Loading...
HomeMy WebLinkAboutRCC AGENDA PK 1995/05/08negative declaration PROJECT NAME: Northeast Corner of Interstate 5 and 'L PROJECT LOCATION: Northeast corner of Interstate 5 an ASSESSOR'S PARCEL NO.: 571-250-18 & 20; 571-170- PROJECT APPLICANT: City of Chula Vista Planning De CASE NO: IS-95-20 DATE: April 21, ]99. A. Project Settine The project site, consisting of two parcels totalling ±4.0 acres, contains a .5 acre Park & Ride lot. The remaining portion of both parcels is vacant. Surrounding land uses include San Diego Trolley tracks and multiple family dwellings to the east, I-5 to the west, a truck rental yard ro dte south and a vacant site to the north (zoned ILP). Mature California Pepper trees exist on a portion of the site. There are no sensitive plant or animal resources on the site. The average graded slope of the site is 2%. In 1975, the Ciry Council approved the placement of the I-L-P (Limited Industrial subject to Precise Plan modifier) zone on this site. However, this site, which previously consisted of excess freeway right-of-way property, did not have a General Plan land use designation applied to it. As a result of inquiries by the current property owner, the City staff realized that a General Plan designation ,was needed to demonstrate compliance with underlying zonine. B. Proiect Description The proposed project consists of an amendment to the Land Use Diagram of the General Plan to designate a 4.0 acre site as Research and Limited Manufacturing. The amendment will enable possible future development of the site as an unspecified industrial land use. An industrial land use could result in impacts to such areas as traffic, noise, schools, glare, etc. However, environmental analysis will be required when such a proposal is submitted to the City. Given the size, location and configuration of the site, its development potential appears to he limited. As a result, the environmental analysis for a specific use on the project site is expected to find that potential environmental impacts are less than significant. Future discretionary actions necessary for development of the site include approval of a Precise Plan. oily of ~~rr~ :..~.: ehula vista planning dapartmant Q1Y OF _ anvlronmantal nvlaw aadbn . CHUTA VLSTA C. Compatibility with Zonine and Plans The project involves an amendment to the General Plan to allow for furure development of a site which is currently designated on the General Plan Land Use Diagram, however, the site is zoned ILP. The proposed General Plan designation of the site to Research and Limited Manufacturing will be consistent with nearby industrial land uses, the San Diego Trolley line, and the ILP zone. A required Precise Plan will ensure that the project is compatible with surrounding uses. D. Compatibility with Zonin¢ and Plans The project involves an amendment to the General Plan to allow for future development of a site which is currently not designated in the General Plan text, but is designated as Open Space on the General Plan land use diagram and zoned ILP. The proposed General Plan designation of the site to Research and Limited Manufacturing will be consistent with surrounding industrial land uses and the ILP zone. A Precise Plan as required in the ILP zone will ensure that the project is compatible with surrounding uses. E. Identification of Environmental Effects An initial study conducted by [he City of Chula Vista (including the attached Environmental Checklist Form) determined that the proposed project will not have a significant environmental effect, and the preparation of an Environmental Impact Report will not be required. This Negative Declaration has been prepared in accordance with Section 15070 of the State CEQA Guidelines. The following is a discussion of impacts which have been determined to be less than significant Land Use The nearest residential development exists over 100 ft. from the project site, on the east side of the San Diego Trolley right-of-way. This residential development, consisting of multiple family dwellings fronting on Colorado Street, is not expected to be adversely impacted by the any development proposal anticipated for the subject site, which could result through subsequent proposals. However, as stated previously, any subsequent development proposal will require separate environmental analysis. A "conceptual" master plan for beautification of the MTDB right-of-way was approved by the City Council in 1988, which included the subject site. The property, both the privately- owned and City-owned parcels, are designated for use as a park on the "conceptual" master plan. The City Council authorized participation in implementation of landscaping at "E" and "H" Streets, however, no authorization or approval has occurred for the subject site or other areas. In addition, the site does not appear in the Parks and Recreation Element of the General Plan as a proposed park. The General Plan Amendment to designate the site Research and Limited Manufacturing will result inconsistency with the existing ILP zone and current development potential and not preclude the City's ability to require enhanced project landscaping, consistent with the MTDB right-of-way landscaping program, if and when future development is proposed. This would also be consistent with Precise Plan Guidelines WPC F.AHOMEVPLANNINGASTOREDAI@0.97Ref. 1021.93.1022.931 PdgE ~ currently applied to the project site through the ILP zoning, which calls for enhanced landscaping as a "gateway" to the City. Schools As noted with the project description, amendment of the site's General Plan designation to Research and Limited Manufacturing from its presently non-designation condition is necessary as a "clean-up" amendment to allow use of the site pursuant to its ILP zoning classification established in 1975. No development