Loading...
HomeMy WebLinkAboutAttachment 8R - Addendum No. 2 to Geotechnical InvestigationGROCON INCORPORATED GEOTECHNICAL • ENVIRONMENTAL MATERIALSO 6960 Flanders Drive • San Diego, California 92121-2974 • Telephone 858.558.6900 • Fax 858.558.6159 Project No. G2755-42-01 March 21, 2022 VWP-OP Nirvana Owner, LLC 2390 East Camelback Road, Suite 305 Phoenix, Arizona 85016 Attention: Mr. Steven Schwarz Subject: ADDENDUM NO. 2 TO GEOTECHNICAL INVESTIGATION NIRVANA INDUSTRIAL BUILDINGS AND SELF-STORAGE COMPLEX 821 MAIN STREET CHULA VISTA, CALIFORNIA References: 1. Addendum to Geotechnical Investigation, Nirvana Industrial Buildings and Self Storage Complex, 821 Main Street, Chula Vista, California, prepared by Geocon Incorporated, dated February 18, 2022 (Project No. G2755-42-01). 2. Preliminary Geotechnical Investigation, Nirvana Industrial Buildings and Self Storage Complex, 821 Main Street, Chula Vista, California, prepared by Geocon Incorporated, dated September 14, 2021 (Project No. G2755-42-01). 3. Grading Plan, OnPoint Development Project Nirvana, 821 Main Street, Chula Vista, CA 91911, prepared by Pasco Laret Suiter & Associates, undated. Dear Mr. Schwarz: In accordance with the request of Mr. Andrew Gracey, we prepared this addendum to the geotechnical investigation for the subject project to provide an updated project description and geologic map based on the lasted grading plan (Reference 3). Reference 2 indicated wall heights up to 40 feet. Based on the latest plans, walls with heights up to 48-feet are planned. The recommendations contained in Reference 1 and 2 remain applicable for the planned wall heights up to 48 feet. Figure 1 provides an updated geologic map for the project based on Reference 3. Based on our review of the grading plan, the geotechnical recommendations contained in References 1 and 2 remain applicable. If you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED Rodney C. Mikesell GE 2533 RCM:am (e-mail) Addressee 136.6 136.3 136.8 137.1 138.1 137.9 138.1 137.5 137.2 136.2 135.9 135.1 135.1 134.4 134.2 133.5 133.2 132.4 132.2 131.5 131.3 130.7 130.5 129.9 130.2 129.6 129.4 129.9 130.8 131.7 132.3 133.8 135.5 136.9 135.6 134.7 133.8 133.1 131.8 131.2 130.2 129.7 131.2 136.9 134.4 142.8 137.5 153.2 149.4 148.6 158.6 174.3 218.7 222.5 223.4 217.2 218.6 219.7 219.9 220.3 221.7 227.9 233.7 235.5 194.2 191.9 201.5 197.3 193.5 189.4 134.4 136.4 137.6137.1135.5 134.1 198.5 220.5 219.5 217.7 181.3 179.3 180.1 178.8 178.3 176.9 177.2 175.6 187.6 214.8 211.2 219.2 218.8 218.3 220.4 221.5 219.6 235.9 236.3 204.2 202.6 203.7 201.5 202.5 202.7 194.2 193.7 193.7 193.4 192.5 193.5 190.4 192.9 191.7 192.6 190.5 187.7 179.2 180.9 168.7 175.2 144.4 142.3 164.7 166.3 165.4 163.9 163.7 201.4 205.2 235.5 219.1 218.7 222.4 223.2 224.7 223.4 TTTUP UP T7777777788888888MAIN STREET INDUSTRIAL BLDG 4 187.5 FFNIRVANA AVEINDUSTRIAL BLDG 3 186.5 FF INDUSTRIAL BLDG 2 185.25 FFINDUSTRIAL BLDG 1 184.25 FF 2:11.0%1.0%6.7% 2.0 %1.5%1.5%1.5%1.0%1.0%1.4%1.5%1.5%1.5%1.5%2:12:12:12:11.0%1.0%0.7%2.1%2.0%1.0% 3.4%1.0%0.8% 0.8%1. 0% 0.6% 1.0%1.0% 0.7% 1.0% 0.7% 0.8%1.0%1.0% 1.0% 1.0% 1.0% 1.0% 2.5% 1.0% 1.9% 1.0% 1.0% 1.7%2:15:15:15:15:15:15:1MAIN S T R E E T2:14.5%2.0%4.2%1.0%6.7% 6.7% 1.0% 1.0% 2.0% 2.0% 0.8%0.8% 0.7% 1.0% 1.0% 0.7% 0.8%0.7%0.7%1.0% 1.5% 1.8%5.5%AACCBBDDAA'BB'Qal Qt Qt Qt Qt Qal To To Qal Qal Qt B-1 B-2 T-5 T-4 T-6 T-3 T-2 T-1 TP-2 TP-4 TP-3 TP-1 TP-7 TP-6 TP-5To To To To To To To To ??????????? ? ?? ?????? ??? ? Qudf CC'D D' LB-4 LB-3 LB-2 LB-1 LB-5 GG' E E' F F' TP-5 TP-8 TP-1 TP-3 TP-2 TP-4 TP-6 TP-7 To Qt Qt APPROX. FRONT LIMIT OF CLAYBED REMOVAL APPROX. FRONT LIMIT OF CLAYBED REMOVAL FT-1 HH' I I' 10' OFFSET FROM JURISDICTIONAL LIMITS APPROX. AREA OF GEOGRID STABILIZATION JURISDICTIONAL DELINEATION LIMITS PROJECT NO. SCALE DATE FIGURE SHEET OF Plotted:03/18/2022 2:03PM | By:ALVIN LADRILLONO | File Location:Y:\PROJECTS\G2755-42-01 (Nirvana Self Storage)\SHEETS\G2755-42-01 Geo Map.30.dwg GEOLOGIC MAP NIRVANA INDUSTRIAL BUILDINGS AND SELF STORAGE COMPLEX 821 MAIN STREET CHULA VISTA, CALIFORNIA 50'03 - 21 - 2022 G2755 - 42 - 01 1 1 1 *LA2(E67 (6I:E  7A2 (IEGO CALI*O62IA    P,O2E    *A<   GEOTECHNICAL ENVIRONMENTAL MATERIALS 1" = T-6 TP-7 B-2 ........UNDOCUMENTED FILL ........ALLUVIUM ........TERRACE DEPOSITS ........OTAY FORMATION ........APPROX. LOCATION OF GEOLOGIC CONTACT ........APPROX. LOCATION OF EXPLORATORY LARGE DIAMETER BORING (Current) ........APPROX. LOCATION OF EXPLORATORY BORING ........APPROX. LOCATION OF EXPLORATORY TEST PIT (Current) ........APPROX. LOCATION OF EXPLORATORY TEST PIT (AGS, 2014) ........APPROX. LOCATION OF EXPLORATORY TEST PIT (AET, 2008) ........APPROX. LOCATION OF GEOLOGIC CROSS SECTION ........APPROX. LOCATION OF PROPOSED SUBDRAIN ........APPROX. SURFACE EXPOSURE OF BENTONITIC CLAYSTONE GEOCON LEGEND Qudf I I' Qal Qt To LB-5 TP-8