HomeMy WebLinkAboutAgenda Statement 1990/05/01 Item 15COUNCIL AGENDA STATEMENT Item /5 Meeting Date 5/1/90 ITEM TITlE: Public Hearings: PCM-90-0S, Consideration of Olympic Training Center Sectional Pl anning Area Pl an (SPA) and Public Facilities Finance Plan (PFFP) -San Diego National Sports Training Foundation Resol uti on 15SQq Approving the Olympic Training Center Sectional Planning Area Plan and Public Facilities Finance Plan Resol uti on 15 f.tJ 1/ Adopting a Street Desi gn Standard - Wueste Road Rural Recreati on Access Route from Orange Avenue to County Regional pank ~ .~ /l.A t,'p7S-~ SUBMITTED BY: Director of Planning ~J /} /") ;"' REVIEWED BY: City Manager#" (4/5ths Vote: YeS_No~J This item involves the consideration of the Olympic Training Center (OTC) project which includes a SPA Plan and Public Facilities Financing Plan. This project was part of the Eastlake II I General Development Pl an and Pl anned Community pre-zoning adopted by the City Council on December 5, 1989. The (OTC) SPA Plan consists of 150 acres of land with on-site dormitory housing for 300-400 athletes. At buildout the OTC will provide housing for up to 1,000 ath1 etes. The Local Agency Formation Commission approved the annexation of Eastlake III to the City of Chula Vista including the OTC site on January 8, 1990. The county Chi ef Admi ni strative Offi cer sent a 1 etter to the Ci ty regarding the OTC SPA P1 an whi ch sta ff has responded to wi th the attached reply (Attachment B). RECOMMENDATION: That Council: 1. Based upon the findings attached to this report (Attachment 1), adopt a motion approving the Olympic Training Center Sectional Planning Area Plan and Public Facilities Financing Plan subject to the Conditions of Approval listed at the end of this report. 2. Wueste Road from Orange Avenue south to the County Park shall be given a special designation per the Wueste Road Rural Recreation Access Route attached (Exhibit "A"l. BOARDS/COMMISSIONS RECOMMENDATION: On April 11, 1990, the Planning Commission recommended approval of the OTC project (6-0, 1 absent). DISCUSSION: 1. Background The Un! ted States Olympic Committee Executi ve Board se1 ected the proposal from the San Diego National Sports Training Foundation on April 29, 1988 IS'"~ / ---Page 2, Item I '::i Meeting Date 5/1/90 which contained seven sites within San Diego County that met the USOC site selection subcommittee criteria. On November 12, 1988, the United States Olympic Committee Executive Board met in Minneapol is and designated the Eastlake property as the site of choice for the Olympic Training Center. This facility will become the third Olympic Training Center in the United States and the only year round, warm weather, buil t from the ground up training facility. During the time leading up to the selection of the Eastlake site for the OTC, the San Diego Sports Training Foundation examined over 30 sites throughout San Diego County. The criteria for selection of a site included size (minimum of 150 acres) good access, development feasibility, transportation and proximity to schools, colleges, jobs, and culture amenities. 2. Eastlake III Planned Community Zone Requirements The planned community zone approved by the City Council on December 5, 1989 for Eastlake III requires the submission of a sectional planning area plan to provide more detailed plans prior to actual development of any portion of the Eastlake III site. The first SPA plan submitted for the Olympic Training Center also includes an environmental impact report and a public facilities financing plan. A precise plan will also be required to govern the operation, use and design of the facility. 3. Project Description The OTC SPA Plan is the long range master plan showing the full development of the OTC as well as a supporting text that defines and descri bes essenti al components and characteri sti cs of the master pl an. The Public Facilities Financing Plan describes the public facilities that will be constructed and a Fiscal Impact Analysis of the project. 4. Spa Pl an The long range master plan of the Olympic Training Center can eventually accommodate most recognized Olympic sports, however, the USOC has desi gnated ni ne pri ority sports whi ch wi 11 recei ve fi rst ri ghts to use the new facilities. These nine priority sports include archery, athletics, canoe/l<.ayaking, cycl i ng, rowing, synchronized swimmi ng, team handball, volleyball and waterpolo. In addition, push start facilities for bobsledding and luge will also be included in the first phase as well as fiel d hockey, soccer and tenni s facil iti es. Several other Olympi c sports such as bi athl on, equestri an, fi gure skat! ng, ice hockey, shooting, skiing and speedskating will remain at other sites in Colorado Springs and Lake Placid. Vehicular access to the Olympic Training Center will be provided via Orange Avenue with secondary access from Hueste Road for resident athletes, visiting athletes, medical and housekeeping staff. On site /5'--;L Page 3, Item I~ Meeting Date 5/1/90 circulation will be strictly limited. All on campus circulation will revolve around a central north south spine which will serve as a pedestri an path, as well as ci rcul ati on for on-si te tours and emergency access. Each athletic training area will be marked along the pedestrian path providing each sports training site with its own address. t~ost of the athletic facilities will consist of outdoor fields, tracks and other open areas. The indoor athletic facilities will consist of one main gymnasium to be used for volleyball and team handball located west of the visitors center. A second gym in this same general area is planned for a future phase. Other structures include a boat house which will be constructed at the edge of Lower Otay Lake Reservoi r on 1 and leased from the City of San Diego. In addition a sWimming complex is located at the north end of the pedestrian path including an Olympic 50 meter sWimming pool and diving pool to be shared by swimmers, waterpo10 players and synchronized swimmers. Later phases of the project will add a second 50 meter pool. Other support faci 1 iti es for the activities within the Olympic Training Center include a Visitor Center, athlete housing (300-400 units or beds). the Sports Medicine/Sports Science Faci1 ities which will consist of a medical clinic as well as scientific testing facilities and weight rooms, dining and recreation areas plus reception areas. meeting room facilities and small office spaces for short term use by athletes and their coaches. The Phase One l1aster Plan uses by acreage breakdown are as follows: 5. Vi sitors Center Bui] dings Roads Parking Open Space which consists of: 4.65 acres 3.1 g acres 7.29 acres (a) outdoor athletic fields 34.52 acres (b) general open space 98.32 acres 147.97 acres It is expected that the Olympic Training Center will attract an estimated 424,000 visitors per year. This is an estimate based upon a percentage of total visitors that visit the San Diego area each year plus a percentage of local residents who could be expected to tour the facility. The Master Plan for the Olympic Training Center will accommodate these visitors and provide them with controlled access to view the OTC via a Visitors Center and guided tours down the pedestrian path. The Visitors Center will Page 4, Item IS;­ Meeting Date 5/1/90 consist of approximately 37,000 square feet of space including a 200 seat auditorium, restaurant, a gift store and a news media center. Visitors will tour the Olympic Site via walking tours and/or mini bus tours and they will also come to the site periodically as spectators attending specific exhibitions and/or just simply watching the athletes train. The Visitors Center is located in the northerly portion of the site where off-street parking is provided immediately off of Orange Avenue. The complex will include an auditorium which will show athletic and inspirational films as well as administrative support offices. This facility is located at the high point on the property so it will provide visual access to the entire site. Small visitor overlooks are provided at various points along the pedestrian path and these will include restroom facilities as well as small concessions stands that may be used for occasional competition and training events as needed. Grass seating areas on gently sloping areas are provided at each of the training areas so that spectators may sit and view the athletes performing during training and/or exhibitions. The Visitors Center will be approximately 60 feet in height and on the floor will contain a United States map approximately 80 feet in length east west and 60 feet in height in the north south direction. On this map of the United States will be noted the approximately 2,000 Gold, Silver, and Bronze U.S. 14edalists from past Olympic games. After each future Olympaid, new medalists will have their names added to the map. Although the primary purpose of the OTC is to provide training and support to U.S. athletes, there will be small exhibitions and competitions which will attract up to 3,000 spectators to the Center. Major tryouts and competitions will be held at other off-site facilities such as San Di ego/Jack Murphy Stadi um, Sports Arena, San Diego State University, UCSD and other similar locations. 6. Traffic Access to the OTC will be provided by the extension of Hunte Parkway and Orange Avenue from Otay lakes Road. These roads will be constructed by the Eastlake Development Company. T~/o poi nts of automobil e access to the site will be from Orange Avenue for visitors and a secondary access off of Wueste Road for athletes and support staff. The traffic analysis indicates an extremely low volume of traffic expected for Phase I consisting of 2,333 trips per day. About 50% of Phase I traffic consists of visitors to the site. Buildout traffic is estimated to be 4,937 trips with about 48% of buildout traffic devoted to visitors. Most of the visitor trips will be automobiles, however 8 to 10 buses per day wi 11 bring vi sitors to the facility. The athl etes share of total trips at Phase I and buildout is estimated to be 10%. 7. Grading Page 5, Item /s Meeting Date 5/1/90 The grading concept for the property will maintain the north/south ridge running the length (4000+) of the site which will be the location of the pedestrian path. The atli'letic fields and other facilities will step down from the ridge to maintain the basic landform. Elevation differences will range from 20 ft. to 50 ft. between the athletic fields. The track and field area will be graded to drain away from Lower Otay Reservoir and discharge via an underground drain system to Salt Creek. Approximately 100 acres of the site naturally drains toward Salt Creek and 50 acres drains toward Otay Reservoir. 8. Landscaping and Irrigation l~le landscape concept plan contains various elements relating to the functional areas of the facility. The practice fields will consist of grass and special turf areas for athletic uses. Wildflowers, native shrubs and meadow grass will provide informal ground cover for erosion control and color. Garden areas around the residential dorms will contain ornamental plantings and seating areas for the athletes use during free time. Park and picnic areas will be 1 andscaped to accommodate 1 eisure gatherings and passive recreation areas. The entry next to Orange Avenue will have formal tree rows to define the entrance and to provide a gateway to the Visitor Center. Perimeter planting will consist of dense trees and shrubs for visual screening and wind deflection. The pedestrian path will be marked with continuous rows of tall trees to define the ridgel ine. Trees and other drought tolerant plants have been maximized to the greatest extent possible in the landscape plan. Reclaimed water from the Otay Municipal Water District will be used for irrigation purposes wherever possible except on areas that potentially could drain into Otay Reservoir. An 8" reclaimed water line will be installed along with the domestic water line within the pedestrian path area. A central computer will monitor irrigation I/ater usage throughout the facility. The system will control sprinklers, pumps, fertilizers and monitor weather conditions. A Water Management Plan will be prepared and reviewed by City staff in conjunction with the Precise Plan. 9. Greenbelt Trail System The General Plan calls for a continuous open space greenbelt around the perimeter of the Chula Vista Planning Area to preserve significant open space resources. The greenbelt will eventually connect the Bayfront, Sweetwater Valley, Otay River Valley and the Upper and Lower Otay Reservoirs. One of the principal features of the greenbelt will be to 1 ink all of the principal parks and recreation areas of the various communities together. i . Page 6. Item /s Meeting Date 571790 The greenbelt lies on both sides of the Olympic Training Center (OTC) site (Salt Creek on the west and lower Otay Reservoir on the east). The OTC facility will be a compatible use with the greenbelt in that 86% of the site will be devoted to open practice fields and related facilities. In addition, the OTC will build the first segment of the greenbelt trail system for hiking and bicycling use along the easterly side of the OTC site. This trail system is an integral recreational element of the eventual 28 mile perimeter system envisioned by the Chula Vista General Pl an. 10. Graphics and Signage The graphics and signage for the project will be designed to provide identification, information and directions for OTC visitors and the athletes. The sign program as well as lighting plans will be part of the Precise Plan to be reviewed by the Design Review Committee prior to start of construction. 11. Archi tecture Preliminary architectural drawings of the OTC facil ity have been prepared by the project architect. A model of the main structures has been constructed and viewed by various members of city staff and members of the community. The Visitor Center located at the entry to the site from Orange Avenue is architecturally di sti ngui shed and sets the tone for the other structures such as indoor facilities, support facilities and athletes housing. The Design Review Committee has been working with the architects on the preliminary plans in conjunction with the Precise Plan. 12. Public Facilities Finance Plan The purpose of the OTC Public Facilities Finance Plan is to identify the capital facil ities that will be required to be constructed prior to the completion of the Olympic Training Center. The attached Public Facilities Financing Plan identifies public facility needs and costs and sets forth responsibilities for financing. Basically, the on-site facilities required by the City will be funded and built by the applicant, the San Diego National Sports Training Foundation, as part of the first phase construction. Off-site public facilities will be constructed by the Eastlake Development Company. These facilities include the extension of Hunte Parkway from Otay Lakes Road to Orange Avenue and the constructi on of Orange Avenue from Hunte Parkway to Wueste Road. In addition, sewer, water, drainage, and utilities will be included in the off-site work. On-site facilities will consist of water facilities (including reclaimed water lines), sewer facilities, drainage facilities, left-turn pockets on Wueste Road and a walking/biking trail along I-Iueste Road. --­Page 7, Item /~ Meeting Date~-=..:..!