Loading...
HomeMy WebLinkAboutReso 2026-199RESOLUTION NO. 2026-199 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA AMENDING CERTAIN SECTIONS OF CHAPTER 10 (BUILDING) OF THE CITY’S MASTER FEE SCHEDULE WHEREAS, the City of Chula Vista (“City”) last prepared a Cost-of-Service Analysis of Development Services Fees in 2017, resulting in an increase to fees to ensure the City recovered the estimated reasonable cost of providing development services; and WHEREAS, the City has not increased Flat and Tiered Fees since 2017; and WHEREAS, in order to achieve equitable cost recovery for development services provided, the City Council wishes to amend Chapter 10 (Building) of the City’s Master Fee Schedule, as set forth in Exhibit 1 to this Resolution, attached hereto and incorporated herein by reference as if set forth in full; and WHEREAS, the proposed fee increase of ten percent (10%), rounded to the nearest dollar, while a comprehensive fee study is completed, does not exceed the estimated reasonable cost of providing the associated services; and WHEREAS, Article XIII C of the California Constitution requires a vote of the electorate to increase any levy, charge, or exaction imposed by a local government, unless specifically exempted; and WHEREAS, the proposed fees are exempt from the vote requirement per Sections 1(e)(2) and 1(e)(3) of Article XIII C of the California Constitution; and WHEREAS, the proposed amendments to the Master Fee Schedule Chapter 10 shall not become effective until 60 days after adoption of this Resolution by the City Council. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista, that it does hereby amend certain sections of Chapter 10 (Building) of the City’s Master Fee Schedule as set forth in Exhibit 1 to this resolution. [SIGNATURES ON THE FOLLOWING PAGE] Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A Resolution No. 2026-199 Page No. 2 Presented by Approved as to form by Roy Sapa’u Marco A. Verdugo Deputy City Manager/ City Attorney Director of Development Services PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 22nd day of September 2026, by the following vote: AYES: Councilmembers: Chavez, Fernandez, Inzunza, Preciado, and McCann NAYS: Councilmembers: None ABSENT: Councilmembers: None John McCann, Mayor ATTEST: Kerry K. Bigelow, MMC, City Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Kerry K. Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2026-199 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 22nd day of September 2026. Executed this 22nd day of September 2026. Kerry K. Bigelow, MMC, City Clerk Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-100 General Building Fees City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 APPEALS 1. Board of Appeals and Advisors, Hearing Application Hearing filing fee ............................................. $484 CODE ENFORCEMENT 1. Administrative Citation 1st violation ...................................................... $100 2nd violation, within 12 months of 1st ............. $200 Each additional violation after 2nd, within 12 months of any prior violation ...................... $500 2. Reinspection Fee As required to obtain code compliance, no fee charged for 1st inspection ........ Full cost recovery 3. Nuisance Abatement The amount of the appeal fee shall be determined periodically by the City Council based upon the costs incurred by the City in processing an appeal pursuant to §1.30.070 of the CVMC. The calculation shall include all costs of the City Abatement Officer, City Clerk, and the City Council but shall exclude actual costs for any work of abatement. Noncompliance with Order to Abate Noncompliance fee ..................... Full cost recovery The fee authorized in case of noncompliance with an order to abate shall be the City’s full costs including overhead for nuisance abatement. 4. Sign Structures Charges for moving, removing, correction or other work performed by the City. Sign structure fee ........................ Full cost recovery TEMPORARY SIGN PERMIT Temporary placement of portable signs in designated areas of the public right-of-way. Sign permit ........................................................ $28 HOUSING PERMIT FEES For each apartment house, lodging house, boarding house, group residence, hotel and motel containing: 1 – 6 units ........................................................ $254 7 – 10 units ...................................................... $344 11 – 15 units .................................................... $413 Base fee, > 15 units ......................................... $413 Additional fee per unit, > 15 units ................. $9.44 For failure to pay a housing permit fee on or before the delinquency date, the penalty shall be computed on the same basis as the penalty to be paid for failure to pay a business license tax on or before the delinquency date as outlined in §5.04.080 of the CVMC. RESIDENTIAL ABANDONED PROPERTY REGISTRATION Annual registration ........................................... $77 Annual registration will expire on December 31st of each year. Resolution A - Exhibit 1Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-100 Page 2 of 2 City of Chula Vista www.chulavistaca.gov 619.691.5272 DETERMINATION OF VALUE The value to be used in computing the State’s Strong Motion Instrumentation Program fee and the State’s Building Standards Administration Special Revolving Fund fee (SB 1473) shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems, and any other permanent equipment. The City’s standard building valuation table is included as Section 10-500 of the Master Fee Schedule. The Building Official shall be authorized to make minor adjustments to the valuation calculation on a case-by-case basis as the situation warrants. FULL COST RECOVERY For all full cost recovery fee items, an initial deposit shall be collected to cover the City’s full cost, including overhead, incurred in conjunction with review and processing as requested by applicant. Additional funds may be collected, as required, to cover City costs. Should the application be withdrawn at any time, the deposit shall be adjusted to cover the City’s actual costs, including overhead, up to that time. Any funds remaining on deposit at the time of the completion or withdrawal of the application shall be returned to the depositor, after accounting for expenses incurred to date. See Master Fee Schedule Fee Bulletins 1-100 and 1-200 for additional discussion of full cost recovery and current hourly rates. Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-200 Mechanical, Plumbing & Electrical City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 With the exception of those permits listed in Master Fee Schedule Fee Bulletins 10-100, 10-300 and 10-400, all fees for processing and inspecting new construction and miscellaneous building, plumbing, mechanical, and electrical permits shall be as set forth herein. All other services not specifically identified in Master Fee Schedule Fee Bulletins 10-100, 10- 200, 10-300 or 10-400 shall be charged at the current full cost recovery rate. See Master Fee Schedule Fee Bulletins 1-100 and 1-200 for additional discussion of full cost recovery and current hourly rates. MECHANICAL, PLUMBING & ELECTRICAL PERMIT INTAKE FEES Intake fee, without plans .................................. $68 Intake fee, with plans ...................................... $102 Intake fees are assessed on a per permit basis. The following Mechanical Permit Fees, Plumbing/Gas Permit Fees, and Electrical Permit Fees are additive to the intake fee. MECHANICAL PERMIT FEES Standalone mechanical plan check, hourly rate .................................................. $205 Mechanical Permit Unit Fees A/C, residential, each ...................................... $153 Furnaces (F.A.U., floor) .................................. $153 Heater (wall) .................................................. $153 Appliance vent/chimney (only) ...................... $153 Refrigeration compressor .............................. $153 Boiler ............................................................ $359 Chiller ............................................................. $359 Heat pump (package unit) ............................. $359 Heater (unit, radiant, etc.) ............................. $359 Air handler ..................................................... $359 Duct work only ............................................... $256 Evaporative cooler ......................................... $359 Make-up air system ....................................... $359 Moisture exhaust duct (clothes dryer) .......... $256 Vent fan (single duct), each ........................... $256 Vent system ................................................... $359 Exhaust hood and duct, residential ............... $256 Exhaust hood - Type I, (commercial grease hood).......................... $910 Exhaust hood - Type II, (Commercial steam hood) .......................... $410 Incinerator, non-residential ........................... $717 Refrigerator condenser remote ..................... $256 Walk-in box/refrigerator coil ......................... $564 Other mechanical inspections, per hour ......... $205 PLUMBING/GAS PERMIT FEES Standalone plumbing plan check, hourly rate .................................................. $205 Plumbing/Gas Permit Unit Fees Fixtures, first 5 fixtures .................................. $153 Fixtures, each additional fixture ....................... $17 Gas system - new/repair/replace, includes 5 outlets ....................................... $153 Gas outlets, each additional ............................ $17 Building sewer ................................................ $153 Grease trap/interceptor ................................. $362 Backflow preventer, first 5 ............................. $153 Backflow preventer, more than 5, each .......... $17 Roof drain - rainwater system ....................... $256 Water heater, commercial, each .................... $359 Water heater, residential, first heater ........... $153 Water heater, residential, each additional ...... $34 Water pipe repair/replacement ..................... $205 Drain-vent repair/alterations ......................... $153 Drinking fountain ........................................... $256 Solar water system fixtures (solar panels, tanks, water treatment equipment) .......... $410 Graywater systems ......................................... $410 Medical gas system, new ............................... $691 Medical gas system (new outlet, repair or replace system) ........................... $153 New gas meter/reset ..................................... $153 Sewer lateral .................................................. $153 Other plumbing/gas inspections, per hour .... $205 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-200 Page 2 of 2 City of Chula Vista www.chulavistaca.gov 619.691.5272 ELECTRICAL PERMIT FEES Standalone electrical plan check, hourly rate .................................................. $205 Electrical Permit Unit Fees Temporary power pole .................................. $153 Temporary or permanent service pedestal ... $153 Temporary lighting system ............................ $153 Temporary power on a permanent base ....... $153 CATV electrical meter enclosure, w/ or w/o gas............................................. $153 New electric meter/reset ............................... $153 Upgrade of existing electrical service ............ $153 Overhead to underground conversion .......... $153 Miscellaneous wiring/conduit (including mechanical apparatus) .............. $153 Electric generator ............................................ $205 Other electrical inspections, per hour ......... $205 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-300 New Construction Permit Fees City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 PLAN CHECK & INSPECTION Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF A-1 - Assembly 5,000 $17,063.34 $40.26 $20,291.55 $48.31 $13,835.13 $32.21 25,000 $25,115.78 $34.63 $29,954.49 $41.56 $20,277.08 $27.70 50,000 $33,773.12 $28.51 $40,343.29 $34.21 $27,202.96 $22.81 100,000 $48,029.18 $12.11 $57,450.56 $14.53 $38,607.80 $9.68 250,000 $66,187.98 $7.01 $79,241.12 $8.42 $53,134.84 $5.61 500,000 $83,712.94 $7.01 $100,271.07 $8.42 $67,154.81 $5.61 A-2 - Assembly 500 $7,482.92 $185.45 $8,795.04 $222.54 $6,170.78 $148.36 2,500 $11,191.95 $132.68 $13,245.88 $159.21 $9,138.01 $106.14 5,000 $14,508.96 $67.27 $17,226.29 $80.72 $11,791.62 $53.81 10,000 $17,872.24 $29.39 $21,262.22 $35.27 $14,482.25 $23.51 25,000 $22,280.61 $25.73 $26,552.27 $30.88 $18,008.95 $20.58 50,000 $28,712.43 $25.73 $34,270.46 $30.88 $23,154.41 $20.58 A-3 - Assembly 2,000 $12,329.91 $71.41 $14,611.44 $85.69 $10,048.39 $57.12 10,000 $18,042.51 $60.64 $21,466.56 $72.78 $14,618.46 $48.51 20,000 $24,106.91 $50.92 $28,743.84 $61.11 $19,469.99 $40.73 40,000 $34,290.33 $21.34 $40,963.95 $25.62 $27,616.72 $17.07 100,000 $47,097.16 $12.34 $56,332.13 $14.82 $37,862.18 $9.88 200,000 $59,441.76 $12.34 $71,145.66 $14.82 $47,737.87 $9.88 A-4 - Assembly 5,000 $17,063.34 $40.26 $20,291.55 $48.31 $13,835.13 $32.21 25,000 $25,115.78 $34.63 $29,954.49 $41.56 $20,277.08 $27.70 50,000 $33,773.12 $28.51 $40,343.29 $34.21 $27,202.96 $22.81 100,000 $48,029.18 $12.11 $57,450.56 $14.53 $38,607.80 $9.68 250,000 $66,187.98 $7.01 $79,241.12 $8.42 $53,134.84 $5.61 500,000 $83,712.94 $7.01 $100,271.07 $8.42 $67,154.81 $5.61 A-5 - Assembly 10,000 $24,082.00 $29.47 $28,713.95 $35.37 $19,450.06 $23.57 50,000 $35,870.89 $24.72 $42,860.61 $29.67 $28,881.17 $19.78 100,000 $48,230.63 $21.20 $57,692.31 $25.43 $38,768.96 $16.95 200,000 $69,423.40 $8.68 $83,123.62 $10.42 $55,723.18 $6.94 500,000 $95,471.76 $4.96 $114,381.66 $5.96 $76,561.87 $3.97 1,000,000 $120,302.41 $4.96 $144,178.43 $5.96 $96,426.39 $3.97 A - Occupancy Tenant Improvements 300 $3,439.69 $143.15 $3,973.90 $171.78 $2,905.49 $114.52 1,500 $5,157.48 $102.27 $6,035.25 $122.72 $4,279.72 $81.81 3,000 $6,691.42 $51.89 $7,875.98 $62.26 $5,506.86 $41.51 6,000 $8,248.00 $22.67 $9,743.87 $27.20 $6,752.12 $18.14 15,000 $10,288.43 $19.86 $12,192.39 $23.83 $8,384.48 $15.88 30,000 $13,267.17 $19.86 $15,766.87 $23.83 $10,767.46 $15.88 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 2 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF A - Occupancy Tenant Improvements (w/ structural) 300 $4,014.86 $179.52 $4,664.10 $215.42 $3,365.62 $143.62 1,500 $6,169.06 $133.38 $7,249.14 $160.05 $5,088.97 $106.70 3,000 $8,169.66 $66.29 $9,649.86 $79.54 $6,689.45 $53.03 6,000 $10,158.14 $28.90 $12,036.04 $34.67 $8,280.24 $23.12 15,000 $12,758.90 $24.92 $15,156.96 $29.91 $10,360.85 $19.93 30,000 $16,496.91 $24.92 $19,642.57 $29.91 $13,351.26 $19.93 B - Business—Animal Hospital 250 $5,434.29 $281.82 $6,336.69 $338.18 $4,531.89 $225.46 1,250 $8,252.52 $210.79 $9,718.57 $252.96 $6,786.47 $168.63 2,500 $10,887.43 $104.39 $12,880.45 $125.27 $8,894.39 $83.51 5,000 $13,497.20 $45.50 $16,012.18 $54.59 $10,982.21 $36.40 12,500 $16,909.24 $39.13 $20,106.64 $46.95 $13,711.85 $31.31 25,000 $21,800.05 $39.13 $25,975.61 $46.95 $17,624.50 $31.31 B - Business—Bank 500 $6,149.28 $171.12 $7,194.67 $205.34 $5,103.87 $136.90 2,500 $9,571.53 $126.67 $11,301.38 $152.00 $7,841.68 $101.33 5,000 $12,738.13 $63.07 $15,101.30 $75.68 $10,374.96 $50.46 10,000 $15,891.60 $27.50 $18,885.47 $33.00 $12,897.74 $22.00 25,000 $20,016.94 $23.75 $23,835.87 $28.50 $16,198.01 $19.00 50,000 $25,954.91 $23.75 $30,961.43 $28.50 $20,948.38 $19.00 B - Business—Barber Shop/Beauty Shop (Other than retail) 200 $4,689.23 $322.21 $5,442.62 $386.66 $3,935.84 $257.77 1,000 $7,266.94 $227.56 $8,535.88 $273.06 $5,998.01 $182.05 2,000 $9,542.51 $116.17 $11,266.55 $139.40 $7,818.47 $92.94 4,000 $11,865.87 $50.80 $14,054.58 $60.95 $9,677.15 $40.63 10,000 $14,913.43 $44.69 $17,711.65 $53.63 $12,115.20 $35.75 20,000 $19,382.46 $44.69 $23,074.50 $53.63 $15,690.42 $35.75 B - Business—Car Wash 400 $5,753.08 $201.28 $6,719.24 $241.53 $4,786.91 $161.02 2,000 $8,973.44 $157.15 $10,583.67 $188.58 $7,363.21 $125.72 4,000 $12,116.46 $76.12 $14,355.30 $91.34 $9,877.63 $60.90 8,000 $15,161.22 $33.09 $18,009.01 $39.71 $12,313.43 $26.48 20,000 $19,132.16 $27.96 $22,774.13 $33.56 $15,490.18 $22.37 40,000 $24,725.13 $27.96 $29,485.70 $33.56 $19,964.56 $22.37 B - Business—Clinic, Outpatient 2,000 $12,946.53 $78.90 $15,351.38 $94.69 $10,541.67 $63.12 10,000 $19,258.80 $63.90 $22,926.10 $76.68 $15,591.50 $51.12 20,000 $25,648.62 $57.82 $30,593.88 $69.38 $20,703.35 $46.24 40,000 $37,210.81 $22.48 $44,468.52 $26.98 $29,953.11 $17.99 100,000 $50,701.86 $12.55 $60,657.78 $15.06 $40,745.95 $10.04 200,000 $63,252.98 $12.55 $75,719.13 $15.06 $50,786.85 $10.04 B - Business—Dry Cleaning 200 $4,536.36 $298.47 $5,259.18 $358.17 $3,813.55 $238.78 1,000 $6,924.16 $208.45 $8,124.53 $250.14 $5,723.78 $166.76 2,000 $9,008.67 $107.05 $10,625.96 $128.47 $7,391.40 $85.65 4,000 $11,149.78 $46.84 $13,195.27 $56.21 $9,104.27 $37.47 10,000 $13,960.05 $41.39 $16,567.61 $49.67 $11,352.50 $33.11 20,000 $18,099.07 $41.39 $21,534.43 $49.67 $14,663.72 $33.11 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 3 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF B - Business— Laboratory 500 $6,400.89 $180.20 $7,496.61 $216.24 $5,305.17 $144.16 2,500 $10,004.90 $130.11 $11,821.43 $156.13 $8,188.38 $104.09 5,000 $13,257.68 $65.64 $15,724.76 $78.77 $10,790.60 $52.51 10,000 $16,539.80 $28.67 $19,663.29 $34.40 $13,416.29 $22.94 25,000 $20,839.53 $25.00 $24,822.97 $30.01 $16,856.08 $20.00 50,000 $27,090.20 $25.00 $32,323.78 $30.01 $21,856.62 $20.00 B - Business—Motor Vehicle Showroom 1,000 $7,775.47 $117.30 $9,146.12 $140.77 $6,404.84 $93.85 5,000 $12,467.84 $71.62 $14,776.95 $85.95 $10,158.73 $57.30 10,000 $16,049.09 $39.63 $19,074.44 $47.56 $13,023.73 $31.71 20,000 $20,012.63 $17.47 $23,830.71 $20.97 $16,194.56 $13.98 50,000 $25,254.47 $16.24 $30,120.90 $19.48 $20,388.03 $12.99 100,000 $33,371.47 $16.24 $39,861.31 $19.48 $26,881.64 $12.99 B - Business— Professional Office 2,000 $8,678.54 $75.42 $10,229.78 $90.50 $7,127.29 $60.34 10,000 $14,711.58 $53.59 $17,469.43 $64.32 $11,953.72 $42.88 20,000 $20,071.22 $26.43 $23,901.00 $31.72 $16,241.43 $21.15 40,000 $25,358.16 $12.76 $30,245.34 $15.31 $20,470.98 $10.21 100,000 $33,015.99 $10.99 $39,434.74 $13.19 $26,597.25 $8.80 200,000 $44,009.12 $10.99 $52,626.49 $13.19 $35,391.75 $8.80 B - Business—High Rise Office 15,000 $26,216.49 $20.34 $31,275.33 $24.41 $21,157.65 $16.28 75,000 $38,422.58 $18.60 $45,922.64 $22.33 $30,922.52 $14.88 150,000 $52,375.94 $13.59 $62,666.67 $16.30 $42,085.21 $10.87 300,000 $72,752.04 $6.19 $87,118.00 $7.43 $58,386.09 $4.95 750,000 $100,602.15 $3.52 $120,538.13 $4.22 $80,666.18 $2.82 1,500,000 $126,977.55 $3.52 $152,188.61 $4.22 $101,766.50 $2.82 B - Occupancy Tenant Improvements 300 $3,174.24 $133.56 $3,655.36 $160.27 $2,693.12 $106.84 1,500 $4,776.94 $100.07 $5,578.60 $120.08 $3,975.28 $80.06 3,000 $6,277.94 $49.51 $7,379.81 $59.41 $5,176.08 $39.61 6,000 $7,763.32 $21.57 $9,162.25 $25.89 $6,364.38 $17.26 15,000 $9,705.10 $18.55 $11,492.40 $22.25 $7,917.81 $14.84 30,000 $12,486.54 $18.55 $14,830.11 $22.25 $10,142.96 $14.84 B - Occupancy Tenant Improvements (w/ structural) 300 $3,749.41 $169.93 $4,345.55 $203.91 $3,153.25 $135.94 1,500 $5,788.52 $131.18 $6,792.49 $157.41 $4,784.54 $104.94 3,000 $7,756.18 $63.91 $9,153.69 $76.69 $6,358.67 $51.13 6,000 $9,673.46 $27.80 $11,454.42 $33.36 $7,892.50 $22.24 15,000 $12,175.58 $23.61 $14,456.96 $28.33 $9,894.19 $18.89 30,000 $15,716.28 $23.61 $18,705.81 $28.33 $12,726.76 $18.89 E - Educational— Group Occupancy 1,500 $8,533.04 $93.46 $10,055.19 $112.15 $7,010.88 $74.77 7,500 $14,140.16 $52.38 $16,783.73 $62.85 $11,496.58 $41.90 15,000 $18,068.57 $30.47 $21,497.82 $36.56 $14,639.31 $24.38 30,000 $22,638.53 $13.50 $26,981.78 $16.19 $18,295.29 $10.79 75,000 $28,710.94 $12.91 $34,268.67 $15.50 $23,153.21 $10.33 150,000 $38,398.91 $12.91 $45,894.23 $15.50 $30,903.59 $10.33 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 4 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF E - Educational—Day Care 600 $5,837.88 $148.13 $6,820.99 $177.75 $4,854.76 $118.50 3,000 $9,392.93 $87.45 $11,087.07 $104.94 $7,698.80 $69.96 6,000 $12,016.47 $49.34 $14,235.31 $59.21 $9,797.63 $39.47 12,000 $14,976.86 $21.79 $17,787.78 $26.15 $12,165.95 $17.44 30,000 $18,899.32 $20.49 $22,494.73 $24.59 $15,303.92 $16.39 60,000 $25,046.05 $20.49 $29,870.81 $24.59 $20,221.30 $16.39 E - Occupancy Tenant Improvements 300 $3,350.81 $143.15 $3,867.24 $171.78 $2,834.37 $114.52 1,500 $5,068.60 $102.27 $5,928.59 $122.72 $4,208.61 $81.81 3,000 $6,602.53 $51.89 $7,769.31 $62.26 $5,435.76 $41.51 6,000 $8,159.11 $22.67 $9,637.20 $27.20 $6,681.02 $18.14 15,000 $10,199.54 $19.86 $12,085.72 $23.83 $8,313.36 $15.88 30,000 $13,178.28 $19.86 $15,660.21 $23.83 $10,696.36 $15.88 E - Occupancy Tenant Improvements (w/ structural) 300 $3,925.97 $179.52 $4,557.43 $215.42 $3,294.50 $143.62 1,500 $6,080.17 $133.38 $7,142.49 $160.05 $5,017.87 $106.70 3,000 $8,080.77 $66.29 $9,543.19 $79.54 $6,618.35 $53.03 6,000 $10,069.26 $28.90 $11,929.38 $34.67 $8,209.14 $23.12 15,000 $12,670.01 $24.92 $15,050.29 $29.91 $10,289.74 $19.93 30,000 $16,408.03 $24.92 $19,535.90 $29.91 $13,280.15 $19.93 F-1 - Factory Industrial— Moderate Hazard 2,000 $9,582.20 $53.97 $11,314.17 $64.76 $7,850.22 $43.18 10,000 $13,899.45 $46.99 $16,494.89 $56.39 $11,304.02 $37.59 20,000 $18,598.17 $37.57 $22,133.34 $45.09 $15,062.99 $30.05 40,000 $26,112.10 $16.05 $31,150.05 $19.26 $21,074.13 $12.84 100,000 $35,741.28 $9.10 $42,705.07 $10.92 $28,777.47 $7.28 200,000 $44,842.96 $9.10 $53,627.10 $10.92 $36,058.83 $7.28 F-2 - Factory Industrial—Low Hazard 2,000 $9,281.77 $52.91 $10,953.67 $63.49 $7,609.88 $42.33 10,000 $13,514.56 $45.51 $16,033.02 $54.60 $10,996.11 $36.40 20,000 $18,064.86 $37.05 $21,493.37 $44.45 $14,636.34 $29.63 40,000 $25,473.69 $15.46 $30,383.97 $18.54 $20,563.41 $12.36 100,000 $34,743.93 $8.61 $41,508.25 $10.34 $27,979.60 $6.90 200,000 $43,362.00 $8.61 $51,849.94 $10.34 $34,874.05 $6.90 F - Occupancy Tenant Improvements 1,000 $4,041.28 $56.32 $4,695.81 $67.57 $3,386.76 $45.06 5,000 $6,293.89 $39.20 $7,398.94 $47.05 $5,188.84 $31.36 10,000 $8,254.28 $20.17 $9,751.40 $24.20 $6,757.15 $16.14 20,000 $10,271.26 $8.82 $12,171.78 $10.59 $8,370.74 $7.06 50,000 $12,919.09 $7.81 $15,349.18 $9.37 $10,489.01 $6.25 100,000 $16,823.58 $7.81 $20,034.55 $9.37 $13,612.59 $6.25 F - Occupancy Tenant Improvements (w/ structural) 1,000 $5,008.30 $75.31 $5,856.24 $90.37 $4,160.38 $60.25 5,000 $8,020.56 $54.49 $9,470.95 $65.40 $6,570.18 $43.59 10,000 $10,745.16 $27.46 $12,740.46 $32.96 $8,749.86 $21.97 20,000 $13,491.17 $11.99 $16,035.68 $14.39 $10,946.66 $9.59 50,000 $17,088.14 $10.45 $20,352.04 $12.54 $13,824.24 $8.36 100,000 $22,312.69 $10.45 $26,621.50 $12.54 $18,003.88 $8.36 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 5 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF H-1 - High Hazard Group 500 $6,786.87 $176.36 $7,959.78 $211.64 $5,613.95 $141.09 2,500 $10,314.14 $129.23 $12,192.52 $155.08 $8,435.77 $103.39 5,000 $13,544.97 $64.69 $16,069.52 $77.63 $11,020.44 $51.76 10,000 $16,779.62 $28.23 $19,951.09 $33.87 $13,608.14 $22.58 25,000 $21,013.59 $24.48 $25,031.85 $29.37 $16,995.33 $19.58 50,000 $27,132.71 $24.48 $32,374.80 $29.37 $21,890.63 $19.58 H-2 - High Hazard Group 500 $6,786.87 $176.36 $7,959.78 $211.64 $5,613.95 $141.09 2,500 $10,314.14 $129.23 $12,192.52 $155.08 $8,435.77 $103.39 5,000 $13,544.97 $64.69 $16,069.52 $77.63 $11,020.44 $51.76 10,000 $16,779.62 $28.23 $19,951.09 $33.87 $13,608.14 $22.58 25,000 $21,013.59 $24.48 $25,031.85 $29.37 $16,995.33 $19.58 50,000 $27,132.71 $24.48 $32,374.80 $29.37 $21,890.63 $19.58 H-3 - High Hazard Group 1,000 $8,722.84 $128.89 $10,282.94 $154.66 $7,162.73 $103.11 5,000 $13,878.26 $91.03 $16,469.46 $109.23 $11,287.07 $72.82 10,000 $18,429.39 $46.46 $21,930.81 $55.76 $14,927.97 $37.17 20,000 $23,076.11 $20.32 $27,506.86 $24.38 $18,645.34 $16.26 50,000 $29,171.22 $17.88 $34,821.01 $21.45 $23,521.43 $14.30 100,000 $38,109.30 $17.88 $45,546.70 $21.45 $30,671.89 $14.30 H-4 - High Hazard Group 1,000 $8,722.84 $128.89 $10,282.94 $154.66 $7,162.73 $103.11 5,000 $13,878.26 $91.03 $16,469.46 $109.23 $11,287.07 $72.82 10,000 $18,429.39 $46.46 $21,930.81 $55.76 $14,927.97 $37.17 20,000 $23,076.11 $20.32 $27,506.86 $24.38 $18,645.34 $16.26 50,000 $29,171.22 $17.88 $34,821.01 $21.45 $23,521.43 $14.30 100,000 $38,109.30 $17.88 $45,546.70 $21.45 $30,671.89 $14.30 H-5 - High Hazard Group 2,000 $12,732.59 $73.56 $15,094.65 $88.28 $10,370.53 $58.85 10,000 $18,617.30 $63.03 $22,156.31 $75.64 $15,078.29 $50.42 20,000 $24,920.63 $52.16 $29,720.30 $62.59 $20,120.96 $41.72 40,000 $35,351.97 $22.10 $42,237.90 $26.52 $28,466.03 $17.68 100,000 $48,612.76 $12.80 $58,150.86 $15.37 $39,074.67 $10.24 200,000 $61,418.84 $12.80 $73,518.15 $15.37 $49,319.52 $10.24 H - Occupancy Tenant Improvements 600 $4,368.80 $87.46 $5,088.83 $104.96 $3,648.77 $69.97 3,000 $6,467.96 $63.89 $7,607.81 $76.66 $5,328.09 $51.11 6,000 $8,384.43 $32.03 $9,907.59 $38.45 $6,861.27 $25.63 12,000 $10,306.47 $13.98 $12,214.04 $16.78 $8,398.91 $11.19 30,000 $12,822.79 $12.13 $15,233.61 $14.56 $10,411.96 $9.71 60,000 $16,464.18 $12.13 $19,603.30 $14.56 $13,325.08 $9.71 H - Occupancy Tenant Improvements (w/ structural) 600 $5,081.44 $109.19 $5,943.99 $131.02 $4,218.87 $87.35 3,000 $7,701.89 $83.67 $9,088.54 $100.40 $6,315.24 $66.94 6,000 $10,211.86 $40.92 $12,100.51 $49.10 $8,323.22 $32.74 12,000 $12,666.90 $17.81 $15,046.55 $21.37 $10,287.24 $14.25 30,000 $15,872.18 $15.17 $18,892.89 $18.19 $12,851.48 $12.13 60,000 $20,421.72 $15.17 $24,352.33 $18.19 $16,491.10 $12.13 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 6 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF I-2 - Institutional—6+ persons, non- ambulatory 2,000 $11,259.41 $64.53 $13,326.84 $77.43 $9,191.99 $51.62 10,000 $16,421.20 $57.12 $19,520.97 $68.55 $13,321.41 $45.69 20,000 $22,133.44 $44.15 $26,375.68 $52.99 $17,891.21 $35.32 40,000 $30,963.96 $19.03 $36,972.29 $22.84 $24,955.62 $15.22 100,000 $42,379.93 $10.58 $50,671.47 $12.69 $34,088.41 $8.46 200,000 $52,960.55 $10.58 $63,368.20 $12.69 $42,552.90 $8.46 I-2.1 - Clinic - Outpatient 2,000 $13,768.81 $84.18 $16,338.11 $101.02 $11,199.51 $67.34 10,000 $20,503.40 $69.23 $24,419.63 $83.07 $16,587.18 $55.39 20,000 $27,426.31 $60.92 $32,727.11 $73.11 $22,125.51 $48.74 40,000 $39,610.87 $23.93 $47,348.59 $28.71 $31,873.15 $19.14 100,000 $53,968.43 $13.21 $64,577.66 $15.85 $43,359.20 $10.57 200,000 $67,175.50 $13.21 $80,426.15 $15.85 $53,924.86 $10.57 I-3 - Institutional— Restrained 2,500 $14,881.59 $72.48 $17,673.45 $86.98 $12,089.73 $57.98 12,500 $22,129.68 $60.05 $26,371.15 $72.06 $17,888.20 $48.04 25,000 $29,635.74 $52.26 $35,378.42 $62.72 $23,893.05 $41.81 50,000 $42,702.22 $20.82 $51,058.21 $24.98 $34,346.24 $16.65 125,000 $58,315.73 $11.61 $69,794.43 $13.93 $46,837.04 $9.28 250,000 $72,816.88 $11.61 $87,195.80 $13.93 $58,437.96 $9.28 I-4 - Institutional—6+ persons, day care 400 $5,436.51 $220.42 $6,339.36 $264.51 $4,533.66 $176.34 2,000 $8,963.27 $129.06 $10,571.46 $154.88 $7,355.07 $103.25 4,000 $11,544.53 $73.17 $13,668.99 $87.80 $9,420.08 $58.53 8,000 $14,471.23 $32.33 $17,181.02 $38.80 $11,761.44 $25.86 20,000 $18,350.81 $30.48 $21,836.51 $36.59 $14,865.10 $24.39 40,000 $24,447.92 $30.48 $29,153.04 $36.59 $19,742.79 $24.39 I - Occupancy Tenant Improvements 600 $3,842.76 $90.74 $4,457.59 $108.89 $3,227.94 $72.59 3,000 $6,020.55 $60.07 $7,070.93 $72.09 $4,970.17 $48.06 6,000 $7,822.82 $31.77 $9,233.65 $38.12 $6,411.98 $25.41 12,000 $9,728.74 $13.94 $11,520.76 $16.73 $7,936.72 $11.15 30,000 $12,237.94 $12.57 $14,531.79 $15.09 $9,944.08 $10.05 60,000 $16,009.71 $12.57 $19,057.92 $15.09 $12,961.50 $10.05 I - Occupancy Tenant Improvements (w/ structural) 600 $4,463.76 $110.10 $5,202.77 $132.12 $3,724.73 $88.09 3,000 $7,106.25 $77.04 $8,373.78 $92.44 $5,838.73 $61.63 6,000 $9,417.45 $39.52 $11,147.21 $47.43 $7,687.68 $31.63 12,000 $11,788.99 $17.29 $13,993.05 $20.75 $9,584.92 $13.84 30,000 $14,901.38 $15.27 $17,727.93 $18.33 $12,074.83 $12.21 60,000 $19,482.05 $15.27 $23,224.73 $18.33 $15,739.36 $12.21 M - Mercantile— Department & Drug Store 10,000 $19,734.34 $24.40 $23,496.75 $29.28 $15,971.92 $19.53 50,000 $29,495.28 $20.23 $35,209.88 $24.28 $23,780.68 $16.18 100,000 $39,610.92 $17.61 $47,348.65 $21.14 $31,873.19 $14.09 200,000 $57,226.24 $7.03 $68,487.02 $8.44 $45,965.45 $5.62 500,000 $78,313.58 $3.93 $93,791.83 $4.72 $62,835.32 $3.15 1,000,000 $97,968.59 $3.93 $117,377.84 $4.72 $78,559.33 $3.15 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 7 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF M - Mercantile— Market (Vons/Ralphs..) 