Loading...
HomeMy WebLinkAboutAttachment 8Q - Addendum to Geotechnical InvestigationADDENDUM TO GEOTECHNICAL INVESTIGATION NIRVANA INDUSTRIAL BUILDINGS AND SELF STORAGE COMPLEX 821 MAIN STREET CHULA VISTA, CALIFORNIA PREPARED FOR VWP-OP NIRVANA OWNER, LLC PHOENIX, ARIZONA FEBRUARY 18, 2022 PROJECT NO. G2755-42-01 GROCON INCORPORATED GEOTECHNICAL • ENVIRONMENTAL MATERIALSO 6960 Flanders Drive • San Diego, California 92121-2974 • Telephone 858.558.6900 • Fax 858.558.6159 Project No. G2755-42-01 February 18, 2022 VWP-OP Nirvana Owner, LLC 2390 East Camelback Road, Suite 305 Phoenix, Arizona 85016 Attention: Mr. Steven Schwarz Subject: ADDENDUM TO GEOTECHNICAL INVESTIGATION NIRVANA INDUSTRIAL BUILDINGS AND SELF STORAGE COMPLEX 821 MAIN STREET CHULA VISTA, CALIFORNIA References: 1. Preliminary Geotechnical Investigation, Nirvana Industrial Buildings and Self Storage Complex, 821 Main Street, Chula Vista, California, prepared by Geocon Incorporated, dated September 14, 2021 (Project No. G2755-42-01). 2. Limits of Grading at Easterly Property Line, Nirvana Business Park, 821 Main Street, Chula Vista, California, prepared by Pasco Laret Suiter & Associates, dated February 1, 2022. Dear Mr. Schwarz: In accordance with the request of Mr. Andrew Gracey, we prepared this addendum to the geotechnical investigation for the subject project. Recommendations provided in Reference 1 were to construct buttress fills along the eastern property line to mitigate for claystone beds that are expected to be present within and near the toe of the slope. Buttress cuts are shown in Reference 1 extending into the jurisdictional area. We understand that you desire to eliminate grading within the jurisdictional area and requested we provide revised grading recommendations. To provide revised recommendations, we generated two additional cross sections (Cross Sections H and I) and performed slope stability analyses. The locations of the cross sections are shown on the Geologic Map, Figure 1. The cross sections are provided on Figure 2. For our analyses, we assumed grading can extend to within 10 feet of the jurisdictional limits shown in Reference 2. The slope stability analysis was performed utilizing the computer program GeoStudio 2018 (SLOPE/W) distributed by Geo-Slope International. This program uses conventional slope stability Project No. G2755-42-01 - 2 - February 18, 2022 equations and a two-dimensional limit-equilibrium method to calculate the factor of safety against deep-seated failure. For our analysis, Spencer’s Method with a block failure mode was used for failure in the claystone bed. We also analyzed a circular failure mode to check stability within the compacted fill buttress. Spencer’s Method satisfies both moment and force equilibrium. The computer program searches for the critical failure surface based on parameters inputted, including the location of the “left” and “right” sliding blocks. The critical failure surface for each analysis is shown on computer-generated output. The factor of safety is shown on each figure directly above the failure surface. The results of the stability analysis are provided on Figures 3 through 6. Based on our analysis, remedial grading can be performed to construct the stability buttresses outside of the jurisdictional