Loading...
HomeMy WebLinkAbout1991/11/18 Board of Appeals & Advisors Agenda Packet (2) ·L.;)¡¿ I v) it jr/ SCANNED 7/·)/ / . 1/ '71) November 15, 1991 ! . 1é../ C :~__'=='_ ------..,... ,..~-~--_._...__.- Date MEMORANDUM TO: Board of Appeals and Advisors FROM: Yeelin Uybungco, Administrative Secretary Department of Building and Housing SUBJECf: ITEM NO. 3A OF THE AGENDA FOR THE MEETING SCHEDULED FOR MONDAY, NOVEMBER IS, 1991 Attached is the proposed fee schedule for items relating to the Department of Building and Housing for the City's Master Fee Schedule. The items underlined are revisions recommended by staff and the items struck over are recommended for deletion. Please review the fee schedule prior to the meeting and an explanation of staffs recommended revisions will be provided at the meeting. In the event clarification should be necessary, please do not hesitate to contact either myself or Brad Remp, Assistant Director of Building and Housing. /yu (FEEMEMO.DOC) November 18, 1991 MEMORANDUM TO: Chairman Leonard and Members of the Board of Appeals and Advisors FROM: Kenneth G. Larsen, C.B.O., Director of Building and HOUsing~at-- SUBJECT: PROPOSED RECOMMENDATIONS FOR AMENDMENTS TO THE MASTER FEE SCHEDULE RECOMMENDATION: THAT THE BOARD OF APPEALS AND ADVISORS ACCEPT THE PROPOSED RECOMMENDATIONS TO CHAPTER 15, CHULA VISTA MUNICIPAL CODE, RELATING TO THE DEPARTMENT OF BUILDING AND HOUSING, AS OUTLINED IN THE STAFF REPORT. STAFF REPORT: Background: A comprehensive City-wide analysis of the Master Fee Schedule has been requested by the City Manager for intended review by the City Council in December 1991. Prior to such Council review, submittal for your evaluation and comment is the proposed recommendations to the Master Fee Schedule by the Department. As you are aware, the Department adjusts our valuation schedule annually at the beginning of the fiscal year to coincide with the Consumer Price Index (CPI) inflationary adjustments. Typically, this reflects approximately three to five percent (3-5%) upward adjustments, which in turn, impact fees collected via building permit issuance. Beyond our annual valuation adjustments, the Master Fee Schedule has not been adjusted since 1987. Discussion: The components of the package before you are recommended fee adjustments for two classifications of service fee accounts. First is fees contained in the adoption of the model codes, such as the Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code and the Uniform Administrative Code for fee adoption regarding the National Electrical Code.1 The second classification is the operations category where services are performed beyond the scope of routine Building and Housing Inspection activities such as Compliance Survey Inspections, Applications to the Board of Appeals and Advisors, issuance of Temporary and/or Certificates of Occupancy, Foundation Only Permits and maintenance of plans via our microfilming and microfiche of records activities. Proposed for the Board's consideration is the following description depicting staffs recommendation for fee modifications: Item #1: To revise our $30.00/hour rate to reflect full cost recovery for services rendered outside normal business hours, assessed at a rate of the requested level of authority; Building Inspector, Plans Examiner, Senior Building Inspector, etc. 1 The National Electrical Code does not contain provisions for electrical permit fees. Board of Appeals & Advisors -2- November 18, 1991 Item #2: Same as Item #1. Item #3: Same as Item #1. Item #4: Compliance Survev - Revise from $75.00 to reflect full cost recovery for staff involvement. Item #9: Foundation Onlv Permit - Currently staff will, at the request of the applicant, process Foundation Only Permits at no cost. Staff