HomeMy WebLinkAboutRCC AGENDA PK 1995/11/06- negative declaration
PROJECT NAME: Reconstruction and resurfacing of Broai
Street.
PROJECT LOCATION: Broadway, from Naples Street to At
ASSESSOR'S PARCEL NO.: See Attached
PROJECT APPLICANT: City of Chula Vista/Engineering Del
CASE NO: IS-94-08
DATE: 10/ 16/95
A. Project Settine
The project consists of approximately 3/4 of a mile of roadway reconstruction and widening
and is located in the Montgomery Community. A portion of the project lies within the
Southwest Redevelopment Area. The reconstruction will occur primazily from Naples to
Falomar and a comprehensive widening of the roadway is planned from Palomar to the
southern terminus of the project. Approximately 3.25 acres of earth will be graded to
accotnmodate various types of roadway improvements. These improvements will consist of
driveway construction, curb and gutter construction, sidewalk construction, A.C. pavement
and raised/landscaped medians. Current surrounding land uses include: high-density
residential, retail and thoroughfare.
B. Project Descrjntion ,
The project involves the reconstruction and resurfacing of Broadway from Naples Street to
Anita Street. This project will extend Broadway to its ultimate width. Curb inlets will be
upgraded to adequately convey runoff away from the roadway. Also, existing medians will be
replaced and traffic signals will be upgraded. Street trees will need to be included to the
satisfaction of the City Landscape Architect. These improvements will bring Broadway into
compliance with the Circulation Element of the General Plan. The discretionary action for this
project is the granting of the construction contract.
C. Compatibili with Zoning and Plans
Surrounding zoning includes: CTP, CC, CCP, R-3, R-3P and 5-94. The current surrounding
General Plan Designations include: high-density residential, thoroughfaze, retail and open
space. This project will conform to these General Plan Designations and the Circulation
Element of the General Plan. ~
WPC F:UIDME\PLANNING\SI'ORED\1020.93 (Ref. 1021.93, 1022.93)
elty o} Chula vista planning department CItY OF
environmental review section CHULA VISTA
D.
E.
F
Identification of F_nvirorLmentl Effects
An initial study conducted by the Ciry of Chula Vista (including the attached Envircnmenal
Checklist Form) determined that the proposed project will not have a significant environmental
effect, and the prepazation of.an Environmental Impact Report will not be required. This
Negative Declazation has been prepazed in accordance with Section 15070 of the State CEQA
Guidelines.
Mitigation necessary to avoid significant effects
The proposed project will not result any significant or potentially significant envuonmenta]
impacts, therefore, no project specific mitigation is be required.
Individuals and Organizations
City of Chula Vista: Keith Barr, Planning
Bazbaza Reid, Planning
Roger Daoust, Engineering
Cliff Swanson, Engineering
Ha] Rosenberg, Engineering
Bob Sennett, Planning
Ken Larsen, Director of Building & Housing
Carol Gove, Fire Mazsha]
MaryJane Diosdada, Crime Prevention
Marry Schmidt, Parks & Recreation Dept.
Ann Moore, Assistant City Attorney
Chula Vista City School District: Kate Shurson
Sweetwater Union High School District: Tom Silva
Applicant's Agent: Roger Daoust
2. Documents
Chula Vista General Plan (1989) and EIR (1989)
Title 19, Chula Vista Municipal Code
3. Initial Studv
This environmental determination is based on the attached Initial Study, any comments
received on the Initial Srudy and any comments received during the public review
period for this Negative Declazation. The report reflects the independent judgement
of the City of Chula Vista. Further information regazding the environmental review
of this project is available from the Chula Vista Planning Department, 276 Fourth
Avenue, Chula Vista, CA 91910.
WPC F.\HOME\PLANNING\SfORED\1030.93 (Ref. 1031.93, 1032.93) Page 2
_ .*-.~
A ~°-^
ENVIRON NTAL REVIEW COORDINATOR
EN 6 (Rev. 5/93)
WPC F:\FiOME\PLANNING\SfOREDN020.93 (Re(. 1021.93, 10]2.93) Page 3
~1 ~ r., ~ I •~ * ~
j ~ = _ ... .`T. r Z `r ~ a
t t I ..`~ r ~`~N `
' .\. r.l
.. .'~r......
, •- ~ NAPLES STREET • _ .,
r- i::' r ....
e=~. _....... ~ ...... ..
~r ;:.~_
._
e .~
~ gN~TA STgE~ ..
f• '
,,,,' ~ d
3 `/; / ~ ,
:~, /~
..J''' !. ,,,~ ~ II ~ ,, ,
PROJECT LOCATION:
unnnnnnunuin
DRARli /Yi A.R./. PROJECT TITLETITLE
RECONSTRUCTION OF BROADWAY FROM
a~-ss: li~i:~•i NAPLES STREET TO ANITA STREET