5,000 $14,879.67 $36.77 $17,671.14 $44.12 $12,088.19 $29.41 25,000 $22,233.34 $29.83 $26,495.55 $35.81 $17,971.13 $23.87 50,000 $29,692.34 $26.93 $35,446.36 $32.31 $23,938.33 $21.54 100,000 $43,153.94 $10.45 $51,600.26 $12.55 $34,707.61 $8.36 250,000 $58,835.89 $5.82 $70,418.61 $6.97 $47,253.17 $4.65 500,000 $73,373.08 $5.82 $87,863.24 $6.97 $58,882.92 $4.65 M - Mercantile— Motor fuel- dispensing Canopy 100 $3,369.07 $396.97 $3,858.44 $476.37 $2,879.71 $317.57 500 $4,956.95 $289.10 $5,763.88 $346.92 $4,150.01 $231.28 1,000 $6,402.45 $145.19 $7,498.48 $174.23 $5,306.41 $116.15 2,000 $7,854.36 $63.37 $9,240.78 $76.04 $6,467.95 $50.70 5,000 $9,755.50 $55.09 $11,522.15 $66.11 $7,988.86 $44.07 10,000 $12,509.86 $55.09 $14,827.37 $66.11 $10,192.35 $44.07 M - Mercantile— Retail or wholesale store (Lowe's/HD) 10,000 $19,490.55 $23.95 $23,204.19 $28.74 $15,776.89 $19.16 50,000 $29,070.78 $19.49 $34,700.48 $23.40 $23,441.09 $15.60 100,000 $38,818.90 $17.55 $46,398.23 $21.05 $31,239.58 $14.04 200,000 $56,362.88 $6.96 $67,451.00 $8.36 $45,274.76 $5.57 500,000 $77,250.45 $3.97 $92,516.08 $4.77 $61,984.81 $3.18 1,000,000 $97,123.07 $3.97 $116,363.24 $4.77 $77,882.92 $3.18 M - Small Mercantile (7/11, Gas Mart., etc.) 200 $4,663.55 $313.37 $5,411.80 $376.05 $3,915.30 $250.70 1,000 $7,170.53 $216.99 $8,420.18 $260.38 $5,920.88 $173.59 2,000 $9,340.41 $111.96 $11,024.02 $134.34 $7,656.78 $89.56 4,000 $11,579.51 $49.01 $13,710.96 $58.81 $9,448.08 $39.20 10,000 $14,519.88 $43.45 $17,239.40 $52.14 $11,800.36 $34.76 20,000 $18,864.87 $43.45 $22,453.38 $52.14 $15,276.35 $34.76 M - Occupancy Tenant Improvements 300 $3,308.95 $135.92 $3,817.01 $163.10 $2,800.89 $108.74 1,500 $4,939.95 $102.88 $5,774.21 $123.46 $4,105.68 $82.31 3,000 $6,483.22 $50.63 $7,626.15 $60.76 $5,340.31 $40.51 6,000 $8,002.29 $22.06 $9,449.02 $26.47 $6,555.56 $17.64 15,000 $9,986.97 $18.88 $11,830.63 $22.65 $8,143.30 $15.10 30,000 $12,818.01 $18.88 $15,227.89 $22.65 $10,408.15 $15.10 M - Occupancy Tenant Improvements (w/ structural) 300 $3,929.94 $174.65 $4,562.20 $209.57 $3,297.68 $139.71 1,500 $6,025.65 $136.82 $7,077.05 $164.18 $4,974.24 $109.45 3,000 $8,077.86 $66.15 $9,539.71 $79.39 $6,616.02 $52.92 6,000 $10,062.54 $28.75 $11,921.31 $34.51 $8,203.76 $23.00 15,000 $12,650.41 $24.27 $15,026.76 $29.12 $10,274.06 $19.42 30,000 $16,290.35 $24.27 $19,394.69 $29.12 $13,186.01 $19.42 R-1 - Residential— Transient (Hotel/Motel) 5,000 $17,188.78 $41.77 $20,434.16 $50.12 $13,943.39 $33.42 25,000 $25,542.04 $34.73 $30,458.09 $41.68 $20,626.01 $27.79 50,000 $34,224.30 $30.04 $40,876.79 $36.06 $27,571.81 $24.04 100,000 $49,246.53 $12.09 $58,903.46 $14.51 $39,589.59 $9.67 250,000 $67,378.96 $6.79 $80,662.38 $8.14 $54,095.54 $5.43 500,000 $84,348.64 $6.79 $101,025.99 $8.14 $67,671.29 $5.43 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 8 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF R-2 - Residential— Permanent, 2+ Dwellings (Appt.) 800 $7,962.50 $174.22 $9,362.63 $209.07 $6,562.37 $139.37 4,000 $13,537.51 $103.96 $16,052.64 $124.75 $11,022.39 $83.17 8,000 $17,695.99 $58.29 $21,042.80 $69.95 $14,349.16 $46.63 16,000 $22,359.41 $25.73 $26,638.93 $30.88 $18,079.91 $20.58 40,000 $28,534.70 $24.10 $34,049.27 $28.92 $23,020.13 $19.28 80,000 $38,175.40 $24.10 $45,618.10 $28.92 $30,732.69 $19.28 R-2 - Residential— Permanent, 2+ Dwellings (Appt.) Repeat Unit 800 $4,183.56 $54.51 $4,851.19 $65.41 $3,515.94 $43.60 4,000 $5,927.58 $58.19 $6,944.01 $69.83 $4,911.16 $46.55 8,000 $8,255.17 $24.31 $9,737.10 $29.18 $6,773.23 $19.45 16,000 $10,200.36 $10.38 $12,071.33 $12.45 $8,329.38 $8.31 40,000 $12,691.75 $7.62 $15,061.00 $9.15 $10,322.49 $6.09 80,000 $15,741.02 $7.62 $18,720.13 $9.15 $12,761.90 $6.09 R-2 - Residential— Permanent, Hi-Rise Condo 15,000 $37,626.19 $31.56 $44,959.06 $37.87 $30,293.33 $25.25 75,000 $56,563.32 $26.09 $67,683.62 $31.31 $45,443.04 $20.87 150,000 $76,128.66 $22.80 $91,162.02 $27.37 $61,095.30 $18.25 300,000 $110,339.65 $9.12 $132,215.20 $10.93 $88,464.09 $7.29 750,000 $151,360.66 $5.13 $181,440.41 $6.15 $121,280.90 $4.09 1,500,000 $189,770.35 $5.13 $227,532.05 $6.15 $152,008.65 $4.09 R-2.1 – Residential – Assisted Living Facility 2,000 $11,452.97 $65.05 $13,551.19 $78.06 $9,354.74 $52.04 10,000 $16,656.87 $57.83 $19,795.86 $69.40 $13,517.87 $46.27 20,000 $22,439.68 $44.43 $26,735.24 $53.32 $18,144.12 $35.54 40,000 $31,325.98 $19.33 $37,398.80 $22.96 $25,253.15 $15.31 100,000 $42,924.10 $10.84 $51,316.55 $13.20 $34,531.65 $8.80 200,000 $53,756.33 $10.84 $64,315.22 $13.20 $43,197.44 $8.80 R-3 - Dwellings— Custom Homes 1 1,500 $7,043.31 $43.07 $8,299.69 $51.68 $5,786.95 $34.45 2,500 $7,473.98 $128.62 $8,816.49 $154.34 $6,131.48 $102.89 3,500 $8,760.16 $530.32 $10,359.91 $636.38 $7,160.42 $424.26 5,000 $16,714.94 $163.78 $19,905.63 $196.54 $13,524.24 $131.02 8,000 $21,628.37 $89.88 $25,801.74 $107.87 $17,454.98 $71.91 15,000 $27,920.26 $89.88 $33,352.01 $107.87 $22,488.49 $71.91 R-3 - Dwellings— Models, First Master Plan 1 1,500 $5,906.11 $42.12 $6,935.04 $50.53 $4,877.17 $33.69 2,500 $6,327.24 $112.55 $7,440.41 $135.07 $5,214.09 $90.05 3,500 $7,452.82 $81.03 $8,791.09 $97.23 $6,114.55 $64.82 5,000 $8,668.15 $83.63 $10,249.49 $100.36 $7,086.82 $66.90 8,000 $11,177.16 $45.03 $13,260.29 $54.03 $9,094.01 $36.03 15,000 $14,329.27 $45.03 $17,042.83 $54.03 $11,615.70 $36.03 R-3 - Dwellings— Production Phase 1 1,500 $3,079.67 $6.17 $3,555.93 $7.40 $2,603.40 $4.94 2,500 $3,141.38 $43.20 $3,629.98 $51.84 $2,652.78 $34.56 3,500 $3,573.37 $32.91 $4,148.38 $39.50 $2,998.37 $26.33 5,000 $4,067.09 $26.73 $4,740.82 $32.08 $3,393.34 $21.38 8,000 $4,869.10 $16.31 $5,703.25 $19.57 $4,034.95 $13.05 15,000 $6,010.66 $16.31 $7,073.13 $19.57 $4,948.21 $13.05 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 9 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF R-3 - Dwellings— Alternate Materials 1 1,500 $6,051.35 $41.29 $7,118.22 $49.56 $4,984.49 $33.03 2,500 $6,464.28 $116.26 $7,613.74 $139.51 $5,314.83 $93.01 3,500 $7,626.88 $84.10 $9,008.86 $100.90 $6,244.91 $67.28 5,000 $8,888.22 $85.20 $10,522.47 $102.23 $7,253.98 $68.16 8,000 $11,444.21 $46.30 $13,589.65 $55.56 $9,298.77 $37.04 15,000 $14,684.96 $46.30 $17,478.55 $55.56 $11,891.36 $37.04 R-3.1 – Residential – Care Facility (1-6 persons) 1,500 $3,366.42 $229.81 $3,876.74 $275.77 $2,856.08 $183.85 2,500 $5,664.54 $178.54 $6,634.50 $214.25 $4,694.59 $142.84 3,500 $7,449.96 $130.41 $8,777.00 $156.49 $6,122.92 $104.32 5,000 $9,406.05 $86.14 $11,124.30 $103.38 $7,687.79 $68.92 8,000 $11,990.43 $56.80 $14,225.56 $68.17 $9,755.31 $45.44 15,000 $15,966.83 $56.80 $18,997.24 $68.17 $12,936.42 $45.44 R-4 - Residential— Assisted Living (6-16 persons) 1,500 $9,327.64 $110.76 $11,000.79 $132.91 $7,654.48 $88.61 7,500 $15,973.05 $63.17 $18,975.28 $75.81 $12,970.80 $50.55 15,000 $20,711.19 $36.37 $24,661.05 $43.64 $16,761.32 $29.10 30,000 $26,166.37 $16.09 $31,207.28 $19.32 $21,125.47 $12.87 75,000 $33,408.07 $15.31 $39,897.31 $18.37 $26,918.83 $12.25 150,000 $44,892.64 $15.31 $53,678.80 $18.37 $36,106.49 $12.25 S-1 - Storage— Moderate Hazard 1,000 $6,644.57 $97.57 $7,789.03 $117.08 $5,500.11 $78.06 5,000 $10,547.34 $64.71 $12,472.35 $77.66 $8,622.33 $51.77 10,000 $13,783.06 $34.19 $16,355.21 $41.02 $11,210.90 $27.35 20,000 $17,201.43 $15.00 $20,457.26 $18.00 $13,945.60 $12.00 50,000 $21,701.33 $13.52 $25,857.14 $16.23 $17,545.52 $10.81 100,000 $28,460.82 $13.52 $33,968.53 $16.23 $22,953.12 $10.81 S-1 - Storage— Moderate Hazard, Repair Garage 600 $5,461.47 $135.48 $6,367.90 $162.57 $4,555.02 $108.37 3,000 $8,712.76 $81.59 $10,269.47 $97.91 $7,156.06 $65.27 6,000 $11,160.53 $45.51 $13,206.79 $54.60 $9,114.28 $36.41 12,000 $13,890.90 $20.08 $16,483.23 $24.09 $11,298.57 $16.06 30,000 $17,504.59 $18.74 $20,819.65 $22.50 $14,189.52 $14.99 60,000 $23,127.69 $18.74 $27,567.38 $22.50 $18,688.01 $14.99 S-2 - Storage—Low Hazard 1,000 $6,347.48 $99.48 $7,432.52 $119.38 $5,262.44 $79.59 5,000 $10,326.98 $65.15 $12,207.92 $78.19 $8,446.04 $52.12 10,000 $13,584.65 $34.66 $16,117.12 $41.59 $11,052.17 $27.73 20,000 $17,050.50 $15.22 $20,276.14 $18.26 $13,824.86 $12.18 50,000 $21,616.16 $13.78 $25,754.93 $16.53 $17,477.38 $11.02 100,000 $28,507.18 $13.78 $34,024.17 $16.53 $22,990.21 $11.02 S-2 - Storage—Low Hazard, Aircraft Hangar 1,000 $5,951.95 $82.20 $6,957.87 $98.65 $4,946.01 $65.77 5,000 $9,240.22 $64.89 $10,903.81 $77.87 $7,576.64 $51.91 10,000 $12,484.70 $31.25 $14,797.18 $37.51 $10,172.22 $25.00 20,000 $15,610.33 $13.57 $18,547.95 $16.29 $12,672.73 $10.87 50,000 $19,684.18 $11.43 $23,436.56 $13.71 $15,931.80 $9.14 100,000 $25,396.24 $11.43 $30,291.03 $13.71 $20,501.45 $9.14 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 10 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF S-2 - Storage—Low Hazard, Parking Garages 5,000 $9,755.91 $22.53 $11,522.64 $27.03 $7,989.19 $18.02 25,000 $14,260.53 $19.48 $16,928.19 $23.38 $11,592.89 $15.59 50,000 $19,130.94 $15.66 $22,772.67 $18.80 $15,489.21 $12.53 100,000 $26,962.39 $6.51 $32,170.41 $7.81 $21,754.37 $5.20 250,000 $36,727.78 $3.58 $43,888.88 $4.29 $29,566.68 $2.86 500,000 $45,658.64 $3.58 $54,605.90 $4.29 $36,711.37 $2.86 S - Occupancy Tenant Improvements 500 $3,170.51 $74.58 $3,650.89 $89.50 $2,690.14 $59.66 2,500 $4,662.20 $60.82 $5,440.91 $72.99 $3,883.48 $48.65 5,000 $6,182.72 $28.82 $7,265.52 $34.58 $5,099.90 $23.06 10,000 $7,623.68 $12.50 $8,994.69 $14.99 $6,252.68 $10.00 25,000 $9,498.28 $10.37 $11,244.20 $12.44 $7,752.35 $8.29 50,000 $12,091.06 $10.37 $14,355.54 $12.44 $9,826.58 $8.29 S - Occupancy Tenant Improvements (w/ structural) 500 $3,058.30 $75.19 $3,516.23 $90.22 $2,600.37 $60.15 2,500 $4,561.95 $54.12 $5,320.62 $64.94 $3,803.29 $43.30 5,000 $5,915.00 $27.35 $6,944.28 $32.81 $4,885.73 $21.88 10,000 $7,282.43 $11.95 $8,585.19 $14.33 $5,979.68 $9.56 25,000 $9,074.14 $10.43 $10,735.24 $12.52 $7,413.04 $8.35 50,000 $11,681.90 $10.43 $13,864.55 $12.52 $9,499.25 $8.35 U - Accessory— Agricultural Building 600 $3,080.03 $66.80 $3,553.96 $80.16 $2,606.12 $53.44 3,000 $4,683.26 $48.33 $5,477.82 $57.99 $3,888.70 $38.67 6,000 $6,133.15 $24.35 $7,217.69 $29.23 $5,048.60 $19.48 12,000 $7,594.55 $10.64 $8,971.38 $12.76 $6,217.73 $8.50 30,000 $9,508.85 $9.27 $11,268.53 $11.12 $7,749.17 $7.41 60,000 $12,289.52 $9.27 $14,605.33 $11.12 $9,973.70 $7.41 U - Accessory— Private Garage 50 $1,794.50 $287.00 $2,011.31 $344.40 $1,577.69 $229.60 250 $2,368.50 $229.75 $2,700.12 $275.70 $2,036.89 $183.80 500 $2,942.87 $109.88 $3,389.36 $131.86 $2,496.40 $87.90 1,000 $3,492.29 $47.70 $4,048.66 $57.24 $2,935.92 $38.16 2,500 $4,207.79 $39.90 $4,907.27 $47.87 $3,508.32 $31.91 5,000 $5,205.16 $39.90 $6,104.09 $47.87 $4,306.21 $31.91 O - Other Tenant Improvements 300 $2,928.52 $122.61 $3,360.49 $147.13 $2,496.54 $98.09 1,500 $4,399.80 $83.89 $5,126.03 $100.67 $3,673.57 $67.11 3,000 $5,658.14 $43.56 $6,636.04 $52.27 $4,680.24 $34.85 6,000 $6,965.06 $19.09 $8,204.34 $22.90 $5,725.78 $15.27 15,000 $8,682.44 $17.00 $10,265.21 $20.39 $7,099.69 $13.60 30,000 $11,231.92 $17.00 $13,324.59 $20.39 $9,139.27 $13.60 O - Other Tenant Improvements (w/ structural) 300 $3,182.91 $142.47 $3,665.75 $170.96 $2,700.05 $113.97 1,500 $4,892.54 $95.27 $5,717.31 $114.32 $4,067.76 $76.22 3,000 $6,321.59 $50.09 $7,432.18 $60.12 $5,211.01 $40.08 6,000 $7,824.55 $21.98 $9,235.73 $26.37 $6,413.36 $17.58 15,000 $9,802.10 $19.75 $11,608.80 $23.69 $7,995.41 $15.80 30,000 $12,763.52 $19.75 $15,162.49 $23.69 $10,364.54 $15.80 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 11 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check & Inspection Fees Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF O - All Shell Buildings 2,000 $6,867.50 $37.32 $8,056.54 $44.79 $5,678.45 $29.85 10,000 $9,853.37 $32.29 $11,639.60 $38.74 $8,067.16 $25.83 20,000 $13,081.50 $26.10 $15,513.34 $31.32 $10,649.65 $20.88 40,000 $18,301.23 $11.02 $21,777.02 $13.22 $14,825.44 $8.82 100,000 $24,913.94 $6.22 $29,712.28 $7.46 $20,115.61 $4.97 200,000 $31,132.23 $6.22 $37,174.23 $7.46 $25,090.24 $4.97 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-300 New Construction Permit Fees City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 PLAN CHECK ONLY Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF A-1 - Assembly 5,000 $7,242.39 $12.29 $8,550.22 $14.75 $5,934.57 $9.83 25,000 $9,699.99 $16.76 $11,499.33 $20.12 $7,900.64 $13.41 50,000 $13,891.54 $4.92 $16,529.19 $5.90 $11,253.88 $3.93 100,000 $16,349.14 $4.62 $19,478.31 $5.54 $13,219.95 $3.70 250,000 $23,282.93 $2.70 $27,798.86 $3.23 $18,766.99 $2.16 500,000 $30,019.28 $2.70 $35,882.47 $3.23 $24,156.07 $2.16 A-2 - Assembly 500 $3,617.21 $92.07 $4,200.00 $110.50 $3,034.42 $73.66 2,500 $5,458.71 $21.08 $6,409.80 $25.29 $4,507.61 $16.86 5,000 $5,985.55 $22.78 $7,042.00 $27.35 $4,929.09 $18.23 10,000 $7,124.84 $10.53 $8,409.16 $12.63 $5,840.53 $8.42 25,000 $8,703.11 $12.63 $10,303.08 $15.16 $7,103.14 $10.10 50,000 $11,860.01 $12.63 $14,091.37 $15.16 $9,628.66 $10.10 A-3 - Assembly 2,000 $5,123.15 $20.98 $6,007.13 $25.17 $4,239.17 $16.79 10,000 $6,801.38 $28.39 $8,021.00 $34.08 $5,581.75 $22.72 20,000 $9,640.93 $8.39 $11,428.46 $10.07 $7,853.40 $6.71 40,000 $11,319.15 $7.74 $13,442.34 $9.28 $9,195.98 $6.19 100,000 $15,963.06 $4.42 $19,015.02 $5.31 $12,911.10 $3.54 200,000 $20,388.71 $4.42 $24,325.80 $5.31 $16,451.61 $3.54 A-4 - Assembly 5,000 $7,242.39 $12.29 $8,550.22 $14.75 $5,934.57 $9.83 25,000 $9,699.99 $16.76 $11,499.33 $20.12 $7,900.64 $13.41 50,000 $13,891.54 $4.92 $16,529.19 $5.90 $11,253.88 $3.93 100,000 $16,349.14 $4.62 $19,478.31 $5.54 $13,219.95 $3.70 250,000 $23,282.93 $2.70 $27,798.86 $3.23 $18,766.99 $2.16 500,000 $30,019.28 $2.70 $35,882.47 $3.23 $24,156.07 $2.16 A-5 - Assembly 10,000 $9,420.19 $8.28 $11,163.58 $9.93 $7,676.80 $6.62 50,000 $12,731.76 $11.20 $15,137.46 $13.44 $10,326.05 $8.97 100,000 $18,332.59 $3.31 $21,858.46 $3.97 $14,806.73 $2.65 200,000 $21,644.16 $3.05 $25,832.35 $3.66 $17,455.98 $2.44 500,000 $30,798.42 $1.74 $36,817.45 $2.09 $24,779.38 $1.40 1,000,000 $39,513.46 $1.74 $47,275.50 $2.09 $31,751.41 $1.40 A - Occupancy Tenant Improvements 300 $1,467.44 $71.23 $1,651.01 $85.48 $1,283.88 $56.98 1,500 $2,322.20 $16.30 $2,676.73 $19.56 $1,967.68 $13.05 3,000 $2,566.75 $17.62 $2,970.18 $21.15 $2,163.32 $14.10 6,000 $3,095.57 $8.14 $3,604.77 $9.77 $2,586.38 $6.51 15,000 $3,828.14 $9.77 $4,483.85 $11.73 $3,172.44 $7.81 30,000 $5,293.49 $9.77 $6,242.26 $11.73 $4,344.70 $7.81 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 13 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF A - Occupancy Tenant Improvements (w/ structural) 300 $1,584.35 $84.02 $1,791.30 $100.83 $1,377.40 $67.21 1,500 $2,592.57 $19.23 $3,001.16 $23.08 $2,183.97 $15.39 3,000 $2,881.02 $20.79 $3,347.30 $24.95 $2,414.73 $16.63 6,000 $3,504.78 $9.60 $4,095.82 $11.52 $2,913.75 $7.68 15,000 $4,368.88 $11.53 $5,132.73 $13.83 $3,605.03 $9.22 30,000 $6,097.29 $11.53 $7,206.83 $13.83 $4,987.75 $9.22 B - Business— Animal Hospital 250 $2,408.05 $130.44 $2,749.02 $156.53 $2,067.10 $104.36 1,250 $3,712.45 $29.85 $4,314.29 $35.83 $3,110.61 $23.88 2,500 $4,085.63 $32.29 $4,762.11 $38.73 $3,409.15 $25.83 5,000 $4,892.64 $14.91 $5,730.51 $17.89 $4,054.75 $11.92 12,500 $6,010.57 $17.89 $7,072.03 $21.47 $4,949.11 $14.31 25,000 $8,246.71 $17.89 $9,755.41 $21.47 $6,738.02 $14.31 B - Business—Bank 500 $2,641.87 $80.56 $3,029.60 $96.68 $2,254.14 $64.45 2,500 $4,253.18 $18.44 $4,963.17 $22.13 $3,543.20 $14.75 5,000 $4,714.17 $19.94 $5,516.36 $23.93 $3,911.99 $15.95 10,000 $5,711.06 $9.21 $6,712.62 $11.04 $4,709.50 $7.37 25,000 $7,092.04 $11.04 $8,369.79 $13.26 $5,814.28 $8.84 50,000 $9,854.34 $11.04 $11,684.55 $13.26 $8,024.12 $8.84 B - Business— Barber Shop/Beauty Shop (Other than retail) 200 $2,230.28 $163.05 $2,535.69 $195.66 $1,924.88 $130.44 1,000 $3,534.67 $37.32 $4,100.97 $44.78 $2,968.39 $29.85 2,000 $3,907.86 $40.35 $4,548.79 $48.42 $3,266.93 $32.29 4,000 $4,714.86 $18.63 $5,517.18 $22.36 $3,912.54 $14.91 10,000 $5,832.79 $22.36 $6,858.71 $26.83 $4,806.89 $17.89 20,000 $8,068.94 $22.36 $9,542.08 $26.83 $6,595.81 $17.89 B - Business—Car Wash 400 $2,288.74 $86.32 $2,605.83 $103.59 $1,971.64 $69.06 2,000 $3,669.86 $19.76 $4,263.18 $23.71 $3,076.54 $15.81 4,000 $4,065.00 $21.36 $4,737.35 $25.63 $3,392.64 $17.09 8,000 $4,919.46 $9.87 $5,762.71 $11.84 $4,076.23 $7.89 20,000 $6,103.16 $11.84 $7,183.15 $14.20 $5,023.18 $9.47 40,000 $8,470.85 $11.84 $10,024.37 $14.20 $6,917.33 $9.47 B - Business—Clinic, Outpatient 2,000 $4,768.03 $19.79 $5,580.98 $23.75 $3,955.07 $15.83 10,000 $6,351.13 $26.27 $7,480.70 $31.52 $5,221.56 $21.01 20,000 $8,977.46 $7.92 $10,632.30 $9.50 $7,322.61 $6.34 40,000 $10,560.56 $6.95 $12,532.03 $8.34 $8,589.10 $5.57 100,000 $14,732.00 $3.77 $17,537.75 $4.53 $11,926.26 $3.01 200,000 $18,505.80 $3.77 $22,066.31 $4.53 $14,945.28 $3.01 B - Business—Dry Cleaning 200 $2,171.83 $153.46 $2,465.55 $184.15 $1,878.12 $122.77 1,000 $3,399.50 $35.12 $3,938.75 $42.15 $2,860.24 $28.09 2,000 $3,750.73 $37.97 $4,360.22 $45.57 $3,141.23 $30.38 4,000 $4,510.25 $17.53 $5,271.65 $21.04 $3,748.86 $14.03 10,000 $5,562.44 $21.04 $6,534.26 $25.26 $4,590.60 $16.84 20,000 $7,667.03 $21.04 $9,059.80 $25.26 $6,274.28 $16.84 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 14 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF B - Business— Laboratory 500 $2,758.78 $88.24 $3,169.89 $105.89 $2,347.68 $70.59 2,500 $4,523.55 $20.20 $5,287.61 $24.23 $3,759.49 $16.16 5,000 $5,028.44 $21.84 $5,893.48 $26.20 $4,163.40 $17.47 10,000 $6,120.27 $10.09 $7,203.67 $12.10 $5,036.87 $8.06 25,000 $7,632.77 $12.10 $9,018.68 $14.52 $6,246.87 $9.68 50,000 $10,658.14 $12.10 $12,649.12 $14.52 $8,667.16 $9.68 B - Business— Motor Vehicle Showroom 1,000 $3,932.69 $70.97 $4,578.57 $85.17 $3,286.80 $56.78 5,000 $6,771.67 $16.25 $7,985.34 $19.49 $5,557.98 $12.99 10,000 $7,583.87 $17.57 $8,960.01 $21.08 $6,207.75 $14.05 20,000 $9,340.29 $8.11 $11,067.69 $9.74 $7,612.88 $6.49 50,000 $11,773.45 $9.74 $13,987.49 $11.68 $9,559.41 $7.79 100,000 $16,640.35 $9.74 $19,827.78 $11.68 $13,452.93 $7.79 B - Business— Professional Office 2,000 $3,795.17 $41.80 $4,413.55 $50.16 $3,176.78 $33.44 10,000 $7,139.45 $11.66 $8,426.69 $13.99 $5,852.21 $9.33 20,000 $8,305.64 $10.43 $9,826.12 $12.52 $6,785.16 $8.35 40,000 $10,391.68 $5.68 $12,329.36 $6.81 $8,454.00 $4.54 100,000 $13,797.87 $6.11 $16,416.80 $7.33 $11,178.95 $4.88 200,000 $19,899.17 $6.11 $23,738.35 $7.33 $16,059.98 $4.88 B - Business—High Rise Office 15,000 $13,190.71 $8.05 $15,688.20 $9.67 $10,693.21 $6.45 75,000 $18,023.13 $10.75 $21,487.10 $12.89 $14,559.15 $8.59 150,000 $26,079.83 $3.22 $31,155.16 $3.86 $21,004.52 $2.57 300,000 $30,912.26 $2.86 $36,954.05 $3.44 $24,870.45 $2.29 750,000 $43,805.03 $1.57 $52,425.38 $1.89 $35,184.68 $1.27 1,500,000 $55,630.11 $1.57 $66,615.48 $1.89 $44,644.73 $1.27 B - Occupancy Tenant Improvements 300 $1,379.76 $61.64 $1,545.79 $73.96 $1,213.73 $49.31 1,500 $2,119.43 $14.11 $2,433.40 $16.93 $1,805.46 $11.29 3,000 $2,331.04 $15.26 $2,687.33 $18.30 $1,974.75 $12.20 6,000 $2,788.67 $7.04 $3,236.48 $8.45 $2,340.84 $5.63 15,000 $3,422.60 $8.46 $3,997.19 $10.14 $2,848.00 $6.77 30,000 $4,690.62 $8.46 $5,518.83 $10.14 $3,862.42 $6.77 B - Occupancy Tenant Improvements (w/ structural) 300 $1,496.67 $74.43 $1,686.08 $89.31 $1,307.25 $59.54 1,500 $2,389.79 $17.04 $2,757.83 $20.44 $2,021.76 $13.63 3,000 $2,645.31 $18.41 $3,064.46 $22.10 $2,226.17 $14.74 6,000 $3,197.88 $8.50 $3,727.53 $10.21 $2,668.22 $6.81 15,000 $3,963.33 $10.21 $4,646.08 $12.25 $3,280.59 $8.16 30,000 $5,494.43 $10.21 $6,483.40 $12.25 $4,505.47 $8.16 E - Educational— Group Occupancy 1,500 $4,575.68 $61.38 $5,350.17 $73.66 $3,801.19 $49.10 7,500 $8,258.68 $14.05 $9,769.77 $16.86 $6,747.60 $11.24 15,000 $9,312.37 $15.19 $11,034.19 $18.23 $7,590.54 $12.16 30,000 $11,590.95 $7.02 $13,768.49 $8.42 $9,413.42 $5.61 75,000 $14,747.49 $8.42 $17,556.33 $10.10 $11,938.64 $6.73 150,000 $21,061.30 $8.42 $25,132.92 $10.10 $16,989.70 $6.73 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 15 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF E - Educational— Day Care 600 $3,109.50 $92.72 $3,590.76 $111.25 $2,628.25 $74.17 3,000 $5,334.65 $21.22 $6,260.94 $25.47 $4,408.37 $16.97 6,000 $5,971.25 $22.95 $7,024.85 $27.53 $4,917.65 $18.36 12,000 $7,347.90 $10.59 $8,676.83 $12.72 $6,018.97 $8.48 30,000 $9,254.97 $12.72 $10,965.32 $15.26 $7,544.63 $10.18 60,000 $13,069.57 $12.72 $15,542.84 $15.26 $10,596.31 $10.18 E - Occupancy Tenant Improvements 300 $1,467.44 $71.23 $1,651.01 $85.48 $1,283.88 $56.98 1,500 $2,322.20 $16.30 $2,676.73 $19.56 $1,967.68 $13.05 3,000 $2,566.75 $17.62 $2,970.18 $21.15 $2,163.32 $14.10 6,000 $3,095.57 $8.14 $3,604.77 $9.77 $2,586.38 $6.51 15,000 $3,828.14 $9.77 $4,483.85 $11.73 $3,172.44 $7.81 30,000 $5,293.49 $9.77 $6,242.26 $11.73 $4,344.70 $7.81 E - Occupancy Tenant Improvements (w/ structural) 300 $1,584.35 $84.02 $1,791.30 $100.83 $1,377.40 $67.21 1,500 $2,592.57 $19.23 $3,001.16 $23.08 $2,183.97 $15.39 3,000 $2,881.02 $20.79 $3,347.30 $24.95 $2,414.73 $16.63 6,000 $3,504.78 $9.60 $4,095.82 $11.52 $2,913.75 $7.68 15,000 $4,368.88 $11.53 $5,132.73 $13.83 $3,605.03 $9.22 30,000 $6,097.29 $11.53 $7,206.83 $13.83 $4,987.75 $9.22 F-1 - Factory Industrial— Moderate Hazard 2,000 $4,423.71 $17.94 $5,167.80 $21.53 $3,679.62 $14.34 10,000 $5,858.56 $23.98 $6,889.62 $28.78 $4,827.50 $19.18 20,000 $8,256.86 $7.17 $9,767.58 $8.61 $6,746.14 $5.74 40,000 $9,691.72 $6.42 $11,489.41 $7.71 $7,894.02 $5.14 100,000 $13,545.51 $3.56 $16,113.96 $4.27 $10,977.05 $2.85 200,000 $17,105.66 $3.56 $20,386.15 $4.27 $13,825.17 $2.85 F-2 - Factory Industrial—Low Hazard 2,000 $4,215.68 $17.14 $4,918.18 $20.56 $3,513.20 $13.71 10,000 $5,586.39 $22.70 $6,563.03 $27.25 $4,609.77 $18.16 20,000 $7,856.88 $6.85 $9,287.61 $8.23 $6,426.16 $5.48 40,000 $9,227.59 $6.00 $10,932.46 $7.19 $7,522.72 $4.80 100,000 $12,825.36 $3.25 $15,249.78 $3.89 $10,400.94 $2.60 200,000 $16,065.95 $3.25 $19,138.49 $3.89 $12,993.41 $2.60 F - Occupancy Tenant Improvements 1,000 $1,702.43 $29.08 $1,933.00 $34.89 $1,471.87 $23.27 5,000 $2,865.64 $6.66 $3,328.85 $7.99 $2,402.43 $5.32 10,000 $3,198.43 $7.19 $3,728.20 $8.64 $2,668.67 $5.75 20,000 $3,918.09 $3.32 $4,591.79 $3.99 $3,244.38 $2.66 50,000 $4,915.02 $3.99 $5,788.11 $4.79 $4,041.94 $3.19 100,000 $6,909.13 $3.99 $8,181.04 $4.79 $5,637.24 $3.19 F - Occupancy Tenant Improvements (w/ structural) 1,000 $1,936.24 $36.75 $2,213.57 $44.10 $1,658.92 $29.40 5,000 $3,406.37 $8.42 $3,977.73 $10.10 $2,835.02 $6.73 10,000 $3,826.98 $9.10 $4,482.45 $10.91 $3,171.50 $7.27 20,000 $4,736.51 $4.20 $5,573.89 $5.04 $3,899.13 $3.36 50,000 $5,996.50 $5.04 $7,085.87 $6.05 $4,907.11 $4.04 100,000 $8,516.76 $5.04 $10,110.19 $6.05 $6,923.32 $4.04 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 16 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF H-1 - High Hazard Group 500 $3,055.87 $84.40 $3,526.39 $101.28 $2,585.34 $67.52 2,500 $4,743.90 $19.32 $5,552.04 $23.18 $3,935.78 $15.46 5,000 $5,226.85 $20.89 $6,131.57 $25.07 $4,322.13 $16.71 10,000 $6,271.20 $9.65 $7,384.80 $11.57 $5,157.61 $7.71 25,000 $7,717.94 $11.57 $9,120.88 $13.89 $6,315.00 $9.26 50,000 $10,611.78 $11.57 $12,593.48 $13.89 $8,630.07 $9.26 H-2 - High Hazard Group 500 $3,055.87 $84.40 $3,526.39 $101.28 $2,585.34 $67.52 2,500 $4,743.90 $19.32 $5,552.04 $23.18 $3,935.78 $15.46 5,000 $5,226.85 $20.89 $6,131.57 $25.07 $4,322.13 $16.71 10,000 $6,271.20 $9.65 $7,384.80 $11.57 $5,157.61 $7.71 25,000 $7,717.94 $11.57 $9,120.88 $13.89 $6,315.00 $9.26 50,000 $10,611.78 $11.57 $12,593.48 $13.89 $8,630.07 $9.26 H-3 - High Hazard Group 1,000 $3,757.33 $65.22 $4,368.13 $78.27 $3,146.51 $52.17 5,000 $6,366.11 $14.93 $7,498.69 $17.91 $5,233.54 $11.95 10,000 $7,112.47 $16.14 $8,394.32 $19.37 $5,830.63 $12.91 20,000 $8,726.48 $7.46 $10,331.11 $8.94 $7,121.83 $5.96 50,000 $10,962.35 $8.94 $13,014.17 $10.74 $8,910.53 $7.16 100,000 $15,434.64 $8.94 $18,380.92 $10.74 $12,488.37 $7.16 H-4 - High Hazard Group 1,000 $3,757.33 $65.22 $4,368.13 $78.27 $3,146.51 $52.17 5,000 $6,366.11 $14.93 $7,498.69 $17.91 $5,233.54 $11.95 10,000 $7,112.47 $16.14 $8,394.32 $19.37 $5,830.63 $12.91 20,000 $8,726.48 $7.46 $10,331.11 $8.94 $7,121.83 $5.96 50,000 $10,962.35 $8.94 $13,014.17 $10.74 $8,910.53 $7.16 100,000 $15,434.64 $8.94 $18,380.92 $10.74 $12,488.37 $7.16 H-5 - High Hazard Group 2,000 $5,415.11 $22.28 $6,357.49 $26.73 $4,472.74 $17.82 10,000 $7,197.32 $30.25 $8,496.14 $36.29 $5,898.51 $24.20 20,000 $10,221.86 $8.91 $12,125.58 $10.69 $8,318.13 $7.13 40,000 $12,004.06 $8.28 $14,264.23 $9.93 $9,743.90 $6.62 100,000 $16,971.92 $4.77 $20,225.66 $5.72 $13,718.19 $3.82 200,000 $21,741.23 $4.77 $25,948.82 $5.72 $17,533.64 $3.82 H - Occupancy Tenant Improvements 600 $1,852.18 $42.08 $2,112.69 $50.49 $1,591.66 $33.66 3,000 $2,861.94 $9.63 $3,324.40 $11.55 $2,399.46 $7.70 6,000 $3,150.82 $10.42 $3,671.06 $12.50 $2,630.57 $8.33 12,000 $3,775.53 $4.81 $4,420.71 $5.76 $3,130.35 $3.85 30,000 $4,640.94 $5.78 $5,459.21 $6.92 $3,822.68 $4.62 60,000 $6,371.98 $5.78 $7,536.46 $6.92 $5,207.51 $4.62 H - Occupancy Tenant Improvements (w/ structural) 600 $1,969.09 $48.47 $2,252.98 $58.16 $1,685.19 $38.78 3,000 $3,132.29 $11.09 $3,648.83 $13.31 $2,615.76 $8.88 6,000 $3,465.09 $11.99 $4,048.19 $14.39 $2,881.99 $9.59 12,000 $4,184.74 $5.54 $4,911.76 $6.64 $3,457.72 $4.43 30,000 $5,181.68 $6.64 $6,108.09 $7.98 $4,255.26 $5.31 60,000 $7,175.80 $6.64 $8,501.03 $7.98 $5,850.56 $5.31 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 17 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF I-2 - Institutional— 6+ persons, non- ambulatory 2,000 $5,473.68 $23.21 $6,427.76 $27.85 $4,519.59 $18.57 10,000 $7,330.48 $30.82 $8,655.92 $36.98 $6,005.03 $24.65 20,000 $10,412.31 $9.28 $12,354.12 $11.14 $8,470.50 $7.43 40,000 $12,269.11 $8.16 $14,582.28 $9.80 $9,955.94 $6.53 100,000 $17,167.54 $4.43 $20,460.40 $5.32 $13,874.67 $3.55 200,000 $21,604.86 $4.43 $25,785.18 $5.32 $17,424.54 $3.55 I-2.1 - Clinic - Outpatient 2,000 $5,381.23 $22.86 $6,316.83 $27.42 $4,445.64 $18.28 10,000 $7,209.59 $30.25 $8,510.85 $36.30 $5,908.32 $24.20 20,000 $10,234.54 $9.14 $12,140.80 $10.97 $8,328.29 $7.32 40,000 $12,062.90 $7.98 $14,334.83 $9.57 $9,790.97 $6.38 100,000 $16,847.55 $4.29 $20,076.41 $5.16 $13,618.69 $3.43 200,000 $21,142.65 $4.29 $25,230.54 $5.16 $17,054.77 $3.43 I-3 - Institutional— Restrained 2,500 $5,872.71 $20.08 $6,906.61 $24.09 $4,838.82 $16.06 12,500 $7,880.59 $26.71 $9,316.05 $32.04 $6,445.12 $21.36 25,000 $11,218.63 $8.03 $13,321.70 $9.64 $9,115.55 $6.42 50,000 $13,226.50 $7.10 $15,731.14 $8.51 $10,721.84 $5.68 125,000 $18,545.30 $3.87 $22,113.71 $4.64 $14,976.89 $3.10 250,000 $23,385.49 $3.87 $27,921.94 $4.64 $18,849.04 $3.10 I-4 - Institutional— 6+ persons, day care 400 $2,842.85 $139.07 $3,270.77 $166.88 $2,414.93 $111.25 2,000 $5,068.00 $31.83 $5,940.95 $38.19 $4,195.05 $25.47 4,000 $5,704.60 $34.42 $6,704.86 $41.29 $4,704.33 $27.53 8,000 $7,081.24 $15.90 $8,356.84 $19.07 $5,805.65 $12.72 20,000 $8,988.32 $19.07 $10,645.33 $22.89 $7,331.30 $15.26 40,000 $12,802.91 $19.07 $15,222.85 $22.89 $10,382.98 $15.26 I - Occupancy Tenant Improvements 600 $1,776.09 $50.06 $2,021.39 $60.08 $1,530.80 $40.05 3,000 $2,977.68 $11.46 $3,463.30 $13.75 $2,492.06 $9.16 6,000 $3,321.44 $12.39 $3,875.81 $14.87 $2,767.07 $9.91 12,000 $4,064.83 $5.72 $4,767.87 $6.86 $3,361.79 $4.58 30,000 $5,094.65 $6.86 $6,003.66 $8.24 $4,185.64 $5.49 60,000 $7,154.53 $6.86 $8,475.52 $8.24 $5,833.54 $5.49 I - Occupancy Tenant Improvements (w/ structural) 600 $1,893.00 $56.46 $2,161.69 $67.75 $1,624.33 $45.17 3,000 $3,248.05 $12.93 $3,787.73 $15.51 $2,708.35 $10.34 6,000 $3,635.71 $13.97 $4,252.93 $16.76 $3,018.49 $11.18 12,000 $4,474.04 $6.46 $5,258.94 $7.74 $3,689.16 $5.16 30,000 $5,635.39 $7.74 $6,652.54 $9.30 $4,618.23 $6.19 60,000 $7,958.35 $7.74 $9,440.09 $9.30 $6,476.59 $6.19 M - Mercantile— Department & Drug Store 10,000 $7,668.41 $6.72 $9,061.45 $8.06 $6,275.38 $5.38 50,000 $10,356.10 $8.99 $12,286.68 $10.78 $8,425.54 $7.18 100,000 $14,847.03 $2.68 $17,675.79 $3.22 $12,018.27 $2.15 200,000 $17,534.73 $2.40 $20,901.02 $2.88 $14,168.43 $1.93 500,000 $24,745.22 $1.33 $29,553.61 $1.60 $19,936.82 $1.07 1,000,000 $31,398.33 $1.33 $37,537.36 $1.60 $25,259.32 $1.07 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 18 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF M - Mercantile— Market (Vons/Ralphs..) 