HomeMy WebLinkAbout2022-04-28 Agenda Packet
.
Date:Thursday, April 28, 2022
Time:6:00 p.m.
Location:John Lippitt Public Works, Center Lunchroom
1800 Maxwell Rd., Chula Vista
Welcome to your Measure P Citizens' Oversight Committee Meeting!
The Measure P Citizens' Oversight Committee has transitioned back to holding live, in-person
meetings.
Public Comments: Public comments may be submitted to the Measure P Citizens' Oversight
Committee in the following ways:
In-Person comments during the meeting. Join us for the Measure P Citizens' Oversight
Committee meeting at the time and location specified on this agenda to make your
comments. Please visit www.chulavistaca.gov/boardmeetings for current mask requirements
and other safety protocols.
•
Submit an eComment. Visit www.chulavistaca.gov/boardmeetings, locate this meeting and
click on the comment bubble icon. Click on the item you wish to comment on, and then click
on "Leave Comment." The commenting period will close one hour before the meeting. All
comments will be made available to the Commission and the public.
•
Mail or email comments. Submit comments via email to PCOC@chulavistaca.gov or by mail
to Finance Department, 276 Fourth Ave, Chula Vista, CA 91910. Please send comments
early; written comments received within one hour of the meeting may not be distributed until
the following day.
•
Accessibility: Individuals with disabilities are invited to request modifications or accommodations in
order to access and/or participate in a Measure P Citizens' Oversight Committee meeting by
contacting us at PCOC@chulavistaca.gov (California Relay Service is available for the hearing
impaired by dialing 711) at least forty-eight hours in advance of the meeting.
Pages
1.CALL TO ORDER
2.ROLL CALL
Measure P Citizen's Oversight Committee Members: Enriquez, Freels, Ilyas,
Lengyel, Martinez, Redo, Saldivar, and Chair Garcias
3.CONSENT CALENDAR
3.1.CONSIDERATION OF EXCUSED ABSENCE(S)5
Committee Member Freels on October 28, 2021.
Recommended Action:
Excuse the absence(s).
3.2.APPROVAL OF MEETING MINUTES OF OCTOBER 28, 2021.6
Recommended Action:
Approve the meeting minutes.
4.PUBLIC COMMENTS
Persons may address the Committee on any subject matter within the Committee’s
jurisdiction that is not listed as an item on the agenda. State law generally prohibits
the Committee from discussing or taking action on any issue not included on the
agenda, but, if appropriate, the Committee may schedule the topic for future
discussion or refer the matter to staff. If you wish to speak on any item, please fill
out a "Request to Speak" form and submit it to the Secretary prior to the meeting.
5.ACTION ITEMS
The Item(s) listed in this section of the agenda will be considered individually by the
Committee and are expected to elicit discussion and deliberation. If you wish to
speak on any item, please fill out a "Request to Speak" form and submit it to the
Secretary prior to the meeting.
5.1.CONSIDERATION OF AMENDMENTS TO THE FY23-27 MEASURE P
SPENDING PLAN
10
(Kelly Broughton, Deputy City Manager)
Recommended Action:
Review and comment on the revised Measure P Spending Plan; 1.
Find the Spending Plan consistent with the Council approved
Measure P Infrastructure, Facilities and Equipment Expenditure
Plan; and
2.
Recommend City Council approval of the revised FY23-27 Measure
P Spending Plan.
3.
2022-04-28 PCOC Agenda Page 2 of 52
5.2.CONSIDERATION OF THE FY21 MEASURE P INDEPENDENT AUDIT 27
(Sarah Schoen, Director of Finance)
Recommended Action:
a. Review and comment on the FY21 Measure P Independent Audit; and
b. Accept Audit findings that (1) the FY21 Measure P Audit complies with
terms of Measure P ordinance and that (2) funds were spent in FY21 in
accordance with Measure P Spending Plan; and
c. Recommend that staff report Audit findings to City Council
5.3.CONSIDERATION OF THE FINANCE DEPARTMENT REPORT (FISCAL
YEAR 2022/23 BUDGET)
35
(Sarah Schoen, Director of Finance)
Recommended Action:
a. Review and comment on the FY23 Finance Department Report; and
b. Recommend City Council approval of the FY22/23 Budget.
5.4.CONSIDERATION OF THE DRAFT MEASURE P ANNUAL REPORT 36
(Sarah Schoen, Director of Finance)
Recommended Action:
Approve the Draft Annual Report prepared on the Committee’s behalf and
request staff schedule the report for presentation to City Council by the
Committee Chair.
6.PRESENTATIONS
The following item(s) will be presentations given to the Committee. Action on these
item(s) is typically limited to the Committee receiving the presentation and providing
direction or feedback to staff, as appropriate.
6.1.MEASURE P ACCOUNTING AND ADMINISTRATION 46
(Ed Prendell, Budget and Analysis Manager)
FY22 Second Quarter Expendituresa.
FY22 Third Quarter Expendituresb.
6.2.MEASURE P PROJECT UPDATES 48
(Matthew Little, Director of Public Works, William Valle, Director of
Engineering & Capital Projects, and Tracy Lamb, Director of Community
Services)
Progress report on projects completed and underway
7.STAFF COMMENTS
8.COMMITTEE MEMBER'S COMMENTS
2022-04-28 PCOC Agenda Page 3 of 52
9.ADJOURNMENT
to the regular meeting on July 28, 2022 , at 6:00 p.m.
Materials provided to the Measure P Citizens' Oversight Committee related to any
open-session item on this agenda are available for public review by contacting the
Finance Department at PCOC@chulavistaca.gov.
2022-04-28 PCOC Agenda Page 4 of 52
2022-04-28 PCOC Agenda Page 5 of 52
1
REGULAR MEETING OF THE MEASURE P CITIZENS' OVERSIGHT COMMITTEE
Meeting Minutes
October 28, 2021, 6:00 p.m.
John Lippitt Public Works, Center Lunchroom
1800 Maxwell Rd., Chula Vista
Present: Committee Member Enriquez, Committee Member Ilyas,
Committee Member Lengyel, Committee Member Martinez,
Committee Member Redo, Committee Member Saldivar, Chair
Garcias
Absent: Committee Member Freels
Also Present: Deputy City Manager Broughton, Director of Engineering/Capital
Projects Valle, Director of Community Services Lamb, Budget &
Analysis Manager Prendell, Secretary Delap, Director of Public
Works Little
_____________________________________________________________________
1. CALL TO ORDER
A regular meeting of the Measure P Citizens' Oversight Committee of the City of
Chula Vista was called to order at 6:03 p.m. in the Public Works Center, located
at 1800 Maxwell Road, Chula Vista California.
2. ROLL CALL
Secretary Delap called the roll.
3. CONSENT CALENDAR
3.1 Approval of Meeting Minutes of April 22, 2021
2022-04-28 PCOC Agenda Page 6 of 52
2
Moved by Committee Member Redo
Seconded by Committee Member Lengyel
Approve the meeting minutes.
Result:Carried
4. PUBLIC COMMENTS
There were no general public comments.
5. ACTION ITEMS
5.1 APPOINTMENT OF COMMITTEE CHAIR AND VICE CHAIR FOR
FISCAL YEAR 2021/22 TERM
Chair David Garcias is nominated to serve as the Committee Chair.
Committee Member Martinez is nominated to serve as the Committee
Vice Chair.
Moved by Committee Member Redo
Seconded by Committee Member Ilyas
Elect Chair and Vice Chair.
Yes (7): Committee Member Enriquez, Committee Member Ilyas,
Committee Member Lengyel, Committee Member Martinez, Committee
Member Redo, Committee Member Saldivar, and Chair Garcias
Result:Carried (7 to 0)
5.2 DISCUSSION REGARDING THE FISCAL YEAR 2021 ANNUAL
ACTIVITY REPORT AND AUTHORIZE STAFF TO FINALIZE AND
SUBMIT
Deputy City Manager Broughton reviews the annual activity reports.
Committee members made comments and asked questions, staff
responded.
Moved by Committee Member Ilyas
Seconded by Committee Member Redo
Committee to review and discuss 2020-21 activities, make any appropriate
changes, and authorize staff to finalize and submit.
2022-04-28 PCOC Agenda Page 7 of 52
3
Yes (7): Committee Member Enriquez, Committee Member Ilyas,
Committee Member Lengyel, Committee Member Martinez, Committee
Member Redo, Committee Member Saldivar, and Chair Garcias
Result:Carried (7 to 0)
5.3 CONSIDERATION OF AMENDMENTS TO THE FY22-27 MEASURE P
SPENDING PLAN
Deputy City Manager Broughton gave an overview of the action items.
Committee members made comments and asked questions, staff
responded.
Secretary Delap called the roll call vote.
Moved by Committee Member Redo
Seconded by Committee Member Lengyel
a. Review and comment on the revised Measure P Spending Plan;
b. Find the Spending Plan consistent with the Council approved Measure
P Infrastructure, Facilities and Equipment Expenditure Plan; and
c. Recommend City Council approval of the revised FY22-27 Measure P
Spending Plan.
Yes (7): Committee Member Enriquez, Committee Member Ilyas,
Committee Member Lengyel, Committee Member Martinez, Committee
Member Redo, Committee Member Saldivar, and Chair Garcias
Result:Carried (7 to 0)
6. PRESENTATIONS
6.1 MEASURE P ACCOUNTING AND ADMINISTRATION
Budget & Analysis Manager Prendell reviewed FY21 Fourth quarter
expenditures. Committee members had no questions.
Budget & Analysis Manager Prendell reviewed FY22 First quarter
expenditures. Committee members made comments and asked questions,
staff responded.
6.2 MEASURE P PROJECT UPDATES
2022-04-28 PCOC Agenda Page 8 of 52
4
Director of Public Works Little reviewed the Public Works projects
completed and in progress. Committee members made comments and
asked questions, staff responded. Director of Engineering & Capital
Projects Valle reviewed Engineering projects. Committee members asked
questions, staff responded. Director of Community Services Lamb
reviewed projects for Community Services. Committee members asked
questions, staff responded.
7. STAFF COMMENTS
Deputy City Manager Broughton discussed Measure P Committee size
recommendation being taken to City Council on November 16, 2021
Budget & Analysis Manager Prendell introduced Director of Finance Schoen.
8. COMMITTEE MEMBER'S COMMENTS
( 1:15:35)Committee Member Enriquez? had a question for Director of
Engineering & Capital Projects Valle regarding communication with San Diego
Gas & Electric about road pavement. Director of Engineering & Capital Projects
Valle provided answers.
9. ADJOURNMENT
The meeting was adjourned at 7:27 p.m.
Minutes prepared by: Xiomara Dodson, Secretary
_________________________
Xiomara Dodson, Secretary
2022-04-28 PCOC Agenda Page 9 of 52
Infrastructure,
Facilities and Equipment
Expenditure Plan
Funding Critical Priorities for
a Stronger, Safer Chula Vista
2022-04-28 PCOC Agenda Page 10 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
1
Amendment #10 April 2022
Introduction
The City of Chula Vista, like many cities throughout the country, is struggling to properly fund our
infrastructure needs. The City of Chula Vista (City) has been developing and implementing its Asset
Management Program to operate and maintain the City’s natural and built infrastructure. Staff has
provided several updates to the City Council on the Asset Management Program. The presentations and
related publications can be found at www.chulavistaca.gov/infrastructure.
To address the City’s infrastructure needs and other City facilities and services, the City Council placed a
funding measure on the November 2016 ballot to address high priority infrastructure projects. On
November 8, 2016, Chula Vista voters approved Measure P, authorizing a temporary ½ cent sales tax
increase on retail sales within the City for a period of ten (10) years. Staff prepared the Infrastructure,
Facilities and Equipment Expenditure Plan to identify the recommended allocation of the temporary ½
cent sales tax revenues which were originally estimated to generate $16 million per year. The updated
2023 revenue estimates are projected to generate $25+ million per year. The recommended funding is
based on the criteria established through the Asset Management Program which identifies the major
citywide infrastructure systems considered in critical need of repair or replacement. Analysis conducted
by consultants experienced in evaluating infrastructure system conditions, ranked infrastructure from
lowest to highest probability of failure, identified a timeline for repair and replacement, and estimated
associated cost. The sales tax revenues generated over the 10‐year timeframe could address all
infrastructure assets designated with the highest probability of failure which, if not addressed, could
result in significant impact to public safety response or availability of highly used community
infrastructure.
Given the needs and limited availability of funds, the items proposed for funding under this plan
represent one‐time allocations of funds and not ongoing commitments. Funding of ongoing
commitments, such as salary and benefit increases, is not included in the Plan as they would result in
continuing financial obligations beyond the ten‐year temporary tax period. Therefore, this Plan focuses
on the areas where one‐time funds could be used to address critical deferred maintenance or
replacement of city infrastructure improving safety and reducing risk to the City as well as strengthening
the City’s overall financial condition by avoiding costly emergency repairs or further deterioration of
existing failing infrastructure.
The following are the highest priority items for funding:
Pave, maintain and repair neighborhood streets and fix potholes
Upgrade or replace aging police, fire and 9‐1‐1 emergency response facilities, vehicles and
equipment
Replace storm drains to prevent sinkholes
Upgrade irrigation systems to conserve water and save energy
Make essential repairs to older libraries, senior center and recreation centers
Improve our Traffic Signal Systems
2022-04-28 PCOC Agenda Page 11 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
2
Amendment #10 April 2022
Repair our Sports Fields and Courts and Park Infrastructure
This Infrastructure, Facilities and Equipment Expenditure Plan also includes long‐term financing of
approximately $70.8 million in order to expedite the most critically needed repairs or replacements of
citywide infrastructure. City Council approved the issuance bonds via Resolution 2017‐089 on June 6,
2017. This Plan also provides a component which identifies the potential annual allocations to projects
which could be included in the annual City Manager proposed Capital Improvement Budget for City
Council consideration and action.
