HomeMy WebLinkAboutAttachment 8S - Sewer StudyCity of Chula Vista PRELIMINARY SEWER STUDY For: Nirvana Business Park DR21-0024 821 Main Street Chula Vista, CA 91911 APN: 644-050-13, 644-050-14 & 644-050-80 Project Permit # DR21-0024 Prepared By: 3-4-2022 Gregory W. Lang, P.E. RCE 68075 EXP: 06-30-23 Pasco Laret Suiter & Associates, Inc. 535 N. Highway 101, Suite A Solana Beach, CA 92075 Prepared for: VWP-OP Nirvana Owner, LLC 2390 E. Camelback Rd. Ste. 305 Phoenix, AZ 85016 March 4, 2022 PLSA Job No. 3668 Preliminary Sewer Study March 2022 Nirvana Business Park ii Table of Contents Section 1 - Introduction .................................................................................................................... 1 Section 2 – Project Description ........................................................................................................ 1 2.1 Project Location ...................................................................................................................... 1 2.2 Proposed Project ..................................................................................................................... 2 2.3 Study Area .............................................................................................................................. 2 2.4 Sewage Generation Rates ....................................................................................................... 8 Section 3 – Sanitary Sewer Analysis ................................................................................................ 9 3.1 Model Methodology ............................................................................................................... 9 2.2 Hydraulic Analysis Results .................................................................................................. 10 Section 4 – Conclusions ................................................................................................................. 10 Section 5 – Appendices .................................................................................................................. 12 Preliminary Sewer Study March 2022 Nirvana Business Park iii Figure Index Figure 2-1 Project Site ...................................................................................................................... 1 Figure 2-2 Proposed Site Layout ...................................................................................................... 3 Figure 2-3 Sanitary System Sewer Map and Study Area ................................................................. 4 Figure 2-4 Sanitary System Node Map ........................................................................................ 5-6 Figure 2-5 Sanitary Sewer Exhibit ................................................................................................... 7 Figure 3-1 Sanitary Sewer Study Summary (Hydraulic Model Results) ....................................... 11 Table Index Table 2-1 Sewer Generation Rates based on Lot Area ..................................................................... 8 Table 2-2 Sewer Generation Rates based on Building Square Footage ........................................... 8 Preliminary Sewer Study March 2022 Nirvana Business Park 1 Section 1 – Introduction This report provides background data, analysis, and a summary of results as part of a preliminary sanitary sewer system study for the proposed Nirvana Business Park project. The purpose of this study is to ascertain the potential impact of the proposed project on the existing sanitary sewer system and to verify that sufficient capacity exists within the existing sewer facilities. The design for this sewer study was completed in accordance with the design criteria listed in the City of Chula Vista’s Subdivision Manual (Revised 03-13-2012), the City of