Loading...
HomeMy WebLinkAboutReso 1985-11960 RESOLUTION NO. 11960 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING TENTATIVE MAP FOR EASTLAKE I VILLAGE AND BUSINESS CENTER - CHULA VISTA TRACT 84-7 The City Council of the City of Chula Vista does hereby resolve as follONS: WHEREAS, the City of Chula Vista Planning Connnission held a duly advertised and noticed public hearing at 7:00 p.m. on February 27, 1985 to =nsider Chula Vista Tract 84-7 proposed by the EastLake Development Company, am. WHEREZ\S, the Planning Commission recoI!U1lended approval of the tentative subdivision map by a vote of 6-0, and WHEREZ\S, the Planning Commission made the fOllONing findings: Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative subdivision map for EastLake Village and business center, Chula Vista Tentative Map Act 84-7, is found to be =nsistent with the EastLake General Development Plan and Sectional Planning Area Plan adopted by the Chula Vista Ci ty Council and the Ci ty' s General Plan based on the following findings: a) Land Use Element - the Specific Plan designates the area for connnercial/industrial use which includes over 400 dwelling units, 7 acres of park land, and nearly 70 acres of open space. The Plan specifies that the Village Center could accommodate approximately 310,000 square feet of retail space. b) Circulation Element - all of the on-site public roads will be installed as shONn on the adopted SPA Plan as well as various off-site improvements which involve the widening of Telegrafh Canyon Road, the extension and widening of "H" Street, the construction of a north-south road identified on the Plan as SR 125, as well as other minor off-site road connections. c) Housing Element - the proposed project will provide for a mixture of affordable and senior housing types within the Village Center. 119 low income units will be required of this subdivision. -1- d) Parks and Re=eation and Open Space Elements - the proposed project will result in the retention of approximately 70 acres of natural open space and 7 acres of park land within the industrial area. The aJrount of land and the locations comply with the adopted Sectional Planning Area plan. The developer is maintaining a. substantial area in natural open space in coordination with the adjacent natural areas presently established adjacent to the EastLake Development. In addition, other areas of manufactured slopes will be placed in permanent open space belts and landscaped scenic routes to provide buffer areas between the main traffic arteries and the =mmercialj industrial development. A paleontologist will be required to be on the site during the critical grading period so that valuable specimens can be re=vered and catalogued and re=rded. e) Seismic Safety Element - the closest identified fault in the area is the La Nacion Fault located over 2 miles to the west. The Environmental Impact Report indicates that the Coronado Banks Fault, which is most likely to affect the project site with ground shaking, is located some 20 miles from the project area. There are no inferred faults located within the subject site. Specific mitigation relating to slope stability and techniques dealing with fill slopes will be incorporated in the grading of the project. All dwelling units within the project will be required to be designed so as to not exceed the maximum interior noise level of 45 dBI\. Additionally, all exterior private open space will be shielded by a combination of earth berms, walls, or buildings. Subsequent noise studies will need to be prepared when precise plans for specific developments are submitted. f) Scenic Highway Element - Manufactured slopes adjacent to "H" Street have been designed to undulate and vary in steepness and both "H" Street and Telegraph Canyon Road will have extensive landscaping planned to soften and beautify their appearance. In addition, a landscaped median is being provided and de=rative walls (or attention to building designs) will be used in areas Where development interfaces with "H" Street or Telegraph Canyon Road. Building locations, design and signing will all be controlled through the use of development standards incorporated in the PC Regulations to ensure compliance wi th the Scenic Highway Element. -2- \~ ~ \,b ~-\ g) Bicycle Routes - the proposed development will include bicycle lanes on the major streets such as "H" Street as well as the interconnects wi th the loop roads which will link up with bicycle paths camecting the elementary school and various parks within the development. "H" Street is identified in the Bicycle Routes Element as a major bicycle link. h) Public Building Elements - the applicant has identified and offered for dedication and is obligated for construction or financing of a fire station, dedication of a library site, provision of an interim store froot library in the Village Center and construction of a park and ride facility. In addition, the applicant is obligated to dedicate and construct a high school site located off-site of this subdivision but within the Eastlake ownership located on the south side of TelegraIil Canyon Road. WHEREAS, the City Council has considered the effect of this approval of the housing needs of the region and has balanced those needs against the public service needs of the residents of the City and the available fiscal and environmental resources as required by Sections 66412.3 of the Subdivision Map Act, and WHEREAS, the approval of the Planning Commission is subject to the following cooditions: 1. The developer shall be required to dedicate and/or construct all public improvements and facilities, determined by the City to be necessary to serve the EastLake Business Center and Village Center area. Specific requirements shall be as specified in each filase of development in conjunction with the proposed recordation of final maps as follows: Ref. Public Facilities Financing Plan. Defined Improvements Said improvements shall include but not be limited to: A.C. pavement, base, curb, gutter, sidewalk, landscaped islands, sewer and water utilities, drainage facilities, street lights, signs, and street trees. Also, pavement markings and conduit, pull boxes, signal standards with luminaires only mounted on ultimate bases, and service points for future traffic signals shall be provided. ,,0 ~ov. l?