Process for Creation of the Plan
Asset Management Program (AMP)
Since March 2014, the City has been working to enhance its asset management practices to promote
effective use of financial and physical resources and to develop a proactive approach to managing
infrastructure assets. As part of this effort, the City embarked on developing a comprehensive, citywide
Asset Management Program that includes the following asset management systems:
Wastewater Management System
Urban Forestry Management System
Building Management System
Drainage Management System
Parks Management System
Roadway Management System
Fleet Management System
AMP Goals
The goal of the City’s Asset Management Program is to shift from reactive to proactive planning and
management of our infrastructure assets. The effort has helped the City to:
Gain better understanding of the current state of the infrastructure and its future needs
Proactively identify the asset replacement and rehabilitation needs and plan the budget and
resources accordingly
Understand the probability and consequence of failure of each asset so that the City can
manage high risk assets before failure and minimize the City’s overall risk profile
Minimize the life‐cycle cost by incorporating latest technological advances in infrastructure to
develop efficient and effective preservation and restoration strategies
Develop a consistent and defendable methodology for prioritizing work and budget expenditure
Focus on high benefit‐to‐cost ratio to ensure the budget is spent in the right place, for the right
reason, at the right time, at the right cost
Be transparent by involving the City Council and the public in the development of the Asset
Management Program and the associated decisions
2022-04-28 PCOC Agenda Page 12 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
3
Amendment #10 April 2022
It is important for the City to gain a better understanding and quantify current and future asset needs,
asset risk profile, appropriate levels of service, cost to provide services, and financial requirements to
sustain the delivery of services. City staff has worked to communicate this improved understanding of
the infrastructure status with the public and decision makers. This analysis and information has enabled
City staff to develop management strategies that deliver the established levels of service while
managing individual assets to minimize life‐cycle cost with an acceptable level of risk.
With this information, the City can better answer the following questions:
Catch Up – What levels of work, resources, and budget are required to bring the asset back to
required conditional state to meet the safety, regulatory, and level of service requirements?
Keep Up – Once the asset is caught up, what levels of work, resources, and budget are required
to keep up the level of service?
Moving Forward – What levels of work, resources, and budget are required to sustain the level
of service?
Asset Management Program Advisory Committee
To help identify the needs of our community and to evaluate the state of our infrastructure, the City
formed the Asset Management Program Advisory Committee (AMPAC) in March 2014. The committee
continues to provide input into setting priorities for the Asset Management Program.
Members of the AMPAC are residents, business owners, community leaders, and stakeholders. AMPAC
members visited various asset management systems and observed and discussed the issues associated
with each system. AMPAC reviewed the City’s overall Asset Management Program methodology and
helped to guide and reach consensus on how to address infrastructure deficits.
A technical committee was formed within AMPAC to further engage the public in the understanding and
review of the asset management methodologies and logic used to define preservation and restoration
costs and schedules.
A comprehensive inventory of assets took place for each asset management system. Where accessible,
assets were visited and their conditions were assessed. Based on the condition, actions required to
restore the asset were identified, and the cost and timing were estimated. Through assessment of risk
(probability and consequence of failures), activities were prioritized and communicated regarding
urgency and the financial and resource requirements.
Public Outreach and Public Opinion Surveys
In July and August 2015, the City of Chula Vista engaged a research firm to conduct a public opinion
survey to identify resident priorities and secure input on potential local funding mechanisms (bond or
sales tax) to upgrade, repair and maintain critical infrastructure. In addition, a survey mailer was
distributed to 54,000 households and an online version posted on the City website from January through
2022-04-28 PCOC Agenda Page 13 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
4
Amendment #10 April 2022
May 2016 to secure broad public input on infrastructure priorities. More than 3,000 responses were
received.
Public Opinion on Prioritizing Infrastructure Projects
Infrastructure, Facilities and Expenditure Plan
With the information gathered through the Asset Management process and community input, staff
developed this Plan taking into account projected available funding, priorities and timing considerations.
The actual allocations will be dependent on updated engineering cost estimates, project specific criteria
and available funding at the time the individual projects are proposed.
The following table presents the Infrastructure, Facilities and Expenditure Plan by Major Category. On
page 14 of this Plan is a 10‐year outlook by fiscal year which includes long‐term financing to expedite the
most critically needed repairs/replacement of citywide infrastructure.
2022-04-28 PCOC Agenda Page 14 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
5
Amendment #10 April 2022
Infrastructure, Facilities and Equipment Expenditure Plan (By Major Category)
Plan Implementation
The ballot measure approved by the voters is anticipated to generate an estimated $234 million over a
10‐year period. The projected revenues from the sales tax measure will address the items which are
considered high risk and in critical need of repair or replacement. The estimated revenues will also
address approximately 11% of the assets identified as having medium probability of failure.
The measure provides that any proposed expenditures of new sales tax revenues in the initial year will
be presented in a form consistent with this Plan as budget amendments for City Council consideration.
For each subsequent year, the spending plan, after review by a Citizen Oversight Committee, will be
included in the City Manager’s proposed budget for Council consideration as part of the annual budget
process.
The measure requires that expenditure of new sales tax revenues be tracked in a variety of ways. First
all new revenues will be accounted for in the General Fund as a separate line item. Second, an
independent audit of measure revenues and expenditures will be performed and presented for public
review. Finally, a Citizen’s Oversight Committee will review all proposed expenditure plans and all
audits.
Note: This Plan is intended to guide City expenditures consistent with its terms. It does not, however,
constitute a binding legal commitment on the City Council to approve any of the expenditures proposed
2022-04-28 PCOC Agenda Page 15 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
6
Amendment #10 April 2022
herein. Provided that all proposed expenditures continue to be for City infrastructure, facilities and/or
equipment, this Plan may also be updated or amended from time to time by City staff, or by action of
the City Council, in order to address changed priorities, standards and/or funding availability. There
shall be no third‐party beneficiaries to the terms of this Plan. This Plan does not modify the terms of the
sales tax measure. To the extent of any conflict between the terms of this Plan and the sales tax
measure, the terms of the sales tax measure shall govern.
Summary Description of Major Infrastructure Categories
To follow are descriptions of the major infrastructure categories within the Expenditure Plan. Included
within several of the categories described below is an emphasis on repairing and replacing existing
inefficient systems and equipment with newer, more efficient systems. Funding for efficient systems
has been incorporated into the existing funding for police facility repairs, sports courts and fields, park
infrastructure, recreation and senior centers, libraries, and other public buildings. Specific projects will
include: citywide lighting upgrades; citywide irrigation upgrades; citywide HVAC equipment
replacement; and other facility and park efficiency upgrades. The projects will be consistent with the
priorities laid out in the original Measure P Expenditure Plan as well as the City's Smart Cities Plans. The
projects will extend the life of the City's facilities and parks, allow for easier and more efficient
maintenance, and provide flexibility to allocate proper maintenance funds are in place to "keep up" with
ongoing maintenance on newly repaired facilities. Measure P funds will not be used to provide ongoing
maintenance.
Street Pavement:
One of the greatest challenges a City faces is maintaining, preserving and restoring its paved streets.
The City of Chula Vista utilizes the Streetsaver Pavement Management System to develop a multi‐year
pavement preservation program. The program has primarily been focused on sustaining more heavily
traveled major arterial and collector streets in good condition. Through the Pavement Management
System, city streets are given a Pavement Condition Index (PCI). The purpose of the pavement
management system is to enable the City to use its pavement dollars in the most cost‐effective manner
so that the overall pavement condition is as good as possible. The pavement preservation approach
significantly prolongs the life of existing pavements for a fraction of what it would cost to rehabilitate
the street once it reached failure. Unfortunately, local/residential streets have reached a failed state (0‐
25 PCI) and the typical strategies used for preventative maintenance would be inadequate. These
residential streets would require major rehabilitation. The Measure P funding for Street Pavement
repair is intended repair these failed residential streets. Additional information is available in the
Roadway Assessment Plan located at www.chulavistaca.gov/infrastructure.
2022-04-28 PCOC Agenda Page 16 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
7
Amendment #10 April 2022
Pavement Condition Index
PCI = 21 PCI = 40 PCI = 68 PCI = 75 PCI = 95
Other Infrastructure (Storm Drains, Sidewalks, Trees, Drainage Systems)
Much of the City’s storm drain system is more than 50 years old. There are approximately 13 miles of
corrugated metal pipes (CMP) located in the City of Chula Vista. Some of the CMP have been
deteriorating due to their age and corrodible nature of the material. According to the 2005 condition
assessment data, 1.8 miles of CMPs were recommended to be lined with CIPP liner and 0.4 miles of CMP
were recommended to be replaced immediately. In order to accelerate the replacement of CMP and
address infrastructure needs in Western Chula Vista, the City issued $10.5 million in debt but despite the
City’s effort to reline and replace as much as possible of the problematic CMP based on the 2005 study,
not all pipe failures could be predicted. In February 2015, a CMP located near one of the elementary
schools failed and created a sinkhole. In order to prevent future failures and to drive lower life‐cycle
cost, the City utilized the asset management strategies to identify which CMPs have a greater risk of
failing. As a result, the City repurposed $1.2 million from streets to fund CMP replacement or lining.
Additional information on the City’s Drainage system is located in the Drainage Asset Management Plan
located at www.chulavistaca.gov/infrastructure.
The City is committed to the goal of increasing the maintenance and number of trees within the city.
Healthy trees provide many benefits to communities, such as reducing storm water runoff, removing air
pollution, lowering summer temperatures, and reducing energy use in buildings.
2022-04-28 PCOC Agenda Page 17 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
8
Amendment #10 April 2022
Traffic Signal System:
Proposed funding could advance traffic signal replacements and upgrades that focus on improving two
major objectives: safety and performance. Each objective listed has a direct correlation to enhancing
safety at intersections or of City roadways while also improving efficiency and operability of the traffic
signal systems. Tax measure funds could also be used as matching funds for federal, state and local
grants.
Improvements could include:
Replacement of aging or legacy traffic controllers and signal cabinet and equipment
Replacement of rusted, faded or missing traffic signal back‐plates or signal heads
Replacement of obsolete pedestal‐mounted traffic signals to overhead mounted traffic signals
Repair and/or replacement of broken inductive pavement loops and failing video cameras
Converting non‐actuated intersections to actuated
Installation of pedestrian countdown indications and ADA compliant push buttons citywide
Replacement of obsolete 8” traffic signal lamps to standard 12” traffic signal lamps
Installation of Bicycle Detection System Citywide
Replacement of legacy communications equipment and expansion of City Fiber Optics, Wireless,
and/or Twisted Pair Communications
Expansion of Adaptive Signal System
Installation of Traffic Monitoring Devices:
o Closed‐Circuit Television (CCTV) Cameras at intersection along Major Trolley, Freeway
interchanges, or major cross streets in the City of Chula Vista
o Expansion of Data Collection Systems to actively monitor Level‐of‐Service of City Streets
o Changeable Message Sign System along Main Street to mitigate special event traffic for
Sleep Train Amphitheater
o Installation of Traffic Calming Devices
Comprehensive Coordination Retiming Project Citywide
Fire Response Vehicles (Apparatus):
The Fire Department’s fire apparatus fleet is currently experiencing excessive years of service. This has
led to increased downtime, decreased reliability, and obsolete safety features. The Fire Department and
Public Works Department are challenged on a daily basis with maintaining an adequate fire apparatus
fleet (frontline and reserve) due to the above factors. The current fleet downtime report shows, for
every five days a fire apparatus is in service, it then requires one full day out of service for maintenance
and repair. Fire apparatus replacement standards call for 10 to 12 years for front line service with five
years in reserve capacity. Over half (10 of 17 fire apparatus) of the fire apparatus fleet exceeds 12 years
of service, three of which are beyond 20 years of service. Funds could be used to replace Fire Engines
and Fire Trucks that are overdue for replacement by excessive maintenance expenses or obsolete
equipment improving response times.
2022-04-28 PCOC Agenda Page 18 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
9
Amendment #10 April 2022
Fire Equipment:
Major fire equipment needs include radio communications equipment, mobile data computer (MDC)
communications equipment, and respiratory protection breathing apparatus.
The City of Chula Vista participates in the Regional Communication System (RCS), which provides public
safety and public service radio communications to the San Diego County area. Federal Regulations,
require the upgrade of the RCS to become compliant. This requires its users to upgrade their handheld,
vehicle mounted, and dispatch radios to match the system backbone upgrade.
The Fire Department also uses mobile data computers (MDCs) to communicate critical emergency
incident information between response units and dispatch. These MDCs are ruggedized, military grade
laptops to withstand use during emergency response. These MDCs are beyond their useful life,
exceeding 10 years old and also no longer meet new operating system requirements to properly
communicate with dispatch.
The Fire Department is required to provide and maintain proper respiratory protection breathing
apparatus equipment for firefighting activity. The current fleet of breathing apparatus is between 13 to
15 years old and beyond the useful life. This has led to increased downtime, decreased reliability and
obsolete safety features. Breathing apparatus are utilized when fighting fires and critical to the
protection of firefighter personnel.
Police Equipment:
Major equipment needs for the Police Department include body worn cameras, video management
system and replacement of network servers. Use of body worn cameras has helped the Police
Department gather more evidence leading to successful prosecution of cases, as well as protecting both
the officer and citizens from allegations of excessive force or misconduct. The video management
system will enable the Police Department to view recordings from different cameras when conducting
investigations and responding to calls. In order to keep up with technology, network servers will be
updated in 5‐year increments.
