Loading...
HomeMy WebLinkAboutRCC AGENDA PK 1995/10/23negative declaration PROJECT NAME: Reconstruction and resurfacing of Brow Street. PROJECT LOCATION: Broadway, from Naples Street to At ASSESSOR'S PARCEL NO.: See Attached PROJECT APPLICANT: City of Chula Vista/Engineering Del CASE NO: IS-94-08 DATE: 10/ 16/95 A. Project Setting The project consists of approximately 3/4 of a mile of roadway reconstruction and widening and is located in the Montgomery Community. A portion of the project lies within the Southwest Redevelopment Area. The reconstruction will occur primarily from Naples to Palomar and a comprehensive widening of the roadway is planned from Palomar to the southern terminus of the project. Approximately 3.25 acres of earth will be graded to accommodate various types of roadway improvements. These improvements will consist of driveway construction, curb and gutter construction, sidewalk construction, A.C. pavement and raised/landscaped medians. Current surrounding land uses include: high-density residential, retail and thoroughfare. B. Project Description The project involves the reconstruction and resurfacing of Broadway from Naples Street to Anita Street. This project will extend Broadway to its ultimate width. Curb inlets will be upgraded to adequately convey runoff away from the roadway. Also, existing medians will be replaced and traffic signals will be upgraded. Street trees will need to be included to the satisfaction of the City Landscape Architect. These improvements will bring Broadway into compliance with the Circulation Element of the General Plan. The discretionary action for this project is the granting of the construction contract. C. Compatibilitu with Zoning and Plans Surrounding zoning includes: CTP, CC, CCP, R-3, R-3P and 5-94. The current surrounding General Plan Designations include: high-density residential, thoroughfare, retail and open space. This project will conform to these General Plan Designations and the Circulation Element of the General Plan. ~`~~~ WPC r.AIIOMEVPLANNINGASTORLDA1020.93 (Ref. 1021.97, 1022.93) city of chula vista planning department CITY OF environmental review section CHULA VISTA D. Identification of Environmental Effects An initial study conducted by the City of Chula Vista (including the attached Environmental Checklist Form) determined that the proposed project will not have a significant environmental effect, and the preparation of an Environmental Impact Report will not be required. This Negative Declaration has been prepared in accordance with Section 15070 of the State CEQA Guidelines. E. Mitigation necessary to avoid significant effects The proposed project will not result any significant or potentially significant environmental impacts, therefore, no project specific mitigation is be required. F. Consultation Individuals and Organizations City of Chula Vista: Keith Barr, Planning Barbara Reid, Planning Roger Daoust, Engineering Cliff Swanson, Engineering Hal Rosenberg, Engineering Bob Sennett, Planning Ken Larsen, Director of Building & Housing Carol Gove, Fire Marshal MaryJane Diosdada, Crime Prevention Marty Schmidt, Parks & Recreation Dept. Ann Moore, Assistant City Attorney Chula Vista City School District: Kate Shurson Sweetwater Union High School District: Tom Silva Applicant's Agent: Roger Daoust 2. Documents Chula Vista General Plan (1989) and EIR (1989) Title 19, Chula Vista Municipal Code 3. Initial Study This environmental determination is based on the attached Initial Study, any comments received on the Initial Study and any comments received during the public review period for this Negative Declaration. The report reflects the independent judgement of the City of Chula Vista. Further information regarding the environmental review of this project is available from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 91910. WPC F:AHOMGAPLANNINCASTOREDAI1tt0.93 (Ref. 1021.93, 1022.93) PdgC 2 ENVIRONME TAL RE EW CO RDI ATOR EN 6 (Rev. 5/93) WEC F:AHOMEVPLANNINCAS"POREDA1020.93 (Ref. 1021.93, 1@293) Page 3 i i = ... ._ ?_ ~ ' i - NAPLES STR! ! ~~ .. ~~ ' ~_~ i r = .... .... .~_ ~i ~:~. ....., ;~ ._ • ~= >- ~ C ..... o~~ '. ~`. a~ o~ :... e . J m~ ~_ •' . 1 ANITq ST ~~ .. _ i ~ -. :~! I .. ~:.. ~~+* MCS ~ _.... `~~ .~ t 1-.-~ ~' l.! :; ~:._. .... -~ .,} ~ .: .~ i.,.,;~s~~„i .' T •.. , an .~•S . ~. 1 ~Np PROJECT LOCATION: tuuunuuniiunn DRJ-W!I 8Yi I1.1-.8. PROJECT TITLE RECONSTRUCTION OF BROADWAY FROM aATE: ii~is~'i NAPLES STREET TO ANITA STREET STREET IMPROVEMENTS -BROADWAY, NAPLES STREET TO ANITA STREET (ST-143) A.2 LIST OF AFFECTED/ADJACENT PARCELS 618-200-5000, 618-200-5400 618-210-0200, 618-210-0300, 618-210-0600, 618-210-1400, 618-210-1500, 618-210-1600, 618-210-3500, 618-210-4000, 618-210-6300 .,:~ 618-142-1300, 618-142-1400, 618-142-1 500, 618-142-1600 618-152-0400, 618-152-0500, 618-152-0600, 618-152-0700 618-280-1600, 618-280-2000, 618-280-2100, 618-280-3200 618-291-1200 618-290-1200, 618-290-1400, 618-290-1500, 618-290-4100 622-041-0400, 622-041-0600, 622-041-2100, 622-041-2200, 622-041-2600, 622-041-2700 622-043-0500, 622-043-0700, 622-043-0800, 622-043-1000, 622-043-1500, 622-043-3300, 622-043-3400 622-091-3200, 622-091-3300, 622-091-3700, 622-091-3800 622-092-0500, 622-092-0600 622-092-03-07 TO 64 622-092-04-07 TO 48 622-111-3800, 622-111-3900, 622-111-4600, 622-111-4700, 622-111-4800, 622-111-4900, 622-111-5000 6 22-1 12-1400