Loading...
HomeMy WebLinkAboutPC Agenda packet - 10.27.21 Date:October 27, 2021 Time:6:00 p.m. Location:Council Chambers, 276 Fourth Avenue, Chula Vista, CA Welcome to your Planning Commission Meeting! The Planning Commission has transitioned back to holding live, in-person meetings. Public Comments: Public comments may be submitted to the Planning Commission in the following ways: In-Person comments during the meeting. Join us for the Planning Commission meeting at the time and location specified on this agenda to make your comments. • Visit www.chulavistaca.gov/virtualmeetings and locate this meeting. Click on "Open for Comment" or the comment bubble. Click on the item you wish to comment on, then click on "Leave comment." The commenting portal will close one hour before the meeting. All comments will be available to the public and the Planning Commission. • Mail or email comments. Submit comments via email to PC@chulavistaca.gov or by mail to Planning Commission, 276 Fourth Ave, Chula Vista, CA 91910. Please send comments early; written comments received within one hour of the meeting may not be distributed until the following day. • Accessibility: Individuals with disabilities are invited to request reasonable modifications or accommodations in order to access and/or participate in a Planning Commission meeting by contacting the Development Services Department at PC@chulavistaca.gov (California Relay Service is available for the hearing impaired by dialing 711) at least forty-eight hours in advance of the meeting. SPEAKER TIME LIMITS: The time allotted for speakers may be adjusted by the Chair. Five minutes* for specific items listed on the agenda• Three minutes* for items NOT on the agenda (called to speak during Public Comments)• A group of individuals may select a spokesperson to speak on their behalf on an agenda item, waiving their option to speak individually on the same item. Generally, five minutes are allotted per person, up to a limit of 30 minutes, although the limits may be adjusted. Members of the group must be present. • *Individuals who use a translator will be allotted twice the amount of time. Pages 1.CALL TO ORDER 2.ROLL CALL Commissioners Burroughs, De La Rosa, Gutierrez, Milburn, Nava, Torres, and Chair Zaker 3.PLEDGE OF ALLEGIANCE TO THE FLAG AND MOMENT OF SILENCE 4.PUBLIC COMMENTS Persons may address the Commission on any subject matter within the Commission’s jurisdiction that is not listed as an item on the agenda. State law generally prohibits the Commission from discussing or taking action on any issue not included on the agenda, but, if appropriate, the Commission may schedule the topic for future discussion or refer the matter to staff. If you wish to speak on any item, please fill out a "Request to Speak" form and submit it to the Secretary prior to the meeting. 5.PUBLIC HEARINGS The following item(s) have been advertised as public hearing(s) as required by law. If you wish to speak on one of these items, please fill out a "Request to Speak" form and submit it to the Secretary prior to the meeting. 5.1.DESIGN REVIEW AND CONDITIONAL USE PERMIT FOR A GAS STATION, CONVENIENCE STORE, AND CARWASH IN THE VILLAGE 8 WEST TOWN CENTER 5 Environmental Notice: The project was adequately covered in previously certified Final Environmental Impact Report (FEIR 10-03) (SCH #2010062093) for the Otay Ranch Sectional Planning Area (SPA) Plan - Village 8 West. 2021-10-27 PC Agenda Page 2 of 207 Recommended Action: Conduct a public hearing and adopt resolutions approving: A) A Conditional Use Permit for a convenience store, gas station, and an automatic carwash on a 1.2-acre site in the Village 8 West Town Center and B) A Design Review Permit for the subject Convenience Store, Gas Station, and Carwash. 5.2.DESIGN REVIEW PERMIT FOR GENPROP BACKHOUSE, LLC, A FOUR-STORY MULTIFAMILY RESIDENTIAL BUILDING ON A 0.28- ACRE SITE 147 Environmental Notice: The project was adequately covered in the previously adopted final Environmental Impact Report FEIR 06-01 prepared for the Chula Vista Urban Core and certified by the City Council in May 2007. Thus, no further environmental review is required. Recommended Action: Conduct a public hearing and adopt Resolution No. DR20-0019 approving the project, based on the findings and subject to the conditions contained therein. 6.ACTION ITEMS The Item(s) listed in this section of the agenda will be considered individually by the Commission and are expected to elicit discussion and deliberation. If you wish to speak on any item, please fill out a "Request to Speak" form and submit it to the Secretary prior to the meeting. 6.1.APPROVAL OF MEETING MINUTES 203 Recommended Action: Approve the minutes of July 28, 2021. 6.2.WRITTEN COMMUNICATIONS 207 Commissioner De La Rosa requested an excused absence for the meeting of July 28, 2021. Recommended Action: Commission excuse the absence. OTHER BUSINESS 7.STAFF COMMENTS 8.CHAIR'S COMMENTS 9.COMMISSIONERS' COMMENTS 2021-10-27 PC Agenda Page 3 of 207 10.ADJOURNMENT to the regular meeting on November 10, 2021 at 6:00 p.m. Materials provided to the Planning Commission related to any open-session item on this agenda are available for public review by contacting the Development Services Department at pc@chulavistaca.gov. 2021-10-27 PC Agenda Page 4 of 207 v . 0 0 1 P a g e | 1 October 27, 2021 ITEM TITLE Design Review Permit and Conditional Use Permit for Conserv 6128 – a Gas Station, Convenience Store and Carwash on a 1.2-acre Site (Lot 26 of Map 16428) in the Village 8 West Town Center Location: Otay Ranch Village 8 West Town Center on the northern side of the La Media Parkway and Main Street couplet. Environmental Notice: The project was adequately covered in previously certified Final Environmental Impact Report (FEIR 10-03) (SCH #2010062093) for the Otay Ranch Sectional Planning Area (SPA) Plan - Village 8 West. Recommended Action Conduct a public hearing and adopt resolutions approving: A) A Conditional Use Permit for a convenience store, gas station, and an automatic carwash on a 1.2-acre site in the Village 8 West Town Center. B) A Design Review Permit for the subject Convenience Store, Gas Station, and Carwash. SUMMARY The applicant requests approval of plans for a convenience store, a gas station, and a car wash (the “Project”). The Project, referred to as Conserv 6128, is located on a 1.2-acre vacant parcel in the Otay Ranch Village 8 West (Cota Vera) Town Center (the “Project Site”). The property is owned by HomeFed Village 8, LLC (the “Property Owner”). Zoning for the Project Site is Town Center (TC) per the Village 8 West Sectional Planning Area (SPA) Plan, and the General Plan designation is also TC. The Project is more specifically described as follows:  Convenience Store is a 4,200 square foot retail/convenience store located on the southern edge of the Project Site. The sale of beer and wine will be conducted within the store.  Gas Station is a 6-pump (12 filling stations) facility with a lighted canopy, air and water stations, and propane tank filling.  Car Wash is a self-serve drive-through automatic car wash with three coin-operated vacuum bays and queuing for approximately five vehicles. 2021-10-27 PC Agenda Page 5 of 207 P a g e | 2 HOUSING IMPACT STATEMENT The TC zone allows a residential density of 34 units per acre. The Village 8 West Tentative Map (CVT 19-03) did not allocate any residential units for the Project Site; therefore, there are no housing units proposed as part of the Project. ENVIRONMENTAL REVIEW The Director of Development Services has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the Project was adequately covered in previously certified Final Environmental Impact Report (FEIR 10-03) (SCH #2010062093) for the Otay Ranch Sectional Planning Area (SPA) Plan - Village 8 West. Therefore, no additional environmental review is required. DISCUSSION Project Site Characteristics: The 1.2-acre Project Site is located within the triangular street intersection of La Media Parkway (North and South) and Main Street West (urban couplet), in the Otay Ranch Village 8 West Town Center. (Attachment 1 – Location Map). Across La Media Parkway North (to the east) is Parcel C – zoned TC, allowing up to 180 residential units and 36,000 square feet of commercial space. West of the Project, across La Media Parkway South, is the future Otay Ranch North Community Park. The Central Square Park is located across Main Street West, to the south of the Project. Location General Plan Zoning Current Land Use Proposed Land Use Site TC TC Vacant Commercial East TC TC Vacant Mixed-Use West OS Park Vacant Community Park South OS Park Vacant Central Square Park Project Description: The Project includes a convenience store, a gas station and canopy, and a car wash. The Conserv 6128 Convenience Store is located along the southern edge of the Project Site, across from the Central Square Park. The store’s main customer entry on the northern building façade provides access from the parking lot, gas pumps, and car wash. A second entry is proposed on the southern façade to provide views, access to the park, and access to the future transit node anticipated in that area. The Project Site has two driveway entrances: one on the east side from La Media Parkway North and one on the west side from La Media Parkway South. The gas station and canopy are located central to the site, and the car wash is located at the northern end. A Parking Study was prepared for the Project (Chen Ryan – May 2021): three similar developments in eastern Chula Vista were studied. City Staff concurred with the results of the study which stated that 11 2021-10-27 PC Agenda Page 6 of 207 P a g e | 3 onsite parking spaces are sufficient to meet the parking demand for the Project. The Project provides a total of 16 onsite parking spaces: 11 spaces at the convenience store and 5 parking spaces for the vacuum area of the car wash. Additional site plan features include a car wash queueing area with storage for 5 vehicles, and a trash enclosure and loading area along the east side of the convenience store building. A Noise Study was prepared for the car wash element of the Project (Helix – May 2021), and the car wash has been designed to control noise levels by means of a car wash blower system, reducing noise levels to less than predicted traffic noise levels, in compliance with the City’s car wash facility ordinance (CVMC 19.58.060). An Intensity Transfer was approved in accordance with the SPA, transferring 1,620 square feet of allowable commercial development from Parcel L to Parcel B, for a total of 5,620 commercial square feet on Parcel B. Both parcels are located in the Town Center. The convenience store and gas station will operate seven days per week, 24 hours per day, to serve the businesses, customers and residents of Otay Ranch, particularly residents of Village 8 West and surrounding existing and future development of Villages 4, 7 and 8 East. The car wash will operate seven days per week, between the hours of 7 am and 10 pm. Project Analysis: The following Project Data Table shows the