HomeMy WebLinkAbout1994/06/13 Board of Appeals & Advisors Agenda Packet (5)
- c, -13"9t
Item 114E
San Ðiego .9l.rea Cnapter Page 1 of 12
International Conference of Building oWkr
Carlsbad, Otula Vista. Coronado. Del MaT, EI Cajon, £1 CenlrO. Encinitas. Escondida, Imperial Beach, La Mesa, Lemon Grove,
National City, Oceanside. Poway, San Diego City, San Diego County. San Marcos, Santee, Solana Beach, Temecu1a, Vista
MEMORANDUM
DATE: June 6, 1994
FROM: Bronson Rideout, Chairman
TO: San Diego Area Chapter
SUBJECT: 1994-1995 Valuation Schedule
The chapter met on May 17, 1994 and voted to accept the building valuation figures
contained in the attached tables,
The unit valuations contained in the proposed schedule are based upon costs published in the
March/April 1994 issue of the Building Standards magazine by the International Conference of
Building Officials,
Almost all of the listed multipliers increased from last year, with the average building
valuation increase being 2.4%, The value of wood frame single family dwellings increased 5.4%
from $74.00 to $78.00,
Continuing with the procedure established in 1987, in an effort to provide a more equitable and
consistent method of computing the miscellaneous valuations, the new miscellaneous valuations
have been calculated based upon the overall percent change from the 1985-1986 schedule,
Using the 1985-1986 valuations as the base year, the proposed 1994-1995 miscellaneous
valuations have been increased 22,9% from the 1985-1986 values, and rounded off as shown
in the schedule.
The committee did not consider any other additions or modifications to the schedule this year.
As stated above, this schedule was approved for use during the next fiscal year by all the San
Diego area jurisdictions present at the May 17, 1994 meeting,
Respectfully submitted,
~~,~~~~þ
Bronson Rideout, Chairman
Valuation Committee Members:
Dan Arbaugh Mike Bouse
AI Hogan Bronson Rideout
Elaine Maxwell Dick Esgate
-
Item 114E
Page 2 of 12
San Diego Area Chapter
International Conference of Building Officials
Proposed Building Valuation Multipliers for 1994-1995
E1Ieaive Dale - J¡jy 1, 1994
Value
Occupancy and Type Per Sq Ft
1994-1995
Apartment Houses
. TweI exlWR $89,00
Twe V ex III (Masmy) $72.00
Twe V Wood Rame $66,00
Twe I Basement Garage $31.00
Banks
. Twe I ex II-F.R $121,00
T we 111-Hot.r $88,00
Twe n·N $86.00
Twe 1111-Holr $98,00
Twelll-N $94,00
TweV1-Hcu $88.00
Twe V-N $85.00
Car Washes
Twe 1111-Hot.r $57.00
Twelll-N $54.00
Twe V 1-HOl.f $48,00
T)IJe V-N $45,00
Churches
Twe I ex II-F.R. $81.00
Twe 111-Holr $60,00
Twe II-N $57,00
Twe 1111-Hot.r $66,00
Twelll-N $63.00
Twe V 1-HOl.f $61,00
T)lJeV-N $58,00
Convalescent Hospitals
. Twe I ex II-F.R $114,00
Twe 111-Hot.r $77,00
T)IJe 1111-Hot.r $00,00
Twe V 1-HOl.f $75.00
-1- June 5, 1994
- Item 114E
Page 5 of 12
Value
Occupancy and Type Per Sq Ft
1994-1995
Public Garages
· Twe I (J" II-F.R, $40,00
· Twel(J"II~Parkirr;¡ $3:),00
Twe II-N $23.00
Twelll1-Holr $30,00
Twe III-N $27.00
Twe V 1-Holr $27,00
Restaurants
TweIll1-HoJ $79.00
Twe III-N $76,00
TweV1-HoiJ $72,00
TweV-N $69.00
Schools
Twe I (J" II-F.R, $91.00
Twe II 1-HoJ $61.00
Twe 1111-Holr $66,00
Twe III-N $62,00
Twe V 1-Hoi.r $61.00
Twe V-N $58,00
Service Stations
Twe II-N $54,00
TweIll1-HoJ $57.00
Twe V 1-Hot.r $48,00
Carqjes $23,00
Stores
· Twe I (J" II-F,R. $67,00
TweIl1-Holr $41,00
Twe II-N $40,00
Twe 1111-HoiJ $50.00
Twe III-N $47,00
Type V 1-Hwr $42.00
TweV-N $38,00
Theatres
Twe I (J" II-F.R, $90.00
TweIll1-HoJ $65,00
Twe III-N $62.00
TweV1-HCM $60.00
TweV-N $57,00
-4- June 5, 1994
-
Item 114E
Page 6 of 12
Value
Occupancy and Type Per Sq Ft
1994- 1995
Warehouses ..