-:~ In addition to roads and other public facilities necessary to support the OTC, other public services will be required to serve the project. Services such as police, fire, emergency medical, libraries, public works maintenance, parks and schools. Each of the public services is discussed in the Public Facilities Financing Plan as well as in the following sections of this report. 13. Roads The primary access to the OTC site wi 11 be provided by Hunte Parkway and Orange Avenue. Both of these roads will be constructed by the EastLake Development Company and the roads will initially be constructed as interim roads. Hunte Parkway is a major road (104' R/W) between Otay Lakes Road and Orange Avenue. Orange Avenue is also a major road from Hunte parkway to east of the entrance road to the Vi stas nei ghborhood in EastLake II I. Orange Avenue is a Class III Collector (60' R/W) from east of the entrance road to the Vistas to Wueste Road. Wueste road is a Class III Collector Street (60' RIll). Orange Avenue will transition at the entrance to the Olympic Training Center from a 4-1ane major road to a 3-1 ane roadway. The estimated trip generati on for the Phase I OTC pl an is a total of 2,333 tri ps per day. This includes athletes, visitors, support personnel, and spectators. At buildout, the traffic is estimated to be 4,937 trips per day. A 4-1ane major road can carry 30,000 trips per day at Los "C." The percentage of OTe traffic on Orange Avenue and Hunte Parkway at buildout is 16.45%. The second road improvement project associated with the OTC is widening of Wueste Road at the athletes entrance and the boathouse road to incl ude 1 eft turn pockets. Under the current Chula Vista Street Design Standards Policy Hueste Road, which is a local road, would have to be widened and constructed to a 36-foot-wide roadway with curb and gutter and meet all of the other design criteria for residential streets. The Olympic Training Center's Traffic Consultant, Urban Systems Associ ates, recommended, on the basi s of the traffi c analysi s, that the existing roadway was adequate to handle the proposed traffic on lIueste Road from Orange Avenue southerly to the County Regional Park. Urban Systems proposed a Wueste Road Rural Recreation Access Route standard that would be adequate to handle the traffic on this scenic roadway due to the volume, character and nature of the projected traffic. City staff concurred wlth Urban Systems' recommendation. Therefore, it is staff's recommendation that the segment of Wueste Road from Orange Avenue south to the County Park be given a special designation of "Wueste Road Rural Recreation Access Road" because of the volume, character and nature of the traffic which will use this segment of the road. /y1 Page B, Item ~S Meeting Date 5 /90 The special designation for Wueste Road will provide for 24 feet of pavement and B-foot graded shoulders within a 60-foot right-of-way. Other design criteria are indicated on Exhibit "A". These criteria can be met by the existing characteristics of the roadway allowing the road to maintain its rustic rural appearance. 14. Sewer -- Sewer mai ns will be constructed by the Eastlake Development Company from Otay lakes Road via Hunte Parkway and Orange Avenue to the OTC site. A pump station will be required on-site and a second pump station will be located at the boathouse. Sewer pump station maintenance agreements and access agreements to the Telegraph Canyon Sewer Trunk line will be required of the applicant prior to grading or construction. 15. Drainage The property lies in the Salt Creek and lower Otay drainage basins. Approximately 39 percent of the site drains naturally into the lower Otay Reservoir. The concern of the San Diego Water Util ities Department is that steps be taken to prevent urban runoff directly into lower Otay Reservoir during winter rains. A master plan to intercept urban runoff is being prepared by the Baldwin Company. The proposed grading plan and drainage system for the OTC would collect urban runoff and direct it toward the west, away from lower Otay Reservoir. Final design of grading and storm drainage systems will ensure the protecti on of the lotler Otay Reservoi r. Due to the increase in the size of the Salt Creek drainage basin (by diverting drainage from the lower Otay basin) retention basins may be necessary to control the rate of peak discharge during storm periods. The. use of reclaimed wastewater to irrigate landscaping on the OTC property may be restricted to the Salt Creek Drainage basin to prevent nutrient or bacteria loads from the wastewater entering the lower Otay Reservoir. The grading plan will redirect the drainage back to the west, but there may still be some areas that need to be restricted from use of reclaimed water for irrigation. The quantity of reclaimed water available for irrigation use is dependent on the Otay Municipal Water District. The Jamacha plant currently produces 1.2 NGD and the irrigation demand for the TOC is .4 MGD. Long term plans by OHWD call for plant expansion to 2.6 MGD. 16. School s Although there will be a, small number (20-25) of school age (junior high and senior high) athletes staying at the OTC, the athletes are not expected to add significantly to the number of the number of school age ch1ldren to local schools. -Page 9, Item /~ Meeting Date 5}1}90 The entire Eastlake property, including the OTC site is included within the Mello-Roos COlTlllunity Facilities District which levies a special tax for construction of elementary, junior high and high schools. 17. Pol ice The OTC is located beyond the standard response time call ed for by the City's Threshold Ordinance. The current threshold standard requires a response to 84% of Priority 1 (emergency) calls within 7 minutes with an average response time to all Priority 1 calls of 4.5 minutes and a response to 62% of Priority 2 (urgent) calls of 7 minutes with an average response time to all Priority 2 calls of 7 minutes or less. A relatively small project like the OTC would not justify the hiring of new police officers and adding a new beat to standard patrol routes. On a permanent basis, the USOC will provide year-around 24-hour private security for the OTC. The plan is for the USOC to enter into an agreement with the City which will permit USOC private security staff to detain suspects until City police arrive on the scene. 18. Fire The citywide threshold for fire service is to respond to 85% of fire and emergency medical calls within 7 minutes. In 1989, the City's fire department responded to 94% of emergency calls within the 7 minute standard. Based on the travel time to the OTC from the City'S closest existing fire station on Otay lakes Road (7-10 minutes), responses to the OTC waul d exceed 7 minutes. However, the potenti al vol ume of emergency fire and medical calls at the OTC would not be sufficient to significantly affect current threshold performance on a citywide basis. In 1989 Counci I adopted the Fi re Stati on 11aster PI an and the project-specific fire coverage guidelines. These project guidelines require that 85% of a development's residential units be within a 5.7 minute travel time. The guidelines for high risk cOlTlllercial or industrial sites require a first-in travel time of 5.7 minutes (for sprinklered buildings) and a second-in response time of 8.7 minutes. Thus, although the citywide threshold for fire services would not be significantly affected by the OTC, the OTC woul d not presently meet the Ci ty' s project specific guidelines. The OTC would meet project guidelines upon development of the fi re stati on network recommended in the Master PI an. Exemptions to the project guidelines may be granted by the City Council by a 3/5th vote, subsequent to the revie~j and recommendati ons of the Ci ty' s Fire Prevention Bureau. Based on a number of interim mitigation measures agreed to by the USOC, the Ci ty' s Fi re Preventi on Bureau is recommending that Council grant an exemption for the OTC. Among the interim mitigation measures required by the City's Fire Department, the OTC will be required to maintain an on-site, private fire brigade, subject to on-going approval and evaluation by the City. On-site medical emergencies will be handled on a 24-hour basis by medical personnel working at the Sports Medicine Clinic. The interim measures shall be maintained until fire stations planned for the Salt Creek area and the Otay Ranch area west of the reservoir are operational. .....­ Page 10, Item Is Meeting Date ?-5 77'1"''''90'''- Agreements between the USOC and the City will be required for fire, emergency medical and police service prior to construction. Any legal or financial liability issues will be resolved to the satisfaction of the City prior to City Council approval of the agreements. The request for an exemption to the project guidelines will be presented to Council when the above mentioned agreements are completed. 19. Parks The OTC is located within the Eastlake master planned community. To date, Eastlake has provided or agreed to provide an excess of 9.5 acres of parkland for Eastlake Hills, Shores and Greens. Eastlake Trails and Eastlake III have not been subdivided yet, however, the General Development Plan for each proposes to provide public parkland in excess of City requirements, (+10.2 acres for the Trails and +48.9 acres for Eastlake III). Therefore, the overall Eastlake development includes actual and credited parkl and in excess of City requirements of approximately +68.6 acres. No additional dedication of land or payment of park fees is required for this project. 20. Public Facility and Service Issues: Olympic Training Center The Planning Community Zone provides for implementation of a specific project within an approved general development plan area by the submission and approval of a sectional planning area plan. In addition to the sectional planning area plan it has been determined that the most appropri ate method of regul ating the operati on, use and desi gn of the Olympic Training would be with a Precise Plan. Accordingly, there will be no need for separate planned community district regulations for the OTC. All of the master planning, design, and conditions of approval will be governed by the Spa Plan, Public Facilities Financing Plan and Precise Plan. Publ ic facil ity and service issues associated with the Olympic Training Center are as follows: 1) The design and adequacy of storm drain protection plans for lower Otay Reservoir as well as storm retention basins on-site to protect downstream flows at peak periods within Salt Creek and otay River Vall ey. 2) The adequacy of long term supply of water for the OTC to be provided by the Otay Municipal Water District and the effect of the current water allocation restrictions on the OTC. 3) The capacity of the Tel egraph Canyon sewer trunk 1 ine to handl e sewage discharged from the OTC and the safety of sewer pump stations located within the water shed of lower Otay Reservoir. 4) The adoquacy of interim police, fire and emergency medical service in relationship to the city's threshold ordinance. /y)t7 Page 11, Item5;:i~ Meeting Date,-",,-,-,-.::..:::..._ 5) The adequacy of off-site traffic mitigation measures at Telegraph Canyon Road and I-B05. 21. Discussion of Issues a. Drainage. The Eastlake III General Development Plan approved by the city Council on December 5,1989 contains a condition which requires the approval of a plan to protect lower Otay Reservoir from urban runoff and/or sewage contami nati on pri or to the issuance of gradi ng or building permits. This plan is under preparation. The SPA Plan for the OTC will be conditioned to require the installation of adequate runoff protection facilities to the satisfaction of the City Engineer and other appropriate agencies such as the City of San Diego Water Utilities Department and the County of San Diego Health Department. b. Water Supply. The question with respect to water supply has to do with the effect of the Otay Municipal Water District's Water Allocation Plan on the OTC. Indications from the representatives of the San Diego National Sports Training Foundation are that the District is considering exempting the OTC from the provisions of the Water Allocation Plan because of the special public purpose of the OTC facility. The exemption would be from Category 3 water permit allocation, but the annual 1950 EDU's limitation would not be exceeded by this exemption. d. Sewer. The issue with respect to sewage disposal has been resolved. The Eastlake Development Company has obtai ned permi ssi on from the City to deposit sewage from the OTC into a foreign basin. This permission is in the form of an agreement (Resolution 15449) whereby the City agrees to such transfer and the Eastlake Development Company agrees to the construction of certain improvements to the system that will accommodate the sewage. Sewage from the OTC will ultimately flow into a sewer trunk line down Salt Creek to Otay River Valley and westerly to existing sewer facilities in Chula Vista. However, it is infeasible to construct a sewer trunk line down Salt Creek to Otay River Valley until the Otay Ranch starts developing. During the interim period, OTC will need to pump its sewage into the Telegraph Canyon basin and tie into the existing 15" sewer line located in Otay lakes Road. d. Police, Fire & Emergency Medical. Since the OTC is being built in a remote location several years in advance of the development of the surrounding area, fire, pol ice and emergency medical services will not meet threshol d standards for mi nimum response times. However, the United States Olympic Committee has agreed to provide comparable service through on-site fire brigades, private security force, and emergency medical personnel until the City can provide such services in line with acceptable standards. The proposed on-site fi re bri gade woul d standards established by the National Fire Federal OSHA requirements. be requi red to meet the Protection Association and --Page 12, Item J~ Meeting Date._'s7mu;;;.!...:.':"'=":;c-- Likewise, the usoe will provide security for the OTe site utilizing professionally trained personnel and techniques certified by the City. Camera surveillance and on-site security patrols will also be util ized. The private security force will enter into an agreement with the City to permit USOC security staff to detain suspects until City police arrive at the OTC facility. law enforcement problem at the OTC are not expected to present any unusual demands on the City. e. Off-Site Traffic. The traffic generated by the OTC is estimated to be 2,333 average daily traffic volume for Phase I and 4,937 average daily traffic volume at buildout. The access from Otay lakes Road to the OTe will be constructed by Eastlake Development Company. The issue is to what extent, if any, the OTC should be responsible for improvements to Telegraph Canyon Road at I-80S in the event that SUNBOW II and Eastlake Greens do not proceed in a timely manner? Today I s vol urnes at I-80S and Tel egraph Canyon Road are 34,500 ADT. Projected volumes at 1991 are 39,000. The OTC share of 1991 trips on Telegraph Canyon Road is +5%. due to the extremely low volume of traffic generated by the orc and due to the conditions of approval imposed on SUNBOW II to make substantial improvements at the Telegraph Canyon Road and I-80S interchange, the OTC EIR concl uded that additional off-site traffic mitigation by the OTC would probably not be needed, but this determination ~/ill be verified by the Traffic Engineer at the time of construction. CONDITIONS OF APPROVAL 1. A trail for hiking and bicycle use shall be constructed along the westerly si de of Wueste Road with adequate cl earance between the trail and the 8-foot shoulder adjacent to the pavement. Said trail and vehicular separation shall be designed to the satisfaction of the City Engineer. 