Loading...
HomeMy WebLinkAbout2006/11/21 Item 8 COUNCIL AGENDA STATEMENT Item ---.li Meeting Date 11/21/06 ITEM TITLE: Resolution Accepting Bids and Awarding a Contract for Construction of HES Traffic Signal Improvements at Fourth Avenue and K Street (TF-341) to Lekos Electric, Inc. and appropriating funds therefor Acting Director of Eng7ng~ Interim City Manager J I ( 4/5th Vote: Yes X No _ ) SUBMITTED BY: REVIEWED BY: At 2:00 p.m. on October 4, 2006, the Engineering Department received two (2) sealed bids for the "HES Traffic Signal Improvements at Fourth Avenue and K Street" Project (TF-341). Lekos Electric, Inc. submitted the low bid of $232,702 to complete said project. RECOMMENDATION: That the City Council adopt the Resolution accepting bids and awarding a Contract for Construction ofHES Traffic Signal Improvements at Fourth Avenue and K Street (TF-341) to Lekos Electric, Inc. and appropriating $25,000 to TF-341 from the available balance of the Traffic Signal Fund. BOARDS AND COMMISSIONS: N/A DISCUSSION: On September 8, 2005, the City was granted $238,500 in CalTrans Hazard Elimination Safety (HES) funds, which were accepted by City Council under Council Resolution 2006-025 on January 24,2006. The grant is to be applied towards improvements at the intersection of Fourth Avenue and K Street. The intersection of Fourth Avenue and K Street was selected for submission to CalTrans for HES funding primarily due to its proximity to a school and the volume of pedestrians using the intersection. This project is intended to improve traffic and pedestrian safety at the subject intersection by providing protected left-turn phasing, ADA compliant pedestrian pushbuttons and LED countdown indications for all approaches to the intersection, two new pedestrian ramps, and sidewalk/cross gutter reconstruction along the east side of the subject intersection. Additional signal improvements include the installation of new traffic signal standards, LED vehicle indications, video detection systems, internally illuminated street name signs, a battery backup system, and new conduit and wiring to bring the traffic signal up to current City standards. Bidding Process Traffic Engineering and Design Engineering recently prepared plans and specifications for this project. Construction cost estimate of $220,000 has been developed using the average unit prices from recently received contractor bids on similar types of projects. 8-1 Page 2, Item ~ Meeting Date 11/21/06 On October 4, 2006, staff received bids from the following contractors: No. Contractor Bid Amount 1. Lekos Electric, Inc. - El Cajon, CA $232,702 2. HMS Construction, Inc. - San Marcos, CA $253,360 The low bid, submitted by Lekos Electric, Inc., is above the final Engineer's Estimate of $210,000 by $22,702 (approximately 11%). The higher than estimated bid submittals are predominantly due to an increase in the cost for materials to complete the conduit installation and associated pavement work. Lekos Electric has completed recent projects in the city with favorable performances. Disclosure Statement Attached is a copy of the Contractor's Disclosure Statement. Construction Schedule With the adoption of this Resolution, staff anticipates execution of the construction contract by November 28,2006, and construction to begin December 18, 2006. A 60-working-day period is given to the Contractor to complete the construction for the project. Barring any setbacks related to traffic signal equipment availability and weather, construction of this project should be completed by February 21,2007. ENVIRONMENTAL REVIEW: The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined the project qualifies for a Class 1 categorical exemption pursuant to Section 15301 (d) ofthe State CEQA Guidelines. Thus, no further environmental review is necessary. DECISION MAKER CONFLICTS: Staff has reviewed the property holdings of the City Council and has found no property holdings within 500 feet of the boundaries of the property that is the subject of this action. FISCAL IMPACT: Upon receiving approval of the