HomeMy WebLinkAboutReso 2004-322
RESOLUTION NO. 2004-322
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA AMENDING CHAPTERS II (RECORDS,
DOCUMENTS, RESEARCH AND PROCESSING FEES), IV
(BUSINESS FEES), XI (ENGINEERING), AND XII
(ENGINEERING - SEWER) OF THE CITY'S MASTER FEE
SCHEDULE
WHEREAS, the Engineering Division and the Public Works Operations Department of
the City of Chula Vista have not updated their elements of the Master Fee Schedule since 1993;
and
WHEREAS, after of a comprehensive review of all fees relating to engineering and
public works services, staff has recommended proposed fee changes to ensure that the costs of
providing engineering and public work services are paid by those who benefit from such
services; and
WHEREAS, the proposed fee schedule has been developed based on current operations,
development volume and service provision costs, and spreads these costs equitably to those
receiving these City services; and
WHEREAS, the fees reflected in the proposed fee schedule are based upon the estimated
reasonable costs of providing engineering and public work services; and
WHEREAS, the proposed fee schedule shall not become effective until 60 days after
adoption by the City Council.
NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Chula Vista
does hereby approve the proposed changes to the Master Fee Schedule as detailed in
Attachments E through H.
Presented by
Approved as to form by
Director
ß?/ 1:2~~
Ann Moore
City Attorney
Resolution 2004-322
Page
PASSED, APPROVED, and ADOPTED by the City Council of the City ofChula Vista,
California, this 5th day of October, 2004, by the following vote:
AYES:
Councilmembers:
Davis, McCann, Rindone, Salas and Padilla
NAYS:
Councilmembers:
None
ABSENT:
Councilmembers:
. Padilla, Mayor
ATTEST:
-~1./,.cr4°~
Susan Bigelow, MMC, City lerk
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO )
CITY OF CHULA VISTA )
I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certifY that the foregoing
Resolution No. 2004-322 was duly passed, approved, and adopted by the City Council at a
regular meeting of the Chula Vista City Council held on the 5th day of October, 2004.
Executed this 5th day of October, 2004.
)~ h ~ ~~
,.- ___ 1. ,J
Susan Bigelow, MMC, City Clerk
ATIACHMENT E
CHAPTER II
Records. Documents. Research and Processinl! Fees
A. ENGINEERING
1. Records and Documents
The City Engineer is authorized to furnish any person applying therefor
any of the following documents, papers, drawings or official records of the
Engineering Department upon payment of the fees herein established:
a. Bid Documents
$6.00 per complete plan' and specification; plus $1.00 per plan
sheet in excess of five sheets; provided, however, that any primary
contractor purchasing one set of plans shall be given up to two
additional copies without additional charge and for payment of two
sets of plans and specifications, the contractor may receive up to
six copies of bid documents; a postage and handling costs, with a
minimum charge of $3.00, will be collected for plan sets mailed at
request of the Contractor.
b. Design and Construction Standardr.............................. $5.00 each
c. Maps and Drawings
Various master street and sewer maps. annexation plats,
legal descriptions, scanned documents. aerial tooo!!Taphv sheets.
and miscellaneous drawings: $.!íj per slj:liare fest, wit¡ a
miBiffi\lffi fee ef............................................................. $4.00/sheet.
2) Digital EìsanReà åeswmeRt (TIFF) files $19 per saeet.
à...^.eria:l T0~e ~Beets
$9.00 per sReet, pllis n.w per eàditisBaJ. SSIIY Elf 9aflie sheet
e.Title Sheets
I)
2)
3)
1)
},fylar title SReet blank
Þ.ly1ar title sàeet 13fefils
Velhu::a title SHeet elanlc
'VelltiHl title sheet l'fefile
$1.00 per saeet
$$.00 per SHeet
$1.39 per sheet
$1.59 per sl!eet
f.d. Subdivision Manual....................................................-$25.00 each
í!oe. Annual Traffic Flow-..................................................... $3.00 each
!r.f. Resale of Publications from other government agencies at City's
cost.
CHAPrERIV
ATTACHMENT F
Business Fees
C.ENClNEERINC
G.
~Carb l.aaEliBg Zsae Permit Fee
(;A r
.. .pple&Bts far a eurtJ IsadiR .
a~ . . .. g i!aRe peFRÙt shaH .