has experienced numerous time constraints in processing, tracking, logging and recording separate permit documents for the same structure. This recommendation is premised upon the actual time involved by staff to accommodate such a request. Staff believes that encumbering an additional 25 percent for the Foundation Only Permit will offset this impact. Item # 10: Application for Board of Appeals and Advisors Hearing - The fee for filing an application before the Board of Appeals and Advisors is intended to offset the cost of staff time for research, report preparation and attendance at the Board of Appeals and Advisors hearings. This fee is consistent with the amount charged by the Planning Department to have a variance request heard at a public hearing. Item #11: Application for an Administrative Hearing - This fee is similar to that charged by the Planning Department for an administrative variance and is appropriate when permit applicant requests approval of a material or method of construction not currently authorized under the uniform codes. This fee will offset the time staff spends on researching and preparing the reports that are required to document the equivalency of these alternate methods or materials. Item #12: Certificate of Occupancy Issuance - Currently staff processes Certificate of Occupancy activity without charge to applicants. As a result of the complexities involving Certificate of Occupancy issuance, the Department has experienced time constraints on the process of using occupancy clearances due to the number of individuals/departments involved in signing-off of the project prior to authorizing occupancy. An example for such is that each commercial building has a minimum of Planning, Engineering, Fire, Landscape and Building & Housing Department review. Since the process is conducted over a three-to-five day period, the Building and Housing Department encumbers numerous staff hours in the initiation process, the contact center for outside departments and the final authority for issuance and distribution of the Certificate of Occufsancy. Staff recommends a $100,00 fee, collected at time of permit issuance to of set this activity, Item #13: Temporarv Certificate of Occupancy - Same as Item #12; the only difference being that this process is a separate reauested function by the applicant to serve selected needs. Staff also recommends a $100.00 fee. Section 15.24.060 - Electrical Permits: Staff is recommending a revision from current fees assessed by a~hre to format adopted within the Uniform Administrative Code. The Uniform Administrative ode more accurately identifies the scope of electrical installations and practices. Board of Appeals & Advisors -3- November 18, 1991 SUMMATION: Staff believes that these proposals for adjustments to the Master Fee Schedule are parallel with jurisdictions in the San Diego County and Southern California Region, and necessary in order to continue to 0Kerate the Department with the highest service level to the citizenry as possible. In the event urther information or clarification should be necessary, please do not hesitate to contact me. KGL:yu (FEEREPRT.DOC) DRAFT ¡ßJØ~JØ7Ø 15.08.050 Building Permit Fees Fees for processing and inspecting building permits sha 11 be co 11 ected in accordance with the fee schedule below. TOTAL VALUATION FEE Sl.00 to S500.00 S15.00 S501.00 to S2,OOO.00 S15.00 for the first S500.00 olus S2.00 for each additional S100.00 or fraction thereof. to and includinQ S2.000.00 S2.001.00 to S25,OOO.00 S45.00 for the first S2,OOO.00 01 us S9.00 for each additional SI.OOO.OO or fract i on thereof. to and includinQ S25.000.00 S25.001.00 to S50,OOO.00 S252.00 for the first S25.000.00 olus S6.50 for each additional SI.OOO.OO or fract i on thereof , to and includinQ S50,OOO.00 S50,OOl.00 to SIOO,OOO.OO S414.50 for the first S50,OOO.00 olus S4,50 for each additional SI ,000.00 or fract i on thereof , to and includinQ SIOO,OOO.OO S100,OOl.00 to S500,OOO.00 S639.50 for the first S100,OOO.00 olus S3.50 for each additional SI. 000.00 or fraction thereof to and includinQ S500,OOO.00 S500.001.00 to S2,039.50 for the first SI.OOO,OOO.OO $500,000.00 olus $3.00 for each additional SI.OOO.OO or fraction thereof. to and includinQ SI. 000,000.00 Sl.000,OOI.00 and uo S3,539.50 for the first $1. 