HES grant application from CalTrans, the City created a Capital Improvement Project account to fund the design and initial installation costs. This funding was encumbered from the Traffic Signal Fund and totaled $288,500. After completion of the project, CalTrans will reimburse the City with the grant funds up to $238,500 that will be deposited in the Traffic Signal Fund. This reimbursement would have resulted in a net City contribution of $50,000. In order to complete the project an additional appropriation from the Traffic Signal Fund is required. As previously mentioned, the bids received on the project were higher than 8-2 Page 3, Item ~ Meeting Date 11/21/06 anticipated. In addition, the design and survey work required to complete the overall design of project was more labor intensive than projected due to site specific constraints and challenges. As a result, an additional appropriation of $25,000 in Traffic Signal funds into CIP Account TF- 341 is required, bringing the total City contribution to the project to $75,000. The following table summarizes the project costs and funding sources: FUNDS REQUIRED FOR CONSTRUCTION A. Contract Amount (Lekos Electric, Inc.) $232,702 B. Contingencies (approx. 10% of Contract Amount) $22,798 C. Staff Costs - Design, Inspection, Contract Administration $58,000 TOTAL FUNDS REQUIRED FOR CONSTRUCTION $313,500 FUNDS AVAILABLE FOR CONSTRUCTION A. Previously Appropriated Traffic Signal Funds $288,500 B. Additional Traffic Signal Fund Appropriation $25,000 TOTAL FUNDS AVAILABLE FOR CONSTRUCTION $313,500 GRANT FUNDS AVAILABLE UPON COMPLETION A. HES Grant Program Reimbursement $238,500 NET CITY CONTRIBUTION (TRAFFIC SIGNAL FUNDS) $75,000 There is no impact to the General fund as a result of this project. As an existing traffic signal, operational and maintenance costs have already been accounted for. The improvements made as a result of this project will not significantly alter these ongoing costs. Attachments: 1 - The City ofChula Vista Disclosure Statement (Lekos Electric, Inc.) 2 - Capital Improvements Program Detail (TF-341) 3 - Resolutions No. 2005-116, 358, and 2006-025 J:\EngineerIAGENDA\CAS2006\11-21-06\CAS TF341 (4TH & K).doc 8-3 I I I I I I , a .',,:'1' ~~: I ATTACHMENT I CITY OF CHULA VISTA DISCLOSURE STATEMENT Pursuant to Council Policy 101-01, prior to any action upon matters that will require discretionary action by tbe Council, Planning Commission and all other official bodies oftbe City, a statement of disclosure of certain ownership or financial interests, payments, or campaign contributions for a City of Chu]a Vista election must be filed. The following information must be disclosed: 1. List tbe names of all persons having a financial interest in tbe property that is tbe subject of the application or tbe contract, e.g., owner, applicant, contractor, subcontractor, material supplier. NON( 2. If any person" identified pursuant to (I) above is a corporation or partnership, list the names of all individuals witb a $2000 investment in the business (corporation/partnership) entity. NON(;: 3. If any person" identified pursuant to (]) above is a non-profit organization or trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. NONe 4. Please identify every person, including any agents, employees, consultants, or independent contractors you have assigned to represent you before tbe City in tbis matter. ItK~5A k. L[)<..u;;, 5. Has any person" associated witb this contract had any financial dealings with an officia]" ofthe City.ofChula Vista as it relates to tbis contract within the past 12 months? Yes_ No~ No ~o4 \\Citywide1000\home\Enginccr\TRA.FFIaACAD Dwgs\STANDARD DWGS (ACAD)\CIP PROJECTS\TF341 \TF341IS1EAspccsrevl .doc. ~. I I I I I I I I I I I I I I I I I - I ~ If Yes, briefly describe the nature of the financial interest the official" may have in this contract. 