Type I (J" II-F.R, $40.00
Type II 1-Holr $24,00
Type II-N $22.00
Type 1/1 1-Holr $27.00
Type III-N $26,00
Type V 1-HOlJ" $24,00
TypeV-N $22,00
Equipment
AIr Coroitioning (Commercial) $3.50
M Conditioning (Residential) $2.90
Spiri<Ia" Systans $1,70
Building Valuation Data
The valuations shown were formulated by taking the unit cost per square foot and
mulliplying it by a regional modifier (1,00) and rounding off to the nearest dollar.
This building valuation data is contained in the March-April 1994 issue of the Building
Standards Magazine, published by the International Conference of Building Officials,
. Add 0,5 percent to the total cost for each story over three.
.. Deduct 11 percent for mini-warehouses,
... For subdivisions with 10 or more single-family dwellings which have pIancheck
and building permit issuances in groups of 10 or more, the valuation or the
plancheck and building permit fees may be decreased by 10 percent.
-5- June 5, 1994
- Item 114[;
Page 7 of 12
Miscellaneous
The following items do not appear in the Standards,
The proposed 1994-1995 values increased 2,36% above the previous 1993-1994 values,
The values shown are rounded to the nearest $.25, $,50, $1,00, $25,00 or $50.00 where appropriate
AUTHORI1Y TO DETERMINE VALUE - use Section 304
The detennination of value or valuation under any of the provisions of this code shall be made by
the building official. The value to be used in computing the building permit and building plan
review fees shall be the total value of all construction wor1<: for which the permit is issued, as well
as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators,
fire-extinguishing systems and any other permanent equi¡rnent.
Value
1994-1995
ADDmOOS
Additions to any building or structure shall be valued at 120'10 of the value for a new building
of the same occupancy and type of construction,
AGRICULTURAL BUILDING $14,75 Isq.ft,
ALUMINUM SIDING $4,25 Isq,ft.
ANTENNAS
Radio, over 30ft. in height $2,700,00 each
Dish, 10ft. dia. w/deccxJer $3,300,00 each
AWNING OR CANOPY (suworted by buik1ing)
AUriTU11 $16,00 Isq,ft.
Canvas $6.75 Isq.ft.
BtlLCONY $11,00 Isq,ft.
CLOSE EXTERIOR WALL OPENING $11,00 Isq.ft.
DECKS (Wocd) $11.00 Isq,ft.
DEMOLmON OF BUILDING $3,00 Isq.ft,
ÆNCE OR FREESTANDING WALL
Wood or Chai1 Uri< $1,50 Isq,ft,
Wre $1,50 Isq,ft.
Masooy $6,75 Isq,ft,
Wrrxs;Jtt Iron $4.25 Isq,ft.
AREPlACES
Coo::rete (J' Masorry $2,700.00 each
PI,-.t.. ~ MeIaI $1,850,00 each
-6- June 5, 1994
-
Item 114E
Page 8 of 12
Value
1994-1995
FOUNDATlQII ONLY
A foundation only permit for a structure shall be valued at 25% of the value of the whole building.
The permit for the remainder of the building shall be based upon a value of 75% of the building.
GFEENHOUSE $4,25 Isq,ft.
