Loading...
HomeMy WebLinkAboutAppendix M.2 - Local Mobility AnalysisNakano (221 Dwelling Units] Citv Of Chula Vista 450 Bloc k of Dennerv Rd December 1, 2023 Citv of San Dieuo PTS# &4n&& Local Mobilitv Analvsis Repon Prepared for: Tri Pointe Homes 13520 Evening Creek Dr N. #300 San Diego , CA 92128 Prepared by Justin Rasas (RCE 60690 & TR 2135) a principal with: I LOS EngiRIJ/JliR!I, Inc. 11622 E l Camino Real , Suite 100 , San Diego , CA 92130 Phone 619-890-1253 Job #1930 LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation ii December 1, 2023 Table of Contents Executive Summary ............................................................................................................................. v  1.0 Introduction .................................................................................................................................. 1  2.0 Local Mobility Analysis Methodology ...................................................................................... 4  3.0 Pedestrian Local Mobility Analysis ............................................................................................ 8  4.0 Bicycle Local Mobility Analysis ................................................................................................ 9  5.0 Transit Local Mobility Analysis ............................................................................................... 10  6.0 Systemic Safety Review ............................................................................................................ 11  6.1 Pedestrian Systemic Safety Review ..................................................................................... 11  6.2 Bicycle Systemic Safety Review .......................................................................................... 12  6.3 Vehicle Systemic Safety Review .......................................................................................... 12  6.4 Systemic Safety Review Recommended Countermeasures ................................................ 14  7.0 Traffic Local Mobility Analysis ............................................................................................... 15  7.1 Study Scenarios ..................................................................................................................... 15  7.2 Local Mobility Analysis Methodology ................................................................................ 15  7.2.1 Intersections ....................................................................................................................... 15  7.2.2 City of San Diego Intersection Queuing .......................................................................... 16  7.2.3 Freeway Off-Ramp Queuing ............................................................................................ 16  7.2.4 Street Segments ................................................................................................................. 16  7.2.5 Project Traffic Effect Thresholds ..................................................................................... 17  7.3 Existing Conditions ............................................................................................................... 18  7.3.1 Existing Street System ...................................................................................................... 18  7.3.2 Existing Traffic Volumes and LOS Analyses ................................................................. 20  7.4 Project .................................................................................................................................... 23  7.4.1 Project Access ................................................................................................................... 23  7.4.2 Project Trip Generation and Distribution ......................................................................... 23  7.5 Opening Year 2025 without Project Conditions .................................................................. 26  7.6 Opening Year 2025 plus Project Conditions ........................................................................ 33  7.7 Horizon Year 2062 without Project Conditions................................................................... 37  7.8 Horizon Year 2062 plus Project Conditions ........................................................................ 42  List of Figures Figure 1: Project Location ....................................................................................................................... 2  Figure 2: Site Plan ................................................................................................................................... 3  Figure 3: LMA Study Area ..................................................................................................................... 7  Figure 4: City of San Diego Pedestrian Systemic Hotspot Map ......................................................... 11  Figure 5: Existing Conditions ............................................................................................................... 19  Figure 6: Existing Volumes .................................................................................................................. 21  Figure 7: Project Distribution ............................................................................................................... 24  Figure 8: Project Assignment ............................................................................................................... 25  Figure 9: Cumulative Project Locations ............................................................................................... 29  Figure 10: Cumulative Project Volumes .............................................................................................. 30  Figure 11: Opening Year 2025 without Project Volumes ................................................................... 31  Figure 12: Opening Year 2025 plus Project Volumes ......................................................................... 34  Figure 13: Horizon Year 2062 Conditions ........................................................................................... 39  Figure 14: Horizon Year 2062 without Project Volumes .................................................................... 40  LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation iii December 1, 2023 Figure 15: Horizon Year 2062 plus Project Volumes ......................................................................... 43  List of Tables Table 1: Project Unadjusted Daily Trip Generation .............................................................................. 4  Table 2: Weekday Bus Service Operations and Frequency ................................................................ 10  Table 3: Weekend Bus Service Operations and Frequency ................................................................ 10  Table 4a: Bicycle Systemic Hotspot Matrix ........................................................................................ 12  Table 4b: Vehicle Systemic Hotspot Matrix ........................................................................................ 13  Table 5: Intersection Level of Service Definitions (6th Edition HCM) .............................................. 15  Table 6: Street Segment Daily Capacity and LOS (City of San Diego) ............................................. 16  Table 7: City of San Diego Traffic Thresholds for Potential Roadway Improvements .................... 17  Table 8: Existing Intersection LOS ...................................................................................................... 22  Table 9: Existing Intersection Turn Lane Queuing ............................................................................. 22  Table 10: Existing Segment ADT Volumes and LOS ........................................................................ 22  Table 11: Project Trip Generation ........................................................................................................ 23  Table 12: Cumulative Project Trip Generation .................................................................................... 28  Table 13: Opening Year 2025 without Project Intersection LOS ....................................................... 32  Table 14: Opening Year 2025 without Project Intersection Turn Lane Queuing .............................. 32  Table 15: Opening Year 2025 without Project Segment ADT Volumes and LOS ............................ 32  Table 16: Opening Year 2025 plus Project Intersection LOS ............................................................. 33  Table 17: Opening Year 2025 plus Project Intersection Turn Lane Queuing .................................... 33  Table 18: Opening Year 2025 Plus Project Segment ADT Volumes and LOS ................................. 35  Table 19: Horizon Year 2062 without Project Intersection LOS ........................................................ 41  Table 20: Horizon Year 2062 without Project Intersection Turn Lane Queuing ............................... 41  Table 21: Horizon Year 2062 without Project Segment ADT Volumes and LOS ............................ 41  Table 22: Horizon Year 2062 plus Project Intersection LOS ............................................................. 42  Table 23: Horizon Year 2062 plus Project Intersection Turn Lane Queuing ..................................... 42  Table 24: Horizon Year 2062 plus Project Segment ADT Volumes and LOS .................................. 44  Appendices Appendix A ....................................................................................... Local Mobility ½ Mile Study Area Appendix B ....... Excerpts from City of San Diego Bicycle Master Plan Update and Community Plan Appendix C .................................................................................................... Transit Map and Schedules Appendix D ........................................................ City of San Diego Roadway Segment Capacity Table Appendix E ..................... Excerpts from City of San Diego TSM for Roadway Improvement Criteria Appendix F ................. Otay Mesa and Otay Mesa-Nestor Community Plan Roadway Classifications Appendix G .............................................................................................................................. Count Data Appendix H ............................................................................................................. Signal Timing Sheets Appendix I ......................................................................................... Existing LOS and Queuing Output Appendix J .................................................. Excerpts from City of San Diego Trip Generation Manual Appendix K ...................................................................................... SANDAG Select Zone Assignment Appendix L ............................................................................................ Cumulative Project Information Appendix M ......................................... Opening Year 2025 without Project LOS and Queuing Output Appendix N ................................................ Opening Year 2025 plus Project LOS and Queuing Output Appendix O .......................................................................... Proposed Improvement Concept Drawings Appendix P .......................................................................................................... Fair Share Calculations Appendix Q .................................................... Horizon Year Volumes and Growth Factor Calculations LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation iv December 1, 2023 Appendix R ........................................................................................ SANDAG Horizon Year Volumes Appendix S .................................... Excerpts from Caltrans EIR Palm Ave Interchange Improvements Appendix T ........................................... Horizon Year 2062 without Project LOS and Queuing Output Appendix U ................................................. Horizon Year 2062 plus Project LOS and Queuing Output LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation v December 1, 2023 Executive Summary Nakano 221 Homes The proposed project includes up to 221 residential dwelling units (mix of up to 67 detached condominiums, 84 duplexes and 70 multi-family units) on vacant land that is located at the 450 block of Dennery Road Chula Vista, California. Project access is proposed from a single private right-in/right-out driveway on Dennery Road (the existing driveway will be closed and replaced with full height curb and gutter). A new driveway is proposed approximately 40 feet southwest of the existing driveway that will be closed. No modification is proposed to the existing median on Dennery Road at the project access location. The two-lane project access will include Class II bike lanes and non-contiguous sidewalks on both sides. Project opening is forecasted to occur in 2025. As part of the project, the applicant is proposing an amendment to change the 23.8-acre parcel from an existing General Plan land use designation of Open Space (OS) to a General Plan land use designation of Residential High (RH). The project requires a change from existing zone A-8 Agricultural to a proposed zone R3P Residential. This Local Mobility Analysis is based on the City of San Diego Transportation Study Manual, updated September 2022 because the project location is unique being located within the City of Chula Vista with sole access to City of San Diego roadways. Furthermore, and based on a SANDAG Select Zone Assignment, the project adds less than 10 peak hour trips to any City of Chula Vista surface streets or intersections within 2 miles of the project site. For these reasons and based on coordination with Chula Vista staff, the City of San Diego LMA criteria were applied because all the study roadways are located within the City of San Diego. The LMA includes the study of pedestrian, bicycle, transit, and traffic facilities. This LMA is to evaluate the effects of the proposed development project on mobility, access, circulation, and related safety elements in the proximate area of the project. The Pedestrian facilities within the ½ mile walking shed along the study roadways did not have any observed missing sidewalk sections, curb ramps, or major obstructions. The project will incorporate sidewalks into the project site from Dennery Road. There is existing parkway and non- contiguous sidewalk along the project frontage on Dennery Road. The Bicycle facilities within a ½ mile bicycling distance along the study roadways were consistent with the Class II bike lanes shown in the City of San Diego Bicycle Master Plan Update and the Otay Mesa Community Plan Update. No bicycle lane improvements are recommended as part of this project. The Transit facilities within a ½ mile walking shed included four bus stops. The bus stops on Palm Ave are approximately 100 feet west of Dennery Road with the north side stop having a combined bench with open shelter and the south side stop having two benches. The bus stops on Dennery Road are located on the east and west sides of the street approximately 1,100 feet south of Palm Ave. The bus stop on the east side of Dennery Road has a bench. The bus stop on the west side of Dennery Road includes a combined bench with open shelter. The bus stops are all in good condition. No bus stop improvements are recommended as part of this project. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation vi December 1, 2023 Systemic Safety Review: The City of San Diego Systemic Safety The Data-Driven Path to Vision Zero (April 2019) policy promotes safe roadway design with a goal toward preventing collisions. As part of that goal, a systemic safety review provides an assessment of hotspots and recommended countermeasures to align with Vision Zero. The systemic safety review identified the following locations that match the criteria for potential improvements: 1) Palm Ave at Dennery Road. Three countermeasures are proposed: 1) For the pedestrian criteria, the proposed countermeasure is for the owner/permittee to install audible countdown pedestrian timers for each pedestrian phase. 2) For the vehicle criteria (Footprint #2), the proposed countermeasure is for the owner/permittee to install backplates with retroreflective borders for better visibility, and 3) Upgrade the traffic controller to provide City of San Diego current 2070 signal controller including software update and communications equipment per current City of San Diego standards, to the satisfaction of the City of San Diego Engineer. 2) Dennery Rd at Red Fin Ln. For the bicycle criteria (Footprint #1), the proposed countermeasure is for the owner/permittee to upgrade bicycle loop detectors along Dennery Rd and install Type E Modified front loops on all approaches. The Traffic facilities included the analysis of six (6) intersections, and five (5) roadway segments under opening day 2025 and horizon year conditions. The intersections included: 1) Palm Ave/I-805 SB Ramps 2) Palm Ave/I-805 NB Ramps 3) Palm Ave/Dennery Rd 4) Dennery Rd/Project Driveway 5) Dennery Rd/The Landing Driveway 6) Dennery Rd/Red Coral Ln/Red Fin Ln The street segments included: 1) Palm Ave between I-805 SB Ramps and I-805 NB Ramps 2) Palm Ave between I-805 NB Ramps and Dennery Rd 3) Dennery Rd between Palm Ave and Regatta Ln 4) Dennery Rd between Regatta Ln and Project Driveway 5) Dennery Rd between Project Driveway and Red Coral Ln/Red Fin Ln A horizon year analysis is included because the project requires a zone change. The project trip generation based on the City of San Diego Trip Generation Manual, May 2003 is expected to generate approximately 1,902 ADT with 153 AM peak hour trips (31 inbound and 122 outbound) and 190 PM peak hour trips (133 inbound and 57 outbound). Under opening day 2025 and horizon year conditions, the project would add more than 50 peak hour turn trips or more than 500 daily trips to the study locations forecasted to operate at LOS E/F; and/or has the potential to exceed the existing turn lane storage capacities at the following locations: 1) Intersection of Palm Ave/I-805 SB Ramps: a. Project would add 9 PM Westbound lefts under LOS E and continue to exceed existing storage under Opening Year 2025 plus Project conditions. b. No improvements are proposed because Caltrans has a circulated Environmental Document (MND/EA) and a Ready to List (RTL) date of August 2023. The scope of work and ultimate plan is as proposed in the MND/ED with details included in LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation vii December 1, 2023 Appendix S. Per ECP, Phase 1 (widening of the south side of the bridge on Palm Ave) is fully funded for design. Funding for construction has not been acquired. As of 4/14/2023, City was awarded a $24M federal grant. Per ECP, additional funding is needed for Phase 1 construction. 2) Intersection of Palm Ave/Dennery Rd. a. Project would add 25 AM & 109 PM Eastbound lefts under LOS F and exceed existing storage under Opening Year 2025 plus Project and Horizon Year 2062 plus Project conditions. b. Project would add 100 AM & 47 PM Southbound rights under LOS F and exceed existing storage under Opening Year 2025 plus Project and Horizon Year 2062 plus Project conditions. c. City criteria states if project adds traffic and causes the 95th percentile queue to exceed storage, then consider lengthening the pocket. The Owner/Permittee proposes the following improvements with conceptual designs to demonstrate feasibility included in Appendix O: i. Extend the eastbound dual left turn storage bay with 280 feet of storage per lane by an additional 85 feet of storage with appropriate taper for a total of 365 feet of storage per lane that will accommodate the highest forecasted 95th percentile queue of 361 feet. ii. Extend the southbound right turn lane with 95 feet of storage by an additional 50 feet of storage with appropriate taper for a total of 145 feet of storage to accommodate the highest forecasted 95th percentile queue of 141 feet. 3) Intersection of Dennery Rd/Red Coral Ln/Red Fin Ln: a. Project would add 130 PM peak hour EB u-turning vehicles and is forecasted to exceed the left turn storage bay of approximately 190 feet under Horizon Year 2062 plus Project conditions. b. City criteria states if project adds traffic and causes the 95th percentile queue to exceed storage, then consider lengthening the pocket. The Owner/Permittee proposes to extend the eastbound left turn lane of 190 feet of storage by an additional 50 feet of storage with appropriate taper for a total of 240 feet of storage to accommodate the highest forecasted 95th percentile queue of 207 feet (Conceptual design to demonstrate feasibility is included in Appendix O). 4) Segment of Palm Ave between I-805 SB Ramps and I-805 NB Ramps: a. Project adds 932 daily trips under forecasted LOS E conditions on the existing 4 lane roadway under Opening Year 2025 Plus Project conditions. b. Project adds 932 daily trips under forecasted LOS F conditions after the Caltrans bridge widening under Horizon Year 2062 Plus Project conditions. c. A fair share of 2.5% is proposed toward planned Caltrans Palm Ave bridge widening to a 5 Lane Major configuration anticipated to be completed after year 2024 (fair share calculations are included in Appendix P). d. No improvements are proposed because Caltrans has a circulated Environmental Document (MND/EA), and a Ready to List (RTL) date of August 2023. The scope of work and ultimate plan is as proposed in the MND/ED with details included in Appendix S. Per ECP, Phase 1 (widening of the south side of the bridge on Palm LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation viii December 1, 2023 Ave) is fully funded for design. Funding for construction has not been acquired. As of 4/14/2023, City was awarded a $24M federal grant. Per ECP, additional funding is needed for Phase 1 construction. Summary of off-site and frontage improvements to be implemented by Owner/Permittee: 1) Palm Ave/Dennery Road: Extend eastbound dual left turn bay by an additional 85 feet. 2) Palm Ave/Dennery Road: Extend southbound right turn lane by an additional 50 feet. 3) Palm Ave/Dennery Road: Install backplates with retroreflective borders on signal heads on all approaches. 4) Palm Ave/Dennery Road: Install audible countdown pedestrian heads for each pedestrian phase. 5) Palm Ave/Dennery Road: Upgrade the traffic controller to provide City of San Diego current 2070 signal controller including software update and communications equipment per current City of San Diego standards, to the satisfaction of the City of San Diego Engineer. 6) Dennery Road/Project Driveway: Replace existing driveway with full curb and gutter and construct new 25-foot wide driveway approximately 40 feet southwest of the existing driveway. 7) Dennery Rd/Red Fin Ln: Extend eastbound left turn lane by an additional 50 feet. 8) Dennery Rd/Red Fin Ln: Upgrade the existing bicycle loop detectors along Dennery Rd at Red Fin and install Type E Modified front loops per Standard Drawing SDE-104 on all approaches. 9) Palm Ave between I-805 SB and NB Ramps: Fair share of 2.5% toward bridge widening. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 1 December 1, 2023 1.0 Introduction The proposed project includes up to 221 residential dwelling units (anticipated mix with up to 67 detached condominiums, 84 duplexes and 70 multi-family units) on vacant land that is located at the 450 block of Dennery Road Chula Vista, California. The project would include 22 affordable units (11 low-income and 11 moderate-income affordable units). The overall project density is 9.3 dwelling units per acre. Project access is proposed from a single private right-in/right-out driveway on Dennery Road (the existing driveway will be closed and replaced with full height curb and gutter). A new 25-foot wide driveway is proposed approximately 40 feet southwest of the existing driveway that will be closed. Project opening is forecasted to occur in 2025. The project is in the City of Chula Vista and is proposed to be annexed into the City of San Diego. Therefore, this report is being submitted to both agencies. As part of the project, the applicant is proposing an amendment to change the 23.8-acre parcel from an existing General Plan land use designation of Open Space (OS) to a General Plan land use designation of Residential High (RH). The project requires a change from existing zone A-8 Agricultural to a proposed zone R3P Residential. The following discretionary approvals are required by the City of Chula Vista as part of the project: 1) Amendment to the Chula Vista General Plan to remove the Open Space designation and designate the project site as Residential High. 2) An Ordinance approving the Nakano Specific Plan. The Specific Plan would implement a new residential zone and apply site-specific policies and development standards. 3) Tentative Map. 4) Certification of the Final EIR including adoption of a Mitigation Monitoring and Reporting Program and approval of required CEQA findings. 5) Annexation Agreement. The site of approximately 23.8 acres is bordered to the north by the Otay River, to the south by Kaiser Permanente medical center, to the east by Riveredge Terrace residential subdivision, and to the west by I-805. The location of the project is shown in Figure 1 with a preliminary site plan shown in Figure 2. The format of this study includes the following chapters: 1.0 Introduction 2.0 Local Mobility Analysis Methodology 3.0 Pedestrian Local Mobility Analysis 4.0 Bicycle Local Mobility Analysis 5.0 Transit Local Mobility Analysis 6.0 Systemic Safety Review 7.0 Traffic Local Mobility Analysis LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 2 December 1, 2023 Figure 1: Project Location Chula Vista San Diego No Scale N No vehicular access to project site from City of Chula Vista roadways due to lack of bridge crossing over Otay River Project access requires use of City of San Diego roadways Source: SANDAG LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 3 December 1, 2023 Figure 2: Site Plan Source: Civil Sense, Inc. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 4 December 1, 2023 2.0 Local Mobility Analysis Methodology The project location is unique because it is located within the City of Chula Vista with sole access to City of San Diego roadways. Furthermore, and based on a SANDAG Select Zone Assignment, the project adds less than 10 peak hour trips to any City of Chula Vista surface streets or intersections within 2 miles of the project site. For these reasons and based on coordination with Chula Vista staff, the City of San Diego Local Mobility Analysis (LMA) criteria were applied because all the study roadways are located within the City of San Diego. The City of San Diego Transportation Study Manual, September 2020 states that all projects must complete an LMA unless they meet the following trip generation screening criteria: 1) Land uses consistent with the Community Plan/Zoning Designation: Generate less than 1,000 daily unadjusted driveway vehicle trips, 2) Land uses inconsistent with the Community Plan/Zoning Designation: Generate less than 500 daily unadjusted driveway vehicle trips, or 3) Projects in the Downtown Community Planning Area that generate less than 2,400 daily unadjusted trips. As shown in Table 1, the project is calculated to generate 1,902 unadjusted daily trips and requires a zone change; therefore, an LMA is required. TABLE 1: PROJECT UNADJUSTED DAILY TRIP GENERATION Proposed Land Use ADT Residential - Single Family 10 /DU 67 DU 670 Residential - Multi Family 8 /DU 154 DU 1,232 Totals:1,902 Source: City of San Diego Trip Generation Manual , May 2003. Rate Size & Units The extent of the LMA is based on each mode as follows: 1) Pedestrian: Documentation of pedestrian facilities and basic deficiencies (missing sidewalk, curb ramps, and major obstructions) within ½ walking distance measures from each pedestrian access point to a public street. 2) Bicycle: Documentation of bicycle facilities and basic deficiencies (bike lane gaps, obstructions) within ½ mile bicycling distance measured from the center of the intersection formed by each project driveway. 3) Transit: Identification of the closest transit routes and stops to the project. If the transit stops are within ½ mile walking distance of each pedestrian access point, the condition of the stop amenities must be described/evaluated. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 5 December 1, 2023 4) Systemic Safety Review: Identification of study area intersections that satisfy the systemic safety criteria. 5) Intersection Operations (projects with < 2,400 daily final driveway trips): a. Signalized intersections within ½ mile path of travel from the project driveway AND the project will add 50 or more peak hour trips to any TURNING movement. b. Un-signalized intersections within ½ mile path of travel from the project driveway AND the project will add 50 or more peak hour trips in EITHER direction. c. Freeway ramp intersections where a project adds 50 or more peak hour trips regardless of their distance from the project site. 6) Roadway Segments: The study area should include any roadway segments where the project adds > 1,000 daily final driveway trips if consistent with the Community Plan, or > 500 daily final driveway trips if inconsistent with the Community Plan AND: the segment has improvements identified in the Community Plan; OR the segment is not built to the Community Plan ultimate classification (including planned new circulation element roadways). The study area is based on a ½ mile walking, biking, or driving distance from the project driveway on Dennery Rd. The limit of the ½ mile extent is included in Appendix A. The project does not conform to the community plan; therefore, the study area included: Pedestrian Facilities 1) Dennery Rd from approximately 1,200 feet south of Palm Ave to approximately 250 feet east of Black Coral Way. 2) Palm Ave from I-805 NB Ramps to Dennery Rd. 3) Ocean View Parkway from Dennery Rd to approximately 500 feet east of Kentmere Terrace. Bicycle Facilities 1) Dennery Rd from approximately 1,200 feet south of Palm Ave to approximately 250 feet east of Black Coral Way. 2) Palm Ave from I-805 NB Ramps to Dennery Rd. 3) Ocean View Parkway from Dennery Rd to approximately 500 feet east of Kentmere Terrace. Transit Facilities Metropolitan Transit System (MTS) lists Bus Routes 933 and 934 within ½ mile walking distance from the project access. There are four bus stops within the ½ mile walking distance of the project driveway with two on Palm Avenue and two on Dennery Road. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 6 December 1, 2023 Systemic Safety Review Facilities The study area included the following intersections: 1) Palm Ave/I-805 SB Ramps 2) Palm Ave/I-805 NB Ramps 3) Palm Ave/Dennery Rd 4) Dennery Rd/Project Driveway 5) Dennery Rd/The Landing Driveway 6) Dennery Rd/Red Coral Ln/Red Fin Ln Vehicular Facilities The study area included the following intersections: 1) Palm Ave/I-805 SB Ramps (signalized with project adding > 50 peak hour turning movements) 2) Palm Ave/I-805 NB Ramps (signalized with project adding > 50 peak hour turning movements) 3) Palm Ave/Dennery Rd (signalized with project adding > 50 peak hour turning movements) 4) Dennery Rd/Project Driveway (un-signalized right-in/right-out only with project adding > 50 peak hour trips in either direction) 5) Dennery Rd/The Landing Driveway (un-signalized with project adding >50 peak hour trips along Dennery Rd) 6) Dennery Rd/Red Coral Ln/Red Fin Ln (signalized with project adding > 50 peak hour turning movements) The study area included the following street segments because the project adds > 500 ADT: 1) Palm Ave between I-805 SB Ramps and I-805 NB Ramps 2) Palm Ave between I-805 NB Ramps and Dennery Rd 3) Dennery Rd between Palm Ave and Regatta Ln 4) Dennery Rd between Regatta Ln and Project Driveway 5) Dennery Rd between Project Driveway and Red Coral Ln/Red Fin Ln The study area is shown in Figure 3. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 7 December 1, 2023 Figure 3: LMA Study Area No Scale N LEGEND S Signazlied study intersection where project adds > 50 peak hour turning trips Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln SS S Project Location Regatta Ln U S The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Dennery Rd Project Access Rd U Un-Signazlied study intersection where project adds > 50 peak hour trips in either direction Half a mile extent from project access Study area roadways where project adds > 500 ADT Bus StopB B B B B City of Chula Vista City of San DIego Power Line Access Road Existing right-in/right-out driveway will be closed and replaced with full height curb and gutter. A new 25-foot wide driveway is proposed approximately 40 feet southwest of the existing driveway that will be closed. Approximate new project driveway location. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 8 December 1, 2023 3.0 Pedestrian Local Mobility Analysis The pedestrian analysis consists of documenting existing pedestrian facilities and basic deficiencies such as missing sidewalk sections, curb ramps, and major obstructions within ½ mile walking from the project access along the study roadways. Dennery Road from approximately 1,200 feet south of Palm Ave to approximately 250 feet east of Black Coral Way currently has either contiguous or non-contiguous sidewalks on both sides of the street and pedestrian curb ramps at intersections. There were no major sidewalk obstructions observed along this segment. Palm Avenue from I-805 NB Ramps to Dennery Road currently has contiguous sidewalks on both sides of the street and pedestrian curb ramps at intersections. There were no major sidewalk obstructions observed along this segment. Ocean View Hills Parkway from Dennery Road to approximately 500 feet east of Kentmere Terrace currently has either contiguous or non-contiguous sidewalks on both sides of the street and pedestrian curb ramps at intersections. There were no major sidewalk obstructions observed along this segment. The pedestrian facilities within the ½ mile walking shed along the study roadways did not have any observed missing sidewalk sections, curb ramps, or major obstructions. The project will incorporate sidewalks into the project site from Dennery Road. There is existing parkway and non-contiguous sidewalk along the project frontage on Dennery Road. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 9 December 1, 2023 4.0 Bicycle Local Mobility Analysis The bicycle analysis consists of documenting existing bicycle facilities and basic deficiencies such bike lane gaps or obstructions within a ½ mile bicycling distance from the project access along the study roadways. Dennery Road from approximately 1,200 feet south of Palm Ave to approximately 250 feet east of Black Coral Way currently has Class II bike lanes on both sides of the roadway. There were no observed bike lane gaps nor major obstructions along this segment. The observed Class II bike lane is consistent with what is shown in the City of San Diego Bicycle Master Plan Update and the Otay Mesa Community Plan Update. Palm Avenue from I-805 NB Ramps to Dennery Road currently has Class II bike lanes on both sides of the roadway. There were no observed bike lane gaps nor major obstructions along this segment. The observed Class II bike lane is consistent with what is shown in the City of San Diego Bicycle Master Plan Update and the Otay Mesa Community Plan Update. Ocean View Hills Parkway from Dennery Road to approximately 500 feet east of Kentmere Terrace currently has Class II bike lanes on both sides of the roadway. There were no observed bike lane gaps nor major obstructions along this segment. The observed Class II bike lane is consistent with what is shown in the City of San Diego Bicycle Master Plan Update and the Otay Mesa Community Plan Update. Excerpts from the City of San Diego Bicycle Master Plan Update and the Otay Mesa Community Plan Update are included in Appendix B. The Class II bicycle facilities within a ½ mile bicycling distance along the study roadways are consistent with what is shown in the City of San Diego Bicycle Master Plan Update and the Otay Mesa Community Plan Update. No bicycle lane improvements are recommended as part of this project. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 10 December 1, 2023 5.0 Transit Local Mobility Analysis The transit analysis includes identifying the closest transit routes and stops to the project. If the stops are within ½ mile walking distance of the project access, the condition of the stop amenities must be describe/evaluated. The project location is technically within ½ mile (as a crow flies) of Transit Priority Area (TPA) that is located within the City of Chula Vista. However, there is no short nor easy path to reach the bus stops on Main Street; therefore, the project is not considered to have reasonable access to a TPA. Metropolitan Transit System (MTS) lists Bus Routes 933 and 934 within ½ mile walking distance from the project access. There are four bus stops within the ½ mile walking distance of the project driveway. Two are on Palm Avenue and two are on Dennery Road as shown on page 7 on Figure 3. The bus stops on Palm Ave are located on the north and south sides of the street approximately 100 feet west of Dennery Road. The bus stop on the north side of the roadway includes a combined bench with open air shelter. The bus stop on the south side of the roadway includes two benches. The bus stops are in good condition. The bus stops on Dennery Road are located on the east and west sides of the street approximately 1,100 feet south of Palm Ave. The bus stop on the east side of the roadway has a bench. The bus stop on the west side of the roadway includes a combined bench with open air shelter. The bus stops are in good condition. No bus stop improvements are recommended as part of this project. A summary of the service times is shown in Table 2 for weekdays and Table 3 for weekend days. A map showing the nearby transit routes and bus schedules are included in Appendix C. TABLE 2: WEEKDAY BUS SERVICE OPERATIONS AND FREQUENCY Bus Route Weekday (Mon-Fri) Service Operations (Off-Peak Service Frequency Range) 7-9 AM Peak Hour Service Frequency 4-6 PM Peak Hour Service Frequency Route 933-934 ≈ 4:40 AM to ≈ 12:30 AM (≈ 20-30 minutes)20 minutes 20 minutes TABLE 3: WEEKEND BUS SERVICE OPERATIONS AND FREQUENCY Bus Route Saturday Service Operations (Service Frequency Range) Sunday Service Operations (Service Frequency Range) Route 933-934 ≈ 5:10 AM to ≈ 12:30 AM (≈20-60 min.)≈ 5:30 AM to ≈ 1:00 PM (≈ 20-60 min.) LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 11 December 1, 2023 6.0 Systemic Safety Review The City of San Diego Systemic Safety: The Data-Driven Path to Vision Zero (April 2019) policy promotes safe roadway design with a goal toward preventing collisions. As part of that goal, a systemic safety review provides an assessment of hotspots and possible countermeasures to align with Vision Zero. The City of San Diego Transportation Study Manual states on page 40: “Study intersections should be compared to the City of San Diego Systemic Safety: The Data-Driven Path to Vision Zero report to determine if a study intersection meets any hot spot criteria identified in Appendix C: Identification of Systemic Hotspots of the report.” 6.1 Pedestrian Systemic Safety Review The City of San Diego pedestrian hotspot map includes the project study intersection of Palm Ave at Dennery Rd as shown in Figure 4. Figure 4: City of San Diego Pedestrian Systemic Hotspot Map Source: City of San Diego The intersection of Palm Ave/Dennery Road has an existing countermeasure of high visibility crosswalks. Therefore, the project Owner/Permittee proposes to install audible countdown pedestrian heads for each pedestrian phase as a countermeasure. No Scale N Palm at Dennery LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 12 December 1, 2023 6.2 Bicycle Systemic Safety Review The study intersections were evaluated to determine if the bicycle systemic criteria would be satisfied. The bicycle systemic hotspot matrix findings are shown in Table 4a. TABLE 4A: BICYCLE SYSTEMIC HOTSPOT MATRIX Intersection Bicycle Footprint #1 Criteria Bicycle Footprint #2 Criteria Signalized? 4 Ln x 2 Ln? OR 4 Ln x 4 Ln? SSSC? 2 Ln x 2 Ln? #1 Palm Ave at I-805 NB Ramps Yes No (a) No No No #2 Palm Ave at I-805 SB Ramps Yes No (a) No No No #3 Palm Ave at Dennery Rd Yes No No No No #4 Dennery Rd at Project Dwy No No No Yes No (b) #5 Dennery Rd at The Landing Dwy No No No Yes No (b) #6 Dennery Rd at Red Fin Ln YES YES No No Yes Notes: Dwy = Driveway 4 Ln x 2 Ln = 4 lane (2-way) roadway intersects with a 2 lane (2-way) roadway. 4 Ln x 4 Ln = 4 lane (2-way) roadway intersects with a 4 lane (2-way) roadway. SSSC = Side Street Stop Control (a) Freeway ramps are one-way roads while criteria require 2-way roadway. (b) Criterion is for crossing a full intersection; thus, side street approach cannot cross raised median on Dennery Rd. BOLD indicates all criteria satisfied to consider implementing a countermeasure. Bicycle countermeasures to address bicyclists approaching an intersection and proceeding through the intersection against a red light include: 1) Bike loop detectors, 2) Public safety messaging campaign, and 3) Bicycle red light running enforcement. The intersection of Dennery Rd/Red Fin Ln satisfied the bicycle Footprint #1 systemic criteria for potential countermeasures. The recommended bicycle countermeasure at the intersection of Dennery Rd/Red Fin Ln is for the Owner/Permittee to upgrade the existing bicycle loop detectors along Dennery Rd at Red Fin and install Type E Modified front loops per Standard Drawing SDE- 104 on all approaches. 