Loading...
HomeMy WebLinkAboutTechnical Report 7 - Sewer StudyMaria Miller May 28, 2024 Page 2 The proposed land use changes will reduce the amount of single family dwelling units and increase the amount of multi-family dwelling units within Village 7; however, the proposed changes would result in no net change to the residential dwelling unit count of 1,456 presented in the Otay Ranch General Development Plan for Village 7. To implement the proposed land use changes, amendments to the Chula Vista General Plan, Otay Ranch General Development Plan, and the Village 7 SPA Plan are necessary. Sewage from Village 7 flows to two sewer basins. Sewage from the northern portion of the project, which includes Parcels R-1, R-2, R-5 and P-1, is conveyed to the Poggi Canyon Sewer Basin under permanent sewer conditions. Wastewater collected within this basin is conveyed to sewer lines in Birch Road and La Media Road that ultimately discharge to the existing Poggi Canyon Interceptor in Olympic Parkway. Parcels R-6, R-7, S-1 and S-3 are currently served by an interim sewer line that flows north to the Poggi Canyon Interceptor until such time that the Wolf Canyon Trunk Sewer is available. In the future, these parcels will abandon the interim northern connection and use the permanent Wolf Canyon Trunk Sewer. Parcels R-3, R-4, and R-8 will sewer by gravity to the south. The offsite sewer facilities necessary to convey flows from the site to the Salt Creek Interceptor have not been constructed. Thus, the development of Parcels R-3, R-4, and R-8 will require either construction of a temporary sewer line south to Village 8 West or the construction of the Wolf Canyon Trunk Sewer. Sewage within Village 8 West is conveyed south to the existing Salt Creek Interceptor. Purpose The purpose of this memorandum is to provide an evaluation of the affect that the current proposed development plan will have on sewer facility planning for the area. Since the proposed SPA Amendment only affects parcels within the Wolf Canyon /Salt Creek Basin and does not propose interim service from Poggi Canyon facilities, this study focuses on the impact this SPA Amendment will have on facilities within the Wolf Canyon/Salt Creek Basin. Attachment 1 includes a sewer basin map of Village 7 for reference (Exhibit A). Maria Miller May 28, 2024 Page 3 Village 7 SPA Amendment Summary A summary of proposed changes to the Village 7 land use plan is provided as follows: • Rename the western portion of Parcel R-3 into a separate Parcel R-8. Parcel R-8 will be located adjacent to La Media Road. • Assign 43 units to Parcel R-3 and change the land use designation in Parcel R-3 from Single Family to Residential Multi-Family. • Assign 121 units to Parcel R-4 and change the land use designation in Parcel R-4 from Single Family to Residential Multi-Family. • Assign 123 units to Parcel R-8 and change the land use designation (based on Parcel R-3 land use designation) in Parcel R-8 from Single Family to Residential Multi- Family. Proposed Land Use Plan The project does not propose changes to the backbone street alignments for Village 7 but does involve adjustments to the land use and residential unit count of Parcels R-3 and R-4, and the addition of Parcel R-8. A land use plan and site utilization table for the proposed changes are included in Attachment 2 for reference. Projected Sewer Flows Parcels R-3 and R-4 have not been developed and were previously planned for single family residential development. Table 1 provides a comparison of projected sewer flows based on the previous and current land use plans for Parcels R-3, R-4, and the addition of Parcel R-8. Maria Miller May 28, 2024 Page 4 TABLE 1 OTAY RANCH VILLAGE 7 PARCELS R-3, R-4, AND R-8 PROJECTED SEWER FLOWS Land Use Proposed Units Generation Factor Average Flow, gallons per day (gpd) Previous Land Use Plan R-3: SF Residential 273 units1 265 gpd/unit 72,345 R-4: SF Residential 59 units1 265 gpd/unit 15,635 Subtotal Previous Land Use Plan 87,980 Current Land Use Plan R-3: MF Residential2 43 units 182 gpd/unit 7,826 R-4: MF Residential 121 units 182 gpd/unit 22,022 R-8: MF Residential2 123 units 182 gpd/unit 22,386 Subtotal Current Land Use Plan 52,234 Decreased Sewer Flow 35,746 Decreased Sewer Equivalent Dwelling Units (EDUs) 3 155 1 Based on Site Utilization Plan presented in the Village 7 SPA Plan adopted October 12, 2004. 