HomeMy WebLinkAboutRDA Packet 2000/07/11
~{ft..
-f!-
- ..;;:::
CIlY OF
CHULA VISTA
TUDDAY, JULY ", 2000 COUNCIL CHAMB."
6:00 P.M. PUBLIC SIRVlCD BUILDING
(I_EDIATELY fOLLOWING THE CITY COUNCIL MiniNG)
ADJOURNED MEETING OF THE
REDEVELOPMENT AGENCY
CALL TO ORDER
ROLL CALL
Agency Members Davis, Moot, Padilla, Salas, and Chair Horton
CONSENT ITEMS (Item 1)
The staff recommendations regarding the fallowing item(s) listed under the Consent Calendar will be
enacted by the Agency by one motion without discussion unless an Agency member, a member of the
public or City staff requests that the item be pulled for discussion. If you wish to speak an one of these
items, please fill aut a "Request to Speak Farm" available in the lobby and submit it to the Secretary of
the Redevelopment Agency or the City Clerk prior to the meeting. Items pulled from the Consent
Calendar will be discussed after Action Items. Items pulled by the public will be the first items of
business.
1. AGENCY APPROVING THE DEVELOPMENT OF THE FORMER SDG&E SERVICE
RESOLUTION CENTER INTO THE CITY OF CHULA VISTA'S PRIMARY PUBLIC WORKS
OPERATIONS FACILITY AND CORPORATION YARD BY EXPANDING/
REMODELING EXISTING STRUCTURES AND CONSTRUCTING A NEW
MAINTENANCE BUILDING; AND ADOPTING NEGATIVE
DECLARATION IS-00-52 FOR THE DEVELOPMENT OF THE CITY'S
PUBLIC WORKS OPERATIONS FACILITY AND CORPORATION YARD
LOCATED AT 1800 MAXWELL ROAD, WITHIN THE OTAY VALLEY
ROAD REDEVELOPMENT PROJECT AREA-The existing Public Works
facility consists of six acres and is located on Woodlawn, just north of F Street.
The facility is not large enough to accommodate the expanding Public Works
Operations. The City purchased the SDG&E service center located at 1800
Maxwell Road in March 1999. The property is 25 acres and has several
existing structures, including a 31,000 sq. ft. administration building. Public
works Operations requires all the existing space and more. The facility
requires expansion and new construction to fully accommodate the expanding
services to meet the demands of the growing City. (Community
Development Director)
Staff Recommendation: Agency adopt the resolution.
-
AGINDA -2- JULY ", 2000
ORAL COMMUNICATIONS
This is an opportunity for the general public to address the Redevelopment Agency on any subject
matter within the Agency's jurisdiction that is not an item an this agenda. (State law, however, generally
prohibits the Redevelopment Agency from taking action on any issues not included an the pasted
agenda.) If you wish to address the Agency an such a subject, please complete the "Request to Speak
Under Oral Communications Form" available in the lobby and submit it to the Secretary to the
Redevelopment Agency or City Clerk prior to the meeting. Those who wish to speak, please give your
name and address for record purposes and fallow up action.
PUBLIC HEARINGS AND RELATED RESOLUTIONS AND ORDINANCES
The fallowing items have been advertised and/or pasted as public hearings as required by law. If you
wish to speak to any item, please fill aut the "Request to Speak Farm" available in the lobby and submit
it to the Redevelopment Agency or the City Clerk prior to the meeting.
2. PUBLIC CONSIDERATION OF GRANTING A SPECIAL USE PERMIT FOR THE
HEARING DEVELOPMENT OF A GAS STATION WITH ASSOCIATED FAST FOOD
RESTAURANT, CAR WASH, AND FOOD MART LOCATED AT 3733 MAIN
STREET WITHIN THE SOUTHWEST REDEVELOPMENT PROJECT AREA-
Worldwide Petroleum Company is proposing to develop the vacant parcel at the
southeast corner of Main and Mace Streets with a service station, car wash,
convenience store and fast food establishment. A variety of landscape moterials
will be installed throughout the site and all missing street improvements around
the facility will be installed as part of the project. [Community Development
Director]
a. AGENCY GRANTING A SPECIAL USE PERMIT, SUP-00-05, TO WORLDWIDE
RESOLUTION PETROLEUM COMPANY TO CONSTRUCT A GAS STATION WITH
ASSOCIATED FAST FOOD RESTAURANT, CAR WASH, AND FOOD MART
LOCATED AT 3733 MAIN STREET
b. AGENCY ADOPTING NEGATIVE DECLARATION IS 00-14 AND APPROVING AN
RESOLUTION OWNER PARTICIPATION AGREEMENT WITH WORLDWIDE PETROLEUM
COMPANY FOR THE DEVELOPMENT OF A GAS STATION WITH
ASSOCIATED FAST FOOD RESTAURANT, CAR WASH, AND FOOD MART
LOCATED AT 3733 MAIN STREET, WITHIN THE SOUTHWEST
REDEVELOPMENT PROJECT AREA
STAFF RECOMMENDATION: Agency adopt the resolutions.
OTHER BUSINESS
3. DIRECTOR'S REPORTS)
4. CHAIR'S REPORT(S)
5. AGENCY COMMENTS
- ..
AGENDA .3. JULY 11,2000
ADJOURNMENT
The meeting will adiourn to a Closed Session and thence to a regular meeting of Redevelopment Agency
on July 18, 2000 at 6:00 p.m., immediately following the City Council meeting, in the City Council
Chambers.
CLOSED SESSION
Unless Agency Counsel, the Executive Director, or the Redevelopment Agency states othervvise
at this time, the Agency will discuss and deliberate on the following item(s) of business which
are permiHed by law to be the subject of a closed session discussion, and which the Agency is
advised should be discussed in closed session to best protect the interests of the City. The
Agency is required by law to return to open session, issue any reports of final action taken in
closed session, and the votes taken. However, due to the typical length of time taken up by
closed sessions, the videotaping will be terminated at this point in order to save costs so that
the Agency's return from closed session, reparts of final action taken, and adjournment will
not be videotaped. Nevertheless, the report of final action taken will be recorded in the
minutes which will be available in the Office of the Secretary to the Redevelopment Agency
and the City Clerk's Office.
6. CONFERENCE WITH LEGAL COUNSEL REGARDING EXISTING LITIGATION -- Pursuant to
Government Code Section 54956.9(a)
a. Agency vs. Shinohara [Case No. GISO02460]
- -
REDEVELOPMENT AGENCY AGENDA STATEMENT
ITEM NO.: I
MEETING DATE: 07 III /00
ITEM TITLE: AGENCY RESOLUTION APPROVING THE DEVELOPMENT OF THE
FORMER SDG&E SERVICE CENTER INTO THE CITY OF CHULA VISTA'S
PRIMARY PUBLIC WORKS OPERATIONS FACILITY AND CORPORATION
YARD BY EXPANDING/REMODELING EXISTING STRUCTURES AND
CONSTRUCTING A NEW MAINTENANCE BUILDING; AND ADOPTING
NEGATIVE DECLARATION IS-00-52 FOR THE DEVELOPMENT OF THE
CITY'S PUBLIC WORKS OPERATIONS FACILITY AND CORPORATION
YARD LOCATED AT 1800 MAXWELL ROAD, WITHIN THE OTAY VALLEY
ROAD REDEVELOPMENT PROJECT AREA
SUBMITTED BY: COMMUNITY DEVELOPMENT DIRECTOR t.C;,
REVIEWED BY: EXECUTIVE DIRECTOR & f í)(V'
4/5THS VOTE: YESD NO0
BACKGROUND
The City of Chula Vista has recognized a need for a new Public Works facility and Corporation
Yard for many years. The existing Public Works facility consists of six acres and is located on
Woodlawn, just north of F Street. The facility is not large enough to accommodate the expanding
Public Works Operations.
The City purchased the SDG&E Service center located at 1800 Maxwell Road in March 1999.
The property is 25 acres and has several existing structures, including a 31,000 square foot
administration building. Public Works Operations requires all the existing space and more. The
facility requires expansion and new construction to fully accommodate the expanding services to
meet the demands of the growing City.
The proposed improvements include a 10,415 square foot addition to the administration building
and a 14,195 square foot addition to the shop building; and the new construction of a 46,540
square foot maintenance building, a 5,370 square foot wash building and a 1,312 square foot fuel
facility (see Exhibit 1). The use is allowed by right under the General Plan, Otay Valley Road
Implementation Plan, and Zoning Ordinance. However, design review is required, as well as
Redevelopment Agency approval. The City's Planning Department reviewed the proposed project
pursuant to the provisions of the California Environmental Quality Ad and determined that it would
have no significant impacts and recommended adoption of Negative Declaration IS-00.52 (see
Exhibit 2).
/- /
- -
PAGE 2, ITEM NO.: I
MEETING DATE: 07/11/00
RECOMMENDATION
It is recommended that the Redevelopment Agency approving the development of the project, and
adopting the Negative Declaration.
BOARDSICOMMISSIONS RECOMMENDATION
The Design Review Committee reviewed the proposed proiect at its meeting of June 26,200. At
that meeting, Committee members stated that the project was well designed and would be an
asset to the area in which it will be located. The DRC recommended approval of the project, as
presented, to the Redevelopment Agency. See Exhibit 3 for the DRC report and conditions of
approval.
DISCUSSION
Site Characteristics
The project site is located at 1800 Maxwell Road in the Otay Valley Road Redevelopment Project
Area. The property is zoned light industrial, per the Otay Valley Road Implementation Plan, and is
approximately 25 acres. The site had been developed for the SDG&E South Service Center.
There are three buildings on the site totaling approximately 54,000 feet. Surrounding uses
include industrial development and the County Landfill.
Proposed Proiect
The project involves the redevelopment and expansion of the existing SDG&E South Service
Center, in order to accommodate the City's Public Works facility and Corporation Yard. The
project consists of expansion of the existing administration building and shops building, and new
construction of a maintenance building, wash building and fuel facility.
The project plans call for the addition of 10,415 square feet of new floor area to the existing
administration building. The floor area would be added at the northwestern and southern
portions of the existing 31,040 square foot structure. The addition would result in the structure
being setback approximately 10 feet from Maxwell Road, a variance will be required for this
encroachment through the Planning and Building Department (the required setback is 25 feet).
A new 46,540 square foot maintenance facility will be constructed on the west side of the
property. The facility will accommodate vehicle repair and maintenance for City vehicles and
transit buses. In addition, the existing 14,195 square foot shop building will be expanded to
16,800 square feet; and a new 5,370 square foot wash building and 1,313 square foot fuel
island will be constructed.
/-:L.
- ~
PAGE 3, ITEM NO.: I
MEETING DATE: 07/11/00
Land Use and Zonina Desianations
The General Plan land Use Designation for the subject site and the surrounding properties is
General Industrial; the zoning, per the Otay Valley Road Redevelopment Plan is limited Industrial
(IL). The use is allowed, however Design Review and Redevelopment Agency approval is
required for the expansion and new construction.
The proposed expansion/redevelopment meets all development standards in the Otay Valley
Road Implementation Plan, with the exception of the front yard setback. The Otay Valley Road
Implementation Plan requires a 25 foot setback. A variance will be required prior to the issuance
of the building permit. The encroachment should not adversely impact the streetscape due to the
sloping topography and placement of screening vegetation.
Site Plan and Parkina
Vehicular access to the site would be taken via two existing driveways located on Maxwell Road.
Existing roadways and parking areas on the property would be utilized for the Public Works
facility. A new guest parking area would be created adjacent to the administrative building. A
total of 550 parking spaces would be provided on the site, 257 of which will be available to City
staff. The remaining spaces would be utilized for storage of City vehicles. The Planning
Department has determined that the project meets City off-street parking requirements, and City
Parking lot standards.
Landscapina
The proposed landscape plan calls for the placement of Brisbane Box trees along the southern
and eastern boundaries of the property. Eucalyptus trees are prosposed on the northern slope of
the property. Most of the existing landscape will be replaced with new material. The plan was
created in conjunction with the City landscaping staff and is in conformance with the City
Landscape Manual.
Architecture
The project is well designed. The proposed improvements are compatible with the existing
structures and greatly enhance the existing facility. The architectural styling is attractive and
provides a contemporary look to the facility that was built in the 1980's. Building materials
consists of concrete block and corrugated metal. Emphasis has been given to the Administration
Building in the form of a metal entryway structure and significant landscaping. The building
elevations, as seen in Exhibit 1, depict a high quality design.
Conditions of Approval
The Planning and Building Department and Engineering Department have conditions of approval
which are attached (see Exhibit 3). they include:
I-..!J
- -
PAGE 4, ITEM NO.: I
MEETING DATE: 07/11/00
0 Construct the project as submitted;
0 Comply with all requirements of the Building Division;
0 Apply graffiHi resistant treatment to wall and building surfaces; and
0 Process grading plans and obtain a grading permit.
CONCLUSION
The proposed project is consistent with the goals of the Otay Valley Road Redevelopment Area, and
complies with City land use policies. The facility should have minimal impact on the surrounding
land uses. The use of the facility by the City is merely a resumption of its prior operation. The
expansion is necessary to accommodate the needs of the growing community. Staff believes that
the planned improvements will result in a high quality industrial development that will greatly
benefit the City and recommends approval of the project and adoption of the Negative
Declaration.
FISCAL IMPACT
The proposed improvements and expansion to the facility at 1800 Maxwell Road is estimated to
be between $22 million and $25 million. This action does not have a fiscal impact.
ATTACHMENTS
1. Project Plans
2. Negative Declaration IS-00-52
3. Design Review Committee Report for 6/26/2000 with Conditions of Approval
Ho\HOME\COMMDEV\STAFF.REP\O7.11-00\Corpymd.doc
1-4
- -
RESOLUTION -
RESOLUTION OF THE REDEVELOPMENT AGENCY OF THE CITY OF CHULA
VISTA APPROVING THE DEVELOPMENT OF THE FORMER SDG&E SERVICE
CENTER INTO THE CITY OF CHULA VISTA'S PRIMARY PUBLIC WORKS
OPERATIONS FACILITY AND CORPORATION YARD BY
EXPANDING/REMODELING EXISTING STRUCTURES AND CONSTRUCTING A
NEW MAINTENANCE BUILDING; AND ADOPTING NEGATIVE DECLARATION IS-
00-52 FOR THE DEVELOPMENT OF THE CITY'S PUBLIC WORKS OPERATIONS
FACILITY AND CORPORATION YARD LOCATED AT 1800 MAXWELL ROAD,
WITHIN THE OTAY VALLEY ROAD REDEVELOPMENT PROJECT AREA
WHEREAS, the City of Chula Vista has presented development plans for the redevelopment and new
construction af the City's new corparatian yard at 1800 Maxwell Road ["Praject"]; and
WHEREAS, the site for the prapased Project is lacated at 1800 Maxwell Raad on a 25 acre parcel within the
Otay Valley Raad Redevelapment Praject Area under the jurisdiction and cantrol of the Redevelapment Agency of the
City of Chula Vista; and,
WHEREAS, the City's Cammunity Development Department Planning and Environmental Manager reviewed the
proposed Praject and issued Negative Declaratian IS-00-52 far the project in accardance with CEQA; and,
WHEREAS, after a public hearing, the Design Review Committee reviewed and recammended that the
Redevelapment Agency apprave the proposed Project subject to the conditions listed in Exhibit B hereof.
NOW, THEREFORE, THE REDEVELOPMENT AGENCY OF THE CITY OF CHULA VISTA does hereby find,
order, determine and resolve as fallows:
1. The proposed project will nat have a significant impact on the environment; accardingly Negative declaratian
IS-00-52 was prepared and is hereby adapted in accardance with CEQA.
2. The prapased project is allowed under the General Plan and is cansistent with the Otay Valley Road
Redevelopment Plan and shall implement the purpose thereof; the praject shall assist with the eliminatian of
blight in the Project Area.
3. The Redevelapment Agency of the City af Chula Vista hereby approves the develapment of the farmer
SDG&E service center inta the City af Chula Vista's primary public works aperatians facility and corporation
yard in the form presented in accardance with plans attached thereto as Exhibit A and subject ta canditians
listed in Exhibits B.
Presented by: Appraved as ta form by:
~, ~~
Chris Salamone
Cammunity Development Director
H:\HOME\COMMDEVlRESOS\Corp Yard. DOC
I-ta-
- ~
---
~-
,
~,
:' .;- . - - -
'i!¿ i
j,,'i j:
j I
I
1- (.
-~-. _.~.._--
-.. ._-- -
EXHIBIT B
CONDITIONS OF APPROVAL:
Planning and Building Department Conditions:
1. Prior to occupancy of the new structure, all landscaping and hardscape
improvements shall be installed in accordance with the approved landscape plan
and the comments of the City Landscape Planner.
2. Construct the project as submitted, unless othemise modified herein.
3. Prior to the issuance of building permits, the applicant shall comply with all
requirements af the Building Division.
a. Submit architectural plans that are stamped and signed by a licensed
architect.
b. Structural plans and calculatians must be stamped and signed by a
Califamia Registered Civil/Structural Engineer.
c. Project shall comply with 1997 UBC and 1996 NEC.
d. Project shall comply with 1998 handicapped accessibility requirements.
e. Plans shall indicate type of occupancy.
4. A graffiti resistant treatment shall be specified for all wall and building surfaces.
This shall be noted for any building and wall plans and shall be reviewed and
approved by the Planning Director prior to the issuance of building permits.
Additionally, the project shall conform with Sections 9.20.055 and 9.20.035 of
the CVMC regarding graffiti control.
5. The manument sign to be located at the entrance to the site shall conform with
applicable setback and area regulations. Prior to the placement of signs on site, a
sign permit shall be obtained.
6. Prior to the issuance of building permits the applicant shall obtain a variance from
the front yard setback requirements of Otay Valley Road Redevelopment Area.
Engineering Department Conditions:
7. Prior to the issuance of building permits, the applicant shall process grading plans
for the site and obtain a grading permit.
8. The project plans shall depict a vehicle maintenance area.
9. The applicant shall consolidate the nine existing parcels into one parcel.
/- 7
- "T
Fire Department Conditions:
10. Prior to the issuance of a certificate of occupancy, all new water supply piping
for fire hydrants of fire suppression systems to be tested by Fire Department.
II. Prior to the issuance of a building pennit, the Fire Department shall review and
approve plans for the automatic fire suppression system.
12. Plans shall specify that fire sprinkler building with more than 100 heads shall be
monitored by a central station.
13. Prior to the issuance of building pennits, the applicant shall submit plans and
State Fire Marshal Listings for fire alann system components.
14. Prior to the issuance of a certificate of occupancy, fire extinguishers shall be
placed in all buildings. Placement and number of fire extinguishers shall be
subject to the approval of the Fire Department.
Police Department Conditions:
15. The applicant shall comply with all recommendatians of the City of Chula Vista
Crime Prevention Unit as shown in Attachment "A."
Attachment "A" - Department comments
H: HOME :lplann ;ng/stevex pi drcOO6 5
1- f(
- "T
. ...
, II
/_10
- . "T
- "T
I-I::J-
- -
- ~
ATTACHMENT 2
Negative Declaration
PROJECT NAME: City of Chula Vista Public Works
Operatians & Corparation Yard
PROJECT LOCATION: 1800 Maxwell Raad
PROJECT APPLICANT: City of Chula Vista
CASE NO: 1S-00-52
DATE: June 9, 2000
A. Proiect Settin~
The site consists af an approximately 25-acre lot located at 1800 Maxwell Road in the
City ofChula Vista (Figure I). The area is generally located in the Otay River Valley,
north afMain Street, west of Maxwell Drive, and east of Interstate 805. The project site
is currently develaped with three buildings and paved parking areas. The existing
improvements are associated with the previous use of the site as the San Diego Gas &
Electric (SDG&E) South Bay Service Center, A large administrative building is located
in the southeast comer, a maintenance building is in the central portion and a third
Structure is in the north central portion of the site. The western portian of the lot was
previously used as the SDG&E storage yard. The improved portion of the site slopes
naturally to the southern property line. From the northern boundary of the improved
portian of the site a natural slape ascends to the property line. Fill slopes descend ftom
the west and south property lines approximately 25 feet at a 2: I ratio. The slopes are
covered with scattered grasses and brush.
The lat is bounded by Maxwell Road ta the east, developed industrial parcels to the
south, vacant industrial parcels (fanner animal rendering plant) to the west, and a vacant
hillside and the Otay Landfill to the north. Access to the site is via Main Street to
Maxwell Road.
B. Project Description
Discretionary permits associated with the existing facilities were granted in 1986 under
Precise Plan 86-3 (p.86-3). A negative declaration was adopted by the Redevelopment
Agency (1S-86-19). Discretionary pennits associated with the proposed project include
Design Review and Redevelopment Agency approval.
The City of Chula Vista recently purchased the fonner South Bay Service Center ftom
SDG&E. The SDG&E Service Center included an equipment storage yard; truck parking
areas; an 8,100 square foot maintenance building; a 14,000 square foot warehouse; and a
25,000 square foat administration building with related off-street parking. The City
proposes to improve the existing facility and relacate the Public Works Operations and
I 1-/4
- -
Corporation Yard, including Chula Vista Transit operations, currently located at 707 F
Street to the subject site.
The majarity of the proposed improvement would be located on the existing paved
portion of the lot. Several retaining walls will be constructed along the northern natural
slope to provide additional building pads. Proposed improvements consists of: 1) adding
approximately 10,415 square feet to the existing administration building to provide
additional office space; 2) renovating the existing warehause and adding approximately
16,975 square feet for "shops" operations; 3) adding a 5,370 square foot wash building
north of the existing warehouse; and 4) adding a 46,540 square foot automotive
maintenance building at the northwest portion of the lot.
The proposal alsa includes a fueling facility for City vehicles and buses; a campressed
natural gas (CNG) fueling facility for City and public use; and a Regional Household
Hazardous Waste callection facility for "Conditionally Exempt Small Quantity
Generators" and residents of Chula Vista, Coronada, Imperial Beach, and National City.
These proposed uses are discussed in mare detail below.
Public Works & Corporation Yard
The proposed Public Warks Operations and Corporation Yard facility would house the
Public Works Department's Administrative offices and the Sewer, Streets, Traffic,
Vehicle Maintenance, and Building Maintenance functions. Additionally, other City
functions such as Engineering and Building Inspection (Canstruction Inspectian,
Surveys, Parks Maintenance, and Central Stores) will be relocated to the new facility. An
estimated 306 City employees are anticipated.
Vehicle maintenance will be conducted in the proposed maintenance building. No
vehicle maintenance will be conducted outdoors. City vehicles will use the proposed on-
site fueling facilities.
Compressed Natural Gas Fueling Facility
The facility is located at the secondary entrance and is fenced off from the remainder of
the site with an existing security gate. The CNG facility will be utilized for City vehicles
and by any member of the public with a credit card. The facility includes ane fuel pump.
It is estimated that approximately 50 non-city vehicles will utilize the CNG facility.
Chula Vista Transit
Chula Vista Transit currently operates 33 public buses from its current location. By this
November 6 buses will be added to the existing fleet. The City anticipates adding 16
buses over the next five years, for a maximum of 55 buses. Approximately 169 transit
employees are anticipated. All new and replacement buses will be CNG buses. The City
is in the process of acquiring a contiguous 7.acre property to the west of said site to
accommodate the expanded fleet of buses. Buses will depart from the site 5:00 AM and
return '\t II :30 PM. Maintenance of the buses will occur during the non-operating hours
in the proposed maintenance building.
2 /-/~
- -
Regional Household Hazardous Waste (RHHW)
The RHHW facility will be located in the northwest portion of the site. Access will be
via the secondary entrance to the site along the narthern internal driveway. The entire
area will be fenced off. Signage notifYing and discauraging persons ftom dropping
materials off after hours will be pasted in the immediate vicinity. The facility will also
be equipped with security camera(s) to record any improper disposal. The facility will
have a trailer affice/education building to house employees.
The packing and storage area will have two l6'xI0' modular double wall storage lockers
and at least one 8'x8' storage lacker. Each of the storage lockers is rated far two hours
with containment/sump areas in the floor. Each of the large lackers has an interior wall
that divides the container into two separate compartments and shelves on the exterior
walls. The locker will be used far low grade and nan-flammable materials. The secand
locker has an autamatic chemical suppression system designed to hold items that should
be isolated and items that are typically stored outside at similar facilities. The facility
will also have at least one above ground storage tank for used oil and filter collection.
The facility will be designed and pennitted to accept hazardous waste ftom residents and
"Conditionally Exempt Small Quantity Generators." The amount of material a resident
can transport is limited by the CA Department of Transportation to approximately 150
lbs. per vehicle. The facility will be open on Saturdays ftom 10:00 AM to 3:00 PM.
Hours may be expanded ftom 9:00 AM to 5:00 PM if demand requires. Depending on
demand the facility may be open one or two weekdays per month or quarter to service the
overflow of residents such as Wednesday and Friday aftemaons from about 2:00 to 6:00
PM. Participation on weekdays will be limited to appointment only
Approximately 90% af the material dropped afby the public will be latex paint and used
motar oil. Both are declassified materials and not cansidered hazardaus for the purposes
afhousehold hazardous waste collection. The remaining materials to be collected at the
facility will include hypodennic needles, solvents, oil based architectural coatings,
fluorescent light tubes, dry batteries, partially full aerosol cans, etc. (list on file in the
Planning Division).
The facility will not treat or dispose afhousehald hazardaus waste on-site. Some
materials will be combined into a comman container. The intent is to reduce bulk and the
amount of required packaging without effecting the potential reuse or recycling of the
material. The materials will be categorized, bulked, packed and shipped by licensed
contractor.
Container trucks will transport materials ftom the site as ftequentIy as 90-120 days. State
law requires the removal of materials at least annually. A contractor licensed by the State
Department of Toxic Substance control and the County Department ofEnviranmental
Health will do the callection, packing and transportation of materials. Materials will be
removed approximately every 90 to 120 days. Household hazardous waste will be
removed approximately ever 80 to 90 days in small moving van or large commercial
truck. A medical waste vehicle will haul away small amounts of medical waste every 75
to 90 days.
3 /-1'
- -
C. Compatibility with Zonin¡¡ General Plan and Sectional P]annin¡¡ Area Plan
The proposed use is permitted under the current Zoning and General Plan designations.
The subject property is zoned IP- General Industrial ZonelPrecise Plan and designated
IL-Light Industrial on the City's General Plan. The project is also located in Otay Valley
Road Redevelopment Area and conforms to the development regulations. No mitigation
is required.
D. Identification of Environmental Effects
An Initial Study canducted by the City af Chula Vista (including an attached
Environmental Checklist form) determined that the proposed project will nat have a
significant environmental effect, and the preparation of an Environmental hnpact Report
will not be required. The Negative Declaration has been prepared in accordance with
Sectian 15070 of the State CEQA Guidelines.
1. Geophysical
A Geotechnical Investigation prepared by GEOCON, Incorporated (December 1999)
for the subject site has been submitted. The Geotechnical Investigation indicates that
the site is suitable for the proposed development, provided the recommendations
presented in the Geotechnical Investigation are followed. As a standard requirement
the Geotechnical Investigation shall be submitted to the Engineering Division with the
grading plan submittal and to the Bnilding Division with the building plans submittal.
2. Transportation and Circulation
The Engineering Department has determined that the proposed project does not result in
a significant increase in vehicle trips or traffic congestion. The primary access roads to
the project are Maxwell Road and Main Street (formerly Otay Valley Road). The
estimated number of one-way auto trips to be generated by the project is 1,176 average
daily traffic, The average daily traffic volumes on the Maxwell Road before and after
are 1,500 and 2,676 average daily trips respectively. The average daily traffic volumes
on Main Street are 18,600 and 19,776 average daily trips respectively. The City
Engineering Division has determined that these traffic volumes do not represent a
significant increase in vehicle trips or traffic generation as measured by the City's
adopted Traffic Threshold Standards. The primary access roads are adequate to serve
the proposed project.
3. Hazards
The proposed fueling and Household Hazardous Waste facilities are subject to
compliance with all applicable standard required permitting processes administered by
local, state and federal agencies. Compliance with established standard procedures
would ensure that people would not be expased to accidental health hazards related ta
these proposed uses. The Fire Department has participated in the approach and
selection of fire suppression options on the storage equipment for the Household
Hazardous Waste Facility to minimize potential flIe hazards.
4 1-/1
- -
The packing and storage area will have two 16' x 10' modular double wall storage
lockers and at least one 8' x 8' storage locker. Each of the storage lockers is rated for
two hours with containment/sump areas in the floor. Each of the large lockers has an
interior wall that divides the container into two separate compartments and shelves on
the exterior walls. One of the larger lockers has interior sprinklers and an exterior
water connection for water. That locker will be used for low grade and non-flammable
materials. The second locker has an autamatic chemical fire suppressian system. That
locker will be used for highly flammable and combustible materials. The smaller
lockers are designed to hold items that should be isolated and that are typically stored
outside at similar facilities. The facility will also have a least one above graund tank
for used oil and oil [liter collection.
The facility will be operated by a contractor licensed by the State Department of Toxic
Substance Control. The connty Department of Environmental Health will perform the
collection, packing, and transportation of materials. Additionally, the City of Chula
Vista will have 3 to 4 employees to oversee the operation. The Environmental
Resource Manager, the Temporary Expert Professional, and two used oil recycling
interns will be trained in a forty hour hazardous waste safety class. Staff is qualified
and trained to enter the packing and storage areas to inspect the contractor's
performance and address any material that may be dropped off at the facility during non
operating hours.
The Household Hazardous Waste operation will be fenced off and a secondary fence
inside the area will separate the packing and storage areas from other uses on the site.
The fencing will include signs that notify and discourage the dropping off of materials
after hours. The facility will be equipped with a video camera(s) to record any
improper disposal.
E. Mitigatian Necessæy to Avoid Significant Effect&
No mitigatian measures are required to reduce potential environmental impacts identified
in the Initial Study to a level below significance.
F. Summæy of Public Comments
A Natice of Initial Study was circulated to property owners within 500-faot radius of the
subject property on May 31,2000. No public comments were received at the end of the
public comment period, which ended June 9, 2000.
Consultation
1. Individuals and Organizations
City af Chula Vista:
Michael Meacham, Conservatian Coordinator
Steve Power, Planning
Frank Rivera, Engineering
Muna Cuthbert, Engineering
5 1-1'1
- -
Dave Byers, Public Works
Cliff Swanson, Engineering
Andy TrujiIJo, CV Transit
Ralph Leyva, Traffic Engineering
Doug Perry, Fire Marshall
Richard Preuss, Police Crime Prevention
Applicant's Agent: Dave Byers. Deputy Director Public Works/Operations
Patrick McKelvey, RNL Design
2. Documents
ChuJa Vista General Plan (1989)
Title 19, Chula Vista Municipal Code
Otay Valley Road Redevelopment Area Plan (May 1985)
3. Initial Study
This environmental detennination is based on the attached Initial Study, any camments
received on the Initial Study and any comments received during the public review period
far this Negative Declaration. The report reflects the independent judgement of the City
ofChuJa Vista. Further infonnation regarding the environmental review afthis project is
available tram the Chula Vista Planning and Building Department, 276 Fourth Avenue,
ChuJa Vista, CA 91910.
~~jJ "W( )<) Date:~.u. 9, ,:;otJo
Environment Review Caordinator
(H:\homelplanningledalia IIschccklist\JS-OO- 52ND.doc)
6 1-/9
- -
Case No.IS-O0-5Z
ENVIRONMENTAL CHECKLIST FORM
1. Name of Proponent: City of Chula Vista
2. Lead Agency Name and Address: City of Chula Vista
276 Faurth A venue
Chula Vista, CA 91910
3. Address and Phone Number of Proponent: City of Chula Vista
Same as Above
4. Name of Proposal: Public Works Operations
Facility & Corporatian Yard
5. Date of Checklist: June 9, 2000
-
"-tiaDy Iy Loa.....
-- - -- No
Impa" ..u""" Im- Impa"
........
d
I. LAND USE AND PLANNING. Would the
proposal:
a) Conflict with general plan designation or 0 0 0 II!I
zoning?
b) Conflict with applicable environmental plans or 0 0 0 II!I
policies adopted by agencies with jurisdiction
over the project?
c) Affect agricultural resources or operations 0 0 0 II!I
(e.g., impacts to sails or farmlands, or impacts
from incompatible land uses)?
d) Disrupt or divide the physical arrangement of 0 0 0 II!I
an established community (including a low-
income or minority community)?
Comments: The propased project consists of the expansion of an existing 53,700 square foot
building (the former SDG&E South Service Center) for use as the City af Chula Vista Public Works
Operations Facility and Corporatian Yard. The proposal includes the addition of 3 buildings totaling
125.850 square feet. The Proposed use is permitted under the current Zoning and General Plan
designations. The subject property is zoned IP- General Industrial Zone/Precise Plan and designated
IL-Light Industrial on the City's General Plan. The project is also located in atay Valley Raad
Redevelopment Area and conforms to the develapment regulations. No mitigation is required.
1-.2.0
pagel
- ..-
..........
--, 1, r.........
........... - SJgn;t;cmt No
Impact otU"'" Im- Impact
MitIgate
d
II. POPULATION AND HOUSING. Would the
proposal:
a) Cumulatively exceed official regional or local 0 0 0 ¡
population projections?
b) Induce substantial growth in an area either 0 0 0 ¡
directly ar indirectly (e.g.. through projects in
an. undeveloped area or extension of major
infrastructure)?
c) Displace existing housing, especially affordable 0 0 0 ¡
hausing?