6. Have you made a contribution of more than $250 within the past twelve (12) months to a current member of the Chula Vista City Council? No )( Yes _ If yes, which Council member? NO 7. Have you provided more than $340 (or an item of equivalent value) to an official" of the City of Chula Vista in the past twelve (12) months? (This includes being a source of income, money to retire a legal debt, gift, loan, etc.) Yes _ No ~ If Yes, which official" and what was the nature of item provided? Date: 10-.3- 010 ~~fliL Signature of Contractor/Applicant 1 [f!-fSfI ~. LE iW-.S Print or type name of Contractor/Applicant . Person is defined as: any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality, district, or other political subdivision, -or any other group or combination acting as a unit. .. Official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member ofa board, commission, or committee of the City, employee, or staff members. \\Citywide2000\home\Engineer\TRAFF1C\ACAD Dwgs\ST ANDARD DWGS (ACAD)\CIP PROJECTS\TF34 J\TF341ISTEAspecs!l:vl .doc Sr5 ATTACHMENT 2. CITY OF CHULA VISTA CAPITAL IMPROVEMENTS PROGRAM OETAIL CIPNO.: TF-341 INITIAL SCHEDULE FOR DESIGN:05 AND CONSTRUCTION: 06 TITLE: HES Traffic Signal System Improvements at Fourth Av & K 5t DEPARTMENT: Engineering COMMUNITY PLAN AREA: Western City PROJECT MANAGER: Jim Newlon/Patrick Moneda TOTAL APPROPRIATIONS PROJECT THRU CURRENT FY 2005-06 FY 2006-07 FY 2007-08 FY 2008-09 FY 2009-10 COST ESTIMATES: TOTAL YEAR I. Preparatory Plannlna/Env Review $0 $0 $0 $0 $0 $0 $0 II. Land Acquisition $0 $0 $0 $0 $0 $0 $0 III. Design $48,500 $0 $48,500 $0 $0 $0 $0 IV. Construction $240,000 $0 $240,000 $0 $0 $0 $0 V. $0 $0 $0 $0 $0 $0 $0 TOTALS I~,~/ /, $0 $288,500 $0 $0 $0 $0 tllNANCING SOURCES: , $288,500 $0 $288,500 $0 $0 $0 $0 'i'RAFFIC SIGNAL FUND , ii $0 $288,500 $0 $0 $0 $0 FINANCING TOTALS ..."",,",", Description: Improvements are to include the addition of left-turn pedestrian phasing, ADA pedestrian push buttons, and video detection at the subject intersection. The project also includes the reconstruction of the cross guller and the two curb returns along the east side of the intersection. Justification: The intersection of Fourth Avenue and K Street lies immediately adjacent to the front entrance of Chula Vista High School. Due to this close proximity, a high volume of pedestrian traffic utilizes this intersection to cross the road. Currently, there are no pedestrian pushbullons or protected left-turn phases. A cross guller runs along the east side of the intersection, which is undesirable for pedestrian/wheel chair accessibility and is in need of complete reconstruction. Schedulino: Design and Contract Administration is scheduled for FY05/06; Construction is scheduled for FY06/07. Status: New Ooeratina Budaet Effect: None (A-151) H:\SHAREOIClPlOOOld.la8.00 IREV.Mon Ocl 23. 2008 2:52PM) \)V~:Y:S-1'\ \~i')\:;r~\.Y;J:~\=:r\ t;~\c:2~':~~\ j{';1:~~'<;} \~1;:~\~::i ~";:\\~r~:;.1;:1 \ll~\'~S~t\;_" (~~\jf~~1;:\ \::~--l;:,~:; t~:J~~\~::'::>'\V@ ~~~~f::~\~t~\ \:;\~:;::(~~\.'\ L\~..\.,:,\ tI ~ ~<). I-r" (~, -\ \:';:.,":"":h->~.~ ~\\....'~ "" ~'-r\ \ .- -.<'r;,+-~;::;.I""''''-a ~1 ,...' ,.\:;....'. . V, ''f ~1c_'a;::JH t-;,\\:.\,~.~-)....-\,\),-\t\\.) ~~""'r1.-o;. {,\' --' \,-;;,,,:"1i~::io'~~,,:X:'~ \-'~'" \ \;;~' .;.~~! ";'.'.t,:: ~:--\'-:, \'"'i'\'t;";,.\:f'--'" :).~....~(~ \;:::'1:)n,:o;;::,. ,--"'~.. :,>;- <;, > ':.,:,-_ X:::::' ,.:-0,;:...'-- .'....~ ;.-?, t:.-y'&--- _....::;-'-C>. ,--;;..'.\--\::\.I..J:' ~:,'" \\;\-'\ >.---\--~5 ~..~. _~.- \ c.:;:q,::-~,... .:.s;::'\ ~;-:>:'-1.-~;\t;A\' " ~;1\s~~~~It'~~~\i~i\~llii%\%r\-- __\-:\;\:i~;~\~~~(:;A~\~=~-;:ri\; ;-:~:'~2~\*,~~~\{~~'~~~~\~~~~~~\;t~~{~~r~'~~"\~) \.~~~~;~i~i\\~~\v}~.(.' .\1t~~?).tB~:~\f. ~~\ \?~\~\~\\.1J;';,g~ ~~). ':~:"~'-:~\\'S\~~~\-\ J ~s:l;'~>V;\~\\1S l\-'J.-~\:\',%.-\"'.'\.J;,:::t:\';)-"'i-~::'\-->':'~lntH,__ ,--1,0:1:\ \ \.).. ,I' ,.___,.V'.......\.t-';X, ,~;~-;, ..\'.-:'-'o-'r;'"t--:\-'S-~.. '.:;:"~ \-?i:-\r:\'). \-~p) ~,.~-:,..---.\ ',.:;:;\.>' 1 _".->----- \..;::::>, \". {-.:"I 1.\1." ."'.'. "'. 'I' ~(....:-. ,... ...---l.,.... Ah',I--'"' _.,- 't:j...-. ~'\" r A. f"-'_''-''~~~'" ',J \ '\..'t';::\::;::\~;\-).O,'~ _::r-.:-~:,.-'-- \ ~~,'0:0:I!\:';~- \C.-\ \ ;\\-\~5)'i8~.~....\').J .;- I, A:<;';,,"-y-_.