City Planning Commission
Agenda Item for Meeting of January 22, 1992
Page 1
3. PUBLIC HEARING: EIR-91-03, Salt Creek Ranch
A. BACKGROUND
This Supplemental Environmental Impact Report (SEIR) has been prepared
for the City of Chula Vista to evaluate the proposed Salt Creek Ranch
Sectional Planning Area (SPA) Plan. This document is a supplement to the
Salt Creek Ranch Annexation/General Development Plan Pre-Zone EIR (EIR
89-3, certified in September 1990).
The California Environmental Quality Act (CEQA) of 1970 requires the
preparation of an EIR or other CEQA environmental document for any
discretionary action under consideration by the City of Chula Vista. The
purpose of an EIR is to inform the public and the decision makers about
the nature of a project being considered and the extent and kinds of
impacts the project would have on the environment if the project were to
be implemented.
This SEIR addresses potential environmental consequences of the Salt
Creek Ranch SPA Plan, currently under consideration by the City of Chula
Vista. The SEIR covers effects on the environment which are peculiar to
the current Salt Creek Ranch SPA Plan and associated offsite facilities,
as well as impacts that require an updated analysis and/or were not
previously addressed in detail.
The City of Chul a Vi sta is the Lead Agency for the project and will be
responsible for action on the project. Other responsible agencies
include the City of San Diego, the County of San Diego, the Cal ifornia
Department of Health Services, Local Area Formation Commission (LAFCO),
California Department of Fish and Game, United States Fish Wildlife
Service, Otay Water District, San Diego Gas and Electric, Sweetwater High
School District and Chula Vista Unified School District.
This Draft SEIR was circulated to the State Clearinghouse in a timely
fashion for the Planning Commission hearing. However, the State did not
distribute or begin their 4S-day review until several days after
receiving the document. And because state law requires that local review
extend longer than the State review period a continuance will be
necessary as our local regulations provide that the public review period
ends at the close of the public hearing.
However, we can 1 i mit the purpose of the cont i nued pub 1 i c heari ng to
receiving only comments from the State Clearinghouse. The Commission
could then proceed with a staff presentation and full publ ic hearing as
scheduled.
B. RECOMMENDATION
Open the public hearing, take any testimony relevant to the Draft SEIR
and continue the heari ng until February 12, 1992 for the purpose of
receiving comments from the State Clearinghouse.
City Planning Commission
Agenda Items for Meeting of January 22, 1992
Page 2
C. PROJECT DESCRIPTION
The principal components of the Salt Creek Ranch plan (see location maps)
includes 2,817 residential units (773.1 acres), neighborhood parks (31.0
acres), two elementary school sites (24 acres), a fire station site (1.3
acre), two community purpose facility sites (7 acres), natural open space
and major roads. A habitat enhancement plan, contained in Appendix A,
has been prepared for the project to mitigate impacts to biological
resources as required by the EIR for the CDP and the conditions of the
California Department of Fish and Game Streambed Alteration Agreement.
The Salt Creek Ranch project is divided into three planning sub-areas.
Each sub-area would contain one or more individual neighborhoods.
Sub-area 1
Thi s area cons i sts of the 380-acre area west of Salt Creek, north and
south of East H Street. East H Street and Lane Avenue would provide the
primary access to the low medium and medium density residential areas
within Sub-area 1 (see sub-area map, attached). Residential projects
include both attached and detached housing. Densities vary from 4 in the
single-family neighborhoods to 15.5 dwelling units per acre in the
multi-family area. Lot sizes in the single-famiy neighborhoods range
from an average of 5,800 to 8,000 square feet. Transitional buffers
would be provided between residential housing units within Sub-area 1 and
the EastLake Technology Park to the south. A 10-acre school and 7-acre
park site in the western port i on of the sub-area woul d be connected to
the rest of the community by a trail system. This trail system is
incorporated into an open space greenbelt which sets Sub-area 1 back from
the southerly employment area from 20 to 150 feet.
There are three neighborhoods within Sub-area 1. Neighborhood 4a will be
developed with apartments in the 15.5 dwell ing units per acre range.