INTERIOR PARTTTlQII $37,50 /1in.fl
INSTALL WINDOW OR
SLIDING GLASS DOOR $11.75 Isq. It.
MANUFACTURED HOUSING (25"10 of value of 'site-built" house)
$19,00 each
PATIO
WrxxJ Frame with Cover $6.75 Isq,lt.
Metal Frame with Cover $8,50 Isq,lt,
WrxxJ Frame - Cover and Walls $9.75 Isq.It,
Metal Frame - Cover and Walls $11.00 Isq, It.
Screen or Plastic Walls $2,50 Isq,lt,
PILE FOUNDATlQIIS
Cast-in-PIaœ Concrete $16,50 /1in,It,
SIeeI $40,00 mn,lt.
PlASTERING
Insde $2,15 Isq,lt,
0Iisi:Je $2,15 Isq,lt.
RELOCATED BUILDINGS (Fee same as for new buildings)
RETAINING WALL
Concrete or Masooy $13,50 Isq.It,
REROOFING (1 square = 100 square feet)
BUt-tp $103,00 /sq,
Canposition ShifY,¡1es $96,00 /sq,
A:JergIass Shingles $96,00 /sq,
Asbestos-Cernent Shingles $227,00 /sq,
WrxxJ Shingles $227,00 /sq.
WrxxJ Sha<es $227,00 /sq,
Altmirun ShifY,¡1es $343,00 /sq.
ClayTde $287,00 /sq,
Concrete TIe $243,00 /sq.
ROOF STRUCTURE REPLACEMENT $11,00 Isq, It,
-7- June 5, 1994
Item 114E
Page 9 of 12
Value
1994-1995
SAUNAS (Stæm) $6,750,00 each
SHEll. BUILDINGS
A shell building is defined as a building tor which HVAC, lighting, suspended ceilings, plumbing
and electrical systems, partition layouts and interior finish are not shown on the plans and for
which separate tenant improvement plans will be submitted for plan check at a later date showing
these items. Warehouses and industrial buildings shall not be considered shell buildings. The
valuation for shell buildings shall be taken as 80 percent of the valuation for the completed building,
SIGNS AND BILlBOARDS
Non-llIIn1inaled Signs and Bill:xJards
FOJF SIGN
1Fæe $20,00 Isq, It,
2Fæe $28,25 Isq,lt,
WÞil. SIGN
1Fæe $13,50 Isq,lt.
PROJEC1lNG SIGN
1 Fæe $19,25 Isq.It,
2Fæe $28,25 Isq.It,
POLE SIGN (Values plus supporting structure)
1 Fæe $20,00 Isq,lt,
2Fæe $28,25 Isq,lt.
BILLBOARDS (Values plus s~porting structures)
1Fæe $20,00 Isq,jt,
2Fæe $2825 Isq,lt,
IIILI1linaled Si¡J1s and Bilboards
FOJFSIGN
1Fæe $32.50 Isq. ft.
2Pcœ $46,00 Isq,ft,
Wfill..SIGN
1 Fæe $28,25 Isq,lt,
PROJECTING SIGN
1 Fæe $39,75 Isq,lt.
2Fæe $46.00 Isq. It,
POLE SIGN (Values plus supporting structure)
1Fæe $32.50 Isq.It,
2Fæe $46.00 Isq, It,
-8- June 5, 1994
-
Item 114E
Page 10 of 12
Value
1994-1995
BILlBOARDS (Values plus supporting structures)
1Fæe $32,50 Isq,ft.
2Fæe $46,00 Isq,ft,
SUPPORTING STRUC1URE $46,00 nn,ft.
sa.AR
Value plus plumbing, electrical,
water arxj heatirg $1,225.00 each
-OR-
Plan Q1ed{ Fee
Ole BUÖ1g $30,75 each
Additional building at same location $12.25 each
, Building Permit Fee (Per gross floor area of collector)
fi'st 100 squa-e feet $:),49 Isq,ft,
Collector area over 100 sq 11 $:),œ Isq,ft,
Fb...,ection Fee $18.50 each
SPA OR JACUZZI $5,525.00 each
STAIRS $11,00 Isq.1I,
STONE AND BRICK VENEER $6,75 Isq,1I,
SWIMMING POOL (per sq,ft, of su:faœ area)
Vnyl Ü100 $25.75 Isq. ft,
GlriB $28,25 Isq,1I,
FbergIass $30.75 Isq. ft.