6.3 Vehicle Systemic Safety Review The study intersections were evaluated to determine if the vehicle systemic criteria would be satisfied. The vehicle systemic hotspot matrix findings are shown in Table 4b. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 13 December 1, 2023 TABLE 4B: VEHICLE SYSTEMIC HOTSPOT MATRIX Intersection Vehicle Footprint #1 Criteria Vehicle Footprint #2 Criteria Sig? 4 Ln x 2 Ln? Major >15k ADT Minor <7k ADT Sig? 6 Ln x 4 Ln? Major >15k ADT Minor >7k ADT #1 Palm Ave at I-805 NB Ramps Yes No (a) Yes No (b) Yes No Yes Yes (b) #2 Palm Ave at I-805 SB Ramps Yes No (a) Yes No (b) Yes No Yes Yes (b) #3 Palm Ave at Dennery Rd Yes No Yes No YES YES YES YES #4 Dennery Rd at Project Dwy No No No No No No No No #5 Dennery Rd at The Landing Dwy No No No No No No No No #6 Dennery Rd at Red Fin Ln Yes No No No Yes No No No Table continued Intersection Vehicle Footprint #3 Criteria Vehicle Footprint #4 Criteria Sig? 4 Ln x 4 Ln? Minor >7k ADT Sig? 3 Ln (1-way) x 3 Ln (1-way)? Major >15k ADT Minor >7k ADT #1 Palm Ave at I-805 NB Ramps Yes No No (b) Yes No Yes Yes (b) #2 Palm Ave at I-805 SB Ramps Yes No No (b) Yes No Yes Yes (b) #3 Palm Ave at Dennery Rd Yes No Yes Yes No No No #4 Dennery Rd at Project Dwy No No No No No No No #5 Dennery Rd at The Landing Dwy No No No No No No No #6 Dennery Rd at Red Fin Ln Yes No No Yes No No No Notes: Dwy = Driveway. Sig? = Signalized (yes or no) 4 Ln x 2 Ln = 4 lane (2-way) roadway intersects with a 2 lane (2-way) roadway. 4 Ln x 4 Ln = 4 lane (2-way) roadway intersects with a 4 lane (2-way) roadway. (a) Freeway ramps are one-way roads while criteria require 2-way roadway. (b) Volumes from SANDAG ABM2+ Year 2016 BOLD indicates all criteria satisfied to consider implementing a countermeasure. Countermeasures to address vehicles proceeding through a red light: 1) Signal hardware updates such as signal heads with backplates that have retroreflective borders for better visibility, 2) Convert the signalized intersection to a roundabout, 3) Intersection control awareness campaign, or 4) Vehicle red light enforcement. The intersection of Palm Ave/Dennery Rd satisfied the vehicle Footprint #2 systemic criteria for potential countermeasures. The recommended vehicle countermeasure is for the Owner/Permittee to upgrade and install signal heads with backplates that have retroreflective borders for better visibility and upgrade the traffic controller to provide City of San Diego current 2070 signal controller including software update and communications equipment per current City of San Diego standards, to the satisfaction of the City of San Diego Engineer. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 14 December 1, 2023 6.4 Systemic Safety Review Recommended Countermeasures In summary, the systemic safety review identified the following locations that match the criteria for potential improvements: 1) Palm Ave at Dennery Road. Three countermeasures are proposed: 1) For the pedestrian criteria, the proposed countermeasure is for the Owner/Permittee to install audible countdown pedestrian heads for each pedestrian phase. 2) For the vehicle criteria (Footprint #2), the proposed countermeasure is for the Owner/Permittee to upgrade and install signal heads with backplates that have retroreflective borders for better visibility, and 3) Upgrade the traffic controller to provide City of San Diego current 2070 signal controller including software update and communications equipment per current City of San Diego standards, to the satisfaction of the City of San Diego Engineer. 2) Dennery Rd at Red Fin Ln. For the bicycle criteria (Footprint #1), the proposed countermeasure is for the Owner/Permittee to upgrade the existing bicycle loop detectors along Dennery Rd at Red Fin and install Type E Modified front loops per Standard Drawing SDE-104 on all approaches. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 15 December 1, 2023 7.0 Traffic Local Mobility Analysis The Local Mobility Analysis includes the analysis of specific study scenarios, methodology for the analysis of roadway operations, and determination of potential off-site improvements triggered by the project. Details for each of these parameters are include herein. 7.1 Study Scenarios The number of study scenarios is dependent on the estimated trips generated by the project and whether the project would require a Community Plan Amendment and/or re-zone. For this project, the following scenarios were analyzed: 1) Existing Conditions 2) Opening Year 2025 without Project Conditions 3) Opening Year 2025 plus Project Conditions 4) Horizon Year 2062 without Project Conditions 5) Horizon Year 2062 plus Project Conditions 7.2 Local Mobility Analysis Methodology The Local Mobility Analysis prepared for this study was based on the 6th Edition Highway Capacity Manual (HCM) operations analysis using Level of Service (LOS) evaluation criteria. The operating conditions of the study intersections, street segments, and freeway segments were measured using the HCM LOS designations, which ranges from A through F. LOS A represents the best operating condition and LOS F denotes the worst operating condition. The individual LOS criteria for each roadway component are described below. 7.2.1 Intersections The study intersections were analyzed based on the operational analysis outlined in the 6th Edition HCM. This process defines LOS in terms of average control delay per vehicle, which is measured in seconds. LOS at the intersections were calculated using the computer software program Synchro 11 (Trafficware Corporation). The 6th Edition HCM LOS for the range of delay by seconds for intersections is shown in Table 5. TABLE 5: INTERSECTION LEVEL OF SERVICE DEFINITIONS (6TH EDITION HCM) Level of Service Un-Signalized Control Delay for TWSC, AWSC, and Roundabout (sec/veh where v/c < 1) Signalized Control Delay (sec/veh where v/c < 1) A 0-10 < 10 B > 10-15 > 10-20 C > 15-25 > 20-35 D > 25-35 > 35-55 E > 35-50 > 55-80 F > 50 > 80 Source: 6th Edition HCM. TWSC: Two Way Stop Control. AWSC: All Way Stop Control. For unsignalized intersections, the control delay is the worst movement delay in seconds/vehicle. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 16 December 1, 2023 7.2.2 City of San Diego Intersection Queuing The 95th percentile queue for study intersections located within the City of San Diego with more than 50 project peak hour turns were analyzed using SimTraffic 11 software. If only one peak hour had > 50 trips, both peak hours were analyzed. The queue was calculated running ten 60-minute simulations runs with a ten-minute seeding time. The 95th percentile queue was compared to the turn pocket storage that is generally measured from the intersection stop bar to the end of the turn pocket striping. 7.2.3 Freeway Off-Ramp Queuing The 95th percentile queue for Interstate 805/Palm Avenue southbound off-ramp was analyzed using SimTraffic 11 software because the project would add more than 50 project peak hour turns. If only one peak hour had > 50 trips, both peak hours were analyzed. The queue was calculated running ten 60-minute simulations runs with a ten-minute seeding time. The 95th percentile queue was compared to the off-ramp storage that is measured from the ramp gore to the off-ramp intersection stop bar. 7.2.4 Street Segments The street segments were analyzed based on the functional classification of the roadway using the City of San Diego Roadway Segment LOS by Classification and Average Daily Traffic capacity lookup table (Appendix D). The roadway segment capacity and LOS standards used to analyze street segments are summarized in Table 6. TABLE 6: STREET SEGMENT DAILY CAPACITY AND LOS (CITY OF SAN DIEGO) Circulation Element Road Classification LOS A LOS B LOS C LOS D LOS E Prime Arterial – 7 Lanes <30,000 <42,500 <60,000 <65,000 <70,000 Prime Arterial – 6 Lanes <25,000 <35,000 <50,000 <55,000 <60,000 Prime Arterial – 5 Lanes <20,000 <28,000 <40,000 <45,000 <50,000 Major Arterial – 6 Lanes <20,000 <28,000 <40,000 <45,000 <50,000 Major Arterial – 5 Lanes <17,500 <24,500 <35,000 <40,000 <45,000 Major Arterial – 4 Lanes <15,000 <21,000 <30,000 <35,000 <40,000 Collector – 5 Lanes <12,500 <17,500 <25,000 <30,750 <37,500 Collector – 4 Lanes <10,000 <14,000 <20,000 <25,000 <30,000 Collector (no Center Ln) – 4 Lanes <5,000 <7,000 <10,000 <13,000 <15,000 Collector (with TWLTL) – 2 Lanes Collector – 2 Lanes (no fronting property) <4,000 <5,500 <7,500 <9,000 <10,000 Collector – 2 Lanes (without two-way left turn lane) <2,500 <3,500 <5,000 <6,500 <8,000 Sub-Collector – 2 Lanes (single-family) <2,200 Source: City of San Diego Transportation Study Manual September 19, 2022. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 17 December 1, 2023 7.2.5 Project Traffic Effect Thresholds A project Owner/Permittee should consider an improvement if the project traffic exceeds the City of San Diego Transportation Study Manual (TSM) defined thresholds as shown in Table 7 (TSM excerpts included in Appendix E). TABLE 7: CITY OF SAN DIEGO TRAFFIC THRESHOLDS FOR POTENTIAL ROADWAY IMPROVEMENTS Facility Thresholds for Considering an Improvement Transit Project causes transit movement to operate at LOS E or worse Signalized Intersection No Existing Left-Turn Lane: If the project adds traffic to an individual left turn movement causing the total number of peak hour left turns to exceed 100, consider adding a left turn lane. Existing Single Left-Turn Lane: If the project adds traffic to an individual left turn movement causing the total number of peak hour left turns to exceed 300, consider adding a second left turn lane. No Existing Right Turn-Lane: If the addition of a right turn lane will not negatively affect other roadway users, will maintain a comfortable roadway environment, AND the project adds traffic to an individual right turn movement causing the total number of peak hour right turns to exceed 500, consider adding a right turn lane. Existing Single Right-Turn Lane: If the addition of a right turn lane will not negatively affect other roadway users, will maintain a comfortable roadway environment, AND the project adds traffic to an individual right turn movement causing the total number of peak hour right turns to exceed 800, consider adding a second right turn lane. Lengthening a Turn Pocket: If the project adds traffic to a turning movement and causes the 95th percentile queue to exceed the available turn pocket length, consider lengthening the turn pocket. Signal Timing Improvements/Signal Modification should be considered for study intersections within a ½ mile path of travel of a Major Transit Stop, if the project causes or adds traffic to an LOS F intersection, or outside ½ mile path of travel of a Major Transit Stop, if the project causes or adds traffic to an LOS E/F intersection. Un- Signalized Intersection An Intersection Control Evaluation should be prepared if: All Way Stop Control: Within a ½ mile path of travel of a Major Transit Stop, if the project causes intersection to degrade to LOS F, or if the project adds traffic to an intersection already operating at LOS F. All Way Stop Control: Outside of a ½ mile path of travel of a Major Transit Stop, if the project causes intersection to degrade to LOS E or F, or if the project adds traffic to an intersection already operating at LOS E or F. Side Street Stop Control: Within a ½ mile path of travel of a Major Transit Stop, if the project causes the worst movement to degrade to LOS F, or if the project adds traffic to an intersection already operating at LOS F. Side Street Stop Control: Outside a ½ mile path of travel of a Major Transit Stop, if the project causes the worst movement to degrade to LOS E or F, or if the project adds traffic to an intersection already operating at LOS E or F. Roadway Segment If the project adds greater than 50% of total daily vehicle trips on the segment, the project should consider implementing the improvements as identified in the community plan. If the project adds less than or equal to 50% of total daily vehicle trips on the segment, the project should evaluate its fair share toward the improvement. Source: City of San Diego Transportation Study Manual, 9/19/2022. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 18 December 1, 2023 7.3 Existing Conditions This section describes the existing study area street system, peak hour intersection volumes, daily roadway volumes, existing LOS, and intersection turn bay queuing. 7.3.1 Existing Street System Within the LMA study area, the following roadways were analyzed as part of this study. Palm Avenue from I-805 SB Ramps to I-805 NB Ramps is classified as a 6-Lane Prime in the City of San Diego Otay Mesa-Nestor Community Plan, December 1996. Palm Avenue from I-805 NB Ramps to Dennery Road is classified as a 7-Lane Prime in the City of San Diego Otay Mesa Community Plan Update, March 2014. Palm Avenue from I-805 SB Ramps to I-805 NB Ramps is constructed as a four (4) lane undivided roadway with a center double-double yellow striping. There are Class II bike lanes in each direction. On-street parking is prohibited on both side of the roadway. From I-805 NB Ramps to Dennery Road, Palm Avenue is currently constructed as a seven (7) lane divided roadway (four westbound travel lanes and three eastbound travel lanes). There are Class II bike lanes in each direction and on-street parking prohibited on both sides of the roadway. A posted speed limit was not observed on Palm Avenue between I-805 SB Ramps and Dennery Road; however, west of I-805 the posted speed limit is 35 MPH. Dennery Road is classified as a 4-Lane Major between Palm Avenue and Regatta Lane and as a 4- Lane Collector between Regatta Lane and Red Fin Lane/Red Coral Lane in the Otay Mesa Community Plan Update, March 2014. Dennery Road between Palm Avenue and Red Fin Lane/Red Coral Lane is constructed as a four-lane divided roadway with Class II bike lanes in each direction. On-street parking is prohibited on both sides of the roadway. The posted speed limit is 35 MPH. Excerpts from the Otay Mesa Community Plan Update and Otay Mesa Nestor Community Plan are included in Appendix F. The existing conditions are shown in Figure 5. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 19 December 1, 2023 Figure 5: Existing Conditions Signal Signal Signal Signal 4U 4D 7D 4D 4D No Scale N Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 6 4 6 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n e r y Rd De n n e r y Rd Dennery Rd Re d Fi n Ln Re d Co r a l Ln The Landing Kentmere Terrace City of Chula Vista City of San DIego RTO LEGEND Analyzed with stop control without physical sign in place 2U Two Lane Un-divided Roadway Lane Geometry MPH Miles Per Hour 4D Four Lane Divided Roadway RTO Right Turn Overlap Phase Existing Roadways Proposed Roadways Ocean View Hills Pkwy Ra i s e d M e d i a n 5 De n n e r y Rd Ra i s e d M e d i a n The Landing Driveway Power Line Access Road Approximate new project driveway location. Existing right-in/right-out driveway will be closed and replaced with full height curb and gutter. A new 25-foot wide driveway is proposed approximately 40 feet southwest of the existing driveway that will be closed. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 20 December 1, 2023 7.3.2 Existing Traffic Volumes and LOS Analyses Existing counts were collected between 7:00 AM and 9:00 AM for the AM commuter period and from 4:00 PM to 6:00 PM for the PM commuter period on Wednesday, February 5, 2020. Street segment counts were also collected on Wednesday, February 5, 2020. These counts were collected before the State of California issued a mandatory statewide stay-at-home order on March 19, 2020 due to COVID-19. The intersections included: 1) Palm Ave/I-805 SB Ramps 2) Palm Ave/I-805 NB Ramps 3) Palm Ave/Dennery Rd 4) Dennery Rd/Project Driveway 5) Dennery Rd/The Landing Dwy 6) Dennery Rd/Red Coral Ln/Red Fin Ln The street segments included: 1) Palm Ave between I-805 SB Ramps and I-805 NB Ramps 2) Palm Ave between I-805 NB Ramps and Dennery Rd 3) Dennery Rd between Palm Ave and Regatta Ln 4) Dennery Rd between Regatta Ln and Project Driveway 5) Dennery Rd between Project Driveway and Red Coral Ln/Red Fin Ln The existing AM, PM, and daily volumes are shown on Figure 6, with count data included in Appendix G. The intersection LOS is shown in Table 8. The 95th percentile turning queues where the project will add traffic, are shown in Table 9. The segment LOS is shown in Table 10. The intersections were analyzed based on existing signal timing. The signal timing sheets are included in Appendix H. The intersection LOS and queueing output are included in Appendix I. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 21 December 1, 2023 Figure 6: Existing Volumes 610 2 759 334 80 28 (813) (5) (1188)(419) (57) (62) 678 (471) 1102 (1266) 574 (553) 53 (58) 939 (817) 356 (444) 1100 (1514) 512 (740) 458 (304) 515 (651) 187 (149) 273 (394) 364 (227) 200 (182) 91 3 299 786 111 236 (130) (4) (454) (474) (54) (223) 0 486 486 70 5 1 () (254) (254) (38) (5) () 30 (11) 37 (114) 3 (3) 75 (217) 246 (127) 0()6 (30) 1 (5) 162 145 17 56 5 1 (435) (394) (41) (36) (3) (4) 36,383 ADT 49,173 ADT 13,869 ADT 8,333 ADT 8,224 ADT No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 22 December 1, 2023 TABLE 8: EXISTING INTERSECTION LOS Intersection and Approach Peak (Analysis)1 Hour Delay 2 LOS3 1) Palm Ave at All AM 35.3 D I-805 SB Ramps (S) All PM 43.8 D 2) Palm Ave at All AM 29.1 C I-805 NB Ramps (S) All PM 49.8 D 3) Palm Ave at All AM 70.6 E Dennery Rd (S) All PM 72.4 E 4) Dennery Rd at EB AM 0.0 A Project Driveway (U) EB PM 0.0 A 5) Dennery Rd at The WB AM 8.9 A Landing Driveway (U) WB PM 9.8 A 6) Dennery Rd at All AM 16.6 B Red Fin Ln (S) All PM 16.8 B Notes: 1) Intersection Analysis - (S) Signalized, (U) Unsignalized. 2) Delay - HCM Average Control Delay in seconds. 3) LOS: Level of Service. Existing TABLE 9: EXISTING INTERSECTION TURN LANE QUEUING Existing Distance Intersection Peak Approach 95th %ile Exceeds Exceeding Hour Queue1 (ft)Storage? Storage (ft) 1) Palm Ave at AM WBL 190 (2) 177 No NA I-805 SB Ramps (S)AM SBL 1,850 (3) 448 No NA PM WBL 190 (2)230 Yes 40 PM SBL 1,850 (3)604 No NA 2) Palm Ave at AM WBR 1,000 (4) 410 No NA I-805 NB Ramps (S) AM NBR 1,450 (3) 245 No NA PM WBR 1,000 (4)259 No NA PM NBR 1,450 (3) 348 No NA 3) Palm Ave at AM EBL 280 (2)307 Yes 27 Dennery Rd (S) AM SBR 95 (2)136 Yes 41 PM EBL 280 (2)306 Yes 26 PM SBR 95 (2)132 Yes 37 6) Dennery Rd at AM EBL 190 (2) 47 No NA Red Fin Ln (S)PM EBL 190 (2)98 No NA Notes: WBL: Westbound Left. NBR: Northbound Right. EB: Eastbound. WB: Westbound. NBL: Northbound Left. NA: Not Applicable. (1) Queue is 95th percentile from SimTraffic analysis. (2) Stop bar to end of turn lane striping. (3) Stop bar to ramp gore point. (4) Dual right turn lanes are a continuation of two travel extending back 1,000 feet to Dennery Rd. BOLD = SimTraffic 95th %ile forecasted queue beyond storage bay capacity. Storage Length in feet (notes) TABLE 10: EXISTING SEGMENT ADT VOLUMES AND LOS Segment Functional LOS E Daily Classification Capacity Volume V/C LOS Dennery Road Palm Ave to Regatta Ln 4 Lane Major 40,000 13,869 0.347 A Regatta Ln to Landing Dwy 4 Lane Major 40,000 8,333 0.208 A Landing Dwy to Red Coral 4 Lane Major 40,000 8,224 0.206 A Palm Avenue I-805 SB Ramps to NB Ramps 4 Lane Collector 30,000 36,383 1.213 E I-805 NB Ramps to Dennery Rd 7 Lane Prime 70,000 49,173 0.702 C Notes: Daily volume is a 24 hour volume. LOS: Level of Service. V/C: Volume to Capacity Ratio. Existing Under existing conditions, there are 95th percentile storage lane deficiencies at 1) I-805 SB Ramps/Palm Ave WB left PM, 2) Dennery Road/Palm Avenue EB left and SB right AM & PM. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 23 December 1, 2023 7.4 Project The proposed project includes up to 221 residential dwelling units (a mix of up to 67 detached condominiums, 84 duplexes and 70 multi-family units). The project site is currently vacant and is located at the 450 block of Dennery Road. Project opening is forecasted to occur in 2025. 7.4.1 Project Access Project access is proposed from a single private driveway that will connect to Dennery Road with right-in/right-out movements due to an existing raised median. No modification is proposed to the existing median on Dennery Road along the project frontage. The existing driveway provides controlled access to utility transmission lines. The existing driveway will be closed and replaced with full height curb and gutter. A new 25-foot driveway is proposed approximately 40 feet southwest of the existing driveway that will be closed. The existing utility access road will have a new connection to the project’s driveway as shown on the site plan. The two-lane project access will include non-contiguous sidewalks and bike lanes on both sides. 7.4.2 Project Trip Generation and Distribution The trip generation for the project was calculated using trip rates from the City of San Diego Trip Generation Manual, May 2003 (excerpt included in Appendix J). The project is calculated to generate 1,902 ADT with 153 AM peak hour trips (31 inbound and 122 outbound) and 190 PM peak hour trips (133 inbound and 57 outbound) as shown in Table 11. TABLE 11: PROJECT TRIP GENERATION Proposed Land Use ADT % IN OUT % IN OUT Residential - Single Family 10 /DU 67 DU 670 8% 0.2 0.8 11 43 10% 0.7 0.3 47 20 Residential - Multi Family 8 /DU 154 DU 1,232 8% 0.2 0.8 20 79 10% 0.7 0.3 86 37 Totals:1,902 8% 0.2 0.8 31 122 10% 0.7 0.3 133 57 AM Total: PM Total: Source: City of San Diego Trip Generation Manual , May 2003. DU: Dwelling Unit. ADT: Average Daily Traffic. Split-% inbound and outbound. 153 190 PM Pk Hr Rate Size & Units Split Split AM Pk Hr Project traffic was distributed to the adjacent roadway network based on a Series 13 Year 2012 SANDAG Select Zone Assignment (Appendix K). The project distribution is shown in Figure 7. Please note that the SANDAG traffic model documented single digit distribution (<10%) to surface streets in Chula Vista (i.e. the Main St distribution of 3% results in 4 or less peak hour directional trips and 57 ADT). The project assignment is shown in Figure 8. Please note that two percent (2%) of outbound project trips (3 AM and 1 PM) will make a southbound U-turn at Dennery Rd/Regatta Ln for eastbound travel and 98% of inbound project trips would make a U-turn at Dennery Rd/Red Fin/Red Coral intersection (30 AM and 130 PM). LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 24 December 1, 2023 Figure 7: Project Distribution 51%82% 9% 7% 51% 82% 7% 16% 16% 67% 31% 15% 15% 9% 100% 100% 98% 2% 2% 100% 100% 100% No Scale N LEGEND #Intersection Reference Number to LOS Tables Existing Roadways Distribution Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 6 64 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Dennery Rd Re d Fi n L n Re d Co r a l Ln 7% 16% 2% 9% 15% 51% 100% Proposed Roadways 82% 49% 98% 100% 100% City of Chula Vista City of San DIego 3%3%Main St 45% 2% U-Turn 5 De n n e r y Rd The Landing Driveway LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 25 December 1, 2023 Figure 8: Project Assignment Chula Vista Main St (first interchange north of Palm) is forecasted to receive 4 directional peak hour trips and 57 daily trips based on 3% distribution. SB U-Turns at Dennery/Regatta AM 3 PM (1) 0016 100 10 9 () () (68)(47) (5) (4) 0 () 62 (29) 25 (109) 2 (9) 5 (21) 19 (9) 21 (89) 38 (18) 0 () 0 () 0() 18(9) 0() 0() 004 030 () () (20) () (12) () 31 0 31 0 0 0 (133) () (133) () () () 0 () 30 (130) 0 () 3(1) 1(3) 122 (57)0() 0() 33 33 0 0 0 0 (131) (131) () () () () ADT 38 ADT 1,902 ADT 1,902 932 ADT ADT ADT 304 171 ADT 133 ADT 1,864 ADT 1,560 No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd 1 3 LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 26 December 1, 2023 7.5 Opening Year 2025 without Project Conditions The Opening Year 2025 without Project conditions describe the anticipated roadway operations during the opening year of the project anticipated to be in 2025. This scenario includes surrounding reasonably foreseeable projects added to the existing traffic volumes. Due to the location of the project, no City of Chula Vista projects are anticipated to contribute traffic to the study area. Upon review of available cumulative project information in Open DSD and discussion with City of San Diego staff, the following cumulative projects were identified that are anticipated to add traffic to the study area roadways used by the project: 1) AMC-Amendment (PTS# 569517) – An existing retail center that is proposed to have a portion of the existing movie theater repurposed with additional retail uses and two drive-thru restaurants. The project is located on the southwest corner of Palm Ave at Dennery Rd. This project has been approved by City of San Diego decision-makers. This project was under construction in February 2020 when traffic data was collected. 2) Azul Playa Del Sol/Luna (California Terraces PA 6) and SCR (PTS# 605702) – A residential project with up to 739 multi-family units located on the south corner of Ocean View Hills Parkway and Del Sol Blvd. Approximately 369 units were occupied when counts were collected in February 2020; therefore, 370 units are yet to be constructed. 3) California Terraces PA61 (PTS# 605191) – A mixed use (residential + commercial) project with up to 267 multi-family units, up to 45,000 sf of commercial, and a 0.19 acre private park located on the southeast corner of Otay Mesa Road and Caliente Avenue. This project has been approved by City of San Diego decision-makers. An amendment to change the 45,000 square feet of commercial on the western portion of the site to 79 multi-family dwelling units was approved by City Council on 11/15/2022 under PTS# 690358. The 79 multi-family dwelling units are forecasted to have an overall reduction in weekday trip generation from the original analysis and a negligible change in peak hour trips at the SR-905/Caliente Ave interchange. The original trip generation for this project was included to provide a conservative analysis. 4) Candlelight (PTS# 40329) – A multi-family project with 475 units located on Caliente Avenue south of Airway Road. This project has been approved by City of San Diego decision- makers, although an amendment to existing permit PTS# 691625 is currently under review. 5) Central Village Specific Plan (Total Project) – A mixed use (residential + commercial) project with 425 multi-family units (<20 du/ac), 4,060 multi-family units (>20 du/ac), 139,700 sf of community commercial, 16.1 acres of active park space, and 1 elementary school (K-8) ; however, the initial phase for Central Village is Lumina TM (described below) planned in year 2027, after the planned opening of Nakano, thus no cumulative trips were included in the year 2024 opening day scenario. This Specific Plan has been approved by City of San Diego decision-makers. 6) Dennery Park (Project ID: RD22001) – A 9-acre city park generally located on the north side of Dennery Road at Black Coral Way. This project has been approved by City of San Diego decision-makers. Per the City of San Diego CIP Project Map Viewer, construction is anticipated to begin in 2023. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 27 December 1, 2023 7) Handler Retail Center (PTS# 659064) – A retail center with 24,000 sf restaurant, 6,000 sf fast food, and 189 room motel located on the south side of Otay Mesa Road between Emerald Crest Court and Corporate Center Drive. This project has been approved by City of San Diego decision- makers, although a CPA/Rezone is currently in process to change the land use designation from “Community Commercial – Residential Prohibited” to “Community Commercial – Residential Permitted”, and rezone from existing CC-2-3 zone to CC-3-6 and change the project to 430 multi- family units and 6,000 SF of retail/commercial uses. This cumulative project is being analyzed with the original trip generation to provide a more conservative analysis. 8) Lumina TM (PTS# 555609 subset of Central Village SP) – A subset of the Central Village Specific Plan; however, the phases for Lumina II & III are planned to open in 2027 after the planned opening of Nakano. Therefore, no cumulative trips from Lumina II & III were included in the year 2025 opening day scenario. This project has been approved by City of San Diego decision-makers. 9) Metropolitan Airpark (PTS# 559378) SCR (PTS# 664354) – An aviation and commercial project with expansion of existing aviation uses, commercial office, industrial, restaurants, and hotel located on the northeast corner of Otay Mesa Road and Heritage Road. By year 2024, Phase 1 of the Metropolitan Airpark is anticipated to add traffic to the study area. This project has been approved by City of San Diego decision-makers. 10) Southview (PTS# 370044) – A multi-family project with 277 units located on Airway Road east of Caliente Avenue. This project has been approved by City of San Diego decision-makers. 11) Southview East (PTS# 371807) – A multi-family project with 136 units located on Airway Road east of Caliente Avenue. This project has been approved by City of San Diego decision- makers. The total trip generation for this project was included to provide a conservative analysis because the number of occupied units were unknown at the time of the data collection in February 2020. 12) Southwind (Previous PTS# 412529) – A multi-family project with 100 units located west of Caliente Avenue and south of Airway Road. This project has been approved by City of San Diego decision-makers. While this project has been closed and no permit was issued, the traffic from this cumulative project was included to provide a conservative analysis. 13) Southwest Village VTM-1 (PTS# 614791) – A residential project with up to 920 units located south of Airway Road and Caliente Avenue. This project is under review by City of San Diego decision-makers. VTM-1 is anticipated to open in year 2025. Cumulative project trip assignments that are anticipated to add traffic to the study area roadways are included in Appendix L. The cumulative project trip generation is summarized below in Table 12. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 28 December 1, 2023 TABLE 12: CUMULATIVE PROJECT TRIP GENERATION Cumulative Status ADT Project In Out Total In Out Total 1 AMC-Amendment (PTS# 569517)Approved 2,511 85 60 145 111 192 303 2 Azul Playa Del Sol (CA Terraces PA 6) SCR PTS# 605702 Approved, 370 du remaining during data collection 2,960 47 189 236 207 89 296 3 California Terraces PA61 Residential (PTS# 690358) Modification Under Review 4,716 101 151 252 271 215 486 4 Candlellight Residential (PTS# 40329) Amdnemdnt (PTS# 691625)_ Approved 2,850 46 182 228 180 77 257 5 Central Village Specific Plan Approved 6 Dennery Park Approved 450 11 7 18 14 22 36 7 Handler Mixed-Use (PTS# 659064) CPA/Rezone I process Approved 9,021 280 274 554 379 360 739 8 Lumina TM Approved 9 Metorpolitan Airpark Phase 1 (PTS 559378) SCR (PTS# 664354) Approved 9617520953171102 10 Southview (PTS# 371807) Approved 2,216 35 142 177 155 66 221 11 Southview East (PTS# 371807)Approved 1,088 17 70 87 76 33 109 12 Southwind (PTS# 415529) Approved 800 13 51 64 56 24 80 13 Southwest Village VTM-1 (PTS# 619791)Proposed 7,084 114 454 568 484 208 692 34,657 824 1,600 2,424 1,964 1,357 3,321 AM Peak Hour AM Peak Hour No phases proposed for completion by 2024 No phases proposed for completion by 2024 Cumulative vol. during data collection (Feb 2020): A map showing the cumulative project locations are shown on Figure 9. The combined cumulative project traffic volumes are shown on Figure 10. Opening Year 2025 traffic volumes (existing + cumulative) without the project are shown on Figure 11. The intersection LOS is shown in Table 13. The 95th percentile turning queues where the project will add traffic are shown in Table 14. The segment LOS is shown in Table 15. The intersection LOS and queueing output are included in Appendix M. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 29 December 1, 2023 Figure 9: Cumulative Project Locations Dennery Park CA PA61 Azul Playa Del Sol Candlelight Southview Handler Southview East South - wind SWV VTM-1 Google Maps Metropolitan Airpark Central Village SP & Lumina No Scale N AMC Amendment Project Location LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 30 December 1, 2023 Figure 10: Cumulative Project Volumes 0030 050 () () (67)() (9) () 0 () 51 (65) 0 () 0 () 26 (44) 29 (52) 56 (111) 38 (82) 18 (61) 52 (28) 3 (1) 10 (33) 40 (52) 52 (43) 1 0 14 37 4 23 (3) () (19) (119) (11) (77) 03 3 001 () (7) (7) () () (1) 0()0() 0(1) 3(4) 3(6) 0()0() 2(5) 330002 (5) (5) () () () (3) 1,648 ADT 2,440 ADT 125 ADT 140 ADT 130 ADT No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 31 December 1, 2023 Figure 11: Opening Year 2025 without Project Volumes 610 2 789 334 85 28 (813) (5) (1255)(419) (66) (62) 678 (471) 1153 (1331) 574 (553) 53 (58) 965 (861) 385 (496) 1156 (1625) 550 (822) 476 (365) 567 (679) 190 (150) 283 (427) 404 (279) 252 (225) 92 3 313 823 115 259 (133) (4) (473) (593) (65) (300) 0 489 489 70 5 2 () (261) (261) (38) (5) (1) 30 (11) 37 (114) 3 (4) 78 (221) 249 (133) 0()6 (30) 3 (10) 165 148 17 56 5 3 (440) (399) (41) (36) (3) (7) 38,031 ADT 51,613 ADT 13,994 ADT 8,473 ADT 8,354 ADT No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 32 December 1, 2023 TABLE 13: OPENING YEAR 2025 WITHOUT PROJECT INTERSECTION LOS Intersection and Approach Peak (Analysis)1 Hour Delay 2 LOS3 1) Palm Ave at All AM 35.6 D I-805 SB Ramps (S) All PM 56.4 E 2) Palm Ave at All AM 33.3 C I-805 NB Ramps (S) All PM 60.0 E 3) Palm Ave at All AM 77.1 E Dennery Rd (S) All PM 91.0 F 4) Dennery Rd at EB AM 0.0 A Project Driveway (U) EB PM 0.0 A 5) Dennery Rd at The WB AM 8.9 A Landing Driveway (U) WB PM 9.8 A 6) Dennery Rd at All AM 17.0 B Red Fin Ln (S) All PM 17.0 B Opening Year Notes: 1) Intersection Analysis - (S) Signalized, (U) Unsignali zed. 2) Delay - HCM Average Control Delay in seconds. 3) LOS: Level of Service. TABLE 14: OPENING YEAR 2025 WITHOUT PROJECT INTERSECTION TURN LANE QUEUING Opening Year Distance Intersection Peak Approach 95th %ile Exceeds Exceeding Hour Queue1 (ft)Storage? Storage (ft) 1) Palm Ave at AM WBL 190 (2)183 No NA I-805 SB Ramps (S)AM SBL 1,850 (3)491 No NA PM WBL 190 (2)230 Yes 40 PM SBL 1,850 (3)811 No NA 2) Palm Ave at AM WBR 1,000 (4) 422 No NA I-805 NB Ramps (S) AM NBR 1,450 (3) 278 No NA PM WBR 1,000 (4)309 No NA PM NBR 1,450 (3) 366 No NA 3) Palm Ave at AM EBL 280 (2)348 Yes 68 Dennery Rd (S) AM SBR 95 (2)136 Yes 41 PM EBL 280 (2)307 Yes 27 PM SBR 95 (2)140 Yes 45 6) Dennery Rd at AM EBL 190 (2)51 No NA Red Fin Ln (S)PM EBL 190 (2)108 No NA Storage Notes: WBL: Westbound Left. NBR: Northbound Right. EB: Eastbound. WB: Westbound. NBL: Northbound Left. NA: Not Applicable. (1) Queue is 95th percentile from SimTraffic analysis. (2) Stop bar to end of turn lane striping. (3) Stop bar to ramp gore point. (4) Dual right turn lanes are a continuation of two travel extending back 1,000 feet to Dennery Rd. BOLD = SimTraffic 95th %ile forecasted queue beyond storage bay capacity. Length in feet (notes) TABLE 15: OPENING YEAR 2025 WITHOUT PROJECT SEGMENT ADT VOLUMES AND LOS Daily Functional LOS E Daily Classification Capacity Volume V/C LOS Dennery Road Palm Ave to Regatta Ln 4 Lane Major 40,000 13,994 0.350 A Regatta Ln to Landing Dwy 4 Lane Major 40,000 8,473 0.212 A Landing Dwy to Red Coral 4 Lane Major 40,000 8,354 0.209 A Palm Avenue I-805 SB Ramps to NB Ramps 4 Lane Collector 30,000 38,031 1.268 E I-805 NB Ramps to Dennery Rd 7 Lane Prime 70,000 51,613 0.737 C Notes: Daily volume is a 24 hour volume. LOS: Level of Service. V/C: Volume to Capacity Ratio. Opening Year Under Opening Year 2025 without Project conditions, there are calculated 95th percentile storage lane deficiencies at: 1) I-805 SB Ramps/Palm Ave WB left PM, 2) Dennery Road/Palm Avenue EB left and SB right AM & PM. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 33 December 1, 2023 7.6 Opening Year 2025 plus Project Conditions This scenario documents the addition of project traffic onto Opening Year 2025 conditions. The volumes shown in Figure 12. The intersection LOS is shown in Table 16. The 95th percentile turning queues where the project will add traffic, are shown in Table 17. The segment LOS is shown in Table 18. The intersection LOS and queueing output are included in Appendix N. TABLE 16: OPENING YEAR 2025 PLUS PROJECT INTERSECTION LOS Intersection and Approach Peak (Analysis)1 Hour Delay 2 LOS3 Delay2 LOS3 Delta4 1) Palm Ave at All AM 35.6 D 36.1 D 0.5 I-805 SB Ramps (S) All PM 56.4 E 58.9 E 2.5 2) Palm Ave at All AM 33.3 C 39.2 D 5.9 I-805 NB Ramps (S) All PM 60.0 E 66.3 E 6.3 3) Palm Ave at All AM 77.1 E 91.6 F 14.5 Dennery Rd (S) All PM 91.0 F 111.7 F 20.7 4) Dennery Rd at EB AM 0.0 A 11.2 B 11.2 Project Driveway (U) EB PM 0.0 A 10.0 B 10.0 5) Dennery Rd at The WB AM 8.9 A 9.0 A 0.1 Landing Driveway (U) WB PM 9.8 A 10.4 B 0.6 6) Dennery Rd at All AM 17.0 B 18.5 B 1.5 Red Fin Ln (S) All PM 17.0 B 18.5 B 1.5 Opening Year Opening Year plus Project Notes: 1) Intersection Analysis - (S) Signalized, (U) Unsignalized. 2) Delay - HCM Average Control Delay in seconds. 3) LOS: Level of Service. 4) Delta is the increase in delay. TABLE 17: OPENING YEAR 2025 PLUS PROJECT INTERSECTION TURN LANE QUEUING Opening Year Intersection Peak Approach 95th %ile 95 th %ile Exceeds Distance Hour Queue1 (ft) Queue 1 (ft)Storage? in feet 1) Palm Ave at AM WBL 190 (2)183 186 No NA I-805 SB Ramps (S)AM SBL 1,850 (3)491 510 No NA PM WBL 190 (2)230 238 Yes 48 PM SBL 1,850 (3)811 1,060 No NA 2) Palm Ave at AM WBR 1,000 (4)422 426 No NA I-805 NB Ramps (S)AM NBR 1,450 (3)278 282 No NA PM WBR 1,000 (4)309 334 No NA PM NBR 1,450 (3) 366 652 No NA 3) Palm Ave at AM EBL 280 (2)348 361 Yes 81 Dennery Rd (S) AM SBR 95 (2)136 137 Yes 42 PM EBL 280 (2)307 335 Yes 55 PM SBR 95 (2)140 141 Yes 46 6) Dennery Rd at AM EBL 190 (2)51 77 No NA Red Fin Ln (S)PM EBL 190 (2)108 178 No NA Storage Notes: WBL: Westbound Left. NBR: Northbound Right. EB: Eastbound. WB: Westbound. NBL: Northbound Left. NA: Not Applicable. (1) Queue is 95th percentile from SimTraffic analysis. (2) Stop bar to end of turn lane striping. (3) Stop bar to ramp gore point. (4) Dual right turn lanes are a continuation of two travel extending back 1,000 fee t to Dennery Rd. BOLD = SimTraffic 95th %ile forecasted queue b eyond storage bay ca pacity. Opening Year + Project Length in feet (notes) LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 34 December 1, 2023 Figure 12: Opening Year 2025 plus Project Volumes 610 2 805 434 95 37 (813) (5) (1323)(466) (71) (66) 678 (471) 1215 (1360) 599 (662) 55 (67) 970 (882) 404 (505) 1177 (1714) 588 (840) 476 (365) 567 (679) 190 (150) 301 (436) 404 (279) 252 (225) 92 3 317 823 118 259 (133) (4) (493) (593) (77) (300) 31 489 520 70 5 2 (133) (261) (394) (38) (5) (1) 30 (11) 67 (244) 3 (4) 81 (222) 250 (136) 122 (57)6 (30) 3 (10) 198 181 17 56 5 3 (571) (530) (41) (36) (3) (7) 38,963 ADT 53,173 ADT 15,858 ADT 10,375 ADT 10,256 ADT No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 35 December 1, 2023 TABLE 18: OPENING YEAR 2025 PLUS PROJECT SEGMENT ADT VOLUMES AND LOS Opening Year Project Segment Functional LOS E Daily Daily Daily Project % Classification Capacity Volume V/C LOS Volume Volume V/C LOS of Total ADT Dennery Road Palm Ave to Regatta Ln 4 Lane Major 40,000 13,994 0.350 A 1,864 15,858 0.396 B 12% Regatta Ln to Landing Dwy 4 Lane Major 40,000 8,473 0.212 A 1,902 10,375 0.259 A 18% Landing Dwy to Red Coral 4 Lane Major 40,000 8,354 0.209 A 1,902 10,256 0.256 A 19% Palm Avenue I-805 SB Ramps to NB Ramps 4 Lane Collector 30,000 38,031 1.268 E 932 38,963 1.299 E 2% I-805 NB Ramps to Dennery Rd 7 Lane Prime 70,000 51,613 0.737 C 1,560 53,173 0.760 C 3% Notes: Daily volume is a 24 hour volume. LOS: Level of Service. V/C: Volume to Capacity Ratio. Opening Year plus Project Under Opening Year 2025 plus Project conditions, the project adds more than 50 peak hour turn moves or more than 500 daily trips to the study locations forecasted to operate at LOS E/F; and/or has the potential to exceed the existing turn lane storage capacities at the following locations: 1) Intersection of Palm Ave/I-805 SB Ramps: a. Project would add 9 PM WB lefts under LOS E and continue to exceed existing storage. b. No improvements are proposed because Caltrans has a circulated Environmental Document (MND/EA) and a Ready to List (RTL) date of August 2023. The scope of work and ultimate plan is as proposed in the MND/ED with details included in Appendix S. Per ECP, Phase 1 (widening of the south side of the bridge on Palm Ave) is fully funded for design. Funding for construction has not been acquired. As of 4/14/2023, City was awarded a $24M federal grant. Per ECP, additional funding is needed for Phase 1 construction. 2) Intersection of Palm Ave/Dennery Rd: a. Project would add 25 AM & 109 PM EB lefts under LOS F and exceed existing storage. b. Project would add 100 AM & 47 PM SB rights under LOS F and exceed existing storage. c. City criteria states if project adds traffic and causes the 95th percentile queue to exceed storage, then consider lengthening the pocket. The Owner/Permittee proposes the following improvements: i. Extend the eastbound dual left turn bay with 280 feet of storage per lane by an additional 85 feet of storage per lane with appropriate taper for a total of 365 feet of storage per lane under Opening Year conditions that will accommodate the Opening Year 2025 Plus Project forecasted 95th percentile queue of 361 feet. ii. Extend the southbound right turn lane with 95 feet of storage by an additional 50 feet of storage with appropriate taper for a total of 145 feet of storage to accommodate the forecasted 95th percentile queue of 141 feet. 3) Intersection of Dennery Rd/Red Coral Ln/Red Fin Ln: a. Project would add 130 PM peak hour EB u-turning vehicles. b. The Owner/Permittee proposes to extend the eastbound left turn lane with 190 feet of storage by an additional 50 feet of storage with appropriate tape for a total of 240 feet of storage to accommodate the project traffic. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 36 December 1, 2023 4) Segment of Palm Ave between I-805 SB Ramps and I-805 NB Ramps: a. Project adds 932 daily trips under forecasted LOS E conditions on the existing 4 lane roadway. b. A fair share of 2.5% is proposed toward planned Caltrans Palm Ave bridge widening to a 5 Lane Major configuration anticipated to be completed after year 2024. Concept drawings for the proposed improvements at Palm Ave/Dennery Rd and Dennery Rd/Red Coral Ln/Red Fin Ln are included in Appendix O. The fair share calculations for Palm Ave are included in Appendix P. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 37 December 1, 2023 7.7 Horizon Year 2062 without Project Conditions A Horizon Year 2062 scenario was prepared because the project site is currently designated as open space and zoned A-8 Agricultural and will be redesignated Residential High (RH). The project requires a change from existing zone A-8 Agricultural to a proposed zone R3P Resident. The Horizon Year volumes were obtained from multiple sources that included: 1) Otay Mesa Community Plan Update (OMCPU), 2) factored up using a growth factor, or 3) SANDAG horizon year traffic model as follows: Study intersections and volumes source: 1) Palm Ave/I-805 SB Ramps (OMCPU) 2) Palm Ave/I-805 NB Ramps (OMCPU) 3) Palm Ave/Dennery Rd (OMCPU) 4) Dennery Rd/Project Driveway (Growth Factor on Major Rd) 5) Dennery Rd/The Landing Driveway (Growth Factor on Major Rd) 6) Dennery Rd/Red Coral Ln/Red Fin Ln (Growth Factor on Major Rd) The street segments and volume source: 1) Palm Ave between I-805 SB Ramps and I-805 NB Ramps (SANDAG) 2) Palm Ave between I-805 NB Ramps and Dennery Rd (OMCPU) 3) Dennery Rd between Palm Ave and Regatta Ln (OMCPU) 4) Dennery Rd between Regatta Ln and Project Driveway (OMCPU) 5) Dennery Rd between Project Driveway and Red Coral Ln/Red Fin Ln (OMCPU) The growth factor for intersections #4) Dennery Rd/Project Dwy #5) Dennery Rd/The Landing Dwy and #6) Dennery Rd/Red Coral Ln/Red Fin Ln were calculated from the increase in the segment volumes on Dennery Road between existing year 2020 and year 2062 ADTs. The calculated growth factor of 52% was applied to the existing through movements along Dennery Rd at these three intersections. The minor legs did not have the growth factor applied because they serve existing communities that are built-out. The growth factor accounts for the horizon year connection of Dennery Road easterly to Avenida de Las Vistas, that also connects to Otay Valley Road providing a connection into Chula Vista and Otay Mesa. The Horizon Year volumes and growth factor calculations are included in Appendix Q. The segment of Palm Ave between I-805 SB Ramps and I-805 NB Ramps did not have a documented horizon year volume in the OMCPU; therefore, the latest available (at the time of the analysis) was obtained from the SANDAG Series 13 horizon highest year 2050 volume. The SANDAG year 2050 daily volume of 46,000 on the bridge was considered to be reasonable and slightly conservative because the same Series 13 year 2050 SANDAG Palm Ave volume just east of the bridge is 61,700, which is higher than the OMCPU Palm Ave year 2062 volume of 59,500 for the same segment just east of the bridge. The SANDAG year 2050 volume is included in Appendix R. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 38 December 1, 2023 The Horizon Year 2062 analysis is based on the geometry shown in Figure 13, which incorporates the Caltrans’ EIR Palm Ave interchange improvements (Appendix S). Per ECP, Phase 1 (widening of the south side of the bridge on Palm Ave) is fully funded for design. Funding for construction has not been acquired. As of 4/14/2023, City was awarded a $24M federal grant. Per ECP, additional funding is needed for Phase 1 construction. The Horizon Year 2062 volumes without the project are shown in Figure 14. The intersection LOS is shown in Table 19. The 95th percentile turning queues, for three intersections where the project will be adding more than 50 peak hour turns, are shown in Table 20. The segment LOS is shown in Table 21. The intersection LOS and queueing output are included in Appendix T. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 39 December 1, 2023 Figure 13: Horizon Year 2062 Conditions *Configuration from Caltrans planned interchange improvements. Signal Signal Signal Configuration from Configuration from Caltrans planned interchange improvements Caltrans planned interchange improvements Signal 4D 5U* 4D 4D 7D No Scale N Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 6 4 6 3 Project Driveway Palm Ave De n n e r y Rd De n n e r y Rd Dennery Rd Re d Fi n Ln Re d Co r a l Ln The Landing Kentmere Terrace City of Chula Vista City of San DIego RTO LEGEND Analyzed with stop control without physical sign in place 2U Two Lane Un-divided Roadway Lane Geometry MPH Miles Per Hour 4D Four Lane Divided Roadway RTO Right Turn Overlap Phase Existing Roadways Proposed Roadways Ocean View Hills Pkwy Ra i s e d M e d i a n Power Line Access Road 5 De n n e r y Rd Ra i s e d M e d i a n The Landing Driveway 21 Palm Ave I- 8 0 5 SB Ra m p s Palm Ave I- 8 0 5 NB Ra m p s Existing right-in/right-out driveway will be closed and replaced with full height curb and gutter. A new driveway is proposed approximately 40 feet south of the existing driveway that will be closed. Approximate new project driveway location. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 40 December 1, 2023 Figure 14: Horizon Year 2062 without Project Volumes 570 1 1095 500 200 50 (770) (1) (1400)(400) (190) (50) 655 (540) 1280 (1380) 600 (600) 60 (50) 890 (900) 355 (615) 1330 (1760) 575 (1000) 515 (630) 790 (490) 175 (145) 280 (500) 450 (900) 200 (150) 60 1 385 600 50 110 (115) (1) (620) (750) (150) (250) 0 740 740 70 5 2 () (390) (390) (38) (5) (1) 30 (11) 37 (114) 3 (4) 110 (330) 370 (190) 0()6 (30) 3 (10) 250 220 17 56 5 3 (660) (600) (41) (36) (3) (7) 46,000 ADT 59,500 ADT 19,500 ADT 12,500 ADT 12,500 ADT No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 41 December 1, 2023 TABLE 19: HORIZON YEAR 2062 WITHOUT PROJECT INTERSECTION LOS Intersection and Approach Peak (Analysis)1 Hour Delay 2 LOS3 1) Palm Ave at All AM 24.4 C -805 SB Ramps (S) All PM 37.9 D 2) Palm Ave at All AM 41.4 D -805 NB Ramps (S) All PM 66.2 E 3) Palm Ave at All AM 119.7 F Dennery Rd (S) All PM 188.4 F 4) Dennery Rd at EB AM 0.0 A Project Driveway (U) EB PM 0.0 A 5) Dennery Rd at The EB AM 9.2 A Landing Driveway (U) EB PM 10.7 B 6) Dennery Rd at All AM 16.5 B Red Fin Ln (S) All PM 16.4 B Horizon Year Notes: 1) Intersection Analysis - (S) Signalized, (U) Unsignalized. 2) Delay - HCM Average Control Delay in seconds. 3) LOS: Level of Service. TABLE 20: HORIZON YEAR 2062 WITHOUT PROJECT INTERSECTION TURN LANE QUEUING Horizon Year Distance Intersection Peak Approach 95th %ile Exceeds Exceeding Hour Queue1 (feet)Storage? Storage (ft) 1) Palm Ave at AM WBL 500 (2)156 No NA I-805 SB Ramps (S)AM SBL 1,850 (3)471 No NA PM WBL 500 (2)217 No NA PM SBL 1,850 (3)509 No NA 2) Palm Ave at AM WBR 1,000 (4)203 No NA I-805 NB Ramps (S)AM NBR 1,450 (5)123 No NA PM WBR 1,000 (4)202 No NA PM NBR 1,450 (5) 230 No NA 3) Palm Ave at AM EBL 280 (2)328 Yes 48 Dennery Rd (S) AM SBR 95 (2)121 Yes 26 PM EBL 280 (2)301 Yes 21 PM SBR 95 (2)136 Yes 41 6) Dennery Rd at AM EBL 190 (2)58 No NA Red Fin Ln (S)PM EBL 190 (2)115 No NA Length in Storage feet (notes) Notes: WBL: Westbound Left. NBR: Northbound Right. EB: Eastbound. WB: Westbound. NBL: Northbound Left. NA: Not Applicable. (1) Queue is 95th percentile from SimTraffic analysis. (2) Stop bar to end of turn lane striping. (3) The SB left and left-through lanes both extend back to off-ramp gore approximately 1,850 feet from stop bar. (4) One of the dual right turn lanes is a continuation of one travel extending back approximately 1,000 feet to Dennery Rd. (5) The NB dual right turn lanes extend back to off-ramp gore approximately 1,450 feet from stop bar. BOLD = SimTraffic 95th %ile forecasted queue beyond storage bay capacity. TABLE 21: HORIZON YEAR 2062 WITHOUT PROJECT SEGMENT ADT VOLUMES AND LOS Segment Functional LOS E Daily Classification Capacity Volume V/C LOS Dennery Road Palm Ave to Regatta Ln 4 Lane Major 40,000 19,500 0.488 B Regatta Ln to Landing Dwy 4 Lane Major 40,000 12,500 0.313 A Landing Dwy to Red Coral 4 Lane Major 40,000 12,500 0.313 A Palm Avenue I-805 SB Ramps to NB Ramps 5 Lane Major 45,000 46,000 1.022 F I-805 NB Ramps to Dennery Rd 7 Lane Prime 70,000 59,500 0.850 C Notes: Daily volume is a 24 hour volume. LOS: Level of Service. V/C: Volume to Capacity Ratio. Horizon Year Under Horizon Year 2062 without Project conditions, there is a calculated 95th percentile storage lane deficiency at Dennery Road/Palm Avenue EB left AM & PM and SB right AM & PM. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 42 December 1, 2023 7.8 Horizon Year 2062 plus Project Conditions The Horizon Year 2062 plus Project conditions were analyzed by adding the project traffic onto Horizon Year volumes. Horizon Year 2062 volumes plus project traffic are shown in Figure 15. The intersection LOS is shown in Table 22. The 95th percentile turning queues for intersections where the project will add traffic are shown in Table 23. The segment LOS is shown in Table 24. The intersection LOS and queueing output are included in Appendix U. TABLE 22: HORIZON YEAR 2062 PLUS PROJECT INTERSECTION LOS Intersection and Approach Peak (Analysis)1 Hour Delay 2 LOS3 Delay2 LOS3 Delta4 1) Palm Ave at All AM 24.4 C 24.5 C 0.1 I-805 SB Ramps (S) All PM 37.9 D 39.7 D 1.8 2) Palm Ave at All AM 41.4 D 48.9 D 7.5 I-805 NB Ramps (S) All PM 66.2 E 69.7 E 3.5 3) Palm Ave at All AM 119.7 F 133.1 F 13.4 Dennery Rd (S) All PM 188.4 F 218.5 F 30.1 4) Dennery Rd at EB AM 0.0 A 13.3 B 13.3 Project Driveway (U) EB PM 0.0 A 10.7 B 10.7 5) Dennery Rd at The EB AM 9.2 A 9.3 A 0.1 Landing Driveway (U) EB PM 10.7 B 11.3 B 0.6 6) Dennery Rd at All AM 16.5 B 17.6 B 1.1 Red Fin Ln (S) All PM 16.4 B 17.9 B 1.5 3) LOS: Level of Service. 4) Delta is the increase in delay. Horizon Year Horizon Year plus Project Notes: 1) Intersection Analysis - (S) Signalized, (U) Unsignalized. 2) Delay - HCM Average Control Delay in seconds. TABLE 23: HORIZON YEAR 2062 PLUS PROJECT INTERSECTION TURN LANE QUEUING Horizon Year Intersection Peak Approach 95th %ile 95 th %ile Exceeds Distance Hour Queue1 (feet) Queue 1 (feet)Storage? in feet 1) Palm Ave at AM WBL 500 (2)156 156 No NA I-805 SB Ramps (S)AM SBL 1,850 (3)471 483 No NA PM WBL 500 (2)217 234 No NA PM SBL 1,850 (3)509 916 No NA 2) Palm Ave at AM WBR 1,000 (4)203 207 No NA I-805 NB Ramps (S)AM NBR 1,450 (5)123 124 No NA PM WBR 1,000 (4)202 330 No NA PM NBR 1,450 (5) 230 354 No NA 3) Palm Ave at AM EBL 280 (2)328 331 Yes 51 Dennery Rd (S) AM SBR 95 (2)121 124 Yes 29 PM EBL 280 (2)301 308 Yes 28 PM SBR 95 (2)136 139 Yes 44 6) Dennery Rd at AM EBL 190 (2)58 79 No NA Red Fin Ln (S)PM EBL 190 (2)115 207 Yes 17 Length in Storage Horizon Year + Project feet (notes) Notes: WBL: Westbound Left. NBR: Northbound Right. EB: Eastbound. WB: Westbound. NBL: Northbound Left. NA: Not Applicable. (1) Queue is 95th percentile from SimTraffic analysis. (2) Stop bar to end of turn lane striping. (3) The SB left and left-through lanes both extend back to off-ramp gore approximately 1,850 feet from stop bar. (4) One of the dual right turn lanes is a continuation of one travel extending back approximately 1,000 feet to Dennery Rd. (5) The NB dual right turn lanes extend back to off-ramp gore approximately 1,450 feet from stop bar. BOLD = SimTraffic 95th %ile forecasted queue beyond storage bay capacity. LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 43 December 1, 2023 Figure 15: Horizon Year 2062 plus Project Volumes 570 1 1111 600 210 59 (770) (1) (1468)(447) (195) (54) 655 (540) 1342 (1409) 625 (709) 62 (59) 895 (921) 374 (624) 1351 (1849) 613 (1018) 515 (630) 790 (490) 175 (145) 298 (509) 450 (900) 200 (150) 60 1 389 600 53 110 (115) (1) (640) (750) (162) (250) 31 740 771 70 5 2 (133) (390) (523) (38) (5) (1) 30 (11) 67 (244) 3 (4) 113 (331) 371 (193) 122 (57)6 (30) 3 (10) 283 253 17 56 5 3 (791) (731) (41) (36) (3) (7) 46,932 ADT 61,060 ADT 21,364 ADT 14,402 ADT 14,402 ADT No Scale N LEGEND XX AM peak hour volumes at intersections (YY) PM peak hour volumes at intersections Z,ZZZ ADT volumes shown along segments #Intersection Reference Number to LOS Tables Existing Roadways Red Coral Ln Ocean View Hills Pkwy Dennery Rd Dennery Rd Palm Ave Red Fin Ln 21 3 Project Location Regatta Ln 4 5 4 2 31 Palm Ave I- 8 0 5 SB Ra m p s Project Driveway Palm Ave I- 8 0 5 NB Ra m p s Palm Ave De n n - er y R d De n n e r y Rd The Landing Island Breeze Ln Admiral Wy Black Coral Wy Kentmere Terrace Proposed Roadways City of Chula Vista City of San DIego 21 3 Project Location 4 5 6 4 2 31 Ocean View Hills Pkwy 5 6 Dennery Rd Re d Fi n L n Re d Co r a l Ln The Landing Driveway De n n e r y Rd LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 44 December 1, 2023 TABLE 24: HORIZON YEAR 2062 PLUS PROJECT SEGMENT ADT VOLUMES AND LOS Project Segment Functional LOS E Daily Daily Daily Project % Classification Capacity Volume V/C LOS Volume Volume V/C LOS of Total ADT Dennery Road Palm Ave to Regatta Ln 4 Lane Major 40,000 19,500 0.488 B 1,864 21,364 0.534 C 9% Regatta Ln to Landing Dwy 4 Lane Major 40,000 12,500 0.313 A 1,902 14,402 0.360 A 13% Landing Dwy to Red Coral 4 Lane Major 40,000 12,500 0.313 A 1,902 14,402 0.360 A 13% Palm Avenue I-805 SB Ramps to NB Ramps 5 Lane Major 45,000 46,000 1.022 F 932 46,932 1.043 F 2% I-805 NB Ramps to Dennery Rd 7 Lane Prime 70,000 59,500 0.850 C 1,560 61,060 0.872 D 3% Notes: Daily volume is a 24 hour volume. LOS: Level of Service. V/C: Volume to Capacity Ratio. Horizon Year Horizon Year plus Project Under Horizon Year 2062 plus Project conditions, the project adds more than 50 peak hour turn moves or more than 500 daily trips to the study locations forecasted to operate at LOS E/F; and/or has the potential to exceed the existing turn lane storage capacities at the following locations: 1) Intersection of Palm Ave/Dennery Rd. a. Project would add 25 AM & 109 PM EB lefts under LOS F and exceed existing storage. b. Project would add 100 AM & 47 PM SB rights under LOS F and exceed existing storage. c. City criteria states if project adds traffic and causes the 95th percentile queue to exceed storage, then consider lengthening the pocket. The Owner/Permittee proposes the following improvements with conceptual designs to demonstrate feasibility included in Appendix O: i. Extend the eastbound dual left turn storage bay with 280 feet of storage per lane by an additional 85 feet of storage with appropriate taper for a total of 365 feet of storage per lane under near-term conditions that will also accommodate the year 2062 forecasted 95th percentile queue of 331 feet. ii. Extend the southbound right turn lane with 95 feet of storage by an additional 50 feet of storage with appropriate taper for a total of 145 feet of storage to accommodate the maximum forecasted 95th percentile queue of 141 feet. 2) Intersection of Dennery Rd/Red Coral Ln/Red Fin Ln: a. Project would add 130 PM peak hour EB u-turning vehicles and is forecasted to exceed the existing left turn lane. b. Owner/Permittee proposes to extend the eastbound left turn lane of 190 feet of storage by an additional 50 feet of storage for a total of 240 feet of storage under Opening Year 2025 plus project conditions, which is forecasted to accommodate the forecasted 95th percentile queue of 207 feet under Horizon Year 2062 plus Project traffic conditions. 3) Segment of Palm Ave between I-805 SB Ramps and I-805 NB Ramps: a. Project adds 932 daily trips under forecasted LOS F conditions after the Caltrans bridge widening. b. No improvements are proposed because Caltrans has a circulated Environmental Document (MND/EA) and a Ready to List (RTL) date of August 2023. The scope of work and ultimate plan is as proposed in the MND/ED with details included in Appendix S. Per ECP, Phase 1 (widening of the south side of the bridge on Palm Ave) is fully funded for design. Funding for construction has not been acquired. As of LOS Engineering, Inc. Nakano 221 Homes LMA Traffic and Transportation 45 December 1, 2023 4/14/2023, City was awarded a $24M federal grant. Per ECP, additional funding is needed for Phase 1 construction. # # # Appendix A Local Mobility ½ Mile Study Area Nakano LMA Appendix Page 1 of 194 NORTH Distance Mapping for Study Area (1/2 mile from center of project driveway intersection)        Nakano LMA Appendix Page 2 of 194 SOUTH Distance Mapping for Study Area (1/2 mile from center of project driveway intersection)      Nakano LMA Appendix Page 3 of 194 EAST Distance Mapping for Study Area (1/2 mile from center of project driveway intersection)        Nakano LMA Appendix Page 4 of 194 WEST Distance Mapping for Study Area (1/2 mile from center of project driveway intersection)        Nakano LMA Appendix Page 5 of 194 Appendix B Excerpts from City of San Diego Bicycle Master Plan Update and Community Plan Nakano LMA Appendix Page 6 of 194 &LW\RI6DQ'LHJR %LF\FOH0DVWHU3ODQ  6DQ'LHJR&DOL I RUQLD ),1$/±'HFHEHU 35(3$5(' %< $OWD3ODQQLQJ'HVLJQ 35(3$5(')25 7KH&LW\RI6DQ'LHJR Nakano LMA Appendix Page 7 of 194   City of San Diego Bicycle Master Plan, December 2013    Existing Bicycle Routes                                                                                       Nakano LMA Appendix Page 8 of 194 Nakano LMA Appendix Page 9 of 194 OTAY MESA COMMUNITY PLAN Amendment Date Approved by Planning Commission Resolution Number Date Adopted by City Council Resolution Number Otay Mesa Community Plan Adopted February 13, 2014 March 11, 2014 R-308810 Corrections to address inconsistencies between the Land Use and Zoning Map. Minor map and text corrections to show land use and the removal of paper streets from map figures April 30, 2015 R-4685 June 2, 2015 R-309773 Otay Mesa Central Village February 23, 2017 April 13, 2017 R-311020 Specific Plan Adopted Editor’s note: After the adoption of the Otay Mesa Community Plan, it was noticed that Figure 3-2 depicted the street classifications for Otay Pacific Drive, Otay Pacific Place, and Las Californias incorrectly; these streets were classified pursuant to City Council Resolution R-307235 on January 10, 2012, which the reclassification was not captured in all places in the Otay Mesa Community Update documents, including Figure 3-2; and therefore, Figure 3-2 in Document Number R-308810 is replaced with Figure 3-2. Nakano LMA Appendix Page 10 of 194 Otay Mesa Community Plan ME- 16 Nakano LMA Appendix Page 11 of 194 Appendix C Transit Map and Schedules Nakano LMA Appendix Page 12 of 194 Nakano LMA Appendix Page 13 of 194 Otay Mesa °Palm City °Imperial Beach °Nestor °Otay Mesa A Iris Ave. Transit Center DEPART B Dennery Rd. @ Walmart C Palm Av. & Beyer Way D Palm Av. Trolley Station E Palm Av. & 9th St. F Imperial Beach Bl. & 4th St. G 13th St. & Iris Av. H Coronado Av. & Hollister St. A Iris Ave. Transit Center ARRIVE 5:08a 5:17a 5:24a 5:29a 5:36a 5:43a — 5:52a 6:02a 6:08 6:17 6:24 6:29 6:36 6:43 — 6:52 7:03 7:08 7:17 7:25 7:30 7:38 7:46 — 7:55 8:06 7:58 8:07 8:15 8:20 8:28 8:36 — 8:45 8:56 8:48 8:57 9:05 9:10 9:19 9:27 —9:36 9:47 9:38 9:48 9:56 10:01 10:10 10:18 — 10:27 10:39 10:18 10:28 10:36 10:41 10:50 10:58 — 11:07 11:19 10:48 10:58 11:06 11:11 11:20 11:28 —11:37 11:49 11:18 11:28 11:36 11:41 11:50 11:58 —12:08p 12:20p 11:47 11:57 12:05p 12:10p 12:19p 12:28p — 12:38 12:50 12:17p 12:27p 12:35 12:40 12:49 12:58 —1:08 1:20 12:47 12:57 1:05 1:10 1:19 1:28 — 1:38 1:50 1:17 1:27 1:35 1:40 1:49 1:58 — 2:08 2:20 1:45 1:56 2:04 2:09 2:19 2:28 — 2:38 2:50 2:15 2:26 2:35 2:40 2:50 2:59 —3:09 3:22 2:45 2:56 3:05 3:10 3:20 3:29 — 3:39 3:52 3:16 3:27 3:36 3:41 3:51 4:00 — 4:10 4:23 3:46 3:57 4:06 4:11 4:21 4:30 — 4:39 4:52 4:16 4:27 4:36 4:41 4:51 5:00 — 5:09 5:22 5:16 5:27 5:36 5:41 5:51 6:00 — 6:09 6:21 6:23 6:33 6:41 6:46 6:56 7:04 — 7:13 7:24 7:23 7:33 7:40 7:45 7:53 8:01 8:10 8:20 8:23 8:33 8:40 8:45 8:52 9:00 — 9:09 9:19 Otay Mesa °Nestor °Imperial Beach °Palm City °Otay Mesa A Iris Ave. Transit Center DEPART H Coronado Av. & Hollister St. G 13th St. & Iris Av. F Imperial Beach Bl. & 4th St. E Palm Av. & 9th St. D Palm Av. Trolley Station C Palm Av. & Beyer Way B Dennery Rd. @ Walmart A Iris Ave. Transit Center ARRIVE ————6:50a 6:59a 7:04a 7:10a 7:22a 7:23a 7:32a — 7:41a 7:50 7:59 8:04 8:10 8:22 8:28 8:37 — 8:46 8:55 9:04 9:09 9:15 9:27 9:28 9:37 — 9:46 9:55 10:05 10:10 10:17 10:29 10:28 10:37 — 10:46 10:55 11:05 11:10 11:17 11:29 11:03 11:12 — 11:21 11:31 11:42 11:47 11:54 12:06p 11:32 11:41 — 11:50 12:00p 12:12p 12:17p 12:24p 12:36 12:01p 12:10p — 12:20p 12:30 12:42 12:47 12:54 1:06 12:30 12:39 — 12:49 12:59 1:11 1:16 1:23 1:35 1:00 1:09 — 1:19 1:29 1:41 1:46 1:53 2:05 1:30 1:39 — 1:49 1:59 2:11 2:16 2:24 2:36 2:00 2:09 — 2:19 2:29 2:41 2:46 2:54 3:06 2:30 2:39 — 2:49 2:59 3:11 3:16 3:24 3:36 3:00 3:09 — 3:19 3:29 3:41 3:46 3:54 4:06 3:32 3:41 — 3:51 4:01 4:13 4:18 4:26 4:38 4:02 4:11 — 4:21 4:31 4:41 4:46 4:54 5:06 5:02 5:11 — 5:20 5:30 5:40 5:45 5:53 6:05 5:58 6:07 — 6:16 6:25 6:35 6:40 6:48 6:59 6:58 7:07 — 7:16 7:25 7:34 7:39 7:46 7:57 7:59 8:08 — 8:17 8:25 8:33 8:38 8:45 8:56 9:00 9:08 — 9:17 9:25 9:32 9:37 9:43 9:54 Route 933A – Sunday / domingo Route 934A – Sunday / domingo Imperial Beach pp Fishing Pier San Diego Bay Sports Park pp Mar Vista H.S. Southland hla Plazaza South Bay u Community m Park Montgomery H.S. Front Gate Southwest H.S. Palmlm Promenaderde (Walmart)(rt) Kaiser K PermanenteermPark & Ride Pa c i f i c O c e a n O ta y R i v e r Naval Auxiliary Aux Landing FieldLanding F Montgomery- ontgomeo Waller ParkWaller ParWa Imperial Beach pp Promenade City HallTijuana Estuary raryLibribrary 4t h S t 4t h S t 9t h S t Sa t u r n B l Coronado Av Satellite Bl Del Sol Bl Palm AvPalm Av Tocay o Av Or o Vi s t a Rd Iris Av Iris AvIris Av Imperial Beach Bl Leon Av Beyer Bl Ho l l i s t e r S t 9t h S t 7t h S t 13 t h S t Ho l l i s t e r S t B e y e r B l Th e r m a l A v 11 t h S t 15 t h S t 27 t h S t Pi c c a r d A v Se a c o a s t D r 3r d S t Ra i n b o w D r 934A 933A B e y e r Bl S i l v e r S t r a n d B l Oro V i s t a R d 2 5 t h S t B e y er W a y Beyer Way D e n n e r y R d Smythe A v O ta y M e s a Rd P i c a d or B l View Hills Ocean Pkwy U C S a n D ie g o Blu e L i n e 5 5 805 805 905 75 IMPERIAL BEACH Palm City Nestors Palm City Otay Mesa 933 933 933 933 934 934 934 933 934 934 901 901 901 901 Iris Avenue Transit Center UC San Diego Blue Line 901 929 905 932 950 906 907 Palm Avenue Trolley Station , UC San Diego Blue Line932 F H G A B E D C 933 934 Timepoint and/or transfer point Transfer point A Weekdays and Saturday only Sunday only N Thank you for riding MTS! ¡Gracias por viajar con MTS! For more information on riding MTS services, pick up a Rider’s Guide on a bus or at the Transit Store, or visit sdmts.com. Para obtener más información sobre el uso de los servicios de MTS, recoja un ‘Rider’s Guide’ en un autobús o en la Transit Store, o visita a sdmts.com. DIRECTORY / Directorio MTS Information & Trip Planning MTS Información y planeo de viaje 511 or/ó (619) 233-3004 TTY/TDD (teletype for hearing impaired) Teletipo para sordos (619) 234-5005 or/ó (888) 722-4889 InfoExpress (24-hour info via Touch-Tone phone) Información las 24 horas (via teléfono de teclas)(619) 685-4900 Customer Service / Suggestions Servicio al cliente / Sugerencias (619) 557-4555 MTS Security MTS Seguridad (619) 595-4960 Lost & Found Objetos extraviados (619) 233-3004 Transit Store (619) 234-1060 12th & Imperial Transit Center M–F 8am–5pm For MTS online trip planning Planifi cación de viajes por Internet sdmts.com Alternative formats available upon request. Please call: (619) 557-4555 / Formato alternativo disponible al preguntar. Favor de llamar: (619) 557-4555 The schedules and other information shown in this timetable are subject to change. MTS does not assume responsibility for errors in timetables nor for any inconvenience caused by delayed buses. Los horarios e información que se indican en este itinerario están sujetos a cambios. MTS no asume responsabilidad por errores en los itinerarios, ni por ningún perjuicio que se origine por los autobuses demorados. A Saturday or Sunday schedule will be operated on the following holidays and observed holidays Se operará con horario de sábado o domingo durante los siguientes días festivos y feriados observados New Year’s Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving, Christmas>>> ONE-WAY FARES / Tarifas Sencillas Exact fare, please / Favor de pagar la cantidad exacta Adult / Adulto $2.50 Senior/Disabled/Medicare*Personas Mayores/con Discapacidades/Medicare*$1.25 Youth (ages 6-18)* Jóvenes (edades 6-18)*$2.50 DAY PASS (Regional) / Pase diario (Regional) Adult / Adulto $6.00 Senior/Disabled/Medicare*Personas Mayores/con Discapacidades/Medicare*$3.00 Youth (ages 6-18)* Jóvenes (edades 6-18)*$3.00 MONTHLY PASSES / Pases mensual Adult / Adulto $72.00 Senior/Disabled/Medicare*Personas Mayores/con Discapacidades/Medicare*$23.00 Youth (ages 6-18)* Jóvenes (edades 6-18)*$23.00 *Proof of eligibility required. Senior Eligibility: Age 65+ or born on or before September 1, 1959. :LYLX\PLYL]LYPÄJHJP}UKLLSLNPIPSPKHK,SLNPIPSPKHKWHYH7LYZVUHZ4H`VYLZ!,KHKV nacido en o antes del 1 de septiembre, 1959. COMPASS CARDS / Tarjeta Compass There is a $2 charge for Compass Cards, which can be reloaded for future use. Hay un costo de $2 por la tarjeta Compass Card, la cual puede ser recargada para usos futuros. COMPASS CLOUD Download the free Compass Cloud app on your Apple or Android phone. Descargue la aplicación gratis Compass Cloud en su teléfono Apple o Android. Visit sdmts.com/fares for more info. Visite sdmts.com/fares para más información. sdmts.com Route Alerts, Updated Schedules, Connections & More 04/20 933 Iris Transit Center – Seacoast via Imperial Beach Bl. or Palm Av. °°° ° Effective APRIL 12, 2020 934 DESTINATIONS •°0TWLYPHS)LHJO7PLY •°2HPZLY7LYTHULU[L •°4HY=PZ[H/PNO:JOVVS •°4VU[NVTLY`/PNO:JOVVS •°5H]HS(\_PSPHY`3HUKPUN-PLSK •°7HST7YVTLUHKL>HSTHY[ •°:V\[O^LZ[/PNO:JOVVS •°0YPZ(]L •°7HST(]L TROLLEY CONNECTIONS Nakano LMA Appendix Page 14 of 194 Otay Mesa °Palm City °Imperial Beach °Nestor °Otay Mesa A Iris Ave. Transit Center DEPART B Dennery Rd. @ Walmart C Palm Av. & Beyer Way D Palm Av. Trolley Station E Palm Av. & 9th St. F Imperial Beach Bl. & 4th St. G 13th St. & Iris Av. H Coronado Av. & Hollister St. A Iris Ave. Transit Center ARRIVE 4:38a 4:47a 4:54a 4:59a 5:05a 5:11a 5:17a 5:23a 5:33a 5:08 5:17 5:24 5:29 5:36 5:43 5:49 5:55 6:07 5:38 5:47 5:54 5:59 6:06 6:14 6:20 6:26 6:39 6:08 6:17 6:24 6:29 6:37 6:45 6:51 6:58 7:12 6:38 6:48 6:56 7:02 7:10 7:19 7:25 7:32 7:46 7:08 7:18 7:27 7:33 7:42 7:51 7:57 8:04 8:18 7:38 7:48 7:57 8:03 8:12 8:21 8:27 8:34 8:48 7:58 8:08 8:17 8:23 8:32 8:41 8:47 8:54 9:08 8:22 8:32 8:40 8:45 8:54 9:02 9:08 9:15 9:28 8:39 8:49 8:57 9:02 9:11 9:19 9:25 9:32 9:45 8:58 9:08 9:16 9:21 9:30 9:38 9:44 9:51 10:04 9:18 9:28 9:36 9:41 9:50 9:58 10:04 10:11 10:24 9:38 9:48 9:56 10:01 10:10 10:18 10:24 10:31 10:44 9:58 10:08 10:16 10:21 10:30 10:38 10:44 10:51 11:04 10:18 10:28 10:36 10:41 10:50 10:58 11:04 11:11 11:24 10:38 10:48 10:56 11:01 11:10 11:18 11:24 11:31 11:44 10:58 11:08 11:16 11:21 11:30 11:38 11:44 11:51 12:04p 11:18 11:28 11:36 11:41 11:50 11:58 12:04p 12:11p 12:24 11:38 11:48 11:56 12:01p 12:10p 12:18p 12:24 12:31 12:44 11:58 12:08p 12:16p 12:21 12:30 12:38 12:44 12:51 1:04 12:18p 12:28 12:36 12:41 12:50 12:58 1:04 1:11 1:24 12:38 12:48 12:56 1:01 1:10 1:18 1:24 1:31 1:44 12:58 1:08 1:16 1:21 1:30 1:38 1:44 1:51 2:04 1:18 1:28 1:36 1:41 1:50 1:58 2:04 2:11 2:24 1:38 1:49 1:57 2:02 2:12 2:20 2:26 2:34 2:47 1:58 2:09 2:17 2:22 2:32 2:40 2:46 2:54 3:07 2:15 2:26 2:35 2:40 2:50 2:59 3:06 3:15 3:29 2:35 2:46 2:55 3:01 3:11 3:20 3:28 3:37 3:52 2:55 3:06 3:15 3:21 3:31 3:40 3:48 3:57 4:12 3:14 3:25 3:34 3:40 3:50 3:59 4:07 4:16 4:31 3:34 3:45 3:54 4:00 4:10 4:19 4:27 4:36 4:51 3:54 4:05 4:14 4:20 4:30 4:39 4:47 4:56 5:11 4:14 4:25 4:34 4:40 4:50 4:59 5:07 5:16 5:31 4:34 4:45 4:54 5:00 5:11 5:19 5:26 5:34 5:48 4:54 5:05 5:14 5:20 5:31 5:39 5:46 5:54 6:08 5:14 5:25 5:34 5:40 5:51 5:59 6:06 6:14 6:28 5:34 5:45 5:54 5:59 6:09 6:17 6:23 6:31 6:43 5:54 6:05 6:13 6:18 6:28 6:36 6:42 6:49 7:00 6:14 6:25 6:33 6:38 6:48 6:56 7:02 7:09 7:20 6:38 6:49 6:57 7:02 7:11 7:19 7:25 7:32 7:42 7:08 7:18 7:26 7:31 7:39 7:47 7:53 8:00 8:10 7:38 7:48 7:55 8:00 8:08 8:16 8:22 8:28 8:38 8:08 8:18 8:25 8:30 8:38 8:46 8:52 8:58 9:08 8:38 8:48 8:55 9:00 9:07 9:15 9:21 9:27 9:37 9:38 9:48 9:55 10:00 10:07 10:15 10:21 10:27 10:37 10:39 10:48 10:54 10:59 11:05 11:12 11:18 11:24 11:34 11:39 11:48 11:54 11:59 12:05a 12:12a 12:18a 12:24a 12:34a Otay Mesa °Palm City °Imperial Beach °Nestor °Otay Mesa A Iris Ave. Transit Center DEPART B Dennery Rd. @ Walmart C Palm Av. & Beyer Way D Palm Av. Trolley Station E Palm Av. & 9th St. F Imperial Beach Bl. & 4th St. G 13th St. & Iris Av. H Coronado Av. & Hollister St. A Iris Ave. Transit Center ARRIVE 5:08a 5:17a 5:24a 5:29a 5:36a 5:43a 5:49a 5:55a 6:05a 6:08 6:17 6:24 6:29 6:36 6:43 6:49 6:56 7:07 6:38 6:47 6:55 7:00 7:08 7:16 7:22 7:29 7:40 7:08 7:17 7:25 7:30 7:38 7:46 7:52 7:59 8:10 7:38 7:47 7:55 8:00 8:08 8:16 8:22 8:29 8:40 7:58 8:07 8:15 8:20 8:28 8:36 8:42 8:49 9:00 8:22 8:31 8:39 8:44 8:53 9:01 9:07 9:14 9:25 8:39 8:48 8:56 9:01 9:10 9:18 9:24 9:31 9:42 8:58 9:07 9:15 9:20 9:29 9:37 9:43 9:50 10:01 9:18 9:28 9:36 9:41 9:50 9:58 10:04 10:11 10:23 9:38 9:48 9:56 10:01 10:10 10:18 10:24 10:31 10:43 9:58 10:08 10:16 10:21 10:30 10:38 10:44 10:51 11:03 10:18 10:28 10:36 10:41 10:50 10:58 11:04 11:11 11:23 10:38 10:48 10:56 11:01 11:10 11:18 11:24 11:31 11:43 10:58 11:08 11:16 11:21 11:30 11:38 11:44 11:51 12:03p 11:18 11:28 11:36 11:41 11:50 11:58 12:04p 12:11p 12:23 11:38 11:48 11:56 12:01p 12:10p 12:19p 12:25 12:32 12:44 11:58 12:08p 12:16p 12:21 12:30 12:39 12:45 12:52 1:04 12:18p 12:28 12:36 12:41 12:50 12:59 1:05 1:12 1:24 12:38 12:48 12:56 1:01 1:10 1:19 1:25 1:32 1:44 12:58 1:08 1:16 1:21 1:30 1:39 1:45 1:52 2:04 1:18 1:28 1:36 1:41 1:50 1:59 2:05 2:12 2:24 1:38 1:49 1:57 2:02 2:12 2:21 2:27 2:34 2:46 1:58 2:09 2:17 2:22 2:32 2:41 2:47 2:54 3:06 2:18 2:29 2:38 2:43 2:53 3:02 3:08 3:15 3:28 2:38 2:49 2:58 3:03 3:13 3:22 3:28 3:35 3:48 2:58 3:09 3:18 3:23 3:33 3:42 3:48 3:55 4:08 3:18 3:29 3:38 3:43 3:53 4:02 4:08 4:15 4:28 3:38 3:49 3:58 4:03 4:13 4:22 4:28 4:35 4:48 3:58 4:09 4:18 4:23 4:33 4:42 4:48 4:55 5:08 4:18 4:29 4:38 4:43 4:53 5:02 5:08 5:15 5:28 4:38 4:49 4:58 5:03 5:13 5:22 5:28 5:35 5:47 4:58 5:09 5:18 5:23 5:33 5:42 5:48 5:55 6:07 5:18 5:29 5:38 5:43 5:53 6:02 6:08 6:15 6:27 5:38 5:48 5:56 6:01 6:11 6:19 6:25 6:32 6:43 5:58 6:08 6:16 6:21 6:31 6:39 6:45 6:52 7:03 6:18 6:28 6:36 6:41 6:51 6:59 7:05 7:12 7:23 6:38 6:48 6:56 7:01 7:10 7:18 7:24 7:30 7:40 7:08 7:18 7:25 7:30 7:38 7:46 7:52 7:58 8:08 7:38 7:48 7:55 8:00 8:08 8:16 8:22 8:28 8:38 8:08 8:18 8:25 8:30 8:37 8:45 8:51 8:57 9:07 8:38 8:48 8:55 9:00 9:07 9:15 9:21 9:27 9:37 9:38 9:48 9:55 10:00 10:07 10:15 10:21 10:27 10:37 10:39 10:48 10:54 10:59 11:05 11:12 11:18 11:24 11:34 11:39 11:48 11:54 11:59 12:05a 12:12a 12:18a 12:24a 12:34a Otay Mesa °Nestor °Imperial Beach °Palm City °Otay Mesa A Iris Ave. Transit Center DEPART H Coronado Av. & Hollister St. G 13th St. & Iris Av. F Imperial Beach Bl. & 4th St. E Palm Av. & 9th St. D Palm Av. Trolley Station C Palm Av. & Beyer Way B Dennery Rd. @ Walmart A Iris Ave. Transit Center ARRIVE 4:38a 4:47a 4:54a 4:59a 5:05a 5:11a 5:17a 5:23a 5:33a 5:08 5:17 5:24 5:29 5:36 5:43 5:49 5:55 6:07 5:38 5:47 5:54 5:59 6:06 6:14 6:20 6:26 6:39 6:08 6:17 6:24 6:29 6:37 6:45 6:51 6:58 7:12 6:38 6:48 6:56 7:02 7:10 7:19 7:25 7:32 7:46 7:08 7:18 7:27 7:33 7:42 7:51 7:57 8:04 8:18 7:38 7:48 7:57 8:03 8:12 8:21 8:27 8:34 8:48 7:58 8:08 8:17 8:23 8:32 8:41 8:47 8:54 9:08 8:22 8:32 8:40 8:45 8:54 9:02 9:08 9:15 9:28 8:39 8:49 8:57 9:02 9:11 9:19 9:25 9:32 9:45 8:58 9:08 9:16 9:21 9:30 9:38 9:44 9:51 10:04 9:18 9:28 9:36 9:41 9:50 9:58 10:04 10:11 10:24 9:38 9:48 9:56 10:01 10:10 10:18 10:24 10:31 10:44 9:58 10:08 10:16 10:21 10:30 10:38 10:44 10:51 11:04 10:18 10:28 10:36 10:41 10:50 10:58 11:04 11:11 11:24 10:38 10:48 10:56 11:01 11:10 11:18 11:24 11:31 11:44 10:58 11:08 11:16 11:21 11:30 11:38 11:44 11:51 12:04p 11:18 11:28 11:36 11:41 11:50 11:58 12:04p 12:11p 12:24 11:38 11:48 11:56 12:01p 12:10p 12:18p 12:24 12:31 12:44 11:58 12:08p 12:16p 12:21 12:30 12:38 12:44 12:51 1:04 12:18p 12:28 12:36 12:41 12:50 12:58 1:04 1:11 1:24 12:38 12:48 12:56 1:01 1:10 1:18 1:24 1:31 1:44 12:58 1:08 1:16 1:21 1:30 1:38 1:44 1:51 2:04 1:18 1:28 1:36 1:41 1:50 1:58 2:04 2:11 2:24 1:38 1:49 1:57 2:02 2:12 2:20 2:26 2:34 2:47 1:58 2:09 2:17 2:22 2:32 2:40 2:46 2:54 3:07 2:15 2:26 2:35 2:40 2:50 2:59 3:06 3:15 3:29 2:35 2:46 2:55 3:01 3:11 3:20 3:28 3:37 3:52 2:55 3:06 3:15 3:21 3:31 3:40 3:48 3:57 4:12 3:14 3:25 3:34 3:40 3:50 3:59 4:07 4:16 4:31 3:34 3:45 3:54 4:00 4:10 4:19 4:27 4:36 4:51 3:54 4:05 4:14 4:20 4:30 4:39 4:47 4:56 5:11 4:14 4:25 4:34 4:40 4:50 4:59 5:07 5:16 5:31 4:34 4:45 4:54 5:00 5:11 5:19 5:26 5:34 5:48 4:54 5:05 5:14 5:20 5:31 5:39 5:46 5:54 6:08 5:14 5:25 5:34 5:40 5:51 5:59 6:06 6:14 6:28 5:34 5:45 5:54 5:59 6:09 6:17 6:23 6:31 6:43 5:54 6:05 6:13 6:18 6:28 6:36 6:42 6:49 7:00 6:14 6:25 6:33 6:38 6:48 6:56 7:02 7:09 7:20 6:38 6:49 6:57 7:02 7:11 7:19 7:25 7:32 7:42 7:08 7:18 7:26 7:31 7:39 7:47 7:53 8:00 8:10 7:38 7:48 7:55 8:00 8:08 8:16 8:22 8:28 8:38 8:08 8:18 8:25 8:30 8:38 8:46 8:52 8:58 9:08 8:38 8:48 8:55 9:00 9:07 9:15 9:21 9:27 9:37 9:38 9:48 9:55 10:00 10:07 10:15 10:21 10:27 10:37 10:39 10:48 10:54 10:59 11:05 11:12 11:18 11:24 11:34 11:39 11:48 11:54 11:59 12:05a 12:12a 12:18a 12:24a 12:34a Otay Mesa °Nestor °Imperial Beach °Palm City °Otay Mesa A Iris Ave. Transit Center DEPART H Coronado Av. & Hollister St. G 13th St. & Iris Av. F Imperial Beach Bl. & 4th St. E Palm Av. & 9th St. D Palm Av. Trolley Station C Palm Av. & Beyer Way B Dennery Rd. @ Walmart A Iris Ave. Transit Center ARRIVE 5:29a 5:36a 5:42a 5:48a 5:55a 6:02a 6:06a 6:12a 6:22a 5:59 6:06 6:12 6:18 6:25 6:33 6:37 6:43 6:54 6:28 6:36 6:42 6:48 6:56 7:05 7:10 7:16 7:27 6:58 7:06 7:12 7:19 7:27 7:36 7:41 7:47 7:59 7:18 7:27 7:33 7:40 7:49 7:58 8:03 8:09 8:21 7:38 7:47 7:53 8:00 8:09 8:18 8:23 8:29 8:41 7:58 8:07 8:13 8:20 8:29 8:38 8:43 8:49 9:01 8:18 8:27 8:33 8:40 8:49 8:58 9:03 9:09 9:21 8:38 8:47 8:53 9:00 9:09 9:18 9:23 9:29 9:41 8:58 9:07 9:13 9:20 9:29 9:38 9:43 9:49 10:01 9:18 9:27 9:34 9:41 9:50 10:00 10:05 10:12 10:24 9:38 9:47 9:54 10:01 10:10 10:20 10:25 10:32 10:44 9:58 10:07 10:14 10:21 10:30 10:40 10:45 10:52 11:04 10:18 10:27 10:34 10:41 10:50 11:00 11:05 11:12 11:24 10:38 10:47 10:54 11:01 11:10 11:20 11:25 11:32 11:44 10:58 11:07 11:14 11:21 11:30 11:40 11:45 11:52 12:04p 11:18 11:27 11:34 11:41 11:51 12:02p 12:07p 12:14p 12:26 11:38 11:47 11:54 12:01p 12:11p 12:23 12:28 12:35 12:47 11:58 12:07p 12:14p 12:21 12:31 12:43 12:48 12:55 1:07 12:18p 12:27 12:34 12:41 12:51 1:03 1:08 1:15 1:27 12:38 12:47 12:54 1:01 1:11 1:23 1:28 1:35 1:47 12:58 1:07 1:14 1:21 1:31 1:43 1:48 1:55 2:07 1:18 1:27 1:34 1:41 1:51 2:03 2:08 2:15 2:27 1:38 1:47 1:54 2:01 2:11 2:23 2:28 2:36 2:48 1:58 2:07 2:14 2:21 2:31 2:43 2:48 2:56 3:08 2:18 2:27 2:34 2:41 2:51 3:03 3:08 3:16 3:28 2:38 2:47 2:54 3:01 3:11 3:23 3:28 3:36 3:48 2:58 3:07 3:14 3:21 3:31 3:43 3:48 3:56 4:08 3:18 3:27 3:34 3:41 3:51 4:03 4:08 4:16 4:28 3:38 3:47 3:54 4:01 4:11 4:23 4:28 4:36 4:48 3:58 4:07 4:14 4:21 4:31 4:41 4:46 4:54 5:06 4:18 4:27 4:34 4:41 4:51 5:01 5:06 5:14 5:26 4:38 4:47 4:54 5:01 5:11 5:21 5:26 5:34 5:46 4:58 5:07 5:14 5:21 5:31 5:41 5:46 5:54 6:06 5:18 5:27 5:34 5:40 5:50 6:00 6:05 6:13 6:25 5:38 5:47 5:54 6:00 6:10 6:20 6:25 6:33 6:45 5:58 6:07 6:14 6:20 6:29 6:39 6:44 6:52 7:03 6:18 6:27 6:34 6:40 6:49 6:59 7:04 7:12 7:23 6:38 6:47 6:54 7:00 7:09 7:19 7:24 7:32 7:43 6:58 7:07 7:14 7:20 7:29 7:38 7:43 7:50 8:01 7:28 7:37 7:44 7:50 7:58 8:07 8:12 8:19 8:30 7:58 8:07 8:13 8:19 8:27 8:35 — — — 8:44 8:52 8:58 9:04 9:12 9:20 9:25 9:31 9:42 9:43 9:51 9:57 10:03 10:11 10:18 10:23 10:29 10:40 10:43 10:51 10:57 11:03 11:11 11:18 11:23 11:29 11:40 11:59 12:06a 12:12a 12:17a 12:25a 12:32a 12:37a 12:43a 12:54a Route 933 – Monday through Friday / lunes a viernes Route 933 – Saturday / sábado Route 934 – Monday through Friday / lunes a viernes Route 934 – Saturday / sábado EASY FARES! WAY Load money on your Compass Card. COMPASS CASH Compass Service Center (619) 595-5636 sdmts.com Great for One-Ways. Follow prompts on machine to load value. Just tap and ride! CHANGING THE WAY SAN DIEGO MOVES Free mobile ticketing app COMPASS CLOUD • One-Day & 30-Day Passes, Special Events • Good on Buses, Trolley, SPRINTER & COASTER • Multiple Riders per Phone • Fast. Easy. Convenient. sdmts.com/compass-cloud Nakano LMA Appendix Page 15 of 194 Appendix D City of San Diego Roadway Segment Capacity Table Nakano LMA Appendix Page 16 of 194 Appendix B: 1 TSM: APPENDIX F Roadway Segment LOS by Classification and Average Daily Traffic (ADT) Table Appendix F-1 provides street classifications and associated LOS thresholds dependent on the roadway’s average daily traffic (ADT). TABLE APPENDIX F-1 ROADWAY CLASSIFICATIONS, LOS, AND AVERAGE DAILY TRAFFIC (ADT) STREET CLASSIFICATION LANES LEVEL OF SERVICE A B C D E Expressway 8 lanes 40,000 56,000 80,000 93,500 107,000 Expressway 7 lanes 35,000 49,000 70,000 82,000 93,500 Expressway 6 lanes 30,000 42,000 60,000 70,000 80,000 Prime Arterial1 8 lanes 35,000 50,000 70,000 75,000 80,000 Prime Arterial1 7 lanes 30,000 42,500 60,000 65,000 70,000 Prime Arterial 6 lanes 25,000 35,000 50,000 55,000 60,000 Prime Arterial10 5 lanes 20,000 28,000 40,000 45,000 50,000 Prime Arterial11 4 lanes 17,500 24,500 35,000 40,000 45,000 Major Arterial2 7 lanes 22,500 31,500 45,000 50,000 55,000 Major Arterial 6 lanes 20,000 28,000 40,000 45,000 50,000 Major Arterial3 5 lanes 17,500 24,500 35,000 40,000 45,000 Major Arterial 4 lanes 15,000 21,000 30,000 35,000 40,000 Major Arterial 3 lanes 11,250 15,750 22,500 26,250 30,000 Major Arterial 2 lanes 7,500 10,500 15,000 17,500 20,000 Major Arterial (one-way)4 3 lanes 12,500 16,500 22,500 25,000 27,500 Major Arterial (one-way)5 2 lanes 10,000 13,000 17,500 20,000 22,500 Nakano LMA Appendix Page 17 of 194 Appendix B: 2 TSM: APPENDIX F STREET CLASSIFICATION LANES LEVEL OF SERVICE A B C D E Collector (with two-way left turn lane) 5 lanes 12,500 17,500 25,000 30,750 37,500 Collector (with two-way left turn lane) 4 lanes 10,000 14,000 20,000 25,000 30,000 Collector (with two-way left turn lane) 3 lanes 7,500 10,500 15,000 18,750 22,500 Collector (with two-way left turn lane) 2 lanes 5,000 7,000 10,000 13,000 15,000 Collector (without two-way left turn lane) 4 lanes 5,000 7,000 10,000 13,000 15,000 Collector (without two-way left turn lane)6 3 lanes 4,000 5,000 7,500 10,000 11,000 Collector (without two-way left turn lane) 2 lanes 2,500 3,500 5,000 6,500 8,000 Collector (with no fronting property) 2 lanes 4,000 5,500 7,500 9,000 10,000 Collector (one-way)7 3 lanes 11,000 14,000 19,000 22,500 26,000 Collector (one-way)8 2 lanes 7,500 9,500 12,500 15,000 17,500 Collector (one-way)9 1 lane 2,500 3,500 5,000 6,500 7,500 Sub-Collector (Single- family) 2 lanes -- -- 2,200 -- -- Notes: The volumes and the average daily level of service listed above are only intended as a general planning guideline. Levels of service are not applied to residential streets since their primary purpose is to serve abutting lots, not carry through traffic. Levels of service normally apply to roads carrying through traffic between major trip generators and attractors. 