Loading...
HomeMy WebLinkAboutReso 1983-11260 RESOLUTION 11260 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA RESCINDING RESOLUTIONS NOS. 11042 AND 11055~ PROVIDING FOR A SPECIAL APPROPRIATION OF FUNDS IN THE AMOUNT OF $37,478.08; APPROVING CHANGE ORDER NO.4 IN THE AMOUNT OF $43,235.08 FOR JIMMY'S- ON-THE-GREEN RESTAURANT; WITHHOLDING $4,400.00 AS LIQUIDATED DAMAGES; WITHHOLDING $1,357.00 FOR ENGINEERING, INSPECTION AND OVERHEAD COSTS; AND APPROVING RELEASE OF ALL FUNDS DUE The City Council of the City of Chula Vista does hereby resolve as fo 11 ows : WHEREAS, the City Council of the City of Chula Vista is authorized by Section 1005 of the City Charter to amend or supplement the annual budget by an affirmative vote of at least four members at any meeting after its adoption; and WHEREAS, the standard specifications for Dub1ic works construction authorize a governmental agency to change plans, specifications, character of work or quantity of work provi ded the tot a 1 ari thmetic do 11 a r va 1 ue of a 11 such changes, both additive and deductive, does not exceed 25% of the contract pri ce; and WHEREAS, the Director of Building and Housing and the Assistant City Manager have recommended certain changes in work were required and such additional work or changes could not be determined at the time of the bidding even though the bidders had inspected the job prior to submitting their bids; and WHEREAS, the Director of Building and Housing and the Assistant City Manager have recommended that $1,357.00 be withheld from all sums due for engineering, inspection and overhead costs experienced due to the extension of time granted for completion of the project from June 14, 1982 through August 31, 1982; and WHEREAS, the Director of Building and Housing and the Assistant City Manager have recommended that liquidated damages be levied at the rate of $100.00 per working day for the period of September 1,1982 through November 4, 1982; and WHEREAS, the Director of Building and Housing and the Assistant City Manager have recommended that Change Order No.4 totaling $43,235.08 represents additional work required that could not be reasonably anticipated under the original plans and specifications. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby approve Change Order No.4 in the amount of $43,235.08 for additional work as specified in Attachment "A" and "B", attached hereto and incorporated herein, and that the sum of $37,478.08 be appropriated from the unappropriated balance of the Residential Construction Tax Fund as a loan to the Golf Course Fund for the purpose hereinabove set forth; and BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista approves assessing liquidated damages for untimely completion of the project under the terms and conditions of the plans and specifications in the amount of $4,400.00, representing 44 working days for the period of September 1, 1982 through November 4, 1982 at the rate of $100.00 per day; and -2- BE IT FURTHER RESOLVED that Resolution No. 11042 adopted by the City Council on October 19, 1982 approving Change Order No.2 be and is hereby rescinded; and BE IT FURTHER RESOLVED that Resolution No.11055 adopted by the City Council on November 2, 1982 appropriating $18,393 for Change Order No. 2 but used for an offset of lost rents for the period September 1, 1982 through November 9, 1982 is hereby rescinded; and BE IT FURTHER RESOLVED that the extra work items as shown on Attachments A and B, totalling $43,235.08 are hereby approve~ and BE IT FURTHER RESOLVED the Director of Finance be, and is hereby directed to record this Council action in the accounting records of the City. PRESENTED BY APPROVED AS TO FORM BY ~~ t<-\\~00 ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 24th day of May 19 83 , by the following vote, to-wit: AYES: Councilmen Cox, Moore, McCandliss, Scott None NAYES: Councilmen ABSTAIN: Councilmen Malcolm ABSENT: Councilmen None fl~ he City of Chula Vista ATTEST f~t1-~ Deputy City Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO 5S. CITY OF CHULA VISTA I, PATRICIA A. GUARDACOSTA, DEPUTY CITY CLERK of the City of Chula Vista.. California.. DO HEREBY CERTIFY that the above and foregoing is a full.. true and correct copy of RESOLUTION NO. 11260 . and that the same has not been amended or repealed. DATED jJ~ ti- ~ Deputy City Clerk (SEAL) :-660 (pag) . Attachment A Explanation of Extras: 1. Johnson Construction a. Framing for additional Air Conditioning unit required when Banquet Room was extended without updating mechanical specs on plans. b. Framing and installation of second pocket door for service station access to 19th