Comments: The redevelopment and expansion of the existing quasi-public facility does not result in
additional population or the displacement of existing housing.
ill. GEOPHYSICAL. Would the proposal result in or
expose people to potential impacts involving:
a) Unstable earth conditians or changes in 0 0 ¡ 0
geolagic substructures?
b) Disruptions, displacements, compaction or ¡
0 0 0
overcovering of the soil?
c) Change in tapography or ground surface relief 0 0 ¡ 0
features?
d) The destruction, covering or modification of 0 0 ¡ 0
any unique geologic or physical features?
e) Any increase in wind or water erosion of soils, 0 0 ¡ 0
either on or aff the site?
f) Changes in depositian or erosian of beach 0 0 0 ¡
sands, ar changes in siltation, deposition or
erosion which may modify the channel of a
river or stream or the bed of the ocean or any
bay inlet or lake?
g) Exposure of people or property to geologic 0 0 ¡ 0
hazards such as earthquakes, landslides. mud
slides, ground failure, or similar hazards?
Comments: A Geotechnical Investigation prepared by GEOCON, Incorparated (December 1999)
for the subject site has been submitted. The Geotechnical Investigatian indicates that the site is
suitable for the proposed development, provided the recommendations presented in the Geotechnical
Investigation are followed. As a standard requirement the Geotechnical Investigation shall be
submitted to the Engineering Division with the grading plan submittal and to the Building Division
with the building plans submittal.
/ -.2.1
page2
- ..
p-
_ny Jy ""'....
SigaJ/kaa, - _am' N.
""- otU,"", Im- Im-
-..
d
Development of the propased project will not expase people or structures to potential substantial
adverse effects, including the risk of loss, injury, or death. Na active faults are known to exist on
the project site. The active Rose Canyon Faults lies approximately 10 miles west of the site. The
other clasest knawn active faults within 62 nùles (100 Kilameters) afthe site are the Coronado Bank.
16 nùles; Elsinore, 43 nùles; Newpon-Inglewood, 45 miles; and the Earthquake Valley, 47 miles.
The site cauld be subjected ta moderate to severe ground shaking in the event of an earthquake along
any of the faults. However, the site is not cansidered to possess any greater risk than that of the
surrounding developments. The seismic design of the Structures will be performed in accordance
with the Uniform Building Code (UBC) guidelines.
No landslides were encountered during the site investigation, and none are known to exist on the
property or at a location that would impact the proposed development.
Soil liquefaction occurs within relatively loose, cohesionless sands located below the water table that
are subjected ta ground acceleratians from earthquakes. Due to the relatively great depth to
groundwater, cohesive nature af the fill soils and dense nature of the formatianal materials at the
site, the potential far liquefaction occurring at the site is conside~ low.
The site is not located near the ocean or any other large bodies af water, so there is nat risk of
tsunamis or seiches affecting the site.
The proposal will not result in substantial soil erosion or the lass af topsoil. A majority of the
project site has been graded and developed. The propasal requires additional grading to
accommodate the proposed uses an the narth portion of the parcel. Grading shall be performed in
accordance with the Recammended Grading Specifications in the Geatechnical Investigation. As a
standard condition af approval the Geotechnical Investigatian shall be submitted to the Engineering
Division with grading plan submittal. No mitigatian is required.
IV. WATER. Would the proposal resu/J in:
a) Changes in absorption rates, drainage patterns, 0 0 181 0
ar the rate and amount of surface runoff?
b) Expasure of people or property to water 0 0 0 181
related hazards such as flooding or tidal
waves?
c) Discharge into surface waters or ather 0 0 0 181
alteration of surface water quality (e.g.,
temperature, dissolved oxygen or turbidity)?
d) Changes in the amount af surface water in any 0 0 0 181
water body?
e) Changes in currents, or the course of direction 0 0 0 181
of water movements, in either marine or fresh
waters?
1- ,;J.:l....
page;
- -
-
PoteotiaDy Iy ..........
........,... S_ "'-"'t No
Im- .tU""" Im- Impact
Mitigate
d
t) Change in the quantity of ground waters, either 0 0 0 I!II
through direct additions or withdrawals, ar
through interception of an aquifer by cuts or
excavations?
g) Altered direction or rate of flow of 0 0 0 I!II
groundwater?
h) Impacts to groundwater quality? 0 0 0 I!II
i) Alteratians to the course or flow of flood 0 0 0 I!II
waters?
j) Substantial reduction in the amaunt of water 0 0 0 181
otherwise available for public water supplies?
Comments: The site is currently developed with the fonner SDG&E Service Center. The proposed
addition to the Administration and Shops building as well as the newly proposed maintenance
building and wash building will be located on the portion of the site which is presently paved.
Grading will occur at the northern boundary af the developed portion of the parcel in order to
accommodate some bus parking, the new fuel building, the compressed natural gas fueling facility,
and the Hausehald Hazardous Waste Recycling Facility. The new pad areas will result in the
addition of an insignificant amount of surface runoff.
As a standard candition af approval the an-site drainage facilities are required to include pollution
preventian devices and fùtration systems in order to prevent contaminatian of soils and groundwater
from undergraund fuel tanks and the wash facility. As a standard permitting procedure, the
applicant will be required to obtain a permit from the Caunty of San Diego Environmental Health
Hazardous Materials Divisian far underground fuel storage tank installation. This established
process includes review and approval by the City ofChula Vista's Fire Department and Building
Division. No adverse impacts to water resources are noted. No mitigatian is required.
V. AIR QUALITY. Would the proposal:
a) Violate any air quality standard ar contribute to 0 0 0 I!II
an existing or projected air quality violation?
b) Expose sensitive receptors to pollutants? 0 0 0 181
c) Alter air movement. maisture, or temperature, 0 0 0 I!II
or cause any change in climate, either locally
or regionally?
d) Create objectionable odors? 0 0 0 I!II
e) Create a substantial increase in stationary or 0 0 0 I!II
non-stationary sources of air emissions or the
deterioration of ambient air quality?
1- 2.3
po."
- ~
........,
""""",,"y Iy Lao !haD
SIgaffiomt s;p¡oo, SJgmtka.. No
1m""" DIU",,", 1m.." 1m.."
_Ie
d
Comments: The proposed project will be subject to standard requirements regarding the installation
af fuel vapor recovery systems aimed at reducing contaminants released to the air. The project is
subject to compliance with all standard requirements as part af the pennitting process involving the
San Diego County Department of Environmental Health Hazardous Materials Division, the Air
Pollution Control District (APCD), and the City of Chula Vista Fire Department.
VI. TRANSPORTATION/CmCULATION. Would
the proposal result in:
a) Increased vehicle trips or traffic congestion? 0 0 l1'li 0
b) Hazards to safety from design features (e.g., 0 0 0 l1'li
sharp curves or dangerous intersections) or
incompatible uses (e.g., fann equipment)?
c) Inadequate emergency access or access to 0 0 0 l1'li
nearby uses?
d) Insufficient parking capacity on-site or off-site? 0 0 0 l1'li
e) Hazards or barriers for pedestrians or 0 0 0 l1'li
bicyclists?
f) Canflicts with adopted policies supporting 0 0 0 l1'li
alternative transportatian (e.g. bus turnouts.
bicycle racks)?
g) Rail, waterborne or air traffic impacts? 0 0 0 l1'li
h) A "large project" under the Cangestion 0 0 0 l1'li
Management Program? (An equivalent of 2400
or more average daily vehicle trips or 200 ar
more peak-hour vehicle trips.)
Comments: The proposed praject does not result in a significant increase in vehicle trips or traffic
congestion. The primary access roads to the project are Maxwell Road and Main Street (fonnerly
Otay Valley Road). The estimated number of one-way auto trips ta be generated by the project is
1,176 average daily traffic, The average daily traffic volumes on the Maxwell Raad before and after
are 1,500 and 2.676 respectively. The average daily traffic volumes on Main Street are 18.600 and
19,776 respectively. The City Engineering Division has determined that these traffic volumes do not
represent a significant increase in vehicle trips or traffic generation as measured by the City's
adopted Traffic Threshold Standards. The primary access roads are adequate ta serve the proposed
project.
The proposed project is nat considered a "large project" under the Cangestion Management
Program. According to the City's Engineering Division, the proposal results in 1,176 average daily
vehicle trips and 153/155 peak-hour vehicle trips.
Proposed parking for the site is 44 bus and 550 auto spaces. It is estimated that approximately 3%
Public Works and 169 Transit employees will occupy the site (total of 475). Due to the nature of the
aperation it is anticipated that 350 employees will be at the site at the start af the day and 200
employees will remain at the site during the remainder of the day. Public Works crews leave the site
1-.2.-1 ...,5
- -
--ÖOl
-tIaU.v Iy .........
Sigatlkut - Sigatlkut No
Im- otU"" Im- Impo"
Mldgale
d
between 7:00 and 8:00 AM and return between 3:00 and 4:00 PM leaving the majority of the
parking lat available.
The Chula Vista Transit currently operates 33 buses and expects to operate 39 buses by November
of 2000. The site plan provides a total of 44 bus parking spaces. Parking provided meets the
requirements of the Municipal Code and no cmitigation is required.
Vll. BIOLOGICAL RESOURCES. Would the
proposal result in impacts to:
a) Endangered, sensitive species, species of 0 0 0 181
concern or species that are candidates for
listing?
b) Locally designated species (e.g., heritage 0 0 0 181
trees)?
c) Locally designated natural communities (e.g, 0 0 0 181
oak forest. coastal habitat, etc.)?
d) Wetland habitat (e.g., marsh. riparian and 0 0 0 181
vernal paol)?
e) Wildlife dispersal or migration carridars? 0 0 0 181
t) Affect regional habitat preservation planning 0 0 0 181
efforts?
Comments: The subject site is currently developed. No sensitive plants ar animal species are
known to occur on-site. No impacts ta bialagical resaurces are noted. No mitigation is required.
VllI. ENERGY AND MINERAL RESOURCES.
Would the proposal:
a) Canflict with adopted energy conservatian 0 0 0 181
plans?
b) Use non-renewable resources in a wasteful and 0 0 0 181
inefficient manner?
c) If the site is designated far mineral resource 0 0 0 181
protection, will this project impact this
protection?
Comments: The proposal does not conflict with adopted energy conservation plans and does not
result in the use of non. renewable resources in a wasteful and inefficient manner. The proposal
includes a Compressed Natural Gas (CNG) fueling facility that provides "alternative clean fuel" for
City vehicles and buses and for public CNG vehicles.
l-:z.r
pagc6
- -
"""'..,
"""'- '" Loa....
- - - No
Impact otU""" Im- Im-
........
d
IX. HAZARDS. Would the proposal involve:
a) A risk of accidental explosion or release of 0 0 ¡¡¡ 0
hazardous substances (including, but not
limited to: petroleum products, pesticides,
chenùcmsorrndrntia~?
b) Possible interference with an emergency 0 0 0 I!II
response plan or emergency evacuation plan?
c) The creation of any health hazard or potentim 0 0 0 I!II
hemth hazard?
d) Exposure of people to existing sources of 0 0 0 ¡¡¡
patential health hazards?
e) Increased fire hazard in areas with flammable 0 0 ¡¡¡ 0
brush, grass, or trees?
Comments: The proposed fueling and Household Hazardous Waste facilities are subject ta
compliance with all applicable standard required pennitting processes administered by locm, state
and federal agencies. Compliance with established standard procedures would ensure that people
}Vould nat be exposed to accidental health hazards related to these propased uses.
X. NOISE. Would the proposal result in:
a) Increases in existing noise levels? 0 0 0 I!II
b) Exposure of people to severe noise levels? 0 0 0 ¡¡¡
Comments:
Previous Use --SDG&E Service Center
A naise analysis by San Diego Acoustics was prepared in 1985 as part of the approvm for the
SDG&E Service Center. The noise analysis found that the SDG&E service center did not result in
significant noise impacts to the nearest residence on Cherry Paint Drive in the Robinhood Point
Subdivision (100 feet northeast of the northern property baundary). The primary saurce of noise
from the previous use resulted fram the use of compressed air drivers for assembly and disassembly.
Tire maintenance was conducted in the parking areas using air guus to remove wheel lugs. This
service occurred between 5:00 and 7:00 PM. Another source of noise, which occurred between
4:00 and 9:00 PM, was the fueling of vehicles. A "tanker" drove within the parking area and
pumped fuel into each vehicle as needed.
Proposed Use--Public Warks Operations Facility and Corporatian Yard
The proposed uses on the site will not result in a significant increase in noise levels. The proposed
maintenance of City vehicles and buses, carpentry associated with coustruction and repair, and the
washing of City buses and vehicles will be perfonned indoors. The noise associated with the
compressed natural gas fueling facility and the Regionm Household Hazardous Waste facility are not
considered significant due to the hours of operation. Additionally, the eastern area of the site is
/--.2.(,
poge7
- ~
-.
---y " ""'tIoan
-., SigDUka SignIfi""" No
1m""" Dt"""" Impact Im-
"""t<
d
dominated by the noise from refuse trucks traveling Maxwell Road to and from the landfill.
XI. PUBLIC SERVICES. Would the proposal have
an effect upon, or result in a need for new or
altered government services in any of the following
areas:
a) Fire protectian? 0 0 0 1111
b) Police protection? 0 0 0 Iii
c) Schools? 0 0 0 1111
d) Maintenance of public facilities, including 0 0 0 1111
roads?
e) Other governmental services? 0 0 0 1111
Comments: The project will not result in the need for new governmental services. No adverse
impacts are noted. Fire and police protection can be adequately provided. No mitigation is required.
XII. Thresholds. Will the proposal adversely impact 0 0 0 1111
the City's Threshold Standards?
As described below, the proposed project daes not adversely impact any of the seen
Threshold Standards.
a) Fire/EMS 0 0 0 1111
The Threshold Standards requires that fire and medical units must be able to respand to
calls within 7 minutes or less in 85 % of the cases and within 5 minutes or less in 75 % of
the cases. The City of Chula Vista has indicated that this threshold standard will be met.
The propased project complies with this Threshald Standard.
Comments: The City of Chula Vista Fire Department indicates that adequate fire and service
protection can be provided to the proposed project. Fire Station #3 is located approximately 3 miles
from the subject site" No mitigatian is required.
b) Police 0 0 0 1111
The Threshold Standards require that police units must respond to 84 % of Priority I calls
within 7 minutes or less and maintain an average response time to all Priority I calls of
4.5 minutes or less. Police units must respond to 62.10% of Priority 2 calls within 7
minutes or less and maintain an average response time to all Priarity 2 calls of 7 minutes
or less. The propased project complies with this Threshold Standard.
Comments: The Police Department indicates that the current levels of police service can continue to
be provided to the proposed project No mitigation will be required.
c) Traffic 0 0 0 1111
1-;1.1
pageS
- -
-
_ny Iy ""'than
_.t - -.. N.
1m.." RtU"",", - 1m.."
_Ie
d
1. City-wide: Maintain LOS "C" or better as measured by observed average travel
speed on all signalized arterial segments except that during peak hours a LOS af "D"
can occur for no more than .any two hours of the day.
2. West of 1-805: Those signalized intersections which do not meet the standard above
may continue to operate at their current 1991 LOS. but shall not worsen.
The proposed project complies with this Threshold Standard.
Comments: The Engineering Divisian has indicated that the propasal the average traffic volumes
associated with the proposed project do not exceed the City's Level-of-Service (LOS) "C" design
Average Daily Traffic volumes.
d) Parks/Recreation 0 0 0 ¡¡;¡
The Threshold Standard for Parks and Recreation is 3 acres/l ,000 population east of 1-
805.
Comments: No adverse impacts to parks or recreatianal opportunities are noted. No additional
parkland or recreational facilities will be required as a result af this development since the project
does not result in an increase in population.
e) Drainage 0 0 0 ¡¡;¡
The Threshald Standards require that storm water flows and volumes not
exceed City Engineering Standards. Individual projects will provide necessary
improvements consistent with the Drainage Master Planes) and City
Engineering Standards. The propased project complies with this Threshold
Standard.
Comments: The Engineering Division has indicated that the storm water flows and volumes from
the proposed project do not exceed City Engineering Standards. The existing on and off site
draipage systems are adequate to serve the proposed praject.
f) Sewer 0 0 0 ¡¡;¡
The Threshold Standards require that sewage flows and volumes not exceed
City Engineering Standards. Individual projects will provide necessary
improvements consistent with Sewer Master Planes) and City Engineering
Standards. The propased project complies with this Threshold Standard.
Comments: The Engineering Divisian has indicated that the sewage flows and volumes fram the
Proposed projects do not exceed City Engineering. The existing 8"sewer main along Research
Court is adequate to serve the proposed project.
g) Water 0 0 0 ¡¡;¡
The Threshold Standards require that adequate storage, treatment, and transmission
facilities are constructed concurrently with planned growth and that water quality
standards are not jeopardized during growth and construction. The proposed project
complies with this Threshold Standard. I-:Lr
p0ge9
- -
l'ÐteotiaI
- Jy ""'....
-, SigDHka s;g.Jfiamt No
""- otUm.. Im- Impart
--
d
Applicants may also be required to participate in whatever water conservation or fee off-
set program the City of Chula Vista has in effect at the time of building permit issuance.
Comments: No additional water service is anticipated as a result of the proposed facilities;
however, the City is will provide a "will serve" letter priar to the issuance of building permits.
xm. UTILITIES AND SERVICE SYSTEMS. Would
the proposal result in a need for new systems, or
substantial alterations to the following utilities:
a) Power or natural gas? 0 0 0 III
b) Communications systems? 0 0 0 III
c) Local or regional water treatment or 0 0 0 III
distribution facilities?
d) Sewer or septic tanks? 0 0 0 III
e) Storm water drainage? 0 0 0 III
f) Solid waste disposal? 0 0 0 III
Comments: No additional utilities or services are anticipated as a result of the improvements to the
existing facility.
XIV. AESTHETICS. Would the proposal:
a) Obstruct any scenic vista or view open to the 0 0 0 III
public or will the proposal result in the creation
of an aesthetically offensive site open to public
view?
b) Cause the destruction or modification of a 0 0 0 III
scenic route?
c) Have a demonstrable negative aesthetic effect? 0 0 0 III
d) Create added light or glare sources that could 0 0 0 III
increase the level of sky glow in an area or
cause this project to fail to comply with Section
19.66.100 of the Chula Vista Municipal Code,
Title 19?
e) Reduce an additional amount of spill light? 0 0 0 III
Comments: Approval of the project design and landscaping is subject ta a discretionary Design
Review process. This process will ensure that the project design is consistent with the goals and
objectives of the Otay Valley Road Redevelopment Project area Implementation Plan/Design Manual
1- :z..,
pag,'O
- -
.........
-!laDy Iy ""'....
5;gnüIoqt - SIgnitkaDt N.
Im- alU",,", Im- Impo"
Mffigale
d
Addendum. No mitigation will be required.
XV. CULTURAL RESOURCES. Would the
proposal:
a) Will the proposal result in the alteration of or 0 0 0 iii
the destruction or a prehistoric or historic
archaeological site?
b) Will the proposal result in adverse physical or 0 0 0 iii
aesthetic effects to a prehistoric or historic
building, structure or object?
c) Does the propasal have the potential to cause a 0 0 0 iii
physical change which would affect unique
ethnic cultural values?
d) Will the proposal restrict existing religious or 0 0 0 iii
sacred uses within the potential impact area?
e) Is the area identified on the City's General Plan 0 0 0 iii
EIR as an area of high potential for
archeological resources?
Comments: There are no identified cultural resources within the project area.
XVI. PALEONTOLOGICAL RESOURCES. Will the 0 0 0 iii
proposal result in the alteration of or the
destruction of paleontological resources?
Comments: There are no identified paleontological resources within the project area.
XVII. RECREATION. Would the proposal:
a) Increase the demand far neighborhood or 0 0 0 iii
regianal parks or other recreational facilities?
b) Affect existing recreational opportunities? 0 0 0 iii
c) Interfere with recreation parks & recreation 0 0 0 iii
plans or programs?
Comments: There are no recreational facilities that will be adversely affected by the proposed
project.
xvIll. MANDATORY FINDINGS OF
I-3D
po.elI
- -
PoteatioJ
"""'tiaJIy /y ""'....
............ - _. No
Im- atU..... '"'- Im-
Mitigate
d
SIGNIFICANCE: See Negative Declarationfor
mandatory findings of significance. If an ElR is
needed, this section should be completed.
a) Does the project have the potential to degrade 0 0 0 III
the quality of the environment, substantially
reduce the habitat of a fish or wildlife species.
cause a fish ar wildlife papulation to drop
below self-sustaining levels, threaten to
eliminate a plant or animal community, reduce
the number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the majar periods or
California history or prehistory?
Comments: The site is presently developed except far the sloped area at the northern portion of the
lot. The subject property is located outside of the "Sensitive hnpact Boundary" designated on the
Otay Valley Road Redevelopment Project Area hnplementation Plan/Design Manual Addendum.
b) Does the project have the potential to achieve 0 0 0 III
short-term, to the disadvantage of long-term,
environmental gaals?
Comments: The scope and nature of the project daes not result in the curtailment of any long-term
environmental goals.
c) Does the project have impacts that are 0 0 0 III
individually limited, but cumulatively
considerable? ("Cumulatively cansiderable"
means that the incremental effects of a project
are considerable when viewed in connection
with the effects of past projects, the effects of
other current projects, and the effects of
probable future projects.)
Comments: There are no incremental impacts associated with the project.
d) Does the project have environmental effect 0 0 0 III
which will cause substantial adverse effects on
human beings, either directly or indirectly?
Comments: No adverse effects to human beings are anticipated from the propased improvements
and operation of the proposed public facility. The Proposed fueling and Household Hazardous Waste
facilities are subject to compliance with all applicable standard required pennitting processes
administered by local, state and federal agencies. Compliance with established standard procedures
will ensure that people will nat be exposed to accidental health hazards related to these proposed
uses.
1-,31
pagel2
- -
XIX. PROJECT REVISIONS OR MITIGATION MEASURES:
The foIlowing project revisions or mitigation measures have been incorporated into the project and will be
implemented during the design, construction ar operatian of the project:
None
XX. AGREEMENT TO IMPLEMENT MITIGATION MEASURES
By signillg the line(s) provided below, the Applicant(s) and/or Operator(s) stipulate that they have each
read, understood and have their respective company's authority to and do agree to the mitigation measures
contained herein, and will implement same to the satisfaction af the Environmental Review Coardinator.
Failure to sign the line(s) provided belaw prior to posting of this [Mitigated] Negative Declaration with
the County Clerk shaIl indicate the Applicants' and/or Operator's desire that the Project be held in
abeyance without approval and that Applicant(s) and/ar Operator(s) shall apply for an Environmental
Impact Report.
N/A
Printed Name and Title of Authorized Representative of
[Praperty Owner's Name]
N/A
Signature of Authorized Representative of Date
[property Owner's Name]
N/A
Printed Name and Title af
[Operator if different from Property Owner]
N/A
Signature af Autharized Representative of Date
[Operator if different from Property Owner]
XXI. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would be potentially affected by this project, invalving at least
one impact that is a "Potentially Significant Impact" or "PotentiaIly Significant Unless Mitigated," as
indicated by the checklist on the faIlowing pages.
0 Land Use and Planning 181 TransportatiOn/Circulation 0 Public Services
0 Population and Housing 0 Biological Resources 0 Utilities and Service
Systems
181 Geophysical 0 Energy and Mineral Resources 0 Aesthetics
1-.3 4-
pag')
- ..
0 Water ~ Hazards 0 Cultural Resources
0 Air Quality 0 Noise 0 Recreatian
0 Mandatory Findings of Significance
XXII. DETERMINATION:
On the basis of this initial evaluation:
I frod that the proposed project COULD NOT have a significant effect on the ~
environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the 0
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the praject. A
MITIGATED NEGATIVE DECLARATION will be prepared.
I frod that the proposed project MA Y have a significant effect on the environment, and 0
an ENVIRONMENTAL IMPACT REPORT is required.
I find that the propased project MAY have a significant effect(s) on the environment. but 0
at least one effect: 1) has been adequately analyzed in an earlier document pursuant to
applicable legal standards, and 2) has been addressed by mitigation measures based on
the earlier analysis as described on attached sheets, if the effect is a "potentially
significant impacts" or "potentially significant unless mitigated." An
ENVIRONMENTAL IMPACT REPORT is required. but it must analyze only the effects
that remain to be addressed.
I find that although the proposed project could have a significant effect on the 0
enviranment, there WILL NOT be a significant effect in this case because all patentially
significant effects (a) have been analyzed adequately in an earlier EIR pursuant to
applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR,
including revisions ar mitigation measures that are imposed Upon the proposed project.
An addendum has been prepared to provide a record of this determination.
Ú/r¡ IJ()
Dale
1- 3.3
page!4
- -
ATTACHMENT 3
DESIGN REVIEW COMMITTEE
Summary Staff Report
CASE NO. DRC-OO-65 MEETING DATE: June 26, 2000 AGENDA NO.
PROJECT DESCRIPTION: Consideration of approval of the development of the
fonner SDG&E South Service Center into the City of Chula Vista's primary public
works operations facility and corporation yard, by expanding/remodeling existing
structures and constructing a maintenance building.
NAME AND LOCATION: City ofChula Vista Public Works and Corporation Yard
APPLICANT: City of Chula Vista
OWNER: City of Chula Vista
ASSESSOR PARCEL NUMBER: 644-230-11 through 19
SPA PLAN DESIGNATION: Otay Valley Road Redevelopment Area
ZONE: Limited Industrial (IP)
STAFF CONTACT: Steve Power AICP, Associate Planner
ENVIRONMENTAL STATUS: Negative Declaration
RECOMMENDATION: Review the project and recommend that the Redevelopment
Agency canditionally approve the project as submitted.
BACKGROUND:
The project site is located at 1800 Maxwell Road in the Industrial Zone. The project site
consists of 9 parcels that total approximately 25 acres in size. The project site is
developed and accommodates the SDG&E South Service Center. There are presently
three buildings on the site that total approximately 54,000 square-feet in area.
Surrounding uses consist of industrial development and the County Landfill. Vehicular
access to the site is presently taken from Maxwell Road.
1- 3</
- "T
DRC-00-65 -2- June 26. 2000
The project site is located in the Otay Valley Road Redevelopment Area. The overall
goal of the Redevelopment Area is the "elimination of blight in the Otay Valley Road
Area and the furtherance of the area's orderly growth, conservation, amenity and
economic development." The City Redevelopment Agency will be reviewing the project
after the DRC completes its review.
According to the Zoning Code, the purpose of the Industrial Zone is "... to encourage
sound industrial development by providing and protecting an environment exclusively for
such development, subject to regulations necessary to insure the purity of airs and waters
in Chula Vista and San Diego County, and the protection of nearby residential,
commercial and industrial uses of the land from hazards and noise or other disturbances."
ANALYSIS:
Project Descriotion:
The project involves the redevelopment and expansion of the existing SDG&E South
Service Center, in order to utilize the site as the City's primary Public Work's facility.
The project involves the expansion of the existing administrative building at the southeast
of the site, the constructian of a new maintenance building, the expansion of an existing
shops building, as well as the construction of a new wash building and fuel facility.
The project plans call for the addition of 10,415 square-feet of new floor area to the
existing administrative building. The floor area would be added at the northwestern and
sauthern portions of the existing 31,040 square-foot structure. Floor area to be
constructed would consist of administrative offices. An entryway canopy structure would
be constructed at the northern elevation of the building. The addition would result in the
structure maintaining an approximately 10 foot setback off of Maxwell Road. Because
the provisions of the Otay Valley Redevelopment Plan call for a 25 foot setback off of
Maxwell Road, the City will be processing a variance application along with this
development submittal (please refer to Condition No. 6). The proposed setback
encroachment should not adversely impact the streetscape environment along Maxwell
Road, due to the sloping topography of the site and placement of screening vegetation
along the eastern and southern elevations of the property.
The project plans also call for the construction of a 46,540 square-foot maintenance
facility located at the west of the project site. The maintenance facility would
accommodate vehicle repair bays and serve as the transit center for the City. A second
story mezzanine would be situated above the center portion of the building. The proposed
structure would be "L" shaped and maintain a maximum height of 37 feet above grade.
The repair bays would be accessed via role-up doors oriented toward a parking area
located toward the south of the site.
The plans also call for the expansion ofthe existing 14,195 square-foot shops building by
16,800 square-feet. The total area of the shops building would be 30,995 square-feet.
Also proposed is a new 5,370 square-foot wash building, as well as a 1,312 square-foot
1- .3S-
- "T
DRC-00-65 -3- June 26. 2000
fuel facility. An existing vehicle maintenance building would be converted into a central
receiving building but would not be expanded.
Site Plan and Parkin!!::
Vehicular access to the site would be taken via two existing driveways located on
Maxwell Road. Existing roadways and parking areas on the property would be utilized
for the Public Works facility. A new guest parking area would be created adjacent to the
administrative building located at the southwest of the site. New parking areas would also
be created toward the west of the site near the new maintenance building.
A total of 550 parking spaces would be provided on the site, 257 of which would be
available for City staff. The remaining parking spaces would be utilized for the storage
of City vehicles. The Planning Department has determined that the project meets City
off-street parking requirements. The parking lot layout has been determined by staff to be
in conformance with City parking lot standards with regard to such issues as minimum
driving lane widths and stall sizes.
Other notable elements of the project site plan include a recycling area located at the
northeast of the site, retaining walls at the north of the site, and a material storage area at
the southwest of the property. Minor grading would occur at the north of the site in order
to provide room for planned improvements.
LandscaDin!!:: A landscape plan has been prepared for the site. The proposed landscape
plan calls for the placement of Tristania Conferta (Brisbane Box) trees along the southern
and eastern boundaries of the property. Eucalyptus trees would also be incorporated into
the landscape plan, and would be placed on the northern slope of the property. Most
existing landscaping on the site would be removed and replaced with new landscape
materials. The landscape plan for the site was created in canjunction with the City
landscaping staff and is in conformance with the City Landscape Manual.
Zonin!!::
The following table demonstrates the project's conformance with the development
standards of the Industrial Zone.
STANDARDS REQUIRED PROPOSED
Front yard setback 25 feet 10 feet *
Side yard setback 20 feet 41 feet
Rear yard setback 25 feet 49 feet
Floor Area Ratio ilia ilia
Lot coverage 45% 16.5%
Height 50 feet 37 feet
Parking 225 required spaces 550
*V ariance required
1- ~f.
- -
DRC-00-6S -4- June 26. 2000
Sie:nae:e
The plans call for a monument sign to be placed at the entrance to the site. The proposed
monument sign would measure approximately 7 feet in height and would consist of
corrugated metal (maroon in color) on a COncrete block base. The provisions of the Otay
Valley Road Redevelopment Area require that monument signs maintain a minimum
setback of 10 feet from the property line. The sign provisions also state that monument
signs shall not exceed 50 square-feet in area. Condition No.5 of approval requires that
the monument sign meet setback and sign area requirements. Building identification signs
consisting of individual metal letters would be utilized thraughout the center. The
building elevation drawings show proposed signage. A sign permit will be required for all
signs on the site.
Architecture:
Building materials for all new structures and proposed additions would consist of a
combination of concrete block and corrugated or "ribbed" metal. Concrete block would
match the materials of the existing structures on site, and would consist of a combination
of smooth and split face blocks. The corrugated or "ribbed" metal paneling would
maintain a maroon color that would be similar to that of the official City of Chula Vista
logo. The canopy structure called out for the entryway to the Administrative Building
would consist of a light blue metal frame with translucent roofing material. The materials
and colors for all improvements on the site would be tied together architecturally and
would create a unified design theme. A materials board, as well as colored renderings
will be available at the DRC meeting af June 26, 2000 for the Committee's review.
PROJECT CONFORMANCE WITH DESIGN GUIDELINES:
The City of Chula Vista Design Guidelines address industrial development and are
"intended to encourage projecfs which respecf the character and scale of adjoining
development, wifh particular attention to sites in older, mixed use areas, and sites which
adjoin residential neighborhoods or to the uses which may be particularly sensifive to fhe
scale and impacts of industrial development. "The Design Guidelines also are intended to
"Promofe a functional and attracfive arrangement of buildings, open spaces, parking,
circulation and loading areas which are sensifive fa the physical characteristics and
constrainfs of the sife, and which provide efficient and pleasant places fa work. "
The project appears to be well conceived and well planned. The proposed improvements
are campatible with structures on site and will significantly enhance the existing facility.
The arrangement of new and expanded structures creates an attractive and functional City
facility that is sensitive to the physical characteristics of the surrounding area. The
architectural styling is interesting and provides a contemporary look to the existing
facility which was built in the 1980's.
The Design Guidelines also state "The main elements of sound industrial sife design
include: controlled site access, service areas located af fhe sides and rear of buildings,
1-~7
- ,
DRC-00-65 - 5 - June 26. 2000
convenient access" visitor parking and on-site circulation; screening of outdoor storage;
work area and equipment; emphasis on the main building entry and landscaping, and;
landscaped outdoor space. "
The project site is consistent with the above criteria in that access to the site is limited to
two driveways, both of which are located off of Maxwell Road. Service areas are located
toward the back of the site and would not be visible from the public right-of-way. Site
access is conveniently located off of Maxwell Road, and ample visitor parking has been
provided at the front of the property. Emphasis has been given to the main building
(administrative building) entryway in the form of a metal entryway canopy structure and
significant landscaping. A comprehensive landscaping plan has been created for the site.