2. The appl icant shall construct Hunte Parkway to a four-l ane ~lajor Street Standard from Telegraph Canyon Road to Orange Avenue as follows: Said constructi on shall i ncl ude improvements of 20 feet of pavement on each side of a fully improved landscaped median including street lights. Improvement of the intersecti on of Hunte Parkway and Orange Avenue shall include transitions as directed by the City Engineer. 3. The appl icant shall construct Orange Avenue to a four-l ane major roadway as follows: a. From Hunte Parkway to the westerly boundary of the project: 20 feet of pavement on each side of a fully improved landscaped median incl udi ng street 1 i ghts. Improvements at the i ntersecti on of Hunte Parkway and Orange Avenue shall include transitions as directed by the City Engineer. 1~-/2 ,-- Page 13, Item IS Meeting Date 5/1/90 b. From the westerly boundary to the easterly boundary of the project: Full improvements to include, but not be limited to, A.C. pavement and base, curb, gutter and sidewalk, street lights and drainage fac; 1i ti es. 4. The app1 icant shall improve both Orange Avenue and Hunte Parkway with a minimum of 50 feet of landscaping on the side (southerly and westerly respectively) of those roadways which require full street improvements. 5. The applicant shall enter into an agreement with the City to provide for the maintenance by City forces and pay all costs associated with maintenance of the sewer pump stations prior to approval of any maps or permits which require said pump stations to be in service. 6. The applicant shall install sewer facilities to provide for future gravity flow within the project to the satisfaction of the City Engineer. 7. The applicant shall extend sewer, water and utilities from existing facilities to the OTC site and install said facilities on-site to the satisfaction of the City Engineer. S. The applicant shall enter into an agreement with the City to hold the City harm1 ess for any effects of diverted storm water, acceptance of the diverted flow from affected property owners shall be obtained prior to issuance of a grading permit. 9. Applicant shall perform traffic studies to verify trip generation rates from Phase I prior to proceeding with development of Phase II. Applicant shall mitigate any increase in traffic from those rates projected by the SPA as requi red by the City Engi neer. Thi s inc1 udes, but is not 1 imited to paying any additional fees resulting from an increase in traffic generation over the projected rates prior to proceeding with Phase II. These additional fees shall be paid retroactively on Phase I development as well as Phase II development. In no case, however, shall fees be refunded nor traffic generation rates lowered from those contained within the SPA plan. 10. An urban runoff protection plan including provisions for lost water charges and maintenance of lake protection facil ities shall be submitted to the City Engineer for approval prior. to the issuance of grading or building permits. The applicant shall install or agree to install any improvements as required by the plan and agree to pay lost water charges and maintenance fees as required by the plan to protect the Lower Otay Reservoir. The applicant shall consult with and obtain approval of such a plan from the Regional Water Quality Control Board, the City of San Diego and the County Health Department prior to issuance of a grading permit. Letters shall be submitted to the City indicating such approval. 11. The applicant shall install reclaimed water lines along with domestic water lines to serve the project. Page 14, Item ;'~ Meeting Date 5/1/90 12. The applicant shall install storm drainage facilities to the satisfaction of the City Engi neer. 13. Wueste Road shall be reconstructed adjacent to the project to Residential Street Standards unl ess a new Street Standard is approved by Ci ty Council for a "Wueste Road Rural Recreation Access Facility." Should the nett street classification be adopted, Wueste Road shall be constructed as necessary from Orange Avenue to the County Regional Park to be in conformance wi th that standard with improvements to i ncl ude, but not be limited to: 24 feet of A.C. pavement and base; and 8 foot graded shoulder on each side of the existing pavement within a 60 ft. right-of-way, all as approved by the City Engineer. 14. Orange Avenue shall transition from a four-lane major road at the eastern boundary of the OlympiC Training Center to a modified Class III Collector Road at Wueste Road. The modified tlass III Collector Road Section shall include an additional east to southbound trap lane at Wueste Road. Said transition shall be to the satisfaction of the City Engineer. Improvements shall include, but not be limited to A.C. pavement, P.C.C. curb, sidewalks and gutter, median drainage facilities and street lights. 15. The applicant shall improve Wueste road at the athletes' entrance road to the Olympic Training Center and to the boat house to provide for left turn pockets to the satisfaction of the City Engineer. Said improvements shall include, but not be limited to AC pavement and base; AC dike and street 1 ights. 16. No park dedication or improvement fees shall be required for the OTC due to the institutional purpose of the facility. 17. All other City fees and charges shall be paid by the applicant in accordance with City requirements. 18. The public facilities listed in the OTe Public Facilities Financing Plan shall be installed by the app1 icant in accordance with the City standards ·and phased as directed by the City Engineer. 19. The applicant shall dedicate all on-site and off-site right-of-way necessary to construct improvements indicated in the Public Facility Financing plan and these conditions of approval. Said dedication shall be as required by the City Engineer. The Public Facilities Financing Plan shall be amended to reflect the minimum street improvements specified in the SPA conditions. 20. Police, fire and emergency medical services shall be provided by properly trained, on-site private or volunteer personnel, subject to entering into an agreement with the City prior to certificates of use and occupancy. In additi on, the appl icant shall provi de an on-si te fi re bri gade and an emergency fire pumper and other fire suppression equipment and facilities, together with sprink1 eri ng and other mi ti gati on measures to the satisfaction of the City's Fire Prevention Bureau. Page 15, Item57,{~ Meeting Date,~~=- Transi ti on to Ci ty fi re protecti on and emergency medi ca 1 servi ces shall occur on a schedule established by the City. Said schedule shall be based on the construction of planned fire stations in the Salt Creek Project and in the Otay Ranch project area west of Lower Otay Reservoi r, as outl i ned in the City's Fire Station Master Plan. 21. Landscape plans, irrigation systems, lighting, graphics and signage, architecture, parking spaces and on-site circulation and operational use conditions shall be addressed in the Precise Plan for the project. 22. The applicant shall enter into a three party agreement with the Environmental Review Coordinator prior to the issuance of a grading permit to retain the services of a mitigation comp1 iance coordinator to fully implement the mitigation monitoring program. 23. The implementation of the SPA Plan is subject to the approval of a Precise P1 an. 24. The applicant shall install or agree to install a communications antenna system for police, fil'e and emergency communications to the satisfaction of the City Engineer. 25. CORRECTIONS TO SPA PLAN AND PFFP: a. Page 3, Section 1.6, third paragraph -change the word "vest" to "assure." b. Page 12, third paragraph -change trips from 3,058 to 2,058. c. Page 13, Section 3.3.2 (On site Access) Third paragraph -change the wording of the last sentence to read: "It has been recommend that Wueste Road be designated specifically as a special "Rural Recreation Access Facility" preserving the existing features of the two-l ane road without curbs and si dewa1 ks as normally required. d. Page 13 -Section 3.3.2, fourth paragraph, second sentence should read: "Improvements that will be required shall include the construction of a pub1ic hiking/biking path adjacent to the road, expansi on of the road at the athl etes' entrance to include left-turn pockets and expansion of the roadway at its intersection with Orange Avenue. Street lights shall be included at the two intersections noted. /5-IS" -Page 16. Item ;'~ Meeting Date 571790 e. Page 22. (Section 4-2-There are two sewage pump stations indicated on Figure 21. The second paragraph only refers to one pump station. f. The SPA Plan and Public Facilities Financing Plan exclude the boathouse facil ity located east of Wueste Road. A separate preci se plan. conditional use permit and environmental review shall be required for the boathouse facility. g. Figure 2 in the SPA Plan shall be replaced with an approved map of the Eastlake III General Development Plan. h. Figure 8 shall be corrected to reflect the amendments to the Ci rcul ati on El ement approved by the City Council for Eastlake II I General Plan Amendments. i. Titles on the Public Facilities Financing Plan should read as follows for C.I.P.: a. Page 4 -Projects Nos. 1 and 2 b. Page 5 -Projects Nos. 3 and 4 c. Page 6 -Projects Nos. 5. 6 and 7 d. Page 8 -Project No. 8 j. On page 15 of the Public Facilities Financing Plan under Municipal Fees -add Traffic Signal Participation Fee. k. The SPA Pl an and Publ ic Fadl ities Fi nancing Pl an texts shall be corrected as indicated above and 50 copies filed with the Director of Planning following the City Council public hearing. 26. The following are Supplemental EIR Mitigation Measures hereby made conditions of approval as follows: a. The applicant shall submit a lighting plan in conjunction with the preci se pl an to uti 1 i ze low sodi urn pressure 1 i ghting to the maximum extent feasible. b. The applicant shall provide analysis to demonstrate that the drainage from the OTC will not increase in volume or intensity in its effect on downstream properties and/or facilities. c. The monitoring of grading activities and recovery of palentological resources shall be in accordance with Section 4.5 of the final EIR. d. The Transportation Mi ti gati on r~easures in the OTC Suppl emental EIR are part of the City's Transportation Phasing Plan and shall be implemented by the City's Traffic Engineer. WPC 7600P 10' EXHIBIT "A" WUESTE ROAD RURAL RECREATION ACCESS ROUTE Design ADT Minimum design speed Traveled Way Graded Shoulder Right-of-Way Maximum grade t1inimum curve radius s' 12' 60' -5,000 -25 mph -24' -8' -60' -10% -200' 12' 8' , ~~Y~/A~~~~~~~~~ZZ~~~~S~'l"'~V~"~' OR AWN BY I s:~~f%:R I S~~~~~R WUESTE ROAD RURAL RECREATION ACCESS ROUTE TIT L E la' L. M. G, ----------- DATE 4 -24-90 WUESTE ROAD RURAL RECREATION ACCESS ROUTE -------- FINDINGS OLYMPIC TRAINING CENTER SECTIONAL PLANNING AREA ATTACHMENT 1 1; THE PROPOSED SECTIONAL PLANNING AREA PLAN IS IN CONFORMITY WITH THE EASTLAKE III GENERAL DEVELOPMENT PLAN AND THE CHULA VISTA GENERAL PLAN. The Olympic Traini ng Center Sectional Pl anning Area Pl an refl ects 1 and use, circulation system, and publ ic facilities that are consistent with the EastLake III General Development Plan and the Chula Vista General Pl an; The Olympic Trai ning Center proposes athl etic training facil iti es that are consistent with the public, quasi-public designations depicted on the General Development Plan and General Plan. 2; THE PROPOSED SECTIONAL PLANNING AREA PAN WILL PROMOTE THE ORDERLY SEQUENTIALIZED DEVELOPMENT OF THE INVOLVED SECTIONAL PLANNING AREA. The SPA Plan and Public Facilities Plan set forth the phasing of the project and the timing of public facilities construction to ensure the orderly, sequentialized development of the project; The Public Facilities Financing Plan identifies the public facilities, public services needed to serve the project. 3; THE PROPOSED SECTIONAL PLANNING AREA PLAN WILL NOT ADVERSELY AFFECT ADJACENT LAND USE, RESIDENTIAL ENJOYMENT, CIRCULATION, OR ENVIRONMENTAL QUALITY. The land uses within the Olympic Training Center represent the same uses approved by the EastLake III General Development Plan. The majority of the 150+ acre site (82%) will consist of open practice facil ities for soccer, -field hockey, archery, tennis, cycl ing, athletics, and swimming. The project has been pl anned to provi de the necessary support for U. S. athletes seeking to compete in international competition. The site plan is compatible with adjacent land uses and to avoid off-site impacts through the provision of mitigation measures specified in the OTC Supplemental Environmental Impact Report. WPC 7305P Is-It ATTACHMENT A ' LETTER RECEl VED FROM COUNTY OF SAN DIEGO REGARDING OTC SPA PLAN • .' ATTACHMENT A NORMAN W. HICKEY CHIEF ADMINISTRATIVE OFFICfR un 91 531-6225 CHIEF ADMINISTRATIVE OFFICE ILQcanon Cod. 7301 . 1600 PACIFIC HIGHWAY, SAN DIEGO. CALIFORNIA 92101-2472 -----_._-_._. __ . -----..... _-.. ----.. John Goss, City Manager City of Chula Vista 276 Fourth Avenue Chula-·Vista, California 92012 '. OLYMPIC TRAINING CENTER SECTIONAL PLANNING AREA (SPA) PLAN, CITY OF CHULA VISTA . -.. '.. .- !,.';;I. ",.:-! t,"r:\\I' ',:" ,,:,:,_ .. _~ '. The County of San Diego appreciates this opportunity to comment on the proposed Olympic Training Center Sectional Planning Area (SPA) Plan currently . being processed by the City of Chula Vista. The site is presently located in ··.·the·.OtaySubregional Planning Area and the CitY'of Chula Vista Sphere of --Influence, and is a portion of.the City's proposed. Eastlake III General. Development Plan Area. This letter includes comments from various County .. departments such as Agriculture, Parks and Recreation, Planning and Land Use, Public Works, and the Sheriff. The site is designated as· (19) Intensive Agriculture (I dwelling unit per 2, 4, and 8 acres) and (18) Multiple Rural Use (I dwelling unit per 4, 8, and 20 acres) in the County General Plan. The following is a summary of the staff comments on the significant planning issues concerning the Olympic Training Center SPA Plan: CHAPTER ONE . INTRODUCTION SPA PLAN SECTION TITLE LEGAL SIGNIFICANCE OF THE SPA: NUMBER Sect ion 1. 5 PAGE Page 3 This section, as written, is incomplete and should be rewritten to explain how this Sectional Plan is consistent with Section 65451 of the State of California Government Code, which addresses the required elements of a specific plan. Furthermore, this Sectional Plan should state, in a separate section if necessary, detailed information which explainss how and why the project is consistent with the General Plans of the City of Chula Vista and the County, ~here applicable . • John Goss, City Manager - 2 - ENVIRONMENTAL IMPACT REPORT: Section 1. 