1Calculated assuming that each additional lane above a 6-Ln Arterial adds 5,000 ADT for LOS A, 7,500 ADT for LOS B and 10,000 ADT for LOS C, D, and E 2Calculated assuming that ADT is 1/2 way between steps of a 6-Ln Major Arterial & 6 Ln Prime Arterial 3Calculated assuming that ADT is 1/2 way between steps of a 4-Ln Major Arterial & 6 Ln Major Arterial 4Calculated using: Capacity = 0.5 (6-Ln Major (2-way) + Added Capacity of 2,500 ADT) 5Calculated using: Capacity = 0.5 (4-Ln Major (2-way) + Added Capacity of 2,500 ADT) 6Calculated using: Capacity = 4-Ln Collector (no center lane) * (3/4) 7Calculated using: Capacity = 2-Ln Collector (one-way) * (3/2) 8Calculated using: Capacity = 0.5 (4-Ln Collector w/continuous left turn lane) + Added Capacity of 2,500 ADT) 9Calculated using: Capacity = 0.5 (2-Ln Collector w/ continuous left turn lane). Capacity took into account parking friction from both sides of roadway 10 Calculated by applying same differences between 8-Ln Prime & 7-Ln Prime & 7-Ln Prime & 6-Ln Prime 11 Calculated assuming ratio between 6-Ln Prime & 6-Ln Major applied to 4-Ln Major Nakano LMA Appendix Page 18 of 194 Appendix E Excerpts from City of San Diego TSM for Roadway Improvement Criteria Nakano LMA Appendix Page 19 of 194 Transportation Study Manual (TSM) DATE: 09/29/2020 Nakano LMA Appendix Page 20 of 194 33 TSM Local Mobility Analysis (LMA) The Local Mobility Analysis (LMA) evaluates the effects of a development project on mobility, access, circulation, and related safety elements in the proximate area of the project. The LMA has the following objectives: • Ensures that improvements identified in the Community Plan that support multi-modal circulation and access are constructed when needed. • Identifies improvements needed to support and promote active transportation and transit modes. • Ensures the project provides connections to the active transportation network and transit system. • Addresses issues related to operations and safety for all transportation modes. DETERMINING STUDY REQUIREMENTS Screening Criteria All projects must complete an LMA unless they meet the following screening criteria: • Consistent with community plan and zoning designation and generates less than 1,000 daily unadjusted driveway vehicle trips • Inconsistent with community plan or zoning designation and generates less than 500 daily unadjusted driveway vehicle trips • Within the Downtown Community Planning Area and generates less than 2,400 daily unadjusted trips.5 The screening criteria provided serve as a guide to determine study requirements. City staff may determine additional study requirements apply due to location, project complexity, local transportation system complexity, or other local context. City staff will provide a written response to 5 Projects that exceed this threshold shall comply with mitigation measure TRF-A.1.1-2 of the Downtown Community Plan & Downtown Mobility Plan FEIR/SEIR Mitigation Monitoring and Reporting Program. Nakano LMA Appendix Page 21 of 194 34 TSM the PIF and request a meeting with the applicant/consultant if the City has identified the need to perform an LMA despite meeting the screening criteria listed above. Extents of Study The extents of the LMA study will be determined for each mode as follows: • Pedestrian: Documentation of pedestrian facilities and basic deficiencies (missing sidewalk, curb ramps, and major obstructions) within ½ mile walking distance measured from each pedestrian access point (for example, driveways, internal project sidewalk connections to the street, etc.). • Bicycle: Documentation of bicycle facilities and basic deficiencies (bike lane gaps, obstructions) within ½ mile bicycling distance measured from the center of the intersection formed by each project driveway. • Transit: Identification of the closest transit routes and stops to the project. If the transit stops are within ½ mile walking distance of each pedestrian access point, the condition of the stop amenities must be described/evaluated. • Intersection Operations: Intersections are focal points within a mobility network where multiple modes interact and at times, conflict, in their movements. Understanding intersection operations is essential for understanding circulation and safety for all modes that traverse through the intersection. o For Projects that generate less than 2,400 daily final driveway 6 trips the typical study intersections are as follows: ƒ All signalized intersections and signalized project driveways located within ½ mile path of travel distance measured from the center of the intersection formed by each project driveway AND the project will add 50 or more peak hour final primary (cumulative) trips6 to any turning movement at the intersection. ƒ All unsignalized intersections (side street stop controlled, all-way stop- controlled, and roundabouts) and unsignalized project driveways located within ½ mile path of travel distance measured from the center of the 6 Refer to the trip generation chart in the Study Initiation chapter for trip generation definitions. Nakano LMA Appendix Page 22 of 194 35 TSM intersection formed by each project driveway AND the project will add 50 or more peak hour final primary (cumulative) trips6 in either direction. ƒ All freeway ramp terminal intersections where a project adds 50 or more peak hour final primary (cumulative) (AM or PM)6 net new trips in either direction must be analyzed regardless of their distance from the project site. o For Projects that generate more than 2,400 daily final driveway6 trips the typical study intersections are as follows: ƒ All signalized intersections and signalized project driveways where the project will add 50 or more peak hour final primary (cumulative) trips6 to any turning movement at the intersection. ƒ All unsignalized intersections (side street stop controlled, all-way stop- controlled, and roundabouts) and unsignalized project driveways where the project will add 50 or more peak hour final primary (cumulative) trips6 on any approach. ƒ All freeway ramp terminal intersections where a project adds 50 or more peak hour final primary (cumulative) (AM or PM)6 net new trips on any approach must be analyzed regardless of their distance from the project site. • Roadway Segments: The study area should include any roadway segments where the project adds 1,000 or more daily final primary trips (cumulative trips)6 if consistent with the Community Plan, or 500 or more daily final primary trips (cumulative trips) 6 if inconsistent with the Community Plan AND: o Have improvements identified in the community plan; OR o Not built to the community plan ultimate classification (including planned new circulation element roadways). • City staff may determine additional study requirements apply due to location, project complexity, local transportation system complexity, or other local context. For purposes of determining the extent of a the LMA, a project applicant may not segment or piecemeal project submittals to avoid studying a greater project area. If two or more adjacent and similar (in land uses and/or applicant/owner) are submitted as two separate projects within a two- year timeframe of each other, City staff may determine if a larger study area is needed based on the combined trip generation of the projects. Nakano LMA Appendix Page 23 of 194 36 TSM The following graphic provides additional guidance on determining the extents of the study for a project that generates less than 2,400 final daily driveway trips. Study Scenarios The following scenarios should be evaluated for the LMA: • Existing Conditions • Opening Year No Project Conditions: Analysis of the project’s opening year. The traffic volumes should include any reasonably foreseeable projects and/or other ambient growth (background traffic that occurs naturally due to general population growth). Historical growth rates should be used to estimate ambient growth. Nakano LMA Appendix Page 24 of 194 37 TSM • Opening Year Plus Project Conditions: Analysis of the opening year volumes generated in the step above plus the project generated traffic. • Phased Analysis: If the project is a large multi-phased development in which several stages of development activity are planned, each phase of the project may need to be evaluated to coincide with each major stage of development or increment of area transportation improvements. For example: Existing, Opening Year of Phase 1, Opening Year of Phase 2, etc. • Horizon Year Analysis (Community Plan Amendments or Rezones): If the project requires a Community Plan Amendment or a rezone, community buildout horizon year analysis may be required. Coordinate with the Development Services Department’s Transportation Development Section staff for study scenario requirements related to Community Plan Amendments or rezones. Study Periods The following study periods shall be analyzed: • The morning and afternoon peak commute hours are analyzed, unless the land use is atypical and an alternate/additional study period is identified by City Staff. The peak hours are based on traffic counts (the procedure for collecting counts is described in the following section). For typical commute hours, the peak hour will fall between 7:00-9:00 AM and 4:00-6:00 PM. • For areas near beaches or Mission Bay, the peak hours are during summer months (between Memorial Day and Labor Day, when public schools are not in session). • Other timeframes may be required based on the project land uses and unique characteristics of the project. Nakano LMA Appendix Page 25 of 194 38 TSM CONDUCTING THE LOCAL MOBILITY ANALYSIS Identifying Existing Conditions A project is required to document the existing conditions of the local mobility system in the study area as identified in the “Extents of Study” section above, including field observations of biking, walking, transit, and roadway conditions/operations during study periods. Existing conditions may include, but are not limited to, the following areas: • Field Reconnaissance of: o Pedestrian facilities and observations on use of facilities o Bicycle facilities and observations on use of facilities o Location of nearby transit stops and observations of use of facilities o Roadway configurations, geometric features, sight distance, intersection lane configurations, intersection operations, presence of closely spaced or offset driveways or intersections, uneven lane utilization o Length of available turn lane storage and observations of typical maximum vehicle queues o Confirmation of traffic signal phasing and timing (from plans obtained from the City or Caltrans) o Adjacent land uses o Ramp meter queues and spill back onto local streets • Transportation Data Collection o New transportation data is required if available data is older than two years, or if warranted by other changes in built environment conditions. o Pedestrian Counts: For each crosswalk leg at each study intersection. o Bicycle Counts: Turning movement counts at each study intersection. o Transit stations, routes, provision of bus-only lanes and/or turn-outs, and schedules. o Study period traffic counts: For typical commute hours, intersection turning movement data should be collected on Tuesday, Wednesday, or Thursday between 7:00-9:00 AM and 4:00-6:00 PM during non-holiday periods and not on the week of a holiday under fair Nakano LMA Appendix Page 26 of 194 39 TSM weather conditions. Counts should be taken when school is in session. Any intersection counts should include pedestrian and bicycle counts. For areas near beaches or Mission Bay, counts should be taken during summer months (between Memorial Day and Labor Day when public school is not in session) or should be adjusted to reflect typical summer conditions. Any deviation should be discussed with City Staff. o If the project is a redevelopment project of which the existing uses are in operation at the time that the transportation data is collected, the trips associated with the existing use should be calculated by conducting driveway counts at all existing site driveways. The site trips should then be distributed to the study intersections and subtracted from the intersection traffic counts to represent the traffic volumes that would be present if the existing use were not in operation. Analysis Methodology Pedestrian Analysis Pedestrian analysis should primarily focus on pedestrian connectivity, walkshed analysis, presence of adequate facilities, etc. However, in dense, urban environments featuring substantial pedestrian volumes, analysis of pedestrian facilities (i.e., sidewalks and crosswalks) may be required in accordance with the latest version of the HCM. Mid-block pedestrian crossing treatments should also be evaluated using available research and recommendations. Applicants should coordinate with the Development Services Department’s Transportation Development Section on the need to perform HCM pedestrian analysis. Bicycle Analysis Project effects on existing and proposed bicycle facilities should be reviewed in consideration of the following: • Bicycle analysis should primarily focus on bicycle connectivity, bikeshed analysis, presence of adequate facilities, etc. • Consistency with the City’s Bicycle Master Plan and the Community’s Bicycle Mobility Element • On-site bike parking supply as well as bikeshare bicycles that may be parked/stored on public sidewalks Nakano LMA Appendix Page 27 of 194 40 TSM Transit Analysis Project effects on the transportation system should be evaluated in consideration of the following: • Increased travel time for buses that could adversely affect on-time performance (intersection delay, corridor delay, movement delay (for transit)) • Conflicts (e.g., weaving, sight distance, etc.) involving buses at stop due to nearby driveways • Planned and/or proposed transit improvements and stops identified in community plans, the RTIP and/or RTP within the study area Project effects on transit system ridership is not typically considered an issue but may be evaluated under special circumstances (e.g., new office building along a bus line that already has substantial peak period ridership). Systemic Safety Review Study intersections should be compared to the City of San Diego Systemic Safety: The Data-Driven Path to Vision Zero 7 report to determine if a study intersection meets any hot spot criteria identified in Appendix C: Identification of Systemic Hotspots of the report. If a study intersection meets any of the criteria, the applicant should evaluate any potential countermeasures and coordinate with the Development Services Department Transportation Development Section staff to determine appropriate intersection improvements. Signalized Intersections Traffic operational impacts at signalized intersections shall be analyzed using standard or state-of- the-practice procedures consistent with the latest edition of the Highway Capacity Manual (HCM) published by the Transportation Research Board. The following provides general guidelines for the parameters necessary to perform the analysis. For existing and opening year conditions within five years of commencement of the LMA, the parameters should generally be based on field measurements taken during traffic data collection or field 7 https://www.sandiego.gov/sites/default/files/systemic-safety-the-data-driven-path-to-vision-zero.pdf Nakano LMA Appendix Page 28 of 194 Appendix F Otay Mesa and Otay Mesa-Nestor Community Plan Roadway Classifications Nakano LMA Appendix Page 29 of 194 Nakano LMA Appendix Page 30 of 194 OTAY MESA COMMUNITY PLAN Amendment Date Approved by Planning Commission Resolution Number Date Adopted by City Council Resolution Number Otay Mesa Community Plan Adopted February 13, 2014 March 11, 2014 R-308810 Corrections to address inconsistencies between the Land Use and Zoning Map. Minor map and text corrections to show land use and the removal of paper streets from map figures April 30, 2015 R-4685 June 2, 2015 R-309773 Otay Mesa Central Village February 23, 2017 April 13, 2017 R-311020 Specific Plan Adopted Editor’s note: After the adoption of the Otay Mesa Community Plan, it was noticed that Figure 3-2 depicted the street classifications for Otay Pacific Drive, Otay Pacific Place, and Las Californias incorrectly; these streets were classified pursuant to City Council Resolution R-307235 on January 10, 2012, which the reclassification was not captured in all places in the Otay Mesa Community Update documents, including Figure 3-2; and therefore, Figure 3-2 in Document Number R-308810 is replaced with Figure 3-2. Nakano LMA Appendix Page 31 of 194 Nakano LMA Appendix Page 32 of 194 - i - OTAY MESA-NESTOR COMMUNITY PLAN Printed on recycled paper. This information, or this document (or portions thereof), will be made available in alternative formats upon request. Nakano LMA Appendix Page 33 of 194 Otay Mesa-Nestor Community Plan - ii - OTAY MESA-NESTOR COMMUNITY PLAN The following amendments have been incorporated into this March 2007 posting of this Plan: Amendment Date Approved by Planning Commission Resolution Number Date Adopted by City Council Resolution Number Adopted the Otay Mesa-Nestor Community Plan Update December 12, 1996 2331-PC May 6, 1997 R-288632 Certified Environmental Negative Declaration No. 95-0233 on May 6, 1997 by R-288630 Certified by the California Coastal Commission on August 13, 1997 by Amendment No. 1-97B/Otay Mesa-Nestor Community Plan (Editors Note: In an effort to create a single, comprehensive document, this Otay Mesa- Nestor Community Plan has been reformatted.) Nakano LMA Appendix Page 34 of 194 APPENDIX 6 TRANSPORTATION FACILITIES Figure 5. Street Classification with Future Traffic Volumes Nakano LMA Appendix Page 35 of 194 Appendix G Count Data Nakano LMA Appendix Page 36 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 0 0 0 108 0 99 0 165 30 69 61 0 532 0 0 0 157 1 174 0 217 35 71 87 0 742 0 0 0 185 1 145 0 217 43 77 107 0 775 0 0 0 197 0 149 0 252 57 69 77 0 801 0 0 0 220 0 142 0 253 52 56 85 0 808 0 0 0 234 0 99 0 215 46 59 72 0 725 0 0 0 167 0 81 0 190 34 52 78 0 602 0 0 0 222 0 115 0 139 40 54 53 0 623 0 0 0 1490 2 1004 0 1648 337 507 620 0 5608 715 AM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 0 0 0 759 2 610 0 939 187 273 356 0 3126 0.967   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000030000 3 000000010030 4 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000040030 7 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000010030 4  TOTAL 0 1 1 0 1 2 1 0 6 TOTAL 3 4200 2100 North Leg South Leg East Leg West Leg 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 TOTAL VOLUMES: PEAK VOLUMES: 0 1 1 0 0 2 0 0 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM Pedestrian Counts I‐805 SB Ramps I‐805 SB Ramps Palm Avenue Palm Avenue 0 0 0 North Leg South Leg East Leg West Leg 0 0 0 Vehicle Counts Bicycle Counts PEAK VOLUMES: I‐805 SB Ramps I‐805 SB Ramps Palm Avenue Palm Avenue Northbound Southbound Eastbound Westbound TOTAL VOLUMES: Count Period: Peak Hour: 7:00 AM to 9:00 AM 7:15 AM to 8:15 AM Date: Day: Project # TURNING MOVEMENT COUNT San Diego I‐805 SB Ramps Palm Avenue Palm Avenue Eastbound Westbound I‐805 SB Ramps Northbound I‐805 SB Ramps Southbound Palm Avenue 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM TOTAL VOLUMES: PEAK VOLUMES: PEAK HR FACTOR: AM Peak Hr Begins at: 8:30 AM 8:45 AM 7:45 AM 8:00 AM 8:15 AM 0.000 0.947 0.911 0.855 7:00 AM 7:15 AM 7:30 AM Nakano LMA Appendix Page 37 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 0 0 0 255 2 172 0 194 31 106 124 0 884 0 0 0 261 0 191 0 210 47 109 128 0 946 0 0 0 277 1 210 0 226 41 83 118 0 956 0 0 0 296 0 192 0 205 26 91 115 0 925 0 0 0 295 2 196 0 224 39 115 112 0 983 0 0 0 308 0 207 0 189 48 83 109 0 944 0 0 0 289 3 218 0 199 36 105 108 0 958 0 0 0 294 2 190 0 197 31 101 100 0 915 0 0 0 2275 10 1576 0 1644 299 793 914 0 7511 445 PM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 0 0 0 1188 5 813 0 817 149 394 444 0 3810 0.969   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000010020 3 000000000000 0 000000010000 1 000000000000 0 000000020020 4 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000020020 4 .  TOTAL 0 2 2 1 0 0 1 0 6 TOTAL 2 Peak Hour: 4:45 PM to 5:45 PM San Diego Date: I‐805 SB Ramps Day: Palm Avenue Project # TURNING MOVEMENT COUNT Count Period: 4:00 PM to 6:00 PM WestboundNorthbound Southbound Eastbound Vehicle Counts I‐805 SB Ramps I‐805 SB Ramps Palm Avenue Palm Avenue 4:00 PM 4:15 PM 4:30 PM TOTAL VOLUMES: PM Peak Hr Begins at: PEAK VOLUMES: 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM Palm Avenue Northbound Southbound Eastbound Westbound PEAK HR FACTOR:0.000 0.974 0.918 0.923 Bicycle Counts I‐805 SB Ramps I‐805 SB Ramps Palm Avenue 4:00 PM 5:45 PM TOTAL VOLUMES: 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM North Leg South Leg East Leg West Leg PEAK VOLUMES: Pedestrian Counts I‐805 SB Ramps I‐805 SB Ramps Palm Avenue Palm Avenue 4:00 PM 0000 4:15 PM 1100 4:30 PM 2000 4:45 PM 1000 5:00 PM 0000 5:15 PM 0000 5:30 PM 1000 5:45 PM 0000 PEAK VOLUMES:2000 TOTAL VOLUMES:5100 North Leg South Leg East Leg West Leg Nakano LMA Appendix Page 38 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 15 0 71 0 0 0 137 143 0 0 120 253 739 23 0 70 0 0 0 169 195 0 0 138 271 866 33 2 67 0 0 0 174 229 0 0 151 266 922 17 0 72 0 0 0 172 271 0 0 129 289 950 22 0 80 0 0 0 177 297 0 0 119 246 941 19 1 80 0 0 0 155 303 0 0 113 301 972 21 1 87 0 0 0 127 228 0 0 103 210 777 14 1 84 0 0 0 89 262 0 0 96 204 750 164 5 611 0 0 0 1200 1928 0 0 969 2040 6917 730 AM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 91 3 299 0 0 0 678 1100 0 0 512 1102 3785 0.974   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000030000 3 000000010020 3 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000040020 6 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0  TOTAL 0 0 0 0 1 0 1 2 4 TOTAL 1 0400 0100 North Leg South Leg East Leg West Leg 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 2 TOTAL VOLUMES: PEAK VOLUMES: 0 0 0 0 0 0 0 0 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM Pedestrian Counts I‐805 NB Ramps I‐805 NB Ramps Palm Avenue Palm Avenue 0 0 0 North Leg South Leg East Leg West Leg 0 0 0 Vehicle Counts Bicycle Counts PEAK VOLUMES: I‐805 NB Ramps I‐805 NB Ramps Palm Avenue Palm Avenue Northbound Southbound Eastbound Westbound TOTAL VOLUMES: Count Period: Peak Hour: 7:00 AM to 9:00 AM 7:30 AM to 8:30 AM Date: Day: Project # TURNING MOVEMENT COUNT San Diego I‐805 NB Ramps Palm Avenue Palm Avenue Eastbound Westbound I‐805 NB Ramps Northbound I‐805 NB Ramps Southbound Palm Avenue 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM TOTAL VOLUMES: PEAK VOLUMES: PEAK HR FACTOR: AM Peak Hr Begins at: 8:30 AM 8:45 AM 7:45 AM 8:00 AM 8:15 AM 0.963 0.000 0.938 0.965 7:00 AM 7:15 AM 7:30 AM Nakano LMA Appendix Page 39 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 37 0 100 0 0 0 129 329 0 0 202 341 1138 31 0 122 0 0 0 105 359 0 0 202 339 1158 33 0 106 0 0 0 119 375 0 0 171 308 1112 34 2 134 0 0 0 131 379 0 0 169 283 1132 32 2 92 0 0 0 116 401 0 0 198 336 1177 33 0 103 0 0 0 105 389 0 0 153 345 1128 30 0 94 0 0 0 107 385 0 0 184 267 1067 32 0 95 0 0 0 111 380 0 0 171 275 1064 262 4 846 0 0 0 923 2997 0 0 1450 2494 8976 415 PM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 130 4 454 0 0 0 471 1514 0 0 740 1266 4579 0.973   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000100000 1 000000000001 1 000000000000 0 000000000000 0 000000100001 2 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000100000 1  TOTAL 0 1 0 0 0 0 0 0 1 TOTAL 1 Peak Hour: 4:15 PM to 5:15 PM San Diego Date: I‐805 NB Ramps Day: Palm Avenue Project # TURNING MOVEMENT COUNT Count Period: 4:00 PM to 6:00 PM WestboundNorthbound Southbound Eastbound Vehicle Counts I‐805 NB Ramps I‐805 NB Ramps Palm Avenue Palm Avenue 4:00 PM 4:15 PM 4:30 PM TOTAL VOLUMES: PM Peak Hr Begins at: PEAK VOLUMES: 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM Palm Avenue Northbound Southbound Eastbound Westbound PEAK HR FACTOR:0.865 0.000 0.960 0.927 Bicycle Counts I‐805 NB Ramps I‐805 NB Ramps Palm Avenue 4:00 PM 5:45 PM TOTAL VOLUMES: 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM North Leg South Leg East Leg West Leg PEAK VOLUMES: Pedestrian Counts I‐805 NB Ramps I‐805 NB Ramps Palm Avenue Palm Avenue 4:00 PM 0000 4:15 PM 0100 4:30 PM 0000 4:45 PM 0000 5:00 PM 0000 5:15 PM 0000 5:30 PM 0000 5:45 PM 0000 PEAK VOLUMES:0100 TOTAL VOLUMES:0100 North Leg South Leg East Leg West Leg Nakano LMA Appendix Page 40 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 188 25 69 13 18 75 130 95 63 79 178 16 949 198 17 61 3 18 70 119 109 92 68 175 12 942 182 21 58 3 22 87 164 107 87 48 100 19 898 220 27 57 8 13 81 135 102 101 42 112 13 911 189 30 61 11 28 96 127 112 88 46 123 6 917 195 33 60 6 17 70 148 137 88 64 180 15 1013 194 22 63 10 17 58 124 132 77 41 125 10 873 215 18 64 6 15 63 118 128 83 45 120 10 885 1581 193 493 60 148 600 1065 922 679 433 1113 101 7388 730 AM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 786 111 236 28 80 334 574 458 364 200 515 53 3739 0.923   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 001000000000 1 003010000000 4 000010000000 1 001010000020 4 010000000010 2 000000000000 0 000000000000 0 015030000030 12 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 014030000030 11  TOTAL 11 6 3 1 2 2 5 1 31 TOTAL 8 02227 0116 North Leg South Leg East Leg West Leg 11 5 2 1 2 1 5 0 0 0 1 0 1 0 0 0 0 0 TOTAL VOLUMES: PEAK VOLUMES: 0 0 0 0 0 0 0 0 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM Pedestrian Counts Dennery Road Dennery Road Palm Avenue Palm Avenue 0 0 0 North Leg South Leg East Leg West Leg 0 1 1 Vehicle Counts Bicycle Counts PEAK VOLUMES: Dennery Road Dennery Road Palm Avenue Palm Avenue Northbound Southbound Eastbound Westbound TOTAL VOLUMES: Count Period: Peak Hour: 7:00 AM to 9:00 AM 7:30 AM to 8:30 AM Date: Day: Project # TURNING MOVEMENT COUNT San Diego Dennery Road Palm Avenue Palm Avenue Eastbound Westbound Dennery Road Northbound Dennery Road Southbound Palm Avenue 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM TOTAL VOLUMES: PEAK VOLUMES: PEAK HR FACTOR: AM Peak Hr Begins at: 8:30 AM 8:45 AM 7:45 AM 8:00 AM 8:15 AM 0.932 0.819 0.936 0.741 7:00 AM 7:15 AM 7:30 AM Nakano LMA Appendix Page 41 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 105 6 31 11 10 119 66 37 37 18 144 5 589 109 8 52 21 11 128 82 67 54 23 143 9 707 129 6 47 19 10 128 93 75 57 39 187 10 800 109 20 57 17 17 108 139 77 48 42 148 15 797 115 16 76 14 16 107 147 94 52 44 126 11 818 121 12 43 12 14 76 174 58 70 57 190 22 849 94 12 26 7 7 56 150 50 75 54 124 9 664 132 9 32 1 12 66 145 47 61 19 83 6 613 914 89 364 102 97 788 996 505 454 296 1145 87 5837 430 PM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 474 54 223 62 57 419 553 304 227 182 651 58 3264 0.961   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000030000 3 000000000020 2 000010010000 2 001000000000 1 000000000000 0 000000000000 0 001000000000 1 000000000000 0 002010040020 9 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 001010010000 3  TOTAL 2 0 1 2 3 0 2 3 13 TOTAL 6 Peak Hour: 4:30 PM to 5:30 PM San Diego Date: Dennery Road Day: Palm Avenue Project # TURNING MOVEMENT COUNT Count Period: 4:00 PM to 6:00 PM WestboundNorthbound Southbound Eastbound Vehicle Counts Dennery Road Dennery Road Palm Avenue Palm Avenue 4:00 PM 4:15 PM 4:30 PM TOTAL VOLUMES: PM Peak Hr Begins at: PEAK VOLUMES: 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM Palm Avenue Northbound Southbound Eastbound Westbound PEAK HR FACTOR:0.907 0.857 0.897 0.828 Bicycle Counts Dennery Road Dennery Road Palm Avenue 4:00 PM 5:45 PM TOTAL VOLUMES: 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM North Leg South Leg East Leg West Leg PEAK VOLUMES: Pedestrian Counts Dennery Road Dennery Road Palm Avenue Palm Avenue 4:00 PM 0002 4:15 PM 0000 4:30 PM 0001 4:45 PM 0101 5:00 PM 0003 5:15 PM 0000 5:30 PM 0002 5:45 PM 0102 PEAK VOLUMES:0105 TOTAL VOLUMES:0 2 0 11 North Leg South Leg East Leg West Leg Nakano LMA Appendix Page 42 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 026401110000005 146 030101310000007 169 026301270000008 164 0488012200000011 189 041501060000004 156 05850780000001 142 03760540000006 103 03330550000001 92 029935078400000043 1161 715 AM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 014517048600000030 678 0.897   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 000010000100 2 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000010000100 2 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000010000100 2  TOTAL 3 2 1 1 0 0 3 1 11 TOTAL 4 01100 0040 North Leg South Leg East Leg West Leg 0 0 0 0 0 0 0 0 1 0 0 3 1 0 0 0 0 0 TOTAL VOLUMES: PEAK VOLUMES: 0 0 0 0 0 0 0 0 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM Pedestrian Counts Dennery Road Dennery Road The Landing The Landing 2 2 1 North Leg South Leg East Leg West Leg 1 0 0 Vehicle Counts Bicycle Counts PEAK VOLUMES: Dennery Road Dennery Road The Landing The Landing Northbound Southbound Eastbound Westbound TOTAL VOLUMES: Count Period: Peak Hour: 7:00 AM to 9:00 AM 7:15 AM to 8:15 AM Date: Day: Project # TURNING MOVEMENT COUNT San Diego Dennery Road The Landing The Landing Eastbound Westbound Dennery Road Northbound Dennery Road Southbound The Landing 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM TOTAL VOLUMES: PEAK VOLUMES: PEAK HR FACTOR: AM Peak Hr Begins at: 8:30 AM 8:45 AM 7:45 AM 8:00 AM 8:15 AM 0.723 0.927 0.000 0.682 7:00 AM 7:15 AM 7:30 AM Nakano LMA Appendix Page 43 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 087140540000002 157 08250500000002 139 010390700000005 187 09380590000003 163 087120650000001 165 0111120600000002 185 081120540000005 152 08980630000003 163 073380047500000023 1311 430 PM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 039441025400000011 700 0.936   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 010010000000 2 000000000000 0 000010000000 1 000010000000 1 000000000000 0 000000000000 0 000000000000 0 010030000000 4 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000020000000 2  TOTAL 1 0 2 2 0 1 1 1 8 TOTAL 5 Peak Hour: 4:30 PM to 5:30 PM San Diego Date: Dennery Road Day: The Landing Project # TURNING MOVEMENT COUNT Count Period: 4:00 PM to 6:00 PM WestboundNorthbound Southbound Eastbound Vehicle Counts Dennery Road Dennery Road The Landing The Landing 4:00 PM 4:15 PM 4:30 PM TOTAL VOLUMES: PM Peak Hr Begins at: PEAK VOLUMES: 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM The Landing Northbound Southbound Eastbound Westbound PEAK HR FACTOR:0.884 0.907 0.000 0.550 Bicycle Counts Dennery Road Dennery Road The Landing 4:00 PM 5:45 PM TOTAL VOLUMES: 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM North Leg South Leg East Leg West Leg PEAK VOLUMES: Pedestrian Counts Dennery Road Dennery Road The Landing The Landing 4:00 PM 0010 4:15 PM 0000 4:30 PM 0020 4:45 PM 0020 5:00 PM 0000 5:15 PM 0010 5:30 PM 0010 5:45 PM 0010 PEAK VOLUMES:0050 TOTAL VOLUMES:0080 North Leg South Leg East Leg West Leg Nakano LMA Appendix Page 44 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 1221001841711600 116 16000017101930670 132 12200319131200600 121 16101216102720593 137 901005122140630 115 400007203230500 116 60000382130280 69 71100452320300 73 82631589821721814173 879 700 AM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 565115703775612463 506 0.923   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 000000000000 0 000000000010 1 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000000 0 000000000010 1 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000010 1  TOTAL 5 9 11 7 0 4 6 2 44 TOTAL 32 918125 315122 North Leg South Leg East Leg West Leg 0 1 1 0 0 1 1 1 4 0 0 0 0 2 0 1 1 1 TOTAL VOLUMES: PEAK VOLUMES: 1 1 0 1 0 2 4 0 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM 7:00 AM 7:15 AM 7:30 AM Pedestrian Counts Red Fin Lane Red Fin Lane Dennery Road Dennery Road 1 0 7 North Leg South Leg East Leg West Leg 3 7 3 Vehicle Counts Bicycle Counts PEAK VOLUMES: Red Fin Lane Red Fin Lane Dennery Road Dennery Road Northbound Southbound Eastbound Westbound TOTAL VOLUMES: Count Period: Peak Hour: 7:00 AM to 9:00 AM 7:00 AM to 8:00 AM Date: Day: Project # TURNING MOVEMENT COUNT San Diego Red Fin Lane Dennery Road Dennery Road Eastbound Westbound Red Fin Lane Northbound Red Fin Lane Southbound Dennery Road 8:45 AM 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM TOTAL VOLUMES: PEAK VOLUMES: PEAK HR FACTOR: AM Peak Hr Begins at: 8:30 AM 8:45 AM 7:45 AM 8:00 AM 8:15 AM 0.912 0.864 0.756 0.933 7:00 AM 7:15 AM 7:30 AM Nakano LMA Appendix Page 45 of 194 PO Box 1178 Corona, CA 92880 951-268-6268 Location: 2/5/2020 N/S: WEDNESDAY E/W:143‐20078   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 50000102441130281 122 401008155590280 120 9110110285180350 144 50201102757101342 149 12010011284794310 143 1020037316230271 146 513036204980291 125 7000110264850311 129 574809721994106552436 1078 430 PM NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 363405381142173051273 582 0.977   NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000000000000 0 000000010010 2 000000000000 0 000000000020 2 000000000000 0 000100000000 1 010000000000 1 000000010000 1 010100020030 7 NL NT NR SL ST SR EL ET ER WL WT WR TOTAL 000100000020 3  TOTAL 1 6 6 8 3 6 1 3 34 TOTAL 23 Peak Hour: 4:30 PM to 5:30 PM San Diego Date: Red Fin Lane Day: Dennery Road Project # TURNING MOVEMENT COUNT Count Period: 4:00 PM to 6:00 PM WestboundNorthbound Southbound Eastbound Vehicle Counts Red Fin Lane Red Fin Lane Dennery Road Dennery Road 4:00 PM 4:15 PM 4:30 PM TOTAL VOLUMES: PM Peak Hr Begins at: PEAK VOLUMES: 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM Dennery Road Northbound Southbound Eastbound Westbound PEAK HR FACTOR:0.827 0.977 0.940 0.912 Bicycle Counts Red Fin Lane Red Fin Lane Dennery Road 4:00 PM 5:45 PM TOTAL VOLUMES: 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM North Leg South Leg East Leg West Leg PEAK VOLUMES: Pedestrian Counts Red Fin Lane Red Fin Lane Dennery Road Dennery Road 4:00 PM 1000 4:15 PM 3120 4:30 PM 1221 4:45 PM 2015 5:00 PM 3000 5:15 PM 1221 5:30 PM 1000 5:45 PM 2001 PEAK VOLUMES:7457 TOTAL VOLUMES:14 5 7 8 North Leg South Leg East Leg West Leg Nakano LMA Appendix Page 46 of 194 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 Start Time 2/5/2020 12:00 AM 65 1:00 AM 32 2:00 AM 38 3:00 AM 58 4:00 AM 136 5:00 AM 335 6:00 AM 533 7:00 AM 934 8:00 AM 910 9:00 AM 797 10:00 AM 735 11:00 AM 760 12:00 PM 869 1:00 PM 833 2:00 PM 932 3:00 PM 1006 4:00 PM 1040 5:00 PM 1003 6:00 PM 911 7:00 PM 690 8:00 PM 561 9:00 PM 341 10:00 PM 235 11:00 PM 115 Total 13869 Volumes represent the combined totals for both directions Dennery Road 2/5/2020 24 Hour Volume Plot B/ Palm Avenue - Regatta Lane 65 32 38 58 136 335 533 934 910 797 735 760 869 833 932 1006 1040 1003 911 690 561 341 235 115 0 200 400 600 800 1000 1200 12 : 0 0 AM 1: 0 0 AM 2: 0 0 AM 3: 0 0 AM 4: 0 0 AM 5: 0 0 AM 6: 0 0 AM 7: 0 0 AM 8: 0 0 AM 9: 0 0 AM 10 : 0 0 AM 11 : 0 0 AM 12 : 0 0 PM 1: 0 0 PM 2: 0 0 PM 3: 0 0 PM 4: 0 0 PM 5: 0 0 PM 6: 0 0 PM 7: 0 0 PM 8: 0 0 PM 9: 0 0 PM 10 : 0 0 PM 11 : 0 0 PM Total Vehicle Volume Number of Vehicles Phone: 951-268-6268 counts@countsunlimited.com Phone: 951-268-6268Nakano LMA Appendix Page 47 of 194 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 Start Time 2/5/2020 12:00 AM 50 1:00 AM 26 2:00 AM 32 3:00 AM 43 4:00 AM 106 5:00 AM 271 6:00 AM 399 7:00 AM 638 8:00 AM 485 9:00 AM 348 10:00 AM 316 11:00 AM 346 12:00 PM 438 1:00 PM 431 2:00 PM 545 3:00 PM 581 4:00 PM 631 5:00 PM 639 6:00 PM 593 7:00 PM 491 8:00 PM 378 9:00 PM 254 10:00 PM 192 11:00 PM 100 Total 8333 Volumes represent the combined totals for both directions Dennery Road 2/5/2020 24 Hour Volume Plot B/ Regatta Lane - The Landing 50 26 32 43 106 271 399 638 485 348 316 346 438 431 545 581 631 639 593 491 378 254 192 100 0 100 200 300 400 500 600 700 12 : 0 0 AM 1: 0 0 AM 2: 0 0 AM 3: 0 0 AM 4: 0 0 AM 5: 0 0 AM 6: 0 0 AM 7: 0 0 AM 8: 0 0 AM 9: 0 0 AM 10 : 0 0 AM 11 : 0 0 AM 12 : 0 0 PM 1: 0 0 PM 2: 0 0 PM 3: 0 0 PM 4: 0 0 PM 5: 0 0 PM 6: 0 0 PM 7: 0 0 PM 8: 0 0 PM 9: 0 0 PM 10 : 0 0 PM 11 : 0 0 PM Total Vehicle Volume Number of Vehicles Phone: 951-268-6268 counts@countsunlimited.com Phone: 951-268-6268Nakano LMA Appendix Page 48 of 194 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 Start Time 2/5/2020 12:00 AM 49 1:00 AM 18 2:00 AM 32 3:00 AM 45 4:00 AM 113 5:00 AM 284 6:00 AM 411 7:00 AM 652 8:00 AM 474 9:00 AM 336 10:00 AM 315 11:00 AM 341 12:00 PM 447 1:00 PM 420 2:00 PM 535 3:00 PM 566 4:00 PM 610 5:00 PM 621 6:00 PM 575 7:00 PM 478 8:00 PM 372 9:00 PM 250 10:00 PM 187 11:00 PM 93 Total 8224 Volumes represent the combined totals for both directions Dennery Road 2/5/2020 24 Hour Volume Plot B/ The Landing - Red Coral Lane 49 18 32 45 113 284 411 652 474 336 315 341 447 420 535 566 610 621 575 478 372 250 187 93 0 100 200 300 400 500 600 700 12 : 0 0 AM 1: 0 0 AM 2: 0 0 AM 3: 0 0 AM 4: 0 0 AM 5: 0 0 AM 6: 0 0 AM 7: 0 0 AM 8: 0 0 AM 9: 0 0 AM 10 : 0 0 AM 11 : 0 0 AM 12 : 0 0 PM 1: 0 0 PM 2: 0 0 PM 3: 0 0 PM 4: 0 0 PM 5: 0 0 PM 6: 0 0 PM 7: 0 0 PM 8: 0 0 PM 9: 0 0 PM 10 : 0 0 PM 11 : 0 0 PM Total Vehicle Volume Number of Vehicles Phone: 951-268-6268 counts@countsunlimited.com Phone: 951-268-6268Nakano LMA Appendix Page 49 of 194 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 Start Time 2/5/2020 12:00 AM 125 1:00 AM 61 2:00 AM 84 3:00 AM 156 4:00 AM 323 5:00 AM 745 6:00 AM 1332 7:00 AM 2126 8:00 AM 2145 9:00 AM 1824 10:00 AM 1736 11:00 AM 1998 12:00 PM 2286 1:00 PM 2293 2:00 PM 2531 3:00 PM 2802 4:00 PM 2805 5:00 PM 2817 6:00 PM 2479 7:00 PM 2059 8:00 PM 1656 9:00 PM 1168 10:00 PM 571 11:00 PM 261 Total 36383 Volumes represent the combined totals for both directions Palm Avenue 2/5/2020 24 Hour Volume Plot B/ I-805 Southbound Ramps - I-805 Northbound Ramps 125 61 84 156 323 745 1332 2126 2145 1824 1736 1998 2286 2293 2531 2802 2805 2817 2479 2059 1656 1168 571 261 0 500 1000 1500 2000 2500 3000 12 : 0 0 AM 1: 0 0 AM 2: 0 0 AM 3: 0 0 AM 4: 0 0 AM 5: 0 0 AM 6: 0 0 AM 7: 0 0 AM 8: 0 0 AM 9: 0 0 AM 10 : 0 0 AM 11 : 0 0 AM 12 : 0 0 PM 1: 0 0 PM 2: 0 0 PM 3: 0 0 PM 4: 0 0 PM 5: 0 0 PM 6: 0 0 PM 7: 0 0 PM 8: 0 0 PM 9: 0 0 PM 10 : 0 0 PM 11 : 0 0 PM Total Vehicle Volume Number of Vehicles Phone: 951-268-6268 counts@countsunlimited.com Phone: 951-268-6268Nakano LMA Appendix Page 50 of 194 Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 Start Time 2/5/2020 12:00 AM 186 1:00 AM 103 2:00 AM 146 3:00 AM 207 4:00 AM 463 5:00 AM 1027 6:00 AM 1782 7:00 AM 2745 8:00 AM 2813 9:00 AM 2533 10:00 AM 2552 11:00 AM 2779 12:00 PM 3239 1:00 PM 3083 2:00 PM 3504 3:00 PM 3797 4:00 PM 3919 5:00 PM 3858 6:00 PM 3147 7:00 PM 2583 8:00 PM 2089 9:00 PM 1417 10:00 PM 814 11:00 PM 387 Total 49173 Volumes represent the combined totals for both directions Palm Avenue 2/5/2020 24 Hour Volume Plot B/ I-805 Northbound Ramps - Dennery Road 186 103 146 207 463 1027 1782 2745 2813 2533 2552 2779 3239 3083 3504 3797 3919 3858 3147 2583 2089 1417 814 387 0 500 1000 1500 2000 2500 3000 3500 4000 4500 12 : 0 0 AM 1: 0 0 AM 2: 0 0 AM 3: 0 0 AM 4: 0 0 AM 5: 0 0 AM 6: 0 0 AM 7: 0 0 AM 8: 0 0 AM 9: 0 0 AM 10 : 0 0 AM 11 : 0 0 AM 12 : 0 0 PM 1: 0 0 PM 2: 0 0 PM 3: 0 0 PM 4: 0 0 PM 5: 0 0 PM 6: 0 0 PM 7: 0 0 PM 8: 0 0 PM 9: 0 0 PM 10 : 0 0 PM 11 : 0 0 PM Total Vehicle Volume Number of Vehicles Phone: 951-268-6268 counts@countsunlimited.com Phone: 951-268-6268Nakano LMA Appendix Page 51 of 194 Appendix H Signal Timing Sheets Nakano LMA Appendix Page 52 of 194 Nakano LMA Appendix Page 53 of 194 Nakano LMA Appendix Page 54 of 194 Nakano LMA Appendix Page 55 of 194 Caltrans signal timings were used to code Synchro; however, the timing sheets are not included  within this appendix as Caltrans specified that the sheets were not to be reproduced.   Therefore, timing sheets are on file at Caltrans.    Nakano LMA Appendix Page 56 of 194 AM Existing 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 939 187 273 356 00007592610 Future Volume (veh/h) 0 939 187 273 356 00007592610 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 1032 205 317 414 0 1000 0 429 Peak Hour Factor 0.91 0.91 0.91 0.86 0.86 0.86 0.95 0.95 0.95 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1465 641 371 2019 0 1138 0 496 Arrive On Green 0.00 0.42 0.42 0.22 1.00 0.00 0.32 0.00 0.32 Sat Flow, veh/h 0 3618 1544 3428 3618 0 3534 0 1541 Grp Volume(v), veh/h 0 1032 205 317 414 0 1000 0 429 Grp Sat Flow(s),veh/h/ln 0 1763 1544 1714 1763 0 1767 0 1541 Q Serve(g_s), s 0.0 28.1 10.4 10.3 0.0 0.0 31.0 0.0 30.3 Cycle Q Clear(g_c), s 0.0 28.1 10.4 10.3 0.0 0.0 31.0 0.0 30.3 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1465 641 371 2019 0 1138 0 496 V/C Ratio(X)0.00 0.70 0.32 0.85 0.21 0.00 0.88 0.00 0.86 Avail Cap(c_a), veh/h 0 1465 641 423 2019 0 1307 0 570 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.94 0.94 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 28.0 22.9 44.6 0.0 0.0 37.2 0.0 36.9 Incr Delay (d2), s/veh 0.0 2.9 1.3 13.5 0.2 0.0 6.5 0.0 11.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 12.2 4.0 4.6 0.1 0.0 14.2 0.0 12.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 30.9 24.2 58.1 0.2 0.0 43.6 0.0 48.8 LnGrp LOS A C C E A A D A D Approach Vol, veh/h 1237 731 1429 Approach Delay, s/veh 29.8 25.3 45.2 Approach LOS C C D Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 18.3 54.3 43.5 72.5 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 40.9 42.9 60.9 Max Q Clear Time (g_c+I1), s12.3 30.1 33.0 2.0 Green Ext Time (p_c), s 0.2 5.8 4.3 3.1 Intersection Summary HCM 6th Ctrl Delay 35.3 HCM 6th LOS D Nakano LMA Appendix Page 57 of 194 AM Existing 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 678 1100 0 0 512 1102 91 3 299 0 0 0 Future Volume (veh/h)678 1100 0 0 512 1102 91 3 299 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 721 1170 0 0 528 1136 95 163 204 Peak Hour Factor 0.94 0.94 0.94 0.97 0.97 0.97 0.96 0.96 0.96 Percent Heavy Veh, % 3 30033333 Cap, veh/h 772 2496 0 0 1528 1164 125 215 286 Arrive On Green 0.45 1.00 0.00 0.00 0.43 0.43 0.19 0.19 0.19 Sat Flow, veh/h 3428 3618 0 0 3618 2685 671 1151 1532 Grp Volume(v), veh/h 721 1170 0 0 528 1136 258 0 204 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1342 1822 0 1532 Q Serve(g_s), s 23.1 0.0 0.0 0.0 11.6 48.2 15.6 0.0 14.5 Cycle Q Clear(g_c), s 23.1 0.0 0.0 0.0 11.6 48.2 15.6 0.0 14.5 Prop In Lane 1.00 0.00 0.00 1.00 0.37 1.00 Lane Grp Cap(c), veh/h772 2496 0 0 1528 1164 341 0 286 V/C Ratio(X) 0.93 0.47 0.00 0.00 0.35 0.98 0.76 0.00 0.71 Avail Cap(c_a), veh/h 836 2496 0 0 1528 1164 675 0 568 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.48 0.48 0.00 0.00 0.57 0.57 1.00 0.00 1.00 Uniform Delay (d), s/veh31.1 0.0 0.0 0.0 21.9 32.3 44.7 0.0 44.2 Incr Delay (d2), s/veh 9.4 0.3 0.0 0.0 0.4 15.0 3.5 0.0 3.3 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.4 0.1 0.0 0.0 4.8 17.6 7.3 0.0 5.