 YU LOYDA M - bONITA CA 92002 6401910500 DE TOCA A_AOOR/TERESA G C/O INTERNATleNAL REALTY SER\ 579 TELEGRAPH CANYON RO CHULA VISTA CA 92010 6401910900 PASCUA JOSE FINO C FAMILY TRU~ . - CHULA VISTA CA 92010 6401911300 MITTER DEB < --- CHULA VISTA CA 92012 6401911700 fRAT CnRTER CHULA VISTA H/MARY R CA 92010 ,i XXXXXXX xx x XXXXXXXX XXXX xx xx xx Xl X XX X XX XX XX X XX xx XX XX XX XX XX X XXx) 'XXX XX XX XX XXX XX X XX XX XX X X X X X XXx) XX XX XX XXXXXXXXXXXXXXX X XX XX XX XX "". XXXXXXXXXXXXXXXXXXXXXXXXXXXXX! XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI XXXXXXXXXXXXXXXXXXXXXXXXXXXXX' XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI .. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI XXXXXXXXXXXXXXXXXXXXXXXXXXXXX) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXI ., ., 6243200200 6243200300 p tOH~SON ROBERT E/JOYCE .~SHER WA~TER ~/NAO~I E .. - -. CHULA VISTA CA 92011 CHULA VISTA CA 92011 6243300200 6243300300 DELGADO HANUEL JR/ROHANA R VALDEZ GERARDO/OFELIA L I. . CHULA VISTA CA 92011 CHULA VISTA CA 92011 a., - 6243300100 , CHRISTIAN VIRGINIA II ~ CHULA VISTA CA 92011 ,.. -, 6243300600 HARNS RAYIIOND E/~ARY H CHULA VISTA CA 92011 6243300700 ADAIIS SUE G TRUST OF 1990 CHULA VISTA CA 92011 6243300500 ~ORIARITY ROBERT J/GALEL . -. - ..- CHULA VISTA CA 92011 " , 6243300900 ~SHA LE~ON GROVE CA 92045 6243301000 ~AN ~92011 6243301100 COLLINS CHARLES F/IIARIA E I t,,, CHULA VISTA CA 92011 TRS 'l '. 6243301300 HUNNICUTT ETTA C EST OF C/O ~ARTHA TAUN ..n _ AUBURN CA 95603 6243301400 ELSEY JOHN N . -, T ._ ... _. CHULA VISTA CA 92011 6243301500 COATES THO~AS WI SANDRA S CHULA VISTA CA 92011 'l 1 6243301700 JONES RONALD ~DORIS 1 J If CHULA VISTA CA 92011 6243301BOO HARQUEZ JOSE H/EVA A IJll . CHULA VISTA CA 92011 6243301900 HAZLEY SHARRON R . --- . -' CHULA VISTA CA 92011 ") lit 6243302100 LARSON LEONARD D/WIL~A L rr .-W~ -- CHULA VI A CA 92011 6243302200 LANE STANLEY W/CYNTHIA RIDVAI . CHULA VISTA CA 92011 6243302300 CABRAL FERNANDO JR/HARY L .- CHULA VISTA CA 92011 " 6243200400 ~L~ HARVI~l~/GENEVIEVE C CHULA VISTA CA 92011 6243300400 ROSS JAHES III WILLA 0 CHULA VISTA CA 92011 6243300800 ~HACKER HOWARD A LIANNE C CHULA VISTA l~92011 6243301200 ~ASE TOKUKO CHULA VISTA S CA 92011 6243301600 WILSON IIAUREEN F ~92011 6243302000 DUNHAII BARBARA J CHULA VISTA CA 92011 6243302400 ~F CHULA VISTA CA 92011 ,.. .... ",. r~~ .. p ,. ~"'-. I 6401912000 PEGE THOMAS J/CAROl J . ~10 . 6401920200 6401920300 KONTOS ~ONA7D A BUNCE THOMAS ~/PENNY V CHUlA VISTA CA 92010 ~ . ,~.~,-;-- . 6401920600 6401920700 C.. ( XAVIER JOY~UCY ~n~A~~EOERICK Y/FU~I N () (; . CAllSBAO CA 92008 CHUlA VISTA CA 920lo C., C. . 00 }.l C. ~ ( ~(~ ~ . 6401921000 6401921100 o. ~SIEH JIANN-S~ FELIX JOSEPH P ~O ~ . CHUlA VISTA CA-92010 I 6401921400 6401921500 BRANSFORD R/DINAH S ~fRTINEI JOSEPH P/ESTELA S HULA VISTA CA 92010 CHUlA VISTA CA 92010 I I 6401921 SOO 6401921900 PINPIN EOElBERTO T/lUANA M ~~~ FOT,W.WA ~ULA VISTA CA 92010 CHUlA VISTA CA 92010 - , C 6401922200 6401922300 BAUTISTA-aQlANDO/MARY A ~KATHlEEN E . ~A VISTA CA Y<Ul0 CHUlA VISTA CA 9 010 . 6401922600 6401922700 2RKINSJYRON H/BARBARA J CHAMBERLAIN KATHRYN l C' ~ r I""\lf . CHUlA VISTA CA 92010 ~010 C.- 0 COt! . (J. r () . 6401923000 6401923100 C O.~ III LEO RICHARD ~O G-.~ (1 ~ VISTA CA 92010 C O,~ . . Q. .JL,.;' -...r:: . 6401923400 6401930100 ~TRICIA R ~ . CHUlA VISTA CA ~2010 CHUlA VISTA C 10 . 6401930400 6401930500 ~ DU ~ETI..RICHARO G CHULA VISTA CA 920 0 CHUlA VISTA CA 92~10 . , 6401930800 6401930900 ~UlA ROOOlFO lEONAROO A/CORAION l UlA VISTA CA 92010 ~ . ~,~,-~-'_.~"- .31-4/~ 6401920400 TARANTINO FRANK A/LOREN R iHULA VISTA CA 920fo 6401920800 , _ RIVER~IMANUEI/~A ~f';.~ CHULA VISTA CA 92010 C. ,:t' ooe.. o.{~ 0(;<\ 6401921200 c.:: CAVANAWii 1 PATRICk/MOLLY A o e ( CHULA VISTA CA 92010 a. .. >4- 6401921600 8ERESkY MiCHAEL T/CHRISTINE CHULA VISTA CA 92010 6401922000 SARINAS RENATO C/ALITA T CMULA VISTA CA 92010 6401922400 LEE GREGORY CHULA VISTA A/DAWN M CA 92010 -. 640H22800 LAWSON LESLEY CHULA VISTA CA 92010 " 0 one :)e<ll' 6401923200 : 0 c;';t II VARGAS JOSE DE J/MELlNDA A J.C 11. CMULA VISTA CA 92011) . oc-:u:a ,:ec ):{' , 0 COJ;( 11 . e;" 6401930200 u ~ GUERRA GUADALUPE R --- CHULA VISTA CA 92010 6401930600 GOMEZ JOE A/FELISI~A P I CHULA VISTA CA 92010 6401931000 RUIZ ADRIAN CHULA VISTA M/CAROL A -~ CA 92 3/- ~9 6401920100 RUSSO VINCENT M/GAILANNE C~ULA VISTA CA 920"0 . . 6401920500 ~ CHULA VISTA CA 92010 . . 6401920900 eERDICHE~r Jrfioeo II _I. __ CHULA VISTA CA 92010 . . 6401921300 BARRAGAN RICHARD/MARGARITA - CHULA VISTA CA 92010 e . 6401921700 REED WAYNE P/YVONNE E CHULA VISTA CA 92010 . . 6401922100 COLeERT LARRY/CHRISTINA k 17 -'~~ . CHULA V S A CA 92010 . . 64U1922500 SCPUGGi ROBERT -- CHULA VISTA. C A . A/DEeORAH S 92010 . 6401922900 OCHOA LUIS A/MARGARITA ~ ~ A, ~ CHULA VISTA CA 92010 . . 6401923300 CROSTHWAITE DAVID/NATALIE CHULA VISTA CA 92010 . . 6401930300 WOLF PAUL D/SUSAN ~HULA VPr+A CA 92010 . . 6401930700 ~ ~ . . 6401931100 SANSERINO RICHARD A/STELLA RS CHULA ViSTA-CA 9201d M T · . ~~-'l lit 6401931200 6401931300 LUDI DARWIN B/PATRICIA A ~AMLYN Y --I .. ~ CHULA VISTA CA 92 CHULA VISTA CA 92010 C. () 6401931600 640193170C WUNSCH JOHN J/FE P ~IAA - - CA 920-/0 CHULA VISTA CHULA VISTA CA 92010 0 . ~ r;r.( . 6401932000 6401932100 ce.. . ~URA L JANKIE~if JQ~EPH J{HOLLY V aocI . CHULA VISTA CA 9201 CHULA VISTA CA 92010 Oe(l:t. o () ( J) G e ~a. . 6401932400 6401932500 al:ClI ~W'. mWEL S/VIRGINIA K SCOTT CHAOLES T/V!CKI L oe )t: CA 9-%-10 . CHULA VISTA CHULA VISTA CA 92 10 ...&....- . 6401932800 6401932.900 CALVO MARTIN V/MARTHA ITO SHIGEMASA/KIY~E . CHULA VISTA CA 92010 CHULA VISTA CA 92010 . 6401933200 6401933300 KING RONALD L/LINDA D WHITLEDGE JIM 0 . CHULA VISTA CA 92010 ~010 . 6401940100 6401940200 ~SUNNY G ~M . CHULA VISTA CA 92010 CHULA VISTA CA 2010 . 6401940500 6401940600 BARRAGAN DANIEL/VICTORIA ~LE . CHULA VISTA CA 92010 UL S 0 (' 0 Of)(' . ':J e OtJ c a 1;'3 !I: . 6401940900 6401941000 JeCIJ HILL ~ARRY G/OLIVIA E ~CAROL R C 0 1 :::Col: I - -~ ,Jec..t) CHULA VISTA CA 92 ro CHULA VISTA CA 92010 '. a I:L( il . oeu'U 9 6401941300 6401941400 GARCIA ARTHUR/ELIZABETH A ~NET P 111 I I r -- CHULA VISTA CA 92010 CHULA VISTA CA 92 10 .) ,I 6401941700 6401941800 ROBINSON JAMES M/ESTER A RENTZ LEONARD/KAREN M CHULA VISTA CA 92010 ~H~LA VISTA CA 92010 .1 6401942100 6401942200 HOUCK DEWARD J/REBECCA E STONE CARVIN/MARILYN V '" - ~ CHULA VISTA CA 92010 3/- 50 1 6401931400 WITTREICH JOHN ., of CHULA VISTA CA l/CLARICE M 2010 6401931800 EMERSON JI~MI-l O/JO C CHULA VISTA CA 920f! 6401932200 ~ROL M ~ r:.l!"'JI CHULA VISTA CA 92010 c: . (lJC <> ( 1.'tl!J l:. ~:1,' 6401932600 o (d/f MARTINEZ VIN~JR/NORA E C. f;J. MLA VISTA CA 92010 <> ( .,( If o.l.~ ..0.- 6401933000 t?NG MELVYtl I/Y~NOA ~ CHULA VISTA CA 92010 6401933400 ORUMHELLER JOHN O/LUCILLE M ~010 6401940300 HARTWELL A~NE ~ '., 6401940700 BONELLI GARRY J/MARTHA J ~O r-.r.~ '.C R 16401941100 ~O.:,( If LATSKr THR~AS I ;.ClfJCHULA VISTA CA 92010 0''1111 :.c"1 ,0':;1 B; 6401941500 U.lJU STROVERi P~UL J II/ANDREA S CHULA VISTA CA 92010 6401941900 HUNTING DA~~H CHULA VISTA CA B 92010 6401942300 APPEL ALEJANDRO M/MARIA G ~LLA VI~.A lA ~~~te' 3/-5/ 6401931500 rENNIS TARRY O/LYNN L CHULA VISTA CA 920fo ( << 6401931900 RIDS ANDRES H/SANDRA G ~o . . 6401932300 ~RIAI ~10 . . 6401932700 BEAROSLEY Re~~R/JOYCE 0 CHULA VISTA CA 92010 . . 6401933100 ~L CHULA VISTA CA 92010 . . 64 RANCHO REY PARTNERSHIP C/O Me MILL OEVELOPMENT 2727 HoeVER AV, NATIONAL CITY CA . . 6401940400 ~ ~O . . 6401940800 ~BORAH A CHULA VISTA CA 92010 . . 6401941200 ~RMA M ~010 . . 6401941600 DISO MAlLIl..Q.. M/ ELISA L tHULA VISTA CA 92010 . . 6401942000 ~NNA S ~ . . 6401942400 REJON J GONZALO LL ~ CHULA VISTA CA 9201 . . _.'---~1 << 6401942500 6401942600 lINEN CHARLES J IROBINSON-lINEr< YEt MICHAEL l/KYlE A NAHY CA 9. ~ . CHULA VISTA . 6401942900 6401943000 ~AS ON ~&iId 92010 ~IA C . CHULA VISTA CA CHULA VISTA CA 92010 c~t':.~ . 6401950300 6401950400 ~ZENAIDA R ~A ae ,,(1 CHULA VI TA CA 92010 HUL S CA 10 <>. ; s . c. ~ (J 00 }'I ce~l" . 6401950700 6401950'00 o (~ II: BYRNE ~A~ES D/KATHERINE L ADAMS VICTOR L/SUSAN E oe (1 Mo ISTACA 92010 ~010 ~ . . 6401951100 6401951200 VAN BRUNT CHARLES J/DOROTHEA TIETZ ~RIEDRICH K/ELEANOR G . ~010 ~10 . 6401951500 6401951600 ~BORGHILD EVANS FRANCIS E/FAYE S & CA 92010 ~ . 6401951900 6401952000 FERRER FE~ANO M/MARITA M ~ &uLA 0\5 A CA 9d N DIEGO CA 92101 . . 6401960300 6401960400 GUARNES JOHN P TAKAHASHI MUT . MeA VISTA CA no!!' CHULA (' C) ~ ('")(' G .':11 c Ot!(lI . 6401960700 6401960800 o.~ 11 HERNANDEZ CESARIO L/ADELAIDA c~ 01:01 ~ ULA VISTA CA 92010 C-." ,.1 . COI:~jJ (). "I,.) ..,. . 6401961100 6401961200 ~YE ~E RICHARD F/ELISA B CHUlA VISTA CA 92010 CHULA VISTA CA 92010 . . 6401961500 6401961600 ~PHIE A ~ CHULA VISTA CA 10 CHULA VISTA CA 92010 . . 6401961900 ~L/EMILY S ~O 6401962000 CHAVEZ RAMON/CARMEN ~A VISTA CA 9~~10 ~ 3/-52. 6401942700 GARDINIER JO ANN ~10 6401950100 ~HA ~10 6401950500 ~IAS ~10 . ,.,riA C.,. C 1:, '" 6401950900 (... (;J. ~R N HIRLEY M :0';( )l (.r~ HL 010 C'~( l C.lX 4- 6401951300 ~L 6401951700 ~E ~ 6401960100 ~G ~ RENEE 6401960500 PAYNE RULON K/CATHERINE A ~ Of'.n 6401960900 I.I..~ . C~~.i CHULA VISTA CA 92010 I:>I"IJ . ., A Co I.... 1 6401961300 \,0., A. BURKS RICHARD SIJEANNETTE L CHULA VISTA CA 92010 6401961700 WHEATFALL ARTHUR C/LINOA K CHULA VISTA CA 92010 6401962100 GERKEN GARY B C RED CARPET CHUL 3/- 52. 6401;>42800 HORWATH ROBERT PI BEVERLEY K ~O . . 6401950200 ~FORO jE1NNETTE M C A VISTA CA 9~0 . . 6401950600 GEORGE JAMES J ~O . . 6401951000 Iil1ILO C~~~r:jl'JILL A CHULA V 10 . . 6401951400 ~ CHULA VISTA CA 92010 . . 64019S1800 ~A ~ . . 6401960200 ~AM ~ . . 6401960600 CROW BYRON W ~ . . 6401961000 STAFFORD MARSHALL L/ECHO H ~ . . 6401961400 BLAIR JAMES F/NEWTON-BLAIR ERANZA E C~UL~ V1STA CA 92010 ESP · . 6401961800 ~ARA A ~O . . 6401962200 ~ ~O . . ""~~"'-"""'-"-"""~.,...:;:::;;,..""....",..."."", ~'W :;",~7>.'.;. .., '~!l" - '~"E-' l~ ~ r;-. . 0., ',( Oil 11 CO~~ ..~ - · c.:- oe - . a. -,- -=-. C'~r(")( . o e- J.J C Of!ClI ce~t) . C 01:01 Ce'1'1 :"0(;(.. Oe",L) ~ 1 6401962300 ~AG ~O . . 6401970400 ~ANA ~010 . 6401970800 ~/PATTY A CHULA VISTA CA 92010 6401971200 ~AS ~ . 6401971600 MICHEL JOSEPH B/KAREN M ~ . . 6401972000 MURPHY JAMES SILE IE A HUL CA 2010 . . 6401972400 ~R ~ . . 6401972800 BANGS ROBERT R JR/ELIZABETH A TRUST 07-05-90 ~ 6401973200 ~ CHULA VISTA CA 92010 . 6401980100 ~ ~O . . 6401980500 ~ELL B ~ . ~ 6401980900 STRIBLING DAVID MIJEAN K ~CLA VISTA tA J~~ .. , 3/-53 6401970100 ~ ~ 6401970500 ~ 6401970900 ~LJ ~ 6401971300 ~ 6401971700 ~YD 6401972100 ~AREN G ~O 6401972500 ~R 6401972900 ~ 6401973300 ~INO I/MOhINA J ~A 92010 64019B0200 ~RYL 6401980600 ~IWARD ~10 ERIN 6401981000 ~ER ~10 GIHSUEH 6401970200 OTTf rATI' Y HII" \2-06-90 CHULA VISTA CA 919T0 6401970600 ~JR/DeBORAH ~10 6401971000 .-c>>r.~~RA G c.,-<.]~ 00 .. c. ~ L: s> (; ~ 6401971400 C.:- <'!~S JOSE A/OLGA P oe '8 o. OC ....-.;;.;.... 6401971800 ~ENCE R ~ 6401972200 ~ ~10 ", 6401972600 ~ 6401973000 ~VICKI L (' c>> ~. l)( C.(J] - 0 C' (]( 6401973400 ". '. ~T 09-06-90 ~.~ ll- C ot:(JiCHULA VISTA CA 92010 C -. . lJ 1 ~. at:(]1 c;. 'JLl 6401980300 .,.~ 6401980700 ~HARON L ~10 64019E1100 ~ ,31-5tf 6401970300 SABLAN JOSEPH P/KATHLEEN M ~O'O .- 6401970700 { s ~ D/ANGELINE C ~2010 ~ " 6401971100 ~A~ ~ ( t 6401971500 ~HG ~ << << 6401971900 ~ ~92bl0 << << 6401972300 JARRETT DAVID A V A C A << MA. ReEN L 2 10 << 6401972700 ~ CHULA VISTA CA 92010 << . 6401973100 ~V CHULA VISTA CA 92010 . . 6 RANCHO REY PARTNERSHIP C/O ~C"I N 2727 HOOVE R NATIONAL CITY . . 6401980400 SELDEN WAYNE R/LYNN M CHULA V~TA CA 9201~ . . 6401980800 ~EK . . 6401981200 ~CQUELINE L ~10 . . . . ~ r;-J6 c..c . ~o 9 . e.( C- oo }4 e.~(. ~e :n o. .c . C' ~ t' C)<' ee'll c ~4:C" . c.:'" ~j 04:C)1 ee' J' 1 . CO(;(li o e ~L: . ~ i 6401981300 ANDERSON MICHAEL J/CHESTA T ~ I c 6401981700 eOW~~N~,pf.;\ H ~~!iATHLEEN M CHU A . 6401982100 ~OYCE ~O 6401982500 WHITE CARLfMADONNA F TRS CHULA VIS~ CA 920~ . 6402110400 ~L CHULA VISTA CA 9 10 . . 6402110800 ~CECILIA HULA VISTA CA 010 . . /:402120200 ~RITA E HULA VI CA 10 . . 6402120600 ~GLADYS S HULA VISTA CA 92010 . 6402121300 cARBIERI R08ERT L JRfMARY A ~ VISTA CA~2010 , 6402130300 GENERATION SKIPPING TAX EXEMPl TRUST CfO UNION BANK POBOX109 SAN DIEGO CA 92112 . . . 6402210400 HALL W~AM AfISABFL K ~NlT A CA ~2on2 . 31-S~ 6401981400 ~UST 11-09-84 ~2010 6401981800 ~IANNE C ~O 6401982200 ~VfROCIO C ~2010 6401982600 MC CLENDON GARY Of PATRICIA A ~LA VISTA CA 928~ 6402110500 ~D a/DEBRA A ~010 6 111400 CITY CHULA VISTA ClO CIT NAGER 276 FOURTH CHULA VISTA CA 6402120300 RADFORD MICHAEL JfSUSAN G ~010 6402120700 ~10 6402121400 THACKER JAMES A/SNYDER ROSEM, Y T - ~ULA VISTA CA 92010 6402130400 ~DELAIDA M .~ 92010 6402210100 ~fCINDI J ~2010 6402210500 ~NAD ~10 6401981500 ~C ~O 6401981900 LOREN MARl ETA R TRUST ~ 6401982300 ~MMA R ..'~r..,r~O 0., ,;:.1 C) (; ~ c.{ c, a (; a 6.. 700 ,~.. .'CITY 0 ULA VISTA ~ ,...: C/O CITY ER () (~ ~ 276 FOURTH AV. a. C CHULA VISTA CA 9 ~ 6402110600 ~ICHELE A CHULA VISTA CA 92010 6402120400 ~/PATRICIA A ~010 6402121100 ~ ~ C' 0 t ('")( G . " 't 1 6402130100 C C)(leX ~R/JACQUELlNE :J. ~ t) CHULA VISTA CA 92010 co(:ex c. ~ .) c 0(: or O.f1~E C ~CA 92010 6402210200 ~WT ~ 92010 6402210600 ~ ~010 3/-$1. 6401981600 ~L ~ ~ 6401982000 ~VNiAS.~D I/VICKI L CHULA VISTA CA 92010 1 t 6401982400 ~ . 92143 . 6 RAN Rev PARTNERSHIP C 10 MC M 2727 HoaVER NATIONAL CITY . . 6402110700 . HORTON WILLIE J JRISYKES-HORTO N V<NORlA 1 I. _ CHULA VISTA CA 92010 . 6402120100 . ~M/WANOA J CHULA VISTA CA 92010 . 6402120500 ~TA tit.PH ~ iRIGRACE L CHULA VISTA CA 92010 . . 6402121200 ~ E/SYLVIA G CHULA VISTA CA 92010 . . 6402130200 L.~ CHULA VISTA CA J/MARY J 92010 . . 6402130600 iffSENJVICKI L CHULA VISTA CA . 92010 . 6402210300 JO YONG IL/MYONG JA ~92010 . . 6402211100 MERZA ER~IE R/CAMILLE M ~CA 92010 . . 6402211600 ~ORA J ~10 6402212400 ~OR ~CA J R/MARY H 92010 6402310800 TROTTER ALFRED DIll/wANDA J ()r,rJll~2010 C..... ~ all:{ B d.ltC 00) ;( 0402311200 C.C::J.~A a(~;{'n~O O.Oc -""-- t402311600 KINSMAN RAYMOND TR ~HULA V,.[. y]iho 6402312300 CUNNINGHAM AGUSTIN/MARIA ~2010 6402312700 ~C/MARINA L ~010 6402313100 ~IS AMELIA CHULA VISTA CA 92010 r, 0 r"Ot :; e C J( J 6402313500 o <<:;l 11 LOPEZ CRUZ/VERA )eC"]~O 0<<:[( . .oec 'K 1 0<<:"'. U el.JL,; 6402313900 ~RION I ~O 6402320400 JjATES JAMES CHULA VISTA ./CATHERINE A CA 9<~0 6402321100 PETERSON BRIAN CHULA VISTA CA LlJEANNE M ~910 3/-5 r 6402211700 EGU.. DANljl A/CECILIA P CHULA VISTA CA 92~ . . 6402310500 ~~ERLINOA F ~O . . 6402310900 HUM8ARGER JEFFREY A/STAUB9E-HU M8ARG~H PI!' _n HULA VISTA CA 92010 C' . 6402311300 CAMe EROS ALFONSO/ISABELA T ~92010 . . 6402312000 ~ ~O . . 6402312400 ~M CHULA VISTA CA 92010 . . 6402312800 ~R ~10 . . 6402313200 ~MARY S ~10 . . 6402313600 ~ . . 6402320100 ~TINE A ~O . . 6402320500 ~M . . 6402321200 ~A . . --'-', I 6402211200 6402211500 BULL THOMAS S/JOY A ~/MEGAN ~CA 92010 CHULA VISTA CA 92010 I . 6402211800 6402211900 ~/SUSAN C TORRE WILLIAM V/SINCLAIR ItERE C STA CA 92010 ~ . CHULA VISTA CA 92010 CI r; -_ . 6402~10600 6402310700 ~A MARIE MANGARIN MARIA T ee- l CHULA V~ CA 92010 aD D . CHULA VISTA CA 92010 c.{ L 00 XI ce:" l . 6402311000 6402311100 a (~ 'It ~RDIE K ~W/SUEN oe ( . A CA 0 CHULA VISTA CA 92010 ~ . 6402311400 6402311500 ~ESA M ~ . 92010 CHULA VISTA CA 92010 . 6402312100 6402312200 ~CAROL I ~RNE L TRS . CH 0 CHULA VISTA CA 92010 '"-::: . 6402312500 6402312600 ~RESA S RUSZAT MARK . 10 CHULA VISTA CA 92110 . 6402312900 6402313000 ~ A/TERRI A f~FTIN fhSE-i':ii M A CA 92010 CHULA V A A 10 r CI r- f'")( . ce'- tJ c a <<: r. . 6402313300 6402313400 c.~." , ~ ~CHENG ( 0 <<:-:a: CA 0 _ LA IS A CA 92010 c-.' r: . '_ 0 <<: -jt oeJL.: -~ . 6402313700 6402313800 , ~:ARGIE f ~ C U 0 . . 6402320200 6402320300 ~ RAUSCH DAVID L/SANDRA f 9 10 ~2010 . .. 6402320600 6402321000 ~ J SULLIVAN CURT D/CYNTHIA M ~10 f 3/-5' . 6402321300 6402321400 rOMINQ HIROYUKI/KUNIKO KIMBROUGH JOHN W SR ~ ~10 . . 6402321700 6402321800 ~ORA G CASTANHO JOSEPH/THEA C A A 92010 mLA VISTA CA 920"10 . -, CI f: .~ . 6402322100 6402322200 ~ iNiARNACION JAIM~ D/MARLINDA 0.,-<.1 CA 92or!' ~(; B ULA VISTA CA 92 CHULA VISTA 0.' C . au )'f C.::'~ . 6402400400 6402400500 . a (~ MENG JACK H/WE~DY C y<RGAS MARIA E a.I ~2010 CHULA VISlA CA~2010 ~ . . 6402400800 6402400900 ~ ~TZ ALFRED J/TERRIE M STA C CHULA VISTA c! ~2010 . . 6402401200 6402401300 ~ADALUPE R aCf'.lG R ABE A/GLORIA L A VISTA CA 92010 CHULA VISTA CA 92 0 t - . 6402401600 6402401700 ~EMIKO ~NIO D CHUL 010 CHULA VISTA CA 92010 J . 6402402000 6402402100 ~TERESA A ~TA S VISTA CA 92010 CHULA VISTA CA 92010 (' CI r: Of . C.'.J COC;()I 6f 6402402400 6402402500 (~.:-. ~,y SABINO A/NORMA P iailAN GERRY F/MARIA M ': oeO-. c.....' . LA VIrrI ~9201 0 CHULA VISTA CA 92010 '.O<<:<'B O. JL -r:" !S 6402402800 6402402900 ~ ~ CHULA VISTA CA 92010 , . 6402403200 6402403300 GILDEA PAUL F/ MARY P MAG ALONG HENRY MERLINDA C !m-LA VISTA CA 92010 CHULA VISTA CA 92010 J , 6402403600 6402403700 ~NC MICLAT REY M/ROSAFIO S CHULA VISTA CA 92010 CHULA VISTA CA 92010 -...,.,.. 3/- 5'7 (' 0 r.or O. ell) 6402402600 C 0 el:l Tl ~HARYN M :J.C 1I )~2010 C 0 e:U-:II c.Oll , oe:l(lI u. L!L1 6402403000 ,~ ~ 6402403400 ~/BARBARA A ~2010 6402403800 BALUYOT AMADO I/ROSALINDA ~10 3/-'0 . 6402402700 . ~ VICENTA T ~O . 6402403100 . SEVILLA FRANCISCO J/LOURDES ~2010 6402403500 HERCE ROLANDO G/LORNA E ~O . . . 6402403900 . ~ISCO P/SONIA D ~92010 . -1 c ~ r;-:. . c., ~ ~o I e.' {, . 00 J: c. ~ ( ~(~ I . a. ,~ -=-. . . . ",;: . -"... . . . " 0 t:' (")( . c.'- I' e ~e: ~ll '3.~ t . C 0 e: ~. 0.' ..' cae:',. o. ~L ~ - 6402404000 DELACALZADA DAVID D/IRMA ~ 92010 1 . 6402404400 ~OURDES B CHULA VISTA CA 92010 . 6402404100 RAM HRISTOPHER D/TERESA G CHULA V A 9 0 6402404500 ~U/MARGARITA ~ 92011 6402404800 VILLANUEVA ANASTACIO S CHULA VISTA CA 92010 6402404900 L/EUGENI'~CO N/ROSITA N CHULA VISTA CA 92010 6402800523 ~YNA ~10 6402800527 JOHNSON TYLER DEAN/JANET ELAlt E CHULA VISTA CA 92010 6402800531 ~ CHULA VISTA CA 92010 6402800551 ~LINDA C CHULA VISTA CA 92010 6402800555 MC MAHON MAURICE R/LOUISE M CHULA VISTA CA 920~0 6402800559 JIMENEZ LUPE M SA VI~ CA 92"'0 . 6402800563 ~ ~O . . . . 6402800904 ..BEASLEY HAROLD CHULA Vlf'rA CA R/CAROL A 92010 ~. 3/- (" 6402800524 HUjTO~ ~FREY CHULA VISTA CA C/CHERI R 92010 6402800528 SCHRECKENGOST ROBERT L/CHRIST ~A M CHULA VISTA CA 92010 6402800532 ~INDA R CHULA VISTA CA 92010 6402800552 ~/CAROLYN ~2010 6402600556 ARENDA~H FRANK IJ.\. CHULA VISTA CA J/MILDRED A nb10 6402800560 ~A ~10 6402800564 ~ ~O LTt 6402800901 ~/BARBARA L ~2010 6402800905 ~~~ :A 92010 6402404200 6402404300 I MANUEL ~O SiFE E ~ A/ERLINDA T ~H~LA VISTA CA 2010 (HUL V S 92010 t 6402404600 2404700 t ~ F CHULA VISTA C/O C MANAGER ISTA CA 92 10 276 FOUR AVE CHULA VISTA << 6402800200 6402800522 << VILLA PALMER A ~/LOURDES D 'COl.'=: ~ SAN DIEGO CA 92120 010 . CJOUl CO~; iY~ 6402800525 6402800526 . ~ C..f\c~ CJ (~(,' HULA VISTA CA 97010 CHULA 10 o. .., . .&.- 6402800529 6402800530 . ~IAJ NAREAU JOAN G HULA VISTA CA 91910 ~Tl CLJU02 . 6402800549 6402800550 . ~ TRUJILLO ALICIA CHULA VISTA CA 92010 CHULA VISTA CA 97010 . , 6402800553 6407800554 . ~ SHAW SCOTT H/CATHY G (HULA VISTA CA 92010 ~ULA JVY'I ~~-J2010 " . 6402800557 6402800558 . ~SUELO A SCHLE~NijR FRANCIS DIMARION R - - 10 BONITA CA 92062 . f"'~O ~ 6402800561 ,l-'.C.l~UG PH RI ANN _ o<<~ 11 <}.C}I)CULAVISTA 900 onlJl ,;.Cj(; . 0 <<:i( Jl 6402800565 U.LJL: ~/CORNELL S . ~10 6402800562 ~ANE CHULA VISTA CA 92010 . . . . 6402800902 LOPEZ LUIS A ~10 6402800903 ~LORIA C ~010 . . 6402800906 ~MARSHA S ~2010 6402800907 SMITH JOSEPHINE H TPUST 90 ~010 04-04- . . .31-~~ 1 "-;:.. (' ~ r;'-/I . ce.. aocll eel:!:, . a <<; c~' c.::" a(~(l. oe J- -'L.-" ('~r-0( t'I C.CJl ( ant 'e '3 . r It .. o . ::r ~. C'.C:::I .. c 0':<'1<< A o . U1.. 6402800908 ~ ~-92010 . . . t402800912 AUTHELET BEVERLY A ~10 . 6402800916 ~ III/KATHY L ~92010 6402800920 ~ACQUELINE L ~010 t 6402800947 ~ CHULA VISTA CA 92010 . t 6402 RANCHO DEL PARTNERSHIP C/O MC MILLIN - OPMENT 2727 HOOVER AVE NATIONAL CITY CA 92050 ) ) 6402920400 RANCHO DEL REY PTNRSP ~ARESE NATIONAL CITY CA 92050 .) ) 2920900 RD SINESS CENTER LTD C/O MILLIN COMMERCIAL IND t 2727 HOO AVE NATIONAL CI 92050 "'" 6402931600 ~ 90232 6410201900 ~ ~ 6422910700 ~ARSHA E ~910 31 - (,3 6402800909 REFKIN CHARLES 8 ~2010 6402800913 CHUPPE GEORGE II/TERI L CHULA VISTA CA ~2010 6402800917 ~ MARY F CHULA VIS TA CA 92010 6402800921 ~ ~2010 6402800948 ATIENZA MILAGROS 8 ~LLA VISTA CA 9<010 040 RDR BU ESS eE~TER LTD C/o Me MI 2727 HOOVER A NATIONAL CITY IND 20500 RANC EL REY PARTNERSHIP c/o MC N OEVELOPM~NT 2727 HOOV ER NATIONAL CITY CA 6 21 000 RANC EL REY PARTNERSHIP C/O MC N DEVELOPMENT 2727 HOOVER NATIONAL CITY CA 92 6423110100 ~CA ~ ...._'--~ , 6402800911 RIvERA CA~LOS AIMYRNA Y CHULA VISTA CA 92010 . . 6402800914 STONE WI AM/MARY L VISTA CA 2010 6402800915 ~LAUDIA CHULA VISTA CA 92010 . . 6402800918 ~L ~t';""'~~2010 C.' .1 Q()~~ (~l'; () {; ( . 6402800945 C...L03 A RIA ~(){~( '~10 o. .' 6402800919 ~USAN K ~2010 . . 6402800946 ~RA ~92050 . . .00-- /:4 0200 ROO 8 'SS CENTER LTO C/O MC MIL OMMERCIAL INO 0 2727 HOOVER Av NATIO'AL CITY CA 9 . . 02920300 . R BUSINESS CENTER LTO INO 0 CIO MILLIN CCMMERCIAL INO 0 2727 H ER AVE NATIONAL CA 92050 . 640 0700 . RANCHO L REY PARTNERSHIP CIO MC M N 2727 HOCVER NATIONAL CITY tl 6 2921200 ROR USINESS CENTER LTO CIO MILLIN COMMERCIAL 2727 HO PAVE NATIONAL CI 2050 tl 64 ROR INESS CENTER LTO INO 0 C/O MC LLIN COMMERCIAL INO 0 2727 HOOV NATIONAL CI tl r-~~ ~.( Jt 16402931200 '()t':f 11 CMASE INTERNATIONAL LTO , '.c' '112712 TRANSPORTATION AVE ..' ~ NATIONAL CITY CA 92050 o 0.01 }.Oll o t:4 if U.Ll1..l ~OR SINESS C/o M LIN 2727 HOOV NATIONAL CITY PTNSHP #STE F tl INO 0 tl CENTER LTO COMMERCIAL C 50 INO 6410201200 ~ O~ tl tl /:422910200 ~ ~ 6422910400 ~INEE ~010 tl tl L/LI NOA 6423110300 TYLEE JAMES G/JCLENE 0 CHULA VISTA CA 92010 tl tl 31-~'I -------"1 ()f:.1I c.' t ()n .Ii c.' {. OO:}" C.:".l . CJ(~()I o. , .L.-. .) (' () r-0< c.cn : O(::1J ~ -=: .(ll. C (:;J -j ~.(~ ) a (:1( Ii ().u~ . 6423110400 SPEZZANO JAMES A CHUlA VISTA CA 92010 . . 6423110800 SIRLES CARL P SR/JOYCE l ~ . . 6423142200 ~BETH 0 ~ . 6423150200 ~ CHULA VISTA CA 92010 . 6423200500 ~TTY J CHULA VISTA CA 92010 . . . 6423201200 ~DO CHULA VISTA CA 92010 JI ANITA . 6423201600 D~NN RC.ERT ~~ CHULA VISTA CA 92010 6423202000 MAHONEY RAYMOND W/LILLIAN T CHULA VISTA CA 92010 6423202900 ACUN~CHARD/CATHERINE A CHULA VISTA CA 92~0 :[',1 64 910700 RAN DEL REY PARTNERSHIP C/O MC LIN DEVELOPMENT 2727 HOOVe VE NATIONAL CIT 92050 31 - ,.5 6423110500 AASEN ROY V/SUE M CAMARILLO CA 9301~ ; 6423140100 .~ ~ 6423142300 ~ ~ 6423150300 SNYDER WILLIA. W REVOCABLE TF ~ 6423200600 JACOBS K~S i H/JOYCE A CHULA VISTA CA 92010 6423201300 MENDIVIL GEORGE H/LETHA C ~[A VISTA CA 92010 6423201700 ~ ~ 6423202100 MC GILL KEVIN J/JANE H C~ULA VIStA CA 920/0 6423203000 ~ ~O NO 1 L TO PARTHR 64 10BOO RANC EL REY PARTNERSHIP C/O MC N DEVELOPMENT 2727 HOOVER NATIONAL CITY CA 0 "1 6423110600 ~ ~ 6423140200 ~RIAE ~O 6423142400 "'~r.-r~ 'c.~,_1~ CO~: J Q (; ): 6423150400 c. ~ -::J ~ 04-02-90 0(: "l~o 0..:) . ~ 6423200700 ~IKAH ~10 6423201400 ~ 6423201800 ~ ~10 6423202700 ~ARY T ~O C' 0 t I"'t( C e ,"C) 6423203100 CO.: Il~A oer (J~o CO.: .' c::'e~ n r_ 0.: .- oeJ~l ~AN EL REY PARTNERSHIP .~. ClO MC N DEVELOPMENT 2727 HOOVER : NATIONAL CITY CA 31-" (. 6423110700 ~~ER CHARLES F/M ELISAEETH ~A VISTA CA J<O~ 6423140300 GUTIERRE2 GEORGE R/ROSA L CHULA VISTA CA 9~O't ~ .. 6423150100 NILSSEN LILLIAN CHULA VISTA CA 92~1~ ~ 1 6423200400 ~ANDRY~/PATRICIA A CHULA VISTA CA 92010 1 \2 6423201100 DAVIS EAR HULA VISTA t JR/LINDA D CA 91910 . 6423201500 ACUNA ELEAIAR/YOh~NOA CHULA VISTA CA 92010 . . 6423201900 MANNING JOHN ~NIA A lJ CHULA VISTA CA 92 . . 6423202800 YESENSKY DOUGLAS A/MARILYN CHULA VISTA CA 92010 . . 6 RAN REY PARTNERSHIP C/O MC IN D.EVELOPMENT 2727 HoeVER NATIONAL CITY . . 64 910600 RANC REY PARTNERSHIP C/O MC LIN DEVELOPMENT 2727 HOOVE NATIONAL CITY C . . . . . . / 1.-- (~ / -! ~ - , V..". \.../) - ,,/1-', ::...-" f ~--' " I' Rl='r;FWI":" D ~ ---....-'- '91 JJN 10 P3:13 NOTICE OF PUBLIC HEARING BY THE CHULA VISTA CITY COUNCIL CHULA VISTA, CALIFORNIA Ci"!'"V, 'II! CITY ,,-. .~ NOTICE IS HEREBY GIVEN THAT THE CHULA VISTA CITY COUNCIL will hold a pub1 ic hearing to consider the following: PCS-90-02: Consideration of a tentative subdivision map known as Chula Vista Tract 90-02, and community design guidelines, for the Rancho del Rey SPA III project, located east of I-80S, between East "H" Street and Tel egraph Canyon Road. The map consi sts of 405 acres creating single family lots, a spcecialty housing area for seniors, a townhome development area, a neighborhood park, a junior high school, a community purpose facil ity lot. and open space lots. The design guidelines are part of the Rancho del Rey Sectional Plan and provide details for the development of the area covered by the tentative map. A1 so being considered is a Water Conservation Plan and an Air Quality Improvement Plan for Rancho del Rey SPAs II and III. Copies of the related documents are on file in the Office of the Planning Department. 276 Fourth Avenue. Any petitions to be submitted to the City Council must be received by the Office of the City Clerk no later than noon of the hearing date. If you wish to challenge the City's action on this tentative .subdivision map in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice. or in written correspondence delivered to the City Clerk's Office at or prior to the public hearing. SAID PUBLIC HEARING WILL BE HELD BY THE CITY COUNCIL on Tuesday. June 18, 1991 at 6:00 p.m. in the Council Chambers. Public Services Building, 276 Fourth Avenue, at which time any person desiring to be heard may appear. DATED: June 4, 1991 Beverly A. Authe1et Ci ty Cl erk ) , i j!j/>';'J;.;( ii' '1\--: -(, \ '., ,'\. -1( ) (. ~,"":':' ! "I ..........- ,C_ , '"J' WRITTIN COMMUNICATION ( S 31-' 1- Allan C. Olson - Chuta Vista. CA 91910-6748 -CDfi~L~A\~-~\~-~~, .~-~-~i1~~'-1-~C~~~B~~~~L~ HOtv\l="~.. O\'~ (;-",C:0L\ ;-,,~"'t0lA.bUlLT_U\J 15.65_____ ~, T Efvilf2Q[s:6RY.,U::X.JSTRUc..LLOt,J AWb_M~T ER IALSm_ .3'TOR('\(~E Yi'-\.RD. FORD\:.LA\ R fs\DGE BO\v'\E:S. .cX\SUJ,J.c:"__TEJ/1PORr\\<::(_ D\RT_, CDUSTR\.JCT\ON ..ROf\.t.J .WAS bUH... -T-r':J_SCRV\ cs:~ XI \\'::Sc . BOh/1E'5. _THIS D\ r:T ROAt) \/vAS 'SPR.\UfCU: ueVEX?x-DE'",''C_..IO_ I-':E ['J--' T\-I[~ ';::'US"-I I/(j\)) r ] . FIJrt/.", /j'r-r:'..,..."" )1, pr-.cr:(J I (.'<:C7( ._.,., . ., .....__.. '. , _ '-' j t- > -J~ ~ . l-. ~ ;....; .__~., _ ___ \;\Jf''Sm'v'J f'\~ ',\',2l..-- C LEL:,J 0 Fu_{=>.L1 b,tPJ_B~<':'OU Gf\:--l' , u_ G~'UOW1\1--B..'C- TR\)(J-(S__..i:'':..Ll~LC0RS.....USlJ,:lG__ c.:;c;-(,)s-rr\l. RD- ___~JNJ:::t83_,,_V\ LLP:.__t?8.LM elSa_CONSuLS 111")(1 OET::J _SEPCr'J','r;r ., ___UJJITS_ WL.\S_BUl LT~__\hJSTU\.\)_OF_COMJfJG_.1 N ON ..,Pf:\SCO __C:NTR('\\:)AVI~\mf'c'LL_J.:JA.\)LD_5TR[)=T5, ALL COtJS n:\)( 'I "r ; 1:;J!m:J)Y\\~O-\\V\c 1~.JOt''-.!.b\RT COtJ:JTF':\J'':'''~!',);J [<OAD G', ,.. _OUJz_J::l.OUSc, T\-\\ ':l tl--J C.C.U_DLL_tlEl\\LY_b_IJI'L.....J:':>UlL _DOze?':}. _____t:r\c;' ItLr""LOJLE-RS,.. Cctv1CUl~__TR.IjG,_~."LUt-dE>ff_l-'-\ t.l ';:J . OT \- \ C (2 __.~ eJ\)ILDLi'l(.:.,__Mio\TC:.R\ l. Tr,",-uCfC ,_PUJS._BLl,.___U\ r \,/ )C)':2. (\ '- c' " ___lM__LIJfJ F'm' J)J s:\.i:=.Jl r )'._+f~__L':L L HC:._\.)\.JS:j=__\c:V.D\~ \ \or~!.:..!. [ \. /' _. __\AJ!.\Fr0\Tu_I<J\lr)f .D Pf\-s(oL('\\:Jr\s:_~----".6/...b.\S._CO\)l" F:'cL:J__'! :!;.' _u_MUu_At,m V..J\-\i'()__TU\ STJR.l E \) t\LL__C0--.'?-S (H..) r::)r .-=. ~:' . ___I.....tc\t>J':: Kf:-\.nv\Ji' k: \e t( [i') (', . ')-':._l:.L's::L____ \ T_Y\if\ .~, . U_ L-'~_ .._____~LVJl'-LC-, Ob.J.J\DJ.s-':.:L__KQLn_,l_ht -\ 1\ E Co U t---J'IJ..:.....\"._____ . .~J(':LJ?<:JQ-=.2\_2<J---S..LWGLL-..D~,MJ..LY HD \o'1.C_:::;_ -'"'I,' F' rz c __mmn'i3LL\.L::I. /\ITWf _...1--:...t,:;T~_LND_C)E_eM~CL', ',,;:;'rK'{-\\) (, \-JES~.CI.":' '~JTHC_'2'f'\'LC~Q.m': '.U_TS___WJ:::::\(:f-. '\ yy,-- u_____USE\)_L_j:_\J\'~S'LT HI ~'Jc.On"... ,',' f:'.._JtJ .__OV.E.IL_ D LIZ T _e 0 I' J ..' .S:IRvcr\ O")'?O('\D.Pf'\ST.. O\..W l \C'JSC LTI-\'.... Dv"- .,- .....)1 _ . . ."~)('.~' " n '~.J (\ 1" I ", ~j, :.~)_. __J:'__OI:,l----",_ <':<')l,)_~__ \': \--.JOT_GL .. \ " ,! I~ " . I . ~-~ :, LJ ~ f'"\. ," ,., , .~_~~_( ~"'\ '_I L_<_\\; . \:: ._~ , \V' \ " ,,' \ -1- '1' II , .. ) (,." . -\'".L\ J'. .' ~ \ . -. . . - \. '. '.' ; m,,'_' _" '..." . '_.~ __un .__ , \ , 'r' ,,3/-, , ., \ ,.! c, -'-'\-, C' \ ' _V\./\ _,...) ,~\~ ~ ~ : _ \ ~ '\. ..1,.._,,-,..._ I,.:' '~__ 1 ;. / [ " ) \.J ,; "' ~ ) \' \,<"-,'-,,., ..._0 __J.~<.J '.1'_ ,_L", ".' },'. "1 'J; , r';",,_-t'. ,-OF:; J0.'JbDR.\~D. QUI, Ttic DUS:r~-SFI.I',,)j;:.__-8~LELOI,JK.._ _-.CQ_\l~~(;:IL~VER'l'" TH';'J UL. THE'r':_L.QL2LC_LJ QI W~'S..\-LTt:l E J2L~"""'L_~.L OF PI\SE:O_L[:o..DER...C"BE,Ct:\0SE:.CU= TJ:\ e: J6/ATER. ~B.oIS'IA.GE__ .. __________ THEel TY(:;.Ll6lf-JEE.R1L)G__AUj;) ~" )l:...DJ.L.lG__Dea...R::r..t1.f"!:JTS ...NOw Sfc\Y_. T~',:S CO NSTg\JCT\.D.tI_R.Q~~_.w.Ll..L...NQT_:3C __LJ5E.DAG,C\..\u,. ( I_YV0.10DE.e.1L __ ______n______ _lE_~ 0 ~_J:;"i;-.j yR,C_;2,'S J.. ~JT1-~LS .I:l..l R-T .... COr0STRU.GTJ Q.'J _DQ~s..b\~..:JE. .TO BL~....15'CS' AG:,{\...'..'.LJT_5}:lou' ,) BE. n _R.E:.LO_Cf~C: " . AS. _s\-\Q',j.J"lQ.w..._6.::rrf'~lC') s\-r'erc..1-L......l:I_. _W1LL_.Jl::\"'-l'J. BE. ELk'_E.WOly.,t-I EQOM_Exi~TII\..IG ~()t)5J::.S SO_Tbl.EbDST Wm~nL l3Dnir-:RA~_':c:\30\)Y. AL-:::'O ._......AT_TB LJ'.jg 1.0_ PRO Po SED. .E_~T(7"f\J'J( "': ___TD....II-\ \>_R...cL.~D. ______. _..l'{1utL_W.lLL UQ La N&E rz . t-:::L01.0.__.::2t'JTD._r:=?ASl"'o______ .. ___Lf\DE:.R-A. BECp.~sE (-\T THiS. ~';>QIi'jT__Tt\t=: P20?EK.T.'L ..___.E(::\S_T_ OF nP~SEO L../'~::;"E:r.:.L':L__nl ':;___\3'ELOW STREE T nn.. _ _LEYJ==L_ .. _.__.____.I3.Ef':O~X'--.MoRL_DE_'1r I n P\""~.I...._1S... At : ()wE..D_.__ -------- E"~__<2S:_ \=>(\S\'=il-.L~'" DE'? :: r- '?A<.r::..L.'i?A10ct-\~~.::::> \VI US_I.. _n'al::. OPE fJE;:L_ U.E' ..8S._8uCo WS T R \ KIlQl'LRD I"':::L_ <:> \S:'...E~ .C 0\\1\ P lET 0 D M(.l.,U'J__ ARTE;.R...Y_u _u_ . .~ :1- ~~__________m _ _.P......sL..c RO.e, c,J-4i'-:'1' ;,'~l..L_.ARE A~ \ t-,.),\) \ CfU E c, TH F ?ROP...D.SED_ __..Mc..Mu..UhL_MNCHQ_D...EL RE y bDleLOE1::'1.ElJTL_____ .. . ---u----7:f 31= ~n_ r. PAGE ~oF3 -,- I I ~ : ^ ~-<// ~~ WJ 1. A ~ n ~.,. ~t::!/ / iF' 'Y'J 1 J / ' / / V ~&#~ ~~~I ''I . /j '! r- r71~~ / I ~wA..L )1 ~ r;r 1fln~ . _( ~~~~~~ :I#::::.w 0/' / "r-~3 / VI ~ ~~f'.... t::. ~Q; CONST. ~""'\) -/ ~ ct 'I' ~.c': ~. ' I... ILJ"" ~ \,\' / L, - ~.r s :z a '---1 ~~ ~>7" ',' ' ~~/ Q"- I T. V ILJ '~!' , >?\rL :-.' ~l I~ ~~~ ~~ /! ',~ ,. I: I l~ r- f-'v-K SITE of. j I 'f - II II \ Hlrn IIJ'"' "J :l:111 oj /j I I I 1 I Ll1JT} 1= &. " 1111 .;J. I \ , l LlUJ}-l t::: II , ',,- ~~ ~:-~ J:. lllWj - @ , ~~ 'L:Y \(1) ~ '" / L \ ')- , ~1..E:.r-R . ~ '" APH i f . _~ lV CAN y- OA..; \ \ \', \\ , \ , \ RD. . . I , . . . . . . , 3' ~ 'f'D - The attached is additional information for Item No. 31 3/- rl '- in "II' , '1'1"1 ~I ! ", ' ,'141!.I' 'Iill'il' i:i!';J'~ (li:!;:I', "JI'li ,'illll'!!1 ',i,' iii il!I!I:I:1 ..., ~_u_::t._'-~' i!!11 , l;i_1 ' I hi! I I ! \,,' I Ii II i" ii, 'I' I' , lil'I'!" ,1'11.1/1 i d I. I~ ...'" illl! L~ lU IliU 'I! I! !I!I ! Iii il'; 11'; 11'; II,; I' "I! 'hil hill' !;Il ti!li tlli! 1m! im! ill! .":" I Ilimi I~~;'~;';'~ I,mill ,liiiiii ,mllll ........ m!iln . II II III III :! !\ I II . " " I I "'II I, , , 'I ,I ' I 1,'1 1,1 III III I',i !'! ili , I ,II ,II "I ,I II' " Iii hi hi h! lit I, Ii Iii e III III III III l!lllllll i I II ., iii II 'I' ,I i~ ,; Ii :; ~I! i: ~i j! I ilil! ill(i I!ll i; III 1 ii~1 ; ! 1;\ 1IIIlllMlli eeeee e e e . eee e e' . e 15 ' II! ~~ S 'j i i1i:iIl !" I i ~ i ill ct)..':...:i.' en ::::'( ~mll, ~ II! lillI" ~] '111111'11' n l"'IIIIH '11'11111 'Iii I' III !!II'111"11 i I~! 11111'! '1'11'1, 'I 111!llill Idllilllll"!11 illlll!"'i!'lll'I!1 'I'ill' ~111~ .lll' 11"l'lljliJ11 ill Ultllll 11!,1 III III'" ~l!~ I! ,Iiijl';ii~ ~llil!!: Ililili!ii'!! !'il!; ,:lllal!!l: , ~illili~ Illl',I!lJI1!1 ;i~~i~ 'llllili!!'~1 'li1f: !!!i!illl!jll, ~I:;t.llll!:l.iljl lili1!lbUIi.ii!il:u;i lillill:irllibl .:.;.t .. ':.0.: .t.. i ~ i ~ :i i . :; i i ~ ~ i Ii H ' . I I I, ~' "'''l'~d - I Ii Ilhllllllhhl I ,. " ' i i i I Ii' h I. . II J,LI _LIlLI ----- p~...., ,€: l it.... !......~l:.. J..a............ 1 .. :I~"" 'II" ,.) " ~--;;-;--~1~-~-;--"l ," 1_' _:_~. _:_:.:_ ' --~---!.-- I , III::' :n': , I ri !, I - -,- ----,-..- ----m-- I ~ II ! ,', i (I:: :::::::; :::-, !:~!; :-;-;!~;-n I ~ I I . ;~ ;:;:::::ii ~:i:l~~~~.; i i ia~.; . 11 -, J Ii - ~i !i!-:E~! !!E:!::: ----iiI-I i 1101 ' ill i i I ili i i I it '1111 \1111111' III '--1-- : - :=:=:= ===-:-:-:- I 1.11111 I 11 ,-I. '. - .. .. ,,- " . ., -~-'..- , 'r~-----rJ , -I ~ ~ . I'.' i !M li ' III' " !.it I! ,IJ, 3/-':f2 ~ ~~-\\ \ 2: I I I I I li ' I I I I I I I I ~! j ~I . -..;... . .. .. l_ i: -- , Ii , . I -j I l.-...~-....iiI 3/- ~.3 I! I i '" , :;: I II . a .o; II~ I , ':i : 0 G 11 ~ kl:1 Ii tdi ! ~ '. i .... :. ~I I I I I I C'<I. I , 01 ell Q.O z it) ~~, j::1- ffi~ ~c( oJ ~ :J: o ~1 ....,. ! S1 -1: >- 0$ o~ 01 ~! 0 a! ~I .1 I. l ~ ~II ! : I ~ I. , N I o Ql Q"O ~Z ~l:; ~<I: r;:l!: ~~ ~!a j:::> ,j ::l :J: o ""-~ " 3/- 1-'1 -'~ '? (. n .: iI ; ! ~ ~ " ~ I CD i ! III !! " ~ 11 Il .i;:1 . 15 .!!: Ii t Ii (11 ; ~ ~:.i I' ~I . i I ! ~; i ~ ! (>II I I ~ I Q.Ol ~~I ~gl R<e ~... ~~ f..;j ::l :I: U '. '.~_""'-o- \,.~ ~ --~~ ~~ ~t: ~ ~ \ ~~?'~~~-.>-~ ~~-:~IlI~ ~ ~"- '\\.'"'\ \...i: ~ . '~~ ='_ '~> \\ '~",~-. ~i~"'~~~ , .. \ /i\>i, ~) 'l "~ '~ \\\"'-9, ~ . ,....r""'4>~,,,. ;'c D ,~, '''''~ 8 ~. <A.~,1 ('""/If \ l'" rl~\~ ~"\ ( I.~ '-~'''''J- - h~J''l. '~., -1\ ~ ,.A. A'l)., J', I~,:~ ::";'Hi'~ Il 11~t11;fE. ',~ \"c;:.-- L_.::!o ~/'~X/ 'l ' -~,~ I ~'. ' " y, '/'/ It" . ~,~" "I' \ "e' T" --- .-.-=.;:..- J<.-... ~/~ /' ' , .. .L--- /: u//, ' -- 'h _i#<" . '! iH' :i'"../ ~~<. ic" . "i'-~~I/~ j'/,-"--~><~/z-.:"~.:... h '- '>l ~~. '''.'ifse. I f'~~~____ ., ~~21'C0;:.~>~ -'"I ''!!:.Jii . "" .' ~ ~'~ \ I >JIj. ~ is ' ~'-'-_ 1;1i\ '\ !! /\jV..... l~ :::.I-J, ~, ~ ~~ ~/. "~) 1,) , !ll:.. ~_I ...#'~I \ i.. Sii ~ f/ /(. \ .-1'l\ - , '; "'-'I.IlL" , '1'. ,',_ //. ( I ~.~, u ''-1''''1.:'':'. , ,.., , h'~,: I, I. X'.' , IIi: '; "':- ~:'i : ' . 't h '''?~./.~ ~ ~ ~( \~ ~ ....~\... ..\ I i %,.:, , I .'iT 7." <';. \ t kJ\ ".'~ \\\\ \ ~ 'f ~. '-'~'K~'~'~ II ;, \ ,. ~" :,,^", '-'< '" ,.-:...;: 11, "1" I lJ~t, 'o.!/ !~. / 1. ,", ~~ \-f! .~. '. :'Z",' ! ( ::-:-;;" ,J!.. "'. "o>'"~ ". ......"-... I , '1>" .... ~.n, ",' /,. '.. '<. \ '" :''-'-' ; "., -- '" ~ ' ',," t., ,,' '/ .. ;;. ,\ ~"C:~": Ik'\~~':\~~~"~ ~ .~ <" ",,;>~~~,~ ".' \ Ii ~ ~"lm \ . ... ;~~r;~ \,.<:;. " " " , '" ''-'' , , ' 'L""" ,t, 'c," ". \' \~~~.""~ ...~'\'-;"'~:/; . ~ ~ - -i. " i Iii ::J.' g I II \ \ "\1i" , K ~.m'l _ '" ' , !: \ ( , 1t'\('\I\~"-'/,. ~' ;,." ': . I iii'!li': i j ..\.\t. 1 .~ ~ \ \ 2'{.....J ,.,'.. . . 'if..~. "\.', &' IU' '''', - " ,', "11""\ d.. 'j]", ,,~, .' ',,', '" 0 ;o;;c. '''~ 'L~_ ',,,,, .. '''. '.', '\~L'\ r\.g . ". I. . " .. >-<, I,~'"d :jI (t;, '~i - .-; ~f~,\f-- 6 i "~-;",m ., ~ .. "" -. ':'r -:;'L'l~\'f ~ .I ~) 'I"f'fjl' \)~'I; ~\I :1.n;..'~"ri2r.~..",:/.",.. i--C',01'{1'9.'".. ~Ilrl ~''J al II/I' Rio! ~~c';:' -'. ""'~., I ' · - ~\ ""IJii,'(7;/-' '''', .' l.i~ ~ v/ < hi . \'(/-/IJ{...I'\~_-.,- ."'&"'. ~~i,~ '. ',' .1 .' - . I\~\~ '". i~' ~ .. ~~ ~\~"u.j I .;;;.. . ~ ~\--:U' '," }n:~ . 1 >~\i ~. J"-i , ---- ~-,\ 3/- r5 '~' '~'(l\'. ' I.~,__~ " .~\\~\'("'. ~~~ 1,-, ~~:;J~\~ · ... ~ . ~,.' ~"l\(\ '~ J;, ,'-- . J 'I' "I""""" \\\'\ ~~~'{' , . . .- "~ ,. , . \" ~. ~ ' " ;~, ". 1:~--.. .. l' '" ~. \ ~_\~~ :-.:~'" ~"o...;.,,*," ~'!.i. .'/, P' :7 "\ ).~~'~ " I~..' ,~;;-x !i(:;~ -d7j\~ "~\ '~\ ~ '\ ~ '~~> '~fj ~ ' '. '\~0 ,~~~\ \ \11 , '~~~"\~".a-\:\' i,'-..;.~. · \~ Q, \ '~ \CY"'.ff1,';"'~~~"\..;' 0. . '. \~ ~l;:" ~-~C, .' ~: !io:. .'4:':."." ". n ".' \.' '~~ \' ~'~-' .' -"J~', ~', I' ~ , -",~ ' , ' " ~. .\ ..l;' I ' .' t., . \, \ \ \ l~'-Y ';', .' - ~,.,~ - "~. :'< '\ /I ~ ,". -[~Ij uk. ft ~ ' ~',.. ~~ ~;~"-~'\"~V':f):';:' "'~'~_~~:.' .. \' ", !\.~, '~~i ::=1.:;;/ ~ ", .. ~,,~, .. \ ~ '. \ J' ,~;~. I, ,~:'~~~ ~ ,\ . 'I,,~:I i!" ,>, , f ~~ '?~..a.I\I..\I~III{~"'.,"" \, ,!,;., ,5' (, ~.. '';; I ~ ,"~ ~o--C-~~~'II\~ !\\\\n-\ , I i!1 ,'I, ,T fl"_ _: >., ,~--t"" ., :::\:\\I\'c\'~ ~: . . I,' .~ '~\ ' '.' '. 0.,";':.. -!t,~.~ ~~\>.::-<.~ .._c' _0. ". ~n!\\" \. ' ~\'~..,. "',' ~l~t h\\\ . 'NJ,i':!6~,-.r,;'LE--::-; 8~~\ I~\"" ~v . ", ..I::'~\~\~l~ \ :k~>f~~",~:~l ,~~ '~\f,)~J'/ ....", r\\~,~~~~ \\,.\ e . -~ \t- ~i1 ~~ ~i-<~;~~. "-'= " .~ jIJr./.', '/) . \ ~X"'\ ,~, , . .' ~ 9;'1 t';L,g,g .' . ~~'l . , _~ ;~ ' . I . I ~"f'~-;' 1;.:::". - ~),. , .....! ", ..1:\ \~. \"'" . ' ~ ~ ,,'-. - '- . '-.: , '. .'&-J;-( ~.')1 ., \\~~\ .' ' ." ,I, ~'L r 1/; .=-- ~~ . ~'~_ ~ ;:;~: ,$?r~?* /.(,Ii. ' I ' II >- ,Y., lJ;>, ")(,f7:t". . ( :'~1'C/cPJl\' .... '. ~ '/i,~ / I .' t.-... I ~ i I:' ,- ,~, ;.! -~ ,~ - ",. ;Jj ., ."IO,j> ,.\ 1 ~ . : '\cf80~~, ~:' :. - "~'~ i;~ r,.. ,1"~. '. _, '~, 7 ,~;?!fI/%?t!/1~ '_~_' - '== _ _..L~- ~-;. ~. ,./, ~~ tt- --.r_ 'ti, ... .. ""'''' I H, ~. ~ fW " ' '?' ~.., "XI !"~ a.g !IW'~I~tf--\'l.l!.,~'fJfif:~ it i it , i;i~. ~' .' 9i1(1 ' I \ l~:\\ -;f ~ H . ~ :J. 1\ 1( 0 ~ '~. ' "'~l!il ..;~ ~ " '.A71!.!'~!':./-"~ 1"1111' ~ i 15 ..I 0 'j. "\ , ~ 't' . I, ~ H \ 'I J I'\:: . ,;:.. ih ,~ if . - ~~.L 'r' me, . "....., " ' \ It'". I~ a ,.>".-~ "ill ,'; tlg'~-;-~~~' l,\<.~'~,,,,;:;,~' , \\1:' ~il\ .\, ~ ]< :.v- 7"",;:,,,. 7i~ ", "", ' ~ ~ .. D J.33HS 33S + ~ P.i" .: ~ ,c"",- tj,II" , ~' i- ,~ , -I,;: 1" I . I .. I .r' , ~ 1 ~I i ~. '.,' ~i~; I'TI!"'~ i ii:. I!l m"1 !: ; I " .' b :" t '~ lm.r ' ~'.I I . : I ~ ~, I i I! ell I 61 . Ol Q.O ~z I' ::e l; Ii ~~I i=: < I i!,... ~~ I ~:s :;, :c o .... 3/-1~ .;, ",c,. - ... I. i I " "f~'~' .... -=~,..,..\\, ,,> , ,. '; !~i.I~' , , !,' ,"m, . ,~ - '" .....;co '"'," :,~, nC_ '_if' ...,..... , . \ II ' i - 'I" \\\,!- J i ~7:i.:i;:_'f':'.l --,,;4Y Yf~kl\ ~ \'V-1i'il,';), .' ,', I, r I,', ,\ :l W,.j.:TI ;.;;*fQ;4~-- 'fR, ,i\ ~: ('.!JJ. ,; g ,1:!4i I . 'I' . ' .; ,,,y~<: .,,:' \l "", I f" I " ,,~. "'cV.y,, '" " " . .. ""'". ' ".~'_"_ , Ii I 'Iii' "",' '"' ,,"" ",,' I ~ : 'I ~.' : i:,,, -'t,,, ." , . ..~~'-' ~~'~c\;~;:, " ~ ~ii '1 " ' , ii,' . ~ ' ' ' ftj - flltl~ '" ... " .1 ;:;,!!, ": - ~;.J ",: · . ,d'J"':'~'~~\~'~~~' \ ~ I' !&)liff~;, ,\ ,p.!' l!l! I ~ ~_~~'" ',- "~\~~ ~~, *',~ . -,.." .- , ')' ." " .. . -l,. " ,"'$> " ~~ ,'W' .~,,,~ · " ' ", ',-'" ,. I. ""'1'i ",.'" !- j , ' . "t,,' H ~ I I~U!I ~ ," :J; \ . \1 ,,) ,L'. 'c~l ~ _,. . >'" ."," !. .: 1;1. iidi : '" ';.,.. -" · · ' ' . ' ' ' W~ >' ""V" .. ..r.u. . I :r. " 7 ~ ... . '. ~ ' ~ ~ >.' ,," ..(, 1.' ,. _' · >'~'~--"""- J N I',i ",' , ,. , ',' ,. rm "," \". , " ~ .' 0 " _ [0>-' I _ ' ~ _, ," "I m " ,,,:, ~ ,,,. ' .' , "'" ,. Uj ~" J _ '- ::&i~ ~d~ 1,111 ",,,~~ . -. --- ,- .. llHr, , " . - ,," ""'I' - ffl' '.C ,'I"" 1.' " , -, n:;" .:RJ ~~, . !:!~ I' \ I' 11'\1'" _~ _ _,' /1 ,. ; ~,,~, J ~'!' ~~ II ! ... i.-If " 'I,' ~ II) , . ...' " - ~ "'" ,. I ..;'" . ,\ .\ <!J):1'", ,lNl'" l ,l, . ~:;:' 7 ~' I .~ ,'. .. III [,!\' .' ]!M' " ;jJi,!l. -:. 'I!:" ~\" -,>.1. ~ ~ " . · " , · · i1 /" . ~1 :0. 1%:l .. . ' ',' u' ,/ I' ~ ., 'I '" ,- ~0Il n<"'.' 0 'J :~Mtfk,'{pl~jj ~" ~. ;,~~,..-<<~ .'~ ~'t II i Illwt~'~'k ~@ZPi';...J;l~>;f '.." ..',;""' !:iU I! ,,:" I", .\ :: ~,<:~ _..'1 'I"~ ...,:", ,,'I' Iii I ~ I '" ,'> ... .<<" -~. . ,', ,...:!" I~ i\'>- _ .w.,p ~. oJ" -,' ,,_:, r~ " ' ~~ I I @ ,(~ --:-'.:;::', Ii'\-li: · .-@, . ~ '- , ~II. 0: ': C'i j ! J. . lD~ '" "I ..,., '. "' .-'" . ;\ill- O' ~. Mti~ ---=Ilfi,.o.., ~", ,'.I, ~ It ~lE ~ ~), .., 1{} f/!1\.. ~ --'"' -Q ." . . ' I "U II . rn~ ~'- ;:"',~'rc_-""'f".,.~~_~~11 , I \1 jl\},( ;- 1.1 t ::=,-j7 r ' ~ .- Ci/~ , ,," '_ !e.., '" ''ii:~ . I i _ u .... " ''\ p. 3/- ~r - .~ ,.' ,-, ' .. i .~~:; .: ,:'. c. ~. L .r ~- ~ 1 . \ , J' i; ii a . ~ ,.... ~ I;~~ I . i --,-- : . i I!f a ii II 5 .!lq. . ~ fl!! I ~I l . l . . N' I I gl Q,ol i ~z . ~l3 ~ ~c(l i::(!:1 ~~I ~~ ~j .::l :c 0 gj & ~i , ~j , a~ III .. 3/- y. i ;......,.'...,..:,. , "'!:o<."" ,;,g,:I- . I I ,', '1;;~" ".: ';':'9l""'r' ii, ,,' . ~ ol:;.. . __,. .'f' ~ . ' ",,:, . '-'" . .- ,,"';'~ :rS,.t::p!:_~ \ ~. ~1 ~, cl ~j Of " OJI \n al \~11 .1; ~ ...,.". 1 ,~~~~~~/~1 ,'t*,;-Z,Wy)"!!. \it.ll . . }\ . ';,', ... . i~'I' : 'P' ""': T - :. -" II< ".1 ,,' It I " , L.~'C~!. ! ,C '. . ,I "! '- - - I . - . ~-.-- --. ~. lle\\ Illhllil~[ ~ ~ I I en g I >'0 II 1'111 W ~z I dill jlllll N-:it ~lllIplllllllllllllil .... W ct' ~ 11.111111111111 I ...I > ~ W i=;;'~ C ~I- z!!! O~; :I: ;:) () ,n ~-I z <C a: ..., ;i" "11' . ;llil'~ I - . - .... ~:,4~!'I' ~hl{'I' i:il'~I'i lli;l;ll', "JI'li ',illl,',!11 ~,,: Ii! ':1111'1;1 I;, ... II :.-u....-.-... dl :lll' I ! iiI. ,-!I! !! I! , lIii,';ll,!!!!.!!!! IIII( I,I! Ilidiii! 1l!.1! ! I ! I I! III! !ll! -!Ii! iii! I-!Id Mllb!! 1m! Iud ili! r~-c--I- fj 11,1 i !M Ii ! 'III ", Ill. '.-, i .1 'III II , -. ,. 98&8.'.8 iI ll,11 1,1 :' !! I II . ~I ~I ': ': ~I III :; 1I'II'I!Il!11 Iii,'! ;Ii , I 'II 'II 'II 'I !I' 'I Iii hi III III Iii !; I Iii e iZl ~ I1n ~ iZl iZl,iZl i I II ',Ill II 'j I ,I i~ ,~ l~:; ~I!i: ~i j! I I'j I'! I'j Iii Iii I'j II i~ ' I II "I I II 'I 1,1 lid I!h J.! I Ii eeeee e e e .. 15 : . I. J , ia"'1 llillii ...11 ...... ~ lu..1 II""" l!. ,;Illili. ~ ~ ~ _ liifiiii o ~ ~~ , illllll :l ~~~~~' Ii D lillll .11111111. ~ I!! II II~' II"'! '1lllliS!ij 1I11'I':I~ 11111 : II '!II,II 'I'i, I!I, .1\'111'11 I ",!I'I,I ',!, i!l'll ; Iii li!i il'lll i!illll '11& Ii 1\1'li~ ~~ I!I!! I !!:;~ il~;~JI!II',1 !I!!!I'I'" !llI!:I,l! II:!!! i t\ ~ II I'll' ". 111'~th 11'1'1111 ,I'lil ~!l,l i g !'liill',IlI',i,I,lilj'llll! j"'lh' I,' :!"!,- ..I'll Ijh ! d'11~,:11 iI""IIi'! : ,Iii I I : ~111 u; Illlllll~1 !'il~!'lill l!i!l!i~I!!'lllillllli.! Ii" I'll I . I ..... ' .. ,d," I 's! 1'1 I ~11;(.II,I!i ,Idl lill1.lbl.!ll.llIll.lldllll!.lIllillllllnlll I .,..; .. ol~ ol....:I i.:i ~ its ii ~ ili ,I I I, I h 11111111 I,hhll . II hhLh hllidu ----~- i. ~~ !!~'~I~'" I..S............ . . ........ , 1'--;-;---;';" . l " . .;. . ..... <I Ii I. 1 - --- ------- ------ III'" ...... , 1 . n ~. I - -~-~-: :-:,:,.: ----.,'~ · ~ I'. .' 3: 1-" :: :::::::; :::-' ::~!: :-;-~!:.;-n I ~ I I ;~ ;:;::::li ~:::;i2~2:: i _ j2;.: i. II J i,- ~ EEEj jjjEE: ----n( i I. ( , :11" Ili' · II Il 11111 llilll II II --,- -- -------- ------- I, , ._ 151,'"_ : :-:-:--:-- :--=--=--=--ij'llu" h 3/- gO I i c..i , ~ I, i a "\ I Iii I ~. 'e i i if · ,,~~ .1 Ii a;11 I ." i'li . ~ <t'j ,; I ~I . . - - - - --:\, ~ '..;... ' \ .., \ ' \ \ \ \ \ \ \ \ , \ '~ \ \ \ '. \ ~ \ - - .....\ \ - z I I I I CII. I , 01 ~I Q"OI ~~ co' ~~, j::1- ffi~ ~<( ...I ;:) is gj ~~ CSj o~ o~ 01 a! .1 li ' I I I I I I I '--- I. i: ,f -, I i~' , l ! ", I ,I, o . oJ I l-....___ :f.E:: l~! 0 ,t: 0 ~I .. " . [-, '''~I ....~ ... 3/- i I . : f . I I I. N I 0 Ol a.O ~Z ~13 1;' ~<C , !::l!: ~~ ~s: ,j ::I % 0 '-...~ " \- ! kr \ , 1 ~l ~ I, r I I'~ ! I tl 3/-S2.. . ;. ". ~ -~.,. \ ~-~ ---~ ~~~ ~b~:~ ~'~. \ ~~\~Pd' ~~~~'~~~~-~A 'f.4~ " :tir~\ --, "\00 ,'l,,,,"\:, " ':~~ \ '>.~ ' Br~( f;i ~>>'" ...,,,, t-l~ v. '~:3."-' ~%~~;::--1..'~'~rmD ~:1 ,\.~~\\\ ~."~~.' '. :7, 'lit ""," <. . " ?=, I nJ /. " /m.,X. . ">~,\ 'f/.-',j I .::-..~~v]= :~1i ... [1' ,/:-.. -~1-;:- W!' "'1-8 ~/./j, -=: ~ . ~e.1 ., \ a:lIj..:: ' '_'-- ~" // '. i-~ _, 't, ___ .;/ .. -. ' .\'J'~7 ~. '., \;. . ~ _-:- "_, , /' _____ /. ' I1l "',""" ~ '/"., , ',_ ,.' _ ',<j ~ / ~~ " .~:.': .....~'1.J/~-;:~...:. If. ,', ........ .:]:., ,.-'t~~5,~ :.}\ ~~.;' "0 ,': ;t 'i..;.~~~~j;: ) ~ ," ,. · , .. I -,>Jf(, Lite """""_ ___.._. \ ~.." ~ . (C.,.. · !4>L.-fJI"'" ,... " __ ,h{ , I,l,\ ~ 1)..' r J~' r-j-'fJ1 ".' "&~~..::%~.~.~. (\~ '\\ . '.' '~:.:'1 '~i ,l;;.: I l-;V\-. '--, / \:." \ . "\.... l~. 1\. '",,.; \\\ '. ", I. .. ~ ' ", ~~'ic''-.' 1~\:f ,. ~:t "-' ~""", ~~~~" r~ .. .J..!J,: . ....... . ". _ · · ,"'* 'x" ~" '. ,. :-; "A, - "" ~ J' . ri._\, _, . \) "'~ , ",\" . \ ' \1;' '\~~ (/~,i<... . : [I, . " \\\~~ '\\~'\~.. '~'..- . ~1~\tl'~:~.. "l~\I1 ,', ~". "'V'1 J I ~l ':. """-'&v lIIi,i " """c, ~I ,~ >-=l ~ I ~2fA~~, . -- ..' :~ "'3,lt', -" ." u 'M4l ~, " :: l'o,:l ~ I~_'~'t ~~~~'r't " '''~',' - ~ ':; __- a, '-;e ~~ ~~."~ :; 'I!', ~I'>t\~.;: -" '~ I~.:,' -. o~ '..:~ -.L ~ i'fuJ'" ~~'1' ~ ';"''''J '. -.. - -C'~i~\~~I.\::? DB I . ':':lo..";.1L1>- -\\j. -~ _ '~M' \, ') , --..'..... "ili= -!, I , '=~~':" -.. ,.-.- , · ' '~n ,-', 0 ~I illl@illI:>':,~ ~-~r.)~~ ~~ ~l ' , I ~~I~\J1'~Rr,', "Ii.~/ tt h!i \- <~. -( ,,-' . '},~ ')1"1., '~~1' ., ~~. ___ _.1 \;;' .. i . , . ~ _ . !--:'i'i \ ' . i \' ~ ~ '~\. Ii... " l ~ -~_,.'H - i' .crr-'.L:."', ----*1- , - /' . .~ '? ~, 3/-8.3 .\ ~ S : ~ I .. q OI, ~ ~ ; .~ Iii i ,~pi :: 1; ,!!; I. ! 5 i,1!1 . ~ ~;.l I. ~I I I I I ! t ~ i I N I I I ~ i 0.01 ~~l ~gl ~~ ~Iii ~> f.;j :J :J: o ~ - I C)Q ~ f - ~ ~" . ',_ ," ~~ ~L- _' -~-=~ ~,. ~;~'lff.f7)7,~/j' x".~\y\ -:'" E e;~"" -Jl>:'~ , ,.~~' ",. , , ' " - " ,CT' , ,,',",:-0 ' ," W';!" V\~:, ,'I::: J,~-'~ 11Th-.I.;U lilh' _ ,,.;, \,',\ {.,<(:,."-" "". '. -1' b-_,'~ ~<:-.: v~"-'--'.:;,:_ ~o/"';$','~:': '4:~ ", -', 'ij\ {~Hfr;ft:(~""", ,);\, \.(~;:::;j , , ~; ~ '" .,,' -;>, -I'-( '. '/ '-- " ~....": h, " , II , A . ". /lPll.X ~~ : 1 ,;O-01lAHCHE'Ao ,. ~'i,-.;,~--.:c"~,,,<,-;;,,:',/J I('lJ'., ""'" \ ""1",", ',' 0/\:,"" ~:&u' -' /....- {( tSEENOl!:NO.~. r , ~~\u:? rJ- .r'["F~.~""';;;:'"~\<-f"Y\ /'~P' . .' ~.:; ~y'(:K\,..' ~ : ","_HO._~>r,',,' .~:V, %8, "J~J,;:- \ ',~~~~0'J'1,J(p.'1r.~;r~~~))I1\\\'Sl i;.:' '" i", x~" '~~t~, ;'. ~ ~ ;". '.' v, '~'" . -'~r;Yjfj 'IPJW'Z~~:::::::) A\ \~ ,;:.l-. . (\ ~~:;.~ - .t j'~ -ht . ....~- ~~" '..(~::1~. ,') . J..- .'" ,~ \ " CHULA VJS,':"~, ~ ' ,XO". ~ ~'ti"~j3' ~ ~s-:-~' !.~, -: ',\ ~~.g;" J SCHOOLDlSTR.~~" .,,- '~" il"'1lii 1< ,\I~~'/I ';;''':/ -. '\~'T";'C~>(v /{6 . "\ , I ,- v '\ 'II\:: . c\ ',>, '0' ' , ~}M'~""" ':i?;;~ \1 x ~. \ ... '\\.'J'LC" yo -.~ . . 'Ii ...- . ../-~.J" I .\', . 'i~ . \I,/I!.~, '-''''''''.,M> ";'''~ "'1 ""~" .ft' "gy--- 1 "fi'\ -, :~ ~ I, "" \~~\ Ii.. _, \'1 ,.,:) \~W~ ~ ~'\' .~. 't,~~. '1. ,!, , ,~ " .~ . ,'- _ I ~ik' _ '_-4) ,,) \11\\\\": , " ~ ~~-,"I' I [1/ 11" 4" '"\"'I"\"I-Lr,_,' ,I \~)J II i'''' "j' ,." ~;;, </,~, " .1 I I'!' ... ~'I ...\fo... Ill'i\,,:' ,--"""'''1/''; .'(/;,..,......., ~ , ""'"'I'" ,1[ ,,;;-, ;-'J)//, ",.~^~ ,,-,,,,,_"" - ,., ~\$ ~:,: ',.'1' :!':' , ,~Z,'t "~j\;:i/~~v^'L''''-' . .'~.;/ - 1f17 .,_ ~ ' ,.; '_:,~\'..._.~\l'~~,. - ,.,., ,,~>-- ] ~ ~ " :, ~'7.'-:....~ .. :J~%t~i.:,;, ~~;,: /.;~~~c-.~_~' /< J;c~ '~ .~~~,., ' . -?de" -j'---, ~~;:'~ /",/ ,~~ ;/ ,-... T\ .: 1.<;;:1","/"1. :/"~." ........" ,..," ,.,',,' ~ _.' .':" ,;;~/.;: ~(-::;:0 ". ~~,-=~- ~.-t,'/lt ,~-:"~_' -- \1\1... '1-.," AI:"'/ - _:-:/~ ; ~/. 'Y~'~'/~~~. r .- :- ,; ~ ; "~~. .... "', .,it ~~ _ _' ~ _ . " ~~~/:/7~/___ .<j i:..:,c:; ;:...-/. \, .~-:~; , ~ ~-"- ",'-;" .-:~; ,:-"~~/,_~~~/; ,,~..- , :;:;~.... 0; " .,'~ ',y, x~ -. .~~ A.....; __~-", . N ~~~ -~~'~ ,~-.'''i~~~" ~ _ >' . ~;? _J~;, - I~ ?'~~ (" VI '... _ _...';,,,-;&::---~v ~ ~ =<~' , ::.:t=l ' l"~ -~g~'':;;~~. ~ ,-;P ,'~-;;iio""'- rf.<"':'-f-"~,.1' .; , ---:, ~ ~ --::'i; _:: . ::F!'.-- ....- -,,' ~~-::ii'--- ----, -......... --~-';- ~-~ ~i"J.------;'" '. '\-....~ '" ,~,:.o,;.;..-._._":~~---'-:'.J.' . ~!p-J./ ! r::::.:#- -" .- :~ml(iii?~1'\\\I/Y ',; ~_..... " .' ., .......;.""CHULAVIIT......;."OO-.. ' I!IiI!nA~TrrHO om nli'V TENTAnVEMAP """'-"',...... ~Prqedn.um~)" ~_L. 1!!~~I7iIheRard-o~R.y~ CHULA VISTA TRACT NO. 90:-2 .:. rb,'('" =~~;;:":;;;''''~' ~_:.;. ~. 0 I I . . I .' ~ " J , , . ~ , . ..~ ,\ " .. .~,.\ --- ---....--.- -~:~,.. __,. ~M'1l.61I" , , , "'I' : r~\\ r~: ',~ ,~'~ :r:;p:: i- )~ '\ ~1.'1 ,J(1~' : , Wff~ii ,I ~( ~if _ ~xx.' a- ~_~~~'s,: ~j" 'r/ :~V: " ~ :,1" r,O.! JJ( ; i':\' - b ", ,\7 '" " ,. I~i j' f ," \,~ ,- I~ (..' 't- "'~'# ~: . 2\,) 1, :/~ " ~B" " -at -I" .. ~ . ,- - ~ ,.u" I ~" ," '\'"}IG.\." r-: '~, ~ ' .., _ r, ,- 'x "'" ' ... ... \ I~ ~ I, \l\II': ' ..,,~ - - - ' I ". ' .\ · .Iolr""" . I' '~\ I . :..;-, ~'i 11 ~'~.. ~, :, '~" -:~. 1.;; ., 1\ 'l"l V..:..; , J' /r ~ii", ., ~ I\d ..j ~"i' ~ ..!<",,-, ~'r( ,,:II"'(~~' :l-~\il':''im' *' ~~ p.'" I ' ,'''''it " ~\ "" ". ~\ ,A' III 'j '" ~.';: .,,;., " ~,i1l ~ 'I "'~ lX:C ~",. <Y ',.", ,'"'..' , . " , , _-=;::<-4i* 'I t " ...'"l~ '// ,y ~c' ',' -. 11 ~///Y - 11;'0 , f~~~ _, _ -, (1--1=l, ) m ~ K~J ,~- ~ [I ~1! 7, , I' . ~ '\ ..;; 'I, ",' '" b-'" 'fD' " '. "", ~ '-- -I ",'" - -','--f r' -. ' L---', - 1 . " -'-I' . , .... " 3/- is .'.( I. " ." ' ..1):;;.:.,:-' . J,q ~ I , I ~ I ,i I'~~ i I, ----., , , ~ I,: I 5 ~" , I!s illl " " ~ . Ii i~ I- I" \\ ~~Hli ',I. / ~,. I : II. " , , ' I I ~ I"W th ,~, , ~: ,1\,( ~:!' I .' 1 , I; \'~ ,~ -J I I' ! . I I . , I \r- ~ . . . N' I I gl 0..01 ~z ~t; ~oct) j:::1=1 i!~1 ~~ j .::1 ::t: U ~- - \ . \ 3/-8b gj ! Sj ~j a~ III . ~",' \\{\'~I\lt~~ 'k ~,' ,~,S\\r!l!~," ~~':.\~\~\'~:' ~,lil~d 1\, V\~ \ . v.......~ "'. r~" ~"" . ~ fI I ~i~ I " ~ 'K .('I~'" ;\~;,~. ,.~~;, i 'J0.~N~\ \\~;r~': lii.~' . \ IUJ;.; .l\~ \. n. .' ~ ~ ..1Jl'.\"'t!..k ;'11 ~'~~ff~:.,. \, '1\\olL'~ ~. ~ ~l:) > "Ii J:~i{ " \ \/iN ,I, ~"; FI' "'i l;.~~l ,I }.1 . -il.6r;;l; '. if !)' ~^ 'J..;r........ ",~~: I ,:;!~~~ I \., ~lf,I:./(*I--~j .' " . '::.:.: ~ . ~il'~'I~\)~i:. H~ ..,."l \. \ ". ;iJVl/~' ~~ ' ..r'\ I}. ~ . "'.1!r~"C1~~; ii1ll ~~ \ ,~"(jl~?f~/~ F~T;' \'''.~f' t'1~~~l~'V~\~~!11 i l~'~ I' ::" ~~~;~L' (I,!u.~j';': "Ii-Ui .............~', I. '.' ,1 , f-~d:----/. ". '" ....j . r I i;J J<.. .:~' ".. ~I , ,. I ..:'--. . . .... /-: I 'II.: "'~~I;;:-' .;. i' '1.---,' ,'......... I" ~ I \\ :\~ ~~;il~\) ,,: . ~./':,; :;~ ~ 1 . ~.I I I ~ t'~I~' \ ;~\,);, ',' . Ii 'I /~)' ~f!Jj ~ 7 I I!\ i 'I/L~I . 1 ~%. / ~ ?!fl' r), y. N I II:' ,t t'i' ;,r ~ / "I . ~ThI/11II ,,, y.1o' /. 6 I I . ',," -I '~::l\\\i 1\1 ~, - i ,I '. ' ~ ~ 10' 10 ~ Ol I I.' III' I~P~\~\~" ',\,\~,' " . t:;t y'y. y.1f- ~~.~ ~ i Is _ . I I in)))' '1It/" ..~.!'}j' ~~. If 10' ,t.<~, ~... ~ I I '~' I 1 111\.lll 'I/!J. : 1''\ 1 \ I' ~.~ .. *..r-, .!u ~ ~ I I ." ,:" \&: 11'1' . 'I~Z ,I I' ~lL:l l ~~/1<v.'''' ~ 1= II I ,f':;~,m: }~' , I, ~l1J,\ .~ ~l~; ~~ I f' ',j,r. Y4 I ~I,~ I \..y ~~ f,.~0';;: !Q I 1"./ . V, I '!\. .y ~ .J if 1.1' " !li > l~ fl" i:b:?i . ':'~" I W I ~'? -4 ;j>- j.~ ~ C I I ,'/ " (\I(((I/~ ,~~.~ / ;."'" q '-.,., 5 ,I . I . ,;!II(, I irfl./f I,. i ~I' 'lit- ' :z: ~I 11 . , ' II 'fi/,!(, r 77if!. 1 c': .. i( t;- '- 0 1 ~ l'ti./' ~ ~.J)M 1/' ~~I// J 11 ~~l ~ I 111 ,j" i,~,,, I} /1 "'.... L -r--JC, gj : 'I i, / ': I ~I i'~ r;... 'Do~" 1'1,1 fll . ~l : 1\ ill ',' ~: 1/ i /1" l ~ I I '----l 'I \c:' I' - , I~S )) I! -/..I~1f TN-~ ~'1 ,v~ '; )I~,~" I ~-~~ !f1.f ~, ~ ~.': 'll'';.JI~~~f<, ;~:j~,..:JJ~ ~~. ~m < I d~ ,I Y!1/!' "J ..Jir!r , o(!.. / t?~~ OJ :,. /. r ;'/jl 9~)" '" II(, n~il,' .t . ri1i!-:J:2'1/ I 'jT/:, ~ \ - 7?' 11. 0$ 1 , ~.,~J.:'lffir' '!;~ ~/1;, '.' . ~J~~ 1 ' . " ~J I f'flNJ Wf:>/~ Ap, J";YPt~-. - , ' U .' I'll I ~~//" . .. .,' ~ . ..'1 ' ~ , ".. ~ ' ,,:~ _,~~~ ~:~~#:, l ~/~' r %~..\"\ : -<I, ,,_' I, Ji . , ~,- '.~,. . . .' '-~. ";.".f " ~ z" ItI .' . ~.." ~ 'I..... /I' g:.?, kl~~~,1 1 '''C ',":'" " ,."*,.,,,,',:',~;):"I:'1i',:~:d' '., ,;i"l.i":.:".;.n\ld:,~.t':,' .,.. .~, ~"'il.",t+o-,(\~...~r,_-''''';;~'-o.'r.' T....~. -r,:'.:." ~ ' .... ,. -,. ~, -# 3; RESIDENTIAL DESIGN GUIDELINES Rancho del Rey SPA III SUBMITTAL DRAFT August 10, 1990 Revised 10/26/90 12/18/90 3/4/91 Prepared for: Rancho del Rey Partnership 2727 Hoover Avenue National City, CA 92050 Prepared by: Cinti & Associates 1133 Columbia street #201 San Diego, CA 92101 (619) 239-1815 3,...ft TABLE OF CONTENTS Paqe INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-1 Purpose Organization Project History Relevant Planning Documents Design Influences Community Concept DESIGN REVIEW PROCESS.................................... 11-1 Introduction and Summary Master Developer Review Process City of Chula Vista Design Review Process COMMUNITY DESIGN GUIDELINES.............................. III-1 Introduction Circulation Grading Entries Fencing Edges Streets capes GENERAL DEVELOPMENT GUIDELINES........................... IV-1 Introduction Architecture Signing Lighting Parking LANDSCAPE DESIGN......................................... V-1 Introduction Landscape Concept Landscape Zones Slope Erosion Control Natural Open Space Enhancement Plant Materials by Zone Fuel Modification Landscaping Streets cape Landscaping Landscape Standards Irrigation Standards Maintenance Standards Landscape Design Criteria Checklist (08/10/90) i ~/- r 9 TABLE OF CONTENTS (Continued) Paqe SITE PLANNING CRITERIA................................... VI-1 Product Development Site Development Standards Design Issues by Parcel (08/10/90) ii 3/- '0 I. INTRODUCTION (08/10/90) 1-' 3/- CJ I Purpose This document is q manual to guide the design of site plans, architecture, and landscape architecture within Sectional Plan- ning Area III (SPA III) of the Rancho del Rey Planned Community. It illustrates the master developer's philosophy and commitment to a high quality, planned development program. These guidelines address the design issues relevant to develop- ment within SPA III. Separate manuals have been prepared for areas within SPAs I and II. The applicable area is depicted below. SPA III Design Guidelines Area (02/02/90) 1-2 3/-92- This manual is being provided to ensure that the quality and fundamental concepts established at the master planning stage are maintained in the final phase of detailed planning and design. This manual includes design concepts to guide specific areas of consideration, but more importantly it establishes a design context within which each element is important to the suc- cess of the entire program. Just as the entire community can be impacted by a substandard project, carefully crafted design themes and standards can be compromised by inattention to one element of the overall design program. The purpose of this manual is to ensure that all development within Rancho del Rey SPA III will maintain a high standard of design through consistency with these published standards, which are in turn consistent with those of the previous SPAs. All designers are expected to refer to and implement the guidelines herein for development projects within Rancho del Rey SPA III. While it is the intention of the master developer to allow as much freedom as possible for creative design expression at the parcel and individual project levels, it is sometimes mandatory to precisely control the design of areas critical to the success of the overall community; locations where only a limited number of solutions are acceptable. Orqanization This document is organized in six chapters. This introductory chapter is intended to provide the necessary background informa- tion needed to understand the project and the purpose of these guidelines. The second chapter outlines the design review pro- cesses of both the master developer and the City of Chula Vista. The third chapter is devoted to community design issues which were carefully considered during the SPA Plan process and are now expected to be carried through in subsequent detailed design. The fourth chapter addresses issues which are more gen- eral and did not directly influence the SPA Plan design. The fifth section addresses landscape design issues. The final chap- ter includes some site planning criteria and provides a parcel- by-parcel discussion of critical design issues and references solutions. Proiect History SPA III is the final development phase within the amendment area of the comprehensive update of the EI Rancho del Rey Specific Plan in 1985. Earlier planning efforts for the overall project include the Rancho Bonita Plan adopted in 1970 and a major amendment to that plan in 1978 which created the first specific plan for the area. The specific plan area includes the recently developed Terra Nova area directly to the west of SPA I and that along East "J" Street, east of Paseo Ranchero. These areas, although constructed under previous SPA Plans, are important because they have established design factors which must be cons i- (02/02/90) 1-3 3/- 93 dered in the overall community design and theme. Current and planned construction within SPAs I and II will establish numer- ous precedents for the "community aesthetic" of Rancho del Rey. The established standards and guidelines for these areas are reflected in this SPA III document. Relevant Planninq Documents This Design Manual is the latest in a series of documents which have, in increasing detail, established the development and design standards for the Rancho del Rey Planned Community. The most general standards are contained in the El Rancho del Rey Specific Plan which is incorporated in the City's General Plan for the property. The Specific Plan allocates land uses and intensities throughout the planning area and establishes general regulations and guidelines for development, as well as preserva- tion and conservation of open space and other on-site resources. The second level of planning is achieved through the plans pre- pared for each of the three SPAs which comprise the then undevel- oped portion of the specific plan area. SPA I was the first of these areas to be planned and is now under construction. It encompasses the majority of the property north of East "H" Street. The remainder of that area, directly adjacent to Terra Nova, has been planned as SPA II. The area to the south, be- tween East "H" Street and Telegraph Canyon Road, is SPA III. It is the final planning phase of the project and the subject of these guidelines. The SPA Plan and companion Planned Community (PC) District Regulations expand upon the provisions of the Specific Plan and provide more detailed design specifications and regulations. The focus of the SPA Plan is the delineation of community level facilities (e.g., collector roads, neighborhood parks, trail and open space system, etc.) while also providing some site specific information such as basic grading design, lotting and interior street layouts. The PC Regulations provide the use and devel- opment standards which are applied to individual lots. These regulations should be reviewed during the design process for height, bulk, and setback standards. Desiqn Influences The primary influences which affected the design of the SPA III Plan were the adopted El Rancho del Rey Specific Plan, existing improvements, and the landform characteristics of the site, as depicted in Exhibit 1. The topography of the site consists pri- marily of east-west trending ridges and intervening valleys. The primary topographic feature of the SPA III site is the cen- tral ridge which separates the southern leg of the Rice Canyon Open Space Preserve and Telegraph Canyon. Rice Canyon contains sensitive biological resources which are to be respected during the development process. The development plan places develop- (02/23/90) 1-4 31-'1 Ul - I ~~ ~ '---l ('" , ---- ~ -- Design Influences - ~ Connects 10 Proposed Y SPA I Pedestrian lrail o Proposed SPA 1 Employment Park Side S1opes-retaln as Open Space Ridge Plateau Development A,aa View Opportunltias Use major circulation elaments to link neighborhoods J:::;J Q Scenic Highway tit ~ ~... .... .-'.....,......:. .....'::...:.... ~ r-il LSlJ - QUa"'.,. HIls ElernlIfUrySctlool - Actlvny Node I. \- ~rnb r..l t. \\ ", , Pedestrian Unkages ,-"",0;;;:, " o,;;:~:!'ot. " II '" -- I,' i- y..J Rice Canyon Open Space Preserve Adjacent Land Use Water Tank ~ .R@Q!<;lQ~B1! 7123190[!] n....n em &- 16191 2:l'. l'lS I=vhlhlt 1 ment areas on higher elevations while maintaining the canyon in natural open space with some recreational uses, as was done with the northern and central legs of Rice Canyon in SPAs I and II. As illustrated in Exhibit 1, Design Influences, the preserved side slopes are intended to provide a natural open space back- drop for development. Graded slope areas are to be planted with naturalized species to also contribute to this effect. The location of the development areas provides numerous view oppor- tunities, but will also necessitate screening and other design features to maintain a high aesthetic quality throughout the community and as viewed from off-site. A primary design con- sideration is the integration of development into the natural setting while preserving the natural ambiance of the canyon area. Another primary consideration is the integration of SPA III with the existing development which adjoins most edges of the project. Projects within SPA III will need to balance the "Rancho del Rey aesthetic" with the existing designs and pat- terns of development on adjacent property. Community Concept The Rancho del Rey Planned Community includes a diversity of residential products, together with employment and support land uses in a well planned arrangement, (see Exhibit 2, Site Utilization Plan). The predominant residential product in the overall project is the single family detached (SFD) home which is sited on a variety of lot sizes. Within SPA III, SFD pro- ducts are proposed in the western and central portions of the site. A single townhouse site is designated at the southeastern corner of the project, south of East "J" Street. The residen- tial parcel at the northern edge, along East "H" Street, is designated for Specialty Housing. This will most likely be a retirement housing project which may include two or more product types, attached and/or detached. To the south of the Specialty Housing site is the southern leg of Rice Canyon, designated for open space. The other major on-site open space area is on the southern edge of the project, an open space buffer along Telegraph Canyon Road. These areas continue the pattern of using open space as both an amenity and the setting for the Rancho del Rey Community which was establish- ed by the Specific Plan and implemented in SPAs I and II. The major proposed public use within the project is a junior high school site located at the southeast corner oj Paseo Ranchero and East "J" Street. A large neighbor hood park site is provid- ed between the junior high school and townhouse residential sites. A small community facility site is located along Paseo Ladera, on the western edge of the project. The arrangement of these public uses necessitates an amendment to the EI Rancho del Rey Specific Plan which will be accomplished concurrent with SPA Plan adoption. The major circulation routes through the project are Paseo Ranchero and East "J" Street. Paseo Ranchero and an off-street (10/26/90) 1-6 3/- 'If, ~ ~ a. -' rf' ~'._~'-= r ~~!\,:jr' ~ //' Z ~,-".--,\:.,. . ~ \~;\,.> I ',,:.Y\',\' \\~:~ \. ',' "\. N ,,,~,,,. /, -...... , ~ w ~ .' ' ,.' \\ . \ \\ ,,';,'- I/~~ \'. \ \ ~.\ ~. .. " t " ~ . . . ~ - " . " . t 0 ~ - ~ 0 : ; . . ~ " 0 . 0 0 . " . " . . . " . ~ o~1 5 EJ . i , trail system provide connections between SPA III and the major public facilities located to the north in SPA I. The realign- ment of East "J" Street so that it does not connect to Buena Vista Way, east of Paseo Ranchero, also requires a General/ Specific Plan Amendment which has been incorporated with SPA Plan approval. (10/26/90) 1-8 31-'1Q II. DESIGN REVIEW PROCESS (08/10/90) 0-1 3/ - '19 Introduction and Snmm..ry The design review process includes two integrated procedures: design review and approval by the master developer and review and approval by the City of Chula Vista. Essentially the pro- cess requires the builder to formulate the design for his parcel and review it with the master developer prior to formal applica- tion and review of final designs by the City. The City of Chula Vista requires Site Plan and Architectural Review, as well as Landscape Review. The overall process is sketched below. ~~ DESIGN REVIEW PROCESS CHART ~ fleJIlGi' .f ~'crTr M:~ ~I'E-VW ~. ~~trJlt trNrt-.