Landscaping will serve to enhance building entryways, as well as screen outdoor work
areas.
The Design Guidelines further state that "High quality, innovative and imaginative
architecture is encouraged. The focus is expected to be on the development of a high
quality industrial environment. "
The building elevation drawings depict a high quality and imaginative design. The
building forms and materials serve to create an architectural theme that is interesting, and
suggests an industrial type use. The planned improvements will result in a high quality
industrial environment the will be of great benefit to the City.
CONCLUSION:
The existing SDG&E South Service Center is an ideal site for the City Public Works
Operations Facility and Corporation Yard. Most of the existing structures and facilities
on the site will be readily utilized. A facility of this size (25 acres) is needed by the City
in order to accommodate a Public Works operation that has expanded in order to meet the
demands of a growing city. The existing Public Works facility located at the northeast
corner of "F" Street and Woodlawn Avenue is not large enough to accommodate the
expanding Public Works operation. The facility should have minimal impact upon
surrounding land uses since the site is relatively isolated and is surrounded by industrial
type uses. The use of this existing facility by the City would merely constitute a
resumption of its priar operation. The project is in conformance with the City Design
Review Guidelines and Landscape Manual. The City is currently on track to complete
planned improvements and begin utilizing the facility within the next 12 months. The
City is fast tracking this project in order to meet the increased demand placed upon the
Public Works operation by the growth of the City.
I-.ßf'
- ..,
DRC-00-65 - 6 - June 26. 2000
CONDITIONS OF APPROVAL:
Planning and Building Department Conditions:
1. Prior to occupancy of the new structure, all landscaping and hardscape
improvements shall be installed in accordance with the approved landscape plan
and the comments of the City Landscape Planner.
2. Construct the project as submitted, unless otherwise modified herein.
3. Prior to the issuance of building permits, the applicant shall comply with all
requirements of the Building Division.
a. Submit architectural plans that are stamped and signed by a licensed
architect.
b. Structural plans and calculations must be stamped and signed by a
California Registered Civil/Structural Engineer.
c. Project shall comply with 1997 UBC and 1996 NEC.
d. Project shall comply with 1998 handicapped accessibility requirements.
e. Plans shall indicate type of occupancy.
4. A graffiti resistant treatment shall be specified for all wall and building surfaces.
This shall be noted for any building and wall plans and shall be reviewed and
approved by the Planning Director prior to the issuance of building permits.
Additionally, the project shall conform with Sections 9.20.055 and 9.20.035 of
the CVMC regarding graffiti control.
5. The monument sign to be located at the entrance to the site shall conform with
applicable setback and area regulations. Prior to the placement of signs on site, a
sign permit shall be obtained.
6. Prior to the issuance of building permits the applicant shall obtain a variance from
the front yard setback requirements of Otay Valley Road Redevelopment Area.
Engineering Department Conditions:
7. Prior to the issuance of building permits, the applicant shall process grading plans
for the site and obtain a grading permit.
8. The project plans shall depict a vehicle maintenance area.
9. The applicant shall consolidate the nine existing parcels into one parcel.
/- .3,
- -
DRC-00-65 - 7 - June 26. 2000
Fire Department Conditions:
10. Prior to the issuance of a certificate of occupancy. all new water supply piping
for fire hydrants of fire suppression systems to be tested by Fire Department.
11. Prior to the issuance of a building permit, the Fire Department shall review and
approve plans for the automatic fire suppression system.
12. Plans shall specify that fire sprinkler building with more than 100 heads shall be
monitored by a central station.
13. Prior to the issuance of building permits, the applicant shall submit plans and
State Fire Marshal Listings for fire alarm system components.
14. Prior to the issuance of a certificate of occupancy, fire extinguishers shall be
placed in all buildings. Placement and number of fire extinguishers shall be
subject to the approval of the Fire Department.
Police Department Conditions:
IS. The applicant shall comply with all recommendations of the City of Chula Vista
Crime Prevention Unit as shown in Attachment "A."
Attachment "A" - Department comments
H,HOME)planning/stevexp/drcOO65
/-40
- ~
REDEVELOPMENT AGENCY AGENDA STATEMENT
ITEM NO.: .,.
MEETING DATE: 07 /11 /00
ITEM TITLE: PUBLIC HEARING: TO CONSIDER GRANTING A SPECIAL USE PERMIT
FOR THE DEVELOPMENT OF A GAS STATION WITH ASSOCIATED FAST
FOOD RESTAURANT, CAR WASH, AND FOOD MART LOCATED AT 3733
MAIN STREET WITHIN THE SOUTHWEST REDEVELOPMENT PROJECT
AREA
IJ.. AGENCY RESOLUTION GRANTING A SPECIAL USE PERMIT, SUP-00-05,
TO WORLDWIDE PETROLEUM COMPANY TO CONSTRUCT A GAS
STATION WITH ASSOCIATED FAST FOOD RESTAURANT, CAR WASH,
AND FOOD MART LOCATED AT 3733 MAIN STREET
J>. AGENCY RESOLUTION ADOPTING NEGATIVE DECLARATION IS 00-14
AND APPROVING AN OWNER PARTICIPATION AGREEMENT WITH
WORLDWIDE PETROLEUM COMPANY FOR THE DEVELOPMENT OF A
GAS STATION WITH ASSOCIATED FAST FOOD RESTAURANT, CAR
WASH, AND FOOD MART LOCATED AT 3733 MAIN STREET, WITHIN
THE SOUTHWEST REDEVELOPMENT PROJECT AREA
SUBMITTED BY: COMMUNITY DEVELOPMENT DIRECTOR C- t;' ,
REVIEWED BY: EXECUTIVE DIRECTOR (a If: \/ \'
4/STHS VOTE: YES DNO0
BACKGROUND
The Worldwide Petroleum Company is proposing to develop the vacant parcel at the southeast
corner of Main and Mace Streets with a service station, a car wash, a convenience store, and a
fast food establishment. A variety of landscape materials will be installed throughout the site. In
addition, all missing street improvements around the facility will be installed as part of the
project. The proposed project also includes a 30-foot free-standing (pole) sign to be located
along the Main Street frontage close to the intersection with Mace Street. This element of the
project is further discussed below.
The proposed use is allowed under the General Plan, Southwest Redevelopment Plan, and
Zoning Ordinance through the issuance of a Special Use Permit to be considered by the Agency
during a noticed public hearing. The Applicant is entering into an Owner Participation Agreement
(OPA) with the Redevelopment Agency for the development of the proposed proiect. The
Community Development Department's Planning and Environmental Manager reviewed the
proposed project pursuant to the provisions of the California Environmental Quality Act and
determined that it would have no significant impacts and recommended adoption of Mitigated
Negative Declaration IS.OO- 14.
~-I
- -
PAGE 2, ITEM NO.: ;;.
MEETING DATE: 07 /11 100
Since the proposed project is within the Southwest Redevelopment Project Area, the Special Use
Permit, the environmental document, and the Owner Participation Agreement (which includes the
design plans and a list of conditions) are being presented to the Redevelopment Agency for
consideration and approval.
RECOMMENDATION
It is recommended that the Redevelopment Agency hold the required public hearing, take public
testimony, if any, and approve the resolutions granting the Special Use Permit, adopting the
Mitigated Negative Declaration, and approving the Owner Participation Agreement approving the
proposed project without a pole sign.
BOARDSICOMMISSIONS RECOMMENDATION
The Resource Conservation Commission (RCC) reviewed the draft Mitigated Negative
Declaration for the project (lS-00-14) at its meeting of April 17, 2000. RCC members
recommended that Phase 2 soils testing needs to be performed J2.IiQr to consideration of the
MND by the Redevelopment Agency. The results of the Phase 2 study indicated that no further
testing was required and this was confirmed by the San Diego County Department of
Environmental Health Site Assessment Management. No adverse noise impacts associated with
the car wash proposed for the eastern portion of the site was noted due to the industrial nature of
the surrounding area and the proposed hours of operation of the car wash and the proposed
facility design.
The Design Review Commi"ee reviewed the proposed project at its meeting of May 1, 2000.
At that meeting, Committee members stated that the project was well designed and would be an
asset to the area, and recommended approval of the project to the Redevelopment Agency. DRC
members, however, raised objections regarding the proposed pylon (pole) sign. Committee
members stated that the City Design Guidelines specifically discourage pole signs and that a
monument-type sign should be used in place of a pole sign. The DRC recommended that the
Redevelopment Agency not approve the proposed pole sign.
The Planning Commission held a public hearing to consider the Special Use Permit for this
project at its meeting of May 24, 2000 and recommended approval subject to the conditions
listed in the SUP resolution as well as in Exhibit B of the OPA..
DISCUSSION
Site Characteristics
The project site is located at 3733 Main Street (southeast corner of Main and Mace Streets) within
the Montgomery Specific Plan area and the Southwest Redevelopment Project Area (see locator
map attached to the OPA as Exhibit C). The site consists of a 67,700 square-foot relatively
02-;1...
- "T
PAGE 3, ITEM NO.: J-
MEETING DATE: 07/11/00
leveled vacant parcel. Surrounding uses consist of heavy commercial/light industrial to the west,
east and north of the site, and a residential structure located to the immediate south of the parcel.
This residential structure is on a parcel that is also zoned Limited Industrial, which makes the
residence a non.conforming use. In addition to being vacant, the site currently does not have
any street improvements along Main and Mace Streets.
Proposed Project
The applicant is proposing to construct a new gas station, with an associated food mart/fast food
restaurant, and a self-service car wash (see copy of plans attached to the OPA as Exhibit A). The
proposed gas station portion of the project would consist of two separate filling areas covered by
canopies. The main service area would be located toward the north of the site and would consist
of eight pump islands with a capacity to serve sixteen vehicles at one time. A second dispensing
area for commercial trucks (dispensing diesel fuel) would be situated toward the west of the site
and would consist of three pump islands (six pumps).
A 5,433 square-foot convenience store building is proposed to be constructed at the south of the
site. This structure consists of a food mart and drive through fast food restaurant. A drive-through
lane is situated along the southern property line of the site, and is accessed via Mace Street. A
menu/speaker board is situated at the southwest of the site. A block wall, ranging in height from
6 feet to 9 feet, will be placed along the southern property line in order to separate the proposed
use from the adjacent residential unit and to reduce the level of noise generated by vehicles and
customers using the drive-thru lane and the speaker board. A noise study completed as a part of
the environmental review of the project determined that there would not be any adverse noise
impacts associated with the operation of this facility.
The proposed food mart will include the sale of beer and wine for off-site consumption. The
Police Department has reviewed the proposal and has incorporated several conditions related to
the sale of these items, which will make the business operation consistent with City regulations
and guidelines. One of these conditions is that the sale of alcoholic beverages will be permitted
during the hours of 8 a.m. and 1 a.m. only.
The plans also call for the construction of a 1,248-square foot car wash to be located on the
eastern portion the site, next to Main Street. The proposed car wash would be situated
immediately adjacent to the existing self-storage facility located on the adjoining parcel to the
east of the development site. The car wash will be open between the hours of 7 a.m. and 9 p.m.;
the food mart will be open from 5 a.m. to 12 mid-night; and the gas pumps will remain open the
24 hours.
Land Use and ZoninQ DesiQnations
The General Plan land Use Designation for the subject site and the surrounding properties is
Research and limited Manufacturing; the zoning is limited Industrial with a Precise Plan (Il-P).
Service stations such as the one being proposed are considered Unclassified Uses, which may be
permitted in the Il zone through the issuance of a Special Use Permit. As proposed and with the
c2'~
- -
PAGE 4, ITEM NO.: "-
MEETING DATE: 07/11/00
conditions imposed, the service station and its accessory uses is consistent with the Limited
Industrial zoning designation. The required findings for the Special Use Permit have been made
and are outlined in the Agency resolution approving the Special Use Permit.
Site Plan and Parking:
The site for the proposed project has access from Mace and Main Streets. Two driveways will be
constructed along each of these streets. Access and internal circulation have been reviewed by
the City's Traffic Engineer and have been found adequate in terms of driveway width and back
up space for vehicles and customers to circulate well.
The proposed project provides a total of 32 parking spaces on site. City regulations require one
parking space for every two hundred square feet of the food mart /fast food restaurant building,
plus three parking spaces for the car wash for a total of thirty parking spaces required. Thus, the
proposed project is in conformance with the City's parking requirement. After reviewing the
proposed plans, staff has determined that the parking lot layout is in conformance with City
parking lot standards related to minimum driving lane widths and stall sizes.
The proposed site plan includes a trash enclosure to be located at the southeastern corner of the
property and an air and water reel at the northwest of the site. The plans also call for the
construction of curb, gutter, and sidewalk along both Mace and Main Streets.
Landscapina
The proposed landscape plan calls for the placement of fifteen-foot wide planter areas along
Main Street and ten foot wide planters along Mace Street. Street trees will be placed along both
street frontages. A three.foot-wide planter area is to be maintained along the southern property
line. Staff has included a condition of approval calling for the planting of vines on the wall along
the southern property line to decorate the wall and soften the appearance of its hard surface. The
proposed trash enclosure called out at the southeast of the site would be surrounded by a planter
area that would range in width from approximately 3 feet to 20 feet. The City Landscape Planner
has reviewed the proposed landscaping plan and found it to meet City landscaping
requirements.
Sianaae
As indicated previously, the proposed project includes the use and enhancement of an existing
pole sign to be used to identify the gas station and the other uses on site. The Design Review
Committee and the Planning Commission recommended against the pole sign based on the
guidelines of the City's Design Manual. However, Section 19.44.060A2c and d (Sign Regulations
of the I-L zone) of the Chula Vista Municipal Code states, "Freestanding (pole): Each lot shall be
allowed one freestanding sign subject to the following: Maximum height, thirty five feet, Minimum
ground clearance, eight feet", while 19.44.050E states, "The design review committee may
reduce sign areas below those authorized above based on the sign guidelines and criteria
cJ -el
- "T
PAGE 5, ITEM NO.: J-
MEETING DATE: 07/11/00
contained in the design manuaL" Chula Vista Municipal Code Section 19.60.360C Service
Station Price Signs states, "Price signs may be displayed on the main body of a pole sign...".
The Applicant has forwarded a letter requesting that the Agency consider approval of the pole
sign (see letter, Attachment 4). The applicant is relying on these sections of the code, which state
pole signs are allowed and imply that the purview of the Design Review Committee is limited to
area considerations, not height, to allow construction of their proposed signage, as well as
additional data provided in the Applicant's letter, which speaks to existing conditions. It is
important to note that the Design Review Committee and the Planning Commission have
recommended against the pole sign based on the recommendation within the Design Manual
that pole signs are strongly discouraged and the information provided in their respective staff
reports.
Conditions of Approval
The Agency resolution for the Special Use Permit contains a list of thirty-three conditions, which
are intended to address specific requirements from the different City departments. The Applicant
has reviewed and agreed to all of the conditions imposed, except condition # 29, which speaks
to the pole sign. In addition to those conditions listed, the Planning Commission included in its
recommendation a list of statements conditioning the project. These statements are listed as
items 25 thru 33. Most of these items will be dealt with during the entitlement process. Item #29
is related to the pole sign, which was discussed above. Item # 25 deals with the Commission's
request for the Traffic Engineer to look into the installation of medians and traffic control at the
intersection. Some of the Commissioners considered that additional safety measures were
needed to protect pedestrians (especially children) trying to cross the intersection. They felt that
the number of pedestrians will increase in the area due to the opening of the Otay Recreation
Center and the proposed service station.
The Traffic Engineer looked into this request and determined that no median or additional traffic
controls were necessary. The typical median installed at an intersection is only four feet wide in
order to permit the necessary left turn lane. Such a narrow median would not be desirable for
the following reasons:
1. The intersection of Main and Mace is not a major intersection where medians are
normally needed;
2. Narrow medians of this type are not useful for pedestrian safety; and
3. Narrow medians of this type should not be used as refuge for pedestrians crossing the
street.
CONCLUSION
Staff conclusion is that the proposed project will represent an asset for the area. The project is
designed with an appealing architecture, landscaping, and other amenities. The project will also
provide a needed service for the increasing number of automobile and trucks that serve this
industrial corridor of the City. It is staff's opinion that the construction of the proposed building
~-S-
- ~
PAGE 6, ITEM NO.: ~
MEETING DATE: 07/11/00
will be beneficial for the City, because it will put a vacant parcel to a higher and better use, bring
new development to the area, and will contribute to the elimination of blighting influences, which
further the goals and objectives of the Southwest Redevelopment Plan.
FISCAL IMPACT
The total estimated project valuation is $3,000,000. This will generate tax increment revenues of
approximately $30,000, which will be distributed as follows: Twenty percent ($6,000) for the
Housing Set-Aside fund; of the remaining $24,000, fifty three percent ($12,720) will be allocated
to other taxing entities as part of the tax sharing pass thru agreements; the rest ($11,280) will
accrue to the Southwest Redevelopment Project Area fund. The proposed project will generate
approximately $28,000 in annual sales tax revenues for the City.
ATTACHMENTS
1. Minutes of DRC of 05/01/00
2. Minutes of RCC of 04/17/00
3. Minutes of PC of OS/24/00
4. Letter requesting approval of pole sign
5. Negative Declaration IS-00-47
6. Owner Participation Agreement with the following:
Exhibit A - Design Plans
Exhibit B - Conditions of Approval
Exhibit C - Locator Map
H,\HOME\COMMDEV\STAFF.REP\7 /6/003,15 PM\Mo;n & Moce Project.doc
r::¿-G.
- "T
RESOLUTION NO. -
A RESOLUTION OF THE REDEVELOPMENT AGENCY OF THE CITY OF CHULA
VISTA GRANTING A SPECIAL USE PERMIT, SUPS.00.05, TO WORLDWIDE
PETROLEUM COMPANY, TO CONSTRUCT A GAS STATION WITH
ASSOCIATED FAST FOOD RESTAURANT, CAR WASH, AND FOOD MART,
LOCATED AT 3733 MAIN STREET.
A. RECITALS
1. Project Site
WHEREAS, the parcel which is the subject matter of this resolution is represented in Exhibit A
attached hereto and incorporated herein by this reference, and for the purpose of general
description is located at 3733 Main Street, Chula Vista,
2. Project Applicant
WHEREAS, on December 21,1999 a duly verified application for a special use permit (SUPS.OO.
05) was filed with the City of Chula Vista Planning Division by Worldwide Petroleum Company
(Applicant); and,
3. Project Description; Application for Special Use Permit
WHEREAS, Applicant requests permission to construct a gas station with associated fast food
restaurant, car wash, and food mart (project); and,
4. Planning Commission Record on Application
WHEREAS, the Planning Commission scheduled and advertised a public hearing on the Project for
May 24, 2000, and
WHEREAS, at the Planning Commission meeting of May 24, 2000, the Commission considered a
motion to support staff's recommendation for approval of the project; and,
5. WHEREAS, the Planning Commission voted 7.0 to recommend approval of the project; and,
6. Redevelopment Agency Record of Application
.2-;
- -
Resolution No. - Page #2
WHEREAS, a duly called and noticed public hearing on the Project was held before the
Redevelopment Agency on July 11, 2000, to receive the recommendation of the
Planning Commission, and to hear public testimony with regard to same.
NOW, THEREFORE BE IT RESOLVED that the Redevelopment Agency does hereby find,
determine and resolve as follows:
B. PLANNING COMMISSION RECORD
The proceedjngs and all evidence on the Project introduced before the Planning Commission at
their public hearing on this project held on May 24, 2000 and the minutes and resolution
resulting therefrom, are hereby incorporated into the record of this proceeding.
C. ENVIRONMENTAL DETERMINA TIDN
The Environmental Review Coordinator has prepared a Mitigated Negative Declaration for
approval by the Redevelopment Agency pursuant to the California Environmental Quality Act.
D. CERTIFICATIDN DF CDMPLIANCE WITH CEnA
The Redevelopment Agency does hereby find that the environmental determination of the
Environmental Review Coordinator was reached in accordance with requirements of the
California Environmental Quality Act, the State EIR Guidelines, and the Environmental Review
Procedures of the City of Chula Vista; and, after independent consideration of all oral and
written testimony with respect to the project, does hereby adopt Mitigated Negative Declaration
IS.OD.14 finding that the project will have no significant impact on the environment.
E. SPECIAL USE PERMIT FINDINGS
The Redevelopment Agency of the City of Chula Vista does hereby make the findings required by
the Agency's rules and regulations for the issuance of special use permits, as herein below set
forth, and sets forth, thereunder, the evidentiary basis that permits the stated finding to be
made.
1. That the proposed use at the location is necessary or desirable to provide a
service or facility which will contribute to the general well being of the
neighborhood or the community.
The proposed gas station with associated fast food restaurant, car wash, and food mart is
desirable in that it will provide needed services to residents of Chula Vista in a conveniently
located and easily accessible site. The project is well designed and the construction of public
improvements associated with the project will serve to improve the right. of. way along both
Mace Street and Main Street.
2. That such use will not under the circumstances of the particular case, be
detrimental to the health. safety or general welfare of persons residing or
working in the vicinity or injurious to property or improvements in the vicinity.
,;(-1
- "T -
Resolution No. - Page #3
The proposed gas station and associated improvements will not be detrimental to persons or
property in the vicinity of the project site. An environmental analysis was performed for the
project site in accordance with the provisions of the California Environmental Quality Act. As a
result of that envjronmental analysjs specific mitigatjon conditions have been placed upon the
project. Said conditions are included in the Mitigated Negative Declaratjon for the project and
are incorporated herein as conditions of approval for SUPS.OO.O5.
3. That the proposed use will comply with the regulations and conditions specified
in the code for such use.
Special Use Permit SUPS.OO.O5 requires the permittee to comply with all the applicable
regulations and standards specified in the Municipal Code for such use.
The conditioning of SUPS.OO.O5 is approximately proportional both in nature and extent to the
impact created by the proposed development in that the conditions imposed are directly related
to and are of a nature and scope related to the size and impact of the project.
4. That 1he granting Df this conditional use permit will not adversely affect 1he
general plan Df the City Dr the adopted plan Df any government agency.
The granting of SUPS.OO.O5 will not adversely affect the Chula Vista General Plan in that said
project is conformance with the City Zoning Ordinance and General Plan. The site is in an area
that is characterized by commercial and industrial uses, said uses conforming with the General
Plan.
F. TERMS OF GRANT OF PERMIT
The Redevelopment Agency hereby grants Special Use Permit SUPS.OO.O5 subject to the
following conditions whereby the applicant and/or property owner shall:
Planning and Building Department Conditions:
1. Prior to the issuance of building permits, the project landscape and irrigation plan shall be
reviewed and approved by the City Landscape Planner.
2. Prior to the issuance of a certificate of occupancy for the new structures, all landscaping and
hardscape improvements shall be installed in accordance with the approved landscape plan.
3. The final landscape plan shall provide for a landscape treatment (vines) for the wall to be located
at the south of the site. Sajd plan shall be reviewed and approved by the City Landscape Planner
prior to the issuance of building permits.
4. Construct the project as submitted, unless otherwise modified herein.
02-'1
. ~
Resolution No. - Page #4
5. Prior to the issuance of building permits, the applicant shall comply with all requirements of the
Building Division. Said requirements include but are not limited to:
a. Submjt architectural plans that are stamped and signed by a licensed archjtect.
b. Structural plans and calculations must be stamped and signed by a California Registered
Civil/Structural Engineer.
c. Project shall comply wjth 1997 UBC and 1996 NEC.
d. Project shall comply with 1998 handicapped accessibility requirements.
e. Plans shall indicate type of occupancy.
6. A graffiti resistant treatment shall be specified for and applied to all wall and building surfaces.
This shall be noted for any building and wall plans and shall be reviewed and approved by the
Planning Director prior to the issuance of building permits. Additionally, the project shall
conform with Sections 9.20.055 and 9.20.035 of the CVMC regarding graffiti control.
7. All mitigation measures outlined in the Mitigated Negative Declaration for the project (lS.00.14)
shall be complied with to the satisfaction of the Director of Planning and Building in perpetuity.
8. Prior to the issuance of building permits, the applicant shall obtain a sign permit for all proposed
signage.
Public Works and Engineering Department Conditions:
9. Prior to the issuance of building permits, the applicant shall dedicate two feet of right.of-way
along Main Street.
10. A separate sewer connection shall be required for the car wash area drainage system.
11. Prior to the issuance of a certificate of occupancy, the applicant shall install a 250 watt street
light on Main Street, and a 150 watt street light on Mace Street.
12. Prior to the issuance of building permits, the applicant shall submit improvement plans which
specify and guarantee the completion of the following public improvements:
A) Widen Main Street to 41 feet centerline to curb for the 53 foot half of the street
right.of.way.
B) Construct curb, gutter, and 8.foot.wide sidewalk along the entire Main street
Frontage.
C) Widen Mace Street to 26 feet centerline to curb for the 36 foot of the street right.of.
way.
D) Construct curb, gutter, and 5.foot.wide sidewalk along the entire Mace Street
frontage.
E) Construct driveway approaches per Chula Vista Construction Standard No.1.
F) Construct pedestrjan ramp per ADA Standards as southeast corner of the jntersection
of Main Street and Mace Street.
.2 -10
- -
Resolution No. - Page #5
13. Driveway approaches must meet all applicable City of Chula Vista standards and must be 8 feet
minimum from the Point of Curb Return (PCR).
14. If the total on.site excavation exceeds the amount permitted without a grading permit as
prescribed by the City of Chula Vista Grading Ordinance Number 1797 Section 15.04.150,
applicant shall apply for and obtain a grading permit prior to the commencement of grading.
15. The applicant shall address all other comments noted in the attached Engineering Department
Memorandum dated January 19, 2DDD and included as Exhibit "B" to the satisfaction of the City
Engineer.
Fire Department Conditions:
16. Project plans shall be subject to the review and approval of the City of Chula Vista Fire
Department.
Police Department Conditions:
17. The applicant shall comply with all recommendations of the City of Chula Vista Crime Prevention
Unit as shown in memorandum included in Exhibit "B:
Conditions relating to the sale of alcohof.
18. No floor displays of beer are allowed. All alcohol must be displayed in the cooler area.
19. Locks shall be installed and maintained on cooler doors where alcohol will be displayed. The
cooler doors shall be locked after 12 mid-night until 6 a.m. in the morning.
20. Wine shall not be sold in bottles or containers smaller than 750 milliliters. Wine.coolers shall not
be sold in units of less than a four pack.
21. Alcohol sales shall be permitted only between the hours of 6 a.m. and 12 mid.night.
Other Conditions
22. The applicant shall comply with all requirements of the Sweetwater Authority as described in
Exhibit "B."
23. Prior to the issuance of building permits, the appljcant shall pay all required school fees.
24. This conditional use permit shall become void and ineffective if not utilized or extended within
one year from the effective date thereof, in accordance with Section 19.14.260 of the Municipal
Code.
02 .I(
- -
Resolution No. - Page #6
Planning Commission Conditions
25. That further consideration be given to the possibility of installjng a median on Main Street as
well as enhanced traffic control for pedestrian crossing at the intersection of Mace and Main
Streets.
26. That specification be given as to where the vacuums for the car wash will be located.
27. That enhanced measures for removing excess water on the vehicles exiting the car wash be
provided.
28. That a condition be included specifying requirements for landscaping, signage and on.site
maintenance.
29. That the signage conform to the sign ordinance and any redevelopment design guidelines and
goals envisioned for that area. The signage should be consistent with other new developments
which do not include pole signs.
30. That landscaping and street improvements be consistent with the long term objectives of the
Montgomery Redevelopment Area Plan with respect to street landscape design and traffic
control measures.
31. That a condition be included stating that the car wash will have a "striper" (air.blower).
32. That the hours of operation be clearly defined in the conditions of approval.
33. That prior to issuance of a certificate of occupancy for new structures all State, Federal and
local permits will have been received as required by that particular law or regulation.
Applicant/operator shall and does hereby agree to indemnify, protect, defend and hold harmless City and
Redevelopment Agency, its Council members, officers, employees, agents and representatives, from and
against any and all liabilities, losses, damages, demands, claims and costs, including court costs and
attorney's fees (collectively, liabilities) incurred by the City arising, directly or indirectly, from (a) City's
approval and issuance of this Special Use Permit, (b) City's approval or issuance of any other permit or
action, whether discretionary or non.discretionary, in connection with the use contemplated herein, and c)
Applicant's installation and operation of the facility permitted hereby. Applicant/operator shall
acknowledge their agreement to this provision by executing a copy of this Special Use Permit where
indicated, below. Applicant's/operator's compliance with this provision is an express condition of this
Special Use Permit and this provision shall be binding on any and all of Applicant's/operator's successors
and assigns.
02-1)...
- -
Resolution No. - Page #7
G. EXECUTION AND RECORDATION OF RESOLUTION OF APPROVAL
The property owner and the applicant shall execute this document by signjng the Ijnes provided below,
said execution indicating that the property owner and applicant have each read, understood and agreed to
the conditions contained herein. Upon execution, this document shall be recorded with the County
Recorder's Office of the County of San Diego, and a signed, stamped copy returned to the Community
Development Department. Failure to return a signed and stamped copy of this recorded document within
ten days of recordation to the Community Development Department shall indicate the property
owner/applicant's desire that the project, and the corresponding application for building permits and/or a
business license, be held in abeyance without approval. Said document will also be on file in the
Community Development Department's files and known as Document No.
-
Signature of Representative of Date
Worldwide Petroleum Company
H. INVALIDITY; AUTOMATIC REVOCATION
It is the intention of the City Council that its adoption of this Resolution is dependent upon the
enforceability of each and every term, provision and condition herein stated; and that in the event that
anyone or more terms, provisions or conditions are determined by a Court of competent jurisdiction to be
invalid, illegal or unenforceable, this resolution and the permit shall be deemed to be automatically
revoked and of no further force and effect ab initio.
Presented by Approved as to form by
Chris Salomone
Director of Community Development
.2. - 1.3
- "T
EXHIBIT A
---"
\
(\
~\ I
\ I ,\
\
lë) .Ä~~~I~<;.k: All AMANI, President of WPC PRaJECT OESCRIPTlaN:
SPECIAL USE PERMIT
PRaJECT 3733 Main Street
AOORESS: Request: Proposed 3,352 square foot 24 hour, food mart and
a detached 1,248 foot self-serve car wash.
SCALE: I FILE NUMBER: oJ-I"
NORTH No Scale SUPS - 00-05
h:lhamelplanninglhectarllocatarslsupsOOOS.cdr 01/11/00
- -
EXHIBIT B
ME M 0 RAN DUM
January 3.9,2000
.File# D6DD-3D-ZG-652
TO: St.eve Power, .Pla.."ming.Department:.
V"-'.A: Clifford L. Swanson, Deputy Public Works Director/Cit,J 1
~=='::Jeer V
FROM= . Sohaib.Ai-Agha, Senior Civil'EngineerJl.¡~
Ralph JL Ley;.-a, :Senior CiVil'En9ín~~ .'
S1J3.13CT= -1)c~ign'Review.Appli=tio..": 'for' 3733é:~~treet. (your: File
No.DRC-DO-42) .
-u- ?::.::::.=.:: ;'::rf:.s :ëìe;;=:::::e:-l:: ::.=..5 re-.-:.e",'e:: ::::e .5~j.ec:: :;::ropos.=.1. v,e
::0 ~D= p=Q9o.5e ::he incl~ion of ~.y condi::ions of approval of the
Design R:view :for ;:he S1Jbject prop=....rty.. 30we,\TEr, we request that you
prm-ïde the appliCa1!t ,,'it11 the following i1J£o=ma:tio!l:
~. -.. .~~_:~-tglJ~;1;~'~=~1::~~1 (::e ::~iët~ -~~:î:~~:~;::c~î~:;
-. ._- - .. for.,::,"or=: 21-.i-?n-~1:=':::=-:) .:-- .. - -- - - ..-
-. -~'...~- ::='"0='::':' ::.: =-~:: ::::=--=--e::::.:.::~ =",,5
b. Deyelopmen:: :Impact Fees.
c. Traffic Sig-..al Fees
.. - .. .- -
2. .~ 1:WO feet dedic.=.:::,oD of r=.g~::-of-",'.=.y =.lo:1g Mai!l S1:reet is
req-..:ire5.
3. A s:?=~e se",'e= :::o=ectiO::l ..-='11 be =eq-ci=-:d for t~e car w=.sh
ar:a ===.=.::a9= sys::=:7:.
4 - Two .street. lights a:!:'e required, 250 watt on Main Street and.:J.5D
. _. watt . on' Mace -Street-
5. The EngÌDeerÏ1Jg Division will réguire the applica1!t to obtain
a constrùction permit to perform any work in the City's right
of way, which TIE.Y i:1cluD.=, b:::: is :lOt limi1:ed to: ..
¥Ô
02 -I S'
-' ~. ..
_. ;¡:.::e= ¡':si:: õO::==e:: ::::> .;:. Ce::::,:;=:':.::,:; -~ :::.:=::0 ::::= =0.. --"--
~--~,- =:'S~::-::::-~sy.
-. _::::E:::-..::::: ----, - "- - ---- E~::=",'~_': ..
e:::~=,:; Ks=-:: õO::===:: :=:::::s::=.