limits. To construct the revised buttresses, the forecut on the buttress will need to start at a distance of 10 feet from the jurisdictional limits and down at a 1:1 plane to a vertical distance of approximately 5 feet below the clay bed. At this elevation, a minimum 15-foot-wide buttress key needs to be constructed. We estimate the bottom of the clay bed to around elevation 145 feet MSL. We estimate the buttress key bottom elevation to be near 140 feet MSL, as shown on Figure 2. Within a portion of the eastern buttress, geotextile reinforcing grid will be required to provide a factor of safety against slope instability of at least 1.5. The geotextile reinforcing grid should consist of Miragrid 20XT that has a length of at least 20 feet extending from the face of the buttress forecut. The grid should be placed every 3 feet vertical height as shown on Figure 2 and on the stability figures (Figures 3 and 4). The locations where geotextile reinforcing grid will be needed to installed is shown on Figure 1. Modifications to the buttress dimensions, location, and grid reinforced area may be needed based on actual conditions encountered during grading. A representative of Geocon will observe buttress construction during grading and can provide additional and/or modified recommendations, if they are needed. All other recommendations contained in Reference 1 outside of Cross Sections I and H area remain applicable. Additionally, all buttresses should incorporated drainage as recommended in Reference 1. Project No. G2755-42-01 - 3 - February 18, 2022 If you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED Rodney C. Mikesell GE 2533 RCM:arm (e-mail) Addressee 137.9 138.1 137.5 137.2 136.2 135.9 135.1 135.1 134.4 134.2 133.5 133.2 132.4 132.2 131.5 131.3 130.7 130.5 129.9 130.2 129.6 129.4 129.9 130.8 131.7 132.3 133.8 135.5 136.9 135.6 134.7 133.8 133.1 131.8 131.2 130.2 129.7 131.2 136.9 142.8 137.5 153.2 149.4 148.6 158.6 174.3 217.2 218.6 219.7 219.9 220.3 221.7 227.9 233.7 235.5 194.2 191.9 201.5 197.3 193.5 189.4 137.6137.1135.5 134.1 181.3 179.3 180.1 178.8 178.3 176.9 177.2 175.6 187.6 211.2 219.2 218.8 218.3 220.4 221.5 219.6 235.9 236.3 204.2 202.6 203.7 201.5 202.5 202.7 194.2 193.7 193.7 193.4 192.5 193.5 190.4 192.9 191.7 192.6 190.5 187.7 179.2 180.9 168.7 175.2 144.4 142.3 164.7 166.3 165.4 163.9 163.7 201.4 205.2 235.5 219.1 218.7 LOT 23 MAP 8147 HELD RECORD ANGLE LOT 22 MAP 8147 LOT 21 MAP 8147 LOT 20 MAP 8147 LOT 19 MAP 8147 LOT 3 MAP 8147 LOT 2 SEC 20 T18S R1E SBM ROS 16999 PARCEL 1 PM 21587 PARCEL 2 PM 21587 64'64'2 2 3 3 4 4 4 4 4 4 4 5 N 87°34'46" W 1356.85' ( N 8 7 ° 3 4 ' 0 8 " W 1 3 5 6 . 6 6 ' R 2 ) N 02°26'11" E 0.15' N 02°25'25" E 0.13'N 02°26'11" E 276.91' (N 02°25'152 E 276.79' R2)749.13' 607.72'N 00°14'32" E 287.73' (N 00°12'10" E 287.52' R2)N 00°27'05" E 424.23' (N 00°27'28" E 424.24' R2)L =2 9 9 .2 0 ' R =2 0 6 4 .0 0 ' D =8 °1 8 '2 0 " M &R 2 N 82°38'33" E 3 7 3 . 1 3 ' ( N 8 2 ° 3 8 ' 3 6 " E 3 7 3 . 1 5 ' R 2 ) D =2 °0 9 '1 1 " M &R 2L=7 7 .5 5 ' L =5 9 7 .1 7 ' D =1 6 °3 4 '3 8 " M &R 2L=6 7 4 .7 0 ' R =2 0 6 4 .0 0 ' D =1 8 °4 3 '4 6 " M &R 2 N 78°37' 4 1 " W 2 3 . 9 7 ' (N 78°3 7 ' 3 8 " W 2 3 . 