000 , 000.00 01 us S2.00 for each additional $1. 000.00 or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours full cost recovery (minimum charge -- two hours) 2. Reinspection fees assessed under provisions full cost recovery of Section 305 (g) 3. Inspection for which no fee is specifically full cost recovery indicated (minimum charge -- one·half hour) WPC 0862B (1'/14/91) -1- Master Fee Schedule (Building ¡ Housing Excerpt) DRAFT !... Compliance Survey Inspections (minimum charqe - full cost recovery one hour) i... ftl Additional plan review required by changes, full cost recovery additions or revisions to approved plans (minimum -- one-half hour) §.... Stronq Motion Instrumentation Proqram fees per State requirements per California Health and Safety Code 1... 'PI Applications requiring additional plan review to confirm conformance with California Administrative Code Title 24 requirements for Energy Conservation shall pay an additional 15% for plan check and an additional 15% for inspection. ª-... ßI Applications requiring additional plan review and inspection to confirm conformance with California Administrative Code Title 24 requirements for disabled access shall pay an additional 10% for plan check and an additional 10% for inspection. î.. Foundation only permits (not credited 25% of permit fee or toward buildinq cermit\ as otherwise determined by Buildinq Official lQ... Apclication for hearinq before Board of $440 Appeals and Advisors lL. Application for Administrative Hearinq to $200 evaluate alternate methods and materials li... Certificate of Occupancy issuance l.lQQ ~ Temcorary Certificate of Occucancy l.lQQ issuance ~ Plan maintenance charqe (retention 2% of buildinq permit fees mandated by California Health and (bldq,mech,plmb & elect\ Safety Code Sec. 19850\ 15.08.075 DETERMINATION OF VALUE - UBC SECTION 304 The determination of value or valuation under anv of the Drovisions of this code shall be made by the buildinq official. The value to be used in comcutinq the buildinQ cermit and buildinQ clan review fees shall be the total value of all construction work for which the permit is issued, as well as all finish work, caintinq. roofinq, electrical, clumbinq. heatinq, air cond it ion i nq, elevators, fire·extinQuishinq svstems and any other permanent equipment. WPC 08628 (11/14/91) -2- Master Fee Schedule (Building & Housing Excerpt) DRAFT OCCUPANCY & TYPE VALUE/SO FT. OCCUPANCY & TYPE VALUE/SO FT. APARTMENT HOUSES: FIRE STATIONS: *TYPE I OR II-F.R. 86.00 TYPE I OR III-F.R. 90.00 TYPE V OR III (MASONRY) 70.00 TYPE II I-HOUR 59.00 TYPE V WOOD FRAME 63.00 TYPE II-N 56.00 JYPE I BASEMENT GARAGE ~ TYPE III I-HOUR 65.00 TYPE llI-N 62.00 BANKS: TYPE V I-HOUR 58.00 *TYPE I OR II-F.R. 118.00 TYPE V-N 55.00 TYPE II I-HOUR 85.00 TYPE II-N 81. 00 OFFICES: TYPE III I-HOUR 96.00 TYPE I OR II-F.R. 85.00 TYPE I II-N 2L.Q.Q. TYPE I I I-HOUR 55.00 TYPE V I-HOUR 85.00 TYPE II-N 52.00 TYPE V-N ª-L.QQ TYPE III I-HOUR 61. 00 TYPE III-N ~ CHURCHES: TYPE V I-HOUR 56.00 TYPE I OR II-F.R. 78.00 TYPE V-N 53.00 TYPE II I-HOUR 58.00 TYPE II-N 55.00 PRIVATE GARAGES: TYPE III I-HOUR 63.00 WOOD FRAME 18.00 TYPE III-N 60.00 MASONRY 22.00 TYPE V I-HOUR 57.00 OPEN CARPORTS 13.00 TYPE V -N 54.00 PUBLIC BUILDINGS: CONVALESCENT HOSPITALS: TYPE I OR II-F.R. 99.00 TYPE II I-HOUR 74.00 *TYPE I OR II-F.R. 111. 