\.,-t:'~l---- -';.iI~"j'+-\ - \'; \,;,--.._,)J....U .,.-.,', \ ~'-' -, ,,-'t-\.--\"',.~,,\;.:>.' .,-" i ~ '.>-\\f}~).~ \..----"" \-""\,.,,>, ~\~~\\.1--..'''':: '\\ \'--\\-d....'~\-'SV.\.I-":~' ';VC\\.~-' ') \, ~\Y<":;.\~.\~:>-'"i. ~>~:\?t~~S\\;%[i~~~\ \~t~~.;t-A;,;~~~?~\~#"~'r/ / .\ ;.1 ~ \..C 'n\...'k...~.,.0\ \\\\',._.v:-~$l; j'k_\\ _"" 1\:}\\~~{~;\t\{\iJi:~\ - rl' ~~;\/C\(~.- ) 1:-;:;\,.-- \-----~-- ATTACHMENT 3 RESOLUTION NO. 2005-116 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE FILING OF A GRANT APPLICATION TO THE HAZARD ELIMINATION SAFETY (HES) PROGRAM FOR FUNDS TO IMPROVE TRAFFIC SIGNAL AND PEDESTRIAN FACILITIES AT FOURTH A VENUE AND K STREET, AND CERTIFYING THE COMMITMENT OF MATCHING FUNDS WHEREAS, the intersection of Fourth Avenue and K Street lies just north of Chula Vista High School and is used during the school year by a large number of school-aged pedestrians; and WHEREAS, the current traffic signal system at the intersection would benefit from updating and improvements to enhance safety conditions for both pedestrians and motorists; and WHEREAS, sidewalk and cross-gutter improvements are also required at the intersection in order to comply with current Americans with Disabilities Act (ADA) design standards; and WHEREAS, the estimated costs for the project can be met through a combination of Hazard Elimination Safety (HES) grant funds administered by Caltrans, and local matching funds; and WHEREAS, City staff recommends that the City apply for the RES Grant; and WHEREAS, grant requirements include Council certification that matching funds are available and committed for those projects. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby: I. Approve the filing of an application for local assistance funds from the Hazard Elimination Safety (BBS) Program for the Fourth Avenue and K Street traffic signal project; and 2. CertifY that the City has or will have available, prior to commencement of any work on the projects, the required ten percent match. Presented by Approved as to form by ~\:k,{<J~ ,,\W~~, Ann Moore City Attorney 8-7 Resolution 2005- I 16 Page 2 PASSED, APPROVED, and ADOPTED by the City Council of the City ofChula Vista, California, this 12th day of April, 2005, by the following vote: AYES: CounciImembers: Castaneda, Davis, McCann, Rindone and Padilla NAYS: CounciImembers: None ABSENT: Councilmembers: None At c9~ Stephen C. p1dilla, Mayor ATTEST: ::-- _;; u /1 ~ --;~ C ~ Susan Bigelow, MMC, City~lerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2005-116 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 12th day of April, 2005. Executed this 12th day of April, 2005. :::: ~.LUjLL ~'~ 6~ Susan Bigelow, MMC, City Cle , 8-8 RESOLUTION NO. 2005-358 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING CONTRACT FOR THE UPGRADE OF THE TRAFFIC SIGNAL AT SECOND AVENUE AND H STREET PROJECT (TF- 326/TF-311) TO HMS CONSTRUCTION, INCORPORATED AND APPROPRIATING FUNDS AS A LOAN FROM TRAFFIC SIGNAL FUNDS WHEREAS, the TF-311 project's budget is to fund the upgrade of two signalized intersections at First Avenue/H Street and Second AvenuelH Street. Staff separately advertised each of the signal locations in order to properly document the contract for the upgrade at Second Avenue and H Street after it was authorized for Hazard Elimination Safety (HES) funding; and WHEREAS, on February 10, 2005, Caltrans authorized the construction of federal project number STPLH 5203 (018), Upgrade of Traffic Signal at Second Avenue and H Street. Staff advertised the project on May 27,2005 and opened bids on June 22, 2005; and WHEREAS, all three bids received were found to be non-responsive based on the incomplete bids. On August 8, 2005, City Council approved the rejection on all of the bids and the re-advertisement of the project. This project was re-advertised on August 19,2005; and WHEREAS, costs for traffic signal work have gone up due to general increases in equipment and labor costs since the project was appropriated. For this project, additional staff costs have arisen due to federal documentation/authorization