~ ~ VF ~ e{rr~ ~ . . . (02/02/90) 1-2 3/- 100 Master Developer Review Process The review requirements of the master developer are intended to ensure that the builder's intended product and designs meet the standards and criteria for the entire planned community. The items to be included in the builder's design submittal package are listed below. Preliminary Architectural Plans Schematic floor plans (1/4" scale min. with room dimensions) Schematic unit elevations (1/4" scale min. - front, rear, and exposed sides with color and material callouts) Typical schematic street elevations (1/8" scale min.) Color and materials sample board Preliminary Site and Landscape Plans Preliminary site plan with tabulation of units, parking, and view analysis (1"=40' or 1"=20' scale, depending on parcel size) Conceptual grading plan with cross sections Conceptual landscape plan with plant materials list and sizes (1"=20' scale) Cost estimates and references, as required Following acceptance of the builders schematic design, a con- tinuing exchange of information will be expected as the design is finalized and the City's review process begins. Final, ap- proved plans shall be provided to the master developer for his records. City of Chula Vista Desiqn Review Process The requirements of the City are fairly typical but each builder and/or his consultants should contact the City for current, spe- cific requirements. The design review process with the Master Developer should be complete prior to formal review by the City. The standards and requirements for Site Plan and Architectural Approval shall be as provided for in the Rancho del Rey Planned Community District Regulations. Single family detached resident- ial areas with lots 5,000 s.f. or larger in any residential dis- trict may use the tentative tract map with typical building elevations and typical building locations on lots as a substi- tute for elevations and siting of all buildings. Specific re- quirements for application and review procedures are published in the City's Zoning Ordinance. (02/23/90) 11-3 3/-/0/ The City has also published a "Landscape Manual" which describes the landscape review process and provides some guidelines for landscape design from the City's perspective. The Manual also includes specific standards for landscape and irrigation improve- ments. (02/02/90) 1-4 3/ - 10 2.. III. COMMUNITY DESIGN GUIDELINES (08/10/90) 11-1 31-/03 Introduction The character of the Rancho del Rey Community at the broadest level is established by the El Rancho del Rey Specific Plan and SPA Plans. During the preparation of these plans, numerous com- munity design features were established or considered. As indi- vidual parcels are developed, attention to these established cri- teria is necessary to successfully execute the intended design. This section is intended to describe and promote the design fea- tures of the SPA Plan and to provide guidance for consistent detailed design. Several SPA Plan Exhibits which address these design issues have been reproduced herein for reference. The following chapter, General Development Guidelines, addresses those design issues (e.g., architecture, lighting, parking, etc.) which were not intregral to the previous plans. Circulation The circulation network provides both a physical and visual con- nection between residential neighborhoods. The overall street circulation plan is indicated in Exhibit 3 on the following page. The exhibit also illustrates typical road sections. In addition, a comprehensive system trails for pedestrian and bicyclist use has been included throughout the community. The SPA III trail system includes a hiking trail which extends the length of the southern leg of the Rice Canyon OPen Space Pre- serve and connects to a regional network through SPA I. Access to the trail system will be site planning issue for some parcels. Special landscape designs and treatments have been established for community entries, parcel entries and streetscapes. These are discussed in the Landscape Design section of these Guide- lines and should be referenced for further information. (02/23/90) W-2 ~-/o1 I '- -- A P..eo Ranchero 'NorUI .1 'e'I.,ph Cln,o" R..d) ~~ " ,. it , "i' I B P..eo Renchero Clout.. of E..I H en..d ~, " ,J~' j;J-lL~~=~ ......._--;;.:;.-:...,_.......... ".,."-._". h.. o e:.:~~n:,~::, ~'Ie~:::r ~'~'Lr ~ E Pa..o Ranchero CThI--" Soulll Riel CIl't)lon) 'i:a "j\ ", '11 ~~'II: ".,.- __._0- ._...........- ._10-._....-. F P...o Aenchero (Nor'''' ,,- .,UI..lofIV.,cIe) ~ "I~ Jl G Pa.eo Ranchero (lDul. 01 Ea'l J a.,..t) ~ It . ~i H Ea.' J Sir..' (htl 01 P...oAane.....o) .~ ~. I e..t J Str..t 18.'__ C... 01' A., end 8,1 A... RMtge) E--!t~ ..__.......\ , ~-.l..-- .. E--t=E./ _____- . ) -----y ./\ \ I\./' ':-. 'B"."~ .--/ 7. Rldg. . : 8utHtIvlelo, ~.... F F H;' ~ ..j \M~:~~O: 0 J;.,..e~\ .. I Sub~Iyj.lon D ,.,. .".,- ~ \ J V ~.,...... H \ A"~ " \\ L I r-- K 0 ,..rv-_.J G . . eu. H St,... ----. --- -.--- -- '0' ~lc ....."'"'_.._._r_.. .........-.-....-. J E... J Str..t e., ... Air RIcl~ Ea" of P,... Lldora) . ~ J .......-..-.. .'. 'r .--........ 0 1\. . II ;;;--'-'..':' * ,'<- -. '7 K e"l J Sir;;'... .....Ion V'r'" , W"I 01""'0 R_hero) (.1 C... 0.1 R.,W." 01 P...o R.ncllero) Jt:~_.. ..1._._-_101...... L Pa.eo L,der, (Soutll 01 E..t J 8t"..) .~~Q~Rey~ Circulation Plan C4lndlawoocl Subdivision ea., Del Rey Subdl"llIlon --\ . . .--., _.--' A .-- " . . NCJre ~ na i'IIICMI....... .d........-.npqKt. .0' c."(\~ Prime Arterial ,..9'(\ ~.\.9 --- ClBSS I Collect... Clsss II Collect... as.. I CoIecl... m'l9O[!J n...n Ci1Ii & ....- 1....m....5 Exhibit 3 Trails The interconnecting trail system provided in SPA III is graphically shown in Exhibit 4 on the following page. Trails in open space areas such as the southern leg of Rice Canyon are to be aligned and constructed to minimize adverse impacts to sensitive biological resources. Trails should follow utility access roads and existing paths whenever feasible to minimize disturbance of natural vegetation. The SPA III trail system will provide a connection between the existing residential development west of the project site and the school and park amenities at the northeastern edge. Schools and parks, including the on-site junior high school and neighborhood park are expected to be the primary destinations of trail users and are indicated on the Trails exhibit. In addition to pedestrian and hiking trails, a bicycle trail (bike lane) connection is provided between the existing bicycle routes on Telegraph Canyon Road and East "R" Street. The SPA III trail system will connect to the system within the Sunbow community, south of Telegraph Canyon Road, via Paseo Ladera. These routes will encourage non-vehicular circulation within the community. Final location of the trail system is subject to review by the City Parks and recreation Department. A sketch on a following page illustrates the trail crossing at Paseo Ranchero. The sketch also includes a section which describes the grading adjacent to the roadway. At the can- yon crossing, the streetscape will be comprised primarily of views down and across either side of the canyon. Some of the landscaping installed on the down slopes adjacent to the roadway will also be visible. Access from the SPA III neighborhood park to the trail paralleling Telegraph Canyon Road will also be provided. A sketch conceptually illustrating the access route is provided. Recontouring of the slopes facing Buena Vista Way, to improve the appearance and reduce maintenance of the slope, are also illustrated. (03/04/91 ) 111-4 .31-/0 " .. , . ~......~.!.t...~ .. ~I~S~~,,~:L. ,~~'t1.l1"'~~-';'>~',':.~ -.. \: \" .1.",\\ ."~t""''''iS.. .\ ,':~,~;I:\~t\'r:W\~'~l..~"'~.~" ' "~~';1t~V{{?,\\.~~:t,~~~.. "" ~"'\'<\' ,...,'~",'..,,:~,., -. "'--<.,tW.\'.~:\~~~'1:i1 . ... . ~~'N.s:.\\~~~"i<\.\\:. .~.... . . <o.l~tH~rr:;),:~~{~~~~~{ " ...~..::.:0~~~'., '~i~J ~oooocc..J Hiking Trail B Pedestrian Trail ~......[ Existing Bicycle Trail Proposed Bicycle Trail Recreation /Open Space /Trails .... ... .-! : r;?- .. v~ .... 1f' Connect. to P<opooed p'~~led ....~.~... SPA I Hiking Trail --..~'tf5-:>v- .._~~ , ~ ......~"V~ ! I \ . ."" M 8TMU ........... j I I .........................................!~-~ Land Use " , " " " II I, l' \--- II " )1 \.1\ .,.'" ~ "\ I .... --; --' ~ ... .,."'~"'1' \ *:,. . t........... \ @ \ Rellldentlal .!.!-e . \--- \ . '..'" .. . " <\<;., .~~"'.f, '>; ..- ..':t!..<{'..trc .- \ -1-~i\'..i'~ ~~ !-< ..- )\1': .- ,f-tF ".- r.'" , .. ,..- ....-tf' '-._ ........0 .. .. .. .... .... ..... ..... ... .. "'. ....::........-..... .).. .................... - .. I ..... Residential .'\~.A"'h,~\ 'I "'\.,' '~r,.'I; ~i;:V., t~_~ t\ ~ ,.C;'I<:',~....,h;. ;!k.;H',~4'~,bt;.,i Open Space 147.6 @ Neighborhood Park 10.0 Total 157.6 ac : Community Facllllles /. . .~~Q~Rey~ 7/23/90~ REV 3/4/D1 rt..J1 Ci1Il &- ,,,"231.1'1$ Exhibit 4 : ( d PASEO RANCHERO at RICE CANYON ~ fZb!~. ~ W65r eIOT ]M/t- ~;U7 WV~i/ffA/T ffM qwroA/71WL- --- .........-........------- ....J 111-6 .3/-/og - .~ t= c: ~ c: ~ o ..c 0- ~ 0) CD - ~ - ~r 3{-&a/o9 ~ ~~I; 5 EJ Gradinq Attention to detail in the execution of grading is important at both the mass grading and detail grading levels. The EI Rancho del Rey Specific Plan included design standards for grading. The most relevant portion is repeated below. The Alternative Grading Concept (Exhibit 5) is responsive to these policies as well as those of the General Plan Land Use Element. Final design should reflect the approved conceptual design. The requirements of the Chula Vista Grading Ordinance and other city policies, which are not superseded by those herein, shall also be incorporated in grading plans for development within the SPA. Grading Standard The design intention of the specific plan is that graded areas be contoured to blend with natural landforms. Round- ing both vertical and horizontal intersections of graded planes, obscuring slope drainage structures by massing a variety of plant materials, incorporating variable slope ratios for larger slope banks, use of landscape planting to control erosion and obscure man-made banks, architectural solutions to topographic changes, and other similar tech- niques should be used. Slope banks with rigid angular characteristics shall not be permitted. Slope Banks - General The following guidelines are summarized from the SPA III Plan. Specific standards will be implemented through the tentative tract map process. Slope banks should be constructed at 2:1 or less (unless otherwise approved). Erosion potential on all slopes should be reduced through the use of small berms at the top of the slope, drainage improvements, and/or the use of appropriate vegetation (see Landscape Design). Provision should be made for adequate maintenance of graded slopes and landscaping. Streetscape Slopes The City's Street Design Standards Policy establishes stan- dards for the grading of slopes adjacent to the right-of-way of major streets. These generalized standards are applied unless more precise designs are submitted and approved in conjunction with the project planning process. Considerable attention has been given to streetscape appearance in the design of SPA III and generalized design concept is included in this chapter (see Streetscapes). A more detailed evalua- tion of landscaping and slope design, utilizing the design criteria and concept presented in these Guidelines, shall (03/04/91 ) 111-7 31-110 occur with tentative subdivision map review. The approval of the SPA Plan and Design Guidelines shall constitute a more precise discretionary action by the Director of Planning and the City Council with regard to landscaping and slopes, superseding the general policy. Re-grading of the area along Buena Vista Way, in the vicinity of the planned East "J" street intersection, will be completed to establish final slope conditions. Permanent landscaping, irrigation, curb and gutter improvements will also be constructed. An Alternative Grading Concept prepared as a component of the SPA III Plan will implement the grading design standards noted above (see Exhibit 5). The tentative subdivision map shall also be consistent with the grading standards herein and the Alternative Grading Concept. Subsequent detailed planning is not expected to involve major grading but rather focus on small refinements on a parcel-by-parcel basis. The critical issues at that level will be landscape treatments, erosion control, etc. The Landscape Design section should be referenced for guidance. (12/18/90) 111-8 8/-/11 ALTERNATIVE GRADING CONCEPT ~ " , ...... " f'J """"""'" SLOPE!ll.Pro~_41 SlOF'ESOf FlAlTEll ",$U.l.ATf' NAll.RALlN<<lf'ORM_EH-tANCf: EAST 14' STREET YEWStED ~_J1.~*C: -....., \..... '.- ~ '-:r" ,.>\......,..:.--' \ , /.aII .,/-:\1_ ~.~ -r;"f"."')' ~-. ,,"~4 ..".,i,....<... \\\,\.\-.,,1\-, r'-~-' / '''-Ir~'.d'.- ~~~:.~ )/1, '. ,"'._ .,\ ,,- ----, II" :,. .." l' "--"\ . ,'-- . ~-- ,. ,._-;_.\'.\. ') '~i,:~\" -.' ~', ""..' .~:.~~:, '1 --1 It -, ._'J ,- -', ~~::-'::_-~- <~:::,..r}'''''_7___ ,-, u, AEDUCE!>2'ttGHCNfl'ON FUSl..OPElOU..CAN'lON _ 22' _ PlIlUC TAAL CONlOlR SlOPES 10 IIlEN),,*,NATLflAl """"""" ..... .... ~...~~ _ NA1t.IW.. aoPES OEHT1YlHlI.I.m~EOOES'" M.Eft)_NAJl,IW.lAHDf(lAMS .. a..osElY .. f'OSS8L """""'''''''''' U!lE \Il.lWa.l GlWlEHt aOPE ol2S;I...GAEATEA "!_-------:". ~ ~ , /-' - -r.-- " -- .~QQ~~~ [IJr\)1 Ci1li .- 15"123'. '&I~ Exhibit 5 ~ '" I ~ ..... ..... lJJ ALTERNATIVE GRADING PLAN SPECIALTY HOUSING EAST ~'-- RAISE EXISTING DEPRESSION to CREATE ~" ee~ ( LANDSCAPED BACKDROP and VISUAL ~""\""\" S\t. . CONT1NUlTY along EAST "H" STREE~.,---- E.as\.;.:.....-- , \\ -----' ~ 1 "'-::::"' -.--'----- , 'I CREATE INTERNAL ) } j 'CONTOURED TERRACING. L~ 'Cr] lfil 9 KU "" '" """ II i~, and GENTLY CONTOUR ,/ cf',~/ r"~. into NATURAL. / I I 1\ / / (J -'._to '-.- - --'J...---r.=- -L..-C::r_..>-/ PULL BACK INTERNAL CIRCULATION to REDUCE CANYON FILL. -<'" '<:.:;,--- --- .. ~ -", REDUCE CANYON FILL from 65' to IS', /' CREATE ACCESS to CANYON FLOOR and GENTLY CONTOI TRANSITIONAL SLOPES, REDUCE CANYON SLOPE FROM 90' to 26' in CANYON and 25' above PUBLIC TRAIL. r .~QQ~B!Y cr.i ..- 10/30/90 l~ ~ ...... I .. U, ...... r:T " ~ --~~ ~! "If'Street CREATE FI.U lENGTH PUBLIC TRAIL along CANYON RIM. USE 3: 1 CONTOURING to TRANSITION to NATURAL. ALTERNATIVE GRADING PLAN SPECIALTY HOUSING WEST RECONTOUR SLOPES UP TO RESERVOIl with 4:1 SLOPES Of flATTER to 5IU.ATE CONTOUR SLOPES . . REOUCE 52' HIGH CANYON FLl SLOPE TO 32' in CANYON and 22' above PUBLIC TRAIL. ~ CONTOUR TRANSITION SLOPE to NATURAL. CANYON SLOPE REDUCED from 61' to 40' in CANYON with 21' above PUBLIC TRAIL. .~QQ~~ en .- 10/30/90 .....nt.,'" ALTERNATIVE GRADING PLAN TELEGRAPH CANYON ROAD TRANSITION SLOPES from 2:1 or FLATTER and RADIATE FILL SLOPES 10 EMULATE Ihe NATURAL SLOPES. UJ = T' co o - , ....... U GENTLY UNDUlATE PAD EDGES 10 BLEND wilh NAtuRAL LANDFORMS as CLOSELY as POSSIBLE. REMOVE EXISTING 2: 1 SLOPES ADJACENT 10 TELEGRAPH CANYON ROAD and RECONTOUR SLOPES 10 NATURAL. .. -" USE VARIABLE GRADIENT SLOPE of 2.5: 1 or GREATER. .~QQ~~ em .- 10/30/90 "fltm..." Entries Entries serve two primary purposes. The first is informational; they identify the community or neighborhood. To this end, entry graphics must be clearly readable to the motorists and not so overly sculpted and landscaped that their basic message becomes obscured. The second purpose is to provide unifying design accents through- out the community. If each project or neighborhood attempted to compete for attention via their entries, the overall unity of the community would be decreased. Therefore, there will be a common design treatment for all entries to reinforce the overall sense of community. Entry monumentation will be provided by both the master develop- er and individual builders. There are three primary types of entries: major entries, minor entries, and gated entries. The approximate location of these entries is depicted on Exhibit 6, Community Signage. (02/02/90) 10-10 .a/-III- Q) @' c: .Q> C/) >a ~ E ~ o () i.n....)... ,_ O' ..; y::;' '.;,"~\~~\ .' _.-rr;- .'''1 "- I (:.('\j-~ 'SiL' ",,-:,,: " ' .' \""(<"'~-::"""\. ''<C/ ~ '1<0 \. ~ ' \ . . ,'.:,) r.~ '.... .~~, ',,- . ,)P!:~i i.~' ,--.':~~C' "\' ". t+-'rr'''''' c?' -~ "- \r~ .-.,' I 1'.' ,xffic" ., ~" :,';:;Jl? ...,"-) . u-.~ ~.\ ~ . . '" ."" v"'L4 .v/"-':) '\ ,~ \ '*' f\ I .., . ;,.)~.,<:..."\. " . " I ,. \ , V~(\~..~~~t.F;'J.:;f" .:,,,\"~i, \ ~~~~">;'(~~' \ \, \\\ \ .~~.".\\,_n" ,,)~,< \ . .,....r..~""''''''' .'1 If ,,,), >, \ .I~""":' ..~~__ _. ,;..>-....'-~~. ':'~, \ ._ \ 1--:;:-":::)"', --l_~' \ -.:"tW" ",,,'.- v\.,,-~ ; ~~_ _' .~~~"",.:;1"~ \ \ ''''j "\\'1\ ',. .'~ ,~.\. " , " P ~ft7~;- \~\ .\. I .'. '. 'iJf 'rJ._ .1.\ \ :.. [(0 ~.i:f~~;;\ \,," \ " \ ' '"" " '. ',.,' ", ,1\ ,'" ~~. . .~,:...., >,.UJC'i .\-I;'w.......,o<i 1:~ . '-""~' \ > \ , "/ f --..\,..:.-u'-~ '"It , . , ~,14":::'T'_r7>;:::!'!"" \ "" (\ ,,, .' '"t1/}.i' ' " " "",,';".''',' . '. \,ZJrs''',.''' \ \ ".. "-,, ,-}I ,- .~/_,.::-. \... I. ~;j\ ",,,-:. '",')1)' ". ~ 1,\ \\ <, ~,i:"'!~ (:'..' .... .~/(.'~~. \ ". \,\ 1'1 ~.'.jl..il/;' ,- ~_'.~'-0',r'~%';' · \ ,\ "".," , ~":Y",. . --'I \\"'i~.....:t:..'lt~~ "I ,r--,/w,..:: .:-'S . ,J:,,,,-;e-' -\ ,-~:, /<.O...'."i.' ."..... ' ,~,". .~ "l"~~.. ' " /4)t{.:., ..... i-.... "'~ _,.t. '/0":>' I .J' '.....' ""- " .., I =..._: :.. "....1 -~. "I Jr"'.;; .'.'. t.... ~"" I . ."."/' ." ___, ., '",j ~. . I r' ',' i --, I y----..J ____J, i ,"'~~'/ ' -' j }~(t\'<, !/, /:~;.~ / ~ _)('I:III:{' , . ./ / Jk17~; nlLI \::( -'" . y ~l':,,:,;',/ I . 7 /1' ,r . ",\\\'. II, "';j/ I L \.-.. I \ J i, \, ., ", \ ;; > ~ j j j I ,. i . j I ~ ~ ~ ~0@] ~1- /lr ~ . " ~ . .. .. u . . u . o .. ; . D :; o .. .. . " " . . . ~ o . a. = o D . . ~ .. . ~ . . .. o . - c . au ;; . ~ c . . c E . . ~ c 0 o ~ c . c . .. .. ~ 0.': Z . 1<<<: O. ~ ~;g .- ""~~ " W 5 EJ ~ M "' ~i ~& ~j @t aj . Major Entries Major entries are those which provide access to the entire community. They consist of special monumentation and land- scape planting, as illustrated below. These entries should be designed to create a portal and convey a sense of arrival. They will inform the motorist that this is the entrance to the Rancho del Rey Community. They will include design features that are consistent with community fencing materials and may include a mock guard house element. Entry design should flow with the terrain and appear to be an extension of adjacent land forms. -----..--- ---..-...--- Minor Entries These are the entries to the individual parcels in Rancho del Rey. They are to be designed as an enhanced extension of the community fencing detail. These should be limited to the one or two major entry points into a parcel and will provide visitors with the project name identification. The master developer will provide individual builders with proto- typical details of these entry treatments to insure conti- nuity. (02/02/90) "'-12 31--/1 V Gate Guarded Entry There is a single neighborhood, identified as Parcels R-7 on the Site Utilization Plan, which may be developed as a gated neighborhood, due to its specialized housing character. Even though this will be an exclusive neighborhood, it is intended that the entries will conform to the community-wide entry theme, should the gate guarded concept be implemented. GATE GUARDED ENTRY MONUMENT Fencinq One of the most dominant visual elements of a community is its fencing. It is essential for this element to be aesthetically pleasing and provide continuity in design to unify the various architectural styles within individual neighborhoods into a single community theme. Fences and walls can serve many functions including security, identity, enclosure, privacy, etc. However care must be exer- cised in the design of fencing in order to avoid long, boring or awkward sections of fencing. It is intended that the available fencing types be combined to attract interest and provide variety. Using a combination of open and solid styles, changing angles and directions is encouraged. Long straight runs of a single fence style is monotonous and inappropriate. Section VI.3 of the SPA III Plan provides additional fencing design and placement guidelines. (08/10/90) 111-13 .3/-IIt; Below are the elevations of the Rancho del Rey fencing program. These are to be used for all fencing indicted on the Fencing Plan, Exhibit 7, on the preceding page. Fencing for townhome and multi-family projects are not specified on the fencing plan, because the placement of such fences will be a design detail of each individual site plan in these areas. However, any fencing proposed in these attached residential neighborhoods shall use the same fencing style as indicated for the single family detach- ed areas. Pilasters with the spherical cap shown in the sketches should be used occasionally for design continuity along long fence runs and at fencing "end points" (e.g., all entries, and where substantial changes in direction or elevation occur). A flat cap (no sphere) shall be used at other pilaster locations. Pilasters should be provided at each property line intersection or at a maximum spacing of 50 feet. .,' SOUND W ALL(Noise)1 V" SOLID WALL , :~ " CONCRETE IILOCK W, STUCCO fN8H CONeReTI IILOCK PLAITER WI STUCCO ,..eH TYI'tCAL ~ 1..__ CONCRne: kOOK WI lTUCCO Ale" l:- - : ~ LOW FENCE ~.~ OPEN-THEME VIEW FENCE L.OW WALL WROUGHT -.oN 'IENCE :~ " SOLID FENCE V" with PILASTERS . '. STUCCO '''.M ~bP*IIlII~ (02/02/90) 111-14 .31 -I !LO c ro ([ 0) c "0 c ~ \ "- '\ ,..~t' .' /,.. !\ ::J. . ',x/., I '-j .1 * ! OJ ~ ~ E ~ ~ I- :!! "0 en OJ ~ ~ E ~ ~ l- e ~ 8 ~ "> ~ e ~ 0. J!! ;; '" . D ~ ." -" ~~ .! '0 :g~ -;; ~ ~ - ~ Ii D 0 O~ - ~ 0> 0> e e O"U e e ~ ~ LLLL [DIG g-'fi-/2./ ~~I 5 EJ~ !!! ~ Ii;;; fJ:> ,w , ~ ~j ~~ ~j 8i a~ . COORDINATING FENCE HEIGHTS ~ If 11t~ p:7 711ft) tY 1ffJr; lAW fi4i'{T fIfD FEWce 'ff{Gl~~r .su::r IJOJltY ~ ~ 111-16 3/-/22.. Edqes The interfaces between uses, or "edges", are extremely important in'creating an overall harmony in community design. Site plan- ning and landscape design should not terminate at the boundary of an individual parcel, but should make a design connection with the adjacent use. Four common edge conditions are discus- sed and sketched below as examples of how to appropriately respond to typical situations. Canyon Interface A major feature of the Rancho del Rey community is the large open space areas which surround the development areas. These are primarily canyon and slope areas located at lower elevations from the development parcels. A critical element of the overall community design is the interface between these open canyon areas and the developed ridges. Grading in these areas should simulate natural contours, to the extent practicable. The site plans and architectural design for residential projects should take advantage of the view opportunities into and across the canyons. Designs should also avoid the "hard brown edge" described in the Easements section. A logical progression from the urbanized and mani- cured landscape of the developed areas to the open and natural vegetation of the canyons will be provided (see also "Landscape Design"). Appropriate barriers and/or buffers should be incorporated at the edge of the neighborhood parks and where necessary. The following sketches illustrate these canyon interface concepts. ,,~ fIwtv ~- --< ~ (10/26/90) 111-17 3/- /23 ALTERNATIVE SENSITIVE EDGE TREATMENTS ~ ~ rllt6 a/'l7lIJ(/(}tl~ 7W~ 676/0/ /f01'1e6 ~~7'JH fft~ .' 11I-18 tl:J 7/f/5 /;vajV"IJ/Y'<7e. sr/.fGtG s~H ~elv-r-::; fttfP.~v~ ~ / . I .sl- /2. r VIEW PRESERVATION VIeW afCllllXfl- (iy' UJT ~p;;. ,,~V~ ~" HN ~C:;~ -- V~ OW'fC- ) ) > .~ ~ PARK INTERFACE 111-19 3/-/25 School/Park Interfaces Although schools and parks are generally considered to be compatible with residential uses, some level of conflict is unavoidable and a buffer must be provided. Whenever pos- sible the buffer should include a change in elevation, plac- ing the residential units higher. A difference of only three or four feet is a significant improvement. Dense planting of the slope and fencing should also be provided to create a physical and visual separation. If sufficient slope height is provided, an open fence could be used to allow views from the residential lots across the open park area. These features should provide an aesthetically pleas- ing perimeter to the school or park while minimizing the intrusion of noise and distractions to the adjacent home sites. BOGlE Easement A major SDG&E easement runs through the western portion of the community. This corridor divides the R-8 development parcels and presents both an opportunity and a constraint. The opportunity arises from the open space characteristics of the feature which also incorporates the trail network. The constraint lies in the limitations on the type of land- scaping that can occur consistent with SDG&E restrictions. Nonetheless, a fundamental design concept is that the easement interface should not become a hard brown edge; landscaping on the adjacent parcels should be blended into the easement area to create a soft edge. See the Landscape Design section for addition information. (08/10/90) 111-20 31-/-(,. EASEMENT LANDSCAPING at STREETS (iiF ~c:rrl/./$ ~~ ~ ~ 111-21 31-/~1- Scenic Corridors Two off-site scenic corridors will be affected by develop- ment within SPA III. These are the Telegraph Canyon Road and East "R" Street corridors. Views from these streets to residential development areas will mainly comprise rear unit elevations and rooflines, rear yard fencing, and some graded slope areas. In such visible areas, attention will need to be given to the aesthetics of the rear exposure, as well as the front. Additional rear elevation detailing, variable lot depths or rear yard setbacks, and special slope land- scaping should be considered as potential design solutions. The canyon interface discussion and the landscape design section of these Guidelines should be referenced for addi- tional guidance. Additional discussion of this issue is included in the SPA III Plan in Section VI.7. The detailed guidelines for Parcel R-7 include design criteria for the special setback area along a portion of East "R" Street which borders on that development parcel. Special attention should also be given to the graded slope at the corner of Paseo Ranchero and Telegraph Canyon Road. This area, adjacent to the junior high school site, is visible, both as a project entry and a component of the Telegraph Canyon Road scenic corridor. Design efforts should be directed toward achieving a rustic/natural character while maintaining site area for the school. The incorporation of boulders or other techniques to retain the slope, or provide opportunities for special landscaping to "naturalize" the slope appearance should be considered. (12/18/90) 111-22 31-/~ V streetscapes As noted earlier, considerable attention has been devoted to the design of the major road streets capes within SPA III. A wide variety of visual experiences are evident in the sketch on the following page. Along East "H" Street, large areas of natural open space contrast with residential development areas within Parcel R-7 and the Employment Park on the north side of the street. Canyon views are available at the intersection with Paseo del Rey. The 80 foot special landscape setback is also noted. Areas where development area landscaping will transition to natural landscaping are indicated. Where slopes are adjacent to the roadway, in the eastern portion of Parcel R-7, variable slope ratios are to be utilized and the height of the slopes should be limited. Detailed sketches describing the East "H" Street streetscape are included in the design criteria for Parcel R-7 (see Chapter VI). Natural open space is the primary streetscape where the project adjoins Telegraph Canyon Road. A flood control channel (not a part of this project) will be visible along the northern side of the road. Only minor slopes will largest will be slopes school and park sites. these facilities. be visible along East "J" Street. The down from the road to the junior high This will allow views over and into Traveling along Paseo Ranchero, from north to south, undulating slopes of limited height will be visible on either side of the street. The view will open up as the road tends down and crosses Rice Canyon. Views to either side down and across the canyon will constitute an expansive streetscape. South of East "J" Street higher landscaped slopes associated with the Ladera Villas project and the junior high school site will frame long range views across Telegraph Canyon to Otay Ranch. These slopes are created because Paseo Ranchero must descend quickly from the development area and East "J" Street to connect with Telegraph Canyon Road. The following graphics describe the intended streetscape design. The landscape guidelines in Chapter V should also be referenced for plant materials and landscape design criteria. (03/04/91 ) 111-23 31-/~9 ....-. ffi <( j II ! II . <( & - ~ j \t 5 li /t 1 ( I - , I~ tll I \1 'V - .. lIt II. ~ i It 51 ~ j I ~ Ii .. ~ <:J W , I ;;; ~di ~ W a: ~ ~ ~l!ill I ~>>r.;!I .l!!!J <l1! ~I ~!( \ I i -hI U I~ L t-~ ~= w~ L.- :- ---::---._~------::~ L~.... ~ __ ~~ifO ,~...""."""~"",,x"'."J'J,ujJ""-- --I' ~tr!l.....!f/' ""'WJ",,~_~.'fR' _llld"""'''"':''PV- 'Vf 1'1' .~ ". - ~ J,....IfJf>f/ ~~j C ~ t:;rre .' ~,=o :ffJ ~ - I = ,;;; bJ'" "'" ~ Conwnunily Theme Fencng VarJable Slope liansilion Area ..P" Communly 1. Monumeo' LocallOfl MQANCIIO DEL QEY - .. ... . . A Pl,mned CClCY\munity by the Rancho Del Rey PartnershIp STREETSCAPE Paseo Ranchero I I ~ 7B PFO I ---. ~'- Plan Detail SPECIAlJY HOUSING .-.-.A.. '7~ .. Variable Slope TrallSltion Area dSltJ'?i;"'t/" i, .f/' , ,"'" "40/'-01,jf}"'T/['%<;'i;n 1.f",.'o,_.r"",W.",,'-""''''-'"''''''"''~ .... """ .._" ih.. y, .. "",,"'''.'','-'_., Ill< Paseo Ranchero r SFD i SFD Commt.nly Theme Feoc.-.g (3Cinti .~ '6'~'?19 '8'<' ~ / /'-~ E ~~( . -'Iv //~ .J /, r 'Z"" r--- 1/ '~, '-.-/f SFD" " ) ./1#/ "-\ SFD " L,/1 " ' ~/j/ \~ ) ~ III /ff ~ //-.-~~_ '___Jil '/I)"'~ 11.~r=t-~~1 ...' .' f-I- cd.tt1tWfl'/ I i' / W?trr \ I '.i ........../ ". "K:'~ Plan Detail /) Extra Setback Area for Garages Taking Access along "J" Street . / Extra Setback Area . SFD for Garages Taking I~l~ . t . C"7~ =-"= ~~~=d1.__~l___ ~ QIr j - I _ i I~ Il'~~1!9~RQ~~eYB!Y STREETSCAPE East "J" Street/ Paseo Ladera '. '- ". \\ 'i. 0 ~VariatMe s;~WNHO~~~ {'. QI' " Transition Area / ~:;~ing ~a,-r - , -- ~~ 0> IV . PARK SITE .k.1ig1 School Site ! "-.Plan Detail COlTVnunity Theme Fencing / ~ SFD ~ n.JLn~": 12/17/90 ---- ---- . STREETSCAPE SECTIONS Paseo Ranchero exist!ng sectIOn 5.5' Sidewalk .8' 5:1 Slope * 2:1 Slope SFD ( 98' ROW. I , +- * Slope varies along Paseo Ranchero adjacent to Mission Verde SWdivision. Refer to the "Premiminary Detailed Graoll1g Plan" for precise sk>pes. Section C-C SFD W 5:1 5.5' Slope Sidewalk 2:1 I Slope , -+ 94' ROW. 5.5' Sidewalk 2:1 Slope SFD 5.5' 5: 1 Slope Section B-B Specialty Housing 2:1 Slope 5.5' Sidewalk Slope varies I from ' 5:1102:1 SFD I -+ 98' ROW. I +- Section A-A U~l!g~Q~~eyB!! 3j'-;7/.33 ri~ r--i.f ..I W~ I~ Cinti & A!s::ae; ~'9' 219 '8'~ 5.5' 5: 1 Slope 60' R.Ow. ~ .~1!9heQ~~eY~ .3l~8 /.3 ~ STREETSCAPE SECTIONS ==== SFD 60' R.OW. 2:1 Slope Section E-E Paseo Ladera Jr. High School Site Section D-D East "J" Street r1" r--1! .,1 Wot I~ anti &~ '619' 239. '8'~ TELEGRAPH CANYON RuAD Drainage Channell wail System Interface '" .. - '" I CD ffl1CB ~ &<c: I ~Q) ~~ c: ~ Telegraph j UJ Canyon Road "" III CIlj!:: CIl__ (1)'0 0<0 Open Space ::t. ~ Drainage Channel Drainage Channel 1QhNOBIO DIlL m rlJ1 Ci1li .- rntZll-"" (08/10/90) IV. GENERAL DEVELOPMENT GUIDELINES IV-1 .3/-/3iD Introduction The design issues discussed in this section are those which were not directly addressed in the SPA III Plan, beyond the esbablish- ment of regulations. Design solutions in these areas will be much more the product of the creativity of each parcel's desig- ner rather than conformance to the pre-established community standard. The design review process of the master developer and the City of Chula Vista will be used on a parcel-by-parcel basis to evaluate and approve the design programs of individual builders. Chapter VI of the SPA III Plan should be referenced for an overview of general development issues. Architecture While the landscaping, fencing, and signing will have a common design throughout the entire community, a variety of architect- ural styles are envisioned for structures within the community. Although various architectural styles are intended to coexist in the overall community, they should not be mixed within a single project. Each parcel on the Site Utilization Plan shall have internal consistency. And, of particular importance, archi- tecture should not be a hybrid style, such as "Spanish Cape Cod". THIS (JO (02/02/90) NOT THIS fffll;&:~ ~m;CT{}trt- IV-2 3t-13=;- THIS NOT THIS ]/[ '. f)t7 ~~riv;w- 5,;rJ:$ .. m .. . 00 V~Y GU3l/A71,?/f$ . . o ;AfPIf) ~~ ~ . . . '. . .." t1PAlT tlse. ~ jPI~ ~ ~ ~~c.-7IdIY ~-G FI/I/5I1t!!!i(/ I"'~P(/c-r. . fa f4 O,?/vT hGT Et6~/Vs ~11e. 11t7(Vt7TC'/YO()S; IV-3 3/- /3 ~ THIS o DO a; j'rUGfY WI/IIOOU/5 f}tJ /t:rJ ~ ;. ~ et-tM/'r~ . . NOT THIS o ~~~ !~'cep W/lVWW5 ~ j/ m 0 ill l~jp. OJ 1ft c:::- o I?PIf'T 00 ~~ NC(1/7l3CTlI1Y'rt- [JI/I'T ~::::---#~ S7J'~ IY-4 $/-/3' Siqning In the SPA Plan, the distinction is made between permanent and temporary signs. Some aspects of permanent community signing have been previously discussed under "Entries" in this manual. The illustrations below provide some common sense guidance in the design of temporary signs. Within the SPA III Plan, Chapter XI - Comprehensive Sign Regulations should be consulted for specific sign restrictions (e.g., sizes, permit requirements, prohibitions, etc.). THIS a/lSl9!PVr ~~ a~/'rIT ~ ~ f-' + ~/~N~7!a ~ NOT THIS ~spWT 5~ ~~ 1C /MPf'".-.o!tl-Q"\7lS- ~ IV-S 31-/~() Liqhtinq The design issue of "lighting" includes street lighting, as well as, building and landscape accent lighting, and sign illumina- tion. Three basic principals should be considered in the pro- vision of lighting: street lights should provide a safe and desirable level of illumination for both motorists and pedestrians without intruding into residential areas. Lighting fixtures should relate to the human scale especially in pedestrian areas. Lighting and lighting fixtures should complement the design and character of the environment in which they are placed. All street lighting shall conform to City standards or an approved theme lighting program, and shall be approved by the City Engineer. Lighting for community facilities and recreation areas shall be considered as an element of Site Plan Review. Any such lighting which will illuminate a residential area past the hour of 10:00 p.m. shall be clearly identified on the site plan per the provisions of the SPA ill Plan (see Chapter VI). Illuminated entries should direct lighting low to the ground and be limited to only the immediate vicinity of the entry. Lig~ted entries should not be distracting, create visual hot spots, or glare etc. Suggested entry sign illumination techniques are illustrated below. j$~11 ~ $l/~ ~tl4W"' /J.U'tIf/,I'ffll'IV (02/02/90) IV-6 31 -/~ I ~ . ........., t~ r/~Ke. STREET LIGHTING FIXTURE IV-7 31 - / l/ 2. Parkinq The amount of parking required within each residential district is specified in the Rancho del Rey Planned Community District Regulations (see chart in Product Development section of these Guidelines). Basic guidelines for the design of parking areas are provided in Section VI.6 of the SPA III Plan. Additional zoning requirements for sizing and spacing are published in the Chula Visa Zoning Ordinance. Sinqle FaJrlly In single family districts, supplemental parking (beyond that provided in garages) will be provided either by drive- way spaces (between back of sidewalk and garage face) or on-street parking. No special design criteria are required for these areas. Required dimensions for these parking spaces are provided in the SPA III PC District Regulations, Chapter XII. Multi-Family Beyond providing the number of spaces required, the design of common parking areas for attached and multi-family neighborhoods is an important element in site planning. Following are a series of illustrations to guide the design of these parking areas, with particular attention to open parking details. ENHANCE PAVING at ENTRIES ~~ USE of BARRIER to SCREEN PARKING -- ~ Wr""19 tV , r-;r H~ ~ ~6~ jr IV~-{ -f' o (08/10/90) VISlI'V- ~-/~W""'I 1I'P/4( sJriW!i ""... IV-a 3/-11/3 ~ /~"'.~ W8lS ~ ~ if1'1 ~ qw-t"t?6 ",.. ~fl JJ:{:ZL iU- V77W~.h. ~ VI' ~ ~~ ~'f 1'/'VYc.f,N6 t.-P~ IJ. .,SfS' t. , I I/YWtIe gF BREAK-UP of INTERIOR PARKING AREAS PARKING PLANTERS IV-9 31 - l'f~ LANDSCAPE SCREENING o IV -'r\ p.oe.. ~ IV-l0 ~/-1"I.5 V. LANDSCAPE DESIGN (08/10/90) V-l .3/-1'1 b Introduction The purpose of the landscape component is to visually reinforce the patterns established by the Land Use Plan, and communicate the overall landscape concept of the Rancho Del Rey community. Since various groups will be responsible for the provision of landscape improvements, this chapter will serve as a guide to assure that the individual projects will be compatible within the comprehensive landscape plan for the overall community. Trees will be the dominant thematic element used to create a logical sense of order, continuity and contrast throughout the community. Trees will be pre-selected to provide the necessary guidance to the various parties responsible for implementing and administering the landscape program. Trees and other plant materials will be selected from a suggest- ed list of approved materials which is to be coordinated and approved by the City Landscape Architect. The Plant Material Matrix found later in this chapter includes all recommended landscape materials for the SPA III project. The selected materials reflect the sensitivity of the landscape concept to the need to conserve water. In addition to the plant material selections and other guidelines included herein, a landscape water management and monitoring program will be prepared and implemented for water conservation. (02/02/90) V-2 31 -/Yr Landscape Concept The general components of the landscape concept are as follows: Parcel or Specific District (theme trees) Each neighborhood may have a distinctive architectural theme. Selected landscape elements, including trees, should reflect that theme. Streets (dominant, support street trees) Landscaping of streets ~ill provide continuity throughout the community and create the appropriate link with adjacent areas. East "H" Street, East "J" Street, Telegraph Canyon Road and Paseo Ranchero will continue existing tree patterns established by the City of Chula Vista. Streets within indi- vidual neighborhoods will reflect the neighborhood design character. Special materials within a landscape buffer will be installed in masses with earthen berms along East "H" Street to reinforce the established streetscape pattern within the Employment Park across the street. Special attention will also be paid to the graded area near the water tank. Landmarks (theme trees) Each major character. sites. and minor landmark may have its own distinct Landmarks in SPA III include the school and park Entries (accent trees) Entries are in three categories (see Entries in Chapter 4, herein) : Major Entry (community entry) Minor Entry (neighborhood entry) Gated Entry (special entry) Accent trees will be used to contrast with designated street trees. Major entry accent trees will be pre-selected; how- ever, the minor and gate guarded entry trees will be selec- ted by the builder subject to approval by Master Developer and the City of Chula Vista. Arterial Accent Planting Flowering accent tress will be used at these major and minor focal points to provide distinctive contrast. (12/18/90) V-3 1;/-/'13 Landscape Zones Landscaping within Rancho Del Rey SPA III has been planned to create a well balanced landscape statement. Landscape zones have been identified so that this balance may be established and maintained as the community matures. Landscape zones are dis- tinguished by their water and maintenance requirements. These zones are as follows: Manicured and Ornamental Landscape Manicured landscape is characterized as areas of high visual impact requiring the greatest amount of care and water. Community and neighborhood entries, and accent planting areas fall within this category. These areas are kept to a minimum to conserve water and energy. Ornamental landscape requires routine maintenance and water; however, of a less intensive degree. Limited lawn and groundcover/shrub beds are in this zone, however seasonal flower color or plants of a highly sensitive nature are not included here. This is intended for parkways, parks, schools and other areas where a good foundation of ornamen- tal planting is required. Enhanced slopes will also include this type of landscaping. Drought Tolerant/Naturalized Landscape This zone is used in low intensity use areas, and where a natural appearance is more appropriate. Trees, shrubs and groundcover in this area will require much less maintenance and water. In many areas, the landscape will be allowed to naturalize. This zone includes planting at transitions into native areas. It will also include fire retardant landscape and major slope areas. Fire Retardant Landscape Landscape zones between Native/Naturalized landscape (seasonally dry vegetation areas) and improved properties shall utilize fire retardant and low fuel plant materials. This will help protect the properties in the event of brush fire. The location and extent of this zone will be deter- mined in conjunction with the approval of parcel-level landscape plans. Native Landscape (Pristine Native Community) The native landscape zone (natural open space) is an area where existing vegetation will remain with little modifica- tion. This zone generally includes native canyons and slopes. (12/18/90) V-4 .3/- 14/'7 ~<? =-~ ~~~ ,,-""i;.~b.. ~~~\ ~~ ..!!!::~~ D '---. '~~ ~~ .~. !l1 ~ ___ ~;;~ _ "';".'1 H 8"a.1 ,...., ~:=:! ~'___ -_--------~_rl.. 'f .... ~~, ~~......-~,. "..,,~-r.~~~ / / If' , -"J ~ .<:::...,"'.....""~"- "". ....,~ fCA C!" / "'''" ' ...;;;:-,;;......?\ -.............. ~ . / / I .-~~--. d~ \ --__ ~..'V'--/ './ ,,\""/J ! -'--'______y..~, '" l(~ C//\ '-~Ii \_l ~~~:,~~::'::.~^::.::;::'::.. :' \ \"--\\,~. ..... ...... \ II \ '- .hllllltln4 with IdOl pl.nllngl l- \ .'1':1:,. ~ ~ ' and r,lnforclch.rIClllf and . ~.... , ,. ':-'~" .....:.::"(\ 'n.. ,..."..... ..... ... . '.?" . .'/"'-""" tJ;.;' \] .P .. \..., .' r... .... };~ltt . 'i~/ "ATlRAL OPEN SPACE .! .~: tFfI.::~..J ~ ' ' ,::~::.~:/"';:>.j ." r!,~._J-- \~\~, .~~~.~/y , ".---- , , \\:f:' . / f:!-. .:.. .. / /' "'1 .____ .____ .----.- ~.......; I .0\ ( ..~...... \ . ".....01"; (. ___-L-J,:=:;.:':-;;'OO Uv - < u. , ..... ~~~............ ............... ............... rn. "'dI ............. ..... ..................... ..................... ..................... .... ....... .... C::2 PARK Pt..ANTINO HIglrilr.nclllng............1&tlll R~.If_.plIo"'edln _.... and orin. 10 pro.,loe .-oe, .....lIlIo.IIIO.,I....1 .c:c....T..III...dgr_dcov... 10pro.,1cIe ..,_'.c:.. ARTERIAL ACCENT Pt.ANTINO FIo..rlngl,... and .ccen' .....uD. ot groundc:O...... an ....tr, poIn'. ENHANCED 8LOf>E PLANTING V...Ilc:a1 ......._ Ir..' In random p.n.rn, .I'"IIo....InlI.....uba and apr..llllnegroundcO"..... NATURALIZED PLANTING N.II". ..-cIna,...IIl.d ."...gr..n lIhrub. 10 1I6encl1ll,truDed .,... ot ~..llbnal...loP8l'Iapac.. FLEL MODIFICATION ZONE AC:IU.lloc:.llon 10b.d.l.rmln.d 'allowing plolllngol building. .,.p.r' 01 III. plec:i.. pl.n 'lIbmiU,I. PI.n,......I.I. .11,11 c:on.let 01 10.-111.1 .hrllb. .nd Qfoundco""', o o --- --- ~ & ARTERIAL PLANTING PI.n, m.tarl.I.lnconllnull, .llh ,>lI.lIng III.m. .nd Cll, L.nd.c.p. Arc:III'.cl', .t.nd.rd.. EAST oW 8TREET BUFFER Lo. ..ergr.,n .Mllb. In III..... In C:oMln.llon .1111 ..,," b.rm.. Pt.nl met.rl.l. In c:ontlnull, .1111 SPA I Employmenl P..... .C:leen1n8 10 ..Intotc. ..I.llngl"''''''. RESERVOIR SCREENING F."....bol....I.Ung....gr..n I.... .nd 10. ,,,"gr..n 'MilO' In m..... 10 .c:r..n ..1.. ......'IoIr. .~<;lQ~ReyB11 General Landscape Plan 7123190~ rt.J1 Cinli & ........ (llUt)2U.18'S Exhibit 8 Sensitive Plant Species Preservation The SPA III project includes a mitigation program to offset impacts to sensitive plant species which are found on the undeveloped site. Impacts to populations of San Diego barrel cactus and snake cholla are to be mitigated through a transplantation program. Cacti from impacted areas are to be relocated to permanent natural open space areas. This work shall be conducted under the supervision of qualified experts. A monitoring program will also be implemented to gage the success of the transplant program. The General Landscape Plan, Exhibit 8, illustrates the general location of each element described above. Each individual parcel should also be studied as detailed planning progresses. It can be assumed however, that these areas will generally consist of a balance of lush, ornamental and drought tolerant/ naturalized zones. Refer to Plant Materials Matrix for examples of approved plants. Additionally, a landscape water management and monitoring program will be implemented for water conserva- tion. (02/02/90) V-6 31-/~1 Slope Erosion Control All slope erosion control planting shall conform to the require- ments of the "City of Chula Vista Landscape Manual" and the City Landscape Architect. The general intent of the slope erosion control program is to protect newly created slopes or denuded areas from erosion or unsightliness. Dust abatement is also a concern. All areas of the site on which new grades have been created or vegetation has been disturbed will be planted. One of two types of planting will be required. Type I plantings are those which require ongoing irrigation to supplement natural rainfall. Generally, all areas adjacent to street right-of-ways will be Type I plantings. The City Landscape Architect may designate any other areas as Type 1 to maintain the aesthetic quality of the community. Fire resistant strips which are necessary between structures and natural open space will be included in Type I planting. Type II plantings are defined as areas which, once will survive and grow with only natural rainfall. Type II planting could be hydro-seeded with native which is then irrigated until established. established, For example, vegetation (12/18/90) V-7 .J I-/~ ~ TYPICAL PERMANENT SLOPE LANDSCAPING ~ ..s'#UU' f!e;. ~. ~ ~1!6 Sfll#f ~~ ~p;JYeS. SECTION f!!{F:f efl-~ f#"fn~ ~()e €ftIl.U/!!G ~ - tI,q~~l'e~PV<- . ~/~~~ . - - PLAN VIEW v-a ~'''15.3 Natural ~ Space Enhancement The Rancho Del Rey SPA III Plan provides for the preservation and enhancement of significant areas of open space. The major areas are the southern leg of Rice Canyons, buffer along Telegraph Canyon Road, and the SDG&E Easement. These areas provide several unique opportunities: _ Preservation of unique natural resources and wildlife habitats. Nature Study experience. - Drainage basins for runoff. - Less pollution, more oxygen in the atmosphere. - View corridors. Uses The following are appropriate uses within the Open Space areas: Rice Canyon Sensitive plant and wildlife habitat preservation Nature study Trail systems SDG&E Easement Improved park & recreation facilities Parking T,rail systems Picnic areas Nature study Other day use activities Teleqraph Canyon Open Space Buffer Sensitive plant and wildlife habitat preservation (02/02/90) V-9 3/- /5 'I Landscaping The general intent of the landscaping program will be to preserve and enhance the natural character while providing fire protection zones between native areas and structures. Transition zones will also be created to provide visual blending with adjacent areas. Landscape Zones The canyon and SDG&E Easement areas consist of various landscape zones to create the appropriate relationship between man-made areas and natural habitats. These areas are as follows: Fuel Modification Zone This zone exists between all structures and the native vegetation of the canyon. Prototypically, it may consist of the rear yard ornamental plant- ing, brush clearance/thinning, and fire retardant planting to create a 40 foot wide setback from native planting. Fire retardant plant materials and irrigation systems shall be utilized. Naturalized Zone This zone exists in disturbed areas (not included in the fuel modification zone or other designated zones). The purpose of this zone is to provide landscaping and maintenance of disturbed areas. Once established, this area shall be allowed to naturalize. Sensitive Plant Zone This zone has been identified by the biologist as a significant native plant community which is sensitive to the impact of development or is a site for the transplantation of sensitive plant species. An effort has been made to route trails away from these zones. Native Zone This zone consists of native (existing) plant materials that are not disturbed by construction activities or cleared for fire retardant purposes. Native trees may be introduced to enhance the trail system and define use areas. Irrigation is provided by natural rainfall only. Periodic cleanup and clearing of seasonal growth in limited areas may be required. (12/18/90) V-l0 gl-ISS SDG&E Easement Landscaping within the SDG&E Easement shall con- form to agency restrictions. The actual zones may' vary among fuel modification, naturalized, native and ornamental areas, based on the adjacent areas. (12/18/90) V-ll 3/-/5feJ Plant Materials ~ Zone (suggested) Fuel Modification Zones Trees, Shrubs Callistemon (Bottlebrush) Heteromeles arbutifolia (Toyon) Nerium oleander - dwarf varieties (Oleander) Perennials, Vines Artemisia - low growing types (California Sagebrush) Baccaris pilularis (Prostrate Coyote Bush) Ice Plant - various types (no Carpotrotus edulis) Myoporum parvifolium (Myoporum) Trifolium fragiferum - O'Connor's varieties (O'Connor's Legume) Vinca species (Periwinkle) Naturalized Zones Artemisia (California Sagebrush) Cistus crispus (Rockrose) Eriophyllum species (Yarrow) Eschscholzia californica (California Poppy) Heteromeles arbutifolia (Toyon) Mimulus species (Monkey Flower) Penstemon species (penstemon) Rhus - Evergreen types Schinus molle (California Pepper) Trichostema lanatum (Woolly Blue Curls) Zauschneria species (California Fuchsia) Native Zones - Introduction of Trees Platanus racemosa (California Sycamore) Populus fremonti (Poplar) Quercus agrifolia (Coast Live Oak) Ornamental Zones .See Plant Matrix (General Landscape Plan) (12/18/90) V-12 3/-/59- PLAJI'r MATERIALS MAnIX KEY: MAN a Manicured ORN a Ornamental DTN a Drought TOlerant/Naturalized FM = Fuel Modification NAT = Native ~ ORN DTN FM NAT TREES Albizzia julibrissin * Arecastrum romanzoffianum * * Bauhinia variegata * * Brachychiton acerifolia * Cupaniopsis anacardiodies * * Erythrina coralloidies * Eucalyptus species * * Ficus rubiqinosa * Jacaranda acutifolia * Koelreuteria bipinnata * * Leptospermum laevigatum * Liquidambar styraciflua * Magnolia grandiflora * Melaleuca leucadendra * Pinus canariensis * * * pinus species * * . Platanus acerifolia/racemosa * . Populus species * * prunus cerasifera * . pyrus bradfordii * . Pyrus kawakamii * * Quercus agrifolia * Schinus molle . SHRUBS Acacia redo lens . Agapanthus africanus . * Arcotostaphylos species * . Artemisia (low growing) * . Buxus sempevirens * * Callistemon citrinus . * Camellia species . Ceanothus species . . . Cistus species * Coprosma kirkii * * cotoneaster species * * Dodonaea viscosa * Elaeagnus * * Escallonia * * . Eugenia uniflora * * Feijoa sellowiana . Hemerocallis hybrids . Hetermoles arbutifolia * . Hibiscus rosa-sinensis * Juniperus species . * Lantana sellowiana * . (10/26/90) V-13 ~/"ISg PlaD~ Ma~erial. Ma~rix (coD~'d) KEY: MAN - Manicured ORN - Ornamen~al DTN - Drought Tolerant/Naturalized FM - Fuel Modification NAT - Native MAN ORN DTN n1 NAT SHRUBS (cont'd) Moraea bicolor . . Nandina domestica . Nerium oleander . . . Photina species . . Pittosporum tobira . Plumbago auriculata . Podocarpus species . . Pyracantha species . Raphiolepis indica . Rhamnus alaternus . . . Rhus integrifolia . . . Rosmarinus officinalis . . . Tecoma capensis . Viburnum species . Xylosma senticosa . . VINES Bougainvillea species . Cissus antarctica . Ficus repens . . Hibbertia scandens . Parthenocissus tricuspidata . Trachelospermum jasminoides . wisteria . GROUND COVERS Arctotheca calendula . . Asparagus sprengeri . . Baccharis pilularis "Twin Peaks" . . . . Cerastium tomentosum . Fragaria chiloensis . Gazania species . . . . Hedera helix . Myoporum parvifolium . Ophiopogon japonicum . . Pelargonium peltatum . . Potent ilIa verna . Rosmarinus officinalis "Prostrata" . . Santolina virens . Verbena hybrids . Vinca major and minor . NOTE: This is a recommended list for selection of plant materials; other materials may be used subject to approval. (10/26/90) V-14 3/-/5'1 ~ Modification Landscapinq A fuel modification zone must be established between natural open spaces and building development. This zone will consist of an area cleared of natural brush and modified by the addition of fire retardant materials (see list under "Natural Open Space Enhancement"), and an automatic irrigation system. The minimum width of this zone shall be established by the City of Chula Vista Fire Marshal. Plants should vary in height and be planted in random patterns to avoid a hard edge appearance. ~l;!!tJj/~) ~ f"~ ~S lJ'J ~ . ~ W~\,. FUEL MODIFICATION ZONE (10/26/90) V-IS 31-/tpO streets cape Landscapinq The streetscape, or street scene, is comprised of the buildings, structures, street scale, adj~cent view/vistas, signage, land- scaping and street furnishings. Building massing, articulation of structures, setbacks and the arrangements of street furnish- ings are discussed in other sections of these guidelines. The following sketches illustrate important landscape treatments of the streetscape. (02/02/90) V.16 31-/~1 TYPICAL STREET TREE PATTERNS f)1)1f/tf1l[J~) SINGLE F AMIL Y RESIDENTIAL ~ ~~9 PVe:.f. ~ c."tVRe~1'I V-17 31-/~;;> LANDSCAPED PARKWAYS PARKWAY with MEANDERING WALK (Meandering Walk along Artf3rials in selected locations) ( - < PARKWAY with MONOLITHIC WALK V-18 3/-1~3 LANDSCAPED P ARKW A YS t~. ~+'~ f), ~~ { I' ,,. tp'& PARKWAY with TRAFFIC GUARD V-19 31-lfI~ MEANDERING SIDEWALKS ~""~~A ~ l' ~~ I!t!t!!:~ ill,"," 6/lfF/C(#i;IIT fCRIf ~ ~ ~ V-20 ,AWltJ !-EI'eTIV.s f'Lr77F#WG WIv 7T4'fT ~1'I~,..v6 ~ ~ ':J~ 7~f,.~wcrtY MT~ (;;J,i~~~~"~ . . ... . '" 4: . ~r~c~ a~- ...._60 ,I,r ~- ~ .E I - /(",5 Landscape Standards All landscape installation shall conform to the City of Chula Vista Landscape Manual. streetscape and common area landscape shall be planted to the following minimum standards: Ground covers shall be used to cover the entire planting area (flatted material at the appropriate spacing or hydroseed with City and Master Developer approval) . Spreading shrubs shall be used to eventually cover a minimum of fifty (50%) percent of the area at mature growth. Shrub and ground covers shall be selected from the Plant Material Matrix. Tree plantings shall consist of the designated dominant, accent, and parcel trees. A minimum of four (4) trees per 100 linear feet of street frontage will be required. Spacing shall be 40 foot maximum. All trees will be staked in accordance with the City Standard detail. Type, size, location, and installation of trees in the City right-of-way require City approval. 'II f~, ~- f7J(/1'-- ~ 11/;fJ/;o/rJ;f/. (02/02/90) V-21 ~'-I"" Irriqation Standards All irrigation systems shall conform to the City of Chula Vista Landscape Manual. Irrigation systems shall be designed so that separate areas of maintenance responsibility (i.e., private association vs. Open Space Maintenance District) are metered and controlled independently. Open Space Maintenance District irrigation shall be coordinated with the City of Chula Vista Open Space Coordinator (Parks & Recreation Dept.). Systems in these areas must conform to standard equipment and installation techniques. Equipment shall be located and installed to minimize negative visual impact. Low precipitation sprinkler heads should be utilized for optimum coverage and maximum water conservation. All Open Space Maintenance Areas shall be fully irri- gated with an automatic irrigation system, as required by the City Landscape Architect and/or Parks and Recreation Department Landscape Architect. Maintenance Standards All landscape maintenance shall conform to the City of Chula Vista Landscape Manual, community requirements and project CC&R's. Maintenance is divided into the following categories of responsi- bility: Individual Property Ownership Private Homeowner's Association Master Developer Open Space Maintenance District Open Space Maintenance District - Administered by the City of Chula Vista Areas proposed for inclusion in public Open Space Districts are indicated in the exhibit on the following page. In general, the overall appearance of the landscape shall be neat, healthy and free of weeds and debris. All new construc- tion of multi-family, Planned Unit Development and unclassified uses shall be landscaped in accordance with a City approved Landscape Plan, and subject to City inspection for adequate maintenance levels. (03/04/91 ) V-22 31 -/~r Q) () c co c .$ .c ffi ~ Q) ~ S- c Q) Q. o .' r. " ~,' ,. 'f 11\ . .~ " \ , ..,' . ... \ +" u .>= +" CIl is Q) u c: co c: Q) +" .~ co ~ Q) U co a. C/) c: Q) a. o o - . Ul UlQ. 0'" ';:: E - Ul- .- '"' 0'" ~ (fj- , >- 0.0 -"'0 o Q) _J:: c: Ul Q):= _.0 )( ." Q)- _ Ul ." Q) .~ Q) u...Q W I- o Z V-23 ~/-/~g ~H (5~ ~ r= ~~ EJ o 0> - en - - o - ~i I--;;;r~ ~i @j aJ =1 Landscape Desiqn Criteria Checklist The landscape development of each specific parcel must be com- patible with the overall comprehensive landscaping effort. The following checklist is provided for the convenience of the parcel developer and those responsible for reviewing the imple- menting a specific portion of work. All landscape design shall conform to appropriate landscape and irrigation standards, and the maintenance requirements contained herein, and shall be approved by the City Landscape Architect. The following components of the landscape designs prepared for each development project (parcel) should be reviewed for con- sistency with these guidelines: 1. Entries a. Entry Monument Refer to "Entries" section to determine location and type. Parcel R-7 is potential gate guarded neighborhood. b. Signage Refer to "Signage" section in the development regu- lations. Signage must be approved by the city of Chula Vista and the Master Developer. c. Plant Materials Flowering accent trees and permanent, easily main- tained flowering shrubs and ground covers are en- couraged, subject to approval. Seasonal flower color and high maintenance plant materials are discouraged. 2. Walls and Fencing a. Periphery Fencing Refer to wall/fence exhibit for type and location. b. Interior Fencing Should be compatible with project architecture and located to provide free access to service meters. It should also screen any undesirable views (e.g., trash storage) c. Fencing heights and types should be coordinated to present a compatible appearance. (12/18/90) V-24 31 - I h9 3. Interfaces Refer to the "Edges" section for the type of treatment. The following types of interfaces should be recognized: a. Canyon/open Space Interface Parcels R-1, R-2, R-3, R-6 & R-7. Conform to "Fire suppression/Fuel Modification" requirements. b. Park or School Interface Parcel R-6. c. SDG&E Interface Parcel R-7. d. East "H" Street Landscaped Buffer Parcel R-7. 4. Periphery Landscape a. Periphery landscaping shall conform to the General Landscape Plan. b. Adherence to the streetscape techniques contained herein will also be required. 5. Interior Landscape a. There are two categories for interior landscape: Developer installed - subject to Master Developer and City approval. Individual installed - Not subject to Master Developer and City approval, except for pos- sible encroachment into open space. b. Developer installed landscape will include: Slope erosion planting with manual irrigation system. Systems to be connected to indivi- dual house meter. Street trees installed in the street tree easement. Exact type, location and staking of tree subject to approval by City. (12/18/90) V-25 3 1- I rO VI. ~ PLANNING CRITERIA (08/10/90) VI-l 31-lrl Product Development The Rancho del Rey SPA III Plan includes certain minimum resi- dential property development standards. These have been repro- duced below for reference. It should be understood however, that adherence to these minimum standards will not automatically create a project that will be acceptable to the City. The adop- ted standards are intended to provide flexibility for creative and efficient site planning, and innovative architectural solu- tions. They are not intended to be used to create substandard developments. RESIDENTIAL PROPERTY DEVELOPMENT STANDARDS Land Use District ~ ~p- RC RSP 1. Lot area (in net OOO's s.f.) minimum minimum average 2. Lot width (in feet) minimum minimum average 3. Lot depth (in feet) 4. Lot coverage (percentage) 5. Floor Area Ratio. 6. Front yard setback (from Public Street ROW) al To direct entry garage** b) To side entry garage** c) To main residence 7. Side yard setback a) To adjacent residential lot (min. total/min. one side) Distance between detached residential units To adjacent street (corner lot) 1 yard setback 10/5 bl c) 8. 9. Rear Building height, feet (maximum)2 12-1/2 story maximum in RS & RP) accessory bldg., maximum 5.0 6.0 50 50 90 45 .55 15 10 15 10 10 15 28 15 15 3.5 4.0 Sp Sp 40 45 Sp Sp 90* Sp Sp 50 .60 Sp Sp Sp Sp 15 10 10 Sp Sp Sp Sp Sp Sp 10/3 Sp Sp 10 Sp Sp 10 Sp Sp 15* Sp Sp 28 Sp Sp 10. Parking spaces per unit 2 21.5sp (gar.) (gar.) 1 bdrm +1 guest unit 15 ppJ *May be modified with Site Plan approval **Lots fronting on East "J" Street, west of Paseo Ranchero: 28' direct entry, 23' side entry garage in RS & RP districts 1 . f Except10n or one story structures per 19.26.150 CVMC 2 May be increased to 35 feet with Site Plan approval 3 As required for uses approved in Precise Plan (12/18/90) VI-2 3/-IT';; 2.0 sp 2 bdrm unit 2.5 sp 3+ bdrm unit .",rr\:~)-~\ "'.0', \\".v..;...-'~\: 1.t\\::'..:,1., -r~~r;;\~\."-:. ~__t-:- I{r'~, _ \~'~nQ' ~.,1~~lf..?> i)\~~~\ ~~f~'t 1 r-;' .....'~.......- ~ ll~ "'"'''\ ~-'"........ " ....~~.,.<<,j,"'")~..,-(' ,I' \ .-.:r-;j'-" {..~ ~........<..."'l,;'1\.~Jr'r'.....~.:.~ ,)'-t- C.\t:. J~ ........-Y"...-.......................,Ji"I'.'.-(T'1.... ----7 <it" -1v->-v--<",- ..)............- ....'.. lrJ.1'- ~ ...r:,....,~'ttt1 _ ;]It",'l'A t1o;--r.:."\ I""'_',V..... t-\......~"..l" .-.-- ~'<..",X..... ~.... ('\"1 ..."'- """"''''''',\ ;,).. ~ E"" ,r"'\...,~,~'r"( ~~~H/ \... _ _ --."'_<;..~;/'~~'<..;" \~' >'::1 ...,:: ,,~(, ' I \).~(liJ "~""\ft1' ~,''',?<<, J'-.\"...... o I .,,11 ~.. / '\'~/......,,/....O\:.. \. RS~...;---_...... ,'r<-~~'7-].r.:.. -- ........./ , "'~Yf. "Yt: :'\ \ 05-1/ R5 R5 \ ';,$~~\'{/l\ _, ....-_......"'""\ !Ii /t'\,,\y <'~/} - , '- _",--.;:f" 'v-;:'~'1 , / -r '.. V \";,"-' ..... ,.. y"l -- RP I " >> ," ;;~V'(i;~ ^ ' rr"':';,,\:"~ .('){',,' <> J' c.. 05-1 ........................ ---- .................... ---- -- ,~ '-~ -'I 11 Ii lr / / / 'K -/ / (0,05-2/ ~:i~ /"/ // J .------.... ---- ,/ /' --.;" -- ...._J.._/ --- H URU' EH' R5P R5P ~ Residential Land Use District i- \;:IRS t> L-..::.--J Residential Single Family District ~ 0 Residential P1amed Concept District ~ 0 Residentiel Condominium District G Residential Speciality District Special Purpose District B Open Space-l District B a Open Space-2 District R5 RP 1:." '"' ~ " t,:",,,,,')~~1'" ~RS""''''' ..'I'rm-.;r~;~~\,y:~y~ , l....