00 TYPE II-N 71. 00 TY PE III 1- HOUR 79.00 TYPE III I-HOUR 83.00 TYPE V I-HOUR 1.L.Q.Q TYPE III-N 79.00 TYPE V I-HOUR 73.00 DWEL LI NGS: *** TYPE V-N lQ....Q.Q TYPE V ADOBE 92.00 TYPE V MASONRY 77.00 PUBLI C GARAGES: TYPE V WOOD FRAME 73.00 *TYPE I OR II-F.R. 39.00 BASEMENTS (SEMI-FINISHED) ~ TYPE, I OR II OPEN PARKING 1L.QQ TYPE II-N 23.00 ADDITIONS - WOOD FRAME 73.00 TYPE III I-HOUR £ª-....QQ SOLARIUMS 1.1JLQ TYPE Ill-N 26.00 TYPE V I-HOUR ll...QQ WPC 08628 (1'/14/91) -3- Master Fee Schedule (Building & Housing Excerpt> bRAFT RESTAURANT: INDUSTRIAL PLANTS: TYPE III 1- HOUR 74.00 TYPE I OR II-F.R. 45.00 TYPE III-N 70.00 TYPE I I I-HOUR 31. 00 TYPE V I-HOUR 65.00 TYPE II ( STOCK) 29.00 TYPE V-N §1.J¿Q TYPE III I-HOUR 34.00 TYPE III-N R..QQ SCHOOLS: TI L T UP 23.00 TYPE I OR II-F.R. 89.00 TYPE V I-HOUR 31. 00 TYPE II I-HOUR 63.00 TYPE V-N tl..QQ TYPE III I-HOUR 64.00 TYPE III -N 60.00 MEDICAL OFFICES: TYPE V 1- HOUR ~ *TYPE I OF II-F.R. 95.00 TYPE V-N ~ TYPE I I I-HOUR 1.L.QQ TYPE II-N 67.00 SERVICE STATIONS: TYPE I II I-HOUR 77.00 TYPE II-N a..Q.Q TYPE III-N l4."QQ TYPE I II I-HOUR 53.00 TYPE V I-HOUR 72.00 TYPE V I-HOUR 46.00 TYPE V-N 68.00 CANOPIES ZQ."QQ STORES: HOSPITALS: *TYPE I OR II-F.R. 66.00 *TYPE I OR II-F.R. 130.00 TYPE I I I-HOUR 40.00 TYPE III I-HOUR 108.00 TYPE II-N 39.00 TYPE V I-HOUR 100.00 TYPE I II I-HOUR 49.00 TYPE III-N 46.00 HOTELS & MOTELS: TYPE V I-HOUR 39.00 *TYPE I OR II-F.R. 81. 00 TYPE V-N 37.00 TYPE I II I-HOUR 70.00 TYPE III-N 67.00 THEATERS: TYPE V I -HOUR 61.00 TYPE I OR II-F.R. 87.00 TYPE V-N 58.00 TYPE I II I-HOUR 63.00 TYPE III-N 60.00 WAREHOUSES: TYPE V I-HOUR 57.00 TYPE I OR II-F.R. 39.00 TYPE V-N 54.00 TYPE II I-HOUR 23.00 TYPE II-N 22.00 EOUIPMENT: TY PE III 1- HOUR 27.00 AIR CONDITIONING (COMMERCIAL) 3.40 TYPE II I-N 26.00 AIR CONDITIONING (RESIDENTIAL) 2.80 TYPE V I-HOUR 23.00 SPRINKLER SYSTEMS 1.60 TYPE V-N ll...QQ * ADD 0.5 PERCENT TO THE TOTAL COST FOR EACH STORY OVER THREE. - ~ DEDUCT 11 PERCENT FOR MINI-WAREHOUSES. ***FOR SUBDIVISIONS WITH 10 OR MORE SINGLE-FAMILY DWELLINGS WHICH HAVE PLAN CHECK AND BUILDING PERMIT ISSUANCES IN GROUPS OF 10 OR MORE. THE VALUATION OR THE PLAN CHECK AND BUILDING PERMIT FEES MAY BE DECREASED 8Y 10 PERCENT. AGRICULTURAL BUILDING 514.25 SO. FT. ALUMINUM SIDING 5 4.25 SO. FT. WPC 08628 (11/14/91) -4- Master Fee Schedule (Bu;lding & Hous;ng Excerpt) ANTENNAS DRAFT RADIO. OVER 30 FT. IN HEIGHT $2,600.00 EACH DISH. 10 FT, DIA. W/DECODER $3.150.00 EACH AWNING OR CANOPY (SUPPORTED BY BUILDING) ALUMINUM $15.50 SO. FT. CANVAS $ 6.50 SO. FT. BALCONY $10.75 SO. FT. CLOSE EXTERIOR WALL OPENING $10.75 SO. FT. DECKS (WOOD) $10.75 SO. FT. DEMOLITION OF BUILDING $23.75 SO. FT. FENCE OR FREESTANDING WALL WOOD OR CHAIN LINK $ 1. 50 SO. FT. WIRE $ 1. 50 SO. FT. MASONRY $ 6.50 SO. FT. .. WROUGHT IRON $ 4.25 SO. FT. FIREPLACES CONCRETE OR MASONRY $2,600.00 EACH PREFABRICATED METAL S1. 775.00 EACH GREENHOUSE $ 4.25 SO. FT. INTERIOR PARTITION $36.25 UN. FT. INSTALL WINDOW OR SLIDING GLASS DOOR $11 .25 SO. FT. MANUFACTURED HOUSING (25% OF VALUE OF "SITE-BUILT" HOUSEl $18,25 EACH £Allil WOOD FRAME WITH COVER . $ 6.50 SO. FT. METAL FRAME WITH COVER $ 8.25 SO. FT. WOOD FRAME - COVER AND WALLS $ 9.50 SO. FT. METAL FRAME - COVER AND WALLS $10.75 SO. FT. SCREEN OR PLASTIC WALLS $ 2,25 SO. FT. PILE FOUNDATIONS CAST-IN-PLACE CONCRETE $16.00 UN. FT. illEJ. $38.50 UN. FT. PLASTERING INSIDE $2.00 SO. FT. OUTSIDE $2.00 SO. FT. RELOCATED BUILDINGS (FEE SAME AS FOR NEW BUILDINGS) WPC 08628 (11/14/91) -5- Master fee Schedule (Building & Housing Excerpt) - . . 'DRAFT RETAINING WALL CONCRETE OR MASONRY $13.00 SO. FT, RE-ROOFING II SOUARE . 