proposal is being made at this time. Both the Chula Vista Elementary School District and the Sweetwater Union High School District have expressed a necessity to fully mitigate any impacts associated with future student generation as may be tied to possible future industrial development on the subject site. Absent a development proposal, emollment impacts which may generate from future development on the site cannot be specifically determined at this time. However, given the size, location and configuration of the site, and its related limited future development potemial, school enrollment impacts which may be tied to future development on the site are projected to be individually insignificant. From the standpoint of cumulative impacts, Harborside Elementary School, Chula Vista Junior High School and Chula Vista High School, within whose attendance areas the subject site lies, are presently operating above capacity. Therefore, any additional enrollment impact, no matter how individually insignificant, is seen as adding to already overcrowded conditions, and the school districts are requesting provision for full mitigation of any potential furure enrollment impact beyond that which would be mitigated through payment of State-mandated building permit fees. At present, the Ciry and both school districts, in conjunction with SourcePoint (the non-profit arm of the San Diego Association of Governments), are working on a joint srudy to identify and quantify the various sources of enrollment increase and their impacts, and to develop equitable methods for mitigating these impacts. As a result, future development on the project site shall be required to fully mitigate any associated impacts to local schools to the satisfaction of the school districts, as determined in accordance with the provisions of the aforementioned study and related mitigation program(s), or with whatever mitigation program(s) is in effect at the time of building permit issuance. E. Mandatory FindinQS of Significance 1. Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause fish or wildlife population to drop below self-sustaining levels, threaten levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory? The Initial Study indicated that there are no endangered species or sensitive biological resources on the project site, which is located in a developed area of the Ciry and surrounded by industrial uses, a freeway and trolley tracks. The General Plan Amendment to allow for an industrial use on the site will not have a significant WPC F:HOMEVPLANNING~STORED11020.97Ref. I(nl 93.1022.931 Page 3 adverse effect on the quality of the natural environment, reduce the habitat of a fish or wildlife species, or eliminate a plant or animal community. 2. Does the project have the potential to achieve short-term environmental goals to the disadvantage of long-term environmental goals? The proposed General Plan amendment will allow for the possible future development of a 4.0 acre area (consisting of two parcels) for an industrial use. Environmental review will be required when such a proposal is submitted to the City. Given the size, location and configuration of the site, and its related limited future development potential, the environmental analysis of a specific use is expected to determine that impacts are less than significant. In addition, development of the parcel will also be subject to precise plan review. Future review of a specific proposal will ensure compliance with long-term goals. 3. Does the project have possible effects which are individually limited but cumulatively considerable? As used in the subsection, "cumulatively considerable" means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects. The development of the proposed site could have an incremental effect on the surrounding uses. Environmental review will be required when such a proposal is submitted to the City and impacts will be determined and mitigated. School impacts of the proposed amendment, as discussed in section D of this document, will be mitigated prior to issuance of a building permit to ensure that impacts are less than significant. This will ensure that the proposed development on the site will not have any effects which are cumulatively considerable. 4. Will the environmental effects of a project will cause substantial adverse effects on human beings, either directly or indirectly. The proposed project is in compliance with threshold standards for fire, police, and other public services as discussed in the threshold section of the Initial Study. Therefore, a General Plan Amendment to allow for an industrial use on the project site will not cause significant environmental impacts to humans, either directly or indirectly. F. Consultation 1. Individuals and Or¢anizations City of Chula Vista: Susan Vandrew, Planning Roger Daoust, Engineering Cliff Swanson, Engineering Hal Rosenberg, Engineering Bob Sennett, Planning Ken Larsen, Director of Building & Housing WPC F~.\HOME\PLANNING\STORED\1020.97Ref. 1021.93, 1022.93) Page 4 Carol Gove, Fire Marshal Crime Prevention, MaryJane Diosdada Marty Schmidt, Parks & Recreation Dept. Ann Moore, Assistant City Attorney Duane Bazzel, Planning Ed Batchelder, Planning Paul Manganelli, Planning Chula Vista City School District: Kate Shurson Sweetwater Union High School District: Tom Silva Applicant's Agent: Paul Manganelli 2. Documents Chula Vista General Plan (1989) and EIR (1989) Title 19, Chula Vista Municipal Code MTDB Right-of-Way Conceptual Master Plan (1988) 3. Initial Study This environmental determination is based on the attached Initial Study, any comments received on the Initial Smdy and any comments received during the public review period for this Negative Declaration. The report reflects the independent judgement of the Ciry of Chula Vista. Further information regarding the environmental review of this project is available from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 91910. ~ P ~„/ l~~~Qsc~/,l y~o7/~~' ENVIRONM TAL R IEW CO RDI TOR EN 6 (Rev. 5/93) WPC F:AHOMEVPLAN NINGASTOREDA10209IRef. 1021.93, 1022.93) negative declaration PROJECT NAME: Eastlake Affordable Housing Program PROJECT LOCATION: ASSESSOR'S PARCEL NO. PROJECT APPLICANT: CASE NO: IS-95-21 Eastlake N/A Ciry of Chula Vista 276 Fourth Avenue Chula Vista, CA 91910 A. Project.Settina/Description DATE: April 20, ]99'_ Eastlake I - Hills, Shores, Village Center, Business ___..