Fire Station Repairs/Replacements:
The Fire Department currently operates nine fire stations to provide a network of emergency response
service delivery. Three of these fire stations are well beyond their service life. Fire bay doors must be
enlarged to accommodate new fire apparatus and extensive termite treatment and repair is needed. In
addition, these fire stations are not compliant with seismic building codes. Also, as emergency response
volume increases beyond the current network of response capacity, existing Fire Station 4 will require
expansion to accommodate a secondary response unit in order to meet the service delivery demand.
Funding is needed in order for the expansion to move forward and improve response times to the
community.
2022-04-28 PCOC Agenda Page 19 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
10
Amendment #10 April 2022
Police Vehicles:
There are 128 police vehicles in the Police Department. The vehicles in this fleet are technologically
complex and specially outfitted for law enforcement work. In addition to being very sophisticated pieces
of equipment they are subjected to very high levels of utilization. Approximately 41% of the fleet is
identified as needing replacement due to excessive repairs from high mileage and heavy use. The failure
of operating patrol vehicles would impact response times to the community.
Police Facility Repairs:
The Police facility is 12 years old and is in relatively good condition. Although, the facility is in good
condition it is given the highest rating possible for Consequence of Failure. This is because the facility
operates 24 hours a day, 7 days a week. The Asset Management Plan did identify a few items which
need immediate attention to avoid operational impacts with the most immediate being the replacement
of the heating and air conditioning system. Failure of the system could cause disruption to critical
service delivery and the ability to dispatch police personnel.
Public Safety Computer Aided Dispatch System (CAD):
The Computer Aided Dispatch (CAD) system is a critical Information and Technology (IT) component,
which serves as the lynchpin of the 911 emergency service frame work for the police department. CAD
is critical because it is used to dispatch police officers to citizens’ calls for service, and its efficiency and
performance directly impact response times and officer safety. In 2015, the police department
processed 97,632 calls for service in the CAD system. The department’s CAD system is also the central
repository for all records and data related to calls for service. It is a key performance measurement tool
used by supervisors and managers to make important tactical and strategic decisions. Finally, the CAD
system’s reliability and stability are critical because it must have continuous availability. In short, CAD is
the virtual and technical heart of all police department operations, especially pertaining to emergency
service delivery.
Public Safety Regional Communications System (RCS):
The Regional Communications System (RCS) provides public safety and public service radio
communications service to San Diego County, Imperial County, 24 incorporated cities, and a multitude
of other local, state, federal and tribal government agencies in the San Diego County/Imperial County
Region. The RCS infrastructure is approaching the end of its life cycle and must be replaced. The County
of San Diego has been working with member RCS partner agencies to plan for the replacement of the
RCS system with a “Next Generation” public safety interoperable communications system which will
comply with Federal Communications System (FCC) and the national Association of Public Safety
Communications Officials standards. These regulations set in place standards for communication
systems which allow for interoperability between different cities, agencies, and various state and federal
agencies. This has been done to ensure that during emergency events, various public safety and
emergency response personnel can communicate with each other. The City of Chula Vista currently has
2022-04-28 PCOC Agenda Page 20 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
11
Amendment #10 April 2022
737 radios operating on the RCS. Based upon the radio count for the City, the approximate cost to the
City for participating in the Next Gen RCS project would be $4.5 million, not including financing cost. This
does not include the mandatory radio and equipment upgrades that would be needed at the City.
Other City Vehicles:
The “Other City Vehicles” comprises the remaining vehicles in the City’s inventory and supports all other
City provided services with the exception of those supporting the wastewater section. These vehicle
replacements have been deferred for many years resulting in excessive repair costs. The “out of
service” rates for many of these vehicles are at record highs impacting staff’s ability to provide services
to the community. Funding is needed to replace these vehicles (including lawnmowers, pick‐ups, dump
trucks, forklifts, etc.) and help the City move toward a more environmentally friendly and economically
efficient fleet composition reducing emissions, fuel and related operating costs. In addition, this
category includes the Fleet Infrastructure project for replacement of fuel systems, installation of EV
charging stations, a heavy duty in‐ground lift and replacement of the City’s obsolete fleet information
management system.
Sports Courts and Fields:
There is a high demand for use of the City’s various sports fields. Most sports fields are reserved for City
programs coordinated through the Youth Sports Council. The Youth Sports Council, which represents 22
member organizations in the City of Chula Vista, was formed in 1989 to assist the City in coordinating
youth sports programs and allocate field use in the City. Due to the combination of budgetary cuts and
water use restrictions, the City’s sports fields are overdue for renovation including re‐seeding, aeration,
fertilizing, and in some cases sod replacement. The Public Works department prepares a Field
Management Report which identifies the condition of the various fields. The current Field Management
report, located at www.chulavistaca.gov/infrastructure identified four fields that are closed due to poor
condition of the fields. Another 20 were classified as fair condition but at risk of deteriorating further.
This significantly limits the number of fields available to the various organizations providing youth sports
activities in the City of Chula Vista which includes participation of over 10,000 kids.
With additional funding, the sports fields could be brought back to good standings and available for field
allocation. In addition, funds could be allocated to upgrade the irrigations systems to a smart system
allowing for efficient and effective water allocation which would assist in keeping the fields healthy even
through the drought.
In addition to the sports fields, there are a total of 62 tennis courts and basketball courts. Based on the
most recent Court Management Report, located at www.chulavistaca.gov/infrastructure a total of 31
courts are considered in fair condition due to worn surfaces, visible cracks or separation and lifting
which will require replacement.
2022-04-28 PCOC Agenda Page 21 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
12
Amendment #10 April 2022
Park Infrastructure:
The City owns and manages 56 parks that cover approximately 560 acres. The largest park, Rohr Park,
covers nearly 60 acres. The asset management study identified several assets under the Park
Infrastructure category which included items such as barbeque grills, benches, drinking fountains,
irrigation controls, lights, picnic tables, play structures, playground surfacing, signage, trash bins, etc.
This Infrastructure, Facilities and Equipment Expenditure Plan recommends funding assets identified in
the AMP which are beyond their service life and in need of repair or replacement. Additional details are
available in the Parks Asset Management Plan located at www.chulavistaca.gov/infrastructure.
Recreation and Senior Centers:
In 2015, there were nearly 800,000 visits to our recreation facilities participating in sports, recreation,
senior programs and other activities. With nine recreation centers, two aquatic facilities and 56 parks,
the Recreation Department offers a myriad of opportunities for everyone to enjoy. Due to the high
volume use of these facilities any interruption or reduction in their availability directly impacts the City’s
residents. Additional funds could be used to replace roofs, water and waste water plumbing, heating
and air conditioning elements that have all reached or exceeded your expected service life.
More specifically, at the Norman Park Senior Center the condition assessment indicates that there is a
need to repair the perimeter exterior eaves, paint the interior and exterior of the building, repair the
kitchen and the restroom. At Loma Verde Recreation Center the pool pump system, decking, lighting
and shower areas are also in need of repair. The City’s newest recreation facilities, Salt Creek and
Montevalle, are now over 10 years old and are beginning to experience heating and air conditioning
failures and are in need of floor resurfacing throughout the gyms and classrooms. Other facilities, such
as the Women’s Club, are also in critical need of repair or replacement.
Civic Center Library and South Chula Vista Library:
The Chula Vista Civic Center Library opened its doors in 1976 and is celebrating its 40th Anniversary. The
Civic Center Library and South Chula Vista Library are highly valued and well used by the community.
Funding for the Library Department has been focused on increasing access to services and materials.
Over the years, through fundraising efforts by the Friends of the Chula Vista Library and Chula Vista
Public Library Foundation as well as State grants, the City has been able to do some cosmetic upgrades
to the interior of the buildings. At this point, there is a need to address some more significant
infrastructure repairs such as the roof, water and waste water plumbing, bathroom upgrades, heating
and air conditioning systems that have all reached or exceeded their expected useful life.
Other Public Buildings: (Animal Care Facility, Living Coast Discovery Center, Ken Lee Building)
In addition to the buildings discussed previously, there are other public buildings such as the Animal
Care Facility, Living Coast Discovery Center, and Ken Lee Building which are also in need of heating and
air conditioning replacements, roof and plumbing repairs, flooring replacements, restroom renovations
and upgrades to meet ADA standards.
2022-04-28 PCOC Agenda Page 22 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
13
Amendment #10 April 2022
Citywide Network Replacement
The overall computer network which provides all the connectivity between PC’s, servers, phones and
other network attached devices throughout the City is outdated with 20% of the equipment beyond
end‐of‐life status, and a majority of the rest of the equipment within a year of end‐of‐life status. Due to
advancements in technology the City is proposing a complete restructuring of the City’s computer
network in order to bring it up to industry standards in terms of: 1) Capability to handle high‐volumes of
data traffic; 2) Provide industry standard reliability and redundancy to ensure near 100% up‐time across
the network; and 3) To ensure high levels of security and resistance to modern day malware/hacking
attacks. Measure P funds will be used to upgrade the network, which will directly benefit the community
by allowing for Smart City functionality which will reduce traffic congestion on streets, reduce associated
carbon emissions, enable enhanced energy savings in City buildings, provide advanced citizen
engagement through data sharing and capabilities of virtual City Hall, and enable enhanced security at
City parks and other locations.
In addition to updating the City’s network, the Public Works Department deploys approximately 45
laptops in the field in order for crews to be able to receive work orders in the field, and then capture
data regarding issues they see in the field back into our asset management systems. The current fleet of
laptops is over 5 years old and only has 3G wireless modems which allow them to transmit data back to
the Public Works Department. 3G’s data footprint in Chula Vista is shrinking due to wireless carriers
focusing on 4G and 5G deployments. There are many areas in the eastern portion of Chula Vista, which
do not have 3G connectivity. This means crews must return back to the Public Works Department to
enter data. Types of data transmitted include photos and videos which require high‐speed connections.
Additionally, older laptops are limited in terms of processing speed and memory, which affects overall
productivity of the laptop in a data rich environment. Measure P funds will be used to replace these
laptops which will provide time savings and better work productivity allocating more time for the crews
to be out in the field serving the public.
Citywide Telecommunications
Measure P funds will be used to upgrade its telecommunications system which is nearly 20 years old.
Although functioning, the back‐end equipment required to keep the phone system working is no longer
manufactured. This requires the City to find replacement parts through used equipment if any
equipment fails. Due to the age of the phone system, it is becoming extremely difficult to find used
equipment to keep the system working. The phone system is also very limited in terms of how it can be
used in a modern business environment. New modern systems are run over a computer network (Voice
Over I.P. – VOIP) rather than by an analogue system. Analogue systems have significant limitations on
how a phone system can be used, while more modern systems allow for video conferencing, computer
screen sharing, call following (“desk phone” can be accessed regardless of location), and other features
which increase productivity and responsiveness for employees to the public. An updated
telecommunications system will also significantly reduce the risk of systematic failure.