2 Parcel R-3 split into two parcels: Parcels R-3 and R-8. 3 Based on sewer generation factor of 230 gpd/EDU. Impact on Previous Planning Studies The November 2010 Overview of Sewer Service for the Village 8 West (November 2010 Sewer Study) project planned for sewer flows from the Village 7 project. These flows were planned to flow south through Village 8 West to the Salt Creek Interceptor on a temporary basis and to the Wolf Canyon Trunk Sewer in Main Street in the ultimate condition. Attachment 3 includes a list of Village 7 parcels in the Wolf Canyon/Salt Creek Basin, and their corresponding sewer flow projections, that were planned to flow south through Village 8 West in the November 2010 Sewer Study; Village 7 parcels that had been accounted for are R-3, R-6, R-7, MU-1 (Mixed Use), TS-1 (Town Square), CPF-2b (Community Purpose Facility), CPF-3, CP-4, S-1, and S-3 (School). The previous site plan used to estimate sewer flows for Village 7 in the November 2010 Sewer Study is included at the end of Attachment 3 for reference. Maria Miller May 28, 2024 Page 5 The sewer analysis presented in the November 2010 Sewer Study was updated in May 2018 (May 2018 Sewer Study) to include minor land use changes to Village 8 West and to reflect pipeline slopes that had been established through final engineering plans. Additionally, as part of the May 2018 Sewer Study, through final engineering efforts for Village 8 West, the original onsite concept of constructing a temporary deep sewer to convey flows south through Village 8 West on an interim basis was revised to reflect a permanent gravity sewer to the south to collect offsite sewer flows from La Media Road/La Media Parkway to the north and from Main Street to the east. The sewer analysis presented in the May 2018 Sewer Study was updated in May 2019 (May 2019 Sewer Study) to include minor land use changes to Village 8 West. In all three Village 8 West Sewer Studies (November 2010 Sewer Study, May 2018 Sewer Study, and May 2019 Sewer Study), the sewer generation for Village 7 was estimated using the City of Chula Vista’s previous sewer generation factors. Table 2 provides a comparison of projected sewer flows for Village 7 using A) previous land use plan and sewer generation factors, and B) current land use plan and sewer generation factors. As previously mentioned, the previous land use plan for Village 7 accounted for Parcels R-3, R-6, R-7, MU-1, TS-1, CPF-2b, CPF-3, CP-4, S-1, and S-3 within the Wolf Canyon/Salt Creek Basin per Attachment 3. This sewer evaluation for the proposed Village 7 SPA Amendment accounts for Parcels R-3, R-4, R-6, R-7, R-8, CPF-2b, S-1, S-3 within the Wolf Canyon/Salt Creek Basin per Attachment 2. The Site Utilization Table in Attachment 2 includes “Future Development Areas” that are not accounted for in this Village 7 sewer system evaluation, as these future areas have not been approved for development and will require a separate SPA Amendment. As shown in Table 2, the flows from the proposed SPA Plan Amendment are more than offset by the reduction in flows as a result of the revised land use plan and current City sewer generation factors. Thus, the calculations to determine sewer line sizing through Village 8 West in the May 2019 Village 8 West