~ 1..")< ;..") _ JLl\I.1~;,:.,.<T~t...:>)\~t_".~.:. ,- -_,.....-r" q~~fI~ >_.,"'-....l,~... ~ 05-3 \1 ~~r 1.-') 11"', ('(:);1,~~~...1\--1 1[:.1;"lll\I~,qt1\\\ I."'\"}~~~" ._.;;;~..T\\\\\\\\\rl,\H}~\;,\\\>'\~-~ .. ___ H\-~\H-\,l-....L"j\f: "'~~ ....,;,.-~.. /." l \ I,' I;',\'(T,.,....... ~ t"; -""'.... I R5 :"-1"\1'0'"~' .,~ I ,/7"," .....- 05-1 '_..I, (' . . . Open Space-3 District ~l...lG"~'" 05 1 .R@2!QQ~ReyB11' Land Use Districts 05-2 ^ \ 10126/90 ['J ~ iB. : ~ ! '~'9'1l9'6'~ Exhibit 20 Ci1ti .- HOUSING TYPE: SFD-Conventional EXAMPLE LOT SIZE: 50'x 100' !70' 1Yf'/Ct'V- ~It' ~ ~ , ~ "-I ~ ,~~., ~~ T'rfJ~ BfJ(UJI/'Ie ,qwa..ot'.e .=;rO Q;fVqw~, /--OT 51U!3- 91"(00 y----:=- ---- -" - --, Im~1 , . ~ ~ I ,: 7.! Sr ~ ,I I I -, I rr-;. ,/ ~_~--_I, L - \ __oJ AII1lV "", I ."1"..... I I \ I \ \ \ . I \ I I VI-3 f)f/'.Ie ~t{ 1# a:w ~ , , J -J ~~~ /-or ~~~PW'1f/rf ~~A$ 3/-lr'l HOUSING TYPE: SFD-Cottage EXAMPLE LOT SIZE: 44'x95' /'fL'fJ'/7lVl{ I () , .::t31/'fYWO/,/ --l I \ I r1 1~ I~ +----4 ,~ I ~ I I _J "If 1Y11tN- -- -~ I I ~'~'.~. ~~ ,~ ~~ 7ff/0- ~()/UJ/AG /qW~ ~ s7W'/ffj.15' VI-4 lC-~----~--'-:r I I " ., ' ',,-- /, ......-...-..... .... l / -... /(~'A F;Wt1' {<ff 'jJtP f)t'{'VB- €/"f~ \ ~ti% ~ UTT W/J7Tft5 ~ ON~ptVff ~ O.G5~ fr' .~iJIjf~ 3'-/"r5 HOUSING TYPE: SFD-Cottage EXAMPLE LOT SIZE: 40'x90' ~'7Y/'/~ sif~tf --, -........... ~-l I - I .............. . 't ~~. ~ ,~ . ~ .~ ~~ ~ ~ 7Yf/~ f!}()/tOlNG P;wew~ lfO ClJT}A€e., , J.4T ~ -fOX1tJ VI-S 31-1"1-' f'=:'-- -;="-~) ,I ~ \ ,I I . ....-, 'I I / , I I . \ ' \... _ _ J fJj;Ie \. _ '" 'J ~ NT ~. -- ~f'1JN FUt7jl-. JAlT WI{)71iS~~ A%!1':ta Je t7~ . i:';Y: f} .:7{'/'fCe HOUSING TYPE: SFD-Cottage g4l~~ r -- ----- (._~----~- 1 . 'S d J __ I . ,-:---_...-- "'" , ~:::::.:.:::::::::::::::~:::~:::::::::::::::::t, t I,' I '/I 5 I~t:~:~r""'" ........................ ..................................... G \ f7Y'1/v I ~~~~~jjIjjjjj~~~jjjjjj~~~~~j~jjjjjjjj~~~~jjIjj~jjjjjj~jjjjjIj~~jjjjjjjjt { I \ : :.:.:.:.:.:.:.:.:.:.::.:.:.:.:.:.:.:.:.:.:.:.::.:.:.:.:.:.:.:.:.:.:.:.::.:.:.:.:.:, I ,_-.... ./ ~~, - 5~! ~~ ~ ~ W/~~!HJ1/'8 sr=O ~ ~!~ FH~ I'~ ~.",,~eu;r ~Mi11 tw5 t'#- .~ WG~~ ~~~. VI-6 3/-lrr- Site Development Standards Numerous site development criteria are included in Section VI.8 of the SPA III Plan. The following are presented as supplements to those basic guidelines. Single Family Products On the following pages a series of lot/building schematics are presented to provide additional guidance in the design of single family housing types. The attached townhouse and specialty developments follow. It should be stressed that the schematics and building envelopes that follow are proto- typical lotting concepts and are not intended to constrain more creative solutions to spatial relationships. Special attention is also given to the issues of streetscape quality and corner lot situations in small lot areas. The open cul-de-sac site planning technique is also illustrated. Yard Restrictions Careful attention to maintaining continuity of design during initial construction can be negated by subsequent individual homeowner improvements. Enclosed additions, patio struc- tures, decks, storage sheds, fencing and other similar home- owner improvements are of particular concern. Yet, restric- tions such as setbacks, coverage, materials, etc. must relate to the particular type of lot and residence involved. In order to both control these homeowner improve- ments and, at the same time, relate the restrictions to the particular characteristics of the housing type involved, a "Homeowner Improvements Guide" shall be a required component of the mandated Site Plan Review. This supplement will detail for each housing type, the specific restrictions on the size and location of balconies, covered patios, enclosed additions, or storage buildings. In addition, specific guidance and restrictions shall be provided for materials, colors and design characteristics. This supplement shall be officially adopted as a component of the Site Plan Review approval. And to insure continued conformance, it will also become a component of the recorded CC&R's given to each new home purchaser. (08/10/90) VI-7 a I-Ir~ r--rr r- I I I I I I I I I I I I ~ ~~J.w I ~' L~' . ~- /~~ \ \ \ ~"'" STREETSCAPES -r ---rr-- I I I : 1 I I I I I ;;,'_1-t5' I .14-1' 1'7' 5/' -- VARY LOT WIDTHS "ARY' FRONT YARD SETBACKS .. e. . . VI-8 PARKWAY FURNITURE .3/-1-,.9 CORNER LOT TREATMENT with SMALL LOTS 1 . I I 1 iIItroHE ~_.L (,(jp et~ tJ!7fl -- r I~ I I.ME6~ . ~ ~- ~~~~LW r'w~ ~terNP ~ I ~1 : /0,1.. /5 /6' /I,~T \ ;crw:/r'~;ze. '5ft VI-9 ,3/-/ra ~~~. OPEN CUL DE SAC (with Open Space Access) /f~ W'~fiF PRESERVE DESIRABLE VIEW VI-l0 BLOCK UNDESIRABLE VIEW 31 -I <j I Open Space Fencing (without Open Space Access) DWjW ~ t)fff::l? CtiVr()Jl/tJ{/S / ~ F/..IfT VIew ffiU::I~ -1 fftrt ---== . .... . .....,..~ ..---:::: .......- ""..,. '::f$/;:~:::::::' ::::.:.:::::~:;:/ . ~~ --...;. ---...... .",.,. ~ -.....; --;;,- -....- ........ ~ 14/}J. IP{ , UW!JMIIJ6 @NO- ~ $f rew:-e -------- " . -------- VI.l0a al-18~ !If.flto fer' t~~ Open Space Fencing .. .. tf4 fIrAP/fd tJ6l tet ~f8J~ V/BJ.J ft;if,Ce "- ." ft. I fZ,k{ Iftrt "::J * WAtL- \ .. . t~Mr Rear and Sideyard Fencing !1JN. 10 I U4tI1/Jtf:IrfI;fJS tre4 ~~<;ft}l~ j1/1!i !W/) f ffr$t:nC- @ 4 !!Jr~ ca.te.~ VI-10b Cul-De-Sac Fencing 3/-/fl3 Attached Products Site plans for attached products should consider the follow- ing issues: indoor and outdoor privacy, solar access, build- ing appearance, and overall project design appeal. Build- ings should be oriented to create courtyards and open space areas, thus increasing the aesthetic appeal of the site. Building architecture should incorporate a variety of units, building sizes and heights, and color accents. Building facades should include relief to avoid a monotonous appear- ance. Stairwells should be covered and integrated into the overall building design, and private spaces such as patios or balconies are encouraged for each unit. Another design consideration is the need to buffer group parking areas from the street and adjacent properties. A few of these design concepts are illustrated below and on the following pages. w 711~ ... . -..' , . -.. .....:". .... ." .... ".. .~. ."... ........ w~. ./111(5. !!tJ~ ~!VI1', y~y .se~ frY" //f7E!Il-ES"r (10/26/90) !lr;f 7fl1f; .0 '. 11J;:~1'<5 'VI; 6~. .' . ." . . tll((!5fj;J-~ ~~~. ~ I1INI77J~r MUL TI-F AMIL Y SITE DESIGN VI-12 .3 I - I' If tVIlG>l'~ ,..- c;r;;c-ve .5~~ ~ ViSQ;'\"- 6. --..... 7111:;; IVIT 71fI'G ti&1\fl~#:fii;ff$ ",I>". ..vg:!~~fidjW ;!41i.'llij~~- I ~\'!S= 'W' ~ ~e ~tJSr?6 ~ ~ "'-' /'fP/y077?I'i?V,5 G~ MULTI-FAMILY STREET ORIENTATION VI-12 3/-185 /II /ilGlCI'- ~ ~B::;J'3 ~ 7fJ::I<. II~ t?flN1e ;,M. P~IV6J ~ .1'Vt:1V/Pt1/'t=- t//YI!2 ~ ~ 7VfW!iiiP ~ tl~ IW 4(, Yl'r'Ve:rr VI JV/"tf'$ rf? /'dIlltJ /k I1ll1fJ71I1Y ,c ~ ~'^ afV/I~~' GQ 6b I S '1 i'ltlbT!J:/1/H' ~ /t-r:f1~CI. ~(/Sf/rt9. If:" / IS;' #A ~. ~ r /i<o?~ ~ II/Itr('fi;;; d/V/'I IPIfi!rV7TTY ~ ~ ~J~~n~~ ~$'AI9~~'g;~ /JUIIPTIV&' flj<;'fS ft ~M"\7P 1'I.AS..5~. 7JtIS W/~ /'t6~ ~j<<-QY~ V/f'Ver( ~ ~ b~~e. MUL Tt-F AMIL Y SITE DESIGN VI-13 31-1'i~ Desiqn Issues ~ Parcel The product descriptions, lot and pad sizes, and parcel plan features described in this section are those envisioned at the the of SPA III Plan preparation. These designs and specifica- tions are subject to change and refinement in conjunction with the tentative tract map approval, and are subject to such ap- proval. Any alternative parcel plans which are prepared should respond to the listed planning and design criteria, implementing the techniques and solutions described in the previous sections of this text. All parcel plans shall conform to the development standards and other provisions of the Rancho del Rey SPA III PC District regulations adopted by the City of Chula Vista. Single Family Detached Single Family Detached is the primary housing type in the development of SPA III. The following are guidelines for site planning each of the single family detached parcels designated for single family detached products (key maps are provided to identify the location of each parcel). (12/18/90) VI.14 3/-/rr Parcel R-1: This "parcel" consists of three in-fill areas at the end of Paseo Margarita, Paseo Cresta, and along Paseo Entrada. The most important design issue regarding ~his parcel is the integration of new development with the exist- ing homes on adjacent lots. The architectural design and scale of the new homes should compliment the established neighborhood character. Grading to create lots should also blend with the contours of existing development. The street interface of the several flag lots proposed at the end of Paseo Margarita should also receive special attention. Where lots back to Paseo Ladera, the rear fencing and street landscaping should be consistent with community themes. Parcel R-1 Design Criteria Summary Product: CONVENTIONAL SFD ~,-;"-> -, . , i:~ -- ."" , - ~--; - \_~~- Minimum Pad Size: 6,000 sf Average Lot Size: 9,120 sf Special Desiqn Issues Grading: adjacent to Telegraph Canyon buffer, adjacent to paseo Ladera Entry: Existing adjacent neighborhood Fencing: Telegraph Canyon Road views; integration with eXisting neighborhood fences Edges: Telegraph Canyon Road, Paseo Ladera; community facility parcel (CF-1); existing neighborhood Landscaping: open space edges; community facility edge (10/26/90) VI-15 3/- IB 8 Parcel R-2: This conventional SFD parcel is located in the northeastern portion of the site, adjacent to open space, an existing elementary school and neighborhood park/greenbelt. Pedestrian access through this parcel via East "J" street to the elementary sChool/park area is an important design criterion. The primary access to the parcel is from Paseo Ranchero and from the eastern end of East "J" street. A small portion of the parcel adjoins the SFA site (parcel R-6). This edge should recieve special edge treatment for buffering. This parcel also includes several lots on Calle Candelero, adjacent to an existing residential neighbor- hood. The integration design issues discussed for Parcel R-1 are relevant for these lots. Parcel R-2 Design Criteria Summary Average Lot Size: 7,430 sf Product: TRADITIONAL SFD Minimum Pad Size: 5,000 sf Special Desiqn Issues Grading: Slopes adjoining open space Entry: Located on major community entry road; transistion of East "J" Street from collector to residential street Fencing: Open space views Edges: Open space; existing school/park and residential neighborhood; townhouse edge Landscaping: Interface with natural open space; Paseo Ranchero streetscape (10/26/90) VI-16 3/-/i' Parcel R-3: This parcel is located on the central plateau, north of East "J" street and overlooks the south leg of Rice Canyon. It is planned for traditional single family detach- ed products on conventional sized lots. The important design areas in this parcel are the edges, one abutting the canyon rim, one facing East "J" Street, and two adjoining existing development. Most lots adjacent to the Villa Palmera project, at the southwestern edge of the parcel, will have down slopes in their rear yards creating a buffer to separate the two pro- jects. Where a grade differential does not exist, adequate fencing and landscaping will need to be provided. At the western parcel boundary, SPA III homes will share a collec- tor street with existing homes. The issue of complimentary design and scale become important at this location. Along the southern edge, additional lot depth is required for those lots on East "J" Street because of the City's setback standard for homes fronting on collector streets. The lot pattern along the canyon rim has been designed to maximize the view potential of these home sites. Repetitive roof styles which would be noticeable from within or across the canyon should be avoided. Landscaping on the adjacent slopes should obscure these homes as viewed from the canyon trail without blocking the views from the homes themselves. Parcel R-3 Design Criteria Summary ~~ Product: TRADITIONAL SFD Minimum Pad Size: 5,000 sf Average Lot Size: 7,200 sf ~..:--~-- Special Desiqn Issues Grading: Canyon slopes; existing adjacent development Entry: none Fencing: Canyon views; compliment existing development Edges: Canyon; existing development Landscaping: Canyon interface; existing development (10/26/90) VI-17 31-/90 Parcel R-4: This parcel is located south of East "J" Street and east of existing Paseo Ladera. This site is above the existing development to the southeast so design coordination with existing development is limited to that north of East "J" Street. The views from East "J" street and Paseo Ladera to rear elevations, perimeter fencing and landscaping will be the most important edge considerations. Access to the parcel from East "J" Street is to be provided by two entries. The location of these entries must be coor- dinated with those to parcels north of East "J" Street to provide adequate intersection spacing. Parcel R-4 Design Criteria Summary Product: SFO (Home size 1,300 - 1,700 sf) Minimum Pad Size: 3,520 sf Special Oesiqn Issues Average Lot Size: 5,640 sf Grading: Slopes adjacent to Paseo Ladera Entry: Intersection spacing Fencing: Perimeter fencing; views to the south Edges: East "J" Street; Paseo Ladera Landscaping: East "J" Street & Paseo Ladera perimeter (10/26/90) VI-18 3/- /9 I Parcel R-5: This parcel is located in the middle of the central ridge and lies between Parcel R-2 and East "J" street. All property adjacent to this parcel is within the SPA III so coordination with existing development is not an issue here. The primary design issue for this parcel is the appearance of the project perimeter along East "J" street and Paseo Ranchero. A second issue is the alignment/spacing of entries with those of the school, park and single-family attached project across East "J" Street. Parcel R-5 Design Criteria Summary Product: SFD (Home size 1,550 2,000 sf) Minimum Pad Size: 3,600 sf Special Desiqn Issues Average Lot Size: 4,360 sf Grading: none Entry: Spacing with entries to S-1/P-1 and R-6 Fencing: Perimeter fence along Paseo Ranchero and East "J" Street Edges: Paseo Ranchero and East "J" Street Landscaping: Edge conditions (10/26/90) VI-19 31-19~ Single Family Attached In attached product areas, site design, landscaping and grading should create housing clusters to establish "neigh- borhoods" within the larger housing project. Neighborhood clusters should be limited to approximately 100 dwelling units. Satellite recreational/social centers, which compli- ment the primary project amenity, should be provided within each cluster. Greenbelt pedestrian circulation routes should provide a framework for housing clusters, connecting to local recreation areas and community-wide paths. Parcel R-6: This parcel is located on the south side of East "Jlr""""5treet, adjacent to the neighborhood park site. Due to this location, a primary design issue is establishing a buffer between the residential and educational/recreation- al uses while also providing a visual integration of the two uses. It will be important to clearly define public vs. private open space areas and to prevent students from other areas using the SFA project as a "short-cut" to the school/ park. Where feasible, an elevation change should be provid- ed, along with appropriate fencing and landscaping to buffer the two uses. Alternatively, an interior street could be used to separate the two uses. Similar or complimentary plant materials should be used to unify the visual character of the area. Interesting forms and detailing should be evident in the building elevations which face the park or public open space areas, as well as those visible from public streets. See the accompanying sketch which illus- trates the desired park edge treatment. The southern edge of the parcel is within the Telegraph Canyon Road view corridor. This is a designated scenic highway and the edge of residential development should be sensitive to views from the roadway. Grading and landscape design in this area should be responsive to scenic highway design criteria; graded contours blending with natural slopes and planted with native/naturalized landscaping to maintain the natural character of the Telegraph Canyon Road corridor. The perimeter treatment along the northern edge, adjacent to East "J" street, should also receive special landscape and/or fencing design consideration. Parcel entries from East "J" Street should be coordinated with the school site and Parcels R-2 and R-5 to assure proper intersection spacing. Because of the residential units within this parcel are attached, an effort should be made to maximize the quality of common open space during the site planning process. The site plan should incorporate internal elevation changes and landscaping to create smaller clusters of units within the project. (12/18/90) VI-20 ~/-I'~ fIJ:Y MJRff"lfl7<fU . . , . , . . ~ . ~.: ~. . . . . . . . ~ '0. . r- VlH C Townhouse oncept Plan " I ~' . . . . .~1!9heQEL m Del Rey Part _ VI-21 nership 3/-1'i1/ TOWNHOME/PARK EDGE ";';:::;:::;:;:;::'" ............. ................ ....:.:;::;:::;:::::.:.;.... 'Jew WAtt, ~";V /JJfTl! /~~ "p'f<6f ~~. NOTE: Final design should meet the following objectives: 1) minimize park activity nuisances to residents (noise, stray balls, etc.); 2) minimize visual perception of residential structures and parking by park users; and, 3) provide security to private residences adjoining public park property. VI-22 31 -1'1.5 Parcel R-6 Design Criteria Summary =-~J:. ~rO- Product: TOWNHOMES "' -- Minimum Pad Size: N/A Average Lot Size: N/A Special Desiqn Issues Grading: Park site interface; Telegraph Canyon edge Entry: Alignment with adjacent entries Fencing: Views to Telegraph Canyon Road; Park site separation Edges: Telegraph Canyon; East "J" Street; Park site Landscaping: Edge conditions (10/26/90) VI-23 3/-/'''' Specialty Residential Parcel R-7: This parcel is the proposed site of a seniors oriented community which would include a combination of single family attached and detached products, along with multi-family or stacked housing products with densities comparable to other projects within Rancho del Rey. Single family products could include innovative zero-lot line, Z-lot, or other clustered designs to maximize common open space areas. Lower densities should be planned toward Paseo Ranchero with-higher densities west of the SDG&E easement. The location, distribution and amount of each product type will be determined during the precise plan process which is required prior to any development of this parcel. This parcel has a visually prominent location along the south side of East "H" street, a designated scenic highway, and along the edge of the south leg of Rice Canyon. A special landscape setback which averages 80 feet in width (measured from the southern curb line of East "H" street) is required by the EI Rancho del Rey Specific Plan for that portion of the residential parcel across from the Employment Park on the north side of East "H" Street (portion of R-7 west of SDG&E easement). The greenbelt/trail should also extend to Paseo Ranchero but is not required to have the minimum dimensions specified for the area across from the Employment Park. The exhibits on the following pages illustrate the setback requirement and conceptual design for the area. The berm along East "H" Street should screen the first floor of buildings within the Specialty Housing area, at its highest point. All visible development, entries, fencing, building elevations, and landscaping along the entire East "H" Street frontage should receive special design attention. Along the canyon edge, these same design elements will define the development edge which will be highly visible from the existing residential areas on the south side of the canyon. Site planning along the canyon edge should extend canyon views into the development area through the use of the open cul-de-sac or parking area technique where appropriate (see sketch). Public utility facilities, an SDG&E powerline and water district reservoir, are located within the parcel. On-site grading will need to maintain these facilities and adjacent landscaping will need to transition to the naturalized vegetation within the open space parcels. The design concept for adjacent areas should attempt to integrate these areas into the overall plan rather than exclude or block from view with massive forms which have an artificial appearance. Public trail access from East "H" Street to Rice Canyon will be provided via the SDG&E easement or vicinity. The alignment of the trail, together with consideration of accessory or incidental uses of the privately maintained open space area which are compatible with utility and trail uses, will be determined in (03/04/91) VI-24 3/-/t1-r- Specialty Housing Concept Plan Parcel R-7 < .. I\) ~'" - , - ...a 00 '/I'tfl'tliT ~ ::::.... .... ;tWo'- ~r"'#r ~ttm' ~~. ~~~~ .~<2r!2~""'~ Ci1ti & As&x;aes 1""lI,' I', II:II~ CANYON EDGE Parcel R-7 /~OMp ::'JI;fJ6t...e tJT~Y ~e7IT6 /11 . 'NfRfG:5 ~N'6 CWJttJAl ~ ~<f~ OI'rU/JP ~ /V,tIJW -/11/ f{)f!il~ wewAlG ,-1t7Q;S ~~ fJrtUr,iJ If. /Pfrlo-f ~~~ VI-26 3 I - 19' .. a. Q) (.) c: 8 "- ~ - ::J co Q) ~ C,) (J) 1:J c: as ...J \ 1\ , \~ _,J ' -l \ i \ \ If \ ~~ . I ~I; ~ I u..,.....a . -- I 00' ~ . w i . j 00< . i 0 / EJ / ~ . i i i i . i / / / / i i . ~ i . . If-' ~' i Iff : I~" / J'~ / ~ : : / _ w / -l/ r~;;/ . . VI-27 / _J -'I ~~~ .'Q~ Sj si @J al [Ii '3 ,- 200 at7T /I!lP~ , ,. ~: ~k, PrO. {::()cC6 L'(.V / ..-r-. I'm~ A"t!7't ~r /f?C-f5tW7V ~ :5 '" <Xl ......... ........... ............. ............... ................ .................. ........ .......... ........... ............ ............. ............. .<:;:: :-I.:;:;:: ~ - . tI o " 'f1 &"Or "1/' f:1Jreer ~ /1U:iAb {}tfJ .~QQ~E!rr East H Street Buffer Conceptual Features ~ <'IWkJIriI<.. ~ teffl fJJT ill:! ~1fj ?tWt~ . . Ci1li .- Ifol9' 1l!l 'e'~ " \ 1 ... ... 8f <Do. "'-. <D<D ~ .;:U 5 (/)c 0 ::co '\ ~-- ... ~ EJ en <D co..... w..... ::s en I ..r .J ~~~ I ~[~ I J~ I !~ ~! ~ ;., ~ J d~ / o~ ~ ~ ~ / . & /~ ~i !i- II aJ / // ~ ~ ~ . [I VI-29 I .3 ~t-; ~-().O) EAST H STREET Expanded Parkway /l!1'If: '7r"_~'____ .f,tUfI6~";'-4f:/ .-.....,.,.,.,.. tl!<Ml' "",... ,.' ~ ..' ~ -, , '~erf~"'''':t''MlT~ .~~.t.:1-1:' .~~linf!!f'. ~ -"'" ,.' tJVrOfO II'f'I'*'i( lMT if"~ u' ~ ni:l T.\1TrrtrmO DiIW1T IQIW r; ...~cm ~)I,!'\lUJ.JJ; UW ~JJ. J/7 -o)(j.3~ It~ conjunction with Precise Plan approval. Dedication of the trail as an open space lot through the private area shall occur with subdivision mapping to implement the approved Precise Plan. Within the parcel, as the locations for each distinctive product type are established, grading, landscaping and other buffering techniques should be implemented to separate less compatible densities. A connector road which extends between the two primary access points (East "R" street and Paseo Ranchero) should be provided to function as a circulation spine for the project, provide guest parking and link housing clusters (see Concept Plan sketch). Internal circulation and parking areas should be planned to avoid confusion and congestion. Direction and information signs should be designed to be functional and to blend with the architectural character of the development. Circulation for oversized emergency and service vehicles is also an important design criteria. Parcel R-7 ,""--.-~- \_---::.~- Design Criteria Summary Product: SPECIALTY NEIGHBORHOOD (mixed products) Minimum Pad Size: N/A Average Lot Size: N/A Special Desiqn Issues Grading: Slopes along Rice Canyon; adjacent to SDG&E easement and water tank Entry: Align with Employment Park on East "R" Street Fencing: Perimeter along East "H" ~treet and Paseo Ranchero; canyon views Edges: All Landscaping: Treatment along scenic corridors, entry, and employment park; integration/transition to natural and naturalized open space (03/04/91 ) VI-31 31-~otf The attached is additional information for Item No. 31 ~ [- JOS RESOLUTION EIR-89-10(a) RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION RECERTIFYING THE FINAL EIR-89-10 FOR RANCHO DEL REY SPA III. WHEREAS; the Planning Commission at its meeting of November 14, 1990, voted to recommend certification of EIR 89-10, Rancho del Rey SPA III and WHEREAS; the Planning Corrvnission approved tentative subdivision map PCS 90-02, Request to subdi vide 404.9 acres known as Rancho del Rey SPA I II, at its meeting of May 22, 1991 and WHEREAS; it was determined that the EIR 89-10 should be recertified prior to the approval of the PCS 90-02, NOW, THEREFORE, BE it resolved that the Planning Commission recertifies EIR 89-10 has been prepared and in compliance with CEQA, the state CEQA Guidelines and the environmental review procedure of the City of Chula Vista. PASSES AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA, this twelfth day of June, 1991 by the following votes, to witness: AYES: Commissioners Carson, Tugenberg, Grasser-Horton, Martin, Decker, Full er NOES: None ABSENT: None ABSENTIONS: None S&:{:~~J~~ ATTEST: ~~u 7>. 1I'.l~ r Na cy Ri Jl ey, Secret ry WPC 9428P ~I'JO(P /' ~ ~- Resolution PCM-90-6-(C) RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL APPROVE THE DESIGN GUIDELINES FOR RANCHO DEL REY SECTIONAL PLANNING AREA (SPA) III WHEREAS, a duly verified application for a Sectional Area Plan including Design Guidelines was filed with the Department of the city of Chula Vista by Rancho Partnership, and WHEREAS, said Design Guidelines constitute a manual to guide the design of site plans, architecture, and landscape architecture within sectional Planning Area III (SPA III) of the Rancho del Rey Planned community, and planning Planning del Rey WHEREAS, the planning Commission set the time and place for a hearing on said Design Guidelines and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held at the time and place as advertised, namely 7:00 p.m., May 8. 1991, and continued to 7:00 p.m., May 22, 1991, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed, and WHEREAS, the commission found that the Design Guidelines are not a project under CEQA. NOW THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION finds as follows: 1. The Design Guidelines for Rancho del Rey SPA III are in conformance with the EI Rancho del Rey Specific Plan and the Chula vista General Plan: and 2. The Design Guidelines for Rancho del Rey SPA III will promote the orderly development of the involved sectional planning area and ensure a consistent quality of development in keeping with the fundamental concepts established for the approved SPA. BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION recommends that the city council approve the Design Guidelines for Rancho del Rey SPA III. That a copy of this resolution be transmitted to the owners of the property and the city council. 3'- Jo=1-" PASSED AND ADOPTED BY THE PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA, this 22nd day of May, 1991, by the following vote, to- wit: AYES: Commissioners Carson, Tugenberg, Grasser Horton, Martin, Decker, and Fuller None NOES: ABSENT: None ABSTENTIONS: None )/-.11 /1 0 ,.?;-1l' (jif'~ Jhn. "'--' Sh ,ley Grasser Horton ATTEST: ~~2~) Nancy Ri ley, See etary -01" J,6<6 RESOLUTION NO. PCS-90-02 RESOLUTION OF THE CITY OF CHUIA VISTA PIANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL APPROVE THE TENTATIVE SUBDIVISION MAP FOR RANCHO DEL REY SECTIONAL PIANNING AREA (SPA) III, CHUIA VISTA TRACT 90-02 WHEREAS, a duly verified application for a tentative subdivision map was filed with the Planning Department of the City of Chula vista on November 8, 1989 by Rancho del Rey PartnerShip, and WHEREAS, said application requested the subdivision of approximately 405 acres into residential lots, open space areas, a school lot, park and community purpose facility lot, and WHEREAS, the Planning Commission set the time and place for a hearing on said tentative subdivision map application and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held at the time and place as advertised, namely 7:00 p.m., May 8, 1991, and continued to 7:00 p.m., May 22, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed, and WHEREAS, the Commission recertified EIR-89-10, with Statement of Overriding Considerations, and associated Mitigation Monitoring Program for Rancho del Rey SPA III. . NOW THEREFORE, BE IT RESOLVED THAT THE PIANNING COMMISSION finds as follows: Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative subdivision map for Rancho del Rey Sectional Planning Area (SPA) III, Chula Vista Tract no. 90-02, is found to be in conformance with the various elements of the City's General Plan based on the following: 1. The site is physically suitable for residential development and the proposal conforms to all standards established by the city for such projects. 2. The design of the subdivision will not affect the existing improvements -- streets, sewers, etc. -- which have been designed to avoid any serious problems. 3. The project is in substantial conformance with the Chula Vista General Plan Element as follows: d/-;Jo1 a. Land Use - The proj ect is consistent with the General Plan, El Rancho del Rey specific Plan and the SPA III Plan which designates the property PC - Planned community, with a variety of land uses and residential densities. b. Circulation - All of the on-site and off-site public streets required to serve the subdivision are consistent with the circulation element of Chula vista General Plan and the circulation proposed within the El Rancho del Rey Specific Plan. Those facilities will either be constructed or in-lieu fees paid in accordance with the Rancho del Rey SPA III Public Facilities Financing Plan. c. Housing - A low and moderate housing program with an established goal of 5% low and 5% moderate will be implemented subj ect to the approval of the ci ty' s Housing Coordinator. Computation of the satisfaction of this condition will include the entire E1 Rancho del Rey Specific Planning Area. d. Conservation and Open Space - The project provides 148.3 acres of open space, 36% of the total 404.9 acres. Grading has been limited on hillsides and grading plan approval will require the revegetation of slopes in natural vegetation. Approval of EIR- 89-10 included the adoption of a mitigation monitoring program outlining the mitigation measures required for project impacts on geology, soils, biology, air, water, cultural resources, land form, transportation and utility sources. e. Parks and Recreation The project will be responsible for the improvement of the 10 acre net neighborhood park and payment of PAD fees or additional improvements as approved by the Director Parks and Recreation. In addition, a trail system will be implemented through the south leg of Rice Canyon, connecting with other open space areas. f. Seismic Safety - The Rancho del Rey site is crossed by the La Nacion Fault Zone which has one prominent fault, running north to south, with other potential traces. The mitigation monitoring program adopted with EIR-89-10 provides for measures to be taken to mitigate the impacts of development in association with the fault zone. g. Safety - The site will be within the threshold response times for fire and police services. The project will increase the need for additional personnel, however, the city is planning to meet 31-~ /0 that need with additional revenues provided by this project. h. Public Facilities Element This project is obligated in the conditions of approval to provide all on-site and off-site facilities necessary to serve this project. In addition to that, there are other regional facilities which this project ( together with SPAs I and II) is contributing to, including a public library site, fire station site, and fire training facility site. The subdivision is also contributing to the Otay Water District's improvement requirements to provide terminal water storage for this project as well as other major projects in the eastern territories. h. Noise - The units will be required to meet the standards of the UBC with regard to acceptable interior noise levels. i. Scenic Highway - The project does not affect this element of the General Plan. j. Bicycle Routes - Bicycle paths are provided along Telegraph Canyon Road, East "H" Street and paseo Ranchero Road as shown in the circulation Element. k. Public Buildings - No public buildings are planned for the site. The project shall be subject to RCT and DIF fees. 4. Pursuant to Section 66412.2 of the Subdivision Map Act, the Commission certifies that it has considered the effect of this approval on the housing needs of the region and has balanced those needs against the public service needs of the residents of the City and the available fiscal and environmental resources. The development will provide for a variety of housing types from single family detached homes to attached single family and senior housing. In addition, the addressment to providing a percentage of low and moderate priced housing is in keeping with regional goals. 5. The configuration, orientation and topography of the site partially allows for the optimum siting of lots for passive or natural heating and cooling opportunities. BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION recommends that the city Council approve the tentative subdivision map for Rancho del Rey SPA III, Chula vista Tract 90-02 subject to the following conditions: 31-~11 General/Preliminarv 1. The Public Facilities Financing Plan shall be followed with improvements installed in accordance with said plan or as required to meet threshold standards adopted by the City'of Chula vista. In addition, the sequence in which improvements are constructed shall correspond to any future East Chula vista Transportation Phasing Plan adopted by the city. The city Engineer and Planning Director may at their discretion, modify the sequence of improvement construction should conditions change to warrant such a revision. 2. All mitigation necessary to avoid significant effects itemized in the Mitigation Monitoring Program for Environmental Impact Report EIR-89-10 as required prior to Final Map approval, are hereby incorporated as conditions of approval. The Director of Planning may modify the sequence of mitigation at his discretion should changes warrant such a revision. 3. The developer shall comply with the Community Purpose Facility Ordinance. The areas proposed to show compliance with said ordinance shall be provided prior to approval of the first final map. Areas of consideration for qualification must be within the areas of SPAs I, II or III. Amendment to the El Rancho del Rey Specific Plan and Sectional Plan Areas may be necessary to accomplish compliance. 4. Prior to final map approval for Phase 1, a Precise Plan shall be approved by the city Council detailing the development of the Specialty Housing project. The precise plan shall include but is not limited to: detailing the density of the various portions of the project; identifying the amount of recreational and open space facilities; detailing the financial arrangements available to proposed tenants; identifying the age limits and any income requirements of tenants; and showing the percent of the project for sale or rent. Streets. Riqhts-of-Wav and ImDrovements 5. Prior to any final map approval for Phase 2 or 3 or any unit thereof, the developer shall obtain all necessary right-of-way for the construction of the unimproved off site portion of East "J" Street west of Paseo Ladera, from River Ash Drive to Red Oak Place. 6. The developer shall construct the unimproved off site portion of East "J" Street west of paseo Ladera, from River Ash Drive to Red Oak Place, to a Class II Collector Standard, except that the 5 foot sidewalk may be asphalt concrete instead of portland cement concrete. The construction of these improvements shall be guaranteed prior to final map approval for Phases 2 or 3 or any unit thereof. The subdivider may request the formation of a reimbursement district for these off-site improvements in accordance with section 15.50 of the Municipal Code. 7. The developer shall request the vacation of that portion of paseo Marguerita as necessary to accomplish the design as 3/- ,;J10l shown on the tentative map. accomplished prior to the approval 2, unit 3. Said vacation shall be of the final map for Phase 8. The off site portion of East "J" Street adjacent to Buena vista Way shall be granted in fee to the City for Open Space, public utilities and other public uses. The grant of this property shall be completed prior to approval of a final map for Phase 3, Unit 3. The developer shall enter into an agreement to not oppose the inclusion of this property in Open Space District # 20 (Zone 7) prior to approval of any final map for Rancho del Rey SPA III. The developer shall be responsible for the costs associated with annexing this property to Open Space District # 20. 9. The developer shall be responsible for the construction of off site improvements at the westerly end of paseo del Norte in the Casa del Rey subdivision. The construction of these improvements shall be guaranteed prior to approval of the final map for Phase 2, unit 2. A cash deposit was previously deposited with the City to pay the cost of this work. The amount deposited is available to the developer for construction of these improvements. 10. Prior to final map approval for Phase 1, the developer shall dedicate additional right-of-way along the frontage of the property on East "H" Street to provide a 20 foot parkway (existing curbline to property line). 11. The developer shall be responsible for construction of a sidewalk/recreational pathway along the entire frontage of subj ect property on East "H" Street from Paseo Ranchero westerly to Paseo del Rey to the satisfaction of the City Engineer, Director of Planning and the Director of Parks and Recreation. The construction of these improvements shall be guaranteed prior to final map approval for Phase 1. 12. The developer shall be responsible for construction of an expanded 8 to 10 foot wide sidewalk/recreational pathway along the western side of Paseo Ranchero, to connect the trail systems in the south leg of Rice Canyon and in the Telegraph Canyon Road open space area. These improvements shall be installed in conjunction with the construction phases of paseo Ranchero specified in the Public Facilities Financing Plan. 13. The developer shall be responsible for the construction of wider sidewalks at transit stops, subject to the approval of the city Engineer. 14. The final design of paseo Ranchero shall include eight foot wide landscape easement buffers as required by the Street Design Standards or be adjoined by an open space lot at least eight feet wide with slopes no greater than 5:1, except in the following areas where the final design shall be subject to the 31 - ~/3 approval of the Planning Director, Landscape Architect and City Engineer: a. Adjacent to the lots fronting on Cabo Calabazo, Calle Candelero and Punto Miraleste where a special slope and retaining wall design will be implemented: b. Along the Junior High School site: c. Along the existing Ladera Villas and Mission Verde subdivisions where existing conditions shall remain: and d. Adjacent to the out-parcel owned by the Chula Vista School District. 15. The final design of East "J" Street shall include 5.5 foot wide landscape easement buffers as required by the Street Design Standards or be adjoined by an open space lot at least 5. 5 feet wide with 5: 1 maximum side slopes, except in the following locations where the final design shall be subject to the approval of the Planning Director, Landscape Architect and city Engineer: a. Along the park site: b. Along the two corner lots at the intersection of East "J" Street and Camino Hiel (lots 82 and 97 of Phase 2, unit 1) and the southeast corner lot of East "J" Street and Cabo Capote (lot 85 of Phase 2, unit 2): c. Adjacent to the out-parcel owned by the Chula vista School District: and d. Along the existing Bel Aire Ridge subdivision where existing conditions shall remain. 16. All retaining walls which interface with the public street system shall be constructed to match the Ranch Rancho del Rey SPA III Design Guideline standards for exterior walls. 17. The developer shall be responsible for construction of full street improvements for all public and private streets shown on the Tentative Hap within the subdivision boundary: and for the construction of off-site improvements to construct Paseo Ranchero, East "J" Street and paseo Ladera as shown on the Tentative Hap, to the satisfaction of the city Engineer. Said improvements shall include, but not be limited to, asphalt concrete pavement, base, concrete curb, gutter and sidewalk, sewer and water utilities, drainage facilities, street lights, signs, fire hydrants and transitions to existing improvements. Street intersection spacing as shown on the tentative map is hereby approved. .31-,;UY 18. All the streets shown on the Tentative Map within the subdivision boundary, except private streets, shall be dedicated for public use. Design of said streets shall meet all city standards. 19. A temporary turnaround conforming to City standards shall be provided at the end of streets having a length greater than 150 feet, measured from the center line of the nearest intersecting street to the center of the cul-de-sac, except as approved by the city Engineer. 20. CUl-de-sacs and knuckles shall be designed and built in accordance with City standards unless otherwise approved by the City Engineer. Lot Confiauration 21. Frontage on all lots shall be a minimum of 35 feet at the right-of-way line except as approved by the city Engineer. This condition does not apply to flag lots, as defined in the Municipal Code. 22. Lot lines shall be located at the top of slopes except as approved by the city Engineer. When adjacent to open space lots, property lines shall be located a minimum 2.5 feet from the top of slope. 23. The preparation of final maps and plans for the locations listed below shall be carried out in accordance with the following criteria unless otherwise approved by the City Engineer and Director of Planning: a. Provide a minimum 50 feet from the corner of paseo Ranchero and East "J" street to lots 6 and 7, Phase 3, Unit 2, to provide additional buffer and transition area at the corner. b. Provide a pedestrian throughway between lots 130 and 131, Phase 3, Unit 2, from Camino Calabazo to east "J" street across from the school and park sites. c. Lot 128 of Phase 2, Unit 1, shall be widened to a minimum 50 foot width to accommodate a combined slope and maximum 5 foot retaining wall. This is to avoid a "tunnel" effect created at side lot lines. d. Lots 3 and 5, Phase 2, Unit 3 shall utilize maximum 5 foot high retaining walls, and/or a combination of retaining walls and crib walls. e. Provide a different name for each of the portions of Palazzo Court located to the east and west of East nJ" street and the portions of Dorado Way located to the east and west of camino Miel. J I - ~/S street Trees/Ocen Scace 24. The developer shall grant to the city street tree planting and maintenance easements along all public streets as shown on the Tentative Map. The width of said easements shall be as outlined in the City's street Design Standards Policy. 25. The developer shall be responsible for street trees in accordance with Section 18.28.10 of the Chula vista Municipal Code. The use of cones shall be included where necessary to reduce the impact of root systems disrupting adjacent sidewalks and rights-of-way. 26. All open space lots adjacent to public rights-of-way shall maintain a width so as to provide 10 feet of landscaping treatment behind the back of sidewalk. 27. Maintenance of all facilities and improvements within open space areas covered by home owners associations shall be covered by CC&Rs to be submitted and approved by the Planning Department prior to approval of the associated final map. 28. Prior to the approval of any final map, the developer shall request in writing that maintenance of all facilities and improvements within the open space area associated with such map shall be the responsibility of the Rancho del Rey Open Space Maintenance District. 29. Prior to approval of the first final map, a comprehensive landscape plan shall be submitted for review and approval of the City Landscape Architect and Director of Parks and Recreation. Prior to approval of each final map, comprehensive, detailed landscape and irrigation plans, erosion control plans and detailed water management guidelines for all landscape irrigation shall be submitted in accordance with the Chula vista Landscape Manual for the associated landscaping in that final map. These detailed landscape and irrigation plans shall be for the review and approval of the City Landscape Architect and Director of Parks and Recreation. The landscaping format within the project shall be to emphasize native, drought tolerant plant material. Exceptions can be made for areas where reclaimed water is exclusively used. The comprehensive landscape plans shall address: a. Slope enhancement and landscape treatment for the slope in Open Space Lot A, Phase 3, Unit 3, beneath the Junior High School lot. The plan shall address and provide for mature size plant material, boulder work and/or buttress work on the slope. b. A naturalized revegetation program for areas in open space lots, which may include irrigation. of grading temporary 31 - cJ/(, c. The disturbed "native" areas within Telegraph Canyon Road open space corridor. This area shall include tree groupings or tree groves. These plantings shall be treated as random plantings and shall be identified in at least six areas along the corridor with each location providing plantings of 50 to 100 trees. The exact number of trees and locations are to be approved by the Planning Department and Department of Parks and Recreation. The intent of these grove areas is to provide a consistency with existing grove areas in the open space corridor west of the Rancho del Rey SPA III area. 30. Prior to approval of the first final map, details showing the location and design of the trail system and a sign program shall be submitted to and approved by the Directors of Planning and Parks and Recreation. The trail system in the open space lots shall be a minimum 6 feet wide within an 8 foot horizontal clear space and a 10 foot vertical clear space. The associated sign program shall identify the trail network in the open space areas and connecting along Paseo Ranchero, to the satisfaction of the Directors of Planning and Parks and Recreation. 31. Prior final map approval for Phase 3, Unit 3 and Phase 4, Unit 2 as shown on the Tentative Map, cross sections shall be submitted to and approved by the Director of Planning and City Engineer illustrating the interface where the trail is located adjacent to the drainage ditch along Telegraph Canyon Road. The fencing of the drainage channel shall be aesthetically pleasing incorporating the use of plantings, equestrian type fencing and vinyl clad fencing. These cross sections and decorative fencing program may be included with the comprehensive landscape plan. Fence gates shall be provided at locations approved by the city Engineer to allow maintenance of the drainage channel. Parks 32. The developer shall be obligated for 12.5 acres of parkland as described in the approved SPA Plan, including land, and/or fees, and/or additional improvements, in accordance with the Parkland Dedication Ordinance. The actual final acreage will relate to the number of units approved with the final maps. 33. The park located in Phase 3, Unit 4 shall be a minimum 10 net useable acres. Design and development of the park shall be subject to the approval of the City'S Director of Parks and Recreation and shall conform with the park master plan to be adopted by the City Council. 34. An adequate buffer and separation of 50 feet shall be provided between the residential lots at the eastern end of Palazzo Court and the existing park facilities, to the satisfaction of the Director of Parks and Recreation. Solution may include 31-~1 r but is not limited to relocating an existing tennis court or lot redesign. 35. A minimum 20 foot wide access corridor shall be maintained at the end of Paseo Palazzo where the cul-de-sac abuts the existing park. Said area shall be made part of the park. Detail and design of the access shall be submitted to and approved by the Departments of Planning and Parks and Recreation prior to final map approval for Phase 3, unit 1. Gradina/Drainaae 36. An erosion and sedimentation control plan shall be prepared as part of the grading plans. 37. Specific methods of handling storm drainage are subject to detailed approval by the City Engineer at the time of submission of improvement and grading plans. Design shall be accomplished on the basis of the requirements of the Subdivision Manual and the Grading Ordinance (No. 1797 as amended). The developer shall submit calculations to demonstrate compliance with all drainage requirements of the Subdivision Manual. 38. Grading proposals shall be reviewed and approved by the city Engineer and Director of Planning for consideration of balanced cut and fill, utilization of appropriate soil types, effective landscaping and revegetation where applicable. Grading shall occur in separate phases unless a single phase operation is approved with the grading plan. 39. A letter of permission for grading shall be obtained from SDG&E prior to any grading within or adjacent to an SDG&E easement or which would affect access thereto. 40. The developer shall make a reasonable effort to obtain permission to grade the slopes along Buena vista Way at the former intersection of East "J" Street. If permission to grade said slope is not reasonably attainable as determined by the city Engineer, the regrading of these slopes shall not be required. The provisions of this condition shall be complied with prior to approval of the final map for Phase 3, Unit 3. 41. Prior to approval of any final map for single family residential use, the developer shall submit a list of proposed lots indicating whether the structure will be located on fill, cut or a transition between two situations. 42. Lots shall be so graded as to drain to the street or an approved drainage system. Drainage shall not be permitted to flow over slopes. Lots 71, 72 and 89 of Phase 2 Unit 1 shall be designed so that there will be no negative grading or drainage impacts to the adjacent off-site properties. .J 1- ~I Y 43. Graded access shall be provided to all public storm drain structures including inlet and outlet structures. Paved access shall be provided to drainage structures located in the rear yard of any residential lot or as approved by the city Engineer. 44. The use of boulders in minor drainage basins and energy dissipators in the canyon and open space areas in the manner approved by the City Engineer and Planning Director, is encouraged to allow water to be captured and to allow trees to grow naturally. Sewer 45. The developer shall be responsible for performing sewage flow metering to monitor three segments of main identified in the Rick Engineering report dated September 5, 1990 as sections QR, XlX2 and KL. Metering shall be accomplished at the locations determined by the city Engineer. Metering shall be accomplished prior to the issuance of any building permit for SPA III and be repeated at intervals directed by the city Engineer. Should any of these segments have metered flows which fill more than 80% of the pipe diameter, the applicant shall construct parallel facilities as determined by the City Engineer. The developer shall enter into an agreement with the City prior to first final map approval providing for all items indicated above. 46. An improved access road with a minimum width of 12 feet shall be provided to all sanitary sewer manholes. The roadway shall be designed for an H-20 wheel load or other loading as approved by the City Engineer. 47. The developer shall obtain permission from the city to deposit sewage in a foreign basin. The developer shall enter into an agreement with the city relative to the diversion of sewage prior to final map approval for any phase or unit thereof proposing said diversion. 48. The developer shall be responsible for the removal of the existing sewer pump stations (Mission Verde and Candlewood). Prior to approval of any final map entailing said removal, the owner and the City shall enter into an agreement to establish the scope of work and the amount to be reimbursed by the City to the subdivider for performing said work. The developer may also request the formation of a special sewer service area to provide for the cost of connection of the area currently being served by the Candlewood pump station to the permanent gravity sewer system. Unless otherwise approved by the City Engineer, the scope of work at both sites shall be limited to the removal and disposal of equipment, grading, landscaping and construction of new sewerlines and manholes required for connection to the 3/-01'" proposed Rancho del Rey sewer system. Any upsizing of Rancho del Rey Sewer lines due solely to the flow generated by the Mission Verde and Candlewood areas shall also be included. Reclaimed Water 49. Prior to approval of the associated final map, the developer shall provide on-site infrastructure to accept and to use reclaimed water when it is available, along Paseo Ranchero from Telegraph Canyon Road to East "H" street and along East "J" street from paseo Ranchero to the park site, per the adopted Public Facilities Financing Plan. 50. Any costs incurred from retrofitting the reclaimed water system, when reclaimed water becomes available, shall be paid by the developer. Monies for this shall be held by the City, through a deposit set up by the developer. The amount shall be determined by the developer, approved by the city and in place prior to approval of each associated final map. Fire 51. Fire hydrants will be required per the Fire Department standards. Hydrant spacing is 500 feet for single family and 300 feet for mUlti-family dwellings. 52. Maximum hydrant pressure shall not exceed 150 psi. 53. Fire hydrants and roadway access (per city Fire Marshall approval) shall be installed, tested and operational prior to any combustible materials placed on-site. Aareements/Covenants 54. Prior to final map approval for Phase 1, Unit 1, the developer shall enter into an agreement with the City to guarantee the development of the parcel specifically for senior housing. 55. Prior to the approval of the first final map, the developer shall enter into an agreement to provide a right turn lane at the intersection of paseo del Rey and East "H" street, to the satisfaction of the city Engineer, if the threshold standards for this intersection as expressed in the then current Growth Management Ordinance are exceeded at any time during the development of this project. 56. Prior to approval of the first final map, the developer shall enter into an agreement to provide a park-n-ride facility near the intersection of East "H" street and paseo Ranchero to include 50 parking spaces, 10 bicycle lockers, lighting, trash receptacles and circulation striping to the satisfaction of the city Transit Coordinator. In addition, a transit stop, to include a bencn, shelter and trash receptacle, shall be provided on the north side of East "H" street. A plan of said a J - d~ 0 improvements and the timing thereof shall be submitted and approved by the City Transit Coordinator. 57. Prior to approval of each final map, copies of CC&Rs for the subdivision shall be submitted approved by the City Planning Department. proposed to and 58. Prior to approval of the first final map, the developer shall provide a schedule, subject to the approval of the Planning Director and City Housing Coordinator, for the development of low income housing as defined in the agreement executed between the city and Rancho del Rey Partnership per City Council Resolution No. 15751 dated August 7, 1990. 59. Prior to the approval of any final map for the subject subdivision or any unit thereof, the developer shall obtain all off-site right-of-way necessary for the installation of required improvements for that unit. The developer shall also provide easements for all on-site and off-site public storm drains, sewers and other public utilities prior to approval of the final map. Easements shall be a minimum width of 6 feet greater than pipe size, but in no case less than 10 feet. 60. The developer shall notify the City at least 60 days prior to consideration of the final map by City if off-site right-of-way cannot be obtained as required by the Conditions of approval. (Only off-site right-of-way or easements affected by section 66462..5 of the Subdivision Map Act are covered by this condition.) After said notification, the developer shall: a. Pay the full cost of acquiring off-site right-of-way or easements required by the Conditions of Approval of the tentative Map. b. Deposit with the City the estimated cost of acquiring said right-of-way or easements. Said estimate to be approved by the City Engineer. c. Have all easements and/or right-of-way documents and plats prepared and appraisals complete which are necessary to commence condemnation proceedings. d. If the developer so requests, the City may use its powers to acquire right-of-way, easements or licenses needed for off-site improvements or work related to the Tentative Map. The developers shall pay all costs, both direct and indirect incurred in said acquisition. The requirements of a, b, and c above shall be accomplished prior to the approval of the Final Map. .3 J - ~~ / All off-site requirements which fall under the purview of section 66462.5 of the State Subdivision Map Act will be waived in accordance with that section of the Act if the City does not comply with the 120 day limitation specified in that section. 61. Prior to approval of each final map, the developer shall enter into an agreement with the City to include the subdivisions in the Mello Roos public facilities district or an acceptable alternative financing program, subject to the approval of both the Chula Vista Elementary and Sweetwater High School Districts. 62. Prior to approval of each final map, the developer shall enter into an agreement with the City wherein he agrees to comply with that version of the Growth Management Ordinance in effect at the time a building permit is issued. Such compliance includes but is not limited to the then current East Chula vista Transportation Phasing Plan. 63. Prior to final map approval for any phase or unit thereof, the developer shall enter into an agreement with the City whereby: a. The developer agrees that the City may withhold building permits for any units in the subject subdivision if any one of the following occurs: 1. Regional development threshold limits set by the then current adopted East Chula vista Transportation Phasing Plan have been reached. 2. Traffic volumes, level of service, public utilities and/or services exceed the threshold standards in the then effective Growth Management Ordinance. b. The developer agrees that the City may withhold occupancy permits for any of the phases of development identified in the Public Facilities Financing Plan (PFFP) for Rancho del Rey SPA III if the required public facilities, as identified in the PFFP or as amended by the Annual Monitoring Program have not been completed. 64. Prior to approval of each final map, the developer shall agree to not protest the formation of a district for the maintenance of landscaped medians and parkways along streets within and adjacent to the subject property. 65. Prior to approval of each final map, the developer shall enter into an agreement with the city wherein he holds the City harmless for any liability for erosion, siltation or increased flow of drainage resulting from this project. 31-';)c.)~ 66. The developer shall enter into an agreement with the City whereby the developer agrees to participate in the monitoring of existing and future sewage flows in the Telegraph Canyon Trunk Sewer and the financing of the preparation of the Basin Plan and, pursuant to any adopted Basin Plan, agree to participate in the financing of improvements set forth therein, in an equitable manner. Said agreement shall be executed by the developer prior to final map approval for any phase or unit proposing to discharge sewage into the Telegraph Canyon Trunk Sewer. 67. The developer shall permit all franchised cable television companies ("Cable Company") equal opportunity to place conduit to and provide cable television service for each lot within the subdivision. The developer shall enter into an agreement with all participating Cable Companies which shall provide, in part, that upon receiving written notice from the City that said Cable Company is in violation of the terms and conditions of the franchise granted to said Cable Company, or any other terms and conditions regulating said Cable company in the City of Chula Vista, as same may from time to time be amended, developer shall suspend Cable company's access to said conduit until city otherwise notifies developer. Said agreement shall be approved by the City Attorney prior to final map approval. Fees/Pavments 68. The subject property is within the boundaries of Open Space District #20 (Zone 7), Open Space District #10 (Phase II) and Assessment District #87-1. Prior to final map approval or other grant of approval for any phase or unit thereof, the developer shall pay all costs associated with: a) detachment of subject property from Open Space District #10 (Phase II); and b) reapportionment of assessments for open space District #20 (Zone 7) and Assessment District #87-1 as a result of subdivision of lands within the project boundary. 69. The developer shall pay: a. spring Valley Sewer Trunk connection fees ($130/acre) prior to final map approval for any phase or unit thereof contributing flow to the spring Valley Trunk Sewer. b. Telegraph Canyon drainage fees in accordance with Ordinance 2384. 70. PAD fees shall be waived or modified as provided in the adopted Public Facilities Financing Plan for Rancho del Rey. RCT fees and DIF fees shall be paid in accordance with the 31-~;).3 applicable regulations. PAD fees shall be guaranteed until such time as the city waives said fees. Miscellaneous 71. The boundary of California System the subdivision shall Zone VI (1983). be tied to the 72. Prior to final map approval for any unit, the developer shall submit a copy of said final map in a digital format such as (DXF) graphic file. This Computer Aided Design (CAD) copy of the final map shall be based on accurate coordinate geometry calculations and shall be submitted on 5 1/2 HD floppy disk prior to recordation of the final map. 73. The developer may file a master final map which provides for the sale of super block lots corresponding to the units and phasing or combination of units and phasing thereof, shown on the tentative map. If said super block lots do not show individual lots depicted on the approved tentative map, a subsequent final map shall be filed for any lot which will be further subdivided. The City Engineer may condition approval of such a final map to require necessary plans to provide infrastructure necessary top meet City threshold policies and to conform to the approved Public Facilities Financing Plan. All super block lots created shall have access to a dedicated public street. Bonds in the amounts determined by the city Engineer shall be posted prior to approval of a master final map. Said master final map shall not be considered the first final map as indicated in other conditions of approval unless said map contains single or multiple family lots shown on the tentative map. Code Reauirements 74. The developer shall comply with all relevant Federal, State and Local regulations, including the Clean Water Act. The developer shall be responsible for providing all required testing and documentation to demonstrate said compliance as required by the City Engineer. 