$1:~~~::::~~:: iBi.tial iastallatiaR f:ea:t$~el~: ::; ;; ~am the esst
fee, IR aElEliüsa, if it i5 =e:::~r ~:: lIBEl !HI. eEJuÎYllleøt IIBRIIIII =t~~~!eIu5
SIßB a£ $39 shall lie ehargeEl ta ~e apr;¡.an IUI. eètiBg parkiag meter tl.ee
~.leant. ' it
CHAPTER XI
ATIACHMENT G
Enl!Íneerine:
A. DEFERRALSIWAIVERS
1. Deferral of Public Improvements
8..$259 Blieg Fees fer 8ÌF1~le faffiily resià6Rtia1
8.$333 f:iliag f1!es far multi family Fesiàentia!, comæereial, aßå industria!
e.$3Q fibiRg f-ee f-er 6JlteBsiea af a deferral
$200 a!!eaJ feeAppeal fee................................................................$200.00
4-,2. Deferral of Underground Utilities
The fee shall be a deposit to cover the city's full cost including overhead
in review and processing of the deferral request.
3. Waiver of Public Improvements
a.The fi1iBg fee sRall be a à~Ðsit te ee':er the ei·ty's full ssst iBs1uàiag
Ðverhea.à ißÐWTed .Î:A. eeajaBsåsa \yith re~.yie\·: and preeessing ef
the 't':ai";er.
a. An initial deposit of $1.000 shall be collected to cover City's full
cost. includinl! overhead. incurred in coniunction with review and
processinl! of waiver. Additional funds may be collected. as
required. by the Citv Engineer to cover City costs. Should the
wai ver be withdrawn at anv time. the deposit shall be adiusted to
cover the Citv's actual costs includinl! overhead UP to that time.
Any funds remaining on deposit at the time of the completion or
withdrawal of the waiver shall be returned to the depositor. after
accounting for expenses incurred to date.
b.$200 éIfJ!eaJ. fee.
b. AODeal fee .............................................................. ............. ..$200.00
B. PLAN REVIEW
1. Adjustment Plat Examination Fee
a~$500 per plat fes1:iltiag ia atijl:15tmeat aT eeaselidatiéA. Elf YfJ te ~~J:01ets
anè a smgle 13refJeft)' liRe.
8.$1200 per plat F8S1:dtiag ia eøRsøliàatiøe øf tlu:ee aT male p8feels aT t"::ø
at FBÐf8 p:r6136ft)' liRes.
a. Plat resulting in adiustment of orODertv lines ....................$1.050.00
b.
Plat resulting in consolidation of two or more parcels .........$950.00
Master Fee Schedule
Part 11 - Development
Chapter XI - Engineering
Page 1
c. The adjustment plat fee and consolidation fee shall include a
certificate of compliance, if needed, at no additional cost.
2. Certificate of Compliance
$200 filiBg feeFiline: fee....................................................................$200.00
3. Tentative CPreliminarv) Parcel MaD
Prior to the subnrission of a tentative Darcel map to the citv Enstineer for
processing. the Dfopertv owner shall submit an initial deposit. as detailed
in the Subdivision Manual. to cover the Citv's full cost including
overhead. Additional funds ffiav be collected. as reQuired. bv the City
Enstineer to cover City costs. Should the maD be withdrawn at anv time
the deposit shall be adiusted to cover the Citv's actual costs includinl!
overhead UP to that time. Anv funds remaining on deposit at the time of
withdrawal of the map shall be returned to the deDositor. Said deDOsit
shall not include checking: of anv reQuired improvement plans or
insoection of improvements.
4. Final Map and Improvement Plan Fee
Prior to the submission of a fina1 map and improvement plans or any
portion thereof to the Planning Department and/or the City Engineer fòr
processing, the property owner or subdivider shall submit a deposit. as
detailed in the City ofChula Vista. EnI!ineerin¡;¡ DelJartment. Land
DevelolJment Subdivision Manual (the "Subdivision Manual"). to cover
the City's full cost including overhead incurred in conjunction with review
and processing of said map and plans. Additional funds may be collected.
as reQuired. bv the Citv Enl!ineer to cover Citv costs. Should the map or
plans be withdrawn at 'anv time the deposit shall be adiusted to cover the
CilV's actual costs including: overhead. UD to that time. Anv funds
remainine: on deposit at the time of withdrawal of the map or plans shall
be retumed to the deDositoU\ay reqliireli aàjlistmeBt ¡¡flaY ee æaàe pRef
te City CSHssil eeRsiàefatieR sf tiie Fiaa:l Þ.fap.
4.-5. Final Map Recordation Fee
UDOn the minI! of the final maD with the Citv Council. the Prooertv owner
or subdivider shall deposit with the Citv Clerk a sum sufficient to cover
the cost of recording the map.