-' -3- A. \00 -::::- C\. ~' Unit #1 !bads* Water Sewer B. Unit #2 Ibads* Parks C. Unit #3 Roads* D. Uni t #4 Public Areas en-Site #5 (Road A) #6 (!bad C) #7 (!bad D) #8 (!bad F) #18 Telegraph Canyon a:1. 1/2 street section #9 (Reservoir) #10 (Pump Station/Main) #11 (Trunk) en-Site #19A (EastLake Pkwy) B street to Telegraph Canyon a:1. #21 (!bad B) #22 (!bad C) #23 (!bad D) #24 (Road E) #15 (Neighborhood Park) #26 ("H" St. west to 125 #27 (!bad D) #28 (!bad G) #19b B to west side Route 125 #29 #30 #31 #3lA #46 (Fire Station) (Transit Center) (Library Site) (Storefront Library) (SR 125) Off-Site Off-Site #40 (Telegraph Canyon Rd. - Otay Lakes Rd. to EastLake Pkwy) No Number -construct Connection to Proctor Valley Rd. at "HI! St. #45 (Telegraph Canyon Rd. - EastLake Pkwy to !bad A) #46 (SRl25 to #54 including the =nstruction of any bridges. All off-site facilities required to be =nstructed under the "Public Financing Plan," phasing plan and Development Agreement shall be =nstructed as an obligation of this developer. The actual aJrOunt of improvements shall be dependent upon: 1) location and extent of 2. -4- growth of other developments; 2) inprovements installed by other developments; 3) results of an annual traffic study to determine levels of service in the eastern sectors of Chula Vista. Where construction of offsite facilities is required which are of potential benefi t to other properties, consistent with the Public Facilities Financing Plan, the developer shall provide all necessary funding for such work in anticipation of future reimbursement by benefiting parties. 3. A qualified paleontological monitor shall be present at the pregrading conference with the developer. grading contractor and the Environmental Review Coordinator. The purpose of this meeting will be to consult and coordinate the role of the paleontologist in the grading of the site. A qualified paleontologist is an individual with adequate knowledge and experience with fossilized remains likely to be able to identify them in the field and is adequately experienced to remove the resources for further study. The paleontologist monitor shall be present during the grading of the SWeetwater formation (TSW) on the site. The monitor shall have the authority to tenporarily direct, divert or halt grading to allow recovery of fossil remains (primarily marine mammals). At the discretion of the monitor, recovery may include washing and picking of soil samples for micro-vertebrate bone and teeth. The developer shall authorize the deposit of any resources found on the project site in an institution staffed by qualified paleontologists, such as the Natural History of MuseLml (operated by the San Diego Society of Natural History). The developer should be aware of the random nature of fossil occurrences and the possibility of a discovery of remains of such scientific and/or educational inportance which might warrant a long term salvage operation. 4. pri= to the issuance of any grading permit or approval of any grading plan which may impact any of the loci of archeological site CA-SDi-7179 (loci A, C, D and E), the subdivider shall provide the Environmental Review Coordinator a report prepared in compliance with City standards demonstrating compliance with the mitigation measures specified in Section 3.12.3 of EIR-84-1. 5. pri= to the issuance of grading permit (f= any area) the applicant shall submit and the Ci ty Engineer, the City's Landscape ArChi tect. and Environmental Review Coordinator shall approve appropriate landscaping plans covering said area. The plans may include suCh items as supplemental canyon tree planting, slope planting and trails -5- o \~\,; Q-'\ as depicted on the overall trails plan. Signs and fencing shall also be included. Any clear ing of brush shall be limi ted to the boundary lines of grading shCM1l1 on the approved grading plan. 6. The developer shall not be required to pay OCT or PAD fees based on the subdivision plan approval obligating the developer to construct approximately 24+ acres in parks with the adjacent residential area as shCM1l1 in the SPA plan. The improvements of said parks shall be completed prior to or concurrent with each development phase, based on the City s adopted park standards. 7. The developer shall be obligated to provide a minimum of 119 low income units (80 percent or less of median income) within the EastLake Village Center area as approved by the City's Housing Coordinator. The construction of said units shall occur prior to or concurrent with construction of the retail commercial buildings with the Village Center. 8. Prior to the issuance of residential building permits for the Village area the applicant, working with the school districts, shall furnish evidence to the satisfaction of the City that the school districts are able to provide school service to the future residents of that area. 9. The rear 25 feet of lots 55-58 Which abut natural open space areas will be evaluated as to the need for fire retardant plant materials. Attempt will be made to place the material within the Open Space area controlled by the Business Association. Final selection of materials will be determined by the City's Landscape Architect. 10. The applicant shall file a copy of the CC&R s and the Master Property CMners Association with the City. Said documents shall: a. Stipulate all areas of open space maintenance required by the Master Property CMners Association. b. Require the owner of any lot and subsequent owners to maintain all required landscaping/paving/fencing and buildings in accordance with acceptable City standards. '!he Ci ty shall have the right to enter onto any private lot and perform the required maintenance and assess a charge to the individual homeowner. 11. Prior to the submittal of a final map, the applicant shall submit a master list of street nameS to cover the entire EastLake development. 12. Decorative block walls or acceptable barriers up to 6 feet in height shall be required in accordance wi th the master fencing plan for all -6- ",,0 ~e.:. ~- lots backing up to major or arterial road system. IDwer walls shall be allONed subject to final approval of landscaping plans for a given area. 13. All above-ground utility installations proposed in the right-of-way shall be identified on future site plans and placed outside of the normal 5-foot-wide sidewalk path. Additional right-of-way or appropriate easement will be required prior to approval of the site plans. 