Loading...
HomeMy WebLinkAboutReso 2004-257 RESOLUTION NO. 2004-257 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING CHANGES TO THE MASTER FEE SCHEDULE WHEREAS, departments reviewed their flat fees in order to update fees to account for significant increases in the cost of providing services; and WHEREAS, the Fire Department, Nature Center, Police Department, and Recreation identified a number of fees where increases were warranted; and WHEREAS, the Chula Vista Chamber of Commerce and the Chula Vista Downtown Business Association support the proposed changes to the Fire Department permit fees. NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Chula Vista does hereby approve the proposed changes to the Master Fee Schedule as detailed in Attachments C through F. Presented by Approved as to form by r- ~~ Ann Moore City Attorney ~ Ric ard P. Emerson Police Chief Bu Martin Recreation Director · Resolution 2004-257 Page 2 ~~~ Edward Van Eenoo Budget and Analysis Assistant Director PASSED, APPROVED, and ADOPTED by the City Council of the City ofChula Vista, California, this 3rd day of August, 2004, by the following vote: AYES: Councilmembers: Davis, McCann, Salas and Padilla NAYS: Councilmembers: Rindone ABSENT: Councilmembers: None ATTEST: ~ -=- -"'l,l/' ''-J~ ~ Susan Bigelow, MMC, City lerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certifY that the foregoing Resolution No. 2004-257 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 3rd day of August, 2004. Executed this 3rd day of August, 2004. -;.- ~JJ..A.~~~ Susan Bigelow, MMC, Ci Clerk Attachment C CHAPTER XV Fire Department Fees A - PERMITS The City of Chula Vista has implemented a permit fee schedule. The following fees are based on an inspection/review of the activity to be conducted. Issuance of a permit is contingent upon compliance. Multiple permits will be required if applicable. Excluding penalties, annual Fire Permit fees shall not exceed $750.00 per business location. (The following fee schedule is subject to annual COLA adjustments, not to exceed full cost recovery) Activitv Fee Frenuenc" Annlicabilitv/Comments Place of Annually/Each The gathering together of 50 or more persons for Assembly $95 Occurrence such purposes as deliberation, education, instruction, worship, entertainment, amusement, drinking, or awaiting transportation. (CFC 25). Wrecking Yards Annually Automobile wrecking yards, junk yards or waste $95 material handlina plants (CFC 341. Outdoor Carnival Each Occurrence Operation of a carnival or fair. Exits, access, or Fairs $150 emergency lighting, seating, occupant load, fire protection devices, including concession booths iCFC 25\. Combustible Annually Storage or handling of fibers in quantities in Fiber Storaae $95 excess of 100 cu ft. . ICFC 28\ Combustible Annually Storage of more than 2500 cu. ft. gross volume of Materials Storage $150 combustible empty packing cases, boxes, barrels or similar containers, or rubber or cork or other similarlv combustibie material ICFC 11) Compressed Annually/Each Compressed gases - storage, handling, and/or Gases $110 Occurrence use ICFC 74 table 105a). Cryogens Annually Cryogenic fluids - production, storage, handling, $105 and/or use (CFC 75 table 105b). Dry Cieaning Annually Dry cleaning operations or to change to a more Operations $95 hazardous cleaning solvent after annual permit issued ICFC 36). Dust Producing Annually Dust producing operations, processes and Operations $95 equipment (CFC 30, 76). Explosives or Annually/Each Manufacture, storage, sale, display, or disposal of Blasting Agents $95 Occurrence explosive materials; and/or transportation or use of explosive materials commonly used for blasting operations (CFC 77\. Fireworks Annually/Each Manufacture, display, storage or use of $130 Occurrence/ pyrotechnic special effects material. . Barge Organization providing evidence of Federal Tax- exempt status will be permitted a fee waiver. ICFC 78\ Garages for Annually Structures used as a place of business for Motor Vehicle $105 servicina or repairina motor vehicles. Flammable Attachment C Repair and corrosive materials use, disposal, and storage ICFC 29 and 79\. Hazardous Annually Hazardous chemicals - storage, handling, or Materials Use & $180 transport of solids, liquids, and gases (CFC 50, 79 Storace and 80\ High-Piled Annually Use of any building or portion thereof exceeding Combustible $150 500 sf. for high-piled combustible storage CFC Storace 81\.. Liquefied AnnuallylEach Storage, handling, and transportation of LP-gas Petroleum Gases $95 Occurrence and the installation of equipment pertinent to svstems for such uses (CFC 