5,000 $5,489.46 $9.27 $6,446.70 $11.13 $4,532.22 $7.41 25,000 $7,344.05 $12.35 $8,672.21 $14.83 $6,015.89 $9.89 50,000 $10,432.95 $3.71 $12,378.89 $4.46 $8,487.01 $2.97 100,000 $12,287.54 $3.29 $14,604.39 $3.95 $9,970.68 $2.63 250,000 $17,223.09 $1.80 $20,527.05 $2.17 $13,919.11 $1.44 500,000 $21,737.45 $1.80 $25,944.29 $2.17 $17,530.61 $1.44 M - Mercantile— Motor fuel- dispensing Canopy 100 $1,598.89 $191.82 $1,778.02 $230.19 $1,419.76 $153.46 500 $2,366.18 $43.90 $2,698.77 $52.68 $2,033.59 $35.12 1,000 $2,585.70 $47.48 $2,962.19 $56.97 $2,209.21 $37.97 2,000 $3,060.41 $21.92 $3,531.84 $26.30 $2,588.97 $17.53 5,000 $3,718.01 $26.31 $4,320.97 $31.57 $3,115.06 $21.04 10,000 $5,033.39 $26.31 $5,899.42 $31.57 $4,167.36 $21.04 M - Mercantile— Retail or wholesale store (Lowe's/HD) 10,000 $6,932.33 $6.00 $8,178.16 $7.19 $5,686.52 $4.80 50,000 $9,329.89 $8.03 $11,055.23 $9.64 $7,604.56 $6.42 100,000 $13,343.92 $2.40 $15,872.07 $2.88 $10,815.79 $1.91 200,000 $15,741.48 $2.16 $18,749.14 $2.59 $12,733.84 $1.73 500,000 $22,205.24 $1.20 $26,505.63 $1.44 $17,904.83 $0.96 1,000,000 $28,200.77 $1.20 $33,700.27 $1.44 $22,701.26 $0.96 M - Small Mercantile (7/11, Gas Mart., etc.) 200 $2,230.28 $163.05 $2,535.69 $195.66 $1,924.88 $130.44 1,000 $3,534.67 $37.32 $4,100.97 $44.78 $2,968.39 $29.85 2,000 $3,907.86 $40.35 $4,548.79 $48.42 $3,266.93 $32.29 4,000 $4,714.86 $18.63 $5,517.18 $22.36 $3,912.54 $14.91 10,000 $5,832.79 $22.36 $6,858.71 $26.83 $4,806.89 $17.89 20,000 $8,068.94 $22.36 $9,542.08 $26.83 $6,595.81 $17.89 M - Occupancy Tenant Improvements 300 $1,424.20 $61.64 $1,599.13 $73.96 $1,249.28 $49.31 1,500 $2,163.88 $14.11 $2,486.73 $16.93 $1,841.02 $11.29 3,000 $2,375.48 $15.26 $2,740.66 $18.30 $2,010.31 $12.20 6,000 $2,833.11 $7.04 $3,289.80 $8.45 $2,376.41 $5.63 15,000 $3,467.04 $8.46 $4,050.53 $10.14 $2,883.55 $6.77 30,000 $4,735.07 $8.46 $5,572.16 $10.14 $3,897.97 $6.77 M - Occupancy Tenant Improvements (w/ structural) 300 $1,541.11 $74.43 $1,739.41 $89.31 $1,342.81 $59.54 1,500 $2,434.23 $17.04 $2,811.16 $20.44 $2,057.31 $13.63 3,000 $2,689.75 $18.41 $3,117.79 $22.10 $2,261.73 $14.74 6,000 $3,242.32 $8.50 $3,780.85 $10.21 $2,703.78 $6.81 15,000 $4,007.77 $10.21 $4,699.41 $12.25 $3,316.14 $8.16 30,000 $5,538.87 $10.21 $6,536.73 $12.25 $4,541.02 $8.16 R-1 - Residential— Transient (Hotel/Motel) 5,000 $6,771.24 $11.72 $7,976.93 $14.06 $5,565.56 $9.37 25,000 $9,114.13 $15.58 $10,788.38 $18.69 $7,439.86 $12.46 50,000 $13,007.32 $4.69 $15,460.23 $5.62 $10,554.42 $3.75 100,000 $15,350.21 $4.14 $18,271.69 $4.96 $12,428.74 $3.31 250,000 $21,549.29 $2.26 $25,710.59 $2.71 $17,388.00 $1.80 500,000 $27,183.34 $2.26 $32,471.44 $2.71 $21,895.24 $1.80 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 19 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF R-2 - Residential— Permanent, 2+ Dwellings (Appt.) 800 $4,084.36 $107.90 $4,752.66 $129.48 $3,416.05 $86.32 4,000 $7,537.17 $24.70 $8,896.03 $29.63 $6,178.29 $19.76 8,000 $8,524.99 $26.70 $10,081.42 $32.04 $6,968.56 $21.36 16,000 $10,661.17 $12.33 $12,644.84 $14.80 $8,677.50 $9.87 40,000 $13,620.42 $14.80 $16,195.94 $17.75 $11,044.90 $11.84 80,000 $19,539.63 $14.80 $23,298.99 $17.75 $15,780.27 $11.84 R-2 - Residential— Permanent, 2+ Dwellings (Appt.) Repeat Unit 800 $1,290.66 $7.19 $1,423.51 $8.64 $1,157.82 $5.75 4,000 $1,520.85 $1.65 $1,699.73 $1.98 $1,341.97 $1.32 8,000 $1,586.71 $1.78 $1,778.76 $2.13 $1,394.65 $1.42 16,000 $1,729.11 $0.83 $1,949.65 $0.99 $1,508.57 $0.66 40,000 $1,926.40 $0.99 $2,186.39 $1.19 $1,666.40 $0.79 80,000 $2,321.01 $0.99 $2,659.93 $1.19 $1,982.09 $0.79 R-2 - Residential— Permanent, Hi-Rise Condo 15,000 $14,057.65 $8.62 $16,720.62 $10.34 $11,394.68 $6.90 75,000 $19,229.51 $11.46 $22,926.84 $13.76 $15,532.17 $9.17 150,000 $27,827.26 $3.44 $33,244.15 $4.14 $22,410.38 $2.76 300,000 $32,999.12 $3.05 $39,450.38 $3.65 $26,547.86 $2.43 750,000 $46,697.93 $1.66 $55,888.95 $1.99 $37,506.91 $1.33 1,500,000 $59,162.76 $1.66 $70,846.75 $1.99 $47,478.77 $1.33 R-2.1 – Residential – Assisted Living Facility 2,000 $5,605.69 $23.56 $6,578.26 $28.28 $4,633.11 $18.85 10,000 $7,490.93 $31.38 $8,840.56 $37.66 $6,141.31 $25.11 20,000 $10,629.66 $9.43 $12,607.02 $11.31 $8,652.29 $7.55 40,000 $12,514.90 $8.35 $14,869.32 $9.63 $10,160.49 $6.41 100,000 $17,527.10 $4.58 $20,883.95 $5.50 $14,170.24 $3.66 200,000 $22,106.63 $4.58 $26,379.40 $5.50 $17,833.87 $3.66 R-3 - Dwellings— Custom Homes 1 1,500 $3,027.64 $31.43 $3,504.15 $37.71 $2,551.12 $25.15 2,500 $3,341.91 $47.15 $3,881.27 $56.57 $2,802.54 $37.71 3,500 $3,813.32 $174.92 $4,446.97 $209.90 $3,179.66 $139.93 5,000 $6,437.08 $74.82 $7,595.49 $89.79 $5,278.67 $59.86 8,000 $8,681.84 $35.63 $10,289.20 $42.76 $7,074.49 $28.50 15,000 $11,176.01 $35.63 $13,282.21 $42.76 $9,069.82 $28.50 R-3 - Dwellings— Models, First Master Plan 1 1,500 $2,783.14 $33.14 $3,210.76 $39.77 $2,355.52 $26.51 2,500 $3,114.52 $49.72 $3,608.41 $59.66 $2,620.63 $39.78 3,500 $3,611.73 $33.14 $4,205.07 $39.78 $3,018.40 $26.52 5,000 $4,108.95 $44.75 $4,801.73 $53.70 $3,416.17 $35.79 8,000 $5,451.38 $21.31 $6,412.64 $25.58 $4,490.11 $17.05 15,000 $6,943.02 $21.31 $8,202.62 $25.58 $5,683.43 $17.05 R-3 - Dwellings— Production Phase 1 1,500 $896.26 $- $959.11 $- $833.40 $- 2,500 $896.26 $- $959.11 $- $833.40 $- 3,500 $896.26 $- $959.11 $- $833.40 $- 5,000 $896.26 $- $959.11 $- $833.40 $- 8,000 $896.26 $- $959.11 $- $833.40 $- 15,000 $896.26 $- $959.11 $- $833.40 $- Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 20 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF R-3 - Dwellings— Alternate Materials 1 1,500 $2,627.74 $31.42 $3,033.16 $37.70 $2,222.31 $25.14 2,500 $2,941.92 $47.15 $3,410.18 $56.57 $2,473.66 $37.71 3,500 $3,413.32 $31.43 $3,975.87 $37.71 $2,850.78 $25.15 5,000 $3,884.74 $42.43 $4,541.57 $50.91 $3,227.92 $33.94 8,000 $5,157.49 $20.21 $6,068.88 $24.24 $4,246.12 $16.16 15,000 $6,571.73 $20.21 $7,765.96 $24.24 $5,377.50 $16.16 R-3.1 – Residential – Care Facility (1-6 persons) 1,500 $1,737.78 $136.43 $1,945.67 $163.72 $1,529.90 $109.15 2,500 $3,102.14 $39.04 $3,582.90 $46.84 $2,621.39 $31.23 3,500 $3,492.48 $56.28 $4,051.30 $67.53 $2,933.66 $45.02 5,000 $4,336.57 $38.97 $5,064.21 $46.77 $3,608.94 $31.19 8,000 $5,505.91 $33.42 $6,467.41 $40.10 $4,544.40 $26.73 15,000 $7,844.85 $33.42 $9,274.13 $40.10 $6,415.55 $26.73 R-4 - Residential— Assisted Living (6- 16 persons) 1,500 $4,682.91 $71.61 $5,470.93 $85.93 $3,894.89 $57.29 7,500 $8,979.74 $16.39 $10,627.12 $19.67 $7,332.36 $13.11 15,000 $10,209.03 $17.72 $12,102.28 $21.26 $8,315.79 $14.18 30,000 $12,867.39 $8.18 $15,292.30 $9.82 $10,442.48 $6.55 75,000 $16,550.02 $9.82 $19,711.45 $11.78 $13,388.57 $7.85 150,000 $23,916.13 $9.82 $28,550.80 $11.78 $19,281.47 $7.85 S-1 - Storage— Moderate Hazard 1,000 $3,228.82 $53.71 $3,733.94 $64.45 $2,723.71 $42.97 5,000 $5,377.24 $12.30 $6,312.04 $14.75 $4,442.44 $9.83 10,000 $5,991.89 $13.29 $7,049.61 $15.95 $4,934.16 $10.64 20,000 $7,321.06 $6.14 $8,644.63 $7.37 $5,997.50 $4.91 50,000 $9,162.37 $7.37 $10,854.21 $8.84 $7,470.55 $5.90 100,000 $12,845.44 $7.37 $15,273.87 $8.84 $10,417.00 $5.90 S-1 - Storage— Moderate Hazard, Repair Garage 600 $2,941.13 $83.13 $3,387.31 $99.75 $2,494.94 $66.50 3,000 $4,936.09 $19.03 $5,781.26 $22.83 $4,090.91 $15.22 6,000 $5,506.83 $20.57 $6,466.15 $24.68 $4,547.51 $16.46 12,000 $6,741.06 $9.50 $7,947.24 $11.40 $5,534.90 $7.60 30,000 $8,450.86 $11.40 $9,998.98 $13.68 $6,902.73 $9.12 60,000 $11,870.84 $11.40 $14,102.97 $13.68 $9,638.72 $9.12 S-2 - Storage—Low Hazard 1,000 $2,931.73 $55.63 $3,377.43 $66.76 $2,486.03 $44.51 5,000 $5,156.88 $12.73 $6,047.61 $15.28 $4,266.15 $10.19 10,000 $5,793.48 $13.76 $6,811.53 $16.52 $4,775.44 $11.01 20,000 $7,170.13 $6.36 $8,463.51 $7.62 $5,876.75 $5.08 50,000 $9,077.20 $7.63 $10,751.99 $9.15 $7,402.41 $6.11 100,000 $12,891.80 $7.63 $15,329.51 $9.15 $10,454.09 $6.11 S-2 - Storage—Low Hazard, Aircraft Hangar 1,000 $2,288.74 $34.53 $2,605.83 $41.44 $1,971.64 $27.62 5,000 $3,669.86 $7.90 $4,263.18 $9.48 $3,076.54 $6.33 10,000 $4,065.00 $8.55 $4,737.35 $10.25 $3,392.64 $6.83 20,000 $4,919.46 $3.95 $5,762.71 $4.73 $4,076.23 $3.16 50,000 $6,103.16 $4.73 $7,183.15 $5.69 $5,023.18 $3.78 100,000 $8,470.85 $4.73 $10,024.37 $5.69 $6,917.33 $3.78 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 21 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF S-2 - Storage—Low Hazard, Parking Garages 5,000 $4,552.71 $7.55 $5,322.61 $9.06 $3,782.82 $6.04 25,000 $6,062.50 $9.97 $7,134.35 $11.96 $4,990.65 $7.98 50,000 $8,553.67 $3.03 $10,123.75 $3.62 $6,983.58 $2.42 100,000 $10,063.45 $2.62 $11,935.48 $3.14 $8,191.40 $2.09 250,000 $13,987.58 $1.40 $16,644.45 $1.68 $11,330.72 $1.12 500,000 $17,482.88 $1.40 $20,838.81 $1.68 $14,126.96 $1.12 S - Occupancy Tenant Improvements 500 $1,307.30 $29.32 $1,458.83 $35.18 $1,155.76 $23.45 2,500 $1,893.51 $6.71 $2,162.28 $8.05 $1,624.72 $5.37 5,000 $2,061.21 $7.25 $2,363.54 $8.70 $1,758.89 $5.81 10,000 $2,423.89 $3.34 $2,798.75 $4.02 $2,049.04 $2.68 25,000 $2,926.31 $4.02 $3,401.65 $4.83 $2,450.97 $3.21 50,000 $3,931.26 $4.02 $4,607.59 $4.83 $3,254.92 $3.21 S - Occupancy Tenant Improvements (w/ structural) 500 $1,424.20 $36.98 $1,599.13 $44.39 $1,249.28 $29.59 2,500 $2,163.88 $8.47 $2,486.73 $10.15 $1,841.02 $6.78 5,000 $2,375.48 $9.15 $2,740.66 $10.98 $2,010.31 $7.33 10,000 $2,833.11 $4.22 $3,289.80 $5.07 $2,376.41 $3.38 25,000 $3,467.04 $5.07 $4,050.53 $6.08 $2,883.55 $4.06 50,000 $4,735.07 $5.07 $5,572.16 $6.08 $3,897.97 $4.06 U - Accessory— Agricultural Building 600 $1,412.50 $32.62 $1,585.07 $39.13 $1,239.92 $26.09 3,000 $2,195.13 $7.47 $2,524.24 $8.95 $1,866.03 $5.97 6,000 $2,419.04 $8.07 $2,792.92 $9.68 $2,045.15 $6.46 12,000 $2,903.24 $3.73 $3,373.96 $4.48 $2,432.51 $2.98 30,000 $3,574.00 $4.48 $4,178.88 $5.37 $2,969.12 $3.58 60,000 $4,915.69 $4.48 $5,788.90 $5.37 $4,042.48 $3.58 U - Accessory— Private Garage 50 $994.87 $117.23 $1,083.93 $140.67 $905.82 $93.78 250 $1,229.32 $26.83 $1,365.27 $32.20 $1,093.38 $21.46 500 $1,296.39 $29.01 $1,445.75 $34.82 $1,147.04 $23.21 1,000 $1,441.44 $13.40 $1,619.82 $16.07 $1,263.08 $10.71 2,500 $1,642.38 $16.08 $1,860.94 $19.29 $1,423.83 $12.86 5,000 $2,044.31 $16.08 $2,343.24 $19.29 $1,745.36 $12.86 O - Other Tenant Improvements 300 $1,453.43 $64.83 $1,634.19 $77.80 $1,272.67 $51.87 1,500 $2,231.46 $14.84 $2,567.84 $17.81 $1,895.09 $11.87 3,000 $2,454.06 $16.05 $2,834.94 $19.25 $2,073.16 $12.84 6,000 $2,935.41 $7.41 $3,412.56 $8.89 $2,458.25 $5.93 15,000 $3,602.23 $8.89 $4,212.75 $10.67 $2,991.70 $7.12 30,000 $4,936.02 $8.89 $5,813.30 $10.67 $4,058.74 $7.12 O - Other Tenant Improvements (w/ structural) 300 $1,570.34 $77.63 $1,774.49 $93.15 $1,366.19 $62.10 1,500 $2,501.83 $17.77 $2,892.27 $21.32 $2,111.38 $14.21 3,000 $2,768.33 $19.21 $3,212.07 $23.06 $2,324.59 $15.37 6,000 $3,344.62 $8.87 $3,903.63 $10.65 $2,785.62 $7.10 15,000 $4,142.96 $10.65 $4,861.63 $12.77 $3,424.29 $8.51 30,000 $5,739.83 $10.65 $6,777.87 $12.77 $4,701.79 $8.51 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 22 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Plan Check Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF O - All Shell Buildings 2,000 $3,219.23 $12.16 $3,722.42 $14.59 $2,716.03 $9.72 10,000 $4,191.40 $16.23 $4,889.03 $19.47 $3,493.77 $12.98 20,000 $5,814.12 $4.86 $6,836.29 $5.83 $4,791.94 $3.89 40,000 $6,786.30 $4.33 $8,002.90 $5.20 $5,569.69 $3.47 100,000 $9,387.60 $2.40 $11,124.48 $2.87 $7,650.73 $1.91 200,000 $11,781.06 $2.40 $13,996.62 $2.87 $9,565.50 $1.91 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-300 New Construction Permit Fees City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 INSPECTION ONLY Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF A-1 - Assembly 5,000 $9,820.94 $27.97 $11,741.33 $33.57 $7,900.56 $22.37 25,000 $15,415.80 $17.86 $18,455.14 $21.44 $12,376.44 $14.29 50,000 $19,881.60 $23.60 $23,814.11 $28.31 $15,949.09 $18.88 100,000 $31,680.04 $7.48 $37,972.25 $8.98 $25,387.85 $5.98 250,000 $42,905.05 $4.31 $51,442.26 $5.18 $34,367.85 $3.45 500,000 $53,693.67 $4.31 $64,388.60 $5.18 $42,998.75 $3.45 A-2 - Assembly 500 $3,865.71 $93.38 $4,595.04 $112.06 $3,136.38 $74.70 2,500 $5,733.24 $111.61 $6,836.08 $133.93 $4,630.40 $89.29 5,000 $8,523.41 $44.48 $10,184.28 $53.37 $6,862.54 $35.59 10,000 $10,747.40 $18.87 $12,853.06 $22.64 $8,641.72 $15.09 25,000 $13,577.51 $13.10 $16,249.20 $15.72 $10,905.81 $10.48 50,000 $16,852.42 $13.10 $20,179.09 $15.72 $13,525.74 $10.48 A-3 - Assembly 2,000 $7,206.76 $50.44 $8,604.30 $60.51 $5,809.21 $40.35 10,000 $11,241.13 $32.25 $13,445.54 $38.70 $9,036.71 $25.80 20,000 $14,465.98 $42.53 $17,315.36 $51.03 $11,616.59 $34.02 40,000 $22,971.18 $13.61 $27,521.60 $16.32 $18,420.75 $10.88 100,000 $31,134.10 $7.92 $37,317.12 $9.50 $24,951.09 $6.34 200,000 $39,053.05 $7.92 $46,819.85 $9.50 $31,286.24 $6.34 A-4 - Assembly 5,000 $9,820.94 $27.97 $11,741.33 $33.57 $7,900.56 $22.37 25,000 $15,415.80 $17.86 $18,455.14 $21.44 $12,376.44 $14.29 50,000 $19,881.60 $23.60 $23,814.11 $28.31 $15,949.09 $18.88 100,000 $31,680.04 $7.48 $37,972.25 $8.98 $25,387.85 $5.98 250,000 $42,905.05 $4.31 $51,442.26 $5.18 $34,367.85 $3.45 500,000 $53,693.67 $4.31 $64,388.60 $5.18 $42,998.75 $3.45 A-5 - Assembly 10,000 $14,661.82 $21.20 $17,550.38 $25.43 $11,773.27 $16.95 50,000 $23,139.13 $13.52 $27,723.15 $16.23 $18,555.11 $10.81 100,000 $29,898.04 $17.89 $35,833.84 $21.46 $23,962.25 $14.30 200,000 $47,779.24 $5.63 $57,291.28 $6.75 $38,267.20 $4.51 500,000 $64,673.35 $3.22 $77,564.20 $3.87 $51,782.48 $2.57 1,000,000 $80,788.95 $3.22 $96,902.94 $3.87 $64,674.97 $2.57 A - Occupancy Tenant Improvements 300 $1,972.26 $71.92 $2,322.89 $86.31 $1,621.61 $57.53 1,500 $2,835.28 $85.97 $3,358.53 $103.15 $2,312.04 $68.77 3,000 $4,124.67 $34.25 $4,905.80 $41.11 $3,343.55 $27.41 6,000 $5,152.42 $14.53 $6,139.10 $17.44 $4,165.74 $11.63 15,000 $6,460.28 $10.09 $7,708.53 $12.11 $5,212.03 $8.07 30,000 $7,973.68 $10.09 $9,524.61 $12.11 $6,422.76 $8.07 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 24 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF A - Occupancy Tenant Improvements (w/ structural) 300 $2,430.51 $95.50 $2,872.79 $114.60 $1,988.21 $76.40 1,500 $3,576.50 $114.15 $4,247.98 $136.97 $2,905.00 $91.31 3,000 $5,288.64 $45.50 $6,302.56 $54.59 $4,274.72 $36.39 6,000 $6,653.36 $19.29 $7,940.22 $23.16 $5,366.49 $15.43 15,000 $8,390.02 $13.40 $10,024.21 $16.08 $6,755.83 $10.71 30,000 $10,399.62 $13.40 $12,435.73 $16.08 $8,363.50 $10.71 B - Business— Animal Hospital 250 $3,026.23 $151.38 $3,587.67 $181.67 $2,464.79 $121.11 1,250 $4,540.07 $180.94 $5,404.28 $217.13 $3,675.86 $144.75 2,500 $6,801.80 $72.12 $8,118.34 $86.54 $5,485.24 $57.68 5,000 $8,604.57 $30.59 $10,281.68 $36.71 $6,927.46 $24.48 12,500 $10,898.68 $21.24 $13,034.60 $25.49 $8,762.74 $17.00 25,000 $13,553.33 $21.24 $16,220.19 $25.49 $10,886.48 $17.00 B - Business—Bank 500 $3,507.39 $90.55 $4,165.07 $108.66 $2,849.73 $72.44 2,500 $5,318.35 $108.23 $6,338.20 $129.87 $4,298.48 $86.58 5,000 $8,023.96 $43.13 $9,584.94 $51.76 $6,462.97 $34.51 10,000 $10,180.56 $18.29 $12,172.85 $21.96 $8,188.25 $14.64 25,000 $12,924.90 $12.71 $15,466.08 $15.25 $10,383.73 $10.16 50,000 $16,100.57 $12.71 $19,276.87 $15.25 $12,924.26 $10.16 B - Business— Barber Shop/Beauty Shop (Other than retail) 200 $2,458.95 $159.17 $2,906.93 $190.99 $2,010.97 $127.34 1,000 $3,732.27 $190.23 $4,434.91 $228.28 $3,029.62 $152.20 2,000 $5,634.65 $75.82 $6,717.78 $90.98 $4,551.53 $60.65 4,000 $7,151.00 $32.16 $8,537.40 $38.59 $5,764.62 $25.73 10,000 $9,080.63 $22.33 $10,852.94 $26.80 $7,308.31 $17.86 20,000 $11,313.52 $22.33 $13,532.42 $26.80 $9,094.62 $17.86 B - Business—Car Wash 400 $3,464.34 $114.95 $4,113.40 $137.94 $2,815.27 $91.96 2,000 $5,303.57 $137.39 $6,320.49 $164.87 $4,286.67 $109.91 4,000 $8,051.47 $54.76 $9,617.95 $65.71 $6,484.98 $43.80 8,000 $10,241.76 $23.23 $12,246.30 $27.87 $8,237.22 $18.58 20,000 $13,028.98 $16.13 $15,590.98 $19.35 $10,467.00 $12.90 40,000 $16,254.28 $16.13 $19,461.32 $19.35 $13,047.23 $12.90 B - Business—Clinic, Outpatient 2,000 $8,178.50 $59.11 $9,770.39 $70.94 $6,586.60 $47.29 10,000 $12,907.68 $37.63 $15,445.40 $45.17 $10,369.94 $30.11 20,000 $16,671.16 $49.90 $19,961.59 $59.87 $13,380.74 $39.92 40,000 $26,650.25 $15.53 $31,936.50 $18.63 $21,364.01 $12.43 100,000 $35,969.86 $8.78 $43,120.02 $10.54 $28,819.69 $7.02 200,000 $44,747.19 $8.78 $53,652.82 $10.54 $35,841.55 $7.02 B - Business—Dry Cleaning 200 $2,364.53 $145.01 $2,793.63 $174.02 $1,935.43 $116.02 1,000 $3,524.66 $173.33 $4,185.80 $208.00 $2,863.54 $138.67 2,000 $5,257.96 $69.08 $6,265.73 $82.90 $4,250.17 $55.26 4,000 $6,639.52 $29.30 $7,923.62 $35.17 $5,355.43 $23.44 10,000 $8,397.62 $20.34 $10,033.33 $24.41 $6,761.90 $16.28 20,000 $10,432.03 $20.34 $12,474.63 $24.41 $8,389.44 $16.28 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 25 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF B - Business— Laboratory 500 $3,642.11 $91.96 $4,326.73 $110.35 $2,957.49 $73.57 2,500 $5,481.34 $109.91 $6,533.81 $131.90 $4,428.89 $87.93 5,000 $8,229.24 $43.80 $9,831.28 $52.57 $6,627.20 $35.05 10,000 $10,419.53 $18.58 $12,459.62 $22.30 $8,379.43 $14.86 25,000 $13,206.75 $12.90 $15,804.31 $15.48 $10,609.21 $10.32 50,000 $16,432.05 $12.90 $19,674.66 $15.48 $13,189.45 $10.32 B - Business— Motor Vehicle Showroom 1,000 $3,842.80 $46.33 $4,567.54 $55.61 $3,118.04 $37.07 5,000 $5,696.19 $55.39 $6,791.61 $66.46 $4,600.75 $44.31 10,000 $8,465.20 $22.07 $10,114.45 $26.49 $6,815.97 $17.66 20,000 $10,672.34 $9.36 $12,763.00 $11.23 $8,581.68 $7.49 50,000 $13,481.02 $6.50 $16,133.41 $7.80 $10,828.62 $5.20 100,000 $16,731.12 $6.50 $20,033.53 $7.80 $13,428.70 $5.20 B - Business— Professional Office 2,000 $4,883.36 $33.61 $5,816.23 $40.33 $3,950.50 $26.88 10,000 $7,572.13 $41.93 $9,042.75 $50.33 $6,101.51 $33.55 20,000 $11,765.58 $16.01 $14,074.89 $19.21 $9,456.27 $12.80 40,000 $14,966.48 $7.08 $17,915.96 $8.50 $12,016.99 $5.67 100,000 $19,218.13 $4.90 $23,017.95 $5.87 $15,418.32 $3.92 200,000 $24,109.95 $4.90 $28,888.15 $5.87 $19,331.77 $3.92 B - Business—High Rise Office 15,000 $13,025.78 $12.29 $15,587.13 $14.75 $10,464.43 $9.83 75,000 $20,399.46 $7.87 $24,435.54 $9.44 $16,363.37 $6.29 150,000 $26,296.11 $10.36 $31,511.52 $12.43 $21,080.70 $8.29 300,000 $41,839.79 $3.32 $50,163.94 $3.99 $33,515.64 $2.66 750,000 $56,797.13 $1.94 $68,112.75 $2.33 $45,481.51 $1.55 1,500,000 $71,347.45 $1.94 $85,573.14 $2.33 $57,121.77 $1.55 B - Occupancy Tenant Improvements 300 $1,794.49 $71.92 $2,109.57 $86.31 $1,479.39 $57.53 1,500 $2,657.51 $85.97 $3,145.20 $103.15 $2,169.82 $68.77 3,000 $3,946.90 $34.25 $4,692.48 $41.11 $3,201.33 $27.41 6,000 $4,974.65 $14.53 $5,925.78 $17.44 $4,023.53 $11.63 15,000 $6,282.51 $10.09 $7,495.20 $12.11 $5,069.81 $8.07 30,000 $7,795.91 $10.09 $9,311.29 $12.11 $6,280.54 $8.07 B - Occupancy Tenant Improvements (w/ structural) 300 $2,252.73 $95.50 $2,659.47 $114.60 $1,846.00 $76.40 1,500 $3,398.73 $114.15 $4,034.66 $136.97 $2,762.78 $91.31 3,000 $5,110.86 $45.50 $6,089.24 $54.59 $4,132.50 $36.39 6,000 $6,475.59 $19.29 $7,726.90 $23.16 $5,224.27 $15.43 15,000 $8,212.25 $13.40 $9,810.89 $16.08 $6,613.61 $10.71 30,000 $10,221.85 $13.40 $12,222.41 $16.08 $8,221.29 $10.71 E - Educational— Group Occupancy 1,500 $3,957.36 $32.07 $4,705.02 $38.48 $3,209.69 $25.65 7,500 $5,881.48 $38.34 $7,013.97 $45.99 $4,749.00 $30.67 15,000 $8,756.20 $15.28 $10,463.63 $18.33 $7,048.77 $12.22 30,000 $11,047.58 $6.48 $13,213.29 $7.78 $8,881.87 $5.18 75,000 $13,963.46 $4.50 $16,712.33 $5.40 $11,214.57 $3.60 150,000 $17,337.60 $4.50 $20,761.31 $5.40 $13,913.89 $3.60 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 26 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF E - Educational— Day Care 600 $2,728.37 $55.42 $3,230.24 $66.50 $2,226.50 $44.33 3,000 $4,058.29 $66.23 $4,826.13 $79.48 $3,290.43 $52.99 6,000 $6,045.22 $26.40 $7,210.46 $31.68 $4,879.99 $21.12 12,000 $7,628.96 $11.20 $9,110.95 $13.43 $6,146.98 $8.95 30,000 $9,644.35 $7.78 $11,529.41 $9.33 $7,759.28 $6.22 60,000 $11,976.48 $7.78 $14,327.96 $9.33 $9,624.99 $6.22 E - Occupancy Tenant Improvements 300 $1,883.37 $71.92 $2,216.24 $86.31 $1,550.51 $57.53 1,500 $2,746.39 $85.97 $3,251.86 $103.15 $2,240.92 $68.77 3,000 $4,035.79 $34.25 $4,799.14 $41.11 $3,272.43 $27.41 6,000 $5,063.54 $14.53 $6,032.44 $17.44 $4,094.64 $11.63 15,000 $6,371.40 $10.09 $7,601.87 $12.11 $5,140.93 $8.07 30,000 $7,884.80 $10.09 $9,417.95 $12.11 $6,351.64 $8.07 E - Occupancy Tenant Improvements (w/ structural) 300 $2,341.61 $95.50 $2,766.14 $114.60 $1,917.10 $76.40 1,500 $3,487.61 $114.15 $4,141.32 $136.97 $2,833.90 $91.31 3,000 $5,199.76 $45.50 $6,195.89 $54.59 $4,203.61 $36.39 6,000 $6,564.47 $19.29 $7,833.56 $23.16 $5,295.39 $15.43 15,000 $8,301.13 $13.40 $9,917.55 $16.08 $6,684.71 $10.71 30,000 $10,310.73 $13.40 $12,329.08 $16.08 $8,292.39 $10.71 F-1 - Factory Industrial— Moderate Hazard 2,000 $5,158.48 $36.03 $6,146.37 $43.24 $4,170.60 $28.82 10,000 $8,040.89 $23.00 $9,605.26 $27.61 $6,476.51 $18.40 20,000 $10,341.31 $30.39 $12,365.76 $36.48 $8,316.86 $24.32 40,000 $16,420.38 $9.63 $19,660.65 $11.55 $13,180.11 $7.70 100,000 $22,195.77 $5.54 $26,591.11 $6.66 $17,800.42 $4.43 200,000 $27,737.30 $5.54 $33,240.96 $6.66 $22,233.65 $4.43 F-2 - Factory Industrial—Low Hazard 2,000 $5,066.08 $35.77 $6,035.49 $42.93 $4,096.68 $28.62 10,000 $7,928.16 $22.80 $9,469.99 $27.36 $6,386.34 $18.24 20,000 $10,207.98 $30.20 $12,205.77 $36.23 $8,210.19 $24.16 40,000 $16,246.10 $9.45 $19,451.51 $11.34 $13,040.69 $7.57 100,000 $21,918.57 $5.38 $26,258.47 $6.46 $17,578.66 $4.30 200,000 $27,296.05 $5.38 $32,711.45 $6.46 $21,880.64 $4.30 F - Occupancy Tenant Improvements 1,000 $2,338.85 $27.24 $2,762.82 $32.68 $1,914.89 $21.79 5,000 $3,428.25 $32.55 $4,070.09 $39.06 $2,786.41 $26.04 10,000 $5,055.84 $12.97 $6,023.20 $15.57 $4,088.48 $10.38 20,000 $6,353.17 $5.50 $7,580.00 $6.60 $5,126.34 $4.40 50,000 $8,004.07 $3.82 $9,561.08 $4.59 $6,447.07 $3.06 100,000 $9,914.43 $3.82 $11,853.51 $4.59 $7,975.35 $3.06 F - Occupancy Tenant Improvements (w/ structural) 1,000 $3,072.06 $38.56 $3,642.66 $46.27 $2,501.46 $30.84 5,000 $4,614.19 $46.08 $5,493.22 $55.30 $3,735.16 $36.86 10,000 $6,918.19 $18.37 $8,258.02 $22.03 $5,578.36 $14.70 20,000 $8,754.67 $7.79 $10,461.79 $9.35 $7,047.54 $6.24 50,000 $11,091.65 $5.41 $13,266.18 $6.49 $8,917.13 $4.32 100,000 $13,795.93 $5.41 $16,511.31 $6.49 $11,080.55 $4.32 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 27 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF H-1 - High Hazard Group 500 $3,730.99 $91.96 $4,433.39 $110.35 $3,028.61 $73.57 2,500 $5,570.24 $109.91 $6,640.47 $131.90 $4,499.99 $87.93 5,000 $8,318.12 $43.80 $9,937.94 $52.57 $6,698.31 $35.05 10,000 $10,508.41 $18.58 $12,566.29 $22.30 $8,450.54 $14.86 25,000 $13,295.65 $12.90 $15,910.96 $15.48 $10,680.32 $10.32 50,000 $16,520.93 $12.90 $19,781.31 $15.48 $13,260.56 $10.32 H-2 - High Hazard Group 500 $3,730.99 $91.96 $4,433.39 $110.35 $3,028.61 $73.57 2,500 $5,570.24 $109.91 $6,640.47 $131.90 $4,499.99 $87.93 5,000 $8,318.12 $43.80 $9,937.94 $52.57 $6,698.31 $35.05 10,000 $10,508.41 $18.58 $12,566.29 $22.30 $8,450.54 $14.86 25,000 $13,295.65 $12.90 $15,910.96 $15.48 $10,680.32 $10.32 50,000 $16,520.93 $12.90 $19,781.31 $15.48 $13,260.56 $10.32 H-3 - High Hazard Group 1,000 $4,965.51 $63.67 $5,914.81 $76.40 $4,016.22 $50.93 5,000 $7,512.15 $76.10 $8,970.78 $91.31 $6,053.53 $60.87 10,000 $11,316.92 $30.33 $13,536.50 $36.39 $9,097.34 $24.27 20,000 $14,349.63 $12.86 $17,175.75 $15.43 $11,523.51 $10.30 50,000 $18,208.87 $8.93 $21,806.84 $10.71 $14,610.90 $7.15 100,000 $22,674.66 $8.93 $27,165.79 $10.71 $18,183.54 $7.15 H-4 - High Hazard Group 1,000 $4,965.51 $63.67 $5,914.81 $76.40 $4,016.22 $50.93 5,000 $7,512.15 $76.10 $8,970.78 $91.31 $6,053.53 $60.87 10,000 $11,316.92 $30.33 $13,536.50 $36.39 $9,097.34 $24.27 20,000 $14,349.63 $12.86 $17,175.75 $15.43 $11,523.51 $10.30 50,000 $18,208.87 $8.93 $21,806.84 $10.71 $14,610.90 $7.15 100,000 $22,674.66 $8.93 $27,165.79 $10.71 $18,183.54 $7.15 H-5 - High Hazard Group 2,000 $7,317.48 $51.28 $8,737.17 $61.53 $5,897.79 $41.03 10,000 $11,419.98 $32.79 $13,660.17 $39.35 $9,179.80 $26.24 20,000 $14,698.77 $43.24 $17,594.72 $51.90 $11,802.82 $34.60 40,000 $23,347.91 $13.83 $27,973.68 $16.59 $18,722.13 $11.06 100,000 $31,640.85 $8.04 $37,925.21 $9.65 $25,356.49 $6.42 200,000 $39,677.61 $8.04 $47,569.32 $9.65 $31,785.90 $6.42 H - Occupancy Tenant Improvements 600 $2,516.62 $45.39 $2,976.14 $54.47 $2,057.11 $36.31 3,000 $3,606.02 $54.25 $4,283.42 $65.11 $2,928.63 $43.41 6,000 $5,233.61 $21.63 $6,236.53 $25.95 $4,230.70 $17.30 12,000 $6,530.94 $9.17 $7,793.32 $11.01 $5,268.56 $7.34 30,000 $8,181.84 $6.37 $9,774.40 $7.65 $6,589.28 $5.09 60,000 $10,092.20 $6.37 $12,066.84 $7.65 $8,117.57 $5.09 H - Occupancy Tenant Improvements (w/ structural) 600 $3,112.35 $60.72 $3,691.02 $72.86 $2,533.69 $48.58 3,000 $4,569.60 $72.57 $5,439.71 $87.09 $3,699.49 $58.06 6,000 $6,746.77 $28.92 $8,052.32 $34.71 $5,441.23 $23.13 12,000 $8,482.16 $12.27 $10,134.77 $14.72 $6,829.53 $9.81 30,000 $10,690.50 $8.51 $12,784.79 $10.22 $8,596.20 $6.81 60,000 $13,245.93 $8.51 $15,851.30 $10.22 $10,640.54 $6.81 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 28 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF I-2 - Institutional— 6+ persons, non- ambulatory 2,000 $5,785.74 $41.32 $6,899.08 $49.58 $4,672.40 $33.06 10,000 $9,090.72 $26.30 $10,865.05 $31.57 $7,316.39 $21.04 20,000 $11,721.14 $34.87 $14,021.56 $41.84 $9,420.72 $27.90 40,000 $18,694.84 $10.87 $22,389.99 $13.04 $14,999.68 $8.69 100,000 $25,212.40 $6.14 $30,211.07 $7.37 $20,213.73 $4.92 200,000 $31,355.69 $6.14 $37,583.02 $7.37 $25,128.36 $4.92 I-2.1 - Clinic - Outpatient 2,000 $8,387.58 $61.33 $10,021.29 $73.59 $6,753.87 $49.06 10,000 $13,293.81 $38.98 $15,908.76 $46.77 $10,678.86 $31.19 20,000 $17,191.77 $51.78 $20,586.31 $62.14 $13,797.22 $41.43 40,000 $27,547.97 $15.95 $33,013.75 $19.15 $22,082.18 $12.76 100,000 $37,120.88 $8.91 $44,501.25 $10.69 $29,740.51 $7.13 200,000 $46,032.86 $8.91 $55,195.61 $10.69 $36,870.09 $7.13 I-3 - Institutional— Restrained 2,500 $9,008.87 $52.40 $10,766.83 $62.89 $7,250.90 $41.92 12,500 $14,249.08 $33.34 $17,055.09 $40.02 $11,443.08 $26.68 25,000 $18,417.11 $44.23 $22,056.73 $53.09 $14,777.50 $35.39 50,000 $29,475.72 $13.73 $35,327.06 $16.47 $23,624.38 $10.98 125,000 $39,770.43 $7.73 $47,680.72 $9.27 $31,860.16 $6.18 250,000 $49,431.39 $7.73 $59,273.86 $9.27 $39,588.92 $6.18 I-4 - Institutional— 6+ persons, day care 400 $2,593.66 $81.36 $3,068.58 $97.63 $2,118.73 $65.08 2,000 $3,895.28 $97.23 $4,630.52 $116.68 $3,160.03 $77.78 4,000 $5,839.93 $38.75 $6,964.11 $46.50 $4,715.76 $31.00 8,000 $7,389.99 $16.43 $8,824.18 $19.72 $5,955.80 $13.15 20,000 $9,362.49 $11.42 $11,191.18 $13.70 $7,533.80 $9.13 40,000 $11,645.00 $11.42 $13,930.19 $13.70 $9,359.81 $9.13 I - Occupancy Tenant Improvements 600 $2,066.67 $40.68 $2,436.19 $48.81 $1,697.15 $32.54 3,000 $3,042.88 $48.62 $3,607.65 $58.34 $2,478.11 $38.90 6,000 $4,501.38 $19.37 $5,357.84 $23.25 $3,644.91 $15.50 12,000 $5,663.91 $8.22 $6,752.89 $9.87 $4,574.93 $6.58 30,000 $7,143.29 $5.71 $8,528.14 $6.85 $5,758.43 $4.57 60,000 $8,855.18 $5.71 $10,582.40 $6.85 $7,127.95 $4.57 I - Occupancy Tenant Improvements (w/ structural) 600 $2,570.74 $53.65 $3,041.08 $64.37 $2,100.41 $42.91 3,000 $3,858.22 $64.12 $4,586.04 $76.95 $3,130.38 $51.29 6,000 $5,781.73 $25.55 $6,894.27 $30.67 $4,669.19 $20.44 12,000 $7,314.93 $10.84 $8,734.12 $13.00 $5,895.76 $8.67 30,000 $9,266.00 $7.52 $11,075.39 $9.03 $7,456.60 $6.02 60,000 $11,523.70 $7.52 $13,784.64 $9.03 $9,262.77 $6.02 M - Mercantile— Department & Drug Store 10,000 $12,065.92 $17.69 $14,435.30 $21.22 $9,696.54 $14.15 50,000 $19,139.16 $11.25 $22,923.20 $13.50 $15,355.14 $9.00 100,000 $24,763.89 $14.93 $29,672.86 $17.91 $19,854.92 $11.95 200,000 $39,691.51 $4.63 $47,586.00 $5.56 $31,797.02 $3.70 500,000 $53,568.36 $2.60 $64,238.23 $3.12 $42,898.49 $2.08 1,000,000 $66,570.25 $2.60 $79,840.50 $3.12 $53,300.01 $2.08 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 29 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF M - Mercantile— Market (Vons/Ralphs..) 5,000 $9,390.21 $27.50 $11,224.43 $33.00 $7,555.97 $22.00 25,000 $14,889.29 $17.48 $17,823.34 $20.98 $11,955.24 $13.98 50,000 $19,259.39 $23.21 $23,067.46 $27.85 $15,451.33 $18.57 100,000 $30,866.40 $7.16 $36,995.87 $8.60 $24,736.93 $5.73 250,000 $41,612.81 $4.00 $49,891.57 $4.81 $33,334.06 $3.21 500,000 $51,635.63 $4.00 $61,918.95 $4.81 $41,352.31 $3.21 M - Mercantile— Motor fuel- dispensing Canopy 100 $1,770.19 $205.15 $2,080.42 $246.18 $1,459.95 $164.12 500 $2,590.76 $245.20 $3,065.12 $294.24 $2,116.42 $196.15 1,000 $3,816.75 $97.72 $4,536.29 $117.26 $3,097.20 $78.18 2,000 $4,793.95 $41.45 $5,708.95 $49.74 $3,878.97 $33.17 5,000 $6,037.49 $28.78 $7,201.18 $34.54 $4,873.80 $23.02 10,000 $7,476.47 $28.78 $8,927.95 $34.54 $6,024.98 $23.02 M - Mercantile— Retail or wholesale store (Lowe's/HD) 10,000 $12,558.21 $17.95 $15,026.04 $21.55 $10,090.38 $14.37 50,000 $19,740.89 $11.47 $23,645.26 $13.76 $15,836.51 $9.17 100,000 $25,474.98 $15.15 $30,526.17 $18.17 $20,423.79 $12.12 200,000 $40,621.39 $4.81 $48,701.86 $5.78 $32,540.92 $3.85 500,000 $55,045.21 $2.77 $66,010.45 $3.33 $44,079.98 $2.22 1,000,000 $68,922.30 $2.77 $82,662.95 $3.33 $55,181.65 $2.22 M - Small Mercantile (7/11, Gas Mart., etc.) 200 $2,433.27 $150.33 $2,876.12 $180.39 $1,990.43 $120.26 1,000 $3,635.85 $179.67 $4,319.22 $215.60 $2,952.49 $143.74 2,000 $5,432.55 $71.61 $6,475.25 $85.93 $4,389.85 $57.29 4,000 $6,864.66 $30.37 $8,193.78 $36.44 $5,535.53 $24.30 10,000 $8,687.07 $21.09 $10,380.69 $25.31 $6,993.47 $16.87 20,000 $10,795.92 $21.09 $12,911.29 $25.31 $8,680.54 $16.87 M - Occupancy Tenant Improvements 300 $1,884.75 $74.27 $2,217.89 $89.13 $1,551.61 $59.42 1,500 $2,776.07 $88.78 $3,287.48 $106.54 $2,264.67 $71.03 3,000 $4,107.74 $35.39 $4,885.49 $42.46 $3,330.00 $28.30 6,000 $5,169.19 $15.00 $6,159.22 $18.01 $4,179.16 $12.01 15,000 $6,519.92 $10.42 $7,780.10 $12.51 $5,259.75 $8.34 30,000 $8,082.95 $10.42 $9,655.73 $12.51 $6,510.16 $8.34 M - Occupancy Tenant Improvements (w/ structural) 300 $2,388.83 $100.21 $2,822.79 $120.26 $1,954.87 $80.17 1,500 $3,591.40 $119.78 $4,265.88 $143.74 $2,916.94 $95.82 3,000 $5,388.11 $47.74 $6,421.92 $57.29 $4,354.30 $38.19 6,000 $6,820.22 $20.25 $8,140.45 $24.30 $5,499.98 $16.20 15,000 $8,642.63 $14.06 $10,327.36 $16.87 $6,957.92 $11.24 30,000 $10,751.48 $14.06 $12,857.97 $16.87 $8,644.99 $11.24 R-1 - Residential— Transient (Hotel/Motel) 5,000 $10,417.53 $30.05 $12,457.24 $36.06 $8,377.83 $24.05 25,000 $16,427.92 $19.15 $19,669.69 $22.99 $13,186.14 $15.32 50,000 $21,216.98 $25.36 $25,416.57 $30.43 $17,017.39 $20.28 100,000 $33,896.31 $7.95 $40,631.77 $9.55 $27,160.86 $6.37 250,000 $45,829.67 $4.53 $54,951.80 $5.45 $36,707.55 $3.63 500,000 $57,165.30 $4.53 $68,554.55 $5.45 $45,776.05 $3.63 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 30 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF R-2 - Residential— Permanent, 2+ Dwellings (Appt.) 800 $3,878.15 $66.32 $4,609.97 $79.59 $3,146.33 $53.05 4,000 $6,000.35 $79.27 $7,156.61 $95.12 $4,844.08 $63.42 8,000 $9,170.99 $31.59 $10,961.38 $37.91 $7,380.60 $25.28 16,000 $11,698.25 $13.40 $13,994.09 $16.08 $9,402.40 $10.73 40,000 $14,914.28 $9.31 $17,853.33 $11.17 $11,975.24 $7.45 80,000 $18,635.77 $9.31 $22,319.12 $11.17 $14,952.42 $7.45 R-2 - Residential— Permanent, 2+ Dwellings (Appt.) Repeat Unit 800 $2,892.90 $47.31 $3,427.68 $56.77 $2,358.14 $37.85 4,000 $4,406.74 $56.54 $5,244.28 $67.85 $3,569.20 $45.23 8,000 $6,668.46 $22.54 $7,958.35 $27.04 $5,378.58 $18.03 16,000 $8,471.24 $9.56 $10,121.68 $11.47 $6,820.80 $7.65 40,000 $10,765.35 $6.63 $12,874.61 $7.96 $8,656.09 $5.31 80,000 $13,420.01 $6.63 $16,060.20 $7.96 $10,779.81 $5.31 R-2 - Residential— Permanent, Hi-Rise Condo 15,000 $23,568.55 $22.95 $28,238.44 $27.53 $18,898.64 $18.36 75,000 $37,333.81 $14.62 $44,756.78 $17.55 $29,910.86 $11.70 150,000 $48,301.40 $19.36 $57,917.87 $23.23 $38,684.92 $15.49 300,000 $77,340.53 $6.07 $92,764.82 $7.28 $61,916.23 $4.86 750,000 $104,662.72 $3.45 $125,551.46 $4.15 $83,773.99 $2.77 1,500,000 $130,607.59 $3.45 $156,685.30 $4.15 $104,529.88 $2.77 R-2.1 – Residential – Assisted Living Facility 2,000 $5,847.28 $41.48 $6,972.92 $49.78 $4,721.63 $33.19 10,000 $9,165.94 $26.44 $10,955.31 $31.72 $7,376.56 $21.15 20,000 $11,810.02 $35.00 $14,128.21 $42.01 $9,491.82 $28.01 40,000 $18,811.08 $10.98 $22,529.49 $13.33 $15,092.67 $8.89 100,000 $25,397.01 $6.25 $30,432.60 $7.70 $20,361.41 $5.14 200,000 $31,649.70 $6.25 $37,935.82 $7.70 $25,363.56 $5.14 R-3 - Dwellings— Custom Homes 1 1,500 $4,015.68 $11.64 $4,795.54 $13.97 $3,235.83 $9.32 2,500 $4,132.07 $81.48 $4,935.22 $97.77 $3,328.94 $65.19 3,500 $4,946.85 $355.40 $5,912.94 $426.48 $3,980.76 $284.32 5,000 $10,277.86 $88.96 $12,310.14 $106.74 $8,245.57 $71.16 8,000 $12,946.53 $54.25 $15,512.55 $65.11 $10,380.50 $43.41 15,000 $16,744.24 $54.25 $20,069.81 $65.11 $13,418.67 $43.41 R-3 - Dwellings— Models, First Master Plan 1 1,500 $3,122.97 $8.98 $3,724.28 $10.77 $2,521.65 $7.18 2,500 $3,212.73 $62.83 $3,831.99 $75.41 $2,593.46 $50.27 3,500 $3,841.09 $47.87 $4,586.02 $57.45 $3,096.15 $38.30 5,000 $4,559.20 $38.89 $5,447.76 $46.66 $3,670.65 $31.11 8,000 $5,725.78 $23.72 $6,847.65 $28.47 $4,603.90 $18.98 15,000 $7,386.25 $23.72 $8,840.22 $28.47 $5,932.28 $18.98 R-3 - Dwellings— Production Phase 1 1,500 $2,183.41 $6.17 $2,596.81 $7.40 $1,770.01 $4.94 2,500 $2,245.12 $43.20 $2,670.87 $51.84 $1,819.38 $34.56 3,500 $2,677.13 $32.91 $3,189.26 $39.50 $2,164.98 $26.33 5,000 $3,170.83 $26.73 $3,781.71 $32.08 $2,559.94 $21.38 8,000 $3,972.85 $16.31 $4,744.14 $19.57 $3,201.56 $13.05 15,000 $5,114.42 $16.31 $6,114.02 $19.57 $4,114.81 $13.05 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 31 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF R-3 - Dwellings— Alternate Materials 1 1,500 $3,423.62 $9.88 $4,085.07 $11.85 $2,762.18 $7.90 2,500 $3,522.37 $69.12 $4,203.55 $82.94 $2,841.17 $55.30 3,500 $4,213.55 $52.66 $5,032.98 $63.20 $3,394.13 $42.13 5,000 $5,003.48 $42.78 $5,980.90 $51.33 $4,026.07 $34.22 8,000 $6,286.72 $26.09 $7,520.78 $31.32 $5,052.65 $20.88 15,000 $8,113.23 $26.09 $9,712.59 $31.32 $6,513.86 $20.88 R-3.1 – Residential – Care Facility (1-6 persons) 1,500 $1,628.63 $93.38 $1,931.08 $112.06 $1,326.18 $74.70 2,500 $2,562.40 $139.51 $3,051.60 $167.41 $2,073.20 $111.61 3,500 $3,957.48 $74.13 $4,725.70 $88.96 $3,189.26 $59.30 5,000 $5,069.47 $47.17 $6,060.09 $56.61 $4,078.86 $37.73 8,000 $6,484.53 $23.40 $7,758.16 $28.07 $5,210.91 $18.71 15,000 $8,121.98 $23.40 $9,723.10 $28.07 $6,520.87 $18.71 R-4 - Residential— Assisted Living (6- 16 persons) 1,500 $4,644.74 $39.14 $5,529.88 $46.97 $3,759.59 $31.32 7,500 $6,993.31 $46.78 $8,348.15 $56.14 $5,638.45 $37.43 15,000 $10,502.15 $18.65 $12,558.77 $22.37 $8,445.53 $14.92 30,000 $13,298.98 $7.91 $15,914.97 $9.49 $10,682.99 $6.33 75,000 $16,858.06 $5.49 $20,185.86 $6.59 $13,530.25 $4.39 150,000 $20,976.51 $5.49 $25,127.99 $6.59 $16,825.01 $4.39 S-1 - Storage— Moderate Hazard 1,000 $3,415.75 $43.86 $4,055.10 $52.64 $2,776.41 $35.09 5,000 $5,170.10 $52.43 $6,160.31 $62.91 $4,179.89 $41.93 10,000 $7,791.17 $20.89 $9,305.59 $25.07 $6,276.74 $16.71 20,000 $9,880.37 $8.87 $11,812.63 $10.64 $7,948.09 $7.10 50,000 $12,538.96 $6.15 $15,002.93 $7.38 $10,074.97 $4.92 100,000 $15,615.38 $6.15 $18,694.65 $7.38 $12,536.12 $4.92 S-1 - Storage— Moderate Hazard, Repair Garage 600 $2,520.34 $52.35 $2,980.59 $62.82 $2,060.08 $41.88 3,000 $3,776.67 $62.57 $4,488.21 $75.09 $3,065.15 $50.05 6,000 $5,653.70 $24.94 $6,740.64 $29.92 $4,566.77 $19.94 12,000 $7,149.84 $10.58 $8,536.00 $12.69 $5,763.68 $8.46 30,000 $9,053.73 $7.35 $10,820.67 $8.81 $7,286.80 $5.87 60,000 $11,256.85 $7.35 $13,464.41 $8.81 $9,049.28 $5.87 S-2 - Storage—Low Hazard 1,000 $3,415.75 $43.86 $4,055.10 $52.64 $2,776.41 $35.09 5,000 $5,170.10 $52.43 $6,160.31 $62.91 $4,179.89 $41.93 10,000 $7,791.17 $20.89 $9,305.59 $25.07 $6,276.74 $16.71 20,000 $9,880.37 $8.87 $11,812.63 $10.64 $7,948.09 $7.10 50,000 $12,538.96 $6.15 $15,002.93 $7.38 $10,074.97 $4.92 100,000 $15,615.38 $6.15 $18,694.65 $7.38 $12,536.12 $4.92 S-2 - Storage—Low Hazard, Aircraft Hangar 1,000 $3,663.21 $47.67 $4,352.04 $57.21 $2,974.37 $38.15 5,000 $5,570.36 $56.99 $6,640.62 $68.39 $4,500.09 $45.60 10,000 $8,419.71 $22.72 $10,059.84 $27.26 $6,779.58 $18.17 20,000 $10,690.87 $9.64 $12,785.23 $11.56 $8,596.50 $7.71 50,000 $13,581.01 $6.69 $16,253.40 $8.03 $10,908.61 $5.35 100,000 $16,925.39 $6.69 $20,266.65 $8.03 $13,584.12 $5.35 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 32 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF S-2 - Storage—Low Hazard, Parking Garages 5,000 $5,203.20 $14.97 $6,200.03 $17.97 $4,206.37 $11.98 25,000 $8,198.04 $9.52 $9,793.84 $11.42 $6,602.24 $7.61 50,000 $10,577.27 $12.64 $12,648.92 $15.17 $8,505.63 $10.12 100,000 $16,898.95 $3.89 $20,234.93 $4.68 $13,562.97 $3.11 250,000 $22,740.20 $2.18 $27,244.44 $2.61 $18,235.97 $1.74 500,000 $28,175.75 $2.18 $33,767.09 $2.61 $22,584.41 $1.74 S - Occupancy Tenant Improvements 500 $1,863.21 $45.28 $2,192.06 $54.33 $1,534.38 $36.22 2,500 $2,768.69 $54.11 $3,278.62 $64.93 $2,258.76 $43.29 5,000 $4,121.50 $21.57 $4,901.99 $25.88 $3,341.01 $17.25 10,000 $5,199.80 $9.15 $6,195.95 $10.98 $4,203.64 $7.32 25,000 $6,571.97 $6.35 $7,842.56 $7.62 $5,301.38 $5.08 50,000 $8,159.80 $6.35 $9,747.96 $7.62 $6,571.65 $5.08 S - Occupancy Tenant Improvements (w/ structural) 500 $1,634.09 $38.20 $1,917.10 $45.84 $1,351.09 $30.56 2,500 $2,398.09 $45.66 $2,833.90 $54.79 $1,962.28 $36.53 5,000 $3,539.51 $18.19 $4,203.61 $21.84 $2,875.42 $14.55 10,000 $4,449.32 $7.72 $5,295.39 $9.26 $3,603.27 $6.17 25,000 $5,607.10 $5.36 $6,684.71 $6.44 $4,529.49 $4.29 50,000 $6,946.83 $5.36 $8,292.39 $6.44 $5,601.28 $4.29 U - Accessory— Agricultural Building 600 $1,667.55 $34.19 $1,968.89 $41.03 $1,366.20 $27.36 3,000 $2,488.12 $40.87 $2,953.59 $49.04 $2,022.67 $32.69 6,000 $3,714.11 $16.29 $4,424.76 $19.55 $3,003.45 $13.02 12,000 $4,691.31 $6.91 $5,597.42 $8.29 $3,785.22 $5.52 30,000 $5,934.85 $4.80 $7,089.65 $5.75 $4,780.05 $3.84 60,000 $7,373.83 $4.80 $8,816.42 $5.75 $5,931.22 $3.84 U - Accessory— Private Garage 50 $799.62 $169.77 $927.39 $203.73 $671.87 $135.82 250 $1,139.18 $202.92 $1,334.85 $243.51 $943.51 $162.34 500 $1,646.48 $80.87 $1,943.61 $97.04 $1,349.36 $64.70 1,000 $2,050.84 $34.31 $2,428.84 $41.16 $1,672.85 $27.45 2,500 $2,565.41 $23.82 $3,046.33 $28.58 $2,084.50 $19.05 5,000 $3,160.85 $23.82 $3,760.85 $28.58 $2,560.84 $19.05 O - Other Tenant Improvements 300 $1,475.09 $57.77 $1,726.30 $69.32 $1,223.87 $46.22 1,500 $2,168.34 $69.05 $2,558.19 $82.86 $1,778.48 $55.24 3,000 $3,204.08 $27.52 $3,801.09 $33.02 $2,607.08 $22.01 6,000 $4,029.65 $11.67 $4,791.78 $14.00 $3,267.53 $9.34 15,000 $5,080.22 $8.11 $6,052.46 $9.72 $4,107.98 $6.48 30,000 $6,295.91 $8.11 $7,511.28 $9.72 $5,080.54 $6.48 O - Other Tenant Improvements (w/ structural) 300 $1,612.57 $64.85 $1,891.26 $77.81 $1,333.86 $51.88 1,500 $2,390.70 $77.51 $2,825.03 $93.01 $1,956.37 $62.01 3,000 $3,553.28 $30.89 $4,220.12 $37.07 $2,886.42 $24.71 6,000 $4,479.93 $13.10 $5,332.11 $15.72 $3,627.76 $10.48 15,000 $5,659.15 $9.10 $6,747.17 $10.91 $4,571.13 $7.28 30,000 $7,023.69 $9.10 $8,384.62 $10.91 $5,662.76 $7.28 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-300 Page 33 of 33 City of Chula Vista www.chulavistaca.gov 619.691.5272 Inspection Fees Only Construction Types: IIA, IIB, IIIA, IIIB, IV Construction Types: IA, IB Construction Types: VA, VB UBC Class & Occupancy Type Project Size Threshold (SF) Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF Base Cost @ Threshold Size Cost per Additional 100 SF O - All Shell Buildings 2,000 $3,648.27 $25.17 $4,334.12 $30.21 $2,962.43 $20.14 10,000 $5,661.98 $16.05 $6,750.56 $19.26 $4,573.38 $12.85 20,000 $7,267.38 $21.24 $8,677.04 $25.49 $5,857.71 $17.00 40,000 $11,514.93 $6.69 $13,774.11 $8.02 $9,255.75 $5.35 100,000 $15,526.35 $3.83 $18,587.81 $4.59 $12,464.88 $3.06 200,000 $19,351.18 $3.83 $23,177.61 $4.59 $15,524.75 $3.06 Note: Foundation only permits are assessed 25% of the fees above, per construction and occupancy type. 1 Also applies to pool houses and casitas. Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-400 Miscellaneous Item Permit Fees City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 MISCELLANEOUS PERMIT FEES Description Intake Fee Plan Check Fee Inspection Fee Total Fee Accessory Dwelling Unit Detached Standard (All Plans) 1 $524 $586 $3,236 $4,346 Nonstandard, up to 1,200 SF $601 $1,623 $3,236 $5,460 Attached First Story, first 300 SF $524 $697 $1,397 $2,618 First Story, each additional 300 SF $0 $232 $233 $465 Multi-story, first 300 SF $524 $931 $1,514 $2,969 Multi-story, each additional 300 SF $0 $232 $350 $582 SFD Garage Conversion to ADU First 400 SF $524 $465 $776 $1,765 Each additional 400 SF $0 $57 $117 $174 SFD Conversion of Habitable Space First 300 SF $524 $465 $776 $1,765 Each additional 1,000 SF $0 $116 $117 $233 Antenna Dish > 2 Ft, first dish $524 $232 $310 $1,066 Dish > 2 Ft, each additional dish $0 $57 $58 $115 Cellular/ Mobile phone, free-standing, each $524 $349 $542 $1,415 Cellular/ Mobile phone, attached to building, each $524 $232 $542 $1,298 Equipment shelter, ≤ 1,000 SF2 $568 $428 $696 $1,692 Awning/ Canopy (Supported by Building) Residential, each structure $369 $232 $310 $911 Commercial, each structure $568 $509 $556 $1,633 Balcony Addition First balcony addition $369 $465 $776 $1,610 Each additional balcony addition $0 $116 $58 $174 Carport First carport $369 $465 $542 $1,376 Each additional carport $0 $116 $58 $174 Close Existing Openings Interior wall, first $524 $116 $310 $950 Interior wall, each additional $0 $39 $58 $97 Exterior wall, first $524 $116 $310 $950 Exterior wall, each additional $0 $39 $58 $97 Commercial Coach, each unit3 $524 $349 $582 $1,455 1 City Standard Plans publicly available on the City’s website. 2 For equipment shelters > 1,000 SF, use Fee Bulletin 10 -300. 3 Applies to sales and other temporary trailers. Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-400 Page 2 of 7 City of Chula Vista www.chulavistaca.gov 619.691.5272 Description Intake Fee Plan Check Fee Inspection Fee Total Fee Deck City standard design, first 300 SF $151 $100 $659 $910 City standard design, each additional 100 SF $0 $0 $57 $57 Nonstandard design, first 300 SF $369 $465 $776 $1,610 Nonstandard design, each additional 100 SF $0 $57 $58 $115 Demolition Interior (entire interior) $135 $116 $310 $561 Interior (partial interior) $135 $116 $310 $561 Exterior (entire structure) $135 $0 $309 $444 Swimming pool, spa, and/or hot tub demolition $135 $0 $309 $444 Door, Structural Shear Wall or Masonry (New) First door $524 $465 $426 $1,415 Each additional door $0 $116 $58 $174 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-400 Page 3 of 7 City of Chula Vista www.chulavistaca.gov 619.691.5272 Description Intake Fee Plan Check Fee Inspection Fee Total Fee Electrical Vehicle Charging Station Residential (SFD or duplex), each $174 $0 $776 $950 Commercial or multifamily residential, first $77 $349 $699 $1,125 Commercial or multifamily residential, each additional $0 $57 $58 $115 Fence or Freestanding Wall Non-Masonry First 100 LF $369 $116 $310 $795 Each additional 100 LF $39 $58 $97 Masonry Standard, first 100 LF $151 $100 $428 $679 Standard, each additional 100 LF $0 $0 $57 $57 Nonstandard design, first 100 LF $369 $349 $659 $1,377 Nonstandard design, each additional 100 LF $0 $39 $117 $156 Fire Damage Repair $369 $116 $542 $1,027 Fireplace Masonry & nonstandard design, first $369 $349 $659 $1,377 Masonry & nonstandard design, each additional $0 $232 $117 $349 Prefabricated/ metal, first $369 $116 $427 $912 Prefabricated/ metal, each additional $0 $39 $58 $97 Flag Pole First pole $369 $232 $426 $1,027 Each additional pole $0 $39 $58 $97 Lighting Pole First pole $369 $232 $310 $911 Each additional pole $0 $39 $39 $78 Manufactured Home on Continuous Footing, each $704 $554 $1,047 $2,305 Mezzanine First 500 SF $587 $975 $1,254 $2,816 Each additional 500 SF $0 $393 $554 $947 Modular Structures, each $568 $715 $1,253 $2,536 Move-on House, each $704 $832 $1,280 $2,816 Partition Residential, interior, first 30 LF $542 $116 $427 $1,085 Residential, interior, each additional 30 LF $0 $39 $58 $97 Commercial, interior, first 30 LF $587 $277 $470 $1,334 Commercial, interior, each additional 30 LF $0 $102 $102 $204 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-400 Page 4 of 7 City of Chula Vista www.chulavistaca.gov 619.691.5272 Description Intake Fee Plan Check Fee Inspection Fee Total Fee Patio Cover/ Covered Porch - Standard Open, wood frame, first 300 SF $151 $50 $543 $744 Open, metal frame, first 300 SF $151 $50 $427 $628 Open, wood or metal frame, each additional 300 SF $0 $0 $57 $57 Enclosed, wood frame (new cover & encl.), first 300 SF $151 $151 $776 $1,078 Enclosed, metal frame (new cover & encl.), first 300 SF $151 $151 $426 $728 Enclosed patio, each additional 300 SF $0 $100 $58 $158 Enclose existing patio cover, each $151 $100 $542 $793 Patio Cover/ Covered Porch – Nonstandard Open, wood frame, first 300 SF $369 $232 $659 $1,260 Open, metal frame, first 300 SF $369 $349 $542 $1,260 Open, other frame, first 300 SF $369 $349 $776 $1,494 Open, all materials, each additional 300 SF $0 $116 $58 $174 Enclosed, wood frame (new cover & encl.), first 300 SF $369 $349 $892 $1,610 Enclosed, metal frame (new cover & encl.), first 300 SF $369 $349 $542 $1,260 Enclosed, other frame (new cover & encl.), first 300 SF $369 $349 $1,008 $1,726 Enclosed patio, each additional 300 SF $0 $116 $58 $174 Patio Cover, Enclose Existing, each $369 $174 $542 $1,085 Photovoltaic System Residential (SFD/Duplex), expedited4, each $30 $0 $423 $453 Residential (SFD/Duplex), traditional5, each $70 $158 $494 $722 Residential (SFD/Duplex), panel upgrade, each6 $0 $62 $141 $203 Commercial or multifamily residential, first 500 panels $146 $504 $1,033 $1,683 Commercial or multifamily residential, each additional 500 panels $0 $93 $252 $345 Private Sewer, Water, Storm Drains and/or Site Lighting (valuation of improvements to be permitted) $0 - $250,000 $568 $975 $1,048 $2,591 $250,001 - $500,000 $568 $1,906 $1,514 $3,988 $501,000 - $750,000 $568 $2,837 $1,980 $5,385 $750,001 - $1M $568 $3,769 $2,445 $6,782 Each additional $250,000, in excess of $1M $0 $509 $465 $974 Remodel (Residential) First 300 SF $524 $465 $776 $1,765 Each additional 300 SF $0 $116 $117 $233 Re-roof First 1,000 SF $97 $57 $310 $464 Each additional 1,000 SF $0 $0 $57 $57 4 Applies to expedited small residential rooftop solar energy (photovoltaic) systems, as defined by Chula Vista Municipal Code §15.29.020. 