TENANT IMPROVEMENTS (Other) $26,00 Isq,ft,
TENANTIMPROVEMENTS(H~he0 $36,00 Isq.ft,
The valuation of tenant improvements shall be based on one of the following:
1. $36.00 for banks, churches, medical offices, restaurants and hazardous "H" occupancies,
2, $26.00 for other Tenant Improvements such as stores and offices.
3, An actual construction cost estimate (See attached form),
-9- June 5, 1994
Item 114E
Page 11 of 12
REMODEL OR TENANT IMPROVEMENT CONSTRUCTION VALUATION
The Building Official is mandated by State law to determine the value
of work proposed in each application for a Building Permit. The value
to be used shall be the total value of all construction work for which
the permit is issued as well as all finish work, painting, roofing,
electrical, plumbing, heating, air conditioning, elevators, fire exting-
uishing systems and any other permanent equipment. Uniform Building
Code Section 304 (a)
***********************************************************************
APPLICANT PLEASE COMPLETE
SITE ADDRESS PLAN CHECK NO.
DESCRIPTION OF PROPOSED WORK
AREA OF D REMODEL
c:J TENANT IMPROVEMENT
o ADDITION
PROPOSED WORK INCLUDES:
NEW SUSPENDED CEILING DYES c:J NO
NEW HVAC c:J YES 0 NO
NEW FIRE SPRINKLERS c:J YES 0 NO
NEW PARTITIONS DYES 8 NO
NEW PLUMBING DYES NO
NEW ELECTRICAL DYES 0 NO
HAS A CONTRACTORS ESTIMATE BEEN RECEIVED FOR THE PROPOSED WORK?( ]YES ( ]Nu
ITEMIZED COST ESTIMATE IS ATTACHED ( ] YES ( ] NO
I CERTIFY THE VALUE OF ALL PROPOSED CONSTRUCTION WORK COVERED BY THE
PERMIT APPLICATION INCLUDING: ALL STRUCTURAL WORK, FINISH WORK, PAINT-
ING, ROOFING; ELECTRICAL, PLUMBING, HEATING, AIR CONDITIONING, ELEVATORS,
FIRE EXTINGUISHING SYSTEMS, AND ALL PERMANENT EQUIPMENT IS:$
THIS VALUE IS BASED ON:
0 DESIGNER'S ESTIMATE
CJ CONTRACTOR'S ESTIMATE
CJ OTHER, DESCRIBE BASIS
THE ABOVE INFORMATION IS TRUE AND CORRECT
D APPLICANT
SIGNATURE DATE 0 DESIGNER
0 CONTRACTOR
**********************************************************************
PLAN CHECKER USE ONLY
THE VALUE IS ACCEPTABLE DYES D NO
AN ITEMIZED COST BREAKDOWN IS REQUIRED TO CONFIRM THE ESTIMATED
CONSTRUCTION VALUE. D YES D NO
BY:
DATE:
- Item 114I
Page 3 of 12
Value
Occupancy and Type Per Sq Ft
1994-1995
Dwellings ...