development regulations along with the applicant’s proposal to meet the requirements: Assessor’s Parcel Number: 644-071-0200 Current Transect/Zoning: Town Center (TC) General Plan Designation: Town Center (TC) Lot Area: 1.2 acres Commercial Development: 5,620 square feet PARKING REQUIRED: Commercial Gen. Retail (4200 SF) @ 2.7 p/1K = 11 Total = 11 spaces PARKING PROVIDED: Commercial General Retail = 11 Standard = 8 (1 is EV) Handicap Accessible = 3 (1 is EV) Car Wash/Vacuum Area = 5 Standard = 3 Compact = 2 Total = 16 spaces 2021-10-27 PC Agenda Page 7 of 207 P a g e | 4 Design Review Permit Village 8 West (Cota Vera) is intended to be a vibrant community with a wide variety of uses, activities, and design features that will promote a pedestrian friendly environment with proximity to shopping, entertainment, transit, and employment opportunities. In such an environment, the overriding design goals are high quality design and excellent functionality. Adherence to any specific architectural style or any set of preconceived design solutions beyond what is specified in the Village 8 West Landscape Master Plan and Town Center Master Precise Plan, as applicable, is neither required nor desired. Design Review shall comply with the procedures and requirements set forth in Chula Vista Municipal Code Section 19.14.581 through 19.14.600, except that the findings and actions of both the Planning Commission and the Zoning Administrator shall be based upon the provisions of this SPA. The Design Review process requires a determination that a project is in compliance with the defined standards and guidelines of the Village 8 West SPA Plan, Landscape Master Plan, and Town Center Master Precise Plan, as applicable. SPA Plan The Site Plan is arranged to support the pedestrian corridor along Main Street and the Central Square Park to the south. The convenience store building creates an attractive visual buffer between the Central Square Park and the gas station and car wash elements of the Project. The building type is “Innovative.” The SPA Plan recognizes and encourages innovative design solutions to positively contribute to diverse and interesting street scenes. Innovative building configurations may be appropriate to address the constraints of the site and demands of the current market. Parking and circulation, as well as trash and loading areas, are sized appropriately for the site and land use. The building is designed with a sloped roof, varied architectural planes, and glazing at the street level. A second entrance is provided on the southern elevation of the convenience store to provide a friendly street scene and pedestrian connections to the future transit node on Main Street and to the Central Square Park. Landscape Master Plan The design theme of "Contemporary European with an Agrarian influence" is established in the architectural elevations and features of the Project, and these elements are enhanced with plantings of this character. Olive trees have been selected to provide filtered shade while maintaining a semi- transparent view of the architectural features. The use of vertical elements, such as columnar cypress shrubs and hedges, a geometric vine trellis, and gabion planters with citrus trees contrast with the long architectural building planes. Color is added along the eastern and western edges with lavender crape myrtle trees. Irrigation for the Site utilizes low-flow sprinkler heads and sub-grade drip irrigation in compliance with the City of Chula Vista Landscape Water Ordinance. Town Center Master Precise Plan The purpose of the Master Precise Plan (MPP) is to coordinate the spatial relationship between buildings, structures, landscaping, and public spaces as well as ensure a unified design theme for signage, lighting and street furniture in order to implement the SPA’s vision of creating a pedestrian friendly Town Center. The MPP provides specific requirements for each parcel within the Town Center – the Subject Property is identified as Parcel B. MPP Exhibit 2-1: Illustrated Conceptual Town Center Plan includes a conceptual site plan for development of Parcel B. The Project is consistent 2021-10-27 PC Agenda Page 8 of 207 P a g e | 5 with the uses and site design in the MPP and includes mandatory elements such as orientation of a convenience store pedestrian entrance toward Main Street to activate the Town Square Edge and the pedestrian corridor along the Village Pathway. The gateway element required at the north end of Parcel B (shown in the MPP – north of the public street connection) was mapped as a separate lot and will be built by the Master Developer. Per SPA Table 9.1 Discretionary Permit Matrix, a Minor Design Review (Administrative) is required for projects that include 20,000 square feet or less of non-residential building area or 200 or fewer multifamily residential dwelling units. Minor Design Review requires approval by the Zoning Administrator. However, since the DR and CUP are being processed together, and in accordance with the consolidated review Council Policy, the entire Project follows the Planning Commission approval process of the CUP. The Design Review Findings are provided as Enclosure A. Conditional Use Permit In accordance with the Permitted Land Uses table for the TC zone (3.3.7.C), a Conditional Use Permit (CUP) is required for the sale of alcohol (at the convenience market), for a gas station, and for a car wash. Table 9.1 Summary of Discretionary Review, states that CUPs require a Zoning Administrator recommendation and Planning Commission approval. Resolution CUP20-0018 incorporates all three items into one permit for Zoning Administrator and Planning Commission consideration. The Zoning Administrator has reviewed the Project and recommends approval of CUP20-0018 by the Planning Commission. The CUP Findings are provided in Enclosure B. CONCLUSION The proposed Project is consistent with the Otay Ranch Village 8 West SPA Plan, the Landscape Master Plan, and the Master Precise Plan for the Town Center. DECISION-MAKER CONFLICT Staff has reviewed the property holdings of the Planning Commission members and has found no property holdings within 1,000 feet of the boundaries of the property which is the subject of this action. Consequently, this item does not present a disqualifying real property-related financial conflict of interest under California Code of Regulations Title 2, section 18702.2(a)(7) or (8), for purposes of the Political Reform Act (Cal. Gov’t Code §87100, et seq.). Staff is not independently aware and has not been informed by any Planning Commission member, of any other fact that may constitute a basis for a decision-maker conflict of interest in this matter. FISCAL IMPACT The application fees and processing costs are paid for by the applicant, resulting in no net fiscal impact to the Development Services Fund or the General Fund. ATTACHMENTS 1 – Location Map 2 - Noise Study 2021-10-27 PC Agenda Page 9 of 207 P a g e | 6 3 – Parking Study 4 – Design Review Checklist 5 – Non-Residential Monitoring Table 6 – Resolution CUP20-0018 7 – Resolution DR20-0018 8 – Project Plans Staff Contact: Janice Kluth, Senior Project Coordinator 2021-10-27 PC Agenda Page 10 of 207 PROJECT LOCATION S R - 1 2 5 - TO L L RO A DLA MEDI A R D VILLAGE8 EAST VILLAGE8 WEST LOCATOR NORTH DR20-0018 CHULA VISTA PLANNING AND BUILDING DEPARTMENT J:\Planning\Public Notices\DR200018\DR20-0018 SCALE:FILE NUMBER: PROJECT DESCRIPTION: PROJECT ADDRESS: Village 8 west - Parcel B (La Media Rd & Main St) Moller Retail Inc. Related cases: CUP20-0018No Scale DR20-0018 Project Summary: Convenience Store / Gas station / Car Wash PROJECT APPLICANT:LOCATOR NORTH MAJOR PLANNING APPLICATION 2021-10-27 PC Agenda Page 11 of 207 Conserve 6128 Project Noise Assessment May 2021 | MRI-01 Prepared for: Moller/Dansk Investment Group, Inc. 6591 Collins Drive, Suite #E11 Moorpark CA 93021 Prepared by: HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard La Mesa, CA 91942 2021-10-27 PC Agenda Page 12 of 207 2021-10-27 PC Agenda Page 13 of 207 Conserve 6128 Project Noise Assessment Prepared for: Moller/Dansk Investment Group, Inc. 6591 Collins Drive, Suite #E11 Moorpark CA 93021 Prepared by: HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard La Mesa, CA 91942 May 2021 | MRI-01 2021-10-27 PC Agenda Page 14 of 207 This page intentionally left blank 2021-10-27 PC Agenda Page 15 of 207 i TABLE OF CONTENTS Section Page EXECUTIVE SUMMARY .................................................................................................................................. 1 1.0 INTRODUCTION ................................................................................................................................ 1 1.1 Purpose of the Report ......................................................................................................... 1 1.2 Project Location .................................................................................................................. 1 1.3 Project Description ............................................................................................................. 1 1.4 Noise and Sound Level Descriptors and Terminology ........................................................ 1 1.4.1 Descriptors ............................................................................................................. 1 1.4.2 Terminology ........................................................................................................... 1 1.5 Regulatory Framework ....................................................................................................... 2 1.5.1 City of Chula Vista Municipal Code ........................................................................ 2 2.0 ENVIRONMENTAL SETTING .............................................................................................................. 3 2.1 Surrounding Land Uses ....................................................................................................... 3 2.2 Noise-Sensitive Land Uses .................................................................................................. 4 3.0 ANALYSIS, METHODOLOGY, AND ASSUMPTIONS ............................................................................ 4 3.1 Methodology....................................................................................................................... 4 3.1.1 Noise Modeling Software ...................................................................................... 4 3.1.2 Receiver Locations ................................................................................................. 4 3.1.3 Off-Site Traffic Noise Modeling ............................................................................. 4 3.1.4 Car Wash Modeling ................................................................................................ 5 3.1.5 Convenience Store and Gas Station Modeling ...................................................... 6 4.0 RESULTS ........................................................................................................................................... 