Master Fee Schedule
Part n - Development
Chapter XI - Engineering
Page 2
6. Public Works Construction Inspection
Following Council apProval of the final map but prior to the recordation of
said map. the property owner or subdivider shall submit a deposit. as
detailed in the Subdivision Manual. to cover the City's full cost of
inspection. and administration during the construction phase of the proiect.
including plan revisions and any special investigations including soils and
geologv reviews and Citv consultants. Additional funds mav be collected.
as reauired. bv the City Engineer to cover the City's full cost. including
overhead Prior to acceptance of improvements and/or release of bonds.
Upon acceptance of public improvements and/or release of bonds. any
funds remaining on deposit will be refunded to the depositor.
Upen!lie miBg ef~e [mal map veith !lie City COlIl'lcil.!lie preferty SV:Ber
af s1:1sEHviaer shaM àefJ8sit ·~'ith the City Clefk a Slim sl:rffieieBt te eøver
!lie esst sf reseFàiag the map.
5.Pla:ø Re'lie·s and IÐ.speetisR. Ba6feaeøæ.eRt B.Bà Csastruet3.BB PeffiH!B
8peeiaI
Estimated P,¡"'-ate lII:ve6'&igatisR
Censt;ruetisB PIøø EneF88ehIBeM
GeH ReYÎew . GøI¥
~ ~ m ~
19i 111 ~ ;g ~
113191 ~ ;w. #
193 2~1 ~ .µ¡ H-
2§§ 329 ~ ð{¡ @
J~g 119 ~ 63 ~
129 $29 ~ &9 9;
539 ~59 ~ .wg .wg
ééQ gOO ~ m ~
g tq ~g9 ~ +é;! ~
900 1,200 ~ ~ ~
.,2191,1'J9 ~ +93 ~
1,1RQ 1.~19 ~ ~ m
l.g20 2,259 ~ ~ ~
2,2éQ 2,fi99 ~ ;¡Q ;¡.j.9
2.7Q9 J,1J9 ~ ;;s.¡. ~
3,1193,$79 ~ ;w.9 ~
J,3gg 1,939 ~ ~ ;!é4
1,9ég 1,3:9 9Q ;;H ;!+é
1,§g9 §,1:J9 9Q ~ ;w.4
S,l1g j,7:JÇ' 99 ~ ~
3,;1g ~.J39 9Q ;% ,HQ
á.319 fi.9~9 ~ 4+3 ~
éSg9 7 .é~9 ~ 4J9 ~
1.ééO 8,379 ~ 4{H. J84.
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 3
-
I
~,~~g §'~~~ I
9,11(,) 19,9gg
::1
::1
:1
fer estifRateà eoastrnstJea ee3ts o~:er $10,000 the fee shaH Be a àefJÐsit tø
CÐyer the City's f1:l-11 east iBsII:1à.iBg øveæ2aè. iBetlrreå La plaa r8~:iew aBd
iHSfl8GtJoa (.or sssfsaehmeat f]ermÏts and eøastfHetioB permits.
Speeiad iByestigaåeR 8f'~lieatioß fees 8:fe Bet refll:aŠa131e.
ti.PreliFJ:HBary Pm-eel Þ:lap Fee
l-
Prier tø the stlàmissieB sf a pre:Hm1Bary parcel map te the eity BBgiaeør
feI" ¡:!feeessing, tae ~feper~' r¿r::Bsr shall sl:leæit a àe~esit to ee·;er the
City's faIl east iBslaàing e?efReaå. ShGalè tHe æ&f' Be ·.\'i1ftàfw~ì'B at any
time tBe à8!f8sit shall 88 aèj1:lsteà te es':e! the City's aetual eests ieeluàiH£
o·¡erkeaà \=If! te tkat time. 8aià àef'esit sà.aU Ret iaelaàe ea.eelsRg ef aFlj'
fefjHifeà iæf'rs·:emeRt plans SF iaspestisB ef impfs·.'eæeats. Fees fer
eaefeaeaæeRt peæÜt, 131aø re":ie\~¡ aaå inspeetiea sRan Be eSffijJl:1teà
9Hrm:laB:t te S~etisB XI.B.5 (OpeR S9aee DislFiet BBersaehmeat) eSRtaÌBeEl
iB tJIe master fee sse.sàæe.