Hole lounge. c. Install oak framing in both the Banquet and Gazebo rooms. d. Install sub floor in the service area and restrooms adjacent to the 19th Hole lounge to allow for floor tile. e. Remove and replace floor joist and sub flooring in south end of Fairway room and adjacent service station to support floor tile. f. Replumb north exterior wall in the Fairway room to meet code requirements. Total Extras *Amount Paid Amount Due 2. Strang Heating and Air Conditioning a. Purchase and installation of airconditioning unit to meet additional demands due to the extension of the banquet facilities. Total Extras *Amount Paid Amount Due 3. KDR Specialties a. Install new ceiling tile and T-bar in Gazebo room that was originally bid to be repainted. Interior design consultant stated that the old material would always appear patched and would distract from the over-all quality of the project. Total Extras *Amount Paid Amount Due *Amont previously approved but withheld from payment. /f- //;1 (; 0 379.00 450.00 250.00 1,400.00 645.00 3,492.00 6,616.00 5,537.00 $1,079.00 2,990.16 2,990.16 None $2,990.16 3,250.00 3,250.00 3,250.00 None Attachment A Conti nued 4. BCR Inc. a. Added modernfold carpet to all wall panels to reduce sound from 50 to 35 DPA after inspecting and upon the recommendation of Kaiser Steel. b. Added three passage doors to insure public safety through ready access to exists, original request included these but was underestimated. Total Extras *Amount Paid Amount Due 5. Sweetwater Authority a. Upon request for one each 6 and 2 inch meters the Sweetwater Authority required an engineering fee. b. Before meters could be installed the Sweetwater Authority required an easement survey. c. Final meter installation. Total Extras *Amount Paid Amound Due 6. Horni n and Morgan' ns. a. At t awarding the con ract and ~ a part of the "0 ectives" c tained the Spe ifications Alj AI.\.QUI~"" for Reno tion and pansionl document, the City IV~J of Chula 'sta requir a perf rmance Bo which Jimmy's was naware of hen try g to red e the bid to stay w thin the C y's bu et requir ents. Total Extra *Amount Paid Amount Due 7. Active Air Conditioning a. At the request of the City of Chula Vista to meet budget requirements through a 45,000.00 cut in the bid, the contractor selected an alternate heating and air conditioning sub-contractor, at a savings of 15,000.00. The original listed sub required a legal settlement for the lost contract. Total Extra *Amount Paid Amount Due *Amount previously approved but withheld from payment. //~6o 3,400.00 1,027 .00 4,427.00 3,400.00 $1,027.00 500.00 175.00 5,530.00 6,206.00 6,206.00 None 8,000.00 8,000.00 None $8,000.00 3,500.00 3,500.00 None $3,500.00 r Attachment A Conti nued 8. a. lot ~'-l.'UI It. 0 Total Extra Amount Paid Amount Due 9. Rand E Electric In order to insure safety and improve the quality of service the following electrical additions were required: a. Weather proof box fixture for outside Pro-Shop b. Building communication wiring , c. Provide and install hanging light fixtures in 19th Hole lounge. d. Provided and hung fixtures in Banquet hallway storage. e. Cut and installed 110 outlet in stainless counter. f. Installed one (1) additional outlet in island in mai n lounge. g. Building rewiring to meet R.W. Smith equipment changes from 110 to 220 volts. h. Wire and install automatic door closers in banquet rooms. i. Wi re and hook up fi r'e guard system to meet new standards to provide for shut-down of both gas and electricity whereas old standards provided only for gas. j. Replace six (6) dimmers with larger units to meet demands beyond those originally anticipated. k. Additional wiring for Banquet Room air conditioning. 1. Rewire three (3) kitchen units to meet wiring presently available; such rewiring was less expensive than changing existing equipment. m. Safety covers for receiving and working area lights to prevent breakage during normal activity. Total Extras Amount Paid Amount Due //;(&,o 1,360.00 1,360.00 None $1,360.00 66.00 1,051. 