7 4.1 Car Wash Noise ................................................................................................................... 7 4.2 Combined Convenience Store, Gas Station, and Car Wash Noise .................................... 10 5.0 LIST OF PREPARERS ........................................................................................................................ 14 6.0 REFERENCES ................................................................................................................................... 15 LIST OF APPENDICES A Noise Modeling Input and Output B Equipment Data Sheets 2021-10-27 PC Agenda Page 16 of 207 ii TABLE OF CONTENTS (cont.) LIST OF FIGURES No. Title Follows Page 1 Regional Location ............................................................................................................................. 2 2 Otay Ranch Village 8 West ............................................................................................................... 2 3 Site Plan and Noise Sources ............................................................................................................. 2 4 Modeled Receivers .......................................................................................................................... 4 LIST OF TABLES No. Title Page 1 Exterior Noise Limits ........................................................................................................................ 3 2 Otay Ranch Village 8 West Traffic Volume ...................................................................................... 5 3 Modeled Car Wash Noise Levels ...................................................................................................... 8 4 Modeled Car Wash Noise Levels With Noise Reduction Measure .................................................. 9 5 Modeled Combined Non-Transportation Daytime Noise Levels ................................................... 11 6 Modeled Combined Non-Transportation Nighttime Noise Levels ................................................ 12 2021-10-27 PC Agenda Page 17 of 207 iii ACRONYMS AND ABBREVIATIONS APN Assessor’s Parcel Number CAD Computer Aided Design CadnaA Computer Aided Noise Abatement City City of Chula Vista dB decibel dBA A-weighted decibels FHWA Federal Highway Administration hp horsepower HVAC heating, ventilation, and air conditioning Hz Hertz kHz kilohertz LEQ equivalent sound level MH Medium-High Density Residential land use designation mPa micro-Pascals mph miles per hour NSLU noise-sensitive land use P Park land use designation SF square feet SPA Sectional Plan Area SPL sound pressure level TC Town Center land use designation TIA Traffic Impact Analysis TNM Traffic Noise Model 2021-10-27 PC Agenda Page 18 of 207 iv This page intentionally left blank 2021-10-27 PC Agenda Page 19 of 207 Conserve 6128 Project Noise Assessment | May 2021 ES-1 EXECUTIVE SUMMARY This report presents an assessment of the non-transportation noise sources of the Conserve 6128 Project (project) for compliance with the City of Chula Vista (City) car wash and noise ordinance. The project site is located within the triangular street intersection of La Media Parkway (North and South) and Main Street West in the Village 8 West Sectional Plan Area in Chula Vista, California. The project would construct a commercial convenience store, gas station and car wash. As currently planned, operation of the car wash would not comply with the City car wash and exterior noise limit ordinances. However, with implementation of a noise reduction measure that would require a car wash blower system with reduced noise levels, car wash noise would be reduced to less than predicted traffic noise levels, in compliance with the City car wash facility ordinance. With implementation of the reduced noise level blower measure, the combined non-transportation noise sources from the project, including the car wash blower system, vacuums, building heating, ventilation, and air conditioning (HVAC) systems, commercial refrigeration condensers, and gas station air compressors, would not exceed the City noise ordinance exterior 1-hour L EQ daytime or nighttime limits for applicable land uses measured at the receiving property lines. 2021-10-27 PC Agenda Page 20 of 207 Conserve 6128 Project Noise Assessment | May 2021 ES-2 This page intentionally left blank 2021-10-27 PC Agenda Page 21 of 207 Conserve 6128 Project Noise Assessment | May 2021 1 1.0 INTRODUCTION 1.1 PURPOSE OF THE REPORT This report presents an assessment of the non-transportation noise associated with operation of a commercial/retail convenience store, gas station, and car wash for compliance with the City of Chula Vista Municipal Code. 1.2 PROJECT LOCATION The project would be within the triangular street intersection of La Media Parkway (North and South) and Main Street West in the Otay Ranch Village 8 West Sectional Plan Area (SPA) in the City of Chula Vista (City), California within a portion of Assessor’s Parcel Number (APN) 644-070-24. See Figure 1, Regional Location, and Figure 2, Otay Ranch Village 8 West. 1.3 PROJECT DESCRIPTION The project plans to construct and operate a 4,200 square-foot (SF) convenience store, a 4,160-SF gas station, and a 1,420-SF car wash. See Figure 3, Site Plan and Noise Sources. 1.4 NOISE AND SOUND LEVEL DESCRIPTORS AND TERMINOLOGY 1.4.1 Descriptors All noise level or sound level values presented herein are expressed in terms of decibels (dB), with A-weighting (dBA) to approximate the hearing sensitivity of humans. Time-averaged noise levels are expressed by the symbol LEQ and have a 1-hour duration unless a specified duration is noted. 1.4.2 Terminology 1.4.2.1 Sound, Noise, and Acoustics Sound can be described as the mechanical energy of a vibrating object transmitted by pressure waves through a liquid or gaseous medium (e.g., air) to a hearing organ, such as a human ear. Noise is defined as loud, unexpected, or annoying sound. In the science of acoustics, the fundamental model consists of a sound (or noise) source, a receiver, and the propagation path between the two. The loudness of the noise source and obstructions or atmospheric factors affecting the propagation path to the receiver determines the sound level and characteristics of the noise perceived by the receiver. The field of acoustics deals primarily with the propagation and control of sound. 1.4.2.2 Frequency Continuous sound can be described by frequency (pitch) and amplitude (loudness). A low-frequency sound is perceived as low in pitch. Frequency is expressed in terms of cycles per second, or Hertz (Hz) (e.g., a frequency of 250 cycles per second is referred to as 250 Hz). High frequencies are sometimes 2021-10-27 PC Agenda Page 22 of 207 Conserve 6128 Project Noise Assessment | May 2021 2 more conveniently expressed in kilohertz (kHz), or thousands of Hertz. The audible frequency range for humans is generally between 20 Hz and 20,000 Hz (20 kHz). 1.4.2.3 Sound Pressure Levels and Decibels The amplitude of pressure waves generated by a sound source determines the loudness of that source. Sound pressure amplitude is measured in micro-Pascals (mPa). One mPa is approximately one hundred billionth (0.00000000001) of normal atmospheric pressure. Sound pressure amplitudes for different kinds of noise environments can range from less than 100 to 100,000,000 mPa. Because of this wide range of values, sound is rarely expressed in terms of mPa. Instead, a logarithmic scale is used to describe sound pressure level (SPL) in terms of dBA. The threshold of hearing for the human ear is about 0 dBA, which corresponds to 20 mPa. 1.4.2.4 Addition of Decibels Because decibels are logarithmic units, SPL cannot be added or subtracted through standard arithmetic. Under the decibel scale, a doubling of sound energy corresponds to a 3 dBA increase. In other words, when two identical sources are each producing sound of the same loudness, the resulting sound level at a given distance would be 3 dBA higher than from one source under the same conditions. For example, if one automobile produces an SPL of 70 dB when it passes an observer, two cars passing simultaneously would not produce 140 dBA—rather, they would combine to produce 73 dBA. Under the decibel scale, three sources of equal loudness together produce a sound level 5 dBA louder than one source. Under controlled conditions in an acoustical laboratory, the trained, healthy human ear is able to discern 1-dBA changes in sound levels, when exposed to steady, single-frequency (“pure-tone”) signals in the mid-frequency (1,000 Hz–8,000 Hz) range. In typical noisy environments, changes in noise of 1 to 2 dBA are generally not perceptible. It is widely accepted, however, that people begin to detect sound level increases of 3 dB in typical noisy environments. Further, a 5 dBA increase is generally perceived as a distinctly noticeable increase, and a 10 dBA increase is generally perceived as a doubling of loudness. 1.5 REGULATORY FRAMEWORK 1.5.1 City of Chula Vista Municipal Code Chapter 19.58, Uses, Section 19.58.060 of the City Municipal Code, defines requirements for operation of a commercial car wash facility. The following sections of the ordinance would be applicable to the project operational noise associated with the proposed car wash (City 2010): 19.58.060 Automobile Car Wash Facilities A. All equipment used for the facility shall be soundproofed so that any noise emanating therefrom, as measured from any point on adjacent property, shall be no more audible than the noise emanating from the normal street traffic at a comparable distance. B. Hours of operation shall be from 7:00 a.m. to 11:00 p.m., unless specifically approved by the Planning Commission. 2021-10-27 PC Agenda Page 23 of 207 ! !!! !! ! ! !!!!!! !! !!!! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!! !!!!!!!! !!!!!!!!!! !!!! !! !!!! !! !!!!!! !! !! !!!!!! ! ! ! !!!!!!!!! !! !!!!!! !!!!!! ! ! !! ! !!!! !!! !!!!!!!!! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!! !!!!!!!!!!!!! !!!!!!! !!!!!!!!!!!!!!!!! !! !! !!!!!!! ! ! ! !!!!!! !! !!!!!!!!!!!! !!!!!! !! !!!!!!!! !! !!!! !!!! !! !!!! !!!!!!!!!!!!!! ! !!! !! !! !! !! !!!!!!!!!!!!!! !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!! ! !!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!! !! !!!!!! ! !!! !!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!! ! ! ! ! ! !!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !!!! !!!!!!!!!"a$?¹ !"^$ ?³ ?¸ !"^$WÌ !"a$?¸ ?¸ ?t WÊ ?¦ ?¦%&s( !"a$!"^$ WÌ !"_$ !"_$ ?n Ag Aä ?Ë ?p !"^$%&u( %&s( ?Ë Aä ?p ?¹ POWAY OCEANSIDE CARLSBAD VISTA ESCONDIDO OTAY CHULA VISTA SANTEE SANMARCOS ENCINITAS EL CAJON LA MESA CORONADO NATIONALCITY IMPERIALBEACH LEMONGROVE SOLANABEACH DEL MAR SANDIEGO CAMP PENDLETON LakeSan Marcos Lake Hodges Lake Wohlford Lake Ramona Lake Poway Miramar Reservoir San VicenteReservoir LakeMurray SweetwaterReservoir LakeJennings OtayReservoir Pacific Ocean S a n D i e g o B aySantee Lakes SutherlandReservoir Lake Henshaw El Capitan Reservoir Loveland Reservoir Vail Lake O'Neill Lake Barrett Lake TIJUANA UNITED STATES MEXICO DULZURA JULIAN RAMONA WARNERSPRINGS RIVERSIDECOUNTY ORANGECOUNTY SAN DIEGOCOUNTY !Project Site ALPINELAJOLLA ?