75. The developer shall comply with all applicable sections of the Chula vista Municipal Code as they exist at the time of issuance of the building permit. Preparation of the final map and all plans shall be in accordance with the provisions of the Subdivision Map Act and the City of Chula vista Subdivision Map Act and the City of Chula Vista Subdivision Ordinances and Subdivision Manual. ,31 - ~d. If .' That a copy of this resolution be transmitted to the owners of the property and the City Council. PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA, this 22nd day of May, 1991, by the following vote, to- wit: NOES: Commissioners Carson, Tugenberg, Grasser Horton, Martin, Decker, and Fuller None AYES: ABSENT: None ABSTENTIONS: None &ht~/b;?Md/J~~ Shirl rasser Horton ATTEST: ~-'~ ?fc;OJ~~ Nancy Ri ey, S cret ry 3 I - 0)~5 RESOLUTION EIR-89-10 (f) RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION AMENDING THE MITIGATION MONITORING PROGRAM FOR EIR 89-10, RANCHO DEL REY SPA III WHEREAS; the Planning Commission at its meeting of November 14, 1990, voted 5-0 to recommend adoption of the Mitigation Monitoring Program for EIR 89-10, Rancho del Rey SPA III, and WHEREAS; subsequent to its adoption, additional water conservation measures and further mitigation of negative impacts to air quality were required as well as new information regarding gnatcatcher mitigation and vernal pool mitigation became available and the adopted Mitigation Monitoring Program required correction and WHEREAS; this new information was incorporated into an amended Mitigation Monitoring Program which was presented to the Planing Commission at its meeting of June 12, 1991, NOW, THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION amends the motion of November 14, 1990 to adopt the amended Mitigation Monitoring Program for EIR 89-10. PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA this twelfth day of June, 1991 by the following note, to-wit: AYES: Commissioners Carson, Tugenberg, Grasser-Horton, Martin, Decker, Full er NOES: None ABSENT: None ABSTENTIONS: None ATTEST: ~."1 'K. ~ t~~ Nancy Ri ley, Slcreta y WPC 9429P .31 -01~ (. U~~~~r"'rL~M !\ I! r:A. I'!l","~ ~":"'r ~'~;~,J~ 'ii:Ji,j -~L.u...-..:....:2 J\.t~LJU~u:",' EXCERPT FROM PLANNING COMMISSION MEETING OF 6/12/91 ITEM 1: CONSIDERATION OF PROPOSED AMENDMENTS TO MITIGATION MONITORING PROGRAM FOR EIR-89-10, RANCHO DEL REY SPA III Associate Planner Reid stated that the Mitigation Monitoring Program for Rancho del Rey SPA III was adopted at the same time of the certification of the Final Supplemental EIR on November 14, 1990, by the Planning commission and in January 1991 by Council. The changes included in the proposed Amended Mitigation Monitoring Program included removal of all references to a specific EIR consultant, correction of sections inconsistent with the EIR, and more specific language regarding mitigation for gnatcatcher habitat. Additionally, the Commission had received before the meeting language including lerner pool litigation and monitoring to be added. Staff recommended that the Planning commission adopt the Amended Mitigation Monitoring Program and recommend that Council adopt the Mitigation Monitoring Program for Rancho del Rey SPA III. Commissioner Tugenberg suggested that with the City moving east, the city should possibly obtain an additional monitoring station for air quality. MSUC (Fuller/Decker) 7-0 that the Planning commission adopt the Amended Mitigation Monitoring Program for the Rancho del Rey SPA III and recommend that the Council adopt the Amended Mitigation Monitoring Program. .3 I - ';>;;J. -=J- U"'~~, )'"";~~4"'l~ /'\!! L,~ ~ ",~" __'" , U _., .... iiI .. ........-.l..,_._~ f./\ r'lri'-. "n (3yr-"l"""" -> ..,.:<<': r: ti ' '"i''''''' ",I(J !Ii L.~' PC Minutes -4- May 22, 1991 EXCERPT FROM PLANNING COMMISSION MINUTES OF 5/22/91 ITEM 2: PUBLIC HEARING: A) RECERTIFICATION OF EIR-89-1O, RANCHO DEL REY SPA III B) CONSIDERATION OF WATER CONSERVATION PLAN FOR RANCHO DEL REY SPAs II AND III; C) CONSIDERATION OF AIR QUALITY IMPROVEMENT PLAN FOR RANCHO DEL REY SPAs II AND III; D) PCS-90-02; REQUEST TO SUBDIVIDE 404.9 ACRES KNOWN AS RANCHO DEL REY SECTIONAL PLANNING AREA III, CHULA VISTA TRACT NO. 90-02 LOCATED BETWEEN EAST 'H' STREET AND TELEGRAPH CANYON ROAD, IMMEDIATELY SOUTH OF RANCHO DEL REY SPA I, RANCHO DEL REY PARTNERSHIP E) CONSIDERATION OF RANCHO DEL REY SECTIONAL PLANNING AREA III DESIGN GUIDELINES; F) CONSIDERATION OF AMENDED MITIGATION MONITORING PROGRAM FOR EIR-89-1O, RANCHO DEL REY SPA III; G) CONSIDERATION OF AMENDED CEQA FINDINGS FOR EIR-89-1O, RANCHO DEL REY SPA III. Associate Planner Barbara Reid stated the Final Supplemental EIR was certified by the Planning Commission in November 1990 and by Council in January 1991. Since the recertification of EIR-89-10 should occur prior to the tentative subdivision map being adopted, staff recommended that the Commission recertify the EIR. Staff also recommended that items 'f and 'g' (the Amended Mitigation Monitoring Program and the Amended CEQA Findings) be continued to correct inconsistencies in the Amended Mitigation Monitoring Program, to incorporate a staff meeting with developers which had been held and to be assured that the EIR consultant agreed with those changes, to incorporate more specific language from a recommendation from the U. S. Fish & Wildlife regarding the gnatcatcher protection, and ascertain that the CEQA Findings as a result of these amendments reflect those. Ms. Reid noted that a letter had been received from a resident west of the proposed project who was opposed to development in the area; it was the Planning Department's opinion that it had been dealt with at the time of SPA Plan approval. Planning Consultant May discussed briefly a memo which had been given to the Commission regarding the air and water plans, the tentative map, and the design guidelines. She stated the ..31 -<<~ t PC Minutes -5- May 22, 1991 applicant had submitted to the Commission a letter stating their opposition to any amendments to the water conservation plan. Ms. May noted that City Council had directed the zero net increase in water use. She also said that an outcome of the air quality improvement plan prepared for SPAs II and III was the suggestion of the park and ride facility to help limit individual car trips and to encourage carpooling and bus ridership. The Transit Coordinator had identified the need for a facility near the intersection of East "H" Street and Paseo Ranchero. The developer is being required to provide the improvements for that facility. Ms. May stated the applicant was opposed to the park and ride. Staff had discussed this further with the applicant and recommended that condition no. 5 be moved to the agreement section beginning with Condition no. 55 and be modified to require the applicant to enter into an agreement to provide the facility. The precise language would be approved by the Transit Coordinator. Staff recommendation was that the Commission take action on items 'a' through 'e' and provisionally approve the project, pending the final action on items or and 'g', the Mitigation Monitoring Program and the Modified CEQA Findings which would be brought back to the Commission at a later date. Commissioner Casillas asked for clarification of the impact of the policy statement on water conservation going to the City Council, and why it was going to them after the Commission met on the project currently before them. Assistant Planning Director Lee answered that from staff s perspective and in fairness to the applicant, this was the first project which had been required to come forward with an air and water plan. In terms of timing, staff felt it was important. A memo had been provided to Council advising them of staffs intent to move forward with a proposed outline of a program for water policy that would be before Council on June 11. The Commission's recommendation on this particular water program could be as definitive as the Commission wished. Staff suggested consideration as a condition for the zero net increase. While this project could be held until the Council moved ahead with their policy, staff didn't feel that would be equitable. Commissioner Casillas felt the City would want to develop a good policy statement that applied to everyone as to how to handle the water conservation. Ultimately, the policy statement may come up with information that may not be valid as to a particular applicant. Assistant Planning Director Lee concurred. He said that including the condition allowing the project to proceed with the zero net increase would allow the applicant to proceed, and if the Council wanted to soften that posture, they would have the opportunity to do so, or to qualify their approval for the applicant to come back to have another opportunity to comply with an overall City policy. Commissioner Fuller asked if the staff s recommendation on the water policy had any input from the County Water Authority as to a broader perspective of how our City's pian would tie into a regional policy. a I - 01~' PC Minutes -6- May 22, 1991 Contract Planner Gray responded that there had not been the opportunity by City staff to explore that with the County Water Authority at this point. The objective would be to coordinate any kind of water policy that the Council may wish to pursue in Chula Vista with the County Water Authority, Otay Water District, and Sweetwater. The Interagency Water Task Force had been established with membership including the City, Sweetwater and Otay to provide that kind of thrust and coordination on the water issue. Commissioner Fuller suggested that staff use that approach in the presentation to Council. She felt if the zero net increase and water policy were to be imposed on developers in our area, the same restrictions should be imposed on other developers throughout the County. Commissioner Decker asked if the policy hadn't fully evolved at the Council, how could we ask the applicant to abide by it. Assistant Director Lee said it was the Commission's choice. The applicant had presented a water conservation program, and staff was making a recommendation that the zero net be applied. It had been requested by Council, but the Commission was not required to take action on the plan. Commissioner Tugenberg asked about the equation for retrofitting. Planning Consultant Gray answered that the technique was to reduce everything to gallons saved. Parks and Recreation could calculate how many gallons of water could be saved by particular sprinkler heads, moisture sensing type of irrigation system, etc. Commissioner Tugenberg was concerned with the sites selected for the park and ride, and why East "H" Street and Paseo Ranchero was chosen over the other suggested sites. Transit Coordinator Gustafson said the primary reason Paseo Ranchero was one of the areas chosen was because that location and the location to the west at Terra Nova Drive were two major access points from Rancho del Rey to East "H" Street which would be a major corridor for transit service. He explained why some of the other sites were not suitable. Commissioner Tugenberg asked if there was consultation with the applicant. Assistant Planning Director Lee answered that there had been consultation, but he thought the applicant was looking at other options. Discussion followed regarding the potential sites which could be used, and the security offered by them. Commissioner Casillas felt Condition 57 was ambiguous. Commissioner Carson asked if there would be some kind of adjustment to the developer if they developed one place, and had to redevelop another place. 3/- ~ 30 PC Minutes -7- May 22, 1991 Assistant Planning Director Lee answered there would be. The applicant would not be required to develop two sites. Commissioner Martin commented about the church area being designated. He thought one of the things Council wanted to do everything they could to have a multi-use parking area. Commissioner Tugenberg suggested the Pilgrim Lutheran Church as a candidate for the park and ride facility. Transit Coordinator Gustafson said they were flexible. If an arrangement could be worked out with the Church, it would make an ideal candidate because the parking lots are normally not utilized during the week. This being the time and the place as advertised, the public hearing was opened. Craig Fukuyama, 2727 Hoover A venue, National City, representing Rancho del Rey Partnership, objected to Conditions 5 and 57 dealing with the park and ride facility. They did not object to their fair share obligation to meeting the needs of the park and ride facility, is committed to its air quality plan, and felt it was a good idea to secure with the air quality provisions moving forward through the County system that it would be a good idea. They objected to a finite location being established and further study was necessary to arrive at an area that could be more optimally located to serve a larger area. A development impact fee may be the way to equitably share and spread costs for these types of facilities. In addition, the applicant was opposed to the timing. They also objected to Condition 57, and the zero net increase. He requested a workshop allowing the CIF and developers to participate in a forum to discuss what the County is doing, and what other water solutions might be available to help the City Council arrive at a water policy. He believed any commitment that sought a zero net increase in their project in absence of that policy was inequitable. He requested that the discussion of the water conservation plan, mitigation monitoring, and air quality plan be deferred until Council policy is prepared and committed to. He asked for approval of the tentative map, recertification of the EIR, and approval of the Design Guidelines. Commissioner Fuller asked Mr. Fukuyama what his position was regarding the zero net policy. Mr. Fukuyama answered they would prefer not to have the zero net increase applied to their project, independent of a City-wide policy that would enact that. Commissioner Casillas asked what impact the rebate program might have. Would it be encouraged more in certain parts of the City. Mr. Fukuyama thought it would. He read a letter from the Construction Industry Federation as their statement of what was ongoing. 31-0l31 PC Minutes -8- May 22, 1991 No one else wishing to speak, the public hearing was closed. Commissioner Decker asked that the air quality improvement plan be revisited after an agreement had been reached between the applicant and staff. MS (Tugenberg/Carson) to continue the item until such time as the City Council defmes its policy regarding the zero water increment. Commissioner Decker asked him to clarify. Commissioner Tugenberg said it would be item 2 in its entirety. Commissioner Decker asked why the need to exclude 2a and 2d and 2e since they seem to be rather straight forward and have nothing to do with water policy or agreement to set up a ride and share facility. Discussion ensued as to whether to delay the whole project or just the air and water conservation plan. Commissioner Tugenberg felt condition 57 was inequitable. Assistant Planning Director Lee suggested modifying condition 5 as suggested by Planning Consultant May that prior to the first final map an agreement be reached with the applicant; condition 57 could be excluded. The final agreement could be brought back for ratification by the Planning Commission. Commission Carson said that if Mr. Lee's wording for condition 5 that there be an agreement reached before the final map was accepted, condition 57 would be deleted. She could go along with that. The whole thing could go ahead and be processed. Commissioner Tugenberg withdrew his motion and Commissioner Carson withdrew her second. AMENDED MOTION MS (Tugenberg/Casillas) 7-0 that the Planning Commission accept item 2(a),(b), (c), (d) with the deletion of condition 57 and the rewording of condition 5, and (e) contingent upon the Planning Commission's subsequent approval of (f) and (g). Assistant Planning Director Lee asked if there was a particular statement or direction the Planning Commission wished staff to carry forward to the City Council when the map moved forward, or if they desired to have those plans brought back before the Commission after the Council had adopted a policy. 31 - .;J..3 ~ PC Minutes -9- May 22, 1991 The Commissioners asked that the plans be brought back; Commissioner Tugenberg said he would like to see the Council make every effort possible to expand this program into a countywide or regional program; Commissioner Carson said she believed in zero net increase. Commissioner Decker said he would like some workshops opened regarding air and water. Commissioner Tugenberg was concerned that if the credit for off-site retrofit is to be only in the General Plan area, there may be a time that the City would run out of retrofit in order to accommodate the new housing. Assistant Planning Director Lee concurred that it was a real issue. Commissioner Casillas asked if it was conceivable to develop a plan that gave credit for saving water outside the City limits; could there be a program where someone outside the City could sell their credits to the City--similar to a tax credit. Mr. Lee agreed it could possibly be done, and had been done between districts. Commissioner Decker requested that the Commission revisit the Air Quality Improvement Plan as soon as there was some kind of reasonable agreement between the applicant and staff. Ed Elliott, Executive Vice President of Development Engineering for McMillin, said he was currently serving on several committees involving the issue. The Governor's plan was to study water marketing; find the sources; move them around the state through their system; and develop a credit system. He went on to explain some of the other issues. 3/- .;) .33 EXCERPT FROM MINUTES OF PARKS & RECREATION COMMISSION MEETING OF 3/21/91 b. Ranoho del Rev SPA III Jack Nakawatase of ONA, Inc. presented the Rancho del Rey SPA III Park Plan. Commissioner Willett expressed concern about the lack of parkinq on the south side of the park near the ballfields. In addition, he was concerned about the traffic flow throuqh the school/park area and lack of an emerqency access to the field area. Chair Sandoval-Fernandez feels that we should encouraqe the ball players to walk by placinq a bicycle rack near the fields rather than have the parkinq lot be a focal point of the area. Commissioner Lind feels that the lack of a road around the field area could hamper the access of emerqency vehicles durinq ballqames. Motion to accept the concept plan as presented but recommend that consideration be qiven to puttinq another road through the park. The Commissioners discussed the pros and cons of having parkinq in the field area. In addition, they questioned why the fields were not beinq liqhted. Director Valenzuela stated that the plan would come back to the Commission at the various staqes of development and the issue of liqhtinq could be addressed at some future date. MSC WILLETT/LIND 4-0 ..il -..,)3 JI . I. , EXECUTIVE SUMMARY , This document is a Supplemental Environmental Impact Report (SEIR) which addresses the proposed Rancho del Rey Sectional Planning Area (SPA) III project. This SEIR should be read in conjunction with the previously prepared Final EIR (EIR-83-2). The project applicant, Rancho del Rey Partnership, is proposing development of the third phase (SPA III) of the El Rancho del Rey Specific Plan. The first and second phase of the project, SPA I and SPA II, are currently under construction. The El Rancho del Rey Specific Plan ,area encompasses approximately 2,450 acres located east of Interstate 805, south and west of Otay Lakes Road, and north of Telegraph Canyon Road in the City of Chula Vista. SPA III consists of a detailed plan for residential development, com~unity facilities, and park and open space uses on approximately 405 acres located southeast of East H Street and north of Telegraph Canyon Road. The SPA III Plan is in conformance with the overall specific plan. Included within the provisions of the El Rancho del Rey Specific Plan is a mechanism to transfer density from one category to another as a part of the SPA Plan approval process. The density transfer will involve the transfer of 171 residential units within the SPA III project area. The approval of SPA III will include the SPA III Plan, a tentative map, a Public Facilities Financing Plan, Design Guidelines, a Development Agreement, and a Specific Plan Amendment for density transfers and park acreage additions. The elimination of the East J Street link connecting Paseo Ranchero and Buena Vista will require a Specific Plan and General Plan Amendment. PROJECT DESCRIPTION The Rancho del Rey SPA III Plan proposes the construction of 1,380 single-family dwelling units (DU) ranging in density from from 3.8 to 10.6 DUlac on eight residential parcels on approximately 206 acres. Included among the planned dwelling units are 583 DUs of specialty housing on approximately 85 acres for a small retirement community which will be composed of detached and attached housing. In addition, a junior high school site totalling 24.7 acres, a neighborhood S-l 3/-.;3$ park totalling 10.0 acres, eight open space areas totalling 147.6 acres, and major circulation routes totalling 1.3.7 acres are proposed. The environmental analysis performed for the proposed project includes the following issues: geology/soils, drainage/groundwater/water quality, land- form/aesthetics, air quality, biology, cultural resources, transportation/access, land use/general plan!zoning, community social factors, community tax structure, parks/recreation/open space and public services. The EIR includes an analysis of project conformance with the City's Threshold Policy standards for fire, police, sewer, water, parks/recreation and drainage. All of the threshold standards are met. ENVIRONMENTAL ANALYSIS Geology/Soils Development of the proposed project will involve grading of ridge-tops and filling of canyons and side slopes. Soils such as the San Diego Formation are susceptible to erosion. Although the La Nacion Fault traces cross the western portion of the site, they are not considered active. Most of the required excavations can be made by conventional heavy grading equipment. The geotechnical report identifies detailed grading and earthwork recommendations. The geotechnical consultant would monitor grading to confirm that field conditions are consistent with the conditions predicted by the preliminary investigations. Drainage/Groundwater/Water Quality The proposed project will result in additional impervious surface are,! which will increase surface water runoff rates. Development of the site will result in a change in the type and amount of contaminants contained in surface runoff. This represents a cumulative impact to local water quality. Existing drainage facilities are sufficient to handle runoff from the project and no mitigation or monitoring is necessary. Potential impacts to groundwater/water quality would be reduced to below a level of significance through adherence to the regulations of the National Pollutant Discharge Elimination System (NPDES) permit for storm water discharge. S-2 JI -.)3.1. Landform/ Aesthetics Development of SPA III would significantly alter landforms on-site and" create manufactured slopes of approximately 50 feet. These are considered significant landform and visual impacts. Grading would primarily be confined to the ridge-top areas, with the major canyon areas retained as open space. The degree of visual alteration is consistent with what was anticipated when the specific plan was approved. Grading associated with the project will be in conformance with the general grading slope bank standards set forth in the SPA III Plan. Implementation of the community design guidelines would partially reduce significant impacts. They include landscaping, fencing design, community signing, lighting, and parking design/street furniture. Air Quality The development of the proposed project would result in increased traffic on new and existing roadways as well as additional air emissions and would result in cumulative impacts to the San Diego Air Basin. The project will be in conformance with the forthcoming State Implementation Plan (SIP) which is based on Series VII population projections. Short-term emissions from construction activities would generate dust and diesel emissions resulting in short-term emissions impacts. Emissions from residential activitiy and from the Junior High school site including the use of paint, industrial strength cleaners, fumigation, barbecues and gasoline powered lawnmowers are not considered significant on a project level, but would have cumulative impacts to regional air quality. To reduce potential impacts to air quality the use of mass transit and bicycles within the project would be facilitated, and recommended actions to prevent the development of pollution "hot spots" at intersections would be implemented. Biology Implementation of Rancho del Rey SPA III as proposed would result in significant impacts to coastal sage scrub (on a local and regional basis), vernal pools, C~lifornia gnatcatchers, cactus wren, and snake cholla. Impacts to the coastal sage scrub community would also include losses of sensitive plants such as the San Diego barrel cactus and ashy-spike moss. In addition to the California gnatcatcher S-3 .31- ~3T and cactus wren, impacts to the orange-throated whip-tail,the coast cholla, and the San Diego horned lizard may result. With implementation of the proposed mitigation and monitoring measures, significant impacts to biology would not be reduced to below a level of significance. Cultural Resources Two archaeological sites located on the SPA 1II property have been identified as significant cultural resource sites and contain evidence which can address the question of the presence of early man in San Diego. The development of the proposed project would significantly impact these sites. The implementation of an extensive mitigation and monitoring program would reduce impacts to the sites to below a level of significance. The mitigation program has been completed and approved by the City. All impacts have been reduced to a level below significance. Transportation The proposed project is expected to generate 11,405 ADT. All intersections relevant to the project will operate at LOS C or better in the morning and afternoon peak hours under buildout conditions with the exception of the East H Street/Paseo del Rey intersection. This intersection will operate at a LOS D during the afternoon peak period but not for greater than two hours and thus would be within the limits of the City of Chula Vista's Threshold Policies for traffic. Potentially significant impacts would be mitigated to below a level of significance with implementation of the proposed mitigation. Land Use The Rancho del Rey SPA 1lI Plan as proposed, is in conformance with the land use policies and plans of the City of Chula Vista, the EI Rancho del Rey Specific Plan, and with existing and proposed land uses in the vicinity of the project site. Development of SPA 1II would not result in significant land use impacts and mitigation/monitoring is not necessary. S-4 $/-:>.38 Community Social Factors No potential adverse impacts regarding community social factors are associated with the development of the proposed plan. Impacts to population, housing, and employment are consistent with the EI Rancho del Rey Specific Plan. No significant impacts would be associated with the proposed project; no mitigation or monitoring measures are necessary. Community Tax Structure Implementation of the proposed Rancho del Rey SPA 1Il would result in a net fiscal benefit of approximately $64,800 annually to the City of Chula Vista; therefore no adverse impacts would result to the community tax structure. No mitigation or monitoring measures are required. Parks, Recreation and Open Space As part of the proposed project, a 10.0-acre neighborhood park would be developed on-site. A large portion of the site (36%) would be dedicated as open space. Although the park does not meet the required acreage as set forth in the City's parkland ordinance, upon meeting the conditions established by the City, the project would not significantly impact Parks, Recreation and Open Space. As a condition of approval of the tentative map, City' staff would ensure that conditions for the 10.0-acre park have been implemented. Public Services The 1989 Water Allocation Report distributed by OWO limits the number of new dwelling units that can receive water in one year. The receipt by the City of Chula Vista of a service letter from the OWO regarding the proposed project would allow the project to meet the Threshold Standards related to water, and potential impacts would be reduced to below a level of significance. Oue to the regional shortage of water, the project proponents would work with the City of Chula Vista to develop a project level water conservation program to reduce water consump- tion. The development of on-site sewage facilities consistent with the 1986 sewer study would provide adequate infrastructure to accommodate project flows. The 5-5 .f I - _ ~ 39 City of Chula Vista has a surplus of contract capacity in the METRO sewage system and no significant impacts are anticiapted. SDG&E would provide utility services to the project site and there would be no impacts associated with the provision of utilities. The proposed project would be served by the Chula Vista Police Department. Development of the project would significantly impact police protection from the development of the proposed project; however, the addition of 4.6 police personnel would reduce impacts to below a level of significance. Emergency fire and medical protection would be supplied in compliance with the Threshold Policy and no significant impacts are anticipated. Both the Sweetwater Union High School District and the Chula Vista City School District are involved in the planning and construction of new facilities which would provide adequate facilities for the additional students generated by the project. Project related impacts to schools would be mitigated through the phased implementation of additional facilities in eastern Chula Vista. The two MeIJos Roos Community Facilities Districts, (Sweetwater Union High School District Community Facilities District No. 3 and the Chula Vista City Schools Facilities District No.3) will provide tax moneys directly to the school districts for implementation of their long-range development plans. S-6 3/ - .J 410 Table 5-1 ENVIRONMENTAL CONSEQUENCES SUMMAR Y Issue Monitoring Impact Mitigation Geology/Soils Drainage/ Groundwater/ Water Quality Landform/ Aesthetics Air Quali ty Potential impact from proximity to La Nacion Fault zone. Potential impacts to groundwater/water quality from runoff. Significant alteration of on-site landforms. Significant impacts to landform and visual quality. Cumulative impacts to regional air quality Adherence to Uni- form Building Code would reduce impacts to below a level of significance. Adherence to NPDES permit regulation for stormwater discharge would reduce impacts to below a level of significance. Grading would con- form with standards established in SPA 111 Plan. Implementation of community design lines would par- tially reduce level of impacts to land- form and visual quality. Adherence to SIP regarding local participation in air emission re- duction measures, encourage use of alternate transpor- tation, and accom- modate mass transit vehicles in front of retirement community would partially re- duce cumulative impacts. S-7 3/-OJ"/ Prior to building permit issuance, geotechnical recom- mendations would be made a condition of the tentative map. Prior to issuance of the occupancy permit, the City would ensure that the project is in '. conformance with NPDES regulations. Prior to or as a con- dition of tentative map approval, grading plans would be inspec- ted by Planning and Building departments to ensure that grading standards have been adhered to. Prior to or as a con- dition of approval of the tentative map, City staff would ensure that recom- mended mitigation measures have been implemented. Table 5-1 (Continued) ENVIRONMENTAL CONSEQUENCES SUMMAR Y Issue Impact Mitigation Monitoring Biology Si-gnificant impacts Quali fied biologis t Prior to or as a con- to coastal sage to monitor en- dition of the grading scrub, California croachment of open permit, tentative and gnat catchers, cactus fill slopes. Re- final map approval, wren and snake vegetation of the City Planning De- cholla. coastal sage scrub partment would ensure nati ve species on that recommended manufactured s mitigation measures slopes. Trans- have been imple- plant program for mented. cactus. Monitoring program for Calif- ornia gnatcatchers. Acquisition of land for a preservation of gnatcatcher and vernal pool habitat. Cultural Significant Implementation of Prior to or as a con- Resources impacts to two extensive recovery dition of tentative resource si tes. program would reduce map approval, City impacts to below a staff would ensure level of sig- that recommended nificance. mitigation measures have been implemented. Transportation Potentially signi- Mitigation Annual monitoring ficant impacts of measures proposed program as directed the proposed project for buildout include by City Transpor- would be mitigated signalization, re- tation Department. to below a level of configuration to Other site specific significance with provide dual lanes, measures will be implementation of construction of new made conditions of the proposed miti- road segments, and of Tentative Map and gation. placement of stop Public Facili ties signs. Finance Plan. Land Use None None None Community None None None Social Factors S-8 31 -';;l/~ Table 5-1 (Continued) ENVIRONMENTAL CONSEQUENCES SUMMAR Y Issue Impact Mitigation Monitoring Community Tax Structure Parks! Recreation! Open Space Public Services None Potential impacts due to net deficiency of of 2.6 acres of parkland. Potential impacts to water, fire pre- vention, police and schools. None None Addition of amenities Prior to or as a con- in proposed park and dition of approval of utilization of ad- the tentative map. jacent junior high City staff would en- school site would re- sure that conditions duce impacts to parks. for the IO.O-acre park Park would also meet have been imple- conditions estab- mented. lished by the City. Would reduce impacts to below a level of significance. The receipt of a service letter from the OWD would reduce potential impacts to water to below a level of significance. The addition of another Fire Inspector would reduce impacts to fire p,revention to below a level of significance. The addition of 4.6 police personnel would reduce impacts to police to below a level of sig- nificance. S-9 Prior to building permit issuance City staff would ensure that the project proponent has received a water service availability letter, has entered an agree- ment with the City of Chula Vista to provide an additional Fire Inspector and 4.6 pollee personnel, and entered into the Mello Roos for school facilities. ~ I - ~ '13 Table S-2 SUMMARY OF ALTERNATIVES ISSUE ALTERNATIVE DESIGN 2 NO PROJECT/EXlSTING SPECIFIC PLAN ALTERNATIVE DESIGN I .Projecl Description Geo!ogy/SOils /. DrainolfiOrouncI- "'waler/Walcr Quality '" , iJ -t Landform ~ Allcl>liool " Aesthetics DeYcJopmcnt would be based upon the existing General Develop- ment Plan for Rancho del Rey SPA Ill. Jncludes a maximum potential development of 1,380 du's consisting of single (..mily- conventional (2-4 DU/ac), single family and specially housing (4-6 DUlac) and IOwnhouses (6-8 DUlac). This allernative also includes a 23.0 aae school site and a 2.0 acre p:ut. A density trnnsfer 0( 9S residential units as proposed in the SPA III plan would nol occur. East J Street would be extended 10 its (uD General Plan length wilh Ihis aIlemalive. Impocts 10 G<oIogy/SO~s would be lhe same :IS lhe proposed project. The si'" cuuld be suhject 10 rnodeI1Itc-lo-severe ground- sh:1kin1 in the Cvetll of a map carlhquake on lhe Coron.-.do Banks. Rose Canyon. or Elsinore Faull$. Polenlial impacU 10 Drainago,oUroundwaler/Wa... QuaIity would be similar' 10 the proposed project. This Waler Quality allcmative wiD create large areas of impervious ground slBface with lhe over- all errect of facilitaling water runoff durina rainy periods. An increase in urban pollutants would resulL No signifanl impacts 10 Drainago,oUroandwaler/Wa... Qua1ity would occur. Dwelling units ningc from 7so..1.380 uniu with density opportuni- lies rnnging from 3-11 du'S/:K: on approximately 160 dcvctop.,blc acres. Allowable uses within this design include single family dweUing~ventional, cottages, lownhouses. specialty housing, open space, school., and parts. Developmenl in Areas A and E would be eliminated, leaving Ihcse areas in nalW'31 open space. Easl J Street would not be CJllended 10 ils full General Plan lenglh and would be designed as :l cul-ctc.sae SUt:et. This allemalive would reduce imp:tC1s 10 biological and cultural rcsoorces,landfonn alter- ation, and part/rtaeation and open space. Potential a>nsIrainls ....cialcd with geologie and soils resoun:es would be somewhal reduced with the climinalion or grading in AJeas A and E. PoIenlially significant impac:1s from lround sh.1king would -be reduced with Area A left in open space. . POIenli:J1 surficial erosion and instabilily would not resull in An:::I A with inc:orponlion of lhis allernative. A ICO"lcchnical analysis would be _ired 10 detennine appropriate mi6gation m........ Land ~ with Ihis a1temali.. would resuII in .. increase .in waler impervious surfaces and poIenIiaI impacls "10 on-SilC waler quality and quanlily may f'CSUIL Eliminalioo of development in Area. A and E would reduce lhe amount of urban pollutanlS and impervious _ surfaces associated. Impocts to I....form IIIClllliooVaeslhe would be essen6ally the Impocts 10 Iandfomo alleration would be reduced AII....ion ..ilb a ..... u tbe.--.l projec~ wilb lhe exception or addi60nal grad- fewer number of building pads tequired overalL Elimination of ins required. (or the extension of East J SIreet wilh Ihis a1lema1ive. development in __ A and E would miuce impacls 10 visu.,. quality. ImpaelS 10 landform aesthetics are considered adverse bul substantially reduced from lhe JlfOIlOS'd project wi1h lhis aller- native. . No ProjedJNo r;>evdopmenl Allemltive was DOl summarized in Ibis lable Dwelline units ranee from 894-1380 units wilh density oppoduni- ties ranging from 3-11 du's/ac 00 IJIIlI'Olimalley 200 developoble areas. Developmenl in Area A would be diminaleel, leavinllhis .... in ..,uta! open space. Area Eo originaUy JllUIX*<I as open space in tho proposed project, would have Optimal developable uses ineludinl single f:mily dweUinl-convenlional. COllages. lownhouses and special'y. East J Stseel would ... be extended 10 ilS (ull General Plan length and wooW be desilncd as :I cuI.-de-sac sIrcet. This allemalive wooW reduce impcu to bioIo&icaI raoun:- es. lanctrorm aher.Uion, Md parb'recn:ation and open space. Pocential consIrainls associated wilh geoIoeic and soils resourc:a IS i_ir...s in the proposed project would be some..... reduced with Ihe elimination of cmdin& in Arta A. Adoption of Ihis allcmalive would reduce poICRlially siJflirrcanl imp;ICIS due 10 ground sh....dlll in An:a A. PoIential surfkial erosion and insWriJily would nor resull in Area A. Slope fail.... mayoceur in Area D if developed. A geoIec!tnical analysis woo!d be rflquUedeo determine Ippt"OpriIlc miligalion measures. f I Land development with this altemalive would result in an incrasc in the impervious smfx:es. and potential impaclS 10 on-silC walct qtJ."llily and quantity may result Elimination of developmenc in Area A would reduce Ihe ImOURI of'urban pollutants and impervi- ous surfaces mociated. Impacts to landforin alteration would be reduced wilh . fewer number of buildin& pads n:quired overall. Elimiruuion of develop- menl in Area A would Ieduce imp.:1s 10 visual quality. Impacts 10 Iand(Of1l1/aesthelies are considered adverse. bul subslanlio1lJy _ from lhe JlfOIlOS'd project wich Ibis al......ive. SolO f --"I ",,~>....,..j H'''' 'j.,. ..., Table S.2 SUMMARY OF ALTERNATIVES (Continued) - ISSUE ALTERNATIVE DESIGN 2 NO PROJECTIEXlSTINO SPECIFIC PLAN ALTERNATIVE DESIGN I . Air Qualily BiololY CullwaJ Resoun:es <u ...... , T..........1ion tJ ~ ImpadJ to air quaJ~y woold be Ihe _ as Ihe proposed project. The development of this alternative would resuh in incre..,sed lraCfic on new and aistinl roadways and additional air emissions, and would result in cumulativa impacts to regional_ quality. ImpadJ to bioIoaY woold be amiIII' to the proposed project. ImpadJ to ~ .... scrub. CaliComia paIClltchen. _us W1<IlS and snake cholla IIJ'C considered signiflCalll and unmiligable. ImpadJ to cui.... resources woold be similar to lhose 01 lhe proposed project. This allemative would have significanl impacls on two archaeological sileS. Miligation measures of a similar magnitude IS identifJCd in the proposed project would be required. . This altema1ive would result in ami.. tramc: impoclS 10 lhe proposed project. Adoption of Ihis allernative would resull in the full extensiOn of East J Sueet 10 Buena Vista Way according 10 (he General Plan No sianirlcanl impacts 10 tnJn.~"lion would re.'lult wilh adoption of this allernative..provided thai milipion measures as discussed Cor the proposed project '"" implemcn'ed. Decreased tnarrlC volumes would decrease project emissions:' Dccn:ased traffic volumes would decrease projected emissions; however, cumulative imp3ds 10 regional air qualily woukl n:sull. however. cumubtive impacts 10 recionallir qu:alily would result. This aloemati.. _lei ....h in ....... IIllOUnts 01.......... open space with the climination of development in areas A and E. Approximat~ly seven California gnalcalcher habilals would be preserved. as well JS IfC'Ier than SO" of lhc Diepn coaslal sage scrub oo-site. nis alternative is considered the biolOCic.lIly preferred allernative and would result in a significant reduction of impacts to biology, if mitigation measures similar 10 the proposed project are implemented. AcIoptioo of this aUem:uive would re:suk in rdluced impaclSlo archacologic:al sile SUi 96C:t1J61. Impacts to cullural resources arc "considered signifant wilh &his alternative. Implementation of lhe proposed miligation would reduce potential impacts to below a level of signifICanCe. Adoption of &his alternative would result in I pou:nliaUy lower number of ADTs Ihan the proposed projecl. East J Slrecl would not be developed 10 its fulllenglh per lhe Cirt:ulal.ion Elemenl 01 lhe Genernl Plan. Impacts 10 lhe regional circularioo network would be similar. Miligalion measures of a similar magnitude as idcnlified in the projJOScd project _lei be I<quiled. This aI......he _....11 i. area'" IIIIOUIIlS or...- open sp:x:e wilh the diminalion 01 cIe-Idopment in ...... A. Appro.i. maldy fi.. Cal[omia InaltalCher habi.... woolel be ......-1. .. weD as approximately 40% of the Diegan ooastaI sage scrub 00- sile. Portions of cxlUS wmt habitat and snake cholla would be preserved with &his altemalive.This altemalive is cons~ lhe biologically prefened 1I11emo11ive. Adoption orthis alternative would result in .impacts that 1ft considered signiflcanl. and partially mitipble. if mitipion rncuwes similar 10 those discussed in lhe proposed project.. implemented. AdopIion cllhis ........i.. _ ....... in simk impaclS 10 sll"irlCllll cuhural .- as lhose idenlirocd Cor lhe. proposed project; Impacts 10 cullural. resources with this ~temalive are repded as sll"iroc...lmplcmcnlation 0I1he JlfDPlS'd mitiplion identirlCd widt lhe proposed project woold reduce Impacts 10 lhe sites 10 below :II 1eYd of signifance. Adoption or IIUs _.. would ....h in . "","'Iially - number 01 ADTs ..... the proposed project. Eas11 Stn:e, would not be .....Ioped 10 tis Culllenlth per lhe Cueal";... Elemcnl of lhe General Plan. Imp;ICIS to lhe rqional circulation network' would be sUnilar. Miliplion mea5UR:1 of a similar magnilude as idenlified in the proposed projc<t _Id be I<quiled. S-1I ;1 ISSUE Land U~I PIanIZoninJ Communily Social Factors ~ - I Community Tax Slructure tJ -t. I' NO PROJECTIEXISTINO SPECIFIC PLAN L.'Uld Use is in confonn:mce with the S"p(:ciftc Plan~ No imp.lelS to boo use would result with the adoption of Ihis allem..1Iivc. Adoption of this. alternative would result in similar impacts to the proposed project. No signifICant impacCs 10 c:ommunit)' soci." (actors would result with this alternative. ImpadS 10 community tax structure would be similar 10 ahose of (he proposed project. As a result. this alternative wold h:ave :m overall positive rlSCal impact on the at)' of Chuta Vista. No 3dvene impaclllo community lax struCture would result with Ihis alternative. ,..,'. Table S-2 SUMMARY OF ALTERNATIVES (Continued) ALTERNATIVE DESIGN I Development of Ihis alternative would be consislent with surround~ in, land uses and with Use current General Plan on a plan~I01llan level. On a plan-Io-ground level. this allcm:llive, would reduce intrusion inlo steep slopes and reduce the destruction or sensitive biological n:soun:es in Areas A and E. Adoption of Ihis akemative would not be in conformance with &he adopted Rancho del Rey SpecifIC Plan. Imp3CtS 10 land use would DOl be considered si&riifi- cant wilh implementation of this design alternative. This allemative would generate fewer or an equal amount of people based on density opportunities. PqNlaaion generaled with this altc:mative would not exceed growth CJCpectation as oullined in the ERDR Spceirlc Plan Amendment; therefore. no adverse population impacts are anticipated. Implementalion of Ihis allem:uive woukl anow for Ihe devclopmenr. of up 10 1,380 units on' approxim:llely 160 acres. DeveIopmenI or lhis allemative as proposed would nol be consislent with lhe adopIed plan. No employmenl opportunilies would be generaled by lite allemative. No significan~ impacls 10 community social radars would result with this allemative. Jmplementaiion !llhis alternative would result in afewcr Of equal number of residential units being consIRlCted. It is unknown what lhe impact would be to t~ Cily of Chub Vista. "''''-'' ., .....-.......,. ~ ALlERNATIVE DESIGN 2 DevdopmellI ollila lI......i.. wouId be _ wilh surmnl- inl land .... and wilh lhe tunall GcncraIPIan on . pIan-lo-pIan JeveI, On. pian.........., Ieod. this .hemal;", wouIcl mluce intrusion inlO sleep slopes :and redoce Ihc destruction of SCftSilive biological n:sources. Adoption of this ahemelivc would not be in conformance willi the lIlIoplcd ERDR Specific Plan. Impacts 10 land use would not be considered sianirlClnl with implementation of I": desiln 01.......... This a1tc:mative would aeneratc fewer or an equal amount of peupIe basIClI on densily opportunities dcpendiftl on finlll ~iln. As . resull. population lenerated wilh this allcmative would nul CM:CCd IfOwIh cxpedalions as oullined in the ERDR SpccirK: Plan Amendment No adverse populalion impacLS an: anticiJDlcd. Wilh respc:cl1O housin.. implemenlation of Ihis allemalive would lllow lor the c1cvdopmcnl of up 10 IJ80 unill on _imaleIy 2lD acres. Ocvclopmcnl of Ihis allemative as proposed would not be consisIcnl wilh lhe lIlIopl<d plan. No employmcnl _un.a would be lener:ded by lite altemalive. No silniracanl "impaas to community social faclors would result wilh Ihis a1lCm11ivc.. ImplemenlStion ollila 01_ _IcI....I' in .1_.,. cquaI number of residenlial units beiD. conslNCled. II is unknown what lhe impact wouIcI be 10 IIle City of Quia ViSII. SoU .~\ ..- Tabl. S-2 SUMMARY OF ALTERNATIVES (Continued) ISSUE NO PR01ECTIEXISTlNG SPECIFIC PLAN ALTERNATIVE DESIGN 2 ALTERNATIVE DESIGN I Services and Uti6.ies ImpoclS 10 services and olilities would be .imilar '0 Ihose of ,he proposecI project and .. summarized as lollows: Water: If waler facltilies are conscructed in occonbnce with spccifalions included. in lite water master plan. adequate infra- structure would exist to serve the projccl. No signiracanl impacls 10 ~terllelftticipaled. Sewer. No"vase UnpKu relaled.1O ...geapacity are 3rnicipat- ed, proricIed that or..sile infrastruClure and off-sile impro\'Cmenls outlined in the 1986 sewer study a'e implemented. U,i1i.ies: SDG&E would be able 10 provide &IS ond electrici.y lor this alternative. No imp3CtS to utilities would resull' . Police: No .ianilican. impoclS 10 police _Id I...II.. provided 'ha' . threshold policy standards .. met lor ..gmenting police ...Il. w ...... r L -t 1 Fire: Eventual constrocllon of . rue aalion within lhe ERDR planning would allow for adequate service for Ihis allern:uive. School: Capacl.y 10 service an ........ in elementary Md high . school SIudenIs is noI available. The capacity 10 salisJy fUlure demands is not adequate. New schools in the planning and c:onsuuction phases _Id salisly I..... cIemands. No ad..... impoclS 10 school. are anticipated. Water. Adoption of this altcmalive would result in water dem.-md of 60-100% of that estimated for the proposed projcct No signifi- cant impactS would result 10 waler if walcr facilities arc constructed . in accordance wilh lhe spccif.cations included with lhe waler maslC:r plan. Sewer: Adoption of this allcmalivc would result in a rtduction or equal sewer demand as the proposed projc:cL h is anlicipated that on-site infraslrUClUre and designed off.site improvcmenls would provide an adequate sewer system 10 ac:commodatc Oows associaled willa this alternative. ~ AdopIim of lhis allernative would result in Wlter demand of 6O-100lJ, of lhat esIimated for the pnJpOSCCI project. No $lInin.. CIIlt impaclS would result 10 water if wier fxililies are construcIed in accord:\nce wilh lhe spec:iflCalions included wi'" lhe WIler _plan. I ;j il ., I .Sc.wa. AdopIion ci Chis IIlCmIIive would raull in . reclucliol'l 0. . equaI sewer demand as .he proposecI projocl I' is lIlIkipaled "'" c....,ite infrasuucture lAd desilned oCr-sile improvemcms would provide an adcquale sewer system 10 acc:ommodalC flows associaIed wilb this allemabve. I I ,I ~l I ',1 i i Ulililies: It is anticipated that SOO&.E would be able 10 savice lhis ~: II is "'licipaled IhaI SOGAe would be able 10 Jef'Yice II.. design and no impacts lo utililies would result. ~In and no impaclS.1O ulililies would result Police: Developmenl of this allernative would involve Ihc addition of up 10 approx.im:llcly 3.600 persons to Ihe sector. As a resulc. it is anticipaled Ihat this design allemati...e would require additional police SI.,rr al buildoul. This number would depend on the number of additional persons lenernled (rom this altemalive. Fire: Evenlual construcdon of a rue SUlIion within the ERDR planning would allow for adequate service for this allcmlltive. School: Capoci'y 10 ....ice an ........ in eIementary ond high school studcnlS is not available. 1be capacily 10 addy (ulure demands is not adequate. New schools in the planninl and conslruclioo pi-. would salisfy I..... demonds. No ad..... impoclS 10 schools are Ift'icipaled. Police: DevdopmenI of Ihis allemalive would involve the addiliol of up 10 l'Ipflf'OIimalcly 3.600 perJORS 10 lhe seclOl'. As a result. it is anlicipalcd lhallhis dcsiln allemalive would rcquin:.addilioo:ll police scaff II. buildouL This number would depend un the number . of addilionaJ persons aencra1cd from this Ikern....iw;. Fire: EYCntual consIIUdion of a rue SlDlioI wilhm lite EROR pL'W1ing would .lIow for adcquaIe savice for Ihis allcmative. School: eapachy 10 _ 1ft increase in dcmCnlary lIlId .iJll school sludenlS is ;milablc. The capacity 110 satisfy rUlute cIe:nt3'Mb is not adcquaIc. New schools in lhe plaRnin, and c;onslnlClton pIwcs would salisly I.".. demands. No adverse ;mpacu 10 schools are anlicipalcd. SoU . ::, ." \J J ..~ ~." .. -,..........---.........................,.....-...., ..... Table S-2 SUMMARY OF ALTERNATIVES (Continued) ISSUE ALn:RNAllVE DESIGN 2 NO PROJECT/EXISTJNG SPECIFIC PLAN ALn:RNAllVE DESIGN I Parks. Rccn::uion and Open Spocc ~ - , 2J ..t ~ Imp:ICIS to parks. recreation and open space would be simiL'tr 10 (hose of the proposed project. SignifICant impaas to p.vks. recre- aLion and open space would result with (he proposed two acres 0( parkbtd. SignirJCanl imp.1Cts would be mitigated 10 a level below significance with miligation proposed in conformance with the City of O1u1a Vista's porkI:md cIedicalion ordinance. Adopcion of Ihe aI.....a.. design would "",,,,,;,Uy dr.a<asc 'h. number of rcsidenlS in this area and cause a com:sponding decrease in the demand for m:rearionat facilities. The allemative design would base acr<:Ise of por\dllnd requhed on a senernled poiJullllion usinS Ihe City Tho:shoId Standards of 3 ..... of pnrIdand per 1.000 population. This al.....a.. would poIClllially resul, in less pari< space Ihan Ihe JlIllIlOS'd projecl.. . This a1......i.. would also ........ _ima"ly 2SO aclOS .of open space or approximatdy 60 percent of the sile. an increase. of approximately Joo acres over the proposed project. No significant impacts to parks. reaealion and open space would result with this alternative. ,.' ,. AdopIion of Ihe a11em:1d.. design would "",,,,,;,Uy dccn:ase .he number of residents in this area and cause a co..espo.:WSing decrease in the demand for nxreaaional facilities. The allem.'llivc dcsian would base acreage of partIand required on I generated papulal ion usins the Ci'y llneshold StllldanI of 3 aa<s of porkIand per 1.000 populalion. This aJlemauve would potentially result in less pmt space Ihan Ihe plUIlOSed projecl. 'i r , ~ "j This alternative would also preserve lppfOJ.inwcly 210 acres rI open Sp:K:e or approximalely SO percent or lhe silt. .. iACfeo'UC or Ipproximalely 60 ICreS over lhe proposed project No siCllilic:lnl impacls to parts, rem:alion InlI open space woukl result with lhi$ allernative. 1 .~ , I " i i 'i 'l " :.1 1 , 5-14 ,.~:j ..' ISSUE Project IJescriplim Geolo&y/Sou. tv '" I lJ ~ .J) Table S-3 SUMMARY OF OFF-SITE ALTERNATIVES CTTAY RANCH ALTERNATIVE SITE Under Ibis .1I.....i.. scenario. devdopmenl of dle proposed project sile would occur on this sile instead of the proposed Otay Ranch projecL No ooncq>Iual plans have been develOped lor Ibi. a1temalive sileo but it would consist of similar componenlS found in the proposed Rancho del Rey project such as 1,380 single.family dwelling units. IncludinS specially housins. . junior hip school sile,. neishbodlood part, open space ..... lIIld major c_ roo.... Be:ause of the dose proximity of the proposed alternative sile. geologic conditions &reroughly the same. Severe JIOUndshalcing may occur on-silc in the event of I major earthquake from known active faullS in the San Diego area. II is Mlicipated that strong around. shakinS could cause landslides 10 occur m dle property. plIdicularly where slopes are Sleep such as Poggi Can)'Cll. and where aUuvium is located. Many of the major sOil unilS present 00 the western portion of lhe proper1y cootain expansive clays. which could pose potential sooted1nical problems lor dle desisn lIIld construc600 of ooildinas. roodwsys. lIIld pI_colS. . In lddi6on, the Olay lIIld S.....WSIer Formations idcnlified on-site contain beds of expansive clays. such as benlonite. which would likewise present such ,..oolems. due 10 lheir moderale 10 severe expansive properties. A signirlcanl part oltlle area 00 dle western por6oo of dle Qlay IlIncho property conlains formalions with these ctunclenslics. In addition. grading during development could decrease the stability of existing slopes. An on- sile specific gCOlechnica1 investigation would, however, have 10 be conducted to delennine specifIC geologic hazards 10 lhe proposed projecl. Due 10 lhe potential for groundshaking. landslides. and ex.pansive soils on the altemalive site associaled with active (aullS in Ihe San Diego area. potentially signifacanl impaclS lO geology could resulL CTTAY MESA ALTERNATIVE SITE Under Ibis a11emll6ve scenario. dcvdopmenl of lhe proposed project sile would OCt_ on this site instead of Ihe proposed Olay Mesa projecL No conceplual plans have been developed lor Ihis .llemll- live sile, but il would consist of similar componenlS found in the JllOIlO""! Rancho del Rey project such IS I J80 sinSIc-I...Uy dwelling units. including specially housing, ajunior high school sire. . neishborhood part. open space .....lIIld major cin:u1a6oo roo.... BISCd on surroundinS proposed projeclS' sooteclutiClI inves6p1ions. it is anticipaled that potenlial geologic hazards such IS ancient landslides (associaled willi benlonitic clay layers) and faullS cold u.isl on the projccl sile. Potenlial landslide localities lSSOCialed with the Olay formation are also anticipaled 10 u.ist on-site, 15 well as exJXlnsive soils associated with bentonitic clays. This site would be influenced by several fault sysIems in the region including Ihe Rose Canym Faull Zone. dle Coroondo Banks Faull Zone. lIIld the San Miguel Faull Zone. A northeast-SOUIhwesl trendinS fault probably Ida"" '0 ,he 1.1 NlCion is 1000'ed 10 the eIS.lIIld should be considered poIentia11y active. Alluvial malerials located. in ravines and canyons may be subject 10 Iandsliding in associaliod with potential earthquakes. Potential impaclS 10 JCOIogy are considered signiflC8nL AJ a result. a site-specifIC geotechnical investigation should be conducted 10 delennine geotechnical constraints and provide miligation recommendations as necessary. w ,. 1 .~ l I '1 j I I I EASJ1.AKE VISTAS AND WOODS Under Ihis a1_ivc JCcnario. deodopmcnl of the proposed projecl site would occur 00 Ibis sile insJead of \he proposed Ess1Iate Villas snd Woods projecL No conceplUlI plans have been developed lor Ibis a1lemalive .~.. buJ il _Id cmsiSl of simillr oompmenlS lound in \he Il"'P"*d Rlncho del Rey project such IS 1,3lIO sinslc-l...Uy dwdtins ...ig. incIudinS specillly housina. . junior hip school .ile, . neiShbodlood part. open spoce ..... and IOIjar cin:ulalioo routes. The _ cttnowft flUlt ...... 00 1he .k, snd ,lie low seismic history of \he Chula Villa .... indicale IIun flUlt displscement ....Id not pose . Ib.... to fu.... de..IopmenL There is I possibililY that fulure ~ 8Ctivily in the San Dieso rqion could produce modenole 10......,__S 00 dle project sile. This is . _ eWlinS ,lwouShoul Southern Calilornia. In addi6on, .......lUCicnt landstides and possible landslide I..'.... have been identified m the si.e by Leishlm snd Associ.... (1919). Thm: is the potential lor dle occ........ of liquef...,1e soils in localized ..... 01 alluvial deposilS on-site in combination wilh perched poundwalU dlling the Jliny DSOO. PoIentu.lly signifanl ceotolY impsclS could .....11 wilb constnJCIion of the proposod project mo this sile. A sile specirtc p:oIeChnicaJ study would be conducted to determine these impacts if this a1lemalive is lIdopled. 5011 ISSUE BioIotly Cullln) Resources Tl1nsportalion "" "- I & ~ Land US</Ocneral Plan/loning OTAV RANCH ALreRNATIVE SITE Based on the biological resources mapped in the preliminary OIay Ranch program EIR, development of Ihe proposed project on Ihis sice would result in impacls 10 agricultural land. maritime succulent scrub, Diegan coastal sage SCf1Ib. and native grassland (RECON, 1989). No scnsilivc plants were mapped within lhe boundaries of this alternative sile. Ir this alternative site were selected. a thorough biological survey would be necessary 10 determine potential impacts. Based on preliminary biological n:source information it is anlicipaled that adoption of this alternative would result in fewer biological resource impacts. There are no known cultural resources on this site: therebe, no impacts lo cultural resources would occur (Reid. pers. comm.. 1990). Impacts 10 cullural resoun:es ror lhe proposed projecl were reduced 10 below a level or sisnirlcance. Development of this area would create traCrac volumes grealer than .hose planned for Ihe Qtay Ranch project and lhose planned by Ihe General Plan. As a resull, an on.sile specifIC traffIC study would have 10 be conducted 10 detennine poIential signiflCanCC of the impacts and required mitigation. The East Chuta Vista Transportation Phasing Plan would be used u Ihe basis for determining ttafflc impacts. II is anticipated Ihat lhese impacls could be mitigaled lo below a level or significance. This allemalive sile is located within proposed developmena areas of the Easlem Terrilories of OIula Vista. Developmenl of Ihis allerna- live sile wilh lhe proposed project woukl be partially in conformance wilh the proposed low-medium density (3-6 du/ac) and open space residential land uses; however. it would be considered a more inlensive use Ihan bolh Ihe proposed Olay Rancho projecl and @eneral plan deSi@n.'llion. Devclopmenl or lhe proposed project on this sile Table S.] SUMMARY OF OFF-Sire ALTERNATIVES (Con.inucd) OTAY MESA ALreRNATlVE SITE The olHitc biological resources are not known at this time; however. based on existing topography and the presence of inlennit. tenl Slreams on the allcrnalive site. il is anlicipated IhaI Diegan coastal sage scrub and low quality riparian vegetation may exist on. site. Slopes wilh I northern exposure may support chaparral. U this a1lernative sile were selected. a thorough biological suney would be necessary 10 dclermine poIential impacls. The site may be subject 10 applicable portions of the City of San Diego's Resource ProIec1ion Ordinance penaining 10 biological issues. The on-site cullUr3l resources are nol: known II this time. U this alternalive wen: selected. a thorough archaeological invesrigation would be necessary 10 locale sites and detennine poIential impaces. Developmen' of Ibis aUcmative silO wilh the proposed project would create comparable lramc volumes as (he proposed General Plan uses. A sirc specifIC traffIC study would be conducted 10 determine poICRlially signiflCal1t lrafflc impacls if this alternative sile is selected. Developmenl 01' thas alternative sile would be in substantial confonnance wilh the General Plan's proposed residential, park and school uses; however. il is anticipaled lhal placemenl 01 residenlial uses on the aIlemalive site would require processing of I SpecifIC Plan Amendment Allhough the surrounding area is for lhe tnOSl pari prescnlly undeveloped. this area is planned for rUlure develop- ment. A portion or the sile depending on sile design may be subjccl EAS11.AKE VISTAS AND WOODS The allernative sile is primarily composed of I,ricullur:ll uses (ERCE). Impacts 10 biollllY _Id ... he ..liei"",cd to he signifICant. Cullural re!IOUI'teS were discovered on-sile durin, Ihe envi. ronmental review conducled ror the EaslIake Vistas and Wood project. AJ I resull. potentially lianie-cant impactS 10 cullural .