process requirements and further design changes in plans to accommodate the federal requirements, as well as the re- advertisement process described above; and WHEREAS, additional staff time was also required during the construction of the traffic signal at the intersection of First Avenue and H Street due to the contractor's staffing changes. AEC Contractor's main field supervisor left the company in the middle of the signal installation, which created delays in the frequent/daily inspections by City inspectors; and WHEREAS, four contractors submitted bids to perform the work as follows: Contractor ! Bid Amount HMS c:()!l~~cti()~, Inc-,?rp~~t~d (San Marcos: CA) i $102,016 T & M Electric dba Perry Electric (Santee, CA) ! $106,750 Lekos Electric, Incorporated eEl Cajon, CA) : $ I 08,400 - -.. ---------r-- Select Electric, Incorporated (Spring Valley, CA) : $144,200 WHEREAS, the low bid, submitted by HMS Construction is below the engineer's estimate of$102,350 by $334 (0.3 %). HMS Construction has installed traffic signal projects in the City with satisfactory performance. All bids submitted were complete; and 8-9 Resolution No. 2005-358 Page 2 WHEREAS, after completion of the traffic signal installation work at First Avenue and H Street, the remaining project account balance was $58,340 out the $250,000 total budget amount for both First A venue/H Street and the Second A venuelH Street intersections; and WHEREAS, staff requests that Council approve the estimated additional traffic signal appropriation of $71,660 required to complete the subject projt:ct. The intersection at Second A venue and H Street signal upgrade will ultimately be reimbursed up to $95,040 of HES federal funding upon the completion of the project in early summer of2006; and WHEREAS, there are no impacts to the General Fund and the available balance of the Traffic Signal Fund is sufficient to allow the appropriation. Upon completion of improvements at Second Avenue and H Street, normal annual signal energy and preventive maintenance costs are estimated to be $5,500 for the intersection; and WHEREAS, the Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act and has determined that the project qualifies for a Class 1 categorical exemption pursuant to Section 15301 of the State CEQA Guidelines. Thus, no further environmental review is necessary. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and award the contract for the Upgrade of Traffic Signal at Second Avenue and H Street (TF-326rrF-31I) project to HMS Construction, Incorporated in the amount of $102,016 and authorizes staff to appropriate funds in the amount of $71,660 from the Traffic Signal Fund needed to complete the project. BE IT FURTHER RESOLVED that the Mayor of the City of Chula Vista is hereby authorized and directed to execute said contracts on behalf of the City of Chula Vista. Presented by Approved as to form by ~d~k~ Sohaib AI-Agha Resolution No. 2005-358 Page 3 PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 1st day of November, 2005, by the following vote: AYES: Councilmembers: Castaneda, McCann, Rindone, and Padilla NAYS: Councilmembers: None ABSENT: Councilmembers: Davis ,J& /(i,f2 cL (z Stephen C. Padilla, Mayor ATTEST: ~Lu~B~ ~ ~ Susan Bigelow, MMC, City erk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2005-358 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 1st day of November 2005. Executed this 1 st day of November 2005. ~' ) -: 1.u 6.....L 1 ~ Susan Bigelow, MMC, City erk 8-11 RESOLUTION NO. 2006-025 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING A $238,500 GRANT FROM THE HAZARD ELIMINATION SAFETY (HES) PROGRAM; AND AMENDING THE FISCAL YEAR 2006 CAPITAL IMPROVEMENT PROGRAM BUDGET BY APPROPRIATING THE GRANT FUNDS AND A $50,000 CITY MATCH INTO THE "HE'S IMPROVEMENTS AT 4TH AND K" PROJECT , FROM THE TRAFFIC SIGNAL FEE FUND' WHEREAS, the intersection of 4th Avenue and K Street lies just north of ChuIa Vista High School and is used during the school year by a large number of school-aged pedestrians; and WHEREAS, the current traffic signal