14. An open space easement shall be provided over the natural and manufactured slopes contained in those lots abutting common open space areas. Said easement shall be granted to the Master Business Association to limit future grading and control maintenance/ landscaping. 15. 'TI1e developer shall dedicate and construct the necessary transit center; fire station and interim library facilities plus dedicaticn of a I-acre permanent library site as identified in the SPA Plan and in accordance with the Public Facilities and Finance Plan and Development Agreement. (Reference Condition #1) 16. Parking shall be prohibited along EastLake Parkway, "H" Street, Telegrafil Canyon Road or FDute 125. 17. The location of fencing and buildings for L:Jt "A" shall be subject to precise plan approval by the City Planning Department. 18. Construction of all building and the authorization of any land use not contained wi thin a building shall be subject to precise plan approval and the Project Design Guidelines for the Village and Business Center. 19. All buildings, walls, signs, and landscaping located within 50 feet of the right-of-way along ei ther side of Telegraph Canyon Road (otay Lakes Road as presently identified) shall adhere to the scenic highway design criteria identified in the SPA Plan. 20. Approximately 46 corrnnercial type fire hydrants will be required. 'TI1e required fire flow will be 5,000 GPM based upon 20 PSI regional operating pressure in the street main. 21. 'TI1e developer shall grant an open space easement to the City of Chula Vista for all designated open space lots. 22. 'TI1e 7 acre private park shown in Unit #2 shall be improved by the time approximately 600,000 square feet of industrial buildings are occupied wi thin Units #1 and #2. -7- \.~ \,0 (?--" 23. On all streets having superelevation or having non-standard =oss sections, positive measures to control sheet flow across the street shall be provided to the satisfaction of the City Engineer. 24. Lot lines shall be located at the top of slopes. 25. The maximum grade at any intersection of two streets shall be 6% within the intersection and for at least 50 feet past the curb lines of each street. 26. The developer shall dedicate to the City the portion of Street "E" north of Street "c" for street purposes. 27. The developer shall grant to the City a me foot control lot at the ends of all the following streets: Street "B", Street "D", Street "E", Street "ell and East "H" Street. 28. The developer shall grant to the City lO-foot wide sewer easements for all public sewers outside of public right-of-way. Paved access to all sewer manholes and pump stations shall be provided to the satisfaction of the City Engineer. 29. The developer shall enter into an agreement with the City wherein he holds the City harmless fram any liability for erosion, siltation or increased flow of drainage occurring as a result of this project other than that resulting from the negligent acts of the City ac=nplished after completion and acceptance of any involved facilities. 30. That the developer shall measures, as listed in the project prior to approval of comply with the following environmental review document any Final Subdivision Map: mitigation for this a. Bus turnouts should be incorporated in the street designs for major intersections and benches located subject to City approval. b. The developer shall be responsible for the preparation of an analysis to determine the need for funds to subsidize the line-haul transit operations in EastLake 1. 31. An erosion and sedimentation control program shall be prepared as part of the grading plans. 32. The developer shall request the formation maintenance district for the maintenance of the the recordation of any map. All other open maintenance shall be the responsibility of association. of an open space median areas prior to space and park area the property owners -8- .0 0\,\0 ,-' <:r 33. The architectural treatment of all protective fencing required by the City Engineer where slope banks are located within 10 feet of the public right-of-way shall be subject to the approval of City Planning Director. 34. Specific methods of handling storm drainage are subject to detailed approval by the City Engineer at the time of submission of improvement and grading plans. Design shall be accomplished on the basis of the requirements of the Subdivision Manual and the Grading Ordinance (#1797 AS AMENDED). Drainage easements for all onsite and offsite facilities shall be provided as required by the City Engineer. 35. Lots shall be so graded as to drain to the street or an approved improved drainage facility. Drainage shall not flow over slopes. 36. The developer shall be responsible for the installation of all drainage facili ties approved by the City Engineer to carry drainage from the subdivision to existing adequate facilities. 37. All energy dissipators proposed shall be permanent devices such as shawn on Regional Standard Drawing D-4l or similar. 38. The developer shall grant/provide adequate drainage easements for all offsite public drainage systems. 39. The magnitude and veloci ty of peak drainage flows leaving the boundaries of this project shall be equal to or less than those under existing conditions. 40. No diversion of flows between tributary areas shall be permitted in this project. 41. The developer shall be responsible for the oorrection of any damage resulting from any drainage, siltation or erosion problem or any surface or subsurface discharge problem resulting from this project. 42. The developer shall grant/provide 10 foot sewer easements for all offsite public sewers. 43. All sewer facilities shall be designed and oonstructed in acoordance with criteria expressed in the City's Subdivision Manual. 44. Sewers serving 10 or less equivalent dwelling units shall have a minimum grade of 2%. 