5 Applies to residential photovoltaic systems that do not qualify for expedited processing (Chula Vista Municipal Code §15.29.020). 6 Applies to panel upgrades in conjunction with installation of new residential photovoltaic systems only. For all other panel upgrades, see Fee Bulletin 10-200 (Upgrade Existing Electrical Service). Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-400 Page 5 of 7 City of Chula Vista www.chulavistaca.gov 619.691.5272 Description Intake Fee Plan Check Fee Inspection Fee Total Fee Residential Garage Conversion Conversion to/from habitable living space, first 400 SF $524 $465 $776 $1,765 Conversion to/from habitable living space, each additional 400 SF $0 $57 $117 $174 Conversion to/from sales office, each $369 $0 $426 $795 Retaining Wall (Concrete or Masonry) Standard Design < 4 Ft, first 50 LF $151 $100 $542 $793 < 4 Ft, each additional 50 LF $0 $0 $116 $116 4 Ft - 8 Ft, first 50 LF $151 $100 $659 $910 4 Ft - 8 Ft, each additional 50 LF $0 $0 $116 $116 Special Design < 4 Ft, first 50 LF $369 $232 $601 $1,202 < 4 Ft, each additional 50 LF $0 $0 $116 $116 4 Ft - 8 Ft, first 50 LF $369 $349 $659 $1,377 4 Ft - 8 Ft, each additional 50 LF $0 $0 $116 $116 8 Ft - 12 Ft, first 50 LF $369 $465 $891 $1,725 8 Ft - 12 Ft, each additional 50 LF $0 $0 $116 $116 > 12 Ft, first 50 LF $369 $697 $1,241 $2,307 > 12 Ft, each additional 50 LF $0 $0 $116 $116 Roof Structure Replacement First 500 SF $524 $349 $426 $1,299 Each additional 500 SF $0 $57 $58 $115 Room Addition First story, first 300 SF $524 $697 $1,397 $2,618 First story, each additional 300 SF $0 $232 $233 $465 Multi-story, first 300 SF $524 $931 $1,514 $2,969 Multi-story, each additional 300 SF $0 $232 $350 $582 Sauna, Steam, each $369 $232 $426 $1,027 Siding (Interior or Exterior) All materials, first 1,000 SF $155 $116 $310 $581 Each additional 1,000 SF $0 $0 $57 $57 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-400 Page 6 of 7 City of Chula Vista www.chulavistaca.gov 619.691.5272 Description Intake Fee Plan Check Fee Inspection Fee Total Fee Signs Directional, first $155 $57 $427 $639 Directional, each additional $0 $39 $58 $97 Ground/ roof/ projecting signs, first $155 $57 $427 $639 Ground/ roof/ projecting signs, each additional $0 $39 $58 $97 Monument sign, first $155 $349 $484 $988 Monument sign, each additional $0 $116 $58 $174 Subdivision directional sign, first $155 $116 $485 $756 Subdivision directional sign, each additional $0 $39 $58 $97 Wall/ awning sign, non-electric, first $155 $116 $310 $581 Wall/ awning sign, non-electric, each additional $0 $39 $58 $97 Wall, electric, first $155 $116 $310 $581 Wall, electric, each additional $0 $39 $58 $97 Pole sign, first $155 $232 $426 $813 Pole sign, each additional $0 $116 $58 $174 Skylight < 10 SF, first skylight $369 $116 $310 $795 < 10 SF, each additional skylight $0 $0 $57 $57 ≥10 SF, first skylight $369 $232 $426 $1,027 ≥10 SF, each additional skylight $0 $0 $57 $57 Spa or Hot Tub (Interior, Prefabricated), each $77 $57 $310 $444 Stairs First flight $369 $232 $310 $911 Each additional flight $0 $116 $58 $174 Storage Racks ≤ 8 Ft high, first 100 LF $587 $438 $515 $1,540 ≤ 8 Ft high, each additional 100 LF $0 $102 $161 $263 > 8 Ft high, first 100 LF $587 $670 $556 $1,813 > 8 Ft high, each additional 100 LF $0 $102 $161 $263 Storage Shed (Residential, Custom or Prefabricated) First 300 SF $413 $393 $1,009 $1,815 Each additional 300 SF $0 $161 $58 $219 Stucco Applications First 1,000 SF $174 $0 $310 $484 Each additional 1,000 SF $0 $0 $57 $57 Swimming Pool, Spa, and/or Hot Tub Residential Vinyl-lined, each $309 $116 $776 $1,201 Fiberglass, each $309 $116 $776 $1,201 Gunite, each $309 $116 $886 $1,311 Commercial Standard design, ≤ 800 SF, each $309 $232 $1,125 $1,666 Standard design, >800 SF, each $309 $232 $1,242 $1,783 Nonstandard design, ≤ 800 SF, each $309 $697 $1,282 $2,288 Nonstandard design, > 800 SF, each $309 $697 $1,398 $2,404 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-400 Page 7 of 7 City of Chula Vista www.chulavistaca.gov 619.691.5272 Description Intake Fee Plan Check Fee Inspection Fee Total Fee Trash Enclosure, each $174 $232 $427 $833 Window or Sliding Glass Door Repair/ replace, first 10 $174 $116 $310 $600 Repair/ replace, each additional 5 $0 $0 $57 $57 New window, structural, first $369 $232 $426 $1,027 New window, structural, each additional $0 $57 $58 $115 OTHER CHARGES & ACTIVITIES Board of Appeals & Advisors Hearing ............ $619 Change of contractor, architect, or owner, each ............................................................. $100 Compliance survey, each ............................... $619 Disabled access compliance inspection ......... $206 Duplication of plans, each set ........................ $206 Job card replacement ..................................... $102 Product review ............................................... $206 Refund processing, each ................................ $116 Emergency call-out (unscheduled) ................ $826 After hours call-out (scheduled) .................... $413 Certificate of Occupancy Duplicate, each ................................................. $67 Temporary, each ............................................ $206 Request/Research for Alternate Methods Building & Fire review, per hour .................... $383 Building review only, per hour ....................... $206 Fire review only, per hour .............................. $177 Special Events, Activities (Plan Review and/or Inspection) First ½ hour .................................................... $792 Each additional ½ hour, or portion thereof ... $204 Supplemental Plan Check First ½ hour ................................................... $161 Each additional ½ hour, or portion thereof .. $102 Supplemental Inspection First ½ hour ................................................... $154 Each additional ½ hour, or portion thereof .. $102 Additional Plan Check Fee After 3rd Submittal Building & Fire Review First ½ hour ................................................... $385 Each additional ½ hour, or portion thereof .. $204 Building Review Only First ½ hour ................................................... $252 Each additional ½ hour, or portion thereof .. $116 Fire Review Only First ½ hour ................................................... $133 Each additional ½ hour, or portion thereof .... $88 Plan Check and Permit Extensions Processing Fee, each ..................................... $116 Plan Check Unexpired7 ..... 50% of new permit plan check fee Expired .......................new permit application fee Permit Unexpired7 ...... 50% of new permit inspection fee Expired ........................ new permit inspection fee 7 Unexpired plan check or permit extension fees do not include changes to plans and/or specifications. Review and Inspection of changes to plans and/or specifications will be subject to the Supplemental Plan Check and Supplemental Inspection rate Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A MASTER FEE SCHEDULE FEE BULLETIN Chapter 10 – Building Fees 10-500 Building Valuation Tables City of Chula Vista Development Services 276 Fourth Avenue, Chula Vista, CA 91910 November 2026 City of Chula Vista www.chulavistaca.gov 619.691.5272 Occupancy Use Construction Type Valuation/ Square Foot R-2 Apartment Houses Type I A or I B* $192.04 Type V or III (Masonry) $156.79 Type V Wood Frame $144.46 Type I Basement Garage $66.95 B Banks Type I A or I B $260.74 Type II A $192.02 Type II B $186.75 Type III A $211.41 Type III B $204.37 Type V A $192.04 Type V B $184.99 B Car Washes Type III A $123.32 Type III B $118.04 Type V A $105.71 Type V B $98.66 A-3 Churches Type I A or I B $174.42 Type II A $132.13 Type II B $125.08 Type III A $142.70 Type III B $135.65 Type V A $133.89 Type V B $125.08 I-2 Convalescent Hospitals Type I A or I B $244.88 Type II A $170.90 Type III A $174.42 Type V A $163.85 R- 3 Dwellings Type V Adobe $214.94 Type V Masonry $170.90 Type V Wood Frame $162.09 Basements (semi-finished) $40.52 Additions - Wood Frame $193.80 Solariums $53.85 Cabana - Pool House (Type V) $151.51 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-500 Page 2 of 6 City of Chula Vista www.chulavistaca.gov 619.691.5272 Occupancy Use Construction Type Valuation/ Square Foot B/R/S Fire Stations Type I A or I B $200.84 Type II A $132.13 Type II B $125.08 Type III A $144.46 Type III B $139.18 Type V A $135.65 Type V B $128.61 A-3 Fitness Centers Same values as Office Buildings I-2 Hospitals Type I A or I B $287.17 Type III A $237.17 Type V A $227.27 R-1 Hotels & Motels Type I A or I B $177.94 Type III A $155.03 Type III B $146.22 Type V A $133.89 Type V B $132.13 F Industrial Plants Type I A or I B $100.42 Type II A $70.47 Type II B (Stock) $65.19 Type III A $77.52 Type III B $72.24 Tilt-up $52.86 Type V A $72.24 Type V B $66.95 B Medical Offices Type I A or I B $211.41 Type II A $162.09 Type II B $155.03 Type III A $176.18 Type III B $163.85 Type V A $158.55 Type V B $153.27 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-500 Page 3 of 6 City of Chula Vista www.chulavistaca.gov 619.691.5272 Occupancy Use Construction Type Valuation/ Square Foot B Offices Type I or I B* $188.51 Type II A $126.85 Type II B $119.80 Type III A $135.65 Type III B $130.37 Type V A $126.85 Type V B $119.80 U Private Garages Wood Frame - Finished $42.28 Wood Frame - Unfinished $42.28 Masonry $49.32 Open Carports $29.95 B Public Buildings Type I A or I B* $216.70 Type II A $176.18 Type II B $169.13 Type III A $183.23 Type III B $176.18 Type V A $167.37 Type V B $162.09 S-2 Public Garages Type I A or I B* $86.33 Type I or II Open Parking* $65.19 Type II B $49.32 Type III A $65.19 Type III B $58.14 Type V A $59.90 A-2 Restaurants Type III A $172.66 Type III B $165.61 Type V A $156.79 Type V B $151.51 E Schools Type I A or I B $195.56 Type II A $133.89 Type III A $142.70 Type III B $137.42 Type V A $133.89 Type V B $128.61 M Service Stations Type II B $118.04 Type III A $123.32 Type V A $105.71 Pump Island Canopies $49.32 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-500 Page 4 of 6 City of Chula Vista www.chulavistaca.gov 619.691.5272 Occupancy Use Construction Type Valuation/ Square Foot M Stores Type I A or I B* $144.46 Type II A $88.09 Type II B $86.33 Type III A $107.47 Type III B $102.18 Type V A $91.61 Type V B $84.57 Retail Garden Center (Type V B) $70.08 A-1 Theatres Type I A or I B $193.80 Type III A $140.94 Type III B $133.89 Type V A $132.13 Type V B $125.08 S Warehouses ** Type I A or I B $86.33 Type II A $51.10 Type II B $49.32 Type III A $58.14 Type III B $56.38 Type V A $51.10 Type V B $49.32 MISCELLANEOUS Agricultural Building $29.95 Aluminum Siding $8.81 Antennas (each) Radio over 30 ft. high $5,672.89 Dish, 10 ft. diameter w/decoder $6,897.32 Awning or Canopy (supported by building) Aluminum $33.47 Canvas $14.09 Balcony $22.90 Decks (wood) $22.90 Demolition of Building $7.05 Fence or Freestanding Wall Wood or Chain Link $3.52 Wood Frame with Stucco $8.81 Wire $3.52 Masonry $14.09 Wrought Iron $8.81 Foundation Only 25% of value of whole building. Remainder of building will be valued at 75% of the building. Greenhouse $8.81 Manufactured Housing (25% of value of "site built" house) $38.75 Mobile Home $38.76 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-500 Page 5 of 6 City of Chula Vista www.chulavistaca.gov 619.691.5272 Occupancy Use Construction Type Valuation/ Square Foot Patio Wood Frame with Cover $14.09 Metal Frame with Cover $17.62 Wood Frame Cover & Walls $19.38 Metal Frame Cover & Walls $22.90 Screen or Plastic Walls $5.28 Plastering Inside $5.28 Outside $5.28 Retaining Wall Concrete or Masonry $28.19 Reroofing (1 square = 100 SF) Built-up $214.94 Composition Shingles $200.84 Fiberglass Shingles $200.84 Asbestos Cement Shingles $477.44 Wood Shingles (Class C min) $477.44 Wood Shakes (Class C min) $477.44 Aluminum Shingles $720.57 Clay Tile $604.29 Concrete Tile $510.92 Roof Structure Replacement $22.90 Saunas (Steam) (each) $14,159.33 Spa or Hot Tub ("Jacuzzi®") (each) $11,617.10 Stairs $22.90 Stone and Brick Veneer $14.09 Storage Racks (per CF) $1.76 Swimming Pool (per SF surface area) Vinyl-lined $54.62 Gunite $59.90 Fiberglass $65.19 Tenant Improvements Medical offices, restaurants, $74.00 hazardous 'h' occupancies Other such as stores & offices $53.17 General Additions and Modifiers Fire Sprinkler System $4.58 Air Conditioning Commercial $7.40 Residential $6.17 Fireplace (each) Concrete or Masonry $5,672.89 Prefabricated metal $3,856.51 Pile Foundations Cast-in-place concrete piles $36.99 Steel piles $91.61 Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A November 2026 MASTER FEE SCHEDULE ◼ FEE BULLETIN 10-500 Page 6 of 6 City of Chula Vista www.chulavistaca.gov 619.691.5272 Occupancy Use Construction Type Valuation/ Square Foot Alterations to Existing Structures (with no additional Floor Area or Roof Cover) Interior Partition (linear feet) $84.57 Install Windows or Sliding Glass Doors $26.42 Close Exterior Wall Opening $24.66 Shell Buildings B Banks Type I A or I B* $205.29 Type II A $153.63 Type II B $149.40 Type III A $169.13 Type III B $163.49 Type V A $153.63 Type V B $147.98 B Medical Offices Type I A or I B* $169.13 Type II A $129.67 Type II B $124.03 Type III A $140.94 Type III B $131.09 Type V A $126.85 Type V B $122.62 B Offices Type I A or I B* $150.81 Type II A $101.48 Type II B $95.84 Type III A $108.53 Type III B $104.30 Type V A $101.48 Type V B $95.84 A-2 Restaurants Type III A $138.13 Type III B $132.48 Type V A $125.43 Type V B $121.21 M Stores Type I A or I B* $115.58 Type II A $70.47 Type II B $69.06 Type III A $85.98 Type III B $81.74 Type V A $73.29 Type V B $67.65 *Add 0.5% to the total cost for each story over three. **Deduct 11% for mini-warehouse. Docusign Envelope ID: 302C08AD-048D-8FB9-8229-ADE043CA954A