82). Oven, Industrial Annually Location, construction & operation of industrial Baking or Drying $95 baking & drying ovens which are heated with oil or cas fuel ICFC 62) Spraying or Annually Spraying or dipping operations utilizing flammable Dipping/ $150 or combustible liquids or the application of Flammable combustible powders regulated by CFC 45. Finishes Tents, Canopies Each To erect or operate an air-supported temporary & Temporary $95 Occurrence/ membrane structure or tent having an area in Membrane Per T enll excess of 200 sq. ft. or a canopy in excess of 400 Structures Canopy with a sq. ft. (CFC 32) caD of $285.00 Hot work Annually Public exhibitions and demonstrations where hot Operations $95 work is conducted. Use of portable hot work equipment inside a structure. Fixed-site hot work equipment such as welding booths. Hot work conducted within a hazardous fire area or for roofing operations. Storage Tanks Each Occurrence Installation, operation, repair or modification of (Flammable $150 (Per Tank) pipelines, equipment or facilities where flammable and/or or combustible liquids are produced, processed, Combustible dispensed, stored, handled or used. Tanks to be Liq u ids)- inspected for design & construction, and soil INSTALLATION comnaction. CFC 79 Storage Tanks Each Occurrence Removal, abandonment, placing temporarily out of (Flammable $150 (Per Tank) service, or otherwise disposing of a flammable or and/or combustible liquids storage tank. Vessel must be Combustible inspected for penetration - tanks shall be triple- Liq u ids)- washed, purged with dry ice & removed from REMOVAL around. (CFC 79\ Storage of Annually I Flammable and combustible liquids - storage, Flammable or $95 use, dispensing, mixing and handling, (CFC 79) Combustible Licuids Christmas Tree Each Occurrence Operation of an area used for the sale of Lots $75 Christmas trees. Electrical safety, access, flame- retardancv, fire protection, etc. Resolution 17939, effective 7/1/951 General Use $95 Annually Shall be required for any activity or operation Permit and not specifically described below which, in the Certificate iudament of the Fire Chief or Fire Marshal is Attachment C likely to produce conditions hazardous to life or property, and shall be accompanied by fees as set forth herein. Magnesium $95 Annually Storage, handling and processing of Working Magnesium. (CFC 48) Fumigation or $180 Annually To operate a business of fumigation or thermal Thermal insecticidal fogging and to maintain a room, Insecticidal vault or chamber in which a toxic or flammable Foaoina fumiQant is used (CFC 47). Lumber Yards $150 Annually To store lumber in excess of 100,000 board feet (CFC 30\. Mall/ Open and $180 Annually To operate a structure as an open or covered Covered mall.' (CFC 35) Battery Systems $95 Annually To install or operate stationary lead-acid battery systems having a liquid capacity of more than 100 Qallons-(CFC 64). B - PLAN REVIEWS AND INSPECTIONS Fees for the plan review, plan re-submittal, consultation, inspection, and re-inspection of fire suppression systems, hydrant placements, and fire alarm systems shall be collected in accordance with the following fee schedule. (The following fee schedule is subject of annual COLA adjustments, not to exceed full cost recovery) ACTIVITY FEE Fire sprinkler system $640 Tenant improvement fire sprinkler system $275 Fire Hydrant Installation - One (1) to Five (5) hydrants $275 plus Above Five (5) hydrants $50 per hvdrant Fire Alarm System $140 plus $5.50 per initiating device Fire suppression systems - To include kitchen hood, $140 plus $5.50 per clean aaent, and alternative fire suppression systems nozzle 13-R Sprinkler Svstem $275 13-D Sprinkler Svstems $95 Standpipe Systems - Including all wet, dry, or combination $110 plus $5.50 per systems. outlet Technical Report $150 Failed inspection I test $95 Attachment C C - SPECIAL INSPECTIONS The City of Chula Vista has implemented a new Fee Schedule For Other Services. No. Service Fee Frequency Applicability/Comments 1. Federal, $95 Annually B Occupancies, R-2's Occupancies, and E - 3 State, or other Occupancies Government Agencies $105 I - 1 and 2 Occupancies - Convalescent hospitals, nursing homes, homes for the aged, sanitariums, boarding homes, and children homes. $150 I - 1 OccuDancv - hosDitals. No. Service Fee Frequency Applicability/Comments 2. High-rise $130 Annually Buildings over 75ft in height. Building plus Inspections $10 per floor No. Service Fee Frequency Applicability/Comments 3. Re- $95 Per Re-inspection fee would be assessed upon Inspection Occurrence the third re-inspection when required and/or; Fees