¹ FALLBROOK Figure 1 Regional LocationI:\PROJECTS\M\MRI\MRI-01_MollerCarwash\Map\NoiseRpt_CarWash\Fig1_Regional.mxd MRI-01 1/19/2021 - SABSource: Base Map Layers (SanGIS, 2016)K Conserve 6128 Car Wash 0 8 Miles 2021-10-27 PC Agenda Page 24 of 207 Otay Ranch Village 8 West Figure 2I:\PROJECTS\M\MRI\MRI-01_MollerCarwash\Map\NoiseRpt_CarWash\Fig2_Village8W.indd MRI-01 1/19/21 - SABSource: WHA, Inc. (2013) Conserve 6128 Car Wash Otay Ranch Village 8 West SPA 2-4 February 2020 Exhibit x-x: Name Exhibit 2.1 - Site Utilization Plan Town Center (TC) Medium-High Density Residential (MH) Medium Density Residential (M) Low-Medium Density Residential Village (LMV) Open Space (OS) Open Space (Preserve - OSP) Park (P) Community Purpose Facility (CPF) School Boundary of Town Center (Master Precise Plan Required - See Section 9.3.7) Legend - Land Use Calle Escuela Project Location 2021-10-27 PC Agenda Page 25 of 207 Conserve 6128 Car Wash I:\PROJECTS\M\MollerRetail_04881\MRI-01_MollerCarwash\Map\NoiseRpt_CarWash\Fig3_Site.indd MRI-01 5/18/2021 - SABSite Plan and Noise Sources Figure 3 Source: Hunsaker and Associates (2020)2525252525252525STOPONLYAHEADAHEADSIGNALSIGNALONLYSTOPPARCEL G PARCEL F PARCEL 'A' PARCEL H PARCEL 'C' LA MEDIA PKWY. SOUTH GAS PUMP CANOPY UNDERGROUND TANK P=456.8FF=457.3H-007 H-006 S-001 S-005 S-008 S-010 TRASHEVH-011 EV S-012 C -01 3S -0 1 7 L A M E D IA P K W Y . N O R T H MAIN ST WEST4,160 SF 4,200 SF 1,420 SF CONVENIENCESTORECAR WASH 3 4 OF SHEETPREPARED BY: HUNSAKER& ASSOCIATES PROPOSED SITE PLAN DR20-XXXX CONSERVE 6128 CONDITIONAL USE PERMIT & CITY OF CHULA VISTA, CALIFORNIA DESIGN REVIEW SITE PLAN FOR: Car Wash Exit Car Wash Entrance Rooftop HVAC and Condensors Air Compressor Vacuum Stations 2021-10-27 PC Agenda Page 26 of 207 Conserve 6128 Project Noise Assessment | May 2021 3 C. Vacuuming facilities shall be located to discourage the stacking of vehicles entering the car wash area and causing traffic congestion adjacent to any areas used for ingress or egress. Chapter 19.68, Performance Standards and Noise Control, of the City Municipal Code defines noise level limits and exceptions. The following sections of the ordinance would be applicable to the project operational noise associated with the proposed car wash (City 1999): 19.68.030 Exterior Noise Limits A. Maximum Permissible Sound Levels by Receiving Land Use 4. No person shall operate, or cause to be operated, any source of sound at any location within the City or allow the creation of any noise on property owned, leased, occupied, or otherwise controlled by such person which causes the noise level to exceed the environmental and/or nuisance interpretation of the applicable limits given in Table III [reproduced in this report as Table 1, Exterior Noise Limits]. a. Environmental noise shall be measured by the equivalent sound level (LEQ) for any hour. Table 1 EXTERIOR NOISE LIMITS Receiving Land Use Category Weekdays from 10 p.m. to 7 a.m. and Weekends from 10 p.m. to 8 a.m. (dBA)1, 2 Weekdays from 7 a.m. to 10 p.m. and Weekends from 8 a.m. to 10 p.m. (dBA)1, 2 All residential (except multiple dwelling) 45 55 Multiple dwelling residential 50 60 Commercial 60 65 Light industry – I-R and I-L zone 70 70 Heavy industry – I zone 80 80 Source: City Ordinance Section 19.68.030, Table III. 1 Environmental Noise – LEQ in any hour. 2 Nuisance Noise – Not to be exceeded any time. 2.0 ENVIRONMENTAL SETTING 2.1 SURROUNDING LAND USES Otay Ranch Village 8 West is surrounded by Village 4 to the west, Village 7 to the north, Village 8 East to the east, and open space to the south. As of this analysis, Village 8 West currently consists of vacant, undeveloped land, and only partial grading has occurred. Once developed, the project site will be bounded by Main Street West, La Media Road North, and La Media Road South. According to the SPA: parcel A (west of the project site) has a land use designation of Park (P); parcels C-A (east of the project site), F (southwest of the project site), G1 (south of the project site) and H1-A (southeast of the project site have a land use designation of Town Center (TC); and parcel D-A (northwest of the project site) has a land use designation of Medium-High Density Residential (MH; City 2020a). See Figure 2. 2021-10-27 PC Agenda Page 27 of 207 Conserve 6128 Project Noise Assessment | May 2021 4 2.2 NOISE-SENSITIVE LAND USES Noise-sensitive land uses (NSLUs) are land uses that may be subject to stress and/or interference from excessive noise. Typical NSLUs include residences, schools, hospitals, convalescent homes, senior and childcare facilities. Because the Otay Ranch Village 8 West has not been developed yet, there are no existing NSLUs in the project vicinity. The SPA defines the TC designation as mixed-use development with a mix of retail sales and services with high-density attached homes. The SPA MH designation allows higher density residential uses up to 3 stories. Future surrounding development could contain NSLUs in the TC and MH land uses (City 2020b). 3.0 ANALYSIS, METHODOLOGY, AND ASSUMPTIONS 3.1 METHODOLOGY 3.1.1 Noise Modeling Software Modeling of the exterior noise environment for this report was accomplished using the Computer Aided Noise Abatement (CadnaA) model version 2021. CadnaA is a program developed by DataKustik for predicting noise impacts in a wide variety of conditions. It allows for the input of project-related information, such as noise source data, barriers, structures, and topography to create a detailed model, and uses the methodology from the U.S. Department of Transportation Federal Highway Administration (FHWA) Traffic Noise Model TNM version 2.5 (FHWA 2004). The noise models used in this analysis were developed from Computer Aided Design (CAD) plans provided by the project architect. Input variables included car wash mechanical equipment reference noise levels, road alignment, elevation, lane configuration, area topography, projected traffic volumes, estimated truck composition percentages, and vehicle speeds. 3.1.2 Receiver Locations To estimate future noise from the project car wash and future noise from traffic on surrounding roadways, receivers were placed in the model at a height of 5 feet (1.52 meters) along the borders of the future development parcels surrounding the project site. The modeled receiver locations are shown in Figure 4, Modeled Receivers. 3.1.3 Off-Site Traffic Noise Modeling To determine compliance with the City car wash facility noise ordinance, traffic noise was analyzed for the noisiest hour of the day (p.m. peak hour) and the quietest hour permitted for car wash operation in the City Municipal Code (10:00 p.m. to 11:00 p.m.; 10:00 p.m. hour). Because the SPA area has not yet been developed, measurements of typical street noise in the project vicinity are not available or possible. Future traffic noise levels were modeled using estimated peak hour traffic data for the 2030 mitigated scenario (which assumes buildout of Village 8 West with mitigated street network) from the Otay Ranch Village 8 West Traffic Impact Analysis (TIA; RBF 2013). To determine future traffic levels during the 10:00 p.m. hour, typical hourly traffic distribution for U.S. metropolitan roadways was used from a report by Wyle Laboratories, “Development of Ground Transportation Systems Noise Contours for the San Diego Region” (December 1973). Similar traffic distribution patterns were noted in a study prepared by Ogden International, “Road Travel Survey” (1986). The typical afternoon (p.m.) 2021-10-27 PC Agenda Page 28 of 207 Conserve 6128 Car Wash I:\PROJECTS\M\MRI\MRI-01_MollerCarwash\Map\NoiseRpt_CarWash\Fig4_Receiver.indd MRI-01 1/19/2021 - SABModeled Receivers Figure 4 Source: Hunsaker and Associates (2020)2525252525252525STOPONLYAHEADAHEADSIGNALSIGNALONLYSTOPPARCEL G PARCEL F PARCEL 'A' PARCEL H PARCEL 'C' LA MEDIA PKWY. SOUTH GAS PUMP CANOPY UNDERGROUND TANK P=456.8FF=457.3H-007 H-006 S-001 S-005 S-008 S-010 TRASHEVH-011 EV S-012 C -01 3S -0 1 7 L A M E DI A P K W Y . NO RT H MAIN ST WEST4,160 SF 4,200 SF 1,420 SF CONVENIENCESTORECAR WASH 3 4 OF SHEETPREPARED BY: HUNSAKER& ASSOCIATES PROPOSED SITE PLAN DR20-XXXX CONSERVE 6128 CONDITIONAL USE PERMIT & CITY OF CHULA VISTA, CALIFORNIA DESIGN REVIEW SITE PLAN FOR: H1H2 H2 G4 G3 G2 G1 C1 C2 C3 C4C5C6C7 C8 C9 C10 D1D2 D3D4 A10 A9 A8 A7 A6 A5 A4 A3 A2 A1 F1 F2 F3 XX Noise Receiver 2021-10-27 PC Agenda Page 29 of 207 Conserve 6128 Project Noise Assessment | May 2021 5 peak traffic hour is from 4:00 to 5:00 p.m. which contains approximately 8.6 percent of the total daily traffic. Typical traffic levels during the 10:00 to 11:00 p.m. hour are 1.6 percent of the total daily traffic. Therefore, for typical traffic distribution, the 10:00 p.m. hour has 18.6 percent of the p.m. peak hour traffic.1 Table 2, Otay Ranch Village 8 West Traffic Volume shows the p.m. peak hour traffic volumes on surrounding streets from the Otay Ranch Village 8 West TIA and the estimated 10:00 p.m. hour traffic. According to the Otay Ranch Village 8 West TIA, the speed limit in on Main Street and La Media Road around the project site will be set at 25 to 35 miles per hour (mph). Because typical traffic on city streets produces lower average noise levels at 25 mph than at 35 mph, all traffic was modeled at 25 mph to provide a more conservative standard for compliance. A typical residential suburban roadway vehicle mix of 96 percent cars and light trucks, 2 percent medium trucks, and 1 percent heavy trucks was assumed in the modeling for all roadway segments. The traffic noise modeling input parameters are included in Appendix A to this report. Table 2 OTAY RANCH VILLAGE 8 WEST TRAFFIC VOLUME Road Segment p.m. Peak Hour Traffic 10 p.m. to 11 p.m. Traffic Main Street West East 1256 234 Main Street West Central 2016 375 Main Street West West 1837 342 Main Street East East 2001 372 Main Street East Central 1501 279 Main Street East West 1187 221 La Media Road North South 1238 230 La Media Road North Central 1511 281 La Media Road North North 1080 201 La Media Road South South 1875 349 La Media Road South Central 1394 259 La Media Road South North 948 176 Source: RBF 2013. 