7 Page 4 .. .' ~.". :''-<1:: .. The Supplemental Dr;~ft_Env-ironme!ltal, Impact ,Report (DEIR) for the project has not been completed at this time and is tentatively scheduled to be heard by the Chula Vista Planning Commission in December of 1989. The County would like an opportunity to comment on the DEIR upon its completion, in order to have its comments addressed in the Final Environmental Impact Report (FEIR). CHAPTER THREE -SPA PLAN PLANNING CONCEPTS: Section 3.1 Page 8 This document lacks additional information normally included in a specific plan, such as what specific development standards and criteria are to be met. Also lacking are documents confirming availability and commitment for provision of needed public facilities from service providers. This information is valuable in showing that the project will be consistent with the General Plan and implementing ordinances. VISITORS: Section 3.1.2 Page 9 This section states that the proposed visitor center is at the highest pOint an the property, and would include 30-40 foot high observation towers for visitors. It also states that the proposed athletes' village is to be built on-slopes overlooking Lower'Otay Lake, using stepped grading. Because the visitor center and athletes' village are in prominent locations and have the potential for visual impacts to a wide area, information should be provided which allows for these concerns to be studied and evaluated. Such information should include a conceptual grading plan showing natural and proposed finished contour lines, height of cut and fill slopes, elevation drawings showing profiles of buildings and ridgeline development which would assist in grading and visual impact analysis. These concerns are vital in making the loc~tional decision for these facilities and these stUdies should be done prior to approval of the SPA, as well as being discussed in the ErR. 3.3 TRAFFIC/CIRCULATION SUB-REGIONAL NETWORK: Section 3.3.1 Page 11 The SPA plan should include a discussion of how the project meets the circulation element of the City of Chula Vista and County General Plans, emphasizing ways that the site can be served by mass transit such as express bus service. Traffic generation is forecasted utilizing standard San Diego Association of Governments (SANDAG) traffic generation rates. These rates should be supplemented with traffic generation data from ongoing planning efforts in the surrounding area, such as the Otay Ranch General Plan Amendment review, which include more current data on proposed land uses surrounding the • John Goss, City Manager - 3 - site. Also, improvements to Orange Avenue and Hunte Parkway should be clearly identified. This data will help to reevaluate the assumptions made concerning Or,ange Av~nue.,. WuesJe. R.o,ad and,,,o.tber nearby ctr.cul ati on r,outes. , , .• -~.~ ..... ~·r·':·:·· .. "';. ~;.~~ .~".:. ..' ONSITE ACCESS: Section 3.3.2 Page 12 The project as proposed would require visitors to drive their personal autos via Wueste Road to the boathouse adjacent to lower Otay Lake. Alternatives such as shuttle bus service and walking trails should be provided. Leaving Wueste Road in its present condition is not acceptable. The road needs upgrading to light collector standards, including curbs, gutters and sidewalks for pedestrjan travel around Lower Otay Lake. Entrance road improvements to the facility are not identified, i.e., traffic control such as left-turn pockets and traffic signals are not mentioned. PARKING: Section 3.3.3 Page 12 The total number of parking spaces required for this project using County parking standards is 560 spaces. The developer uses City of San Diego parking standards, which requires 470 parking spaces. Most of the difference is due to County standards for guest dormitories, which require one space per person for a total of 150 spaces, while City of San Diego standards require one space per three rooms for a, total of 50 spaces. In addition, County standards would require that bicycle parking spaces be provided as well. TRANSIT: Section 3.3.4 Page 13 This section should address the need for mass transit service for visitors as well as athletes and employees. The SPA plan should provide the facilities for mass transit on this site. The project should provide onsite transit shelters for several busses since many visitors will use mass transit to get to the Olympic Training Center. CYCLING ROUTES: Section 3.3.5 Page 13 The·project also proposes the use of roads located in the unincorporated area for offsite cycling training. The training center has proposed two 40 mile cycling loops, one 60 mile loop, and a 100 mile cycling loop, which involve using the following roads in the unincorporated area: 40 Mile CYcling Loop l. 2. 3. 4. Otay lakes Road Honey Springs Road Skyline Truck Trail Campo Road (SR 94) • John Goss, City Manager Great Western Cycling Loop (40 Mile) 1.-_ JIi11Qw.Glen~Drive 2. 'uehesa Road 3. Japatul Road 4. Lyons Valley Road 5. Skyline Truck Trail 60 Mile Cycling Loop 1. Otay Lakes Road 2. Honey Springs Road 3. Lyons Valley Road 4. Japatul Road 5. Oehesa Road 6. Willow Glen Drive 7,' Campo Road (SR 94) 100 Mile Cycling Loop 1. Otay Lakes Road 2. Honey Springs Road 3. Lyons Valley Road 4. Japatul Valley Road 3. SR 79 4. Sunrise Highway 5. Old Highway 80 - 4 - .. :: ~ : The. Olympic Training center proposal would assign leading and following vehicles to escort cyclists in training on these routes. No mention of eXisting or proposed bicycle lanes is made. Alternative bicycle routes should be studied in order to identify potential traffic hazards and conflicts and to assure the selection of routes that provide the safest passage. Construction of bicycle lanes should be considered where feasible. Because no public telephones are available in many remote backcountry areas, the developer should ensure ~at adequate supervision is present so that cycl ists can get· help in an accl~ent or other emergency. 3.5 PARKS, OPEN SPACE AND LANDSCAPE CONCEPTS PARKS AND OPEN SPACE: Section 3.5.1. Page 14 The Olympic Training Center will be primarily a facility that is open to the public for spectator/tourist use, but not usable for recreational purposes. Therefore it does not satisfy any Recreation Element standards of the County of San Diego . • John Goss, City Manager - 5 - The~exi.stence of high quality athletic facilities should inspire local residents to demand and pay for high quality recreational facilities and programsifor~tbeir"own communities. The long term effect of providing such programs"and:'facilities should be a reduction in crime and substance "abuse and corresponding increase in public health and welfare. This section states "Because the majority of use on the Olympic Training Center campus is outdoor athletic venues, approximately 82% of the 150 acre site will be retained as visual open space". This term requires definition and clarification to determine what public benefits, if any, will be gained from this type of open space. In addition, a quasi-public picnic area for the benefit of visitors is proposed adjacent to the visitors center, but no other useable public open space is proposed on site. The distance from the visitors center to the end of the walkway at the southern end of the site is approximately 3,300 feet (3/5 of a mile), and therefore additional useable open space and.public facilities along this route are necessary for rest and relaxation of Visitors. LANDSCAPE CONTENTS: Section 3.5.2 Page 14 To minimize potable water usage, the developer should be required to use drought-tolerant plant species in all landscaped areas. Landscaped areas should be irrigated with reclaimed water where such irrigation will not contaminate potable water supply. The landscaping plan should include more trees around the perimeter of the site and fencing for increased security; increased use of trees around playing fields to create improved visual background, glare reduction, and protection from wind; and proper drainage control to minimize impacts to Salt Creek. IRRIGATION GUIDELINES: Section 3.5.3 Page 15 A discussion of impacts of recreational use to the Lower Dtay Lake, including runoff, and impacts of water sports and spectator events should be included. Also included should be discussion as to impacts to Salt Creek and the Lower Dtay Regional Park to the south. These studies should include elevations and section drawings of these areas. 3.6 GRAPHICS AND SIGNAGE: Page 17 The SPA plan should state that proposed signage will be consistent with City standards and also include specific language which controls the type, size, height, and location of signage such as donor or special event signage, which has the greatest potential for negative visual impacts to the surrounding area. 3.7 LIGHTING DESIGN GUIDELINES: Page 19 Light pollution from this project may effect astronomical research activities at the Mount ~aguna and Palomar Mountain Observatories. Because of the John Goss, City Manager - 6 - proximity of the Mount Laguna Observatory and the concentration of athletic fields and other facilities proposed for this site, the potential for light 'p't>llift'ion':from-,exte"rior:Tightfng=-is great .. Control of lighting types and 's"bUrces' shouHI' be re"quired which' elililrnat"e's"or" shields any light' from' shining upward_ Low-pressure sodium exterior lighting should be required because this lighting type has the least light pollution impact. The City of Chula Vista's Lighting Ordinance permits high-pressure sodium lighting, which is one of the most impactive lighting types. The County recommends that all lighting be consistent with the County Light Pollution Control Ordinance and that the hours of operation of outdoor lighting should be limited to 10:00 p.m., not 11:00 p.m. or later as proposed by the applicant, in order to minimize light pollution impacts on the neighboring residents as well as the observatories. This section of the SPA plan should include a discussion about lighting for the project in relation to dark sky reqUirements for astronomical research, including wave lengths that can be filtered out by observatory equipment. CHAPTER 4 -PUBLIC FACILITIES A· sectfoh should be 'included withTn' this chapter which describes how the project will finance required public facilities and whether these facilities will be developed in phases or at one time. This section should be consistent with the findings of the Public Facilities Finance Plan and Development Agreement. 4.1 STORM DRAIN SYSTEM: Page 21 The project should include a detailed drainage study, including the amount of diversion area and flow; the increase in flow due to improved areas should be determined; preparation of a complete drainage design; and identification of offsite mitigation such as fees, construction, etc. The storm system design should be reviewed as more specific information is developed. Water quality information is ~eeded. 4.2 " SEWER SYSTEM: Page 21 A more detailed analysis of the temporary sewage system, including design standards, treatment, capacity, physical alignment and location of facilities, and financing should be included in the approved SPA plan. This analYSis should also include a contingency plan in the event of a pump failure which addresses the handling of sewage spills and protection of the water quality of Lower Otay Lake. Also, a similar study of the permanent sewage system should be prepared which includes phasing and future improvements and expansion of the system. 4',3.2 RECLAIMED WATER: Page 23 The use of reclaimed water on the site should be required, not considered (as stated by the applicant). A water reclamation plan should be prepared in '. John Goss, City Manager - 7 - cooperation with the Otay Water District and County Health Department. This plan should include a discussion of how groundwater and lower Otay lake water supply .will ·be protected; ".Consideration should· be given to .redesigning the project to ensure that as many athletic fields and 'landscaped -areas as possible are located on the west side of the project so that reclaimed water can be utilized to the greatest extent possible. If you have any questions, please contact Richard Zumwalt at the Department of Planning and land Use, 694-3681. NORMAN W. HICKEY Chief Administrative Officer NWH:REZ:sv cc: lari Sheehan, Deputy Chief Administrative Officer (A6) ---Gerald Jamriska, Department of Planning and land Use (06S0) Robert Copper, Department-of Parks and Recreation (029) J.M. Drown, Sheriff's Department (C41) David Solomon, Department of Public Works (0336) Kathleen A. Thuner, Department of Agriculture, Weights and Measures (01) Robert leiter, Director of Planning, City of Chula Vista, 267 Fourth Avenue, Chula Vista, California 92012 David Nielsen, San Diego National Sports Training Foundation, 1904 Hotel Circle North, San Diego, CA 92108 BOARD11\CPlTRRZ.119-sv • :e . .. . ', • • • • • .. • • • • • • • • • • ~ • • • , , , ) • , ~ , ) ~ • • ) ~ ) , , • , ) ) ) ) , I " s VICINITY ,"lAP UNITED STATES OLYMPIC TRAINING CENTER SAN DIEGO TilE SAN DIEGO NATIONAl. SrOI\TS TRAINING FOUNIlATIIlN UNITED STATES OLYMl'lctOMMITTf.E IS: 27 r~ __ .... 1 SKID,\lOur. OWINGS.~ MERRII,L TUC~F.R SAUI.EIl.if.: ASSOCIATES ARClfm:cr WYA ASSOCIATES LAtm5t'"I'£ ARt111n:C.T RICK ENGJ,'iEf.JtI:-"G crvU,t .. '(jIN[U I'''TRICK ,"'1AOlJUX GltI.rtUC VCJ:fCH ,'RANeJS "RAilE LIGUTfflC D[JICH URIIA,'I SYSTEM ASSOCIATES TRAlllC COlUtlLT4HT TIlE M'K'Nlf-;Y Gnour n..,t.'NINO CONIvt.T4f« .. • • • II • • i i i , ":" • = • l :!' ERe ~ Environmenlal and Energy Services Co, .... IOU. --- ADOPTED GENERAL PLAN RESlCENT1Al. --W<l""" __ ~~ CU.!,I,£. , ... .... >-, -- "' '-,,. .. --Sb-TClIl "" NClN-REOOENTlAL __ ~Oyse • __ .• A~_S •• _ ~ ~~., 1021 , : ...... &IIoocJ .. _ !oO' ,0 ~:so.c.,o.. .;..al ~fOl" .". 'QUI '0l0.1 • IAAXf,V,4 OJ LOW 1"""" """ - 0 ." ,," '" '" w, '211 '". Adopted General Plan Update Is-if .. ,' r \' , \4.0 1 o FEET " \ ( / 2000 SOURCE: Cinti & Associates, October 1989 FIGURE A-3 I , ;. , LONG RANGE MASTER PLAN (labeled) UNITED STATES OLYMPIC TRAINING CENTER 'SAN DIEGO THE SAN DIEGO .'ATIOI/AL SPORTS TRAIN INC FOUNDATION UNITED STATES OLnlPIC <;O.lfMITTEE SKIDMORE. OIvr.<GS '" MERRILL TUCKER SADLER & ASSOCIATES ARClaTICT "'1,1'" Figure 7 WYA ASSOCt. .... TES l. ...... t)sc.\J't ,\JOOTtCT RICK £.'1GINEERI~G ClVILL'ICt'o'EF.ll PATRICK MADDUX Cll.4.rHIC OCSICN FRANClS KRAHE l.ICl{"re\C Cts1Cli URBAN' SYSTEM ASSOCIATES TllAIllC CQ!'tSl,;t,TA..VT TilE .\t'KI~LEY GROUP ~c co.out1.TA.1tT • KATHLEEN A THUNER AGRICUL.TURAL CQMMISS10N£RI SEAt.ER OF W£IGHTS ([nunt~ nf ~Ctn ~i.egu OEPARTMENT OF AGRICULTURE. WEIGHTS & MEASURES AND MEASURES sS5s-0,iERtAN,D ~YE.~. S·L,[)G. 3. SAN DIEGO. CALIFORNIA 92123-1292 ... ~ .... -.............. _ ...... , ...... . October 25, 1989 TO: Gordon Howard MS 0650 Department of Planning and Land Use FROM: Kathleen A. Thuner·· MS 01 Agricultural Commissioner/ Sealer of Weights. and Measures OLYHPIC TRAINING CENTER SECTIONAL PLANNING AREA PLAN AGRICUL TUAE. (6t9) 6942739 WEIGHTS a. MEASURES 1819) 694-2778 This department has reviewed the Olympic Training Center (SPA) Plan for the Otay Lakes region. The actual Training Center site does not appear to displace any agricultural activities. However, the lands adjacent to the Center location are being farmed in barley and have been used for wheat and barley in the past. I,e are aware of the East Lake General Plan which would eventually eliminate these lands from agricultural use. The Department of Agriculture, Weights and Heasures encourages the use of reclaimed water for irrigation of playing fields and landscaped areas taking precautions to avoid drainage into the Otay Lakes. We appreciate the opportunity to comment on the Olympic Training Center Plan. ~{~ Agricultural Co~~issionerl Sealer of Weights and Heasures • ~--. . ROBERT R. COPPER QIRECTOR DEPARTMENT OF PARKS AND RECREATION 16191 &S40.JOJO ~1 AUfF'{N'R:QAO.'.S\J1T1:j'.'SAn -oIEGO:. CAUFORNtA 92123'-1699 october 18, 1989 TO: Lauren Wasserman, Director Department of Planning and Land Use .. Attn: Gordon Howard, Regional Planner FROM: Robert R. Copper, Director Parks and Recreation Department SUBJECT: U.S. Olympic Training Center, San Diego This memo is in response to your Department's request for comments on the draft of the report on the subject training center. After reviewing the report and attending the october 3, 1989 information meeting on the project, Parks staff has prepared the following comments which I offer for inclusion in your letter to the Board of Supervisors on this project. 