9 8 ' R 2 ) NW COR SW 1/4 NW 1/4 SEC 20 2'1 25'2 NE COR SW 1/4 NW 1/4 SEC 20 3 27' 15' 28' 20' 28'5 5 5 5 5128'7720'1424'13 20' 13 24'121 2 ' 1 24'1 24'2 64'64'3433' 34' 12'4 5 4 4 4 6 7 (137.94 FG) (131.82 FG) 183.0 TW 141.5 FG H=41.5' 184.0 TW 145.0 FG H=39' 183.1 TW 162.5 FG H=20.6' 189.75 TW 183.5 BW H=6.25' 185.25 TW 146.2 FG H=39.1'MAIN STREET 2:12:12:12:1202.5 TW 184.5 FG H=18'205.75 TW 185.75 FG H=20' 184.00 TW 184.00 FG H=0' 212.25 TW 186.75 FG H=25.5' 180.9 TW 155.6 FG H=25.3' 180.9 TW 139.4 FG H=41.5' (139.7 FG) (186.00 FG) (186.00 FG) INDUSTRIAL BLDG 4 187.5 FF 186.0 TW 186.0 BW H=0' 189.5 TW 184.5 FG H=5' 186.0 TW 186.0 FS H=0' 186.25 TW 146.9 FG H=39.4' 187.0 TW 183.3 FS H=3.7' 186.25 TW 159.1 FG H=27.2' TYPE A-6 CO 188.8 RIM 172.60 IE OUT MOD. TYPE A-6 CO 135.32 TOP 129.38 FL MOD. TYPE A-8 CO WITH TYPE F OPENING 175.0 TOP 154.35 IE OUT MOD. TYPE A CO 137.63 TOP 130.64 FL 183.75 FS 5%NIRVANA AVEINDUSTRIAL BLDG 3 186.5 FF INDUSTRIAL BLDG 2 185.25 FF INDUSTRIAL BLDG 1 184.25 FF 182.9 TW 141.4 FG H=41.5' 184.0 TW 143.5 FG H=40.5' 184.0 TW 144.3 FG H=39.7' 185.25 TW 146.5 FG H=38.8' 186.25 TW 145.9 FG H=40.4' 187.0 TW 183.6 FS H=3.4' 187.0 TW 183.4 FS H=3.6'2:12:12:12.0%198.5 TW 183.5 BW H=15' 202.0 TW 183.5 BW H=18.5' 202.5 TW 183.5 BW H=19' 200.5 TW 184.5 FG H=16' 184.5 TW 184.5 FG H=0' 203.0 TW 184.5 FG H=18.5' 206.25 TW 185.75 FG H=20.5' 209.25 TW 185.75 FG H=23.5' 211.0 TW 185.75 FG H=25.25'211.25 TW 186.75 FG H=24.5' 210.0 TW 186.75 FG H=23.25' 208.25 TW 186.75 FG H=21.5' 191.75 TW 186.75 FG H=5' 184.5 TW 184.5 FG H=0' 189.5 TW 184.5 FG H=5' 212.25 TW 186.25 FG H=26' 212.0 TW 185.75 FG H=26.25'2.0%2.0%2.0%2.0%AA'BB'Qal Qt Qt Qt Qt Qal To To Qal Qal Qt B-1 B-2 T-5 T-4 T-6 T-3 T-2 T-1 TP-2 TP-4 TP-3 TP-1 TP-7 TP-6 TP-5To To To To To To To To ??????????? ? ?? ?????? ??? ? Qudf CC'D D' LB-4 LB-3 LB-2 LB-1 LB-5 GG' E E' F F' TP-5 TP-8 TP-1 TP-3 TP-2 TP-4 TP-6 TP-7 To Qt Qt APPROX. FRONT LIMIT OF CLAYBED REMOVAL APPROX. FRONT LIMIT OF CLAYBED REMOVAL FT-1 HH' I I' 10' OFFSET FROM JURISDICTIONAL LIMITS APPROX. AREA OF GEOGRID STABILIZATION JURISDICTIONAL DELINEATION LIMITS PROJECT NO. SCALE DATE FIGURE SHEET OF Plotted:02/18/2022 9:39AM | By:ALVIN LADRILLONO | File Location:Y:\PROJECTS\G2755-42-01 (Nirvana Self Storage)\SHEETS\G2755-42-01 Geo Map.20.dwg GEOLOGIC MAP NIRVANA INDUSTRIAL BUILDINGS AND SELF STORAGE COMPLEX 821 MAIN STREET CHULA VISTA, CALIFORNIA 50'02 - 18 - 2022 G2755 - 42 - 01 1 1 1 *LA2(E67 (6I:E  7A2 (IEGO CALI*O62IA    P,O2E    *A<   GEOTECHNICAL ENVIRONMENTAL MATERIALS 1" = T-6 TP-7 B-2 ........UNDOCUMENTED FILL ........ALLUVIUM ........TERRACE DEPOSITS ........OTAY FORMATION ........APPROX. LOCATION OF GEOLOGIC CONTACT ........APPROX. LOCATION OF EXPLORATORY LARGE DIAMETER BORING (Current) ........APPROX. LOCATION OF EXPLORATORY BORING ........APPROX. LOCATION OF EXPLORATORY TEST PIT (Current) ........APPROX. LOCATION OF EXPLORATORY TEST PIT (AGS, 2014) ........APPROX. LOCATION OF EXPLORATORY TEST PIT (AET, 2008) ........APPROX. LOCATION OF GEOLOGIC CROSS SECTION ........APPROX. LOCATION OF PROPOSED SUBDRAIN ........APPROX. SURFACE EXPOSURE OF BENTONITIC CLAYSTONE GEOCON LEGEND Qudf I I' Qal Qt To LB-5 TP-8 0 10050 150 200 0 10050 150 200 250E L E V A T I O N (M S L)100 150 200 250 H E L E V A T I O N (M S L)100 150 200 250 IH'E L E V A T I O N (M S L)100 150 200 250 I'E L E V A T I O N (M S L)100 150 200 250 D I S T A N C E