100 SOUARE FEET) BUILT-UP SIOO.OO SO. COMPOSITION SHINGLES S 92.00 SO. FIBERGLASS SHINGLES S 92.00 SO. ASBESTOS-CEMENT SHINGLES S219.00 SO. WOOD SHINGLES S219.00 SO. WOOD SHAKES S219.00 SO. ALUMINUM SHINGLES S330.00 SO. CLAY TILE S277 .00 SO, CONCRETE TI LE S234.00 SO. ROOF STRUCTURE REPLACEMENT S10. 75 SO. FT. SAUNAS I STEAM) S6.500.00 EACH SHELL BUILDINGS A SHELL BUI LDING IS DEFINED AS A BUILDING FOR WHICH HVAC, LI GHTI NG. SUSPENDED CEILINGS, PLUMBING AND ELECTRICAL SYSTEMS, PARTITION LAYOUTS AND INTERIOR FINISH ARE NOT SHOWN ON THE PLANS AND FOR WHICH SEPARATE TENANT IMPROVEMENT PLANS WILL BE SUBMITTED FOR PLAN CHECK AT A LATER DATE SHOWING THESE ITEMS. WAREHOUSES AND INDUSTRIAL BUILDINGS SHALL NOT BE CONSIDERED SHELL BUILDINGS. THE VALUATION FOR SHELL BUILDINGS SHALL BE TAKEN AS 80 PERCENT OF THE VALUATION FOR THE COMPLETED BUILDING. SOLAR VALUE PLUS PLUMBING, ELECTRICAL, WATER AND HEATING S1.175.00 EACH --OR-- PLAN CHECK FEE ONE BUILDING S29.50 EACH ADDN'L BLDG. AT SAME LOCATION Sl1.75 EACH BUILDING PERMIT FEE IPER GROSS FLOOR AREA OF COLLECTOR) FIRST 100 SOUARE FEET .47 SO. FT. COLLECTOR AREA OVER 100 SO. FT. .06 SO. FT. REINSPECTION FEE S17.75 EACH SPA OR JACUZZI S5.325.00 EACH STAIRS S10.75 SO. FT. STONE AND BRICK VENEER S 6.50 SO. FT. SWIMMING POOL IPER SO. FT. OF SURFACE AREA) VINYL LINED S25.00 SO. FT. GUNITE S27.25 SO. FT. FIBERGLASS S29.50 SO. FT. WPC 0862B (11/1'/91) -6- Mister Fee Schedule (Buildins & Housins Excerpt) TENANT IMPROVEMENTS bRAFT THE VALUATION OF TENANT IMPROVEMENTS SHALL BE $21. 00 PER SO. FT. OR THE ACTUAL CONSTRUCTION COST ESTIMATE. SIGNS AND BILLBOARDS NON- ILLUMINATED ILLUMINATED ß.QQE I FACE $19.25 SO. FT. $31.50 SO. FT. 2 FACE $27.25 SO. FT. S44.50 SO. FT. ~ 1 FACE S13.00 SO. FT. S27.25 SO. FT. PROJECTING 1 FACE $18.50 SO. FT. S38.25 SO. FT. 2 FACE $27.25 SO. FT. S44.50 SO. FT. POLE (VALUE PLUS SUPPORTING STRUCTURE) 1 FACE S19.25 SO. FT. S3 I. 50 SO. FT. 2 FACE $27.25 SO. FT. S44.50 SO. FT. BILLBOARDS (VALUE PLUS SUPPORTING STRUCTURE) 1 FACE S19.25 SO. FT. S3 I. 50 SO. FT. 2 FACE S27.25 SO. FT. S45.50 SO. FT. SUPPORTING STRUCTURE S44. 50 LI N. FT. 15.16.010 Mechanical Permit Fees Fees for processing and inspecting mechanical permits shall be as follows: A. For the issuance of this permit 15.00 .e.... For issuinq each supplemental permit 4.50 'Nt.. For the installation or relocation of each forced air or gravity type furnace/burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu's 9.00 ~I !L. For the installation or relocation of each forced air or gravity type furnace/burner, including ducts and vents attached to such appliance over 100,000 Btu's. 11.00 Øl f.... For the .installation or relocation of each floor furnace, including vent. 9.00 'UL. For the installation or relocation of each suspended heater, recessed wall heater or floor mounted unit heater. 9.00 P I Ii.. For the installation, relocation or replacement of each appliance vent installed and not included in an application. 4.50 ~I !:!.... For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, comfort cooling unit, absorption unit, or evaporative cooling system, including installation of controls regulated by this Code. 9.00 ¡il L. For the installation or relocation of each boiler or compressor up to and including three horsepower, or each absorption system up to and including 100,000 Btu's. 9.00 WPC 08628 (11/14/91) -7- Master Fee Schedule (Building & Housing Excerpt) bRAFT U~ For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horse- power, or each absorption system over 100,000 Btu's to and including 500,000 Btu's. 16.50 N'&. For the installation or relocation of each boiler or compressor over 15 horsepower, or each absorption system over 500,000 Btu's to and including 1,000,000 Btu's 22.50 Y-./1.... For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horse- power, or