1. COUNTY RECREATION STANDARDS The Recreation Element of the county General Plan specifies a standard of 30 acres per 1,000 people: 15 acres per 1,000 for regional parks and 15 acres per 1,000 for local parks. ~he regional and local parks provided by these standards in the Recreation Element are those that are open to and usable by the general public for recreation purposes: The Olympic Training Center, hOlolever, is a facility IoIhich \dll be open to, but not usable by the general public for recreation purposes. From the standpoint of the general public, the training facili ty will be a spectator/tourist type of attraction. Only the athletes training for the Olympics will be allowed to actually use the recreation facilities provided by the Center. The only exception to this, mentioned by the NcKinley Group at the information meeting, might be an occasional special event where residents of San Diego County could partiCipate by using the facili ties. This would be an infrequent occurrence, not on a regular basis, and consequently, does not satisfy the ongoing recreational need of residents of the County. For this reason, the training facility loIould not be considered as satisfying any of the Recreation Element's standards for regional or local parks. /~3J .' Gordon Howard Department of Planning and Lund Use 2. THE LONG RANGE MASTER PLAN October 18, 1989 Page 2 The Long Range Master Plan (Figure 4 in the report) appears to be a comprehensive weIi" thought':'out 'pl~m for intensive recreational use of the ISO-acre site. The proj ect has national and international significance (another reason for not being counted toward satisfying regional park and local park standards) but is designed to be sensitive to local conditions (topography, drainage, community character, etc.). The Landscape Concept Plan (Figure 18) is an attempt to use planting (particularly trees) to denote c~rtain areas in the project while establishing overall landsd'ape continuity not only within the proj ect but with the proposed development surrounding the project site. We suggest the following: more generous use of trees around the periphery as a buffer in combination with boundary fencing (to our knowledge, fencing was not mentioned in the report) for increased security; addi tional tree plantings around sportsfields to create a consistent visual backdrop for better visibility of balls, reduction of glare, and increased wind control; and proper drainage detention and/or.dissipation of the increased runoff from the project'into Salt Creek. We would like to see a discussion of the impacts on public use of Lower Otay Lakes from the proj ect including runoff into the lakes. Also, please discuss. the impacts of runoff into Salt Creek and the cumulative impacts on the proposed otay River Regional Park to the south. Elevations and sections of the site would help in understanding and evaluating these impacts. There should also be some discussion about lighting of the project in relation to the dark sky requirements of the Palomar Obse'.=vatory, including "lave lengths that can be filtered out by palomar equipment. 3. REGIONAL EFFECTS OF THE TRAINING CENTER It appears that the location of the Olympic Training Center in San Diego County will have a strong positive effect with several ramifications : pOlitically, economically, socially and recreationally. The Center will obviously help increase tourism to County by creating and sustaining jobs. Also, as local residents visit the Training Center and observe the variety of facilities available, they should be inspired to want more and better recreation facilities in their own neighborhoods and communi ties. ~lhen this desire grows into a popular demand, the majority of residents then become willing to make the necessary sacrifices to obtain better /y32- . " Gordon Howard Department of Planning and Land Use october 18, 1989 Page 3 recreation facilities and programs, proper~y staffed and maintained. . The long-term effects of providing such constructive activities for all age groups should be a reduction in crime and substance abuse with a corresponding increase in the public health and welfare. If you have Manager, at please call R.B. C~aire, Project PPER, Director Recreation Department RRC:wr • /5--33 .. GRANVILLE M. BOWMAN DIRECTOR . DEPARTMENT OF PUBLIC WORKS COUNTY ENGINEER COUNTY AIRPORTS COUNTY ROAD COMMISSIONER TRANSPORTATION OPERATIONS COUNTY SURVEYOR FLOOD CONTROL LIQUID WASTE SOLID WASTE :"::~:~-:: ::;:.:~r 115191 1594-2212 (lOCA110N eOOE 7501 October 25, 1989 TO: Lauren M. Yasserman, Director Department of Planning and Land Use (0650) Attn: Gordon HO'Jard ~ . DAVID s. SOLOMON John S. Burke, Dep~ty DIrector De u: County Engincor Department of Publ1c Yorks (033 p Y FROM: SUBJECT, Olympic Training Center Sectional Planning Tree Plan As you requested in your memo dated October 5, 1989, we are submitting comments (see attachments) regarding the proposed training center. The traffic and flood control comments would be Public Yorks concerns if the project 'Jere to remain in the unincorporated part of the County. If you have any questions, please contact Gary Cane at 694-2491. JSB:GAC:ds At tachmen ts 0512719 Subject: Flood Control/Drainage Comments, Ref. Section 4.1 "Storm Drain System" I. The project should include a detailed drainage study. A. The amount of diversion area and flov should be determined. B. Increase in flov due to paving roads parking, etc. should be determined. C. Complete drainage design should be prepared. D. Offsite mitigation (fees, construction, etc.) should be identified. II. The storm system design should be revieved as more specific information is developed. Vater quality information is needed. Subject: Traffic Reviev.of Olympic Training Center Proposal in Chula Vista A. Entrance road improvements to the facility are not identified Le., traffic control such as left-turn pockets and traffic signals are not· mentioned. B. Leaving Vueste Road as it currently exists is not acceptable. This roadvay needs upgrading to light collector or residential collector standard, i.e. 40 feet of A.C. on 60 feet of R/V vith curb, gutter and sidevalk for the considerable pedestrian travel along Otay Lake. C. And onsite transit shelter stop for several buses vould be desirable for this proposal. Since many of these visitors viII Use mass transit (air, rail and bus) to access this developmen t. D. Improvement of Orange Avenue and Hunte Parkvay also should be clearly identified • • • COUNTY OF SAN DIEGO INTER·DEPARTMENTAL CORRESPONDENCE October 19, 1989 TO: Gordon Howard, Regional planner Department of planning and Land Use (0650) FROM: J. M. Drown, Assistant Sheriff Sheriff's Department (C41) OLYMPIC TRAINING CENTER PLAN We have reviewed the plan submitted for the Olympic Training Center. The Sheriff's Department has identified the following areas of potential problems which we feel must be addressed: 1. The bicycle loops are located in the unincorporated areas to the east of the training center. The area is mostly . two-lane,~ nart'ow, and' at places, winding road. To ensure the safety of bicyclists, these roads need to be improved with bicycle lanes. 2. Regarding'these outlying areas, some have no public telephones within any reasonable spacing. In case of accident or other emergency, how will the cyclists get help? Will the training center ensure riders have some way of getting help? If you need further information, please feel free to contact this office. J·l\,I.' (ku.vJ J. M. Drown, Assistant Sheriff Law Enforcement Services JHD:lhc IS3to ATTACHMENT B DRAFT REPLY PREPARED BY DIRECTOR OF PLANNING TO LETTER FRO~l COUNTY OF SAN DIEGO /5-31 ,. ATTACHMENT B OTC RESPONSE The Olympic Training Center Sectional Planning Area Plan (SPA Plan) filed with the City of Chula Vista in August, 1989 is the second level of master planning required by City ordinances for major projects (over 50 acres). The subject project has been dealt with in the City's General Plan Update adopted by the City Council on July 11, 1989 as well as the Eastl ake I II General Development Plan adopted by the City Council on December 5, 1989. The Eastlake III General Development Plan is the first level of master planning required by the City's Planned Community Zone. Following the adoption of the Eastlake III General Development Plan, the City's Planned Community Zone requires the preparation of a Sectional Planning Area Plan (SPA Plan) and Precise Plan prior to approval of Tentative Subdivision Maps and/or grading plans and building permits. We are now reviewing the SPA Pl an and the Publ ic Facil ities Financing Pl an for the DTC. Public hearings on the OTC draft EIR are scheduled for the Planning Commission on I~arch 14 and hearings on the SPA Plan/Public Facilities Financing Plan are scheduled for April 11. City Council hearings are tentatiVely scheduled for 1 ate April. Our response to your comments follow the format outlined in your letter addressed to me dated December 5, 1989 (Attachment A). CHAPTER ONE -INTRODUCTION SPA PLAN SECTION TITLE LEGAL SIGNIFICANCE OF THE SPA: Section 1.5 , Page 3 1. Legal significance of the SPA. The Sectional Planning Area Pl an is not a specific plan as defined in Section 65451 in the State of California Government Code. The Sectional Planning Area Plan is a unique creation of the City of Chula Vista's Planned Community Zone which is contained in Chapter 19.48 of the Zoning Ordinance. Findings of consistency with the General Plan were made by the Chula Vista City Council when the Eastlake III General Development Plan was adopted on December 5, 1989. The SPA Plan is required to be consistent with the General Development Plan of the Planned Community Zone. In this case the Olympic Training Center is des'ignated for Public/Quasi Publ ic use on the City of Chula Vista General Plan and also on the Eastlake III General Development Plan. The SPA Plan for the Olympic Training Center which shows the various athletic training facilities including fields, gymnasium, and SWimming facilities is consistent with the Public/Quasi-Public land use designation of the Chula Vista General Plan and also with the uses permitted by the Planned Community Zone. IS3t' ENVIRONMENTAL If4PACT REPORT: Section 1.7 Page 4 The supplemental draft Environmental Impact Report 89-11, State. Clearinghouse No. 89010284 for the Olympic Training Center SPA Plan was distributed to the County of San Diego in January, 1990. The Planning Commission Public Hearing on the supplemental draft EIR is scheduled for Harch 14, 1990 at 7:00 p.m. in the City Council chambers. CHAPTER THREE -SPA PLAN PLANNING CONCEPTS: Section 3.1 Page 8 The speci fic development standards will be set forth in the Preci se Pl an which is part of the Pl anned Community Zone requi rements. The Preci se Pl an will be acted upon by the City's Design Review Committee after the SPA Plan. The Precise Plan requires detailed architectural review, landscape plans, irrigation systems, sign program, lighting ~lar., site plan, off-street parking design, ingress and egress desi gn, and oper',tional use standards (much like a Conditional Use Permit). Once again the SPA Pl an is not a speCific pl an and does not need to be judged by criteria of the Government Code concerning specific plans, what is important is that the SPA Pl an must be eval uated in accordance with the Specific Developments Standards and Criteri a contai ned in Chapter 19.48, the Planned Community Zone of the Chula Vista Zoning Ordinance. The specific reqUirements for institutional uses in a PC Zone include a General Development Plan followed by a SPA Plan and Public Facilities Financing Plan and a Precise Plan. The applicant has submitted an OlympiC Training Center Public Facility Fi nance Pl an whi ch detail 5 the pl ans for provi di ng roads, sewer, water, and drainage facilities for the project, as well as police service, fire service and emergency medical service, 1 ibraries, parks and recreation, and public works maintenance. VISITORS: Section 3.1.2 Page 9 The archi tects for the OTC have submi tted prel imi nary desi 9ns of the vi sitor' s center and athl etes housi ng to the City of Chul a Vi sta' s DeSign Review Committee. A large model of the OTC is on display at the Public Services Building at Fourth and F Streets. In addition, a tentative subdivision map with grading information is on file with the Chula Vista Engineeri ng Department. The grading desi gn has been revi ewed by ERC environmental consultants who are under contract to the City to prepare the OTC Suppl emental EIR. No envi ronmenta1 impacts have been i dentifi ed in the Supplemental EIR for grading or visual impacts. -2- 3.3 TRAFFIC/CIRCULATION SUB-REGIDtIAL NETWORK: Section 3.3.1 Page 11 The Eastlake III General Development Plan addressed circulation element. conformance. The City Council upgraded several General Plan roads as a response to the traffic analysis performed by JHK and Associates as part of the Eastlake III Environmental Impact Report. One of the actions taken by the City Council was to amend the Circulation Element to provide for a future express bus route to the OTC Visitor's Center when sufficient demand warrants such service. In addition, the Council's adopted Circulation Element proposes a mass transit component to be included in Future State Route 125 corridor. Improvement standards for Orange Avenue and Hunte Parkway will be made conditions of approval for the OTC SPA Plan based upon the City's Circulation Element and the mitigation measures contained in the Eastlake III General Development Plan EIR. ONSIlE ACCESS: Section 3.3.2 Page 12 Onsite access to the boathouse has not been finalized yet, however, vi si tors to the OTC will not drive their personal autos to the boathouse. Access will probably be limited to walking trails. Wueste Road has been proposed to remain as a Rural Recreational Facility Collector Road based upon several considerations. First, traffic projections made by USA indicate that Wueste Road will not attract sUfficient volumes to warrant future widening. The City is considering adopting a street standard to reflect the characteristic of Wueste Road. Second, the Chula Vista General Plan designation the area along Wueste Road or open space as part of a continuous 28 mile greenbelt around the perimeter of the planning area. Future development within the greenbelt will be limited to recreational uses and open space. Thirdly, the City would prefer to avoid urban street standards adjacent to the Lower Otay Reservoir due to the impact on the rural character of the area. Pedestri ans and bicycl i sts uti] i zi ng Hueste Road wi 11 be accommodated by a 25 foot wide off-street path and bikeway along the westerly side of Wueste road. The design of this facility envisions a 6 foot decomposed granite pedestrian path and a 8 to 12 foot concrete bike path. Entrance road improvements at the athl etes entrance and the boathouse entrance on Wueste Road will consist of left turn pockets and other appropriate traffic control improvements. These requirements are part of the conditions of approval of the OTC SPA Plan. -3- PARKING: Section 3.3.3 Page 12 The actual number of off-street parking spaces provided in the OTC SPA Plan for Phase I is 800 spaces. At bui1dout the total number of parking spaces will be 1033. Both numbers are considerably in excess of City of Chula Vista or County of San Diego standards. In addition, bicycle parking spaces will be addressed in greater detail in the Precise Plan. TRANSIT: Secti on 3.3.4 Page 13 Chula Vista Transit will establish a route along Orange Avenue out to the OTe when there is sufficient demand for required bus service. The Precise Plan will address the location of bus shelters. CYCLl NG ROUTE: Section 3.3.5 Page 13 The cycling routes shown off-site are conceptual and these routes will be studied by the cyclists organization personnel and coaches prior to initiation of training. If these county roads are used by the cyclists, appropriate safety measures will be coordinated with County officials. 