-.- coold ....11 w~h placemenl of lhe proposed project on Ihis siIe. If !his a1tem11live is seIecIecI. I lhorougb .. chacololical invesliption 10 locale sites Ind determine poIen.ial impocu _Id be n<<essary. 1 I' I~ :11 :1 I , II is estimaled IhaI cJemopment of residenIiaI .... as proposed would raull in higher Ieneral.ioo raIcs of tralftc 10 IIlaI of the Easdake VislaS and Woods racilily. The Eas\ OIula Visll Transpof18lioo Phasinl Plan (ECVTPP) _Id be used as lhe basis for delermining lIaale impacls. II is anlicipaled ahalthe ...mc volumes lenctllIcd wilh Rancho del Rey SPA 111 on Ihis site would crt3Ie signmcMltraffic impaCls that would require circulation i~ls as mili,llion measuru. ~ This rcsidettlial projccl as proposed _Id ... be in rou conformance wilh land uses prescribed by lhe: Eaulake Planned Community ror lhe Easllake VislU and Woods. As I resull. . General Plan Amcndmcnl would have 10 be submilled and liven discrCItonary npproval before imp&cmenlalion. Pre. scribed rcsidenltal. !IChooI and part UliCS i5 considcn:d more land usc ialcnsivc III.m thc Ea.~lakc Vi.'ltlS and Woods pn>>p- 1: S-l' r , '.. ,,10, .. ......, ~.... '. ..'.........,..... ......_.'~-."._-.,."...,......... . ......."..........- Table S-3 SUMMARY OF OFF-Snc ALTERNATIVES (Continued) - ISSUE EASTLAKE VISTAS AND WOODS II ~ !~ I 1 1 1 I 1 i l OTAY RANCH ALTERNATIVE snc OTAY MESA ALTERNATIVE snc Drainage/Ground- waf.er{Water Quality Landform Aller- llion/Aesthetics (.u Air Qualily " , ~ ...... As in the proposed project, devclopment of Ihe alternative site would involve covering of surface soils during grading for building pads and roads and would creale large areas of impcrvioos ground surface wilh the 0VCJ311 dfect of facilitating water runoff during rainy periods. Development of lhe site willi urban uses would resuU in a change in the type and amount of contaminants contained in surface runorr. but would not result in greater impacts to waler qualily Ihan the proposed projecl Development of the sile would not significandy impact dminage or groundwater/Wiler quality. Development of lhe proposed project at Ihis alternative sile would result in alleralion of the existing landform for the constnJClion of roads and housing pads. II is anticipated that changes 10 landform would not be as great as landform alteration on die proposed Rancho del Rey site because (he existing topography on the OIay Ranch altemalive is relatively level. TItc impacls would probably be below a level of significance. Adoption of Ihis allemative would allow developmenl of residences lhal would generate aUlomobile Irips and resull in increased vehicular emissions (loog-Ierm air quality impacls). Short-Ierm emissions from conslruclion activilies would lenerale dusl and diesel emissions resulling in short..enn emissions impacts. Stenuse lhe density prescribed by lhe developmenl of lhe R.1flCho del Rey projccl is higher lhan thai projcclcd in the General Plan for Ihe 0I3Y Ranch projecl in Ihis 500-acre ponion, it is expected lhalthis allcnmlive sile would be expecled to gcnerate more vehicle emissions. TItis would result in significanl cumulnlivc air imp..1Cls to lhe San Diego Air Basin. The sile conWns unnamed inlermiltenl slreams which drain south 10 north in lite northern half of lhe allernative sile. Buildout of too proposed residential projecl onlo this sile would resull in increased impervious surfaces which would drain into lhe local drainage syslem. In .rdilion, additional urban pollulanls associated with traffic and project buildoul would conlribule 10 runoff. A hydrologi- cal analysis would need 10 be eooducled pior 10 developmenl to determine silnificance of poIenlial impaclS and needed infraslrUc- lure. Developmenl of the proposed projecl allhis IllCmIlive sile would resull in alleralion of lhe exisling landform for Ihe construc:lioo of roads and housing pads. The alternative site is fairly hilly. bul wilh nal portions which should be considered for the majorily of proposed development Incorpontling sensitive design fealures would probably result in impacts 10 landform lhal are below a level of signirlCallCe. Because the surrounding land is primarily vacant. Ihc ehange in visual qualily would be dnmllic and is considered poIenlwly signirlC8l1t Adoption of this allCmalive would allow developmenl or residences, schools, and parks and would gener.lIe aulomobile lrips lhal would. in lurn, gencrale emissions. Proposed land uses of lhe proposed projecl onlo Ihis site are companble and, as a resull, il is anlicipaled Ihal the proposed projecl would DOl generate sianirlcaI1lly grealer vehicular emissioos Ihan lhe General Plan proposed land uses. Deveklpmcnl of lhe proposed projecl on Ihis sile would rosull in adverse cumulalive air qua lily impacts 10 the San Diego Air Basin. The sile COIIlains the south-Oowing Salt Cn:et which drains a major portion of the site. Buildoul of (he site would resuk in increascll impervious surface which would increase url8n runoff inlo lhe creek; 1$ . resull. addilional urban pollulants could eventually enler lhe lower Olay Reservoir and me San Diego Bay with litis runoff. II may be feasible 10 Iller lhe drainage pallem 10 divert the runoff away from OIay Lales into defenlion racililies, thereby minimizing impaccs 10 the resenoir. Developmen' of II1e pnlf'CJS<llI project II lIti, .......dve site would resull in aItemlion of the exiscina landform for the oonstruction of roads and housina pads. Topognphy of litis allemalivc area is fairly hilly and may resuh in sisnirllClRl impacts to landform if sensitive desiln of cluslerinl is not implemented. LocaJ scclions ofTelearaph Canyon Road, OIay Lakes Road and East H S_ (ProcIor VlUey Road) have been designaled Scenic Roadways and visual impacts mly result if proposed residenlial uses are noI sensilively hx:aled. II is expected that increased landform allenltion would result in this alternative area because of lhe more inaensive residential land uses than lhose pnlf'CJS<llI in .his ..... Adoption or litis altemacive would lllow deveIopmenI or residences and schools, resullina in I IreIICt number of residential unils 10 be developed. A areater level of vehicular emissions would result. Construction on lhis allemalive site would resull in cumulalive si,nilicanl impacts 10 air"qualily. 1 I 5-.1 ISSUE OTAY RANCH AL11!RNAl1VE Sill! Table S-3 SUMMARY OF OFF-SITE AL11!RNAl1VES (Con.inucd) OTAY MESA AL11!RNAl1VE SITE i I.' EASTLAKE VISTAS AND WOODS .' Land UseJOeneral PIan/Zooing (conl) Community Social F1cton Parts, R<CJUIion and Open Space Service IlId Utilities ~ ....... I t.. <,. f'J would require I General Plan Amendment and cluslering of develop.. ment in accordance with proposed General Plan open space areas. Incorpooltion allhis cluslering would avoid potentially signifICant impaclS 10 land use. Adoption of this ahemative would result in the genemion or a pealer nwnber cl people than tl1aI proposed for Ihis ponion of Olay Ranch. However. the greater population. housing. and employment require- ments induced would not be signiflC8Dlly grealer and as I resull. would not resull in adwne impacts to commooily social factors. Adoption of Ihit 1I.....u.. ....Id requi.. !he _tion of a 12.3- acre part. on-site. Under the City of Chula Vista parkland dedication ordilllllCe, .hr<e acr<s of parkland per 1.000 people is r<quin:<!. Open space acreages would need 10 be designated I. the project design stage.. It is anlicipaled that no impacts to Parts.. Recreation and Open Space would occur provided (hat surficienl parkland is dedicaled. This alternative assumes the retention of Poggi Canyon IS a natural. open space 00lrid0r. The lltematiw: silo is IocaIed in a su_iaUy deodoped .... and would have access 10 all infrastruCture requirements. The addiLional population genented by the project ....Id place a gI<IIer demand on all utilities and services than wilh land uses proposed roc Olay Ranch; however. the increase would not be substantially grealer 10 create signirlcant impacts. An increase in JX>lice staff would be required as well as tal mooies provided 10 Ihc school districts for implementation of this Ions-range development plan to avoid potenlial impacls 10 police and schools. 10 potentially signifICant noise impaclS from Brown Field lo residential and park uses (i.e.. noise wings above 6OdB). No oIher land use impacls are expected. It it anlic:ipllled tl1aI populadon, housing. and employmen' r<qninl. menU JenClIIcd from Ihc proposed project onto Ibis sire would resuU in similar volumes. AJ a result. no impacts 10 mmmunity social fJDn would resolL Adoption cllhit lI......i-Ie ....Id r<quino !he -.ction cl a 123-",", pari: on.si.e. Undc<!he City of Omla Vi". parkland dedicalion ordinance three acres of partlMd per .1.(1)) people is required. II is anticipated that no impacts to Parks, Recrealion and Open Space would occur prorided tl1aI sufficient parI:Iand dedication is provided. The lllOmaIi-Ie siIe is Iocatcd in a subslanlillly developed .... and would hale ICCe5S to all infrastructure requirements. The additional population gmerat<d by the project would place a aimilar demand on all ulilities and services as land uses proposed by the General Plan for Ihis area. An increase in police S1aff would be requirtd as well as laX monics provided 10 the school distticls for implemcnla. lion of this 1onl-l'll11C development plan 10 avoid potenlial impacts 10 police and schools. osaI, but ... dramalically ... As a .....~ no signirlcant impacb to land use would ....11. Wilh i_'ion of 0- uses CIl 'lhis sI... im..... In populalion, housing and employment ..........- -.Jd be greater .han Ibose of EaslIake VisIas and Woods bu. would ... result in signifanl implCtS 10 community social r.:lOI1. i I ';1 ;) AdopIion of Ihis a1ternatiYe would noquile!he __ cl . a 12.3-ac1e park CIl-Site. Under the Cily cl Olula Vista parkland dedication ....inanee Ilu<e acr<s cl parkland per 1,000 people is n:quin:d. h it anlieipalCd tl1aI no impaclJ '0 Parts, Rec....iun and Open SJIICC would occur proYided lhaI sufficien' paRland dedication is provided. \ ,i .~ il , ., , II it anticipokd lhaI consInlCIion cl.he raidenliaI uses ... !he altcmalllvc site would resuh in increased demands for water, sewer, fire, school JnCI pJlice services. It is anlicipaced that no sipirlCMl impaclS 10 water woold resuh it cmstruction of poposed ClCililies coincides with lhe ..licipaled IfOWl.h. II is an.icipaled lhaI!he proposed projec' would .....'In signir_. sewage il1lJ*lS due to lack or uistinl capacity. Consuuction or additional sewlae flCilities and provision of. U'eltmenI c."pacity would miliplc projcc:t.spccirlC impaclS 10 below . level of signirocanc:e. At buildoul 01 !he project site.oddi,;..... police <tall may be requil<d to serve !he population g- by the proposed projecl Cumula.ive impaclS 10 schools may ....U ond can be mi.igal<d by provision and/Ot fundin, cl approfII'iac Cacililics. ! I'll , 1 I :1 ,I 5-1. I, I " .......... ,..".#. ",...,. ..-... '...'........... AMENDED RANCHO DEL REY SECTIONAL PLANNING AREA (SPA) m PLAN (EIR-89-10) CANDIDATE CEQA FINDINGS IN ACCORDANCE WITH SECTION 21081 OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND SECTION 15091 OF TITLE 14 OF THE CALIFORNIA ADMINISTRATIVE CODE .31 - dS.3 . 1. BACKGROUND It is the policy of the State of California and the City of Chula Vista that the City shall not . approve a project if it would result in a significant environmental impact if it is feasible to avoid or substantially lessen the effect. Only when there are specific economic, social, or technical reasons, which make it infeasible to mitigate an impact, can a project with significant impacts be approved. Therefore, when an EIR identifying one or more potentially signjficant environmental impacts has been completed, one of the following findings must be made: 1. Changes or alternatives which avoid or substantially lessen the significant environmental effects as identified in the fmal EIR have been required in or incorporated into the project, or 2. Such changes or alternatives are within the responsibility and jurisdiction of another public agency and not the agency making the fmding. Such changes have been adopted by such other agency or can and should be adopted by such other agency, or 3. Specific economic, social, or other considerations make infeasible the mitigation measures or project alternatives identified in the final EIR. The following findings are made relative to the conclusions of the fmal Environmental Impact Report (EIR) for the proposed Rancho Del Rey Sectional Planning Area (SPA) ill Plan (EIR-89- 10) based on the EIR text, and all documents. maps, and illustrations included in the public record. -1- .]'-015~ 2. PROJECT DESCRIPTION The proposed project involves a SPA Plan and tentativ~ map for approximately 405 acres. The plan for the SPA m area is consistent with the Specific Plan although minor land use changes have been made during the detailed planning process. The Rancho del Rey Spa ill Plan proposes the construction of 1,380 single-family dwelling units (DU) from 3.8 to 10.6 DU/acre on eight residential parcels comprised of approximately 206 acres. Included among the planned dwelling units are 583 DUs of specialty housing on approximately 85 acres for a small retirement community which will be composed of detached and attached housing. In addition, the project proposes to provide a junior high school site totalling about 25 acres, a neighborhood park estimated at 10 acres, a community facility consisting of approximately two acres, eight open space areas totalling about 148 acres, and major circulation routes totalling about 14 acres. Included with the provision of the EI Rancho del Rey Specific Plan is a mechanism to transfer density from one category to another as a part of the SPA Plan approval process. The density transfer will involve the transfer of 171 residential units within the SPA ill project area. The approval of SPA ill will include the SPA ill Plan, a tentative map, a Public Facilities Financing Plan, Design Guidelines, a Development Agreement, and a Specific Plan Amendment for density transfers and park acreage additions. The elimination of the East J Street link connecting Paseo Ranchero and Buena Vista will require a Specific Plan and General Plan Amendment. The proposed project would be developed in three phases. The first phase would involve development of the proposed retirement community. The second phase would involve the development of the area west of Paseo Ranchero. The third and final phase would involve the development of the area on the east of Paseo Ranchero which would include the junior high school site and the neighborhood park. -2- 31- .,55 3. INSIGNIFICANT IMPACTS The final EIR for the Rancho del Rey SPA ill Plan concluded that the project would not have significant adverse impacts in the following areas (numbers refer to the section of the EIR where the issue is discussed): 1. 2. 3. 4. 5. 6. Orainage/Groundwater/Water Quality Land Use/General Plan/Zoning Community Social Factors Community Tax Structure Parks, Recreation and Open Space Services and Utilities Sewer Utilities Police Protection Fire Protection Schools (4.2) (4.8) (4.9) (4.10) (4.11) (4.12) -3. 3/- ~s(. 4. IMPACTS FOUND TO BE MITIGABLE TO INSIGNIFICANT LEVELS 1. GEOLOGY/SOILS (4.1) Development of the proposed project would involve mass grading for installation of utility facilities and creation of streets and building pads. Detailed grading and earthwork mitigation measures for project impacts associated with geologic units: seismicity, earthwork, slope stability, foundation stability, drainage, shrinking and bulking, compaction, expansion, and erosion and seepage, would be implemented prior to and during construction. Findings A. Changes or other measures which mitigate the significant environmental effect have been included in the project or are otherwise being implemented. These measures will be incorporated as conditions of approval for final grading plans, foundation plans, and the tentative map. 1) All fill would consist of approved earth material. The geotechnical consultant would be contracted for evaluation of all fill at least two working days before importation. 2) The height, slope ratio, and compaction of all cut-and-fill slopes would conform to specifications identified by the geotechnical consultant, as appropriate. Fill slopes not conforming to the assumptions stated in the geotechnical recommen- dations would be individually studied prior completion of grading. Cut slopes would be evaluated by the geotechnical consultant during grading. Grading would be done in accordance with Chula Vista Grading Ordinance Number 1797 as amended by ordinances 1877 and 2128. 3) Stabilization fills would be used in areas deemed appropriate by the geotechnical consultant. The types and specifications of stabilization fills would be determined during excavation by the geotechnical consultant. 4) Subdrains would be installed at the base of fills placed in canyons and draws or over areas of actual or potential seepage. Specific locations would be determined by the geotechnical consultant during excavation. 5) To reduce impacts from ground shaking during a major earthquake, the project proponent would adhere to the Uniform Building Code and the Recommended Lateral Force Requirements of the Structural Engineer's Association of California. -4- .3/- ~5 r -- 6) Foundations, slabs, footings, and retaining walls would be designed in accordance with specifications identified by the geotechnical consultant, based on the type of s.oiIs encountered and pertinent structural considerations. 7) Final grading plans and foundation plans for the project site would be reviewed and approved by the geotechnical consultant and the City prior to construction. 8) Highly expansive soils used as fill or settlement sensitive improvements, loose topsoil/colluvium, landslide debris, alluvial deposits, end-dump fills and undocumented fills not removed by planned grading operations would be removed to fIrm natural ground. The exposed natural ground would be scarified and properly compacted to at least 90 percent relative compaction prior to placing additional fill and/or structures. 9) The outer portion of fill slopes would be composed of compacted granular soil fill to reduce the potential for soil erosion. 10) The site would be brought to final subgrade elevations with structural fill compacted layers. Lifts of fill would be no thicker than will allow for adequate bonding and compaction. Variable lift thicknesses would not exceed 6 to 8 inches. 11) Periodic on-site observations would be made by the soil engineer or engineering geologist during grading and/or construction to monitor for the presence of groundwater. Grading operations on the site would be scheduled to place oversize rock and expansive soils in the deeper canyon fills and to utilize granular materials having a low expansive potential to cap building pads and fill slopes. 12) A detailed grading and drainage plan would be prepared in accordance with the City of Chula Vista Municipal Code, Subdivision Manual, applicable ordinances, policies, and adopted standards. The plan would be reviewed and approved before a permit is issued by the Engineering Division prior to start of any grading work and/or installation of any drainage structure. B. All significant effects that can be feasibly avoided will be eliminated or substantially lessened by virtue of mitigation measures identified in the final EIR and incorporated into the project as set forth above. 2. AIR QUALITY (4.4) Development of the proposed project under the proposed Specific Plan would result in significant cumulative regional impacts to air quality. The proposed project is expected to generate approximately 11,405 ADT. -5- . 31-~5f Findine-s A. Changes or other measures which mitigate this significant environmental effect have been included in the project or are otherwise being implemented as follows. These measures will be incorporated as conditions of approval for the tentative map. 1) The developer shall provide a park-n-ride facility at the intersection of East H Street and Paseo Ranchero to include 50 parking spaces, 10 bicycle lockers, lighting, trash receptacles and circulation striping to the satisfaction of the City Transit Coordinator. In addition, a transit stop, to include a bench, shelter and trash receptacle, shall be provided on the north side of East H Street. A plan of said improvements shall be submitted and approved by the City Transit Coordinator and improvements shall be accomplished prior to approval of the first final map. 2) The developer shall be responsible for the construction of wider sidewalks at transit stops, subject to the approval of the City Engineer. 3) The developer shall provide a pedestrian throughway between lots 130 and 131, Phase 3, Unit 2, from Camino Calabazo to East J Street across from the school and park sites. 4) A minimum 20 foot wide access corridor shall be maintained at the end of Paseo Palazzo where the cul-de-sac abuts the existing park. Said area shall be made part of the park. Detail and design of the access shall be submitted to and approved by the Departments of Planning and Parks and Recreation prior to final map approval for Phase 3, Unit 1. 5) Prior to approval of each final map, the developer shall enter into an agreement with the City wherein he agrees to comply with that version of the Growth Management Ordinance in effect at the time a building permit is issued. Such compliance includes but is not limited to the then current East Chula Vista Transportation Phasing Plan and the adopted Air Quality Improvement Plan and Water Conservation Plan for Rancho del Rey SPA m. -6- a /- 0;5''7 B. All significant effects that can be feasibly avoided will be eliminated or substantially lessened by virtue of mitigation measures identified in the final EIR and incorporated into the project as set forth above. 3. CULTURAL RESOURCES (4.6) Development of the project under the proposed Specific Plan would require extensive grading of the project area and would impact the identified cultural resources. Findings A. The two archaeological sites SDi-9601961 and Sdi-9893, located on the SPA III property area have been identified as significant cultural resources. Site SDi-9601961 contains evidence which can address the question of the presence of early man in San Diego. Site SDi-9893 consists of surface and subsurface lithic scatter with the potential to yield important information regarding resource exploitation patterns in southern San Diego County. . B. The following mitigation program has been completed and significant effects have been mitigated. The program included: SDi-960/961 1) The examination of existing surface collections. 2) A detailed grid-controlled surface collection of any artifacts remaining on the surface site. Broken cobbles were also collected to evaluate whether or not they are of human manufacture. 3) Surface disturbance was be recorded. Mapping and photographic documentation were completed. 4) Mirna mounds were investigated to see whether the artifacts or broken bones were incorporated into the mounds, were found on the surface under the mounds, or were absent from the mounds. 5) The site was examined by a qualified geomorphologist to analyze the mima mounds, their site setting, age, and stratigraphic integrity. 6) All material collected was washed, cataloged, and analyzed. -7- J/-.:>4.0 : 7) A report was prepared detailing the investigation and was submitted to the City of Chula Vista, San Diego State University Clearinghouse, and the Museum of Man. SDi-9893 1) The site was analyzed through the excavation of 25 lxI-meter test units. These units were analyzed to determine how much of the site would be excavated. A total of 150 meters of backhoe trenches were excavated to search for potential hearth features. 2) A report was prepared detailing the investigation and was submitted to the City of Chula Vista, San Diego State University Clearinghouse, and the Museum of Man. C. The mitigation program has been completed and approved by the City. All significant effects that can feasibly be avoided have been eliminated by virtue of completion of the mitigation program as set forth above. 4. TRANSPORTATION (3.7) Development of the proposed traffic under the proposed Specific Plan would result in impacts on the roadway network in the vicinity of the project. The proposed project is expected to generate approximately 11,405 ADT. Findin gS A. Changes or other measures which mitigate this significant environmental effect have been included in the project or are otherwise being implemented as follows. These measures will be incorporated as conditions of approval for the final map of each phase of project development. 1) Signalize intersection of Telegraph Canyon Road and Paseo Ladera (Phase 1). 2) Open up the south leg at the intersection of East H Street/East Business Park Road where Phase 1 traffic is assumed to enter and exit (Phase 2). 3) Construct Paseo Ranchero between H Street and Telegraph Canyon Road (Phase 2). 4) Extend J Street to provide a through two-lane road between Paseo del Rey and Paseo Ranchero (Phase 2). -8- 31-;;),,1 5) Place stop sign controls on Paseo Ladera at East J Street, East J Street at Paseo Ranchero, and Paseo Ranchero at Telegraph Canyon Road (Phase 2). (The intersection of Telegraph Canyon Road/Paseo Ranchero operates at LOS E for left turns out of Paseo Ranchero; however, low traffic volumes on the minor street do not meet signal warrants.) 6) Signalize the intersection of Telegraph Canyon Road and Paseo Ranchero. 7) East H StreetlHidden Vista Drive There are a number of mitigation measures to bring the level of service at this intersection to an acceptable LOS C. a) Widen East H Street to four travel lanes in each direction; b) Widen East H Street to four travel lanes in each direction and signalize the Home Depot driveway; or c) Widen north approach to provide three left tuni lanes. When SR-125 is in place, it is possible that none of the above noted mitigation measures for this intersection would be necessary. Yearly monitoring at the intersection would provide guidance as to when and what type of mitigation measures are best. B. All significant effects that can be feasibly avoided will be eliminated or substantially lessened by virtue of mitigation measures identified in the [mal EIR and incorporated into the project as set forth above. 5. SERVICE AND UTILITIES - WATER (4.12) Development of the proposed project under the proposed Specific Plan would result in an increased demand for potable water. Development of the residential component of the project would result in a demand for 420,000 gallons per day and 100,000 gallons per day schooVpark/landscape areas of the development. Findings A. Changes or other measures which would mitigate the significant environmental effect have been included in the project or are otherwise being implemented. These measures will be incorporated as conditions of approval for the tentative map for the project. -9- J /-01 '-~ - 1) The applicant shall establish a water use offset program for Rancho del Rey SPA IT and ill. This program shall be designed to fully offset the projected water consumption of the project, after conservation measures are taken into account (see Table 1-1). This requirement may be met by one or both of the following means: a.) The applicant shall participate in specific water conservation projects such as C.I.M.I.S., new water wells, park and open space irrigation system retrofitting or other such projects in combination with water conservation offset fees to the satisfaction of the Director of Parks and Recreation; or b.) Participate in a water conservation program by paying a water conservation offset fee of $5.00 (to be adjusted annually) for each gallon of water used by the project. The applicant shall enter into an agreement with the City which establishes a specific program in accordance with the requirements set forth above. As an alternative to the above measures, the City Council may authorize the applicant to participate in any other Citywide or regional water conservation program adopted by the City Council with the overall level of water offsets to be left to the sole discretion of the City Council. 2) Prior to approval of the associated fmal map, the developer shall provide onsite infrastructure to accept and to use reclaimed water when it is available, along Paseo Ranchero from Telegraph Canyon Road to East H Street and along East J Street from Paseo Ranchero to the park site, per the adopted Public Facilities Financing Plan. 3) Any costs incurred from retrofitting the reclaimed water system, when reclaimed water becomes available, shall be paid by the developer. Monies for this shall be held by the City, through a deposit set up by the developer. The amount shall be determined by the developer, approved by the City and in place prior to approval of each associated final map. B. All significant effects that can be feasibly avoided will be eliminated or substantially lessened by virtue of mitigation measures identified in the final ElR and incorporated into the project as set forth above. -10- 3'- a <<.3 S. IMPACTS FOUND INFEASmLE TO MITIGATE TO AN INSIGNIFICANT LEVEL 1. LANDFORM ALTERATION/AESTHETICS (4.3) Development of the project under the proposed Specific Plan would require substantial landform alteration. The site would be modified from a vacant area of canyons and ridges to a planned residential community. While the SPA II Plan is consistent with the adopted specific plan in terms of landform and visual character, the project would result in significant landfonn/aesthetic impacts including manufactured slopes up to 50-feet Findings A. Changes or other measures which mitigate this significant environmental effect have been incorporated in the project or are otherwise being implemented, in that: I) The project would adhere to the community design guidelines of the ERDR Specific Plan. These guidelines include: buildings of a low-profile with a variety of sizes, shapes, colors, and materials. 2) The final grading plan would be in conformance with general grading standards and slope bank standards set forth by the City's Engineering Department and the SPA ill Plan. 3) An overall landscape plan providing a comprehensive framework for individual landscape plans would be prepared. Planting would conform to the applicable City of Chula Vista standards for landscape planting. 4) As a condition of the tentative map, the City Engineering Department would approve the grading plan to determine that it is in conformance with the ERDR and SPA ill plans and the City's design guidelines. The final grading plan would be reviewed by the City Planning Department prior to issuance of a grading permit to verify that the design standards have been incorporated into the grading plans. 5) Prior to issuance of the grading permit, a final landscape plan prepared by a licensed landscape architect would be submitted to and approved by the City Planning Department The landscape plan would show appropriate landscaping of all slope areas and public rights-of-way. Landscaping within each phase would be installed prior to occupancy of the first building with the corresponding phase and 100 percent coverage would be achieved for groundcover within nine months of planting. -11- al-;)~Co/ 6) A temporary landscape and erosion control plan which would be approved by the City Planning Department would be prepared by a licensed landscape architect prior to issuance of a rough grading permit The plan would provide for temporary landscaping on all disturbed areas not proposed to be landscaped in accordance with the approved final landscape plans. B. Potential mitigation measures or project alternatives which would eliminate or substantially lessen the environmental effects and were not incorporated into the project were found infeasible, based on economic, social, and other considerations as set forth in the final EIR and listed below. 1) Development of the project in an economically feasible manner would require significant landform alteration because of the hilly nature of the subject property. To reduce the landform and visual impacts would preclude development of the proposed project according to the goals in the EI Rancho del Rey Specific Plan and the City of Chula Vista General Plan. 2) Development of the site in a way which would substantially reduce the landform alteration/aesthetic impacts would preclude the use of the site to meet current and project needs for housing, employment, and recreational opponunities. 3) Development of the site in a way which would substantially reduce the landform alteration/aesthetic impacts would preclude the use of the site to meet current and project needs for housing for senior citizens. 4) The reduction of landform alteration and visual impacts on the project site would preclude the project applicant from achieving the goals of developing the project. C. All significant landform alteration/aesthetic environmental effects that can feasibly be avoided have been eliminated or substantially lessened by virtue of project changes and mitigation measures identified in the final EIR and incorporated in the project as set forth above. There remain some significant landform alteration/aesthetic impacts. D. The remaining unavoidable significant effects have been reduced to an acceptable level when balanced against facts set forth above and in the Statement of Overriding Considerations. 2. BIOLOGY (4.5) A prior investigation of the biological resources on the Rancho del Rey SPA m site prepared in conjunction with the EI Rancho del Rey Specific Plan EIR identified significant unmitigable impacts to biological resources related to development to the -12- 61-0)1,5 proposed project On the basis of those findings, a subsequent biological report (RECON, 1989) was prepared and reviewed for adequacy by ERCE (1989). In response to the review, RECON performed a field survey and updated the original report (February 1990). The SPA ill Plan incorporated measures designed to reduce identified impacts which include preservation of approximately 40 percent of the Diegan coastal sage scrub habitat occupied by the California gnatcatcher. Findings A. Changes or other measures which mitigate this significant environmental effect have been included in the project or are otherwise being implemented, in that: 1) Natural open space is consolidated in the Rice Canyon. 2) The SPA m Plan will preserve approximately 40 percent of the Diegan coastal sage scrub occupied by the California gnatcatcher. 3) A landscape plan to restore natural habitat in disturbed areas is being developed. 4) A revegetation plan to replant cacti in the Diegan coastal sage scrub to recreate habitat for the cactus wren. 5) Acquisition of land with Diegan coastal sage scrub occupied by California gnatcatchers. 6) Acquisition of 0.4 acres of land with vernal pools. B. Potential mitigation measures or project alternative which would eliminate or substantially lessen the environmental effects and were not incorporated into the project were found infeasible, based on economic, social, and other considerations as set forth in the final EIR and listed below. 1) Development of the proposed project in a economically feasible manner would involve some loss of biological habitat. The preservation of all, or even a substantial portion, of the biological resources on the project site would not allow development to occur according to the goals expressed in the El Rancho del Rey Specific Plan or the City of Chula Vista General Plan. 2) Development of the site in a way which should provide substantially more open space could result in inefficient infrastructural design and would not respond to the current and forecasted housing market needs. -13- 3'-d~" 3) The preservation of the biological resources on the project site would preclude the use of the site to meet current and project needs for housing, employment, and recreational opportunities. 4) The preservation of the biological resources on the project site would preclude the project applicant from achieving the goals of developing the project. 5) The preservation of the biological resources on the project site would preclude the City of Chula Vista from benefiting from the projected increase in net revenues which would accrue to the City from the development of the Rancho del Rey SPA ill project. ' C. All significant environmental effects that can feasibly be avoided have been eliminated by virtue of project changes and mitigation measures identified in the fmal EIR and incorporated into the project as set forth above. There remain some significant biological impacts. D. The remaining unavoidable significant effects have been reduced to an acceptable level when balanced against facts set forth above and in the Statement of Overriding Considerations. -14- 31-~"r ,. AMENDED MITIGATION MONITORING PROGRAM CITY OFCHULA VISTA RANCHO DEL REY SPA m PROGRAM DESCRIPTION AND GENERAL GUIDELINES This mitigation monitoring program is based on the mitigation and monitorina propam prepared for the City of Qlula Vista for the Rancho del Rey SPA m Bnvironmentallmpact ~ (EIR) and certified by the City Council in January 1991. This comprehensive monitoring program is presented in two pares, the first of which addresses mitigation measures to be monitored by the City of Chula Vista and the second of which addresses monitorina to be provided by the City's environmental consult&nL The program will serve a dual purpose of verifying implementation of the mitigation measures for the proposed project and of generating Information on the effectiveness of the mitigation measures to guide future mitigation prosrams. The program includes specific monitoring activities, a reportina system, and criteria for eValuating the success of the mitigation measures. The monitoring program for Rancho del Rey SPA m addresses impacts for the following issues: o Geology and Soils o Drainage/Oroundwater/Water Quality o Landform Alteration/Aesthetics o Air Quality o Biology o Cultural Resources o Transportation o Parks, Recreation, and Open Space o Services and Utilities A monitoring team has been assembled. Management of the team is the responsibility of the City of Chula Vista. Monitoring activities will be accomplished by City staff and by environmental consultants to the City. PROGRAM PROCEDURAL GUIDELINES Prior to any con5tr\1ction activities. meetings should take place between &l1 the parties involved to initiate the monitorlna program and to establish the responsibility and authority of the participants. 3/-;Jl,g 210'/200-' 3!')tid ILI5169 01 WOi!l.::l 017: II 16. 5 Nnr It is important that III effective reporting sySlem be Cltablished prior to any monitoring efforts, It is necasary that all the parties involved have a clear understanding of the mitigation monitoring measures as adopted and that these mitigation measures be dislributed to the participants of the monitoring effon. Those whO would. have a complete list of III the mitigation measures Idopted by the City would include appropriate City ,taff, the City', environmentAl coDlUltant. the project applicant. the applicant', consultants. and the consttuction crew aupc:rvisor, The City will diltribute to each monitor a specific list of mitigation measures that pertain to their 11lC)ft1toring tasks and the appropriate time frame that these mitigation measures are anticipated to be implemented. The following text includes a lummary of the project Impacts, The next section of the text foc\llel on the monitoring responsibilities of the City of O1ula Vista staff. followed by a section describina the propm for which the City's environmental consultant is responsible, The mitigation and monitoring program included in the EnvironmentAl Impact Report is included as Attachment A of this document. MOMrrO~GBYCITYSTAW Please note that the following section derives from the EnvironmentAl Impact Report prepared for the Rancho del Rey SPA m project. GEOLOGY AND SOILS Mitigation Measures 1. All fill would consist of approved earth material. The geotechnical consultant would be contacted for evaluation of imported fill at least two worldng days prior to importation. 2. The height, slope ratio. and compaction of all cut-and.fill slopes would conform to specif'lCations identified by the geotechnical consultant. as appropriate, rill slopes not conforming to the assumptions stated in the geotechnical recommendations would be individually studied prior to completion of grading, Cut slopes would be evaluated by the geotechnical consultant during grading. Grading would be done In accordance with Chula Vista Grading Ordinance number 1797 IS amended by ordinances 1877 and 2128. 3. Stllhili 7tlrion fills should be utilized in areas deemed appropriate by the geotechnical consultant. The types and specifications of stabilization fills would be determined during excavation by the geotechnical consultant. 2 21 <l/C<l<l'39t:1d 1,(15169 01 3/- :11p9 WO~.:l lv:l1 16,5 Nnr 4. Subdrains would be installed at the base of fills placed in canyons and chaws or over IlClIS of actual or potenua! seepage. Specific locations would be determined in the field durinl Jl'ldi1lJ. with installltion bcinl reviewed by the poloJical consultant prior to pJacement of fill. 5. To reduce irnplCts from sroundshaking during a major earthquake. the project proponent would adhere to the Unifonn Buildl.n& Code and the Recommended Lateral Force Req~ts of the Structural Engineer's Association of California. 6. FOUDdatlons. slabs, footings. and retaining walls would be dcsianed in ICCOfdance with lpeCificatIons Identified by the geotechnical consultant, based on the type of lOlls encountered and pertinent strUCtural considerations. 7. Final grading plans and foundations plans for the project lite would be reviewed and approved by the ICOtechnical consultant and the City prior to constrUCtion. 8. Hilhly expansive soils used IS fill would be p1&ced a minimum of 3 feet below finish grade and IS feet inside of fill slopes. Bentonite. if used as fill, would be placed a minimum of 10 feet below fmish JI'Bde and IS feet inside of fill slopes. 9. In &reIS that receive fill or settlement sensitive improvements. loose topsoiVcolluvium. landslide debris, aIluvW deposits. end-dump fills. and undocumented fills not removed by planned grading operations would be removed to linn natural sround. The exposed JIAtUrIl ground would be scarified and properly compacted to It kISt 90 percent relative compaction prior to placing additional fill and/or strUCtUreS. 10. The outer portion of fill slopes would be composed of compacted granular lOil fill to reduce the potential surfiCial erosion. 11. The site would be brought to final subgradc elevations with structUr8l fill compacted in layers. Ufts of fill would be no thicker than will allow for adequate bonding and compaction. Variable lift thicknesses would not exceed 6 to 8 inches. 12. Periodic on-site observations would be made by the soil eniiDccr or enJineering geologist during grading and/or construction to monitor for the presence of Il'oundwater. Grading operarions on the site would be scheduled to place oversize rock and expansive soils in the do:eper canyon fills and to utilize: granular m&teri&ls hiving I low explll5ion potential to cap building pads and fill slopes. MonItoring Agenc)' The City of Olula Viats Engineering Department would be leSpOnsibk for verifying irnplcmenta- Ion of the mitigation measures associated with the potential geology and soils impacts. 3 210/1'00'38I:1d 11.15169 0.1. 31 - ~ 'TtJ WO~:1 21': 11 16. 5 Nnr DRAlNAGElGROUNDWATER/WATER QUALITY Mitlption MllIIlIUl'CS 1. Adherence to regulations resardin, stonnwatcr disc:harie set forth in the National Pollutant Discharge Blimination System (NPDES). MoaltorlDl Apncy The City of Quia Vista Engineering Department would be responsible for verlfyinJ implementa- tion of the mitilat10n measures associated with the potential groundwater/wate:l' quality impacts. LANDFORM ALTERATION/AESTHETICS Mitigation Measures 1. Implementation of the community design guIdelines detailed in the SPA m plan. 2. Preparation of an overall landscape scheme (refer to p. 4-18 of the EIR) providing a comprehensive framework for individual landscape plans. Planting would confonn to the applicable City of Chula Vista standards for landscape planting. If a l'Ou,h aradin, permit is requested, an erosion control plan would also be DeCC&SlII)' (scc p. 4-19 of the BlR). The plan would provide for installation of temporary landscaping on all disturbed areas not proposed to be landscaped in accordance with approved final landscape plans. This plan must be prepared by a licensed landscape architect. Monltorln& A&ency The City of OIula Vista Planning Department and Engineering Depanment would be responsible for verifying the Implementation of the mitigation measures associated with the landfonn alteration/aesthetic impacts. AIR QUALITY Mitigation Measures 1. Adherence to recommendations made by the 1982 SIP and the forthcoming San Diego Air Quality Plan regarding local participation in air emission miuction measures. 2. The project proponent would facilitate the use of alternative transportation modes by promoting public transit usage and carpooling by project residents through provision of 4 210/S00'3Eltld lLIS169 01 3/- ~rl WO~.::l 21': II 16, 5 Nnr park-aDd-ride lots and bicycle facUities. including bicycle lanes and IeCU!'e storage facilities at all publlc facilities within the project IJ'eL 3. The project proponent would provide mass uanslt lCCommodations for convenience of CIIa&omm (bus shelters) llJld vehicles (bus turnouts) ineluding a transit stop in front of the redrement eonununity on East H Street. 4. To avoid C!Qtion of air pollution Mhot spotsM at intersections, mitigation measures reeommended in the Transportation Section would be implemented to zeduce potentially al",lflt''lnt impacts to air quality. MonItoriDa Apney The City of ChuIa Vista Planning llJld Engineering departments would be raponsible for verifying the implementation of the mitigation measures associated with the air quality impacts. CULTURAL RESOURCES MitiptioD Measures . Mitiption measures for cultural resources have been completed; no additional mitigation or monitoring is necessary. TRANSPORTATION MittptiOD Measures 1. Bxisting + Cumulative Mitigation Measures L Prior to occupancy of any units of SPA m. subject to meeting traffic warrants, signalize Telegraph Canyon Road and Pasco LaderL 2. Existing + Cumulative + Phase 1 of SPA m Mitigation Measures L Open up the south leg of the East H Stree!/East Business Park Road intersection where Phase 1 traffic is assumed to enter and exit 3. Existing + Cumulative + Phase 1 + Phase 2 of SPA m Mitigation Measures L Construct Pasco Ranchero between H Street and Telegraph Canyon Road. , 3'- d T~ WO~,j CI>: II 16.5 Nnr <: I (:l/se~'~~I;I;:l 1l.15169 01 b. Extend 1 Street to provide a through two-lane road between ~ del Rey and Paseo ~hcro. c. Place stop sign controls on Paseo Ladera 11 East 1 SU'CCt. Bast 1 Street at Pueo Ranchero. and Paseo Ranchero at Tc1epaph Canyon Road. 4. Existin& + Cumulative + Phases 1.2. and 3 of SPA m Mitlption Measures L S1analize Telepaph Canyon Road and Pasco Ranchero. 5. Compliance with ECVTPP for c:um:nt and future updates to maintain ICCeJltab1c levels of service on all affected intersections and roadway scamcnts. Monltorln& Alene)' The City of CluIa Vista Planning Department and the City Traffic Engineer would be respon&lble for verifyini implementation of the mitigation measures associated with transponation impacts. PARKS. RECREATION, AND OPEN SPACE Mitiaation Measures 1. The project proponent would provide a detailed concept plan for the park acceptable to City staff and the Parks and Recreation Commission. 2. Slopes within the park would be 4; 1 or less. If slopes are pater than this ratio. the project proponent would be required to provide additional parkland. 3. The project proponent would enter unto an agreement with the Sweetwater Union High School District and the City of Chula Vista to insure public access to the proposed junior high school's recreational amenities which would include soccer fields. basketball courts. and teDDis couns. 4. The proponent wouId provide funding for the difference in cost between facilities built to school standards and facilities built to City standards. 5. School recreational facilities available to the public would be consl1'UCtcd to City of CluIa VisU. standards and desiJlled in consultation with City staff. 6 2t0/<.00'3~tOd l<.t5:169 01 31'" ~=1-3 WO~j;:I \7\7:11 16.5: Nnr 6. To insure Idcquate interface between the adjacent townhomcs. the pllJ'k, and the school. the park would be designed so that it would not be Isolated with only backs of buildings flCinJ onto the park. 7. The park would be deslJOed to provide adequate visibility into the pllJ'k from But 1 Street. 8. Access to .the school parking lot for overflow parkina would be provided. MonltoriDI Apncy Tbc City of Qula Vista Planning Department and Parks and R~on Depanmcnt would be I'IlIlponsible for verifying implementation of the mitigation meuum associated with the park impacta. SERVICES AND maITIES MitlptioD Meuures Water. Sewer .. 1. . 2- f911ce - 1. ll!:!- 1. ~ 1. MonItoriD& Alency 1. The applicant shall meet whatever policy regarding water conservation is adopted by City Council. Development of on-site sewaae facilities consistent with the 1986 sewer study to accommodate project flows. Compliance with City Enpeerlng Standards for sewage facilities. Addition of 4.6 police personnel. Addition of one Fire Inspector. Applicant participation in the Mello Roos ColJU!lunity Facilities District is required. Specifically the project is located within two Mello Roos Districts. Sweetwater U~on High School District CPO *3 and Chula Vista City Schools CFD 4113. The City of Chula Vista Planning Department and Engineerini Department would be responsible for verifying implementation of the .mitigation measures associated withimpaets to water, sewer, police protection. fire protection, and schools. 210/S00'391:ld 7 ILI5169 01 3/- ;; '-1'/ wo~=' \:>1>: II 16, 5 Nnr MONITORING BY THE ENVIRONMENTAL CONSULTANT Monitmina will be pcrfonncd by both general environmental monitors and environmental apeclalists. The primary role of the environmental specialists servina as consultants to the City is to provide expenise wbeI1 environmentally sensitive issues occur IDd to provide direction for mitiption. In addition to the list of mitiption measures provided, each monitor will have compliance report forma with each mitiaation measure written on top of the fonn. The monitors will complete the npoIt form IDd flle It with the City followlna each monltorinl actlvit)'. The conclUlions of these forma will be compiled into an interim and final comprehensive construetion report to be submitted to the City of Clula Vista. This report will describe the major accomplishments of the monitorinl prosram. summarize problems encountered in achievina the aoats of the proaram. evaluate solutions developed to overcome problems. and provide a list of future monitorina programs. In addition. each monitor will be required to f1ll out and submit a log report. The 101 report is.used to record and account for the monitoring activitie& of the monitor. Weeklyhnonthly status reports will be generated from the daily logs and compliance reports and will include supplemental material (1.e.. photographs, memoranda, telephone logs. and letters), The Mitiption Monitorinl Coordinator (MMC) will provide monitoring services for biological resources with the exception of the impacts associated with the vernal pools which will be monitored by the Vernal Pool Mitigation Monitoring Consultant (VPMMC), BIOLOGY DlEGAN COASTAL SAGE SCRUB AND CALIFORNIA GNATCATCHERS M!!i2atlon - Monitor Jrading to reduce impacts to coastal sage scrub habitat. The app~cant shall define and the MMC shall verify the Diepn coastal sage scrub lIJCas to be retained on the final grading plans prior to any clearinl. dlstlU'binl. or grading activities onsite in areas containing coastai sage sc;rub. All those lIJCas to be retained shall be flagged by the applicant and reviewed by the MMC to prevent encroachment. A field map will clearly identify the Diegan sage scrub mitigation activity locations. MonltorinR _ The MMC will review the flagging with the constrUction supervisor. The MMC will inspect the Diegan scrub areas prior to grading to ensure the flag markers lIJC visible and that the areas have not been encroached uPon. The MMC willlnspect the area during grading once cvt:ry 1-2 weeks and after grading is completed to determine whether or not encroachment has occurred. JleDOrtln2 _ The MMC will provide the City with a report when the aradlna is completed. 8 21121/6121121'3Eltld lLl~169 01 .3 / - J =1-5 WO~.:l ~\:>:11 16. ~ Nnr . Rancho del Rey developers will identify a site with coastal saae ICl'IIb habitat offaite. and the U.S. Fish and Wildlife ServIee (USPWS) and the California Department of Fish and Game (COPo) will de1elmine whether or Dot the site is IICceptable as off site mitigation. The USFWS and the CDFO will ensure that the CIlifomia lfIatcatcher populauon dcnsilies meet the requbed density per acre or otherwise meet the criteria speclfled in Comment f90 and Responae to Comment f90 in the CertIfIed BIR.89.10 that states, the applicant Ihall "acquire and preserve an off.site area of coastal saae scrub habitat ~wledgcd by the U.S. FlIh and WildUfe Service and the City of Clula Vista to equal or to exceed the conservation aoals" of the other options stated In the EIR.. The developer would dedicate the mitiption site to the City of Clula Vista or any other appropriate entity approved by the City of Qula Vista. On an interim basis, protection of any resources may be carried out through the imposition of a conservation easement. 1dWIIllm1- . Mm1l!m:In&' The City of Qula Vista Planning Department in consultation with the U.S. Pish and Wildlife Service and the California Department of Fish and Game would approve the mitigation site. JleDOrtln2 - The MMC would verify that conditions have been met. 1dltlntlon. Areas to be preserved in native open space would be staked by a representative of the Rancho del Rey survey team and checked by the MMC. MsmlWiD1- The MMC would inspect to ensure that no grading IICtivity occurs in the specialty housing area until after the gnatcatcher mitilation site has been approved and acquired. Prior to grading, the MMC would inspect t1a&ged areas to ensure that markers are visible and that there is no siJll of encroachment. The MMC would again inspecl after the grading is completed to determine whether or not encroachment has occurred. ReDOrUnl! - The MMC will provide the City with a report indicating when the grading for the apecialty housing may begin and. again, at the conclusion of gradina IICtivities. CONSTRUCTION STAGING AND SEWER LATERAL CORRIDORS Mltlntlon. The applicant and the construction supervisor will examine the proposed construCtion staging areas to determine whether or not these areas will impact sensitive biological resources. 9 210/010'39t:1d 1<'15169 01 31-cJ=f h WO~,:j 91>: II 16, 5 Nnr Mgpltoriu. The MMC will inspect all staging areas to determine whedler or not encroachment !nil) eensitive biological resource areas has occum:d. Paiodic !nspecdons will be conducted to ensure that the stalinl cea does not expand into ICnSitive ceas. Jl,eDOrtin,. A Iwnmary of the findinp relardinl construCtion stalinl U'CU will be iDcludcd in the annual report throulhout the construction period. ldIliDlIm - The applicant will stalee proposed lOwei' corridor and the MMC will review the ltaking for the lOwer installation corridorl prior to deslan fi1\,t;'Jltlon. These conidors will be adjusted to avoid ICnsitive biological resourt:CS. Sewer laterals will alIobe positioned to minimize impacts to biolopcal resourceS. MlmI&5IdDl- The MMC will inspect the flailed corridor just prior to Jl'ldinl to determine that the corridor is poSitioned in a manner as to avoid sensitive bioloaiea1 resources. ReDOrtlnv - The MMC will provide the City with a report indicating that the lOwer laterals have been implemented according to the specifICations of the monitoring biologist Mltleation - The applicant would monitor and the MMC verify the cxistinl population of California anatcatchers on the SPA m site to detennine the effect of development on the anatcatchcr. The open space ceas of SPAs I and n would be included in the study area. Monltorine - The MMC would survey the area throughout the matina and nestinl period from early spring through late summer. The surveys will be population counts. of the California gnatcatcher and will determine approximate territorial boundaries of each pair. The surveys will be specif'1C to the California gna.u:atcher. but will be general in approach, No banding, netting, or trapping is proposed. Detailed field notes will be completed and reasonable assumptions will be made as to whether or not the same individuals are present before and after construction. No detailed Ye,etation analysis. including ttansects or quadrants, are proposed as part of this task. A pneral veaetation description will be conducted. Jl,eDOrtlfll - The MMC will provide the City of Chula Vista with reports indicaUnI the effects of development on the anatcatcher population. The report will include the number of birds and their territories. These reportS will be included in the annual report for a period of five yea:5 after completion of the project to assess the recovery of the California anatcatcher population. The infonnation ptbcred in this study will be Ihared with the resource aaeocies to help develop a reponal set of JUidc1ines for California anatcatcher mitiaation plans. 10 2t0/1t0'3!:>t:ld lL15169 OJ. 1>' - J=1:f 1oJ0~.::l 91" 11 16. 5 Nnr REVEGET ATJON Jofitill1ltion _ Thc MMC will revicw McMillin's revcJctation program. This revclctation plan will be submitted to the CI1y of Chuia Vista Planninl Department for final approval. In Iddition, the MMC will review all ereas revegewed in open space areas and arus impacted by sewer laterals with coastal saJe sc:rub species native to the site. RDR will design and incorporate a ttansplant proJl'llT1 for snake chelIa and San Diego barrel cacti which wilJ be reviewed by the MMC. The golden- apincd cercus cactus clump will remain in open space. MmI1lm:IDl- The moegetation plan will be monitored by the MMC for a period of five yem to ensure the success of the revegetation project. The MMC will conduct field visits quarterly the first year, twice the second year, and once per year for the followlnl three years. lleDOrtfnr.' The MMC will provide the City with reports documenting the a:eas which have been reveletated and monitorinl the Jl'owth of the reveletated areas. These reports will continue for a period of five years after starting the revegetation efforts. ITEMS TO BE PROVIDED BY THE APPLICANT The MMC will require copies of the following documents which wUI used in the evaluation of the bioloaica1 resources mitigation monitoring program: o RDR SPA DI master grading plan o RDR SPA m erosion and sedimentation plan o RDR SPA m water manaaement ~deline/plan o RDR SPA m landscape and irrigation plan o RDR SPA m reveletation plan o RDR SPA m plan for access to open space arus for mainteJlancc and fire protection o RDR SPA m map of open space trail system and adjacent landscaping o RDR SPA m tentative maps 11 211!1/21I!1'39l;jd 1'-11;;169 0.1. 3 I - ~ =1K WOi!l.:l '-I': 11 16. 