:.Paè1ie '''arKs InGfJestieB
a.Fslls·;:ing CSlil'leil 83:Jre';aJ. sf tlJ.e fiaa!. IB83 'slit prier te !lie FDeeFGatioR
ef said map, tÀe prepefty e·...:aer at s1:lÐEii?ièer shall s1:lBæit a
elej)8SR te eev8f·the Cit)·'s f1:ilI eest sf iaspeeEÎ.sR, aBå
adfBinisætiea EltlHag the e€lsstrnetiee ~à.ase af the ~fejeet,
ÌaslHàiag fJlaB f8visieBs and aay speeial iR~:e5tigatieH5 iaelu.èiBg
58MS anti gealøgJ' Fevie';/s and City 6aRSHhBfits~ TaB åel3esit saaH
Be aàjesteå 18 ss'¡er the Ci~y's fyl1 east, iøshlàiag 0\'eæaari prier
te aeeeptanee af if.R¡;Jfs9:eæeats anàlsr release sf l3eBàs.
à,IB af!àitiea te et:fter fees eefttaiBed ia tfie 1\1aater Fee Sskeà1ile relaÐ),8 ta
Pl:1elie V/Ðr~cs iBspeetieas, 51:1Ðàiviàer af 8sBtraetar saadllJay [S the City,
prier tø lSbe eeeeptaftse Bf ,Heae impFS":eme&ts is any 51::l~åi::i8ieR sr stæøt
Fight sf \'ray sr easemeRt fer fHielie rrtiPj3E1ses, M\e S1:lfR 1.5 times the
iRspeeter's 8e1:lr~)' rate sf pay (iRShu:liBg friage heaeFits and 81"erheaå) per
aStir roT teese Puelie ".r arks iAS]:1eetieHS \:laàeftakeB ßatsiàe af regelar
·.~:ÐrkiRg Bet::1fS sa SaÐ.ifàays, SYRelays aBel-legal keliEi83's èøfing tBe S91:H=Se
af eøBs~etieR sf any p\:Ièlie iæpreveæeets.
C. PERMITS
-
l. Construction Permits - Administration and Plan Review
Master Fee Schedule
Part n - Development
Chapter Xl - Engineering
Page 4
·
a. Proiect with an estimated construction cost of less than ten
thousand dollars ($10.000). ............ ................ ,.....,......... ...... .$250.00
Additional inspection and traffic control fees shall be collected as
appropriate.
,\a $82 aelmffiistmti\'e fee shall ee eolleeteà ...:ita eaeh l!ÐeIieatiea f-er a
semHt t6 eÐBstroet Ð1::1'6lie iBærs?ements. ÐFÐ~;iàeå 8e",':6"/8[. that Be Su.eR
fe.e is reauireå f-er the aselieatiøR [><af B. l:ItiJif?¡.' eeRstnietiGR s8fl'ftit. Plan
Re':iB\~: and InSì3eetiea fees shall be 6aHeeteà as as'Brssria.-te.
b. For a proiect with an estimated construction cost which exceeds
ten thousand dollars ($10.000). property owner or developer shall
submit a deposit. as detailed in the Subdivision Manual. to cover
the City'S full cost. including overhead. incurred in coni unction
with review and processine: of said permit. Additional funds mav
be collected. as required. bv the Citv Ene:ineer to cover City costs.
Should the permit application be withdrawn at any time the deposit
shall be adiusted to cover the Citv's actual costs includin¡¡
overhead UP to that time. Any funds remainine: on deoosit at the
time of withdrawal of the application. or City acceptance of the
subiect improvements shall be returned to the depositor.
2. Construction Permits Insoection I
Estimated Inspections Fee
Construction ( % of Estimated
Cost Construction Cost)
$0 1.999 10%
2.000 4.999 8%
5.000 9.999 6%
For a project with an estimated construction cost which exceeds ten
thousand dollars ($10.000). property owner or developer shall submit a
deposit. as detailed in the Subdivision Manual. to cover the Citv's full
cost. includin¡¡ overhead. incurred in conìunction with permit
administration and inspection during the construction phase of said
improvements. including any special investie:ations or City consultants.
Additional funds mav be collected. as reauired. bv the Citv Engineer to
cover Citv costs. including overhead. prior to acceptance of improvements
and/or release of bonds. Upon acceptance of improvements and/or release
of bonds. anv funds remaining on deposit shall be refunded to the
depositor.