for each absorption system over 1,000,000 Btu's and including 1,750,000 Btu's 33.50 UIi.. For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu's 56.00 ~.1 .tL. For each air handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto 6.50 ~I Q... For each air handling unit over 10,000 cubic feet per minute 11.00 Øl .e.... For each evaporative cooler other than portable type 6.50 P.1 !h For each ventilation fan connected to a single duct 4.50 f11 R.. For each ventilation system which is not a portion of any . heating or air conditioning system authorized by a permit. 6.50 IV i.. For the installation of each hood which is served by mechanical exhaust, including the ducts for each hood 6.50 $1 1.... For the installation or relocation of each domestic type incinerator 11.00 lJ!!.... For the installation or relocation of each commercial or industrial type incinerator 45.00 .111 Y.... For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code 6.50 ï... When ChaDter 22 is aDDlicable (see Section 103), Dermit fees for fuel-qas DiDinq shall be as follows: For each qas-DiDinq svstem of one to four outlets 3.00 For each qas-DiDinq svstem of five or more outlets, Der outlet .75 '1.1 !.:. In addition, in situations similar to those listed under the subsection titled "Other Inspection and Fees" of Section 15.08.070, the fee shall be the same. 15.20.040 Housing Permit Fees The fee for a housing permit as authorized by Section 15.20.040 of the Municipal Code shall be as follows: A. For each apartment house, lodging house, boarding house, group residence, hotel and motel containing not more than six (6) units, $62.60. B, For each apartment house, lodging house, boarding house, group residence, hotel and motel containing not less than seven (7) units but not more than ten (10) units, $85.30. C. For each apartment house, lodging house, boarding house, group residence, hotel and motel containing not less than ten (10) units but no more than fifteen (15) units, $102.40. WPC 08628 (11/14/91) -8- Master fee Schedule (Building & Housing Excerpt) bRAFT D. For each apartment house, lodging house, boarding house, group residence, hotel and motel containing more than fifteen (15) units, $102.40 plus $2.30 for each unit in excess of fifteen (15) units. For failure to pay a housing permit fee on or before the delinquency date, the penalty shall be computed on the same basi s as the penalty to be paid for fa i 1 ure to pay a bus i ness 1 i cense fee on or before the deli nquency date as outlined in Section 5.04.080 of the Municipal Code. 1ßn~Jl.ßø 15.24.060 Electrical Permit Fees Fees for processing and inspecting electrical permits shall be as follows: p..j For issuing each permit llØ/ØØ S15.00 For issuina each suoolemental oermit 4.50 ß/ ~Ø~/~p~~~f~~~jp~/lfpfIØ~~~/~~pØfØlpf/~~j~1 $j~~UIP~~# /PØ ~Øf!j~Ø/I~~j~~~/lf~~¢/lpfIÞf¢~~¢f l~f#IP~#¢ /ßø '1-/ ~¢~/~¢f!j¢¢/Ø~/¢xj~~j~~/þ~jl¢j~~/lf¢fIØ~¢~ $j~~lØIP~#Ø /PØ ~~pØfØI¢flj~¢f¢~~¢lj~/~~j~/~Øf!j¢Ø/I~~j~¢~/ l~f#IP~~# /ßø . f~~Ø/I¢fIÞfØ~~Øf Ø/ ~Ø~¢¢¢l/l~l~Øf~~jp~/I~¢/¢~~~~¢lj~/~Øf!j¢Ø/ $j~~lØIP~~# /PØ f¢fIØ~~~/~~pØfØlpflj~~fØ~~Ø l~fØØIP~~# /ßø U lØ~p¢f~fi/~¢f!j¢Ø/~p/~¢/~~¢lj~¢l~¢j~~/~ØØ ß/ØØ ~~p¢fØ Y.1 lØ~p¢f~fi/~Øf!j¢¢/Ø!