-. ;¡:.:::,:;:: !>Icce 5::=ee<: - ~ "=, Ce::::e=:':.::e :::::> :::.:=::0 ::::= - - n__-
s~reer righr-ef-way
b. C=sL-r¡¡ct:: cur.b; gu~ter .. five (5) foot sidewalk sl::J:"Jg
e:¡ti':Å’~M<iiè:e~Street fr=tage.
c. ConstrUct. d=iveway a?preaches per Chula Vis::a ConS:::::-c1:::::.e::
Srandaxd,NohJ.. '
e. CenSt:ruct Pedestrian :Ramp per'ADA St=dards at sou~heas~
co~er of the intersection of JII'.ab Street E..'1d Mace Stre&:::.
-. ::>ri.-.reway approac.:.'1es mus:: be eight fee:: minimum from ¡:he PCR and
- per ChulaVista Sra:ndards.
7. If tile to1:al on.,.siu exc:av=.tiDD. exceeds the requirements
. presI:-.~-d .by' the - ðty oÍ 'Chiù~LVista Gi:-adiTIg Ordina..'1ce number
2797 Sec::ion25_~4.l5D, a gradL"g p~~it will be re~Jired.
:-::e =.;:;::'i:=.::: ~E ::: ::.e s::','ise:: :::::s:: ::::,e== ::-.=.~' ;:,§ =§~..::=e",§::::s --.. -..
"C.::,e ::ime .::is/'::'€::' deyelopme.m: "Cakes place E.."16/0r a buildi:::;¡ pe=.i:: is
applied for, d€p'>....nåi.:J:;¡ 1Jpon final plë::lS submi::ted for buildi"g
pe~..its. '1';-".5 ::-e.sp=se .is based solely 0::1 the pl,,-,""1.5 thë:: were
s:::r.itte::. fer 0= ::-e.,-iew.
.....:-::- --._----- -=-,~"--..u_--- --, -- --..-.. -,"--
._--- ---
---.. --'----'------'
.._. 3:;;:' ::"e:.:=::, ::..--..,; :Æ;;=",",::::
':;ame5- :?"-6=y~?=~::s S=:::::.:::::
--.E-.i=,ZI<""~?= ...~,~.~"'- --,--
'YI ..
82- I'
ENGINEERING
.;;;,~ DIVISJO,,"OFTHE
~ DEPARTME~T OF
QUA.- PUBLIC WORKS
DEVELOP MEr\ "T CHECK LIST
FO~MVl\'ICIP AI:; CODE1Å’Q~S
J'TOjectLocat;on: ~:n~~ n7AiN~";"5-r. FileNo. '7-bl - {¡;..c;7
DEDICATION BEQDIREME!\'TS .,
.'=mrimg1O 1iJ::phms)'Dl1==:ady .suIm:ån::d2D1Ì:Emmmg~inr~'.1Z:iI::ms DÅ“:d beJ""....-:iJ] k ID::iIIÅ“d as =aäm
af~ÐÍ:w>ár~.m~;1~~ CoÅ“.:]'ar:ñmiJe:r.~Dm~1ÎÙs1:Ï1:
JÏsI. pJ= ~ P=an3Îsll:dJtt1Zi>oImm ÐÍ1Z 3ast~'
~ OR ;:¡ ~Dfënñl)::åj::2rirm.of~-",~ (B¡j::jrl:s::ripricm: 3-' dPd',;,.;;z;.:;",.. .::J"".."
. """"{'~/, ~- -f'".."fï..JJI¿ L" ì'Ô;,,¡,._f .
-. .-'-.
"°'-": ::oæ I!) c..':}' z:s;::::riäD';'0:;::f=::riDg Å“ =i=::í=:a] "" m:: ~i= Í>~ g:=1 ~ ",us; ;,.... =.j""",à ¡'y C¡'y :
~~. :sigu::ã ¡,y <>WD::r( s), ....m,;a] sipÅ“mri:s :nmari:z::rl znd a=:p¡=ã by m: ~'. C21J (6191 69 J -5(140 i or '1
~~.àD=1Ctt~
:PIJBIJ:C IMP.ROv:E:ME!\"TnQllIREME!\'"IS :
-"'--'-"---'-"----'_--0""_"- -- -.---.. n-
o -" :~" . _ic.",,=....m,5=1rm12.:M.CJ4Dafm: Enm=":;smMnm::majÜ>ã:2!Dñ-fum::ij}'J)Ji::y',ND. 5é3-02.ifz.3uüdIDg ?:::::rniI.isissæ
-- - iÌXcm:~-..mi.:~:ar=:Jimn1Z1ñ=DWd:mm=::rl:Ïn5=úm 1224.020afm: C:V.M.c. (S20.000pmsID=?=f
-~~':;~~~:"': ~~¿;~~~:,~;'~~~~m ~~=::;;;~:~¿:;~O~:~y ;",p= ,r
- Z~~:oci ~~:ci~~i~:"'~) ~:==~=WzL - ---
:J~CC¿':}2"mg-=--=--~ .~~ñ;",,?=:;>5-- .. :J_t,Jj,,3'-"YP=~
;:¡SI=ñ:zm ;:¡-~&i:=:m=;:¡
:J?~~ñ::iv=-....m,=D =siâ=2k :J
7C~~S)(2~ 5--~7fo:;:=;mtmnzriÅ“¡
!'\ates: :-J TJ):~""""';¡mus¡D-..issu:ãì'~=~DI~~=YD-..ñ=cmID:DD-sit:Í>";¡m,,!,.
3) 5--~ 6 far~~ ~ of1ñ:¡~"';'~1C~-pD1ilit::ÏIDfIII>V==.
. .;:¡ It "J'I!=S 1ÏmI yomP"!i=unay =!IIÍI= Å“i}'" IIÌinar ÚJnsI!m::i!m P==iI (DO ~ jmprov=:¡ilims :n=:') and yo¡:
= 10 snimrit m: ~ Dcms:
-+ :ms;>=ian f='~ (Am01lIlI .is ó:::!::Imm:d Ì>zs:rl "PDD ~ vain: of wori;: 1D D: ÒDD:.)
.oV:L.
, oZ -I 7
J'lz¡uc I.>.D'ROY:EMI:.'\"T REQliD:.EME.'-rs (Conl'd):
+ Su¡"",=J a;. T:6: Con",,)?Jz:J ;0-. :;O"&=f', m-;:..' =~ Z??'!',...:. :Su~:;-~::: i=: " ::.:::." =:10: ;: ===c
Co==:;;o::?:::::i: 1°?Tt""D::i:::r Io-. m'I:'" z:¡:: ===0:::5. ;:; =:=,'.)
+ Suh;ni;=m'j¡;m:== a:: ]C% ofm: =,.¿ :m::i:=='s =1:: D;m: wo:~;O ~= do::>:. 5:=-::;.' =:- ~=
of m: foDo..~ iatms: SurcI)' bond iram z ~, ~. j,a1~ z:B::st:s ImÌI>g in at::Ord== ".,...¡, en:" "ojj:::!~
of =diI; us. Om=y; SOVÎIIp]>lSSÌlODk; =1ificu:: of dq>osit b2nk's =Tfficd cbc::k (N~ p::rsom!. ::ampan~' 0:
pånjii:1ll:d:UIC :DØI8a:q,abldau:asb bonds). .
... A~;,;;.;:7:-~;~~~Ih=;;' "¿':Br:~j;m~~ Ccnifi::m:of1nsm== ...ui:I;,r Ci1)'of(
I'Wa 1U11Mdm Dildilitmalirzsirred_wjfu Ih=fono..;"g>nimnmmJDbiliIy llinns 2S set fonh in "S¡r..ciDcaians for r
- 'WàibÛJmDi~;;m.~{CÅ“';"¡;'d.Y;î:fd':d1OJiS1hé~BDak.):' .
BDðÏJ)' ÎI!.ÌttT\." SSDO..OOiJ .czciJ ~
51.000.000::zcl¡ 0====
.')1,000,000 ~¡:xroåu= and::ompku:d DJ'=ri=
~,~ 5:!5D,ODO.czciJ=
5500,000 ~
l"øtc - . .A~SÙIgh:~~_:Wnh*,~mxmsin'1ÌJ::==nt ofS2.DOD,{}DD "iU ir.. =siã::r:d ~
m~mininmm"~=~'Ì>:~f~'~~)a!1;,:ãis=riOD oflh= CÎ1)' Eng;"
';o(]¡~ maz:m:;ili="iUin::ìnÅ“-';';:n=i m ÓDmajor.=aion m:r-..-=nsm=iOD of~ :ttt1pID"=,~
. w;,;-m..õ' 1ñ: =O:~~ =io. ;m':. s;:i.""V."21i:: 211= =bz];;: =OD=Ï:pzy;:,g. Tn= fallow:mg ;'=,,':Ïj
:::.,"-'-:;; ~O:-1D ,=.~- of m: CÅ“:.=::¡;",,?~ (NOI!:: ;~-..,;;:>j¡ms = "'a~ =:gujr:è if =io5 Dav: D= O""S;r.lO
~ 1iJ::ir.:JÙ1:imaI::lo::aritm andins:aJJ:d unñ::r-pÅ“v1ansiÿ-~ pja=) Tho follow:mg i= = ID b: 5IIÌ>mttI:d ID :
~
... ~~ D)'2~ om¡ ~fuc=":Í= andzppro.-al' ~ upOD wari:ioaè, tD: c;:
- ~~~'31D-'I.:w::=i:s:fur:fu:st~",!,!:"~.,:1 w=1::sfCTanySJñ=qu==.;:wS.)
-- ~ - ?;,;;-"~ ~;.,;¡;:- I-~~~UPOD ~ =diCT~' ofwoii:. (.'i2000:nriIriIm=)j
-----~--~~ --.----::;: -:-:.~=---- - . - --'-- - -
.- . - - -- -- - - ---
-. G?~~-='J:"C'., ~Q~!<.::;:-",~:
- --- . :J -SID::: ";';'-:;ili:ñs-",,;m,;;'-- iÅ’ ?i2im;¡"?5 =,=0.: Show:£= ~~gir'...;"g ?ro?õS=a~-o:-1i¡£ sir::. j: =y ~= :i.~:
-- - - -z¡m: ~;;,;m~ .,..-=i.~,;;", 2 ¡;::z:fu!¡;p=ri': is~..:!. 11:';';'; is 1ñ: =. = "':X! i= focz:qui!--::l:S.)
-- -- t( ñ"?P=iram~~~~2pañiDgp::=i¡=)'b::r-..",m-..::. Thofolla"'ingi==b:fujffibdm ODw"m:J>=i¡:
... A ¡;::zåjDg p1zn JIm>! b:~..,; D)' 2:r-..gi=r:d ""oj) =c;:iD= 3I1d 5IIÌ>mttI:d 10 1m!; ~:ïor =.;::w znd ~
~ (~~ ~ ¡:ux=ssing 1Îm:: 31D 4 w=1::s:ïor:fu:st:r=ri..-w; appr~ :1 -..:::i:sfuc BIIY snÏ=z1=n=o:í.........
+ :~]Z:¡;¡ës",,?i:og~===zss=:fo:1Ìl;':"1Ò1= C":;'~:is=2p=-",-,-..j;j::;;-~ .:i:is:;,==y,,=o=-~z (619) 691-5j02.
+ 5mmõt.z. ~ å::¡>osit, Ammmt;s d::pcndcnulpon =:JpkriIy and = of proj=fnr:pJzn-clI::ci:: jn a::cnrñam:::,..;-.
.". ---- - lÌ>::UIy'sFn11~1'rogIam(S2,OOO:mñrlmmn).
... -bnvifu:=:ÏIyin1Ì>:zmamm¡ of: .2:>"'%of~!:2IIñwnñ: =; 100% of1h:: csrim=d::om of "Ppwb;;ww1=
(i:. J::Iaining....'Blis, tn1v:::ns, ÏnJ::!s SII1II:Im:s, r:I::.) as tì=mm::d by'fut o;:>¡>roY:d::ngin='s f:SIÍma:I:; 100% ofJaDås::a¡>ing an
~ fzciliD:s; ""d 100% ofhmis::ap::=rim::mma: foa p:::1od sw::ë 1m m: G=nng P::mri1. Tn:: S=:¡;' fo:!Ì>::s: it=>
!m)' b::i:n 1ÌI:: == 1= zs =Ii 1m!i= """"'lio:iJ:J;=v= R::~ ~ ,,¡,ov=. '.:
A,l..3
-2- ol-I'l'
- ..
GR.4.DL"G REQù"IRDn:."'TS (CODI'd"
~'OT£: ;~~':~:.~~:, =~-=: ~.,;:c:;,;= :::.;; ~;~~ =:,:~= ;~~;r~~;'i~':~=:~i:=;~~~. :
s"Î>==<õ w "'= ~ DJ\-ma::'s 1m;=:ria:: 5==
~~ =.-;. "'"'" .. .., ""'- b ,.. a.
D .'ID =-.hu...u.pam;:fm-yÅ“"-]>IIUpDS::d~:Iiu::iJm::s,,;m;,, iii: Cny'" =:rigitt of...'2~' ""diar = (Call far lÌ=i
ENGII\'EERING l'EES A1'.PI.1CAm.'£ ON.BmI.J1ING P.IÅ’MIT:
TJ>: fo]Jtncing;f;s:iDñir=d=~'ID~1m!Ícèumd_~m 1>=pa;dJltIil: 1ÍID:: of >ssuam:c of liI:.BlIilmng P=nit unå:
1il:2II!hariJ:J'afIil:Uty.ofÜlllJaY..ism~Masn::r=5Å“oànJeaod:DlÌl::r.:ii:l:sæui " . ":as2pprDV<:d1>y~ City CòImcil.-.PJom
nDldJuzrtiÅ“f=rJist~/lßINiMiiàø.q,~~ ;:;.Z 0'. ..,jDiI.n;SIIb)errZD~,,;øT".tl#Ût~_"'"'" DnllÅ“fiiml btù1t1in
pbms...
5-=F<=:
,::K .".' '~i,-==,,'=;,,-, o:õ3['.OD;", S="o:::- '-~~-:;nOI1?=
~ S",,=g=~.F=: of'M."?O:¡>::r~.Da-~ r.mn (5=:~ ï for:aãäiIiamJ :infm:mm:iDD)
X 5:1...,. m::w(=~h_~~~:ins:zliæioni--:iar m=J iÌmn=rin lDprop=:r :ïi:n=:
~in::ìr.53,D15.00?ñtsS86..00;p::r:iìxnof .:batp¡'¡d::D~m ov::r 35:f=;
t'-in::ìrE_14B.DD:niDs589.8D=iDøt ofrlmm:aì>1:: i::Å“m ov::r 35 Ï--
T 2D:imD 1 D- m::;, ~ -== ~ .ADd S6.OO .; àov:: ;:;.. .
"I"j;-:ixiJDDJri ~ (9j Ï=m ñ::pñ::~"óå S' ~,;:OO, ¡ili,s 536.00 P::¡ foD! DV= 35 f= lD .Do,,:: Î::,,-,:
--- - - -- --'I"P:imD:mam-~'~msz::a¡;of=~ -. 4"JiW:it:a].-s3Jï.OD;-- -- .
. .- ~ T§Å¡~~-;;~~¿*~ ::; ~2~.=, ~ ~-;,
Trrlñc Si"1J2"'=::. - --
-- -.. - -----_.
/
A MOS¡1J::Wpro5=prop=iim:fu: CiIY=snbi=lD2 T:>5: s.;",w.F=: i:;zs::¡j O"""'P::..~mp g::t>=DD!J ""<õ is :;2j~"',-6
/ æS13.DDp:r<=ip. (5:::::fu:s::ñ::ñW:: D1l1:Ìp ~Îa::ID:>; ~~=5 & D.)
:J Y=piam::2JJïÅ“ ~ iii: ~i2::iliñ::s an ~ Th::"jp ~DI!:f=m will Å“ i:;zs::¡j D:D m:: PITf?o=3. DliD:mDnDl
=-
D Y omJilims .ca1lïÅ“~:fu:= aflil::åsñog:!àciJÏty. JZ1rip:gcm::¡añÅ“:iåclarwill.becaJI::aJaI!:d bastd an íb:: åfff=:z=
-- "'-=:fu: =êstiniznd~ m:s {NO:Å’: ~Dmimãs"'¡¡¡.be givi:n ~ ~ D='= gcnr:¡m:s fewo:r1rips.) -
0- YomJilims.ca1l ïÅ“~~ of 2Il~= Tn= 1ripg::Dt:rañan fa::mr Will 1>= D=d ~ -me t:SIÎ!mI1::d in=se in
1rips (:if2Dy)-£mmíb::om1miiõmg'tDIiI::n::w. (No n:Ïnnãs"'¡¡¡ ~ givc:nfarJ= s]z::rl =.)
~ --
.3- ~-19
- -
D,vtlo"mrnl lmnad Fee< !DIF"I
- :.=;>m¡>as:::'~í:=ii:s"-nin::::r. er.-,E.z='==z:>::i! S:::;1=10:>:rF 1:> =D"=::r=:>S'.! :>:1.==°"= 0= =
::><:i;:i::ri-,:-C",'=a:J-St'Õ z:>.:::S::'I:Rou:=,~ ",fo1b,,~ ::i:::<::i::i:::i:r.1O:;';;= j", =::i:::; C:-:-; :~=;;:,,;, =~:>,,-::::,-,
=-=05-d T,.,.,.., 0"""'.= ~ ~
5~famiJ)" d::ó::d (per E)U) ..................... S 5,9">..D..OD ...,.... S E2D.D0
5iDgJe-famiJy~(IIupJI:=ß:.ûmdos) (=E>UJ ..... .4,738.00........... 66.00
MnJñ.fmiüIy(Apamm:zàs)~EDU).................... 3.5S200........... 492.00
G=ä:J~cPcrm:n:) :....................... 1.48,000.00........20.:500.00
~';'~~iDüi'~~~~~~:::::::::::::~~:::::::. 8~::~ ::::::::.~~':~:~~.
5g:åRise Camm::.ciaI (==) """"""""""" 236,800.00 ... w 1>:: à=miDed
GolfCom= cp<:r=) "." "".""" " . . . . .. ""'" 4]4.400.00 ... 10 i>: å..-t=1ÏD=d
,,'=;;;=zJC:::J>=\?==j ............................ 3&4.800.00 ... 1OÌ>=ri~
~ Y D11Tp1'DJ>DSed pmj=:is SUÌ!Î= 10 ~ hiilir hciIñi.s D1F 10 =v::r ~.= of ~:ID= CiIy's i:acifuj",;:
~JTvœmr-;o;"', . .ImsL
~{p::rE>l:l ........:............... ........52.150.00
KOT~{==)................. ..........., JO.750.00
- '.=:::-;=P=:iF"-,=isj~"Ë1m O:"yJ'==il y~= 10"'.5 io:-?=ó=sr::izn3rièg=D]F:'::=:
- ~l=d=~ZDùl ........................ ..... 5545.00
:ø: Yo:r;=pos:rlpm,i-iswiDriD =orJDOl""-ni1:Ì1dD1iDw:ingm.;",,~ or=Ï>zsin5 (D]F:i'=:m ;",~...;m~o
-_. -n:-=ilinngP=Î!)-'-"_._~_..- -- u.-
.--_u- -----
.-- - - ---.. T~.Qmy¡m~ÍJ==J...:.:.............. S4.579.0D - --. .---
- - . .7=.'.~"1'¡'("-""Y""'~o:,~=:,-C) :-'::::-::.:~...:-56D.O[J.
-~. -. -i~r=~~~~~~;~,~;;~~~c-~-....... :~~:~;
~~.s~~-i!yjiDWS-(?-...EDL1-.. ".-'-'."" .-.. 2&4.00
- - --
Ò'DUI ::r:,!= ""'}. :f.ill ~ "" == riis:ri=! wID::b.i:z! zi:r=rì}' pzj¿ 1D= ::qui::-=d 2:>:rF. :rr. m= i:ri=riOD :r--g2I::ÜDf
:D=vci~:im?=:'=,pi=zs==:::1Ì12:5=:ion-s=ñ'" (619) 691-5024~ :3505 OJ' (619) 691-5258.
:"I DE: T6 ~ fur E Dz.s=:i solciy Å“: 1D= pj= ~ m>rl å= DOl D==:Ss2:::iiy:in::iJ.uj: ill :ñmJ :r-~. 11 is ~ 2S
, "2Y m 1nfÅ“m yÅ“, 2S z Å“v-...iDJ=!DWD:x, I>Ï D.= g==:a1~";'~ m>rl .= yon = 1:IpC'" 1D == as yoarproj=
~'Thr:~:æid :i=SI:DD:Ii=ìh::rcinme DDÏy1imse È>pCSed 1>yD.= ;:,,~ Division.. Yon slma1å "PŽdact
- - - 1D=D:;>anmi:m m"'BuiIóiDg ß:.Boasingim:iIñDlImlIÏml ~ aãåiIiÅ“m1 f=. 'pJ2s.... do 1IDI il=sÏm:= Ie C2ll1iñs Ji=;panm::m
fa: fuI1m:r:infonnarirm.
~S- ..
01--2.0
- -
'LffiC'll] ..R TIUJ> GF.""ER..TIO"'- T ...BI E IO"T-W... Y TRTP"\
'D~ 70z5: 5,=: ?= z.-: '=:ci "" IÌr = 0=,,",- == = .=:::z:,=~ ,,",;, 5_L_"-=>_<,G-, .3;-.:.' c".~-{ c'- J -:'--,:".:" -:-
GcnC:--=:I:), ;'0';; fC>T ,hc 5=, :Ju:g" Rt:gwr. ~:::: b=- :- =-- ;=-.. " ~=",,1:i or. oS 2:3 .ú~ ;>== "'?- ;=::="',:= :>=: ==:'
Tn¡, G:m:miDD ú= åzy) raz10:
1.aDdlMr~ (J""-1:rÍD!: "/.-TY:::)
SCrri::esœiau;,<. .
'.~i~~~;.;;~':::::::::::::::::::: :::::::::::::::: ~:'i;':;:;::
ear:-~S13riaD d=s;gn :.. --- .. .. , .. .. , - .. .. .. .. , .. .. .. . . . .. 150 TIl'iIcling spaa-
A1namarit: "-".....................................oo.... . . . .. 900 T/Day Dr 600laD-..
.s-~"oo.....oo....oo.."....oo................._.....,... JOO T!S!,,]]
.l.mos:.b:(ê:zj=&=,--- ---'-.--.,-. "'-----.-. .,----_.,50 TfJOOú51'.or3úO:a...-"'torõú:s:,-,',=:s:zli
Amo ~ =- .. ..'. .. -oo . .. . .. .. . . .. . .. oo . .. . .. . . .. .. .. .. .. . . . .. 20 TJI000 5.F. Dr 400.-2= Dr 20is:r:n'iœ s:ra1J
~¿Lamr
- ,,<'3:lauk("":1k-intmJy) .""""""" """"OO""'" oo............. 150 TIJOOOS.F" Dr JOoo/a=:
J3auk (-..DñJ:!ri-.1>p w:iDóa..-) """"""""""""oo.......... 2OD .'TJ.lDDD 5£ or.150Di=
- --..s.nomg.:.t:hn ".. ......"...."....oo............."........... .60...TIJOOD£E""":8DD12=
c:.mm:¡,.ør 5~ .. .. .. .. .. .. oo . .. .. oo .. . oo . . .. . .. . .. . oo . . . . . . . 9 TJJ ooo'si";DT 4o.2::r--
c:ñm::è:stŽlDa1 :". - -" """"'oo"oo...."....... . . . . . . . . . ..... . . . . .. (5= '$t;boo1s")
Camm:::rcialÅ“::=.(:Iùs:oSlrip~)_...... .... ............. 40 -TIJDDDS.F.or400l.::r....
C==m.!-'<ÏILH.w,g = (3G-60=::s, lOOK-30m:: 51'.) . ... , .. - - -. 70 T/JOOO S:F. or 700,=
:<~åsñ~ =«JOz:::--'. <lOOK S.:_ì :~:. ,-'JODD 5':- 0: 2~Dh===
C=zj~:
~--.. """OO"'oooo.. ......................... }SO T/JDO05.F.or100D.'a=
Cœn-::oicm::=J:-..I OO"'OO"'OO""""""""""'OO'OO' 700 T/J 000 S:F. Dr 700
Dù:::Å“:mJ:ÌlIÏ:> .. .. .. .. .. oo oo .. . oo .. .. . . . . . . .. . . .. .. .. . . . . .. 60 T/1 OOOS.F. Dr 800:,,=
Dù:::Å“:m= ".. -"... . "" .. .. -"".. .. .. .. """'" oo .. 60 T!JOOO5:F. Dr 600."'=
--=-=-_.........-.-.....,~..-..:_.-'7..;.:.-......:. "T/J00OS1'.orl00,'a6-:
~~~~~~:~;:-:::::~::~-~::~::::: - :::~:::::::::: :-~~- ;;:~~::~~~=-
Gzn5::z:=..........._.:....::.........- ""=-'--'-'----'--'.'~ 40 Tíl.Q¡JOS.F.or90:.=_-
- Bos:pj:z2: - - --- - - --.-~. _nn -- --- - -- ---- - - . - -
-- - _00---- ~: '-=-....~or2D'JDO:.5.:.D:2;'J-==
~.Dmn: """"""""""""""""--""""""'-'---~ I';;3:å .--- _0-- . --
--'_~-cb~--- - -~-- ~- -- -----
- ~'3nsin=-;o:ci: (Camm::-'...zJ in-i.".--,) . - . . . . . . . . . -. . . . . . . .. .. T'1DOO 5':. or 200,'.::;-,
~pzIi:(No~) '-'-"" .....:....oo.... .--..oo.....'- .8- -TL~.DT90ia=
1:n:ñ=:ia1 piam (mWDpJ: s:irifu) ............................oo.... j 0 T/J 000 5:F. Dr 120/=
Manm'2::mI:inglz=bJy.................._.._....._............ ' T,10005:F.orSO/=
Wm:::hoos:iDg "..................oo............................ :5 T/JOOO 5.F. or6Df=
~ """ --...........oo.....oo............ OO"'OO...... '1 T/JDDOoTO.2h.",,}¡or30i.=
LO';::'7.-=ci1.so å::\'ila;=r oo...........,................... E TI1 ODD 51'. Dr 80/.=
H=::¡-.mñ=m::mian:iO::iliñ::s&= """""" """'OO". 10 TiRoamDr3DO1=
- Mm:::1 "" ... .. , .. . .. .... .. ., . .. .. .. , .... oo .. .. , .. . oo oo.. .... 9 TIRDmn or 200/=
-- - ~~':"':'-"""."': '-,:: .-....... ....,-::.:: .::... "':""" E TlRDmno}')oola::r:
- SIanãaro~ Dffi=ñzWå:ing «100,00051'.) . -oo --OO"OO".... 20 mOOD 5:F. or3OOl",;;r--
--- Bmnàmd~nffu::;""ïm"g (>100,0005:F.) .....:. .."oo..... 17 TIlOooS.F. or6001a::r:
Cmp~Dffi=1>cilD:ing(s::ingJ-..=) ..............-.oo........... j4 T/JOO05:F.or14o.",=
M:dñ:aJ¡å::ll!aJbmïm,,2-........................- """"""', 50 TIJOOOS:F.orSOOf= "..
'?It
= 02. - .:2../
- ~
... "EHlC! .. TRIP GE"-"ER.. no...- F ",("TORe; Il.Dn,'d.1
P.:s~:
S"'fi, '=iiy è==,,== :0 7.'5JDfJ, :z=i!, ~u'=ll=~'
C=:io~b ......... . . . .. ..... .. . . . .. .... .. ¡; TTunn
~ """""" .. .. .. .. .. .. .. . .. . . . . . .. .. .. .. .. . . . . . .. 6 TJümI
Mo1Dk 3Iam::, AdabumJy . .. . , . . .. .. . .. . . . . . . . .. . .. .. . .. . .. . .... - TlVnit
...~~~::¿~:::::::::::::::::::::::::::::::::::::::: ~. ~~c:
~.' '.
Low~'gÅ“]ñy~ ........~..... """"""""'" Joo TlJODD.s.F.OT3!=.DT5DO¡,,=
~¥1IIIJJDV<:r .............. ......,................... :!DO TI1OOO.s.F.OT7is::ator 12DOi=
:ñsI-fClDð-.oÏlbDxivr-tiIroagJ¡ . . .. .. .... . .. .. .. . . .. . .. ... ........ 700 Tn ODD S.F. OT 231=1 'OT 3000/=
:=-jooè"-;:;'ou:D:-;v='¡¡"-a~ """""""""""""""'" ,5ú TJjOO05.1'.OT::2'S:al
~= """"""""""""""""""".""""""'" J 00 Til OOD.5.F. of possiJOOUI:a
5dJOo1s::
~{4-yar).............. """""""'" ............. 25'TJSmœntoriOOl=
CammmmyI:<>1kge f2-y:a:r) "'" .. . .. .... .. . .. .... .. .. . .. .. . . ... 1.6 TJSmœntDT 8D1a:::rr:
.-;;-~c.imo1 ..,. ....._,......... ............... ...,........... J.4 ...TIS1Ùd=i-DTJ1IJOOD5.F.DT5DIa=
Mitidi:"",;..;Ëg]n:hool...... .. .. . . . """""" ............" . .. J.O TJSmÅ“ntDT4DIa=
~'.................................................. J..! TJSmœnt or J4!][)00 5":. OT 60':,,=
~.= ....................................................5.0 T/Childor80nOOOS.F.
";n~:. ï;'"= 21---'~,~ ;--=';0= :2=1o:-:,=".-,o,.j:;i=::. ""':.-x=': ~=>:l!"::: == ¡';~"=w:zJ v==S:;:::i? g:"="",;o,, s;;"j; "=:l.'
= :""':"'.,=.: :;;" :;~.:5: 5:ìfml ::0=.
- ---.- -- .. --.. - --
- .-. -.. - - --.- -- __d' ....n. -:C"D.u-"1Å’..u'-Th"FORMA.TIO1l;
_n .-_.- -.'.- ----.--.
-_.---- ----'-'--. - ---'. - - .. -.-
. ::::""'-;-.4.- "O.-;,;,5:..-n".., ::':".0'0 D::::~_~ '\~=],i:::::=",.c::=~. =~ ~,,-::::=-,=,=,,~¡==-,:,==,:,,:o:: =:::= ::""=:::0--=--=::
cO =-=l: ~ ;::::,;;: '"'7D'.'=:';' ::;'-.;=lE =y:,: p'o"'= I::: z:oy D:-:::: iDliD"-::og =,,"":
-- -----r- ;;'~Î;;;;;"';~f1D=~'~;o-';¡¿~,,~-;;;;¡¡jri~
- -~-:: =~-;;~~::;~r~~=,:-:~~~~~=~:",:~::==-
4. 1!WOI:Ùd Å“ ~ Ie D2.v= 1mprov= 1n=]J::d zs :1m m-=J] proj=-
(NO:r:E: :D-...f=zJsJD>}' nozœ ~fan=zsan of:5mmcial~.)
T 0 ~. forz Ii::ï=zJ, yon 11mS! =1= "Ik:n=v f= Z\~j: Z! -fu~ Eooci:J-m~ Di'I-isiD!! ,,==. TlO: ZD?li::a';DL == :,.,
=~DYIÏl<:~i:o=~=ñmIÏl<:~.F=~. - - .
Jf 1he à::i=a1;,; gI2II1'::d, 2 ro:dz hond {US;=cy Dr" =riñoiI t2SÍ1it:I's t:b<:clë):Ïn IÏI<: amoan! ofJ 10"10 of"lk :stiJmI::d ~ of"lk
.' - .~bcing-dci=n:d=Å“pns1::d-w.i!Ì1Jj,eOt)'F=::::O:ffi::::. ..'. .
- 1:n =:Å“in =,"Ik City ~ 2="'12 lli:a 2gZÏDSI"Ik ~ prop::Iy :Ïn n:::n of"lk casñ Dand. However, 1D= fonD'\-1ng it=s =
Å“ 5DÌm1in::d b::iar: 1he C:ity will amsid::r æ:::::p12n:::: 01z =='
_. A i=:fIom tb:: ap;ili::amfWiy ~ ...'¡'y m= ;s z ~ for " Ji::n m liT::! of me casñ bcmd. ..
J.l7
~ 02 - -'.:2...
- -
DEFERR...., 1'1,"FORM4TIO,\ (CoOnr'd,
-- .'.=: ~J of';'" ?,,?~'?'=?L-== """ S1~ b~- Z 5:= 0: Cz.üfa-..2 ~...5=:; .L.=:s:-.- 5~== "==;.,,j shz:: hz'." ~
;r==-:è ""¡",, 0" :i2~~ afID:,;,:: of:::-. ":T"-= :'::~= f:r ~~ 1:::-..- ~,;"" :-:zn~: fo" z~ ZpP"z.¡szJ ¡, Zpp"o:::jmzl:j~- 5:::;['
S:;['O fa".. siD~< !zmily hom: zIIè 5"'-000 10 5",-SOO fo~ ::Dmmen:ia¡ p""pen:-.
-, ." TnJ: 1ù;pon;=;>m=! by a DtIe iD=:e t:om¡>aII}' wi1mo 60 Å“}'S of m:: da1:: of tht: ,.7iu= n:qu-...n. Tbe price ~ f01
TJtJeBoportis~~1OSl5O0 foT.am.:¡eiamùy homcand S2.000 tDS:!.50D for commercial propeny.