3. Gradine: Permits
Master Fee Schedule Page 5
Part II - Development
Chapter XI - Engineering
a. Prior to submission of grading plans to the Citv Engineer for
processing. the propertv owner or developer shall submit a deposit,
as detailed in the Subdivision Manual, to cover the Citv's full cost.
including overhead. Citv's reimbursable costs shall also include
any special investigations. including soils and geologv reviews.
and consultants. Additional funds may be collected. as reauired.
bv the Citv Engineer. to cover Citv costs. including overhead. prior
to a9proval of grading plans and issuance of !!Tadin g permit.
b. Following the approval of IITadin¡z plans. but prior to issuance of
land development permit. the property owner or develooer shall
submit an additional deposit as detailed in the Subdivision Manual
to cover the City's full cost. including overhead. incurred in
coni unction with permit administration and inspection during the
construction Dhase of the proiect. Additional funds may be
collected. as reouired bv the City Enllineer to cover City costs.
including overhead. Upon acceptance of grading bv the Citv and
release of applicable securitv. any funds remaininll on deposit shall
be refunded to the depositor.
*4. CSRslruelisn P_its UlilitiesUtilitv Permits
I*a. THe fee f-er a Iiti1i~' eenslroetien pennitUtilitv permit fee for ajob
for which the cost of replacement of the surface improvements
(including the top three (3) feet of any trench or other excavation)
within the City right-of-way, is estimated to be less than ten
thousand dollars ($10,000) sRall Be $123. ............................$300.00
B,b. The f.¡¡e f-er a ¡¡âJ:ity eenstFllelieB peræit for a utility permit for a
job for which the cost of replacement of the surface improvements
(including the top three (3) feet of any trench or other excavation)
within the City right-of-way, is estimated to be ten thousand
($10,000) or more, aPDlicant shall submit an initial cash deposit
shall Be a cash èe! esit in an amount sufficient to cover the City's
full cost of administering the permit and inspection of the work,
including overhead. Additional funds mav be collected. as
reauired. bv the Citv Enllineer to cover Citv costs. including
overhead. Anv funds remainim! on account upon acceDtance of the
permitted work shall be refunded to the depositor.
~5. Construction Security Deposit Bookkeeping Fee
a.
A fee of one percent (1 %) of the total amount deposited with the
city for each construction security deposit shall be deducted from
sliBæitteà ·.dlh each Sl!el!-bond. Drior to release to deoositor.
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 6
G.ó. Driveways; Excessive Width
H,a. Filing fee$5& [lding fee..........................................................$250.00
hb. A\,J?Cal fee ........................................................... $250.00 9!!I"ea! fee
J.: 7. Encroachment Permit§., :..Application
The application fee referred to in Section 12.28.050 of the Municipal Code
shall be:
a. $1 95 fsr ~65e p£ermits reviewed by the City Engineer; aaè$275.00 I
bb. Permits $259 fer !Rese reviewed by the City Council~.........$850.00
8. Encroachment Permits - InsDection
Estimated Insnections Fee
Construction ( % of Estimated
Cost Construction Cost)
$0 - 1.999 10%
2.000 4.999 8%
5.000 9.999 6%
M,9. Temporary Encroachment for storage of building materials in City right-
of-way Permit Application
a.$3G nNonrefundable application fee................................................$50.00 I'
If materials are placed in the street by the applicant prior to issuance of a
temporary encroachment permit, the application fee shall be doubled.
~¡.'TJ..'ater-eøarse cmà Gfaèiag Permit Fees
a.'.\'atefe81iFSe mE! graåiBg permit f.ees shall be defl8Sits tl':.l seyer tke City's
flill e6Gt iBs!lIaiag Elyerfleaà. Prisr to release efÈJsaès the èepssit5
saan Be aEijl:lsteà t8 ee\~er tàe f1:ln eest ta tRe City ieslaàiBg
8yerkeaå f'£lr preeessiag, plan 6eeek, iAspeetisH and aR)' BoHB er
geelegie refJ8Rs ~y City sSR81:dtan1s.
D. STREETS
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 7
1. Street Marking Fees
a. Striping (Paint)
Per Hli.le sf cIDouble yellow centerline. per foot$0.32$I,º24.9~
ii Per mile af sSingle solid line striping. Per foot$0.29$8S7.37
iii Per mile Elf sSkip line striping. per foot...........$O.27$7n58
IV Line removal. per foot...................................................$3.S0
b. Striping (Thermoplastic Installation)
i Crosswalks 02" wide). Derfoot ...................................$3.88
ii Turn Pockets (S" wide). per foot............:......................$3.74
iii Line stripe (4" wide). per foot.......................................$3.6l
R-,c. Legends (Painted Legends)
&i Per eaelt-word or lane+-(e.g.. "-&§.top:. "Y¥Ïeld:, pavement
arrow. limit line. crosswalk. etc.)¡:jgfit tlH'B ..............$l26.oo
(a:)enly, ete. $ 11.39
ii2) Per ease: limit lise ~er laRe
$ l1.17
iii3) Per eaeh: eresG'::aJk lief laae
$ 28034
d. Legends (Thermoplastic)
Per word (e.!!.. ..Stop..)..............................................$250.00
11 Pavement arrow. each ...............................................$126.00
+.e. Reflective Pavement Markers:
tAll types. installed (each) ......................"...."...............,,~11.52
;!'f. Non-reflective Pavement Markers:
tBon's dot 4" round ceramic. installed (each) ............."a4G$1 1.17
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 8
~g. Painted Curb
~i Curb Loading Zone
(a)See Seetiaa I'.'.C.l C¡¡fi! LeaEliag Zese Permit Fee.