¢f/~ØØ/~~pØf¢/pØfllØØ lß/ØØ ~~p¢fØ ß/ l~/~¢¢j~j¢~/lj~/~j~~~~j¢~~/~j~jl~f/~Ø/~~¢~Ø lJ~t¢¢/~~¢¢flt~¢/~~Þ~¢¢tjØ~/tJtl¢¢IYØt~¢f 1~tp¢¢tJ¢~~/~~¢lf¢¢tYIØfl$¢¢tj¢~/1ß/Øß/Ø7Øj t~¢lf¢Ø/~~~llIÞØlt~Ø/~~~¢/ SYSTEM FEE SCHEDULE (Note: The followina do not include oermit-issuina fee.) New Residential Buildinas The followinq fees shall include all wirinq and electrical eauioment in or on each buildina, or other electrical eauioment on the same oremises constructed at the same time. For new multifamily residential buildinqs (aoartments and condominiums) hayina three or more liYina units not includina the area of aaraaes, caroorts and other noncommercial automobile storaae areas constructed at the same time, oer sauare foot .03 For new sinqle- and two-family residential buildinas not includinq the area of aaraaes. caroorts and other minor accessory buildinas constructed at the same time, oer sauare foot .035 For other tyoes of residential occuoancies and alterations, additions and modifications to existina residential buildinas, use the UNIT FEE SCHEDULE. WPC 0862B (11/14/91) -9- Master Fee Schedule (Building & Housing Excerpt) t>RAFT Private Swimmina Pools For new private. residential. in-around, swimmina pools for sinale-familv and multifamily occupancies includina a complete system of necessary branch circuit wirina, bondina, aroundina, underwater liahtina, water pumpina and other similar electrical eauipment directly related to the operation of a swimmina pool. each JQ...QQ For other types of swimmina pools, therapeutic whirlpools. spas and alterations to existina swimmina pools. use the UNIT FEE SCHEDULE. Carnivals and Circuses Carnivals, circuses, or other travelina shows or exhibitions utilizina transportable-type rides, booths, displays and attractions. For electric aenerators and electrically driven rides. each li...QQ For mechanically driven rides and walk-throuah attractions or displays havina electric liahtina. each 4.50 For a system of area and booth liahtina. each 4.50 For permanently installed, rides, booths, displays and attractions, use the UNIT FEE SCHEDULE. Temporarv Power Service For a temporarv service power pole or pedestal includina all pole or pedestal-mounted receptacle outlets and appurtenances, each li."QQ For a temporarv distribution system and temporarv liahtina and receptacle outlets for construction sites, decorative liaht, Christmas tree sales lots, firework stands. etc., each 7.50 UNIT FEE SCHEDULE (Note: The followina do not include permit issuina fee.) Receptacle, Switch and Liqhtinq Outlets For receptacle, switch, liahtinq or other outlets at which current is used or controlled, except services, feeders and meters First 20, each ill Additional outlets, each ....!á Note: For multioutlet assemblies. each 5 feet or fraction thereof mav be considered as one outlet. Liahtina Fixtures For liahtina fixtures. sockets or other lamp-holdina devices First 20, each .75 Addition~l fixtures, each ....!á WPC 0862B (11/14/91) -10- Master Fee Schedule (Building & Housing Excerpt) - bRAFT For Dole or Dlatform-mounted liQhtinQ fixtures, each ...n For theatrical-tvDe liQhtinQ fixtures or assemblies. each .75 Residential ADDliances For fixed residential aDDliances or receDtacle outlets for same. includinQ wall-mounted electric ovens: counter-mounted cookinQ tODs; electric ranQes, self-contained room, console, or throuQh-wall air conditioners; SDace heaters: food waste Qrinders: dishwashers: washinQ machines; water heaters: clothes dryers: or other motor-oDerated aDDliances not exceedinQ one horseDower (HP) in ratinQ. each 3.00 Note: For other tVDes of air conditioners and other motor-driven aDDliances havinQ larQer electrical ratinQs, see Power ADDaratus. Nonresidential ADDliances For residential aDDliances and self-contained factory-wired, nonresidential aDDliances not exceedinQ one horseDower (HP), ,. kilowatt (KW), or kilovolt-amDere (KVA), in ratinQ includinQ medical and dental devices: food, beveraQe, and ice cream cabinets; illuminated show cases; drinkinQ fountains: vendinQ machines; laundry machines; or other similar tVDes of eQuioment, each hQQ Note: For other tVDes of air conditioners and other motor- driven aDDliances havinQ larQer electrical ratinQs. see Power ADDaratus. Power ADDaratus For motors, Qenerators, transformers, rectifiers, synchronous converters, caoacitors, industrial heatinQ. air conditioners and heat DumDS, cookinQ or bakinQ eQUiDment and other aDDaratus. as follows: RatinQ in horseDower (HPJ. kilowatts (KWJ. kilovolt- amDeres (KVA), or kilovolt-amDeres-reactive (KVAR): Uo to and includinQ 1, each 3.00 Over 1 and not over 10, each 7.50 Over 10 and not over 50, each 15.00 Over 50 and not over 100, each 30.00 Over 100, each 45.00 fiQk;. 