Neighborhood 5 and 6 will be developed as a townhome neighborhoods at 8.6
dwelling units per gross acre.
Sub-area 2
This area consists of the 241-acre area east of the Salt Creek and west
of the Otay Lakes drainage basin. East H Street and Hunte Parkway would
provide primary access to the low and low-medium density residential
areas located within Sub-area 2. Sub-area 2 is planned as a transitional
area between higher density uses west of Salt Creek and larger lot areas
in the eastern portion of the project. Sub-area 2 contains two low
density neighborhoods of single family homes (Neighborhoods 7b and 8) and
a low-medium density neighborhood along the northern edge (Neighborhood
7a). Sub-area 2 (Neighborhoods 7b and 8) contains lot sizes which
average 10,170 to 12,670 square feet. Neighborhood 8 is proposed as a
private-gated community. Sub-area 2 also contains the Salt Creek
greenbelt, a 23-acre community park, 10-acre school site, and trails.
City Planning Commission
Agenda Items for Meeting of January 22, 1992
Sub-area 3
Sub-area 3 consists of 584-acre area in the eastern portion of Salt Creek
Ranch and contains much of the hillside and valley terrain on the
property. Primary access to the low density residential areas is to be
provided by East H Street. Access to properties north and east of
Sub-area 3 will be provided through Neighborhood 11. Single-family
detached units on large lots are proposed. The lot sizes range from
15,000 square feet to more than one acre in size. An equestrian trail
would run along the eastern-most drainage.
Page 3
D. ISSUES FOUND NOT TO REQUIRE FURTHER ANALYSES
Those issues areas considered not to require further analyses beyond that
discussed in the General Development Plan EIR-89-3 listed below:
Conversion of Agricultural Land (addressed in EIR-89-3)
Geology/Soils (addressed in EIR-89-3)
Air Quality (addressed in EIR-89-3)
Fiscal Analysis (addressed in EIR-89-3)
Public Services/Utilities (addressed in EIR-89-3)
Police Protection
Fire Protection
Schools
Parks, Recreation and Open Space
Gas, Electricity, Energy
Public Transit
Library Facilities
Solid Waste Disposal
E. ENVIRONMENTAL ISSUES DISCUSSED IN THE SEIR
Each of the issues areas/sections 1 isted below were identified by the
City of Chula Vista as potentially significant impacts requiring an
updated analysis and/or new analysis beyond that discussed in EIR-89-3.
The SEIR reviews in sufficient detail these potential issues associated
with implementation of the project, constituting the scope of this SEIR:
Land Use
Landform/Aesthetics
Hydrology
Water Quality
Biological Resources
Cultural Resources
Transportation and Circulation
Noise
Public Services and Utilities (Water and Wastewater)
Offsite Areas of Impact
City Planning Commission
Agenda Items for Meeting of January 22, 1992
Page 4
F. IMPACT ANALYSIS
As is noted below in this summary, the direct project related impacts can
be mitigated to a level below significant, however, there would be
cumulatively significant impacts in the following areas:
Aesthetic/landform Alteration
Water Supply
Coastal Sage Habitat loss
Summary
1. land Use
Potential compatibility impacts would exist with adjacent properties
and developments.
The SPA Plan proposes speci fi c techni ques to ensure compat i bil ity
with adjacent land uses. This EIR identifies sensitive surrounding
area and specifies mitigation to provide adequate buffer and design
at those boundaries/areas to ensure compatibility.
Inconsistencies with the General Plan involve the residential
densities and the provision of affordable housing. Measures include
the provision of affordable housing as determined by the 1991/92
Housing Element revisions to be adopted by City Council.
2. landform/Aesthetics
Urbanization will permanently alter existing topography, views to
the site and aesthet ic character of the area. Measures requi re
detailed Open Space and landscape Plan; sensitive grading, design
standards; natural open space preservation; greenbelt and scenic
highway view treatments; and extensive buffer treatments to be
created at the SPA Plan and subsequent stages (see Section 13 below).