"
,. --
PROCEDmiE FOR THE INSTAIJ.A.TIO1\l OF STREE-rLIGÌITS
jj":;,= =;,~ mm= ¡;¡~ "",!WI=:oJJ 10 ms:.Jj CD: or m= = iiglm, Ii>: ;olio..'11>£ st::¡>s = ""-'1uiT-..c.:
1. TIle à::vdøpcr, iUs =P=r ar1:tlIlml!:lDf2pJ>lit:s fur.a ==iIIDJ=IÒI £ram this d..-pam=n 10 mswJ 1M == Jigñt. (.-ili
=~far.~J>c:mit~";"-'=W>-tin~ l.j - .
L .2 TIle1':ìÌlD!s$u';lIIn.jJI.x:bet:k;wj¡ñ m::Thd'iic 5caixm 1D~:Ii>: :xa¡:¡ lm:a:rion. of:Ii>:~ =-];gin;
-. UDan~2iås.in::atian1Dm::D:=3=ar.mS>l= ,;",æ,-..1=::o:c:Z= 5zI1Dj""o Gzs &:::J:..""1ri:1O O"WI> m:
~~.,.,m:m::æian. . - - . - -
.:. :-o~ :i.""'ciO?:-. ==- =::= .;:::¡7::O= S":"'=: "".TI..5Ì::-.:::: :;'0..-;:'. .I o:::::~ :oliov-=;:
A S1:r= ~ 1=::íÅ“
3. .5:m=po;m
c: C. Condråtsize,~æñJo::miIID
.. D. .?IIll1xx=;
..:.~-=~ -~ "'W""¿m:s-==-:n~'_~-- - _.-'- .:-.:e_-=- --- --_-:
5._TIle1::zffi::S:::::rim:~io""pp,.m'2J'- .----- -- - - - n--
-- _on_> ?-'~:!-.s"=:ò:r~"",~;;~7.i'f;;;;¡;::;:j~:;:",;-",,=-~;;;S=;"; ~- ."- - - -
- - --- --.
._n__.- --. -----
SEWERAGE P ARTICIP A 110" FEE
T= c:¡",jz ,:;"" em. Coo",::iLmsmnDori=im::::oJJ:::riIID ofzÏ--1DziDintht: =of~~ =din m:: r:i1\'. This
j=e ;s "0=1:." coñ==:rl "",;,:,;",= oj =:=nrm 1:> me DUbD: = or w;,::¡¡ z ~ is issu-;ò jar ..i~" "Dñ=Din¡; ~ in =
....;"""~ Ìm;i:iin~ Tn: =Ï--js ~?_??O.OOp--~.,.j=Dw-..lling1JIñ¡ {EDùl. arsiDgk:famiJy ãw-.liing' ~in~ 125<: of
==::i2!Jpmj= Ì>z=i IID~F=1mi1s (EFU)]. Th:ii>Jlowingis1Clkl1S:dzs z gW.dein a1:;nJ3riDJPñ::D:daryom
~:ñøwev:r. tb=:fimù ~ Will 1>e 1>zs=j t1pDll1D: phm ~ fur z ~~ 1'.e:mn=.
;. R::s;å=ri21'
-------.._.
,- Singk Family Dwc.lliDgs ... .. .. .. .. .. . .. .. . . . . . . .. . .. .. .. . .. . . .. . .... 1.00 EDU
MuJñ-FzmiiyThciIs ("P"=>=, ,..nnñ~<, lri¡>l:xes) .,...... .. .. . ..... 0.75 EDU
Mob~ E=. T:ail::r .... . .. . .. .. .. .. . . .. .. .. . . . . . .. .. .. .. . . .. .. .... 0.50 EDU ..
~r .
- -; - 02 -.2..8
SI:"\>.n...GT PARTICP'...nO" F"EF I("ony'd"
(:077"-=-'-:2"
?_\".?z=i:3 .... -"""--", """""""'" '-""""'" -.. .... O.:5¡=iwaJ.:-uppJus.:õFüsmb;:;;s\=w.J:<
ks:amzms:
. ,_5maD{Sl:mÌDgbn¡mxIJOO) """"""" """"""""" ..EFUcDu:nt(sceubkbdow)
;£if¿~~~¡,; ;-,i~=
5<:Jf-s::!\-;Å“ Læmåri::s" .... .. .. . .. . . .. . .. .. .. .. .. .. .. .. . . . - . . . . . . . 0.5 EDUlwash::rpJus EFUs DD1 mm::hf:d to"""2!
. ::a::jjj';-s =ng ,,= ia-,;:an=smg pmp= sD2Jj i>= 2=saj ;",;;\,àIWb' iJ)' Ii1= DEcaor.
= Faciliri:swilil ~svm:ms5baJ)iJe.ass:=ss:cdÉliividD2li\..dnÏmmarillD=nñred:for.= sJWJ Dtprm.;ó:d b\
..apj>1ú:am. f ""c " -- . ,', . -.. .'
T~kfoT",,¡""nm....E=Tjs:
~ .EL' E1= B!
3rmr(r~J).... -..... '-"" 5mkt"=ñ-.",,;.J:i=ilirr~y) "" -. . .. -4
~...'............ ...... ...-... 5mk \""25Ì!-up. :æ:b = of~ . . . .. :!
D=Jmma:-~ ......-.. 'Li:i=J (iius;¡ =1:,
="",~" ;0::::""= '~:O::2~, L~ ::>="=.;-.23.).. ,;,
~mDa:-=iD:i>=s,,~ """'.-. üri:Å“j~mni n............. ....... :5
2.z>'JI!IXY.".. ""'" ..._............ ;) Lõrimù(,,"'¡¡)............,......,... :5
lznIm:!' {D=!ì .. - .. .. .. .. - . .. .. ... ] T o~ (I2ni;:) .... .. .. .. .. .. .. .. .. ... :5
5:i:ù:ar iiisiIwæ:ñ::r .. . . . .. . . . . .. . . . - " ' Toij=(T2h~) ""-"""""""'" ]0
.. - . .. .--n. ..
-~.. <fffi'. M']!~?I"po~J:ER~~:~:)", -G;'!> ~.;Å“ 1mn1DIrIili-.. ¡'y 2D5 GP.D=] 3:>V &"- - Mulri;>jy =J¡ iJ)' .>2220 to ::ci:æi= to:;¡] i:
..... _n -~
_~~_..n_u__. '-- --
~ ""'T:< ry, c' (\')M".~-.-:-::.:
-- .~..- P-. --
-- -- - . ..
- - -. - ..... -.-
.. --
"'If' .-
Cn=:-.J: Es: b)c -q..", '. \. \.-" S:c-.\";", ~--, ,/':J/']~ P;'O:o:: í6]9,', ¡~':J¡-5c-.¡.:-,~
.:; - .J. 'I
.. .,.
~.._- CHUL< 'Er-< POUÅ’ DEP-~=-7
<:RIME PRE\L."-nO~ 'ù""!\TI
PLA.!';; REnEW
Dare: Jamwy19;2000
. .
To: S1evePO~~- -
From: Richard E. - --- rnne Free Multi-Housing
Projea: DRC 00-42, 3733MaÏn.5treet .
Fo1lowIDg.POJDIDems are to æsist with~c proper milizaIionof security wdware, aJam¡s (access
comrol},c~~:a.mn~2"tri~ . :'~"~; ,;..¡ iàcü víly,;and .mbeigbtCD:;crimc preve:nrion
awareness 1ÌJroU!!Ì11De amce:p1 :of~ defelisibÌé -spaÅ“~ -æd1mvñ-{)II]])eIIIa1deÅ¡ign.
ACCESS COl'lROL
XX Perimeter .sec:aÚy
DOOT>
XX Steel1ioar:fum1es - Solid core doaI3 XX -~
~=~=-~ -=-~~~~~~~-~~~oni~l;~'-:O-~~~-= = =--~:_- -
- -- - - - --..
- --- --. -.. -- - ------:-.::. =-=~==-==-_.:_.:.---c-:_-~_::-'-_.---':'~ -~. -
-=-----'f-o.,-::-mcil s-;:r~ws-fCJr moÅ“Ëng deadb"lt-1ock.sm'1æ Dl2.L::s ----
~ - Pf4J Holes en -:íTont .doors, 1.80_deg:re"'..J3Ilge of view minimum-
---- -Glass- --.. ------------- -----
- Wmdows must meet.Þ-4M:4 FORCED EJ.íTRY RESISTANCE STANDARDS
- SlidiDg g12ss rloor(s) must have Track aT CbaImeI locks - Glazing
Exæ;-¡or
XX SecmÏIy Dardware XX Security sysæm( s); camera -and special applicañons
L --. .- - .. - _FenciDgandgates . ---
'-c.-...c. .---..-----
C!'IED
""'PD'C'I!""" ,s-ð
Ol--'~
.. -
~ . -- -.-
CHù"L~ VISTA POUCE DEPARTME~"T
CRJME PRE\"L'ïION l~TI
PL4. 'V RÐ IE.V
SURVEnLAN CFlD ETECTI ON
XX Lighring
- High pressure sodium - Low pressure sodium
-'- Metal HaJides - Break resisÌanthamper~i>fiixmres
XX"MinDmm1PJ1~{12-:feè't) . -- XXcIriinsiTiDnaHighring'
- PJace:meIJt
XX Landscape appJicarion
- Trees/shrubbery mamxamed XX Grnffiri detern:m
- VmDility ~ :trees .cleared up 2t lees¡ six:feet, shrubbery trimmed down to three
fuet tall
- - -----
_Exrer:iDrvie~'-Í"'fI.rjDi . -- -. - - -. -
- Wfoùgb!.ITon - Tübu)a:r:sree] - Cham fuJk - .- - - - - -. -
-.. - -. . XX- S~cu¡iI},_¡¡j~ SYs.:.:n:s.. --.
. - -- -: P~~er .~_~orion d~OD - ~ --RobberylHold =1' . .xx ~ur~aryJ1mrusion
POllCE RESPONSE
:x..'C Addressing - Access to property - Knox bax
XX V1Sibility; allowing patrol officers to moniIOr acrivity
:xx RepDIring :procedures
C!'!UJ
CVIDa" 0</99 S-I
~-.2..(,
--- ~
~ --.- ..
CHl:"L.\ YISTA POucr DEPARTME)l.j
CRL\Å’ PR£\"L'\lIO:-< l:~TI
PLA.7'<; REVIEW
.,<
POliCE SERVICES
TI Traññng of1DlD12gernem and employees in se.."Uriry procedures and crime prevemjoD
awareness.
XX Secoritysmvey~ed by1he Cñme Prevention Unit.
-.-
.'
SPICIEICRECOMMENDATION5 A~ì) CûMMENTS
C:-i:::>= ?reve:rian ?=aDIld 2Te a\"2ilibJe far U2Í!Ji~ reganiing emergency and paJice reponing
proÅ“:iures. ScheàuJiDg of!his mmñDg is reca=ded 10 coincide wirl1 me beginning of regular
openmons.
Thank you "fur me oppornmiI:y to Dave input 1mO !be plæming process. If you have any questions
ornIcan be offur1he:r.assistancepJease call memmeL:rime Prevemjbnunif m69F512T
.-- --. --.-
-- .- .
-- . -- U __H_- - n
- - -- - - --- - - - - - - -
=- ----- ----- -----_. - - - -- --
-- - -
C!'1W ..)0(
C\'!'D.cp!: """'"
" ..
c2 -~ 7
- -
. ..~~..~
505 """"£""TTAveN"E
~---"'"'-" . POST OFFICE S::X 232=
~ CnUu. V'.SõA. CAU;:oRNJ,< ~1512':Z32: '. --
.. - . (5,g~2!).1"':; .=".........""~
~ =¡;)( (S1g) "25-7"S;; .! soo W"C"Õ"::':: =~, "
~~.¡('\~ \ '-'-'~~=~w-,."\""~.
...~, '\ " ,~, ',' --"If.,."., s....,,"'-'.. ... """"~, ~, ~ '.<.- .
l~~. :>:,,;~ j "'-, , , .,-,-: ~:
'~~.é~:)/ @ Gë!JRG£H.W~TERs
~ flY II; '.- ,-' ,'.". . ~ CUlYF."""G>!T
I U ) r---=:-=~ ---
'-'1 ~
December 28, 1999 1;; ;; -""""",,-,DwoN
; ~ :... SE=- '
'I' L -
Edali Olivo-Gomez - ?~,~,.'1t;;"iG
City of Chula Vista
Planning Department
275 Fourth Avenue
Chula Vista, CA 91910
Subject WATERAVAlLAB1UTY
PROPOSED FOOD MART & CAR WASH
3733 MAIN STREET
CASE NO: 1S-O0-14, DRC-OD-42. PCC-OO-25
SWA Gen. File: Water Availability, 1999
Dear Ms. Olivo-Gomez:
This letter is in -response to notices of an Initial Study, Design Review ApplicaTIon and
Conditional Use Pennit Application for the subject project within the Sweetwater
- - AuthQ,~seDlica..aÅ’a-Jbere is a 5-inGh water mainiocated on,the eaÅ¡Í sjde'of-Mace ..
=-~- --streeranaãï'lB=îifcn watermah located on the north side of Main Street adjacent!Q.J~~
--=--.1?t-Pp)serf deyelo;unsnt. o.ur..recomS..j¡:¡dicat~:that1iJere""2rn-rwo-water seiVíëëS ro this
' -properiy. Enclosed is" c::mY:¡T 1i.1.8EC. 23-3-;:-,=:; ::;.=: s:;:;ws :~,= =xis,;¡-,; W.=:=;
~.=::i;¡:i=S.
Þ. private developer paid Tor upgrades to thB ;~;utha~'ity's water system in 1993. There is
an agreement between Sweetwater Authority and th=-developeT that witl reqiJïfe the -
owner of this proposed project to pay $2.240.14 to the Authority prior to providing wat=r
service to this parcel.
At this TIme, we cannot comment on the adequacy of the existing system to Drovide fire
protection fOT this project. The Owner must submit a leIT=r to the Authority from the
appropriate fire agency stating fire flow requirements. Based on this requirement, the
Authority wjJ detennine if there is â need for new water systems or substantial
al.teration to the existing water system. The Authority recommends that your Agency
work with ours to -determine if the existing water facilities are adequate to meet the
-added demands pnor toîssuing a building pennit.
~3
-1 Public f1'í:z:,~ ArT~,,[v
Se-r-.;ing Natio1Ul.I City, Chula Vi.sta ~mi Su7TDuna'ing Areas
02-.2'
- ~
p- ..__JTll-
City of Chula VISta
Planning Department
Attn: Ms. Edali OJivo-Gomez
De::ember 28, í 999
Page two -
. . .
. If the :Owner pròvidesthe required me Tiow information ~nd enters into ~h agreement
for waterfa.Clli1y improvements with the Authority, water service can be obtained at a
pressure ranging from a maximum of 90 p.s.Î. to a minimum of 80 p.s.Î.
. If you have anY.questions,pleaseronfact Mr, Russell ColJinsat422.:B395; exl: 639.
Very truly yours,
SWEETWATER AUTHORITY
It _011. ,}J--.l--.O,;thl.....-;..
~ ~~"'ZD~/ T. I
J"mes L. Smyt:-: " '. .. \ ,,_. ~
Chief Engineer
- enclosure: photocopyot 1/4 SEC. -?3-B map
~~-~'i~::;., ~~~... ~-~.;.~= . -"" - -
~-
- ~ -Mr. -St€vê-Po~er - ~
. L;ny of-Ghula Vista
Planning Department
2ì6 Fourth Avenue
ChuJa Vista, CA 91910
s-y
-- .2 - .2..1
- -
~.."" ';'.'F'-~ .-._,"..i>.'-
. .' ,.., . f
. ' , .fì"""'1 " ,..~"""... í!!!¡';::.'~,?~:..I~" --~.' .
;¡" ~~-""'" j . -:-. -'. " .,¥"hOì-
~;. ..~............' ..' <..I.'[).".-.'
~.' tP"..I-..~ . '. Cì ~ i"
'. ~- -- ----- -- -_!. ~--~ ~
:"'1 '." ,. . ;)~
- :0::
,. ..' f: - : L?
PRoj.éc~SlïE -; . ',:. '.:~-§
--_w', ~-~BRI1TOO- ~~- .'. - - - ;~~.~-==
" ,e" ",...,. , ,~ ,,','
',',., !l¡:\}S~-I' .'- ~~I""" --" -,-:,;¡;
iJji-_- sr
~ ¡ ----- --
cJ. - ¿o--- -
RESOLUTION NO.
RESOLUTION OF THE REDEVELOPMENT AGENCY OF THE CITY OF
CHULA VISTA ADOPTING NEGATIVE DECLARATION IS-00-14 AND
APPROVING OWNER PARTICIPATION AGREEMENT WITH THE WITH
WORLDWIDE PETROLEUM COMPANY FOR THE DEVELOPMENT OF
A GAS STATION WITH ASSOCIATED FAST FOOD RESTAURANT, CAR
WASH, AND FOOD MART LOCATED AT 3733 MAIN STREET, WITHIN
THE SOUTHWEST REDEVELOPMENT PROJECT AREA
WHEREAS, the Worldwide Petroleum Campany awns the praperty at the southeast corner ot Main
Street and Mace Street, which is diagrammatically shawn in the Locator Map attached ta the Owner
Participation Agreement and incorporated herein by reference; and,
WHEREAS, the Warldwide Petroleum Campany has presented development plans for the
canstructian of a gas statlan with associated fast foad restaurant, car wash, food mart, and associated site
and off-site improvements located at 3733 Main Street ("Project"); and
WHEREAS, the site far the proposed Project is lacated within the Sauthwest Redevelopment Project
Area under the jurisdictian and cantrol af the Redevelopment Agency af the City af Chula Vista; and,
WHEREAS, the City's Cammunity Develapment Department Pianning and Enviranmental Manager
reviewed the praposed Praject and issued Mitigated Negative Declaratian IS-00-14 far the Praject in
accardance with CEOA; and,
WHEREAS, a notice of determinatian far the project was prepared and distributed in accardance
with the requirements af CEOA (Public Resources Code Sectian 21092.3); and,
WHEREAS, the Design Review Committee and the Planning Commission reviewed and
recammended that the Redevelapment Agency approve the proposed Praject subject to the canditians listed
in Exhibit B of the Owner Participatian Agreement; and,
WHEREAS, the Redevelapment Agency af the City of Chula Vista has been presented an Owner
Participatian Agreement, said agreement being an file in the Office of the Secretary to the Redevelapment
Agency and known as document RACO 00-11, appravlng the construction af the Project located at the
sautheast corner of Main Street and Mace Street, depicted in Exhibit A and subject ta conditions listed in
Exhibits B af said agreement.
NOW, THEREFORE, THE REDEVELOPMENT AGENCY OF THE CITY OF CHULA VISTA daes
hereby find, arder, determine and resolve as follaws:
1. Based upan its independent consideration of the project and all written and aral testimany
presented, the prapased project will not have a significant impact an the envlranment;
accardingly Mitigated Negative declaratian IS-00-14 was prepared and is hereby adapted in
accardance with CEOA.
2. The prapased praject is consistent with the Sauthwest Redevelapment Plan and shall implement
the purpose thereaf; the praject shall assist with the eliminatian af blight in the Project Area.
3. The Redevelopment Agency af the City af Chula Vista hereby appraves the Owner Participation
Agreement with the Warldwide Petroleum Company for the construction ot a gas station with
associated fast faad restaurant, car wash and faad mart lacated at 3733 Main Street, within the
02-.3(
- ~
Southwest Redevelapment Praject Area in accardance with plans attached thereta as Exhibit A
and subject ta canditians listed in Exhibits B af said agreement
4. The Chairman of the Redevelapment Agency is hereby authorized to execute the subject Owner
Participation Agreement between the Redevelopment Agency and the Worldwide Petroleum
Company.
5. The Secretary of the Redevelapment Agency Is autharized and directed ta recard said Owner
Participatlan Agreement in the Office af the County Recarder of San Diega, Califarnia.
Presented by: Approved as ta term by:
Chris Salomone
Cammunity Develapment Directar
.)-.J-'-
- -
ATTACHMENT 1
Design Review Committee DRAFT
Minutes -3- May 1.2000
asked if the weather was a concern. Mr. Foster indicated that is why one lane is
covered.
Chair Aguilar asked Mr. Faster if the color of the black was being changed. Mr.
Foster responded in the affinnative.
MSC (AlberdilMorlon) to approve DRC-99-34 as presented. Vote: (4-0-0.1) with
Araiza absent.
F. PUBLIC HEARING
2. DRC-00-42 W orldwidePetroleum
3733 Main Street
Consideration of approval of a new 24-hour gas station with
associated food mart and car wash to be canstructed on a vacant
parcel
Staff Presentation
Mr. Steve Power (Associate Planner) indicated that this is a gas station at the
southeast comer of Mace and Main Streets associated with a food mart and a
drive-thru fast food area as well as a car wash facility. The project site is a 67,700
square foot vacant parcel. He passed around photagraphs afthe site. The site plan
calls for two driveway entrances on each street: Main and Mace Streets. The more
notable features of the site plan include a 15-foot wide landscape buffer alang
Main Street and a 1O.foot wide landscape buffer along Mace Street. These are
both required pursuant to the Montgamery Specific Plan, which this project is in.
The project is also in the Southwest Redevelopment Area. The plan includes a 9-
foot high concrete block wall, which drops down to 6 feet. The wall is particularly
important because there is an existing residence on the site, which also has a
junkyard an it. There will be a drive-thru restaurant operation with a speaker
~ board with people going thraugh at all hours, and the wall wauld help to screen
the potential noise impact upon this residence. A noise study was completed as
part of the applicants' environmental review of the project. The noise study faund
that there would be no adverse noise impact associated with the drive-thru partion
of the project. A landscape buffer is going around the southern and eastern
property lines. The elevations call far earth tone colors. All structures would be
architectura1ly integrated in tenns of materials, colors, style, stucco exterior, red
clay barrel tile roofing and tile insets. The City Landscape Planner detennined
that the landscape has met the landscape requirements. The only issue staff had
raised with regard to the signage is the proposed pole sign at the narthwestern
corner of the parcel. The Design Guidelines discourage the use of pole signs.
Overall, staff feels .this is a good project. The Design Review Committees' action
wauld be advisory to the City Council because this is in a redevelopment area.
The project wauld also go to the Planning Commissian for a use aspect. The gas
02 -33
- ..
Design Review Committee DRAFT
Minutes - 4 - Mav 1.2000
station requires a SUP in this case because it is in the redevelopment area. Staff
has recommended approval.
Member Alberdi asked if the square footage of the signage on the building was
within the requirement Mr. Pawer responded in the affirmative.
Applicant Presentation
Mr. Bob Faudoa (Gary Engineering, 4901 Morena Boulevard, Suite 304, San
Diego, CA 92117) did not have a presentation, but he would answer any questions
the DRC may have.
Chair Aguilar asked if the applicant was all right with the conditions outlined in
the staff report? Mr. Faudoa respanded in the affirmative. The autstanding issue is
the two pole signs getting approved for this project.
Committee DiscussionJRecommendations
Chair Aguilar thought this was a great project and an asset to the area. What are
the materials of the canopies? Mr. Faudoa indicated that it is called a touch coat
finish, which is textured paint that looks like plaster. As far as the building, it will
be a sand-type finish.
Chair Aguilar indicated that her ouly concern was the pole sign. That is the major
issue. The Chula Vista Design Guidelines strangly recommend no pole signs. Mr.
Faudoa could understand DRC being hesitant to approve a pole sign if it were in
the middle of downtown Chula Vista, but this was in an outlying area where there
is a precedent for pole signs.
Chair Aguilar stated that it makes it difficult for the DRC because they recognize
there are pole signs. Especially in that area, there are lots and lots of pole signs.
This pole sign is probably going to be more attractive than most of the pole signs
that are out there. Nevertheless, what the DRC would like for the City to do is
slowly get rid of pole signs. The Guidelines strongly discourage them, and the
DRC supports those guidelines. But what happens is, applicants come to the DRC
with photagraphs showing that everybody up and down the street has got pale
signs, so why shouldn't they have one. It is a bit of a dilemma for the DRc. She
had been thinking a lot about this, especially after the last meeting on the bay
ttont project. Maybe it was time for the DRC to take a position on this and just
say, no more pale signs, no place, na how, nowhere.
Member Alberdi indicated that, unfortunately, some projects that do not come
through the DRC are allowed pole signs. Planning approves them
administratively. Mr. Faudaa indicated that there is signage on the canopies,
02-.jC¡
- -
DRAFT
Dešign Review Committee
Minutes - 5 - Mav 1.2000
which will be 25 feet above grade. The pole signage is important identification for
the project.
Member Alberdi indicated that there are a lot af monument signs with gas stations
on 'E' Street and Third A venue. Vice-Chair Morlon indicated that there is a lot of
traffic on Main Street, and the canopy is going to be 25 feet up in the air. That is
going to be acting as a pretty good billboard. Mr. Faudaa indicated that it would
not because there is not enough fascia. Would the DRC consider reducing the
scope of the signage?
Mr. AIi Amani (President of Worldwide Petroleum Corporation, 1768 EI Paso
Real, La Jolla, CA 92037) indicated that the canopy was only going to represent
one product, which is the gasaline. The pole sign was gaing to show the other
products being offered to the public (food and car wash). The speed of the peaple
on Main Street is very high. The applicant wants the driver to know fTom a very
far distance to warn them to make up their mind what this is going ta offer.
Otherwise, they are going to pass. It is typical of this type business based on
studies and on the kind of store.
Member Alberdi could see it from a business point of view. But fTom a DRC
point of view, he had to worry about the design. He wauld go for a monumental
sign and would strongly discourage a pole sign. Mr. Amani indicated that the
other areas have a lower speed limit or the traffic is compact. If a pole sign is
standing in fTont of that mass an the comer of Mace and Main, you can see at high
speed as yau are passing. The applicant would like ta get the attention of drivers
at least I mile before they are going to pass. He stressed that it is very critical for
the oil corparation. Maybe there is a way to compromise.
Chair Aguilar reminded everyone that this particular project is in a redevelopment
area. All the DRC was doing was advising the Redevelopment Agency. The
project is going to them, and they will be making the decision. The DRC's role
here is ta give them whatever advise we feel is appropriate.
Member Mestler concUITed with the monument sign.
Member Alberdi asked how the architect was going to handle the water splashing
into the stucca? Mr. Faudoa indicated that the tile is set back about 6 inches and
then there is a built in gutter.
Member Alberdi indicated that was a main concern because the DRC does not
want the building to discalor. It is important in the long-term ta have a goad
design. His concern was that the overhangs on the tower are designed in such a
way where the water will not splash onto a stub. Whether that is a gutter or an
overhang is up to the architect.
02 -.:J~
.. ..
DRAFT
Dèsign Review Cammittee
Minutes - 6 - May 1,2000
Mr. Faudoa asked what the limitations are on the monument sign? He was
worried about the window of visibility on that carner. That is something he would
have to think about and talk over with Mr. Power.
MSC (AguilarlMestler) to approve DRC-00-42 with all the Conditions of
Approval included the staff repart. Add Condition #20: That the pole sign in the
propasal be replaced with a monument sign. The monument sign would be subject
to staff approval so it would nat have to come back to the Committee. Add
Condition #21: That the overhangs of the building, towers and walkway are
designed in such a way where the water does not run to the face of the stucco.
Vote: (4-0-0-1) with Araiza absent.
G. STAFF COMMENTS: Cancellation of June 19, 2000 meeting.
Ms. Blessent stated that June 19,2000 is the Ken Lee Memorial Golf Toumament. That
meeting mayor may not be rescheduled depending on the worklaad.
H. MEMBER COMMENTS
ChaIT Aguilar had concerns regarding pole sign regulatians on the bay ITont and pole
signs in generaL These concerns were discussed at length,
Vice-Chair Morlon inquired abaut the County building sign. Mr. Sandoval indicated that
staff is working with the County on that sign.
I. ADJOURNMENT
The meeting was adjoumed at 5:35 p.m. to a regular meeting on Monday, May 15,2000,
at 4:30 p.m. in Conference Rooms 2& 3.
Prepared by:
~/æ/~L-
Linda Bond, Recorder
(k\lIbIDRC1999\drcO50 1 OO.mins.doc)
02 -~,
- -
ATTACHMENT 2
RESOURCE CONSERVATION COMMISSION
MINUTES
APRIL 17,2000
Public Services Building DRAFT
Conference Room 1
CALLING MEETING TO ORDER: Chairperson Burrascano called the meeting to order
at 6:50 p.m.
RCC MEMBERS PRESENT: Chair Cindy Burrascano
Mr. Charles Bull
Ms. Theresa Thomas
Mr. Juan Diaz
MEMBERS ABSENT: Mr. Robert Fisher
Ms. Viviane Marquez
A motion was made by Commissioner Bull to excuse the absent Commissioners. The mation
was seconded by Cammissioner Thomas and passed unanimously.
GUESTS PRESENT: Mr. Bill Behum representing the Chula Vista Community Church
Mr. Javier Fadoa representing the Chula Vista Faod Mart & Car
Wash
Mr. Ted Marioncelli, JM Consulting Graup, Inc.
STAFF PRESENT; Marilyn Ponseggi, Environmental Review Coordinator
Benjamin Guerrero, Environmental Project Manager
Leilani Warren, Recording Secretary
APPROVAL OF MINUTES: April 3, 2000
The minutes of April 3, 2000 were discussed. Cammissioner Thomas asked for two corrections.
The first is to correct the spelling af Commission Bull's name an page 3.**. The second
correction on Page 2,to add a statement ** as part of the motion on Rolling Hills Ranch, IS-OO-
OS, that the Commissianers were concerned about traffic congestion and an increase in accidents
at the intersection adjacent to the I-80S Freeway. A motion was made by Commissioner Thomas
to approve the minutes with carrections. The motion was seconded by Cammissioner Bull and
passed by a unanimous vote.
Commissioner Burrascano requested that in the future all motions be recorded in the minutes
whether seconded or not approved.
ORAL COMMUNICATIONS: None
.2-.3'1
- -
OLD BUSINESS: None DRAFT
NEW BUSINESS:
1. Review of Negative Declaration IS-00-21, Chula Vista Community Church
Ms. Ponseggi presented an overview of the project. Although there were concerns raised by
neighbors, they are of a nuisance nature not environmental.
The commission discussed the Negative Declaration at length. Ms Ponseggi assured the
commission that if the noise exceeded the City's noise standard then it would be considered a
significant impact and it would be necessary to mitigate. Commissioner Thamas made a motian
to accept the Negative Declaration as presented. The motion was seconded by Commissioner
Bull and passed unanimously.
2. Review Mitigated Declaration IS-00-18, PCS Sprint antenna at SDG&E
transmission Line Corridor at the end of Sesame Street.
Ms. Panseggi presented an overview of the project. Theanteuna is proposed to be attached to an
existing SDG&E tower at the tap of a slope surrounded by Diegan coastal sage scrub.. There is
an existing access road. The actual construction area and access road are completely devoid of
any kind of vegetation. A variety of mitigation measures have been included to protect the
sensitive species
Commissioner Thomas voiced concern that signs or colors af an obtrusive nature could be
installed at a later date. Ms Ponseggi assured the commission that no changes could be made to
the project without being approved.
Commissianer Thomas made a motian to approve the Mitigated Negative Declaration to include
that if a Whisperwatt power generator were ever needed, a liner would be utilized to prevent any
fuel spillage that could impact the wildlife or the water. Commissioner Bull seconded the
motion and it was passed unanimously.
3. Review of Mitigated Negative Declaration IS-00-14, Chula Vista food Mart &
Car Wash.
Mr. Benjamin Guerrero reviewed the proposal for a proposed fueling statian, a convenience faod
mart, drive-thru restaurant and an express car wash. Studies far noise and traffic impact were
done and it was deteITllined to have no significant impact on the surraunding area and further
mitigation would not be required. The Environmental Consultants for the subject site
recommends limited soil sampling and laboratory analyses to investigate the potential presence
of toxic pollution due to the fact that this site was a foITllerly used as an auta wrecking yard.
The Commissian discussed the project at length. Commissioner Bull suggested that for future
reference when there is a noise study done and there is a carwash on the property the commission
feels the noise from a carwash should be a part ofthe study.
2 02 -.ai"
- -
DRAFT
Commissioner Thomas was concerned about the vapor control monitaring and that the storage
tanks were double layer liners.
Mr. Fedora stated that after 1998 the State of California required double lined tanks and piping
and computerized sensors to detect any leaking in the tanks. He also stated that the Air Pollution
Cantrol cantrols the monitoring of the vapor.
Commissioner Bull made a motion to approve the Mitigated Negative Declaration with the
following recommendations: (1) a reference to the noise from the carwash be a part of the noise
study and it's impact to the sensitive receptor and (2) that a more detailed statement be put in the
mitigation measure should toxic materials be discovered in the soil when grading, and if at all
possible testing results be available and incorporated in the Neg. Dec. prior to going to Council.
Commissioner Burrascana seconded the motion and it was passed unanimously
Mr. Fedora asked the Commission if it would be necessary to have another soil report done since
the last one was done in 1981 and there have been no significant changes. The RCC thought it
necessary to have another report done because of updated standards and methods in place since
1981.