Re-inspection as a result of a requested inspection not cancelled two hours or more prior to established appointment time, or not ready for inspection and/or test upon arrival of the fire deoartment representative. Attachment D CHAPTER XVII Chula Vista Nature Center A. Admission Adults (18+) $5.00 Seniors (55+) $3.00 Juniors (12-17) $3.00 Students (18+ with 10) $3.00 Children (6 -12) $2.00 Children (under 6) Free B. Facility Rental Event T .. fee ~ :Iii' 'It", Conference, meeting Reception (each 100 people) Dinner (indoor seating) Dinner (outdoor seating) Child's Birthday Party Wedding/Reception $300 $500 $500 $750 $150 $1,500 Attachment E CHAPTER VI Police A. ALARMS 1. Alarm Use Permit A nonrefundable fee shall accompany each application for an alarm user permit as follows: a. A fee of twenty-five dollar ($25.00) for residential applications. b. A twenty-five dollar ($25.00) residential renewal fee will be required every twenty-four months. c. In the case of alarm permits for commercial customers, the fees shall be as follows: 1) A fee of fifty dollars ($50.00) 2) A) fifty dollar ($50.00) renewal fee will be required every twenty-four (24) months. [Reso/ution 17939, effective 7/1/95J Attachment E CHAPTER III Animal Control A. DOG LICENSES 1. Purchase a. For license expiring one year from date of issue 1) Altered $12.00 2) unaltered $25.00 b. For license expiring three years from date of issue 1) Altered $23.00 2) unaltered $50.00 Any dog license issued pursuant to this section shall be issued for one-half the fees required herein above for any dog if a certificate from a licensed veterinarian is presented or an affidavit is received stating that the dog has been spayed or neutered. For all licenses, the license period cannot exceed the expiration date of the rabies vaccination. 2. Penalty for Late Application/Payment The penalty authorized to be collected for late payment shall be $3.00. 3. License Replacement a. Processing fee in person - $2.00 b. Processing fee by mail - $3.00 4. License Transfer The fee for all types of dog license transfers shall be $5.00. B. SALE OF DOGS, CATS AND OTHER ANIMALS 1 Sh It Ad f e er oPllons DOGS CATS RABBITS LIVESTOCK OTHER Adootion Altered $60 $50 $5 $30 $5 Unaltered $40 $40 $25 $30 $5 Neuter DeDosit $40 $40 SDav DeDosit $40 $40 Rabies Shot DeDosit $8 N/A 2. Off Site Adoptions Dogs $60 Cats $50 Rabbits $30 Attachment F CHAPTER VII Recreation Programs/Facilities C. Facility Use 1. General Facilities - Use Permit b. Basic Fee FACIL TY USE FEE SCHEDULE Facilitv II III IV Per hour Per hour Per hour 1. Parkway Gymnasium a. Gvmnasium $15 $60 $120 2. Parkway Communitv Center a. Auditorium/Main Hall $15 $50 $100 b. Classroom $10 $30 $60 c. Dance room $10 $30 $60 d. Kitchen facilities $5 $10 $20 3. Heritaae Community Center a. Auditorium/Main Hall $15 $50 $100 b. Outdoor/stage $15 $50 $100 c. Craft room $10 $30 $60 d. Kitchen $5 $10 $20 4. Norman Park Senior Center $100 $200 5. Lorna Verde Recreation Center a. Auditorium/Assemblv Hall $15 $50 $100 b. Classroom $10 $25 $50 c. Dance room $10 $30 $60 d. Kitchen $5 $10 $20 6. CV Community Youth Center a. Gvmnasium $15 $50 $100 b. Classroom $10 $30 $60 c. Dance room $10 $25 $50 7. CV Woman's Club $75 $150 8. Other Recreation Facilities a. Memorial Bowl $60 (2 hour $120 minimum) 9. Otav Recreation Center a. Gvmnasium $10 $50 $100 b. Fitness Center Fee for 12 week session Resident Non Resident Adults & Senior $25 i90 14to 18 $15 $30 10 Swimmino Pools RENT STAFF AS NEEDED a. Loma Verde/Full pool $50/hrplus Prevailing hourly staff rate /Partial pool $25/hr plus b. Park Way/Full pool $50/hr plus Prevailing hourly staff rate /Partial Dool $25/hr Dlus c. Rental by ARCO OTC" $25/hr plus Prevailina hourlv staff rate d. Rental by CVESD or SUHSD" $25/hr Dlus Prevailina hourlv staff rate [Reso/ution 18356, effective 719196J '[Reso/ution 18777, effective 9/23/97J "[effective FY99/00J {effective 5/13/03} Attachment F 3. Sallfields For the Non-Resident surcharge for ballfields, all reservation fee rates listed below will be increased by 100%. Liahted Unliahted a. Reservation Fee $30/hr* $20/hr b. Reservation Fee - partial $15/hr* $10/hr field b. Cleaning/Security Deposit N/A N/A c. Maximum Group Size N/A N/A d. Cancellation Fee Groups that cancel a reservation will be charoed a $5 handlino fee. [Reso/ution 18356, effective 7/9/96J *Additional fee of prevailing staff rate per hour for staff to turn on lights, field preparation requested and turn off lights which will include travel time to site location. $10.00 per hour charged for lighted fields for Youth Sports Council organizations during regular seasoned activities.