Chula Vista Wastewater Collection Master Plan (May 2014), and the Sewer System Management Plan (April 2021). Section 2 – Project Description 2.1 Project Location: The proposed Nirvana Business Park project is comprised of 13.31 acres, located at 821 Main Street in the City of Chula Vista, San Diego County, California (APN 644-050-13, 14 and a portion of 644-050-80). The property is defined as Parcel 1 and 2 of Parcel Map 21587 and a portion of Lot 2, Sec 20, T18S, R1E San Bernadino Meridian of ROS 16999. The site is bounded on the north by automobile salvage yards, on the west by commercial buildings, on the south by Main Street, and on the east by the Otay Ranch Village 3 development. The entire project site is currently undeveloped. See Figure 2.1 for vicinity map. Figure 2-1 Vicinity Map Preliminary Sewer Study March 2022 Nirvana Business Park 2 2.2 Proposed Project: The proposed project at 821 Main Street will construct four buildings as follows: • Building 1 – a 59,044 square-foot warehouse with office and mezzanine • Building 2 – a 44,592 square-foot warehouse with office and mezzanine • Building 3 – a 140,802 square-foot, 3-story self-storage building • Building 4 – a 50,030 warehouse with office and mezzanine Total building square footage = 294,468 square-feet The site is General Plan designated IL – Limited Industrial and Zoned (ILP) Limited Industrial. The proposed light industrial uses include primarily warehouse and manufacturing, assembly, storage, and warehouse distribution. The self-storage facility will feature interior and exterior accessible storage spaces, with surface loading and elevators for upper floors. Hours of operation for the business park are planned to be Monday through Friday 6:00 a.m. to 6:00 p.m. and Saturday 6:00 a.m. to noon. The self-storage facilities will have 24/7 access. Please refer to Figure 2-2 on the following page for schematic site layout. 2.3 Study Area: The project’s study area, shown in Figure 2-3, generally encompasses existing parcels abutting Energy Way and Nirvana Avenue as well as along Main Street between Heritage Road and Nirvana Avenue. The primary zoning in the area consists of limited industrial (IL) per the city’s 2005 General Plan. In accordance with the requirements specified in the preliminary permit review submittal comments, the proposed project is required to prepare a sewer system study with manhole-to-manhole calculations performed from the upstream sewer system reach on Energy Way downstream to the connection to the existing 10-inch sewer in Main Street, south of Nirvana Avenue. Please refer to Figure 2-4 for Sanitary System Node Map. The proposed project will connect to an existing 8-inch PVC gravity sewer located west of the project site in Nirvana Avenue (see Figure 2-5). The 8-inch sewer main in Nirvana Avenue flows southwesterly and connects to an existing 10-inch sewer main in Main Street at an existing manhole located in the intersection of Nirvana Avenue and Main Street. There is no additional sanitary sewer flow from the east along Main Street at this manhole location. The existing 10-inch sanitary sewer main flows westerly in Main Street approximately 5,800 lineal feet to the intersection of I-805 and Main Street and then an additional 2,100 lineal feet to the intersection of Otay Valley Road and Main Street. Please refer to the City of Chula Vista’s CV Mapper website for GIS wastewater systems. The existing 8-inch sewer mains in both Energy Way and Nirvana Avenue and the existing 10-inch sewer main in Main Street were all constructed in during the 1970s and are generally comprised of PVC pipe. The systems were installed under Work Order No. EY026 (Drawing No. 75-105D through Drawing No. 75-111D). The existing branch connecting sewers along Main Street and west of Brandywine Avenue are generally comprised of