3.1.4 Car Wash Modeling Wash Volume The proposed car wash is anticipated to have typical cycle time of 5 minutes per car and a maximum capacity of 12 cars per hour. The project proponent anticipates the car wash operating at maximum capacity during the afternoon peak traffic hour and car wash volume dropping off to 2 to 3 cars per hour after 8:00 p.m. This analysis assumes 12 cars washed during the 4:00 p.m. peak traffic hour and 3 cars washed during the 10:00 p.m. hour. Building Orientation The car wash was modeled as a 15-feet high rectangular building with the perimeter and orientation matching the site plan (see Figure 3). Noise emanating from the car wash entrance and exit was 1 1.6 / 8.6 * 100 = 18.6 percent 2021-10-27 PC Agenda Page 30 of 207 Conserve 6128 Project Noise Assessment | May 2021 6 modeled as vertical area sources 13 feet wide by 10 feet high corresponding to typical car wash tunnel vehicle entrance and exit dimensions. Blower Noise generated by the car wash is assumed to be from several internal sources. The loudest single source, and the primary noise source of concern, is the air-blast drying system (blower) just inside the car wash exit. Typical blower units generate noise levels of 85 to 92 dBA measured 10 feet from the car wash exit and levels of 80 to 85 dBA measured 10 feet from the carwash entrance. The project proposes to install a Ryko SoftGloss MAXX car wash system. Typical noise data for similar installed systems (with blower) was provided by the manufacturer. The system would produce approximately 87.2 dBA at 10 feet from the car wash exit, and 80.8 dBA at 10 feet from the car wash entrance. The modeled blower system manufacturer’s noise data sheet is included in Appendix B to this report. The 1/3 octave band frequency spectrum for a typical air movement blower, corrected to result in the specified SPL at 10 feet was, used for the vertical area noise source. The model blower noise spectrum inputs are included in Appendix A to this report. To calculate the 1-hour LEQ for the car wash blowers, a duration of 99 seconds per wash cycle was assumed resulting in approximately 19.8 minutes of blower operation during the p.m. peak hour and 5 minutes of blower operation during the 10:00 p.m. hour. Vacuum Systems Although vacuum systems for interior cleaning by customers are not shown on the site plan, this analysis assumes that vacuum systems would be installed at the five parking spaces near the car wash, as shown in the site plan (see Figure 3). The project proposes to install individual J.E. Adams Super VAC model 9250 system at each vacuum station. Noise data provided by the manufacturer shows a rated SPL ranging from 98.4 to 101.3 dBA, depending on the restriction to the vacuum nozzle. The manufacturer’s noise data sheets are included in Appendix B to this report. This analysis assumes the maximum vacuum noise level, 101.3 dBA SPL, with the nozzle fully blocked. Twenty-five percent of cars using the car wash were assumed to use one of the vacuum stations for approximately 10 minutes per vehicle, resulting in three vacuum station operating concurrently for 10 minutes each during the p.m. peak hour and one vacuum station operating for 10 minutes during the 10:00 p.m. hour. 3.1.5 Convenience Store and Gas Station Modeling Operational non-transportation noise sources for the proposed convenience store and gas station would include heating, ventilation, and air conditioning (HVAC) systems, refrigeration condensers for the convenience store, and an air compressor for customer tire inflation. Building Orientation and Geometry The car wash was modeled as a 15-feet high building with the perimeter and orientation matching the site plan (see Figure 3). Flat roofed commercial buildings typically include a parapet wall around the roof perimeter to shield rooftop mounted building mechanical systems (e.g., HVAC systems, refrigeration condensers) visually and acoustically, and to provide safety for maintenance personnel working on the building mechanical systems. The height of a parapet wall can vary depending on the 2021-10-27 PC Agenda Page 31 of 207 Conserve 6128 Project Noise Assessment | May 2021 7 slope of the roof for drainage and the physical size of the mechanical systems. Typical commercial building parapets range from 3.5 feet to 6 feet high. The proposed building design, and the noise modeling, include a 4-feet 1-inch high parapet wall. Heating, Ventilation, and Air Conditioning Units Specific HVAC planning information for the project, including unit types and locations, was not available at the time of the analysis. The project applicant provided specifications for HVAC systems used for past similar projects—a Carrier 48LC packaged unit (electric/natural gas) rated at 7.5 tons of cooling/heating capacity. Standard HVAC planning assumes one ton of HVAC capacity for every 350 square feet of conditioned space (American Society of Heating, Refrigeration, and Air Conditioning Engineers [ASHRAE] 2012). Based on the 4,200 square-foot building size, two 7.5-ton units would be required for the project. Each Carrier HVAC unit has a rated noise level of 83.2 dBA S WL. The HVAC systems were assumed to operate continuously during the hottest part of the day and operate at a 50 percent duty cycle at night (10 p.m. to 7 a.m.). The manufacturer’s data sheets are included in Appendix B. Commercial Refrigeration Specific information was not available about the planned refrigeration systems for the convenience store cold food storage was not available at the time of the analysis. Typical commercial refrigeration systems include compressor systems mounted inside the building, and condenser systems installed outside of the building. This analysis assumes the use of two Hussman Proto-Air 3280 units mounted on the rooftop. The units would use 0.5-horsepower (HP), 1150 revolutions per minute (RPM) motors and variable speed drives (fan speed controllers). For daytime operation, the fan was assumed to operate ate 1150 RPM, producing an overall sound level of 87.6 dBA SWL. For nighttime operations, the fan was assumed to operate at 850 RPM, producing an overall sound level of 79.3 dBA S WL. The manufacturer’s data sheets are included in Appendix B. Air Compressor Gasoline stations are required by California law to provide air compressors and water for vehicles. The air is typically provided by a small compressor near the gas pumps. These small air pump units may produce noise ranging from a 65 dBA to 85 dBA measured at 5 feet from the unit. Air compressors are assumed to be used once per hour, with a two-minute cycle time. This analysis conservatively assumes one air compressor generating 85 dBA at 5 feet. 4.0 RESULTS 4.1 CAR WASH NOISE The results of the traffic noise and car wash modeling for each receiver, assuming the proposed Ryko system, as described in Section 3.1, is shown in Table 3, Modeled Car Wash Noise Levels. Bold text indicates where the noise level would exceed the limit in the City noise ordinance. 2021-10-27 PC Agenda Page 32 of 207 Conserve 6128 Project Noise Assessment | May 2021 8 Table 3 MODELED CAR WASH NOISE LEVELS Receiver Traffic p.m. Peak Hour (dBA LEQ) Car Wash p.m. Peak Hour (dBA LEQ) Difference (dBA) Traffic 10 p.m. Hour (dBA LEQ) Car Wash 10 p.m. Hour (dBA LEQ) Difference (dBA) A1 61.8 48.5 -13.3 54.5 42.7 -11.8 A2 59.8 51.9 -7.9 52.4 46.1 -6.3 A3 58.8 56.5 -2.3 51.3 50.9 -0.4 A4 58.7 55.8 -2.9 51.1 50.6 -0.5 A5 58.7 56.9 -1.8 51.1 51.8 0.7 A6 59.0 55.9 -3.1 51.3 50.7 -0.6 A7 58.9 54.6 -4.3 51.2 49.4 -1.8 A8 59.5 53.6 -5.9 51.6 48.3 -3.3 A9 59.6 52.0 -7.6 51.6 46.7 -4.9 A10 59.7 49.5 -10.2 51.5 44.2 -7.3 C1 63.5 50.8 -12.7 54.4 45.0 -9.4 C2 62.7 54.0 -8.7 52.7 48.2 -4.5 C3 62.2 56.3 -5.9 51.8 50.8 -1.0 C4 62.6 58.8 -3.8 52.2 53.2 1.0 C5 63.0 60.9 -2.1 52.5 54.8 2.3 C6 62.9 62.3 -0.6 52.4 56.2 3.8 C7 63.3 63.2 -0.1 52.8 57.2 4.4 C8 63.4 53.7 -9.7 53.0 47.6 -5.4 C9 63.3 57.1 -6.2 52.8 51.1 -1.7 C10 63.4 56.0 -7.4 53.0 50.0 -3.0 D1 63.0 54.6 -8.4 52.6 48.1 -4.5 D2 63.0 53.6 -9.4 52.7 48.9 -3.8 D3 62.2 51.9 -10.3 52.0 47.2 -4.8 D4 61.6 49.9 -11.7 51.5 45.2 -6.3 F1 64.1 42.7 -21.4 56.8 36.7 -20.1 F2 64.7 43.9 -20.8 57.4 38.0 -19.4 F3 62.1 42.3 -19.8 54.8 36.4 -18.4 G1 65.0 40.5 -24.5 57.7 34.8 -22.9 G2 64.2 33.1 -31.1 56.8 27.2 -29.6 G3 64.2 43.7 -20.5 56.8 37.7 -19.1 G4 65.5 46.7 -18.8 58.0 40.9 -17.1 H1 62.0 44.7 -17.3 54.6 38.9 -15.7 H2 63.5 46.1 -17.4 56.0 40.3 -15.7 H3 62.8 45.8 -17.0 55.4 40.0 -15.4 Sources: CadnaA version 2021. Bold text indicates where the noise level would exceed the limit in the City noise ordinance. As shown in Table 3, the car wash noise level would exceed the predicted traffic noise level by a maximum of 4.4 dBA at receiver C7 during the 10:00 p.m. hour. This would not comply with the City Municipal Code Section 19.58.060, Automobile Car Wash Facilities. In addition, the maximum car wash LEQ would be 63.2 dBA during the p.m. peak hour and 57.2 during the 10:00 p.m. hour. These levels would exceed the City Municipal Code Section 19.68.030 exterior noise limits of 60 dBA during the day and evening and 50 dBA at night for a multiple dwelling residential receiving land use. 2021-10-27 PC Agenda Page 33 of 207 Conserve 6128 Project Noise Assessment | May 2021 9 Noise reduction measure NOI-1 is recommended to be applied for code compliance and would require a reduced noise car wash blower system that would produce no more than 79.9 dBA measured 10 feet from the car wash exit and no more than 73.4 dBA measured 10 feet from the car wash entrance. To reduce car wash blower noise, some equipment manufacturers use silencers on the blower air intake and blast nozzles. As an example, Proto-Vest produces a range of car wash blower system designs with silencers. A Proto-Vest Windshear 30 hp system with a sound rating of 76.9 dBA from the blower assembly would meet the requirement of noise reduction measure NOI-1. This does not constitute a requirement or recommendation that this particular model or manufacturer be specified. The model was selected to demonstrate that systems are available with adequate noise reduction; any manufacturer’s system with equivalent or lower noise specifications would be acceptable. The example blower system manufacturer’s noise data sheets are included in Appendix B to this report. The results of the traffic noise and car wash modeling for each receiver with implementation of measure NOI-1, is shown in Table 4, Modeled Car Wash Noise Levels With Noise Reduction Measure. Table 4 MODELED CAR WASH NOISE LEVELS WITH NOISE REDUCTION MEASURE Receiver Traffic p.m. Peak Hour (dBA LEQ) Car Wash p.m. Peak Hour (dBA LEQ) Difference (dBA) Traffic 10 p.m. Hour (dBA LEQ) Car Wash 10 p.m. Hour (dBA LEQ) Difference (dBA) A1 61.8 44.0 -17.8 54.5 38.6 -15.9 A2 59.8 47.7 -12.1 52.4 42.3 -10.1 A3 58.8 53.1 -5.7 51.3 47.9 -3.4 A4 58.7 54.8 -3.9 51.1 49.7 -1.4 A5 58.7 55.5 -3.2 51.1 50.7 -0.4 A6 59.0 54.1 -4.9 51.3 49.3 -2.0 A7 58.9 52.6 -6.3 51.2 47.8 -3.4 A8 59.5 51.4 -8.1 51.6 46.6 -5.0 A9 59.6 49.8 -9.8 51.6 44.9 -6.7 A10 59.7 47.2 -12.5 51.5 42.3 -9.2 C1 63.5 46.2 -17.3 54.4 40.8 -13.6 C2 62.7 49.3 -13.4 52.7 44.0 -8.7 C3 62.2 51.0 -11.2 51.8 46.4 -5.4 C4 62.6 53.1 -9.5 52.2 48.6 -3.6 C5 63.0 54.5 -8.5 52.5 48.3 -4.2 C6 62.9 55.2 -7.7 52.4 49.0 -3.4 C7 63.3 55.9 -7.4 52.8 49.9 -2.9 C8 63.4 46.5 -16.9 53.0 40.5 -12.5 C9 63.3 49.9 -13.4 52.8 43.9 -8.9 C10 63.4 48.8 -14.6 53.0 42.9 -10.1 2021-10-27 PC Agenda Page 34 of 207 Conserve 6128 Project Noise Assessment | May 2021 10 Table 4 (cont.) MODELED CAR WASH NOISE LEVELS WITH NOISE REDUCTION MEASURE Receiver Traffic p.m. Peak Hour (dBA LEQ) Car Wash p.m. Peak Hour (dBA LEQ) Difference (dBA) Traffic 10 p.m. Hour (dBA LEQ) Car Wash 10 p.m. Hour (dBA LEQ) Difference (dBA) D1 63.0 49.5 -13.5 52.6 41.8 -10.8 D2 63.0 50.0 -13.0 52.7 46.5 -6.2 D3 62.2 48.5 -13.7 52.0 45.0 -7.0 D4 61.6 46.6 -15.0 51.5 43.1 -8.4 F1 64.1 