2022-04-28 PCOC Agenda Page 23 of 52
Infrastructure, Facilities and Equipment Expenditure Plan 2022
14
Amendment #10 April 2022
2022-04-28 PCOC Agenda Page 24 of 52
Category CIP #Facility (Project)Description Status Measure P Allocation Est. Completion Date
Public Safety Buildings
Public Safety Buildings GGV0232 Police Facility Repairs HVAC- Replace boilers/chillers and heating/air conditioning system 1,000,000$
Public Safety Buildings GGV0232 Police Facility Repairs Control Panel/Intercom 500,000$
Total Public Safety Buildings 1,500,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library: Adult and Children Restrooms (4) Remodel Construction 929,389$ Summer 2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library HVAC 1,200,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library ADA Parking Improvements Awarded 175,000$ Summer 2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library LED Lighting 20,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library Boiler/Chiller Construction 240,000$ Summer 2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library Exterior Stucco Repairs 50,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library Flooring 329,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library HVAC 265,000$
Public Facilities GGV0233 Recreation and Senior Center Repairs Otay Recreation Center Egress Study 6,500$
Public Facilities GGV0233 Recreation and Senior Center Repairs Otay Recreation Center Egress Updates 40,000$
Public Facilities GGV0233 Recreation and Senior Center Repairs Montevalle HVAC 100,000$
Public Facilities GGV0233 Recreation and Senior Center Repairs Norman Park Senior Center HVAC Phase IB 165,000$
Public Facilities GGV0257 Recreation and Senior Center Repairs 1301 Oleander Ave Building Repairs 750,000$
Public Facilities GGV0234 Other Public Facilities Living Coast Discovery Center Deck and Rails Construction 238,485$ Summer 2022
Public Facilities GGV0234 Other Public Facilities Public Works Chiller/Boiler Replacement Construction 700,000$ Spring 2022
Public Facilities GGV0234 Other Public Facilities Public Works Air Handlers - Phase I 200,000$
Public Facilities GGV0234 Other Public Facilities Electrical Switchgear Upgrades- 1031 Oleander Facility (former Boys/Girls Club)Construction 50,700$ Summer 2022
Public Facilities GGV0234 Other Public Facilities Citywide Gate Replacements 10,000$
Public Facilities GGV0235 Other Public Facilities CC Roof/HVAC Repair (Pan) - Building A In Progress 88,000$ Summer 2022
Public Facilities GGV0234 Other Public Facilities Miscellaneous HVAC Maintenance/Repair Projects I In Progress 40,000$ Ongoing
Public Facilities GGV0234 Other Public Facilities Public Works Shops and Garage - LED Lighting In Progress 50,000$ Ongoing
Public Facilities GGV0234 Other Public Facilities Solar Inverters Replacement and Restoration 356,309$
Public Facilities GGV0234 Other Public Facilities Public Works Shops - New Air Compressor 100,000$
Public Facilities GGV0234 Other Public Facilities Public Works Air Handlers (6) - HVAC 350,000$
Public Facilities GGV0234 Other Public Facilities Living Coast Discovery Center Repairs - Phase I 150,000$
Public Facilities GGV0234 Other Public Facilities Garage Plymovent Exhaust Recovery System Assessment 10,000$
Public Facilities GGV0234 Other Public Facilities Exterior Wood Surfaces- Fire Station 8 60,000$
Public Facilities GGV0234 Other Public Facilities Citywide Plumbing Retrofits 125,000$
Public Facilities GGV0234 Other Public Facilities Animal Care Facility HVAC 200,000$
Public Facilities GGV0234 Other Public Facilities Civic Center Bldg C - HVAC (IT Server Room)410,000$
Public Facilities GGV0234 Other Public Facilities Civic Center Bldg B - HVAC 63,470$
Public Facilities GGV0234 Other Public Facilities Civic Center Bldg C - HVAC 500,000$
Public Facilities GGV0234 Other Public Facilities Miscellaneous Electrical Maintenance/Repair 40,000$
Total Public Facilities 8,011,853$
Infrastructure
Infrastructure CTY0226 Other Public Infrastructure Removal of Dead/Dying Trees Citywide In Progress 300,000$ Ongoing
Total Other Public Infrastructure 300,000$
Infrastructure PRK0326 Park Infrastructure Electrical Switchgear Upgrades -Eucalyptus Park - Tennis Courts/Baseball Fields Construction 121,004$ Summer 2022
Infrastructure PRK0326 Park Infrastructure Playground Renovations/Replacements Design 1,000,000$
Project Status Updates
Measure P - In progress
Public Facilities
Infrastructure
4/15/2022 Page 1 of 22022-04-28 PCOC Agenda Page 25 of 52
Category CIP #Facility (Project)Description Status Measure P Allocation Est. Completion Date
Infrastructure PRK0326 Park Infrastructure Path/Walkway Repairs/ADA Access - Rancho Del Rey Design 150,000$
Infrastructure PRK0327 Park Infrastructure McKenzie Creek Pickleball Light Pole Replacement In Progress 9,600$ Spring 2022
Infrastructure PRK0326 Park Infrastructure Path/Walkway Repairs/ADA Access - Citywide Design 850,000$
Infrastructure PRK0326 Park Infrastructure Replace Distressed Park Pathway Lights Design 300,000$
Infrastructure PRK0326 Park Infrastructure Park LED Lighting Design 100,000$
Infrastructure PRK0326 Park Infrastructure Rohr Fitness/Jogging Path Design 350,000$
Infrastructure PRK0326 Park Infrastructure Dog Parks Renovation Design 100,000$
Infrastructure PRK0326 Park Infrastructure Len Moore Skate Park Design 75,000$
3,055,604$
Infrastructure
Infrastructure PRK0328 Park Infrastructure Rohr Park Restroom Replacement Construction 1,111,767$ Spring 2022
Infrastructure
Infrastructure PRK0327 Sports Courts and Fields Irrigation and Controller Changeover Citywide In Progress 1,600,000$ 2023
Total Park l Infrastructure 5,767,371$
Completed Projects
Public Safety Buildings GGV0232 Police Facility Repairs Police Facility Drone Rooftop Upgrades Project Completed 200,000$ NOC filed 3/24/2022
Public Safety Buildings GGV0232 Police Facility Repairs Police Facility Salley Door Replacement Project Completed 35,882$ NOC filed 3/24/2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library Door Replacement Project Completed 42,040$
Infrastructure PRK0326 Park Infrastructure Replacement of Pedestrian and Parking Lot Lights (Windingwalk and Veterans)Project Completed July 2021 381,307$ NOC filed 8/13/2021
Public Safety Buildings GGV0233 Police Facility Repairs Upgrade to Hormonn Highspeed Gates (3 locations)Project Completed 98,599$
Public Safety Buildings GGV0232 Police Facility Repairs Uninterruptible Power Supply Project Completed 80,000$
Total Completed 837,828$
16,417,052$ TOTAL PROJECT ALLOCATIONS
4/15/2022 Page 2 of 22022-04-28 PCOC Agenda Page 26 of 52
CITY OF CHULA VISTA, CALFORNIA
2016 MEASURE P SALES TAX FUND
FOR THE YEAR ENDED JUNE 30, 2021
REPORT ON COMPLIANCE WITH THE
INFRASTRUCTURE, FACILITIES
AND EQUIPMENT PLAN
2022-04-28 PCOC Agenda Page 27 of 52
&,7<2)&+8/$9,67$&$/,)251,$
0($685(36$/(67$;)81'
5(325721&203/,$1&(:,7+7+(
,1)$6758&785()$&,/,7,(6$1'(48,30(17(;3(1',785(3/$1
)257+(<($5(1'('-81(
2022-04-28 PCOC Agenda Page 28 of 52
&,7<2)&+8/$9,67$&$/,)251,$
0($685(36$/(67$;)81'
5(325721&203/,$1&(:,7+7+(
,1)$6758&785()$&,/,7,(6$1'(48,30(17(;3(1',785(3/$1
)257+(<($5(1'('-81(
7$%/(2)&217(176
3DJH
1XPEHU
,QGHSHQGHQW$XGLWRUV¶5HSRUWRQ&RPSOLDQFHZLWK$SSOLFDEOH5HTXLUHPHQWV
DQGRQ,QWHUQDO&RQWURO2YHU&RPSOLDQFH
6FKHGXOHVRI0HDVXUH36DOHV7D[)XQG
%DODQFH6KHHW
6WDWHPHQWRI5HYHQXHV([SHQGLWXUHVDQG&KDQJHVLQ)XQG%DODQFH
2022-04-28 PCOC Agenda Page 29 of 52
203 N. Brea Blvd., Suite 203 Brea, CA 92821 Lance, Soll & Lunghard, LLP Phone: 714.672.0022
,1'(3(1'(17 $8',7256¶ 5(3257 21 &203/,$1&( :,7+ $33/,&$%/(
5(48,5(0(17 $1' 21 ,17(51$/ &21752/ 29(5 &203/,$1&(
7R WKH +RQRUDEOH 0D\RU DQG 0H PEHUV RI WKH &LW\ &RXQFLO
&LW\ RI &KXOD 9LVWD &DOLIRUQLD
Report on Compliance
Opinion on the 2016 Measure P Sales Tax Fund
:H KDYH DXGLWHG WKH FRPSOLDQFH RI WKH 0HDVXUH 3 6DOHV 7D[ )XQG RI WKH &LW\ RI &KXOD 9LVWD
&DOLIRUQLD WKH ³&LW\´ ZLWK WKH UHTXLUHPHQWV GHVFULEHG LQ 2UGLQDQFH 1R WKH 2UGLQDQFH DQG WKH
,QIUDVWUXFWXUH )DFLOLWLHV DQG (TXLSPHQW ([SHQGLWXUH 3ODQ WKH 6SHQGLQJ 3ODQ IRU WKH \HDU HQGLQJ
-XQH
,Q RXU RSLQLRQ WKH &LW\ FRPSOLHG LQ DOO PDWHULDO UHVSHFWV ZL WK WKH W\SHV RI FRPSOLDQFH WKDW FRXOG KDYH D
GLUHFW DQG PDWHULDO HIIHFW RQ WKH UHTXLUHPHQWV UHIHUUHG WR DERY H DSSOLFDEOH WR WKH 0HDVXUH 3 6DOHV
7D[ )XQG IRU WKH \HDU HQGHG -XQH
Basis for Opinion
:H FRQGXFWHG RXU DXGLW RI FRPSOLDQFH LQ DFFRUGDQFH ZLWK DXGLWLQJ VWDQGDUGV JHQHUDOO\ DFFHSWHG LQ WKH
8QLWHG 6WDWHV RI $PHULFD *$$6 WKH VWDQGDUGV DSSOLFDEOH WR IL QDQFLDO DXGLWV FRQWDLQHG LQ
Government Auditing Standards LVVXHG E\ WKH &RPSWUROOHU *HQHUDO RI WKH 8QLWHG 6WDWHV DQG W KH
UHTXLUHPHQWV GHVFULEHG LQ WKH 2UGLQDQFH DQG WKH 6SHQGLQJ 3ODQ 2XU UHVSRQVLELOLWLHV XQGHU WKRVH
VWDQGDUGV DUH IXUWKHU GHVFULEHG LQ WKH $XGLWRU¶V 5HVSRQVLELOLWL HV IRU WKH $XGLW RI &RPSOLDQFH VHFWLRQ RI RXU
UHSRUW
:H DUH UHTXLUHG WR EH LQGHSHQGHQW RI WKH &LW\ DQG WR PHHW RXU RWKHU HWKLFDO UHVSRQVLELOLWLHV LQ
DFFRUGDQFH ZLWK UHOHYDQW HWKLFDO UHTXLUHPHQWV UHODWLQJ WR RXU DXGLW :H EHOLHYH WKH DXGLW HYLGHQFH ZH
KDYH REWDLQHG LV VXIILFLHQW DQG DSSURSULDWH WR SURYLGH D EDVLV IRU RXU RSLQLRQ 2XU DXGLW GRHV QRW SURYLGH D
OHJDO GHWHUPLQDWLRQ RI WKH &LW\¶V FRPSOLDQFH ZLWK WKH FRPSOLDQFH UHTXLUHPHQWV UHIHUUHG WR DERYH
Responsibilities of Management for Compliance
0DQDJHPHQW LV UHVSRQVLEOH IRU FRPSOLDQFH ZLWK WKH UHTXLUHPHQWV UHIHUUHG WR DERYH DQG IRU WKH GHVLJQ
LPSOHPHQWDWLRQ DQG PDLQWHQDQFH RI HIIHFWLYH LQWHUQDO FRQWURO R YHU FRPSOLDQFH ZLWK WKH UHTXLUHPHQWV RI
ODZV VWDWXWHV UHJXODWLRQV UXOHV DQG SURYLVLRQV RI FRQWUDFWV RU JUDQW DJUHHPHQWV DSSOLFDEOH WR WKH &LW\¶V
JRYHUQPHQW SURJUDPV
Auditor’s Responsibilities for the Audit of Compliance
2XU REMHFWLYHV DUH WR REWDLQ UHDVRQDEOH DVVXUDQFH DERXW ZKHWKHU PDWHULDO QRQFRPSOLDQFH ZLWK WKH
FRPSOLDQFH UHTXLUHPHQWV UHIHUUHG WR DERYH ZKHWKHU GXH WR IUDXG RU HUURU DQG H[SUHVV DQ RSLQLRQ RQ WKH
&LW\¶V FRPSOLDQFH EDVHG RQ RXU DXGLW 5HDVRQDEOH DVVXUDQFH LV D KLJK OHYHO RI DVVXUDQFH EXW LV QRW
DEVROXWH DVVXUDQFH DQG WKHUHIRUH LV QRW D JXDUDQWHH WKDW DQ DXG LW FRQGXFWHG LQ DFFRUGDQFH ZLWK *$$6
Government Auditing Standards ZLOO DOZD\V GHWHFW PDWHULDO QRQFRPSOLDQFH ZKHQ LW H[LVWV 7KH U LVN RI
2022-04-28 PCOC Agenda Page 30 of 52
To the Honorable Mayor and Members of the City Council
City of Chula Vista, California
not detecting material noncompliance resulting from fraud is higher than for that resulting from error, as
fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal
control. Noncompliance with the compliance requirements referred to above is considered material if
there is a substantial likelihood that, individually or in the aggregate, it would influence the judgment made
by a reasonable user of the report on compliance about the City’s compliance with the requirements
described in the Ordinance and the Spending Plan.
In performing an audit in accordance with GAAS, Government Auditing Standards, and the compliance
requirements referred to above, we:
Exercise professional judgment and maintain professional skepticism throughout the audit
Identify and assess the risks of material noncompliance, whether due to fraud or error, and
design and perform audit procedures responsive to those risks. Such procedures include
examining, on a test basis, evidence regarding the City's compliance with the compliance
requirements referred to above and performing such other procedures as we considered
necessary in the circumstances.
Obtain an understanding of the City’s internal control over compliance relevant to the audit in
order to design audit procedures that are appropriate in the circumstances and to test and report
on internal control over compliance in accordance with the Ordinance and the Spending Plan, but
not for the purpose of expressing an opinion on the effectiveness of the City’s internal control
over compliance. Accordingly, no such opinion is expressed.
We are required to communicate with those charged with governance regarding, among other matters,
the planned scope and timing of the audit, and any significant deficiencies and material weaknesses in
internal control over compliance that we identified during the audit.
Report on Internal Control Over Compliance
A deficiency in internal control over compliance exists when the design or operation of a control over
compliance does not allow management or employees, in the normal course of performing their assigned
functions, to prevent, or detect and correct, noncompliance on a timely basis. A material weakness in
internal control over compliance is a deficiency, or combination of deficiencies in internal control over
compliance, such that there is a reasonable possibility that material noncompliance with a compliance
requirement will not be prevented, or detected and corrected, on a timely basis. A significant deficiency in
internal control over compliance is a deficiency, or a combination of deficiencies, in internal control over
compliance that is less severe than a material weakness in internal control over compliance, yet important
enough to merit attention by those charged with governance.
Our consideration of internal control over compliance was for the limited purpose described in the first
paragraph of this section and was not designed to identify all deficiencies in internal control over
compliance that might be material weaknesses or significant deficiencies in internal control over
compliance. Given these limitations, during our audit we did not identify any deficiencies in internal control
over compliance that we consider to be material weaknesses, as defined above. However, material
weaknesses or significant deficiencies in internal control over compliance may exist that have not been
identified.
Our audit was not designed for the purpose of expressing an opinion on the effectiveness of internal
control over compliance. Accordingly, no such opinion is expressed.