45. The developer shall provide adequate offsite sewer facilities (as discussed in the EIR and EastLake Sewer Study) to carry the sewage flow to existing adequate gravity sewer lines, including such a line in Proctor Valley. The developer may request the formation of a reimbursement district to finance the offsite costs. -9- :\....0 ~~\\ 46. The developer shall enter into an agreement with the City to incorporate certain assurances relative to any proposed sewer pump stations. Said agreement shall specify that the developer will be responsible for the cost of: a. Construction, maintenance, and operation of said proposed p=p station facilities. b. Construction of all sewer relief facilities needed to be provided if overload problems occur prior to the time the facilities are scheduled for construction. c. All damages might occur as a result of overloads created by this project. 47. The developer shall extend sewer lines wi thin the project to the subdivision boundary as necessary for provision of service to upstream properties. 48. All sewer lines shall be designed in accordance with City standards to a=lIIlOC>date flows from the entire related upstream gravity basin. 49. Any sewage diverted between gravity basins by pumping shall be pumped on a temporary basis only. 50. The developer shall enter into an agreement with the City of Chula Vista agreeing to disconnect those sewage flows diverted from other basins at such time that the City determines that the flaws within the system exceed the design flow for any downstream segment. The agreement shall be secured by bonds or other security to the satisfaction of the City Attorney, in a sufficient amount to provide for completion of the sewers in the appropriate gravity drainage basin. 51. All work within the public right-of-way shall be done in a=rdance with the standard specifications for Public Works construction, the San Diego Area Regional Standard Drawings and the Design and Construction Standards of the City of Chula Vista except as modified by these conditions. 52. Temporary turnarounds shall be provided at temporary stub ends of streets to the satisfaction of the City Engineer and in accordance with City policy. 53. No compound horizontal curves shall be incorporated in street designs. -10- a...",O ~.\\ 54. The developer shall grant to the City. street tree planting and maintenance easements along all public streets within the subdivision. Said easements shall extend to a line typically 10 feet from the back of sidewalk in all locations where street tree easements are granted. 55. Street lights shall be provided to the satisfaction of the City Engineer. 56. East "R" Street shall be designed for adequate sight distances using a 60 mph design speed. 57. East "R" Street shall have a design speed for horizontal alignment of 50 mph. 58. The developer shall pay the cost of a study to be prepared by an assessment engineer. This study shall determine the proportionate responsibility for each development in the financial plan. EastLake shall pay its fair share of costs, including the cost of said study and if required to install improvements in excess of its fair share may request reimbursement from future developers for such excess consistent with the Public Facilities and Financing Plan. 59. The developer shall pay the cost of forming a maintenance district for street lighting and landscaping to the satisfaction of the City Engineer. 60. The developer shall provide for a future traffic signal interconnect system to the satisfaction of the City Traffic Engineer. 61. Preliminary indications are that standard Traffic Signal Participation fees under City Council policy will not be adequate to cover the developer's fair share for those signal improvements needed for the streets listed in the Public Facilities Plan. Therefore, the developer shall pay his fair share as determined by the City Engineer. 62. The developer shall provide permanent traffic count stations on Telegraph Canyon Road east of Route 125 and on Route 125 at locations as determined by the City Engineer. 63. The developer shall dedicate to the City the street rights-of-way within the subdivision as shown on the tentative map. (See Condition #1 for proper sequencing.) 64. The retention/desilting basin shown on the tentative map may be relocated to any approved location at some future time. However, theiprovision of such facility as part of this project shall be permanent, unless otherwise provided for to the satisfaction of the City Engineer. -11- o..l.oV ~/\\ 65. A design study for the future vertical horizontal alignment of East "H" Street between Street "G" and and an extension of Street IIB" shall be made prior to the approval of any Final M3p for Unit 2. The results of this study shall be considered by the property owners and the City Engineer prior to the approval of any improvement plan for Unit 3. 66. Roadway improvements referred to in these amdi tions shall include but not be limited to: A.C. pavement, base, curb, gutter, sidewalk, landscaped islands, sewer and water utilities, drainage facilities, street lights, signs, and street trees. Also, pavement markings and conduit, pull boxes, signal standards with luminaires only mounted on ultimate bases, and service points for future traffic signals shall be provided. (Reference Condition ill) 67. The developer shall pay his fair share allocation for regional drainage facilities as such facilities may be established by the City. ~, the City Council considered and certified Environmental Impact Report EIR-84-l at January 29, 1985. NaY, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that the findings of the Chula Vista Planning Commission as set forth in Resolution PC8-84-7 are adopted by the City Council of the City of Chula Vista. BE IT FURI'HER RESOLVED that the Ci ty Council of the ci ty of Chula Vista approves the tentative subdivision map for EastLake I Village and Business Center, Chula Vista Tract 84-7, subject to the amdi tions enumerated in the Planning Commission Resolution PCS-84-7. Presented by Approved as to form by &ent~tor of Planning ('LRL /2 C~ Charles R. Gill, Assistant City Attorney 023la -12- ItJO \\0... 0- ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 19th 19 85, by the following vote, to_it: day of March '- AYES: Councilmen NAYES: Councilmen ABSTAIN: Councilmen ABSENT: Councilmen Cox, Malcolm, McCandliss, Scott, Moore None None None ~ !!' fA\' g,~. , /J.r ~,. ,,:;...ol . " Mayltl ot'lthe City of Chula Vista City STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) I, JENNIE M. FULASZ. CMC, CITY CLERK of the City of Chula Vista, California, DO HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 11960 ,and that the same has not been amended or repealed. DATED ( seal) City Clerk CC-660 RESOLUTION NO. PCS-84-7 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION APPROVING THE TENTATIVE SUBDIVISION MAP FOR EASTLAKE I, CHULA VISTA TRACT 84-7 WHEREAS, a duly verified application for a tentative subdivision map was filed with the Planning Department of the City of Chula Vista on November 28 1984, by the EastLake Development Company, and WHEREAS, said application requested approval of 61 commercial/industrial lots and one open space lot involving approximately 384 acres of land located north of Otay Lakes Road and directly east of SR-125, and WHEREAS, the Planning Commission set the time and place for a hearing on said tentative subdivision map application and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held at the time and place as advertised, namely 7:00 p.m., February 27, 1985, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed. NOW, THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION finds as follows: Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative subdivision map for EastLake Village and business center, Chula Vista Tentati ve Map Act 84-7, is found to be consi stent wi th the EastLake General Development Pl an and Secti onal Pl anni ng Area Pl an adopted by the Chul a Vi sta City Council and the City's General Plan based on the following findings: a) Land Use Element - the Specific Plan designates the area for commercial/industrial use which includes over 400 dwelling units, 7 acres of park 1 and, and nearly 70 acres of open space. The Pl an speci fi es that the Vi 11 age Center coul d accommodate approximately 310,000 square feet of retail space. b) Circulation Element - all of the on-site public roads will be installed as shown on the adopted SPA Plan as well as various off-site improvements which involve the widening of Telegraph Canyon Road, the extension and widening of "H" Street, the construction of a north-south road identified on the Plan as SR 125, as well as other minor off-site road connections. c) Housing Element - the proposed project will provide for a mixture of affordable and senior housing types within the Village Center. 119 low income units will be required of this subdivision. <\\,0 ~\\ d) Parks and Recreati on and Open Space El ements - the proposed project wi 11 resu1 tin the retenti on of approximately 70 acres of natural open space and 7 acres of park land within the industrial area. The amount of 1 and and the locations comply with the adopted Sectional Planning Area plan. The developer is maintaining a. substantial area in natural open space in coordination with the adjacent natural areas presently established adjacent to the EastLake Development. In additiont other areas of manufactured slopes will be placed in permanent open space bel ts and 1 andscaped scenic routes to provi de buffer areas between the main traffic arteries and the commercial/industrial development. A paleontologist will be required to be on the site during the critical grading period so that valuable specimens can be recovered and catalogued and recorded. e) Seismic Safety Element - the closest identified fault in the area is the La Nacion Fault located over 2 miles to the west. The Environmental Impact Report indicates that the Coronado Banks Faultt which is most likely to affect the project site with ground shakingt is located some 20 miles from the project area. There are no inferred faults located within the subject site. Specific mitigation relating to slope stability and techniques dealing with fill slopes will be incorporated in the grading of the project. All dwelling units within the project will be required to be designed so as to not exceed the maximum interior noise level of 45 dBA. Additional1Yt all exterior private open space will be shielded by a combination of earth bermst wallst or buildings. Subsequent noise studies will need to be prepared when preci se pl ans for specific de vel opments are submitted. f) Sceni c Hi ghway El ement - Manufactured slopes adj acent to "H" Street have been desi gned to undu1 ate and vary in steepness and both "H" Street and Tel egraph Canyon Road wi 11 have extensive 1 andscapi ng planned to soften and beautify their appearance. In additiont a landscaped median is being provided and decorative walls (or attention to building designs) will be used in areas where development interfaces wi th "H" Street or Tel egraph Canyon Road. Building locationst design and signing will all be controlled through the use of development standards incorporated in the PC Regulations to ensure compliance with the Scenic Highway Element. g) Bicycle Routes - the proposed development will include bicycle lanes on the major streets such as "W Street as well as the interconnects with the loop roads which will link up with bicycle paths connecting the elementary school and various parks within the development. "H" Street is identified in the Bicycle Routes Element as a major bicycle link. - 2 - l\~O ~ ~' h) Public Building Elements - the applicant has identified and offered for dedication and is obligated for construction or financing of a fire station, dedication of a library site, provision of an interim store front library in the Village Center and construction of a park and ride facility. In addition, the applicant is obligated to dedicate and construct a high school site located off-site of this subdivision but within the EastLake ownership located on the south side of Telegraph Canyon Road. Pursuant to Section 66412.3 of the Subdivision Map Act, the Council certifies that it has considered the effect of this approval on the housing needs of the regi on and has ba1 anced those needs agai nst the publ ic servi ce needs of the residents of the City and the available fiscal and environmental resources BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION approves the tentative subdivision map for EastLake I residential Chu1a Vista Tract 84-7 subject to the following conditions: 1. The developer shall be required to dedicate and/or construct all public improvements and facilities, detennined by the City to be necessary to serve the EastLake Busi ness Center and Vi 11 age Center area. Specific requirements shall be as specified in each phase of development in conjunction with the proposed recordation of final maps as follows: Ref. Public Facilities Financing Plan. Defined Improvements Said improvements shall include but not be limited to: A.C. pavement, base, curb, gutter, sidewalk, landscaped islands, sewer and water utilities, drainage facilities, street lights, signs, and street trees. Also, pavement markings and conduit, pull boxes, signal standards with luminaires only mounted on ultimate bases, and service points for future traffic signals shall be provided. Sewer On-Site Off-Si te #5 (Road A) #6 (Road C) #7 (Road D) #8 (Road F) #18 Telegraph Canyon Rd. 1/2 street section #9 (Reservoi r) #10 (Pump Station/Main) #11 (Trunk) - 3 - A. Unit #1 Roads* Water o ~\o ~,\.