1;; Nnr MITIGATION MONITORING PROGRAM CITY OF CHULA VISTA RANCHERO DEL REY SPA m MITIGATION Prior to issuance of a grading permit the Planning Department of the City of Chula Vista would ensure that the project proponent acquires and preserves 0.4 acres of vernal pool-associated lands. The vernal pool acquisition is not required to be in the City of Chula Vista. This mitigation area is equivalent to twice the vernal pool area (0.2 acres) lost as a result of grading on the proposed project area. The proposed vernal pool mitigation site would be acceptable to the City of Chula Vista in consultation with USFWS. The criteria for determining the acceptability of the mitigation site will be (I) the presence of vernal pool habitat, and (2) its long-term conservation potential. The acquired vernal pool mitigation area would be an area recognized by the USFWS as an area supporting pool habitat. It would be a vernal pool area that is currently in private ownership and not protected by a conservation easement. The mitigation site can have existing vernal pools occurring on it, or it may be an area that is historically known to support vernal pools and that could be restored. If an area requiring restoration is chosen as the site, a vernal pool restoration plan which is acceptable to the City of Chula Vista in consultation with the USFWS would be prepared and implemented. The site would be adjacent to or connected by an appropriate landscape corridor to a larger area or interconnected set of patches of preserved vernal pool habitat that are currently in designated open space. A spring survey would be conducted to ensure that no additional vernal pools would be affected. If additional vernal pools are identified, additional acquisition of mitigation area would be required in the ratio of 2: 1. A-I 3 I - ~ 1-7' MONITORING The City of Chula Vista Planning Department would be responsible for verifying the acquisition and preservation. REPORTING A summary report of the spring survey, final requirements for mitigation, and the acquisition site will be placed on file with the City of Chula Vista and submitted to U.S. Fish and Wildlife Service. MITIGATION No grading or activities which would adversely affect the habitat in the vernal pool area would occur prior to accomplishing the offsite acquisition. Immediately upon acquisition of a suitable vernal pool mitigation area, the acquired site would be fenced with a six-foot chain-link fence to protect the area. The applicant would be required to secure a conditioned Nationwide pennit, to be issued by the U.S. Army Corps of Engineers (Section 404 of the Clean Water Acct), that contains the conditions outlined in this section concerning vernal pools. This Corps permit would be applied for and received to grading. MONITORING The City of Chula Vista Planning Department would confirm that acquisition of the vernal pool mitigation site and USACOE pennit process had been completed. The MMC would verify the fencing. A-2 31-.Jt{O REPORTING The MMC will provide the City of Chula Vista with a report documenting the fencing. MITIGATION The project proponent would make an irrevocable offer to dedicate the offsite acquisition/mitigation site to the City of Chula Vista. County of San Diego. or other appropriate open space holder at the time of issuance of the grading permit. Interim responsibility for the preservation of the site would remain with the project applicant until an acceptable dedication of the land has occurred. MONITORING The City of Chula Vista Planning Department will confirm the dedication offer. REPORTING A copy of applicable dedication offer documentation will be placed in project file. MITIGATION Prior to or as a condition of approval of the grading permit the applicant would secure a Streambed Alteration Agreement as stated under Section 1601-1603 of the California Fish and Game Code. for proposed access road (Paseo Ranchero) that would cross a major drainage on the site. A-3 3/-;)81 MONITORING The City of Chula Vista Planning Department would review the Streambed Alteration Agreement. REPORTING A copy of the Streambed Alteration Agreement will be placed in the project file. A-4 3/- ~ 9- RANCHO DEL REY SPA III MITIGATION AND MONITORING PROGRAM Task Geologv and Soils Approve and evaluate fill mate- rial at least two days prior to fill importation. Evaluate cut and fill slopes for conformance with specifications established by geotechnial re- port Analysis and evaluation of appropriate location of stabiliza- tion fills. Install subdrains at the base of fills in canyons and draws or over areas of potential seepage. Determine locations during grading. Conduct grading in accordance with City of Chula Vista Grad- ing Regulations. Adhere to uniform building code for construction. Design foundations, slabs. foot- ings, and retaining walls in accordance with specifications identified by geotechnical re- port. Review and approve fmal grad- ing and foundation plans for the project site. Time Frame Prior to issuance of Grading Permit Tentative Map Grading Permit Grading Permit Grading Permit Grading Permit Grading Permit. and Building Permit Grading Permit and Building Permit Place bentonitic clays used as Grading Permit fill material a minimum of 10 feet below fmished grade and 15 feet ulSide fill slopes. Place expansive soils correctly. Grading Permit Move fill not removed by Grading Pern,it plaIUled grading operations to fum natural ground. Responsible for Task Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consu Itant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant A pplicant/Geotech- nieal Consultant Applicant/Geotech- nical Consultant 31-~i3 Responsible for Verification Chula Vista Depart- ment of Engineering Chula Vista Depart. roenl of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depa11- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart. ment of Engineering Chula Vista Depart- ment of Engineering Dale of Completion Mitigulion Compldc.Dall'J and Vcrili,-.d RANCHO DEL REY SPA ill MITIGATION AND MONITORING PROGRAM (Continued) Task Time Frame Geology and Soils (Continued) Insure that temporary slopes Grading Permit meet the minimum requirements of applicable Health and Safety Codes. insure that outer portion of fill Grading Permit slopes are composed of com- pacted granual soil fill. Bring site to final subgrade Grading Permit elevation<; with structural fill compacted in layers. Monitor for presence of Grading Pe.rmit groundwater. Design for the removal of allu- Grading Permit vial/colluvial deposits in the canyons adjacent to the pro- posed toes of fill slopes. Undercut portion of transition Grading Permit settlements a minimum of three feet and replace by low expan- sive granual soils. Grade site to allow soils within Grading Permit tilTee feet of finish grade to possess an expansion index of less than 50. Include the design and construc- Grading Permit lion recommendations on the fmal grading and foundation plans. Review fmal grading plans. Grading Permit :Monitor on-site grading to Grading Permit confirm soil conditions as antic- ipated. During Construction Provide testing and observation report to verify that design and construction recommendations are completed according to grading plans. Responsible for Task Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant A ppl icant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant A P pi icant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant Applicant/Geotech- nical Consultant A ppl i cant/Geotech- nical Consultant 3/- ~ tlli Responsible for Verification Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering ChuJa Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Dale of Completion Mitig,ilioll Complete.Dillcd and Verillcd RANCHO DEL REY SPA ill MITIGATION AND MONITORING PROGRAM (Continued) Task Time Frame Drainage/Groundwater! Water Ouality Insure that project is in con- Occupancy Permit formance with NPDES regula- tions regarding storm water discharge. Landform Alteration! Aesthetics Implement community design Final Map guidelines detailed in SPA ill plan. Implement grading standards Tentative Map outlined in the ERDR and SPA III plan and the City's design guidelines. Review and approve the Final Final Map Map for consistency with adopt- ed grading and design guide- lines. Review fInal grading plans to Grading Permit confirm that the design stan- dards have been included in the grading plan. Submit fmal landscape plan Grading Permit prepared by a licensed land- scape architect for approval. Air Quality Provide bicycle facilities, in. Tentative Map eluding bicycle lanes and secure storage facilities at all public facilities within the project area. Provide mass transit accom- modations including bus shelter Tentative Map and bus turnouts and a transit stop in front of the retirement conUTIunity on East H Street. Responsible for Task Applicant Applicant Applicant Applicant Applicant Applicant Applicant Applicant 3/-"JBS Responsible for Verification Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Date of Completion Miligaliull Compll..:lc.D<lll.:d anJ Vl..:rifil.'d RANCHO DEL REY SPA ill MITIGATION AND MONITORING PROGRAM (Continued) Task Air Ouality (Continued) Time Frame Implement mitigation measures Tentative Map to reduce potential for air pollu- tion "hot spots" at intersections. Adhere to recommendation Tentative Map made by the 1982 SIP regarding local participation in air emis- sion reduction measures and the ". forthcoming San Diego Air Quality Plan. Bioloev Monitor grading to reduce im- pacts to coastal sage scrub habitat. Hand clear fire buffers that encroach into open space areas. Revegetate open space areas and areas impacted by sewer laterals with coastal sage scrub species native to the site. Insure that biologist has been retained to devise revegetation program and that a five-year revegetation program has been designed that is acceptable to City staff. Position sewer laterals to cause minimum impacts to biological resources. Locate staging areas for con- struction to minimize impacls to sensitive biological resources. Slake sewer installation cor- ridors prior to design finaliza- tion. Adjust corridors ifreques- led by monitoring biologist Grading Permi t Grading Permit Prior to issuance of Building Permit Grading Permit Grading Permit Grading Permit Grading Permit Responsible for Task Applicant Chula Vista Depart- ment of Planning Applicant/Biological Consultant Applicant Appl icant/Biological Consultant Applicant A ppl icantlB io logical Consultant A ppl icantlBio logical Consultant ApplicantlB iological Consultant 31-~'i~ Responsible for Verification Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Date of Completion MiligallOJl Complclc.Dnll'd and Vcritil'd RANCHO DEL REY SPA ill MITIGATION AND MONITORING PROGRAM (Continued) Task Biologv (Continued) Design and implement moni- toring program to determine the effecl of lbe SPA ill develop- ment on the population of Cali- fornia gnatcatchers. Design and incorporate project- wide revegetation plan that includes a transplant program for cacti and a five year mau1te- Dance and monitoring plan. Acquire and preserve an area of coastal sage scrub habitat to reduce impacts to the California gnatcatcher according to condi- tions established in the SPA ill EIR. Evaluate mitigation site for use by California gnatcatcher. Approve gnatcatcher mitigation site. .. Insure that gnatcatcher mitiga- tion site is within, adjacent to or connected by an appropriate landscape canidar to a larger area or interconnected set of patches of habitat lbat are cur- rently in public ownership or designated open space or rea- sonably expected to remain in a natural stale. The habitat would be 800-1,000 acres. Prohibit grading activities which would adversely affect the habi- tat of the specialty housing area. Dedicate off-site acquisition! mitigation site to the responsible public agency. Time Frame Final Map Final Map Tentative Map Tentative Map Tentative Map Tentative Map Prior to issuance of Grading Permit Grading Penni t Responsible for Task Applicant/Biological Consultant Applicant/Biological Consultant Applicant/Biological Consultant A ppl ic an t/B io logical Consultant Chula Vista Depart- ment of PI arming, USFWS, CDFG Applicant/B iological Consultant A ppl icant/B i 0 logical Consultant Applicant ~/- ~i?- Responsible far Verification Chula Vista Depart- ment of Planning ChuIa Vista Depart- ment of Planning Chula Vista Depart- ment of Planning ChuIa Vista Depart- ment of Planning Chuta Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista DepaTl- ment of Plarming Chula Vista Depart- ment of Planning Date of Completion Miligl'llian CamplCIl.:.Dall.:d and Vcrifil:d RANCHO DEL REY SPA III MITIGATION AND MONITORING PROGRAM (Continued) Task Biolo~v (Continued) Time Frame Responsible for Task Responsible for Verification Applicant Chula Vista Depart- ment of Planning Record a conservation easement Grading Permit with an agency of appropriate jurisdiction oyer the off-site mitigation area if ownership of the mitigation site does not transfer prior to issuance of a grading permit- Implement gnatcatcher mitiga- tion program. Acquire and preserve 0.4 acres of vernal pool associated lands that is acceptable to the City of Chula Vista and the USFWS. Prepare and implement vernal pool restoration plan if miti- gation site requires restoration. Prohibit grading in RDR SPA III vernal pool area prior to accomplishing the off-site ac- quisition. Fence off vernal pool mitigation site with a six-fOOl chain-link fence inunediately upon acquisi- tion of the site. Secure a U.S. Army Corps Nationwide permit. Dedicate the off-site acqUisI- tion/mitigation vernal pool site to the appropriate public agen- cy. Conduct spring survey and implement vernal pool mitiga- tion program. Secure a Streambed Alteration Agreement as stated under Sec- tion 1602-1603 of the California Fish and Game Code, for pro- posed access road (Paseo Ran- chero). Chula Vista Depart- Applicant ment of Planning Tentative Map Chula Vista Depart - Applicant ment of Planning Grading Permit Chula Vista Depart. A ppl icant/B i 0 logical ment of Planning Grading Permit Consultant Chula Vista Depart- Applicant ment of Planning Grading Permit Chula Vista Depart- Applicant ment of Planning Grading Permit Chula Vista Depan- Applicant/Biological ment of Planning Grading Permit Consultant Chula Vista Depart- Applicant ment of Planning Grading Permit Chula Vista Depart- A ppl icant/B i 0 log ical ment of PlannIng Grading Permit Consultant Chula Vista Depart- A ppl icant/B io I 0 gica I ment of Planning Grading Permit Consultant 3/-~'iV Dale of Complelion Mjligaliull Complt::lc.Dult:J ilnd Verili~d RANCHO DEL REY SPA III MITIGATION AND MONITORING PROGRAM (Continued) Task Responsible for Task Time Frame Cultural Resources Examine existing surface collec- Tentative Map tion for Site SDi-960/ 961. Applicant/Cultural Resource Consultant Perform a detailed grid-con- Tentative Map trolled surface collection to collect any artifacts remaining on the surface site and collect broken cobbles to evaluate whether or not they are of hu- man manufacture for Site SDi- 960/961. Applicant/Cultural Resource Consultant Record surface disturbance and Tentative Map document with mapping and photographs for Site SDi- 960/961. Applicant/Cultural Resource Consultant Investigate mirna mounds of Tentative Map Site SDi-960/961 to see whether the artifacts or broken cobbles are incorporated into the mounds, are found on the sur. faces under the mounds, or are absent from the mounds. Appl icant/Cultural Resource Consultant Retain qualified geomorpholo- Tentativ~ Map gist to examine Site SDi960/ 961 to analyze the site setting, age, and stratigraphic integrity of the mima mounds. Applicant/Cultural Resource Consultant Wash, catalogue, and analyze Tentative Map collected material from Site SDi-960/961. Appl ic ant/Cultural Resource Consultant Analyze site SDi-9893 through Tentative Map the excavation of 25 1x 1 meter test units to determine how much of the site would be exca- vated, and excavate a total of 150 meters of backhoe trenches to search for potential hearth features. Applicant/Cultural Resource Consultant 31-~~" Responsible for Verification Chula Vista Depart. ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Plaruling Chula Vista Depart- ment of Planning Chula Vista Depan- ment of Planning Chula Vista Depart- ment of Planning Dale of Complelion Mitig~lIiOJl Comph.=lc.l.)al....,: and Verifi....J RANCHO DEL REY SPA ill MITIGATION AND MONITORING PROGRAM (Continued) Task Time Frame Cultural Resources (Continued) Prepare reports detailing the Tentative Map investigations of both sites and submit to the City of Cbula Vista, SDSU Clearing-house, and The Museum of Man. Transportation Signalize Telegraph Canyon Final Map, Phase I Road and Paseo Ladera. Open south leg of East H Final Map, Phase I Street!East Business Park Road intersection where Phase I traf- fic is assumed to enter and exit. Construct Paseo Ranchero be- Final Map, Phase 2 tween H Street and Telegraph Canyon Road. Extend ] Street to provide a Final Map, Phase 2 through two-lane road between Paseo del Rey and Paseo Ran- chero. Place stop sign controls on Final Map, Phase 2 Paseo Ladera at East ] Street, East J Street at Paseo Ranchero, and Paseo Ranchero at Tele- graph Canyon Road. Signalize Telegraph Canyon and Final Map, Phase 3 Paseo Ranchero. Complaince with ECVTPP for Final Map, all phases current and future updates to maintain acceptable levels of service on all affected intersec- tions and roadway segments. Responsible for Task Applicant/Cultural Resource Consultant Applicant Applicant Applicant Applicant Applicant Applicant Applicant 3/-.2'0 Responsible for Verification Chuta Vista Depart. ment of Plaruling Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista DepaTl- ment Planning Chula Vista DepaTl. ment of Planning Chula Vista Depart- ment Planning Chula Vista Depart. ment Planning/City Traffic Engineer Date of Complelion Mitigation COlllpkll',Oalnl and V~rilil.'J RANCHO DEL REY SPA III MITIGATION AND MONITORING PROGRAM (Continued) Task Responsible for Task Responsible for Verification Time Frame Parks. Recreation and Open Space Provide a detailed concept plan Tentative Map for proposed park. Applicant Chula Vista Depart- ment of Parks and Recreation and Parks and Recreation Com- mission Design 4:1 slopes or less for Tentative Map park. Applicant Chula Vista Depart- ment of Parks and Recreation Enter in an agreement with the Tentative Map Sweetwater Union High School District and the City of Chula Vista to insure public access to the recreational amenities of the proposed junior high school which would include soccer fields, basketball courts, and tennis courts. Applicant Chula Vista Depart- mem of Parks and Recreation Provide funding for the differ- Tentative Map Applicant Chula Vista Depart- coce in cost between facilities ment of Parks and built to school standards and Recreation facilities built to City standards. Design and construct recrea- Tentative Map Applicant Chula Vista Depart- lional facilities to City of Chula ment of Parks and Vista standards and in consul- Recreation tation with City staff. Design park so that it would not Tentative Map Applicant Chula Vista Depart- be isolated with only backs of ment of Parks and buildings facing onto the park. Recreation Design park to provide adequate Tentative Map Applicant Chula Vista Depart- visibility from East I Street ment of Parks and Recreation Provide access to the school Tentative Map Applicant parking lot for overflow parking Chula Vista Deparl- from park, ment of Parks and Recreation 3/- ~91 Dale of Completion Miligilliull CUll1pll..:lc.l);IIl.'~! ;lIld Vcrifil..:d RANCHO DEL REY SPA III MITIGATION AND MONITORING PROGRAM (Continued) Task Time Frame Services and Utilities Provide a water service letter Building Pennit from the Otay Water District which includes a construction schedule of reservoir, mains, and hydrants to be included on the project. Design and implement a pro- Building Permit jecl-wide water conseIVation program through the use of infrastructure that minimizes water use. Review project-related projected Building Permit sewage flows and volumes for compliance with Ciry Engin- eering Standards. Hire 4.6 additional police per- Occupancy Pennit sonne!. Hire one Fire Inspector. Building Permit Participate in Mello RODS Com- Tentative Map munity Facilities Districts estab- lished by the Chula Vista City School District and the Sweet- water Union High Responsible for Task Applicant Applicant Applicant City of Chula Vista Police Department Chula Vista Fire Pre- vention Bureau Applicant Responsible for Verification Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Engineering Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning Chula Vista Depart- ment of Planning 31- ~9~ Date of Completion Mitigation CompJ~tl.:.Uall'll and Verilil.:d " , .~ RANCHO DEL REY SPA II and SPA III AIR QUALITY IMPROVEMENT PLAN SUBMITTAL DRAFT January 28, 1991 Revision #1 (4/25/91) Prepared for: Rancho del Rey Partnership 2727 Hoover Avenue National City, CA 92050 Prepared by; CINTI & ASSOCIATES 1133 Columbia street #201 San Diego, CA 92101 (619) 239-1815 31- ~f'3 " Table of Contents Paqe I.. EXECtJTIVE SUMJ.1ARY.................................................................. 1 II.. INTRODUC'rION.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 3 A. Purpose B. Planning Context C. Goals D. Approach E. Roles and Responsibilities III. AIR QUALITY LEGISLATION AND PLANS................. 8 A. Background B. Air Quality Plan Requirements C. Transportation Control Measures D. Indirect Source Regulations E. Other Planning Programs Affecting Air Quality IV. AIR QUALITY IMPACTS............................... 15 A. Existing Climate/Air Quality Conditions B. Project Air Quality Impacts V. AIR QUALITY MITIGATION MEASURES................... 24 VI. MONITORING/CONCLUSIONS............................ 26 VII. REFERENCES............................................................................... 27 i 3/- ~,.y " X. EXECUTXVE SUMMARY The purpose of this Air Quality Improvement Plan is to respond to the Growth Management Policies of the City of Chula Vista. The most significant air quality improvement measures are those policies and regulations established at the broadest geographic level, ie. state and Federal. However, there are measures that can be applied on a City or project level which can have a positive impact. This report presents an overview of these issues, and offers the following improvement measures which are to be imple- mented at the local level. 1. Pedestrian and Bicvcle Paths: The Specific Plan, and subsequent SPA Plans, adopted by the City have emphasized the use of an extensive trail system, connecting activity centers, to enable non-vehicular travel. There has also been a suggestion that programs to encourage pedestrian and bicycle travel could be applied, such as reduced parking availability at retail centers. These concepts would require City-wide debate to fully appreciate competing goals, and are not applicable at the project level. 2. Jobs/Housinq Balance: The Specific Plan adopted by the City has included job opportunities within this community. While intensification of the Business Center could meet some local opposition, the implementation of this employment base should be encouraged to facilitate local employment opportunities. 3. Access To Reqional Svstems: The LOS requirements applied to Rancho del Rey will encourage free-flow travel, which reduces air emissions. However, there are those who argue that transit use is actually enhanced by congestion. These competing approaches to air quality improvements needs to be reviewed as City-wide policy to determine the appropriate balance. 4. Transit Access: The project circulation will improve routes for transit, especially by connecting Telegraph canyon Road to East "H" Street via Pas eo Ranchero. Transit stops can be incorporated where desired at key intersections without significant plan modification. The Specialty Housing Area, envisioned for senior housing, is especially well suited for transit stops and includes an extensive trail access system. 5. Educational Proqrams: The developer will participate in an educational program for residents of Rancho del Rey. This program could also be coordinated as part of a larger city- wide program to inform residents of the services and alterna- tive transportation options available to them. (04/25/91) 1 3/- ;;'5 .. 6. Park-and-Ride Facilities: The potential for providing a Park- and-Ride facility in proximity to the project exists. Cal trans currently has a site in Terra Nova. However, the vacant city owned parcels, at Terra Nova at East "HI! street and Paseo Ranchero at East "H" Street, are in the preferable A.M. west bound location. Such a Park-and-Ride facility could also provide a staging area for carpools, vanpools, and transit vehicles. 7. Local and Reaional Air Qualitv Reaulations: A new Air Quality Plan will supersede the 1982 SIP. This plan, which is projected for adoption prior to the implementation of SPA III development, will include increased standards and regulatory measures to mitigate this as well as other anticipated growth in the San Diego Air Basin. Rancho del Rey will be subject to compliance with these regulations and mitigation measures as they evolve. 8. Develooment Monitorina: The Design Review process provides a point for monitoring the inclusion of on-site transit stops and trail linkages. In addition, this development will be subject to the ongoing monitoring programs inherent in the City's Transportation Phasing Plan and Growth Management Program. These local mitigation measures might have a minimal impact on Air Quality in quantifiable terms, but their enhancement of future transit options and public awareness should have a greater long term public benefit. (04/25/91) 2 3/- ~'" " :I:I. :IJlTRODUCT:ION A. Purpose The purpose of this Air Quality Improvement Plan for the Rancho del Rey SPA II and SPA III projects is to respond to the Growth Management Policies of the City of Chula Vista. As described below, these policies are the culmination of a long term, comprehensive planning process. The City of Chula Vista has looked comprehensively at issues dealing with development and the additional impacts it places on public facilities and services. The approval of the Threshold Ordinance and the General Plan update were the first steps in the overall process of addressing growth related issues. The second step in this process was the development and adoption of the Growth Management Element which set the stage for the creation of the Growth Management Program. The Growth Management Program is the final component in the ci ty' s effort to create a comprehensive system to manage future growth. This program implements the Growth Management Element of the General Plan and establishes an orderly process to carry out the development policies of the City. It directs and coordinates future growth patterns and rates to guarantee the timely provision of public facilities and services. The primary area of focus of the Growth Management Program is east of 1-805 where most of the remaining vacant land is located, including the project sites. B. Planning Context The planning context for this air quality plan ranges from state-wide and regional considerations to local planning requirements. SANDAG'S draft Quality of Life Standards and Objectives, prepared by the Regional Growth Management Technical Committee, consist of eight factors including air quality and water, sewage disposal, sensitive lands protec- tion, solid waste management, toxic and hazardous waste management, transportation system management, and housing. These regional standards and objectives are based on State and Federal law and at a minimum, must be carried out on a regional level by agencies such as APCD, Regional Water Quality Control Board, County Water Authority, etc. The strategies to be included in the Regional Growth Management Strategy are of necessity long term in nature and will involve every city and special district in this county. At the local level, cities and special districts must carry out their fair-share responsibilities within a day-to-day (04/25/91) 3 3,-0l'fr decision making framework to ensure attainment of the regional standards and objectives. Many of the regional standards and objectives that will involve Chula vista and other cities are the provisions of the California Clean Air Act and the San Diego County Water Authority (SDCWA) water availability standards addressing supply, storage, conservation and reclamation. Chula vista is actively participating, through the growth management program and other efforts, in the regional endeavor to establish effective long term regional strategies to implement the air quality and water standards and objectives. The SANDAG Quality of Life Standards and Objectives regard- ing air quality, transportation system management (TSM) and transportation demand management (TDM) incorporate Federal and State Air Quality Standards. The California Air Resour- ces Board (ARB) has classified the San Diego region as having a severe air pollution problem because the region will not comply with State standards until some time after 1997. According to the San Diego Air Pollution Control District (APCD), the major sources of air pollutants in the region are motor vehicles and pollution blown in from Los Angeles. Given this situation, local air quality improvement efforts are focused on transportation issues. To address air quality problems related to transportation, level of service standards for arterials, highways and transit are being developed, as are goals for reducing solo auto trips. Actions necessary to achieve state and federal clean air standards, and TSM and TDM objectives include: · reducing solo auto trips by carpooling and using transit · promoting telecommuting and staggered work schedules · improving transit service · building additional high occupancy vehicle lanes · coordinating traffic signals and implementing other circulation system improvements · reducing trip lengths through jobs/housing balance, mixed use development and focusing development near transit stations The regional plans required by State law are now being prepared by SANDAG and the APCD. Although the areas of focus are well known, specific guidelines and standards are not currently available. Thus a direct comparison or evaluation of the measures included in this plan with the regional standards cannot be made at this time. However, because of the residential nature of these projects and the transporta- tion focus of the specific measures expected to be adopted in the regional plan, project level consistency is very likely (04/25/91) 4 3 /- ~'1g .' (i.e., specific requirements for residential projects are expected to be minimal). The following chapter will more fully detail the basis for this conclusion. At the local level, within Chula Vista, there is no local air quality plan. However, the City Council is in the process of implementing the Growth Management Program which requires Air Quality Improvement Plans for major development projects (50 residential units or commercial/industrial projects with equivalent air quality impacts). Because no local plan exists or is in preparation, project compliance will need to be measured against the requirements of the regional plan. This report for the Rancho del Rey SPA II and SPA III projects has been prepared to meet that policy requirement, in anticipation of the adoption of the proposed Growth Management Policy by the Chula vista City Council. At the present time, no guidelines for such plans have been adopted. As the initial project report, this plan is the first effort to implement the proposed policy and may serve as an example/guideline for future project reports. It also represents the first effort to implement the proposed growth management policies of the City of Chula vista. C. Goals The following are goals of the SPA II and SPA III Air Quality Improvement Plan: 1. To minimize air quality impacts during and after construction of the SPA II and SPA III projects. 2. To comply with the air quality standards and policies of the city of Chula vista and San Diego County APCD. 3. To create a framework for the design and implementation of air quality mitigation measures in these residential development projects. 4. To be economically efficient and cost effective. D. Approach ~he approach to air quality mitigation outlined in this plan 1S focused on the strategies and measures available to residential development projects. As will be described in the next chapter, few transportation/air quality improvements measures in the State and regional plans are addressed to these projects. The majority address transportation system efficiency, alternative transportation modes, heavy vehicle (04/25/91) 5 31-.J.'1~ .' restrictions, and increased vehicle occupancy. None of these are directly influenced or effected by residential develop- ment. Some measures are available however, and these are described and incorporated into the project as appropriate. These include integration of land uses, construction of facilities to support pUblic transportation, and the provision of private group transportation where feasible. Efforts to educate and increase awareness of the need to minimize air quality impacts and the opportunities to do so, will be directed toward future residents. The roles and responsibili- ties of all affected parties are described in the following section. B. Roles and Responsibilities In order for this plan to be effective, it is necessary to clearly assign appropriate roles and responsibilities to all of the participants in the development and occupancy phases of the SPA II and SPA III projects. There are three primary groups involved: developer/builders; government/service agencies; and future residents. Each has an important role to play, as described below. 1. Developer/Builders The community developer, the Rancho del Rey Partnership, is providing the basic planning, design, and management of this program. community level transportation facilities, vehicu- lar and non-vehicular, will be implemented by the master developer. Individual builders will construct homes according to the standards set by the master developer (and the City) and will be responsible for energy planning and management within their own project. Builders will also be the primary communicators with homebuyers. In this role, they will be responsible for identifying the energy conservation features incorporated in the project, and educating homebuyers regarding a continuing conservation effort. 2. Propertv Owners/Residents The long term success of the air quality mitigation effort rests with residents who choose their own modes of transporta- tion, driving habits and lifestyles. In the aggregate, choices by residents affect the air quality in the region more than any effort by the city or developer. Generally, commercial and industrial are the land uses which have significant opportunities to incorporate air quality/ transportation mitigation measures because of the concentrated (04/25/91) 6 3/-3DO number of automobile trips associated with them. The decision to utilize public transit or non-vehicular transportation will rest with future residents, influenced by the availability and convenience of such facilities. 3. Government/Service Aqencies The city of Chula Vista will review project plans and monitor this plan. Because of its development approval role, the City can effectively enforce transportation phasing and other standards for new construction. Some local public transporta- tion systems are operated under authority of the City, in cooperation with regional operators. The City can also be a source of on-going education and air quality awareness through citizen communication programs. The San Diego APCD will adopt regional air quality plans which will implement measures to meet State and Federal standards. Although these plans will focus primarily on transportation issues, land use and indirect source guidelines will also be included. State law prohibits the intrusion of the APCD on the land use decision authority of the city, so it will be up to the city to implement any such guidelines. To a certain extent, the local school districts also have a role to play based on the transportation they offer to students. Bussing of students to school facilities, instead of parent auto trips, can have beneficial effects in the same way that using public transit for employment commuting reduces total trips, improving air quality and traffic congestion. (04/25/91) 7 3/-301 XXX. AXR QUALXTY LEGXSLATXON AND PLANS A. Backqround Based on air quality data from the regional air quality monitoring network, the California Air Resources Board classified San Diego county as a non-attainment area for the State Ozone (03) and inhaleable particulate matter (PMIO) air quality standards. In addition, the western portion of the county was classified non-attainment for the State Nitrogen Dioxide (NO;!) and Carbon Monoxide (CO) standards. The eastern portion of the County is classified attainment for these standards. Ozone is the principal pollutant of concern in San Diego County. Despite considerable reductions in ozone levels during the past ten years, in 1988 San Diego County exceeded the federal standard on 45 days and the state standard on 160 days. Pollution transported from the greater Los Angeles area was responsible for two-thirds of the days over federal standards and one-half the days over state standards. By comparison, the state nitrogen dioxide standard was violated in downtown San Diego on only one day each in 1988 and 1987. In Escondido, there was also one violation in each of these years. Because violations of the CO and NO;! standards are marginal compared to the significant 03 problem, the principal focus of the regional air quality effort will directed toward reducing reactive organic gases and oxides of nitrogen, which are ozone precursors. The ARB motor vehicle pollution control program will continue to provide significant reactive hydrocarbon, oxides of nitrogen, and CO reductions from motor vehicles. Transporta- tion control measures will also reduce these emissions. Since 80% of the region's CO and 50% of the NO;! pollution is from on-road motor vehicles, this combination of measures will substantially contribute to attaining and maintaining these two standards. While transportation control measures and motor vehicle emission controls will be major elements in the CO and NO;! control program, additional stationary source control measures may be necessary to control oxides of nitrogen. B. Air Quality Plan Requirements 1. Involved Aqencies The four agencies involved in the air quality planning process are the Environmental Protection Agency (EPA), which is (04/25/91) 8 31-.30~ responsible for the administration of the federal Clean Air Act; the state Air Resources Board (ARB), which is responsible for the implementation of the California Clean Air Act of 1988; the San Diego County Air Pollution Control District (APCD), which is responsible for the development of the Air Quality Plan mandated by the State Clean Air Act and for regulating the emissions in the region; and SANDAG, which is responsible for the preparation of the transportation control measures component of the Air Quality Plan. The Plan is to be consistent with the traffic congestion management and regional growth management plans also being prepared by SANDAG. Within this context of a long term strategy to be carried out by the state and the APCD, Chula vista can also do its fair share, although it does not have a formal role in formulating the plan. state law does provide for the delegation of administration of APCD Regulations to local agencies if the following conditions are met: · Measures adopted and implemented are as stringent as the District's measures. · The local agencies submitting an implementation plan have sufficient resources and the District approves the plan. · The District adopts procedures to audit local agency performance to insure compliance. The District can revoke the delegation for inadequate performance. Any land use provisions of the adopted plan will ultimately be the responsibility of the City as state law prohibits the APCD from intruding in this area. 2. Air Qualitv Standards Attainment of air quality standards is based on federal and state law which establishes such standards, with the state standards more strict than federal standards (see Table 1). Given this situation, compliance with state law will generally lead to conformance with federal law. The California Clean Air Act of 1988 requires that each air district develop and submit a plan by July 1991 Showing how the district will achieve the mandated standards. In their plans, the districts must consider all emission sources, independent of transport into the air basin. Each district not in attainment of the standards by 1994 must reduce non- attainment pollutants or their precursors by an average of 5% per year, beginning from the 1987 levels. The plan must also demonstrate that improved air quality will be maintained after attainment; thus, the plan must have provisions for continued air quality improvement to accommodate growth. The plan must (04/25/91) 9 31-,303 TABLE 1 AMBIENT AIR QUALITY STANDARDS Pollutant Averaging California National Time Standards Standards Ozone 1 Hour 0.09 ppm 0.12 ppm Carbon 8 Hour 9.0 ppm 9ppm Monoxide 1 Hour 20 ppm 35 ppm Annual 100~g/m3 Nitrogen Average - Dioxide 1 Hour 0.25 ppm - Annual 80 ~g/m3 - Sulfur Average Dioxide 24 Hour 0.05 ppm 0.14 ppm 1 Hour 0.25 ppm - Suspended Annual Mean 30 ~g/m3 50 ~g/m3 Particulate Ma tter (PM 10) 24 Hour 5Ollg/m3 15Ollg/m3 Sulfates 24 Hour 25llg/m3 - 30 Day Average 1.5Ilg/m3 - Lead Calendar - 1.51lg/m3 Quarter Hldro~en 1 Hour 0.03 PPII1 - ulfi e Vinyl Chloride 24 Hour 0.010 ppm - (chloroethene) Visibility Visibility of 10 - Reducing 1 Observation miles when humidity is . Particles <70%. (04/25/91) 10 .3 I - 301/ contain transportation control measures, transportation system measures, and direct source regulations. 3. Mandated Measures Because the San Diego region is classified "severe", specific controls are required by state law. These are: the best available retrofit control technology for existing sources; a permitting program that mitigates emission increases from all new and modified sources; reasonably available transporta- tion control measures; indirect and area source control measures; and, specifically, transportation control measures to hold vehicle emissions constant after 1997 and achieve an average commute-time ridership of 1.5 persons per vehicle by 1999, and measures to achieve use of a significant number of low-emission vehicles by fleet-operators. If the region cannot meet the 5% annual reduction standard, then the next best level of reduction is to be achieved. The Act authorizes the ARB to adjust the emission reduction target for individual areas, if two legal conditions are met. First, the Plan must include all feasible measures and the region must be expeditiously implementing the Plan. Based on the currently available data, the APCD believes that the 5% annual reduction will not be met and thus the "all feasible measures" standard will be applied. C. Transportation Control Measures In November 1990, the APCD Board adopted criteria for developing a transportation control measures (TCM) plan. The plan is being prepared by SANDAG according to the criteria of APeD, and, once completed (first draft due in March 1991), the plan will be implemented through district regulations and transportation system improvements. The TCM criteria addressed six major areas: transportation demand management (reduction in number vehicle trips & heavy duty vehicle restrictions); alternative transportation mode capacity expansion (public transit, park and ride, high occupancy vehicle facilities & bicycle/pedestrian facilities); transportation system management (traffic signals & incident management); land use (jobs/housing balance, mixed use development & focused development); market based incentives (fees & taxes); and, driving restrictions. Regulations which will be proposed to meet these criteria could include: 1. Ride sharing and van pool programs. (04/25/91) 11 3/-,305 2. Employer subsidized transit ticket passes. 3. Flexible work schedules to accommodate ride sharing and . transit. 4. Telecommuting and teleconferencing. 5. Parking incentives to support ride sharing. 6. Trip management education. 7. Limiting heavy duty truck traffic during peak commute periods and reducing the number of trips through better fleet management. 8. Measures to reduce trips to large facilities. In addition, the Air Quality Plan will contain transportation system measures to attempt to reduce motor vehicle pollution utilizing some of the following measures: 1. Adding more high occupancy vehicle by pass ramps and lanes. 2. Improving transit services. 3. Special bridge toll rates for drivers who ride share. 4. Increase bus fleets and upgrading of vehicles. 5. Development of long range policies supporting vehicle trip reduction. D. Indirect Source Regulations A residential development is considered an indirect source in that it generates/attracts motor vehicle trips, although the homes themselves do not directly impact air quality. Because all feasible measures will be required, indirect source measures will be included in the Plan. The focus of these provisions will be to reduce motor vehicle-related emissions, although measures addressing aspects of development such as improved energy conservation could be included. Key elements for indirect source regulation would include the following: 1. New source review and approval prior to construction. 2. Determine if the project is consistent with the APeD Air Quality Plan. (04/25/91) 12 3/- 30 h 3. Analysis of the location, distance, time of day, vehicle occupancy and mode split. 4. Assess the quantity of air pollution which could result from the project. 5. Require the best available design to reduce trips, maintain or improve traffic flow, reduce vehicle miles traveled and implement appropriate transportation control measures. 6. Define the means for monitoring results. 7. Issue a permit specifying air quality construction and operating requirements to provide a basis for determining on going compliance. 8. Incorporate energy conservation measures/opportunities in new construction. E. other Planning Programs Affecting Air Quality As noted earlier, other planning programs are currently underway which should be coordinated with the Air Quality Plan. Currently, the city of Chula vista is participating in the regional effort to implement the transportation demand ordinance. City staff is evaluating the model transportation demand ordinance prepared by SANDAG. The near term focus of the regional transportation demand program will be on the largest components of the principal traffic stream including employment travel, college and university student travel, and goods movement. The objectives for each of the larger traffic components are as follows: 1. The objectives of the freeway traffic element policies and programs shall lead to the achievement of a 1.4 average vehicle occupancy rate for all area freeways during the principal travel period by the year 2000 and a 1.5 average vehicle occupancy rate by the year 2010. 2. The objectives of the employment traffic element policies and programs shall lead to the achievement of a 50% drive alone ratio for region wide employment traffic during the principal travel period by the year 2000 and 40% drive along ratio by the year 2010. 3. The objectives of the college and university traffic element policies and programs shall lead to the achieve- ment of a 50% student drive along ratio by the year 2000; and a 40% student drive along ratio by the year 2010. (04/25/91) 13 at ~ 30 r 4. The objective of the goods movement traffic element policies and programs shall lead to the achievement of a 25% reduction in goods movement traffic during the principle travel period by the year 2000; and a 35% reduction by the 2010. violation of the transportation demand management ordinance as currently proposed may constitute a violation of the Regional Air Quality Plan. The basic requirements of the transportation demand management ordinance will be to require employers to prepare plans to carry out the objectives of the program and to file annual reports showing the degree of compliance with said standards. In addition, each college and university will develop, implement and promote student commute alternatives in order to achieve the regional college university student drive along targets. Finally, with respect to the goods movement/trucking traffic element, each business providing goods movement/traffic trucking services shall develop, implement and promote a non- peak period delivery program as well as other measures to further reduce truck traffic during the principal travel period which is to defined as between 6:30 a.m. to 8:30 a.m. through 1995 after which time it shall be 6:00 a.m. to 9:00 a.m. (04/25/91) 14 3/- ~o 8 :IV. A:IR QOAL:ITY :IMPACTS This chapter discusses the Air Quality Impacts associated with the Rancho del Rey SPA II and SPA III projects. This type of analysis is typically included in the Environmental Impact Report (EIR) prepared for each project. This discussion is based on information provided in the Supplemental EIR for SPA III prepared by P&D Technologies and is also applicable to SPA II. The Air Quality topic was not required to be addressed in the Supplemental EIR for SPA II. This indicates that the Initial Study for SPA II, prepared by the City, determined that no significant air quality impacts would be associated with the project. A. Existing Climate/Air Quality Conditions The climate of the Chula vista area, as with all of Southern California, is controlled largely by the strength and position of the subtropical high pressure cell over the Pacific Ocean. It maintains moderate temperatures and lower humidities, and limits precipitation to a few storms during the winter "wet" season. Temperatures are normally mild with rare extremes above 100 degrees Fahrenheit (F) or below freezing. The annual mean temperature is 62 degrees F. winds in the City of Chula Vista are almost always driven by the dominant land/sea breeze circulation system. Regional wind patterns are dominated by daytime on-shore sea breezes up to 20 miles per hour with an average of 7 miles per hour. At night, the wind generally slows and reverses direction, traveling towards the sea. Wind direction is altered by local canyons, with winds tending to flow parallel to the canyons. Chula vista is dominated by the coastal type climate with a significant amount of oceanic influence on relative humidity. The relative humidity ranges from 40 percent to 80 percent in the winter and 30 to 60 percent in the summer. There is an average of 250 clear (not overcast) days a year. The on-shore flow of air provides the driving mechanism for both air pollution transport and dispersion. The winds described above control the horizontal transport in the region. The interior valleys of San Diego County also have numerous temperature inversions that control the vertical extent through which pollutants can be mixed. When the on- shore flow of cool, marine air undercuts a large dome of warm, sinking air within the oceanic high pressure area, it forms a marine/subsidence inversion. These inversions allow for good local mixing, but act like a giant lid over the larger area. As air moves inland, sources add pollution from below without any dilution from above. The boundary between the cool air near the surface and the warm air aloft is a zone (04/25/91) 15 .3 I - 309 v where air pollutants become concentrated. As the air moves inland and meets elevated terrain, inland foothill communities such as Alpine are exposed to many of the trapped pollutants within this most polluted part of the inversion layer. A second inversion type forms when cool air drifts into lower valleys at night and pools on the valley floor. These radiation inversions are strongest in winter when nights are longest and air is coldest. They may lead to stagnation of ground-level pollution sources such as automobile exhaust near freeways or major parking facilities. The proposed project is located in the San Diego Air Basin and, jurisdictionally, is the responsibility of the San Diego Air Pollution Control District (SOAPCO) and the California Air Resources Board (ARB). The SOAPCD sets and enforces regula- tions for stationary sources in the basin. The ARB is charged with controlling motor vehicle emissions. The SDAPCD, in coordination with the San Diego Association of Governments (SANOAG), has developed and updated the "1982 State Implementation Plan Revision for the San Diego Air Basin" (SIP). The 1982 plan had the goal of aChieving healthful levels of air quality by 1987, mandated by state and federal laws; however, with the passage in time of the 1987 attainment deadline, a call for a new post-1987 SIP has been issued by the Environmental Protection Agency. Included in the SIP plan are new stationary and mobile source controls; carpooling, vanpooling, and other ride-sharing programs; and energy conservation measures. The air plan is designed to accommodate a moderate amount of new development and growth throughout the basin. This air quality planning document is based on SANOAG's adopted Series V regional growth forecasts. The document is being revised using the Series VII regional growth forecasts and to meet the requirements of the State Clean Air Act, as described in the previous chapter. To assess the air quality impact of the proposed project, that impact, together with the baseline air quality levels, must be compared to the Ambient Air Quality Standards (AAQS). These standards are the levels of air quality considered safe, to protect the public health and welfare. The Clean Air Act Amendment of 1970 first established national AAQS. States retained the option to adopt more stringent standards or to include other pollution categories. Because California already had standards in existence prior to 1970 and because of unique meteorological problems in California, there is considerable diversity between state and federal clean air standards. The standards currently in effect in California are shown in Table 1. (04/25/91) 16 .31-~/O I Air quality at any site is dependent on the regional air quality and local pollutant sources. Regional air quality is determined by the release of pollutants throughout the air basin. Within the San Diego Air Basin, it has been calculated that mobile sources are the major source of regional emissions and are responsible for approximately 73 percent of the smog emissions in San Diego County ("Climate and Smog in San Diego County", SDAPCD). The air monitoring station closest to the project sites, operated by the SDAPCD, is on H Street in Chula Vista. The data collected at this station is considered to be representa- tive of the air quality experienced in the vicinity of the projects. Air quality data for 1983 through 1988 for the Chula vista station is provided in Table 2. The air quality data indicate that ozone is the air pollutant of primary concern in the project area. Ozone is a secondary pollutant; it is not directly emitted. Ozone is the result of the chemical reactions of other pollutants, most important- ly hydrocarbons and nitrogen dioxide, in the presence of bright sunlight. Pollutants emitted from morning rush hour traffic react to produce the oxidant concentrations experien- ced in Chula Vista. Ozone is the primary component of the photochemical oxidants and it takes several hours for the photochemical process to yield ozone levels which exceed the standard. All areas of the San Diego County Air Basin contribute to the ozone levels experienced at Chula Vista, with the more significant areas being those directly upwind. The ozone levels at Chula vista have not significantly increased or decreased over the last six years. On occasion the wind and weather patterns are such that oxidants produced in Los Angeles County are blown southward contributing to the smog level readings in San Diego County. Particulate matter (PMIO) refers to suspended particulates which are respirable. PM10 levels in the area are due to natural sources, grading operations, and motor vehicles. The federal standards for particulates have not been exceeded at the Chula vista station since before 1982. The carbon monoxide standards have not been exceeded over the past several years, although no clear trend in maximum carbon monoxide concentrations is evident. Carbon monoxide is generally considered to be a local pollutant. That is, carbon monoxide is directly emitted from several sources (most notably motor vehicles), and the highest concentrations experienced are directly adjacent to the source. (04/25/91) 17 3/- .311 ~ Table 2 Air Quality Levels Measured at Chula vista Ambient Air Monitoring station 1983-88 Max. Days Fed. Std. Pollutant CA Std. Fed. Std. Year Level Exceeded Ozone 0.1 ppm* 0.12 ppm 1983 0.21 6 for 1 hr. for 1 hr. 1984 0.15 4 1985 0.20 4 1986 0.14 2 1987 0.16 2 1988 0.22 4 Suspended 50 "g/m3 150 "g/m3 1983 103 0 Particulate for 24 hr for 24 hr 1984 88 0 1985 96 0 1986 119 0 1987 100 0 1988 109 0 CO 9 ppm 9 ppm 1983 9 0 for 8 hr for 8 hr 1984 7 0 1985 7 0 1986 7 0 1987 7 0 1988 8 0 N02 0.25 ppm 0.05 ppm 1983 .18 0 for 1 hr annual avg. 1984 .20 0 1985 .16 0 1986 .14 0 1987 .15 0 1988 .21 0 *ppm = parts per million Source: P&D Technologies (1990) (04/25/91) 18 3 I - 3/2 A Lead and sulfur oxide levels are also well below state and federal standards. Sulfur oxide levels are not exceeded anywhere in the San Diego Air Basin, primarily because of the lack of major industrial sources. Due to the introduction and increased usage of unleaded gasoline, lead concentrations are now well below the federal and state standards throughout the basin. B. Project Air Quality Xmpacts The development of the SPA II Project would generate approxi- mately 5,670 daily automobile trips while the SPA III project would generate approximately 11,405 daily trips. These trips would result in increased air emissions on new and existing roadways. Institutional facilities such as schools could also increase project related emissions. Short-term emissions from construction activities would generate dust and diesel emissions resulting in short-term emissions impacts. 1. Construction Impacts Soil disturbance to prepare the project site would generate fugitive dust during the construction phase. Soil dust is typically chemically inert and much of the dust is comprised of large particles that are readily filtered by human breathing passages and also settle out on nearby surfaces. It comprises more of a potential soiling nuisance than an adverse air quality impact. Construction activities for large development projects are estimated by the U.S. Environmental Protection Agency to add 1. 2 tons of fugi ti ve dust per acre of soil per month of activity. If water or other soil stabilizers are used to control dust, the emissions can be reduced by up to 50 percent. However, fugitive dust control using water must be balanced against the need to conserve water resources. CUrrently, water conservation has taken priority. While there would be project related dust emission levels during construc- tion, the air quality impact would be minimal. In addition to fugitive dust, construction activities would also cause combustion emissions to be released from on-site construction equipment and from off-site vehicles hauling materials. Heavy duty equipment emissions are difficult to quantify because of day-to-day variability in construction activities and equipment used. Typical emission rates for a diesel powered scraper are provided in Table 3, and were obtained from the San Dieqo Air Qualitv Manaqement Division Air Qualitv Handbook (April 1987). A diesel powered scraper is the most common equipment used for grading operations. (04/25/91) 19 31 - 3/~ .' Table 3 Emission Rates for Grading scraper POLLUTANT EMISSION RATE (Grams/8 Hr.l Carbon monoxide Nitrogen oxides Hydrocarbons Sulfur oxides Particulates 5,280 22,560 2,272 1,680 1,472 The emission rates above are provided in grams per 8-hour day. To provide a regional perspective of construction emissions generated by projects, the projected emissions for San Diego County (Year 2000) have been provided for comparison. These emissions are based on construction of planned land uses and regional transportation facilities consistent with the input data for the forthcoming Air Quality Plan, and are given in units of tons/day (Table 4). [909,091 grams = 1 ton) 2. Mobile Source Impacts Impacts to air quality result primarily from automobile emissions. The proposed project would result in an increase in air emissions. If future development has been anticipated in the 1982 SIP then air quality impacts are considered mitigated by adherence to the measures as outlined in the SIP. The proposed projects are consistent with SANDAG Series VII projections, while the 1982 SIP is based on Series V projec- tions. Typically, Series VII projections are higher than Series V. Adherence to the policies and measures in the 1982 SIP may result in some residual impacts as not all growth has been anticipated. However, the air quality planning process now underway utilizes the Series VII projections and will result in a new Air Quality Plan that will supersede the 1982 SIP. with adoption of the new plan, the projects will be in conformance with the regional air quality plan. This plan will include increased standards and regulatory measures based on the anticipated growth. Because the new plan includes the projects in its baseline information, project impacts would no longer be considered significant. Although not included in the EIR analysis, project air quality impacts can be estimated. Emissions associated with the SPA II and SPA III are presented in Table 5. The figures can be compared with the regional daily totals provided in Table 4 earlier. The calculation is utilizes per dwelling unit factors from Guidelines for the Preparation of Air Oualitv (04/25/91) 20 31,gJY " Table .. San Oi.qo Air Basin Emission Inventory SUDIIIlary (tons/day) (Preliminary Data) SOURCES 1987 2000 Reactive Orqanic Gases (ROG) Solvent Use 73.81 (27%) 106.63 (43%) Other stationary Sources 27.54 (10%) 36.23 (15%) Lt. Duty Passenger Vehicles 107.10 (39%) 49.38 (20%) Other On-road Vehicles 47.98 (18%) 29.86 (12%) Other Mobile Sources 18.07 ( 6%) 24.70 (10%) Total ROG 274.50 246.80 Oxides of Nitroqen NOx All Stationary Sources 36.47 (15%) 55.97 (22%) Lt. Duty Passenger Vehicles 76.52 (31%) 41.49 (16%) Other On-road Vehicles 65.50 (26%) 64.92 (25%) Ships 51. 98 (21%) 71.42 (28%) Other Mobile Sources 18.08 (7%) 24.15 (9%) TOTAL NO" 248.55 257.94 Carbon Monoxide (CO) Fuel Combustion 46.03 (3%) 60.25 (6%) Other Stationary Sources 10.52 (1%) 13.22 (1%) Lt. Duty Passenger Vehicles 870.33 (61%) 519.66 (51%) Other On-road Vehicles 402.64 (28%) 290.94 (29%) Other Mobile Sources 97.08 (7%) 134.29 (9%) TOTAL CO 1,426.60 1,018.37 Nitroqen Dioxide CN021 Fuel Combustion 42.16 (17%) 63.55 (25%) Other Stationary Sources 1. 50 (1%) 2.00 (1%) Lt. Duty Passenger Vehicles 70.63 (29%) 38.43 (15%) Other On-road Vehicles 57.30 (24%) 56.11 (22%) Ships 52.83 (22%) 72.59 (28%) Other Mobile Sources 17.59 (7%) 23.47 (9%) Total N02 242.01 256.15 (04/25/91) 21 3 I - 3/05 .' . Impact Analvses (October 1989) adopted by the Ventura County APeD. Ta!:lle 5 Estimated Project Emissions (Year 2000) Residential Units Emission Rate (lbs./day)* ROC* * NO x Emissions NO x Project ROC** SPA II 567 du SFD 0.180 0.188 102 lbs. 107 lbs. SPA III 792 du SFD 0.180 588 du Retirement 0.094 0.188 0.066 143 lbs. 149 lbs. 55 lbs. 39 lbs. 300 lbs. 295 lbs. TOTALS *Emissions from vehicular and non-vehicular sources associated with residential land uses. **Reactive Qrganic ~ompounds Localized air quality impacts can also result from vehicle emissions. The volume of carbon monoxide released when a large volume of slow moving vehicles are contained in one small area can create air pollution "hot spots". Often such "hot spots" can occur when intersection congestion is LOS D or below. If traffic on East "H" Street deteriorates to these levels, potentially significant "hot spots" could result. 3. On-Site Impacts Emissions from residential activity including painting, household cleaning, fumigation, gasoline powered lawnmowers, chemicals associated with swimming pools, wood burning fireplaces and barbecues, while not considered significant, would have a cumulative impact on regional air quality. Emissions from the Junior High School site including the use of gasoline powered lawnmowers, chemicals associated with maintenance activities and classroom activities are not considered significant on a project level, but could have cumulative impacts on regional air quality. Within the South Coast Air Basin (Los Angeles area), regulations to prohibit or restrict these types of air impacts are being adopted. If similar regulations are adopted in the San Diego region, the (04/25/91) 22 3/-3JI. . . SOAPeD (or its designee) will enforce compliance, including the subject projects. (04/25/91) 23 31-3/?