4. Review of Mitigated Negative Declaration IS-OO-13, Jack In The Box/Gasoline
Sales/ Mini Mart
Mr. Ben Guerrero reviewed the MND project, which consists of a construction of a drive-thru
restaurant, a gasoline service station and convenience grocery store. There was a traffic study
done for the project the results of that study indicates that there were no adverse impacts to the
surrounding intersections. The traffic study also looked at the an-site circulation and indicates
that based on the location of the underground tanks the refueling would not interfere with
customers approaching the site far business purposes. There was also soils report by the soils
engineer indicating that there were standard recommendatians and no mitigation is required.
The Commission voiced a cancern of pollution generated from the gas station going into the
stonn drainage system.
The applicant is required to implement the Best Management practices to prevent pollution of
stann drainage systems.
A motion was made by Commissianer Diaz to approve the Mitigated Negative Declaration.
Commissioner Bull seconded the motion. The motion was approved unanimously.
ENVIRONMENTAL REVIEW COORDINATOR'S COMMENTS:
The Beautification Awards on May 5, 2000 has been changed ta May 23, 2000 due to the fact
that the recipient, Daug Reid, will be out of town.
It is possible that the RCC will not be meeting an May I, 2000 because of lack af items for the
agenda but Ms. Ponseggi but she will notify everyone in advance.
3 .2 -~ 'I
- -
DRAFT
There is an RCC applicant that is ready for approval and will probably an the Council agenda for
their first meeting held in May. There is a possibility of a second candidate ready for approval
for that same meeting.
CHAIRMAN'S COMMENTS:
Commissioner BulTascano stated that she was uncomfartable in approving any projects when
there is a level D surface. She would like the city council to direct someone to reexamine what
the standards are for the City of Chula Vista she feels that if there is a Level D, there shauld
some mitigation.
Ms. Ponseggi stated that the autharity the ordinance gives the RCC is to loak at enviranmental
documentation for its adequacy. If anyane wishes ta be involved in the growth management you
need to make a motion ta ask the city council to change the ordinance for growth management to
include RCC as part of the process.
Commissioner Bull suggested that if there is a Phase I audit that indicates there is a potential for
hazardous material at a site, environmental documentatian will be better served if limited testing
or some more specificity was included in the environmental review. It makes for a stronger
document.
COMMISSIONERS'S COMMENTS: None
ADJOURNMENT:
The meeting adjourned at 8:00 p.m. to a regularly scheduled meeting on Monday, May 1,2000,
at 6:30 p.m. in Conference Room #1.
Respectfully submitted,
Leilani WalTen
Recording Secretary
4 02-c/O
- -
ATTACHMENT 3
MINUTES OF THE
CITY PLANNING COMMISSION OF
CHULA VISTA, CALIFORNIA
May 24, 2000 Council Chambers
6:00 p.m. Public Services Building
Wednesday, 276 Fourth Avenue, Chula Vista
ROLL CAW MOTIONS TO EXCUSE:
Present: Chair Willett, Commissioners Castaneda, Hall, Ray, Thomas, Cortes, and
O'Neill
Staff Present: Steve Power, Associate Planner
Jim Sandoval, Assistant Director of Planning and Building
Ann Moore, Assistant City Attarney
PLEDGE OF ALLEGIANCE/SILENT PRAYER
INTRODUCTORY REMARKS: Read into the re;ord by Chair Willett
ORAL COMMUNICATIONS: No public input.
1. PUBLIC HEARING: SUPS-00-05; Adoption of the resolution recommending that the City
of Chula Vista Redevelopment Agency approve the construction of an
automobile service station with associated mini-mart and car wash
located at 3733 Main Street in the Southwest Redevelopment Area
and the limited Industrial (Il) Zone.
Background: Steve Power, Associate Planner reported that the proposed project is located in the
northeastern corner of Mace and Main Street in Chu/a Vista.
The Resource Conservation Commission reviewed the project on April 17,2000 and approved
the Mitigated Negative Declaration. The RCC expressed concern that there were issues related
to mitigation measures for potential hazardous waste on site and the Commission felt that Phase
2 soils testing needed to be performed prior to consideration of the MND by the Redevelopment
Agency.
The project Engineer has stated that since the RCC's review of the project, the Phase 2 soils
testing has been completed and no significant findings were made as a result of the study.
On May 1, 2000 the Design Review Committee approved the project and indicated that it was
a well-designed project that would greatly enhance the area, however, they recommended that
the Redevelopment Agency recommend that a monument sign be installed as opposed to a
pylong (pale) sign, which is what the applicant is proposing.
The project site is a vacant lot measuring 67,700 sf and the surrounding uses are Industrial and
Commercial. The project would include the construction af sidewalk, curb and gutter along
~... c/,
- "'
Planning Commission Minutes - 2 - February 24,1999
Mace and Main Streets. There is one residence abutting the site and no opposition from
homeowner has been received. A proposed drive -thru for a fast food restaurant would be
located in close proximity to the residence, therefore staff was concerned with the noise impacts,
however, as part of the environmental review, a noise study was conducted that it concluded that
there were no adverse noise impacts with the drive-thru and speaker board because the residence
would be located approximately 20 feet away and there would be a 9 foot high block wall that
would serve to attenuate the noise.
The project consists of a fueling facility, with an associated mini-mart/restaurant, and car wash.
The main service area would be located to the north of the site and would consist of two
canopied dispensing areas, one for automobiles at an 8 pump island, and the second area for
trucks dispensing diesel fuel at a 6 pump island.
There would be ingress and egress from both Mace and Main Streets, and on-site improvements
include landscaping surrounding the property as approved by the City's Landscape Planner and
consistent with the Landscape Manual and there would be a total of 32 parking spaces on site,
which is also consistent with parking requirements.
Two letters in opposition to the project were received stating concern with traffic circulation and
one letter in particular addressed concerns with trucks parking and blocking traffic on both Mace
and Main Streets. These letters were referred to the City Traffic Engineer who did not express the
same concerns.
Staff Recommendation: That the Planning Commission recommend that the Redevelopment
Agency approve the project as submitted to the Planning Commission and approve the Mitigated
Negative Declaration as it will be amended to include the results of a Phase 2 environmental
study.
Commission Discussion:
Commissioner Thomas asked if staff could elaborate on the Traffic Engineer's position with regard
to Mr. Breedlove's letter addressing his concern with trucks parking in front of his business.
Assistant Director Sandoval responded that the letter was forwarded to the Traffic Engineer for
review and comments, and although he did not address any specific concerns with the truck
parking issue, if the Commission feel comfartable moving forward with the praject, you could
condition it so that staff would revisit these issues and to see if any modification is needed.
Commissioner O'Neill stated that he hoped the prominent liquor sign as depicted in the site plan
was simply to indicate that a sign would be installed at that location and not the actual intended
sign for that locatian.
Additionally, Commissioner O'Neill expressed concern and stated that the confined area on site
is not conducive ta efficient interior traffic flow as well as the exterior on Mace and Main Streets
for big rigs.
02-'1;....
- -
Planning Commission Minutes - 3 - February 24, 1999
Commissioner Cortes inquired if there would be a center divider on Main Street as part of the
street improvements.
Steve Power responded that the required public improvement on Main Street would be a
widening of the street, sidewalk, curb and gutter.
Commissioner Thomas stated he shared Commissioner O'Neill's concerns with the traffic flow
and vehicular queuing. Additionally, Cmr. Thomas asked for further clarification on drainage and
excess run-off water from the car wash.
Mr. Power responded that the water from the car wash would be recycled, however, he deferred
to the project engineer for further details on the system and mechanics of the car wash.
Commissioner Castaneda stated that he shares Cmr. Cortes' comments on the installation of a
median on Main Street, and indicated that there is merit in further consideration of it in order to
avoid the same situation that has been created along Third Avenue where center dividers are
being installed after the fact.
Cmr. Castaneda stated that Main Street is an east/west corridor and inquired if there is any specific
landscape theme designated for Main Street.
Cmr. Castaneda asked if there are conditions for this project that would require the applicant to
adhere to on site maintenance and landscaping maintenance.
Mr. Power indicated that the Montgomery Area Specific Plan required that there be a 15 foot
wide landscape median, however, he is nat aware of any specific type of vegetation or uniform
these that is required.
Ann Moore, Assistant City Attorney responded that it is a common provision that is found in
Special Use Permits, which delineates landscape maintenance requirements in accordance with
the landscaping plans approved by the City.
Chair Willett stated he shared the same concerns already raised by other Commissioners with
regard to traffic circulation, stacking, on-site and landscape maintenance. Chair Willett also
pointed out that the setback distance (3 feet) along the east and south side of the property line
is probably too small ta accommadate planting trees and recommended that be looked into to
allow at least a 5 foot landscape buffer.
Public Hearing Opened 6:45
Bob Faudoa, 4901 Morena Blvd. #304, San Diego, CA, applicant, addressed the concerned
raised by the Commission. He indicated that the fueling facility is envisianed to serve the area's
small truck fleets with diesel fuel and not the large semi-trucks and they will find that the
confined space for maneuvering will be a deterrent ta their continued patronage of the facilities.
With regard to traffic circulation and the complaint raised regarding trucks parking on the street,
the applicant has been working the City Traffic Engineer and the reasan why the trucks presently
0) - </.1
- -
Planning Commission Minutes - 4 - February 24, 1999
park there is because there are no parking restrictions since there are no existing street
improvements or parking requirements posted on the premises, therefore, when the street
improvements, sidewalk and curbs are installed, there are ways to prohibit parking at that
location and the problem will be eliminated.
The proposed car wash will process and recycle approximately 95% of the water, the reason its
not 100% is because there is minimal amount of vehicle carry-off water.
All ADA requirements will be met for parking, ramp access, and restrooms.
The applicant is in discussions with City Engineer staff and is proposing installing a traffic signal
at the corner of Mace and Main Street at the applicants expense, however, this would be in lieu
of the City waiving some traffic impact fees that are being imposed on the project.
The applicant will be working with the Redevelopment Agency on a signage program. At the
time that the application was submitted to the Planning Department, the tenants (oil company
and restaurant company) was unknown. Those companies have been secured, therefore, a
signage packet will be designed.
With regard to the east and south side setbacks, the applicant is proposing to have a 6 foot high
masonry wall on the east side property line and a 9 foot wall on the south to help mitigate any
noise impacts from the drive-thru restaurant order board, both sides having a 3 foot landscaping
buffer which would contain vines to cover the walls.
The applicant expressed no concerns with regard to an-site and landscaping maintenance
because he reaffirmed that it is the owners best interest to upkeep and care for his investment.
The car wash is of masonry construction and will have what is called a "striper" , which is the
blower at the end of the car wash that strips the water off just before the vehicle exits the car
wash.
Commissioner O'Neill asked if there would be any vacuum stands in front of the car wash.
Mr., Faudoa stated that although the plans do not show vacuum statians, there will probably be
a couple of them located in front of the car wash.
Mr. Faudoa stated that he will be working closely with the Police Department to ensure that all
requirements for the sale of alcohol are met.
Commissioner Hall asked if there is any potential ground pollution associated with the project.
Mr. Faudoa stated that there is virtually no possible potential ground pollution because of the
regulatory agency requirements imposed on fueling facilities, which are the strictest in the State
of California, and especially in San Diego County. The underground fuel tanks are double wall
steel and have sensors under each dispensor.
Steve Palma, a neighboring resident stated that he was at the meeting to affer this project his
ol - </'1
- -
Planning Commission Minutes - 5 - February 24,1999
support and to whole-heartedly welcome it to the area. The project will be a good complement
to the newly built Otay Recreation Center.
Commission Castaneda reaffirmed that Mr. Palma raised an important issue with regard to the
rec. center being a neighbor and the need for the City Traffic Engineer to take a very close look
at providing a safe way for the patrons (especially chi Idren) of the recreation center to cross over
and patranize the proposed facility.
MSC (Castaneda/Thomas) (7.0-0-0) that the Planning Cammission adopt resolution
recommending that the City of Chula Vista Redevelopment Agency approve the construction
of an automobile service station with associated mini-mart, fast food and car wash located at
3733 Main Street in the Southwest Redevelopment Area with the following recommendations:
. That further consideration be given to the possibility of installing a median on Main
Street as well as enhanced traffic control for pedestrian crossing at the intersection of
Mace and Main Streets,
. That specification be given as to where the vacuums for the car wash will be located,
. That enhanced measures for removing excess water on the vehicles exiting the car wash
be provided,
. That a condition be included specifying requirements for landscaping, signage and on-
site maintenance,
. That the signage conform to the sign ordinance and any redevelopment design
guidelines and goals envisioned for that area. The signage should be consistent with
other new developments which do not include pole signs.
. That landscaping and street improvements be consistent with the long term objectives
of the Montgomery Redevelopment Area Plan with respect to street landscape design
and traffic control measures
. That a condition be included stating that the car wash will have a "striper" (air-blower
. That the hours of operation be clearly defined in the conditions of approval, and
. That prior to issuance of a certificate of occupancy for new structures all State, Federal
and local permits will have been received as required by that particular law or
regulation.
Motion carried.
DIRECTOR'S REPORT:
COMMISSIONERS COMMENTS:
ADJOURNMENT at 7:45 p.m. to the Planning Commission meeting of June 7, 2000.
Diana Vargas, Secretary to Planning Commission
ol-4S-
- -
ATTACHMENT 4
GARY ENGINEERING, INC.
4901 Morena 8lvd. . Suite 304 . San Diego. California 92117
Telephone (619) 483.0620 . FAX (619) 483.2943
E-mail: GaryengCA@aol.com
Mr. Miguel Z. Tapia May 26,2000
Senior Community Development Specialist VIA FAX (619) 476-5310
CITY OFCHULA VISTA
COMMUNITY DEVELOPMENT DEPARTMENT
276 Fourth Avenue
Chula Vista, California 91910
SUBJECT: PROPOSED SERVICE STATION / CAR WASH FACILITY
3733 Main Street & Mace Street
Chula Vista, Califarnia 91911
RE: SUP-00-05
ReQuest for aDDroval of a 30'-0" hi!!h two-Dole si!!n
Dear Mr. Tapia
Mr. Ali Amani, DBA Worldwide Petroleum Company is proposing to construct a two-million dollar service
statian facility and associated appurtenances at 3733 Main Street in the Sauthwest Redevelopment Area
and the Limited Industrial (IL) Zane. This letter is to request from the Cammunity Development
Department approval of the installation of a 30'-0" high, two-pole (pylon) identification sign.
Project was conditianally approved by the Design Review Cammittee on May I, 2000 with the
recommendation that a monument price sign be installed in lieu of the proposed 30'-0" high pylon sign.
Planning Commission conditionally approved the project on March 25,2000 with the recommendation our
sign be compatible with what is installed in the area (Industrial Zone).
Our appeal to the Community Development Department to apprave the proposed sign is based on the
following justifications:
1- The project site consists of a 67,700 square-faot vacant parcel that is bordered by cammercial-
industrial area. The Engineering Dept. has requested we provide impravement plans to widen Main
Street to the 53 foot half of the street right-of-way with an 8 foot sidewalk and a 15 foot
landscaping set-back. The site to the west afthe subject property has no air-site develapment or
landscaping improvements. Proposed pole sign would be installed at 5 feet from the property line.
Any ground-based signage installed on the carner of the property will not be visible to east-bound
traffic on Main Street due to the business practices at 3679 Main Street (Economy Upholstery).
Parking and automobiles being worked-on will obstruct any and all ground signage. Economy
Upholstery is on the southwest corner of Main and Mace. We have enclosed a site plan showing
the adjacent properties and the location of the proposed pole sign and the existing pole signs.
MEMBER OF THE AMERICAN SOCIETY OF CIVil ENGINEERS
~-4~
. -
Mr. Miguel Z. Tapia
May 25, 2000
Page 2 of2
2- Currently existing within 300' feet of the subject site are three pole signs averaging thirty to thirty
five feet in height. The Industrial (IL) Zone (Sign Code 19.44.060) allows a freestanding pale up
to thirty-five in height. We have enclosed an exhibit with photographs showing the proposed and
existing pole signs.
3- Current speed limit an Main Street is 40 miles-per-hour. Having a pale sign will alert traffic of aur
facility and allow them to slow down to enter the facility ar warn them oftraffic exiting the facility.
The intersection of Main and Mace is not signalized. althaugh we are preparing feasibility studies
on the installation of one.
4- The Department of Weights and Measures require we display price signs that are clearly visible from
each street of the intersection. Due to the speed limit and the restricted sight lines to the project,
a ground based sign would incur sign violations and passible fines to Mr. Amani. We have attached
sign requirements from the Department of Weights and Measures for your reference.
It is vital to the community and Mr. Amani that this facility succeeds when it opens, due in part to the
extensive investment of Mr. Amani, and the capital needed to suppart the project for the first year. A pole
sign advertizing the many services we have to have offer will be critical for this project ta thrive and provide
the necessary revenue to Mr. Amani, and in part to the City ofChula Vista. In short, a monument sign will
not serve the needs of this project.
We are prepared to submit any additional exhibits, phatographs, documents, etc., and attend any necessary
meetings needed to support our position. We hope the Community Development Department will support
our request for the proposed sign and make this a productive business for our client and the City ofChula
Vista.
If you need any additional information please da not hesitate to call me at (858) 483-0620.
Sincerely,
~GINEERING, IN .
~Ywoa:
Project Manager
(1) Mounted Exhibit
(I) Sign Ordinance 19.44.060
(1) Site Plan Exhibit
(1) Dept. of Weights and Measures 13531
cc: A. Amani, Worldwide Petroleum Company
dJ-t/7
- -
141 001
THU OB: 36 FAX 619 476 5310 CHl! LA VI STA cm!!!. DEVEL.
OS/25/00
,.', é. V, ZvV'-'~ì é)~ ..{i,~~~
4. Turpentine, matches, paint and orher combusrible materi¡¡Js, Ic./' ߣ
5. Stockyards, slaughterhouses and rendering pJants,
6. The storage of fireworks or explosives,
7. Industrial metal, waste rag, glass or paper salvage operations and sJag piIes,
.' 8. Fish, sauerkraut, vinegar and similar Uses,
'"
~: 9. Brewing or distilling of liquors or perfume manufacturing;
f~ B. The foI/owing processes: Nitrating of Carton or orher materi¡¡Js; foundries; reducrian, refining,
smelring, allaying, rolling, drawing and eXtruding of metal or metal ores; refll1ing of petroleum
products; disrillarion of wood or bones; storage, cllring or tanning of raw, green or salted hides or
ì -; "" "om .olm.
'; c, ""YO~u~.whkh I. d"~,,.d hy~. """""'" ,. h. o¡~. ,...'" "'=",,~.. "'ow ~~
. (Ord. 1281 §1 (Part), 1970; Ord. 1212 §] (Part), 1969; prior code §33.5J3(E».
WI ~OO) ~;~~~,
Iii See Sections 19.60.020 and 19.60.030 for permit requirement and approval procedlll'e.
:1 A Types of signs allowed: Business (walJ and/or marquee and a freestanding sign) subject to rhe
oil following: °-
1, Wall and/or marquee: Each business shall be allowed a combined sign area of one square foot
per lineal foot of bUilding fromage facing a dedicated street or alley; however, rhe sign area may
be increased to a maximum of three square feet per lineal foot of bUilding frontage provided rhat
rhe sign does not exceed ftfry percent of rhe background area on which rhe sign is applied as set
forth in Secrion 19.60.250.
Each business shall also be allowed signs facing on.site parking areas for five cars or more and
walkways ten feet or more in Widrh. Such signs shall be allowed an area of one square foot per
lineal foot of building fromage facing said area; however, rhe area may be increased to two
square feet per lineal foot of building fromage provided rhat rhe sign does not exceed ftfry
percem of rhe background area on which rhe sign is appJied as set forth in Section 19.60.250.
The maximum sign area shall not exceed one hundred square feet;
2. Freestanding (pole); Each Jot shall be allowed one freestanding sign subject to rhe following: I
a. Signs are restricted to rhose Jots having a minimum fromage of one hundred feer on a
dedicated Streer. In rhe case of comer lots only one frOntage shall be coumed, if
b. The sign may contain one square foot of area for each lineal foot of street frontage but
&halJ not exceed one hundred fifty square feer. In rhe Case of comer Jots or through Jars, I
only rhe frontage rhe sign is oriemed to shall be counted toward rhe allowable sign area,
c. Maximum height, rhirty.five feet, 02 - 41
.- ..
o.!. Muúmum ground clearance, ei~hr feer
- -
I 8
I ~
8
I ~
* ~i I
þl!Ál
8 I!ÁI~
~~
~ .
~
t I
M f i. í
¡.. ! II I
'II II I I
¡ 11111
~
~
I
I -EÐ
8
~ I ~S
8 !
t I ~ ¡ J¡
~~ - If - -.L:aønloLS -I!EO~ ~ - - --
~Oj) I I.
il @15
I ~~.
DCD
I DCD
8 8
~ ~ DCD § . "
8 I 8
t ti DCD IoT~
I DCD f" I,!I!I¡ jli!j
DCD 8
~~ I ~~ §§§§§ ~1!!ì<!J !/II hi
þl!Ál ~~ I~@
;1 ~~ !ur 111,1
I ~! sl!Ál
~~
I Þ :;j
~e¡;¡ -$-
I I ~
~R
I
.2.-4f
.
- -
".., .."
mJ
I c. The sign shaJJ not be pennitted to project inca the public right.of,way.
~I f. ", "" ,Ii'" mol",", , "'~o/.foo, ,,",,' "m 0" I""rim pmp"" Ii",.
1- g. Freescandi.ng pole signs less than eight feet in height are restricted to a maximum si¡:n
, area of twelve square feet and shaJJ maintain a minimum setback of five feet from "JJ
streets,
I h. Omy~.,,~ .f~. oom,l.. ~d f", """ >.",>. ". ",. .f"" "'~, >."" mlY
" be displayed on the sign. Where the pole sign is used to identify the name of the complex
. or the major tenant. the sign shall be designed to identify aJJ proposed tenants up to the
II maximum number allowed herein. The minimum sign area anocated for each tenant sha I
. be not Jess than ten square feet;
II) 3. Ground (monument): A low.profùe ground sign may be used in lieu of a freestanding pole sign.
If' The sign shaJJ be subject to the foJJowing;
[ a. Maximum height, eight feet,
. b. Maximum sign area, fifry ~quare feet,
E c. The sign shaJJ maintain a minimum setback of five feet from all streets and ten feet from
. all interior property lines,
ÐI: d. The sign struCture shaJJ be designed to be architecturaJJy compatible with the main
~, building and constructed with the same or similar materials, Where the pole sign is used
to identify the name of the complex or the major tenant, the sign shaJJ be designed to
ni identify all proposed tenants up to the maximum number aJJowed herein. The minimum
V sign area allocated for each tenant shaJJ be not less than ten square feet,
,~ B. Other signs: See Chapter J9,60 for window (Section 19.60.270); canopy (Secrion 19.60.280):
~ temporary construction (Section 19.60.290); public and quasi.public (Secrian 19.60.310); drive.in
'; theater marquee (Secrion 19.60.320); directional (Section 19.60,340); warning and instructional
.. (Section 19,60.350); service sration price signs (Section 19.60,360); directory (Section 19,60.370); rea!
estate (Section 19,60.380); unclassified Uses (Section 19.60.400); signs on mansard roofs (Section
. 19.60.410); signs on pitched roofs (Section 19,60.420); business (Section 19,60.430); and signs on
. architectural appendages (Section 19.60.440);
", , '.., M '~,j" '011, ~ ¡""", "Ii" or 0 'O"~dj" ,j",. """ moy b""liod ,.. '011
~. or fence u¡ed for screening of parking areas. The sign shaJJ be subject to the following:
[
~/., a. The sign may only denote the name of the principal business or the name of the
f commercial complex,
.
, b. Maximum sign area, twenry.five square feer.
\.
, C. Other regulations: AU signs are subject ro the regulations of Secrions 19,60.040 through 19.60.130
' and the standards of Sections 19,60.140 through 19.60.210,
D. Nonconfonning signs: See Sections 19.60.090 through 19.60.120,
02 - ,!)()
1223
- ~
PETROLEUM
§ 13531. DISPLAY REQUIREMENTS: EXEMPTION OF SPECIFIED GEOGRAPHIC
AREAS: VIOLATIONS: ENFORCEMENT
(a) Every person offering for sale or selling any motor vehicle fuel to the public from any
place of business shall display on the premises an advertising medium which complies
with the requirements of this article and which advertises the prices of the three major
grades of motor vehicle fuel offered for sale. The advertising medium shall be clearly
visible from the street or highway adjacent to the premises. When the place of business
is situated at an intersection, the advertising medium shall be clearly visible from each
street of the intersection. For the purposes of this subdivision, motor vehicle fuel does
not include propane.
(b) The governing body of any city, county, or city and county may, by ordinance, exempt
specified geographic areas from the provisions of this section if, pursuant to Article 5
(commencing with Section 65300) of Chapter 3 of Title 7 of the Government Code, the
areas are designated on the local general plan as scenic corridors or historic preservation
areas.
(c) (1) Except as provided in paragraph (2), any person who violates the provisions of
subdivision (a) is guilty of an infraction and, upon conviction, is punishable by a fine
not to exceed five hundred dollars ($500).
(2) Any person who violates the provisions of subdivision (a) and who has been
previously convicted two or more times of a violation of subdivision (a) is guilty of a
misdemeanor and, upon conviction, is punishable by imprisonment in the county jail
not exceeding six months, by a fine not exceeding one thousand dollars ($1,000), or
by both.
(d) Notwithstanding Section 13590, the district attorney of each county, or pursuant to
Section 41803.5 of the Government Code, the city attorney of any general law city or
chartered city within each county, or the county sealer, shall, upon complaint or upon his
or her own motion, enforce the provisions of this section and, in addition, may bring an
action for injunctive relief in accordance with Section 13611.
Added Stats 1984 ch 698.
§ 13532. MOTOR FUEL: CONTENTS OF DISPLAY
(a) It is unlawful fo~ any person to display any advertising medium whjch indicates the
price of motor fuel unless the advertjsing medjum displays all of the following:
.
145 o2-SI
- -
WEIGHTS AND MEASURES
(1) The price per gallon or liter, including all taxes, in numerals, and fractions when
applicable, not less than six inches in height and of uniform size and color. For the
purpose of this article, fractions are considered one numeral.
(2) The trademark or brand of the motor fuel in letters, figures, or numerals not less
than one-third the size of the numerals designating the price.
(3)The word "gasoline" or the name of other motor fuel in letters not less than one-
third the size of the numerals designating the price, but these words need not be
more than four inches in height.
(4) The grade designation of the motor fuel in letters or numerals not less than one-
sixth the size of the numerals designating the price, but this designation need not be
more than four inches in height.
(5) If motor fuel prices are advertised by the liter, the word "liter" shall be displayed
on the advertising medium in letters not less than one-third the size of the numerals
designating the price.
(b) (1) It is unlawful for any person to display an advertising medium which advertises
a discount or price reduction for motor fuel, unless the advertising medium contains
all the following:
(A) The price per gallon or liter from which the discount or price reduction is to
be taken.
(B) The amount of the discount or price reduction in cents per gallon or liter
using numerals which do not exceed the height of the numerals in the advertised
price.
(C) The conditions of the discount or price reduction using words whose. letters
are not less than one-third the size of the price numerals.
(2) Any limitations under which the discount or price reduction is offered shall be
explained in words whose letters are not less than one-third the size of the numerals
indicating the prices.
(3) There shall be available for each customer's reference, a chart showing the
amount of discount for each type unit being sold (gallon/liter) or fraction thereof in
one cent ($0.01) increments, or the retail dispensers used to dispense fuel at the
discount price shall be set to compute the total sale at the discounted price per gallon
or liter and shall be clearly labeled "Includes Cash Discount" in letters not less than
one inch in height.
)
.146 02-~o1...
- -
~e/lMt# 2 for. Gðs
PrI"e"'9rr and 'Propane"
sigh dellúloc
REQUIRED ELECTRICAL
LOAD FOR ENTIRE
PYLON SIGN: 1.20 Amp
5ervice.
NOTE; Above
grade footing at
South end of
faunda\an only
\
." """':;<'.
NOTE; Actual footing to be
determined by engineertng ~];".ff.9.f-"y\:QE!5,
Clirb @ QLF INTEBNALLYlbLUMINAT~ ~~~TOIN^,ALlS"'PPEDIN
S 1 '. -~- -- -~. _. - . All. 910NS SUPPLIED "y on<fRS
SCALE: 1/2' .
Sheet 1 of 9 On. (1) ReqUIred COPYRIGHT@1997 ~~$~::~
<",.~..~:".;,~~:~::;0~§~:~i978;,::è~~f;; :::~.: -~ g~~,:n,~".,:;:,':;~.'?,T,~.'~".~~';;:~",c,'?,!,~:,,?,~~
o1-S.3
----~ -- - -----.
PROPOSED CHULA VISTA MOBIL SERVICE STATION
.....
-
LOOKING WEST ON MAIN STREET
(from the south side of Main Street)
cJ - ~-r./
~-. ~ - - -
PROPOSED CHULA VISTA MOBIL SERVICE STATION
""
III ,~.íJj.
. '"
SiÒ¡AGE
EXAMPLES OF POLE SIGNS ON MAIN STREET
(100 yards from proposed site)
<::J - ~-r
-, ..,. - - - -
PROPOSED CHULA VISTA MOBIL SERVICE STATION
EXAMPLE OF POLE SIGN ON MAIN STREET
(at Main Street and 3rd Avenue)
02-~
-... . - - - - _.
PROPOSED CHULA VISTA MOBIL SERVICE STATION
EXAMPLES OF POLE SIGNS ON MAIN STREET
(100 yards from proposed site)
02 -~7
-.. . ..,. -
PROPOSED CHULA VISTA MOBIL SERVICE STATION
EXAMPLES OF POLE SIGNS ON MAIN STREET
(1/4 mile from proposed site)
02-st!
--. - --- -
PROPOSED CHULA VISTA MOBIL SERVICE STATION
LOOKING EAST ON MAIN STREET
(from the south side of Main Street)
02-.sq
--- ..,. -. - - -
PROPOSED CHULA VISTA MOBIL SERVICE STATION
.c~""-
LOOKING WEST ON MAIN STREET
(from the north side of Main Street)
This is the last signal to have a chance to
to view the site and decide to enter
r::./ - (,. 0
-.. ..,. -- -
.' Mitigated Negative Declaration ATTACHMENT 5
PROJECT NAME: Chula Vista Food Mart & Car Wash
PROJECT LOCATION: SEC of Main & Mace Streets, City of Chula Vista
ASSESSOR'S PARCEL NO.: 629-130-30
PROJECT APPLICANT: Ali Amani, Worldwide Petroleum Co.
CASE NO.: IS-00-14 DATE: April 7, 2000
A. Project Setting
The project site consists of a vacant near-level graded 1.57 acre site located on the south east
corner of Main Street and Mace Street in the City's Southwest Redevelopment Area.
Surrounding uses are as follows: North: (across Main Street) Light Industrial - V-Haul
Storage; East: Light Industrial- Self Storage facility; South: Light Industrial- single family
residence/auto storage; West: (across Main Street) Light Industrial- muffler & raditator
repair shop.
The project site has been cleared of all vegetation and therefore does not represent viable
habitat for any sensitive animal species.
Main Street is designated as a four-lane major arterial, by the City's Circulation Element.
Mace Street is a local street.
B. Project Description
The proposed project consists of a proposed fueling station with .16 fueling stations (pumps)
for passenger vehicles, two fueling stations for commercial trucks, convenience food mart,
dcrive-thru restaurant and an express car wash. The total building area is 6,529 square feet.
The service station and food mart are proposed to operate 24 hours and the car wash will be
open between the hours of7:00 a.m. and 7:00 p.m.
The applicant is proposing to install two driveways on Main Street and two driveways on
Mace Street to serve the proposed development. The project will provide a total of 22
parking spaces on-site in accordance with the City's Zoning Ordinance parking standards for
the proposed uses. New landscaped areas, will be provided essentially along the perimeter
ofthe project site with special emphasis along the Main Street frontage. The landscaped area
will include grass turf and shrubs. The total on-site and off-site landscaping area proposed
is 9,042 square feet.
~\~
A:Illbllindalis9807.neg .1-(.1 Page 1 -..-
.~
city of chula vista planning department 0lY Of
environmental review section CHUIA VISfJ
- -
The project will require granting of a discretionary pennit of approval from the City of Chula
Vista Design Review Committee and the Redevelopment Agency and will require that the
applicant obtain permits from the Air Pollution Control District and the San Diego County
Department of Environmental Health.
C. Compatibility with Zoning and Plans
The current zoning on-site is ILP (Limited Industrial Precise Plan) and the site is designated
as Limited Industrial use by the City's General Plan. The proposed project is in compliance
with the Zoning designation and the adapted General Plan.
D. Identification of Environmental Effects
An Initial Study conducted by the City ofChula Vista (including an attached Environmental
Checklist fonn) determined that the proposed project will not have a significant
environmental effect, and the preparation of an Environmental Impact Repart will not be
required. This Mitigated Negative Declaration has been prepared in accordance with Section
15070 of the State CEQA Guidelines.
\. Public Services Impact
Fire
The nearest fire station is located about 5 miles from the project site. The estimated
response time is less than seven (7) minutes. The response time complies with the
City Threshald Standards for fire and medical response time. The Fire Department
will review the building construction plans to ensure that the proposed construction
complies with applicable California Building Code regulations, including installation
of underground fuel tanks.