Permit investigation fee ............................................$120.00
¥.ii Painted Curb Installation Other tRaB yellsw
(a) Red. per foot......................................................$3.93
(b) Yellow. per foot ................................................$3.88
(c) White. per foot ..................................................$3.88
(d) Green. per foot ..................................................$3.90
(e) Blue. per foot ....................................................$3.88
(a)New
(13 )RepaiBtiBg
w-'h. Parking
$ 1.3 Miaeal feet
$ .€i€i/HBeal f-eet
~i
Parking stalls: $5.03 per liRe, $HJ.Oá eeæplete. per line$8.oo
¥.ii
Parking T's.: $4.79 each ............................................$10.00
~iii
Parking meter pole>s plus installationiBDtalleà: $!í 1.:5: eaeilr
Existinl! parking meter pole. removal.........................$60.oo
iv
,^~".2. Street Name and Regulatory Signs
a. Regulation. Warning and Guide Signs:
(Does not include pole or pole installation)
Size SÎlm Only Silffi Onlv Installed
~ $4:QQ $33.W
18" $19.S0+,00 $ 130.00n,00
24" $23.7Q.!.9.,OO $134.~
30" $S2.8œMG $ 163.00é+:00
36" $73. (J()4.;1OO C¡;lg3.~
48" $l04.~ $214.00 11}!í. W
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 9
-- -_.._---~---_._-~----_. ---
. .
-
&b. Street Name:
(Does not include pole or pole installation)
Bill
@ii
Blade I S~gn oruv. .each ....:.........................$ 50.::: ~::: l
Blade I SIgn. plus mstallatJOn. eacb$ 49.W SlgB ] al 185.00
YY.c. Pole Pricing:
ZZ.i 2" ID round steel galvanized metal. per foot. ..............$lAQ
(ft) OR
11
U skar.nel }3eH0Eateà metal pests ¡ 1.1 9 per feet
Tel-Spar ;L,Perforated Square Tubing ......... $::UQ >'per foot
$3.62
III Tel-Spar 1.75" Perforated Square Tubing. per foot......$2.95
-
iffiv Pole. blade/sign installation .............................$4+.00300.00
AM,v~Aadditiona1 charge for Tel-Spar Break-Away Post
installation.... ... ..... ............ ......... ......... .......... ......... ..... .$1 0.00
.~vi...............................................................................................~
W-Aadditional charge for installations requiring core
-drillißl!....................................................................... .$50. 00
Gb&.3.
Street Vacation Fees
a.
A deposit. as detailed in the Subdivision Manual. shall be collected
bv the City En~eerTh8 fee shall Be a Etef!8sit to cover the City's
full cost. including overhead. for street closings or vacations or
easements for public purposes, including investigation, costs of
services provided by the City in processing the application, and the
preparation of maps, plats or legal descriptions~;- The required
deposit shall be paid te Iile BBgiBeeRBg Depaftæeet at the time of
filing of the application for said closing or vacation.
mID.E.
TRAFFIC
éé&l. Street Overload/Transportation Permit
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 10
a. Single triP. oversized load transportation Dermit
i Loads greater than the California Vehicle Code weight$9.00
ii Loads greater than 12 feet wide or 14 feet high..........$55.OO
b. Multiple trip transDQrtation permit
Non oversized loads only. for a maximum period of six (6) months
onlv ............ .....,........... ........ ..... ........................ .... .......... ........ .$45.00
c. Emergencv move permit fees shall be two times single trip fees. in
addition to an v other acplicable fines.