\ On-Site Off-Site B. Unit #2 Roads* #19A (Eas tlake Pkwy) #40 (Telegraph B street to Canyon Rd. - Telegraph Canyon Rd. Otay lakes Rd. #21 (Road B) to Eastlake #22 (Road C) Pkwy} #23 (Road D) #24 (Road E) Parks #15 (Neighborhood Park) C. Unit #3 Roads* #26 ("H" St. west No Number -Construct to . 125 Connection to #27 (Road D) Proctor Valley Rd. #28 (Road G) at "H" St. #19b B to west side Route 125 D. Un it #4 Pu b 1 i c #29 (Fire Station) #45 (Tel egraph Areas #30 (Transit Center) Canyon Rd. - #31 (Li brary Si te) EastLake Pkwy to #31A (Storefront library) Road A} #46 (SR 125) #46 (SR125 to #54 including the construction of any bri dges. 2. All off-site facilities required to be constructed under the "Public Financing Plan," phasing plan and Development Agreement shall be constructed as an obligation of this developer. The actual amount of improvements shall be dependent upon: l) location and extent of growth of other developments; 2} improvements installed by other developments; 3) results of an annual traffic study to determine levels of service in the eastern sectors of Chula Vista. Where construction of offsite facilities is required which are of potential benefit to other properties, consistent with the Public Facilities Financing Plan, the developer shall provide all necessary funding for such work in anticipation of future reimbursement by benefiting parties. 3. A qualified paleontological monitor shall be present at the pregrading conference with the developer, grading contractor and the Environmental Review Coordinator. The purpose of this meeting will be to consult and coordinate the role of the paleontologist in the grading of the site. A qualified paleontologist is an individual with adequate knowledge and experience with fossilized remains likely to be able to identify them in the field and is adequately experienced to remove the resources for further study. - 4 - \~~o ~_\ The paleontologist monitor shall be present during the grading of the Sweetwater formation (TSW) on the site. The monitor shall have the authority to temporarily direct, divert or halt grading to allow recovery of fossil remains (primarily marine mammals). At the discretion of the monitor, recovery may include washing and picking of soil samples for micro-vertebrate bone and teeth. The developer shall authorize the deposit of any resources found on the project site in an institution staffed by qualified paleontologists, such as the Natural History of Museum (operated by the San Diego Society of Natural History). The developer should be aware of the random nature of fossil occurrences and the possibility of a discovery of remains of such sci entifi c and/or educati ona1 importance which mi ght warrant along term salvage operation. 4. Pri or to the issuance of any gradi ng permi t or approval of any grading plan which may impact any of the loci of archeological site CA-SDi-7179 (loci A, C, D and E), the subdivider shall provide the Environmental Review Coordinator a report prepared in compliance with City standards demonstrating compliance with the mitigation measures specified in Section 3.12.3 of EIR-84-1. 5. Prior to the issuance of grading permit (for any area) the applicant sha 11 submi t and the Ci ty Engi neer, the Ci ty I S Landscape Archi tect, and Envi ronmental Revi ew Coord i nator shall approve appropri ate landscaping plans covering said area. The plans may include such items as supplemental canyon tree planting, slope planting and trails as depicted on the overall trails plan. Signs and fencing shall also be included. Any clearing of brush shall be limited to the boundary lines of grading shown on the approved grading plan. 6. The developer shall not be required to pay RCT or PAD fees based on the subdivision plan approval obligating the developer to construct approximately 24+ acres in parks with the adjacent residential area as shown in the SPA pl an. The improvements of sai d parks shall be completed prior to or concurrent with each development phase, based on the City s adopted park standards. 7. The developer shall be obligated to provide a minimum of 119 low income units (80 percent or less of median income) within the EastLake Village Center area as approved by the City's Housing Coordinator. The construction of said units shall occur prior to or concurrent with construction of the retail commercial buildings with the Village Center. 8. Prior to the issuance of residential building permits for the Village area the applicant, working with the school districts, shall furnish evidence to the satisfaction of the City that the school districts are able to provide school service to the future residents of that area. - 5 - C\60 r::?- J \\ 9. The rear 25 feet of lots 55-58 whi ch abut natural open space areas will be evaluated as to the need for fire retardant plant materials. Attempt will be made to place the material within the Open Space area controlled by the Business Association. Final selection of materials will be determined by the City's Landscape Architect. 10. The applicant shall file a copy of the CC&R s and the Master Property Owners Association with the City. Said documents shall: a. Stipulate all areas of open space maintenance required by the Master Property Owners Association. b. Requi re the owner of any lot and subsequent owners to mai ntai n all required landscaping/paving/fencing and buildings in accordance with acceptable City standards. The City shall have the right to enter onto any private lot and perform the required maintenance and assess a charge to the individual homeowner. 