36.9 -27.2 56.8 31.2 -25.6 F2 64.7 38.2 -26.5 57.4 32.6 -24.8 F3 62.1 36.5 -25.6 54.8 30.9 -23.9 G1 65.0 36.9 -28.1 57.7 31.7 -26.0 G2 64.2 27.1 -37.1 56.8 21.4 -35.4 G3 64.2 36.8 -27.4 56.8 30.8 -26.0 G4 65.5 41.8 -23.7 58.0 36.4 -21.6 H1 62.0 39.7 -22.3 54.6 34.3 -20.3 H2 63.5 41.0 -22.5 56.0 35.6 -20.4 H3 62.8 40.7 -22.1 55.4 35.2 -20.2 Sources: CadnaA version 2021. As shown in Table 4, with implementation of noise reduction measure NOI-1, the highest calculated 1-hour LEQ for receivers with residential uses (parcels C-A and D-A, receivers C1 – C10 and D1 – D4) car wash noise would be 55.2 dBA during the p.m. peak hour and 49.9 dBA during the 10:00 p.m. hour at receiver C7. The car highest calculated car wash noise for parcel A (receivers A1 through A10) would be 50.7 dBA LEQ at receiver A5. However, parcel A has a land use designation of park and the 50 dBA multiple dwelling residential nighttime limit would not apply. The car wash noise levels at all locations and hours would less than the traffic noise levels. Therefore, with incorporation of the measure, noise levels from operation of the proposed car wash would be in compliance with the City car wash facilities ordinance and would not exceed the City noise ordinance exterior noise limit of 60 dBA L EQ during the day and evening and 50 dBA LEQ at night for multiple dwelling residential uses. Recommended Noise Reduction Measure NOI-1 To comply with the City Municipal Code Sections 19.58.060, Automobile Car Wash Facilities and 19.68.030, Exterior Noise Limits, the applicant shall specify on the project plans and/or car wash specifications the use of a car wash blower system that, once installed, does not exceed 79.9 dBA measured 10 feet from the car wash building exit and does not exceed 73.4 dBA measured 10 feet from the car wash building entrance. Prior to occupancy, a City-approved qualified acoustic consultant shall verify the car wash system noise levels through a review of manufacturers’ data and/or measurement of the project car wash noise levels after installation. 4.2 COMBINED CONVENIENCE STORE, GAS STATION, AND CAR WASH NOISE To evaluate the combined non-transportation noise from the project, the total combined noise from the convenience store, gas station, and car wash (assuming implementation of noise reduction 2021-10-27 PC Agenda Page 35 of 207 Conserve 6128 Project Noise Assessment | May 2021 11 measure NOI-1) was modeled for the daytime and nighttime scenarios, as discussed in Section 3.1, above. In addition, noise from the convenience store and gas station was modeled without the car wash to calculate nighttime noise levels after operation of the car wash ceases. The results of the convenience store, gas station and car wash combined daytime modeling for each receiver is shown in Table 5, Modeled Combined Non-Transportation Daytime Noise Levels. Parcel A (receivers A1 – A10) has a land use designation of Park. The Municipal Code Section 19.68.030, Exterior Noise Limits, does not specify any exterior noise level limits for a Park land use. For this analysis, the 60 dBA L EQ daytime limit for a land use of Multiple Dwelling Residential was assumed to apply to Parcel A. Because typical city parks do not have noise sensitive nighttime uses, no exterior nighttime noise limits from the Municipal Code would apply to Parcel A. Table 5 MODELED COMBINED NON-TRANSPORTATION DAYTIME NOISE LEVELS Receiver Relevant Noise Ordinance Land Use1 Noise Ordinance Limit (dBA LEQ)1 Combined Non-Transportation Noise (dBA LEQ) Exceed Ordinance Limit? A1 Park 60 46.0 No A2 Park 60 49.0 No A3 Park 60 53.5 No A4 Park 60 54.9 No A5 Park 60 55.6 No A6 Park 60 54.1 No A7 Park 60 52.6 No A8 Park 60 51.5 No A9 Park 60 49.9 No A10 Park 60 47.4 No C1 Multiple Dwelling Residential 60 47.2 No C2 Multiple Dwelling Residential 60 49.9 No C3 Multiple Dwelling Residential 60 51.4 No C4 Multiple Dwelling Residential 60 53.3 No C5 Multiple Dwelling Residential 60 54.6 No C6 Multiple Dwelling Residential 60 55.3 No C7 Multiple Dwelling Residential 60 56.0 No C8 Multiple Dwelling Residential 60 46.8 No C9 Multiple Dwelling Residential 60 50.0 No C10 Multiple Dwelling Residential 60 48.9 No D1 Multiple Dwelling Residential 60 49.6 No D2 Multiple Dwelling Residential 60 50.0 No D3 Multiple Dwelling Residential 60 48.6 No D4 Multiple Dwelling Residential 60 46.8 No F1 Multiple Dwelling Residential 60 40.2 No F2 Multiple Dwelling Residential 60 41.9 No F3 Multiple Dwelling Residential 60 40.9 No G1 Multiple Dwelling Residential 60 43.6 No G2 Multiple Dwelling Residential 60 43.7 No G3 Multiple Dwelling Residential 60 43.8 No G4 Multiple Dwelling Residential 60 44.5 No 2021-10-27 PC Agenda Page 36 of 207 Conserve 6128 Project Noise Assessment | May 2021 12 Table 5 (cont.) MODELED COMBINED NON-TRANSPORTATION DAYTIME NOISE LEVELS Receiver Relevant Noise Ordinance Land Use1 Noise Ordinance Limit (dBA LEQ)1 Combined Non-Transportation Noise (dBA LEQ) Exceed Ordinance Limit? H1 Multiple Dwelling Residential 60 41.6 No H2 Multiple Dwelling Residential 60 42.8 No H3 Multiple Dwelling Residential 60 42.3 No Sources: CadnaA version 2021. 1 Per City of Chula Vista Municipal Code Section 19.68.030 Exterior Noise Limits. The results of the convenience store, gas station and car wash combined nighttime modeling for each receiver is shown in Table 6, Modeled Combined Non-Transportation Nighttime Noise Levels. Table 6 MODELED COMBINED NON-TRANSPORTATION NIGHTTIME NOISE LEVELS Receiver Relevant Ordinance Land Use1 Ordinance Limit (dBA LEQ)1 Combined Non-Transportation (dBA LEQ) Store and Gas Station Only (dBA LEQ) Exceed Ordinance Limit? A1 Park N/A 41.6 38.6 No A2 Park N/A 44.8 41.2 No A3 Park N/A 48.8 41.6 No A4 Park N/A 50.1 38.4 No A5 Park N/A 50.7 32.9 No A6 Park N/A 49.4 30.8 No A7 Park N/A 47.8 30.1 No A8 Park N/A 46.7 31.3 No A9 Park N/A 45.1 30.3 No A10 Park N/A 42.5 28.9 No C1 Multiple Dwelling Residential 50 42.1 36.3 No C2 Multiple Dwelling Residential 50 44.8 37.1 No C3 Multiple Dwelling Residential 50 46.8 36.7 No C4 Multiple Dwelling Residential 50 48.8 36.0 No C5 Multiple Dwelling Residential 50 48.5 35.3 No C6 Multiple Dwelling Residential 50 49.1 33.9 No C7 Multiple Dwelling Residential 50 50.0 33.0 No C8 Multiple Dwelling Residential 50 41.1 31.9 No C9 Multiple Dwelling Residential 50 44.1 29.5 No C10 Multiple Dwelling Residential 50 43.0 26.4 No D1 Multiple Dwelling Residential 50 41.9 26.0 No D2 Multiple Dwelling Residential 50 46.6 26.8 No D3 Multiple Dwelling Residential 50 45.1 29.4 No D4 Multiple Dwelling Residential 50 43.3 28.9 No F1 Multiple Dwelling Residential 50 34.9 32.4 No F2 Multiple Dwelling Residential 50 36.6 34.4 No F3 Multiple Dwelling Residential 50 35.4 33.5 No 2021-10-27 PC Agenda Page 37 of 207 Conserve 6128 Project Noise Assessment | May 2021 13 Table 6 (cont.) MODELED COMBINED NON-TRANSPORTATION NIGHTTIME NOISE LEVELS Receiver Relevant Ordinance Land Use1 Ordinance Limit (dBA LEQ)1 Combined Non-Transportation (dBA LEQ) Store and Gas Station Only (dBA LEQ) Exceed Ordinance Limit? G1 Multiple Dwelling Residential 50 38.1 36.9 No G2 Multiple Dwelling Residential 50 36.9 36.8 No G3 Multiple Dwelling Residential 50 37.8 36.8 No G4 Multiple Dwelling Residential 50 39.1 35.6 No H1 Multiple Dwelling Residential 50 36.2 31.6 No H2 Multiple Dwelling Residential 50 37.4 32.7 No H3 Multiple Dwelling Residential 50 36.9 31.9 No Sources: CadnaA version 2021. N/A = not applicable. 1 Per City of Chula Vista Municipal Code Section 19.68.030 Exterior Noise Limits. As shown in Table 5 and Table 6, with implementation of noise reduction measure NOI-1, the combined non-transportation noise levels (including from the car wash blower system, vacuums, building heating, ventilation, and air conditioning (HVAC) systems, commercial refrigeration condensers, and gas station air compressors) from operation of the project would not exceed the City Ordinance Section 19.68.030 daytime or nighttime exterior noise limits at any modeled receiver location. 2021-10-27 PC Agenda Page 38 of 207 Conserve 6128 Project Noise Assessment | May 2021 14 5.0 LIST OF PREPARERS Martin Rolph, Noise Analyst Charles Terry, Principal Acoustician Joanne M. Dramko, AICP, Senior Technical Specialist, QA/QC HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard La Mesa, CA 91942 2021-10-27 PC Agenda Page 39 of 207 Conserve 6128 Project Noise Assessment | May 2021 15 6.0 REFERENCES American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE). 2012. ASHRAE Handbook. City of Chula Vista (City). 2020a. Tentative Map Otay Ranch, Village 8 West. Available at: https://www.chulavistaca.gov/home/showpublisheddocument?id=20601 . 2020b. Sectional Planning Area Plan Village 8 West. Available at: https://www.chulavistaca.gov/home/showdocument?id=10234. 2010. Municipal Code Section 19.58.060, Automobile Car Wash Facilities. Available at: https://chulavista.municipal.codes/CVMC/19.58.060. 1999. Municipal Code Section 19.68.030, Exterior Noise Limits. Available at: https://chulavista.municipal.codes/CVMC/19.68.030. Ogden International. 1986. Road Travel Survey. RBF. 2013. Otay Ranch Village 8 West Traffic Impact Analysis. Available at: https://www.chulavistaca.gov/home/showpublisheddocument?id=11834 . U.S. Department of Transportation Federal Highway Administration (FHWA). 2004. Traffic Noise Model (TNM) Version 2.5. Available at: https://www.fhwa.dot.gov/environment/noise/traffic_noise_model/tnm_v25/. Wyle Laboratories. 1973. Development of Ground Transportation Systems Noise Contours for the San Diego Region. 2021-10-27 PC Agenda Page 40 of 207 Conserve 6128 Project Noise Assessment | May 2021 16 This page intentionally left blank. 2021-10-27 PC Agenda Page 41 of 207 Appendix A Noise Modeling Input and Output 2021-10-27 PC Agenda Page 42 of 207                                           This page intentionally left blank    2021-10-27 PC Agenda Page 43 of 207 CadnaA 2021 PM Peak Hour Car Wash Spectrum Input Table Name ID Type 1/3 Oktave Spectrum (dB) Weight. 