SiRgle lE.€r:e H'aBspeItatiSB peFlf!i.t $&,00
(flaB 881:158)
e. Hous~ :æe~;e $33.99
e. ~4:l:lltiple lead transpeftatieB $10.00
~eFfBit f-er a fJeåed 1:1[1 18 sUt.
meRtlts
à. EæergeJftey fR09¡e :fJ8Fæit f~es shall be åS1iBle t13.e
. _I. ^
MMM.2. Traffic Signal Participation Fee I
IR. $23 fer eaeàPer trip generated by intended land use description I
according to SANDAG (San Diego Association of Governments) trip
generation rates. (SEE APPENDIX C) . .
-{Resolution 200/·385 effective 11·/3·011
NNN,3. Traffic Control Plan Fee I
¡¡,.Non refundable clan review and ap,plication fee............................$l7S.00
$59Æ'lFSt skeet Ð1Hs $25.'eael! aèelitieflaJ skeet
[Resolution 18356, effective 7191%]
OOO.F. TREES I
Master Fee ScheduJe Page 11
Pan IT - DeveloPment
Chapter XI - Engineering
-
p2f!., I. Street Tree Deposits I
a. For all interior lots having less than 75 $-H4$330 per I
feet of street frontage lot
b. For all other interior lots $65~ per I
lot
c. For all comer lots whose street frontage $65~ per I
is less than 175 feet lot
d. For all comer lots whose street frontage $l.300$4W )
is 175 feet or more ~rlot
2. Tree Planting Fee $SQ.'tree
Standard 15 gallon tree. Dlus biobarrier installation ...........................$50.00
Other tree sizes to be charged according to prevailing market Drice
[Resolution 18356, effective 7/9/96J
&.G. REIMBURSEMENT DISTRICTS I
- ~ I. Reimbursement District Formation I
.^.... ^,;;}' ......~....a. The costs of the formation of the reimbursement district
shall iael1:1še as estiæateå BY the Elireeter øf f)ti91ie ·::0r~sbe
estimated bv the Citv Enpneer. to include:
BBBB.i The costs of all notices published or mailed I
pursuant to Chapter l5.50 of the Municipal Code.
CCCC.ü The cost to the city of associated staff time, I
preparation of the estimated costs of the facilities,
determination of the benefited area and estimate of the
proper assessment.
DDDD.b. An initial deposit shall be collectedTAe fee fer f.eræaiisB sf
a reiæel:lfSeæeøt åistfiet silall be a àef1esit to cover the City's full
cost. including overhead, for the formation of the reimbursement
district. Additional funds may be collected. as reauired. by the
Citv EDlzineer. to cover Citv costs. including overhead. In the event
a reimbursement district is not formed, the deposit shall be
adiusted to cover the City'S actual costs. including overhead. UD to
that time. Anv funds remaininsz on deposit at the time of
L- withdrawal fo the aDPlication shall be returned to the deDositor.~
Master Fee Schedule Page 12
Part II - Development
Chapter XI - Engineering
aet:aal søsts saa-Il èy Renrefund.ablB, bat sR0uld they ee less than
¡Be de~sßit, tile balanee s¡aH èe refuBàeà. In the event a district is
formed, the costs shall be considered an incidental cost of the
improvements to be recouped by the terms of the reimbursement
agreement.
¡,OTHER
EEEE.Flood ZOEl6 detefffliBatieR fee
i$l5/pàsae detemtiBatieR
ii$2$/mailed dateff&.ÌRat1øa
(s)/:::fl26s1wHs/If ! 8Jj~. eff:.eti·'E :<:~:r;é}
Master Fee Schedule
Part II - Development
Chapter XI - Engineering
Page 13
L_
J
CHAPTER XII
ATlACHMENT H
Enl!Ìneerinl! . Sewer
A. CONSTRUCTIONIDEVELOPMENT
B., I. Minimum Front Footage Charge
Charge per front foot of the lot or parcel to be connected..................$l6.00
Such front foot charge shall not be imposed uoon a Derson who
constructed or paid for the construction of the sewer line into which he
seeks to connect.
a.The !aymetlt ef $16.00 per frsBt feet sf the let sr !!IF6sl se!!gfit Ie Be
eenneeteà shall BB Fe~1::1ireà, 1;n~t SlieR Heat feet saarge SAaR Rat Be
impeseà \:If38B a 138i'S0A. y:à.e eeastn:1eteà SE fJa:i.à f-er tee eeøStfüetieR øf the
se-];er liae fits ·.vhise Be seeks 18 eeftBeet
<;'2. Sewer Construction and Connection Fees
Q.,a. AB-Administrative fee-4- ............................................ $39.oo15.00r
~. ~onstruction of a four-inch í£ldiameter lateral in a street or
alley containing a single sewer main intended to serve abutting
properties on both sides,- ..........................................$~.990.00
Additional chare:e for laterallene:th in excess of 35 feet. per
foot.. ........ ........... ....... ..... ....................... .................. ..$174.73
sIlls ¡S6.00 eer feet af eaareeaele ]eR~ Îa eKsess sf 35 wet.