SCALE: 1" = 50' (Vert. = Horiz.) GEOLOGIC CROSS-SECTION H-H' D I S T A N C E SCALE: 1" = 50' (Vert. = Horiz.) GEOLOGIC CROSS-SECTION I-I' 15' WIDE BUTTRESS KEY 10' EXISTING GRADE EXISTING GRADE PROPOSED GRADE PROPOSED GRADE STABILITY BUTTRESSSTABILITY BUTTRESS MIRAGRID 20XT AT 3' VERTICAL SPACING, 20 FEET LONG Qt Qt To To To 15' WIDE BUTTRESS KEY To JURISDICTIAL LIMITS 10'JURISDICTIAL LIMITS 2 NIRVANA INDUSTRIAL BUILDINGS AND SELF STORAGE COMPLEX 821 MAIN STREET CHULA VISTA, CALIFORNIA 6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121 - 2974 PHONE 858 558-6900 - FAX 858 558-6159PROJECT NO. G2755 - 42 - 01 DATE 02 - 18 - 2022 FIGURE GEOTECHNICAL ENVIRONMENTAL MATERIALS Plotted:02/18/2022 2:09PM | By:ALVIN LADRILLONO | File Location:W:\1_GEOTECH\G2000\G2755-42-01\2022-02-18\G2755-42-01 XSections.20.dwg ........TERRACE DEPOSITS ........OTAY FORMATION ........APPROX. LOCATION OF GEOLOGIC CONTACT GEOCON LEGEND Qt To 1.5Distance (Feet)0 25 50 75 100 125 150 175 200 225 250Elevation (Feet)100125150175200Elevation (Feet)100125150175200Color Name Unit Weight(pcf)Cohesion'(psf)Phi' (°)PiezometricLineClaystoneBed (CL/CH)130 50 18 1Qcf 130 250 28 1Qt 130 350 35 1To 130 300 34 1To (2) 1NIRVANAProject No. G2755-42-01File Name: I-I' - Case3 Geogrid (15 ft Key).gszDate: 02/18/2022Directory: S:\Engineering and Geology\ENGINEER PROGRAMS, GUIDES, ETC\EngrgPrg\GEO-SLOPE2018\G2755-42-01 (Nirvana)\CROSS SECTION I-I'QcfToToToTo - CH/CLTo - CH/CLQtGeogrid Reinforcement20 ft long, Miragrid 20 XT @ 3 ft spacing10 ft20 ftFIGURE 3 1.5Distance (Feet)0 25 50 75 100 125 150 175 200 225 250Elevation (Feet)100125150175200Elevation (Feet)100125150175200Color Name Unit Weight(pcf)Cohesion'(psf)Phi' (°)PiezometricLineClaystoneBed (CL/CH)130 50 18 1Qcf 130 250 28 1Qt 130 350 35 1To 130 300 34 1To (2) 1NIRVANAProject No. G2755-42-01File Name: I-I' - Case3 Geogrid (15 ft Key) Circular.gszDate: 02/18/2022Directory: S:\Engineering and Geology\ENGINEER PROGRAMS, GUIDES, ETC\EngrgPrg\GEO-SLOPE2018\G2755-42-01 (Nirvana)\CROSS SECTION I-I'QcfToToToTo - CH/CLTo - CH/CLQtGeogrid Reinforcement20 ft long, Miragrid 20 XT @ 3 ft spacing10 ft20 ftFIGURE 4 1.6Distance (Feet)0 25 50 75 100 125 150 175 200 225 250Elevation (Feet)100125150175200Elevation (Feet)100125150175200Color Name Unit Weight (pcf)Cohesion'(psf)Phi' (°)PiezometricLineClaystoneBed (CL/CH)130 50 18 1Qcf 130 250 28 1Qt 130 350 35 1To 130 300 34 1NIRVANAProject No. G2755-42-01File Name: H-H' - Case1 (15 ft Key).gszDate: 02/18/2022Directory: S:\Engineering and Geology\ENGINEER PROGRAMS, GUIDES, ETC\EngrgPrg\GEO-SLOPE2018\G2755-42-01 (Nirvana)\CROSS SECTION H-H'QcfToToToTo - CH/CLTo - CH/CLQt10 ft15 ft Wide Buttress Shear KeyJurisdictional LimitsFIGURE 5 1.6Distance (Feet)0 25 50 75 100 125 150 175 200 225 250Elevation (Feet)100125150175200Elevation (Feet)100125150175200Color Name Unit Weight (pcf)Cohesion'(psf)Phi' (°)PiezometricLineClaystoneBed (CL/CH)130 50 18 1Qcf 130 250 28 1Qt 130 350 35 1To 130 300 34 1NIRVANAProject No. G2755-42-01File Name: H-H' - Case1 (15 ft Key) Circular.gszDate: 02/18/2022Directory: S:\Engineering and Geology\ENGINEER PROGRAMS, GUIDES, ETC\EngrgPrg\GEO-SLOPE2018\G2755-42-01 (Nirvana)\CROSS SECTION H-H'QcfToToToTo - CH/CLTo - CH/CLQt10 ft15 ft Wide Buttress Shear KeyJurisdictional LimitsFIGURE 6