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 40.5 0.3 0.0 0.0 22.2 47.3 48.1 0.0 47.5 LnGrp LOS D A A A C D D A D Approach Vol, veh/h 1891 1664 462 Approach Delay, s/veh 15.6 39.3 47.9 Approach LOS B D D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 88.2 31.8 56.4 27.8 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 28 26.8 43.0 Max Q Clear Time (g_c+I1), s2.0 25.1 50.2 17.6 Green Ext Time (p_c), s 12.2 1.0 0.0 2.3 Intersection Summary HCM 6th Ctrl Delay 29.1 HCM 6th LOS C Nakano LMA Appendix Page 58 of 194 AM Existing 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 574 458 364 200 515 53 786 111 236 28 80 334 Future Volume (veh/h)574 458 364 200 515 53 786 111 236 28 80 334 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 611 487 387 270 696 72 845 119 254 34 98 407 Peak Hour Factor 0.94 0.94 0.94 0.74 0.74 0.74 0.93 0.93 0.93 0.82 0.82 0.82 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 564 1524 473 324 1169 358 782 223 475 74 1027 449 Arrive On Green 0.16 0.30 0.30 0.09 0.23 0.23 0.16 0.43 0.43 0.02 0.29 0.29 Sat Flow, veh/h 3428 5066 1571 3428 5066 1549 4983 522 1113 3428 3526 1541 Grp Volume(v), veh/h 611 487 387 270 696 72 845 0 373 34 98 407 Grp Sat Flow(s),veh/h/ln1714 1689 1571 1714 1689 1549 1661 0 1635 1714 1763 1541 Q Serve(g_s), s 21.6 9.8 30.0 10.2 16.1 4.9 20.6 0.0 22.2 1.3 2.7 33.4 Cycle Q Clear(g_c), s 21.6 9.8 30.0 10.2 16.1 4.9 20.6 0.0 22.2 1.3 2.7 33.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.68 1.00 1.00 Lane Grp Cap(c), veh/h564 1524 473 324 1169 358 782 0 698 74 1027 449 V/C Ratio(X) 1.08 0.32 0.82 0.83 0.60 0.20 1.08 0.00 0.53 0.46 0.10 0.91 Avail Cap(c_a), veh/h 564 1524 473 449 1169 358 782 0 729 107 1128 493 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh54.8 35.5 42.6 58.4 45.0 40.7 55.3 0.0 27.9 63.4 33.9 44.8 Incr Delay (d2), s/veh 62.3 0.6 14.6 6.8 2.2 1.3 56.1 0.0 1.0 1.6 0.1 21.4 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln14.2 4.1 13.5 4.7 7.0 2.0 12.7 0.0 8.9 0.6 1.2 15.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh117.1 36.0 57.1 65.2 47.2 42.0 111.4 0.0 28.9 65.1 34.0 66.2 LnGrp LOS F D E E D D F A C E C E Approach Vol, veh/h 1485 1038 1218 539 Approach Delay, s/veh 74.9 51.5 86.2 60.2 Approach LOS E D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s16.8 45.9 25.0 43.5 26.0 36.7 7.2 61.3 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s17.2 * 36 20.6 42.0 21.6 30.3 4.1 58.5 Max Q Clear Time (g_c+I1), s12.2 32.0 22.6 35.4 23.6 18.1 3.3 24.2 Green Ext Time (p_c), s0.2 2.9 0.0 2.3 0.0 5.5 0.0 4.1 Intersection Summary HCM 6th Ctrl Delay 70.6 HCM 6th LOS E Nakano LMA Appendix Page 59 of 194 AM Existing 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 162 486 0 Future Vol, veh/h 0 0 0 162 486 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 72 72 93 93 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 225 523 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 262 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 734 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 734 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 60 of 194 AM Existing 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 30 145 17 0 486 Future Vol, veh/h 0 30 145 17 0 486 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 33 158 18 0 528 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 88 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 950 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 950 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 8.9 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 950 - HCM Lane V/C Ratio - - 0.034 - HCM Control Delay (s) - - 8.9 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 61 of 194 AM Existing 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 37 75 6 1 246 3 56 5 1 1 5 70 Future Volume (veh/h) 37 75 6 1 246 3 56 5 1 1 5 70 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 49 99 8 1 265 3 61 5 1 1 6 81 Peak Hour Factor 0.76 0.76 0.76 0.93 0.93 0.93 0.92 0.92 0.92 0.86 0.86 0.86 Percent Heavy Veh, %333333333333 Cap, veh/h 73 976 78 4 913 10 85 378 76 4 22 304 Arrive On Green 0.04 0.30 0.30 0.00 0.26 0.26 0.05 0.25 0.25 0.00 0.21 0.21 Sat Flow, veh/h 1767 3300 263 1767 3569 40 1767 1497 299 1767 109 1476 Grp Volume(v), veh/h 49 52 55 1 131 137 61 0 6 1 0 87 Grp Sat Flow(s),veh/h/ln 1767 1763 1800 1767 1763 1847 1767 0 1797 1767 0 1585 Q Serve(g_s), s 1.2 0.9 1.0 0.0 2.6 2.6 1.5 0.0 0.1 0.0 0.0 2.0 Cycle Q Clear(g_c), s 1.2 0.9 1.0 0.0 2.6 2.6 1.5 0.0 0.1 0.0 0.0 2.0 Prop In Lane 1.00 0.15 1.00 0.02 1.00 0.17 1.00 0.93 Lane Grp Cap(c), veh/h 73 522 533 4 451 472 85 0 454 4 0 326 V/C Ratio(X) 0.67 0.10 0.10 0.24 0.29 0.29 0.72 0.00 0.01 0.24 0.00 0.27 Avail Cap(c_a), veh/h 180 894 913 168 865 907 205 0 1285 168 0 1101 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.4 11.0 11.0 21.5 12.9 12.9 20.3 0.0 12.1 21.5 0.0 14.4 Incr Delay (d2), s/veh 10.3 0.1 0.1 28.4 0.4 0.3 10.8 0.0 0.0 28.4 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.3 0.3 0.0 0.9 0.9 0.8 0.0 0.0 0.0 0.0 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.7 11.1 11.1 49.9 13.3 13.3 31.0 0.0 12.1 49.9 0.0 14.8 LnGrp LOS C B B D B B C A B D A B Approach Vol, veh/h 156 269 67 88 Approach Delay, s/veh 17.3 13.4 29.3 15.2 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.4 18.5 6.5 13.8 6.2 16.7 4.4 15.8 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 22 5.0 30.0 4.4 21.2 4.1 30.9 Max Q Clear Time (g_c+I1), s 2.0 3.0 3.5 4.0 3.2 4.6 2.0 2.1 Green Ext Time (p_c), s 0.0 0.5 0.0 0.5 0.0 1.3 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 16.6 HCM 6th LOS B Nakano LMA Appendix Page 62 of 194 PM Existing 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 817 149 394 444 00001188 5 813 Future Volume (veh/h) 0 817 149 394 444 00001188 5 813 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 888 162 428 483 0 1488 0 560 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.97 0.97 0.97 Percent Heavy Veh, %033330 333 Cap, veh/h 0 979 431 423 1586 0 1572 0 699 Arrive On Green 0.00 0.28 0.28 0.25 0.90 0.00 0.44 0.00 0.44 Sat Flow, veh/h 0 3618 1551 3428 3618 0 3534 0 1570 Grp Volume(v), veh/h 0 888 162 428 483 0 1488 0 560 Grp Sat Flow(s),veh/h/ln 0 1763 1551 1714 1763 0 1767 0 1570 Q Serve(g_s), s 0.0 28.2 9.8 14.3 2.2 0.0 46.8 0.0 35.7 Cycle Q Clear(g_c), s 0.0 28.2 9.8 14.3 2.2 0.0 46.8 0.0 35.7 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 979 431 423 1586 0 1572 0 699 V/C Ratio(X)0.00 0.91 0.38 1.01 0.30 0.00 0.95 0.00 0.80 Avail Cap(c_a), veh/h 0 979 431 423 1586 0 1600 0 711 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.79 0.79 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 40.5 33.8 43.7 3.3 0.0 30.9 0.0 27.8 Incr Delay (d2), s/veh 0.0 13.6 2.5 42.1 0.4 0.0 12.0 0.0 6.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 13.9 4.0 7.6 0.8 0.0 21.9 0.0 14.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 54.0 36.3 85.8 3.7 0.0 42.9 0.0 34.3 LnGrp LOS A D D F A A D A C Approach Vol, veh/h 1050 911 2048 Approach Delay, s/veh 51.3 42.3 40.5 Approach LOS D D D Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 20.0 38.3 57.7 58.3 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 31.3 52.5 51.3 Max Q Clear Time (g_c+I1), s16.3 30.2 48.8 4.2 Green Ext Time (p_c), s 0.0 0.7 2.8 3.7 Intersection Summary HCM 6th Ctrl Delay 43.8 HCM 6th LOS D Nakano LMA Appendix Page 63 of 194 PM Existing 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 471 1514 0 0 740 1266 130 4 454 0 0 0 Future Volume (veh/h)471 1514 0 0 740 1266 130 4 454 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 491 1577 0 0 796 1361 149 281 338 Peak Hour Factor 0.96 0.96 0.96 0.93 0.93 0.93 0.87 0.87 0.87 Percent Heavy Veh, % 3 30033333 Cap, veh/h 544 2190 0 0 1457 1144 173 326 424 Arrive On Green 0.32 1.00 0.00 0.00 0.41 0.41 0.27 0.27 0.27 Sat Flow, veh/h 3428 3618 0 0 3618 2768 632 1192 1551 Grp Volume(v), veh/h 491 1577 0 0 796 1361 430 0 338 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1384 1824 0 1551 Q Serve(g_s), s 15.9 0.0 0.0 0.0 19.8 48.0 26.0 0.0 23.5 Cycle Q Clear(g_c), s 15.9 0.0 0.0 0.0 19.8 48.0 26.0 0.0 23.5 Prop In Lane 1.00 0.00 0.00 1.00 0.35 1.00 Lane Grp Cap(c), veh/h544 2190 0 0 1457 1144 499 0 424 V/C Ratio(X) 0.90 0.72 0.00 0.00 0.55 1.19 0.86 0.00 0.80 Avail Cap(c_a), veh/h 600 2190 0 0 1457 1144 676 0 575 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.21 0.21 0.00 0.00 0.59 0.59 1.00 0.00 1.00 Uniform Delay (d), s/veh38.8 0.0 0.0 0.0 25.8 34.0 40.0 0.0 39.1 Incr Delay (d2), s/veh 4.2 0.4 0.0 0.0 0.9 90.8 8.5 0.0 5.5 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln5.9 0.1 0.0 0.0 8.4 30.0 12.7 0.0 9.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 43.0 0.4 0.0 0.0 26.7 124.8 48.5 0.0 44.7 LnGrp LOS D A A A C F D A D Approach Vol, veh/h 2068 2157 768 Approach Delay, s/veh 10.5 88.6 46.8 Approach LOS B F D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 78.1 24.1 54.1 37.9 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 20 34.8 43.0 Max Q Clear Time (g_c+I1), s2.0 17.9 50.0 28.0 Green Ext Time (p_c), s 20.7 0.5 0.0 3.6 Intersection Summary HCM 6th Ctrl Delay 49.8 HCM 6th LOS D Nakano LMA Appendix Page 64 of 194 PM Existing 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 553 304 227 182 651 58 474 54 223 62 57 419 Future Volume (veh/h)553 304 227 182 651 58 474 54 223 62 57 419 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 614 338 252 219 784 70 521 59 245 72 66 487 Peak Hour Factor 0.90 0.90 0.90 0.83 0.83 0.83 0.91 0.91 0.91 0.86 0.86 0.86 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 541 1672 512 275 1278 397 466 122 505 116 1168 512 Arrive On Green 0.16 0.33 0.33 0.08 0.25 0.25 0.09 0.39 0.39 0.03 0.33 0.33 Sat Flow, veh/h 3428 5066 1551 3428 5066 1572 4983 311 1292 3428 3526 1546 Grp Volume(v), veh/h 614 338 252 219 784 70 521 0 304 72 66 487 Grp Sat Flow(s),veh/h/ln1714 1689 1551 1714 1689 1572 1661 0 1604 1714 1763 1546 Q Serve(g_s), s 19.6 5.9 16.1 7.8 17.0 4.3 11.6 0.0 17.7 2.6 1.6 38.2 Cycle Q Clear(g_c), s 19.6 5.9 16.1 7.8 17.0 4.3 11.6 0.0 17.7 2.6 1.6 38.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.81 1.00 1.00 Lane Grp Cap(c), veh/h541 1672 512 275 1278 397 466 0 627 116 1168 512 V/C Ratio(X) 1.13 0.20 0.49 0.80 0.61 0.18 1.12 0.00 0.49 0.62 0.06 0.95 Avail Cap(c_a), veh/h 541 1672 512 381 1278 397 466 0 627 180 1193 523 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.2 29.8 33.2 56.1 41.0 36.3 56.2 0.0 28.4 59.2 28.3 40.5 Incr Delay (d2), s/veh 81.2 0.3 3.4 5.3 2.2 1.0 78.2 0.0 0.9 2.0 0.0 28.1 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln14.5 2.5 6.6 3.6 7.3 1.8 8.2 0.0 6.9 1.2 0.7 18.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh133.4 30.1 36.6 61.4 43.3 37.3 134.4 0.0 29.3 61.2 28.3 68.6 LnGrp LOS F C D E D D F A C E C E Approach Vol, veh/h 1204 1073 825 625 Approach Delay, s/veh 84.2 46.6 95.7 63.5 Approach LOS F D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s14.3 47.4 16.0 46.4 24.0 37.7 8.6 53.8 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s13.8 * 39 11.6 42.0 19.6 31.3 6.5 47.1 Max Q Clear Time (g_c+I1), s9.8 18.1 13.6 40.2 21.6 19.0 4.6 19.7 Green Ext Time (p_c), s0.2 6.9 0.0 0.8 0.0 6.1 0.0 3.0 Intersection Summary HCM 6th Ctrl Delay 72.4 HCM 6th LOS E Nakano LMA Appendix Page 65 of 194 PM Existing 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 435 254 0 Future Vol, veh/h 0 0 0 435 254 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 88 88 91 91 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 494 279 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 140 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 879 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 879 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 66 of 194 PM Existing 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 11 394 41 0 254 Future Vol, veh/h 0 11 394 41 0 254 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 12 428 45 0 276 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 237 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 761 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 761 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 9.8 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 761 - HCM Lane V/C Ratio - - 0.016 - HCM Control Delay (s) - - 9.8 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0 - Nakano LMA Appendix Page 67 of 194 PM Existing 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 114 217 30 5 127 3 36 3 4 0 5 38 Future Volume (veh/h) 114 217 30 5 127 3 36 3 4 0 5 38 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 121 231 32 5 140 3 43 4 5 0 5 39 Peak Hour Factor 0.94 0.94 0.94 0.91 0.91 0.91 0.83 0.83 0.83 0.98 0.98 0.98 Percent Heavy Veh, %333333333333 Cap, veh/h 158 1011 138 10 848 18 66 248 310 4 35 271 Arrive On Green 0.09 0.32 0.32 0.01 0.24 0.24 0.04 0.33 0.33 0.00 0.20 0.20 Sat Flow, veh/h 1767 3113 426 1767 3526 75 1767 748 935 1767 178 1388 Grp Volume(v), veh/h 121 129 134 5 70 73 43 0 9 0 0 44 Grp Sat Flow(s),veh/h/ln 1767 1763 1776 1767 1763 1839 1767 0 1682 1767 0 1566 Q Serve(g_s), s 3.0 2.4 2.4 0.1 1.4 1.4 1.1 0.0 0.2 0.0 0.0 1.0 Cycle Q Clear(g_c), s 3.0 2.4 2.4 0.1 1.4 1.4 1.1 0.0 0.2 0.0 0.0 1.0 Prop In Lane 1.00 0.24 1.00 0.04 1.00 0.56 1.00 0.89 Lane Grp Cap(c), veh/h 158 573 577 10 424 442 66 0 558 4 0 306 V/C Ratio(X) 0.76 0.23 0.23 0.53 0.16 0.17 0.66 0.00 0.02 0.00 0.00 0.14 Avail Cap(c_a), veh/h 510 1208 1217 163 846 883 259 0 1229 163 0 1059 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 19.7 10.9 10.9 22.0 13.3 13.3 21.1 0.0 10.0 0.0 0.0 14.8 Incr Delay (d2), s/veh 7.4 0.2 0.2 38.3 0.2 0.2 10.6 0.0 0.0 0.0 0.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 0.8 0.8 0.1 0.5 0.5 0.6 0.0 0.1 0.0 0.0 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.2 11.1 11.1 60.3 13.5 13.5 31.7 0.0 10.0 0.0 0.0 15.0 LnGrp LOS C BBEBBCAAAAB Approach Vol, veh/h 384 148 52 44 Approach Delay, s/veh 16.2 15.1 27.9 15.0 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.6 20.1 6.0 13.6 8.4 16.4 0.0 19.6 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 30 6.5 30.0 12.8 21.3 4.1 32.4 Max Q Clear Time (g_c+I1), s 2.1 4.4 3.1 3.0 5.0 3.4 0.0 2.2 Green Ext Time (p_c), s 0.0 1.5 0.0 0.2 0.2 0.6 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 16.8 HCM 6th LOS B Nakano LMA Appendix Page 68 of 194 AM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 517 498 175 191 172 95 74 551 515 500 Average Queue (ft) 407 317 79 109 124 28 33 294 310 254 95th Queue (ft)556 508 176 177 172 69 68 437 448 377 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 14 2 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)15 0 0 0 Queuing Penalty (veh)28 1 0 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 242 255 412 411 246 201 414 474 310 183 Average Queue (ft) 209 224 243 179 129 104 205 225 146 42 95th Queue (ft)283 288 446 352 234 191 384 410 245 100 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)1 0 Queuing Penalty (veh)12 1 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)2 8 1 1 Queuing Penalty (veh) 11 45 9 1 Nakano LMA Appendix Page 69 of 194 AM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 304 1143 1122 158 186 189 197 140 212 286 243 Average Queue (ft) 291 303 897 479 46 85 76 104 89 125 176 36 95th Queue (ft)294 307 1279 1129 128 154 154 174 134 221 276 105 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%)4 0 Queuing Penalty (veh)19 0 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 14 65 0 0 3 0 Queuing Penalty (veh) 22 99 1 0 1 0 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 283 292 300 810 31 72 92 227 120 Average Queue (ft) 229 289 299 732 3 22 36 83 101 95th Queue (ft)291 293 301 915 17 52 71 194 136 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)32 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)1 7 42 4 0 14 Queuing Penalty (veh) 2 25 145 28 0 6 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB NB NB SB SB Directions Served L T TR T TR L TR L TR Maximum Queue (ft)54 52 74 139 133 79 31 30 70 Average Queue (ft)22 17 19 44 52 35 2 1 30 95th Queue (ft)47 43 52 87 103 66 15 10 61 Link Distance (ft)413 413 873 873 390 231 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 75 Storage Blk Time (%)1 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 827 Nakano LMA Appendix Page 70 of 194 PM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 498 498 175 202 212 325 179 607 845 818 Average Queue (ft) 413 339 111 164 170 74 64 327 406 336 95th Queue (ft)543 468 216 230 226 179 116 480 604 534 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 4 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)28 0 2 12 0 0 Queuing Penalty (veh)42 0 5 28 2 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 240 255 419 420 380 315 324 334 393 275 Average Queue (ft) 153 220 317 321 202 147 153 158 231 166 95th Queue (ft)236 298 463 459 316 249 259 257 348 309 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)3 3 Queuing Penalty (veh)29 29 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)0 1 13 6 0 Queuing Penalty (veh) 3 9 59 13 0 Nakano LMA Appendix Page 71 of 194 PM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1015 890 73 106 152 165 202 233 340 250 Average Queue (ft) 291 303 595 150 22 52 63 106 128 153 200 69 95th Queue (ft)295 306 908 479 64 90 139 164 181 224 294 202 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 13 62 0 2 0 Queuing Penalty (veh) 13 63 1 1 0 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 276 290 300 450 95 110 74 249 120 Average Queue (ft) 147 210 232 117 21 49 28 65 95 95th Queue (ft)251 321 329 295 64 90 66 204 132 Link Distance (ft)758 1884 1884 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)0261 0 014 Queuing Penalty (veh) 0 5 16 4 0 0 4 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR L TR TR Maximum Queue (ft) 114 93 115 31 92 114 70 31 31 Average Queue (ft) 60 29 45 4 36 37 27 3 20 95th Queue (ft)98 66 99 21 69 75 59 18 43 Link Distance (ft)413 413 873 873 390 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)0 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 332 Nakano LMA Appendix Page 72 of 194 Appendix I Existing LOS and Queuing Output Nakano LMA Appendix Page 73 of 194 AM Existing 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 939 187 273 356 00007592610 Future Volume (veh/h) 0 939 187 273 356 00007592610 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 1032 205 317 414 0 1000 0 429 Peak Hour Factor 0.91 0.91 0.91 0.86 0.86 0.86 0.95 0.95 0.95 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1465 641 371 2019 0 1138 0 496 Arrive On Green 0.00 0.42 0.42 0.22 1.00 0.00 0.32 0.00 0.32 Sat Flow, veh/h 0 3618 1544 3428 3618 0 3534 0 1541 Grp Volume(v), veh/h 0 1032 205 317 414 0 1000 0 429 Grp Sat Flow(s),veh/h/ln 0 1763 1544 1714 1763 0 1767 0 1541 Q Serve(g_s), s 0.0 28.1 10.4 10.3 0.0 0.0 31.0 0.0 30.3 Cycle Q Clear(g_c), s 0.0 28.1 10.4 10.3 0.0 0.0 31.0 0.0 30.3 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1465 641 371 2019 0 1138 0 496 V/C Ratio(X)0.00 0.70 0.32 0.85 0.21 0.00 0.88 0.00 0.86 Avail Cap(c_a), veh/h 0 1465 641 423 2019 0 1307 0 570 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.94 0.94 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 28.0 22.9 44.6 0.0 0.0 37.2 0.0 36.9 Incr Delay (d2), s/veh 0.0 2.9 1.3 13.5 0.2 0.0 6.5 0.0 11.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 12.2 4.0 4.6 0.1 0.0 14.2 0.0 12.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 30.9 24.2 58.1 0.2 0.0 43.6 0.0 48.8 LnGrp LOS A C C E A A D A D Approach Vol, veh/h 1237 731 1429 Approach Delay, s/veh 29.8 25.3 45.2 Approach LOS C C D Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 18.3 54.3 43.5 72.5 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 40.9 42.9 60.9 Max Q Clear Time (g_c+I1), s12.3 30.1 33.0 2.0 Green Ext Time (p_c), s 0.2 5.8 4.3 3.1 Intersection Summary HCM 6th Ctrl Delay 35.3 HCM 6th LOS D Nakano LMA Appendix Page 74 of 194 AM Existing 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 678 1100 0 0 512 1102 91 3 299 0 0 0 Future Volume (veh/h)678 1100 0 0 512 1102 91 3 299 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 721 1170 0 0 528 1136 95 163 204 Peak Hour Factor 0.94 0.94 0.94 0.97 0.97 0.97 0.96 0.96 0.96 Percent Heavy Veh, % 3 30033333 Cap, veh/h 772 2496 0 0 1528 1164 125 215 286 Arrive On Green 0.45 1.00 0.00 0.00 0.43 0.43 0.19 0.19 0.19 Sat Flow, veh/h 3428 3618 0 0 3618 2685 671 1151 1532 Grp Volume(v), veh/h 721 1170 0 0 528 1136 258 0 204 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1342 1822 0 1532 Q Serve(g_s), s 23.1 0.0 0.0 0.0 11.6 48.2 15.6 0.0 14.5 Cycle Q Clear(g_c), s 23.1 0.0 0.0 0.0 11.6 48.2 15.6 0.0 14.5 Prop In Lane 1.00 0.00 0.00 1.00 0.37 1.00 Lane Grp Cap(c), veh/h772 2496 0 0 1528 1164 341 0 286 V/C Ratio(X) 0.93 0.47 0.00 0.00 0.35 0.98 0.76 0.00 0.71 Avail Cap(c_a), veh/h 836 2496 0 0 1528 1164 675 0 568 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.48 0.48 0.00 0.00 0.57 0.57 1.00 0.00 1.00 Uniform Delay (d), s/veh31.1 0.0 0.0 0.0 21.9 32.3 44.7 0.0 44.2 Incr Delay (d2), s/veh 9.4 0.3 0.0 0.0 0.4 15.0 3.5 0.0 3.3 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.4 0.1 0.0 0.0 4.8 17.6 7.3 0.0 5.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 40.5 0.3 0.0 0.0 22.2 47.3 48.1 0.0 47.5 LnGrp LOS D A A A C D D A D Approach Vol, veh/h 1891 1664 462 Approach Delay, s/veh 15.6 39.3 47.9 Approach LOS B D D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 88.2 31.8 56.4 27.8 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 28 26.8 43.0 Max Q Clear Time (g_c+I1), s2.0 25.1 50.2 17.6 Green Ext Time (p_c), s 12.2 1.0 0.0 2.3 Intersection Summary HCM 6th Ctrl Delay 29.1 HCM 6th LOS C Nakano LMA Appendix Page 75 of 194 AM Existing 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 574 458 364 200 515 53 786 111 236 28 80 334 Future Volume (veh/h)574 458 364 200 515 53 786 111 236 28 80 334 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 611 487 387 270 696 72 845 119 254 34 98 407 Peak Hour Factor 0.94 0.94 0.94 0.74 0.74 0.74 0.93 0.93 0.93 0.82 0.82 0.82 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 564 1524 473 324 1169 358 782 223 475 74 1027 449 Arrive On Green 0.16 0.30 0.30 0.09 0.23 0.23 0.16 0.43 0.43 0.02 0.29 0.29 Sat Flow, veh/h 3428 5066 1571 3428 5066 1549 4983 522 1113 3428 3526 1541 Grp Volume(v), veh/h 611 487 387 270 696 72 845 0 373 34 98 407 Grp Sat Flow(s),veh/h/ln1714 1689 1571 1714 1689 1549 1661 0 1635 1714 1763 1541 Q Serve(g_s), s 21.6 9.8 30.0 10.2 16.1 4.9 20.6 0.0 22.2 1.3 2.7 33.4 Cycle Q Clear(g_c), s 21.6 9.8 30.0 10.2 16.1 4.9 20.6 0.0 22.2 1.3 2.7 33.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.68 1.00 1.00 Lane Grp Cap(c), veh/h564 1524 473 324 1169 358 782 0 698 74 1027 449 V/C Ratio(X) 1.08 0.32 0.82 0.83 0.60 0.20 1.08 0.00 0.53 0.46 0.10 0.91 Avail Cap(c_a), veh/h 564 1524 473 449 1169 358 782 0 729 107 1128 493 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh54.8 35.5 42.6 58.4 45.0 40.7 55.3 0.0 27.9 63.4 33.9 44.8 Incr Delay (d2), s/veh 62.3 0.6 14.6 6.8 2.2 1.3 56.1 0.0 1.0 1.6 0.1 21.4 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln14.2 4.1 13.5 4.7 7.0 2.0 12.7 0.0 8.9 0.6 1.2 15.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh117.1 36.0 57.1 65.2 47.2 42.0 111.4 0.0 28.9 65.1 34.0 66.2 LnGrp LOS F D E E D D F A C E C E Approach Vol, veh/h 1485 1038 1218 539 Approach Delay, s/veh 74.9 51.5 86.2 60.2 Approach LOS E D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s16.8 45.9 25.0 43.5 26.0 36.7 7.2 61.3 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s17.2 * 36 20.6 42.0 21.6 30.3 4.1 58.5 Max Q Clear Time (g_c+I1), s12.2 32.0 22.6 35.4 23.6 18.1 3.3 24.2 Green Ext Time (p_c), s0.2 2.9 0.0 2.3 0.0 5.5 0.0 4.1 Intersection Summary HCM 6th Ctrl Delay 70.6 HCM 6th LOS E Nakano LMA Appendix Page 76 of 194 AM Existing 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 162 486 0 Future Vol, veh/h 0 0 0 162 486 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 72 72 93 93 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 225 523 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 262 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 734 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 734 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 77 of 194 AM Existing 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 30 145 17 0 486 Future Vol, veh/h 0 30 145 17 0 486 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 33 158 18 0 528 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 88 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 950 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 950 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 8.9 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 950 - HCM Lane V/C Ratio - - 0.034 - HCM Control Delay (s) - - 8.9 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 78 of 194 AM Existing 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 37 75 6 1 246 3 56 5 1 1 5 70 Future Volume (veh/h) 37 75 6 1 246 3 56 5 1 1 5 70 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 49 99 8 1 265 3 61 5 1 1 6 81 Peak Hour Factor 0.76 0.76 0.76 0.93 0.93 0.93 0.92 0.92 0.92 0.86 0.86 0.86 Percent Heavy Veh, %333333333333 Cap, veh/h 73 976 78 4 913 10 85 378 76 4 22 304 Arrive On Green 0.04 0.30 0.30 0.00 0.26 0.26 0.05 0.25 0.25 0.00 0.21 0.21 Sat Flow, veh/h 1767 3300 263 1767 3569 40 1767 1497 299 1767 109 1476 Grp Volume(v), veh/h 49 52 55 1 131 137 61 0 6 1 0 87 Grp Sat Flow(s),veh/h/ln 1767 1763 1800 1767 1763 1847 1767 0 1797 1767 0 1585 Q Serve(g_s), s 1.2 0.9 1.0 0.0 2.6 2.6 1.5 0.0 0.1 0.0 0.0 2.0 Cycle Q Clear(g_c), s 1.2 0.9 1.0 0.0 2.6 2.6 1.5 0.0 0.1 0.0 0.0 2.0 Prop In Lane 1.00 0.15 1.00 0.02 1.00 0.17 1.00 0.93 Lane Grp Cap(c), veh/h 73 522 533 4 451 472 85 0 454 4 0 326 V/C Ratio(X) 0.67 0.10 0.10 0.24 0.29 0.29 0.72 0.00 0.01 0.24 0.00 0.27 Avail Cap(c_a), veh/h 180 894 913 168 865 907 205 0 1285 168 0 1101 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.4 11.0 11.0 21.5 12.9 12.9 20.3 0.0 12.1 21.5 0.0 14.4 Incr Delay (d2), s/veh 10.3 0.1 0.1 28.4 0.4 0.3 10.8 0.0 0.0 28.4 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.3 0.3 0.0 0.9 0.9 0.8 0.0 0.0 0.0 0.0 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.7 11.1 11.1 49.9 13.3 13.3 31.0 0.0 12.1 49.9 0.0 14.8 LnGrp LOS C B B D B B C A B D A B Approach Vol, veh/h 156 269 67 88 Approach Delay, s/veh 17.3 13.4 29.3 15.2 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.4 18.5 6.5 13.8 6.2 16.7 4.4 15.8 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 22 5.0 30.0 4.4 21.2 4.1 30.9 Max Q Clear Time (g_c+I1), s 2.0 3.0 3.5 4.0 3.2 4.6 2.0 2.1 Green Ext Time (p_c), s 0.0 0.5 0.0 0.5 0.0 1.3 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 16.6 HCM 6th LOS B Nakano LMA Appendix Page 79 of 194 PM Existing 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 817 149 394 444 00001188 5 813 Future Volume (veh/h) 0 817 149 394 444 00001188 5 813 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 888 162 428 483 0 1488 0 560 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.97 0.97 0.97 Percent Heavy Veh, %033330 333 Cap, veh/h 0 979 431 423 1586 0 1572 0 699 Arrive On Green 0.00 0.28 0.28 0.25 0.90 0.00 0.44 0.00 0.44 Sat Flow, veh/h 0 3618 1551 3428 3618 0 3534 0 1570 Grp Volume(v), veh/h 0 888 162 428 483 0 1488 0 560 Grp Sat Flow(s),veh/h/ln 0 1763 1551 1714 1763 0 1767 0 1570 Q Serve(g_s), s 0.0 28.2 9.8 14.3 2.2 0.0 46.8 0.0 35.7 Cycle Q Clear(g_c), s 0.0 28.2 9.8 14.3 2.2 0.0 46.8 0.0 35.7 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 979 431 423 1586 0 1572 0 699 V/C Ratio(X)0.00 0.91 0.38 1.01 0.30 0.00 0.95 0.00 0.80 Avail Cap(c_a), veh/h 0 979 431 423 1586 0 1600 0 711 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.79 0.79 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 40.5 33.8 43.7 3.3 0.0 30.9 0.0 27.8 Incr Delay (d2), s/veh 0.0 13.6 2.5 42.1 0.4 0.0 12.0 0.0 6.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 13.9 4.0 7.6 0.8 0.0 21.9 0.0 14.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 54.0 36.3 85.8 3.7 0.0 42.9 0.0 34.3 LnGrp LOS A D D F A A D A C Approach Vol, veh/h 1050 911 2048 Approach Delay, s/veh 51.3 42.3 40.5 Approach LOS D D D Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 20.0 38.3 57.7 58.3 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 31.3 52.5 51.3 Max Q Clear Time (g_c+I1), s16.3 30.2 48.8 4.2 Green Ext Time (p_c), s 0.0 0.7 2.8 3.7 Intersection Summary HCM 6th Ctrl Delay 43.8 HCM 6th LOS D Nakano LMA Appendix Page 80 of 194 PM Existing 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 471 1514 0 0 740 1266 130 4 454 0 0 0 Future Volume (veh/h)471 1514 0 0 740 1266 130 4 454 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 491 1577 0 0 796 1361 149 281 338 Peak Hour Factor 0.96 0.96 0.96 0.93 0.93 0.93 0.87 0.87 0.87 Percent Heavy Veh, % 3 30033333 Cap, veh/h 544 2190 0 0 1457 1144 173 326 424 Arrive On Green 0.32 1.00 0.00 0.00 0.41 0.41 0.27 0.27 0.27 Sat Flow, veh/h 3428 3618 0 0 3618 2768 632 1192 1551 Grp Volume(v), veh/h 491 1577 0 0 796 1361 430 0 338 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1384 1824 0 1551 Q Serve(g_s), s 15.9 0.0 0.0 0.0 19.8 48.0 26.0 0.0 23.5 Cycle Q Clear(g_c), s 15.9 0.0 0.0 0.0 19.8 48.0 26.0 0.0 23.5 Prop In Lane 1.00 0.00 0.00 1.00 0.35 1.00 Lane Grp Cap(c), veh/h544 2190 0 0 1457 1144 499 0 424 V/C Ratio(X) 0.90 0.72 0.00 0.00 0.55 1.19 0.86 0.00 0.80 Avail Cap(c_a), veh/h 600 2190 0 0 1457 1144 676 0 575 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.21 0.21 0.00 0.00 0.59 0.59 1.00 0.00 1.00 Uniform Delay (d), s/veh38.8 0.0 0.0 0.0 25.8 34.0 40.0 0.0 39.1 Incr Delay (d2), s/veh 4.2 0.4 0.0 0.0 0.9 90.8 8.5 0.0 5.5 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln5.9 0.1 0.0 0.0 8.4 30.0 12.7 0.0 9.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 43.0 0.4 0.0 0.0 26.7 124.8 48.5 0.0 44.7 LnGrp LOS D A A A C F D A D Approach Vol, veh/h 2068 2157 768 Approach Delay, s/veh 10.5 88.6 46.8 Approach LOS B F D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 78.1 24.1 54.1 37.9 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 20 34.8 43.0 Max Q Clear Time (g_c+I1), s2.0 17.9 50.0 28.0 Green Ext Time (p_c), s 20.7 0.5 0.0 3.6 Intersection Summary HCM 6th Ctrl Delay 49.8 HCM 6th LOS D Nakano LMA Appendix Page 81 of 194 PM Existing 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 553 304 227 182 651 58 474 54 223 62 57 419 Future Volume (veh/h)553 304 227 182 651 58 474 54 223 62 57 419 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 614 338 252 219 784 70 521 59 245 72 66 487 Peak Hour Factor 0.90 0.90 0.90 0.83 0.83 0.83 0.91 0.91 0.91 0.86 0.86 0.86 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 541 1672 512 275 1278 397 466 122 505 116 1168 512 Arrive On Green 0.16 0.33 0.33 0.08 0.25 0.25 0.09 0.39 0.39 0.03 0.33 0.33 Sat Flow, veh/h 3428 5066 1551 3428 5066 1572 4983 311 1292 3428 3526 1546 Grp Volume(v), veh/h 614 338 252 219 784 70 521 0 304 72 66 487 Grp Sat Flow(s),veh/h/ln1714 1689 1551 1714 1689 1572 1661 0 1604 1714 1763 1546 Q Serve(g_s), s 19.6 5.9 16.1 7.8 17.0 4.3 11.6 0.0 17.7 2.6 1.6 38.2 Cycle Q Clear(g_c), s 19.6 5.9 16.1 7.8 17.0 4.3 11.6 0.0 17.7 2.6 1.6 38.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.81 1.00 1.00 Lane Grp Cap(c), veh/h541 1672 512 275 1278 397 466 0 627 116 1168 512 V/C Ratio(X) 1.13 0.20 0.49 0.80 0.61 0.18 1.12 0.00 0.49 0.62 0.06 0.95 Avail Cap(c_a), veh/h 541 1672 512 381 1278 397 466 0 627 180 1193 523 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.2 29.8 33.2 56.1 41.0 36.3 56.2 0.0 28.4 59.2 28.3 40.5 Incr Delay (d2), s/veh 81.2 0.3 3.4 5.3 2.2 1.0 78.2 0.0 0.9 2.0 0.0 28.1 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln14.5 2.5 6.6 3.6 7.3 1.8 8.2 0.0 6.9 1.2 0.7 18.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh133.4 30.1 36.6 61.4 43.3 37.3 134.4 0.0 29.3 61.2 28.3 68.6 LnGrp LOS F C D E D D F A C E C E Approach Vol, veh/h 1204 1073 825 625 Approach Delay, s/veh 84.2 46.6 95.7 63.5 Approach LOS F D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s14.3 47.4 16.0 46.4 24.0 37.7 8.6 53.8 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s13.8 * 39 11.6 42.0 19.6 31.3 6.5 47.1 Max Q Clear Time (g_c+I1), s9.8 18.1 13.6 40.2 21.6 19.0 4.6 19.7 Green Ext Time (p_c), s0.2 6.9 0.0 0.8 0.0 6.1 0.0 3.0 Intersection Summary HCM 6th Ctrl Delay 72.4 HCM 6th LOS E Nakano LMA Appendix Page 82 of 194 PM Existing 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 435 254 0 Future Vol, veh/h 0 0 0 435 254 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 88 88 91 91 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 494 279 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 140 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 879 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 879 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 83 of 194 PM Existing 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 11 394 41 0 254 Future Vol, veh/h 0 11 394 41 0 254 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 12 428 45 0 276 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 237 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 761 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 761 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 9.8 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 761 - HCM Lane V/C Ratio - - 0.016 - HCM Control Delay (s) - - 9.8 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0 - Nakano LMA Appendix Page 84 of 194 PM Existing 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 114 217 30 5 127 3 36 3 4 0 5 38 Future Volume (veh/h) 114 217 30 5 127 3 36 3 4 0 5 38 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 121 231 32 5 140 3 43 4 5 0 5 39 Peak Hour Factor 0.94 0.94 0.94 0.91 0.91 0.91 0.83 0.83 0.83 0.98 0.98 0.98 Percent Heavy Veh, %333333333333 Cap, veh/h 158 1011 138 10 848 18 66 248 310 4 35 271 Arrive On Green 0.09 0.32 0.32 0.01 0.24 0.24 0.04 0.33 0.33 0.00 0.20 0.20 Sat Flow, veh/h 1767 3113 426 1767 3526 75 1767 748 935 1767 178 1388 Grp Volume(v), veh/h 121 129 134 5 70 73 43 0 9 0 0 44 Grp Sat Flow(s),veh/h/ln 1767 1763 1776 1767 1763 1839 1767 0 1682 1767 0 1566 Q Serve(g_s), s 3.0 2.4 2.4 0.1 1.4 1.4 1.1 0.0 0.2 0.0 0.0 1.0 Cycle Q Clear(g_c), s 3.0 2.4 2.4 0.1 1.4 1.4 1.1 0.0 0.2 0.0 0.0 1.0 Prop In Lane 1.00 0.24 1.00 0.04 1.00 0.56 1.00 0.89 Lane Grp Cap(c), veh/h 158 573 577 10 424 442 66 0 558 4 0 306 V/C Ratio(X) 0.76 0.23 0.23 0.53 0.16 0.17 0.66 0.00 0.02 0.00 0.00 0.14 Avail Cap(c_a), veh/h 510 1208 1217 163 846 883 259 0 1229 163 0 1059 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 19.7 10.9 10.9 22.0 13.3 13.3 21.1 0.0 10.0 0.0 0.0 14.8 Incr Delay (d2), s/veh 7.4 0.2 0.2 38.3 0.2 0.2 10.6 0.0 0.0 0.0 0.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 0.8 0.8 0.1 0.5 0.5 0.6 0.0 0.1 0.0 0.0 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.2 11.1 11.1 60.3 13.5 13.5 31.7 0.0 10.0 0.0 0.0 15.0 LnGrp LOS C BBEBBCAAAAB Approach Vol, veh/h 384 148 52 44 Approach Delay, s/veh 16.2 15.1 27.9 15.0 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.6 20.1 6.0 13.6 8.4 16.4 0.0 19.6 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 30 6.5 30.0 12.8 21.3 4.1 32.4 Max Q Clear Time (g_c+I1), s 2.1 4.4 3.1 3.0 5.0 3.4 0.0 2.2 Green Ext Time (p_c), s 0.0 1.5 0.0 0.2 0.2 0.6 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 16.8 HCM 6th LOS B Nakano LMA Appendix Page 85 of 194 AM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 517 498 175 191 172 95 74 551 515 500 Average Queue (ft) 407 317 79 109 124 28 33 294 310 254 95th Queue (ft)556 508 176 177 172 69 68 437 448 377 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 14 2 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)15 0 0 0 Queuing Penalty (veh)28 1 0 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 242 255 412 411 246 201 414 474 310 183 Average Queue (ft) 209 224 243 179 129 104 205 225 146 42 95th Queue (ft)283 288 446 352 234 191 384 410 245 100 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)1 0 Queuing Penalty (veh)12 1 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)2 8 1 1 Queuing Penalty (veh) 11 45 9 1 Nakano LMA Appendix Page 86 of 194 AM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 304 1143 1122 158 186 189 197 140 212 286 243 Average Queue (ft) 291 303 897 479 46 85 76 104 89 125 176 36 95th Queue (ft)294 307 1279 1129 128 154 154 174 134 221 276 105 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%)4 0 Queuing Penalty (veh)19 0 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 14 65 0 0 3 0 Queuing Penalty (veh) 22 99 1 0 1 0 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 283 292 300 810 31 72 92 227 120 Average Queue (ft) 229 289 299 732 3 22 36 83 101 95th Queue (ft)291 293 301 915 17 52 71 194 136 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)32 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)1 7 42 4 0 14 Queuing Penalty (veh) 2 25 145 28 0 6 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB NB NB SB SB Directions Served L T TR T TR L TR L TR Maximum Queue (ft)54 52 74 139 133 79 31 30 70 Average Queue (ft)22 17 19 44 52 35 2 1 30 95th Queue (ft)47 43 52 87 103 66 15 10 61 Link Distance (ft)413 413 873 873 390 231 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 75 Storage Blk Time (%)1 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 827 Nakano LMA Appendix Page 87 of 194 PM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 498 498 175 202 212 325 179 607 845 818 Average Queue (ft) 413 339 111 164 170 74 64 327 406 336 95th Queue (ft)543 468 216 230 226 179 116 480 604 534 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 4 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)28 0 2 12 0 0 Queuing Penalty (veh)42 0 5 28 2 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 240 255 419 420 380 315 324 334 393 275 Average Queue (ft) 153 220 317 321 202 147 153 158 231 166 95th Queue (ft)236 298 463 459 316 249 259 257 348 309 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)3 3 Queuing Penalty (veh)29 29 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)0 1 13 6 0 Queuing Penalty (veh) 3 9 59 13 0 Nakano LMA Appendix Page 88 of 194 PM Existing Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1015 890 73 106 152 165 202 233 340 250 Average Queue (ft) 291 303 595 150 22 52 63 106 128 153 200 69 95th Queue (ft)295 306 908 479 64 90 139 164 181 224 294 202 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 13 62 0 2 0 Queuing Penalty (veh) 13 63 1 1 0 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 276 290 300 450 95 110 74 249 120 Average Queue (ft) 147 210 232 117 21 49 28 65 95 95th Queue (ft)251 321 329 295 64 90 66 204 132 Link Distance (ft)758 1884 1884 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)0261 0 014 Queuing Penalty (veh) 0 5 16 4 0 0 4 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR L TR TR Maximum Queue (ft) 114 93 115 31 92 114 70 31 31 Average Queue (ft) 60 29 45 4 36 37 27 3 20 95th Queue (ft)98 66 99 21 69 75 59 18 43 Link Distance (ft)413 413 873 873 390 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)0 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 332 Nakano LMA Appendix Page 89 of 194 Appendix J Excerpts from City of San Diego Trip Generation Manual Nakano LMA Appendix Page 90 of 194 TABLE 1 (Continued) May 2003 TRIP GENERATION RATE SUMMARY (WEEKDAY) 6 LAND USE DRIVEWAY (1) (2) VEHICLE TRIP RATE CUMULATIVE (8) VEHICLE TRIP RATE PEAK HOUR AND IN/OUT RATIO AM (IN:OUT) PM (IN:OUT) RESIDENTIAL (3) Congregate Care Facility 2 trips/dwelling unit 2 trips/dwelling unit 3% (6:4) 8% (5:5) Estate Housing 12 trips/dwelling unit 12 trips/dwelling unit - - - - Mobile Home 5 trips/dwelling unit; 40 trips/acre 5 trips/dwelling unit; 40 trips/acre 9% (3:7) 12% (6:4) Multiple Dwelling Unit: Under 20 dwelling units/acre 8 trips/dwelling unit 8 trips/dwelling unit 8% (2:8) 10% (7:3) Over 20 dwelling units/acre 6 trips/dwelling unit 6 trips/dwelling unit 8% (2:8) 9% (7:3) Retirement/Senior Citizen Housing 4 trips/dwelling unit 4 trips/dwelling unit - - - - Single Family Detached: Urbanized Area (1) 9 trips/dwelling unit 9 trips/dwelling unit 8% (2:8) 10% (7:3) Urbanizing Area (1) 10 trips/dwelling unit 10 trips/dwelling unit 8% (2:8) 10% (7:3) TRANSPORTATION FACILITIES (3) Bus Depot 25 trips/1,000 sq. ft. 25 trips/1,000 sq. ft. Park & Ride Lots 400 trips/acre; 600 trips/paved acre 400 trips/acre; 600 trips/paved acre 14% (7:3) 15% (3:7) Transit Station (rail) 300 trips/acre 300 trips/acre 14% (7:3) 15% (3:7) Notes: (1) From the 1990 Trip Generation Manual. Driveway rates reflect trips that are generated by a site. These rates are used to calculate the total number of trips that impact the project and its immediate vicinity. (2) Does not include trip rates for Centre City area. See Table 5. (3) San Diego Association of Governments (SANDAG), "Traffic Generators," San Diego, California, December 1996, and July 1998. (4) City of San Diego memo, "Trip Generation Rate for Churches," December 9, 1992. (5) Refer to Cumulative Vehicle Trip Rate column for reduced trip rates. (6) Ln = Natural logarithm; fitted curve logarithmic equation is used for Commercial Office and Regional Shopping Center. For example, the trip generation of an Office Building with 100,000 sq. ft. of GLA is: Ln(T) = 0.756 Ln(100) + 3.95, or Ln(T) = 0.756 (4.60517) + 3.95, or Ln(T) = 3.481509 + 3.95, or Ln(T) = 7.431509, which is 1,688 trips. The trip generation of a Regional Shopping Center with 1,000,000 sq. ft. of GLA is: Ln(T) = 0.756 Ln(1,000) + 5.25, or Ln(T) = 0.756 (6.907755) + 5.25, or Ln(T) = 5.222263 + 5.25, or Ln(T) = 10.47226, which is 35,322 trips. See Table 2 for calculated trip generation for selected sizes of Regional Shopping Centers, and Table 3 for calculated trip generation for selected sizes of Commercial Offices. GLA = Gross Leasable Area; T = trips; x = GLA in 1,000 square feet. (7) Institute of Transportation Engineers, "Trip Generation," 5th and 6th Editions, Washington, District of Columbia, 1991 and 1998. (8) Trips made to a site are Pass-By and Cumulative trips. See Appendix A for definitions of these trips. Cumulative rates are used to determine the community-wide impact of a new project. Nakano LMA Appendix Page 91 of 194 Appendix K SANDAG Select Zone Assignment Nakano LMA Appendix Page 92 of 194 1 45 7 1015 781 69 2 9 8 2 6 1 1 8 9318 26 1 9 1 1 4 9 3 4 6 18737 9685 7 18737 0 0% 0 0 % 0 0 % 0 0% 4 0 2 0 % 1 0 4793 4774 4740 4759 4804 4792 4766 SANDAG Series13 