vitrified clay pipe (VCP). Preliminary Sewer Study March 2022 Nirvana Business Park 8 2.4 Sewer Generation Rates: Preliminary sewer generation rates for the proposed development are based on the planning requirements provided in the City of Chula Vista Subdivision Design Manual and the City of Chula Vista Wastewater Collection System Master Plan, May 2014. The Wastewater Master Plan methodology calculates sanitary flows based on the current or planned parcel zoning, lot area, and duty factor demands obtained from Table 3-2 of the Wastewater Master Plan. The Average Dry Weather Flow (ADWF) was calculated for the proposed site as shown in Table 2-1 below. As a comparison, an alternative method for calculating the ADWF is provided in Table 2-2 on the following page. The alternative method utilizes a combination of duty factor demands and known building square footage. Proposed building areas were previously provided in Section 2.2. Table 2-1 Sewer Generation Rates based on Lot Area Net Acreage = 13.31 ac Duty Factor = 712 gpd/ac AVERAGE DRY WEATHER FLOW = Net Acreage (ac) * Duty Factor (gpd/ac) = 13.31 ac * 712 gpd/ac = 9,477 gpd Table 2-2 Sewer Generation Rates based on Building Square Footage Building Square Footage = 294,468 sf Duty Factor = 80 gpd/1000 sf ADWF = Building Square Footage (sf) * Duty Factor (gpd/1000 sf) = 294,468 sf * 80 gpd/1000 sf AVERAGE DRY WEATHER FLOW = 23,557 gpd Based on the above methods of calculating the ADWF, the more conservative ADWF of 23,557 gpd will be utilized as the basis of determining equivalent population and sanitary flows from the proposed site during sewer modeling in Section 3 of this report. Preliminary Sewer Study March 2022 Nirvana Business Park 9 Section 3 – Sanitary Sewer Analysis This section of the study report discusses the hydraulic analysis of the existing sewer system with new flows from the proposed Nirvana Business Park project. 3.1 Model Methodology: A Microsoft Excel spreadsheet was utilized to perform the hydraulic analysis of the existing sanitary sewer with the Study Area. Each reach or “Line” of the existing sanitary sewer system includes the upstream and downstream manhole designations, invert elevations, length, and diameter of the sewer. Sewer lengths and inverts were obtained from GIS sewer manhole and sewer main shape files used on the City of Chula Vista GIS website, and from as-built sewer data also obtained by the City of Chula Vista. The Average Dry Weather Flow (ADWF) was calculated for each reach by the product of the cumulative sanitary flow rate. Peak Wet Weather Flow (PWWF) was calculated for each reach by multiplying the ADWF by the calculated Peaking Factor for Wet Weather Flow. In accordance with the direction received from the City of San Diego Public Utilities Department, the peaking factor used was 1.85, found from Chapter 3.3.6 of the City of Chula Vista Wastewater Collection System Master Plan (May 2014). The pipe capacity was calculated utilizing Manning’s Equation and a Manning’s “n” value of 0.013. The ratio of actual depth to pipe diameter (d/D) was calculated by using an Excel algorithm to select the appropriate d/D (to the nearest 0.1 increment) based on the corresponding ratio of calculated ADWF to full pipe flow (Q/Qfull). Existing wastewater flows for reach DD between manholes were found from Appendix 2 of the City of Chula Vista Wastewater Collection System Master Plan, May 2014. The Average Dry Weather Flow (ADWF), the Peak Wet Weather Flow (PWWF), and the Peak Wet Weather Flow d/D were input into the Microsoft Excel Spreadsheet. The downstream system has been studied to the point in the system where the projected peak wet weather flow from the proposed development is less than 10% of the total flow, in accordance with Section 1.7.1 of the City of San Diego Sewer Design Guide (2013). 