Police
The Police Department indicates that current levels of service and response time will
be provided to the proposed land uses.
2. Utility and Service Systems
Soils
The applicant will be required to prepare an updated soils report as part of the
standard conditions of the proposed grading plan. The applicant shall comply with
the applicable recommendations as detennined by the City engineer.
A:\llb\linda\is9807.neg Page 2
.2-'~
- -
Drainage
On-site
The Engineering Division indicates that existing on-site drainage patterns will need
to connect to public storm drain facilities. The applicant will be required as a
standard candition by the Engineering Division to submit hydraulic study and car
wash water recycling plan with the first submittal of grading/improvement plans. The
on-site drainage plan will address the prevention of contamination of soils and
groundwater trom underground fuel tanks and the car wash and food martldrive-thru
restaurant operations. As a standard permitting procedure, the applicant will be
required to obtain a permit trom the County of San Diego Environmental Health
Department, who will oversee the installation of the underground fuel tanks in
conjunction with the City's Fire Department and the Regional Water Quality Control
Board.
Off-site
The Engineering Division states that there is an existing curb inlet and a manhole on
the south side of Main Street and three curb inlets on the north side of Main Street.
Through the preparation and submittal of the aforementioned hydraulic plan the
Engineering Division will be able to determine the type of storm drain pipes, their
size and the existing routing pattern. This report will be required with the first
submittal of grading/improvement plans. The developer is required to implement
Best Management Practices to prevent pollution of storm drainage facilities per City
ofChula Vista Municipal code 14.20. A National Pollutant Discharge Elimination
System (NPDES) Permit is not required because the subject site is less than five
acres.
Sewer
Sewage flows and volumes are currently being adequately maintained. A 10 inch
sewer main flaws in a westerly direction in Main Street. The Engineering Division
states that the Salt Creek sewer main will provide additional capacity and thus ensure
future development in the area has no adverse impact to existing sewer facilities. The
proposed project will comply with City adopted Sewer Threshold Standards. A
wastewater industrial permit may also be required trom the City of San Diego
Metropolitan Wastewater Department. As a standard engineering condition the car
wash will be required to be equipped with an automatic water recycling system.
A:lllbllindalis9807.neg Page 3
.2- ,.3
- . -
Streetsffraffic
The Threshold Standards Policy requires that all signalized arterial segments operate
at a Level of Service (LOS) "c" or better, with the exception that Level of Service
(LOS) "D" may occur during the peak two hours of the day at signalized
intersections. No intersection may reach an LOS "F" during the average weekday
peak hour. Intersections of arterials with freeway ramps are exempt from this policy.
The proposed project would comply with this Threshald Policy for the immediately
affected intersection of Main Street and Mace Street.
Pursuant to a traffic study prepared by Will dan, (3/20/00) the proposed project will
generate a total Average Daily Traffic of 2,580 driveway daily trips. A great majority
of these trips (79 %) are considered to be pass-by trips (trips where the primary
destiny is not the proposed project). Three intersections analyzed by the report
included Main Street and Hilltop Drive, Main Street and Albany Avenue, and Main
Street and Mace Street. The three intersections are currently operating at a Level of
Service "c" or better. The first two intersections are signalized and would continue
to operate at an LOS "c" with the proposed project. The "T" intersection of Main
& Mace Street is presently unsignalized and would continue to operate at an LOS
"B" during AM Peak hour traffic and LOS "D" during PM Peak hour traffic. The
Engineering Divisian has reviewed the report findings and concurs that both Main
Street and Mace Street have adequate street volume capacity to serve the project. The
Engineering Division indicates that the project has been found to be consistent with
the General Plan Traffic Element. The applicant will be required to make minor
street dedication and improvements along Main Street and improvements along Mace
Street frontages per the City Engineering Division. No traffic impact mitigation will
be required.
3. Noise
Proiect operation
An acoustical report prepared for the proposed project identified three main sources
of noise associated with the proposed project. The project would generate 1.)
construction noise 2.) equipment noise (PA menu ordering) and 3.) mobile noise
generally from vehicles utilizing drive-thru. The nearby sensitive noise receptor is
an existing home located west of the site in an industrially designated site. The report
findings indicate that the vehicle noise and the outside P A system would not generate
noise levels that would adversely impact the adjacent residence located over fifty feet
from the proposed location ofthe drive"thru restaurant. Additionally, the applicant
proposes to construct a nine-foot wall that would effectively further reduce the
projected acceptable noise levels by 15 dBA. No mitigation will be required.
A,\lIb\linda\is9807.neg Page 4
.2-,ý
- -
Construction
Temporary construction noise would occur at the site, however, the short term nature
0 f the noise, the proximity of a maj or arterial and the commercial/industrial nature
of the surrounding area results in less than significant impacts. No mitigation will
be required.
4. Aesthetics
The propased project will be subject to review and approval by the Design Review
Committee (ORe). The proposed site plan, architectural design, landscaping and
lighting plans will be subject to' review by the DRC to ensure the proposed project
will complement surrounding development and comply with all applicable design
and landscaping standards.
5. Air Qualitv
The project has the potential approval will generate an incremental increase in short
and long-term emissions associated with a small increase in traffic. Redevelopment
of the subject site is consistent with the zoning and general plan designations and is
therefore consistent with the goals and objectives of the Regional Air Quality
Strategy (RAQS). The traffic will be generated for the most part from the local
existing surrounding area and is not expected to induce growth in other areas af the
community. The majority of the traffic associated with the project is considered to
be pass-by traffic (traffic already on the roadway and stopping for services on the
way to another primary destiny, per the San Diego Association of Governments
(SANDAG) publication entitled "Trip Generation Manual").The proposed
redevelopment project will therefore not result in a significant air quality impact.
The applicant will also be required to obtain a permit from the Air Pollution Control
District (APCD) regarding the installation of vapor recovery systems associated with
the fuel pumps and underground fuel storage tanks. No mitigation will be required.
6. Hazardous Waste
A phase I envirorunental site assessment was conducted by GEOCON Envirorunental
Consultants for the subject site. The report is dated March 10,2000. A review of
aerial photographs indicate previous site use as an auto wrecking yard. The
environmental consultant indicates that sites used as former wrecking yards are
commonly impacted with potentially hazardous wastes such as metals, petroleum
hydrocarbons and solvents. The consultant recommends limited soil sampling and
laboratory analyses to investigate the potential presence of impacts to soil resulting
A:lllbllindalis9807.neg Page 5
.2- '" S-
- -
ENG_INC- P - co 1
APR-11-øø TUE 13:4121 GARY
Wor-ld.'¡de Pe~r-oleum Co (8581456-6355 p. 1
Apr- 10 00 08:10"
01110/00 ~ON 07:41 FAX 61a 476 5310 C!I¡'U VISTA CO,\I). DEVEL, Ii1I OO¡ -
fram previous on-site activities. A miHgauon measure will be required in order tt,
addr~ss potentia! impacts to soils, groundwater and tbe propo$cd food related
uses,
E M!.Mation N~c~ö"lry to,.hvoid Si~l1ific~.ff~.
Spl%iCic project Illitigalion m~aS\l.re$ arc required to reduce potential environmonlal imp;¡Gt¡:
idcn1ified in the Initial Study for this pn)j~ct to a level below significant. The miti¡¡atior
measures will be made a condition of,approvaJ. as weB as reqlJ.Írem~nts of the attache,
, Mitica¡jon Mnn;lor;,ns P'°s"= (Attnohmcm "A'}
1 agree t<1 implement the required mitÌgil!Ìon measure(s) as stated below:
~. ~"U;: -,:!-I/-"~
' 't TJ. le Date
I. Prjar the issuance of any grading Or consu"Uetion permit, tile applical1t shall be
required to conlrect with a registered geologist or certified ci"i) engineer ì.c the Slati
of Califorrû~ to conduct soìllestì.cg for haz3J'dous waste materi3Js and to enl~r inte
the voluntary Site Assessment &. Mitigation Program 3S administered by Ùle Sar.
Oioga County Department of Environmental Heahh who will OVersee the results of
the soDs test and recommend appropriate remctliarlon ~ required.
F. ç.Q~
1. lMividuals and OJ~anlZ-lli.Qill!
City ofChula Vist;¡:
Benjamin GuelTero, Community Development
Samj¡ NuhaiJy, F.ngineerin8
Muna Cuthbert, Engineering
Majed AI.Ohafry, Engineering
Ralph Leyva, Engineering
Brad Kemp. Building Division
Dollg Pony. Fire Dep3.llmcnt
Rich3l'd Preuss. Crime Prevention
;¡:¡¡;bii;"~ '-'---~
~-,c.
- -
Chula Vista City School District: Dr. Lowell Billings
Sweetwater Union High School District: Katy Wright
Applicant's Agent: Robert G. Faudoa, Project Manager/Gary Eng.
2. Documents
Chula Vista General Plan (1989) and ErR (1989)
Title 19, Chula Vista Municipal c.ode
Noise Analysis (3/13/00),lnvestigative Science & Eng., Acoustical Consultants
Phase I Environmental Site Assessment (3/00) Geocon Environmental Consultants
Traffic Study (Revised 3120/00, Main & Mace) Willdan
Soils Report (7/10/81) William S. Krooskos & Associates
3. Initial Studv
This environmental detennination is based on the attached Initial Study, any
comments received on the Initial Study and any comments received during the public
review period for this Mitigated Negative Declaration. The report reflects the
independent judgement of the City ofChula Vista. Further infonnation regarding the
environmental review of this project is available from the Chula Vista Planning
Department, 276 Fourth Avenue, Chula Vista, CA 91910.
~~ 1.),00
Date:
Bnan Hunt r
Planning & Environmental Manager
A:\lIb\linda\is9807.neg Page 7
02 -, 1
. ."
Case No. IS-00-14
ENVIRONMENTAL CHECKLIST FORM
1. Name of Proponent: Ali Amani, Worldwide Petroleum Co.
2. Lead Agency Name and Address: City of Chula Vista
276 Fourth Avenue
Chula Vista, CA 91910
3. Address and Phone Number of Proponent: 1768 EI Paso Real
La Jolla, CA. 92037
(619) 920-2827
4. Name of Proposal: Chula Vista Food Mart & Car Wash
5. Date of Checklist: April 6, 2000
P,"o,',II,
P",o",II, 5igolll"o' L.."h,o
Sigoill"o' "0"" Sigolll"o' No
Imp'" M"'g"" Imp", Imp'"
I. LAND USE AND PLANNING: Would the
proposal:
a) Conflict with general plan designation or 0 0 0 181
zoning?
b) Conflict with applicable environmental plans or 0 0 0 181
policies adopted by agencies with jurisdiction
over the project?
c) Affect agricultural resources or operations (e.g., 0 0 0 181
impacts to soils or [¡,rmlands, or impacts from
incompatible land uses)?
d) Disrupt or divide the physical arrangement of 0 0 0 181
an established community (including a low-
incame or minority community)?
Comments: The vacant site is zoned Limited Industrial Precise Plan (ILP) and designated for
Research and Limited Industrial use by the City's General Plan. The proposed project
would require review by the Design Review Committee. No adverse impacts or conflicts
with the zoning or General Plan are noted.
A:lllbllindalis9808ck.frm Page 1
o1-,g
- -
P",o".lly
P,"o".lly S;go;fi"" L", ""
S;go'fi"OI Uol~, Sigoifi,," N,
Imp." M"ig.." Imp." Imp."
II. POPULATION AND HOUSING: Would the
proposal:
a) Cumulatively exceed official regional or local 0 0 0 [;I
population projections?
b) Induce substantial growth in an area either 0 0 0 [;I
directly or indirectly (e.g., through projects in
an undeveloped area or extension of major
infrastructure)?
c) Displace existing housing, especially affordable 0 0 0 [;I
housing?
Comments: The proposed project would not contribute to local population growth nor displacement
of existing housing. No adverse impacts are noted.
III. GEOPHYSICAL: Would the proposal result in or
expose people to potential impacts involving:
a) Unstable earth conditions or changes in 0 0 0 [;I
geologic substructures?
b) Disruptions, displacements, compaction or 0 0 0 [;I
overcovering of the soil?
c) Change in topography or ground surface relief 0 0 0 [;I
features?
d) The destruction, covering or modification of 0 0 0 [;I
any unique geologic or physical features?
e) Any increase in wind or water erosion of soils, 0 0 0 [;I
either on or off the site?
f) Changes in deposition or erosion of beach 0 0 0 [;I
sands, or changes in siltation, deposition or
erosion which may modifY the channel of a
river or stream or the bed of the ocean or any
bay inlet or lake?
g) Exposure of people or property to geologic 0 0 0 [;I
hazards such as earthquakes, landslides, mud
slides, ground failure, or similar hazards?
Comments: No adverse impacts regarding soils or geophysical conditions are noted. A soils report
prepared by William Krooskos & Associates on July] 0, 198] for the subject site has
been submitted by the applicant's agent. The report indicates that the site contains
medium expansive, sandy, clay soils capable of supporting an industrial structure(s). A
Aolllbllindalis9808ck.frm Page 2
.;1-"1
- -
Pot,"'i,II,
P"""'i,II, Sig"ill,,", L6<1h,"
Sig"'fi,,", v""" Sig"ifi,,", N"
Imp", MiHg"'" Imp'" Imp'"
more up to date soils report addressing the proposed project structures shall be submitted
by the applicant as a standard condition of grading penn it approval. No mitigation will
be required.
IV. WATER: Would the proposal result in:
a) Changes in absorption rates, drainage patterns, 0 0 181 0
or the rate and amount of surface runoff?
b) Exposure of people or property to water related 0 0 0 181
hazards such as flooding or tidal waves?
c) Discharge into surface waters or other alteration 0 0 0 181
of surface water quality (e.g., temperature,
dissolved oxygen or turbidity)?
d) Changes in the amount of surface water in any 0 0 0 181
water body?
e) Changes in currents, or the course of direction 0 0 0 181
of water movements, in either marine or fresh
waters?
t) Change in the quantity of ground waters, either 0 0 0 181
through direct additions or withdrawals, or
through interception of an aquifer by cuts or
excavations?
g) Altered direction or rate of flow of 0 0 D 181
groundwater?
h) Impacts to groundwater quality? 0 0 181 D
i) Alterations to the course or flow of flood 0 0 0 181
waters?
j) Substantial reduction in the amount of water 0 0 0 181
otherwise available for public water supplies?
Comments: The subject site is located in a fully urban setting and represents infill development. The
project site is not within a flood plain. On-site drainage facilities design will need to take
into consideration pollution prevention devices and filtration systems in order to prevent
contamination of soils and groundwater from underground fuel tanks, car wash and food
mart. The Engineering Division states that on-site drainage facilities and devices be
incorporated in the design with the first submittal ofthe grading and improvement plans
as part of the standard requirements for new construction. The applicant will be required
by the Engineering Division to submit a hydraulic study and car wash water recycling
plan with the first submittal of grading/improvement plans. A stonn water industrial
pennit may be required from the State Water Resources Control Board. As standard
permitting procedure, the applicant will be required to obtain a pennit from the County
of San Diego Environmental Health Hazardous Materials Division for underground fuel
A:Illbllindalis9808ck.frm Page 3
01- 1fJ
- -
P",,'i,",
P..,,'i,", Si"in"" ""..h"
St"in,,", """, St"ifi,,", N,
Imp'" Miti""" Imp'" Imp'"
tank installation. This established process includes review and approval by the City of
Chula Vista's Fire Department and Building Division. No adverse impacts to water
resources are noted. No mitigation will be required.
V. AIR QUALITY: Would the proposal:
a) Violate any air quality standard or contribute to 0 0 181 0
an existing or projected air quality violation?
b) Expose sensitive receptors to pollutants? 0 0 0 181
c) Alter air movement, moisture, or temperature, 0 0 0 181
or cause any change in climate, either locally or
regionally?
d) Create objectionable odors? 0 0 0 181
e) Create a substantial increase in stationary or 0 0 181 0
non-stationary sources of air emissions or the
deterioration of ambient air quality?
Comments: The project will subject to standard requirements regarding the installation of fuel vapor
recovery systems aimed at reducing contaminants released to the air. The applicant will
be required to comply with these arid other standard requirements as part of the existing
permitting process which involves the San Diego County Department of Environmental
Health Hazardous Materials Division, the Air Pollution control District, and the City's
Fire Department. No mitigation will be required.
VI. TRANSPORTATION/CIRCULATION: Would
the proposal result in:
a) Increased vehicle trips or traffic congestion? 0 0 181 0
b) Hazards to safety from design features (e.g., 0 0 0 181
sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
c) Inadequate emergency access or access to 0 0 0 181
nearby uses?
d) Insufficient parking capacity on-site or off-site? 0 0 0 181
e) Hazards or barriers for pedestrians or 0 0 0 181
bicyclists?
t) Conflicts with adopted policies supporting 0 0 D 181
alternative transportation (e.g. bus turnouts,
bicycle racks)?
0 0 0 181
Ao\llb\linda\is9808ck.fnn Page 4
r:J-71
- -
Po"o"olly
P","';olly S;go;fi"" C""hoo
S;goifi,," "0"" S;go;fi"" No
I"po" M;';g".d Imp'" Imp",
g) Rail, waterborne or air traffic impacts?
h) A "large project" under the Congestion 0 0 I< 0
Management Program? (An equivalent of2400
or more average daily vehicle trips or 200 or
more peak-hour vehicle trips.)
Comments: Main Street, classified as a four-lane major arterial by the City's Circulation Element, will
provide the primary access to the project site. A traffic analysis was prepared for the
proposed project on March 20, 2000 by Willdan consultants. The traffic report stated that
a total of2,580 driveway daily trips, will be potentially generated by this project. A great
majority of these trips are considered to be pass-by trips (trips not actually generated by
this project). Three critical intersections in the vicinity of the project were analyzed by
the traffic study. These intersections were Main Street and Hilltop Drive, Main Street and
Albany Avenue, and Main Street and Mace Street. The three intersections are currently
operating at a Level of Service "C" or better. The first two intersections are signalized
and would continue to operate at an LOS "C" with the proposed project. The "T"
intersection of Main & Mace Street is presently unsignalized and would continue to
operate at an LOS "B" during AM Peak hour traffic and LOS "D" during PM Peak hour
traffic. Based on City of Chula Vista traffic threshold standards for intersections, this is
an acceptable LOS for existing and proposed project conditions. The traffic report does
not recommend any off-site traffic improvements. The Engineering Division will, as
standard condition of design review, require on-site and project frontage improvements
on Main Street and Mace Street. No mitigation will be required.
VII. BIOLOGICAL RESOURCES: Would the
proposal result in impacts to:
a) Endangered, sensitive species, species of 0 0 I< 0
concern or species that are candidates for
listing?
b) Locally designated species (e.g., heritage 0 0 0 I<
trees)?
c) Locally designated natural communities (e.g, 0 0 0 181
oak forest, coastal habitat, etc.)?
d) Wetland habitat (e.g., marsh, riparian and 0 0 0 181
vernal pool)?
e) Wildlife dispersal or migration corridors? 0 0 0 181
f) Affect regional habitat preservation planning 0 0 0 181
efforts?
Comments: The project site is located in an urbanized area and is cleared of all vegetation. There are
presently no native plants or sensitive animal species. The site is located in the midst of
a highly urbanized and trafficked area and does not represent viable habitat for any
A:\llbllindalis9808ck.fll11 Page 5
07- 7~
- -
p",",;,IIy
"',oh,IIy S;go;fi"o' L"..h,o
S;go;fi"o' Vo'", Sigoifi"o' No
Imp", Mitig..'" Imp", Imp",
animal species.
VIII. ENERGY AND MINERAL RESOURCES:
Would the proposal:
a) Contlict with adopted energy conservation 0 0 0 ø
plans?
b) Use non-renewable resources in a wasteful and 0 0 0 I8J
inefficient manner?
c) If the site is designated for mineral resource 0 0 0 ø
protection, will this project impact this.
protection?
Comments: No impacts to non-renewable resources are noted.
IX. HAZARDS: Would the proposal involve:
a) A risk of accidental explosion or release of 0 0 0 ø
hazardous substances (including, but not limited
to: petroleum products, pesticides, chemicals or
radiation)?
b) Possible interference with an emergency 0 0 0 I8J
response plan or emergency evacuation plan?
c) The creation of any health hazard or potential 0 0 0 I8J
health hazard?
d) Exposure of people to existing sources of 0 ø 0 0
potential health hazards?
e) Increased fire hazard in areas with tlammable 0 0 0 ø
brush, grass, or trees?
Comments: A phase I environmental site assessment was conducted by GEOCON Environmental
Consultants for the subject site. A review of aerial photographs indicate previous site use
as an auto wrecking yard. The report indicates that sites fonnerly used as wrecking yards
could potentially be impacted with hazardous wastes such as metals, petroleum
hydrocarbons and solvents. The report recommends limited soil sampling and laboratory
analyses to investigate the potential presence of impacts to soil resulting from previous
on-site activities. A mitigation measure will be required in order to address potential
impacts to soils, groundwater and the proposed food related uses. The proposed project
shall also comply with all applicable standard required pennitting processes administered
by local, state and federal agencies. Compliance with established standard procedures
will ensure that people will not be exposed to accidental health hazards related to the
proposed fueling station. The project proponent will, as standard procedure be subject to
review and approval by the County of San Diego Environmental Health regarding the
A:\llb\lindalis9808ck.frm Page 6
02.-7~
- -
P","<i.lly
Po""<i.Il, Sig"m,,", L.."h..
Sig"ifi,,", V"I", Sig"m,,"! No
Impoc! Mit'g"" Impoc! Imp'"
proposed installation of underground fuel tanks.
X. NOISE: Would the proposal result in:
a) Increases in existing noise levels? 0 0 ¡¡ 0
b) Exposure of people to severe noise levels? 0 0 0 ¡¡
Comments: Surrounding land uses include mixed commercial, residential and light industrial. An
existing legal non-conforming single family detached residence is directly adjacent to the
southwest comer of the project site. Surrounding properties are designated for industrial
zoning and land use by the City's Zoning and General Plan. The topography of the site
and surrounding adjacent areas is le"\el. A Noise study prepared by Investigative Science
and Engineering on March 20, 2000 indicates that the project site and surrounding
property is impacted by surface street traffic and auto repair shop activities immediately
west of the site. The hourly average sound level (or Leq-h) recorded over the monitoring
period was 58.1 dBA. The applicable significance criteria as established by the City of
Chula Vista Noise Ordinance would permit a 62.5 dBA Leq between the hours of 7:00
a.m. to 10:00 p.m. and 57.5 dBA Leq between 10:00 p.m. to 7:00 a.m. The proposed
drive-thru restaurant would be located about 50 feet away from the existing single family
residence. The traffic increment solely associated with the drive-thru facility (estimated
at 150 daily trips) would generate a negligible (less than 0.5 dBA) increase in the ambient
noise level at the project site. Due to the small size of the drive-thru facility (2,388
square-feet) it is anticipated that the refrigeration units, based on building industry
standards would produce a noise factor of between 58 and 60 dBA at 15 feet from the
source. With proper unit installation and standard shielding, the worst-case nighttime
property line standard of 57.5 dBA would be achievable. Therefore, no significant
impacts are expected due to ancillary equipment operation at the proposed drive-thru
facility. The noise study also looked at the potential for the outdoor speaker to create
noise impact. The outdoor speaker has the potential to create noise levels approaching
60 dBA at 30 feet from the source. The residential structure is 30 feet away from the
proposed location of the outdoor speaker. Additionally, allowing for an average
distribution of 150 ADT/24 Hours or 6.25 trips per hour (each with a speaker duration of
1 minute) gives an hourly property line level of 41.2 dBA (in the presence of other
surrounding noises) which is currently below the ambient daytime measured level. It is
also noted that the project design incorporates the use of a 9-foot-high (at grade level)
screen wall along the property line located between the project site and the closest
residential receptor. The use ofthis screen wall would provide an additional maximum
of 15-dBA reduction to ground level receptors at this closest residential structure.
Therefore the report concludes that no direct impacts resulting from the operation of the
proposed drive-thru facility are expected. Temporary construction noise would occur at
the site, however, the short term nature of the noise, the proximity of major arterials and
the commerciallindustrial nature of the surrounding area results in less than significant
impacts. No adverse impacts are noted. No mitigation will be required.
XI. PUBLIC SERVICES: Would the proposal have
A,\llbllind,\is9808ck.frm P'ge 7
02--""
- -
P....".II,
P.....,.II, Slg.,fi,,"' L~,'h,"
S'g.ifiu.. "."" Sig.lfi".' N.
Imp", M"ig..,d Imp." Imp."
an effect upon, or result in a needfor new or
altered government services in any of the following
areas:
a) Fire protection? 0 0 0 181
b) Police protection? 0 0 0 181
c) Schools? 0 0 0 181
d) Maintenance of public facilities, including 0 0 0 181
roads?
e) Other governmental services? 0 0 0 181
Comments: No new Governmental services will be required to serve the project. No adverse impacts
are noted. Fire and police protection can adequately be provided. Appropriate school
fees will be paid. Street dedication and improvements along Main Street and
improvements along Mace Street will be made in accordance with City Standards. No
mitigation will be required.
0 0 0 181
XII. THRESHOLDS: Will the proposal adversely
impact the City's Threshold Standards?
As described below, the proposed project does no,! adversely impact any of the seen Threshold
Standards.
a) Fire/EMS 0 0 0 181
The Threshold Standards requires that fire and medical units must be able to respond to calls
within 7 minutes or less in 85% of the cases and within 5 minutes or less in 75% of the cases.
The City of Chula Vista has indicated that this threshold standard will be met, since the
nearest fire station is 2 miles away and would be associated with a 5-minute response time.
The proposed project will comply with this Threshold Standard.
Comments: The Fire Department indicates that nearest fire statio':! is located within 2 miles and
adequate fire service and protection can be provided to the proposed project site.
b) Police 0 0 0 181
The Threshold Standards require that police units must respond to 84% of Priority 1 calls
within 7 minutes or less and maintain an average response time to all Priority I calls of 4.5
minutes or less. Police units must respond to 62.10% of Priority 2 calls within 7 minutes or
less and maintain an average response time to all Priority 2 calls of7 minutes or less. The
proposed project is located in an area where police ART data for priority I and Priority 2 calls
is currently unavailable.
Comments: The Police Department indicates that current levels of police service can continue to be
provided to the area where the subject site is located. Crime Prevention personnel are
available to assist the applicant with security recommendations. No significant adverse
impacts to Police service are noted. No mitigation will be required.
A,llIbllindalis9808ck.frm Page 8
':;-7~
- -
Po'""'I,",
P",""d,"y Sig"lfi,,", L",'h..
Slg"ifi,,", V""" Slg"m,,", No
Imp", Midg..,' Imp'" Imp",
C) Traffic 0 0 ~ 0
The Threshold Standards require that all signalized arterial segments operate at a Level of
Service (LOS) "C" or better, with the exception that Level of Service (LOS) "D" may occur
during the peak two hours of the day at signalized intersections. Intersections west ofI-80S
are not to operate at a LOS below their 1987 LOS. No intersection may reach LOS "E" or "F"
during the average weekday peak hour. Intersections of arterials with freeway ramps are
exempted from this Standard. The proposed project will comply with this Threshold
Standard.
Comments: The Engineering Division concurs with the traffic study prepared by Willdan (3/20/00)
that the current Level-of- Service (baS) "C" enjoyed by Main Street and Mace Street,
would remain the same with approval of the proposed project. The Engineering Division
reviewed traffic data for Main Street and Mace Street and concluded that these would be
adequate to serve the proposed project subject to standard dedication of r.o.w. and
improvement along the frontage of Main Street and improvement along the frontage of
Mace Street to City Engineering standards. No mitigation will be required.
d) Parks/Recreation 0 0 0 ~
The Threshold Standard for Parks and Recreation is 3 acres/1,OOO population. This
standard does not apply to the proposed project.
Comments: No adverse impacts to parks or recreational opportunities are noted.
e) Drainage 0 0 0 ~
The Threshold Standards require that storm water flows and volumes not exceed
City Engineering Standards. Individual projects will provide necessary
improvements consistent with the Drainage Master Plan(s) and City Engineering
Standards. The proposed project will comply with this Threshold Standard.
Comments: Off-siie drainage facilities exist in the area and pipe capacity willl:ie looked at through
the standard submittal of a hydraulic plan with the first submittal of grading/improvement
plans per the Engineering Division.
t) Sewer 0 0 ~ 0
The Threshold Standards require that sewage flows and volumes not exceed City
Engineering Standards. Individual projects will provide necessary improvements
consistent with Sewer Master Plan(s) and City Engineering Standards. The
proposed project will comply with this Threshold Standard.
Comments: Sewer capacities will not be adversely affected through project implementation. The
existing adjacent sewer lines will be evaluated by the Engineering Divisian as necessary
at the design stage of the project. The Salt Creek Trunk Sewer will eliminate any potential
klllbllindalis9808cUnn Page 9
OJ- 7(.
- -
Po...",II,
P",..I,II, S'g';o~.. u.nh..
S'g.ifi~.. U.,.., Slg';o~.. No
Imp", MI<'g",d Imp", Imp'"
capacity problems. No mitigation is required.
g) Water 0 0 0 ø
The Threshold Standards require that adequate storage, treatment, and transmission facilities
are constructed concurrently with planned growth and that water quality standards are not
jeopardized during growth and construction. The proposed project will comply with this
Threshold Standard.
Applicants may also be required to participate in whatever water conservation or fee off-
set program the City ofChula Vista has in effect at the time of building permit issuance.
Comments: Water quality standards with respect to adequate storage, treatment and transmission
facilities would not be affected as a result of project approval.
XIII UTILITIES AND SERVICE SYSTEMS: Would
the proposal result in a needfor new systems, or
substantial alterations to the following utilities:
a) Power or natural gas? 0 0 0 ø
b) Communications systems? 0 0 0 ø
c) Local or regional water treatment or distribution 0 0 0 ø
facilities?
d) Sewer or septic tanks? 0 0 0 ø
e) Storm water drainage? 0 0 0 ø
f) Solid waste disposal? 0 0 0 ø
Comments: The proposed uses will not generate a need for new systems or cause alteration to the
aforementioned utilities. The existing sewer lines along Main Street currently have the
capacity to handle the proposed sewer per the Engineering Division. The Salt .Creek
Trunk sewer will provide additional capacity in the future. Chula Vista Municipal Code
Section 14.20.120 requires the incorporation of stonn water pollution prevention
measures into the proposed auto repair facility. A stonnwater industrial penn it may be
required from the State Water Resources Control Board. A wastewater industrial pennit
may also be required from the City of San Diego Metropolitan Wastewater Department.
No mitigation will be required, since these would become standard conditions of project
of approval once a detennination is made that these will be required.
XIV AESTHETICS: Would the proposal:
a) Obstruct any scenic vista or view open to the 0 0 0 ø
public or will the proposal result in the creation
of an aesthetically offensive site open to public
A:lllbllindalis9808ck.fnn Page 10
~- 71
- -
Po"oli.lly
Po,,",i.lly S¡,o'fi,,", L,,"hoo
S¡,oifi,,", Vo'", Si,o'fi,,", No
Imp." Mi<i,..", Imp." Imp."
view?
b) Cause the destruction or modification of a D D D 181
scenic route?
c) Have a demonstrable negative aesthetic effect? D D D 181
d) Create added light or glare sources that could D D D 181
increase the level of sky glow in an area or
cause this project to fail to comply with Section
19.66.100 of the Chula Vista Municipal Code,
Title 19?
e) Reduce an additional amount of spill light? D D D 181
Comments: Approval of the project design, iighting and landscaping is subject to a discretionary
Design Review process. No mitigation will be required.
XV .CULTURAL RESOURCES: Would the proposal:
a) Will the proposal result in the alteration of or D D D 181
the destruction or a prehistoric or historic
archaeological site?
b) Will the proposal result in adverse physical or D D D 181
aesthetic effects to a prehistoric or historic
building, structure or object?
c) Does the proposal have the potential to cause a D D D 181
physical change which would affect unique
ethnic cultural values?
d) Will the proposal restrict existing religious or D D D 181
sacred uses within the potential impact area?
e) Is the area identified on the City's General Plan D D D 181
EIR as an area of high potential for
archeological resources?
Comments: There are no identified cultural resources within the project area.
XVI PALEONTOLOGICAL RESOURCES: Will the D D D 181
proposal result in the alteration of or the
destruction of paleontological resources?
Comments: There are no identified paleontological resources within the project area.
XVII RECREATION: Would the proposal:
A:\lIb\linda\is9808ck.fITll Page II
0';- 7'1
- -
P""o<i.Uy
P"..".U, Slgol",,", L,,"h..
Slgom,,", "0"" Slgol",.., N,
Imp." Mlllg.'" Imp." Imp."
a) Increase the demand for neighborhood or 0 0 0 1>0
regional parks or other recreational facilities?
b) Affect existing recreational opportunities? 0 0 0 1>0
c) Interfere with recreation parks & recreation 0 0 0 1>0
plans or programs?
Comments: There are no recreational facilities that will be adversely affected by the proposed auto
repair operations.
XVIII MANDATORY FINDINGS OF
SIGNIFICANCE: See Negative Declarationfor
mandatory findings of significance. If an E1R is
needed, this section should be completed:
a) Does the project have the potential to degrade 0 0 0 1>0
the quality of the environment, substantially
reduce the habitat of a fish or wildlife species,
cause a fish or wildlife population to drop
below self-sustaining levels, threaten to
eliminate a plant or animal community, reduce
the number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major periods or
California history or prehistory?