__ _ The Eastlake ]development, which includes the Hills and Shores residential neighborhoods, was approved in 1985, and includes a total of 1,834 units, of which ]O1 low-income housing units were provided. These residential neighborhoods have been completed with a resultant total of 9 low-income units constructed in excess of the minimum requirement. This Program will address the following partially or undeveloped portions of Eastlake. Eastlake II -Greens, Trails. The Eastlake II development was approved in November, 1989, and authorized a total of 4,034 housing units involving both the Greens and Trails neighborhoods. The Greens included 2.774 housing units and the Trails 1,260 units. In December, 1993, the Ciry Council considered and approved an amendment to the Genera] Plan for 44 acres within the Greens which resulted in the potential increase of 418 units to the Greens. Subsequent approvals by the Ciry will be required to establish the exact number of units, however, this could bring the total number of units within the Greens and Trails to 4,452. At present, only about 32% of the approved units (1,032 utrits) within the Greens have been completed or have started construction and no units have final authorization for construction within the Trails. The total number of low-income housing units required to be constructed within the Greens is 160', with a commensurate total of 160 moderate-income housing units (5% / 5%). The Ciq~ Council authorized the total low-inwme housing units Cor the Greens to be reduced to 4°ic oC the project requirement (128 units). with 6% for moderate-income units (192 units). it it is Cound that a total o(5%low-income units are not [ound to be feasible. See (ootnoie #? for additional provisions applied to the Trails wPC F.~HOMEVPLANNING~STORED`d 020.9IRef- 1021 93.1022.93 elty of ehuN Wsto ptrnntnp ttepntmont t7tY OF onvironmontai ntvltw Netbn . CHULA VLSTA Affordable housing requirements for the Trails amounts to a total of 63 low-income and 63 moderate-income units (5% / 5%). Eastlake III -Woods, Vistas, Business Center Phase II, Olympic Training Center. The Vl'oods and Vistas have General Development Plan-level approvals for a total of 1,767 housing units, which would amount to 88 low and 88 moderate-income units (5% / 5%).' Subsequent levels of Ciry Council approval will still be required prior to authorization to construct units within the Woods and Vistas. Eastlake Land Swao In 1990, Eastlake Development Company and the Baldwin Company executed an exchange of adjacent land holdings to create more logical geographic planning boundaries between the Eastlake and Otay Ranch development projects; hence the reference "Land Swap". The Land Swap area contains 161 acres and is authorized at the General Plan-level only, which would authorize approximately 739 units at mid-range densities. Subsequent planning approvals are expected within the next several years, however, development timing for the area would likely be coordinated with that of the adjacent Otay Ranch. The total number of ]ow-income housing units estimated for the Land Swap properties is 37, with a commensurate total of 37 moderate-income housing units (5% / 5%). Olympic Training Center (OTC) The Olympic Training Center facility, located on 160-acres adjacent to Lower Otay Reservoir will contain a variety of open sports fields, ancillary conference and training buildings, and 300-400 dormitory units for athletes. Construction of the OTC, which commenced in 1992, is expected to be phased over the next few years. Subsequent to approval of the OTC, the City Council authorized an amendment to the Genera] Plan for the adjacent Vistas neighborhood in Eastlake III, to provide support commercial and residential land uses next to the OTC. The Eastlake Development Company has expressed interest in receiving affordable housing credits for the installation of athlete's dormitory units within the OTC. The Task Force has examined the potential and appropriateness of this approach, and while there was no consensus reached on this issue, the Task Force requested that further consideration be given to affordable housing credits for the OTC dormitories. B. Compatibility with Zoning and Plans The primary site #1 is designated as residential medium-high which would permit 348 dwelling units at mid point of the density range, however, the current entitlement permits 4.5 ' A Development Agreemem between the Ciq~ of Chula Vista and the Eastlake Development Company wvering the Eastlake III development area (also including the Eastlake Trails neighborhood), was approved in 1990. 'Ibis agreement states that the City acknowledees shat low and moderate income housing may he economically impractical to build at current density levels, and that the City aerees that it will consider granting Developer density bonuses and!or o[her ineemives. N'PC F.