Type V Add:Je $94.00
Type V Masony $78.00
Type V WOOO RaIne $78,00
Basemen1S (sem~finished) $19,00
Additions - WOOO Frame $78,00
Sdarirns $78.00
Fire Stations
Type I cr II-F.R, $93,00
Type 111-Hc:u $61,00
Type II-N $58,00
Type 1111-Holr $67,00
Typelll-N $64,00
TypeV1-Hc:u $62.00
Type V-N $59,00
Fitness Centers
· Type I cr II-F.R, $87,00
Type 111-Hc:u $58,00
Type II-N $55.00
TypeIll1-Hcu $62.00
Type III-N $60,00
TypeV1-Ha.r $58,00
Type V-N $55.00
Hospitals
· TypelcrlWR $134.00
TypeIll1-Ha.r $110.00
TypeV1-Har $104,00
Hotels & Motels
· Type I cr II-F.R. $82.00
Type 1111-Ha.r $71,00
Type III-N $68,00
Type V 1-Har $63,00
T}Pe V-N $60.00
-2- June 5, 1994
-
Building Valuation Item 114E
Data Page 12 of 12
At the request oj numerous buildinhofficials, Building Standards offers the íe11ewing building valuation data representing average costs ior most blJildings.
Because residential buildings are the most (ommon for many cities, two general classes are considered for these, one for "average" construction and the other
ior "good." Adjustments should be made for special architectural or structural features and the location of the project. Higher or lower unit costs O1.1y often
result.
The unit costs aTe intended 10 comply with the definition of "valuation" in Section 423 of the 1991 Uniform Building CadenA and thus include architectural,
Jctural. electrical. plumbing and mechanical work. except as specificaJ1y listed below. The unit costs also include the contractor's proíit, which should not
.omit1ed.
The determination oj plan check fees for projects reviewed by the International Coníerence o( Building Officials will be based on valuation computed (rom
these í;gures, which were established in Apri11994.
Cosl~r Co~t~r Co~1 per Costpl'r
Squ,¡¡rt Foot, Squart Foot, O<-cup;ilncyandTy~ SqlUrt Foot, Squ.1rt Foot,
Occup¡lncYandTy~ A"'tra!:t Occup;¡,ncyandTy~ A"'tra!:t Anra!:t Occup;¡,ncyandTyP't Avtra!:t
1. APARTMENT HOUSES: 7, DWElLINGS: 13, 'AilS: Type III-N""""".", ~6,70
Type I or II F.R.· S ì2.50 Type V-Masonry. 60.80 Type 1 or II F.R. 130.00 Type V-l·Hour 1ì.1O
IGood! 5B9,OO (Good! 57B,OO Type JII-l-Hour....... 116.90 20, RESTAURANTS:
Type V-Masonry Type V-Wood Frame 54.30 Type V-l-Hour ....... BB.OO Type III-l-Hour . .... i8.80
tor Type III) 58.80 (Good! S77.90 14. LIBRARIES: Type IIJ-N ............ 76.20
IGood! 571.BO Basements-- Type I or II F.R. ......... 95.40 Type V- 1 -Hour 72.00
Type V-Wood Frame... 51.60 Semi·Finished ,..., 16.20 Typell-l-Hour ........ 68.90 Type V-N"",.""", 69,10
IGood! 565,90 (Good) $18.50 Type II-N ............. 65.50 21. SCHOOlS:
Type I-Basement Garage 30,BO Uníinished .. ... .... 12.20 Typelll-1-Hour ........72.70 Type I or II F.R. ......... 90.90
2, AUDITORIUMS: IGoodi 514.30 Type III-N ,.""".", 69,20 Type 1I-1-Hour ........ 61.20
Type I or II F.R. ......... 85.80 B, FIRE STATIONS: Type V-1-Hour ........ 68.20 Type 1II-1-Hour"",," 6S.70
T,·pe II-l-Hour ... 61.50 T"pe I or II F.R. ...... 92,80 Type V-N............ 65.20 Type III-N ....,.,...., 62.30
Type II-N .. ........ 58.80 Type II-l-Hour ........ 60.50 1 S. MEDICAL OFFICES: Type V-1-Hour ........ 61.20
Type 111- 1 ·Hour . . 64.60 Type II-N .. ..,....... 57.50 Type I or II F.R.- ........ 97.40 Type V-N . . . . . . . . . . . .. 58AQ
Tvpe III-N .......... 61.70 Type 1II-1-Hour .. 66.70 Type II-l-Hour ........ 74.60 22, SERVICE STATIONS:
Type V-l-Hour ...... 61.40 Type III-N ............ 63.80 Type II-N ............. 71.20 Type JI-N ... '...... 54.40
Type V-N....... 58.50 Type V-l-Hour ........ 62.20 Type 1II-1-Hour ........ 78.60 Type IIt-l·Hour........ 56.GO
3, BANKS: Type V-N...... 59.20 TYPE'IIJ-N ............ 75.70 Type V-1-Hour 48.10
Type I or II F.R.· .... 121.40 9, HOMES FOR THE ELDERLY: TypeV-l-Hour ........ 72.90 Canopies.............. 22.60
Type II-l-Hour ........ 88.20 Type I or II F.R. .... " 85.00 Type V-N . . . . . . . . . . . .. 70.00 2), STORES:
Type II-N ......, , . , . , 85.60 Type II-l-Hour ........ 68.40 16, OFFICES": Type I or 1\ F.R.· ....,... 67.40
Type 1II-1-Hour ........ 97.70 Type II-N . ,... 65.20 Type I or II F.R.· ........ 87.20 Type II-l-Hour ........ 40.60
Type III-N """""" 94,30 Type III-l-Hour ........ 71.20 Type II-l-Hour ....... S7,BO Type II-N """""'" 39,80
TypeV-l·Hour 87.90 Typelll-N ..... ...... 68.20 Type II-N .... 55.20 Typelll-l-Hour.,......49.60
Typt· V-N............. 85.00 Type V-l-Hour ........ 68.60 Type III-l-Hour........ 62.40 Type III-N ..,.,....." 46,80
4. BOWLING AllEYS: Type V-N .... . . ....... 65.70 Type III-N ............ 59.60 Type V-l-Hour .. ..... 41.60
Ty~ II-l-Hour ........ 41.10 10, HOSPITALS: TypeV-1-Hour ........ 57.80 Type V-N,.",,'."'" 3B.40
Tvpt'rl-N ... 38.30 Type I or II F.R.· .... ... 133.50 Type V-N . ... . .... .... 54.90 24. THEATERS:
T\X' III-l-Hour....... 44.90 Type III-l-Hour ....... 109.40 17. PRIVATE GARAGES: Type I or II F.R. ......... 89.80
Tvpt'III-N ...... 41.90 Type V-1-Hour .... 103.50 \....'ood Fr.Jme .. ...... 19.60 Type 1I1-1-Hour........ 64.lIO
Ivpe \'-l-Hour 30.50 11. HOTElS AND MOTElS: Mðsonrv . . . . 22.00 Type 111-.".1 ........... 61.60
5. CHURCHES: Type J or II F.R.· ........ 82.20 Open CJrports ......... 13.30 Type V-t-Hour 60.40
1vp(> I or II F.R. .. 81.:!0 Type III-I-Hour. . . 71.00 1 B, PU8l1C BUILDINGS: Type V-N . . . ...... 57.40
TVD<-> lI-l·Hour 60.:!0 Type III-N 67.60 Type I or [I F.R.· ....... 101.40 25. WAREHOUSES·":
Tvµ{' II-N ...... 5ï.:!0 TH)(' \'-1-Hour ........ 62.90 Type 1I-1·Hour ...... 80.90 Type I or II F.R. ......... 40.40
Tvpe 111- 1 -Hour. 65.50 TypeV-N....... . ... 59.90 T\'pe [[-N .. i7.bO Type II or V-1-Hour ... 23.60
Tvpe JII-N ...... 62.50 12. INDUSTRIAL PLANTS: Type 1I1-1-Hour . 83.80 Type II or V-:\ ......... 2:!.20
T\'pe V-1-Hour ........ 60.80 Type J or II F.R. ..... 46.60 Typelll-N ... 81.10 Type JII-1-Hour . 27.10
Tvpt'V-N.. . .... 58.00 Type II-l-Hour ....... 32.10 TypeV-1-Hour ........76]0 Type III-N ............ 23.90
6. CONVALESCENT HOSPITALS: Type II-N ... ........ 29.40 Type V-N . ... . . .. . . ... 73.80
Type I or II F.R.· ... 113,80 Type III-l·Hour........ 35.30 19. PU8l1C GARAGES: EQUIPMENT
Type II-l-Hour .... 7ï.20 Type III-N ... 3:!.80 Type I or II F.R.· ......., 39.60 AIR COND!TIO:-":I~G:
Type 1-1-Hour . 80.10 Till-up................. 24.10 Type I or II Open P.Jrking· 30,00 (ommerciðl . 3.50
TypeV-1-Hour ........75.10 Type V-1-Hour ....... 33.00 Type IJ-N ......... 23.20 Residential. 2.90
Type V-t\: .. 30.20 Type IIJ-l-Hour . 29.90 SPRINKLER 5\·S1£,....'S . 1.iO
·Add 0.5 percen! 10 Iota! cost íor e;Kh story over three. "Deduct 20 percent ¡or shell-only buildings. .uDeduc! 11 percenl ior m¡ni·\\,lrl'h()u~l's.