22022-04-28 PCOC Agenda Page 31 of 52
To the Honorable Mayor and Members of the City Council
City of Chula Vista, California
Purpose of this Report
The purpose of this report on internal control over compliance is solely to describe the scope of our
testing of internal control over compliance and the results of that testing based on the requirements
described in the Ordinance and the Spending Plan. Accordingly, this report is not suitable for any other
purpose.
Brea, California
December 28, 2021
32022-04-28 PCOC Agenda Page 32 of 52
Pooled cash and investments 34,867,736$
Restricted assets - cash and investments 181
Accrued interest receivable 21
Prepaid expenses 170,238
Total Assets 35,038,176$
Liabilities and Fund Balance:
Liabilities:
Accounts payable 760,168$
Retention payable 902,736
Total Liabilities 1,662,904
Assigned for Measure P Sales Tax 33,375,272
Total Fund Balance 33,375,272
Total Liabilities and Fund Balance 35,038,176$
CITY OF CHULA VISTA
Fund Balance:
Assets:
JUNE 30, 2021
BALANCE SHEET
SCHEDULES OF 2016 MEASURE P SALES TAX FUND
42022-04-28 PCOC Agenda Page 33 of 52
STATEMENT OF REVENUES, EXPENDITURES AND CHANGES IN FUND BALANCE
JUNE 30, 2021
Revenues:
Local sales and use tax 23,629,265$
Use of money and property 285,712
Miscellaneous 3,038
Total Revenues 23,918,015
Expenditures:
Contracted services 22,364
Equipment and shared infrastructure costs 428,958
Capital outlay 23,636,983
Debt service:
Principal retirement 763,233
Interest and fiscal charges 134,388
Total Expenditures 24,985,926
Excess (Deficiency) of Revenues
Over (under) Expenditures (1,067,911)
Other Financing Sources (Uses):
Transfers Out - Municipal Financing Authority Fund (8,128,500)
Total Other Financing Sources (Uses) (8,128,500)
Net Change in Fund Balance (9,196,411)
Fund Balance - Beginning 42,571,683
Fund Balance - Ending 33,375,272$
SCHEDULES OF 2016 MEASURE P SALES TAX FUND
CITY OF CHULA VISTA
52022-04-28 PCOC Agenda Page 34 of 52
Infrastructure, Facilities and Equipment Spending Plan ESTIMATED
One‐half cent Sales Tax Revenues over 10 year period Fiscal Year
April 2022 Revision 2022‐23
Estimated Revenues:
A Estimated 1/2 cent Sales Tax Revenues 25,588,947$
ESTIMATED TOTAL REVENUES 25,588,947$
Proposed Expenditures
B Fire Vehicles 127,550$
C Police Vehicles 944,950$
Total Public Safety Vehicles 1,072,500$
D Non‐Safety City Vehicles (i.e. Public Works Crews) 2,000,000$
E Fleet Infrastructure ‐$
Total Non‐Safety City Vehicles 2,000,000$
F Fire Equipment (i.e. breathing apparatus, Radios etc) 358,216$
G Police Equipment (i.e. body worn cameras, video camera equip etc)42,123$
H Police Communications & Dipatch System 194,862$
Total Public Safety Equipment 595,201$
I Fire Station Repair/Replacements ‐$
J Police Facility Repairs 25,000$
Total Public Safety Buildings 25,000$
K Recreation Centers and Senior Center 6,860,500$
L Civic Center and South Chula Vista Libraries ‐$
M Other Public Bldgs (i.e. Animal Care Facility & Living Coast DC)1,070,000$
Total Other Public Facilities 7,930,500$
N Sports Courts and Fields 500,000$
O Park Infrastructure 750,000$
P Street Pavement (Arterials/Collectors/Residential)‐$
Q Traffic Signal System (Fiber Network)‐$
R Other Infrastructure (Storm Drains, Sidewalks, Trees etc)554,000$
S Citywide Network Replacement ‐$
T Citywide Telecommunications ‐$
Total Infrastructure 1,804,000$
Projects to be Financed through Annual Capital Lease Payments
U Police Communications & Dipatch System 170,238$
V Regional Communications System (RCS) 345,261$
W Fire Response Vehicles 780,000$
Total Public Safety Capital Lease Pmts 1,295,499$
TOTAL EXPENDITURES 14,722,700$
Bond Proceeds:
X Bond Proceeds ‐$
Y Cost of Issuance ‐$
TOTAL BOND PROCEEDS ‐$
Investment Earnings:
Z Investment Earnings ‐$
TOTAL INVESTMENT EARNINGS ³‐$
Bond Debt Service:
AA Debt Service Principal 6,180,000$
AB Debt Service Interest 1,640,000$
TOTAL DEBT SERVICE 7,820,000$
Administrative Expenses:
AC Audit 5,412$
AD Bond Administration 7,252$
TOTAL ADMINISTRATIVE EXPENSES 12,664$
TOTAL 22,555,364$
2022-04-28 PCOC Agenda Page 35 of 52
Page 1 of 10
DRAFT Annual Report of the Measure P Citizens Oversight Committee
Fiscal Year 2020‐21
Measure P Background
In November 2016, Chula Vista voters approved Measure P: a temporary, ten‐year, half‐cent
sales tax to fund high priority infrastructure needs. Collection of the sales tax began April 1, 2017.
The sales tax is projected to raise $219 million, which will be used to upgrade police, fire,
paramedic and 9‐1‐1 equipment, vehicles and facilities; fund streets and sidewalks; replace storm
drains to prevent sinkholes; improve parks; repair recreation facilities; and repair or replace other
city infrastructure.
Citizens Oversight Committee
The ballot measure also established a Measure P Citizens Oversight Committee (COC). The
Measure P Citizens Oversight Committee (COC) is composed of 16 members. The purpose of the
COC is to review and report on all Measure P expenditure plans, financial reports, and audits.
Eleven of the COC members serve as “Designated Members.” Designated Members were
nominated by local organizations and individuals such as the Chula Vista Chamber of Commerce,
Chula Vista Youth Sports Council, Chula Vista Growth Management Oversight Commission, and
the Chula Vista Police and Fire Chiefs. The remaining five members are “At‐Large Members”
selected from a pool of applicants who applied directly to the City. Five “At‐Large Members,”
included at least one resident from each of the four City Council districts and one nominated by
the Mayor.
The board is composed of 16 members appointed to a four‐year term.
Member Appointment
Criteria Term Expiring
Greg Martinez (Vice Chair) District 1 Rep. 6/30/21
Christopher Redo District 2 Rep. 6/30/21
Saad Ilyas District 3 Rep. 6/30/21
Christopher Sheridan District 4 Rep. 6/30/21
Mona Freels At‐Large Rep. 6/30/21
Vacant Designated Rep.1 6/30/21
Silvestre Vigilante Designated Rep.2 6/30/21
Silvia Saldivar Designated Rep.3 6/30/21
David Garcias (Chair) Designated Rep.4 6/30/21
Todd Voorhees Designated Rep.5 6/30/21
Michael Lengyel Designated Rep.6 6/30/21
Nicole Enriquez Designated Rep.7 6/30/21
Oscar Romo Designated Rep.8 6/30/21
Robert Ziomek Designated Rep.9 6/30/21
Donald Hunter Designated Rep.10 6/30/21
Leon Firsht Designated Rep.11 6/30/21
2022-04-28 PCOC Agenda Page 36 of 52
Page 2 of 10
Nominating Authorities are as follows:
1 ‐ Chula Vista Chamber of Commerce
2 ‐ Chula Vista Sports Council
3 ‐ Alliance of Californians for Community Empowerment, San Diego Branch
4 ‐ San Diego and Imperial Counties Labor Union
5 ‐ San Diego County Taxpayers Association
6 ‐ Growth Management Oversight Commission
7 ‐ Parks and Recreation Commission
8 ‐ Sustainability Commission
9 ‐ Chula Vista Fire Chief
10 ‐ Chula Vista Police Chief
11 ‐ Chula Vista Director of Public Works
The specific duties of the COC are as follows:
1. Review and comment on each year's Finance Department Report (as defined in CVMC
section 3.33.160.A); Measure P Spending Plan (as defined in CVMC section 3.33.160.B);
and the Annual Independent Auditor’s Report (as defined in CVMC section 3.33.160.C).
2. Prepare an Annual Report regarding the Finance Department Report for presentation to
the City Council at a public meeting.
3. Work with City staff to identify and apply "best practices" for tracking and reporting on
Measure P revenues and expenditures relative to other City revenues and expenditures.
Summary of fiscal year 2021 Independent Auditors’ Report on Compliance Revenues and
Expenditures
Major expenditures in the following categories incurred in fiscal year 2021:
Category FY 2021 Expenditures Major Items
Fire Services
14,453,267 Fire Vehicles, Fire Equipment, Facility Repairs
Police Services 2,441,413
Police Vehicles, Communication System,
Facility Repairs
Infrastructure 7,437,311
Streets, Other Public Infrastructure, Sports
Fields and Courts, Non‐Safety Vehicles, Public
Facilities, Traffic Signal Systems, Park
Infrastructure, Citywide Network
Replacement, Citywide Telecommunications
Staff Time 625,817 City Staff‐Time
Debt Service 8,128,500 Bond Debt Service
Administrative Expenses 28,116
Audit, Bond Administration Fees, Banking
Fees, Cost of Issuance
Total Expenditures $ 33,114,425
2022-04-28 PCOC Agenda Page 37 of 52
Page 3 of 10
Audited Statement of Revenues, Expenditures and Changes in Fund Balance
June 30, 2021
Revenues:
Local sales and use tax 23,629,265
Use of money and property 285,712
Miscellaneous 3,038
Total Revenues $ 23,918,015
Expenditures:
Contracted Services 22,364
Equipment and shared infrastructure costs 428,958
Capital outlay 23,636,983
Debt service:
Principal retirement 763,233
Interest and fiscal charges 134,388
Total Expenditures $ 24,985,926
Excess (Deficiency) of Revenues
Over (under) Expenditures (1,067,911)
Other Financing Sources (Uses):
Transfers Out – Municipal Financing Authority Fund (8,128,500)
Total Other Financing Sources (Uses) $ (8,128,500)
Net Change in Fund Balance (9,196,411)
Fund Balance at Beginning of Year 42,571,683
Fund Balance as of June 30, 2021 $ 33,375,272
2022-04-28 PCOC Agenda Page 38 of 52
Page 4 of 10
Plan Expenditures by Replacement Category
($24,957,809)
Major Projects (Fiscal Year 2020/2021) by Cost Category
Fire Stations Repairs/Replacements (GGV0230):
The Fire Department’s present and future functional needs, technical constraints and feasibility,
and budget were considered in developing the project’s design criteria. New Fire Stations 5 and
3 (previously 9) are located at 341 Orange Avenue and 100 Moss Avenue, respectively. In March
2019, Council approved a Design Build Agreement with EC Constructors, Inc. for design of Fire
Stations 5 and 3 (previously 9). In February of 2020, Council awarded the Construction Phase.
13,756,645
581,689 114,933
1,610,594
720,958
107,673
2,188
616,146
962,874
70,875 483,410
1,662,845
105,893
1,402,603
152,945
1,953,846
‐
25,875
Fire Stations Repairs/Replacement (13,905,904)Fire Response Vehicles (581,689)
Fire Safety Equipment (114,933)Police Response Vehicles (1,610,594)
Public Safety Communication Systems (720,958)Police Facility Repairs (107,797)
Police Equipment (2,188)Streets (673,131)
Other Public Infrastructure (1,150,129)Sports Courts and Fields (70,875)
Non‐Safety Vehicles (483,410)Recreation and Senior Centers (1,688,383)
Civic Center and South Libraries (110,419)Other Public Facilities (1,421,030)
Traffic Signal Systems (273,909)Park Infrastructure (2,015,565)
Citywide Network Replacement (0)Citywide Telecommunications (26,896)
2022-04-28 PCOC Agenda Page 39 of 52
Page 5 of 10
Construction for Fire Station 5 began March 2020 and was completed and began operating in
March 2021. Construction for Fire Station 3 (previously 9) began April of 2020 and was completed
and began operating in April of 2021. Old Fire Station 3 (previously 9) and 5 have been
demolished. The contract will remain open until the end of the 1‐year landscape maintenance
period which expires in April of 2022.
Street Pavement Phases I & II (STL0427 & STL0430):
Pavement rehabilitation projects on various residential streets based on recommendations from
City's Pavement Management System for streets with poor pavement condition index (PCI)
ratings. The PCI score was utilized to identify failed (PCI 0‐25) and failing (PCI 25‐34) street
segments that could be addressed using Measure P funding.
Project STL0427 was awarded in January of 2018, which was the first phase of the pavement
rehabilitation project and included street segments with PCI ratings between0 to 15.
Construction was completed on the first phase in October of 2018. The second phase, STL0430,
includes street segments with PCI ratings up to 34. The second phase was awarded by Council in
April of 2019 and completed in August of 2020. Approximately 121,451 feet (23 miles) of
pavement was rehabilitated as part of this project.
Lauderbach Park:
This project will replace the natural grass on the sports field with synthetic turf and replace the
deteriorated basketball court. The replacement of the sports field includes a new walking path,
new sports lighting, and striping for both soccer and softball. A new picnic area will be
constructed replacing the old picnic areas. The new basketball court will also include striping for
a pickleball court. This project will also rehabilitate the failed walkway access to the park for the
senior housing to the south.
$1,000,000 of this Project is funded by the State of California Grant for California Youth Soccer
and Recreation Development Program and an additional $820,000 will come from Measure P.
Construction is expected to start in February of 2022 and completed in September of 2022.
Other Infrastructure ‐ CMP Rehabilitation Outside ROW Phases I & II (DRN0209, DRN0210,
DRN0211 & DRN0216):
Rehabilitation of failed Corrugated Metal Pipe (CMP) and other storm drain related repairs
outside the right of way.