3.2 Hydraulic Analysis Results: The results of the hydraulic analysis model are shown in the Sanitary Sewer Study Summary provided in Figure 3-1 at the end of this section. The results are summarized as follows: 1. The d/D ratios for existing peak flows along the 8-inch diameter Energy Way and Nirvana Avenue sanitary sewer, from just upstream of the project’s point of connection (Line A through N) range from 0.04 to 0.24. Normal depth along the stretch of sewer ranges from 0.03 to 0.16. 2. The d/D ratios for proposed peak flows along the 8-inch diameter Nirvana Avenue and Main Street sanitary sewer, from just downstream of the project’s point of connection (Line O through Z) range from 0.20 to 0.41. Normal depth along the stretch of sewer ranges from 0.13 to 0.34. Preliminary Sewer Study March 2022 Nirvana Business Park 10 Section 4 – Conclusions The analysis demonstrates that while there is an increase in the planned flow in the existing sewer main in Nirvana Avenue with the proposed project, the projected peak wet weather flows in the analyzed, existing sewer mains do not exceed a d/D of 0.7 as required per Table 4-1 of the City of Chula Vista Wastewater Collection System Master Plan (May 2014) and per Page 36 of the City of Chula Vista Sewer System Management Plan (April 2021). Therefore, it is our opinion that the existing sewer infrastructure located in Nirvana Avenue and Main Street have sufficient capacity to convey the anticipated sewer flows from the proposed project per the criteria listed in the city’s Wastewater Master Plan. Furthermore, the project should not be required to upsize the existing sewer mains in Nirvana Avenue since an impact to the existing sewer infrastructure does not occur in the area analyzed. DATE: 3/4/2022 BY: PLSA PREPARED BY: MM JOB NO. REFER TO FIGURE 2-4 MANNING N : 0.013 gpd gpd mgd cfs A 5085 5084 Energy Way 7.43 Industrial 712 5,290 N/A N/A N/A N/A N/A 5,290 1.85 9,787 0.010 0.02 8 225 1.67 0.03 0.04 0.06 1.29 B 5084 5083 Energy Way 13.68 Industrial 712 9,740 N/A N/A N/A N/A N/A 15,030 1.85 27,806 0.028 0.04 8 400 0.63 0.06 0.09 0.14 1.36 C 5083 5082 Energy Way 11.79 Industrial 712 8,394 N/A N/A N/A N/A N/A 23,425 1.85 43,336 0.043 0.07 8 380 3.32 0.05 0.07 0.11 2.69 D 5082 5081 Energy Way 5.30 Industrial 712 3,774 N/A N/A N/A N/A N/A 27,198 1.85 50,317 0.050 0.08 8 300 0.40 0.08 0.14 0.21 1.39 E 5081 5078 Energy Way 9.45 Industrial 712 6,728 N/A N/A N/A N/A N/A 33,927 1.85 62,765 0.063 0.10 8 300 0.40 0.09 0.16 0.24 1.50 F 5078 5077 Energy Way 8.89 Industrial 712 6,330 N/A N/A N/A N/A N/A 40,256 1.85 74,474 0.074 0.12 8 300 0.67 0.09 0.15 0.23 1.89 G 5077 5076 Energy Way 5.19 Industrial 712 3,695 N/A N/A N/A N/A N/A 43,952 1.85 81,311 0.081 0.13 8 248 3.23 0.07 0.11 0.16 3.34 H 5074 5073 Energy Way 2.42 Industrial 712 1,723 N/A N/A N/A N/A N/A 1,723 1.85 3,188 0.003 0.00 8 191 1.33 0.02 0.03 0.04 0.89 I 5072 5073 Private Road 11.94 Industrial 712 8,501 N/A N/A N/A N/A N/A 8,501 1.85 15,727 0.016 0.02 6 568 2.00 0.04 0.06 0.12 1.82 J 5073 5075 Energy Way 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 10,224 1.85 18,915 0.019 0.03 8 24 2.48 0.03 0.05 0.08 1.90 K 5075 5076 Energy Way 1.66 Industrial 712 1,182 N/A N/A N/A N/A N/A 55,358 1.85 102,412 0.102 0.16 8 282 2.48 0.08 0.13 0.19 3.25 L 5076 5102 Nirvana Ave 3.00 Industrial 712 2,136 N/A N/A N/A N/A N/A 57,494 1.85 106,364 0.106 0.16 8 240 3.75 0.07 0.11 0.17 3.74 M 5102 5120 Nirvana Ave 7.07 Industrial 712 5,034 N/A N/A N/A N/A N/A 62,528 1.85 115,677 0.116 0.18 8 320 6.72 0.07 0.11 0.16 4.82 N 5120 5140 Nirvana Ave 3.77 Industrial 712 2,684 N/A N/A N/A N/A N/A 65,212 1.85 120,642 0.121 0.19 8 320 6.72 0.07 0.11 0.16 4.82 13.31 Industrial 712 9,477 294,468 80 N/A N/A 23,557 23,557 1.85 43,581 0.044 0.07 Project Nirvana O 5140 5145 Nirvana Ave 0.92 Industrial 712 655 N/A N/A N/A N/A N/A 89,425 1.85 165,435 