Loading...
HomeMy WebLinkAboutRCC AGENDA PK 1995/11/06- negative declaration PROJECT NAME: Reconstruction and resurfacing of Broai Street. PROJECT LOCATION: Broadway, from Naples Street to At ASSESSOR'S PARCEL NO.: See Attached PROJECT APPLICANT: City of Chula Vista/Engineering Del CASE NO: IS-94-08 DATE: 10/ 16/95 A. Project Settine The project consists of approximately 3/4 of a mile of roadway reconstruction and widening and is located in the Montgomery Community. A portion of the project lies within the Southwest Redevelopment Area. The reconstruction will occur primazily from Naples to Falomar and a comprehensive widening of the roadway is planned from Palomar to the southern terminus of the project. Approximately 3.25 acres of earth will be graded to accotnmodate various types of roadway improvements. These improvements will consist of driveway construction, curb and gutter construction, sidewalk construction, A.C. pavement and raised/landscaped medians. Current surrounding land uses include: high-density residential, retail and thoroughfare. B. Project Descrjntion , The project involves the reconstruction and resurfacing of Broadway from Naples Street to Anita Street. This project will extend Broadway to its ultimate width. Curb inlets will be upgraded to adequately convey runoff away from the roadway. Also, existing medians will be replaced and traffic signals will be upgraded. Street trees will need to be included to the satisfaction of the City Landscape Architect. These improvements will bring Broadway into compliance with the Circulation Element of the General Plan. The discretionary action for this project is the granting of the construction contract. C. Compatibili with Zoning and Plans Surrounding zoning includes: CTP, CC, CCP, R-3, R-3P and 5-94. The current surrounding General Plan Designations include: high-density residential, thoroughfaze, retail and open space. This project will conform to these General Plan Designations and the Circulation Element of the General Plan. ~ WPC F:UIDME\PLANNING\SI'ORED\1020.93 (Ref. 1021.93, 1022.93) elty o} Chula vista planning department CItY OF environmental review section CHULA VISTA D. E. F Identification of F_nvirorLmentl Effects An initial study conducted by the Ciry of Chula Vista (including the attached Envircnmenal Checklist Form) determined that the proposed project will not have a significant environmental effect, and the prepazation of.an Environmental Impact Report will not be required. This Negative Declazation has been prepazed in accordance with Section 15070 of the State CEQA Guidelines. Mitigation necessary to avoid significant effects The proposed project will not result any significant or potentially significant envuonmenta] impacts, therefore, no project specific mitigation is be required. Individuals and Organizations City of Chula Vista: Keith Barr, Planning Bazbaza Reid, Planning Roger Daoust, Engineering Cliff Swanson, Engineering Ha] Rosenberg, Engineering Bob Sennett, Planning Ken Larsen, Director of Building & Housing Carol Gove, Fire Mazsha] MaryJane Diosdada, Crime Prevention Marry Schmidt, Parks & Recreation Dept. Ann Moore, Assistant City Attorney Chula Vista City School District: Kate Shurson Sweetwater Union High School District: Tom Silva Applicant's Agent: Roger Daoust 2. Documents Chula Vista General Plan (1989) and EIR (1989) Title 19, Chula Vista Municipal Code 3. Initial Studv This environmental determination is based on the attached Initial Study, any comments received on the Initial Srudy and any comments received during the public review period for this Negative Declazation. The report reflects the independent judgement of the City of Chula Vista. Further information regazding the environmental review of this project is available from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 91910. WPC F.\HOME\PLANNING\SfORED\1030.93 (Ref. 1031.93, 1032.93) Page 2 _ .*-.~ A ~°-^ ENVIRON NTAL REVIEW COORDINATOR EN 6 (Rev. 5/93) WPC F:\FiOME\PLANNING\SfOREDN020.93 (Re(. 1021.93, 10]2.93) Page 3 ~1 ~ r., ~ I •~ * ~ j ~ = _ ... .`T. r Z `r ~ a t t I ..`~ r ~`~N ` ' .\. r.l .. .'~r...... , •- ~ NAPLES STREET • _ ., r- i::' r .... e=~. _....... ~ ...... .. ~r ;:.~_ ._ e .~ ~ gN~TA STgE~ .. f• ' ,,,,' ~ d 3 `/; / ~ , :~, /~ ..J''' !. ,,,~ ~ II ~ ,, , PROJECT LOCATION: unnnnnnunuin DRARli /Yi A.R./. PROJECT TITLETITLE RECONSTRUCTION OF BROADWAY FROM a~-ss: li~i:~•i NAPLES STREET TO ANITA STREET