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000 6300 8000 10000 A lin Car Wash Exit CWEx Li 51.8 95.8 95.8 90.8 87.8 93.8 81.8 77.8 65.8 95.1 100.8 Car Wash Entr CWEn Li 45.4 89.4 89.4 84.4 81.4 87.4 75.4 71.4 59.4 88.7 94.4 Vacuum Units VU Li 6.3 9.4 17.8 27.5 39 37 46.6 56.3 62.4 66.6 66 79.7 80.9 76.7 83.4 84.9 86.8 89.2 91.9 93 91.6 91.6 91.4 90.8 90.1 88 84.7 101.8 101.2 2021-10-27 PC Agenda Page 44 of 207 CadnaA 2021 PM Peak Hour Car Wash Point Source Input Table Name M. ID Result. PWL Lw / Li Correction Operating Time K0 Freq. Direct. Height Coordinates Day Evening Night Type Value norm. Day Evening Night Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) dB(A) dB(A) dB(A) (min) (min) (min) (dB) (Hz) (m) (m) (m) (m) Car Wash Vacuum + CWV1 101.8 101.8 101.8 Lw VU 0 0 0 10 0 0 0 (none) 1.3 r 501869.87 3607602.25 132.2 Car Wash Vacuum + CWV2 101.8 101.8 101.8 Lw VU 0 0 0 0 0 0 0 (none) 1.3 r 501871.96 3607604.15 132.29 Car Wash Vacuum + CWV3 101.8 101.8 101.8 Lw VU 0 0 0 10 0 0 0 (none) 1.3 r 501872.57 3607607.25 132.11 Car Wash Vacuum + CWV4 101.8 101.8 101.8 Lw VU 0 0 0 0 0 0 0 (none) 1.3 r 501874.47 3607609.15 132.15 Car Wash Vacuum + CWV5 101.8 101.8 101.8 Lw VU 0 0 0 10 0 0 0 (none) 1.3 r 501876.48 3607611.14 132.19 2021-10-27 PC Agenda Page 45 of 207 CadnaA 2021 Car Wash Area Source Geometry Car Wash Entrance Car Wash Exit 2021-10-27 PC Agenda Page 46 of 207 CadnaA 2021 PM Peak Hour Car Wash Area Source Input Table Name M. ID Result. PWL Result. PWL'' Lw / Li Operating Time K0 Freq. Direct. Day Evening Night Day Evening Night Type Value Day Special Night (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (min) (min) (min) (dB) (Hz) Car Wash Entrance + CWEn 99.4 99.4 99.4 88.7 88.7 88.7 Lw" CWEn 19.8 0 0 3 (none) Car Wash Exit + CWEx 105.8 105.8 105.8 95.1 95.1 95.1 Lw" CWEx 19.8 0 0 3 (none) 2021-10-27 PC Agenda Page 47 of 207 CadnaA 2021 PM Peak Hour Car Wash Receiver Table Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night Day Night Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (m) (m) (m) (m) Parcel A R1 A1 48.5 -80.2 0 0 x Total 1.52 r 501864.6 3607516.4 132.78 Parcel A R2 A2 51.9 -80.2 0 0 x Total 1.52 r 501858.24 3607534.93 133.46 Parcel A R3 A3 56.5 -80.2 0 0 x Total 1.52 r 501850.5 3607557.32 133.26 Parcel A R4 A4 55.8 -80.2 0 0 x Total 1.52 r 501843.17 3607578.33 131.77 Parcel A R5 A5 56.9 -80.2 0 0 x Total 1.52 r 501835.29 3607601.56 128.97 Parcel A R6 A6 55.9 -80.2 0 0 x Total 1.52 r 501830.04 3607617.04 127.16 Parcel A R7 A7 54.6 -80.2 0 0 x Total 1.52 r 501825.75 3607628.79 126.68 Parcel A R8 A8 53.6 -80.2 0 0 x Total 1.52 r 501822.85 3607637.64 127.66 Parcel A R9 A9 52 -80.2 0 0 x Total 1.52 r 501818.29 3607650.36 129.31 Parcel A R10 A10 49.5 -80.2 0 0 x Total 1.52 r 501810.06 3607671.76 132.26 Parcel A R11 A11 47.5 -80.2 0 0 x Total 1.52 r 501800.11 3607688.98 134.78 Parcel C R1 C1 50.8 -80.2 0 0 x Total 1.52 r 501965.8 3607550.99 142 Parcel C R2 C2 54 -80.2 0 0 x Total 1.52 r 501952.85 3607571.4 141.05 Parcel C R3 C3 56.3 -80.2 0 0 x Total 1.52 r 501941.22 3607589.18 139.22 Parcel C R4 C4 58.8 -80.2 0 0 x Total 1.52 r 501930.91 3607603 137.43 Parcel C R5 C5 60.9 -80.2 0 0 x Total 1.52 r 501921.91 3607613.32 135.94 Parcel C R6 C6 62.3 -80.2 0 0 x Total 1.52 r 501915.11 3607621.22 134.77 Parcel C R7 C7 63.2 -80.2 0 0 x Total 1.52 r 501907.43 3607628.79 133.54 Parcel C R8 C8 53.7 -80.2 0 0 x Total 1.52 r 501898.66 3607637.48 132.07 Parcel C R9 C9 57.1 -80.2 0 0 x Total 1.52 r 501891.55 3607644.88 130.72 Parcel C R10 C10 56 -80.2 0 0 x Total 1.52 r 501883.04 3607652.36 129.54 Parcel D R1 D1 54.6 -80.2 0 0 x Total 1.52 r 501874.82 3607660.98 129.54 Parcel D R2 D2 53.6 -80.2 0 0 x Total 1.52 r 501867.54 3607667.86 129.54 Parcel D R3 D3 51.9 -80.2 0 0 x Total 1.52 r 501861.02 3607676.65 129.54 Parcel D R4 D4 49.9 -80.2 0 0 x Total 1.52 r 501852.59 3607689.09 129.81 Parcel D R5 D5 47.7 -80.2 0 0 x Total 1.52 r 501841.12 3607705.13 131.56 Parcel F R1 F1 42.7 -80.2 0 0 x Total 1.52 r 501856.56 3607486.36 129.44 Parcel F R2 F2 43.9 -80.2 0 0 x Total 1.52 r 501872.76 3607492.11 131.07 Parcel F R3 F3 42.3 -80.2 0 0 x Total 1.52 r 501877.47 3607481.66 130.47 Parcel G R1 G1 40.5 -80.2 0 0 x Total 1.52 r 501897.32 3607499.95 133.2 Parcel G R2 G2 33.1 -80.2 0 0 x Total 1.52 r 501913.87 3607506.05 134.81 Parcel G R3 G3 43.7 -80.2 0 0 x Total 1.52 r 501937.03 3607514.06 137.06 Parcel G R3 G4 46.7 -80.2 0 0 x Total 1.52 r 501954.1 3607519.81 138.81 Parcel H R1 H1 44.7 -80.2 0 0 x Total 1.52 r 501983.19 3607513.36 140.65 Parcel H R2 H2 46.1 -80.2 0 0 x Total 1.52 r 501979.36 3607526.95 141.7 Parcel H R3 H3 45.8 -80.2 0 0 x Total 1.52 r 501990.68 3607532 143.19 2021-10-27 PC Agenda Page 48 of 207 CadnaA 2021 10 PM Hour Car Wash Point Source Input Table Name M. ID Result. PWL Lw / Li Correction Operating Time K0 Freq. Direct. Height Coordinates Day Evening Night Type Value norm. Day Evening Night Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) dB(A) dB(A) dB(A) (min) (min) (min) (dB) (Hz) (m) (m) (m) (m) Car Wash Vacuum + CWV1 101.8 101.8 101.8 Lw VU 0 0 0 0 0 0 0 (none) 1.3 r 501869.87 3607602.25 132.2 Car Wash Vacuum + CWV2 101.8 101.8 101.8 Lw VU 0 0 0 0 0 0 0 (none) 1.3 r 501871.96 3607604.15 132.29 Car Wash Vacuum + CWV3 101.8 101.8 101.8 Lw VU 0 0 0 10 0 0 0 (none) 1.3 r 501872.57 3607607.25 132.11 Car Wash Vacuum + CWV4 101.8 101.8 101.8 Lw VU 0 0 0 0 0 0 0 (none) 1.3 r 501874.47 3607609.15 132.15 Car Wash Vacuum + CWV5 101.8 101.8 101.8 Lw VU 0 0 0 0 0 0 0 (none) 1.3 r 501876.48 3607611.14 132.19 2021-10-27 PC Agenda Page 49 of 207 CadnaA 2021 10 PM Hour Car Wash Area Source Input Table Name M. ID Result. PWL Result. PWL'' Lw / Li Operating Time K0 Freq. Direct. Day Evening Night Day Evening Night Type Value Day Special Night (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (min) (min) (min) (dB) (Hz) Car Wash Entrance + CWEn 99.4 99.4 99.4 88.7 88.7 88.7 Lw" CWEn 4.95 0 0 3 (none) Car Wash Exit + CWEx 105.8 105.8 105.8 95.1 95.1 95.1 Lw" CWEx 4.95 0 0 3 (none) 2021-10-27 PC Agenda Page 50 of 207 CadnaA 2021 10 PM Hour Car Wash Receiver Table Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night Day Night Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (m) (m) (m) (m) Parcel A R1 A1 42.7 -80.2 0 0 x Total 1.52 r 501864.6 3607516.4 132.78 Parcel A R2 A2 46.1 -80.2 0 0 x Total 1.52 r 501858.24 3607534.93 133.46 Parcel A R3 A3 50.9 -80.2 0 0 x Total 1.52 r 501850.5 3607557.32 133.26 Parcel A R4 A4 50.6 -80.2 0 0 x Total 1.52 r 501843.17 3607578.33 131.77 Parcel A R5 A5 51.8 -80.2 0 0 x Total 1.52 r 501835.29 3607601.56 128.97 Parcel A R6 A6 50.7 -80.2 0 0 x Total 1.52 r 501830.04 3607617.04 127.16 Parcel A R7 A7 49.4 -80.2 0 0 x Total 1.52 r 501825.75 3607628.79 126.68 Parcel A R8 A8 48.3 -80.2 0 0 x Total 1.52 r 501822.85 3607637.64 127.66 Parcel A R9 A9 46.7 -80.2 0 0 x Total 1.52 r 501818.29 3607650.36 129.31 Parcel A R10 A10 44.2 -80.2 0 0 x Total 1.52 r 501810.06 3607671.76 132.26 Parcel A R11 A11 42.2 -80.2 0 0 x Total 1.52 r 501800.11 3607688.98 134.78 Parcel C R1 C1 45 -80.2 0 0 x Total 1.52 r 501965.8 3607550.99 142 Parcel C R2 C2 48.2 -80.2 0 0 x Total 1.52 r 501952.85 3607571.4 141.05 Parcel C R3 C3 50.8 -80.2 0 0 x Total 1.52 r 501941.22 3607589.18 139.22 Parcel C R4 C4 53.2 -80.2 0 0 x Total 1.52 r 501930.91 3607603 137.43 Parcel C R5 C5 54.8 -80.2 0 0 x Total 1.52 r 501921.91 3607613.32 135.94 Parcel C R6 C6 56.2 -80.2 0 0 x Total 1.52 r 501915.11 3607621.22 134.77 Parcel C R7 C7 57.2 -80.2 0 0 x Total 1.52 r 501907.43 3607628.79 133.54 Parcel C R8 C8 47.6 -80.2 0 0 x Total 1.52 r 501898.66 3607637.48 132.07 Parcel C R9 C9 51.1 -80.2 0 0 x Total 1.52 r 501891.55 3607644.88 130.72 Parcel C R10 C10 50 -80.2 0 0 x Total 1.52 r 501883.04 3607652.36 129.54 Parcel D R1 D1 48.1 -80.2 0 0 x Total 1.52 r 501874.82 3607660.98 129.54 Parcel D R2 D2 48.9 -80.2 0 0 x Total 1.52 r 501867.54 3607667.86 129.54 Parcel D R3 D3 47.2 -80.2 0 0 x Total 1.52 r 501861.02 3607676.65 129.54 Parcel D R4 D4 45.2 -80.2 0 0 x Total 1.52 r 501852.59 3607689.09 129.81 Parcel D R5 D5 43.1 -80.2 0 0 x Total 1.52 r 501841.12 3607705.13 131.56 Parcel F R1 F1 36.7 -80.2 0 0 x Total 1.52 r 501856.56 3607486.36 129.44 Parcel F R2 F2 38 -80.2 0 0 x Total 1.52 r 501872.76 3607492.11 131.07 Parcel F R3 F3 36.4 -80.2 0 0 x Total 1.52 r 501877.47 3607481.66 130.47 Parcel G R1 G1 34.8 -80.2 0 0 x Total 1.52 r 501897.32 3607499.95 133.2 Parcel G R2 G2 27.2 -80.2 0 0 x Total 1.52 r 501913.87 3607506.05 134.81 Parcel G R3 G3 37.7 -80.2 0 0 x Total 1.52 r 501937.03 3607514.06 137.06 Parcel G R3 G4 40.9 -80.2 0 0 x Total 1.52 r 501954.1 3607519.81 138.81 Parcel H R1 H1 38.9 -80.2 0 0 x Total 1.52 r 501983.19 3607513.36 140.65 Parcel H R2 H2 40.3 -80.2 0 0 x Total 1.52 r 501979.36 3607526.95 141.7 Parcel H R3 H3 40 -80.2 0 0 x Total 1.52 r 501990.68 3607532 143.19 2021-10-27 PC Agenda Page 51 of 207 CadnaA 2021 Mitigated PM Peak Hour Car Wash Spectrum Input Table Name ID Type 1/3 Oktave Spectrum (dB) Weight. 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000 6300 8000 10000 A lin Blower CWB Li 55.5 99.5 99.5 94.5 91.5 97.5 85.5 81.5 69.5 98.8 104.5 Car Wash Exit CWEx Li 44.5 88.5 88.5 83.5 80.5 86.5 74.5 70.5 58.5 87.8 93.5 Car Wash Entr CWEn Li 38.1 82.1 82.1 77.1 74.1 80.1 68.1 64.1 52.1 81.4 87.1 Vacuum Units VU Li 6.3 9.4 17.8 27.5 39 37 46.6 56.3 62.4 66.6 66 79.7 80.9 76.7 83.4 84.9 86.8 89.2 91.9 93 91.6 91.6 91.4 90.8 90.1 88 84.7 101.8 101.2 2021-10-27 PC Agenda Page 52 of 207 CadnaA 2021 Mitigated PM Peak Hour Car Wash Receiver Table Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night Day Night Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (m) (m) (m) (m) Parcel A R1 A1 44 -80.2 0 0 x Total 1.52 r 501864.6 3607516.4 132.78 Parcel A R2 A2 47.7 -80.2 0 0 x Total 1.52 r 501858.24 3607534.93 133.46 Parcel A R3 A3 53.1 -80.2 0 0 x Total 1.52 r 501850.5 3607557.32 133.26 Parcel A R4 A4 54.8 -80.2 0 0 x Total 1.52 r 501843.17 3607578.33 131.77 Parcel A R5 A5 55.5 -80.2 0 0 x Total 1.52 r 501835.29 3607601.56 128.97 Parcel A R6 A6 54.1 -80.2 0 0 x Total 1.52 r 501830.04 3607617.04 127.16 Parcel A R7 A7 52.6 -80.2 0 0 x Total 1.52 r 501825.75 3607628.79 126.68 Parcel A R8 A8 51.4 -80.2 0 0 x Total 1.52 r 501822.85 3607637.64 127.66 Parcel A R9 A9 49.8 -80.2 0 0 x Total 1.52 r 501818.29 3607650.36 129.31 Parcel A R10 A10 47.2 -80.2 0 0 x Total 1.52 r 501810.06 3607671.76 132.26 Parcel A R11 A11 45.2 -80.2 0 0 x Total 1.52 r 501800.11 3607688.98 134.78 Parcel C R1 C1 46.2 -80.2 0 0 x Total 1.52 r 501965.8 3607550.99 142 Parcel C R2 C2 49.3 -80.2 0 0 x Total 1.52 r 501952.85 3607571.4 141.05 Parcel C R3 C3 51 -80.2 0 0 x Total 1.52 r 501941.22 3607589.18 139.22 Parcel C R4 C4 53.1 -80.2 0 0 x Total 1.52 r 501930.91 3607603 137.43 Parcel C R5 C5 54.5 -80.2 0 0 x Total 1.52 r 501921.91 3607613.32 135.94 Parcel C R6 C6 55.2 -80.2 0 0 x Total 1.52 r 501915.11 3607621.22 134.77 Parcel C R7 C7 55.9 -80.2 0 0 x Total 1.52 r 501907.43 3607628.79 133.54 Parcel C R8 C8 46.5 -80.2 0 0 x Total 1.52 r 501898.66 3607637.48 132.07 Parcel C R9 C9 49.9 -80.2 0 0 x Total 1.52 r 501891.55 3607644.88 130.72 Parcel C R10 C10 48.8 -80.2 0 0 x Total 1.52 r 501883.04 3607652.36 129.54 Parcel D R1 D1 49.5 -80.2 0 0 x Total 1.52 r 501874.82 3607660.98 129.54 Parcel D R2 D2 50 -80.2 0 0 x Total 1.52 r 501867.54 3607667.86 129.54 Parcel D R3 D3 48.5 -80.2 0 0 x Total 1.52 r 501861.02 3607676.65 129.54 Parcel D R4 D4 46.6 -80.2 0 0 x Total 1.52 r 501852.59 3607689.09 129.81 Parcel D R5 D5 44.6 -80.2 0 0 x Total 1.52 r 501841.12 3607705.13 131.56 Parcel F R1 F1 36.9 -80.2 0 0 x Total 1.52 r 501856.56 3607486.36 129.44 Parcel F R2 F2 38.2 -80.2 0 0 x Total 1.52 r 501872.76 3607492.11 131.07 Parcel F R3 F3 36.5 -80.2 0 0 x Total 1.52 r 501877.47 3607481.66 130.47 Parcel G R1 G1 36.9 -80.2 0 0 x Total 1.52 r 501897.32 3607499.95 133.2 Parcel G R2 G2 27.1 -80.2 0 0 x Total 1.52 r 501913.87 3607506.05 134.81 Parcel G R3 G3 36.8 -80.2 0 0 x Total 1.52 r 501937.03 3607514.06 137.06 Parcel G R3 G4 41.8 -80.2 0 0 x Total 1.52 r 501954.1 3607519.81 138.81 Parcel H R1 H1 39.7 -80.2 0 0 x Total 1.52 r 501983.19 3607513.36 140.65 Parcel H R2 H2 41 -80.2 0 0 x Total 1.52 r 501979.36 3607526.95 141.7 Parcel H R3 H3 40.7 -80.2 0 0 x Total 1.52 r 