`,HOt.fE`PLAVNIRG`.STOREDJ020.9IReL 10'1.93.I@'.93i Page 2 dwellling units per acre which would permit 108 dwelling units. By bringing the entitlement density into conformity with the General Development Plan density opportunities for the provision of affordable housing would be achieved. There are no adopted em~ironmental plans or policies that could result in a conflict because of this project. There are no agricultural resources that would be impacted by this project. This project is on the edge of the Eastlake project surrounded by a High School, a major utility element, the furure SR-125, a planned major street and an enclosed water storage facility. This project is at both a project level and a program level. Therefore, this environmental analysis must also be at both levels. The above analysis is at a project level of analysis for Phase I-Immediate effort. The following is a prograrmatic analysis of the Phase II Furure- efforts of the Eastlake Affordable Housing Program. Project site 719 may be in conflict with the GDP/GP, however, as with each of the project sites, more precise analysis will be necessary; this site may not appropriate for the proposed use. The project may be in conflict with the existing Genera] Plan or zoning. However, as future proposals under the policies are developed they will be the subject of further and more detailed environmental analysis to determine the precise level of impact. Almost all of the project site has been used for agricultural purposes for over 100 years and much of the site has been graded. The exception is site #9 within the Phase II area. This potential site involves on site biological resources and is adjacent to the Salt Creek Maritime Coastal Sage habitat area. The evaluation of this site is at a Phase II programmatic level and nmst be further studied at the time of more specific analysis, this site may not be appropriate for further analysis. C. Identification of Environmental Effects An initial srudy conducted by the City of Chula Vista (including the attached Environmental Checklist Form) determined that the proposed project could have one or more significant em~ironmental effects. Specific mitigation measures will be implemented to reduce these effects to a ]eve] below significant. With mitigation, no significant environmental effects will occur, and the preparation of an Environmental Impact Report will not be required. This Mitigated Negative Declaration has been prepared in accordance with Section 15070 of the State CEQA Guidelines. D. Mitigation necessarv to avoid significant effects Specific project mitigation measures are required to reduce potentially significant environmental impacts identified in the initial study for this project to a level below significant. Mitigation measures have been incorporated into the project. A. More precise development plans will be reviewed to determine if there is any potential impact with the existing General Plan or zoning designations. B. Site #t9 in Phase II will be evaluated with furure discretionary actions to determine what, if any, impact there will be on Maritime Coastal Sage. tiPC F. WHOM E~.PLAN ~'ING~.STORED~7 W0.93 Rel. 1 W 1.93. 1022.93) E. Mandatory Findings of Sienificance I. Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause fish or wildlife population to drop below self-sustaining levels, threaten levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory? The project site has been used for agricultural purpose for over a hundred years; there are no significant resources present. There are no habitats of fish or wildlife present. Therefore, there will be no reduction of population levels below aself- sustaining ]eve] effected. There are no cultural resources present. 2. Does the project have the potential to achieve short-term environmental goals to the disadvantage of long-term environmental goals? There are no long term environmental goals that specifically effect this project site or project. Therefore, there are no short-term impacts which will impact long-term goals. 3. Does the project have possible effects which are individually limited but cumulatively considerable? As used in the subsection, "cumulatively considerable" means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects. The adoption of this Eastlake housing program will not have any cumulative adverse impacts on the environment. Rather, the program will promote a broader housing base with a wider range of housing prices and types. 4. Will the environmental effects of a project will cause substantial adverse effects on human beings, either directly or indirectly. The proposed project is in compliance with threshold standards for fire, police, and other public services as discussed in the threshold section of the Initial Study. The project site will not cause significant environmental impacts to humans, either directly or indirectly. F. Consultation Individuals and Oreanizations City of Chula Vista: Roger Daoust, Engineering Cliff Swanson, Engineering Hal Rosenberg, Engineering NPC r.~HO'.~1 P~PLANNINC,STORED'.I020.93 Re! 10:1 93.1022.931 Bob Sennett, Planning Ken Larsen, Director of Building & Housing Carol Gove, Fire Marshal Crime Prevention, MaryJane Diosdada Marty Schmidt, Parks & Recreation Dept. Ann Moore, Assistant City Attorney Chula Vista Ciry School District: Kate Shurson Sweetwater Union High School District: Tom Silva Applicant's Agent: Eastlake Affordable Housing Taskforce City of Chula Vista 276 Fourth Avenue Chula Vista, CA 91910 2. Documents Chula Vista General Plan (1989) and EIR (1989) Title 19, Chula Vista Municipal Code Draft of "A Program for the Provision of Affordable Housing within the Eastlake Community", Dec. 1994 3. Initial Study This environmental determination is based on the attached Initial Study as well as any comments on the Initial Study and this Mitigated Negative Declaration, and reflects the independent judgement of the Ciry of Chula Vista. Further information regarding the environmental review of the project is available from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 91910. A ENVIRONM NTAL RE W COORDINATOR EN 6 (Ree. 5/93) H'PC F.'HOME~PLANKING~STOREDAI O309TRef. 1021.93. 10.3-937 page $