Char!!:eable len!!:th in this case shall be one-half of the
ultimate dedicated street or alley width in feet except as
noted in subsection d:
c. l'ef.eConstruction of a four-inch í£ldiameter lateral in the street
or alley cpntaining two sewer mains, each intended to serve
abutting properties on only one side........................$6.990.~
Additional charge for lateral length in excess of 35 feet. Der
foot ......... ...... .............. ........ ...... ...... ....... .................. ..$174.43
ShlS $&6.00 eer [-eet af eaaFe:eaèle leae:tb. iB exeess af 33 t:eet.
Chargeable lene:th in this case shall be the recorded
distance from the servin~ sewer to the ultimate street or
alley right-of-way line except as noted in subsection d:
Master Fee Schedule
Part II - Development
Chapter XII - Engineering· Sewer
Page 14
@..ct. In those cases where the sewer lateral is to be installed at an angle
of more than fifteen degrees from perpendicular to the roadway
centerline, the chargeable length determined per subsections b and
c shall be increased by the actµal extra length required because of
such skew;
e. Additional charge for construction of a six-inch (6") diameter
lateral. per foot of chargeable lenl!th. as determined in subsections.
b. c, and d ..·...............................................................................$3.37
This charge shall be added to the charges listed in subsections b. c
and e.
R,
Fer six inc-B àiametør lateFa-ls. $3.80 per feet af ehar.::eaàle la-teFal ]ÐB~tk
as àeteFffiiaeå eer Sl:lBSeetiaRs è. e and å sHaY 13e eaar£'ød in
aààil1sR Ie ~e fee fer iastallatioR of a fSHr iBcfl diameter lateral:
f. Additional charge for extra work required for the connection of
laterals of anv size to a trunk sewer ten-inches 00") or more in
diameter.....................,............ ......,.......... ..... ............... ........ ..$l26. 00
Per the eesBeet1eR of ]atefaaS øf all)' size to a trunk se·::er tøa ¡BeRes ør
FBÐPe ie àiBlReter an aàelitiønal amSl:1Rt sf $36.00 Eer eRtra ·.\'er~( r8tjüireà
t8 make sHah a eeaaeetisR
This charge shall be added to the charges listed in subsections b, c
ande,
I.Fol tHe plaeeæeFlt sf a tap is a se\ver leeated in an ease-EBeRt, tee :H!e
BRall ee:
(a)$317fer 1" diameter ta¡' iBs;
(è)$339 f-Ðr !" ài8.ÐIeter tap iBs.
g. Sewer connection "tap-in". where a contractor other than the City
constructs the sewer lateral. This fee shall be in place of the
connection fees detailed in subsections b, c. d. and e. and in
addition to the fee assessed in subsection f.
Four inch (4") diameter tau-ins ................................$528.00
ii Six-inch (6") diameter tap-ins...................................$607.00
h. Additional charge for connections made at a depth in excess of
nine feet (9')., ................... ........................................ ..........$l.350.oo
K.Per eSBseetieas maàe at B eI~tR ia eneess af BiBe [-eet, $1,231 1311:15 $3t3 per f~at øf
ehargeElble leBgth ia e¡¡eeS5 sf 35 feet.
Master Fee Schedule Page 15
Part II - Deve10pment
Chapter XII - Engineering - Sewer
3. Sewerage Capacity Charge
a. The owner or person making application for a permit to develop or
modifY use of any residential, commercial, industrial or other
property which is projected by the City Engineer to increase the
volume of flow in the City sewer system by at least on-half of one
equivalent dwelling unit of flow shall pay a Sewerage Capacity
Charge. The base charge is hereby established as $3,000 per
equivalent dwelling unit of flow.
[Ordinance 29QO-B, effective 4/15103J
b. One equivalent dwelling unit of flow is defined lo be 265 gallons
per day of sewage generation. For purposes of conversion, one
equivalent dwelling unit of flow shall also be equal to 19
equivalent fixture units (EFUs). (SEE APPENDIX D) The fee
for property involving a modification in use shall reflect only the
increase in sewage generation projected from that property.
i The following rates of flow for various land uses shall be
utilized in determining the total fee due for àny given
property:
PLEASE SEE TABLE ON FOLLOWING PAGE
Master Fee Scbedule
Part II - Development
Chapter XU - Engineering - Sewer
Page 16