Project DRN0209 began construction in March 2018 and repaired 28 CMP locations (3,864 linear
feet of CMP) for a project cost of approximately $991,944. Construction was completed in
December of 2018.
2022-04-28 PCOC Agenda Page 40 of 52
Page 6 of 10
Project DRN0210 cleaned, videotaped, and evaluated approximately 28,500 lineal feet of CMP.
Project DRN0211 repaired 134 CMP locations of approximately 18,908 linear feet of storm
drainpipe. A total of 14,955 linear feet of CMP was repaired in FY19/20. Total project cost of
$7,195,911.
Project DRN0216 is dedicated to addressing future emergency CMP failures. By having a funded
CIP project readily available, emergency failures can be addressed directly by this project;
eliminating the need to coordinate with other storm drain CIP projects for change orders to
complete construction based on funding availability. This project allowed for the emergency
repair of the sinkhole adjacent to the property at 604 Melrose Avenue, replacing 184 linear feet
of CMP in December of 2020 for a total of $264,253.
Other Infrastructure ‐ Sidewalk Replacement Citywide (STL0428 & STL0443):
This project repaired and replaced damaged sidewalk at various locations throughout the city
based on recommendations from the Pedestrian Connectivity Plan. The first project (STL0428)
to replace sidewalks was awarded in June 2019 and completed construction in December of
2019. Approximately 100 sidewalk locations were repaired. The second project (STL0443) was
awarded in August of 2019 and began repair of roughly 6,200 locations exhibiting moderate‐to‐
small heave displacements in March of 2020 and is anticipated to be completed in February of
2022.
Traffic Signal System‐Fiber Network (TRF0408):
Traffic signal replacements and improvements for 11 locations including: the expansion of City
fiber optics, wireless and/or twisted pair communications, expansion of Adaptive Signal System,
and installation of traffic monitoring devices. Construction began in February of 2021 and is
expected to be completed in May of 2022.
Max Field/Loma Verde Accessibility Study (PRK0333):
Consultant has completed review of the sports complex area and determined where a new
pedestrian crossing point across the Palm Road drainage basin should be provided to re‐establish
pedestrian connectivity between the Loma Verde Recreation Center and Max Field Sports
Complex since the wooden stairway was removed. Consultant has also completed several
parking lot alternatives and an A.D.A. accessibility review of the sports complex site including a
geotechnical analysis of the failed retaining wall along the southerly edge of the site. The
Accessibility Study was completed in September of 2020.
2022-04-28 PCOC Agenda Page 41 of 52
Page 7 of 10
Renovation of Fire Station 1 (GGV0252):
Existing City of Chula Vista Fire Station No. 1 requires renovations to meet the evolving duties of
the Fire Department, accommodate modern equipment, renovate and repair aging aspects of
the building, and accommodate firefighter personnel needs. The existing ladder truck housed at
Fire Station No. 1 will be replaced in the next year with a larger apparatus that will not fit within
the existing apparatus bay making alterations to the existing apparatus bay necessary. The fire
station age and condition require replacement or rehabilitation of various areas as part of this
Project. The station dorm rooms and bathrooms require upgrades to meet modern firefighter
personnel needs. In May of 2021, Council approved a Design Build Agreement with EC
Constructors, Inc. for design of the Fire Station 1 renovations. The design phase is anticipated to
be completed in June of 2022 at which point a resolution to award the Construction Phase
contract will be brought to Council. Construction for Fire Station 1 renovations is expected to
begin in June of 2022 and be completed in February of 2023.
Loma Verde Recreation Center (GGV0247):
In April 2020, the City approved a Design Build Agreement with EC Constructors, Inc. for design
of Segments 1 and 2 of the Loma Verde Recreation Center. In August 2021, Council awarded the
contract for the Construction Phase of Segments 1 and 2 which includes the demolition and re‐
construction of approximately 20,000 square feet of the Center and will feature a new multi‐
purpose gymnasium, dance rooms, crafts room, fitness room, game room, hard courts,
restrooms, changing rooms, staff offices, lifeguard staff room, and break room. Construction of
Segments 1 and 2 is expected to be completed in December of 2022, but these segments may
not be opened for use until the completion of Segment 3.
Segment 3 is part of the project, but funding for this project is from the American Rescue Plan
Act (ARPA). The segment 3 design started in June of 2021 and is expected to be completed mid‐
2022 and construction will immediately follow. The Segment 3 portion of the project replaces
the balance of the existing building to create space for new pool mechanical equipment, wet and
dry storage, new competition pool, new therapy pool, new pool deck and a classroom space.
Depending on funding availability, the facility may also include a new splashpad, replacement
playground, replacement solar water heater, and new sports lighting. The City does not currently
have adequate funding to construct the current scope of Segment 3.
Sidewalk and Pavement Improvements at City Parks (PRK0326):
The design of this project began in March 2020 and the project was awarded August 18, 2020.
The project includes the installation of sidewalk and pavement improvements at four (4) City park
locations: Eucalyptus Park, Los Niños Park, Rohr Park and Terra Nova Park. ADA compliant
bleachers were also installed at Eucalyptus Park. Project completed May 2021.
2022-04-28 PCOC Agenda Page 42 of 52
Page 8 of 10
Winding Walk Park/Veterans Park Lighting (PRK0326):
The design of this project began in September 2019 and the project was awarded in May 2020.
The project will replace failing pedestrian walkway and parking lot lighting at Winding Walk Park
and Veterans Park and Recreation Center. Project completed July 2021.
Norman Park Senior Center Batten Seam Metal Roof (GGV0233)
Installation of new batten seam metal roof panels including new flashing trim and underlayment
on the West Wing of the Norman Park Senior Center. The project was completed December 5,
2020.
Women’s Club Window Replacement & Exterior Painting (GGV0233):
This project was awarded on June 24, 2020, for the installation of new windows and screens,
associated stuccos and lath and plaster repairs, and exterior painting. Project completed January
2021.
Projects in Progress
Rohr Park Restroom Replacement (PRK0328):
The project replaces an existing restroom building at Rohr Park with a new restroom building.
The restroom building has two community restrooms, one for men and one for women, with a
third room housing utility/mechanical and a fourth room for storage.
Electrical Switchgear Upgrades (GGV0234, PRK0326)
Installation of a new electrical switchgear package at 2 locations: Project GGV0234 at 1301
Oleander Facility (formerly the Boys and Girls Club of South County) and Project PRK0326 at
Eucalyptus Park Tennis Courts and Baseball Field.
Public Works Boiler/Chiller (GGV0234):
The Public Works facility boiler/chiller replacement project includes replacing existing single air‐
cooled chiller, single boiler, four (4) hydronic chilled water pumps and two (2) hydronic heating
hot water pumps.
Upcoming Projects
Chula Vista Civic Center Library – Children’s Library and Restroom Upgrades (GGV0231)
Upgrades of four restrooms to include removal and replacement of existing finishes, fixtures, and
accessories in compliance with accessibility guidelines and City standards: new carpeting and
repainting of the Children’s Library and entry foyer, as well as the removal of no longer needed
bookshelves and furniture
2022-04-28 PCOC Agenda Page 43 of 52
Page 9 of 10
Civic Center Library ADA and Parking Improvements (GGV0231)
Installation of concrete pedestrian ramps in compliance with accessibility guidelines. Slurry seal
and restripe entire Civic Center Library parking lot. Install pipe gates at both Civic Center Library
parking lot entries.
Non‐Safety Vehicles:
Measure P has allowed for the replacement of vehicles that were beyond their recommended
replacement date. The vehicles/equipment listed below represent only those not assigned to
Safety. In fiscal year 2021 approximately $440,000 was spent on public services vehicles and
equipment. Purchases include the following:
(1) Ford F‐150 XL 4WD
(1) Case 590SN Backhoe
(1) Telescopic Aerial Bucket Truck
(1) Ford F‐450 with Royal Stake Bed Dump Body
(1) Ford F‐250 with Irrigation Utility Body
It is important to note that several vehicles and pieces of equipment have been ordered through
Measure P funding. However due to unanticipated production interruptions and supply
shortages at the manufacturers, delivery of the ordered vehicles/equipment has been delayed.
At the end of fiscal year 2021, there were purchase orders open in the amount of $1.8 million for
vehicles/equipment not assigned to Safety.
Conclusion
The Citizens Oversight Committee notes that this Annual Report refers only to the period from
July 1, 2020 to June 30, 2021. This report presents the fourth full year of collections and
expenditures for the Measure P funds. During this period the Committee took additional steps to
improve the format, content, and scope of reports on expenditures, work schedule, and public
information efforts required to provide citizens with transparency on the finances associated
with the implementation of Measure P.
In April 2017, City staff provided a status report to the Committee on the pending Measure P
bond issuance. The intent of the bond issuance was to advance the funds necessary to initiate
projects listed by the City as critical red assets (those in imminent stages of failure) in the City’s
Asset Management Plan.
On July 27, 2017, City staff reported to the Committee that the bond issuance had been
successful, generating $70,000,000 in net bond proceeds to be used for Measure P projects.
Accordingly, all budgets for the Measure P Spending Plan were prepared in compliance with the
ordinance, including the net bond proceeds.
2022-04-28 PCOC Agenda Page 44 of 52
Page 10 of 10
The Citizens Oversight Committee has reviewed the Independent Auditor’s Report on
Compliance with Applicable Requirement prepared by the audit firm of Lance, Soll and Lunghard
(LSL), the Measure P Spending Plan, and various expenditure and revenue reports prepared by
the City staff. In its report dated June 30, 2021, the auditor’s opinion was that “the City complied,
in all material respects, with the types of compliance that could have a direct and material effect
on the requirements…” of the 2016 Measure P Sales Tax Fund.
We would like to acknowledge City staff for their dedication and support to the COC. They have
been responsive as we work to ensure transparency in the reporting of Measure P Funds.