- . . V. AXR QUALXTY MXTXGATXON MEASURES The primary route to air quality mitigation and reduction of project impacts to an insignificant level is conformance to the adopted regional air quality plan. As discussed, the new Air Quality Plan is now being prepared but specifics are unknown at this time. To decrease project level emissions, the City of Chula Vista will adhere to recommendations made by the 1982 SIP and the forthcoming San Diego Air Quality Plan regarding local participa- tion in air emission reduction measures. As is evident from the preceding discussion, the focus of local air quality improvement measures are local sources (industrial uses) and transportation behavior. The SPA II and SPA III projects, as residential developments, are not direct sources. Thus the project approach is to provide alternative transportation routes, and in some cases facilities, and encourage and/or educate residents to use them. Measures currently incorporated in the project to decrease project-related emissions include: · The project facilitates the use of alternative transportation modes by promoting non-vehicular transit usage by project residents by providing bicycle and pedestrian trails connect- ing to all local activity centers (e.g., schools, parks, etc.). All levels of schools (elementary to community college) are within or adjacent to the Rancho del Rey Community. A city library, a YMCA, two day care/church facilities, and a full range of public parks are included wi thin the community to minimize travel distance and encourage non-vehicular modes. Community commercial centers are located within walking distance to the east and west of Rancho del Rey on East "H" street. · The land use plan for Rancho del Rey also includes a signifi- cant business center to potentially reduce commute distances and maintain an appropriate jobs/housing balance. · The location of the development projects is in close proximity to existing major transportation facilities: East "H" street and 1-805. Both are essentially in-fill projects, utilizing land which can be most efficiently served by existing infrastructure, including public and private transportation (as opposed to "fringe" development which requires extensions of facilities and does not have support services/land uses in place). · The project area is bisected by East "H" Street which is expected to become a significant public transit corridor. The business center and other uses fronting this corridor will make provision for transit stops (bus turnouts, shelters, etc.) The seniors project may also provide a private transit (04/25/91) 24 31 - at 'I . . service (mini-bus, etc.) for the convenience of residents of the retirement community. · To avoid creation of air pollution "hot spots" at intersec- tions, transportation phasing measures included in the Growth Management Plan will be implemented to reduce potentially significant impacts to air quality. Maintaining the LOS to C or better will minimize the number of idling cars that are releasing carbon monoxide into the air. The projects will be required to comply with the threshold standards adopted by the City which will maintain acceptable traffic flow. Fee contributions by the projects will also help fund transporta- tion system management improvements (signal synchronization, etc.) planned by the City and funded through development impact fees. · To minimize air quality impacts from energy generation plants, the project will incorporate energy conservation measures as required by the State. Measures associated with reducing energy for hot water heating will also contribute to water conservation efforts. · As a component of the project water conservation program, an on-going program of homeowner education/assistance will be provided by the master developer (or designee). This program can be expanded to include air quality issues; to provide education and information to new homeowners who may be receptive to changing their habits in conjunction with their move to a new environment. · In addition, should new or more definitive measures be adopted for residential development projects, either as a component of the new regional Air Quality Plan or local regulations, these measures will be incorporated into the projects. Because air quality is an issue which can be effectively addressed only on a regional (air basin) basis, the most effective approach will be for each and every project to implement the Air Quality Plan. The Master Developer of SPA II and SPA III is committed to implementing this Plan in both projects and expects such provisions to be fully implemented and/or enforced by the city of Chula Vista. (04/25/91) 25 3/- ~/' .. . VI. MONITORING/CONCLUSION A. Monitorinq To assure compliance with project mitigation measures, City staff will require compliance with the forthcoming San Diego Air Quality Plan. The City General Plan also includes policies encouraging adherence to these measures. Prior to or as a condition of approval of the tentative map, the project design plan would be reviewed by the City Planning Department to insure that there are adequate bicycle faciliti- es on-site, and that area(s) to accommodate mass transit vehicles are reserved. Transportation control systems and development/transportation improvement phasing is also controlled by the City of Chula Vista through the forthcoming Growth Management Plan. These measures will address the potential impacts associated with congested traffic on East "H" Street. The mitigation measures included in the Transportation Phasing Plan will be imple- mented before issuance of the occupancy permit per the Public Facilities Finance Plan. B. Conclusion/Analysis of Significance Development of the projects will result in increased traffic on new and existing roadways and additional air emissions. Fugitive dust released from construction a short-term nuisance and would not constitute a significant impact. The develop- ment of the proposed project is consistent with SANDAG Series VII projections and not the Series V projections associated with the 1982 SIP which is considered a significant impact. The SIP revision, which are currently being initiated using Series VII projections and which is due by July 1, 1991, will be completed and adopted prior to build-out. Both projects will be in compliance with the provisions of the new Air Quality Plan and impacts are expected to be minimized. Compliance with the air quality plan would define project impacts as less than significant. (04/25/91) 26 .3/- 3:J0 I \ ... . VII. RBFERENCES California Air Resources Board; Answers to Commonly Asked Oues- tions About the California Clean Air Act's Attainment Plannina Reauirements (CCAA Guidance Paper #11; August 1989. California Air Resources Board; California Clean Air Act Trans- portation Reauirements Guidance (CCAA Guidance Paper #21; February 1990. California Air Resources Board; Executive Summarv - California Clean Air Act Guidance on the Development of Indirect Source Control proarams; July 1990. cinti & Associates; Draft SPA Plan Rancho del Rey SPA II; November 1988. cinti & Associates; Draft SPA Plan Rancho del Rey SPA III; August 1990. P&D Technologies; Final Supplemental EIR Rancho del Rey SPA III; November 1990. SANDAG; 1991 Air Ouality Plan Development Process (Aaenda Report R-741; September 28, 1990. SANDAG; Air Ouality/Transportation Control Measure criteria (Aaenda Report R-921; November 16, 1990. SANDAG; Reaional Ouality of Life Factors. Standards and Obiec- tives (Aaenda Report RB-191; November 16, 1990. San Diego County Air Pollution Control District; Memorandum: Transportation Control Measure Criteria; November 21, 1990. San Diego County Air Pollution Control District; California Clean Air Act - Air Ouality Strateay Development Workplan; n/d. Ventura County Air Pollution Control District; Guidelines for the Preparation of Air Ouality Impact Analyses; October 24, 1989. willdan Associates and Bud Gray; Draft Growth Manaaement Proaram - city of Chula Vista; August 1990. (04/25/91) 27 ,j/-3;J/ I i .- RANCHO DEL REY SPA II AND SPA III WATER CONSERVATION PLAN SUBMITTAL DRAFT January 8, 1991 Revision #1 (02/08/91) Revision #2 (03/25/91) Prepared for: Rancho del Rey Partnership 2727 Hoover Avenue National City, CA 92050 Prepared by; CINTI & ASSOCIATES 1133 Columbia Street #201 San Diego, CA 92101 (619) 239-1815 ~/-.3~~ t Table of Contents ~ I. EXECUTIVE S~Y....... ......................... .............. 1 II.. INTRODUCTION.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 4 A. Purpose B. Planning Context C. Goals D. Approach E. Roles and Responsibilities III. WATER SERVICE AND SUPPLy.......................... 11 A. Water Sources/Agencies B. Rancho del Rey SPA II and SPA III Project Facilities IV. WATER CONSUMPTION................................. 19 A. Historical Water Use B. Water Use in Rancho del Rey SPA II and SPA III V. WATER CONSERVATION MEASURES....................... 22 A. Available On-Site Conservation Measures B. Conservation Measures Implemented in Rancho del Rey SPA II and SPA III C. Projected Water Savings D. Off-site Conservation Measures VI. IMPLEMENTATION/MONITORING......................... 33 VII.. REFERENCES................................................................................ 34 APPENDIX - Landscape Water Conservation Outline........ A-I (partial) i 31 - 3~.3 ., x. Executive Summary The purpose of this Water Conservation Plan for the Rancho del Rey SPA III project 1s to respond to the Growth Management Policies of the City of Chula Vista. The water conservation measures presented . in this plan are intended to respond to the long term need to conserve water in new development; more stringent short-term, emergency measures (e.g., water rationing, new meter moratorium, etc.) responding to drought or water crisis situations are not included. ~his plan is intended to be implemented over the life of the project and to establish standards which will be acceptable to future project residents regardless of water availability. As detailed in the report, numerous features have been included in the project and commitments made by the Master Developer to minimize the use of water during the construction and habitation of the Rancho del Rey SPA II and SPA III projects. The estimated water consumption statistics, with and without conservation measures are outlined in the table below. Table 1-1 , Rancho del Rey SPA II and SPA III Water Consumption/Conservation Summary Water Consumption Percent wlo Conserv. wI Conserv. Savinas Residential SPA II 0.22 MGD* 0.13 MGD 39% Residential SPA III 0.42 MGD 0.24 MGD 44% School/Park/Lands capel 0.10 MGD 0.03 MGD 70% TOTALS 0.74 MGD 0.40 MGD 46% Averages2 Per capita 140 gal/day 89 gal/day 37% Per dwelling unit 378 gal/day 240 gal/day 37% *MGD=million gallons/day lSavings based on using reclaimed water for irrigation. 2Does not include reclaimed water savings. (03/25/91) 1 31-3~'I The water savings summarized above reflect the implementation of several water conservation measures essentially within the project boundary. These measures are summarized in Table 1-2. In addition, the project is committed to fully participate in any off- site mitigation program adopted by the city. Such a program would be designed to require new development to off-set all or a portion of their new water demand by funding or providing water conserva- tion improvements in older developed areas where efficient plumbing fixtures or irrigation systems were not installed. Fees collected could also be spent on studying or acquiring new or improved sources of water (e.g., expanded water reclamation, desalination, etc.). Although such a program does not exist at the current time, considerable work is being completed by several agencies including the CWA, local water districts, and the city to formulate such a plan and adoption of a region-wide program is anticipated. The primary agency responsible for ensuring compliance with this plan is the city of Chula vista. Requirements for compliance will be .enforced through tentative map conditions and/or development agreement provisions, or other appropriate agreements. The previously approved Mitigation Monitoring Program adopted with approval of the Rancho del Rey SPA III Plan will be expanded to monitor compliance with the provisions of this Water Conservation Plan. Various departments will review and approve plans for development of these projects. In the course of that review, plans will be checked for compliance with the provisions of this plan. The otay Water District will also have a direct role as the water provider, both potable and reclaimed, to these developments. Implementation of reclaimed water use on publicly owned property will be the responsibility of the City (for park and open space areas) and the Sweetwater Union High School District (for the junior high school site in SPA III). (03/25/91) 2 31 - 3;)5 1 Table 1-2 , Rancho del Rey SPA II and SPA III Water Conservation Measures On-Site Measures Fixtures/Devices Ultra-low Flow Toilet Ultra-low Flow Shower Head Faucet Aerator Hot Water Pipe Insulation Pressure Reducing Valves Water Efficient Dishwasher Water Efficient Clothes Washer (advise/assist) outdoors/Landscaping Efficient Builder Installed Irrigation Low Water Use Builder Installed Landscaping Installation of Reclaimed Water Mains Water Conserving Practices during Grading/Construction Public Education/Awareness Program Homebuyer Information Packets Water Conservation Coordinator Public Information Seminars Off-site Measures Full participation in a City approved water conservation/ mitigation program designed to off-set additional water demand associated with new construction through the retro-fit of older, less efficient water fixtures off-site and/or funding for new supplies or sources of water. (03/25/91) 3 3/-3:>'" . II. Introduction A. Purpose The purpose of this Water Conservation Plan for the Rancho del Rey SPA II and SPA III projects is to respond to the Growth Management Policies of the City of Chula Vista. As described below, these policies are the culmination of a long term, comprehensive planning process. In addition, one of the conditions of approval of the SPA III Plan is the preparation and approval of a Water Conservation Plan which mitigates water supply impacts to an insignificant level, as determined by the City Council, prior to the approval of the tentative map for SPA III. Approval of this plan will fulfill that SPA Plan requirement. The city of Chula Vista has looked comprehensively at issues dealing with development and the additional impacts it places on public facilities and services. The approval of the Threshold Ordinance and the General Plan update were the first steps in the overall process of addressing growth related issues. The second step in this process was the development and adoption of the Growth Management Element which set the stage for the creation of the Growth Management Program. The Growth Management Program is the final component in the city's effort to create a comprehensive system to manage future growth. This program implements the Growth Management Element of the General Plan and establishes an orderly process to carry out the development policies of the City. It directs and coordinates future growth patterns and rates to guarantee the timely provision of public facilities and services. The primary area of focus of the Growth Management Program is east of 1-805 where most of the remaining vacant land is located, including the project site. B. Planning Context The planning context for this water conservation plan ranges from state-wide and regional considerations to local, site specific requirements. SANDAG'S draft Quality of Life Standards and Objectives, prepared by the Regional Growth Management Technical Committee, consist of eight factors including air quality and water, sewage disposal, sensitive lands protection, solid waste management, toxic and hazardous waste management, transportation system management, and housing. These regional standards and objectives are based on State and Federal law and at a minimum, must be carried out on a regional level by agencies such as APCD, Regional Water Quality Control Board, County Water Authority, etc. The strategies to be included in the Regional Growth Management (03/25/91) 4 3/- 3~ .,.. Strategy are of necessity long term in nature and will involve every city and special district in this county. At the local level, cities and special districts must carry out their fair-share responsibilities within a day-to-day decision making framework to ensure attainment of the regional standards and objectives. Many of the regional standards and objectives that will involve Chula vista and other cities are the provisions of the California Clean Air Act and the San Diego County Water Authority (SDCWA) water availability standards addressing supply, storage, conservation and reclamation. Chula Vista is actively participating, through the growth management program and other efforts, in the regional endeavor to establish effective long term regional strategies to implement the air quality and water standards and objectives. The SANDAG Quality of Life Standards and Objectives regarding water availability and conservation include four components: supply, storage, conservation and reclamation. These four components can be summarized as follows: 1. A sufficient supply of water should be available to serve the residents, businesses and institutions in the San Diego Region. 2. Per ed. 196 capita increases in water supply should be stabiliz- Current daily per capita water use is approximately gallons. 3. Discharge of effluent into the oceans and streams should be reduced to achieve the reclamation of 100,000 acre feet of water per year by 2010. 4. The County Water Authority recommends that its member agencies be able to operate without water service from the CWA's aqueducts for up to 10 consecutive days in the event of an emergency. In addition to water availability, the following standards and objectives address water quality: 1. Inland service waters should meet the Federal and State Standards and Objectives for water quality as regulated by the Regional Water Control Board. 2. Ground water supply should meet the Federal and State's standards and objectives for water quality as regulated by the Regional Water Control Board. 3. Reclaimed water shall be treated to meet the objectives of the State of California and the Regional Water Control (03/25/91) 5 ]1-.3;)~ -, Board for discharge in receiving waters, i.e., inland service waters or ground water to protect the existing and potential beneficial uses, or for direct use for landscape and agricultural irrigation. At the local level, within Chula Vista, the City Council is in the process of implementing the recommendations of the Chula Vista Water Task Force. The consensus of the Task Force was that Chula Vista must playa more active role in all water related issues. To this end the Task Force has offered the following recommendations: 1. Chula vista should immediately work to establish a Chula Vista Interagency Water Commission (IAWC) to deal with local water related issues. 2. Chula Vista should become more proactive in state and regional water related issues. 3. Chula Vista should provide adequate support staff for increased attention to water issues. 4. The City's General Plan, Land Use Plan, Growth Management Program, and the Master Plans from all appropriate water agencies should be integrated to reflect short term and long term goals. 5. The City should manuals for the related measures. establish ordinances and guideline implementation of conservation water 6. The City should adopt specific policies in regard to water related issues. These policies would be the primary guidance for the council representative to the Interagency Water Commission, and for the staff water person for all guidelines, manuals, and plans. 7. Chula Vista, through the Interagency Water Commission, (IAWC) should work to establish a new water use and conservation ethic in the IAWC planning area as a model for all San Diego County. Among the more significant recommendations of the Water Task Force which will affect growth management in the future is recommendation #5 regarding the preparation of a guideline manual to set forth city policy in regard to water use, conservation and reclamation for new developments. In addition, recommendation #6 of the Water Task Force speaks to the City taking a more active role in promoting conserva- tion efforts in establishing guidelines for itself and all (03/25/91) 6 .J1-3,J' future developments within its jurisdiction to conserve water. Examples of the conservation techniques suggested include: 1. Low flow toilets and low flow shower heads. 2. Require the insulation of hot water systems in all new developments and/or upon resale of existing homes. 3. Require mandatory use of reclaimed water where the appropriate water agency (otay Water District for SPA II and SPA III) has stated that it either currently has or will have the ability to develop such water. 4. Require each developer to prepare a water use/conserva- tion report detailing the programs they propose to implement to reduce water demand. The Water Task Force report contains a list of numerous other recommendations which will be incorporated into the water conservation program in the future. In order to implement some of the above, the Planning Department staff has proposed and Interim Growth Management Policy with respect to water conservation. In response to #4, the proposed policy requires that a Water Conservation Plan be prepared and adopted for all major development projects in conjunction with SPA Plan approval. This report for the Rancho del Rey SPA II and SPA III projects has been prepared to meet that policy requirement, in anticipation of the adoption of the proposed Growth Management Policy by the Chula Vista City Council. At the present time, no guidelines for such plans have been adopted. As the initial project report, this plan is the first effort to implement the proposed policy and may serve as an example/guideline for future project reports. It also represents the first effort to implement the proposed growth management policies of the city of Chula Vista. At the time this report is being prepared (March 1991), California is facing the fifth year of drought and extreme water rationing programs are about to go into effect. These measures require significant changes in the way water is used by all residents of California, both in homes and industry. These measures may preclude or substantially restrict new construction in the short term. Faced with this crisis situation, long term plans are now being proposed and formulated to change water policies at many levels of government to place a greater emphasis on conservation. It is not the purpose of this plan to incorporate the extreme short-term measures, rather the plan is intended to represent (03/25/91) 7 3/-.330 a commitment to the long-term perspective of using water responsibly while providing for growth, including development of the SPA II and SPA III projects. Because these long term programs have yet to be developed, the documentation of specific provisions, timing, and other requirements cannot be detailed herein. Only general descriptions and commitments to implement such plans can be made at this time. c. Goals The following are goals of the Rancho del Rey SPA II and SPA III Water Conservation program: 1. To conserve water during and after construction of the SPA II and SPA III projects. 2. To comply with the water conservation standards and policies of the City of Chula Vista and Otay Water District. 3. To create a comprehensive framework for the design, implementation and maintenance of water conserving measures, both indoor and outdoor. 4. To be economically efficient and cost effective. D. Approach The approach to water conservation outlined in this plan is intended to be comprehensive and implemented throughout the life of the development project. Water conservation during construction and after occupancy are addressed, as well as the installation of water conserving landscaping, appliances and fixtures. Efforts to educate and increase awareness of the need to conserve water and the opportunities to do so, will be directed toward_future residents. Project participa- tion in regional or city-wide water conservation/mitigation programs to provide additional off-site mitigation is also anticipated. The roles and responsibilities of all affected parties are described in the following section. E. Roles and Responsibilities In order for this plan to be effective, it is necessary to clearly assign appropriate roles and responsibilities to all of the participants in the development and occupancy phases of the SPA II and SPA III projects. There are three primary groups involved: developer/builders; government/service (03/25/91) 8 3/--3311 .' agencies; and future residents. Each has an important role to play, as described below. 1. Develooer/Builders The community developer, the Rancho del Rey Partnership, is providing the basic planning, design, and management of this program. Community level facilities, landscaping and construction standards will be implemented by the master developer. Individual builders will construct homes according to the standards set by the master developer (and the City) and will be responsible for water planning and management within their own project. Builders will also be the primary communicators with homebuyers. In this role, they will be responsible for identifying the water conserva- tion features incorporated in the project, and educating homebuyers regarding a continuing conservation effort. The builder/developer will also pay fees or make off- site water conservation retro-fit improvements to comply with any city-wide or regional water supply mitigation or improvement program, if such a program is adopted. 2. Prooertv Owners/Residents The long term success of the conservation effort rests with property owners who are the long term water users within the project. Private homeowners, associations, and public agencies will be responsible for irrigation and landscape materials on individual lots. Builders will incorporate water conserving systems and materials with initial construction but it will be the responsi- bility of the property owner to maintain these installa- tions and use water responsibly on a day-to-day basis. Land uses which have significant irrigation requirements (schools, parks, landscaped open space) should utilize reclaimed water as it becomes available. The decision to utilize reclaimed water will rest with property owners, which are public agencies (school district and city) . 3. Government/Service Aaencies The City of Chula vista will review project plans and assist in the monitoring of this plan. Because of its development approval role, the City can effectively enforce water conservation standards for new construc- tion. The City can also be a source of on-going (03/25/91) 9 3/- 3 3 ~ (03/25/91) education and water awareness through citizen communica- tion programs. The city, through the Interagency Water Commission, will also have a role in formulating and implementing a city- wide or regional water conservation/mitigation program. Such a program would require new development to reduce water supply impacts through an off-site mitigation program which would reduce water consumption in existing development or develop new or alternative water sources such as expanded reclamation or desalination facilities. The otay Water District will provide domestic water service, and potentially reclaimed water service. As the water purveyor, the District may adopt its own guidelines or standards for water conservation. The District now has a water connection allocation program in effect. The District will also monitor adherence to policies or requirements of regional water agencies such as the County Water Authority and the Regional Water Quality Control Board. As owners of property with significant irrigation needs, the City and Sweetwater Union High School District will have the opportunity to utilize reclaimed water when it becomes available. In the interim, they have a responsi- bility to use water conserving plant materials and irrigation systems. 10 3/-.333 .' xxx. ~TER SERVICE AND SUPPLY This section describes the sources of domestic water for the Rancho del Rey SPA II and SPA III projects, identifies the responsible water agencies, and details current issues regarding the supply of water to the project. A. Water Sources/Agencies Metropolitan Water District The primary source of domestic water in Southern California is the Metropolitan Water District of Southern California (MWD) which serves 27 member agencies from Los Angeles to San Diego. These agencies include incorporated cities and water districts along the coast, encompassing over half the population of California. The purpose of MWD is to provide an adequate amount of water to each of its member agencies. To do this, MWD utilizes the California aqueduct system to convey water from the north and east to southern California. San Diego County receives up to 95% of its water through this system. Lake Skinner, the major water storage facility serving San Diego County, has a SO/50 blend of Colorado River water and State Water Project (Northern California) water. Both these water sources are limited. Deliveries of Colorado River water to the MWD are expected to decline as others entitled to the water in the river increase their diversions. Recent drought conditions have drawn attention to the limitations of State Water Project flows. Given this situation, increasing attention has been directed state-wide toward conservation measures to more efficiently utilize this limited resource. On December 11, 1990, the MWD mandated water rationing for member agencies. Delivery quotas for each district will be established based on reductions which range from 5% for residential consumption to 20% for agricultural uses for an overall reduction of 7.8%, beginning February 1, 1991. Any water delivered to the local water agencies in San Diego in excess of their quota will cost $394 per ac/ft, 300% more than water within the quota. For water savings in excess of the quota, local districts will receive incentive rebates of $99 per ac/ft (1 ac/ft equals 326,000 gallons). It will be up to each local agency to determine how to achieve water consump- tion reductions within their district. The required cutbacks are the second phase of a five-phase plan to reduce water consumption by 10% in 1991. Phase I was officially implemented on December 1, 1990 and was designed to achieve voluntary reductions of 10% for residential and industrial use and unspecified reductions in agricultural and groundwater replenishment uses. If the current drought (03/25/91) 11 31'" 33'1 continues and Phase II is ineffective, Phase III would be put into effect. Reductions of 10% for residential and 30% for agriculture would be required. If conditions continued to deteriorate, mandatory reductions would increase to 15% and '. 40\, respectively, in Phase IV and 20\ and 50\ in Phase V. San Diego county Water Authority The San Diego County Water Authority (SDCWA) is the largest member agency of MWD. In 1988-89, MWD delivered 28.1\ of its water to SDCWA and MWD water constituted 90.1\ of all water delivered by SDCWA. Twenty-four member agencies including cities, water districts, irrigation districts, municipal water districts, public utility districts, a federal agency, and a county water district are served by the Authority. The individual member agencies, in turn, directly or indirectly supply over 95\ of the San Diego County population. About half of the member agencies depend completely on supply from SDCWA, while the other half has some local supply available through treated surface and ground water. SDCWA purchases and distributes treated water from various treatment plants owned and operated by its member agencies. SDCWA imports water from the Colorado River and the State Water Project through MWD, their sole supplier of imported water. Distribution of the water takes place through an aqueduct system maintained and operated by the Authority. Each member agency submits a daily request for water and is responsible for having adequate storage facilities when extra is ordered, and adequate reserves for those times when not enough is ordered. In response to the recent drought conditions, the SDCWA requested that member agencies enact mandatory water conserva- tion measures. In response all agencies except the largest, the city of San Diego, did so. The city of San Diego enacted a voluntary conservation campaign. Conservation efforts in San Diego county have been successful in meeting initial targets, including MWD requirements. No specific plans have been adopted in response to the most recent MWD mandates, as current conservation efforts exceed these targets. otay Water District The Otay Water District (OWD) is the local water agency which delivers water to consumers in the Rancho del Rey project area. The OWD has no local surface runoff water available and relies completely on the SDCWA for water supply. There appears to be little opportunity to develop alternative sources (i.e., wells, runoff collection, etc.). OWD owns and operates a local distribution system, but currently lacks sufficient seasonal/emergency reservoir capacity. (03/25/91) 12 3/-3'35 Because of this lack of storage capacity, the own has met peak demands by increased deliveries from the SDCWA aqueduct during peak demand periods. This approach has created potential problems for the SDCWA and other member agencies. Due to the lack of adequate water availability to meet regional short-term peak demands in general, the water supply to OWD has been limited by the SDCWA to 38 cubic feet per second (cfs) during high peak demand. The two aqueducts operated by the SDCWA to import water into the San Diego region reach capacity during peak demand periods; the infrastructure of the importation system itself is occasional- ly not adequate to meet peak water demands. To address this issue, the SDCWA is planning to construct an additional aqueduct, tentatively to be completed by 1994. The OWD receives excess water during non-peak periods to meet the additional demand during peak periods; however, the District does not have sufficient water storage facilities to assure year round availability. The District is currently negotiating with the Sweetwater Authority and the City of San Diego to increase its storage ability to ensure adequate water service during peak periods. The Otay Water District has been experiencing these water storage problem for some time. As a result, the district developed and is implementing a water allocation program. The otav Water District Report on Allocation of Water Reauests Based on Water Availabilitv was adopted by the Board of Directors on April 19, 1989 as Resolution No. 2742. Because of the inability to store adequate water for an unlimited amount of new development, the allocation system allots 1,900 Equivalent Dwelling Units (EDUs) of water service per year for the service area. In the Chula Vista, this limit equates to approximately 700 to 1,000 units per year. This program will remain in effect until supply and terminal storage conditions improve, additional sources of water supply are found, or the SDCWA lifts the limitation of 38 cfs. At that time, the yearly allotment of connections will be increased or the allocation program will be eliminated. Necessary improvements are not anticipated to be completed before 1994-5. The OWD Water Allocation Program implements actions taken by the District to allow issuance of water service connections within the District until the construction of the new Pipeline No. 4 is complete. The issuance of new water service is subject to the District's present limited water storage and water supply. These actions include the approval of guide- lines which: 1) categorize various water requests; and, 2) determine if a water service request qualifies for immediate connection or, future connection based on an allocation of (03/25/91) 13 3' - 33(, water service to the anticipated Equivalent Dwelling Units (EDUs) requests. The following categories are used in determining the allocation of water service in the District: ' Cateaorv I - Water service requests that qualify for immediate water connection with issuance of an approved building permit. Cateaorv II - Water service requests that qualify for water service connection contingent upon completion of conditions of an agreement with the District entered into prior to adoption of the allocation program. Cateaorv III - Land Development water service requests that are allocated water service dependent on contribu- tion to construction of major water facilities including, but not limited to, terminal water reservoirs, major water transmission mains, pump stations, etc., that directly or indirectly support water service. After the adoption of the allocation program, the Otay-Triad Agreement was entered into. This agreement is between the Otay Water District, EastLake Development Company, Rancho Del Rey Partnership (developer of the SPA II and SPA III pro- jects), and Rancho Del Sur Partnership. In essence, the Otay- Triad Agreement allows EastLake, Rancho Del Rey, and Rancho Del Sur to request more EDUs per quarter per development for single family connections than would otherwise be possible. Without the Otay-Triad Agreement, these developers would not be able to request more than 200 EDUs per quarter per development for single family connections. In exchange, the developers have approved bond financing of terminal storage faculties in lieu of paying a Reservoir Storage Fee to OWD. This enables OWD to construct the necessary terminal storage reservoirs at an earlier date than would have been possible by collecting fees only. The OWD also operates a small water reclamation plant (1.3 MGD) which is currently not operated to it's full potential due to strict water quality regulations, high energy costs and limited demand. A pipeline between the plant and the EastLake project (located approximately 3 miles east of Rancho del Rey) has been construct~d and is expected to supply irrigation water to the golf course and other landscaped areas now being developed. It is anticipated that the OWD will supply greater volumes of reclaimed water in the future, either through expansion of the existing plant or additional facilities. (03/25/91) 14 3/-33?-- B. Rancho del Rey Project Facilities Rancho del Rey SPA II and SPA III are the second and third ' phases of the Rancho del Rey Planned Community. The previous phase, SPA I is now under construction north of East "H" street and southwest of otay Lakes Road. SPA II comprises the northwestern portion of the project site, north of East "H" Street. SPA III is located south of East "H" Street and north of Telegraph Canyon Road. Existing water facilities owned and operated by the otay Water District will connect to the proposed facilities depicted in Exhibit A, Domestic Water Plan SPA II, which will complete the looped water system north of East "H" Street. Facilities to serve the SPA III project are depicted in Exhibit B. Also, in anticipation of the increased availability of reclaimed water in the future, reclaimed water mains and service lines will be constructed as a part of the projects. The system within SPA III is depicted in Exhibit C. The proposed main in Paseo Ranchero will convey reclaimed water, when it is available, to SPAs I and II where landscape irrigation systems built to use reclaimed water are being installed in Rancho del Rey Parkway to serve SPA II and the middle ridge of SPA I. A connecting main in East "J" Street will supply irrigation water for the park and school sites in SPA III. (03/25/91) 15 31-.338 w - , \t.l UJ ...0 .--~;s\ .--- .."~",,, -_.-- ~ .-..--.-..-.- -----\ /-------- \/ -.-..-. J '- / -..- \ - rr'~" -- "'----..J ( -.........-- -- /.<~.. ~ --'''' \ i. .---_.~ / .\ . (; ,.' -'- . 1 ,_J ". "l624k . .': J, \ r' \. k~,.,if"". ......!""}!io~~~1 ,......'..\.\.. o j';; ___"","-. ""--__.J \ I ""~~ .." '-""" I- . \. /~~~ ( ~ "., '. .Jl, \ '- .'~'Y ( ),' . ~ ;,~/ . _____\--1 qOj\o8C.~..tO- . ....,7 /, . prilPosWSPA 1 ' ~~(u------/ 'j ! '<pne..~tt~. weler/, 1-- .---;;..-'-'(---- \ J' /:ey.I'I'lt.::> if I . , ~-\' / \ Ii i/ .! I /'\': 16:>41 i-- \ / \ ~, . J I.., .. (' Y~ ~~ \ \ . "'-.' /. .\~ ))= ,_' ..J /,/// J /ri.. . (t,.,.,.::l '/~f-- - -- I~' \ . //1/1'/ / '" / .. conne~lon to ;1111 . ../ - /_~ exl.Unll1r II ..._..-...-u_.. ./.. wele, 1.ln II, ..-'- ---,_u_..-.,-. olf.lIs. i . _/ N 1 .,./ \ ./:JiL/./ o ./ ~ \ ../., Comeclton 16 prOl1088d SPA 1 .. r~ domestlc water syst~ i \ i .,."\ -~QQ~ReyB!r Domestic Water Ran . SPA II KEY: 12" (624) 1 't.. WeIer Pres.... Zone """ llIometer E:=3 m PI oposed Water Mahs Pressure Reducing Valve SoIn:e: RIck Ellgi_'Ill Co.1988 ~' Cinti' 1000 & A<ro:des "" tie 16191139 -1815 Ex,..;t . " c~.- ........... .......... Domestic Water Plan SPA III ............ '........... .........." "..........., '........... '. 11" (824) \ - l " _.- I Cor'IMcllGn to ... - , ..latina 12. (110) IMfn I .0' 111011 '\ .........\ ..-----.:-. _'';:~I_.,. e _-'"._ . ~,,' . \ ~, ,: "---. /'I -. ,~ ,--- .------, ,.,/ \ ~1'0".1- I . Y ,; '1,0) ., . ~.... . . . , ; .' J 2' ~ ....\ S;-:'^--- #0- " _~.... tIII\.... . "~'- KEY: ~2' (110) 't...-- Pressure Zone - PIpe Diameter , ~ e Exlsltlg 22-2 Reservoir I Existing WeIer Main a Proposed Water Main COnMCtton to IJl:lsUng 12. {JJ2rrlMln ConnKtlon 10 .. SlllsUng H'. [e2.(J NI" ,-,'\0' __... .......,...... c__. ,_ .. Note: Pr...ur. Zone. Indtuted by [l2.q .r. cur"nUy 710 zone m.me which will be reduced to 8'. lone m11ln, In the lulur. by O.w.O. .-., -' .-" " . . . . 20. 624jO _., h__ ........ ."1_.....1 ..-.....-- .~QQllLRey~ mmo~ ~ Ci1II .- "lIInt.,." Exhibit B c= ~':"""" o:(f en '- .m ~ "0 Q) E 0(6 13 (E _...-. ,,~"'1''f;~''':~~t.~~;:.. .~'C....", V.;U4,..,....... ~/..,. \.............. ,.",. ...~......,>".......~",:""~.....:~ ....~~ ''''''~'''':'. \. ,,.d(..~~tMI? ~"I.,...~V....":l:.\...........~')..~,-:~..;Vr~'''' \., "....';;.~~i?...~"i..~.,(ly$.,..~(~'\~<:~').....::..!~.~~r!.:t~: A" ''f:\ti\C..Jf>,.,~7.'~'-,>;<-V'.v,tCl'.' ~..' .~,"\ ~.~..\~~1\~"~1 "'~\;\\V ' Bi~\ 'p;.~) '\" ~~~0:'t\T( iv" ..- .~,;;/ (~ c ,~ '_...-<.. J'~ ~~. .2E \.....r~:..;\-:\f: . \ :--- \ ",,' (04) c...".\.'-\c;,~.\" )> -...;::~ '\ \,,\ .,;;; \...... '-OJ\." . ~ ,- I -- '- ~ \" c >- c:;..........-f"\r,.~.~....' "-' __ \ '\ '\. c. (f) "';-"'J'~J\<Y'r;'~ ' -..::::::-X- \,' 0,," "'"' .....,,. -( r,"1r'" ,-/. ....A' '\ - \'lji.t.LJ,,;.;.t; \ \ / ,\,... \ ~2 ~\l~T...~ \\ I _/ '\ \.2'0 \ \\\\~\-~1T~no \\ ",. \) \t B \\ . ,1\~~t ,'t' ,\ 0:> \ .. H1 - t...."... , ~ \ \ \1~~i\.~:\~~r:~" \ ,'t \ \ \ .."..,....,." ..~-\ \ \ I~ \\ \ '\ c: \. . 1\ ...~";;:.'.' .2E,\ ) \ '\.... """,,,'s,..::-;..-;..J,\ \ o~ " .." 1~.J..~:..j:-_l'.( \ G> '" (). lllH' .....:... , c: >- , l\l!.~"~' .', , '" I"'" . ," \ 5 G> \\ '-!;:j:~:~;',/ j \ u:!: " { ( j.,..""c:..~....,. \ e~ i.!I(:;.....";~:-.<,. .2 0...... \. <\1j~"",~:~:;:" \.... 1.1 oro "\'" \ r' C\;:~-.).,t~ ::~-.C.l-,~:'. \il - ""\\;" I" <j,. '<!7 ,0:::";:",:'::, · \i'\<"'j( ~~ XW~f~-' ;\ \'. (...... I . r-'r~' j.:~{~t'" '-" i I it\..t)'-J , " : ~;;;:U.! I \ '" I I \/'~ 'l'~ ~-~~ I __J': I '",,- ~'" I -I! I) ~'ll : i J: .. I: (J I JL-' I : II-I' / I d I / /' J , I / ' I/J I , : : --.-' l I/.f 1(', r::F /1 I: . IJ JI I' (./ I, I' , /1 i / l , 1/ . /.. I :~/ : 7: I 't . /!.J' I ~. II 3/- ~L/I ., .S; Q; c. ii: 'C ., en o C. o ~ Q. rn ~II u - ~ )( w 5 EJ ~ !! SJ ~~ Bj 8~ II :IV. WATER CONSUMPTION This section presents information on historical and projected water use in the region. The anticipated water demand of the SPA II and SPA III projects is also quantified. A. Historical Water Use The availability of imported water in California led to its increased use for landscaping and agricultural. The cultiva- tion of lush ornamental plants and lawns which are typical of landscape in mid western and eastern states where water is plentiful replaced the "drought tolerant" native California vegetation. Agriculture was introduced in formerly arid and semi-arid areas. As the population of California grew, so also did urban water demand In San Diego however, per capita water consumption has not substantially increased. From 1970 to 1988, per capita consumption ranged from 169 to 241 gallons per capita per day, averaging approximately 200 gallons per capita per day, which is also the current factor. This total is divided among land uses in the following percentages: 45% residential, 32% commercial/industrial, and 23% agricultural. By the year 2000, the San Diego area population is expected to grow by approximately 16%, with concurrent increases in water demand. SDCWA is actively working to reduce water consumption by 15%, primarily through controls on agricultural uses. This goal should be easily achievable given the results that were observed during the 1975-1977 drought when reduc- tions of 25-90% were obtained through more efficient irriga- tion and changes in maintenance practices. Because of the on-going drought conditions, water conservation is being promoted or required throughout the state, including San Diego, as described in previous sections of this report. B. Water Use in Rancho del Rey SPA II and SPA III Table 4-2 shows the projected water use in Rancho del Rey SPA II and SPA III, based on average use rates which do not reflect significant conservation measures, categorized according to land use and residential density based on the population estimates given in Table 4-1. The primary unit of measure for water quantity used for comparison in this report is gallons per capita per day (gpcpd). This can be multiplied by the estimated number of persons per dwelling unit (DU) to obtain the gallons per day per dwelling unit. The number of persons per dwelling unit varies with the type of residential unit (apartment, condominium, single family detached, etc.), as shown in Table 4-1. (03/25/91) 19 3'-3Y~ .' The total projected average water use, without conservation measures, for the Rancho del Rey SPA II and SPA III projects is 0.74 million gallons per day (MGD). The ability to use reclaimed water to irrigate large areas in SPA II and SPA III is being built into the project, and is addressed separately, as it is not directly a part of the residential development. Approximately 0.07 MGD (10%) of the total water need could be satisfied by using reclaimed water. The focus of this report is to describe conservation measures for reducing the projected 0.67 MGD potable water use within the residential development. One additional benefit to decreased indoor water use is the reduction in sewage volume generated. Although sewage is not part of this plan, the reductions in volume due to water conservation measures could have a significant cost savings impact on related collection and treatment facilities. Table 4-1 Rancho del Rey SPA II and SPA III Estimated Population Proposed Units (DU) Household Size Population SPA II Single Family Detached 567 3.0 1,701 SPA III Single Family Detached 564 3.0 1,692 Attached Med. Density 522 2.5 1,305 Attached High Density ~ 1.:..Q 588 SPA III Subtotal 1,380 2.6 (avg. ) 3,585 TOTALS 1,947 2.7 (avg. ) 5,286 (03/25/91) 20 3'. ~L/3 Table 4-2 projected Water Use in Rancho del Rey SPA II and SPA III Land Use Population Rate Use (MGDI Residential SPA II - SFD 1,701 persons 130 gpcpd .22 SPA III - SFD 1,692 persons 130 gpcpd .22 Attached Low Density 1,305 persons 110 gpcpd .14 Attached High Density 588 persons 95 gpcpd .06 Sub-total 5,286 persons .64 Jr. High school: Potable 1,400 students 20 gpcpd .03 Irrigation 8.5 acres 3.0 ft/yr .02* Public Park SPA II 6.5 acres 3.0 ft/yr .02* SPA III 10.0 acres 3.0 ft/yr .03* Total Permanent Potable Use 0.67 Total Potential Reclaimed Use .07* Total Water Use 0.74 Average per capita use 140 gal/day*~ gpapd= gallons per acre per day gpcpd= gallons per capita per day MGD= million gallons per day *Areas with potential to be irrigated with reclaimed water. **Per capita amount is well below regional average because project does not include commercial, industrial or agricultural uses which are included in regional per capita statistic. (03/25/91) 21 .5/-3'1-'1 v. Water Conservation Measures Three consecutive years of drought in watersheds supplying San Diego County have lead to changing attitudes and governmental policies regarding water. continued water shortfalls are projected as growth continues in Southern California. Three possible solutions are available: increase water supply from non-tradition- al sources; conserve available water; or, increase production and use of reclaimed water. The conservation approach is the focus of this report, primarily because it is a cost effective approach which can be directly implemented on a project-by-project basis. Over the long-term, water conservation must become an integral component of the Southern California way of life with or without a drought condition in order to avoid drastic lifestyle altera- tions. The potential impact of water conservation can be see in Table 5-1. A. Available On-site Conservation Measures Several general approaches to water conservation are avail- able: demand reduction; increased efficiency; increased supply/reclaimed water use; and, improved water system management. The measures included in this report are limited to those which can be implemented in projects of the size and type of Rancho del Rey SPA II and SPA III. 1. Public Information Any voluntary or mandatory water conservation effort requires cooperation of the public. Most consumers have very little knowledge of the water system that serves them. Historically, water has been inexpensive in california; therefore, people have a tendency to assume that there is an abundant supply and take it for granted. The purpose of public education is to inform and convince the consumer that a change in personal water habits is essential and is in hiS/her own and the community's best interest. Generally, long term results are best achieved through educating children in water conservation. 2. Land Use The per capita and per dwelling unit water use quantity changes with the type of residential units, the value of the residence, and the size of the lot. Table 5-1 shows typical per capita use for a single family detached residence in coastal Southern California. Interior per capita use is similar to other types of residences; the major difference in use is with outside use, which is significantly lower for high density developments such (03/25/91) 22 3/- 3l/5 Table 5-1 Residential Water Use in Southern California Use wi Conservation Potential Typical Use Measures Water Savings (gpcpd) (gpcpd) (gpcpd) % Inside Use Toilet 30.0 20.0 10.0 33 Bath/Shower 22.0 17.0 5.0 23 Laundry 10.0 8.5 1.5 15 Dishwashing 4.0 3.0 1.0 25 Faucet 3.0 2.5 0.5 17 Cooking 3.0 3.0 0.0 0 Total Inside 72.0 54.0 18.0 25% outside Use Landscape 53.0 28.0 25.0 47 Car Washing, etc. 5.0 5.0 0 0 Total Outside 58.0 33.0 25.0 47% TOTAL USE 130.0 87.0 43.0 33% Total Savings: Single Family Detached - 129 Gallons Per DU Per Day at 3.0 Capita Per DU Attached Low Density - 108 Gallons Per DU Per Day at 2.5 Capita Per DU Attached High Density - 86 Gallons Per DU Per Day at 2.0 Capita Per DU NOTE: Total savings without consideration of reclamation Source: Luke-Dudek Engineers (03/25/91) 23 3/*'3t1e. as apartments and condominiums. Table 5-1 also shows the potential savings for each of the water use areas. 3. Mechanical Measures Numerous mechanical devices to reduce household water consumption are available, especially for interior use. As Table 5-1 indicates, about half the water used in California is used indoors. The bathroom is where most inside water is used and wasted daily. Conventional toilets use from 5 to 7 gallons per flush, as opposed to low-flush toilets, which use from 3.3 to 1.5 gallons per flush. Since 1978, California has required that all new toilets installed use no more than 3.5 gallons per flush. Early on there was some concern that low flow toilets would cause clogging problems in sewer laterals, however, this has not been the case. Ultra low flush toilets, which have recently been developed, use about 1.5 gallons per flush. This is a reduction of about 57% from the low flush toilets used in new homes, and a reduction of up to 70% from the older toilets. since the toilet accounts for about 40% of the indoor use, this presents a significant opportunity for reduction. Standard shower heads have a flow rate of about 4.5 gallons per minute (gpm). California requires that new shower heads have a flow of no more than 2.75 gpm. The most water conservative showerheads have a flow rate of 0.5 gpm using a blend of air and water to give the illusion of a higher flow rate. In addition to saving water, low flow showerheads save energy too by reducing the amount of hot water used. Hot water use is the second largest residential energy consumer; heating and air conditioning the home is the greatest residential use. Low flow faucets reduce flow rates from about 5 gpm to between 2.75 gpm and 0.5 gpm; this can save one gallon per person per day. Low water-use appliances can also be large contributors to water conservation. Certain models of dishwashers use 50% less water than others and can thus save between 7 and 9 gallons per load. Clothes washers use 41 to 74 gallons per load. Front loading washers are more efficient than top loading, and various options can save even more water. Water level controls and washers that recycle rinse water save about 1. 5 gallons per person per day. Table 5-2 shows potential water use reduction due to water saving devices installed in an average home. (03/25/91) 24 3/- 3 Yr Table 5-2 summary of Typical Household water-saving Devices Water Use Reduction Device qpd percent Toilet improvements 7.5-17.5 12-27 Faucet aerators 0- 0.5 0- 1 Shower flow limiting 0- 7.5 0-12 Pressure-reducing valves 0-16.0 0-20 Improved clothes washers 0- 8.0 O- S Improved dishwashers 0- 8.0 0- 4 Hot water pipe insulation 0- 8.0 1- 4 Approximate Total 35.0 gpd 25% From: Water Conservation strategies, AWWA, 1980. 4. Landscape Approximately 50% of water used in California is for landscapes. Typical landscape efficiencies are between 50% and 80%; therefor, savings of 20% - 50% are possible through better watering techniques and maintenance. Trickle/drip irrigation applies water exactly where it is needed at an efficiency of 85% - 90%, and results in a total water savings of more than 4% alone. Generally, sprinklers are between 60 and 75% efficient. Watering at night, or in the early morning, using automatic sprinkler systems can save 20% of outside water. Daytime irrigation is inefficient because much water is lost to evaporation. Through the use of drought tolerant plants, water consumption can be reduced by 40% to 60%. Moisture sensors are another way to increase irrigation efficiencies. Residential customers, on the average, over water their landscaping by about 20% while parks and recreational areas are over watered by nearly 80%. Moisture sensors are not considered economical for residential use, but would save millions of gallons of water and thousands of dollars each year if used for parks and recreational areas. Polymers and wetting agents in the soil can also increase irrigation efficien- cy. (03/25/91) 25 31 - 3 t,L'i B. Conservation Measures xmplemented in Rancho del Rey SPA XX and SPA XXX Implementing water conservation measures before a project is constructed provides an opportunity to include measures which might not otherwise be practical. Many of the measures described here could be prohibitively expensive to retro-fit to existing residences, but can be cost effective if included with the initial construction. In addition, moving in to a new home provides a major opportunity to change habits and attitudes while adjusting to the new home/environment. The potential water savings for each of the conservation measures to be implemented in Rancho del Rey SPA II and SPA III are shown in Table 5-3 in units of gallons per capita per day (gpcpd), and can be multiplied by the number of people per dwelling unit (DU) to determine the water savings for each household. Water savings are relative to other newer homes without water conservation devices; much higher water savings can be shown if the proposed measures are compared to older residential units. 1. Fixtures/Devices - Indoors Ultra-Low Flow Toilet - The ultra low flow toilet uses 1.6 gallons per flush, compared to the current require- ment of 3.5 gal/flush, or the older standard of 5 to 7 gal/flush. Tests have shown that the new 3 1/2 gallon toilets actually use 4 to 4 1/2 gallons. Since the toilet is the largest single inside use of water (40%), large savings can be realized by using the ultra-low flow toilets. Although the ultra-low flow toilets can cost $50 more than a standard model, the savings more than make up for the additional cost. Ultra-Low Flow Shower Head - The ultra-low flow shower head reduces the flow from the current standard of 3.5 to 2 gpm. Older shower heads flow from 3 to 5 gpm. The ultra-low flow shower head saves about 5 gpcpd for a minimal extra cost of approximately $3.00. Faucet Aerator - Faucet aerators give the appearance and feel of greater flow, so less water is used. Many new homes already come with aerators, so the actual savings is shown ranging from 0 to 0.5 gpcpd. Although the savings is small, the additional cost is low, so their use is economical. There is also potential savings in energy through reduced use of hot water. Hot Water Pipe Insulation - By insulating the hot water pipes and separating the hot and cold lines to reduce heat exchange, the time the faucet is allowed to flow (03/25/91) 26 31- ~'/, while waiting for the water to become hot is reduced. The cost for insulating the pipes exceeds the value of water saved, but the cost is relatively low, and it is simple to do while the unit is under construction. The potential energy savings with insulation can be signifi- cant. Pressure Reducina Valve - A pressure reducing valve at the water hook-up for each residence can reduce the flow rate by reducing the pressure in the lines. Normal pressures for residential use range from 40 to 80 psi; the optimum is a range of 50 to 60 psi allowing a normal flow of 3 gpm. The amount of potential savings depends on the line pressure available, and ranges from 0 to 3 gpcpd. Water Efficient Dishwasher New water efficient dishwashers can save as much as 6 gallons per cycle over older models. Newer models tend to be more efficient, so the actual amount of water saved will depend on the type of dishwasher proposed. Since there is a relation- ship between cost and water efficiency, more expensive homes would probably already be planned for the most efficient dishwashers. Water Efficient Clothes Washers The relationship between water efficiency and cost of the appliance for the clothes washer is the same as with the dishwasher. Since the clothes washer uses more water, the potential savings is greater. The major difference with the clothes washer is that it is normally supplied by the owner, and would therefore be difficult to mandate the use of more efficient and costly machines, especially since the cost increase exceeds the value of the water saved. Rancho del Rey will advise and assist homeowners in their selection of an efficient machine. 2. Outdoors/Landscapinq Efficient Irriaation Svstem - As much as 50% of total water use is outside the home for a single family detached residence with large turf areas. Most residen- tial landscaping is over-watered, so the potential savings with efficient, timed sprinklers and micro irrigation systems is very large. Builder installed xeriscaped front yards with efficient irrigation systems are now provided in Rancho del Rey SPA I. All builder installed irrigation in SPA II and SPA III will be water efficient. Drip irrigation systems will be utilized where appropriate. The installation of correspondingly efficient systems by homeowners in rear yards will require eduction programs and a project Water Conserva- (03/25/91) 27 3/- 350 tion Coordinator to provide advice and assistance. A water coordinator is now serving Rancho del Rey SPA I, and will also serve SPA II and SPA III projects. A". Homeowner's Guide to Drought Tolerant Landscape will be distributed to all new home buyers to provide information on irrigation systems and low water use landscaping. Low Water Use Landscaoina - The largest potential for reducing outside water use is to decrease the water demand by using low-water use, drought-tolerant landscap- ing. Turf areas require large amounts of water, so restricting the area of turf will have a significant impact. Builder installed front yards will have reduced turf areas and utilize drought-tolerant plant materials. A Homeowner's Guide to Drought Tolerant Landscape will be distributed to all new home buyers to educate and encourage similar homeowner installed landscape design and materials. 3. Education General Water Conservation - In addition to the physical measures to reduce water consumption, a general water conservation program will enforced to reduce waste. Guidelines and educational materials will be distributed to all new homeowners. Water waste may be monitored by the local homeowners' associations, where available, or the Water Conservation Coordinator. McMillin Communities has sponsored and will continue to sponsor weekend seminars on water conservation and xeriscape options for homeowner landscaping. 4. Reclaimed Water Water Reclamation - Water reclamation conserves large amounts of potable water used for irrigation. The major opportunities for irrigation with reclaimed water are the neighborhood parks and the field area of the junior high school. Reclaimed water mains will be installed to deliver water to these sites when it becomes available. The decision to utilize reclaimed water will lie with the respective property owners, the City of Chula vista and Sweetwater Union High School District. The use of reclaimed water on these three sites could result in a 10% reduction in potable water use in the SPA II and SPA III projects (see Table 4-2). In SPA I (units 5 & 6) and SPA II, a reclaimed water main has been installed in the loop road and landscape irrigation systems approved for reclaimed water use have been installed in the public open space areas. These (03/25/91) 28 3' - ,SI will be charged with potable water until reclai~ed water is available (expected within 5-10 years). At that time, a single disconnection/connection is all that will be required to utilize reclaimed water for open space irrigation. Similar installations will be made in SPA III by the Master Developer, where appropriate. The City and school district should consider such an approach for the irrigated areas for which they are responsible. 5. Water Use Durinq Construction Water conservation measures can also be implemented during the construction/grading process. The three primary uses are: dust abatement; soil compaction; and, street washing. Grading and construction which is now going on in SPAs I and II serves as an example of the techniques which can be implemented in SPA III. Since the imposition of Stage 2 water conservation requirements by the Otay Water District, water conservation has been incorporated in Rancho del Rey construction activities, as appropriate. Water use has been limited to that necessary for proper soil compaction; soiled streets have been swept instead of washed. Reclaimed water could be used for these grading activities, however it is not currently available. The use of native/naturalized plant materials on graded slopes in open space will reduce the need for irrigation in the future. The "Rancho del Rey Revegetation Method" (modified Tyson method) is being utilized to re-vegetate some graded areas. The method involves scraping and saving native topsoil and then reinstalling it on top of non-irrigated graded areas. With rainfall, the seeds of the native plants in the top soil sprout and re-vegetate the graded area with the same species that were original- ly present, eventually re-establishing the same natural habitat. The use of dry grains to stabilize/landscape temporary slopes is also being evaluated. This approach avoids the use of water to irrigate temporary landscaping which has traditionally been used in such areas. c. Projected Water savings As indicated in Table 5-3, a total water savings of 0.340 MGD or approximately 46% is projected with full implementation of the water conservation measures specified in this plan. (03/25/91) 29 31 ... ~5 :l Conservation Heasure Table 5-3 Rancho del Rey SPA II and SPA III Water Conservation Measures Function Water Savings Per For Project Capita (HGD) (gpcpd) Per Residence (gpdjDU) Inside Ultra-low flow Toilet I 1.6 9al/flush Ultra-low flow .hower head; 2 GPM Faucet Aerator Hot Water Pipe Insulation Water Hook-up Pressure Reducing Valve Water Efficient Dishwasher Water Efficient Clothes Washer Outside Efficient Sprinklers & Drip Irrigation Low Water Use Landscaping General COnservation ~a~er Reclamation Reduced Flush Volume Reduced Shower Flow Rate Appearance and Feel of Greater Flow Reduces Warm-Up Time Reduces Pressure and Flow Rate Reduced Water Requirement Reduced Water Requirements Increased Irrigation Efficiency Low Water Demand Reduce Waste Replace Potable Irrigation Water 10 0.053 27 14 1 5 8 3 4 27 41 8 PROJECT TOTALS 138 (03/25/91) 5 0.026 0-0.5 0.003 O-l 0.01l 0-1 0.016 0-1 0.005 0-1. 