00 989.00 270.00 71.00 152.00 806.00 332.00 497.00 661.00 625.80 1,679.00 218.00 7,417.80 None $7,417.80 I let Attachment A Conti nued 10. Custom lighting extra a. Additional wrought iron fence adjacent to Gazebo Room fire door exit direct foot traffic toward open area adjacent to Pro Shop. Total Extra Amount Paid Amount Due 12. Donis Decorating a. Sealed walls and lower beverage storeroom to meet Health Department standards Total Extra Amount Paid Amound Due 14. Steve Flores Tile Company a. Set tile around exterior window bases on south and west sides of building to stop discoloaration of stucco due to lawn and plant irrigation, and alter first step by Gazebo Room to prevent possible accidents. Total Extra Amount Paid Amount Due 19. Chris's Backhoe a. In order to meet ceiling sprinkler system demands, a separate water supply system required trenching for additional water line. Total Extra Amount Paid Total Due 20. Bob Crowley a. In order to provide assistance to Hoke Plumbers in hooking up fire guard and ceiling sprinklers, Mr. Crowley was hired as a technical specialist to insure proper completion of the task. Tota 1 Extra Amount Paid Amount Due 1f'Z//orbO 224.99 224.99 None $ 224.99 200.00 200.00 None $ 200.00 1,000.62 1,000.62 None $1,000.62 585.00 585.00 None $ 585.00 500.00 500.00 None $ 500.00 ~ Attachment A Conti nued 21. U.S. Industries a. Additional materials required to connect the fire sprinkler system water line in accordance with Sweetwater Authority standards. Total Extra Amount Paid Amount Due 22. Rent A Bin a. To comply with complaints from golfers and in order to keep up with the trash generated in the final phase of construction, extra trash bins were required. Total Extra Amount Paid Amount Due 23. Jimmy's Maintenance a. Materials and construction of storeroom shelving in Banquet Rooms. b. Materials and installation of sub flooring in Fairway Room and 19th Hole. Carpet sub would not guarantee work unless sub flooring was up- graded. c. R. W. Smith requested an increase in the size of the beverage storeroom. Job required removal of chain link storage fence and framing and siding of beverage storeroom, to allow both the City of Chula Vista cart maintenance area and the beverage storage area to have separate operating and security systems, and to provide adequate storage. Total Extras Amount Paid Amount Due /-1/dbO 1,951.51 None $1,951. 51 216.00 216.00 . None $ 216.00 416.28 2,485.39 1,248.33 4,150.00 None $4,150.00 ATTACH~1ENT B 1. New ceiling tile and grid for dining room no. 1 $ 3,250 The bid documents on this item called for replacement of missing tile and painting. The Lessee/Contractor made the decision to replace the grid system and tile without our prior approval because in his judgment the finished cei~ino would look patched and would detract from the overall appearance of the dining room. Without question, the replacement of ceiling tile in this doning room will make a significant improvement in the overall appearance of the facility. With the number of tiles missing and the construction of the gazebos, we can support the additional cost of this improvement. 2. Plumb north wall of dining room no. 1 3,492 The top plate of the north wall was out of plumb four inches which required a 10-day delay in the work while the structural engineer pre- pared design and structural calculations to make the wall structurally sound. This type of problem would not be known to the contractor when bidding and is a justified change order. 3. Upgrade banquet room panels 3,400 The Lessee/Contractor during the course of construction made trips to look at several banquet room movable walls and after viewing them again made an independent decision to upgrade the partitions by adding carpeting to them. We agree that the added carpeting made them far more attractive and also improved the sound transmission level to 37 decibels. The original specifications only called for solid wood movable panels but with the addition of the carpeting it does enhance the banquet rooms and lowers the sound transmission to a C rating which enhances the use of the rooms for banquets and meetings which is a benefit to the City as well as the Lessee. We can support this change order. 4. Sweetwater Authority fees 6,206 For building, the Sweetwater Authority would not quote any fees to the bidders. Some of the bidders typed on the bid document that the bid price includes the Sweetwater Authority fees, other bidders included an estimate amount to cover the fees. We tried to get the Sweetwater Authority to give an estimate of fees to be paid and they would not give a quote. This is a legitimate request for a change order. 5. Replace flooring in golfers lounge 1,400 Over the past years water damage had occurred due to leakage from the bar sink and the restrooms causing delamination of the plywood subfloor. New floor covering, expecially ceramic tile, coudl not be laid over the existing plywood, hence the need to install a new subfloor. 6. Replace flooring and add floor joist in Room #2 645 The same water damage as noted in Item 5 caused deterioration of the floor joist system structurally damaging the floor joist making the replacement of the joists necessary ~-//~t.o TOTAL COST OF OVERRUNS ATTACHr~ENT B $18,393