Attachment A – Copy of the FY21 Audited Report
Attachment B – Fiscal Year 2020‐21 Expenditure Report (For Informational Purposes Only)
2022-04-28 PCOC Agenda Page 45 of 52
Measure P
Citywide Infrastructure, Facilities and Equipment Expenditure Plan
1/2 cent Sales Tax Revenues over 10 year period
Summary Table as of 12/31/21
10‐Year To Date To Date
Total by Major Category Timeframe Allocations Q1 Q2 Q3 Q4 Totals
REVENUES:
A Sales Tax Revenues 223,089,835$ 108,527,738$ 62,121,456$ 23,629,265$ 2,008,065$ ‐$ ‐$ ‐$ 87,758,786$
B Investment Earnings 3 ‐$ ‐$ 3,592,573$ 617,062$ ‐$ ‐$ ‐$ ‐$ 4,209,635$
C Miscellaneous ‐$ ‐$ 232,987$ 3,038$ 2,516$ 122$ ‐$ ‐$ 238,662$
Total Revenues 223,089,835$ 108,527,738$ 65,947,016$ 24,249,365$ 2,010,581$ 122$ ‐$ ‐$ 92,207,083$
EXPENDITURES:
D Fire Stations Repairs/Replacement 26,210,449$ 26,210,449$ 7,060,742$ 13,756,645$ 187,447$ 117,496$ ‐$ ‐$ 21,122,329$
E Fire Response Vehicles 19,847,580$ 11,790,030$ 6,599,534$ 581,689$ 391,552$ 405,178$ ‐$ ‐$ 7,977,953$
F Fire Safety Equipment 5,197,913$ 1,385,000$ 664,592$ 114,933$ ‐$ 12,548$ ‐$ ‐$ 792,073$
Total Fire Services 51,255,942$ 39,385,479$ 14,324,868$ 14,453,267$ 578,999$ 535,223$ ‐$ ‐$ 29,892,356$
G Police Response Vehicles 12,951,470$ 6,651,250$ 3,410,200$ 1,610,594$ 319,050$ 7,910$ ‐$ ‐$ 5,347,754$
H Public Safety Communication Systems 8,645,689$ 4,993,137$ 3,217,561$ 720,958$ 214,299$ ‐$ ‐$ ‐$ 4,152,818$
I Police Facility Repairs 2,700,656$ 2,575,656$ 720,660$ 107,673$ ‐$ 96,031$ ‐$ ‐$ 924,364$
J Police Equipment 644,318$ 316,239$ 173,166$ 2,188$ ‐$ ‐$ ‐$ ‐$ 175,354$
Total Police Services 24,942,133$ 14,536,282$ 7,521,587$ 2,441,413$ 533,349$ 103,941$ ‐$ ‐$ 10,600,291$
K Streets 22,906,310$ 22,906,310$ 19,301,705$ 616,146$ ‐$ ‐$ ‐$ ‐$ 19,917,851$
L Other Public Infrastructure 17,368,553$ 16,968,551$ 9,669,640$ 962,874$ 86,255$ 563,948$ ‐$ ‐$ 11,282,716$
M Sports Fields and Courts 3,345,655$ 2,445,655$ 713,475$ 70,875$ ‐$ ‐$ ‐$ ‐$ 784,350$
N Non‐Safety Vehicles 13,191,170$ 10,291,170$ 4,549,473$ 483,410$ 523,691$ 475,400$ ‐$ ‐$ 6,031,974$
O Recreation and Senior Centers 21,637,071$ 20,776,571$ 2,710,864$ 1,662,845$ 199,893$ 1,115,464$ ‐$ ‐$ 5,689,066$
P Civic Center and South Libraries 4,781,227$ 4,781,227$ 1,595,163$ 105,893$ 11,092$ 3,221$ ‐$ ‐$ 1,715,369$
Q Other Public Facilities 10,901,789$ 6,910,789$ 2,035,175$ 1,402,603$ 12,089$ 84,721$ ‐$ ‐$ 3,534,589$
R Traffic Signal Systems 7,000,000$ 5,000,000$ 189,795$ 152,945$ 174,884$ 70,784$ ‐$ ‐$ 588,408$
S Park Infrastructure 12,367,201$ 8,592,201$ 2,011,313$ 1,953,846$ 327,796$ 312,008$ ‐$ ‐$ 4,604,963$
T Citywide Network Replacement 2,082,334$ 2,082,334$ 2,082,334$ ‐$ ‐$ ‐$ ‐$ ‐$ 2,082,334$
U Citywide Telecommunications 4,357,602$ 2,609,602$ 1,876,930$ 25,875$ ‐$ 1,463,117$ ‐$ ‐$ 3,365,922$
Total Infrastructure 119,938,912$ 103,364,410$ 46,735,868$ 7,437,311$ 1,335,700$ 4,088,663$ ‐$ ‐$ 59,597,542$
Total Allocations 196,136,987$ 157,286,171$ 68,582,323$ 24,331,992$ 2,448,048$ 4,727,826$ ‐$ ‐$ 100,090,189$
V City Staff Time ‐$ ‐$ 2,104,077$ 625,817$ 47,962$ 216,764$ ‐$ ‐$ 2,994,621$
Total City Staff Time ‐$ ‐$ 2,104,077$ 625,817$ 47,962$ 216,764$ ‐$ ‐$ 2,994,621$
W Debt Service Principal & Interest 78,234,834$ 40,386,084$ 24,123,334$ 8,128,500$ ‐$ 974,625$ ‐$ ‐$ 33,226,459$
Total Debt Service Expenses 78,234,834$ 40,386,084$ 24,123,334$ 8,128,500$ ‐$ 974,625$ ‐$ ‐$ 33,226,459$
X Audit/Admin 48,773$ 20,608$ 10,150$ 16,364$ 188$ 937$ ‐$ ‐$ 27,639$
Y Bond Administration 65,356$ 27,615$ 52,543$ 6,000$ ‐$ ‐$ ‐$ ‐$ 58,543$
Z Banking/Investment Fees ‐$ ‐$ 16,611$ 5,752$ ‐$ ‐$ ‐$ ‐$ 22,363$
AA Cost of Issuance 563,210$ 563,210$ 553,023$ ‐$ ‐$ ‐$ ‐$ ‐$ 553,023$
Total Administrative Expenses 677,339$ 611,433$ 632,327$ 28,116$ 188$ 937$ ‐$ ‐$ 661,568$
Total Expenditures 275,049,160$ 198,283,688$ 1 95,442,061$ 2 33,114,425$ 2 2,496,198$ 5,920,152$ ‐$ ‐$ 136,972,837$
Notes:
1 Audited Total
2 Unaudited Total
Prior FY
Totals
FY 2020‐21
Total
2022-04-28 PCOC Agenda Page 46 of 52
Measure P
Citywide Infrastructure, Facilities and Equipment Expenditure Plan
1/2 cent Sales Tax Revenues over 10 year period
Summary Table as of 3/31/22
10‐Year To Date To Date
Total by Major Category Timeframe Allocations Q1 Q2 Q3 Q4 Totals
REVENUES:
A Sales Tax Revenues 223,089,835$ 108,527,738$ 85,750,721$ 2,008,065$ ‐$ 13,893,020$ ‐$ 101,651,806$
B Investment Earnings 3 ‐$ ‐$ 4,209,635$ ‐$ ‐$ ‐$ ‐$ 4,209,635$
C Miscellaneous ‐$ ‐$ 236,025$ 2,516$ 122$ ‐$ ‐$ 238,662$
Total Revenues 223,089,835$ 108,527,738$ 90,196,381$ 2,010,581$ 122$ 13,893,020$ ‐$ 106,100,104$
EXPENDITURES:
D Fire Stations Repairs/Replacement 26,210,449$ 26,210,449$ 20,817,386$ 187,447$ 117,496$ 207,350$ ‐$ 21,329,679$
E Fire Response Vehicles 19,847,580$ 11,790,030$ 7,181,223$ 391,552$ 405,178$ 1,755,890$ ‐$ 9,733,843$
F Fire Safety Equipment 5,197,913$ 1,385,000$ 779,525$ ‐$ 12,548$ 123,840$ ‐$ 915,913$
Total Fire Services 51,255,942$ 39,385,479$ 28,778,135$ 578,999$ 535,223$ 2,087,079$ ‐$ 31,979,435$
G Police Response Vehicles 12,951,470$ 6,651,250$ 5,020,794$ 319,050$ 7,910$ 45,789$ ‐$ 5,393,543$
H Public Safety Communication Systems 8,645,689$ 4,993,137$ 3,938,519$ 214,299$ ‐$ ‐$ ‐$ 4,152,818$
I Police Facility Repairs 2,700,656$ 2,575,656$ 828,333$ ‐$ 96,031$ 139,454$ ‐$ 1,063,818$
J Police Equipment 644,318$ 316,239$ 175,354$ ‐$ ‐$ 5,217$ ‐$ 180,571$
Total Police Services 24,942,133$ 14,536,282$ 9,963,001$ 533,349$ 103,941$ 190,460$ ‐$ 10,790,751$
K Streets 22,906,310$ 22,906,310$ 19,917,851$ ‐$ ‐$ ‐$ ‐$ 19,917,851$
L Other Public Infrastructure 17,368,553$ 16,968,551$ 10,632,513$ 86,255$ 563,948$ 208,534$ ‐$ 11,491,250$
M Sports Fields and Courts 3,345,655$ 2,445,655$ 784,350$ ‐$ ‐$ ‐$ ‐$ 784,350$
N Non‐Safety Vehicles 13,191,170$ 10,291,170$ 5,032,883$ 523,691$ 475,400$ 92,621$ ‐$ 6,124,595$
O Recreation and Senior Centers 21,637,071$ 20,776,571$ 4,373,709$ 199,893$ 1,115,464$ 1,595,020$ ‐$ 7,284,087$
P Civic Center and South Libraries 4,781,227$ 4,781,227$ 1,701,056$ 11,092$ 3,221$ 40,915$ ‐$ 1,756,284$
Q Other Public Facilities 10,901,789$ 6,910,789$ 3,437,779$ 12,089$ 84,721$ 45,358$ ‐$ 3,579,947$
R Traffic Signal Systems 7,000,000$ 5,000,000$ 342,740$ 174,884$ 70,784$ 42,306$ ‐$ 630,714$
S Park Infrastructure 12,367,201$ 8,592,201$ 3,965,159$ 327,796$ 312,008$ 309,155$ ‐$ 4,914,117$
T Citywide Network Replacement 2,082,334$ 2,082,334$ 2,082,334$ ‐$ ‐$ ‐$ ‐$ 2,082,334$
U Citywide Telecommunications 4,357,602$ 2,609,602$ 1,902,805$ ‐$ 1,463,117$ 66,290$ ‐$ 3,432,211$
Total Infrastructure 119,938,912$ 103,364,410$ 54,173,180$ 1,335,700$ 4,088,663$ 2,400,199$ ‐$ 61,997,741$
Total Allocations 196,136,987$ 157,286,171$ 92,914,315$ 2,448,048$ 4,727,826$ 4,677,738$ ‐$ 104,767,926$
V City Staff Time ‐$ ‐$ 2,729,895$ 47,962$ 216,764$ 188,164$ ‐$ 3,182,785$
Total City Staff Time ‐$ ‐$ 2,729,895$ 47,962$ 216,764$ 188,164$ ‐$ 3,182,785$
W Debt Service Principal & Interest 78,234,834$ 40,386,084$ 32,251,834$ ‐$ 974,625$ ‐$ ‐$ 33,226,459$
Total Debt Service Expenses 78,234,834$ 40,386,084$ 32,251,834$ ‐$ 974,625$ ‐$ ‐$ 33,226,459$
X Audit/Admin 48,773$ 20,608$ 26,514$ 188$ 937$ 13,829$ ‐$ 41,468$
Y Bond Administration 65,356$ 27,615$ 58,543$ ‐$ ‐$ ‐$ ‐$ 58,543$
Z Banking/Investment Fees ‐$ ‐$ 22,363$ ‐$ ‐$ ‐$ ‐$ 22,363$
AA Cost of Issuance 563,210$ 563,210$ 553,023$ ‐$ ‐$ ‐$ ‐$ 553,023$
Total Administrative Expenses 677,339$ 611,433$ 660,443$ 188$ 937$ 13,829$ ‐$ 675,397$
Total Expenditures 275,049,160$ 198,283,688$ 1 128,556,486$ 2 2,496,198$ 5,920,152$ 4,879,731$ ‐$ 141,852,568$
Notes:
1 Audited Total
2 Unaudited Total
Prior FY
Totals
2022-04-28 PCOC Agenda Page 47 of 52
Category CIP #Facility (Project)Description Status Measure P Allocation Est. Completion Date
Public Safety Buildings
Public Safety Buildings GGV0232 Police Facility Repairs HVAC- Replace boilers/chillers and heating/air conditioning system 1,000,000$
Public Safety Buildings GGV0232 Police Facility Repairs Control Panel/Intercom 500,000$
Total Public Safety Buildings 1,500,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library: Adult and Children Restrooms (4) Remodel Construction 929,389$ Summer 2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library HVAC 1,200,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library ADA Parking Improvements Awarded 175,000$ Summer 2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library LED Lighting 20,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library Boiler/Chiller Construction 240,000$ Summer 2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library Civic Center Library Exterior Stucco Repairs 50,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library Flooring 329,000$
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library HVAC 265,000$
Public Facilities GGV0233 Recreation and Senior Center Repairs Otay Recreation Center Egress Study 6,500$
Public Facilities GGV0233 Recreation and Senior Center Repairs Otay Recreation Center Egress Updates 40,000$
Public Facilities GGV0233 Recreation and Senior Center Repairs Montevalle HVAC 100,000$
Public Facilities GGV0233 Recreation and Senior Center Repairs Norman Park Senior Center HVAC Phase IB 165,000$
Public Facilities GGV0257 Recreation and Senior Center Repairs 1301 Oleander Ave Building Repairs 750,000$
Public Facilities GGV0234 Other Public Facilities Living Coast Discovery Center Deck and Rails Construction 238,485$ Summer 2022
Public Facilities GGV0234 Other Public Facilities Public Works Chiller/Boiler Replacement Construction 700,000$ Spring 2022
Public Facilities GGV0234 Other Public Facilities Public Works Air Handlers - Phase I 200,000$
Public Facilities GGV0234 Other Public Facilities Electrical Switchgear Upgrades- 1031 Oleander Facility (former Boys/Girls Club)Construction 50,700$ Summer 2022
Public Facilities GGV0234 Other Public Facilities Citywide Gate Replacements 10,000$
Public Facilities GGV0235 Other Public Facilities CC Roof/HVAC Repair (Pan) - Building A In Progress 88,000$ Summer 2022
Public Facilities GGV0234 Other Public Facilities Miscellaneous HVAC Maintenance/Repair Projects I In Progress 40,000$ Ongoing
Public Facilities GGV0234 Other Public Facilities Public Works Shops and Garage - LED Lighting In Progress 50,000$ Ongoing
Public Facilities GGV0234 Other Public Facilities Solar Inverters Replacement and Restoration 356,309$
Public Facilities GGV0234 Other Public Facilities Public Works Shops - New Air Compressor 100,000$
Public Facilities GGV0234 Other Public Facilities Public Works Air Handlers (6) - HVAC 350,000$
Public Facilities GGV0234 Other Public Facilities Living Coast Discovery Center Repairs - Phase I 150,000$
Public Facilities GGV0234 Other Public Facilities Garage Plymovent Exhaust Recovery System Assessment 10,000$
Public Facilities GGV0234 Other Public Facilities Exterior Wood Surfaces- Fire Station 8 60,000$
Public Facilities GGV0234 Other Public Facilities Citywide Plumbing Retrofits 125,000$
Public Facilities GGV0234 Other Public Facilities Animal Care Facility HVAC 200,000$
Public Facilities GGV0234 Other Public Facilities Civic Center Bldg C - HVAC (IT Server Room)410,000$
Public Facilities GGV0234 Other Public Facilities Civic Center Bldg B - HVAC 63,470$
Public Facilities GGV0234 Other Public Facilities Civic Center Bldg C - HVAC 500,000$
Public Facilities GGV0234 Other Public Facilities Miscellaneous Electrical Maintenance/Repair 40,000$
Total Public Facilities 8,011,853$
Infrastructure
Infrastructure CTY0226 Other Public Infrastructure Removal of Dead/Dying Trees Citywide In Progress 300,000$ Ongoing
Total Other Public Infrastructure 300,000$
Infrastructure PRK0326 Park Infrastructure Electrical Switchgear Upgrades -Eucalyptus Park - Tennis Courts/Baseball Fields Construction 121,004$ Summer 2022
Infrastructure PRK0326 Park Infrastructure Playground Renovations/Replacements Design 1,000,000$
Project Status Updates
Measure P - In progress
Public Facilities
Infrastructure
4/15/2022 Page 1 of 22022-04-28 PCOC Agenda Page 48 of 52
Category CIP #Facility (Project)Description Status Measure P Allocation Est. Completion Date
Infrastructure PRK0326 Park Infrastructure Path/Walkway Repairs/ADA Access - Rancho Del Rey Design 150,000$
Infrastructure PRK0327 Park Infrastructure McKenzie Creek Pickleball Light Pole Replacement In Progress 9,600$ Spring 2022