REGIONAL MODiFIERS
The ¡ollowing modiiiers are recomml'nck>d lor use in conjunction with the building v.Jluation dðt.J. In .Jddi,ion, certain 10c.J1 conditions mJ\ require furl her
modiiications. To use these modiîiers. merely multiply the lisled cost per sqU.Jre fool by the aprroprÎate regional modiÎier. For eX.Jmple. !o .Jdíus! the cas' 01
a T\'pe III One· hour hotel building of average construction lor the Jowa area, select RegionJI Modifier 0.80 and unit cost Îrom v.JluJtion d.Jta. S71.00:
0.80 x 71.00 = 556.80 [adjusted cost per squ.1re (oat)
Eastern U.S. Modifier Eastern U.S. (cont.) Modifier Central U.S. (conI.) ModitÎer Western U.S. Modifier
Connecticut. . . . 0.95 Pennsdv.mia Kentucky.. . .. . .... . .... 0.77 Alasb ................. 1..10
Del.J\\'are....... ....... 0.84 Philadelphi.J .. ...., 0.96 Louisiðna . . ... . .... ..... 0.78 Arizona............. . 0.82
Oistrict oí Columbia. 0.87 Other .......... 0.83 Michigan. . .. . ... . .... .. 0.84 CJliíornia
Florida... . 0.74 Rhode Isl.lnd ...... 0.94 Minnesota .............. 0.86 Los Angeles.. .... 1.00
Georgia........... . 0.68 Soufh Carolina ..... ... O.ïO Mississippi.............. 0.71 San Fr.Jncisco ......... 1.13
MaÎne......... . 0.81 Vermont . ....... 0.80 Missouri. ... .... . .. . .... 0.78 Other........ ....... 0.94
M.Jryland ....... 0.79 Virginia .... .... 0.i3 Nebraska ........... 0.75 Co!or.Jdo ........... 0,81
.....1assachusetts .. 0.94 West Viq~jnia . 0.82 North O.Jkota .......... 0,80 Hawaii ....... 1.14
Ne\...· H.JmpshÎre 0.82 Central U.S. Ohio... .. ."..""..., 0,80 Id.Jho ................ 0.80
Newlersey............ 0.91 Alab.Jma ............ 0.72 Oklahoma. .. . ... . ... 0.71 t..10n!ana ............... 0.79
NE'w York Arkans.Js 0.70 South Dðkota 0.78 Nevada ..... ....... O,B9
New York City. . . . . . . 1.16 Illinois ".."""" 0.87 Tennessee .............. 0.72 New ME'xico ....... .., 0.76
Other .... 0.87 Indiana. 0.82 Texas... . 0.74 Oregon. . . ...... 0,83
North Carolin.J ...... 0.70 Iowa. 0.80 Wisconsin ,..,..,...." 0.85 UI..1h ... .... 0.75
I Kansas 0.74 \V.Jshington ............. 0.88
Wyoming.. ... .. 0.80
44 BUILDING 5T ANOARDS',\1arch·April, 1994
-