0.165 0.26 8 300 4.17 0.08 0.14 0.21 4.48 P 5145 5146 Nirvana Ave 3.25 Industrial 712 2,314 N/A N/A N/A N/A N/A 91,739 1.85 169,716 0.170 0.26 8 300 4.17 0.09 0.15 0.22 4.60 Q 5146 5151 Nirvana Ave 1.05 Industrial 712 748 N/A N/A N/A N/A N/A 92,486 1.85 171,099 0.171 0.26 8 181 1.40 0.11 0.19 0.29 3.12 R 5151 5158 Nirvana Ave 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 92,486 1.85 171,099 0.171 0.26 8 112 0.50 0.14 0.25 0.38 2.15 S 5158 5152 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 92,486 1.85 171,099 0.171 0.26 10 254 0.25 0.15 0.28 0.33 1.64 T 5152 5147 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 92,486 1.85 171,099 0.171 0.26 10 317 0.25 0.15 0.28 0.33 1.64 U 5147 5148 Main Street 63.74 Industrial 712 45,383 N/A N/A N/A N/A N/A 137,869 1.85 255,058 0.255 0.39 10 317 0.25 0.18 0.34 0.41 1.83 V 5148 7279 Main Street 1.81 Industrial 712 1,289 N/A N/A N/A N/A N/A 139,158 1.85 257,442 0.257 0.40 10 317 0.25 0.18 0.34 0.41 1.83 W 7279 7281 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 139,158 1.85 257,442 0.257 0.40 10 317 0.25 0.18 0.34 0.41 1.83 X 7281 7284 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 139,158 1.85 257,442 0.257 0.40 10 317 0.25 0.18 0.34 0.41 1.83 Y 7284 7291 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 139,158 1.85 257,442 0.257 0.40 10 317 0.25 0.18 0.34 0.41 1.83 Z 7291 7283 Main Street 8.51 Industrial 712 6,059 N/A N/A N/A N/A N/A 145,217 1.85 268,651 0.269 0.42 10 317 0.25 0.18 0.35 0.42 1.86 AA 7283 7282 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 145,217 1.85 268,651 0.269 0.42 10 305 0.25 0.18 0.35 0.42 1.86 BB 16681 7280 Main Street 29.00 Industrial 712 20,648 N/A N/A N/A N/A N/A 165,865 1.85 306,850 0.307 0.47 10 450 0.25 0.20 0.38 0.46 1.94 CC 7280 7278 Main Street 0.00 Industrial 712 0 N/A N/A N/A N/A N/A 165,865 1.85 306,850 0.307 0.47 10 449 0.33 0.18 0.35 0.42 2.13 DD 7278 7277 Main Street N/A N/A N/A N/A N/A 288,042 2.00 576,629 0.577 0.89 10 384 0.33 0.24 0.52 0.62 0.523 PDWF provided from Appendix 2(5) Notes (1) Per 2005 General Plan, code designation IL (2) Per Table 3-3: Landuse Zoning Designations of the City of Chula Vista Wastewater Collection System Master Plan May 2014 (3) Per Table 3-2: Wastewater Duty Factors of the City of Chula Vista Wastewater Collection System Master Plan May 2014 (4) Wet Weather Peaking Factor from Chapter 3.3.6 of the City of Chula Vista Wastewater Collection System Master Plan May 2014 (5) Appendix 2 of City of Chula Vista Wastewater Master Plan (May 2014) (6) Uses the more conservative value of ADWF calculated from in-line area and building square footage Remarks Pipe Length (ft) Design Slope (%) Hydraulic Radius Rh (ft) Normal Depth dn (ft) PWWF dn/D Velocity (ft/sec) From MH To MH In-Line Area Served In-Line Area (Acres) Land Use (1) Cum. Total Avg. Dry Weather Flow (ADWF)(6) Duty Factor (gpd/ac)(2) Avg. Dry Weather Flow (gpd) Duty Factor (gpd/DU)(3) PIPE REACH Duty Factor (gpd/1000 sf)(3) Building Square Footage (sf) Avg. Dry Weather Flow (gpd) Wet Weather Peaking Factor(4) Dwelling Units Peak Wet Weather Flow (PWWF)Line Size D (in) NIRVANA BUSINESS PARK FIGURE 3-1 PWWF dn/D Project Nirvana SANITARY SEWER STUDY SUMMARY 3668 ASSUMED IN-LINE AREA = DEVELOPABLE LOT AREA Preliminary Sewer Study March 2022 Nirvana Business Park 12 Section 5 – Appendices 1. City of Chula Vista Wastewater Collection System Master Plan, 2014 – Wastewater Duty Factors and Landuse Zoning Designations (Table 3-2 and Table 3-3, pages 3-9 and 3-10) 2. City of Chula Vista Wastewater Collection System Master Plan, 2014 – Pipeline Design Criteria (Table 4-1, page 4-1) 3. City of Chula Vista Sewer System Management Plan, April 2021 –Design Criteria (page 36) 4. City of San Diego Sewer Design Guide, 2013 – Chapter 1.7.1 Required Capacity Downstream of New Gravity Sewers (page 1-13)