11. Prior to the submittal of a final map, the applicant shall submit a master list of street names to cover the entire Eastlake development. 12. Decorative block walls or acceptable barriers up to 6 feet in height shall be required in accordance with the master fencing plan for all lots backing up to major or arterial road system. Lower walls shall be allowed subject to final approval of landscaping plans for a given area. 13. All above-ground uti 1 ity install ati ons proposed in the ri ght-of-way shall be identified on future site plans and placed outside of the normal 5-foot-wide sidewalk path. Additional right-of-way or appropri ate easement wi 11 be requi red pri or to approval of the si te plan s. 14. An open space easement shall be provided over the natural and manufactured slopes contai ned in those lots abutti ng common open space areas. Said easement shall be granted to the Master Business Association to limit future grading and control maintenance/ 1 andscapi ng. 15. The de vel oper shall dedi cate and construct the necessary transi t center; fire station and interim library facilities plus dedication of a l-acre permanent library site as identified in the SPA Plan and in accordance with the Public Facilities and Finance Plan and Development Agreement. (Reference Condition #l) 16. Parking shall be prohibited along EastLake Parkway, "H" Street, Telegraph Canyon Road or Route 125. 17. The location of fencing and buildings for Lot "A" shall be subject to precise plan approval by the City Planning Department. - 6 - ~100 ~.; '\ \ 18. Construction of all building and the authorization of any land use not contained within a building shall be subject to precise plan approval and the Project Design Guidelines for the Village and Business Center. 19. All buildings, walls, signs, and landscaping located within 50 feet of the right-of-way along either side of Telegraph Canyon Road (Otay Lakes Road as presently identified) shall adhere to the scenic highway design criteria identified in the SPA Plan. 20. Approximately 46 commercial type fire hydrants will be required. The required fire flow will be 5,000 GPM based upon 20 PSI regional operating pressure in the street main. 21. The developer shall grant an open space easement to the City of Chu1a Vista for all designated open space lots. 22. The 7 acre private park shown in Unit #2 shall be improved by the time approximately 600,000 square feet of i ndustri al buil di ngs are occupied within Units #1 and #2. 23. On all streets havi ng superel evati on or havi ng non-standard cross secti ons, posi ti ve measures to control sheet flow across the street shall be provided to the satisfaction of the City Engineer. 24. Lot lines shall be located at the top of slopes. 25. The maximum grade at any intersection of two streets shall be 6% within the intersection and for at least 50 feet past the curb lines of each street. 26. The developer shall dedicate to the City the portion of Street liE II north of Street "C" for street purposes. 27. The developer shall grant to the City a one foot control lot at the ends of all the following streets: Street "B", Street "0", Street "E", Street "C" and East "H" Street. 28. The developer shall grant to the Ci ty 10-foot wi de sewer easements for all public sewers outside of public right-of-way. Paved access to all sewer manholes and pump stations shall be provided to the satisfaction of the City Engineer. 29. The developer shall enter into an agreement with the City wherein he holds the City harmless from any liability for erosion, siltation or increased flow of drainage occurring as a result of this project other than that resulting from the negligent acts of the City accompl i shed after compl eti on and acceptance of any i nvol ved faci 1 i ti es. - 7 - \c, \00 ~~\: 30. That the developer shall comply with the following mitigation measures, as listed in the environmental review document for this project prior to approval of any Final Subdivision Map: a. Bus turnouts shoul d be incorporated in the street desi gns for major intersections and benches located subject to City approval. b. The developer shall be responsible for the preparation of an analysis to determine the need for funds to subsidize the line-haul transit operations in EastLake I. 31. An erosi on and sedimentati on control program shall be prepared as part of the grading plans. 32. The deve 1 oper shall request the formati on of. an open space maintenance district for the maintenance of the median areas prior to the recordati on of any map. All other open space and park area maintenance shall be the responsibility of the property owners association. 33. The architectural treatment of all protective fencing required by the City Engineer where slope banks are located within 10 feet of the public right-of-way shall be subject to the approval of City Planning Di rector. 34. Specific methods of handling storm drainage are subject to detailed approval by the City Engineer. at the time of submission of improvement and grading plans. Design shall be accomplished on the basi s of the requi rements of the Subdi vi si on Manual and the Gradi ng Ordinance (#1797 AS AMENDED). Drainage easements for all onsite and offsite facilities shall be provided as required by the City Engineer. 35. lots shall be so graded as to drain to the street or an approved improved drainage facility. Drainage shall not flow over slopes. 36. The developer shall be responsible for the installation of all drai nage facil i ti es approved by the Ci ty Engi neer to carry drai nage from the subdivision to existing adequate facilities. 37. All energy dissipators proposed shall be permanent devices such as shown on Regional Standard Drawing 0-41 or similar. 38. The developer shall grant/provide adequate drainage easements for all offsite public drainage systems. 39. The magnitude and velocity of peak drainage flows leaving the boundaries of this project shall be equal to or less than those under existing conditions. 40. No diversion of flows between tributary areas shall be permitted in thi s project. 8 - &\00 \\-, ~." 