3.5 PARKS, OPEN SPACE AND LANDSCAPE CONCEPTS PARKS AND OPEN SPACE: Section 3.5.1 Page 14 It is incorrect to state that the Olympic Training Center will be primarily a facility that is open to the public for spectator/tourist use. The OTC will be a facility used for training athletes in a variety of Olympic sports. The facility will be a training facility for athletes who will utilize the OTC to home their athletic skills for various periods. Some athletes ~'il1 be in residence for a few \Ieeks of training and others \·,ill stay for longer periods of training. Occasionally there will be competitions to determine team members and/or exhibitions in various sports with touring squads for other countries. During the training periods, visitors to the OTe will be provided the opportunity to observe the athletes sharpening their skills and/or engaging in exhibitions. There will be opportunities for community athletic groups to use the facil iti es when they are avail abl e and simil ar1y there wi 11 be opportuni ti es when athletes will train at other facilities in the San Diego area such as San Diego State, UCSD, etc. -4- ! With respect to the outdoor athletic venues on site, these fields and outdoor practice facilities constitute about 62% of the 150 acre si teo The tenn "visual open space" refers to the soccer, baseball, field hockey and other similar practice fields. The public benefits for these outdoor facilities are linked to the benefits of having an Olympic Training Center in San Diego County. The Olympic Path linking the Visitor Center to the southerly tip of the site is the route for trams to carry visitors who prefer to ride on their tour of the facility. An Olympic Training Center is not an appropriate location for fUblic open space. This would conflict with the intended purpose of the faci ity which is to provide training opportunities for elite U.S. athletes to represent the United States in international competition. A future park is located south of the OTC and publ ic open space will be provided adjacent to Lower Otay Lake and within Salt Creek at the time Eastlake III develops. In addition, a public walking/bicycling trail will be provided along Wueste Road. LANDSCAPE CONTENTS: Section 3.5.2 Page 14 The City of Chula Vista Landscape Manual requires the use of drought-tolerant plant species. Landscaped areas will be irrigated with recl aimed water from Otay r~unicipal Water District. The landscaping plans will be reviewed at the time of the Precise Plan review. All of the suggestions concerning increased use of trees, fencing and drainage control have been forwarded to the City's Landscape Architect who will review the landscape plan prior to start of construction. IRRIGATION GUIDELHlES: Section 3.5.3 Page 15 The OTC SPA Pl an \~i 11 be candi ti oned to requi re urban runoff facilities and maintenance plan to protect Lower Otay Recommendations received from the City of San Diego Water Utilities will be imposed by the City of Chula Vista. protection Reservoi r. Department The questions concerning impacts to Lower Otay Reservoir from water sports and spectator events should be addressed by the City of San Diego at the time agreements and/or permits for use of the Reservoir are initiated by the San Diego tlational Sports Training Foundation. The City of Chula Vista city limits does not include the Lower Otay Reservoir. 3.6 GRAPHICS AND SIGNAGE: Page 17 The control of signage will be covered in the Precise Plan. A complete sign plan with colors, materials, lighting and copy will be subject to approval of the Chula Vista Design Review Committee. -5- 3.7 LIGHTING DESIGN GUIDELINES: Page 19 The lighting plan will be subject to detailed review by the Chula Vista Design Review Committee. Zero degree cut-off fixtures will be required to prevent off-site glare. Although, low pressure sodium lighting may be desirable for parking lots and maintenance areas, athletic competition may involve the type of lighting typically used at football, baseball, softball and soccer fields. This will be further evaluated during the Precise Plan review. Limits on hours of operation of the outdoor facilities will be established in the Precise Plan. CHAPTER 4 -PUBLIC FACILITIES: A separate aTe Public Facilities Financing Pl an has been prepared and copies were distributed to the County of San Diego on December 18, 1989. The Financing Plan described how the off-site public facilities will be phased and financed. 4.1 STaRN DRAIN SYSTEM: Page 21 The DTC Public Facilities Financing Plan includes a summary of the drainage study and describes the storm drainage system to be constructed. Improvement plans describing the drainage system design and flow calculations will be required prior to construction. Off-site mitigation of lost water charges have been worked out with the City of San Diego and will be made conditions of approval. In addition, the OTC will participate in the construction of an urban runoff protection facil ity for Lower Otay Reservoi r and pay into an annual fund for maintenance. 4.2 SEWER SYSTEM: Page 21 A detail ed study of the sewage system i ncl udi ng fl O~I capacity, desi gn standards, and location and sizing of facil ities has been approved for the Eastl ake Greens project. Thi s Sewer Moni tori ng Agreement i ncl udes provi sions for the temporary diversion of sewage from the OTC into the Telegraph Canyon Trunk Sewer LIne. Discussions are proceeding at the present time between City of Chula Vista engineers and City of San Diego Water Utilities Department engineers regarding the desi gn of sewer pump stati ons, ; ncl ud; n9 conti ngency pl ans to protect Lower Otay Reservo; r. Permanent sewer fadl it; es for OTC will be install ed when sewer facil i ti es are extended to Salt Creek. -6- :,: ' 4.3.2 RECLAIMED WATER: Page 23 The use of reclaimed water will be required as a condition of approval of· the SPA Plan, subject to the approval of the County Heal th Department and Regional Water Quality Control Board. Reclaimed water cannot be used on areas of the OTC that potentially could drain into Lower Otay Reservoir. Ground water protection will be subject to review of the plan by Regional Water Quality Control Board staff. The site plan does place the majority of athletic fields on the west side of the site to maximize the use of reclaimed water for irrigation and to prevent run-off into Lower Otay Reservoir. The recl aimed water 1 ines wi 11 be install ed in Hunte Parkway and Orange Avenue as part of the off-site public facilities to be provided by the Eastlake Development Company. WPC 7373P -7- \' ( CITY OF CHULA VISTA DISCLOSURE STATEMENT ( APPLICANT'S STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS .. WHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL, PLANNING COMMISSION AND ALL OTHER OFFICIAL BODIES. Th~ following information must be disclosed: 1. List the names of all persons having a financial interest in the application. San Diego National Sports Training Foundation"-______________ _ United States Olvmpic Committee (USOC) City of San Diego List the names of all persons having any ownership interest in the property involved. 2. If any person identified pursuant to (1) above is a corporation or partnership, list the names of all individuals owning more than 10% of the shares in the corporation or owning any partnership interest in the partnership. 3. If any person identified pursuant to (1) above is a non-profit organization or a trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. See attachment 3 4. Have you had more than $250 worth of business transacted with any member of City staff, Boards, Commi ssions, Committees and Council with in the past twelve months? Yes __ 110 __ If yes, please indicate person(s) _____________ _ Person is defined as: "Any individual, firm, copartnership, joint venture, aSSOCiation, social club, fraternal oraanization, corporation, estate, trust, receiver, sYndicate, this and any other county, city and county, city, municipality, district or other political subdivision, or any other group or combinati acting as a unit." (liQIT: At tach addit iana I pages as necess/a~~.< IIPC 070lP A-TlO ~~~~~~~~~ -:1 « ( ( ATTACHMENT 3 UNITED STATES OLYMPIC COMMITTEE SAN DIEGO NATIONAL SPORTS TRAINING FOUNDATION Mr. Robert H. Helmick, President Mr. Michael Lenard, VIce President Mr. George Steinbrenner, Vice President Mr. William B. Tutt, Vice President Mr. Charles U. Foster, Secretary Dr. LeRoy Walker, Treasurer Ms. Anita DeFrantz, IOC Representative Mr. Baaron Pittenger, Executive Dir. Mr. Larry McCollum, Director of Olympic Training Centers Councilwoman Gloria D. McColl Mr. Paul C. Barkley Mr. C. Terry Brown Mr. Malin Burnham Mr. Jack W. Davis Mr. Ranney E. Draper ~!r. Daniel J. Epstein Mr. D. Jay Floyd Mr. Ron L. Fowler Mr. Ernest W. Hahn Mr. Jack F. Grundhoffer Mr. Peter J. Hall . Mr. Herb G. Klein Mr. Don M. Koll Dr. Tom C. Kravis Mr. Ron Lane Mr. Carl E. Reichardt Mr. Harold B. Sadler Hr. Don F. Sammis Mr. J. Stacey Sullivan Hr. Harry L. Summers Hr. Robert J. Watkins Hr. James H. West Hr. Walter J. Zable I~L)~ .' i j \ I I , I , I RESOLUTION NO. PCM-90-S RESOLUTION OF THE CITY OF CHULA VISTA PlANHIHG COMMISSION RECOMMENDIHG THAT THE CITY COUNCIL APPROVE THE OLYMPIC TRAINING CENTER SECTIONAL PLANNING AREA PLAN AND PUBLIC FACILITIES FINANCING PLAN SUBJECT TO THE CONDITIONS OF APPROVAL AS ATTACHED IN THIS REPORT WHEREAS, the Olympic Training Center SPA Plan is consistent with the adopted General Plan for the City of Chula Vista, and WHEREAS, the-planned community zone for EastLake III was approved by City Council on December 5, 1989, and WHEREAS, the planned community zone as approved requires the submission of a sectional planning area to provi de more detailed plans prior to actual development of any portion of the EastLake III site, and WHEREAS, the applicant has submitted a SPA Plan and Public Facilities Financing Plan for the lSO-acre Olympic Training Center located in the eastern area of the City of Chula Vista limits, bounded on the east by Wueste Road, and WHEREAS, the Planning Commission set the time and place for a hearing on said Olympic Training Center Sectional Planning Area Plan and Public Facilities Financing Plan and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the Ci ty and its mail i ng to property owners wi thi n 300 feet of the exteri or boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was hel d at the time and pl ace as advertis8d, namely April 11, 1990, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed, and WHEREAS, the Commission recommended certification of the Environmental Impact Report for the project, EIR-89-11, and adopted the Candidate CEQA Findings and Statement of Overriding Considerations and the Miti gat; on Mon; tori ng Program. NOW, THEREFORE, BE IT RESOLVED that from the facts presented to the Planning Commission, the Commission has determined that the OTC SPA Plan and Financing Plan are consistent with the City of Chula Vista General Plan, and BE IT FURTHER RESOLVED that the Pl anni ng Commi ssi on recommends that the City Council approve the Olympic Training Center Sectional Planning Area and Public Facilities FinanCing Plan subject to the Conditions of Approval as attached, And that a copy of this resolution be transmitted to the applicant and the City Council. -; PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA, this 11th day of April, 1990,. by the following vote, to wit: AYES: Commissioners Carson, Cannon, Casillas, Fuller, Grasser, and Tugenberg NOES: None ABSENT: Commissioner" Shipe WPC 7619P -2- e CONDITIUNS OF APPROVAL RECOMI-1ENDED BY THE CHULA VISTA PLANNING COMMISSION AT THEIR r-1EETING OF APRIL 11, 1990 CONDITIONS OF APPROVAL 1. A trail for hiking and bicycle use shall be constructed along the westerly side of Wueste Road with adequate clearance between the trail and the a-foot shoul der adjacent to the pavement. Sai d trail and vehicul ar separation shall be designed to the satisfaction of the City Engineer. 2. The appl icant shall construct Hunte Parkway to a four-l ane 14ajor Street Standard from Telegraph Canyon Road to Orange Avenue as follows: Said construction shall include improvements of 20 feet of pavement on each side of a fully improved landscaped median including street lights. Improvement of the intersection of HUnte Parkway and Orange Avenue shall include transitions as directed by the City Engineer. 3. The applicant shall construct Orange Avenue to a four-lane major roadway as fall ows: 4. 5. 6. 7. a. Fror.1 Hunte Parkway to the westerly boundary of the project: 20 feet of pavement on each side of a fully improved landscaped median i nc1 udi ng street 1 i ghts. Improvements at the i ntersecti on of HUnte Parkway and Orange Avenue shall include transitions as directed by the Ci ty Engi neer. b. From the westerly boundary to the easterly boundary of the project: Full improvements to incl ude, but not be 1 imited to, A. C. pavement and base, curb, gutter and sidewalk, street lights and drainage facilities. The appl icant shall improve both Orange Avenue and Hunte Parkway with a minimum of 50 feet of landscaping on the side (southerly and westerly respectively) of those roadways which require full street improvements. The applicant shall pay the costs associated with the maintenance of the sewer pump stati'ons prior to approval of any maps or permits which require said pump stations to provide sanitary sewer service. The applicant shall install sewer facilities to provide for future gravity flow within the project to the satisfaction of the City Engineer. The applicant shall extend sewer, water and utilities from existing facilities to the OTC site and install said facilities on-site to the sati sfacti on of the Ci ty Engi neer. 8. The applicant shall enter into an agreement with the City to hold the City harmless for any effects of diverted storm water, acceptance of the diverted flow from affected property owners shall be obtained prior to issuance of a grading permit. ! I I I Ii I' ! I Ii : ; , " 9. Applicant shall perfonn traffic studies to verify trip generation rates from Phase I prior to proceeding with 'development of the final phase. Applicant shall mitigate any increase in traffic as required by the City Engineer. This includes, but is not limited to paying any additional fees resulting from an increase in traffic generation prior to proceeding with Phase II. These additional fees shall be paid retroactively on Phase I development as well as Phase II development. In no case, however, shall fees be refunded nor traffic generation rates lowered from those contained within the SPA plan. 10. An urban runoff protection plan' including provisions for lost water charges and maintenance of 1 ake protection facil ities shall be submi tted to. th.e City ~ngi neer for a~prova 1 pri or. to the issuance of 9radi ng or bUlldlOg permlts. The appllcant shall lnstall or agree to install any improvements and agree to pay lost water charges and mai ntenance fees deemed necessary by the Ci ty Engineer to protect'· the Lower Dtay Reservoir. The applicant shall consult with and obtain approval of such a plan from the Regional Water Qual ity Control Board, the City of San Diego . and the County Health Department prior to issuance of a grading permit. Letters shall be submitted to the City indicating such approval. 