5 O.OOB 10 0.053 15 0.079 0-1 0.016 0.070 51 0.340 30 3/-3~.3 D. Off-site Mitigation Measures Because of the crisis created by the mUlti-year drought in " California and the extreme short-term water rationing/use restrictions adopted to respond to the situation, new attention is being given to formulating new policies which will conserve water and allow for long-term growth. As noted in the preceding sections, although the SPA II and SPA III projects implement a variety of water conserving practices, the construction and occupation of these projects will result in an increased demand for water. The drought has demonstrated that water is a finite resource and that current supplies cannot reliably support current demands and continued growth. However, growth is major component of both the state's and, especially, the local San Diego area economy. In order to accommodate growth, while long term water supply options are evaluated and implemented, new programs to more efficiently use the available water are being proposed. An initial area of focus is the retro-fit of plumbing fixtures and landscape irrigation in existing development. According to statistics compiled by the Construction Industry Federation (CIF) retro-fitting the shower and toilet fixtures in approximately 2.8 older homes would save the amount of interior-use water required by one new home (additional older homes would be required to offset outdoor water use at the new home) . Thus a mitigation program which collected fees to complete such conversions, or directly required equivalent conversions, could allow a limited amount of new development to occur without creating a net increase in water demand. Comparable water savings could also be achieved by retro- fitting irrigation systems of schools, parks, golf courses, etc., where significant conservation of irrigation water could be achieved. This type of water consumption off-set program has been conceptually approved by the San Diego County Water Authority. Additional studies to determine the exact specifications, scope and implementation process are now underway. In order to avoid conflicting regulations and to maximize fairness, such a program would need to be implemented on a wide basis, preferably county-wide. The City and local water district would provide input in the establishment of the large scale program and would probably provide local implemen- tation. As indicated earlier, the approval of the Rancho del Rey SPA III Plan was conditioned to require a Water Conservation Plan which reduced any impacts to the local water supply to an "insignificant" level, as determined by the City Council. This is the first and, so far, the only project to be so conditioned. At the time the condition was drafted, it was interpreted to require a zero net increase or complete water (03/25/91) 31 31-35'/ consumption off-set, because no program, adopted policy or city-wide criteria existed to be used as a standard. However, as additional projects request approvals and/or a broad based mitigation/conservation program is developed, "insignificant" is expected to be defined as full implementation of on-site conservation measures and full participation in an off-site mitigation program endorsed by the city. The SPA II and SPA III projects will fully comply with the requirements of a city-approved and/or sponsored water conservation/mitigation program. (03/25/91) 32 ,31-,355 .. , VI. IMPLEMENTATION/MONITORING Implementation of the Water Conservation Plan shall primarily be the responsibility of the Master Developer. The Master Developer will establish requirements and guidelines for merchant builders and provide educational materials and guidance to new homeowners. The Master Developer will also install drought tolerant landscap- ing, approved by the City, in streets capes and open space areas. The Master Developer will also require the inclusion of drought tolerant plant materials and efficient irrigation systems in any builder installed landscaping. Portions of an outline for Landscape Water Conservation, to be implemented on a project-by- project basis within the community, is provided in Appendix A. This approach, prepared for SPA I (units 5 & 6) and SPA II, has been approved by the City's Landscape Architect and will also be implemented in SPA III. A substantial responsibility will also rest with the City of Chula Vista to ensure/enforce the provisions of this plan, specifically the Planning, Building, and Park and Recreation Departments. The Planning and Building Departments will review plan submittals to ensure that water conservation measures are properly included. The Parks and Recreation Department will approve planting and irriga- tion plans for public parks and open space. Mains and laterals for reclaimed water will be installed with the maj or road and infrastructure improvements. The provision of reclaimed water is the responsibility of the otay Water District, which will also be responsible for enforcing water quality regulations. The determination to use reclaimed water for irrigation purposes rests with the City Parks and Recreation Department for parks and open space areas, and the Sweetwater Union High School District for the junior high school site. In order to ensure that all provisions of this plan are met, the Mitigation Monitoring Program for the SPA III project, utilized to ensure the mitigation measures specified in the project EIR are implemented, will also incorporate the provisions of this Water Conservation Plan. This approach will allow for a formal deter- mination by the City that each of the required measures are implemented. Future discretionary or administrative actions with regard to Rancho del Rey SPA II and SPA III (e.g., tentative map, development agreement, building or grading permit, etc.) may be utilized to address or ensure compliance with the prescribed water conservation measures. (03/25/91) 33 .31-.35" VII. REFERENCES ERC Environmental and Energy Services Co.; Draft Suoolemental EIR EastLake III/Olvmoic Traininq Center. August 1989. cinti & Associates; Draft SPA Plan Rancho del Rev SPA III. August 1990. Luke-Dudek civil Engineers; EastLake Planned Communitv Water Conservation studv. September 1989. Luke-Dudek civil Engineers; Water Conservation Recommendations for EastLake Greens. November 1989. Metropolitan Water District of Southern California; Final Draft Reqional Urban Water Manaqement Plan. July 1990. P&D Technologies; Final Suoolemental EIR Rancho del Rev SPA III ElAn. November 1990. "Water Rationing Plan Includes S.D. County"; Los Anqeles Times. San Dieqo Count v Edition, page A-I, December 12, 1990. willdan Associates and Bud Gray; Draft Growth Manaqement Proqram - citv of Chula Vista. August 1990. (03/25/91) 34 .3 I -.35 1- . "0 APPENDIX A A-l .31-':>5 i q , RANCHO DEL REY SPA II and SPA III Landscape Water Conservation outline REVIEW PROCESS AND PROCEDURE A. The creation of the Rancho del Rey irrigation and landscape will consist of the meshing of numerous projects into a pre-established pattern. To monitor this effort, routine review during the planning and implementation states of a project is a necessity. This review will occur as a normal part of the total landscape planning effort. In addition to this master developer review process and procedure, the City of Chula vista requires review. The following is recommended: 1. Prior to commencement of desian of a specific pro;ect within Rancho del Rev a meeting should be conducted with the Rancho del Rey partnership (RDRP) to thoroughly understand: a. The project's relationship to overall landscaped water management program. b. Specific processing procedures and submittal requirements. 2. Durina the Schematic Desian Phase, closely adhere to the principles of the program, General Landscape Plan, the Design Manual, the City of Chula vista Landscape Manual, and the Otay Water District Water Conservation program. Indicate which areas will be irrigated by future reclaimed water. 3. The Schematic Desian must be approved by the Rancho del Rey Design Review Committee. 4. Durina the Desian Development Phase, the project manager should incorporate applicable Landscape and Irrigation standards. 5. The final workina drawinas must be approved by the RDRP and the City of Chula Vista. A-2 ~/-359 . .. Two separate sets of landscape, planting and irrigation plans may be required: a. Slope erosion control plans required as part of the Grading Permit process; b. Project Landscape and Irrigation Plans. B. The formats for landscape submittals are as follows (may be subject to change; verify latest requirements): 1. Schematic Submittal This plan should be at the same scale as the site plan and should clearly illustrate the landscape architectural design including type of landscape and plant materials. The plan shall include a legend indicating all plant materials and sizes and irrigation materials. A water conservation program should also be included. 2. Final Submittals a. Slope erosion control plans. Plan shall be on City of Chula Vista "0" sheets and conform to all applicable City requirements. b. Final Project Irrigation and Landscape Plans. NOTE: As previously mentioned, this is one component of the total landscape planning effort, therefore, separate drawings for the purpose of indicating the Water Management Program do not have to be prepared. Schematic and final submittal plans will be the customary irrigation and landscape plans, unless these plans do not cover specified requirements. IRRIGATION The irrigation for Rancho del Rey shall be controlled by an automatic irrigation system. The project landscape archi- tect, water manager and his staff shall be familiar with optimum use of the system, so that monitoring and response to climate conditions can be achieved in the most expedient and efficient manner. A-) ~/-3'-O . .. The following steps shall also be taken to insure efficient water use and conservation: A. Analysis 1. Review and confirm projected water quality and effects on proposed plant list. Develop plant palette. Emphasize drought tolerant plant materials and xeriscape. 2. Develop "ET zones" for project based upon marketing, low water goals and plant material 3. Meet with City to confirm design standard requests in general. 4. Meet with RDRP to review desired product. 5. Review design standards for otay reclaimed water irrigation approval. Also, adhere to the District Water Conservation program. 6. Establish construction phasing and timing with respect to available water. 7. Review RWQCB and Health Standards. 8. Establish water use plan (master plan), meters, peaking, average use, etc. Review potential of supplementing reservoir during peaking. 9. Establish time of use for irrigation. Note any restrictions mandated by the Water District. 10. Formulate maximum flows, maximum reach and limitations of current and proposed reclaimed system. 11. Review Rancho del Rey needs, check with otay on additional user needs promised. 12. Check future expansion needs. 13. Establish priority list of which areas receive water first, etc., down to the cost priority. 14. Review and confirm most efficient mainline distribution system to service irrigation needs and goals. A-4 31 - 31,1 . .. , B. Irrigation Installation In order to appropriately conserve water, the following general procedure will be followed: 1. Permanent areas planned will be approved plans. where immediate construction irrigated in accordance with Systems may include: is a. Low precipitation sprinkler heads b. Moisture sensors c. Check valves to prevent drainage out of low heads. d. Separation of different types of landscape areas, elevations and climatic conditions and exposures. e. Common areas to be automated systems to maximize conservation. 2. Temporary areas (to be altered by future construction). a. No irrigation to be installed. b. straw punching. c. Water shall be natural rainfall. (Landscaping installed during rainy season). 3. Interior minor slopes landscape areas a. May be treated in a temporary manner with no irrigation, (non-irrigated hydroseed mix), and straw punching. b. Once construction occurs, the permanent irrigation will be installed. Subject to approval by City Landscape Architect. 4. Exterior slopes adjacent to native areas. a. Initially no irrigation will be provided. The "Rancho del Rey Revegetation Method" will be used. Plant material establishment will be monitored for 3 to 5 years. If satis- factory results do not occur, the city may A-5 3'-.3~~ . 1> J require that a permanent irrigation system be installed. LANDSCAPING Landscaping will be carefully planned to provide erosion control and stabilization, energy and water conservation, visual aesthetics and overall enhancement to the community. This will be achieved through appropriate plant material selection, soil analysis and amendment, and landscape installation. A. Plant Material Selection Landscape areas have been classified based on their intensity of maintenance and water requirements. These classifications are generally described as follows: 1. Native Areas - These are existing vegetated areas undisturbed by construction operations. Natural rainfall only is required for irrigation. Periodic clean-up and grubbing of seasonal growth may be required for fire brush management. 2. Naturalized Areas - These are newly planted areas adjacent to native areas. Temporary irrigation may be provided. The "Rancho del Rey Revegetation Method" will be used. During the rainy season, supplemental trees and shrubs will be planted at the ratio of 115 plants per 1,000 square feet (30% shall be trees and 70% shrubs). NOTE: Plant material selections will be coordinated with the City Landscape Architect. B. Soil Analysis and Amendment 1. To assist in plant material designation, careful analysis of the Rancho del Rey soils will be completed by an independent soils laboratory. 2. Recommendations for soil amendment will also be given by the laboratory. 3. Soils in the general area appear to possess these characteristics: a. Unbalanced nutrients b. High in salt content A-6 3 I - 3 {,3 . " , c. High clay content 4. The amendment program will: a. Add organic matter and nutrients for healthy plant growth, where required. b. Chemically treat the soil to reduce salt content, increase permeability, establish correct pH and alleviate any harmful elements such a boron. c. May include amendment to improve the water retention capabilities of the soil, i.e., "agricultural polymers. MAINTENANCE Once the irrigation and landscape are installed, proper maintenance shall be the key to efficient water use. A. Irrigation/Landscape 1. The irrigation system shall be systematically adjusted and monitored to provide optimum moisture without over-water or runoff. 2. Expertly trained personnel shall operate the system to its maximum efficiency and benefit. 3. Routine field observations shall be made to review irrigation operation and landscape conditions. Adjustments, if. necessary, shall be made in an expedient manner. 4. On a periodic basis, the irrigation and landscaping shall be re-evaluated to determine how efficiency and conservation can be improved. 5. Once drought tolerant landscape areas are established, the frequency of watering shall be reduced. 6. Temporary irrigation to be removed by Developer at turnover to Open Space Maintenance District. A-7 3/-311'1 - RESIDENTIAL DESIGN GUIDELINES Rancho del Rey SPA III SUBMITTAL DRAFT August 10, 1990 Revised 10/26/90 12/18/90 3/4/91 Prepared for: Rancho del Rey Partnership 2727 Hoover Avenue National City, CA 92050 Prepared by: Cinti & Associates 1133 Columbia Street #201 San Diego, CA 92101 (619) 239-1815 .J I - 31P.5 TABLE OF CONTENTS (Continued) Paqe SITE PLANNING CRITERIA................................... VI-1 Product Development Site Development Standards Design Issues by Parcel (08/10/90) ii :31-3~(, Purpose This document is q manual to guide the design of site plans, architecture, and landscape architecture within Sectional Plan- ning Area III (SPA III) of the Rancho del Rey Planned Community. It illustrates the master developer's philosophy and commitment to a high quality, planned development program. These guidelines address the design issues relevant to develop- ment within SPA III. Separate manuals have been prepared for areas within SPAs I and II. The applicable area is depicted below. SPA III Design Guidelines Area (02/02/90) 1-2 3 I - 3 ~ ~ dered in the overall community design and theme. Current and planned construction within SPAs I and II will establish numer- ous precedents for the "community aesthetic" of Rancho del Rey. The established standards and guidelines for these areas are reflected in this SPA III document. Relevant Planninq Documents This Design Manual is the latest in a series of documents which have, in increasing detail, established the development and design standards for the Rancho del Rey Planned Community. The most general standards are contained in the EI Rancho del Rey Specific Plan which is incorporated in the City's General Plan for the property. The Specific Plan allocates land uses and intensities throughout the planning area and establishes general regulations and guidelines for development, as well as preserva- tion and conservation of open space and other on-site resources. The second level of planning is achieved through the plans pre- pared for each of the three SPAs which comprise the then undevel- oped portion of the specific plan area. SPA I was the first of these areas to be planned and is now under construction. It encompasses the majority of the property north of East "R" Street. The remainder of that area, directly adjacent to Terra Nova, has been planned as SPA II. The area to the south, be- tween East "H" Street and Telegraph Canyon Road, is SPA III. It is the final planning phase of the project and the subject of these guidelines. The SPA Plan and companion Planned Community (PC) District Regulations expand upon the provisions of the Specific Plan and provide more detailed design specifications and regulations. The focus of the SPA Plan is the delineation of community level facilities (e.g., collector roads, neighborhood parks, trail and open space system, etc.) while also providing some site specific information such as basic grading design, lotting and interior street layouts. The PC Regulations provide the use and devel- opment standards which are applied to individual lots. These regulations should be reviewed during the design process for height, bulk, and setback standards. Desiqn Influences The primary influences which affected the design of the SPA III Plan were the adopted EI Rancho del Rey Specific Plan, existing improvements, and the landform characteristics of the site, as depicted in Exhibit 1. The topography of the site consists pri- marily of east-west trending ridges and intervening valleys. The primary topographic feature of the SPA III site is the cen- tral ridge which separates the southern leg of the Rice Canyon Open Space Preserve and Telegraph Canyon. Rice Canyon contains sensitive biological resources which are to be respected during the development process. The development plan places develop- (02/23/90) 1-4 31:1" 8 ment areas on higher elevations while maintaining the canyon in natural open space with some recreational uses, as was done with the northern and central legs of Rice Canyon in SPAs I and II. As illustrated in Exhibit 1, Design Influences, the preserved side slopes are intended to provide a natural open space back- drop for development. Graded slope areas are to be planted with naturalized species to also contribute to this effect. The location of the development areas provides numerous view oppor- tunities, but will also necessitate screening and other design features to maintain a high aesthetic quality throughout the community and as viewed from off-site. A primary design con- sideration is the integration of development into the natural setting while preserving the natural ambiance of the canyon area. Another primary consideration is the integration of SPA III with the existing development which adjoins most edges of the project. Projects within SPA III will need to balance the "Rancho del Rey aesthetic" with the existing designs and pat- terns of development on adjacent property. Community Concept The Rancho del Rey Planned Community includes a diversity of residential products, together with employment and support land uses in a well planned arrangement, (see Exhibit 2, Site Utilization Plan). The predominant residential product in the overall project is the single family detached (SFD) home which is sited on a variety of lot sizes. Within SPA III, SFD pro- ducts are proposed in the western and central portions of the site. A single townhouse site is designated at the southeastern corner of the project, south of East "J" Street. The residen- tial parcel at the northern edge, along East "H" Street, is designated for Specialty Housing. This will most likely be a retirement housing project which may include two or more product types, attached and/or detached. To the south of the Specialty Housing site is the southern leg of Rice Canyon, designated for open space. The other major on-site open space area is on the southern edge of the project, an open space buffer along Telegraph Canyon Road. These areas continue the pattern of using open space as both an amenity and the setting for the Rancho del Rey Community which was establish- ed by the Specific Plan and implemented in SPAs I and II. The major proposed public use within the project is a junior high school site located at the southeast corner oJ Paseo Ranchero and East "J" Street. A large neighbor hood park site is provid- ed between the junior high school and townhouse residential sites. A small community facility site is located along Paseo Ladera, on the western edge of the project. The arrangement of these public uses necessitates an amendment to the EI Rancho del Rey Specific Plan which will be accomplished concurrent with SPA Plan adoption. The major circulation routes through the project are Paseo Ranchero and East "J" Street. Paseo Ranchero and an off-street (10/26/90) 1-6 JI- 310' trail system provide connections between SPA III and the major public facilities located to the north in SPA I. The realign- ment of East "J" Street so that it does not connect to Buena Vista Way, east of Paseo Ranchero, also requires a General/ Specific Plan Amendment which has been incorporated with SPA Plan approval. (10/26/90) '-8 3'.... 3 TO :l:ntroduction and SUllllllarv The design review process includes two integrated procedures: design review and approval by the master developer and review and approval by the City of Chula Vista. Essentially the pro- cess requires the builder to formulate the design for his parcel and review it with the master developer prior to formal applica- tion and review of final designs by the City. The City of Chula Vista requires Site Plan and Architectural Review, as well as Landscape Review. The overall process is sketched below. ~~ DESIGN REVIEW PROCESS CHART ~ /Y!!:tI1Ei' ,f ~~ ~q-vr ~~av ~. ~~dl:t ~.~ ~ ~ ~ elrr~ ~ . . . (02/02/90) 1-2 3/- .3 1-1 The City has also published a "Landscape Manual" which describes the landscape review process and provides some guidelines for landscape design from the City's perspective. The Manual also includes specific standards for landscape and irrigation improve- ments. (02/02/90) 1-4 3/- 3r~ Introduction The character of the Rancho del Rey Community at the broadest level is established by the EI Rancho del Rey Specific Plan and SPA Plans. During the preparation of these plans, numerous com- munity design features were established or considered. As indi- vidual parcels are developed, attention to these established cri- teria is necessary to successfully execute the intended design. This section is intended to describe and promote the design fea- tures of the SPA Plan and to provide guidance for consistent detailed design. Several SPA Plan Exhibits which address these design issues have been reproduced herein for reference. The following chapter, General Development Guidelines, addresses those design issues (e.g., architecture, lighting, parking, etc.) which were not intregral to the previous plans. Circulation The circulation network provides both a physical and visual con- nection between residential neighborhoods. The overall street circulation plan is indicated in Exhibit 3 on the following page. The exhibit also illustrates typical road sections. In addition, a comprehensive system trails for pedestrian and bicyclist use has been included throughout the community. The SPA III trail system includes a hiking trail which extends the length of the southern leg of the Rice Canyon OPen Space Pre- serve and connects to a regional network through SPA I. Access to the trail system will be site planning issue for some parcels. Special landscape designs and treatments have been established for community entries, parcel entries and streetscapes. These are discussed in the Landscape Design section of these Guide- lines and should be referenced for further information. (02/23/90) 11-2 3/-31-3 Trails The interconnecting trail system provided in SPA III is graphically shown in Exhibit 4 on the following page. Trails in open space areas such as the southern leg of Rice Canyon are to be aligned and constructed to minimize adverse impacts to sensitive biological resources. Trails should follow utility access roads and existing paths whenever feasible to minimize disturbance of natural vegetation. The SPA III trail system will provide a connection between the existing residential development west of the project site and the school and park amenities at the northeastern edge. Schools and parks, including the on-site junior high school and neighborhood park are expected to be the primary destinations of trail users and are indicated on the Trails exhibit. In addition to pedestrian and hiking trails, a bicycle trail (bike lane) connection is provided between the existing bicycle routes on Telegraph Canyon Road and East "R" Street. The SPA III trail system will connect to the system within the Sunbow community, south of Telegraph Canyon Road, via Paseo Ladera. These routes will encourage non-vehicular circulation within the community. Final location of the trail system is subject to review by the City Parks and recreation Department. A sketch on a following page illustrates the trail crossing at Paseo Ranchero. The sketch also includes a section which describes the grading adjacent to the roadway. At the can- yon crossing, the streetscape will be comprised primarily of views down and across either side of the canyon. Some of the landscaping installed on the down slopes adjacent to the roadway will also be visible. Access from the SPA III neighborhood park to the trail paralleling Telegraph Canyon Road will also be provided. A sketch conceptually illustrating the access route is provided. Recontouring of the slopes facing Buena Vista Way, to improve the appearance and reduce maintenance of the slope, are also illustrated. (03/04/91 ) 11I-4 31 - 3T'I d PASEO RANCHERO at RICE. CANYON ~ fl-.t:~. ~ ~ ~ qwr~tV Jn4dL. f)fiVl!fZIffI!j'#T ~ ..r...--.......-------- .- 1-6 31 - 3 ':I-~ Gradinq Attention to detail in the execution of grading is important at both the mass grading and detail grading levels. The EI Rancho del Rey Specific Plan included design standards for grading. The most relevant portion is repeated below. The Alternative Grading Concept (Exhibit 5) is responsive to these policies as well as those of the General Plan Land Use Element. Final design should reflect the approved conceptual design. The requirements of the Chula Vista Grading Ordinance and other city policies, which are not superseded by those herein, shall also be incorporated in grading plans for development within the SPA. Grading Standard The design intention of the specific plan is that graded areas be contoured to blend with natural landforms. Round- ing both vertical and horizontal intersections of graded planes, obscuring slope drainage structures by massing a variety of plant materials, incorporating variable slope ratios for larger slope banks, use of landscape planting to control erosion and obscure man-made banks, architectural solutions to topographic changes, and other similar tech- niques should be used. Slope banks with rigid angular characteristics shall not be permitted. Slope Banks - General The following guidelines are summarized from the SPA III Plan. Specific standards will be implemented through the tentative tract map process. Slope banks should be constructed at 2:1 or less (unless otherwise approved). Erosion potential on all slopes should be reduced through the use of small berms at the top of the slope, drainage improvements, and/or the use of appropriate vegetation (see Landscape Design). Provision should be made for adequate maintenance of graded slopes and landscaping. Streetscape Slopes The City's Street Design Standards Policy establishes stan- dards for the grading of slopes adjacent to the right-of-way of major streets. These generalized standards are applied unless more precise designs are submitted and approved in conjunction with the project planning process. Considerable attention has been given to streetscape appearance in the design of SPA III and generalized design concept is included in this chapter (see Streetscapes). A more detailed evalua- tion of landscaping and slope design, utilizing the design criteria and concept presented in these Guidelines, shall (03/04/91 ) :!"'I - 3=1- ~ WI- >a. -w t;;:o ZZ a:O Wo !::iC) <z C < a: C) ;h~ II. !i~ ~I! I<~i k .-- ~' , ~.I U! ! 5 .~~~.~.. ... . . ,;. :; ,I !I ,'.:O:r":(0.'.I ~ ..- '>'-. \ ' ' " '~ I! ~<","\O,",,' i '_,';" .~ \\_J.....~.. '.-']' - I ~ _, . 'll 'r,,:--- \- . \ \ \\. __ \ . :'--.:'~.: " , . ~\ Ii \\ --' '. ~~ ' - ~ / '" \ \ r \';- \. \. \' ,'~ ;,. \\_- !!I! '\ -di~) \~ -' :,', \ . 1~~~ ~ --d....':;:? \~..-2....:..~~~, ,l... !~.;:::""",,,-\\ . // I~, i i~ 1:' \~~~!\ i ;.-, \ I.~ j :ai...,4: ., +\ /-~ I~ _ ~4. \.' ~ . t,f1-" - ~ ~a~!~~~ r- r , ~ \ ~" Itl".J5~ai ~~~.~ai !,-:. ~\ -," I f!f-' i~l~! ~5:1! '~c_-::, I", '8 ,i,~.-<\.:, ,;.. ,\ '=-C~, II G e!_ ". · ,I ~'~I,,',"'" 'I l" . " ~ ' ',__:, ',' \ B ~ ~ "dPiiV:f:i ' I'~ ~~' ',Il ";/~.,,, \ 18 ~ ~~ ~ ~J I I " r-:-:. \ . II;~ .< ~ tI:~"'{~) 'f. ,: " L:( '\ \ I' -'1" ,rJr__ 1" I ! d! ,,'\'\' I, '-. .~ t' ""~~__,; ....-/". 1 a '~%/;i- ,'-. ;~ i~~ ~~ ,.., : ~ /.';~ ' " '-. !!~! ~~ , 'I ' :~\. ~'" ~i ~~.. ,II ..~ , O' ~. I=i,. !;tCl_';;~ ~ fj~ I i~t /: "" " !!!=~i U ~.': as.Hl B ~,. ~.~ i X ! :" ~~i c ~~w j i~~ ~,/ ;." 3di~ -- Ii ~ ~ , i-a dl ~i ~ - i - .. '" 13ii '~~ ~ . . . l'.~ ' ;Iii~';- , 10-9 3/' 3 -=1-:r- ~I ~ 0.,1 )I u- S, EJ ~1 ~~ Bi 8i a~ [II ALTERNATIVE GRADING PLAN SPECIALTY HOUSING WEST - I E \-..~ ..... oq CREATE FllllENGTH PUBlIC TRAL along CANYON RIM. USE 3: 1 CONTOURING to TRANSITION 10 NATURAl. CONTOUR SlOPES --..~ Easl 'H" 81 -- reel . . ~ REDUCE 52' IIGH CANYON FLL Sl.OPE TO 32' in CANYON and 22' above PUBLIC TRAIL. CONTOUR TRANSITION SlOPE 10 NATURAl. CANYON SLOPE REDUCED from 61' 10 40' in CANYON with 21' above PUBLIC TRAIL. .~QQ~R2yBQ' Ci1ti -- 10/30/90 It...nt.." Entries Entries serve two primary purposes. The first is informational; they identify the community or neighborhood. To this end, entry graphics must be clearly readable to the motorists and not so overly sculpted and landscaped that their basic message becomes obscured. The second purpose is to provide unifying design accents through- out the community. If each project or neighborhood attempted to compete for attention via their entries, the overall unity of the community would be decreased. Therefore, there will be a common design treatment for all entries to reinforce the overall sense of community. Entry monumentation will be provided by both the master develop- er and individual builders. There are three primary types of entries: major entries, minor entries, and gated entries. The approximate location of these entries is depicted on Exhibit 6, Community Signage. (02/02/90) 3/-39-9 1-10 Major Entries Major entries are those which provide access to the entire community. They consist of special monumentation and land- scape planting, as illustrated below. These entries should be designed to create a portal and convey a sense of arrival. They will inform the motorist that this is the entrance to the Rancho del Rey Community. They will include design features that are consistent with community fencing materials and may include a mock guard house element. Entry design should flow with the terrain and appear to be an extension of adjacent land forms. --------- -----..--- Minor Entries These are the entries to the individual parcels in Rancho del Rey. They are to be designed as an enhanced extension of the community fencing detail. These should be limited to the one or two major entry points into a parcel and will provide visitors with the project name identification. The master developer will provide individual builders with proto- typical details of these entry treatments to insure conti- nuity. (02/02/90) 3 I - 3i 0 1-12 Below are the elevations of the Rancho del Rey fencing program. These are to be used for all fencing indicted on the Fencing Plan, Exhibit 7, on the preceding page. Fencing for townhome and multi-family projects are not specified on the fencing plan, because the placement of such fences will be a design detail of each individual site plan in these areas. However, any fencing proposed in these attached residential neighborhoods shall use the same fencing style as indicated for the single family detach- ed areas. Pilasters with the spherical cap shown in the sketches should be used occasionally for design continuity along long fence runs and at fencing "end points" (e.g., all entries, and where substantial changes in direction or elevation occur). A flat cap (no sphere) shall be used at other pilaster locations. Pilasters should be provided at each property line intersection or at a maximum spacing of 50 feet. . :r- " CONCfliETE alOCK WI lTUCCO ,...104 SOUND WALL(Noise)1 V" SOLID WALL CONCMTI' ..OCI( ......TP WI lTUCCO '...H T"r~tC"L r1I f... _ CONCIIIETI! kOCK WI lTUCCO ...... l'" ~ <.~ LOW FENCE .",.}; OPEN-THEME VIEW FENCE LOW WAU. . .t " " . SOLID FENCE V" with PILASTERS ".'. .TUCCO,........ ~ ............. (02/02/90) 3 I -;it; I 111-14 COORDINATING FENCE HEIGHTS ~ ~ 1It~ JAW f7'4.WT fltco FEWce .f{IG,~wr ~ pOJfIY ~ f)!'/ 71ft) '#P~ ~ (Y 11f/rJ 31-a8~ 111-16 ALTERNATIVE SENSITIVE EDGE TREATMENTS ~ ". 1'1lt6 a;V7l/V(/otl~ 7W~ 6~1o/ /fOt'fe5 ~~70H fT'r~ P, 11/15 //VC4N~/Y'<7e 5(/lGt-G: s~N ~E3IJT~ ~~V~ /PJ?I71~fYAt- ~ . I 3/- 3V.3 111-18 School/Park Interfaces Although schools and parks are generally considered to be compatible with residential uses, some level of conflict is unavoidable and a buffer must be provided. Whenever pos- sible the buffer should include a change in elevation, plac- ing the residential units higher. A difference of only three or four feet is a significant improvement. Dense planting of the slope and fencing should also be provided to create a physical and visual separation. If sufficient slope height is provided, an open fence could be used to allow views from the residential lots across the open park area. These features should provide an aesthetically pleas- ing perimeter to the school or park while minimizing the intrusion of noise and distractions to the adjacent home sites. SDG&E Easement A major SDG&E easement runs through the western portion of the community. This corridor divides the R-8 development parcels and presents both an opportunity and a constraint. The opportunity arises from the open space characteristics of the feature which also incorporates the trail network. The constraint lies in the limitations on the type of land- scaping that can occur consistent with SDG&E restrictions. Nonetheless, a fundamental design concept is that the easement interface should not become a hard brown edge; landscaping on the adjacent parcels should be blended into the easement area to create a soft edge. See the Landscape Design section for addition information. (08/10/90) 3/-3B'I- UI-20 ~ Scenic Corridors Two off-site scenic corridors will be affected by develop- ment within SPA III. These are the Telegraph Canyon Road and East "H" Street corridors. Views from these streets to residential development areas will mainly comprise rear unit elevations and rooflines, rear yard fencing, and some graded slope areas. In such visible areas, attention will need to be given to the aesthetics of the rear exposure, as well as the front. Additional rear elevation detailing, variable lot depths or rear yard setbacks, and special slope land- scaping should be considered as potential design solutions. The canyon interface discussion and the landscape design section of these Guidelines should be referenced for addi- tional guidance. Additional discussion of this issue is included in the SPA III Plan in Section VI.7. The detailed guidelines for Parcel R-7 include design criteria for the special setback area along a portion of East "H" Street which borders on that development parcel. Special attention should also be given to the graded slope at the corner of Paseo Ranchero and Telegraph Canyon Road. This area, adjacent to the junior high school site, is visible, both as a project entry and a component of the Telegraph Canyon Road scenic corridor. Design efforts should be directed toward achieving a rustic/natural character while maintaining site area for the school. The incorporation of boulders or other techniques to retain the slope, or provide opportunities for special landscaping to "naturalize" the slope appearance should be considered. (12/18/90) 3/- ''8.5 111-22 m.. < j I I I II . < I i ~ I it J \ t , \1 ( I - , t~ I \1 L( - I ffi t 11 I ) I i I, ~J i i .1 \, . ~* I W "" ~ ~ ~l!ill tb'[] I .D~ 1]! !' ~!( @ ~ ,~ E D.7\r:.~E "~~~ II ,\",,- ,r._.J Ii '~, / ',fill " " )"",{!f) SFD "'\ ' SFD , .t/I " "- /:l~~ /;::~ I 11111 / fJ /'. ~-' ~~_---.i JI~ /}~' -'r'-~ ,..-r_ "I /1 I'~--'l / . Cb\It1tIVITY I I i/ / fjA(:(tll1' \ I \'..~;; ) ~ . . -'"' Plan Detail/ , Extra Setback Area . I. . lor Garages "U Taking Access ~ along" J" Streel _ ~ / Extra Setback Area 1i ; SFD Acce~': ~rag"~~ ~kong li~j -- r- -.-1_ a/reel ~:~=-~ .-L~ .~ ~~'~~1LF- 1--..1 I ISFD, I J I ~-I.l I. STREETSCAPE East "J" Street/ Paseo Ladera -. ~'> \\ SFD ( \. Plan Detail Communily Theme Fencing Variable Slope / SFD \_ ~U;. ~_. . '" 0 ~. TOWNHOUSE ~f--. yariable Slope SITE PARK SITE iii' i Transition Area - Park ~ ~ ParkInQ Area.' r ~ 111~SJ19~RQ~~eyBE riM n n r-1 Gint" U IU U !~,~~~ 12111190 .. Q. -0 SFD Ncn 55' -1 5:1 Slope 60' R.Ow. ~ 11~l!9~Q~~eyB!! ,3/IIf!"ldt8' STREETSCAPE SECTIONS =<=e";i;~ section SFD 60' R.O.w. 2:1 Slope Section E-E Paseo Ladera Jr. High School Site Section D-D East "J" Street .rtrlI anti &~ '61Q. 139 'e'~ (08/10/90) IV. GENERAL DEVELOPMENT GUIDELINES IV-, 31-~gCj pp THIS NOT THIS ] /[ -. ~ ~%-rit11-~- OtJ ~y GUiiI/,A71~/Y$ . . o /tfP/P ~~ ~ PtJA'T 1/$ ~ f'1~ ~ ~ Q~v71i7IY ~<S FI/I~ I"/~ii/7(/c-r. . 1iI fa OPIYT hG-T a.e~/Vs /!!eCtJ1f!3- I1P(V ~ TP;VOtl!7 IV-3 3 I - 3 '0 S!qn!nq In the SPA Plan, the distinction is made between permanent and temporary signs. Some aspects of permanent community signing have been previously discussed under "Entries" in this manual. The illustrations below provide some common sense guidance in the design of temporary signs. Within the SPA III Plan, Chapter XI - Comprehensive Sign Regulations should be consulted for specific sign restrictions (e.g., sizes, permit requirements, prohibitions, etc.). THIS C4~ ~~ ~~ 'I' +- .. 1Y/~Nlf7E= ~ NOT THIS ~spwr ~~ ~~ 1;: //0.Pf'I'-4'~Q"\-re- ~ 1V-5 3/-391 ~~ ~ !Iffi tf/P%-~Ke ,. ~ STREET LIGHTING FIXTURE IV.7 31-39~ 3/- ~~ .3 "f9&~"'r~ No- ~fl .JJ::{:Zt.. IzL. V77W~.~ ~ VI' (/u. ~~,'f t'/'VY'IIIG tA'75 "',f'tNfJ' //yw/J'!!? ;%IF BREAK-UP of INTERIOR PARKING AREAS PARKING PLANTERS IV-9 -3/-- ?l1~ v. LANDSCAPE DESIGN (08/10/90) V-l '3/- 3'.5 Landscape Concept The general components of the landscape concept are as follows: Parcel or Specific District (theme trees) Each neighborhood may have a distinctive architectural theme. Selected landscape elements, including trees, should reflect that theme. Streets (dominant, support street trees) Landscaping of streets ~ill provide continuity throughout the community and create the appropriate link with adjacent areas. East "H" Street, East "J" Street, Telegraph Canyon Road and Paseo Ranchero will continue existing tree patterns established by the City of Chula Vista. streets within indi- vidual neighborhoods will reflect the neighborhood design character. Special materials within a landscape buffer will be installed in masses with earthen berms along East "H" Street to reinforce the established streetscape pattern within the Employment Park across the street. Special attention will also be paid to the graded area near the water tank. Landmarks (theme trees) Each major character. sites. and minor landmark may have its own distinct Landmarks in SPA III include the school and park Entries (accent trees) Entries are in three categories (see Entries in Chapter 4, herein) : Major Entry (community entry) Minor Entry (neighborhood entry) Gated Entry (special entry) Accent trees will be used to contrast with designated street trees. Major entry accent trees will be pre-selected; how- ever, the minor and gate guarded entry trees will be selec- ted by the builder subject to approval by Master Developer and the City of Chula Vista. Arterial Accent Planting Flowering accent tress will be used at these major and minor focal points to provide distinctive contrast. (12/18/90) V-3 31"?>'C, w < u. - \ \)ol ..a ~ ~ ~ fA '<.!J ............. ..... ..................... ..................... ..................... .... ...... .... ~ pARK PLAN1lNGI Hlgft-brancNng ......... aM CMeIOuaue t,... ..........1Il _...........,I.t."'O"~ .....................11...... .ec.... ,... ......---- 10"'..........'_'_. ARTERIAl. ACCENT ....."NTIHG fktweringl'........acc....".. or .ound<:o..... I' an...." poinI. ENHANCED ILOPE PLANTING V.,Ue..........."......,...... PIIItI'nt1 w1ll1llow.................. ...........-*0"..... HA1lMALlZEO PLANTiNG ...1....~...I......Ud......._ lIhr...to~cII.IrIlbecl......Of ~. willi Mlural OC*I ...~. FUEL MOOtFCA TION ZONE Acl.... toc.IIofIIOb.d.'....ln.d lollowlng plolUnllo, bundlng, I' Ipe,1 01 11'.. IUlel,. pll" ,1Ib"llt,1. Pill'll ....'..1... 1",11 con,ll' ollow-h.I' ,hlub' lno ",ounde..."'. D D --- --- ~ (!!It ARTERIAL PLANTINO Pllnl ""t..I,I, In conlhwllr wl'h "'IUnll'''''''' Ind CIl, t......c... ",c:llltlcl', II,nd,rlll. EAST oW STREET BUfFER Low ........n ,twubl In "'.....'" cOtoObln,lIOfl wl'" ..,111 bl'..... Plant 1111,.,1.1. In contlnulllf wllh SPA I EMploymen, P.r. IC,.entng 10 r.lntOfc...IIUnglhefn.. RESERVOIR 8CREENlHCJ F..'.... bolh ....11ng ....,..... "... .ndlow ...r...n .tv"b.ln ........10 Icr.en w.l... .......olr. .~QQ~Bm' General Landscape Plan --;-\ --~;;, . ...r:. {J'" , \ .... - (f~ \ '<,/1 \ /\ \ : , \--- . \ ~? =~~ ~?~ " ~~ ~.,.~~\ . ,~~ f#l!!.p II -..-.... ~~__ E... " ".... _~~~~ Ih ~'''-'''' ~~~==..=====ara~,~~'''~. ",:r: I. -- . ~~" ~~=-'l..~~((~ cP' "'... . --...... I " ...l / .-....1 ~ . /'f \;> . .' -......-.... .. ~, / /J ..-..... V'\7<:;:?_/ ' .-......----..--.y ~ ,,,III''}/J \,/ --. \ "bl ~ DEVELOPMENT AREA Pl.AHTlHO .., . .,--- ".nllllO' wllNn ....Iopllt .,... '\' l .h." b11fN1 willi .." pl.ntlno' l- \1 n ... ".'M" ".,,,.., ... '" .~_.i . 't' <J.. ....01 In.l.lOU.I.III. , p tJ~ '," 0 ~~L' \.... .. (?J,\' / NATUAALOPEN IPACE .. fl- i"~_r::::Jj ,4 -1,;' ;;;r--...J "\\ ',' /1,. 11 r-..-1 \ \. "'::'. ./ ( ,r- ~\~\\' .--.~ Jd.. ~~,~. // /' .,,) .' __ __..--. -l~~ I " ~\ \' ..~; \ " c..n'lol" 1...1 _J;::::O:-'" .......---... .,,,,"" \ \ I \ \ " 1\ 7123/90~ iuI Ci1Ii .~ 1619' .......- Slope Erosion Control All slope erosion control planting shall conform to the'require- ments of the "City of Chula Vista Landscape Manual" and the City Landscape Architect. The general intent of the slope erosion control program is to protect newly created slopes or denuded areas from erosion or unsightliness. Dust abatement is also a concern. All areas of the site on which new grades have been created or vegetation has been disturbed will be planted. One of two types of planting will be required. Type I plantings are those which require ongoing irrigation to supplement natural rainfall. Generally, all areas adjacent to street right-of-ways will be Type I plantings. The City Landscape Architect may designate any other areas as Type 1 to maintain the aesthetic quality of the community. Fire resistant strips which are necessary between structures and natural open space will be included in Type I planting. Type II plantings are defined as areas which, once will survive and grow with only natural rainfall. Type II planting could be hydro-seeded with native which is then irrigated until established. establi shed, For example, vegetation (12/18/90) V-7 3'" ?/If{ Natural ~ Space Enhancement The Rancho Del Rey SPA III Plan provides for the preservation and enhancement of significant areas of open space. The major areas are the southern leg of Rice Canyons, buffer along Telegraph Canyon Road, and the SDG&E Easement. These areas provide several unique opportunities: - Preservation of unique natural resources and wildlife habitats. Nature Study experience. - Drainage basins for runoff. - Less pollution, more oxygen in the atmosphere. - View corridors. Uses The following are appropriate uses within the Open Space areas: Rice Canyon Sensitive plant and wildlife habitat preservation Nature study Trail systems SDG&E Easement Improved park & recreation facilities Parking Trail systems Picnic areas Nature study Other day use activities Teleqraph Canyon Open Space Buffer Sensitive plant and wildlife habitat preservation (02/02/90) V-9 3/- 3'" (12/18/90) SDG&E Easement Landscaping within the SDG&E Easement shall con- form to agency restrictions. The actual zones may. vary among fuel modification, naturalized, native and ornamental areas, based on the adjacent areas. V-ll 3/-1/00 PLlUlT MATERIALS MAnn KEY: MAN - Manicured ORN - Ornamental DTN - Drought TOlerant/Naturalized FM - Fuel Modification NAT - Native /Wi ORN DTN FM NAT TREES Albizzia julibriBsin 0 Arecastrum romanzoffianum 0 0 Bauhinia variegata 0 0 Brachychiton acerifolia 0 eupaniopsie anacardiodieB 0 0 Erythrina coralloidieB 0 Eucalyptus species 0 . Ficus rubiginosa 0 Jacaranda acutifolia 0 Koelreuteria bipinnata 0 0 LeptoBpermum laevigatum 0 Liquidambar Btyraciflua 0 Magnolia grandiflora 0 Melaleuca leucadendra 0 Pinus canariensis 0 0 0 Pinu8 species 0 . 0 PlatanuB acerifolia/racemosa 0 0 PopuluB species 0 0 Prunus ceraaifera 0 0 pyrus bradfordii 0 0 PyruB kawakamii 0 0 Quercus agrifolia 0 SchinuB molle 0 SHRUBS Acacia redolenB . AgapanthuB africanuB 0 0 ArcotoBtaphyloB species . . Artemisia (low growing) . . BUXUB sempevirens . . CalliBternon citrinus . . Camellia specieB 0 Ceanothus species . . . Cistus species . Coprosma kirkii 0 0 Cotoneaster species . . Dodonaea viscosa . Elaeagnus . . Eacallonia 0 . . Eugenia uniflora 0 . Feijoa sellowiana 0 Hemerocallis hybrids . Hetermoles arbutifolia . . Hibiscus rOBa-sinenBis 0 Juniperus specieB 0 0 Lantana sellowiana . . (10/26/90) V.13 3' ..i/ol ~ Modification Landscapinq A fuel modification zone must be established between natural open spaces and building development. This zone will consist of an area cleared of natural brush and modified by the addition of fire retardant materials (see list under "Natural Open Space Enhancement"), and an automatic irrigation system. The minimum width of this zone shall be established by the City of Chula Vista Fire Marshal. Plants should vary in height and be planted in random patterns to avoid a hard edge appearance. (~!ifi;fJfti'/~1/I) ~ ,P~~:S ~ ~ , ~JXf W~ ~. FUEL MODIFICATION ZONE (10/26/90) V-15 a'- '1o~ TYPICAL STREET TREE PATTERNS SINGLE F AMll Y RESIDENTIAL ~ 1'~9 PIe:. f. #IT c."tVA'e~;V V-17 3/- qo3 ~m. ~+'~ LANDSCAPED P ARKW A YS . . 1~J~{ /' ,,. tFf~ PARKWAY with TRAFFIC GUARD V-19 3'-'1 fJ'! Landscape Standards All landscape installation shall conform to the City of Chula Vista Landscape Manual. Streetscape and common area landscape shall be planted to the following minimum standards: Ground covers shall be used to cover the entire planting area (flatted material at the appropriate spacing or hydroseed with City and Master Developer approval). Spreading shrubs shall be used to eventually cover a minimum of fifty (50%) percent of the area at mature growth. Shrub and ground covers shall be selected from the Plant Material Matrix. Tree plantings shall consist of the designated dominant, accent, and parcel trees. A minimum of four (4) trees per 100 linear feet of street frontage will be required. Spacing shall be 40 foot maximum. All trees will be staked in accordance with the City Standard detail. Type, size, location, and installation of trees in the City right-of-way require City approval. 'II f~1 ~ ~(/~ ~ }fj#/~CI# (02/02/90) V-21 3/-1./05 Open Space Maintenance -' .r,~.~'~, ~....:.... I --_I --;u-- ...., , . v' ,-",. -- "I I ..... It.J < '" '" , ~ ! ." . J' ",. " - , ~ ~ Open Space Maintenance District NOTE: Final extent of O.S. Districts to be established by tract maps. .~QQ~kB!Y r1l~~ 10/18/90 ~j I...... I Ci1ti .- ''''~I I J<I '6'~ 3. Interfaces Refer to the "Edges" section for the type of treatment. The following types of interfaces should be recognized: a. Canyon/Open Space Interface Parcels R-1, R-2, R-3, R-6 & R-7. Conform to "Fire Suppression/Fuel Modification" requirements. b. Park or School Interface Parcel R-6. c. SDG&E Interface Parcel R-7. d. East "H" Street Landscaped Buffer Parcel R-7. 4. Periphery Landscape a. Periphery landscaping shall conform to the General Landscape Plan. b. Adherence to the streetscape techniques contained herein will also be required. 5. Interior Landscape a. There are two categories for interior landscape: Developer installed - subject to Master Developer and City approval. Individual installed - Not subject to Master Developer and City approval, except for pos- sible encroachment into open space. b. Developer installed landscape will include: Slope erosion planting with manual irrigation system. Systems to be connected to indivi- dual house meter. Street trees installed in the street tree easement. Exact type, location and staking of tree subject to approval by City. (12/18/90) V-25 ?J /- 1./0 1- Product Deve10pment The Rancho del Rey SPA III Plan includes certain minimum resi- dential property development standards. These have been repro- duced below for reference. It should be understood however, that adherence to these minimum standards will not automatically create a project that will be acceptable to the City. The adop- ted standards are intended to provide flexibility for creative and efficient site planning, and innovative architectural solu- tions. They are not intended to be used to create substandard developments. RESIDENTIAL PROPERTY DEVELOPMENT STANDARDS 1. Lot area (in net oOO's s.f.) minimum minimum average 2. Lot width (in feet) minimum minimum average 3. Lot depth (in feet) 4. Lot coverage (percentage) 5. Floor Area Ratio. 6~ Front yard setback (from Public Street ROW) a) To direct entry garage*. b) To side entry garage.. c) To main residence 7. Side yard setback 8. al To adjacent residential lot (min. total/min. one side) b) Distance between detached residential units c) To adjacent street (corner lot) Rear yard setback' Building height, feet (maximum)2 (2-1/2 story maximum in RS & RP) accessory bldg., maximum 9. Land Use District RS --'RP- RC RSP '0/5 5.0 6.0 50 50 90 45 .55 15 10 15 10 10 15 28 15 3.5 4.0 SP SP 40 45 SP SP 90' SP SP 50 SP SP .60 SP SP 15 10 , 0 SP SP SP SP SP SP 10/3 SP SP , 0 SP SP 10 SP SP 15' SP SP 28 SP SP 15 15 10. Parking spaces per unit 2 2 1.5 5P pp3 (gar.) (gar.) 1 bdrm ., guest unit .May be modified with Site Plan approval ..Lots fronting on East "J" Street, west of Paseo Ranchero: 28' direct entry, 23' side entry garage in RS & RP districts 1 . f Exception or one stacy structures per 19.26.150 CVMC 2Mdy be increased to 35 feet with Site Plan approval JAs required for uses approved in Precise Plan (12/18/90) VI-2 31- 40~ 2.0 5P 2 bdrm unit 2.5 sp 3... bdrm unit HOUSING TYPE: SFD-Conventional . EXAMPLE LOT SIZE: 50'x 1 QQ' GO' 7Y/'I~ ~It' ~ ~ , ~ "-I ...................~ ~ ,~it.\ ~~ TIfJ~ (5tJ(UJ//'Ia ,;q\VEl-OI'F !!!rO Q;YVqvzTON'i--, HT 5(U3- 91100 r.---~---~--) I: frlr I .1 I I --, I r' ,/ ~_,---_I. L - \ __... AlIl'u "" , "'<r- I I \ I \ I \ . I \ I I VI-3 {)fM?; ~q' '1fIj;? aw ~ I . J -J ~~~~ J-or wmle an:/.. nw~/tf hZfWd;f6 ~/~t? / r ~~~~ 3/-l./r/i HOUSING TYPE: SFD-Cottage EXAMPLE LOT SIZE: 40'x90' ~ '7Yt"7~ -- sIr~tf .~~........... ... I~' ~-=""""J , - I" ............................ .. 't ~~. ,~ . ~ ..~ t~ ~ ~I I 7Y!/~ 8fl/tO/I./G p;WCU7~ 6rO CDTJiA6e, , ur ~ . "fQ;<1P VI-S r<:..~- :;-.:;~~1 I ~ I I' ~~ ( ,I I . ...-... ': I I' , , I ., , \,...-.1 /J/,Ae ,-_""...J I I ~. -- ~f~ FUDj'--. j...(JT fl/1tT/1iS.-J- ti'lI~ ~dh ff~ ~~ fj 6;rr:e 3,-1110 Site DeveloPlllent Standards Numerous site development criteria are included in Section VI.8 of the SPA III Plan. The following are presented as supplements to those basic guidelines. Single Family Products On the following pages a series of lot/building schematics are presented to provide additional guidance in the design of single family housing types. The attached townhouse and specialty developments follow. It should be stressed that the schematics and building envelopes that follow are proto- typical lotting concepts and are not intended to constrain more creative solutions to spatial relationships. Special attention is also given to the issues of streetscape quality and corner lot situations in small lot areas. The open cul-de-sac site planning technique is also illustrated. Yard Restrictions Careful attention to maintaining continuity of design during initial construction can be negated by subsequent individual homeowner improvements. Enclosed additions, patio struc- tures, decks, storage sheds, fencing and other similar home- owner improvements are of particular concern. Yet, restric- tions such as setbacks, coverage, materials, etc. must relate to the particular type of lot and residence involved. In order to both control these homeowner improve- ments and, at the same time, relate the restrictions to the particular characteristics of the housing type involved, a "Homeowner Improvements Guide" shall be a required component of the mandated Site Plan Review. This supplement will detail for each housing type, the specific restrictions on the size and location of balconies, covered patios, enclosed additions, or storage buildings. In addition, specific guidance and restrictions shall be provided for materials, colors and design characteristics. This supplement shall be officially adopted as a component of the Site Plan Review approval. And to insure continued conformance, it will also become a component of the recorded CC&R's given to each new home purchaser. (08/10/90) VI-7 31 - ~ II CORNER LOT TREATMENT with SMALL LOTS I . I (,(Jp t:i~ tJ!7fl -- 7w~~ fftEl{tW{ r I~ I I ./JI/lE 6~ I ~ ~- rbV~ ~tV'P~ '"1/f-! .1 ' /0 '. /5 Jf/;r /~' r /I'~ #:'Zf:P ~AS VI-9 31 - i.//~ Open Space Fencing (without Open Space Access) OWjW {/liiJ 6~ C4Vr!)J/ltJ{)S \ / ~ rz-;rr V/f]lIJ ~~ -1 tVm ---=: ." . ........... --=: .......-"""'- .:%;;:~:;:::::::. :;':':'~::::~:i:~;~: .~" "'"' ---........ ."... -.; -...; ~........ .........~ 14/}J. I~( . VrtJ/)():ffI;fJ6 EiHO- ~~ ~~ er~ ~,( II- fiii1p. fl:nICe -----" . --------- VI-lOa ,'-'-/13 Attached Products Site plans for attached products should consider the follow- ing issues: indoor and outdoor privacy, solar access, build- ing appearance, and overall project design appeal. Build- ings should be oriented to create courtyards and open space areas, thus increasing the aesthetic appeal of the site. Building architecture should incorporate a variety of units, building sizes and heights, and color accents. Building facades should include relief to avoid a monotonous appear- ance. Stairwells should be covered and integrated into the overall building design, and private spaces such as patios or balconies are encouraged for each unit. Another design consideration is the need to buffer group parking areas from the street and adjacent properties. A few of these design concepts are illustrated below and on the following pages. w 111~ , . ..... , . ....... .. ..... ....... ." \ ......... W~. .f!II~ I!IJ~ ~!VI'1'. y~y .se~ f"" /~ (10/26/90) /l0i 71t/6 ." ~'K~ VI; 6~, .' . ." " . ~lJ(~ ~7"D~r MULTI-FAMILY SITE DESIGN VI.12 3/-41'1 //'1 ~'ICt'- ~ ~a;/,g. ~ 7rJ:::t<. t/~ ~Ie ~ ~IV& ~ .11/t:rV4?P~ tI/'Il75 ~ ~ 7IIfVEii? ~ (l~ IW .t.. Y,Pr'Verf 6f 1//tfS rb ?V~/tJ Ik- J1ll1071/1'1 If ~ m;<- ~a~. &2 ~~~tttt~tt .. . .......... ......... .......... ........... 6b I . I I I S IN 11//"fjJ!'j1'Jf ~ Am.~Q IfPIISf;U9;-; /H~. ~ i' ~'" ~ a-vtr(~ tJlVh /a::;vTTTY :- ~ ~. ~~~fft'~ ~$'~~ 7U'1J'G;"%-1 /6"9 tJP/lPI/'/& .R'IWS II 6e7'~7,!:: 1I,AS..5~. 71fIs WIIV /'f?6t' ~y~ VIo/VerY fb ~ 6~~e. MUL Tt-FAMIL Y SITE DESIGN VI-13 3t-1I1.5 Parcel R-1: This "parcel" consists of three in-fill areas at the end of paseo Margarita, paseo Cresta, and along Paseo Entrada. The most important design issue regarding ~his parcel is the integration of new development with the exist- ing homes on adjacent lots. The architectural design and scale of the new homes should compliment the established neighborhood character. Grading to create lots should also blend with the contours of existing development. The street interface of the several flag lots proposed at the end of Paseo Margarita should also receive special attention. Where lots back to Paseo Ladera, the rear fencing and street landscaping should be consistent with community themes. Parcel R-l Design criteria Summary Minimum Pad Size: 6,000 sf . &r'.i..;,. -. - ~ ~ ...- \ vI" . . ~--; -' \ '":.--::- --_\-.....~..~ ,.- r Product: CONVENTIONAL SFD Average Lot Size: 9,120 sf Special Desiqn Issues Grading: adjacent to Telegraph Canyon buffer, adjacent to Paseo Ladera Entry: Existing adjacent neighborhood Fencing: Telegraph Canyon Road views; integration with existing neighborhood fences Edges: Telegraph Canyon Road, paseo Ladera; community facility parcel (CF-1); existing neighborhood Landscaping: open space edges; community facility edge (10/26/90) VI-1S 31 - '11~ Parcel R-3: This parcel is located on the central plateau, north of East "J" street and overlooks the south leg. of Rice Canyon. It is planned for traditional single family detach- ed products on conventional sized lots. The important design areas in this parcel are the edges, one abutting the canyon rim, one facing East "J" street, and two adjoining existing development. Most lots adjacent to the Villa Palmera project, at the southwestern edge of the parcel, will have down slopes in their rear yards creating a buffer to separate the two pro- jects. Where a grade differential does not exist, adequate fencing and landscaping will need to be provided. At the western parcel boundary, SPA III homes will share a collec- tor street with existing homes. The issue of complimentary design and scale become important at this location. Along the southern edge, additional lot depth is required for those lots on East "J" Street because of the City's setback standard for homes fronting on collector streets. The lot pattern along the canyon rim has been designed to maximize the view potential of these home sites. Repetitive roof styles which would be noticeable from within or across the canyon should be avoided. Landscaping on the adjacent slopes should obscure these homes as viewed from the canyon trail without blocking the views from the homes themselves. Parcel R-3 Design Criteria Summary Product: TRADITIONAL SFD ," > Minimum Pad Size: 5,000 sf Average Lot Size: 7,200 sf ,19', .---:~~~ ~----- Special Desiqn Issues Grading: Canyon slopes; existing adjacent development Entry: none Fencing: Canyon views; compliment existing development Edges: Canyon; existing development Landscaping: Canyon interface; existing development (10/26/90) VI-17 31-1./1:r- Parcel R-5: This parcel is located in the middle of the central ridge and lies between Parcel R-2 and East "J" Street. All property adjacent to this parcel is within the SPA III so coordination with existing development is not an issue here. The primary design issue for this parcel is the appearance of the project perimeter along East "J" Street and Paseo Ranchero. A second issue is the alignment/spacing of entries with those of the school, park and single-family attached project across East "J" Street. Parcel R-5 Design Criteria Snmm"ry Product: SFD (Home size 1,550 - 2,000 sf) Minimum Pad Size: 3,600 sf '--~ c , ~~~:'._-"'---~--- ~ . .' ~ ..:.- 10l ______ --, ~-~-~_.:-~~~- Average Lot Size: 4,360 sf Special Desiqn Issues Grading: none Entry: Spacing with entries to S-1/P-1 and R-6 Fencing: Perimeter fence along Paseo Ranchero and East "J" Street Edges: Paseo Ranchero and East "J" Street Landscaping: Edge conditions (10/26/90) VI-19 j/-I.{I ~ Townhous Concept Pla~ .. / ~ : ~ z:rrrnu . . ;, . . .. ~ tllJTT ~ ~~~, ~ q,r:f . ~M!" . . GI(fl; . ~.: h'Y~ . . . . . . . . ~ ... . . . r- VI~ p .~9~QEL m Del Rey Part _ VI-21 nership . 3/-'-//9 Cinti . """""'" '1119' 239 :!~; Parcel R-6 Design Criteria Summary Product: TOWNHOMES Minimum Pad Size: N/A ,~'- "r .1 Special Desiqn Issues Grading: Park site interface; Telegraph Canyon edge ~"::'.:;;:" ..~. --'~' . , - .t= __ _,', r ':>'I, .....---._ _ . / L_~_,;--"",,~_~,'-~~ Average Lot Size: N/A Entry: Alignment with adjacent entries Fencing: Views to Telegraph Canyon Road; Park site separation Edges: Telegraph Canyon; East "J" Street; Park site Landscaping: Edge conditions (10/26/90) VI-23 3 , -l/JO Specialty Housing Concept Plan Parcel R-7 :5 N U1 W - , ~ tJ - ,AWo<- IIMJ&r "',.,.. W~. :? OWFr 7l'8:1 ~ tiN/'- twI"- ~ ~""I1"""_ ~_W>.... t>!i'-r~. .~S1!9~Q~~~!?!! Cinti &"'~ 110"",' '" 'HI~ ... a. Q) o c: o () to... J!2 ..... :J CO Q) a. CO o en "C c: CO ...J If . ..."(~ - ~~ . I ~J ~ ~ I 0., ",.CI , -- I 00' ~ , w i , i 00' I 0 / EJ / ~ i / / i / i . i I . \' / i I .1 I j flu / i!! i I~ : _Ji . / / -ll r~;;/ . VI-27 / 3/-q~~ \ \ __J ' ~~~ -l ~~ . M ~ \ j I __J -I SJ si @j aJ . '-0 Q)O) ..... to- .....2 ~ctl CDtf +-' - C1>~ ~o.. +-'0) 00(,) c: J:o U +-' en ctS W .. ~ ~ ~ It a . ~ . tl ~ gDl .\})..~ ~ " Il~ VI-28 3/- 1./-:J.3 ~J ; ~ il gj ~ a Sj :.,. ... ~ -~ ~ "t- @j ~~ a~ . EAST H STREET Expanded Parkway 1l!P'1i: .tr<'_f____ .~~,.:I-.I:I .~-- ~- 'Iff!:!!:. <D' ~ -. ..",......,.. of'... ~~ .tt:<<~":'-"f:, .~.,.".~ IJ',""""" ~ ,,~ ..' ~ 31- 4~ L/ mNOffiO DJft m VI-3D rL!1'l 1Ih. Ci1ti 811 ~ '..'nf."'1