41. The de vel oper shall be responsi bl e for the correcti on of any damage resulting from any drainage, siltation or erosion problem or any surface or subsurface discharge problem resulting from this project. 42. The developer shall grant/provide 10 foot sewer easements for all offsite public sewers. 43. All sewer facilities shall be designed and constructed in accordance with criteria expressed in the City's Subdivision Manual. 44. Sewers serving 10 or less equivalent dwelling units shall have a minimum grade of 2%. 45. The developer shall provide adequate offsite sewer facilities (as discussed in the EIR and EastLake Sewer Study) to carry the sewage flow to existing adequate gravity sewer lines, including such a line in Proctor Valley. The developer may request the fonnation of a reimbursement district to finance the offsite costs. 46. The developer shall enter into an agreement with the City to incorporate certain assurances relative to any proposed sewer pump stations. Said agreement shall specify that the developer will be responsible for the cost of: a. Construction, maintenance, and operation of said proposed pump station facilities. b. Construction of all sewer relief facilities needed to be provided if overload problems occur prior to the time the facilities are scheduled for construction. c. All damages might occur as a result of overloads created by this project. 47. The developer shall extend sewer lines within the project to the subdivision boundary as necessary for provision of service to upstream properties. 48. All sewer lines shall be designed in accordance with City standards to accommodate flows from the entire related upstream gravity basin. 49. Any sewage diverted between gravity basins by pumping shall be pumped on a temporary basis only. 50. The developer shall enter into an agreement with the City of Chula Vi sta agreei ng to di sconnect those sewage flows di verted from other basins at such time that the City detennines that the flows within the system exceed the desi gn flow for any downstream segment. The agreement shall be secured by bonds or other security to the satisfaction of the City Attorney, in a sufficient amount to provide for completion of the sewers in the appropriate gravity drainage basi n. . - 9 - \\.'\ \.oD ~. 51. All work wi thi n the public ri ght-of-way shall be done in accordance with the standard specifications for Public Works construction, the San Diego Area Regional Standard Drawings and the Design and Construction Standards of the City of Chula Vista except as modified by these conditions. 52. Temporary turnarounds shall be provi ded at temporary stub ends of streets to the sati sfacti on of the Ci ty Engi neer and in accordance with City policy. . 53. No compound horizontal curves shall be incorporated in street designs. 54. The developer shall grant to the City, street tree planting and maintenance easements along all public streets within the subdivision. Said easements shall extend to a line typically 10 feet from the back of sidewalk in all locations where street tree easements are granted. 55. Street 1 i ghts shall be provi ded to the sati sfacti on of the Ci ty Engineer. 56. East "H" Street shall be designed for adequate sight distances using a 60 mph design speed. 57. East "H" Street shall have a design speed for horizontal alignment of 50 mph. 58. The developer shall pay the cost of a study to be prepared by an assessment engineer. This study shall determine theproporti onate responsibil i ty for each development in the fi nanci a1 p1 an. Eastlake shall pay its fair share of costs, including the cost of said study and if required to install improvements in excess of its fair share may request reimbursement from future developers for such excess consistent with the Public Facilities and Financing Plan. 59. The developer shall pay the cost of forming a maintenance district for street lighting and landscaping to the satisfaction of the City Engineer. 60. The developer shall provide for a future traffic signal interconnect system to the satisfaction of the City Traffic Engineer. 61. Prel imi nary i ndicati ons are that standard Traffic Si gnal Participation fees under City Council policy will not be adequate to cover the developer's fair share for those signal improvements needed for the streets listed in the Public Facilities Plan. Therefore, the developer shall pay his fair share as determined by the City Engineer. 62. The developer shall provide permanent traffic count stations on Telegraph Canyon Road east of Route 125 and on Route 125 at locations as determined by the City Engineer. - 10 - \\ C\, 60 ~,\ 63. The developer shall dedicate to the City the street rights-of-way within the subdivision as shown on the tentative map. (See Condition #1 for proper sequencing. ) 64. The retention/desilting basin shown on the tentative map may be relocated to any approved location at some future time. However, the provision of such facility as part of this project shall be pennanent, unless otherwise provided for to the satisfaction of the City Engineer. . 65. A design study for the future vertical horizontal alignment of East "W Street between Street "G" and and an extension of Street "B" shall be made prior to the approval of any Final Map for Unit 2. The results of thi s study shall be considered by the property owners and the City Engineer prior to the approval of any improvement plan for Unit 3. 66. Roadway improvements referred to in these conditions shall include but not be limited to: A.C. pavement, base, curb, gutter, sidewalk, landscaped islands, sewer and water utilities, drainage facilities, street lights, signs, and street trees. Also, pavement markings and conduit, pull boxes, signal standards with luminaires only mounted on ultimate bases, and service points for future traffic signals shall be provided. (Reference Condition #1) 67. The developer shall pay his fair share allocation for regional drainage facilities as such facilities may be established by the City. PASSED AND APPROVED BY THE City Planning Commission of Chula Vista, California, 27th day of February, 1985, by the following vote, to-wit: AYES: Cannon, Carson, Green, Guiles, OINeil1, and Shipe NOES: None ABSENT: Tugenberg .~0~ Michael A. Green, Chainnan ATTEST: ~-/L:~ Ruth M. Smith, Secretary WPC 1782P - 11 - C\\e,O , \\ ~.'\