version13_3_2 Scenario ID 1209 2012 Nakano Select Zone Run TAZ 4826 Nakano LMA Appendix Page 93 of 194 27 27 7 55 69 9 418 62 6 0 9 34 6 7 5 0 31 5 447 60 9 32 68 9 7 6 362 1 1192 8 1 205 82 963 1 596 29 7 19 446 7 5605 11147 11261 72 4 15 50 791 6 3 3 4 9858 3 8 1 9 2 48 54 72 8 5 9 28 72 18 9 21 7 21 14824 317 4 181 0 16 5 6 3615 10 9 9 22 2 0 27 8 9 24 122 1 2 5 8 0 14 2 2 81 6 12 3 4 523 4 825 1727 6360 144 8 4 7 7 8 4366 89 2 9 6 7 6 2 165 5 4 1 2 3 2 70 27 5708 4980 17 1 6 0 2027 5 42 8 8 848 3 19305 39 1 6 3 6 7 3212 5838 1 8 0 9 1225 1293 6 5 9 0 3808316654 2625 34 3 7 298 66 14 1 1 92 18 9 2008 42 88 9379 781 97 9 2 2 7 452 12 9 3 17 1 6 0 20 3 4 315 0 1727 1221 15 5 0 0 0 1571 3 1 5 7 1 29866 346 4366 5708 5 838 781 1232 44 6 7 52 3 4 31 7 4 63 6 7 277 3212 40 0 96 3 7042 4366 34 37 18 6 1448 362 1 3 9 1 82 816 0 3 19 0 16 5 5 4 43 3 % 77 6 % 87 7 % 11 1 9 % 66 5 % 36 3% 32 0 2 6 % 4 0 % 31 1 2 5 % 39 3 % 1 205 9 8% 12 1 % 27 2 % 22 2 % 13 1 % 29 2% 1232 100% 158 13% 26 2% 186 15%136 11%7 10% 1 6 1% 20 2% 192 16%622 50% 41 3% 1036 84%1011 82% 0 0 % 6 1%13 1% 2 0 % % 0 0 % 72 6 % 0 0% 2 0% 36 3% 22 2% 0 0 % 0 0 % 6 0 % 00% 0 0% 28 2 % 0 % 9 1% 2 0 % 7 1 % 0% 0 0 % 0 0% 7 0 6 % 0 0 % 66 5 % 4817 4825 4835 4809 4865 4856 4823 4867 4855 4824 4834 4826 4854 4816 52 4814 4869 4870 4813 4815 4 Nakano LMA Appendix Page 94 of 194 83 3 109 4 2 499 3 8 500 10 20 115 27 35835 12 1 1 1 36 50474 5 9 5 1 11 0 27 7 55 6 9 9 418 1628 3868 61 4 6 9 29730 40204 0 75 9 7 62 6 0 9 34 6 7 5 0 3709 7 63 4 8 0 31 5 611 3542 8 3217 50472 125 43 8 1732 2 3 3 0 9 447 24 6 1080 69 3 7 1 18 7 6 6152 576 4271722795 60 9 3 2 68 9 7 6 2008 42 1 36 2 1 25880 119 2 8 2 2 1205 407 66 11 6 1 7 82 6443 4 6 2 9 963 19 1596 29 7 1 9 9 7 0 542 2897 1 6 0 4 2871 10 3 7 8 44 6 7 63 10 3 8 5 74 7 22 5 17 2 9 15039 5605 562 0 1441 33 8 5 7101 4516 37 0 1 1858 5571 915 12 4 1 8 33 3 4 2 5721 17935 37 7 3 5199 89 4 6025 1114 7 80 4 5 3 3931 15540 11261 18662 2821 7 6 6 26 29 0 1 2 213 448 6 45 7 73 4 7 1 72 4 177 76 45 1 8 155 0 5687 98 6 11 9 3 1307 79 1 6 3 12 0 0 2 453 728 35 2 1 8 2 0 3 4 11 7 6 3086 22 9 9858 21 5 4 2 298 9 14737 1 1 4 3 4 3 8 1 9 44 4 8 6417 308 8 4299 19 2 11452 48 5 4 46 4 0 1015 704 72 8 5 9 28 7 2 2612 40 18 9 19 0 3 1 6 0 3 6105 614 21 7 2 1 33 4 6 0 14824 502 1 6 0 0 317 4 90 1 7 181 0 781 16 5 6 39 2 5 7 69 31567 3 1 0 3 1899 15 9 4 8 3615 12 1 0 5 10 9 9 2 9 8 2 856 1 5 6 2 7 285 22 2 0 121 4 15 7 1 12 7 0 7 100 8 9239 25264 199 6 7828 1629 5161 27 8 9 7 5 8 9 8 63 9 3 0 5098 6 1 9 5 275 8 14693 2456 172 122 1 3 5 7 9 16597 607 30 5 6 20930 2 5 8 0 1 8 0 2 1 8 1 2 2155 14 2 2 3 8 4 7 4776 816 14 7 7 46 8 6 19516 2371 12 3 4 52 3 4 326527795 825 1727 1 4 8 7 6360 270 9 5 4 1 144 8 57 7 6 15619 24 8 9 4 7 7 8 4366 7 7 0 9 6 17 8 4 2074 73 8 50641 52370 1 8 6 15 89 2 9 2721 18056 6 1 1 8 7 0 4 2 5880 1749 6 7 6 2 128 5 8 3791 3623 13904 9318 25 5 3 78 4 8469 16 5 5 4 56 9 9 155 9 96 9 3 13439 26 1 9 1 2 3 2 70 2 7 161 9 10367 21 4999 9 7 9 2 3755 0 2 6 4 6 5708 80 0 37 4 3764 19 0 6873 1 6 9 7 3 87 8 7 12568 4980 17 1 6 0 40447 25 7 8 27177 20275 12 5 2 4 54 1 6 1 1 3 0 6 1 2 6 6 6 4 9 42 8 8 47 1 3 34 2 6 1 1 4 9 8483 18 4 9 19305 3 4 6 3 1258 28 9 1 57886 27 8 0 1 0 8 6 0 87 7 39 1 2 8 1 8 5226 12254 88 0 11 0 8 2 6 3 6 7 11386 124 4 0 19 1 1 62 4 6 4975 4 6 5 7 3212 25 1502 549 39 8 2 5 8 0 5838 82 8 9 2677 1 8 0 9 3 2 5 9 1225 2205 2 27 6 6 4203 17758 9379 79 2 4 12 7 8 3 450 33 2 8 7 5 8 7 4 0 0 4 129 3 26 4 7 60 2 7 1 2 2 5 3 6 5 9 0 38083 310 7 18737 478 27 7 2 16654 15 4 8 13941 2 5 2 5 2589 1 3 2 0 1084 2625 3131 30139 34 3 7 43 1 3 55 8 8 1913 42 2 29866 9685 88 3 1 14 1 1 59 2 68 0 26 5 9 1 5 4 0 9 6 3 7 0 3 0 8 2 26271 60 6 108 543 31106 1 6 2 9 44 8 6 5226 0592 22 5 18 9 0 160 4 0 1749 2008 4020 4 0 3265 47 8 66 4288 60 2 7 0 1 6 9 7 3 308 6 9379 0 36 12 78 1 58 0 1258 0 3 2 5 9 9 7 9 2 2 0 0 8 2 7 19 0 3 44 8 6 2619 2821 11452 63 9 3 0 12 9 3 50 9 8 4 50472 17 1 6 0 0 29 0 1 2 37550 11452 781 20 3 4 46 8 6 70 4 986 8469 29 0 1 2 19 315 0 4486 1727 27177 1 9 9 6 15 4 0 9 2553 1899 15 27 5 8 1732 21542 37550 0 1221 10367 2 9 8 9 15 5 0 1 0 8 0 2758 0 19 0 1810 3615 0 1 6 2 8 91 5 0 1 1 4 3 4 18737 1571 76 56 9 9 2897 15540 1 2 1 4 3701 19 2 37550 36 2 3 49 9 35835 1 5 7 1 15 4 0 9 29866 346 27 7 2 4366 478 1008 0 5708 5838 781 362 3 56 9 9 0 1749 1232 5571 44 6 7 26 1 2 52 3 4 42 1 7 8 4 0 4776 022 5 31 7 4 12 5 63 6 7 26 9 5 4 1 4999 225 277 78 2 8 3212 7 4 7 46 4 0 2 5 7 8 6 6 4 9 1571 0 543 15948 192 191 1 14737 96 3 0 7042 2 1 5 4 2 0 3 4 2 6 35835 3 1 0 3 747 6873 40 4366 0 18 9 9 34 3 7 18 6 19 2 6 8 0 2 6 1 2 1448 11 0 8 2 607 1802 10378 36 2 1 580 11 3 0 1876 18 4 9 3 9 1 82 766 816 0 0 17 7 22 9 766 9 8 6 37 4 0 4 6 2 9 15540 6105 11452 13439 4271 7 19 1729 453 17 4 9 0 16 5 5 4 3 0% 7 1% 0 0% 44 4 % 46 4 % 28 2 % 70 6% 35 3% 2 0% 1 0 % 43 3 % 8 1% 77 6 % 87 7 % 6 1% 60 5% 27 5 2 2 % 11 1 9 % 28 7 2 3 % 22 0 1 8 % 2 1 5 1 7 % 66 5% 36 3% 9 1 % 32 0 2 6 % 4 0 % 55 4% 21 2% 31 1 2 5 % 39 3 % 1205 98 % 12 1 % 85 7% 27 2 % 6 0 % 15 1 % 10 1 % 22 2 % 13 1% 19 2 % 5 0% 29 2% 17 1% 42 3% 1232 100% 158 13% 26 2 % 11 1 % 7 2 6 % 25 2% 3 3 3 % 18 1%31 3% 186 15%136 11% 65 5 % 73 6% 93 8% 127 10% 37 3% 16 1% 34 3 % 20 2% 192 16%622 50% 41 3% 1036 84%1011 82% 5 0 % 1 0% 0 0 % 6 1 % 0 0% 8 1% 1 0% 6 1% 0 0% 1 0 % 0 0 % 2 0 % 13 1% 0 0 % 0 0% 9 1% 2 0% 0 0% 5 0 % 2 0% 55 4 % 2 0 % 0 0 % 13 1% 10 1 % 0 0 % 4 0% 0 0 % 7 2 6 % 11 1 % 3 0% 0 0% 9 1 % 2 0% 4 0% 36 3 % 8 1 % 0 0 % 1 0 % 22 2% 7 1% 3 0% 0 0% 1 0% 0 0% 0 0 % 0 0% 0 0 % 0 0 % 0 0 % 0 0 % 6 0 % 11 1% 0 0% 0 0% 8 1 % 0 0% 0 0% 7 1% 0 0 % 1 0% 6 0 % 0 0% 7 1 % 6 1 % 28 2 % 0 0 % 0 0% 2 0 % 2 0 % 0 0 % 0 0% 3 0% 2 0 % 1 0 % 1 9 2 % 0 0% 10 1 % 0 0 % 0 0 % 9 1% 0 0% 2 0 % 2 0 % 5 0 % 4 0 % 7 1 % 0 0 % 0 0 % 0 0% 0 0% 0 0 % 0 0 % 5 0 % 0 0 % 0 0% 0 0% 0 0% 0 0% 0 0 % 0 0 % 0 0 % 0 0% 8 1% 36 3% 0 0% 6 1 % 7 0 6 % 0 0% 2 0 % 1 0 % 4 0% 0 0 % 3 0 % 0 0% 0 0 % 46 4% 11 1 % 0 0 % 0 0% 0 0% 0 0 % 29 2% 66 5 % 15 1% 0 0% 4 0 % 3 0 % 1 0%2 0% 0 0 % 2 0 % 1 0 % 6 0 % 1 0% 0 0 % 0 0% 4784 4758 4761 4862 4818 4817 4825 4835 4861 4809 4865 4909 4697 4897 4802 4875 4856 4823 4751 4867 4855 4889 4938 4894 4754 4824 4936 4728 4771 4915 4908 4834 4769 4826 4729 4734 4868 4775 4937 4948 4757 4790 4853 4744 4777 4854 4912 4780 4720 4918 4800 4816 4920 4934 4852 4794 4939 4814 4869 4747 4935 4770 4870 4793 4917 4931 4916 4813 47724774 49544947 4815 4740 4921 4759 4898 4804 4951 4914 4952 4943 49534950 4945 4902 4812 4946 4956 4913 4741 4874 4792 4713 4753 4715 4893 4925 4719 49674960 49694969 4766 Date: May 18, 2020 ± Portions of this map contain information from the San Diego Association of Governments (SANDAG) Regional Information System. This product cannot be reproduced without the written permission of SANDAG. SAN DIEGO ASSOCIATION OF GOVERNMENTS 401 B STREET, SUITE 800 SAN DIEGO, CALIFORNIA 92101 USA (619) 699-1900 E-mail: sandag@sandag.org Web site: www.sandag.org 0 0.075 0.15 0.225 Miles # Select Zone Vol and % # Model Estimated ADT Selected Zone(s) SANDAG Series13 version13_3_2 Scenario ID 1209 2012 Nakano Select Zone Run TAZ 4826 Nakano LMA Appendix Page 95 of 194 Appendix L Cumulative Project Information Nakano LMA Appendix Page 96 of 194 1) Palm/805 SB NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM TOTAL 0003000026310290 Azul Playa Del Sol x x x 9 x 3 13 x California PA 61 x x x x x Canlelight x x x x x Dennery Park x x x x x Handler x x x x 6 3 x Metropolitan Airpark x x x x 3 1 x Palm Prominade x x x 21 x 17 10 12 x Southview&Southview East x x x x x Southwind x x x x x Southwest Village VTM-1 x x x x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x PM TOTAL () () () (67) () () () (44) (1) (33) (52) () Azul Playa Del Sol x x x (39) x (15) (6) x California PA 61 x x x x x Canlelight x x x x x Dennery Park x x x x x Handler x x x x (7) (4) x Metropolitan Airpark x x x x (1) (4) x Palm Prominade x x x (28) x (22) (33) (38) x Southview&Southview East x x x x x Southwind x x x x x Southwest Village VTM-1 x x x x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x xxx x x Nakano LMA Appendix Page 97 of 194 2) Palm/805 NB NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM TOTAL 1 0 14 0 0 0 0 56 0 0 38 51 Azul Playa Del Sol x x x 12 x x 13 36 California PA 61 x x x x x Canlelight x x x x x Dennery Park x x x x x Handler x x x 6 x x 3 Metropolitan Airpark 1 x x x x x Palm Prominade 14 x x x 38 x x 22 15 Southview&Southview East x x x x x Southwind x x x x x Southwest Village VTM-1 x x x x x 0xxxxx 0xxxxx 0xxxxx 0xxxxx 0xxxxx xxx xx xxx xx xxx xx xxx xx xxx xx PM TOTAL (3) () (19) () () () () (111) () () (82) (65) Azul Playa Del Sol x x x (54) x x (6) (17) California PA 61 x x x x x Canlelight x x x x x Dennery Park x x x x x Handler x x x (7) x x (4) Metropolitan Airpark (3) x x x x x (1) Palm Prominade (19) x x x (50) x x (71) (48) Southview&Southview East x x x x x Southwind x x x x x Southwest Village VTM-1 x x x x x () x x x x x () x x x x x () x x x x x () x x x x x () x x x x x xxx xx xxx xx xxx xx xxx xx xxx xx Nakano LMA Appendix Page 98 of 194 3) Palm/Dennery NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM TOTAL 374230500184052520 Azul Playa Del Sol 5 12 19 49 California PA 61 7 11 Canlelight 1 Dennery Park 1 1 Handler 63 Metropolitan Airpark Palm Prominade 37 3 8 4 40 11 Southview&Southview East 1 1 Southwind 1 Southwest Village VTM-1 2 8 0 0 0 0 0 PM TOTAL (119) (11) (77) () (9) () () (61) (52) (43) (28) () Azul Playa Del Sol (21) (54) (9) (23) California PA 61 (19) (15) Canlelight (1) Dennery Park (1) (2) Handler (7) (4) Metropolitan Airpark (1) Palm Prominade (119) (10) (25) (7) (52) (14) Southview&Southview East (1) (1) Southwind (1) Southwest Village VTM-1 (9) (4) () () () () () Nakano LMA Appendix Page 99 of 194 4) Dennery/The Landing NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM TOTAL 030030000000 Azul Playa Del Sol x x x x x x California PA 61 x x x x x x Canlelight x x x x x x Dennery Park x 2 x 2 x x x x Handler x x x x x x Metropolitan Airpark x x x x x x Palm Prominade x 1 x 1 x x x x Southview&Southview East x x x x x x Southwind x x x x x x Southwest Village VTM-1 x x x x x x 0 xxxxxx 0 xxxxxx 0 xxxxxx 0 xxxxxx 0 xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx PM TOTAL () (5) () () (7) () () () () () () () Azul Playa Del Sol x x x x x x California PA 61 x x x x x x Canlelight x x x x x x Dennery Park x (3) x (5) x x x x Handler x x x x x x Metropolitan Airpark x x x x x x Palm Prominade x (2) x (2) x x x x Southview&Southview East x x x x x x Southwind x x x x x x Southwest Village VTM-1 x x x x x x () xxxxxx () xxxxxx () xxxxxx () xxxxxx () xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx xxxxxx Nakano LMA Appendix Page 100 of 194 5) Dennery/Red Fin NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR AM TOTAL 002100030230 Azul Playa Del Sol California PA 61 Canlelight Dennery Park 2 1 2 2 2 Handler Metropolitan Airpark Palm Prominade 1 1 Southview&Southview East Southwind Southwest Village VTM-1 0 0 0 0 0 PM TOTAL () () (3) (1) () () () (4) () (5) (6) (1) Azul Playa Del Sol California PA 61 Canlelight Dennery Park (3) (1) (3) (5) (5) (1) Handler Metropolitan Airpark Palm Prominade (1) (1) Southview&Southview East Southwind Southwest Village VTM-1 () () () () () Nakano LMA Appendix Page 101 of 194 Roadway Cumu-Azul CA Candle- Dennery Handler Metro- Palm S. Wiew South SWV Segment lative Playa PA61 light Park Commer- politan Promenade SV E. wind VTM-1 Total Del Sol cial Airpark Dennery Road Palm Ave to Regatta Ln 125 75 50 Regatta Ln to Landing Dwy 140 100 40 Landing Dwy to Red Coral 130 100 30 Palm Avenue I-805 SB Ramps to NB Ramps 1648 488 90 40 1030 I-805 NB Ramps to Dennery Rd 2440 770 90 20 1560 Nakano LMA Appendix Page 102 of 194 Appendix M Opening Year 2025 without Project LOS and Queuing Output Nakano LMA Appendix Page 103 of 194 AM Existing + Cumulative 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 965 190 283 385 00007892610 Future Volume (veh/h) 0 965 190 283 385 00007892610 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 1060 209 329 448 0 1032 0 429 Peak Hour Factor 0.91 0.91 0.91 0.86 0.86 0.86 0.95 0.95 0.95 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1428 625 382 1993 0 1164 0 508 Arrive On Green 0.00 0.40 0.40 0.22 1.00 0.00 0.33 0.00 0.33 Sat Flow, veh/h 0 3618 1544 3428 3618 0 3534 0 1541 Grp Volume(v), veh/h 0 1060 209 329 448 0 1032 0 429 Grp Sat Flow(s),veh/h/ln 0 1763 1544 1714 1763 0 1767 0 1541 Q Serve(g_s), s 0.0 29.7 10.8 10.7 0.0 0.0 32.1 0.0 30.0 Cycle Q Clear(g_c), s 0.0 29.7 10.8 10.7 0.0 0.0 32.1 0.0 30.0 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1428 625 382 1993 0 1164 0 508 V/C Ratio(X)0.00 0.74 0.33 0.86 0.22 0.00 0.89 0.00 0.84 Avail Cap(c_a), veh/h 0 1428 625 423 1993 0 1307 0 570 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.92 0.92 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 29.4 23.8 44.2 0.0 0.0 36.8 0.0 36.1 Incr Delay (d2), s/veh 0.0 3.5 1.4 14.4 0.2 0.0 7.1 0.0 10.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 13.1 4.2 4.8 0.1 0.0 14.8 0.0 12.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 32.9 25.2 58.6 0.2 0.0 43.9 0.0 46.4 LnGrp LOS A C C E A A D A D Approach Vol, veh/h 1269 777 1461 Approach Delay, s/veh 31.6 25.0 44.7 Approach LOS C C D Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 18.6 53.1 44.3 71.7 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 40.9 42.9 60.9 Max Q Clear Time (g_c+I1), s12.7 31.7 34.1 2.0 Green Ext Time (p_c), s 0.2 5.3 4.1 3.4 Intersection Summary HCM 6th Ctrl Delay 35.6 HCM 6th LOS D Nakano LMA Appendix Page 104 of 194 AM Existing + Cumulative 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 678 1156 0 0 550 1153 92 3 313 0 0 0 Future Volume (veh/h)678 1156 0 0 550 1153 92 3 313 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 721 1230 0 0 567 1189 96 173 212 Peak Hour Factor 0.94 0.94 0.94 0.97 0.97 0.97 0.96 0.96 0.96 Percent Heavy Veh, % 3 30033333 Cap, veh/h 772 2475 0 0 1508 1148 125 226 296 Arrive On Green 0.45 1.00 0.00 0.00 0.43 0.43 0.19 0.19 0.19 Sat Flow, veh/h 3428 3618 0 0 3618 2684 651 1172 1533 Grp Volume(v), veh/h 721 1230 0 0 567 1189 269 0 212 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1342 1823 0 1533 Q Serve(g_s), s 23.1 0.0 0.0 0.0 12.7 49.6 16.2 0.0 15.0 Cycle Q Clear(g_c), s 23.1 0.0 0.0 0.0 12.7 49.6 16.2 0.0 15.0 Prop In Lane 1.00 0.00 0.00 1.00 0.36 1.00 Lane Grp Cap(c), veh/h772 2475 0 0 1508 1148 352 0 296 V/C Ratio(X) 0.93 0.50 0.00 0.00 0.38 1.04 0.77 0.00 0.72 Avail Cap(c_a), veh/h 836 2475 0 0 1508 1148 676 0 568 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.45 0.45 0.00 0.00 0.52 0.52 1.00 0.00 1.00 Uniform Delay (d), s/veh31.1 0.0 0.0 0.0 22.6 33.2 44.3 0.0 43.8 Incr Delay (d2), s/veh 8.9 0.3 0.0 0.0 0.4 29.1 3.5 0.0 3.3 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.4 0.1 0.0 0.0 5.3 20.2 7.6 0.0 6.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 40.0 0.3 0.0 0.0 23.0 62.3 47.8 0.0 47.1 LnGrp LOS D A A A C F D A D Approach Vol, veh/h 1951 1756 481 Approach Delay, s/veh 15.0 49.6 47.5 Approach LOS B D D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 87.5 31.8 55.7 28.5 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 28 26.8 43.0 Max Q Clear Time (g_c+I1), s2.0 25.1 51.6 18.2 Green Ext Time (p_c), s 13.3 1.0 0.0 2.4 Intersection Summary HCM 6th Ctrl Delay 33.3 HCM 6th LOS C Nakano LMA Appendix Page 105 of 194 AM Existing + Cumulative 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 574 476 404 252 567 53 823 115 259 28 85 334 Future Volume (veh/h)574 476 404 252 567 53 823 115 259 28 85 334 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 611 506 430 341 766 72 885 124 278 34 104 407 Peak Hour Factor 0.94 0.94 0.94 0.74 0.74 0.74 0.93 0.93 0.93 0.82 0.82 0.82 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 564 1423 441 392 1169 358 782 215 482 74 1028 449 Arrive On Green 0.16 0.28 0.28 0.11 0.23 0.23 0.16 0.43 0.43 0.02 0.29 0.29 Sat Flow, veh/h 3428 5066 1571 3428 5066 1549 4983 503 1128 3428 3526 1541 Grp Volume(v), veh/h 611 506 430 341 766 72 885 0 402 34 104 407 Grp Sat Flow(s),veh/h/ln1714 1689 1571 1714 1689 1549 1661 0 1632 1714 1763 1541 Q Serve(g_s), s 21.6 10.5 35.6 12.8 18.0 4.9 20.6 0.0 24.6 1.3 2.8 33.4 Cycle Q Clear(g_c), s 21.6 10.5 35.6 12.8 18.0 4.9 20.6 0.0 24.6 1.3 2.8 33.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.69 1.00 1.00 Lane Grp Cap(c), veh/h564 1423 441 392 1169 358 782 0 697 74 1028 449 V/C Ratio(X) 1.08 0.36 0.97 0.87 0.66 0.20 1.13 0.00 0.58 0.46 0.10 0.91 Avail Cap(c_a), veh/h 564 1423 441 449 1169 358 782 0 727 107 1128 493 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh54.8 37.7 46.7 57.2 45.8 40.7 55.3 0.0 28.6 63.5 33.9 44.8 Incr Delay (d2), s/veh 62.4 0.7 37.0 13.7 2.9 1.3 74.9 0.0 1.4 1.6 0.1 21.3 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln14.2 4.5 18.3 6.3 7.9 2.0 14.0 0.0 9.9 0.6 1.2 15.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh117.2 38.4 83.7 70.9 48.6 42.0 130.3 0.0 30.0 65.1 34.0 66.1 LnGrp LOS F D F E D D F A C E C E Approach Vol, veh/h 1547 1179 1287 545 Approach Delay, s/veh 82.1 54.7 98.9 59.9 Approach LOS F D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s19.4 43.3 25.0 43.6 26.0 36.7 7.2 61.3 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s17.2 * 36 20.6 42.0 21.6 30.3 4.1 58.5 Max Q Clear Time (g_c+I1), s14.8 37.6 22.6 35.4 23.6 20.0 3.3 26.6 Green Ext Time (p_c), s0.2 0.0 0.0 2.4 0.0 5.3 0.0 4.4 Intersection Summary HCM 6th Ctrl Delay 77.1 HCM 6th LOS E Nakano LMA Appendix Page 106 of 194 AM Existing + Cumulative 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 165 489 0 Future Vol, veh/h 0 0 0 165 489 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 72 72 93 93 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 229 526 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 263 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 732 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 732 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 107 of 194 AM Existing + Cumulative 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 30 148 17 0 489 Future Vol, veh/h 0 30 148 17 0 489 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 33 161 18 0 532 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 90 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 947 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 947 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 8.9 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 947 - HCM Lane V/C Ratio - - 0.034 - HCM Control Delay (s) - - 8.9 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 108 of 194 AM Existing + Cumulative 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 37 78 6 3 249 3 56 5 3 2 5 70 Future Volume (veh/h) 37 78 6 3 249 3 56 5 3 2 5 70 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 49 103 8 3 268 3 61 5 3 2 6 81 Peak Hour Factor 0.76 0.76 0.76 0.93 0.93 0.93 0.92 0.92 0.92 0.86 0.86 0.86 Percent Heavy Veh, %333333333333 Cap, veh/h 73 973 75 6 914 10 85 272 163 4 22 304 Arrive On Green 0.04 0.29 0.29 0.00 0.26 0.26 0.05 0.25 0.25 0.00 0.21 0.21 Sat Flow, veh/h 1767 3311 254 1767 3570 40 1767 1080 648 1767 109 1476 Grp Volume(v), veh/h 49 54 57 3 132 139 61 0 8 2 0 87 Grp Sat Flow(s),veh/h/ln 1767 1763 1802 1767 1763 1847 1767 0 1728 1767 0 1585 Q Serve(g_s), s 1.2 1.0 1.0 0.1 2.6 2.6 1.5 0.0 0.2 0.0 0.0 2.0 Cycle Q Clear(g_c), s 1.2 1.0 1.0 0.1 2.6 2.6 1.5 0.0 0.2 0.0 0.0 2.0 Prop In Lane 1.00 0.14 1.00 0.02 1.00 0.38 1.00 0.93 Lane Grp Cap(c), veh/h 73 518 530 6 451 473 85 0 435 4 0 326 V/C Ratio(X) 0.67 0.10 0.11 0.52 0.29 0.29 0.72 0.00 0.02 0.49 0.00 0.27 Avail Cap(c_a), veh/h 180 894 913 168 865 906 205 0 1236 168 0 1101 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.4 11.1 11.1 21.5 12.9 12.9 20.3 0.0 12.2 21.5 0.0 14.4 Incr Delay (d2), s/veh 10.3 0.1 0.1 57.3 0.4 0.3 10.8 0.0 0.0 69.8 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.3 0.3 0.1 0.9 1.0 0.8 0.0 0.1 0.1 0.0 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.7 11.2 11.2 78.7 13.3 13.3 31.0 0.0 12.2 91.3 0.0 14.9 LnGrp LOS C BBEBBCABFAB Approach Vol, veh/h 160 274 69 89 Approach Delay, s/veh 17.2 14.0 28.8 16.6 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.5 18.4 6.5 13.8 6.2 16.8 4.5 15.8 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 22 5.0 30.0 4.4 21.2 4.1 30.9 Max Q Clear Time (g_c+I1), s 2.1 3.0 3.5 4.0 3.2 4.6 2.0 2.2 Green Ext Time (p_c), s 0.0 0.5 0.0 0.5 0.0 1.3 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 17.0 HCM 6th LOS B Nakano LMA Appendix Page 109 of 194 PM Existing + Cumulative 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 861 150 427 496 00001255 5 813 Future Volume (veh/h) 0 861 150 427 496 00001255 5 813 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 936 163 464 539 0 1557 0 560 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.97 0.97 0.97 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1061 467 393 1638 0 1520 0 675 Arrive On Green 0.00 0.30 0.30 0.23 0.93 0.00 0.43 0.00 0.43 Sat Flow, veh/h 0 3618 1551 3428 3618 0 3534 0 1570 Grp Volume(v), veh/h 0 936 163 464 539 0 1557 0 560 Grp Sat Flow(s),veh/h/ln 0 1763 1551 1714 1763 0 1767 0 1570 Q Serve(g_s), s 0.0 29.3 9.5 13.3 1.8 0.0 49.9 0.0 36.6 Cycle Q Clear(g_c), s 0.0 29.3 9.5 13.3 1.8 0.0 49.9 0.0 36.6 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1061 467 393 1638 0 1520 0 675 V/C Ratio(X)0.00 0.88 0.35 1.18 0.33 0.00 1.02 0.00 0.83 Avail Cap(c_a), veh/h 0 1061 467 393 1638 0 1520 0 675 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.71 0.71 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 38.6 31.7 44.7 2.3 0.0 33.0 0.0 29.3 Incr Delay (d2), s/veh 0.0 10.6 2.1 98.7 0.4 0.0 29.4 0.0 8.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 14.1 3.8 10.3 0.6 0.0 26.8 0.0 15.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 49.2 33.7 143.4 2.6 0.0 62.4 0.0 37.8 LnGrp LOS A D C F A A F A D Approach Vol, veh/h 1099 1003 2117 Approach Delay, s/veh 46.9 67.8 55.9 Approach LOS D E E Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 19.0 41.0 56.0 60.0 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 13 34.9 49.9 53.9 Max Q Clear Time (g_c+I1), s15.3 31.3 51.9 3.8 Green Ext Time (p_c), s 0.0 2.2 0.0 4.2 Intersection Summary HCM 6th Ctrl Delay 56.4 HCM 6th LOS E Nakano LMA Appendix Page 110 of 194 PM Existing + Cumulative 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 471 1625 0 0 822 1331 133 4 473 0 0 0 Future Volume (veh/h)471 1625 0 0 822 1331 133 4 473 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 491 1693 0 0 884 1431 153 294 351 Peak Hour Factor 0.96 0.96 0.96 0.93 0.93 0.93 0.87 0.87 0.87 Percent Heavy Veh, % 3 30033333 Cap, veh/h 544 2158 0 0 1425 1119 177 339 439 Arrive On Green 0.32 1.00 0.00 0.00 0.40 0.40 0.28 0.28 0.28 Sat Flow, veh/h 3428 3618 0 0 3618 2768 624 1200 1551 Grp Volume(v), veh/h 491 1693 0 0 884 1431 447 0 351 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1384 1824 0 1551 Q Serve(g_s), s 15.9 0.0 0.0 0.0 23.1 46.9 27.0 0.0 24.3 Cycle Q Clear(g_c), s 15.9 0.0 0.0 0.0 23.1 46.9 27.0 0.0 24.3 Prop In Lane 1.00 0.00 0.00 1.00 0.34 1.00 Lane Grp Cap(c), veh/h544 2158 0 0 1425 1119 516 0 439 V/C Ratio(X) 0.90 0.78 0.00 0.00 0.62 1.28 0.87 0.00 0.80 Avail Cap(c_a), veh/h 600 2158 0 0 1425 1119 676 0 575 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.20 0.20 0.00 0.00 0.42 0.42 1.00 0.00 1.00 Uniform Delay (d), s/veh38.8 0.0 0.0 0.0 27.5 34.5 39.5 0.0 38.6 Incr Delay (d2), s/veh 4.0 0.6 0.0 0.0 0.9 128.5 9.2 0.0 6.0 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln5.9 0.2 0.0 0.0 9.8 35.3 13.3 0.0 9.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 42.8 0.6 0.0 0.0 28.3 163.1 48.7 0.0 44.6 LnGrp LOS D A A A C F D A D Approach Vol, veh/h 2184 2315 798 Approach Delay, s/veh 10.1 111.6 46.9 Approach LOS B F D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 77.1 24.1 53.0 38.9 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 20 34.8 43.0 Max Q Clear Time (g_c+I1), s2.0 17.9 48.9 29.0 Green Ext Time (p_c), s 23.7 0.5 0.0 3.6 Intersection Summary HCM 6th Ctrl Delay 60.0 HCM 6th LOS E Nakano LMA Appendix Page 111 of 194 PM Existing + Cumulative 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 553 365 279 225 679 58 593 65 300 62 66 419 Future Volume (veh/h)553 365 279 225 679 58 593 65 300 62 66 419 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 614 406 310 271 818 70 652 71 330 72 77 487 Peak Hour Factor 0.90 0.90 0.90 0.83 0.83 0.83 0.91 0.91 0.91 0.86 0.86 0.86 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 541 1597 489 325 1278 397 466 111 514 116 1168 512 Arrive On Green 0.16 0.32 0.32 0.09 0.25 0.25 0.09 0.39 0.39 0.03 0.33 0.33 Sat Flow, veh/h 3428 5066 1551 3428 5066 1572 4983 283 1316 3428 3526 1546 Grp Volume(v), veh/h 614 406 310 271 818 70 652 0 401 72 77 487 Grp Sat Flow(s),veh/h/ln1714 1689 1551 1714 1689 1572 1661 0 1599 1714 1763 1546 Q Serve(g_s), s 19.6 7.4 21.2 9.6 17.9 4.3 11.6 0.0 25.3 2.6 1.9 38.2 Cycle Q Clear(g_c), s 19.6 7.4 21.2 9.6 17.9 4.3 11.6 0.0 25.3 2.6 1.9 38.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.82 1.00 1.00 Lane Grp Cap(c), veh/h541 1597 489 325 1278 397 466 0 625 116 1168 512 V/C Ratio(X) 1.13 0.25 0.63 0.83 0.64 0.18 1.40 0.00 0.64 0.62 0.07 0.95 Avail Cap(c_a), veh/h 541 1597 489 381 1278 397 466 0 625 180 1193 523 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.3 31.6 36.4 55.2 41.4 36.3 56.3 0.0 30.7 59.2 28.4 40.5 Incr Delay (d2), s/veh 81.2 0.4 6.1 11.3 2.5 1.0 192.6 0.0 2.6 2.0 0.1 28.1 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln14.5 3.1 8.9 4.7 7.7 1.8 13.2 0.0 10.2 1.2 0.8 18.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh133.5 32.0 42.5 66.5 43.9 37.3 248.8 0.0 33.3 61.2 28.4 68.6 LnGrp LOS F C D E D D F A C E C E Approach Vol, veh/h 1330 1159 1053 636 Approach Delay, s/veh 81.3 48.8 166.8 62.9 Approach LOS F D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s16.2 45.5 16.0 46.4 24.0 37.7 8.6 53.8 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s13.8 * 39 11.6 42.0 19.6 31.3 6.5 47.1 Max Q Clear Time (g_c+I1), s11.6 23.2 13.6 40.2 21.6 19.9 4.6 27.3 Green Ext Time (p_c), s0.1 7.1 0.0 0.8 0.0 6.0 0.0 3.8 Intersection Summary HCM 6th Ctrl Delay 91.0 HCM 6th LOS F Nakano LMA Appendix Page 112 of 194 PM Existing + Cumulative 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 440 261 0 Future Vol, veh/h 0 0 0 440 261 0 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 88 88 91 91 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 500 287 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 144 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 874 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 874 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 113 of 194 PM Existing + Cumulative 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 11 399 41 0 261 Future Vol, veh/h 0 11 399 41 0 261 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 12 434 45 0 284 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 240 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 758 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 758 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 9.8 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 758 - HCM Lane V/C Ratio - - 0.016 - HCM Control Delay (s) - - 9.8 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0 - Nakano LMA Appendix Page 114 of 194 PM Existing + Cumulative 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 114 221 30 10 133 4 36 3 7 1 5 38 Future Volume (veh/h) 114 221 30 10 133 4 36 3 7 1 5 38 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 121 235 32 11 146 4 43 4 8 1 5 39 Peak Hour Factor 0.94 0.94 0.94 0.91 0.91 0.91 0.83 0.83 0.83 0.98 0.98 0.98 Percent Heavy Veh, %333333333333 Cap, veh/h 158 995 134 20 843 23 66 127 254 4 35 271 Arrive On Green 0.09 0.32 0.32 0.01 0.24 0.24 0.04 0.23 0.23 0.00 0.20 0.20 Sat Flow, veh/h 1767 3120 420 1767 3501 96 1767 550 1099 1767 178 1388 Grp Volume(v), veh/h 121 131 136 11 73 77 43 0 12 1 0 44 Grp Sat Flow(s),veh/h/ln 1767 1763 1777 1767 1763 1834 1767 0 1649 1767 0 1566 Q Serve(g_s), s 3.0 2.4 2.5 0.3 1.5 1.5 1.1 0.0 0.3 0.0 0.0 1.0 Cycle Q Clear(g_c), s 3.0 2.4 2.5 0.3 1.5 1.5 1.1 0.0 0.3 0.0 0.0 1.0 Prop In Lane 1.00 0.24 1.00 0.05 1.00 0.67 1.00 0.89 Lane Grp Cap(c), veh/h 158 562 567 20 424 442 66 0 382 4 0 306 V/C Ratio(X) 0.76 0.23 0.24 0.54 0.17 0.17 0.66 0.00 0.03 0.25 0.00 0.14 Avail Cap(c_a), veh/h 510 1207 1217 163 846 880 259 0 1204 163 0 1059 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.7 11.1 11.1 21.8 13.3 13.3 21.1 0.0 13.2 22.1 0.0 14.8 Incr Delay (d2), s/veh 7.4 0.2 0.2 20.9 0.2 0.2 10.6 0.0 0.0 30.1 0.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 0.8 0.8 0.2 0.5 0.5 0.6 0.0 0.1 0.0 0.0 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.2 11.3 11.4 42.7 13.5 13.5 31.7 0.0 13.2 52.2 0.0 15.0 LnGrp LOS C B B D B B C A B D A B Approach Vol, veh/h 388 161 55 45 Approach Delay, s/veh 16.3 15.5 27.7 15.8 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.9 19.9 6.0 13.6 8.4 16.4 4.4 15.2 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 30 6.5 30.0 12.8 21.3 4.1 32.4 Max Q Clear Time (g_c+I1), s 2.3 4.5 3.1 3.0 5.0 3.5 2.0 2.3 Green Ext Time (p_c), s 0.0 1.5 0.0 0.2 0.2 0.7 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 17.0 HCM 6th LOS B Nakano LMA Appendix Page 115 of 194 AM Existing + Cumulative Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 517 526 175 202 210 122 144 474 501 468 Average Queue (ft) 439 362 95 106 123 34 38 326 346 279 95th Queue (ft)568 546 203 176 183 82 103 453 491 425 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 15 3 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)20 0 0 1 Queuing Penalty (veh)37 0 0 2 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 242 255 427 442 286 226 414 460 353 275 Average Queue (ft) 195 217 286 222 158 123 222 246 160 69 95th Queue (ft)284 297 501 410 272 216 387 422 278 194 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)6 1 Queuing Penalty (veh)52 11 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)2 11 4 2 0 Queuing Penalty (veh) 13 66 30 3 0 Nakano LMA Appendix Page 116 of 194 AM Existing + Cumulative Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1151 1143 1132 174 222 251 159 234 334 255 Average Queue (ft) 268 279 673 518 201 88 110 141 97 144 184 59 95th Queue (ft)336 348 1440 1263 783 159 186 204 150 218 282 187 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%)12 1 0 Queuing Penalty (veh) 61 5 0 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%)6 44 0 0 0 1 4 0 Queuing Penalty (veh) 9 70 0 0 0 2 2 0 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 280 292 300 810 31 88 74 205 120 Average Queue (ft) 225 288 299 756 6 33 36 57 94 95th Queue (ft)313 295 300 908 26 66 61 170 136 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)44 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)1 9 44 3 1 12 Queuing Penalty (veh) 3 35 164 22 4 5 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft)56 52 52 31 116 89 53 32 30 54 Average Queue (ft)22 12 18 2 45 44 32 4 1 29 95th Queue (ft)51 37 49 15 83 79 55 21 10 54 Link Distance (ft)413 413 873 873 390 231 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 799 Nakano LMA Appendix Page 117 of 194 PM Existing + Cumulative Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 517 498 175 202 214 407 115 817 943 724 Average Queue (ft) 404 328 92 168 175 134 57 509 569 479 95th Queue (ft)549 481 207 229 230 330 102 700 811 682 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 8 3 1 1 Queuing Penalty (veh) 0 0 4 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)28 0 1 19 0 1 Queuing Penalty (veh)41 0 3 46 0 7 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 236 255 428 420 440 365 337 326 477 275 Average Queue (ft) 157 239 386 382 222 173 198 204 240 161 95th Queue (ft)226 297 477 476 382 315 293 309 366 306 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)7 9 Queuing Penalty (veh)79 94 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)0 2 19 6 0 Queuing Penalty (veh) 1 15 91 14 0 Nakano LMA Appendix Page 118 of 194 PM Existing + Cumulative Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1147 1164 70 121 217 252 224 259 351 255 Average Queue (ft) 291 302 581 233 20 61 88 125 142 153 212 30 95th Queue (ft)294 307 1110 770 57 106 182 211 215 227 300 105 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%)2 0 Queuing Penalty (veh)13 1 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 12 52 1 0 1 0 3 Queuing Penalty (veh) 14 63 4 0 2 1 2 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 282 291 300 797 78 116 228 246 120 Average Queue (ft) 222 267 277 545 24 52 47 86 103 95th Queue (ft)313 338 348 1001 52 91 118 234 140 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)32 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)2 14 34 7 1 0 2 18 Queuing Penalty (veh) 7 49 125 43 0076 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR L TR TR Maximum Queue (ft) 133 116 139 51 111 53 87 31 55 Average Queue (ft) 65 41 60 10 38 26 28 3 19 95th Queue (ft)108 91 107 34 82 56 68 17 45 Link Distance (ft)413 413 873 873 390 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)1 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 710 Nakano LMA Appendix Page 119 of 194 Appendix N Opening Year 2025 plus Project LOS and Queuing Output Nakano LMA Appendix Page 120 of 194 AM Existing + Cumulative + Project 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 970 190 301 404 00008052610 Future Volume (veh/h) 0 970 190 301 404 00008052610 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 1066 209 350 470 0 1048 0 429 Peak Hour Factor 0.91 0.91 0.91 0.86 0.86 0.86 0.95 0.95 0.95 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1396 611 400 1981 0 1177 0 513 Arrive On Green 0.00 0.40 0.40 0.23 1.00 0.00 0.33 0.00 0.33 Sat Flow, veh/h 0 3618 1543 3428 3618 0 3534 0 1541 Grp Volume(v), veh/h 0 1066 209 350 470 0 1048 0 429 Grp Sat Flow(s),veh/h/ln 0 1763 1543 1714 1763 0 1767 0 1541 Q Serve(g_s), s 0.0 30.4 11.0 11.4 0.0 0.0 32.6 0.0 29.8 Cycle Q Clear(g_c), s 0.0 30.4 11.0 11.4 0.0 0.0 32.6 0.0 29.8 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1396 611 400 1981 0 1177 0 513 V/C Ratio(X)0.00 0.76 0.34 0.87 0.24 0.00 0.89 0.00 0.84 Avail Cap(c_a), veh/h 0 1396 611 423 1981 0 1307 0 570 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.91 0.91 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 30.3 24.5 43.6 0.0 0.0 36.7 0.0 35.8 Incr Delay (d2), s/veh 0.0 4.0 1.5 16.2 0.3 0.0 7.4 0.0 9.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 13.4 4.3 5.2 0.1 0.0 15.1 0.0 12.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 34.3 26.0 59.9 0.3 0.0 44.1 0.0 45.4 LnGrp LOS A C C E A A D A D Approach Vol, veh/h 1275 820 1477 Approach Delay, s/veh 33.0 25.7 44.5 Approach LOS C C D Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 19.2 52.0 44.7 71.3 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 40.9 42.9 60.9 Max Q Clear Time (g_c+I1), s13.4 32.4 34.6 2.0 Green Ext Time (p_c), s 0.1 5.0 4.0 3.6 Intersection Summary HCM 6th Ctrl Delay 36.1 HCM 6th LOS D Nakano LMA Appendix Page 121 of 194 AM Existing + Cumulative + Project 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 678 1177 0 0 588 1215 92 3 317 0 0 0 Future Volume (veh/h)678 1177 0 0 588 1215 92 3 317 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 721 1252 0 0 606 1253 96 176 214 Peak Hour Factor 0.94 0.94 0.94 0.97 0.97 0.97 0.96 0.96 0.96 Percent Heavy Veh, % 3 30033333 Cap, veh/h 772 2469 0 0 1502 1144 125 229 298 Arrive On Green 0.45 1.00 0.00 0.00 0.43 0.43 0.19 0.19 0.19 Sat Flow, veh/h 3428 3618 0 0 3618 2684 644 1180 1533 Grp Volume(v), veh/h 721 1252 0 0 606 1253 272 0 214 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1342 1823 0 1533 Q Serve(g_s), s 23.1 0.0 0.0 0.0 13.8 49.4 16.4 0.0 15.2 Cycle Q Clear(g_c), s 23.1 0.0 0.0 0.0 13.8 49.4 16.4 0.0 15.2 Prop In Lane 1.00 0.00 0.00 1.00 0.35 1.00 Lane Grp Cap(c), veh/h772 2469 0 0 1502 1144 355 0 298 V/C Ratio(X) 0.93 0.51 0.00 0.00 0.40 1.10 0.77 0.00 0.72 Avail Cap(c_a), veh/h 836 2469 0 0 1502 1144 676 0 568 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.42 0.42 0.00 0.00 0.38 0.38 1.00 0.00 1.00 Uniform Delay (d), s/veh31.1 0.0 0.0 0.0 23.1 33.3 44.2 0.0 43.7 Incr Delay (d2), s/veh 8.4 0.3 0.0 0.0 0.3 49.1 3.5 0.0 3.2 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.3 0.1 0.0 0.0 5.8 23.3 7.7 0.0 6.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 39.5 0.3 0.0 0.0 23.4 82.4 47.7 0.0 47.0 LnGrp LOS D A A A C F D A D Approach Vol, veh/h 1973 1859 486 Approach Delay, s/veh 14.6 63.1 47.4 Approach LOS B E D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 87.3 31.8 55.5 28.7 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 28 26.8 43.0 Max Q Clear Time (g_c+I1), s2.0 25.1 51.4 18.4 Green Ext Time (p_c), s 13.7 1.0 0.0 2.4 Intersection Summary HCM 6th Ctrl Delay 39.2 HCM 6th LOS D Nakano LMA Appendix Page 122 of 194 AM Existing + Cumulative + Project 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 599 476 404 252 567 55 823 118 259 37 95 434 Future Volume (veh/h)599 476 404 252 567 55 823 118 259 37 95 434 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 637 506 430 341 766 74 885 127 278 45 116 529 Peak Hour Factor 0.94 0.94 0.94 0.74 0.74 0.74 0.93 0.93 0.93 0.82 0.82 0.82 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 549 1371 425 390 1137 348 760 225 493 83 1097 480 Arrive On Green 0.16 0.27 0.27 0.11 0.22 0.22 0.15 0.44 0.44 0.02 0.31 0.31 Sat Flow, veh/h 3428 5066 1571 3428 5066 1549 4983 512 1121 3428 3526 1541 Grp Volume(v), veh/h 637 506 430 341 766 74 885 0 405 45 116 529 Grp Sat Flow(s),veh/h/ln1714 1689 1571 1714 1689 1549 1661 0 1633 1714 1763 1541 Q Serve(g_s), s 21.6 10.9 36.5 13.2 18.7 5.3 20.6 0.0 24.9 1.8 3.2 42.0 Cycle Q Clear(g_c), s 21.6 10.9 36.5 13.2 18.7 5.3 20.6 0.0 24.9 1.8 3.2 42.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.69 1.00 1.00 Lane Grp Cap(c), veh/h549 1371 425 390 1137 348 760 0 718 83 1097 480 V/C Ratio(X) 1.16 0.37 1.01 0.87 0.67 0.21 1.16 0.00 0.56 0.54 0.11 1.10 Avail Cap(c_a), veh/h 549 1371 425 437 1137 348 760 0 718 104 1097 480 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh56.7 39.9 49.2 58.9 47.8 42.6 57.2 0.0 28.2 65.1 33.1 46.5 Incr Delay (d2), s/veh 91.3 0.8 46.7 15.0 3.2 1.4 87.8 0.0 1.3 2.1 0.1 72.2 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln16.3 4.7 19.8 6.6 8.2 2.2 14.8 0.0 10.0 0.8 1.4 25.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh148.0 40.7 95.9 73.9 51.0 44.0 145.0 0.0 29.5 67.2 33.2 118.7 LnGrp LOS F D F E D D F A C E C F Approach Vol, veh/h 1573 1181 1290 690 Approach Delay, s/veh 99.2 57.2 108.8 101.0 Approach LOS F E F F Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s19.8 42.9 25.0 47.3 26.0 36.7 7.7 64.6 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s17.2 * 36 20.6 42.0 21.6 30.3 4.1 58.5 Max Q Clear Time (g_c+I1), s15.2 38.5 22.6 44.0 23.6 20.7 3.8 26.9 Green Ext Time (p_c), s0.2 0.0 0.0 0.0 0.0 5.0 0.0 4.4 Intersection Summary HCM 6th Ctrl Delay 91.6 HCM 6th LOS F Nakano LMA Appendix Page 123 of 194 AM Existing + Cumulative + Project 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 1.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 122 0 198 489 31 Future Vol, veh/h 0 122 0 198 489 31 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 72 72 93 93 Heavy Vehicles, % 3 33333 Mvmt Flow 0 133 0 275 526 33 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 280 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 714 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 714 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s11.2 0 0 HCM LOS B Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- 714 - - HCM Lane V/C Ratio - 0.186 - - HCM Control Delay (s) - 11.2 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.7 - - Nakano LMA Appendix Page 124 of 194 AM Existing + Cumulative + Project 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 30 181 17 0 520 Future Vol, veh/h 0 30 181 17 0 520 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 33 197 18 0 565 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 108 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 922 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 922 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 9 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 922 - HCM Lane V/C Ratio - - 0.035 - HCM Control Delay (s) - - 9 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 125 of 194 AM Existing + Cumulative + Project 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 67 81 6 3 250 3 56 5 3 2 5 70 Future Volume (veh/h) 67 81 6 3 250 3 56 5 3 2 5 70 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 88 107 8 3 269 3 61 5 3 2 6 81 Peak Hour Factor 0.76 0.76 0.76 0.93 0.93 0.93 0.92 0.92 0.92 0.86 0.86 0.86 Percent Heavy Veh, %333333333333 Cap, veh/h 110 1029 76 6 894 10 84 267 160 4 22 297 Arrive On Green 0.06 0.31 0.31 0.00 0.25 0.25 0.05 0.25 0.25 0.00 0.20 0.20 Sat Flow, veh/h 1767 3321 245 1767 3570 40 1767 1080 648 1767 109 1475 Grp Volume(v), veh/h 88 56 59 3 133 139 61 0 8 2 0 87 Grp Sat Flow(s),veh/h/ln 1767 1763 1804 1767 1763 1847 1767 0 1728 1767 0 1585 Q Serve(g_s), s 2.2 1.0 1.0 0.1 2.7 2.7 1.5 0.0 0.2 0.1 0.0 2.1 Cycle Q Clear(g_c), s 2.2 1.0 1.0 0.1 2.7 2.7 1.5 0.0 0.2 0.1 0.0 2.1 Prop In Lane 1.00 0.14 1.00 0.02 1.00 0.38 1.00 0.93 Lane Grp Cap(c), veh/h 110 546 559 6 442 463 84 0 427 4 0 320 V/C Ratio(X) 0.80 0.10 0.11 0.52 0.30 0.30 0.72 0.00 0.02 0.50 0.00 0.27 Avail Cap(c_a), veh/h 175 871 892 163 843 884 199 0 1205 163 0 1073 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.5 10.9 10.9 22.1 13.5 13.5 20.8 0.0 12.6 22.1 0.0 14.9 Incr Delay (d2), s/veh 12.4 0.1 0.1 57.3 0.4 0.4 11.1 0.0 0.0 73.8 0.0 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.3 0.4 0.1 1.0 1.0 0.8 0.0 0.1 0.1 0.0 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.9 11.0 11.0 79.4 13.8 13.8 31.9 0.0 12.6 95.9 0.0 15.4 LnGrp LOS C BBEBBCABFAB Approach Vol, veh/h 203 275 69 89 Approach Delay, s/veh 20.5 14.5 29.7 17.2 Approach LOS C B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.5 19.4 6.5 13.8 7.2 16.8 4.5 15.9 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 22 5.0 30.0 4.4 21.2 4.1 30.9 Max Q Clear Time (g_c+I1), s 2.1 3.0 3.5 4.1 4.2 4.7 2.1 2.2 Green Ext Time (p_c), s 0.0 0.5 0.0 0.5 0.0 1.3 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 18.5 HCM 6th LOS B Nakano LMA Appendix Page 126 of 194 PM Existing + Cumulative + Project 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 882 150 436 505 00001323 5 813 Future Volume (veh/h) 0 882 150 436 505 00001323 5 813 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 959 163 474 549 0 1627 0 560 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.97 0.97 0.97 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1000 440 423 1608 0 1551 0 689 Arrive On Green 0.00 0.28 0.28 0.25 0.91 0.00 0.44 0.00 0.44 Sat Flow, veh/h 0 3618 1551 3428 3618 0 3534 0 1570 Grp Volume(v), veh/h 0 959 163 474 549 0 1627 0 560 Grp Sat Flow(s),veh/h/ln 0 1763 1551 1714 1763 0 1767 0 1570 Q Serve(g_s), s 0.0 31.1 9.8 14.3 2.3 0.0 50.9 0.0 36.1 Cycle Q Clear(g_c), s 0.0 31.1 9.8 14.3 2.3 0.0 50.9 0.0 36.1 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1000 440 423 1608 0 1551 0 689 V/C Ratio(X)0.00 0.96 0.37 1.12 0.34 0.00 1.05 0.00 0.81 Avail Cap(c_a), veh/h 0 1000 440 423 1608 0 1551 0 689 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.67 0.67 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 40.9 33.3 43.7 2.9 0.0 32.5 0.0 28.4 Incr Delay (d2), s/veh 0.0 20.1 2.4 74.1 0.4 0.0 36.9 0.0 7.