3. HvdroloQV
The increase
project wi 11
downstream.
in impervious surface as a result of the proposed
change drainage courses and increase flow rates
Additional hydrologic analysis is required prior to final map
approval to specify facilities (size, dimension, etc.) necessary to
handle'onsite and downstream flows after development no significant
impacts are forecast.
4. Water Oualitv
The proposed project woul d create potential water qual ity impacts
due to short-term impacts from construction activity as well as the
long-term effects of urban development.
City Planning Commission
Agenda Items for Meeting of January 22, 1992
Page 5
The project shall be subject to review and approval by the State
Department of Health Services (DHS). The project shall implement
mitigation measures as set by DHS prior to issuance of any grading
permi t. Other measures i ncl ude the preparation and approval of a
diversion ditch plan (or acceptable plan), an onsite mitigation
monitoring program, an erosion control plan, and a storm drain plan.
5. BioloQicaL Resources
Project development will significantly and directly impact riparian
wetl ands, coastal sage scrub, native grassl and habita ts, and thr.
California gnatcatcher and cactus wren, both sensitive species. The
additional SPA impact to riparian habitat is 0.2 acre.
To mitigate additional SPA impacts to 0.2 acre of riparian habitat,
ERCE recommends creation/enhancement of riparian habitat.
Construction practices and long-term urban activities present
secondary threats to adjacent and/or sensitive non-development
areas. Impact mitigation includes construction activity limitations
to protect resource preservation areas; revegetation with native
species in fire break and cut slope areas; clearing and trimming
restri ct ions; fenci ng and 1 andscape buffering around natural open
space areas; and long-term protection of natural open space areas by
dedication of a natural open space easement (see Section 13 below).
6. Public Services and Utilities
Water:
The project will demand 1,531,531 gpd of potable water and 18B,139
gpd of reclaimed water for a total average water demand of 1,719,670
gpd.
Impacts related to water can be adequately offset by requirements
cited in Section 3.9. Regional cumulative water supply impacts can
be slightly reduced by water conservation mitigation herein.
7. Waste Water
The project will generate approximately 788,800 gpd of waste water.
Mitigation measures include the approval of a Master Plan of
Sewerage for the project and the payment of waste water development
fees. Ultimate capacity of the Telegraph Canyon and Salt Creek
Interceptor will be determined prior to approval of final grading
plan s .
City Planning Commission
Agenda Items for Meeting of January 22, 1992
8. TransDortation and Circulation
Page 6
The project would generate 31,290 daily vehicle trips with 2,777
trips expected during the morning peak hour and 2,986 trips expected'
during the afternoon peak hour. Since the project site is currently
vacant, generation of these trips would be additional to those trips
already on the street network.
Major improvements to the surrounding roadway networks have been
identified to mitigate the traffic impact of this project.
r~provement~ ner~ssary as a result of implementation of the SPA Plan
are outlined in Section 3.7 Mitigation.
9. tiQill
Traffi c-generated and urban noi se wi 11 resul t from project
implementation. Onsite future noise levels due to cumulative
traffic will require onsite noise attenuation along various roadways.
For the project to comply with the City of Chula Vista standards,
mitigation and exterior noise impacts must be incorporated into the
project design. An additional interior acoustical analysis will be
required for all multi-family residences located within the 60 dBA
ldn contour.
10. Prehistoric Resources
The potential impacts to prehistoric resources as a result of
implementation of the SPA Plan are identical to those that would
have occurred with implementation of the GDP.
Sixteen if the 18 important sites will be directly impacted by the
project. Portions of six of those sites, and one additional site,
are also at risk of indirect impacts due to phased development Df
the project. Al so, the site possesses a high potential for the
existence of paleontological resources.
Recommended mitigation includes avoidance and/or data recovery of
important cultural resources. This involves a complete data
recovery program for cultural resource sites, and paleontological
monitoring during grading and, if necessary, a salvage program for
resources discovered (see Section 13 below).