system at the intersection requires updating and improvements to enhance safety conditions for both pedestrians and motorists; and WHEREAS, sidewalk and cross gutter improvements are also required at the intersection in order to comply with current Americans With Disabilities Act (ADA) design standards; and WHEREAS, the City has been awarded a grant from the Hazard Elimination Safety (HES) Grant Program to help meet project costs; and WHEREAS, total project costs can be met through a combination of HES grant funds and local matching funds; and WHEREAS, FlEJiil grant funds are disbursed to the City on a reimbursement-only basis and as such, project funds must be initially appropriated from another available funding source; and WHEREAS, sufficient Traffic Signal Fee funds are available for the necessary appropriation. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of ChuIa Vista does hereby 1. Accept $238,500 in unanticipated Hazard Elimination Safety (HES) Grant Program funds; and 8-12 Resolution No. 2006-025 Page 2 2. Amend the Fiscal Year 2006 Capital Improvement Program budget by appropriating $288,500 into the "HES Improvements at 4th and K" Project (TF-341), from the available balance of the Traffic Signal Fee Fund. Presented by Approved as to form by 4/f-'~~ ~ Sohaib Al-Agha City Engineer (\\'Mq~~\~~~\~ Ann Moore ' City Attorney PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 24th day of January 2006 by the following vote: AYES: NAYS: ABSENT: Councilmembers: Castaneda, Chavez. McCann. Rindone, and Padilla Councilmembers: None Council members: ~ ATTEST: - ~ ~L/~~/ ...-J Susan Bige ow, MMC, City k STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certifY that the foregoing Resolution No. 2006-025 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 24th day of January 2006. Executed this 24th day of January 2006. .~ ~~/~~~ Susan Bigelow, MMC, City Cler R-13 RESOLUTION NO. 2006- RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR CONSTRUCTION OF HES TRAFFIC SIGNAL IMPROVEMENTS AT FOURTH A VENUE AND K STREET (TF-341) TO LEKOS EJjECTRIC, INC. AND APPROPRIATING FUNDS THEREFORE WHEREAS, the City of Chula Vista [City] has been granted $238,500 of CalTrans Hazard Elimination Safety [HES] funds which is to be applied towards improvements at the intersection of Fourth Avenue and K Street; and WHEREAS, the City created Capital Improvement Project TF-341 and appropriated $288,500, which included the HES grant funds and a $50,000 City match, into the TF-341 Project fund from the available balance of the Traffic Signal Fee fund; and WHEREAS, the City issued a Request for Proposals for the improvements and two bids were received; and WHEREAS, the low bid, submitted by Lekos Electric, Inc. [Lekos], for $232,702 is above the engineer's estimate of $21 0,000 by $22,702 (II %); and WHEREAS, $313,500, consisting of the $232,702 bid received from Lekos, the design costs associated with the TF-341 Project, and contingency funds, is necessary to complete the improvements; and WHEREAS, an appropriation of an additional $25,000 into the TF-341 Project from the Traffic Signal Fund is required; and WHEREAS, there are sufficient funds available in the Traffic Signal Fund; and WHEREAS, the Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined the project qualifies for a Class I categorical exemption pursuant to Section 15301 (d) of the State CEQA Guidelines. Thus, no further environmental review is necessary. NOW, THEREFORE, be it resolved by the City Council of the City ofChula Vista that it accepts bids and awards the contract for construction of HES traffic signal improvements at Fourth Avenue and K Street (TF-341) to Lekos Electric, Inc. BE IT FURTHER RESOLVED by the City Council of the City of Chula Vista that it appropriates an additional $25,000 to Project TF-34I from the available balance of the Traffic Signal Fund. 8-14 Presented by Approved as to form by Leah Browder Acting Director of Engineering '---I~~ !l ,~~ ~ Ann Moore City Attorney J:\Attomey\ELISA\RESOS\Reso TF341 HES Traffic Signal Fourth and K.doc 8-15