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 16.1 4.0 9.5 0.8 0.0 28.9 0.0 14.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 61.0 35.6 117.8 3.3 0.0 69.5 0.0 35.8 LnGrp LOS A E D F A A F A D Approach Vol, veh/h 1122 1023 2187 Approach Delay, s/veh 57.3 56.3 60.8 Approach LOS E E E Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 20.0 39.0 57.0 59.0 Change Period (Y+Rc), s * 5.7 6.1 6.1 6.1 Max Green Setting (Gmax), s* 14 32.9 50.9 52.9 Max Q Clear Time (g_c+I1), s16.3 33.1 52.9 4.3 Green Ext Time (p_c), s 0.0 0.0 0.0 4.3 Intersection Summary HCM 6th Ctrl Delay 58.9 HCM 6th LOS E Nakano LMA Appendix Page 127 of 194 PM Existing + Cumulative + Project 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 471 1714 0 0 840 1360 133 4 493 0 0 0 Future Volume (veh/h)471 1714 0 0 840 1360 133 4 493 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 491 1785 0 0 903 1462 153 312 362 Peak Hour Factor 0.96 0.96 0.96 0.93 0.93 0.93 0.87 0.87 0.87 Percent Heavy Veh, % 3 30033333 Cap, veh/h 544 2125 0 0 1393 1093 175 358 453 Arrive On Green 0.32 1.00 0.00 0.00 0.40 0.40 0.29 0.29 0.29 Sat Flow, veh/h 3428 3618 0 0 3618 2768 601 1225 1551 Grp Volume(v), veh/h 491 1785 0 0 903 1462 465 0 362 Grp Sat Flow(s),veh/h/ln1714 1763 0 0 1763 1384 1826 0 1551 Q Serve(g_s), s 15.9 0.0 0.0 0.0 24.2 45.8 28.1 0.0 25.0 Cycle Q Clear(g_c), s 15.9 0.0 0.0 0.0 24.2 45.8 28.1 0.0 25.0 Prop In Lane 1.00 0.00 0.00 1.00 0.33 1.00 Lane Grp Cap(c), veh/h544 2125 0 0 1393 1093 533 0 453 V/C Ratio(X) 0.90 0.84 0.00 0.00 0.65 1.34 0.87 0.00 0.80 Avail Cap(c_a), veh/h 600 2125 0 0 1393 1093 677 0 575 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.09 0.09 0.00 0.00 0.36 0.36 1.00 0.00 1.00 Uniform Delay (d), s/veh38.8 0.0 0.0 0.0 28.5 35.1 39.0 0.0 37.9 Incr Delay (d2), s/veh 1.9 0.4 0.0 0.0 0.9 154.0 10.0 0.0 6.2 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln5.7 0.1 0.0 0.0 10.2 38.4 13.9 0.0 10.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 40.7 0.4 0.0 0.0 29.4 189.1 49.0 0.0 44.1 LnGrp LOS D A A A C F D A D Approach Vol, veh/h 2276 2365 827 Approach Delay, s/veh 9.1 128.1 46.9 Approach LOS A F D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 76.0 24.1 51.9 40.0 Change Period (Y+Rc), s 6.1 * 5.7 6.1 6.1 Max Green Setting (Gmax), s60.8 * 20 34.8 43.0 Max Q Clear Time (g_c+I1), s2.0 17.9 47.8 30.1 Green Ext Time (p_c), s 26.2 0.5 0.0 3.7 Intersection Summary HCM 6th Ctrl Delay 66.3 HCM 6th LOS E Nakano LMA Appendix Page 128 of 194 PM Existing + Cumulative + Project 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 662 365 279 225 679 67 593 77 300 66 71 466 Future Volume (veh/h)662 365 279 225 679 67 593 77 300 66 71 466 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 736 406 310 271 818 81 652 85 330 77 83 542 Peak Hour Factor 0.90 0.90 0.90 0.83 0.83 0.83 0.91 0.91 0.91 0.86 0.86 0.86 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 538 1583 485 325 1268 394 462 129 502 122 1185 519 Arrive On Green 0.16 0.31 0.31 0.09 0.25 0.25 0.09 0.39 0.39 0.04 0.34 0.34 Sat Flow, veh/h 3428 5066 1551 3428 5066 1572 4983 329 1277 3428 3526 1546 Grp Volume(v), veh/h 736 406 310 271 818 81 652 0 415 77 83 542 Grp Sat Flow(s),veh/h/ln1714 1689 1551 1714 1689 1572 1661 0 1606 1714 1763 1546 Q Serve(g_s), s 19.6 7.5 21.5 9.7 18.0 5.1 11.6 0.0 26.4 2.8 2.0 42.0 Cycle Q Clear(g_c), s 19.6 7.5 21.5 9.7 18.0 5.1 11.6 0.0 26.4 2.8 2.0 42.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.80 1.00 1.00 Lane Grp Cap(c), veh/h538 1583 485 325 1268 394 462 0 632 122 1185 519 V/C Ratio(X) 1.37 0.26 0.64 0.83 0.64 0.21 1.41 0.00 0.66 0.63 0.07 1.04 Avail Cap(c_a), veh/h 538 1583 485 378 1268 394 462 0 632 178 1185 519 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.7 32.1 36.9 55.6 41.9 37.0 56.7 0.0 31.0 59.5 28.2 41.5 Incr Delay (d2), s/veh177.7 0.4 6.3 11.6 2.5 1.2 197.0 0.0 2.9 2.0 0.1 51.3 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln21.7 3.1 9.0 4.7 7.8 2.1 13.3 0.0 10.7 1.2 0.9 23.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh230.4 32.5 43.3 67.2 44.4 38.2 253.7 0.0 33.9 61.5 28.3 92.8 LnGrp LOS F C D E D D F A C E C F Approach Vol, veh/h 1452 1170 1067 702 Approach Delay, s/veh 135.1 49.3 168.2 81.8 Approach LOS F D F F Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s16.2 45.5 16.0 47.3 24.0 37.7 8.9 54.4 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s13.8 * 39 11.6 42.0 19.6 31.3 6.5 47.1 Max Q Clear Time (g_c+I1), s11.7 23.5 13.6 44.0 21.6 20.0 4.8 28.4 Green Ext Time (p_c), s0.1 7.0 0.0 0.0 0.0 6.0 0.0 3.8 Intersection Summary HCM 6th Ctrl Delay 111.7 HCM 6th LOS F Nakano LMA Appendix Page 129 of 194 PM Existing + Cumulative + Project 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 57 0 571 261 133 Future Vol, veh/h 0 57 0 571 261 133 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 88 88 91 91 Heavy Vehicles, % 3 33333 Mvmt Flow 0 62 0 649 287 146 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 217 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 784 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 784 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 10 0 0 HCM LOS B Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- 784 - - HCM Lane V/C Ratio - 0.079 - - HCM Control Delay (s) - 10 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.3 - - Nakano LMA Appendix Page 130 of 194 PM Existing + Cumulative + Project 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 11 530 41 0 394 Future Vol, veh/h 0 11 530 41 0 394 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 12 576 45 0 428 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 311 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 682 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 682 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s10.4 0 0 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 682 - HCM Lane V/C Ratio - - 0.018 - HCM Control Delay (s) - - 10.4 - HCM Lane LOS - - B - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 131 of 194 PM Existing + Cumulative + Project 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 244 222 30 10 136 4 36 3 7 1 5 38 Future Volume (veh/h) 244 222 30 10 136 4 36 3 7 1 5 38 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 260 236 32 11 149 4 43 4 8 1 5 39 Peak Hour Factor 0.94 0.94 0.94 0.91 0.91 0.91 0.83 0.83 0.83 0.98 0.98 0.98 Percent Heavy Veh, %333333333333 Cap, veh/h 324 1211 162 20 756 20 64 117 233 4 32 246 Arrive On Green 0.18 0.39 0.39 0.01 0.22 0.22 0.04 0.21 0.21 0.00 0.18 0.18 Sat Flow, veh/h 1767 3122 418 1767 3503 94 1767 549 1099 1767 178 1387 Grp Volume(v), veh/h 260 132 136 11 75 78 43 0 12 1 0 44 Grp Sat Flow(s),veh/h/ln 1767 1763 1778 1767 1763 1834 1767 0 1648 1767 0 1564 Q Serve(g_s), s 7.1 2.5 2.5 0.3 1.7 1.8 1.2 0.0 0.3 0.0 0.0 1.2 Cycle Q Clear(g_c), s 7.1 2.5 2.5 0.3 1.7 1.8 1.2 0.0 0.3 0.0 0.0 1.2 Prop In Lane 1.00 0.24 1.00 0.05 1.00 0.67 1.00 0.89 Lane Grp Cap(c), veh/h 324 683 689 20 380 396 64 0 350 4 0 277 V/C Ratio(X) 0.80 0.19 0.20 0.55 0.20 0.20 0.68 0.00 0.03 0.28 0.00 0.16 Avail Cap(c_a), veh/h 516 1155 1165 145 771 803 145 0 988 145 0 938 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.6 10.1 10.2 24.6 16.1 16.1 23.8 0.0 15.6 25.0 0.0 17.4 Incr Delay (d2), s/veh 4.8 0.1 0.1 21.4 0.2 0.2 11.8 0.0 0.0 38.8 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.0 0.8 0.9 0.2 0.7 0.7 0.7 0.0 0.1 0.0 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 24.4 10.3 10.3 46.0 16.3 16.3 35.7 0.0 15.7 63.8 0.0 17.7 LnGrp LOS C B B D B B D ABEAB Approach Vol, veh/h 528 164 55 45 Approach Delay, s/veh 17.2 18.3 31.3 18.7 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 5.0 25.1 6.2 13.8 13.6 16.5 4.5 15.5 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 33 4.1 30.0 14.6 21.9 4.1 30.0 Max Q Clear Time (g_c+I1), s 2.3 4.5 3.2 3.2 9.1 3.8 2.0 2.3 Green Ext Time (p_c), s 0.0 1.6 0.0 0.2 0.4 0.7 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 18.5 HCM 6th LOS B Nakano LMA Appendix Page 132 of 194 AM Existing + Cumulative + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 535 513 175 198 211 96 96 596 594 532 Average Queue (ft) 503 488 118 96 121 33 41 332 339 262 95th Queue (ft)520 534 219 170 186 74 88 510 492 417 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 67 25 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)41 0 0 2 Queuing Penalty (veh)78 1 0 4 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 242 255 418 427 273 225 467 459 401 275 Average Queue (ft) 196 235 313 249 155 129 232 245 157 73 95th Queue (ft)272 290 497 449 237 215 418 426 282 181 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)7 2 Queuing Penalty (veh)60 18 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)2 9 8 1 0 Queuing Penalty (veh) 9 51 53 2 0 Nakano LMA Appendix Page 133 of 194 AM Existing + Cumulative + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1150 1171 1132 178 234 253 288 301 358 255 Average Queue (ft) 264 280 894 706 251 79 105 144 115 149 204 48 95th Queue (ft)353 361 1574 1491 896 148 193 222 207 235 305 166 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%)24 5 0 Queuing Penalty (veh) 119 25 0 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 12 57 2 0001 60 Queuing Penalty (veh) 19 90 14 0003 40 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 283 292 300 821 80 92 96 270 120 Average Queue (ft) 207 289 298 786 5 25 47 128 109 95th Queue (ft)287 292 303 810 31 62 80 268 137 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)53 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)0 9 45 4 1 21 Queuing Penalty (veh) 1 33 169 32 4 10 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 116 52 73 31 74 93 70 31 31 53 Average Queue (ft) 33 15 20 3 43 42 38 3 2 29 95th Queue (ft)77 44 52 18 71 70 70 18 14 50 Link Distance (ft)413 413 873 873 390 231 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)2 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 1421 Nakano LMA Appendix Page 134 of 194 PM Existing + Cumulative + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB WB WB WB WB SB SB SB Directions Served T T R L L T T L LTR R Maximum Queue (ft) 546 522 175 202 214 282 478 825 967 825 Average Queue (ft) 503 496 132 158 172 119 95 543 607 506 95th Queue (ft)522 536 236 228 238 249 240 931 1060 894 Link Distance (ft)483 483 394 394 928 Upstream Blk Time (%) 76 51 9 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft)150 190 190 800 800 Storage Blk Time (%)69 0 2 15 0 2 8 0 Queuing Penalty (veh)104 1 5 37 0 26 89 2 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB NB NB Directions Served L L TTTTRRLTRR Maximum Queue (ft) 240 255 419 427 393 330 378 404 833 275 Average Queue (ft) 144 232 375 372 249 190 195 205 347 215 95th Queue (ft)222 300 467 477 355 290 324 334 652 312 Link Distance (ft)394 394 1132 1132 1132 1132 881 Upstream Blk Time (%)18 17 Queuing Penalty (veh) 199 185 Storage Bay Dist (ft) 230 230 250 Storage Blk Time (%)1 2 34 21 1 Queuing Penalty (veh) 8 20 162 51 3 Nakano LMA Appendix Page 135 of 194 PM Existing + Cumulative + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1156 1157 1107 154 194 244 298 288 331 255 Average Queue (ft) 284 297 915 560 137 64 92 136 145 159 204 47 95th Queue (ft)321 335 1541 1344 645 116 172 217 228 252 293 163 Link Distance (ft)1132 1132 1132 400 400 400 Upstream Blk Time (%)18 1 Queuing Penalty (veh) 132 9 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 26 62 0 1 4 0 Queuing Penalty (veh) 31 75 0 1 3 0 Intersection: 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 283 291 300 797 119 96 117 290 120 Average Queue (ft) 241 287 298 781 18 47 31 113 106 95th Queue (ft)306 298 303 798 65 87 75 278 141 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)64 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)2 22 57 8 0 0 1 28 Queuing Penalty (veh) 7 83 214 47 0 0 3 10 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR L TR TR Maximum Queue (ft) 207 235 93 31 119 73 72 31 76 Average Queue (ft) 105 29 44 11 37 31 29 4 23 95th Queue (ft)178 100 87 34 84 68 60 21 52 Link Distance (ft)413 413 873 873 390 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)0 0 Queuing Penalty (veh) 0 0 Network Summary Network wide Queuing Penalty: 1261 Nakano LMA Appendix Page 136 of 194 Appendix O Proposed Improvement Concept Drawings Nakano LMA Appendix Page 137 of 194 CIVIL SENSE INC 13475 Danielson Street, Suite 150 Poway, CA 92064 INTERSECTION OF DENNERY RD AT PALM AVE Nakano LMA Appendix Page 138 of 194 CIVIL SENSE INC 13475 Danielson Street, Suite 150 Poway, CA 92064 INTERSECTION OF DENNERY RD AT PALM AVENakano LMA Appendix Page 139 of 194 CIVIL SENSE INC 13475 Danielson Street, Suite 150 Poway, CA 92064 INTERSECTION OF DENNERY RD AT RED FIN / RED CORAL LN Nakano LMA Appendix Page 140 of 194 Appendix P Fair Share Calculations Nakano LMA Appendix Page 141 of 194 The fair share is calculated based on the proportional amount of project traffic being added to the Palm Ave bridge. While the fair share is not required by CEQA, the fair share calculation approach is based on the following section in CEQA: 15041. AUTHORITY TO MITIGATE Within the limitations described in Section 15040: (a) A lead agency for a project has authority to require feasible changes in any or all activities involved in the project in order to substantially lessen or avoid significant effects on the environment, consistent with applicable constitutional requirements such as the “nexus” and “rough proportionality” standards established by case law (Nollan v. California Coastal Commission (1987) 483 U.S. 825, Dolan v. City of Tigard, (1994) 512 U.S. 374, Ehrlich v. City of Culver City, (1996) 12 Cal. 4th 854.). Using rough proportionality, the segment fair share amount is based on the percentage of project traffic compared to the total traffic as follows: Opening Year 2024: 932 project ADT/38,031 background ADT = 2.5% The horizon year fair share calculation: Horizon Year 2062: 932 project ADT/46,000 background ADT = 2.0% The higher Opening Year fair share of 2.5% is the controlling fair share to be paid by the Owner/Permittee. Nakano LMA Appendix Page 142 of 194 Appendix Q Horizon Year Volumes and Growth Factor Calculations Nakano LMA Appendix Page 143 of 194 5.12 Transportation/Circulation This section analyzes the potential transportation-related impacts associated with the adoption of the CPU. The study area boundaries for the purposes of the traffic analysis include the CPU area and extend to those areas outside the CPU area to roads that are common to other communities in the City of San Diego and other jurisdictions such as the City of Chula Vista and the County of San Diego. The analysis in this section is based on the Traffic Impact Analysis (TIA) prepared by Urban Systems Associates (USA), Inc. (June 14, 2012), which is contained in Appendix J. Traffic analysis was conducted in support of the CPU in order to identify the recommended roadway classifications and other recommended transportation improvements to support buildout of the CPU land uses and proposed zoning, and to identify any significant traffic impacts that would remain unmitigated at the programmatic level. Future traffic volumes were forecasted using SANDAG’s Series 11 regional transportation model calibrated for the Otay Mesa area. Land uses within the CPU area were assumed to be built out within the traffic model. The CPU transportation model network included the future improvements from the Adopted Community Plan that were assumed to be completed at buildout of the CPU and included the Year 2030 Regional Transportation Plan “Reasonably Expected” projects in the region such as SR-11 and the SR-905/SR-125/SR-11 freeway interchange. Also, the model was modified to include a half -diamond interchange (instead of a full interchange) at SR-125/Lone Star Road and a portion of SR-125 was modeled as a toll facility. Due to the undeveloped nature of much of the community, a majority of the circulation element roadways are not built, are only partially built, or are not operating near capacity. Therefore, for many facilities, an analysis of the CPU buildout traffic volumes on the existing transportation network was not possible or meaningful. So, although the existing condition is considered the baseline for identifying significant impacts, in order to identify the recommended roadway classifications and other transportation improvements, the proposed CPU land use buildout traffic volumes were initially analyzed on the CPU transportation network. Based on those level of service analysis results and other considerations, where possible, recommendations were made for the CPU roadway classifications, intersection lane configurations, and freeway and ramp improvements that would mitigate or reduce impacts by bringing the facilities to Level of Service D or better operation at buildout. All but 24 potential roadway segment significant impacts would be mitigated at the programmatic level by incorporating the recommended roadway segment classifications (refer to Table 5.12-4 CPU Classification column) in the CPU Figure 3-2 Otay Mesa Roadway Classification Map and Public Facilities Financing Plan, and through future Nakano LMA Appendix Page 144 of 194 FIGURE 5.12-3a Horizon Year Plus CPU Condition Roadway Segment Volumes (West) Map Source: Urban Systems Associates, Inc. 2012 Not to Scale Nakano LMA Appendix Page 145 of 194 TABLE 5.12-5 CPU HORIZON YEAR ROADWAY SEGMENT LEVEL OF SERVICE (continued) Street Segment Horizon Year Horizon Year with CPU Sig? Class1 LOS E ADT2 Segment ADT V/C LOS New Class New V/C New LOS Palm Ave. I-805 to Dennery Rd. 7-PA 65,000 59,500 0.92 D - - - N Ocean View Hills Parkway Dennery Rd. to Del Sol Blvd. Del Sol Blvd. to Street “A” Street “A” to Otay Mesa Rd. 4-M 6-M 6-M 40,000 50,000 50,000 22,000 35,000 23,500 0.55 0.70 0.42 C C B - - - - - - - - - N N N Caliente Avenue Otay Mesa Rd. to SR-905 SR-905 to Airway Rd. Airway Rd. to Beyer Blvd. Beyer Blvd. to Siempre Viva Rd. 6-M 6-M 4-M 4-M 50,000 50,000 40,000 40,000 38,000 32,000 46,000 41,000 0.76 0.64 1.15 1.03 C C F F 6-PA 6-PA 6-M - 0.63 0.53 0.92 - C B E - N N Y Y Beyer Boulevard Alaquinas Dr. to Old Otay Mesa Rd. Old Otay Mesa Rd. to Caliente Ave. 3 4-M 4-M 40,000 40,000 32,500 31,000 0.81 0.78 D D - - - - - - N N Heritage Road/ Otay Valley Road Main St. to Avenida de Las Vistas** Avenida De Las Vistas to Datsun St. Datsun St. to Otay Mesa Rd. Otay Mesa Rd. to SR-905 SR-905 to Airway Rd. 6-PA 6-M 6-M 6-M 6-M 60,000 50,000 50,000 50,000 50,000 83,000 75,500 48,000 23,500 35,000 1.38 1.51 0.96 0.47 0.70 F F E B C - 6-PA 6-PA 6-PA 6-PA - 1.26 0.80 0.39 0.58 - F C A B Y Y N N N Cactus Road Otay Mesa Rd. to Airway Rd. Airway Rd. to Siempre Viva Rd. Siempre Viva Rd. to South End 4-CL 4-CL 2-CL 30,000 30,000 15,000 40,500 40,500 11,000 1.35 1.35 0.73 F F D 4-M 4-M - 1.01 1.01 - F F - Y Y N Britannia Boulevard Otay Mesa Rd. to SR-905 SR-905 to Airway Rd. Airway Rd. to Siempre Viva Rd. Siempre Viva Rd. to South End 4-M 4-M 4-M 2-C 40,000 40,000 40,000 8,000 17,500 63,000 44,500 22,000 0.44 1.58 1.11 2.75 B F F F 6-PA 6-PA 6-M 4-CL 0.29 1.05 0.89 0.73 A F D D N Y N N La Media Road Birch Rd. to Lone Star Rd.** Lone Star Rd. to Aviator Rd. Aviator Rd. to Otay Mesa Rd. Otay Mesa Rd. to SR-905 SR-905 to Airway Rd. Airway Rd. to Siempre Viva Rd. 6-PA 6-PA 6-PA 6-PA 6-PA 4-M 60,000 60,000 60,000 60,000 60,000 40,000 N/A 19,500 22,500 37,500 64,000 33,000 N/A 0.33 0.38 0.63 1.06 0.83 N/A A A C F D N/A 4-M 4-M - - 5-M N/A 0.49 0.56 - - 0.73 N/A B C - - C N/A N N N Y N Harvest Road South of Otay Mesa Rd. Airway Rd. to Otay Center Dr. Otay Center Dr. to Siempre Viva Rd. 4-M 4-M 4-M 40,000 40,000 40,000 8,500 16,000 10,000 0.21 0.40 0.25 A B A 2-CL 4-CL 4-CL 0.57 0.53 0.33 C C A N N N Enrico Fermi Drive SR-11 to Airway Rd.* Airway Rd. to Siempre Viva Rd. Siempre Viva Rd. to Via de la Amistad 4-M 4-M 4-M 40,000 40,000 40,000 15,500 8,000 10,500 0.62 0.20 0.26 B A A - 4-CL 4-CL - 0.27 0.35 - A B N N N Nakano LMA Appendix Page 146 of 194 TABLE 5.12-5 CPU HORIZON YEAR ROADWAY SEGMENT LEVEL OF SERVICE (continued) Street Segment Horizon Year Horizon Year with CPU Sig? Class1 LOS E ADT2 Segment ADT V/C LOS New Class New V/C New LOS Lone Star Road SR-125 to Piper Ranch Rd. Piper Ranch Rd. to City/County Boundary 4-M 4-M 40,000 40,000 35,000 36,000 0.88 0.90 D E 6-PA 6-PA 0.58 0.60 B C N N Aviator Road Heritage Rd. to La Media Rd. 3 2-C 8,000 23,000 2.88 F 4-CL 0.77 D N Dennery Road Palm Ave. to Del Sol Blvd. Palm Ave. to Regatta Ln. Regatta Ln. to Red Coral Ln. Red Coral Ln. to Black Coral Ln. Black Coral Ln. to East End 4-M 4-M 4-CL 2-CL 2-CN 40,000 40,000 30,000 15,000 10,000 28,000 19,500 12,500 12,500 16,500 0.70 0.49 0.42 0.83 1.65 C B B D F - - - - - - - - - - - - - - - N N N N Y Avenida De Las Vistas Otay Valley Rd. to Vista Santo Domingo Vis ta Santo Domingo to Dennery Rd. 2-CN 2-CN 10,000 10,000 7,000 19,500 0.70 1.95 C F - - - - - - N Y Del Sol Boulevard Ocean View Hills Pkwy. to Surf Crest Dr. Surf Crest Dr. to Riviera Pointe Riviera Pointe to Dennery Rd. Dennery Rd. to I-805 4-CL 2-CN 2-CL 4-CL 30,000 10,000 15,000 30,000 19,500 23,000 23,000 16,000 0.65 2.30 1.53 0.53 C F F C - - - - - - - - - - - - N Y Y N Street A Ocean View Hills Pkwy. to Otay Mesa Rd. 4-M 40,000 13,500 0.34 A - - - N Old Otay Mesa Road Otay Mesa Rd. to Airway Rd. Airway Rd. to Crescent Bay Dr. Crescent Bay Dr. to Beyer Blvd. 4-CL 4-CL 2-C 30,000 30,000 8,000 22,000 14,500 16,000 0.73 0.48 2.00 D C F - - - - - - - - - N N Y Emerald Crest Dr. Otay Mesa Rd. to South End 3 4-CL 30,000 25,000 0.83 D - - - N Corporate Center Drive South End to Otay Mesa Rd. 3 Otay Mesa Rd. to Progressive Ave. Progressive Ave. to Innovative Dr. 4-CL 4-CL 2-C 30,000 30,000 8,000 17,500 19,500 8,000 0.58 0.65 1.00 C C E - - 2-CL - - 0.53 - - C N N N Innovative Drive Otay Mesa Rd. to Corporate Center Dr. 4-CL 30,000 15,000 0.50 C - - - N Piper Ranch Road Lone Star Rd. to Otay Mesa Rd. 4-CL 30,000 20,500 0.68 D - - - N Sanyo Avenue Otay Mesa Rd. to Airway Rd. 4 4-C 15,000 24,500 1.63 F 4-CL 0.82 D N Heinrich Hertz Drive Airway Rd. to Paseo de las Americas4 2-CL 15,000 12,000 0.80 D - - - N Paseo de las Americas Airway Rd. to Siempre Viva Rd. Siempre Viva Rd. to Marconi Dr. 2-C 2-C 8,000 8,000 16,500 15,000 2.06 1.88 F F 4-CL 4-CL 0.55 0.50 C C N N Marconi Drive Paseo de las Americas to Enrico Fermi Dr. 2-C 8,000 8,000 1.00 E 2-CL 0.53 C N Otay Center Drive Harvest Rd. to Siempre Viva Rd.4 4-C 15,000 15,500 1.03 F 4-CL 0.52 C N Michael Faraday Drive Airway Rd. to Siempre Viva Rd. 4 Siempre Viva Rd. to Marconi Dr. 4 2-CL 2-CL 15,000 15,000 6,500 8,000 0.43 0.53 B C - - - - - - N N St. Andrews Avenue Otay Mesa Center Rd. to La Media Rd. 2-C 8,000 13,500 1.69 F 4-CL 0.45 C N Nakano LMA Appendix Page 147 of 194 Intersections With the specified proposed classifications the following intersections would be expected to operate at unacceptable levels of service in the Horizon Year Plus CPU condition (Table 5.12-6): 1. Palm Ave./I-805 NB Ramps (LOS F in the AM and PM peak hours) 2. Palm Ave./Dennery Rd. (LOS E in the PM peak hour) 3. Otay Mesa Rd./Caliente Ave. (LOS F in the AM and PM peak hours) 4. Caliente Ave./SR-905 WB Ramps (LOS F in the AM peak hour and LOS D with excessive queues blocking the intersection in the PM peak hour) 5. Caliente Ave./SR-905 EB Ramps (LOS F in the AM and PM peak hours) 6. Caliente Ave./Airway Rd. (LOS F in the AM and PM peak hours) 7. Caliente Ave./Beyer Blvd. (LOS F in the AM and PM peak hours) 8. Otay Mesa Rd./Heritage Rd. (LOS F in the AM and PM peak hours) 9. Heritage Rd./SR-905 WB Ramps (LOS E in the AM peak hour and LOS F in the PM peak hour) 10. Heritage Rd./SR-905 EB Ramps (LOS F in the AM and PM peak hours) 11. Heritage Rd./Airway Rd. (LOS F in the AM and PM peak hours) 12. Otay Mesa Rd./Cactus Rd. (LOS F in the AM and PM peak hours) 13. Airway Rd./Cactus Rd. (LOS F in the AM and PM peak hours) 14. Siempre Viva Rd./Cactus Rd. (LOS F in the PM peak hour) 15. Otay Mesa Rd./Britannia Blvd. (LOS F in the AM and PM peak hours) 16. Britannia Blvd./SR-905 WB Ramps (LOS F in the AM and PM peak hours) 17. Britannia Blvd./SR-905 EB Ramps (LOS F in the AM and PM peak hours) 18. Britannia Blvd./Airway Rd. (LOS F in the AM and PM peak hours) 19. Siempre Viva Rd./Britannia Blvd. (LOS F in the AM and PM peak hours) 20. Otay Mesa Rd./La Media Rd. (LOS F in the AM and PM peak hours) 21. La Media Rd./SR-905 WB Ramps (LOS F in the AM and PM peak hours) 22. La Media Rd./SR-905 EB Ramps (LOS F in the AM and PM peak hours) 23. La Media Rd./Airway Rd. (LOS F in the AM and PM peak hours) 24. La Media Rd./Siempre Viva Rd. (LOS F in the AM and PM peak hours) 25. Lone Star Rd./SR-125 SB Off Ramp (LOS E in the AM peak hour and LOS F in the PM peak hours) 26. Lone Star Rd./SR-125 NB On Ramp (LOS A with excessive queues blocking the intersection in the AM peak hour and LOS F in the PM peak hour) 27. Lone Star Rd./Piper Ranch Rd. (LOS A with excessive queues blocking the intersection in the PM peak hour) 28. Otay Mesa Rd./Piper Ranch Rd. (LOS F in the AM and PM peak hours) 29. Otay Mesa Rd./SR-125 SB Off Ramp (LOS F in the AM peak hour and LOS B with excessive queues blocking the intersection in the PM peak hour) 30. Otay Mesa Rd./Harvest Rd. (LOS F in the PM peak hour) 31. Siempre Viva Rd./Otay Center Dr. (LOS F in the AM and PM peak hours) Nakano LMA Appendix Page 148 of 194 TABLE 5.12-6 CPU HORIZON YEAR INTERSECTION LEVELS OF SERVICE Intersection Horizon Year Plus CPU Mitigation Horizon Year Plus CPU With Mitigation Significant After Mitigation? AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour CD LOS CD LOS CD LOS CD LOS 1 Palm Ave./I-805 SB Ramps 48.9 D 51.3 D Revise SB-LTR to LT; +1 SB-R* 24.8 C 35.7 D - 2 Palm Ave./I-805 NB Ramps 116.1 F 122.6 F +1 dedicated NB-L; +1EB-T; +1EB-R; +1WB-T; +1WB-R 4.6 A 5.5 A No 3 Palm Ave./Dennery Rd. 33.5 C 67.2 E - - - - - Yes 4 Otay Mes a Rd./Caliente Ave. 263.5 F 146.0 F +1 dedicated NB-R 205.9 F 87.2 F Yes 5 Caliente Ave./SR-905 W B Ramps 83.1 F 43.2 D1 +1 NB-L; +1 dedicated SB-R 34.0 C1 34.0 C1 Yes 6 Caliente Ave./SR-905 EB Ramps 165.7 F 150.5 F +1 dedicated NB-R; +1SB-L; +1 dedicated EB-R 55.0 E 70.2 E Yes 7 Caliente Ave./Airway Rd. 228.5 F 223.0 F +1 dedicated NB-L; +1 dedicated EB-R 143.0 F 200.5 F Yes 8 Caliente Ave./Beyer Blvd. 252.0 F 429.8 F +2 dedicated SB-R; +1 dedicated EB-R 212.7 F 122.4 F Yes 9 Otay Mes a Rd./Heritage Rd. 367.5 F 257.4 F +1 dedicated NB-R; +1 dedicated SB-R; +1WB-R 272.0 F 161.2 F Yes 10 Heritage Rd./SR-905 W B Ramps 69.9 E 81.1 F +2 dedicated NB-R 15.9 B1 28.4 C1 Yes 11 Heritage Rd./SR-905 EB Ramps 113.0 F 86.4 F +1 dedicated NB-L; +1 dedicated WB-R 39.5 D1 25.5 C1 Yes 12 Heritage Rd./Airway Rd. 162.7 F 402.8 F +2 dedicated WB-R 144.5 F 88.3 F Yes 13 Heritage Rd./Siempre Viva Rd. N/A N/A N/A N/A - N/A N/A N/A N/A - 14 Otay Mes a Rd./Cactus Rd. 437.9 F 290.5 F +2 dedicated EB-R; +1 dedicated WB-R 139.6 F 199.7 F Yes 15 Airway Rd./Cac tus Rd. 361.5 F 437.7 F +1 dedicated NB-R; +1 dedicated SB-R; +1 dedicated EB-R; +2 dedicated WB-R 188.6 F 306.2 F Yes 16 Siempre Viva Rd./Cactus Rd. 48.7 D 127.7 F +1 dedicated NB-R 47.6 D 117.3 F Yes 17 Otay Mes a Rd./Britannia Blvd. 108.5 F 117.2 F +1 dedicated EB-R; +1 dedicated WB-R 63.1 E 47.5 D Yes 18 Britannia Blvd./SR-905 W B Ramps 240.5 F 577.4 F Restripe 3rd SB-T to SB-TR; +1 dedicated SB-R; Restripe WB-T to LTR 65.0 E 547.1 F Yes 19 Britannia Blvd./SR-905 EB Ramps 353.3 F 235.1 F +2 dedicated NB-R 305.9 F 67.1 E Yes 20 Britannia Blvd./Airway Rd. 618.2 F 615.8 F +1 dedicated NB-R; +2 dedicated SB-R; +1 dedicated EB-R; +2 dedicated WB-R 184.9 F 241.1 F Yes 21 Siempre Viva Rd./Britannia Blvd. 363.3 F 362.8 F +1 dedicated NB-R; +2 dedicated SB-R; +1 dedicated EB-R; +2 dedicated WB-R 177.5 F 143.2 F Yes Nakano LMA Appendix Page 149 of 194 Nakano LMA Appendix Page 150 of 194 Growth between Existing and Horizon Years Existing Horizon Percent Dennery Road Yr 2015 Yr 2062 Growth Regatta Ln to Landing Dwy 8,333 12,500 50.0% Landing Dwy to Red Coral 8,224 12,500 52.0% Higher Growth Rate Applied: 52.0% Nakano LMA Appendix Page 151 of 194 Appendix R SANDAG Horizon Year Volumes Nakano LMA Appendix Page 152 of 194 SANDAG Series 13 Year 2050    Nakano LMA Appendix Page 153 of 194 Appendix S Excerpts from Caltrans EIR Palm Ave Interchange Improvements Nakano LMA Appendix Page 154 of 194 Interstate 805/Palm Avenue Interchange Improvements SAN DIEGO COUNTY, CALIFORNIA DISTRICT 11 – SD – 805 (PM I-805 2.6/3.2) EA No. 11-173700 SCH# 2018101025 Initial Study with Mitigated Negative Declaration/Environmental Assessment with Finding of No Significant Impact and Section 4(f) De Minimis Determination Prepared by the State of California, Department of Transportation in Coordination with the City of San Diego The environmental review, consultation, and any other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by Caltrans pursuant to 23 USC 327 and the Memorandum of Understanding dated December 23, 2016 and executed by FHWA and Caltrans. JUNE 2019 Nakano LMA Appendix Page 155 of 194 Figure 1.4.2 Alternative 2 + IV Project Features Nakano LMA Appendix Page 156 of 194 Road Widening East of the Bridge Between the bridge and the proposed Project end near Dennery Road, two right-turn lanes to the I-805 North on-ramp and three through lanes would be constructed for WB traffic; three through lanes would be constructed for EB traffic. A roadway typical section for Palm Avenue is shown in Figure 1.4.4. Retaining Walls Three retaining walls would be unique to Alternative 1 + IV, as follows: • West of the bridge, a retaining wall (RW2A) with a proposed maximum height of approximately 10 feet would be constructed along the EB side of Palm Avenue within Palm Ridge Neighborhood Park and Caltrans Right-of -Way; • The loop on-ramp would require a retaining wall (RW1B) within Caltrans Right-of-Way east of the freeway main lanes; and • The realignment of the I-805 North off-ramp to accommodate the new loop on-ramp would require a retaining wall (RW1A) along the off-ramp in the slope below Palm Promenade Shopping Center. Utility Relocation Alternative 1 + IV would affect 6 utilities: gas pipelines (SDG&E), telecommunication lines (AT&T), fiber optic lines (Cox Communication), water pipelines (California American Water), and water and sewer pipelines and storm drain facilities (City of San Diego). Hazardous Waste Alternative 1 + IV would have a potential hazardous waste issue due to the presence of the former South Bay Burn Site in the slope below Palm Promenade Shopping Center where this alternative would construct a retaining wall. Property Acquisition Alternative 1 + IV would impact several properties within the project boundaries. Palm Ridge Neighborhood Park would be impacted by a permanent easement that would require 0.09 acres of property acquisition. Palm Promenade Shopping Center would be impacted by a partial acquisition and permanent easement on the slope adjacent to the I-805 North off-ramp that would require 0.286 acres of property acquisition. This information can be found in Table 2.1.8. Unique Features of Alternative 2 + IV: Spread Diamond with Class IV Separated Bikeway Alternative 2 + IV would address the proposed Project purpose and need by widening the Palm Avenue bridge to provide additional lanes and longer turn pockets and widening various ramps and roadway approaches to provide additional turn lanes. In addition to the common design features of both Build Alternatives listed previously, Alternative 2 + IV would reduce congestion by constructing the proposed unique Project features summarized below. Bridge Widening The Palm Avenue bridge structure would be widened to the north and south to accommodate additional vehicular travel lanes, a center median, and other features outside the vehicular travel way. The widening to the south would involve a new concrete column and concrete box girder, and the widening to the north would involve a new column on a concrete pile, similar to Alternative 1 + IV. The main difference between the design of Alternative 1 + IV and Alternative 2 + IV is the width of the bridge deck that is being provided. Alternative 2 + IV will have a wider bridge deck than Alternative 1 + IV. The Nakano LMA Appendix Page 157 of 194 typical section for Alternative 2 + IV bridge widening is shown in Figure 1.4.5. The number of lanes in each direction would be as follows: • For WB Palm Avenue, the widened bridge would have two through lanes plus two left-turn lanes to I-805 South, a Class IV Separated Bikeway, and pedestrian walkways; and • For EB Palm Avenue, the widened bridge would have three through lanes plus two left-turn lanes to I-805 North, a Class IV Separated Bikeway, and pedestrian walkways. Road Widening West of the Bridge Between the bridge and Firethorn Street, two through lanes would accommodate WB traffic; three through lanes plus a longer right-turn lane to the I-805 South on-ramp would accommodate EB traffic. Road Widening East of the Bridge Between the bridge and the proposed Project end near Dennery Road, two right-turn lanes to I-805 North on-ramp and three through lanes for WB traffic would be constructed; three through lanes would be constructed for EB traffic. A roadway typical section for Alternative 2 + IV is shown in Figure 1.4.6. Retaining Walls Two retaining walls would be unique to Alternative 2 + IV, as follows: • West of the bridge, a retaining wall (RW2A) with a proposed maximum height of approximately 17 feet would be constructed along EB Palm Avenue within Palm Ridge Neighborhood Park and Caltrans Right-of-W ay. • East of the bridge, a ground anchor retaining wall (RW2C) would be constructed in place of the existing crib wall along the EB side of Palm Avenue within Palm Promenade Shopping Center. Utility Relocation In addition to the utilities affected by Alternative 1 + IV, Alternative 2 + IV would result in relocation of a 69 kV SDG&E overhead electrical pole in EB Palm Avenue, North of Palm Promenade Shopping Center. Property Acquisition Alternative 2 + IV would impact several properties within the project boundaries. Palm Ridge Neighborhood Park would be impacted by a permanent easement that would require 0.22 acres of property acquisition. Palm Promenade Shopping Center would be impacted by a permanent easement on the slope parallel to Palm Avenue that would require 0.078 acres of partial acquisition and property acquisition. This information can be found in Table 2.1.8. Transportation Demand Management, Transportation System Management, and Mass Transit Alternatives Transportation Demand Management (TDM), Transportation System Management (TSM), and Mass Transit strategies are required for consideration on proposed major highway projects in urban areas over 200,000 population. Although Transportation System Management measures alone could not satisfy the purpose and need of the proposed Project, the following Transportation System Management measures have been incorporated into the Build Alternatives for this proposed Project: • Addition of HOV lanes to ramps; Nakano LMA Appendix Page 158 of 194 Figure 1.4.5 Alternative 2 + IV Palm Avenue Bridge Typical Cross-Section Nakano LMA Appendix Page 159 of 194 From: Jusn Rasas <jusn@losengineering.com> Sent: Monday, January 23, 2023 8:03 AM To: Sanchez Rangel, Rogelio@DOT <roger.sanchez-rangel@dot.ca.gov> Cc: Santos, Mary Rose Ann <MCSantos@sandiego.gov> Subject: Palm Ave/I-805 RTL date and scope quesons Nakano LMA Appendix Page 160 of 194 Appendix T Horizon Year 2062 without Project LOS and Queuing Output Nakano LMA Appendix Page 161 of 194 AM Horizon Year 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 890 175 280 355 00001095 1 570 Future Volume (veh/h) 0 890 175 280 355 00001095 1 570 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 967 190 304 386 0 1191 0 620 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1735 528 373 1768 0 1409 0 1215 Arrive On Green 0.00 0.34 0.34 0.22 1.00 0.00 0.40 0.00 0.40 Sat Flow, veh/h 0 5233 1542 3428 3618 0 3534 0 3048 Grp Volume(v), veh/h 0 967 190 304 386 0 1191 0 620 Grp Sat Flow(s),veh/h/ln 0 1689 1542 1714 1763 0 1767 0 1524 Q Serve(g_s), s 0.0 14.0 8.3 7.6 0.0 0.0 27.5 0.0 13.8 Cycle Q Clear(g_c), s 0.0 14.0 8.3 7.6 0.0 0.0 27.5 0.0 13.8 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1735 528 373 1768 0 1409 0 1215 V/C Ratio(X)0.00 0.56 0.36 0.81 0.22 0.00 0.85 0.00 0.51 Avail Cap(c_a), veh/h 0 1735 528 438 1768 0 1630 0 1406 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.93 0.93 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 24.0 22.2 34.3 0.0 0.0 24.5 0.0 20.4 Incr Delay (d2), s/veh 0.0 1.3 1.9 9.2 0.3 0.0 3.8 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 5.6 3.2 3.3 0.1 0.0 11.7 0.0 4.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 25.3 24.1 43.5 0.3 0.0 28.4 0.0 20.8 LnGrp LOS A C C D A A C A C Approach Vol, veh/h 1157 690 1811 Approach Delay, s/veh 25.1 19.3 25.8 Approach LOS C B C Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 14.3 35.3 40.4 49.6 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s11.5 23.5 41.5 39.5 Max Q Clear Time (g_c+I1), s 9.6 16.0 29.5 2.0 Green Ext Time (p_c), s 0.2 4.2 6.4 2.8 Intersection Summary HCM 6th Ctrl Delay 24.4 HCM 6th LOS C Nakano LMA Appendix Page 162 of 194 AM Horizon Year 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 655 1330 0 0 575 1280 60 1 385 0 0 0 Future Volume (veh/h)655 1330 0 0 575 1280 60 1 385 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 712 1446 0 0 625 1391 65 1 418 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 30033333 Cap, veh/h 771 3673 0 0 1587 1209 305 5 471 Arrive On Green 0.45 1.00 0.00 0.00 0.45 0.45 0.17 0.17 0.17 Sat Flow, veh/h 3428 5233 0 0 3618 2686 1742 27 2694 Grp Volume(v), veh/h 712 1446 0 0 625 1391 66 0 418 Grp Sat Flow(s),veh/h/ln1714 1689 0 0 1763 1343 1768 0 1347 Q Serve(g_s), s 17.6 0.0 0.0 0.0 10.7 40.5 2.9 0.0 13.6 Cycle Q Clear(g_c), s 17.6 0.0 0.0 0.0 10.7 40.5 2.9 0.0 13.6 Prop In Lane 1.00 0.00 0.00 1.00 0.98 1.00 Lane Grp Cap(c), veh/h771 3673 0 0 1587 1209 309 0 471 V/C Ratio(X) 0.92 0.39 0.00 0.00 0.39 1.15 0.21 0.00 0.89 Avail Cap(c_a), veh/h 819 3673 0 0 1587 1209 314 0 479 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.61 0.61 0.00 0.00 0.28 0.28 1.00 0.00 1.00 Uniform Delay (d), s/veh24.0 0.0 0.0 0.0 16.5 24.7 31.8 0.0 36.3 Incr Delay (d2), s/veh 10.5 0.2 0.0 0.0 0.2 70.7 0.3 0.0 17.8 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.0 0.1 0.0 0.0 4.2 23.8 1.2 0.0 5.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 34.6 0.2 0.0 0.0 16.7 95.4 32.2 0.0 54.0 LnGrp LOS C AAABFCAD Approach Vol, veh/h 2158 2016 484 Approach Delay, s/veh 11.5 71.0 51.0 Approach LOS B E D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 69.8 24.7 45.0 20.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s65.0 21.5 39.0 16.0 Max Q Clear Time (g_c+I1), s2.0 19.6 42.5 15.6 Green Ext Time (p_c), s 16.7 0.6 0.0 0.1 Intersection Summary HCM 6th Ctrl Delay 41.4 HCM 6th LOS D Nakano LMA Appendix Page 163 of 194 AM Horizon Year 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 600 515 450 200 790 60 600 50 110 50 200 500 Future Volume (veh/h)600 515 450 200 790 60 600 50 110 50 200 500 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 652 560 489 217 859 65 652 54 120 54 217 543 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 443 1596 485 271 1341 407 438 206 459 95 1227 537 Arrive On Green 0.13 0.31 0.31 0.08 0.26 0.26 0.09 0.41 0.41 0.03 0.35 0.35 Sat Flow, veh/h 3428 5066 1541 3428 5066 1538 4983 505 1123 3428 3526 1542 Grp Volume(v), veh/h 652 560 489 217 859 65 652 0 174 54 217 543 Grp Sat Flow(s),veh/h/ln1714 1689 1541 1714 1689 1538 1661 0 1629 1714 1763 1542 Q Serve(g_s), s 15.6 10.3 38.0 7.5 18.1 3.9 10.6 0.0 8.5 1.9 5.2 42.0 Cycle Q Clear(g_c), s 15.6 10.3 38.0 7.5 18.1 3.9 10.6 0.0 8.5 1.9 5.2 42.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.69 1.00 1.00 Lane Grp Cap(c), veh/h443 1596 485 271 1341 407 438 0 665 95 1227 537 V/C Ratio(X) 1.47 0.35 1.01 0.80 0.64 0.16 1.49 0.00 0.26 0.57 0.18 1.01 Avail Cap(c_a), veh/h 443 1596 485 296 1341 407 438 0 665 151 1227 537 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.5 31.8 41.3 54.6 39.3 34.0 55.0 0.0 23.6 57.9 27.3 39.3 Incr Delay (d2), s/veh223.8 0.6 42.7 12.0 2.4 0.8 231.9 0.0 0.3 2.0 0.2 41.7 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln20.5 4.3 20.0 3.7 7.8 1.6 13.8 0.0 3.4 0.8 2.2 21.