1. For eQuioment or aooliances havinQ more than one motor, transformer, heater. etc.. the sum of the combined ratinqs may be used. 2. These fees include all switches. circuit breakers. contactors. thermostats, relays and other directly related control eQuioment. Busways For trolley and oluQ-in tVDe buswavs, each 100 feet or 4.50 fraction thereof. Note: An additional fee will be reQuired for I iQhtinQ fixtures, motors and other aODliances that are connected to trolley and oluQ-in tvoe buswavs. No fee is reQuired for Dortable tools. WPC 08628 (11/14/91) -11- Master Fee Schedule (Building & Housing Excerpt) bRAFT Sians, Outline Liahtina and Marauees For sians, outline liahtina svstems or marauees supplied from one branch circuit, each 15.00 For additional branch circuits within the same sian. outline liahtina svstem or marauee, each LQQ Services For services of 600 volts or less and not over 200 amperes in ratina, each IB.50 For services of 600 volts or less and over 200 amperes to 1000 amperes in ratina, each 37.50 For services over 600 volts or over 1000 amperes in ratina. ~ iliQQ. Miscellaneous Apparatus, Conduits and Conductors For electrical apparatus, conduits and conductors for which a permit is reauired but for which no fee is herein set forth 11.00 Note: This fee is not applicable when a fee is paid for one or. more services, outlets, fixtures, appl iances. ., DOWer aDDaratus, buswavs, sians or other eauiDment. Jß/~~/ØJØ 15.2B.040 Plumbing Permit Fees Fees for processing and inspecting plumbing permits shall be as follows: A. For issuing each permit ~JØIØØ $20.00 ~ For issuina each sUPDlemental permit 10.00 ßI b- For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection therefore) PJßø 7,00 U!L. For each building sewer and each trailer park sewer illØØ 15,00 f'J L. Rainwater system - per drain (inside building) ~/ßØ 7.00 UL. For each cesspool illØØ 25.00 'IJ§.... For each private sewage disposal system JNØØ 40.00 ßJ !i.. For each water heater and/or vent ~/ßØ 7.00 )11 1. For each gas piping system of one (1) to ~/ßØ .2...QQ fø~f/l~l five IS) outlets J.J J.. For each additional gas piping system øf/fjý¢/lßl/øf 1.00 ~øf¢ outlet, per outlet Øl K. For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen type grease interceptors functioning as fixture traps ~Jßø 7.00 y.,J l. For installation, alteration or repair of water piping and/or water treating equipment ~Jßø 7.00 ~I !:!' For each repair or alteration of drainage or vent piping~ each fixture ~/ßØ L.QQ W N. For each lawn sprinkler system on anyone meter, including backflow protection devices therefor ~Jßø 7.00 /II Q.. For atmosphereic-tvpe vacuum breakers øf/Þ~¢~flø~ Þføt¢¢tjý¢/¢¢ýj¢¢t/ø~/t~~~t¡/ý~tt¡/¢t¢I/Øf/fØf j~tt~ll~tjø~/Ø~/~~ÞfØt¢¢t¢¢/Þl~~þj~g/fjlt~f¢t j~¢l~¢j~g/~¢¢¢tt~fi/~~t¢f/þjþj~g/I/Ø~¢/lJl/tØ/fØ~f/l~l not i nc 1 uded inN. above - I I) to 15) ~/ßØ 5.00 Øl Yjý¢ Over (5) øf/~øf¢, each 1.00 WPC 0862B (11/14/91) -12- Mister Fee Schedule (BuildlnB & Housing Excerpt) bRAFT .- Q... For each backflow erotective device other than atmoseheric tvee vacuum breakers: 2 inch diameter and smaller 7.00 Over 2 inch diameter li...QQ P. In addition, in situations similar to those listed under the subsection titled "Other Inspection and Fees" of Section 15.08.070, the fee shall be the same. .: WPC 0862B (11/14/91) -13- Malter fee Schedule (Building' Housing Excerpt)