11. The applicant shall install reclaimed water lines along with domestic water lines to serve the project. 12. The applicant shall install storm drainage facilities to the satisfaction of the City Engineer. 13. 14. 15. Wueste Road shall be reconstructed adjacent to the project to Resi denti al Street Standards unl ess a new Street Standard is approved by Ci ty Council for a "Wueste Road Rural Recreation Access Facility." Should the new street classification be adopted, Wueste Road shall be constructed as necessary from Orange Avenue to the County Regional Park to be in confonnance with that standard with improvements to include, but not be limited to: 24 feet of A.C. pavement and base; and 8 foot graded shoulder on each side of the existing pavement within a 60 ft. right-of-way, all as approved by the City Engineer. Orange Avenue shall transition from a four-l ane major road at the eastern boundary of the Olympic Training Center to a modified Class III Collector Road at Wueste Road. The modified Class III Collector Road Section shall include an additional east to southbound trap lane at Wueste Road. Said transition shall be to the satisfaction of the City Engineer. Improvements shall include, but not be limited to A.C. pavement, P.C.C. curb, sidewalks and gutter, median drainage facilities and street lights. The applicant shall improve Wueste road at the athletes' entrance road to the Olympic Training Center and to the boat house to provide for left turn pockets to the satisfaction of the City Engineer. Said improvements shall include, but not be limited to AC pavement and base; AC dike and street lights. 16. 110 park dedication or improvement fees shall be required for the DTC due to the institutional purpose of the facility. 17. All other City fees and charges shall be paid by the applicant in accordance with City reqUirements. " . J, 18. The public facilities listed in the OTC Public Facilities Financing Plan shall be installed by the applicant in accordance with the City standards and phased as directed by the City( Engineer. 19. The applicant shall dedicate all on-site and off-site right-of-way necessary to construct improvements indicated in the Public Facility Financing plan and these conditions of approval. Said dedication shall be as required by the City Engineer. The Public Faci'lities Financing Plan shall be amended to reflect the minimum street improvements specified in the SPA conditions. 20. Police, fire and emergency medical services shall be.:provided by properly trained, on-site private or volunteer personnel, subject to approval by the Ci ty pri or to certi fi cates of use and occupancy. In additi on, the app1 icant shall p('ovi de an on-site fire bri gade and an emergency fi re pumper and other fire suppression equipment and facilities, together with sprink1ering and other mitigation measures to the satisfaction of the City's Fire Prevention Bureau. Transition to City fire protection and emergency medical services shall occur on a schedule established by the City. Said schedule shall be based on the construction of planned fire stations in the Salt Creek Project and in the Otay Ranch project area west of Lower Otay Reservoir, as outlined in the City's Fire Station Master Plan. 21. Landscape plans, irrigation systems, lighting, 9raphics and signage, architecture, parking spaces and on-site ci rcu1 ati on and operational use conditions shall be addressed in the Precise Plan for the project. 22. The applicant shall enter into a three party agreement with the Environmental Review Coordinator prior to the issuance of a grading permit to retain the services of a mitigation compl iance coordinator to fully implement the mitigation monitoring program. 23. The implementation of the SPA Plan is subject to the approval of a Precise Plan. 24. The applicant shall install or agree to install a communications antenna system for pol ice, fire and emergency communi cati ons to the sati sfaction of the City Engineer. 25. CORRECTIONS TO SPA PLAN AND PFFP: a. Page 3, Section 1.6, third paragraph -change the word "vest" to lIassure. II b. Page 12, third paragraph -change trips from 3,058 to 2,058. c. Page 13, Section 3.3.2 (an si te Access) Third paragraph -change the wording of the last sentence to read: "It has been recommend that wueste Road be desi gnated specifically as a speCial "Rural Recreation Access Facil ity" preservi ng the exi sti ng features of the two-lane road without curbS and sidewalks as normally required. /y::-j d. Page 13 -Section 3.3.2, fourth paragraph, second sentence should read:- "Improvements that will be required shall -include the construction of a public hiking/biking path adjacent to the road, expansion of the road at the athletes' entrance to include left-turn pockets and expansion of the roadway at its i ntersecti on \~i th Orange Avenue. Street lights shall be included at the two intersections noted. e. Page 22, (Section 4-2-There are two sewage pump stations indicated on Figure 21. The second paragraph only refers to one pump station. f. The SPA Plan and Public Facilities Financing Plan exclude the boathouse facil i ty located east of Wueste Road. A separate preci se plan, conditional use permit and enVironmental review shall be required for the boathouse facility. g. Figure 2 in the SPA Plan shall be replaced with an approved map of the EastLake III General Development Plan. h. Figure 8 shall be corrected to reflect the amendments to the Circulation Element approved by the City Council for EastLake III General Plan Amendments. i. Titles on the Public Facilities Financing Plan should read as follows for C.l.P.: a. Page 4 -Projects Nos. 1 and 2 b. Page 5 -Projects Nos. 3 and 4 c. Page 6 -Projects Nos. 5, 6 and 7 d. Page 8 -Project No. 8 j. On page 15 of the Public Facil ities Financing Plan under Municipal Fees -add Traffic Signal Participation Fee. k. The SPA Plan and Public Facilities Financing Plan texts shall be corrected as indicated above and 50 copies filed with the Director of Planning following the City Council public hearing. 26. The following are Supplemental EIR Mitigation r~easures hereby made conditions of approval as follows: a. The applicant shall submit a lighting plan in conjunction with the precise plan to utilize low sodium pressure 1 ighting to the maximum extent feasibl e. b. The applicant shall provide analysis to demonstrate that the drainage from the aTe will not increase in volume or intensity in its effect on downstream properties and/or facilities. c. The monitoring of grading activities and recovery of palentological resources shall be in accordance with·Section 4.5 of the final EIR. d. The Transportation Mitigation r~easures in the OTe Supplemental ErR are part of the City's Transportation Phasing Plan and shall be implemented by the City's Traffic Engineer. Added Condition: 27. A minimum of 456 off-street parking spaces shall be provided in Phase I. The Director of Planning shall monitor the parking demand and report to the Planning Commission when additional spaces are required. The applicant shall be required to add additional parking upon notification by the Planning Commission. The total number of parking spaces to be provided at buildout shall be determined with any subsequent precise plan or conditional use permit. The SPA Plan text and exhibits shall be amended to reflect the above requirement. EXCERPT FROM DRAFT MINUTES OF PLANNING COMMISSION MEETING OF 4/11/90 3. PUBLIC HEARING: /~6~S~8tR~tION OF OLYMPIC TRAINING CENTER (OTC) SECTIONAL PLANNING AREA PLAN (SPA) AND PUBLIC FACILITIES FINANCING PLAN (PFFP); SAN DIEGO NATIONAL SPORTS TRAINING FOUNDATION Planning Consultant Bud Gray highlighted where the properties were located using overhead projection, and told where the various activities would take place. He said the first phase would involve a gymnasium to accommodate team handball and volleyball, in addition to soccer fields, field hockey, baseball, and other playing fields. He went on to explain other facilities that would be included in the first phase. Mr. Gray noted that Wueste Road would be considered a special road that would remain basically in its present configuration with two lanes of traffic, no curb, gutters or sidewalks but with the addition of an 8-foot graded shoulder for emergency parking. He said staff was recommending that a pedestrian jogging path, together with a concrete bike path, separate from the road and landscaped be included within the greenbelt area. He noted that the staff report answers some of the major issues of concern. He referred to the protection of Lower Otay ReserVoir from any contaminants or runoff. The grading of the site drains toward Salt Creek away from Lower Otay Reservoir, except for a few small areas along Wueste Road. He stated staff wanted to make sure the City of San Diego, who owns the Lower Otay Reservoir, was satisfied with the conditions of approval which consist of an Urban Protection Run-Off Plan for the entire Lower Otay Reservoir; the City of San Diego Water Utilities staff formula for asseSSing the value of IIlost water,lI which will be applied to the project; and ongOing maintenance responsibility by the OTC. Regarding fire and police, the U.S. OlympiC Committee would have their on-site fire protection service, which would be certified by the City, and would require agreements. The police service would be handled in the same manner. Staff recommended that the SPA Plan dnd Public Facilities Financing Plan be approved subject to the 27 conditions contained in the report. Mr. Gray referred to a letter received from the County the day of the meeting regarding the proposed use of roads in the unincorporated area for long distance bicycle usage, and the liability of the County. Through contact with the County, meetings will be scheduled to be held before the Council meeting regarding the SPA Plan to work out details. Mr. Gray noted there was an additional condition of approval regarding off-street parking. He brought the Commissioners' attention to minor changes in conditions no. 5, 9, 10, and 20. Commissioner Cannon asked the Assistant City Attorney if it would be more appropriate to require the OTC to hold the City harmless from any and all liability that may accrue due to the fact that non-City personnel may have some problems that would cause a lawsuit to occur; WOUldn't it also be appropriate to have the OTC hold the City harmless from any suits arising against the City of Chula Vista for failure teo provide those services (Condition #20). Assistant Attorney Rudolf said that was addressed on page 9 of the report, under item 18. This being the time and place advertised, the public hearing was opened. Laurie McKinley, McKinley Group. 309 Laurel Street. San Diego 92101 asked for ~/ support of the Planning Commission for the Olympic Training Center. She /.~;)~ introduced David Nielsen. the Executive Vice President of the Sports Training Foundation who provided history and some perspective on the center; Larry McCollum, MINUTES OF A SCHEDULED REGULAR MEETING Resource Conservation Commission Chula Vista, California 6:00 p.m. Conference Room 1 Public Services Building Monday, February 26, 1990 CALL MEETING TO ORDER/ROLL CALL: Meeting was called to order at 6:00 p.m. by Chairman Fox. City Staff Envirormental Review Coordinator Doug Reid called roll. Present: Commissioners Ray, Johnson and Hall. Absent: Stevens and Chidester. APPROVAL OF MIlWTES: I twas MSP (Johnson/Hall) to approve the minutes of February 12, 1990. NEW BUSINESS: A. Hall abstains from Item G of the Consent Calendar; item pulled. Chairman Fox requested items Band E be pulled. It was MSP (Hall/Johnson) to accept Items A, C, D and F of the Consent Calendar. B. Review of items pulled from the Consent Calendar was trailed at this time.] C. Lorie McKinley of the McKinley Group, presented an in-depth description of the Olympic Training Center SPA and the various phases of building, as depicted on the site plan map. She also provided information on funding. It is noted that annexation to the City of Chula Vista was approved. Carlie Neville presented section by topic issue. Committee members. the general findings of the EIR and reviewed each Many comments and questions were fielded from the It was MSP (Hall/Ray) for the Planning Commis sion to adopt, approve and certify the draft EIR of the Olympic Training Center. It is noted that Chairman Fox objects to the approval of the EIR without assurance of water availability, air quality monitoring and traffic monitoring procedures. After further discussion, it was MSP (Hall/ Johnson) that the commercial area located east of the Olympic Training Center between the SPA and \~esty Road be redesignated as park and open space. ADJOURNMENT: Due to loss of quorum, the meeting was adjourned by Chairman Fox to a workshop at 7: 50 p.m. Respectfully submitted, EXPRESS SECRETARIAL SERVICE S , QZ,llta-{£L 'JlLji,£YJ Barbara Taylor ( CITY OF CHULA VISTA DISCLOSURE STATEMENT ( APPLICANT'S STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS .. WHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL. PLANNING COI~MISSION AND ALL OTHER OFFICIAL BODIES. rh~ following information must be disclosed: I. List the names of all persons having a financial interest in the application. San Diego National Sports Training Foundation::-. ______________ _ United States Olympic Committee (USOC) ° City of San Diego l~st the names of all persons having any ownership interest in the property involved. 2. If any person identified pursuant to (1) above is a corporation or partnership, list the names of all individuals oWning more than lO~ of the shares in the corporation or owning any partnership interest in the partnership. J. If any person identified pursuant to (1l above is a non-profit organization or a trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. See attachment 3 4. Have you had more than $250 worth of business transacted with any member of City staff, Boards, Cornmi ssions. Committees and Counci I with in the past twelve months? Yes_ 110_ If yes, please indicate person(sl ____ o ________ _ _ Person is defined as: "Any individual. firm. copartnership. joint venture. association, social Club, fraternal oraanization, corporation, estate, trust, receiver. syndicate. this and any other county, city and county, city, municipality, district or other political subdivision, or any other group or combinatig acting as a unit." (NOTE: Attach additional pages as necess/a.......,~"'" ~~~~~~~~~~~ WPC 0701? 