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh276.4 32.4 84.1 66.6 41.6 34.9 287.0 0.0 24.0 59.9 27.5 81.1 LnGrp LOS F C F E D C F A C E C F Approach Vol, veh/h 1701 1141 826 814 Approach Delay, s/veh 140.8 46.0 231.6 65.4 Approach LOS F D F E Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s13.9 44.4 15.0 47.3 20.0 38.3 7.7 54.6 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s10.4 * 38 10.6 42.0 15.6 31.3 5.3 47.3 Max Q Clear Time (g_c+I1), s9.5 40.0 12.6 44.0 17.6 20.1 3.9 10.5 Green Ext Time (p_c), s0.0 0.0 0.0 0.0 0.0 6.2 0.0 1.7 Intersection Summary HCM 6th Ctrl Delay 119.7 HCM 6th LOS F Nakano LMA Appendix Page 164 of 194 AM Horizon Year 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 250 740 0 Future Vol, veh/h 0 0 0 250 740 0 Conflicting Peds, #/hr 0 50005 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 272 804 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 412 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 586 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 581 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 165 of 194 AM Horizon Year 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 30 220 17 0 740 Future Vol, veh/h 0 30 220 17 0 740 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 33 239 18 0 804 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 129 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 894 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 894 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 9.2 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 894 - HCM Lane V/C Ratio - - 0.036 - HCM Control Delay (s) - - 9.2 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 166 of 194 AM Horizon Year 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 37 110 6 3 370 3 56 5 3 2 5 70 Future Volume (veh/h) 37 110 6 3 370 3 56 5 3 2 5 70 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.95 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 40 120 7 3 402 3 61 5 3 2 5 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333333333333 Cap, veh/h 62 970 56 6 914 7 85 275 165 4 20 303 Arrive On Green 0.04 0.29 0.29 0.00 0.25 0.25 0.05 0.26 0.26 0.00 0.21 0.21 Sat Flow, veh/h 1767 3379 195 1767 3585 27 1767 1076 646 1767 95 1445 Grp Volume(v), veh/h 40 62 65 3 198 207 61 0 8 2 0 81 Grp Sat Flow(s),veh/h/ln 1767 1763 1812 1767 1763 1849 1767 0 1722 1767 0 1540 Q Serve(g_s), s 1.0 1.1 1.1 0.1 4.0 4.0 1.5 0.0 0.1 0.0 0.0 1.9 Cycle Q Clear(g_c), s 1.0 1.1 1.1 0.1 4.0 4.0 1.5 0.0 0.1 0.0 0.0 1.9 Prop In Lane 1.00 0.11 1.00 0.01 1.00 0.38 1.00 0.94 Lane Grp Cap(c), veh/h 62 506 520 6 449 471 85 0 440 4 0 323 V/C Ratio(X) 0.64 0.12 0.12 0.52 0.44 0.44 0.72 0.00 0.02 0.49 0.00 0.25 Avail Cap(c_a), veh/h 272 1096 1127 189 998 1047 395 0 1408 189 0 1080 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.4 11.3 11.3 21.4 13.4 13.4 20.1 0.0 11.9 21.4 0.0 14.2 Incr Delay (d2), s/veh 10.4 0.1 0.1 57.2 0.7 0.6 10.7 0.0 0.0 68.8 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.4 0.4 0.1 1.4 1.5 0.8 0.0 0.1 0.1 0.0 0.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.9 11.4 11.4 78.6 14.1 14.1 30.8 0.0 12.0 90.2 0.0 14.6 LnGrp LOS C BBEBBCABFAB Approach Vol, veh/h 167 408 69 83 Approach Delay, s/veh 16.1 14.6 28.6 16.4 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.5 18.0 6.5 13.9 5.9 16.6 4.5 15.9 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.6 * 27 9.6 30.1 6.6 24.3 4.6 35.1 Max Q Clear Time (g_c+I1), s 2.1 3.1 3.5 3.9 3.0 6.0 2.0 2.1 Green Ext Time (p_c), s 0.0 0.6 0.0 0.4 0.0 2.2 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 16.5 HCM 6th LOS B Nakano LMA Appendix Page 167 of 194 PM Horizon Year 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 900 145 500 615 00001400 1 770 Future Volume (veh/h) 0 900 145 500 615 00001400 1 770 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 978 158 543 668 0 1523 0 837 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1236 375 596 1606 0 1660 0 1434 Arrive On Green 0.00 0.24 0.24 0.17 0.46 0.00 0.47 0.00 0.47 Sat Flow, veh/h 0 5233 1537 3428 3618 0 3534 0 3053 Grp Volume(v), veh/h 0 978 158 543 668 0 1523 0 837 Grp Sat Flow(s),veh/h/ln 0 1689 1537 1714 1763 0 1767 0 1527 Q Serve(g_s), s 0.0 21.7 10.4 18.7 15.3 0.0 48.2 0.0 24.0 Cycle Q Clear(g_c), s 0.0 21.7 10.4 18.7 15.3 0.0 48.2 0.0 24.0 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1236 375 596 1606 0 1660 0 1434 V/C Ratio(X)0.00 0.79 0.42 0.91 0.42 0.00 0.92 0.00 0.58 Avail Cap(c_a), veh/h 0 1236 375 614 1606 0 1723 0 1489 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.59 0.59 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 42.5 38.2 48.6 22.0 0.0 29.7 0.0 23.3 Incr Delay (d2), s/veh 0.0 5.2 3.4 11.5 0.5 0.0 8.1 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 9.6 4.3 8.9 6.4 0.0 21.7 0.0 8.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 47.7 41.7 60.2 22.4 0.0 37.8 0.0 23.8 LnGrp LOS A D D E C A D A C Approach Vol, veh/h 1136 1211 2360 Approach Delay, s/veh 46.9 39.4 32.8 Approach LOS D D C Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 25.4 33.8 60.9 59.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s21.5 26.5 58.5 52.5 Max Q Clear Time (g_c+I1), s20.7 23.7 50.2 17.3 Green Ext Time (p_c), s 0.2 1.8 6.2 5.3 Intersection Summary HCM 6th Ctrl Delay 37.9 HCM 6th LOS D Nakano LMA Appendix Page 168 of 194 PM Horizon Year 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 540 1760 0 0 1000 1380 115 1 620 0 0 0 Future Volume (veh/h)540 1760 0 0 1000 1380 115 1 620 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 587 1913 0 0 1087 1500 125 1 674 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 30033333 Cap, veh/h 654 3343 0 0 1478 1125 421 3 649 Arrive On Green 0.19 0.66 0.00 0.00 0.42 0.42 0.24 0.24 0.24 Sat Flow, veh/h 3428 5233 0 0 3618 2684 1754 14 2705 Grp Volume(v), veh/h 587 1913 0 0 1087 1500 126 0 674 Grp Sat Flow(s),veh/h/ln1714 1689 0 0 1763 1342 1768 0 1352 Q Serve(g_s), s 15.0 18.6 0.0 0.0 23.3 37.7 5.2 0.0 21.6 Cycle Q Clear(g_c), s 15.0 18.6 0.0 0.0 23.3 37.7 5.2 0.0 21.6 Prop In Lane 1.00 0.00 0.00 1.00 0.99 1.00 Lane Grp Cap(c), veh/h654 3343 0 0 1478 1125 424 0 649 V/C Ratio(X) 0.90 0.57 0.00 0.00 0.74 1.33 0.30 0.00 1.04 Avail Cap(c_a), veh/h 667 3343 0 0 1478 1125 424 0 649 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.32 0.32 0.00 0.00 0.30 0.30 1.00 0.00 1.00 Uniform Delay (d), s/veh35.5 8.4 0.0 0.0 22.0 26.1 28.0 0.0 34.2 Incr Delay (d2), s/veh 5.6 0.2 0.0 0.0 1.0 151.9 0.4 0.0 45.6 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.7 5.8 0.0 0.0 9.3 35.0 2.2 0.0 11.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 41.1 8.6 0.0 0.0 23.0 178.1 28.4 0.0 79.8 LnGrp LOS D A A A C F C A F Approach Vol, veh/h 2500 2587 800 Approach Delay, s/veh 16.2 112.9 71.7 Approach LOS B F E Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 63.9 21.7 42.2 26.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s59.4 17.5 37.4 21.6 Max Q Clear Time (g_c+I1), s20.6 17.0 39.7 23.6 Green Ext Time (p_c), s 22.1 0.1 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 66.2 HCM 6th LOS E Nakano LMA Appendix Page 169 of 194 PM Horizon Year 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 600 630 900 150 490 50 750 150 250 50 190 400 Future Volume (veh/h)600 630 900 150 490 50 750 150 250 50 190 400 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 652 685 978 163 533 54 815 163 272 54 207 435 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 427 1805 550 134 1373 417 535 248 413 97 1136 496 Arrive On Green 0.12 0.36 0.36 0.04 0.27 0.27 0.11 0.40 0.40 0.03 0.32 0.32 Sat Flow, veh/h 3428 5066 1542 3428 5066 1539 4983 617 1030 3428 3526 1541 Grp Volume(v), veh/h 652 685 978 163 533 54 815 0 435 54 207 435 Grp Sat Flow(s),veh/h/ln1714 1689 1542 1714 1689 1539 1661 0 1647 1714 1763 1541 Q Serve(g_s), s 14.6 11.8 41.8 4.6 10.1 3.1 12.6 0.0 25.2 1.8 5.0 31.3 Cycle Q Clear(g_c), s 14.6 11.8 41.8 4.6 10.1 3.1 12.6 0.0 25.2 1.8 5.0 31.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.63 1.00 1.00 Lane Grp Cap(c), veh/h427 1805 550 134 1373 417 535 0 661 97 1136 496 V/C Ratio(X) 1.53 0.38 1.78 1.21 0.39 0.13 1.52 0.00 0.66 0.56 0.18 0.88 Avail Cap(c_a), veh/h 427 1805 550 134 1373 417 535 0 692 155 1263 552 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh51.3 28.1 37.7 56.3 34.8 32.3 52.3 0.0 28.6 56.3 28.6 37.5 Incr Delay (d2), s/veh249.1 0.6 358.0 145.6 0.8 0.6 244.4 0.0 2.5 1.9 0.2 15.8 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln21.0 4.9 70.1 4.7 4.2 1.2 17.4 0.0 10.3 0.8 2.1 13.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh300.5 28.7 395.7 202.0 35.6 32.9 296.8 0.0 31.1 58.1 28.8 53.4 LnGrp LOS F C F F D C F A C E C D Approach Vol, veh/h 2315 750 1250 696 Approach Delay, s/veh 260.3 71.6 204.3 46.4 Approach LOS F E F D Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s9.0 48.2 17.0 43.1 19.0 38.2 7.7 52.4 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s4.6 * 42 12.6 42.0 14.6 30.3 5.3 49.3 Max Q Clear Time (g_c+I1), s6.6 43.8 14.6 33.3 16.6 12.1 3.8 27.2 Green Ext Time (p_c), s0.0 0.0 0.0 3.8 0.0 5.3 0.0 4.3 Intersection Summary HCM 6th Ctrl Delay 188.4 HCM 6th LOS F Nakano LMA Appendix Page 170 of 194 PM Horizon Year 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 660 390 0 Future Vol, veh/h 0 0 0 660 390 0 Conflicting Peds, #/hr 0 50005 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 0 0 717 424 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 222 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 779 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 773 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- - - - HCM Lane V/C Ratio - - - - HCM Control Delay (s) - 0 - - HCM Lane LOS - A - - HCM 95th %tile Q(veh) - - - - Nakano LMA Appendix Page 171 of 194 PM Horizon Year 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 11 600 41 0 390 Future Vol, veh/h 0 11 600 41 0 390 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 12 652 45 0 424 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 349 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 644 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 644 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s10.7 0 0 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 644 - HCM Lane V/C Ratio - - 0.019 - HCM Control Delay (s) - - 10.7 - HCM Lane LOS - - B - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 172 of 194 PM Horizon Year 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 114 330 30 10 190 4 36 3 7 1 5 38 Future Volume (veh/h) 114 330 30 10 190 4 36 3 7 1 5 38 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.95 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 124 359 33 11 207 4 39 3 8 1 5 41 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333333333333 Cap, veh/h 163 1055 96 20 860 17 61 103 275 4 34 279 Arrive On Green 0.09 0.32 0.32 0.01 0.24 0.24 0.03 0.23 0.23 0.00 0.20 0.20 Sat Flow, veh/h 1767 3256 297 1767 3534 68 1767 440 1172 1767 169 1384 Grp Volume(v), veh/h 124 193 199 11 103 108 39 0 11 1 0 46 Grp Sat Flow(s),veh/h/ln 1767 1763 1790 1767 1763 1839 1767 0 1612 1767 0 1553 Q Serve(g_s), s 3.1 3.8 3.8 0.3 2.1 2.1 1.0 0.0 0.2 0.0 0.0 1.1 Cycle Q Clear(g_c), s 3.1 3.8 3.8 0.3 2.1 2.1 1.0 0.0 0.2 0.0 0.0 1.1 Prop In Lane 1.00 0.17 1.00 0.04 1.00 0.73 1.00 0.89 Lane Grp Cap(c), veh/h 163 571 580 20 429 448 61 0 378 4 0 313 V/C Ratio(X) 0.76 0.34 0.34 0.55 0.24 0.24 0.64 0.00 0.03 0.26 0.00 0.15 Avail Cap(c_a), veh/h 531 1243 1263 160 858 895 195 0 1101 160 0 1030 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.0 11.6 11.6 22.2 13.8 13.8 21.6 0.0 13.3 22.6 0.0 14.9 Incr Delay (d2), s/veh 7.2 0.3 0.3 21.0 0.3 0.3 10.9 0.0 0.0 31.3 0.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.3 1.3 0.2 0.8 0.8 0.6 0.0 0.1 0.0 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.2 12.0 12.0 43.2 14.0 14.0 32.5 0.0 13.4 53.9 0.0 15.1 LnGrp LOS C B B D B B C A B D A B Approach Vol, veh/h 516 222 50 47 Approach Delay, s/veh 15.6 15.5 28.3 15.9 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.9 20.4 5.9 14.0 8.6 16.7 4.4 15.5 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 32 5.0 30.0 13.6 22.0 4.1 30.9 Max Q Clear Time (g_c+I1), s 2.3 5.8 3.0 3.1 5.1 4.1 2.0 2.2 Green Ext Time (p_c), s 0.0 2.4 0.0 0.2 0.2 1.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 16.4 HCM 6th LOS B Nakano LMA Appendix Page 173 of 194 AM Horizon Year Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB SB SB SB SB Directions Served T T T R L L T T L LT R R Maximum Queue (ft) 225 500 482 100 178 184 95 94 534 362 95 74 Average Queue (ft) 216 281 175 44 82 101 43 55 326 232 60 43 95th Queue (ft)244 485 365 76 151 156 76 87 471 358 91 73 Link Distance (ft)469 469 506 506 506 506 1650 1650 Upstream Blk Time (%)4 0 Queuing Penalty (veh)0 0 Storage Bay Dist (ft) 200 350 700 700 Storage Blk Time (%) 30 0 0 Queuing Penalty (veh) 90 1 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB EB WB WB WB WB WB NB NB Directions Served L L TTTTTTRRLTR Maximum Queue (ft) 268 258 176 151 174 281 157 129 200 212 114 178 Average Queue (ft) 163 182 73 71 96 83 45 57 114 128 50 76 95th Queue (ft)238 251 148 138 170 182 111 96 193 203 89 123 Link Distance (ft)506 506 506 506 506 1118 1118 1118 1118 1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)200 550 Storage Blk Time (%) 0 0 Queuing Penalty (veh)1 2 Intersection: 2: I-805 NB Ramp & Palm Ave Movement NB Directions Served R Maximum Queue (ft) 113 Average Queue (ft) 50 95th Queue (ft)90 Link Distance (ft)1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Nakano LMA Appendix Page 174 of 194 AM Horizon Year Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1136 1178 1117 215 162 254 472 400 522 255 Average Queue (ft) 285 295 610 363 130 122 71 115 207 360 479 130 95th Queue (ft)320 328 1174 988 471 210 147 206 413 505 499 324 Link Distance (ft)1118 1118 1118 400 400 400 Upstream Blk Time (%)7 1 0 3 1 76 Queuing Penalty (veh)39 7 0 0 0 0 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%)5 43 0 0 4 1 83 0 Queuing Penalty (veh) 9 74 0 0 6 1 50 0 Intersection: 3: Dennery Rd & Palm Ave Movement B14 B14 NB NB NB NB SB SB SB SB SB Directions Served T T L L L TR L L T T R Maximum Queue (ft) 333 369 274 291 300 810 52 149 468 653 120 Average Queue (ft) 286 325 67 273 298 778 9 42 93 354 120 95th Queue (ft)415 395 189 363 303 793 33 87 255 601 121 Link Distance (ft)306 306 758 1884 1884 Upstream Blk Time (%) 24 78 88 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft)275 275 275 125 125 95 Storage Blk Time (%)0 6 83 0 0 1 1 60 Queuing Penalty (veh)0 10 133 0 0 0 3 60 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft)74 48 73 31 155 177 54 29 31 70 Average Queue (ft)24 17 30 3 70 69 38 4 2 27 95th Queue (ft)58 42 65 19 120 129 56 21 15 60 Link Distance (ft)413 413 873 873 390 231 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)1 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 518 Nakano LMA Appendix Page 175 of 194 PM Horizon Year Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB SB SB SB SB Directions Served T T T R L L T T L LT R R Maximum Queue (ft) 225 484 469 67 208 225 200 206 545 504 155 178 Average Queue (ft) 200 273 223 39 143 159 117 131 356 314 86 78 95th Queue (ft)265 508 381 60 203 217 191 205 509 452 135 140 Link Distance (ft)469 469 506 506 506 506 1650 1650 Upstream Blk Time (%)6 0 Queuing Penalty (veh)0 0 Storage Bay Dist (ft) 200 350 700 700 Storage Blk Time (%) 31 3 0 Queuing Penalty (veh) 92 10 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB EB WB WB WB WB WB NB NB Directions Served L L TTTTTTRRLTR Maximum Queue (ft) 223 237 259 293 360 235 213 178 235 224 141 258 Average Queue (ft) 145 150 152 154 221 132 100 90 127 118 66 146 95th Queue (ft)198 208 230 253 318 232 179 155 202 192 120 230 Link Distance (ft)506 506 506 506 506 1118 1118 1118 1118 1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)200 550 Storage Blk Time (%) 0 0 Queuing Penalty (veh)3 1 Intersection: 2: I-805 NB Ramp & Palm Ave Movement NB Directions Served R Maximum Queue (ft) 201 Average Queue (ft) 114 95th Queue (ft)182 Link Distance (ft)1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Nakano LMA Appendix Page 176 of 194 PM Horizon Year Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 304 1142 1143 1158 215 172 192 174 263 285 255 Average Queue (ft) 207 227 287 753 1087 215 100 130 83 93 181 48 95th Queue (ft)296 301 824 1494 1268 215 153 177 141 169 272 167 Link Distance (ft)1118 1118 1118 400 400 400 Upstream Blk Time (%)0 1 12 Queuing Penalty (veh)1 10 91 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%)1 2 2 65 4 0 Queuing Penalty (veh) 2 5 15 136 2 0 Intersection: 3: Dennery Rd & Palm Ave Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 282 292 300 810 50 71 180 431 120 Average Queue (ft) 152 284 299 779 8 36 83 142 107 95th Queue (ft)283 328 302 797 31 65 130 300 136 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)80 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)0 23 76 9 1 1 23 Queuing Penalty (veh) 1 90 306 65 1 6 22 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR L TR TR Maximum Queue (ft) 129 118 135 31 77 93 81 31 94 Average Queue (ft) 66 44 58 4 44 41 26 6 26 95th Queue (ft)115 104 122 21 75 85 63 25 60 Link Distance (ft)413 413 873 873 390 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)2 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 1130 Nakano LMA Appendix Page 177 of 194 Appendix U Horizon Year 2062 plus Project LOS and Queuing Output Nakano LMA Appendix Page 178 of 194 AM Horizon Year + Project 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 895 175 298 374 00001111 1 570 Future Volume (veh/h) 0 895 175 298 374 00001111 1 570 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 973 190 324 407 0 1209 0 620 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1683 512 395 1753 0 1423 0 1227 Arrive On Green 0.00 0.33 0.33 0.23 0.99 0.00 0.40 0.00 0.40 Sat Flow, veh/h 0 5233 1541 3428 3618 0 3534 0 3049 Grp Volume(v), veh/h 0 973 190 324 407 0 1209 0 620 Grp Sat Flow(s),veh/h/ln 0 1689 1541 1714 1763 0 1767 0 1524 Q Serve(g_s), s 0.0 14.3 8.4 8.1 0.1 0.0 28.0 0.0 13.7 Cycle Q Clear(g_c), s 0.0 14.3 8.4 8.1 0.1 0.0 28.0 0.0 13.7 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1683 512 395 1753 0 1423 0 1227 V/C Ratio(X)0.00 0.58 0.37 0.82 0.23 0.00 0.85 0.00 0.51 Avail Cap(c_a), veh/h 0 1683 512 476 1753 0 1630 0 1406 HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.91 0.91 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 24.8 22.9 33.8 0.1 0.0 24.4 0.0 20.2 Incr Delay (d2), s/veh 0.0 1.5 2.1 8.6 0.3 0.0 4.0 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 5.8 3.3 3.4 0.1 0.0 11.9 0.0 4.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 26.3 24.9 42.3 0.4 0.0 28.4 0.0 20.5 LnGrp LOS A C C D A A C A C Approach Vol, veh/h 1163 731 1829 Approach Delay, s/veh 26.1 19.0 25.7 Approach LOS C B C Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 14.9 34.4 40.7 49.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s12.5 22.5 41.5 39.5 Max Q Clear Time (g_c+I1), s10.1 16.3 30.0 2.1 Green Ext Time (p_c), s 0.3 3.6 6.3 3.0 Intersection Summary HCM 6th Ctrl Delay 24.5 HCM 6th LOS C Nakano LMA Appendix Page 179 of 194 AM Horizon Year + Project 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 655 1351 0 0 613 1342 60 1 389 0 0 0 Future Volume (veh/h)655 1351 0 0 613 1342 60 1 389 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 712 1468 0 0 666 1459 65 1 423 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 30033333 Cap, veh/h 764 3666 0 0 1589 1211 307 5 475 Arrive On Green 0.45 1.00 0.00 0.00 0.45 0.45 0.18 0.18 0.18 Sat Flow, veh/h 3428 5233 0 0 3618 2686 1742 27 2694 Grp Volume(v), veh/h 712 1468 0 0 666 1459 66 0 423 Grp Sat Flow(s),veh/h/ln1714 1689 0 0 1763 1343 1768 0 1347 Q Serve(g_s), s 17.7 0.0 0.0 0.0 11.5 40.6 2.9 0.0 13.8 Cycle Q Clear(g_c), s 17.7 0.0 0.0 0.0 11.5 40.6 2.9 0.0 13.8 Prop In Lane 1.00 0.00 0.00 1.00 0.98 1.00 Lane Grp Cap(c), veh/h764 3666 0 0 1589 1211 312 0 475 V/C Ratio(X) 0.93 0.40 0.00 0.00 0.42 1.21 0.21 0.00 0.89 Avail Cap(c_a), veh/h 789 3666 0 0 1589 1211 314 0 479 HCM Platoon Ratio 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.58 0.58 0.00 0.00 0.13 0.13 1.00 0.00 1.00 Uniform Delay (d), s/veh24.3 0.0 0.0 0.0 16.7 24.7 31.7 0.0 36.2 Incr Delay (d2), s/veh 11.5 0.2 0.0 0.0 0.1 93.4 0.3 0.0 18.4 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.2 0.1 0.0 0.0 4.5 27.7 1.2 0.0 5.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 35.8 0.2 0.0 0.0 16.8 118.1 32.0 0.0 54.6 LnGrp LOS D AAABFCAD Approach Vol, veh/h 2180 2125 489 Approach Delay, s/veh 11.8 86.4 51.5 Approach LOS B F D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 69.6 24.6 45.1 20.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s65.0 20.7 39.8 16.0 Max Q Clear Time (g_c+I1), s2.0 19.7 42.6 15.8 Green Ext Time (p_c), s 17.1 0.3 0.0 0.1 Intersection Summary HCM 6th Ctrl Delay 48.9 HCM 6th LOS D Nakano LMA Appendix Page 180 of 194 AM Horizon Year + Project 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 625 515 450 200 790 62 600 53 110 59 210 600 Future Volume (veh/h)625 515 450 200 790 62 600 53 110 59 210 600 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 679 560 489 217 859 67 652 58 120 64 228 652 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 443 1596 485 271 1341 407 438 216 446 106 1227 537 Arrive On Green 0.13 0.31 0.31 0.08 0.26 0.26 0.09 0.41 0.41 0.03 0.35 0.35 Sat Flow, veh/h 3428 5066 1541 3428 5066 1538 4983 532 1101 3428 3526 1542 Grp Volume(v), veh/h 679 560 489 217 859 67 652 0 178 64 228 652 Grp Sat Flow(s),veh/h/ln1714 1689 1541 1714 1689 1538 1661 0 1633 1714 1763 1542 Q Serve(g_s), s 15.6 10.3 38.0 7.5 18.1 4.0 10.6 0.0 8.8 2.2 5.4 42.0 Cycle Q Clear(g_c), s 15.6 10.3 38.0 7.5 18.1 4.0 10.6 0.0 8.8 2.2 5.4 42.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.67 1.00 1.00 Lane Grp Cap(c), veh/h443 1596 485 271 1341 407 438 0 661 106 1227 537 V/C Ratio(X) 1.53 0.35 1.01 0.80 0.64 0.16 1.49 0.00 0.27 0.60 0.19 1.21 Avail Cap(c_a), veh/h 443 1596 485 296 1341 407 438 0 661 151 1227 537 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.5 31.8 41.3 54.6 39.3 34.1 55.0 0.0 24.0 57.7 27.4 39.3 Incr Delay (d2), s/veh250.4 0.6 42.7 12.0 2.4 0.9 231.9 0.0 0.3 2.0 0.2 112.8 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln22.1 4.3 20.0 3.7 7.8 1.6 13.8 0.0 3.5 1.0 2.3 32.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh302.9 32.4 84.1 66.6 41.6 35.0 287.0 0.0 24.3 59.8 27.6 152.1 LnGrp LOS F C F E D C F A C E C F Approach Vol, veh/h 1728 1143 830 944 Approach Delay, s/veh 153.3 46.0 230.6 115.8 Approach LOS F D F F Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s13.9 44.4 15.0 47.3 20.0 38.3 8.1 54.2 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s10.4 * 38 10.6 42.0 15.6 31.3 5.3 47.3 Max Q Clear Time (g_c+I1), s9.5 40.0 12.6 44.0 17.6 20.1 4.2 10.8 Green Ext Time (p_c), s0.0 0.0 0.0 0.0 0.0 6.2 0.0 1.7 Intersection Summary HCM 6th Ctrl Delay 133.1 HCM 6th LOS F Nakano LMA Appendix Page 181 of 194 AM Horizon Year + Project 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 1.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 122 0 283 740 31 Future Vol, veh/h 0 122 0 283 740 31 Conflicting Peds, #/hr 0 50005 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 133 0 308 804 34 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 429 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 571 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 566 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s13.3 0 0 HCM LOS B Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- 566 - - HCM Lane V/C Ratio - 0.234 - - HCM Control Delay (s) - 13.3 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.9 - - Nakano LMA Appendix Page 182 of 194 AM Horizon Year + Project 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 30 253 17 0 771 Future Vol, veh/h 0 30 253 17 0 771 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 33 275 18 0 838 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 147 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 870 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 870 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s 9.3 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 870 - HCM Lane V/C Ratio - - 0.037 - HCM Control Delay (s) - - 9.3 - HCM Lane LOS - - A - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 183 of 194 AM Horizon Year + Project 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 67 113 6 3 371 3 56 5 3 2 5 70 Future Volume (veh/h) 67 113 6 3 371 3 56 5 3 2 5 70 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.95 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 73 123 7 3 403 3 61 5 3 2 5 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333333333333 Cap, veh/h 95 1017 57 6 896 7 85 271 163 4 20 298 Arrive On Green 0.05 0.30 0.30 0.00 0.25 0.25 0.05 0.25 0.25 0.00 0.21 0.21 Sat Flow, veh/h 1767 3385 191 1767 3585 27 1767 1076 646 1767 95 1445 Grp Volume(v), veh/h 73 64 66 3 198 208 61 0 8 2 0 81 Grp Sat Flow(s),veh/h/ln 1767 1763 1813 1767 1763 1849 1767 0 1722 1767 0 1540 Q Serve(g_s), s 1.8 1.1 1.2 0.1 4.2 4.2 1.5 0.0 0.2 0.0 0.0 1.9 Cycle Q Clear(g_c), s 1.8 1.1 1.2 0.1 4.2 4.2 1.5 0.0 0.2 0.0 0.0 1.9 Prop In Lane 1.00 0.11 1.00 0.01 1.00 0.38 1.00 0.94 Lane Grp Cap(c), veh/h 95 530 545 6 441 462 85 0 434 4 0 318 V/C Ratio(X) 0.77 0.12 0.12 0.52 0.45 0.45 0.72 0.00 0.02 0.50 0.00 0.26 Avail Cap(c_a), veh/h 165 860 885 165 844 885 222 0 1233 165 0 1053 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.5 11.1 11.1 21.8 13.9 13.9 20.6 0.0 12.3 21.9 0.0 14.6 Incr Delay (d2), s/veh 12.2 0.1 0.1 57.3 0.7 0.7 11.0 0.0 0.0 72.2 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.4 0.4 0.1 1.5 1.6 0.8 0.0 0.1 0.1 0.0 0.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.7 11.2 11.2 79.1 14.6 14.6 31.6 0.0 12.4 94.0 0.0 15.0 LnGrp LOS C BBEBBCABFAB Approach Vol, veh/h 203 409 69 83 Approach Delay, s/veh 19.0 15.1 29.3 16.9 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 4.5 18.9 6.5 13.9 6.8 16.7 4.5 15.9 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 21 5.5 30.0 4.1 21.0 4.1 31.4 Max Q Clear Time (g_c+I1), s 2.1 3.2 3.5 3.9 3.8 6.2 2.0 2.2 Green Ext Time (p_c), s 0.0 0.6 0.0 0.4 0.0 2.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 17.6 HCM 6th LOS B Nakano LMA Appendix Page 184 of 194 PM Horizon Year + Project 1: I-805 SB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 921 145 509 624 00001468 1 770 Future Volume (veh/h) 0 921 145 509 624 00001468 1 770 Initial Q (Qb), veh 000000 000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 0 1856 1856 1856 1856 0 1856 1856 1856 Adj Flow Rate, veh/h 0 1001 158 553 678 0 1597 0 837 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %033330 333 Cap, veh/h 0 1177 357 586 1554 0 1712 0 1479 Arrive On Green 0.00 0.23 0.23 0.17 0.44 0.00 0.48 0.00 0.48 Sat Flow, veh/h 0 5233 1536 3428 3618 0 3534 0 3054 Grp Volume(v), veh/h 0 1001 158 553 678 0 1597 0 837 Grp Sat Flow(s),veh/h/ln 0 1689 1536 1714 1763 0 1767 0 1527 Q Serve(g_s), s 0.0 22.7 10.6 19.1 16.0 0.0 51.0 0.0 23.4 Cycle Q Clear(g_c), s 0.0 22.7 10.6 19.1 16.0 0.0 51.0 0.0 23.4 Prop In Lane 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 0 1177 357 586 1554 0 1712 0 1479 V/C Ratio(X)0.00 0.85 0.44 0.94 0.44 0.00 0.93 0.00 0.57 Avail Cap(c_a), veh/h 0 1177 357 586 1554 0 1752 0 1514 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 0.57 0.57 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 44.1 39.4 49.2 23.2 0.0 29.1 0.0 22.0 Incr Delay (d2), s/veh 0.0 7.8 3.9 16.4 0.5 0.0 9.6 0.0 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 10.3 4.4 9.5 6.7 0.0 23.1 0.0 8.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 0.0 51.9 43.4 65.6 23.8 0.0 38.7 0.0 22.4 LnGrp LOS A D D E C A D A C Approach Vol, veh/h 1159 1231 2434 Approach Delay, s/veh 50.7 42.5 33.1 Approach LOS D D C Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 25.0 32.4 62.6 57.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s20.5 26.5 59.5 51.5 Max Q Clear Time (g_c+I1), s21.1 24.7 53.0 18.0 Green Ext Time (p_c), s 0.0 1.2 5.1 5.3 Intersection Summary HCM 6th Ctrl Delay 39.7 HCM 6th LOS D Nakano LMA Appendix Page 185 of 194 PM Horizon Year + Project 2: I-805 NB Ramp & Palm Ave HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 540 1849 0 0 1018 1409 115 1 640 0 0 0 Future Volume (veh/h)540 1849 0 0 1018 1409 115 1 640 0 0 0 Initial Q (Qb), veh 0 00000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.97 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln1856 1856 0 0 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 587 2010 0 0 1107 1532 125 1 696 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 30033333 Cap, veh/h 640 3321 0 0 1477 1124 429 3 661 Arrive On Green 0.19 0.66 0.00 0.00 0.42 0.42 0.24 0.24 0.24 Sat Flow, veh/h 3428 5233 0 0 3618 2684 1754 14 2705 Grp Volume(v), veh/h 587 2010 0 0 1107 1532 126 0 696 Grp Sat Flow(s),veh/h/ln1714 1689 0 0 1763 1342 1768 0 1353 Q Serve(g_s), s 15.1 20.4 0.0 0.0 23.9 37.7 5.2 0.0 22.0 Cycle Q Clear(g_c), s 15.1 20.4 0.0 0.0 23.9 37.7 5.2 0.0 22.0 Prop In Lane 1.00 0.00 0.00 1.00 0.99 1.00 Lane Grp Cap(c), veh/h640 3321 0 0 1477 1124 432 0 661 V/C Ratio(X) 0.92 0.61 0.00 0.00 0.75 1.36 0.29 0.00 1.05 Avail Cap(c_a), veh/h 640 3321 0 0 1477 1124 432 0 661 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.25 0.25 0.00 0.00 0.23 0.23 1.00 0.00 1.00 Uniform Delay (d), s/veh35.9 8.9 0.0 0.0 22.2 26.1 27.7 0.0 34.0 Incr Delay (d2), s/veh 5.9 0.2 0.0 0.0 0.8 164.6 0.4 0.0 49.6 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln6.7 6.4 0.0 0.0 9.5 37.0 2.2 0.0 11.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 41.8 9.1 0.0 0.0 23.0 190.7 28.0 0.0 83.6 LnGrp LOS D A A A C F C A F Approach Vol, veh/h 2597 2639 822 Approach Delay, s/veh 16.5 120.4 75.1 Approach LOS B F E Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 63.5 21.3 42.2 26.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s59.0 16.8 37.7 22.0 Max Q Clear Time (g_c+I1), s22.4 17.1 39.7 24.0 Green Ext Time (p_c), s 22.8 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 69.7 HCM 6th LOS E Nakano LMA Appendix Page 186 of 194 PM Horizon Year + Project 3: Dennery Rd & Palm Ave/Ocean View Hills Pkwy HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 709 630 900 150 490 59 750 162 250 54 195 447 Future Volume (veh/h)709 630 900 150 490 59 750 162 250 54 195 447 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 771 685 978 163 533 64 815 176 272 59 212 486 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 33333333333 Cap, veh/h 416 1762 536 131 1340 407 522 269 416 99 1194 522 Arrive On Green 0.12 0.35 0.35 0.04 0.26 0.26 0.10 0.41 0.41 0.03 0.34 0.34 Sat Flow, veh/h 3428 5066 1542 3428 5066 1538 4983 649 1004 3428 3526 1542 Grp Volume(v), veh/h 771 685 978 163 533 64 815 0 448 59 212 486 Grp Sat Flow(s),veh/h/ln1714 1689 1542 1714 1689 1538 1661 0 1653 1714 1763 1542 Q Serve(g_s), s 14.6 12.3 41.8 4.6 10.4 3.8 12.6 0.0 26.2 2.0 5.1 36.6 Cycle Q Clear(g_c), s 14.6 12.3 41.8 4.6 10.4 3.8 12.6 0.0 26.2 2.0 5.1 36.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.61 1.00 1.00 Lane Grp Cap(c), veh/h416 1762 536 131 1340 407 522 0 685 99 1194 522 V/C Ratio(X) 1.85 0.39 1.82 1.24 0.40 0.16 1.56 0.00 0.65 0.59 0.18 0.93 Avail Cap(c_a), veh/h 416 1762 536 131 1340 407 522 0 685 151 1232 539 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh52.8 29.6 39.2 57.8 36.3 33.9 53.8 0.0 28.3 57.7 28.0 38.4 Incr Delay (d2), s/veh392.3 0.6 378.0 157.7 0.9 0.8 261.3 0.0 2.6 2.1 0.2 23.8 Initial Q Delay(d3),s/veh0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln29.0 5.1 71.8 4.9 4.4 1.5 17.9 0.0 10.7 0.9 2.2 17.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh445.1 30.2 417.2 215.5 37.2 34.7 315.1 0.0 30.9 59.8 28.1 62.2 LnGrp LOS F C F F D C F A C E C E Approach Vol, veh/h 2434 760 1263 757 Approach Delay, s/veh 317.1 75.2 214.3 52.5 Approach LOS F E F D Timer - Assigned Phs 1 2345678 Phs Duration (G+Y+Rc), s9.0 48.2 17.0 46.0 19.0 38.2 7.9 55.1 Change Period (Y+Rc), s4.4 * 6.4 4.4 5.3 4.4 6.4 4.4 5.3 Max Green Setting (Gmax), s4.6 * 42 12.6 42.0 14.6 30.3 5.3 49.3 Max Q Clear Time (g_c+I1), s6.6 43.8 14.6 38.6 16.6 12.4 4.0 28.2 Green Ext Time (p_c), s0.0 0.0 0.0 1.9 0.0 5.3 0.0 4.4 Intersection Summary HCM 6th Ctrl Delay 218.5 HCM 6th LOS F Nakano LMA Appendix Page 187 of 194 PM Horizon Year + Project 4: Dennery Rd & Project Access HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 57 0 791 390 133 Future Vol, veh/h 0 57 0 791 390 133 Conflicting Peds, #/hr 0 50005 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 62 0 860 424 145 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 295 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 698 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 692 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s10.7 0 0 HCM LOS B Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- 692 - - HCM Lane V/C Ratio - 0.09 - - HCM Control Delay (s) - 10.7 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.3 - - Nakano LMA Appendix Page 188 of 194 PM Horizon Year + Project 5: Dennery Rd & The Landing Dwy HCM 6th TWSC LOS Engineering, Inc. Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 11 731 41 0 523 Future Vol, veh/h 0 11 731 41 0 523 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, #0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 33333 Mvmt Flow 0 12 795 45 0 568 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 420 0 0 - - Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.96 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.33 - - - - Pot Cap-1 Maneuver 0 579 - - 0 - Stage 1 0 - - - 0 - Stage 2 0 - - - 0 - Platoon blocked, % - - - Mov Cap-1 Maneuver - 579 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach WB NB SB HCM Control Delay, s11.3 0 0 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)- - 579 - HCM Lane V/C Ratio - - 0.021 - HCM Control Delay (s) - - 11.3 - HCM Lane LOS - - B - HCM 95th %tile Q(veh) - - 0.1 - Nakano LMA Appendix Page 189 of 194 PM Horizon Year + Project 6: Red Coral Ln/Red Fin Ln & Dennery Rd HCM 6th Signalized Intersection Summary LOS Engineering, Inc. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 244 331 30 10 193 4 36 3 7 1 5 38 Future Volume (veh/h) 244 331 30 10 193 4 36 3 7 1 5 38 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.95 1.00 0.98 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 265 360 33 11 210 4 39 3 8 1 5 41 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333333333333 Cap, veh/h 329 1278 116 20 770 15 59 95 252 3 31 253 Arrive On Green 0.19 0.39 0.39 0.01 0.22 0.22 0.03 0.22 0.22 0.00 0.18 0.18 Sat Flow, veh/h 1767 3257 297 1767 3535 67 1767 439 1171 1767 168 1381 Grp Volume(v), veh/h 265 194 199 11 104 110 39 0 11 1 0 46 Grp Sat Flow(s),veh/h/ln 1767 1763 1791 1767 1763 1839 1767 0 1611 1767 0 1550 Q Serve(g_s), s 7.3 3.8 3.9 0.3 2.5 2.5 1.1 0.0 0.3 0.0 0.0 1.3 Cycle Q Clear(g_c), s 7.3 3.8 3.9 0.3 2.5 2.5 1.1 0.0 0.3 0.0 0.0 1.3 Prop In Lane 1.00 0.17 1.00 0.04 1.00 0.73 1.00 0.89 Lane Grp Cap(c), veh/h 329 692 703 20 384 401 59 0 347 3 0 284 V/C Ratio(X) 0.81 0.28 0.28 0.55 0.27 0.27 0.66 0.00 0.03 0.29 0.00 0.16 Avail Cap(c_a), veh/h 519 1132 1150 142 742 774 142 0 946 142 0 910 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.9 10.6 10.6 25.1 16.6 16.6 24.4 0.0 15.8 25.5 0.0 17.6 Incr Delay (d2), s/veh 5.0 0.2 0.2 21.5 0.4 0.4 12.1 0.0 0.0 40.6 0.0 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.2 1.3 1.3 0.2 1.0 1.0 0.6 0.0 0.1 0.1 0.0 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.0 10.8 10.8 46.6 17.0 17.0 36.5 0.0 15.9 66.1 0.0 17.8 LnGrp LOS C B B D B B D ABEAB Approach Vol, veh/h 658 225 50 47 Approach Delay, s/veh 16.5 18.4 31.9 18.9 Approach LOS B B C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 5.0 25.8 6.1 14.3 13.9 16.8 4.5 15.9 Change Period (Y+Rc), s 4.4 * 5.7 4.4 4.9 4.4 5.7 4.4 4.9 Max Green Setting (Gmax), s 4.1 * 33 4.1 30.0 15.0 21.5 4.1 30.0 Max Q Clear Time (g_c+I1), s 2.3 5.9 3.1 3.3 9.3 4.5 2.0 2.3 Green Ext Time (p_c), s 0.0 2.4 0.0 0.2 0.4 1.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 17.9 HCM 6th LOS B Nakano LMA Appendix Page 190 of 194 AM Horizon Year + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB SB SB SB SB Directions Served T T T R L L T T L LT R R Maximum Queue (ft) 225 484 482 74 180 179 90 115 521 473 94 92 Average Queue (ft) 220 370 252 44 79 100 35 48 350 262 59 47 95th Queue (ft)234 584 471 68 144 156 77 90 483 417 91 81 Link Distance (ft)469 469 506 506 506 506 1650 1650 Upstream Blk Time (%)8 0 Queuing Penalty (veh)0 0 Storage Bay Dist (ft) 200 350 700 700 Storage Blk Time (%) 42 0 0 Queuing Penalty (veh) 127 0 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB EB WB WB WB WB WB NB NB Directions Served L L TTTTTTRRLTR Maximum Queue (ft) 261 295 154 138 171 137 115 114 305 225 138 139 Average Queue (ft) 167 178 58 59 89 61 35 47 113 133 49 75 95th Queue (ft)249 255 123 116 168 128 82 85 198 207 109 124 Link Distance (ft)506 506 506 506 506 1118 1118 1118 1118 1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)200 550 Storage Blk Time (%) 0 0 Queuing Penalty (veh)3 1 Intersection: 2: I-805 NB Ramp & Palm Ave Movement NB Directions Served R Maximum Queue (ft) 111 Average Queue (ft) 52 95th Queue (ft)82 Link Distance (ft)1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Nakano LMA Appendix Page 191 of 194 AM Horizon Year + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1151 1132 1173 178 185 254 472 413 512 255 Average Queue (ft) 278 294 956 489 393 97 56 96 233 381 479 114 95th Queue (ft)329 331 1570 1253 1228 169 139 188 461 445 500 317 Link Distance (ft)1118 1118 1118 400 400 400 Upstream Blk Time (%)35 3 1 5 2 79 Queuing Penalty (veh)203 19 7 0 0 0 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 13 58 0 0 0 0 2 84 0 Queuing Penalty (veh) 22 99 0 0 0 1 5 52 0 Intersection: 3: Dennery Rd & Palm Ave Movement B14 B14 NB NB NB NB SB SB SB SB SB Directions Served T T L L L TR L L T T R Maximum Queue (ft) 345 358 272 292 300 821 68 150 517 868 120 Average Queue (ft) 300 323 90 281 299 778 11 42 171 519 119 95th Queue (ft)400 358 221 344 301 796 41 117 392 865 124 Link Distance (ft)306 306 758 1884 1884 Upstream Blk Time (%) 42 77 89 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft)275 275 275 125 125 95 Storage Blk Time (%)0 12 84 0 0 7 6 65 Queuing Penalty (veh)0 19 137 1 0 4 34 69 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft)73 52 97 31 140 126 71 31 31 56 Average Queue (ft)42 17 30 6 70 63 40 1 2 33 95th Queue (ft)79 43 77 26 119 113 69 10 14 54 Link Distance (ft)413 413 873 873 390 231 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)2 Queuing Penalty (veh)0 Network Summary Network wide Queuing Penalty: 811 Nakano LMA Appendix Page 192 of 194 PM Horizon Year + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 1: I-805 SB Ramp & Palm Ave Movement EB EB EB EB WB WB WB WB SB SB SB SB Directions Served T T T R L L T T L LT R R Maximum Queue (ft) 225 484 406 375 241 303 224 231 1028 1013 725 155 Average Queue (ft) 196 281 228 52 149 162 99 113 557 496 141 84 95th Queue (ft)268 468 353 154 214 234 174 179 916 859 463 137 Link Distance (ft)469 469 506 506 506 506 1650 1650 Upstream Blk Time (%)4 Queuing Penalty (veh)0 Storage Bay Dist (ft) 200 350 700 700 Storage Blk Time (%) 28 3 0 1 0 Queuing Penalty (veh) 87 8 0 8 0 Intersection: 2: I-805 NB Ramp & Palm Ave Movement EB EB EB EB EB WB WB WB WB WB NB NB Directions Served L L TTTTTTRRLTR Maximum Queue (ft) 280 498 506 532 513 265 247 141 619 225 144 501 Average Queue (ft) 148 201 254 238 263 131 108 89 159 128 72 195 95th Queue (ft)225 394 460 427 421 218 187 142 330 215 129 354 Link Distance (ft)506 506 506 506 506 1118 1118 1118 1118 1450 Upstream Blk Time (%)0010 Queuing Penalty (veh)0131 Storage Bay Dist (ft)200 550 Storage Blk Time (%) 1 0 Queuing Penalty (veh)7 1 Intersection: 2: I-805 NB Ramp & Palm Ave Movement NB Directions Served R Maximum Queue (ft) 459 Average Queue (ft) 179 95th Queue (ft)330 Link Distance (ft)1450 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Nakano LMA Appendix Page 193 of 194 PM Horizon Year + Project Queuing and Blocking Report LOS Engineering, Inc.SimTraffic Report Intersection: 3: Dennery Rd & Palm Ave Movement EB EB EB EB EB EB WB WB WB WB WB WB Directions Served L L T T T R L L T T T R Maximum Queue (ft) 292 305 1142 1167 1168 215 140 156 136 266 304 255 Average Queue (ft) 288 302 1088 710 739 207 65 102 75 95 179 55 95th Queue (ft)302 308 1258 1487 1331 254 134 150 126 186 274 183 Link Distance (ft)1118 1118 1118 400 400 400 Upstream Blk Time (%)36 9 2 Queuing Penalty (veh) 300 78 18 Storage Bay Dist (ft) 280 280 190 230 230 230 Storage Blk Time (%) 24 64 3 1 49 4 0 Queuing Penalty (veh) 50 135 19 13 104 3 0 Intersection: 3: Dennery Rd & Palm Ave Movement NB NB NB NB SB SB SB SB SB Directions Served L L L TR L L T T R Maximum Queue (ft) 282 292 300 810 130 149 270 435 120 Average Queue (ft) 99 274 298 780 13 49 92 150 109 95th Queue (ft)242 363 303 798 56 103 181 322 139 Link Distance (ft)758 1884 1884 Upstream Blk Time (%)81 Queuing Penalty (veh)0 Storage Bay Dist (ft) 275 275 275 125 125 95 Storage Blk Time (%)0 14 79 0003528 Queuing Penalty (veh) 1 59 326 10022427 Intersection: 6: Red Coral Ln/Red Fin Ln & Dennery Rd Movement EB EB EB WB WB WB NB NB SB Directions Served L T TR L T TR L TR TR Maximum Queue (ft) 215 302 139 31 94 75 68 31 50 Average Queue (ft) 126 50 64 11 45 42 30 5 19 95th Queue (ft)207 143 126 34 73 85 61 24 45 Link Distance (ft)413 413 873 873 390 231 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 160 75 Storage Blk Time (%)3 0 Queuing Penalty (veh) 6 0 Network Summary Network wide Queuing Penalty: 1653 Nakano LMA Appendix Page 194 of 194