Sewer Study (most recent sewer study) remain valid. Maria Miller May 28, 2024 Page 6 TABLE 2 OTAY RANCH VILLAGE 7 PROJECTED SEWER FLOWS (SPA AMENDMENT) Land Use Proposed Units Generation Factor Average Flow, gallons per day (gpd) Previous Land Use Plan and Sewer Generation Factors1 SF Residential 290 units 265 gpd/unit 76,850 MF Residential 306 units 199 gpd/unit 60,894 Elementary School 800 students 15 gpd/students 12,000 High School 2,400 students 20 gpd/student 48,000 Commercial/ Community Purpose Facility 7.9 ac 2,500 gpd/ac 19,750 Subtotal 217,494 Current Land Use Plan and Sewer Generation Factors2 MF Residential 603 units 182 gpd/unit 109,746 Elementary School 800 students 12 gpd/student 9,600 High School 2,400 students 13 gpd/student 31,200 Community Purpose Facility 1.0 ac 1,401 gpd/ac 1,401 Subtotal 151,947 1. Includes Parcels R-3, R-6, R-7, MU-1, TS-1, CPF-2b, CPF-3, CP-4, S-1, and S-3. See Attachment 3 for old land use plan. 2. Includes Parcels R-3, R-4, R-6, R-7, R-8, CPF-2b, S-1, S-3. See Attachment 2 for current land use plan. The “Future Development Areas” shown in the Site Utilization Table in Attachment 2 are not accounted for because these future areas have not been approved for development and will require a separate SPA Amendment. Maria Miller May 28, 2024 Page 7 Salt Creek Interceptor Technical Sewer Study. A sewer study for the Salt Creek Interceptor, dated October 2010, was prepared by PBS&J to address the capacity of the interceptor sewer due to increased intensity in development within Otay Ranch than what had previously been evaluated. The October 2010 Salt Creek Interceptor Technical Sewer Study (October 2010 PBS&J Study) included projected sewer flows from Village 7 and concluded that certain sections of the Salt Creek Interceptor may require upgrades at ultimate buildout, but these sections are located upstream of Village 8 West and thus, Village 7 as well. The flows for Village 7 in the October 2010 PBS&J Study were based on previous City sewer generation factors such that the flows from the proposed SPA Plan Amendment will be more than offset based on revised flows as a result of current, lower sewer generation factors. Thus, the findings of the October 2010 PBS&J Study remain valid, and the proposed Village 7 SPA Amendment will not trigger any upgrades to the Salt Creek Interceptor. FF:ah ATTACHMENT 1 EXHIBIT A VILLAGE 7 SEWER BASIN MAP ATTACHMENT 2 CURRENT SITE UTILIZATION PLAN AND LAND USE SUMMARY TABLE INTRODUCTION SPA PLAN Village 7 Site Utilization Plan Exhibit 1.6 INTRODUCTION SPA PLAN Village 7 Land Use Districts Exhibit PC-1 Village Seven Site Utilization Table RESIDENTIAL USE Neighborhood Land Use LU District Acres DU du/ac R-1 Single-Family Detached SF4 53.1 346 6.5 R-2 Single-Family Detached SF4, RM1 51 375 7.4 Sub-total single-family: 721 R-3 Multi-Family RM1 2.4 43 17.9 R-4 Multi-Family RM2 3.1 121 39 R-5 Multi-Family RM1 14.5 132 9.1 R-6 Multi-Family RM2 12.3 193 15.7 R-7 Multi-Family RM2 7.9 123 15.6 R-8 Multi-Family RM1 8.3 123 14.8 Sub-total multi-family: 735 Total Residential 152.6 ac. 1,456 9.5 NON-RESIDENTIAL USE Neighborhood Land Use LU District Acres P-1 Public Park P 7.6 CPF-1 Private Park CPF 1.1 CPF-2a Private Park CPF 0.9 CPF-2b CPF CPF 1.0 *Area included in R-3 S-1 High School S 53.9 S-3 Elem. School S 11.5 OS Open Space OS 42.6 Total Non-Residential 118.6 ac. FUTURE DEVELOPMENT AREA - CONCEPTUAL USES (REQUIRES A SPA AMENDMENT TO OBTAIN DEVELOPMENT APPROVAL) Neighborhood Land Use LU District Acres R-9 Residential Undesignated 42 MU Mixed-Use Undesignated 3.7 OS Open Space Undesignated 3 TS-1 Town Square Undesignated 1.9 CPF-3 CPF Undesignated 1.1 Total Future Development 51.7 ac. VILLAGE TOTAL 321.9 ac. ATTACHMENT 3 PREVIOUS LAND USE SUMMARY TABLE AND SEWER GENERATION ESTIMATES (NOVEMBER 2010 SEWER STUDY)