1\-110 • ( ( ATTACIDIENT 3 ---UNITED STATES OLYMPIC COMMITTEE Mr. Robert H. Helmick, President __ ._Mr. Michael Lenard,,~Ice.Pre!!ident Mr. George Steinbrenner, Vice President Mr. William B. Tutt, Vice President Mr. Charles U. Foster, Secretary Dr. LeRoy Walker, Treasurer Ms. Anita DeFrantz, IOC Representative 'Mr;"1laaron'-Pittenger, Executive Dir. Mr. Larry, McCollum •. Director of Olympic Training Centers SAN DIEGO NATIONAL SPORTS TRAINING FOUNDATION Councilwoman Gloria D. Mr-Coll Mr. Paul C. Barkley Mr. C. Terry Brown Mr. Malin Burnham Mr. Jack W. Davis Mr. Ranney E. Draper Mr. Daniel J. Epstein Mr. D. Jay Floyd Mr. Ron L. Fowler Mr. Ernest W. Hahn Mr. Jack F. Grundhoffer Mr. Peter J. Hall Mr. Herb G. Klein Mr. Don M. Koll Dr. Tom C. Kravis Mr. Ron Lane Mr. Carl E. Reichardt Mr. Harold B. Sadler ~!r • Don F. Sammis Mr. J. Stacey Sullivan Mr. Harry L. Summers Hr. Robert J. Watkins Hr. James H. West Hr. Walter J. Zable .0 I ! I RESOLUTION NO. / {; 5 q9 ' RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE OLYMPIC TRAINING CENTER SECTIONAL PLANNING AREA PLAN AND PUBLIC FACILITIES FINANCE PLAN WHEREAS, the Olympic Training Center (OTC) SPA Plan consists of 150 acres of land with on-site dormitory housing for 300-400 athletes, and WHEREAS, the Local Agency Formation Commission approved the annexation of EastLake III to the City of Chula Vista including the OTC site on January 8, 1990, and WHEREAS, the purpose of the OTC Public Facilities Finance Plan is to identify the capital facilities that will be required to be constructed prior to the completion of the Olympic Training Center and further identifies facility needs and costs and sets forth responsibilities for financing, and WHEREAS, on April 11, 1990, the planning Commission recommended approval of the OTC project (6-0, 1 absent), and WHEREAS, FEIR-89-11 and Addendum has previously been certified. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby adopt the following findings; 1. THE PROPOSED SECTIONAL PLANNING AREA PLAN IS IN CONFORMITY WITH THE EASTLAKE III GENERAL DEVELOPMENT PLAN AND THE CHULA ;'ISTA GENERAL PLAN. The Olympic Training Center Sectional Planning Area Plan reflects land use, circulation system, and public facilities that are consistent with the EastLake III General Development Plan and the Chula Vista General Plan. The Olympic Training Center proposes athletic training facilities that are consistent wi th the public, quasi-public designations depicted on the General Development Plan and General plan. 2. THE PROPOSED SECTIONAL PLANNING AREA PLAN WILL PROMOTE THE ORDERLY SEQUENTIALIZED DEVELOPMENT OF THE INVOLVED SECTIONAL PLANNING AREA. The SPA Plan and Public Facili ties Plan set forth the phasing of the project and the timing of public facilities construction to ensure the orderly, sequentialized development of the project. The Public Facilities Financing Plan identifies the public faci lities, public services needed to serve the project. 3. THE PROPOSED SECTIONAL PLANNING AREA PLAN WILL NOT ADVERSELY AFFECT ADJACENT LAND USE, RESIDENTIAL ENJOYMENT, CIRCULATION, OR ENVIRONMENTAL QUALITY. The land uses within the Olympic Training Center represent the same uses approved by the EastLake III General Development Plan. The majority of the 150+ acre site (82%) will consist of open practice facilities for soccer, field hockey, archery, tennis, cycling, athletiCS, and swimming. The project has been planned to provide the necessary support for U.S. athletes seeking to compete in international competition. The site plan is compatible with adjacent land uses and will avoid off-site impacts through the provision of mitigation measures specified in the OTC Supplemental Environmental Impact Report. BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby approve the Olympic Training Center Sectional Planning Area and Public Facilities Finance Plan subject to the following conditions: 1. A trail for hiking and bicycle use shall be constructed along the westerly side of wueste Road with adequate clearance between the trail and the a-foot shoulder adjacent to the pavement. Said trail and vehicular separation shall be deSigned to the satisfaction of the City Engineer. 2. The applicant shall construct Hunte Parkway to a four-lane Major Street Standard from Telegraph Canyon Road to Orange Avenue as follows: Said construction shall inclUde improvements of 20 feet of pavement on each side of a fully improved landscaped median including street lights. Improvement of the intersection of Hunte Parkway and Orange Avenue shall include transitions as directed by the City Engineer. 3. The applicant shall construct Orange Avenue to a four-lane major roadway as follows: a. From Hunte parkway to the westerly boundary of the project: 20 feet of pavement on each side of a fully improved landscaped median including street lights. Improvements at the intersection of Hunte Parkway and orange Avenue shall include transitions as directed by the City Engineer. b. From the westerly boundary to the easterly boundary of the project: Full improvements to include, but not be limited to, A.C. pc1vement and base, curb, gutter and sidewalk, street lights and drainage facilities. 4. The applicant shall improve both orange Avenue and Hunte Parkway with a minimum of 50 feet of landscaping on the side (southerly and wester1y respectively) of those roadways which require full street improvements. 5. The applicant shall enter into an agreement with the City to provide for the maintenance by Ci ty forces and pay all costs associated with maintenance of the sewer pump stations prior to approval of any maps or permits which require said pump stations to be in service. 6. The applicant shall install sewer facilities to provide for future gravity flow within the project to the satisfaction of the City Engineer. 7. The applicant utilities from and install satisfaction of shall extend sewer, water eXisting facil ities to the OTC said facilities on-site to the City Engineer. and site the 8. The applicant shall enter into an agreement with the Ci ty to hold the City harmless for any effects of diverted storm water, acceptance of the diverted flow from affected property owners shall be obtained prior to issuance of a grading permit. 9. Applicant shall perform traffic studies to verify trip generation rates from Phase I prior to proceeding with development of Phase II. Applicant shall mitigate any increase in traffic from those rates projected by the SPA as required by the City Engineer. This includes, but is not limited to paying any additional fees resulting from an increase in traffic generation over the projected rates prior to proceeding with Phase II. These additional fees shall be paid retroactively on Phase I development as well as Phase II development. In no case, however, shall fees be refunded nor traffic generation rates lowered from those contained within the SPA plan. -3- /:{-&I 1 10. An urban runoff protection plan including provisions for lost water charges and maintenance of lake protection facilities shall be submitted to the City Engineer for approval prior to the issuance of grading or building permi ts. The applicant shall install or agree to install any improvements as required by the plan and agree to pay lost water charges and maintenance fees as required by the plan to protect the Lower Otay Reservoir. The applicant shall consult with and obtain approval of such a plan from the Regional water Quality Control Board, the City of San Diego and the County Health Department prior to issuance of a grading permit. Letters shall be submitted to the City indicating such approval. 11. The applicant shall install reclaimed water lines along with domestic water lines to serve the project. 12. The applicant shall install storm drainage facilities to the satisfaction of the City Engineer. 13. Wueste Road shall be reconstructed adjacent to the project to Residential Street Standards unless a new Street Standard is approved by ci ty Council for a 'Wueste Road Rural Recreation Access Facility." Should the new street classification be adopted, Wueste Road shall be constructed as necessary from Orange Avenue to the County Regional Park to be in conformance with that standard with improvements to include, but not be limited to: 24 feet of A.C. pavement and base: and 8 foot graded shoulder on each side of the existing pavement within a 60 ft. right-oE-way, all as approved by the City Engineer. 14. Orange Avenue shall transition from a four-lane major road at the eastern boundary of the Olympic Training Center to a modified Class III Collector Road at Wueste Road. The modified Class III Collector Road Section shall include an additional east to southbound trap lane at Wueste Road. Said transition shall be to the satisfaction of the City Engineer. Improvements shall include, but not be limited to A.C. pavement, P.C.C. curb, sidewalks and gutter, median drainage facilities and street lights. 15. The applicant shall improve wueste road at the athletes' entrance road to the Olympic Training Center and to the boat house to provide for left turn pockets to the satisfaction of the City Engineer. Said improvements shall include, but not be limited to AC pavement and base: AC dike and street lights. 16. No park dedication or required for the OTC purpose of the facility. improvement fees shall be due to the institutional 17. All other City fees and charges shall be paid by the applicant in accordance with City requirements. 18. The public facilities listed in the OTC Public Facilities Financing Plan shall be installed by the applicant in accordance with the City standards and phased as directed by the City Engineer. 19. The applicant shall dedicate all on-site and off-site right-of-way necessary to construct improvements indicated in the Public Facility Financing plan and these conditions of approval. Said dedication shall be as required by the City Engineer. The Public Facilities FinanCing Plan shall be amended to reflect the minimum street improvements specified in the SPA conditions. 20. Police, fire and emergency medical services shall be provided by properly trained, on-site private or volunteer personnel, subject to entering into an agreement with the City prior to certificates of use and occupancy. In addition, the applicant shall provide an on-site fire brigade and an emergency fire pumper and other fire suppression equipment and facilities, together with sprinklering and other mitigation measures to the satisfaction of the City's Fire Prevention Bureau. Transition to City fire protection and emergency medical services shall occur on a schedule established by the City. Said schedule shall be based on the construction of planned fire stations in the Salt Creek project and in the Otay Ranch project area west of Lower Otay Reservoir, as outlined in the City's Fire Station Master Plan. 21. Landscape plans, irrigation systems, lighting, graphics and signage, architecture, parking spaces and on-site circulation and operational use conditions shall be addressed in the Precise Plan for the project. 22. The applicant shall enter into a three party agreement with the Environmental Review Coordinator prior to the issuance of a grading permit to retain the services of a mitigation compliance coordinator to fully implement the mitigation monitoring program. 23. The implementation of the SPA Plan is subject to the approval of a Precise Plan. 24. The applicant shall install or agree to install a communications antenna system for police, fire and emergency communications to the satisfaction of the City Engineer. 25. CORRECTIONS TO SPA PLAN AND PFFP: a. Page 3, section 1. 6, third paragraph -change the word "vest" to "assure." b. Page 12, third paragraph -change trips from 3,058 to 2,058. c. Page 13, paragraph to read: Section 3.3.2 (On site Access) Third -change the Wording of the last sentence "It has been recommend that Wueste Road be designated specifically as a special "Rural Recreation Access Facility" preserving the existing features of the two-lane road without curbs and sidewalks as normally required. d. Page 13 Section 3.3.2, fourth paragraph, second sentence should read: "Improvements that will be required shall include the construction of a public hiking/biking path adjacent to the road, expansion of the road at the athletes' entrance to include left-turn pockets and expansion of the roadway at its intersection with orange Avenue. Street lights shall be included at the two intersections noted. e. Page 22, (Section 4-2-There are two sewage pump stations indicated on Figure 21. The second paragraph only refers to one pump station. f. The SPA Plan and Public Facilities Financing Plan exclude the boathouse facility located east of Wueste Road. A separa te precise plan, conditional use permit and environmental review shall be required for the boathouse facility. g. Figure 2 in the SPA Plan an approved map of the Development Plan. shall be replaced with EastLake III General h. Figure 8 shall be corrected to reflect the amendments to the Circulation Element approved by the City Council for EastLake III General Plan Amendments. i. Titles on the Public Facili ties Financing Plan should read as follows for C.l.P.: a. Page 4 Projects Nos. I and 2 b. Page 5 -Projects Nos. 3 and 4 c. Page 6 -Projects Nos. 5, 6 and 7 d. Page 8 -Project No. 8 j. On page 15 of the Public Facili ties Financing plan under MUnicipal Fees -add Traffic signal participation Fee. k. The SPA Plan and Public Facilities Financing Plan texts shall be corrected as indicated above and 50 copies filed with the Di rector of Planning following the City Council public hearing. 26. The following are Supplemental Measures hereby made conditions follows: ElR Mitigation of approval as a. The appl icant shall submi t a lighting plan in conjunction with the precise plan to utilize low sodium pressure lighting to the maximum extent feasible. b. The applicant shall provide analysis to demonstrate that the drainage from the OTC will not increase in volume or intensity in its effect on downstream properties and/or facili ties. c. The monitoring of grading activities and recovery of palentological resources shall be in accordance with Section 4.5 of the final ElR. d. The Transportation Mitigation Measures in the OTC Supplemental ElR are part of the City's Transportation Phasing Plan and shall be implemented by the City's Traffic Engineer. presented by Approved as to form by Robert A. Leiter, Director of Planning 7130a ~,¥aohldrJcit, Attorney RESOLUTION NO. )5&/1 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHU:LA VISTA ADOPTING A STREET DESIGN STANDARD -WUESTE ROAD RURAL RECREATION ACCESS ROUTE FROM ORANGE AVENUE TO COUNTY REGIONAL PARK ThePCity Council of the City of Chula Vista does hereby resolve as follows: WHEREAS, under the current Chula Vista street Design Standards Policy Wueste Road, which is a local road, would have to be widened and constructed to a 36-foot-wide roadway with curb and gutter and meet all of the other design criteria for residential streets, and WHEREAS, the Olympic Training Center's Traffic Consul tant, Urban Systems Associates, recommended, on the bas is of the traffic analysis, that the existing roadway was adequate to handle the proposed traffic on Hueste Road from Orange Avenue southerly to the County Regional Park, and WHEREAS, Urban systems proposed a Wueste Road Rural Recreation Access Route standard that would be adequate to handle the traffic on this scenic roadway due to the volume, character and nature of the projected traffic and City staff concurred with Urban systems' recommendation, and WHEREAS, it is staff's recommendation that the segment of Wueste Road from orange Avenue south to the County Park be given a special designation of "Wueste Road Rural Recreation Access Road' because of the volume, character and nature of the traffic which will use this segment of the road, and WHEREAS, the special designation for provide for 24 feet of pavement and 8-foot within a GO-foot right-of-way with other indicated on Exhibit "A'. Hueste graded design Road will shoulders criteria NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby adopt a Street Design Standard -Wueste Road Rural Recreation Access Route from Orange Avenue to County Regional Park as set forth in Exhibit A •. Presented by Robert A. Leiter, Director of Planning 7l3la ~fO~cA Ruth M. Fritsch, Acting City Attorney