Offsite Area of Imoact
11. BioloQV
Hunte Parkway. A total of 13.8 acres of various habitats would be
impacted. Additional impacts from the construction would total 19.7
acres. Any proposed impacts to disturbed wetlands would be
considered significant.
City Planning Commission
Agenda Items for Meeting of January 22, 1992
Page 7
Measures include enhancement of riparian habitat as 1:1 ratio to any
impacted wetlands. Prior to construction a final 1603 Streambed
Alteration Agreement must be obtained from the California Department
of Fish and Game.
East H Street. Approximately 5.0 aces of high quality coastal sage
scrub would be lost. Additional impacts from the construction
corridor would total 6.0 acres of coastal sage scrub. Potential
impacts to coast barrel cactus and California gnatcatcher are
considered significant.
Measures include a strategy of avoidance, habitat enhancement, and
preservation.
Reservoir/Waterl ine. Impacts to coastal sage scrub and Cleveland's
golden star are considered significant.
Measures include a combination of avoidance and habitat enhancement.
12. Landform/Aesthetics
Short-term visual impacts will occur during the construction of
Hunte Parkway, East H Street, and the waterl ine/reservoi r. Short
term visual impacts are not significant due to their limited
duration and temporary nature. No mitigation is required.
The pad elevation of the reservoir is higher than the elevation of
the project site and would be visible from most of the surrounding
area.
Measures to mi t igate the vi sua 1 impact of the reservoi r incl ude
landscaping the site and painting the tank an unobtrusive color.
13. Cultural Resources
Hunte Parkwav. Construct ion of both the proposed interceptor 1 ine
and Hunte Parkway will affect portions of CA-SDi-12,037;
CA-SDi-12,038; and CA-SDi-12,039 and Isolate 1-314.
Mitigation of impacts to important cultural resources can be
achieved through either avoidance or by conducting a data recovery
program.
East H Street. Construction of both the 10-inch pipeline and
proposed East H Street segment will affect portions of site
CA-SDi-4,530/W-643, which has been tested and determined to be
important pursuant to CEQA criteria.
City Planning Commission
Agenda Items for Meeting of January 22, 1992
Page 8
Mitigation of impacts to important cultural resources can be
achieved through either avoidance or by conducting a data recovery
program.
Water Reservoir/Waterline. Both direct and indirect impacts of
equipment staging and access may affect cultural resources
CA-SDi-ll,403 Locus F; CA-SDi-ll,403 Locus G; CA-SDi-ll,415;
CA-SDi -12,030, CA-SDi -12,301; CA-SDi -12, 032; CA-SDi -12,031 ;
CA-SDi-12,034; CA-SDi-12,035; CA-SDi-12,036; CA-SDi-12,260; and
CA-SDi 12,261.
Mitigation of impacts to important cultural resources can be
achieved through either avoidance or by conducting a data recovery
program.
G. FINAL SPA PLAN DESIGN ALTERNATIVE
The Final SPA Plan design (Sec. 5.3) would maintain the same total land
use acreage (1,197.2) as the proposed project. However, the amount of
acreage allotted for residential, open space, and institutional
development would be redistributed. The total number of dwelling units
(2,662) would be less than the proposed project by 155 dwelling units.
The residential density for both designs is the same at 3.6 dwelling
units per acre. Open space acreage is 11.4 acres less with the Final SPA
Plan. Public facilities acreage is slightly less than the proposed
project by 1.2 acres. As described in the SEIR, this final design
alternative would have the same or less significant impacts as the
described project in Section 2.0 of the SEIR. The analysis in the EIR
and the summary are adequate for this alternative.
WPC 0080p
a:
''-~ w ~!;E
~a:
<- b~
~O
~> a:
wa: w
WW en
~en w
en~ a:
.
,.~
'-2&1
i
I~--
. ~
!
j
~
~..
!
i
. I
11'-
er;:,
II(~
III
I
I
III.
Iii
~j
i
. dlhp
o II 1:2~ I.'!~ I!! Ii ...
Z 81 !~ ~~ III 3 g
~[Et]0mOOK]
3
IIi
.
III
I
[I .
i
-
g
of