Infrastructure PRK0326 Park Infrastructure Path/Walkway Repairs/ADA Access - Citywide Design 850,000$
Infrastructure PRK0326 Park Infrastructure Replace Distressed Park Pathway Lights Design 300,000$
Infrastructure PRK0326 Park Infrastructure Park LED Lighting Design 100,000$
Infrastructure PRK0326 Park Infrastructure Rohr Fitness/Jogging Path Design 350,000$
Infrastructure PRK0326 Park Infrastructure Dog Parks Renovation Design 100,000$
Infrastructure PRK0326 Park Infrastructure Len Moore Skate Park Design 75,000$
3,055,604$
Infrastructure
Infrastructure PRK0328 Park Infrastructure Rohr Park Restroom Replacement Construction 1,111,767$ Spring 2022
Infrastructure
Infrastructure PRK0327 Sports Courts and Fields Irrigation and Controller Changeover Citywide In Progress 1,600,000$ 2023
Total Park l Infrastructure 5,767,371$
Completed Projects
Public Safety Buildings GGV0232 Police Facility Repairs Police Facility Drone Rooftop Upgrades Project Completed 200,000$ NOC filed 3/24/2022
Public Safety Buildings GGV0232 Police Facility Repairs Police Facility Salley Door Replacement Project Completed 35,882$ NOC filed 3/24/2022
Public Facilities GGV0231
Civic Center Library and South Chula
Vista Library South Library Door Replacement Project Completed 42,040$
Infrastructure PRK0326 Park Infrastructure Replacement of Pedestrian and Parking Lot Lights (Windingwalk and Veterans)Project Completed July 2021 381,307$ NOC filed 8/13/2021
Public Safety Buildings GGV0233 Police Facility Repairs Upgrade to Hormonn Highspeed Gates (3 locations)Project Completed 98,599$
Public Safety Buildings GGV0232 Police Facility Repairs Uninterruptible Power Supply Project Completed 80,000$
Total Completed 837,828$
16,417,052$ TOTAL PROJECT ALLOCATIONS
4/15/2022 Page 2 of 22022-04-28 PCOC Agenda Page 49 of 52
Measure P Vehicle and Equipment Purchases
MEASURE P ACTUALS TO DATE
Description Category Total Amount
Prior Fiscal Years 2017 through 2021 Police 5,020,812$
Prior Fiscal Years 2017 through 2021(1)Fire 5,937,443$
Prior Fiscal Years 2017 through 2021 Non-Public Safety 4,976,819$
Current Fiscal Year 2022 (2)Police 374,751$
Current Fiscal Year 2022 (2)Fire 56,275$
Current Fiscal Year 2022 (2)Non-Public Safety 996,831$
TOTAL ACTUALS 17,362,932$
Total Public Safety Actuals 11,389,281$
Total Non-Public Safety Actuals 5,973,650$
TOTAL BY GROUP 17,362,932$
MEASURE P VEHICLES ON ORDER
Description Department Total Amount (2)
(2) Pierce Arrow XT Ultimate Configuration (PUC)Fire 1,746,520$
(11) 2021 Ford Interceptor Utility Hybrids Police 457,052$
(3) BMW R-1250 RT-P Motorcycle Police 96,562$
2022 Ford F-150 XL Police 42,302$
2022 Ford Mustang Mach-E Police 53,408$
PB Loader Model BC-4 Asphalt Patcher Non-Public Safety 227,839$
Peterbilt 520 with M-B Companies Striper Body Non-Public Safety 570,096$
Ford Super Duty F-550 with Knapheid Body (Partially funded)Non-Public Safety 33,803$
2022 Ford Super Duty F-450 Stencil Truck Non-Public Safety 144,724$
(2) - 2022 Freightliner M2 with PB Loader 5-7 Yard Dump Body Non-Public Safety 295,133$
2022 Ford Super Duty F-550 Graffiti Truck Non-Public Safety 135,496$
2022 Ford F-650 Diesel Sign Truck Non-Public Safety 160,001$
(2) Ford Super Duty F-250 Animal Control Body Non-Public Safety 132,100$
2023 Freightliner M2-106 Articulating Aerial Device Boom Truck Non-Public Safety 201,837$
(3) 2022 Ford Escape SE Hybrid Non-Public Safety 83,220$
(4) 2022 Ford F150 XL Non-Public Safety 125,274$
(2) 2022 Ford F150 Lightning Non-Public Safety 90,430$
2022 Ford F-250 Non-Public Safety 44,454$
(3) Zieman Trailers Non-Public Safety 171,327$
(2) Toro Groundmaster 5900 Non-Public Safety 235,235$
Fire Vehicle Outfitting Fire 85,654$
Police Vehicle Outfitting Police 312,514$
Vehicle Outfitting Non-Public Safety 10,570$
TOTAL ON ORDER 5,455,548$
Total Public Safety On Order 2,794,010$
Total Non-Public Safety On Order 2,661,538$
TOTAL BY GROUP 5,455,548$
NOTES:
(1) Does not include prior Fire apparatus purchased via lease purchase agreements.
(2) Amounts reflected are actuals and encumbrances as of 03/31/2022.
CURRENT YEAR ANTICIPATED PURCHASES
Description Department Total Count
Light Duty Trucks Non-Public Safety 7
Specialty Equipment Non-Public Safety 4
Other Equipment Non-Public Safety 10
21
2022-04-28 PCOC Agenda Page 50 of 52
Category CIP #Description Status
Measure P
Allocation Est. Completion Date
Public Safety Buildings GGV0230 Completed on 3/15/2022. Contract closeout will commence after
completion of Fire Station 3 because the projects were done under one
contract.
10,085,052$ Completed 3/15/2022
Public Safety Buildings GGV0230 Station received certificate of Substantial Completion on 4/27/2021.
Punchlist work is in progress. Contract will be open until end of 1 year
landscape maintenance on 4/27/2022.
9,715,544$ Landscape maintenace period
ends 4/27/2022
Public Safety Buildings GGV0252 Design Phase began 5/11/2021. The Fire department is evaluating concept
designs. The design phase is expected to last until Fall 2022. Construction
is expected to last approximately 9 months.
3,683,760$ Mid 2023
Total Public Safety Buildings 23,484,356$
Other Public Facilities GGV0247 Construction for Segments 1 & 2 began 9/13/2021 and is planned to be
completed 11/23/2022. Segment 3 is in design and is expected to extend
the completion date by 6-9 months.
16,386,629$ Substantial Completion Segments
1 & 2 - 11/23/2022, Segment 3
summer/fall 2023
Parks PRK0329 Constructuion began 2/25/22 and is expected to be completed in October
2022.
820,001$ Fall/winter 2022
Total Public Facilities 17,206,630$
Infrastructure TRF0408 Construction Notice to Proceed was issued 2/17/21. Potholing the new pole
locations was completed in Summer 2021. Poles were ordered and
delivered to the contractor in March 2022. Construction began in March
2022 and should be completed in November 2022.
5,000,000$ Winter 2022
Infrastructure DRN0219 Bids were recived for this project 1/13/22. Construction will begin pending
contract award.
1,681,986$ Fall 2022
Infrastructure STL0443 Construction Phase -all 4 quadrants were completed March 2022. 2,877,784$ Spring/Summer 2022
Total Infrastructure 9,559,770$
Infrastructure STL0428 Construction Phase - Began September 2019. Completed December 2019. 509,768$ Project Complete
Infrastructure STL0427 Construction Phase I - Began March 2018. Completed December 2018. 6,554,460$ Project Complete
Infrastructure STL0430 Construction Phase II - Began July 2019. Completed August 2020. 16,011,295$ Project Complete
Infrastructure DRN0209 Construction Phase I - Began March 2018. Completed December 2018. 1,256,000$ Project Complete
Infrastructure DRN0210 CMP CCTV completed 140,000$ Project Complete
Infrastructure DRN0211 All field work complete 8,185,000$ Closeout Phase in
progress
Infrastructure DRN0216 Emergency design and repair of corrugated metal pipes citywide. 400,000$ Project Complete
Infrastructure STL0421 Project completed in January 2017 23,385$ Project Complete
Park Study PRK0333
Consultant: Hunsaker & Associates. Accessibility Study completed
September 24, 2020. Presented to COC in October 2020, developing
funding strategy 81,391$ Project Complete
Total Completed 33,161,299$
83,412,054$
Corrugated Metal Pipe Emergency Repair
TOTAL PROJECT ALLOCATIONS
Project Status Updates
Measure P - In progress
Public Safety Buildings
Infrastructure
Completed Projects
Facility (Project)
Street Pavement
Traffic Signal System
Sidewalk Rehabilitation Citywide
Fire Stations
Repairs/Replacements
Fire Station 3: design and construct
Replace sidewalk damaged at various locations based
on recommendations from the Pedestrian Connectivity
Max Field/Loma Verde
Accessibility Study
Reinstra Park/Loma Verde Rec Center - bridge
construction, parking needs and ADA review. Added
scope: retaining wall failure and slope stabilization.
Department of Engineering and Capital Projects
Traffic signal replacements and improvements
Fire Stations
Repairs/Replacements
Fire Station 5: design and construct
Pavement rehabilitation on various streets based on
recommendations from City's Pavement Management
System
Fire Station #1 Repair/Replace Fire Station 1: design and rennovations
Rehabilitation of aged Corrugated Metal Pipe (CMP)
and other storm drain related repairs outside ROW
Street Pavement Pavement rehabilitation on various streets based on
recommendations from City's Pavement Management
Pavement rehabilitation on Floyd AvenueStreet Pavement
Perform drainage infrastructure assessments Citywide
Replace sidewalk damaged at various locations based
on recommendations from the Pedestrian Connectivity
Plan
Other Infrastructure -Sidewalk
Replacement Citywide
Other Infrastructure - Drainage
Pipe Assessment Outside ROW
Other Infrastructure - CMP
Rehabilitation Outside ROW
CMP rehab outside ROW Phase 3 Corrugated Metal Pipe Repair outside ROW
Rehabilitation of aged Corrugated Metal Pipe (CMP)
and other storm drain related repairs outside ROW
Other Infrastructure - CMP
Rehabilitation Outside ROW
Other Public Facilities and Parks
Recreation Centers and Senior
Center
Renovation of the Loma Verde Recreation Center
Other Infrastructure - CMP
Rehabilitation Outside ROW Phase
II
Lauderbach Park Rehabilitation Renovation of Lauderbach Park
Updated 04/06/2022 Page 1 of 22022-04-28 PCOC Agenda Page 51 of 52
Project Status Updates
Measure P - In progress
Department of Engineering and Capital Projects
Actual consultant costs included in project allocations.
Estimated Amt
Task Order Execution
Date
$188,922.00 2/19/2018
$99,958.58 6/26/2018
9,989.65 1/22/2019
452,000.00 12/10/2019
Estimated Amt
Task Order Execution
Date
$618,050.00 3/12/2018
$276,393.00 7/8/2021
Estimated Amt
Task Order Execution
Date
$115,536.00 12/12/2017
$94,865.00 12/22/2017
$325,314.00 4/27/2018
$626,775.00 4/27/2018
$191,004.00 11/19/2018
$997,726.00 4/10/2019
$35,080.00 7/3/2019
$161,000.00 10/30/2019
$469,291.00 2/10/2021
Estimated Amt
Task Order Execution
Date
$99,959.58 6/26/2018
Estimated Amt
Task Order Execution
Date
Prequalified List Determined
10/11/17
STL0443 - Sidewalk Slicing
Awarded 11/7/17
PO 2182005TRF0408 - Traffic Signals Sys
TASK #STL427
CIP
DRN0209- CMP Rehab Outside ROW
STL0430 - Street Pavement Rehab Ph II TASK #STL430 A
STL0427- Street Pavement Rehab Ph I
TASK #STL427
TASK #DRN211
TASK #DR209
Task Order #
STL0427- Street Pavement Rehab Ph I
DRN211 - CMP Rehab Outside ROW Ph II
Construction Management (Civil Projects)
Construction Management (Facilities
/Buildings)
TASK #GG230 A, B, C
Task #GGV0247
Awarded 9/19/17Civil Engineering
PO 2181583
CIP
STL0430 Street Pavement Rehab Phase II
TRF0408 Traffic Signal System (Fiber Network)
STL0428 Sidewalk Replcmnt (Informal Bid) PO 219148
PO 2201516STL0443 Sidewalk Rehabilitation
Task Order #
On Call Consultant Contracts (Available for Measure P Projects)
CIP
GG230 Fire Stations Repairs/Replacements
GGV0247 Loma Verde Rec Center
Awarded 11/21/17
TASK #TRF0408
Awarded 05/15/18
TASK #STL430
TRF0408 - Traffic Signals Sys
Task Order #
Task Order #
CIP
Intelligent Transportation Systems
Consultant (Traffic Engineering)
Design Build Construction Teams
STL0428 - Sidewalk Replcmt (Heaves 1.5" +) TASK #STL428
TASK #STL443
STL0430 - Street Pavement Rehab Ph II
CIP
Task Order #
PO 2182005
Consultant: IBI
Notes
Rick Engineering Company
IBI Group
Southern California Precision Concrete Inc.
Southern California Precision Concrete Inc.
Consultant: O'Connor
Consultant: O'Connor
Consultant: PPC
Now Available: Kimley-Horn; NV5; Rick Engineering Co. and; TY-LIN International.
Now Available: Kitchell CEM; O'Connor Construction Management.
Now Available: Kleinfelder, DHS Consulting, Project Professionals Corporation.
Now Available: IBI Group, Iteris, Kimley-Horn, STC Traffic
5 Design Build teams deemed qualified with the intention of requesting proposals from the top 3 available and interested ranked firms at RFP time.
Notes
Notes
Notes
Notes
Consultant: DHS (task terminated)
Consultant: PPC
Consulant: PPC
Consultant: PPC (Construct. review & bid support)
Consultant: Kleinfelder (construction inspection & administration)
Consultant: PPC
Consultant: PPC
Consultant Kleinfelder (Construction inspection & administration)
Updated 04/06/2022 Page 2 of 22022-04-28 PCOC Agenda Page 52 of 52