Comments: The site is presently vacant and cleared and graded of all plant materials. The site lies
within a fully urbanized area and does not represent viable habitat for any sensitive
animal species.
b) Does the project have the potential to achieve 0 0 0 0
short-term, to the disadvantage of long-term,
environmental goals?
Comments: The scope and nature of the project would not result in the curtailment of any long-term
environmental goals.
c) Does the project have impacts that are 0 0 0 1>0
individually limited, but cumulatively
considerable? ("Cumulatively considerable"
means that the incremental effects of a project
are considerable when viewed in connection
with the effects of past projects, the effects of
other current projects, and the effects of
probable future projects.)
A:\llbl1mdalis9808ck.fnn Page 12
02-'71
- -
"',"",IIy
"""',IIy S,,"'fiu", L....h..
St,"'fi,,", v",.., Si,"'fi,,"' No
Imp", """",,, Imp'" Imp'"
Comments: There are no incremental impacts associated with the project.
d) Does the project have environmental effect 0 Ii 0 0
which will cause substantial adverse effects on
human beings, either directly or indirectly?
Comments: No adverse effects to human beings is anticipated from construction and operation of the
proposed project. The applicant will be required to comply with mitigation involving
limited soil sampling in order to detect the presence of hazardous wastes on the subject
site due to previous use of the site as an auto wrecking yard (see section XIX below).
Compliance with the mitigation measure will ensure potential impacts are reduced to less
than significant.
XIX. PROJECT REVISIONS OR MITIGATION MEASURES:
1. Prior to the issuance of any grading or construction penn it, the applicant shall be required to contract
with a registered geologist or certified civil engineer in the State of California to conduct soil testing
for hazardous waste materials and to enter in the voluntary Site Assessment & Mitigation Program
as administered by the San Diego County Department of Environmental Health who will oversee
the results of the soils test and recommend appropriate remediation as required.
XX. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would be potentially affected by this project, involving at least
one impact that is a "Potentially Significant Impact" or "Potentially Significant Unless Mitigated," as
indicated by the checklist on the following pages.
0 Land Use and Planning 0 Transportation/Circulation 0 Public Services
0 Population and Housing 0 Biological Resources 0 Utilities and Service
Systems
0 Geophysical 0 Energy and Mineral Resources 0 Aesthetics
0 Water 181 Hazards (Hazardous Waste) 0 Cultural Resources
0 Air Quality 0 Noise 0 Recreation
0 Mandatory Findings of Significance
A,\llb\linda\is9808ck.fnn Page 13
02-tlO
- .,
XXI. DETERMINATION:
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the 0
environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the [8
environment, there will not be a significant effect in this case because the mitigation
measures described on an attached sheet have been added to the project. A MITIGATED
NEGATIVE DECLARATION will be prepared.. .
I find that the proposed project MAY have a significant effect on the environment, and an 0
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a significant effect(s) on the environment, but 0
at least one effect: I) has been adequately analyzed in an earlier document pursuant to
applicable legal standards, and 2) has been addressed by mitigation measures based on the
earlier analysis as described on attached sheets, if the effect is a "potentially significant
impacts" or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT
REPORT is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the 0
environment, there WILL NOT be a significant effect in this case because all potentially
significant effects (a) have been analyzed adequately in an earlier EIR pursuant to
applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR,
including revisions or mitigation measures that are imposed upon the proposed project.
An addendum has been prepared to provide a record of this determination.
~~~ April 6. 2000
Date
Planning & Environmental Manager
City ofChula Vista
A:Illbllindalis9808ck.fnn Page 14
ól. -1'
- -
ATTACHMENT "A"
Mitigation Monitoring Program
15-00-14
This Mitigation Monitoring Program is prepared for the Chula Vista Food Mart & car wash to be
located at the southeast comer of Main Street and Mace Street in the City of Chula Vista. The
legislation requires public agencies to ensure that adequate mitigation measures are implemented
and monitored on Mitigated Negative Declarations, such as IS-00-14.
AB 3180 requires monitoring of potentially significant and/or significant environmental impacts.
The mitigation monitoring program for this project ensures adequate implementation of mitigation
for the following potential impact(s): Hazardous Waste.
Due to the nature of the environmental issues identified, the Mitigation Compliance Coordinator
(MCC). shall be the Planning & Environmental Manager for the Community Development
Department in the City of ChuJa Vista. It shall be the responsibility of the applicant to ensure that
the conditions of the Mitigation Monitoring Program are met to the satisfaction of the Planning
& Environmental Manager. Evidence in written fonn confinning compliance with the mitigation
measure specified in Mitigated Negative Declaration No. IS-00-14 shall be provided by the
applicant identified in the attached Mitigation Monitoring and Reporting Checklist, to the Planning
& Environmental Manager within one week of compliance with said mitigation measure. The
Planning & Environmental Manager will thus provide the ultimate verification that the mitigation
measure has been accomplished.
.J-fJ.-
- ."
MITIGATION MONITORING AND REPORTING CHECKLIST
PROJECT NAME: Chula Vista Food Mart & Car Wash
INITIAL STUDY NO: 00-14
Issue Area
Hazardous Waste
Mitigation Measure #1
"Prior to the issuance of any grading or construction permit, the applicant shall be required to
contract with a registered geolagist or certified civil engineer in the State of California to conduct
soil testing for hazardous waste materials and to enter in the voluntary Site Assessment & Mitigation
Program as administered by the San Diego County Department of Environmental Health who will
oversee the results of the soils test and recommend appropriate remediation as required. "
Full compliance with this mitigation will help identifY and if required reduce potential impacts to
the subject site by a previous auta wrecking that may have contaminated on-site soils.
Proiect Phase Implementation (Proiect Design; Construction; Post Construction)
Prior to the issuance of any grading or construction permits means that this will be a condition of
approval reflected in DRC conditions. All grading and working drawings will be subject to review
by the Planning & Building, Engineering and Community Development Departments to ensure
implementation of this mitigation measure.
Responsible Agency lies)'
City Planning & Building Department
City Engineering Division
Community Development Department
2
02 -1.3
- -
ATTACHMENT 6
ReCording Requested By:
CHULA VISTA REDEVELOPMENT AGENCY
276 Fourth Avenue
Chula Vista, CA 91910
When Recorded Mail To:
CHULA VISTA REDEVELOPMENT AGENCY
276 Fourth Avenue
Chula Vista, CA 91910
Attn: Judi Bell
(Space Above This Line For Recorder)
APN: 629-130.30
OWNER PARTICIPATION AGREEMENT
Worldwide Petroleum Company
3733 Main Street
THIS AGREEMENT ('Agreement") is entered into by the REDEVELOPMENT AGENCY OF THE CITY OF
CHULA VISTA a public body corporate and politic (hereinafter referred to as . AGENCY"), and Worldwide Petroleum
Company, a California Corporation (hereinafter referred to as "DEVELOPER") effective as of July 11, 2000.
WHEREAS, the DEVELOPER desires to develop real property within the SOUTHWEST REDEVELOPMENT
PROJECT AREA ('Project Area") which is subject to the jurisdiction and control of the AGENCY; and,
WHEREAS, the DEVELOPER has presented plans for development to the Design Review Committee and the
Planniný Commission for the construction of an Service Station with 16 fueling pumps for passenger vehicles, 2 fueling
pumps for commercial trucks and an associated Mini-mart, a Drive-thru Fast Food Restaurant, and a Car Wash (the
"Project'); and,
WHEREAS, said .plans for development have been recommended for approval, subject to conditions, by said
Committee and Commission; and,
WHEREAS, the AGENCY has considered the Design Review Committee's and the Planning Commission's
recommendation and has approved the Project and design plans subject to certain terms and conditions; and,
WHEREAS, the AGENCY desires that said Project be implemented and completed as soon as it is practicable
in accordance with the terms of this Agreement.
NOW, THEREFORE, the AGENCY and the DEVELOPER agree as follows:
1. The property to be developed is described as Assesso(s Parcel Numbers 629-130-30 located at the Southeast
Corner of Main Street and Mace Street 1n the City of Chula Vista, CA., shown on locator map attached hereto as
Exhibit "cn and by this reference incorporated herein ("Property').
2. The DEVELOPER covenants and agrees by and for himself, his heirs, executors, administrators and
assigns and all persons claiming under or through them the following:
A. DEVELOPER shall develop the Property with the Project in with the AGENCY approved
development proposal attached hereto as Exhibit "A".
B. DEVELOPER shall obtain all necessary federal/state and local governmental permits and
approvals and abide by all applicable federal, state and local laws, regulations, policies and
approvals in connectian with the development of the Project. DEVELOPER and AGENCY
further agree that this Agreement is con~gent upon DEVELOPER securing said permits and
.;; -8
- -
approvals. DEVELOPER shall pay all applicable development impact and processing fees.
AGENCY agrees to reasonably cooperate with DEVELOPER in processing all permits
required in connection with the development of the Project.
C. DEVELOPER shall obtain building permits within one year from the date of this Agreement
and to actually develop the Property wjth the Project withjn one year from the date of
issuance of the building permits. In the event DEVELOPER fails to meet these deadlines,
the Agency's approval of DEVELOPER's development proposals shall be void and this
Agreement shall have no further force or effect.
D. In all deeds granting or conveying an interest in the Property, the following language shall
appear:
"The grantee herein covenants by and for himse/~ his heirs, executors,
administrators and assigns, and all persons claiming under or through
them, that there shall be no discrimination against or segregation o~ any
person or group of persons on account of race, co/o~ creed, national origin
or ancestry in the sale, lease, sublease, transfe~ use, occupancy, tenure,
or enjoyment of the premises herein conveyed, nor shall the grantee
himself or any persons claiming under or through him establish or permit
any such practice of discrimination or segregation with reference to the
selection, location, number, use or occupancy of tenants, lessees,
subtenant lessees, or vendees in the premises herein conveyed. The
foregoing covenants shall run with the land. "
E. In all leases demising an interest in all or any part of the Property, the following language
shall appear.
"The lessee herein covenants by and for himse/~ his heirs, executors,
administrators and assigns, and all persons claiming under or through him,
and this lease is made and accepted upon and subject to the following
condmons:
That there shall be no discrimination against or segregation o~ any person
or group of persons, on account of race, colo~ creed, national origin, or
ancesúy, in the leasing, subleasing, transferring use, occupancy, tenure,
or enjoyment of the premises herein leased, nor shall the lessee himself
or any persons claiming under or through him, establish or permit any such
practices of discrimination or segregation with reference to the selection,
location, number or use, or occupancy of tenants, lessees, sublessees,
subtenants, or vendees in the premises herein leased."
3. The Property shall be developed subject to the conditions imposed by the Design Review Committee,
the Planning Commission, and the AGENCY as described in Exhibit "B" attached hereto and
incorporated herein by this reference. DEVELOPER acknowledges the validity of and agrees to
accept such conditions.
4. DEVELOPER shall maintain the premises in FIRST CLASS CONDITION.
A. DUTY TO MAINTAIN FIRST CLASS CONDITION. Throughout the term of this Agreement,
DEVELOPER shall, at DEVELOPER's sole cost and expense, maintain the Property which
includes all improvements thereon in first class condition and repair, and in accordance with
all applicable laws, permits, licenses and other governmental authorizations, rules,
õ2 -IS-
- -
.' ordinances, orders, decrees and regulations now or hereafter enacted, issued or promulgated
by federal, state, county, municipal, and other governmental agencies, bodies and courts
having or claiming jurisdiction and all their respective departments, bureaus, and officials.
If the DEVELOPER fails to maintain the Property in a 'first class condition', the
Redevelopment Agency of the City of Chula Vista or its agents shall have the right to go on
the Property and perform the necessary maintenance and the reasonable cost of said
maintenance shall become a lien against the Property. The Agency shall have the right to
enforce this lien either by foreclosing on the Property or by forwarding the amcunt to be
collected to the Tax Assessor who shall make it part of the tax bill.
B. DEVELOPER shall promptly and diligently repair, restore, alter, add to, remove, and replace,
as required, the Property and all improvements to maintain or comply as above, or to remedy
all damage to or destruction of all or any part of the improvements. Any repair, restoration,
alteration, addition, removal, maintenance, replacement and other act of ccmpliance under
this Paragraph (hereafter collectively referred to as 'Restoration') shall be compieted by
DEVELOPER whether or not funds are available from insurance proceeds or subtenant
contributions.
C. In order to enforce all above maintenance provisions, the parties agree that the Community
Development Director is empowered to make reasonable determinations as to whether the
Property is in a first class condition. If he determines it is not, he (1) will notify the
DEVELOPER in writing and (2) extend a reasonable time to cure. If a cure or substantial
progress to cure has not been made within that time, the Director is au1horized to effectuate
the cure by City forces or otherwise after written notice to Developer that City forœs will be
making such cure, the ccst of which will be promptly reimbursed by the DEVELOPER. In the
event that there is a dispute over whether the Property is in a first class condition or over the
amount of work and expense authorized by the Director to cure, the parties agree that the
City Manager of the City of Chula Vista ("Manager') or his designee, shall resoive that
dispute and both parties shall be bound by the Manager's decision, which shall specify
findings offacl.
D. FIRST CLASS CONDITION DEFINED. First class condition and repair, means which is
necessary to keep the Property an efficient and attractive condition, at least substantially
equal in quality to the ccndition which exists when the Project has been ccmpleted, nomial
wear and tear excepted, in accordance with all applicable laws and ccnditions.
5. AGENCY and DEVELOPER agree that the ccvenants of the DEVELOPER expressed herein shall run
with the land. DEVELOPER shall have the right, without prior approval of AGENCY, to assign its
rights and delegate its duties under this Agreement
6. AGENCY and DEVELOPER agree that the covenants of the DEVELOPER expressed herein are for
the express benefit of the AGENCY and for all owners of real property within the boundaries of the
PROJECT AREA as the same now exists or may be hereafter amended. AGENCY and DEVELOPER
agree that the provisions of this Agreement may be specifically enforced in any ccurt of competent
jurisdiction by the AGENCY on its own behalf or on behalf of any owner of real property within the
boundaries of the PROJECT AREA. Except for the Agency, however, no owner of real property within
the boundaries of the Project Area shall have the right to enforce any of the provisions of this
Agreement independently.
7. AGENCY and DEVELOPER agree that this Agreement may be recorded by the AGENCY in the Office
of the County Recorder of San Diego County, California.
02 - S"-
- -
.' 8. DEVELOPER shall and does hereby agree to indemnify, protect, defend and hold hannless AGENCY
and the City of Chula Vista, and their respective Council members, officers, employees, agents and
representatives, from and against any and all liabilities, losses, damages, demands, claims and casts,
including court costs and reasonable attomeys' fees {collectively, "liabilities"} incurred by the AGENCY
arising, directly or indirectly, from (a) AGENCY's approval of this Agreement, (b) AGENCY's or City's
approval or issuance of any other pennit or act jon, whether discretionary or non.djscretionary, in
connection with the Project contemplated herein, and (c) DEVELOPER's construction and operatian
of the Project pennitted hereby.
9. In the event of any dispute between the parties with respect to the obligations under this AGREEMENT
that results in litigation, the prevailing party shall be entitled to recover its reasonable attorney's fees
and court costs from the non-prevailing party.
10. Time is of the essence for each and every obligation hereunder.
11. If DEVELOPER fails to fulfill its obligations hereunder after due notice and reasonable opportunity to
cure, DEVELOPER shall be in default hereunder, and in addition to any and all other rights and
remedies AGENCY may have, at law or in equity, AGENCY shall have the right to tenninate its
approval of the Project and this Agreement.
Signature Page Follows
óJ - f'Î
- .,.
Signature Page
IN WITNESS WHEREOF THE PARTIES HAVE ENTERED INTO THIS AGREEMENT EFFECTIVE AS OF THE DATE
FIRST WRITTEN ABOVE.
REDEVELOPMENT AGENCY OF THE CITY OF CHULA VISTA
"AGENCY"
DATED: By:
Shirley Horton, Chairman
"DEVELOPER"
~
DATED: \. - b - () (; By: " . / ;{itJ11Q .,¿",...
, I nI, PH. ., residen
NOTARY: Please attach acknowledgment carel.
APPROVED AS TO FORM BY:
John M. Kaheny, Agency Attorney
ól-f8'
. -,-~
, , , .. 'i'.-
W¡I!I,'nl' 'il .il ~ l\ii',..:1 IIX!
~d il- i¡1 'III II ¡all i' !!'f!liB:i ill.1 11 =:ì Exibit A
11!1!!ì!III!!I-I;!~¡;!~i;I¡~m~I!~¡!I,I; 11!';i! page 1
,III ¡, i.i III II ¡¡'I ¡i .Ii. II".! ~ II i'
Iî~ '¡'i-!I J '¡: Hi i: i. i! il ill ,ill! j iØ I'i:
~: !li!!I~PiPi¡l¡ i¡ I
II; ~':' I I
~--~
- - - q>;- M-A<:E """RE-E~ - - - I -
d .or ;~ .~ "or I :1," I
II-I'\. I-I It
. ~""... - - I
¡ ~... I
P d
,.
I~
,.
I ~
.. .
. §IIIII [
Iii ii
I" ¡
. I I
! I I
:1 I
I ~. I
g 'I .
b II .
I' ~~ I ~-r- I - I
. ¡¡,I I -:"=- I~ 1>--
II II ~:
!Í'III ::, 111;1111111'llilllll'"lllill'IIII;-IIIII'!lil¡iilll'li;'IIIP!.!III'~ 11!111111'¡!11~
,I ;1!jJ¡~'II:III-J,,:IIIIIIIIIIJIIiSi'illIl'lI,11 J'ftl.:!II,lft
t hll ~ j i! i~Wi p!,:IIB!:!! II m~ I': I 'I III hI I~ I ~W :1111 ~
.;~i~~I~r!.I"¡I¡PI!i"l~q!ì,!il;" 1I,.,',i:' li¡I¡llqll§
-I' S~lqlJ f "¡'llllpl" fl', cc' ¡. . II I
,-d!,~ ~!191!i!ld¡!~ì!!!!-!!'~IIHPI¡ íil~I¡I¡¡iíll¡.¡¡
O' , I ~l¡'1 I. I ¡ ,,~"" " "
. ~ ~" ! J . I' iì 02 - i'1 J
CONDITIONAL lIE PERMIT .......... 1IJ2I/IO '" 10
- -. ..
. «-'_4
Exibit A
page 2
!
>
¡;;
"1
11111
Iii Ii
I H~
" I
!'I
I
II
II
. ")
I ¡:, lTl',ti
~ II
I
It ë~11 [!] III ~:!I!:I' 11111::11:::1111' ~:
.~i!Glf II~i:~llljI,IIlIi"'lilllfj f.
"e~~ III I Ii l .fr I:
" !¡u~ IfH"'" ,,11""""\¡if ! ,4-
'! ~~~!IB' ~-9o .
COItD<TQW. \JOE PEJMT p"""",,", - ... OJ
. __4
Exibit A
page 3
~ II I:
I
- - - - - - - - ~-M>'<CE-S-TReET- - - I
I
-- I
0 :
1
¡
: ~
:~ ~
m
.~ ~
. I
.
. t
. ~
. ~
~~ ~
~~ ~
11111 ì'
Iii Ii I
I'li :: I
. I I II
!'¡ :: I
:1 1 I
I' I: I :
I I
I I
¡II I
q , I
'thl;~ ~
.! ~I s,r
,iI!!!!. I.-$-.
" ;;~I.IJ "'-°1 .
'"-~< CK 7
- ... PEllMIT P.....- 1tI2II1I8 10" 10
. ~ - ~
, i ~ ~ II Ii I . .
I I' I , EXl bl t A
i 'I'I I ~
II ~ page 4
I, ~
:;
, ! . . 'I
II
1,1 , ¡ . ,
I I q .
., I P§
K !Z
s -~
3 ~~
~ ~~
: ~
IIglU11i M ¡g
¡ni"fI!1 g ~
'II I i If H~ ~
¡ II " ~ ~
I ~
I ~
, !
Ii
(p
i ~
"
5
I~ ~
11111 ~ I,.~,I ,-, I or I
li!¡:, ¡it i
I I .~~-~~~
I .~ ,~ 'X ,-, .~,~. .¡ .~ J - ,~ r
I I I I I I II!~ I I I
I ~~
p~ -; . ~§
I~H ~
'.U5 II ~
~~ Z
:Í'I!I J
I
II [!]
,~¡~I aIr
'i,I~~11
h s:u r~ tCoJ
I U" "
f! ~~u I J .;J . 92-
CONIXT1CIW. UIE ......., ........... - ..... -- ----
. ~ -, ~
Exibit A
- "::' ,,-< .'- w~M ,<-< ... page 5
¿f
t
I
@[]
0 e e e
Sê ~
;¡; ,
~z
"
..., ,
5
0
:.>
"
¡: -
z ,
-, I '
I
¡ (¡ I
~ I
. I ' ,
I§ I "
-111111 .
I Ii ill I
I II ¡
I I I I
! I I
I
II I
. (¡
liÿ -:
I~ I @@~(jØ
I ill
~ti E~
!'ii19 I II
I
II fjl ,,-
~.;A ~ w~
,~h! alf
f if HU ~f
¡! ~"U I J 0<' - 93
""""""'" \lIE PERMIT ........... 12l11li8 ... 10
. - ~
" "'" , 1 o¡ :~ I'.
I (8 B..! 'II Ii Exibit A
-..,.. rD" .
a:: II t I ' page 6
0 ""
~ I ~lIr ! E~I
"'. ri D'
s! II I
.,,', ,¿ I' . ED!
! ; .[~d i: ~ ¡¡ q i! Iii
s~ ~[ii'D IIII
I'" [:II
~ ~~: IIII~
en I!
g ~ , "3
:g I . ~
¡;¡ 11=
, II ~
. r z
1:ltl'!f'II~ iir~ PTI!! I: ~
II ,If'i", ", ' f , I' .., II ~
!Inl';;' ;;. I = II ~ II ~
l'II'~!O"o: ~~ "Ih
; III I I I Ii 11 OM ø~ h II
'-'UII! III:! liW'!f!!I~ ~ ~~
Ihl I,~ !I,llf,¡), ¡¡¡
'II. tt, 'I 'I'" "
I.,' n' 1,1 II, ,Ii c: ,~
II: i¡1 IUlifl I ¡;;
~ s~
~¡;
~êj ¡-
'"
0
0
..,
." -
¡; I
z
I
I -,
g I ¡-
-Ii 'II ,- -
. I
!q I '~~'I
I I ~j.~~
I ë. I [!],~ Ih5~
q~;! ",I ~ !i~i;~
-I'>.I~ -" 1,
~IS;U'JI e.-" -' ~~~~~
, ! g;l ~ 'I' , I.
'! ~~¡! .. 02-9~
CONDIT1CfW. UIE - PAClWlE 12I21l1O ... 10 ---~ - -
. - - .,~
MAIN ST.
. ¡, ~Iilill -----------
¡ 1:lII¡~ ft" ExibitA
I II ~ r page 7
IIlp
!! q, !
II i ~ n ! ~ j
I ~ ~ ~ ~
~ of!!
, Ie
~ :
~ ~ ,..
1I!l11i1l1 ~ ~ ~~
I ~ Ii ! II J I I ¡; .. ~;¡
Ipl;lIH ~ .. I
I It j! g
I" ,
I I~ h I
'>
II !~
I' I
( " i ,~
I ~ I.
I !
I
!
'1 , , ~
~
. '"
"UIII !E ¡
Iii Ii i""
!' I ¡ ¡~
I I I:
I I ~
¡jj
I l.. i '1" '1"
Iì'.~ I z !~
!!It: I ~~
I'I~ ili ~~
~ ..
d~ I i
~19 II r ..
I' ¡;;
II i 00 ;
ë~11 air ~
, i ~! ¡II ~ !I~'I
'1i~"IBIi
li;~ " !~
..~ i I
.! ~"i! J 02 - <1 s-
- UIE ....... p- -- ... WI
.- -, .'4
1i~~llli1
I I' .' MACE ST ..
'III I ~ ---------.-.:_--- Exlblt A
I! ~ ~ ~ page 8
'PI; ~r f,
! \ I'.
II II ~n - ~ I
. ~ ~
i ~ ~I
I! g 111111 i !
I ( ~ "III I ¡; I
'I' Lilli I~ I~
I I P ~~ ~ z I
I '¡g ;,¡;j -0 1'1::
. ~ ... -.:::> >
II ~ iz
I' '" 'en
q i ~ !~
I~ ~ I
g -e ' -B I
i i
I
, ,
. . I
, -e
~
~§ ~ f ~
I ., .§ .
I ~ .
I" ! 9 III .
I Iii g ål ~Pli~H~
I '" ." "ïl,.,1
. ~ Ii il¡ liar!
!'iiI!I I' fi1 ¡ ~ I
I I ~
I h~1 ~ .
-IH~!plr
iI s;"I'~f
I !&æ ~ ,-!
;z ~~I!IJ 0.1-9'-
C<>NIIITIOIW. USE ........,. ........., 12I2111III 7 of II
- ' -
. - - ~
i~~'illl
i s: 11'11 ; ~ __~_AC~~T:__- Exibit A
. ~ -- page 9
t_-~
~ ~~ ~
1I!1: ~ f F' H
!! I ¡ .
II iI~n i
I I ~ !i
; I~
; ~~
~ h1
I 1 !I iii II 1 ~ ~ .. c::J
¡ ~ Ii lilli' "¡; ~ It
I' I i I ( I . .. .:s I
I II j! ~ '~ . '
I ~ c::J. . I
I" --'" , . 1--'"> ,~
~ ~ . I~ I~
II g c::J I '
, i z I~
( I . ,.
I ! I
. ,
-@II
,
1-
~ il ~ I
1 'I ", ;
;: ~ f f' I 1
...
~ rn
: -@J
!j
1;1
:¡:
~
~
0
z
~
I'i il~I'R~P.
! I ~ Illii II
Ii II I' !¡!!
" ~I
.2 - '1
CONDITIONAL U8E""'" """'--1li21liiii ...'" -------~---
. - -.. ~
~ Exibit A
page 10
'I{Í iii ~..; q i'¡ or ¡; jí i;o:q ¡ f t9 ì
11'_-11 'I!', 1~1!11¡!>I'!llllbl
!!I!IIi1)!'II¡i'I!IIII~il¡.~¡I'¡!
Ili.l~q I!.~I q"q,
,I I I' I' -I - - i
li¡I,!I~~:llli'~i ~!llqll
- I" I - 'I' II' I
1¡'~II"i~l!í! W-Ièld
!¡!~I iil~/!11 li¡'Si~
"~ " I' ii ill 1 I
!
II 'Hß ß IT i' ';
jil:l.: .:11:,11"
'I' r r ~ III !I I
il!!!~~;
I
--
-0
~!:J
,>
Ii"
E
ill 'I
I,
<t:
~
~
I .,
I
I I
I
III
I
I
II. IIJ
I ~t~ lair I. I'"
- i (i~R~i ~f mø
~ !~S~i I-, I; ,;;~t¡f
'; d! I J lë
I
- -
EXHIBIT B
Conditions of Approval
Owner Participation Agreement
Worldwide Petroleum Company
3733 Main Street
Chula Vista, CA
CONDITIONS OF APPROVAL
1. Prior to the issuance of building permits, the project landscape and irrigation plan shall be reviewed and
approved by the City Landscape Planner.
2. Prior to the issuance of a certificate of occupancy for the new structures, all landscaping and hardscape
improvements shall be installed in accordance with the approved landscape plan.
3. The final landscape plan shall provide for a landscape treatment (vines) for the wall to be located at the south
of the site. Said plan shall be reviewed and approved by the City Landscape Planner prior to the issuance of
building permits.
4. Construct the project as submitted, unless otherwise modified herein.
5. Prior to the issuance of building permits, the applicant shall comply with all requirements of the Building Division.
Said requirements include but are not limited to:
a. Submit architectural plans that are stamped and signed by a licensed architect.
b. Structural plans and calculations must be stamped and signed by a California Registered
Civil/Structural Engineer.
c. Project shall comply with 1997 UBC and 1996 NEC.
d. Project shall comply with 1998 handicapped accessibility requirements.
e. Plans shall indicate type of occupancy.
6. A graffiti resistant treatment shall be specified for and applied to all wall and building surfaces. This shall be
noted for any building and wall plans and shall be reviewed and approved by the Planning Director prior to the
issuance of building permits. Additionally, the project shall conform with Sections 9.20.055 and 9.20.035 of
the CVMC regarding graffiti control.
7. All mitigation measures outlined in the Mitigated Negative Declaration for the project (IS-00-14) shall be
complied with to the satisfaction of the Community Development Department's Planning and Environmental
Manager in perpetuity.
8. Prior to the issuance of building permits, the applicant shall obtain a sign permit for all proposed signage.
9. Prior to the issuance of building permits, the applicant shall dedicate two feet of right-of-way along Main Street.
10. A separate sewer connection shall be required for the car wash area drainage system.
11. Prior to the issuance of a certificate of occupancy, the applicant shall install a 250 watt street light on Main
Street, and a 150 watt street light on Mace Street.
12. Prior to the issuance of building permits, the applicant shall submit improvement plans which specify and
guarantee the completion of the following public improvements:
A) Widen Main Street to 41 feet centerline to curb for the 53 foot half of the street right-of-way.
B) Construct curb, gutter, and 8-foot-wide sidewalk along the entire Main street Frontage.
r:2 - 9'
- -
EXHIBIT B
Conditions of Approval
Owner Participation Agreement
Worldwide Petroleum Company
3733 Main Street
Chula Vista. CA
C) Widen Mace Street to 26 feet centerline to curb for the 36 foot of the street right-of-way.
D) Construct curb, gutter, and 5-foot-wide sidewalk along the entire Mace Street frontage.
E) Construct driveway approaches per Chula Vista Construction Standard No.1.
F) Construct pedestrian ramp per ADA Standards as southeast comer of the intersection of Main Street
and Mace Street.
13. Driveway approaches must meet all applicable City of Chula Vista standards and must be 8 feet minimum from
the Point of Curb Return (PCR).
14. If the total on-site excavation exceeds the amount permitted without a grading permit as prescribed by the City
of Chula Vista Grading Ordinance Number 1797 Section 15.04.150, applicant shall apply for and obtain a
grading permit prior to the commencement of grading.
15. The applicant shall address all other comments noted in the Engineering Department Memorandum dated
January 19, 2000 attached as Exhibit C of the Special Use Permit Resolution for this project.
16. Project plans shall be subject to the review and approval of the City of Chula Vista Fire Department.
17. The applicant shall comply with all recommendations of the City of Chula Vista Crime Prevention Unit as shown
in memorandum attached as Exhibit C of the Special Use Permit Resolution for this project.
18. No floor displays of beer allowed. All alcohol must be displayed in the cooler area.
19. Locks shall be installed and maintained on cooler doors where alcohol will be displayed. The cooler doors shall
be locked after 12 mid-night until 6 a.m. in the morning.
20. Wine shall not be sold in bottles or containers smaller than 750 milliliters. Wine-coolers shall not be sold in units
of less than a four pack.
21. Alcohol sales shall be permitted only between the hours of 6 a.m. and 12 mid-night.
22. The applicant shall comply with all requirements of the Sweetwater Authority as described in letter attached as
Exhibit C of the Special Use Permit Resolution for this project.
23. Prior to the issuance of building permits, the applicant shall pay all required school fees.
24. The Special Use Permit issued on this project shall become void and ineffective if not utilized or extended w~hin
one year from the effective date thereof, in accordance with Section 19.14.260 of the Municipal Code.
25. That further consideration be given to the possibility of installing a median on Main Street as well as enhanced
traffic control for pedestrian crossing at the intersection of Mace and Main Streets.
26. That specification be given as to where the vacuums for the car wash will be located.
27. That enhanced measures for removing excess water on the vehicles exiting the car wash be provided.
0; -100
- -
EXHIBIT B
Conditions of Approval
Owner Participation Agreement
Worldwide Petroleum Company
3733 Main Street
Chula Vista, CA
28. That a condition be jncluded specifyjng requirements for landscapjng, signage and on-site maintenance,
29. That the signage conform to the sign ordinance and any redevelopment design guidelines and goals envisioned
for that area. The signage should be consistent with other new developments which do not include pole signs.
30. That landscaping and street improvements be consistent with the long term objectives of the Montgomery
Redevelopment Area Plan with respect to street landscape design and traffic control measures
31. That a condition be included stating that the car wash will have a "striper' (air-blower).
32. That the hours of operation be clearly defined in the conditions of approval.
33. That prior to issuance of a certificate of occupancy for new structures all State, Federal and local permits will
have been received as required by that particular law or regulation.
~'\HOME\COMMOEVITAPIA\OPASIMAIN& MACE OPA (J." ,. 2000902'"11
02-10 I
- -
Exibit C
LOCATOR :~~¿I~: ALiAMANI, PresidentolWPC PRaJECT DESCRIPTlaN:
C) SPECIAL USE PERMIT
PRaJECT 3733 Main Street
ADDRESS: Request: Proposed 3,352 square loot 24 hour, food mart and
a detached 1,248 foot self-serve car wash.
SCALE: I FILE NUMBER:
NORTH No Scale SUPS - 00-05
h:\home\planning\hectar\locators\supsOOO5.cdr 01/t1/00 02 -10 "-
- -