501990.68 3607532 143.19 2021-10-27 PC Agenda Page 53 of 207 CadnaA 2021 Mitigated PM Peak Hour Car Wash Receiver Table Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night Day Night Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (m) (m) (m) (m) Parcel A R1 A1 45 45 0 0 x Total 1.52 r 501864.6 3607516.4 132.78 Parcel A R2 A2 48.2 48.2 0 0 x Total 1.52 r 501858.24 3607534.93 133.46 Parcel A R3 A3 52.3 52.3 0 0 x Total 1.52 r 501850.5 3607557.32 133.26 Parcel A R4 A4 47.6 47.6 0 0 x Total 1.52 r 501843.17 3607578.33 131.77 Parcel A R5 A5 49.8 49.8 0 0 x Total 1.52 r 501835.29 3607601.56 128.97 Parcel A R6 A6 49.6 49.6 0 0 x Total 1.52 r 501830.04 3607617.04 127.16 Parcel A R7 A7 48.7 48.7 0 0 x Total 1.52 r 501825.75 3607628.79 126.68 Parcel A R8 A8 47.9 47.9 0 0 x Total 1.52 r 501822.85 3607637.64 127.66 Parcel A R9 A9 46.4 46.4 0 0 x Total 1.52 r 501818.29 3607650.36 129.31 Parcel A R10 A10 44 44 0 0 x Total 1.52 r 501810.06 3607671.76 132.26 Parcel A R11 A11 42 42 0 0 x Total 1.52 r 501800.11 3607688.98 134.78 Parcel C R1 C1 47.4 47.4 0 0 x Total 1.52 r 501965.8 3607550.99 142 Parcel C R2 C2 50.6 50.6 0 0 x Total 1.52 r 501952.85 3607571.4 141.05 Parcel C R3 C3 53.2 53.2 0 0 x Total 1.52 r 501941.22 3607589.18 139.22 Parcel C R4 C4 55.9 55.9 0 0 x Total 1.52 r 501930.91 3607603 137.43 Parcel C R5 C5 58.2 58.2 0 0 x Total 1.52 r 501921.91 3607613.32 135.94 Parcel C R6 C6 59.7 59.7 0 0 x Total 1.52 r 501915.11 3607621.22 134.77 Parcel C R7 C7 60.7 60.7 0 0 x Total 1.52 r 501907.43 3607628.79 133.54 Parcel C R8 C8 51.1 51.1 0 0 x Total 1.52 r 501898.66 3607637.48 132.07 Parcel C R9 C9 54.6 54.6 0 0 x Total 1.52 r 501891.55 3607644.88 130.72 Parcel C R10 C10 53.5 53.5 0 0 x Total 1.52 r 501883.04 3607652.36 129.54 Parcel D R1 D1 51.3 51.3 0 0 x Total 1.52 r 501874.82 3607660.98 129.54 Parcel D R2 D2 49.6 49.6 0 0 x Total 1.52 r 501867.54 3607667.86 129.54 Parcel D R3 D3 47.7 47.7 0 0 x Total 1.52 r 501861.02 3607676.65 129.54 Parcel D R4 D4 45.5 45.5 0 0 x Total 1.52 r 501852.59 3607689.09 129.81 Parcel D R5 D5 43.2 43.2 0 0 x Total 1.52 r 501841.12 3607705.13 131.56 Parcel F R1 F1 39.7 39.7 0 0 x Total 1.52 r 501856.56 3607486.36 129.44 Parcel F R2 F2 41 41 0 0 x Total 1.52 r 501872.76 3607492.11 131.07 Parcel F R3 F3 39.4 39.4 0 0 x Total 1.52 r 501877.47 3607481.66 130.47 Parcel G R1 G1 36.3 36.3 0 0 x Total 1.52 r 501897.32 3607499.95 133.2 Parcel G R2 G2 30.3 30.3 0 0 x Total 1.52 r 501913.87 3607506.05 134.81 Parcel G R3 G3 41.2 41.2 0 0 x Total 1.52 r 501937.03 3607514.06 137.06 Parcel G R3 G4 43.5 43.5 0 0 x Total 1.52 r 501954.1 3607519.81 138.81 Parcel H R1 H1 41.5 41.5 0 0 x Total 1.52 r 501983.19 3607513.36 140.65 Parcel H R2 H2 42.9 42.9 0 0 x Total 1.52 r 501979.36 3607526.95 141.7 Parcel H R3 H3 42.6 42.6 0 0 x Total 1.52 r 501990.68 3607532 143.19 2021-10-27 PC Agenda Page 54 of 207 CadnaA 2021 Store and Gas Station Spectrum Input Table Name ID Type 1/3 Oktave Spectrum (dB) Weight.63 125 250 500 1000 2000 4000 8000 A lin HVAC 7.5 Ton HVAC Li 89.3 86 82.9 80.7 78.5 73.6 69.6 64.5 83.2 92.2 Refrigeration Fan 850 RPMRF0850Li 80.6 83.6 79.6 76.6 74.6 69.6 65.5 79.3 87.2 Refrigeration Fan 1150 RPMRF1150Li 90.6 93.6 89.6 86.6 54.6 79.6 75.6 87.6 96.9 Air CompressorCMP Li 97.4 97.4 97.4 2021-10-27 PC Agenda Page 55 of 207 CadnaA 2021 Store and Gas Station Point Source Input Table Name M. ID Result. PWL Lw / Li Correction Operating Time K0 Freq. Direct. Height Coordinates Day Evening Night Type Value norm. Day Evening Night Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) dB(A) dB(A) dB(A) (min) (min) (min) (dB) (Hz) (m) (m) (m) (m) HVAC + HVAC 83.2 83.2 83.2 Lw HVAC 0 0 0 60 0 30 0 (none) 1.3 g 501913.81 3607545.64 141.51 HVAC + HVAC 83.2 83.2 83.2 Lw HVAC 0 0 0 60 0 30 0 (none) 1.3 g 501915.95 3607539.52 141.51 Refrigeration Fan 850 RPM + RF0850 79.3 79.3 79.3 Lw RF0850 0 0 0 0 0 60 0 (none) 1.3 g 501898.3 3607533.21 141.51 Refrigeration Fan 1150 RPM + RF1150 87.6 87.6 87.6 Lw RF1150 0 0 0 60 0 0 0 (none) 1.3 g 501898.55 3607533.3 141.51 Refrigeration Fan 850 RPM + RF0850 79.3 79.3 79.3 Lw RF0850 0 0 0 0 0 60 0 (none) 1.3 g 501899.9 3607533.75 141.51 Refrigeration Fan 1150 RPM + RF1150 87.6 87.6 87.6 Lw RF1150 0 0 0 60 0 0 0 (none) 1.3 g 501900.21 3607533.84 141.51 Air Compressor + CMP 97.4 97.4 97.4 Lw CMP 0 0 0 2 0 2 0 (none) 1.3 r 501880.42 3607557.32 135.04 2021-10-27 PC Agenda Page 56 of 207 CadnaA 2021 Combined Non-Transportation Receiver Table Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night Day Night Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (m) (m) (m) (m) Parcel A R1 A1 46 41.6 0 0 x Total 1.52 r 501864.6 3607516.4 132.78 Parcel A R2 A2 49 44.8 0 0 x Total 1.52 r 501858.24 3607534.93 133.46 Parcel A R3 A3 53.5 48.8 0 0 x Total 1.52 r 501850.5 3607557.32 133.26 Parcel A R4 A4 54.9 50.1 0 0 x Total 1.52 r 501843.17 3607578.33 131.77 Parcel A R5 A5 55.6 50.7 0 0 x Total 1.52 r 501835.29 3607601.56 128.97 Parcel A R6 A6 54.1 49.4 0 0 x Total 1.52 r 501830.04 3607617.04 127.16 Parcel A R7 A7 52.6 47.8 0 0 x Total 1.52 r 501825.75 3607628.79 126.68 Parcel A R8 A8 51.5 46.7 0 0 x Total 1.52 r 501822.85 3607637.64 127.66 Parcel A R9 A9 49.9 45.1 0 0 x Total 1.52 r 501818.29 3607650.36 129.31 Parcel A R10 A10 47.4 42.5 0 0 x Total 1.52 r 501810.06 3607671.76 132.26 Parcel A R11 A11 45.4 40.6 0 0 x Total 1.52 r 501800.11 3607688.98 134.78 Parcel C R1 C1 47.2 42.1 0 0 x Total 1.52 r 501965.8 3607550.99 142 Parcel C R2 C2 49.9 44.8 0 0 x Total 1.52 r 501952.85 3607571.4 141.05 Parcel C R3 C3 51.4 46.8 0 0 x Total 1.52 r 501941.22 3607589.18 139.22 Parcel C R4 C4 53.3 48.8 0 0 x Total 1.52 r 501930.91 3607603 137.43 Parcel C R5 C5 54.6 48.5 0 0 x Total 1.52 r 501921.91 3607613.32 135.94 Parcel C R6 C6 55.3 49.1 0 0 x Total 1.52 r 501915.11 3607621.22 134.77 Parcel C R7 C7 56 50 0 0 x Total 1.52 r 501907.43 3607628.79 133.54 Parcel C R8 C8 46.8 41.1 0 0 x Total 1.52 r 501898.66 3607637.48 132.07 Parcel C R9 C9 50 44.1 0 0 x Total 1.52 r 501891.55 3607644.88 130.72 Parcel C R10 C10 48.9 43 0 0 x Total 1.52 r 501883.04 3607652.36 129.54 Parcel D R1 D1 49.6 41.9 0 0 x Total 1.52 r 501874.82 3607660.98 129.54 Parcel D R2 D2 50 46.6 0 0 x Total 1.52 r 501867.54 3607667.86 129.54 Parcel D R3 D3 48.6 45.1 0 0 x Total 1.52 r 501861.02 3607676.65 129.54 Parcel D R4 D4 46.8 43.3 0 0 x Total 1.52 r 501852.59 3607689.09 129.81 Parcel D R5 D5 44.8 41.2 0 0 x Total 1.52 r 501841.12 3607705.13 131.56 Parcel F R1 F1 40.2 34.9 0 0 x Total 1.52 r 501856.56 3607486.36 129.44 Parcel F R2 F2 41.9 36.6 0 0 x Total 1.52 r 501872.76 3607492.11 131.07 Parcel F R3 F3 40.9 35.4 0 0 x Total 1.52 r 501877.47 3607481.66 130.47 Parcel G R1 G1 43.6 38.1 0 0 x Total 1.52 r 501897.32 3607499.95 133.2 Parcel G R2 G2 43.7 36.9 0 0 x Total 1.52 r 501913.87 3607506.05 134.81 Parcel G R3 G3 43.8 37.8 0 0 x Total 1.52 r 501937.03 3607514.06 137.06 Parcel G R3 G4 44.5 39.1 0 0 x Total 1.52 r 501954.1 3607519.81 138.81 Parcel H R1 H1 41.6 36.2 0 0 x Total 1.52 r 501983.19 3607513.36 140.65 Parcel H R2 H2 42.8 37.4 0 0 x Total 1.52 r 501979.36 3607526.95 141.7 Parcel H R3 H3 42.3 36.9 0 0 x Total 1.52 r 501990.68 3607532 143.19 2021-10-27 PC Agenda Page 57 of 207                                           This page intentionally left blank    2021-10-27 PC Agenda Page 58 of 207 Appendix B Equipment Data Sheets 2021-10-27 PC Agenda Page 59 of 207                                           This page intentionally left blank    2021-10-27 PC Agenda Page 60 of 207 The following features come standard on the SoftGloss MAXX: • Five split-rotating brushes thoroughly clean vehicles in less time, maximizing your throughput and your profits. • Rotating rocker blaster and under- chassis wash annihilate grime buildup. • FoamBrite-equipped cleaning arms engulf the car for a top-to-bottom clean. This lightweight material is exclusive to Ryko and designed to deliver a detailed wash without worry of damage to the vehicle. • Efficient chemical application delivers uniform coverage of 360 CleanCut presoak, detergent and TriFoam wax. • An onboard computer memorizes the profile of each vehicle as it goes through the wash and disables brushes where they’re not needed—virtually eliminating mirror, wiper and antenna damage. Plus, a top-brush-interrupt feature prevents the top brush from dropping into the beds of pickup trucks where it could come into contact with debris and damage the truck or the machine. • Low-profile vehicle detection and tall side arms ensure cars of all sizes— from minis to duallies—experience the same spotless clean. • Attractive, large bay is inviting to customers and can accommodate duallies. • A custom look is easy to create with different colors of FoamBrite and virtually limitless choices of body panel colors to choose from. FEATURES AND BENEFITS A proven success in the car-wash industry, SoftGloss MAXX is a wash your clients will return to time and time again. You won’t find its combination of features and benefits anywhere else but from Ryko. Equipped with our patented FoamBrite wash material, SoftGloss MAXX offers a safe, thorough clean that will send your customer satisfaction levels—and your sales—soaring. Gentle, yet powerful five-brush clean 2021-10-27 PC Agenda Page 61 of 207 Push your profits higher with any of these add-ons: • Chemical-injected wheel scrub provides extra cleaning power where vehicles need it most. • ColorWave finishing curtain delivers a customer-wowing light show that will set your wash apart from the competition. (Available in red, yellow or blue.) • Onboard dryers allow your customers to relax while the machine uniformly dries their vehicles. • Bug Buster foam helps eliminate the bugs and debris customers notice most on their windshields and grilles. • RainShield protectant protects vehicle bodies and glass surfaces from corrosives, oxidation and UV rays while improving visibility, enhancing color and shine, and providing a water-repellant coating. • Water reclamation system minimizes the amount of fresh, city water usage while still providing a spot-free rinse. • HP Turbo provides effective and appealing high-pressure cleaning of wheels and rocker panels. SPECIFICATIONSPROFITABLE OPTIONS Maximum Vehicle Height 84" Maximum Vehicle Width 95" Water (min)40 PSI @ 40 GPM, 1" Air (min)100 PSI @ 3 CFM, 3/8" Electrical (basic) 208/230V AC, 60 HZ, 3 Phase, and 120V AC, 60 HZ, 1 Phase OR 460V AC, 60 HZ, 3 Phase, and 120V AC, 60 HZ, 1 Phase Ryko Solutions, Inc. • 1500 SE 37th Street, Grimes, IA 50111 • (800) 284-7956 • www.ryko.com ONLY RYKO CAN OFFER ALL OF THIS! With Ryko as your partner, you’re getting more than a machine. We lead the industry in uptime with the only coast-to-coast, direct support program with locally based technicians and a full line of wash solutions. It all adds up to increased wash counts and higher profit margins. • Equipment and Installation • On-Site Service • Preventive Maintenance • CleanTouch™ Wash Solutions • Remote Monitoring • Online Tech Resources • Central Dispatch • Centralized Billing The most comprehensive line of car wash equipment solutions in the industry. The most advanced technology tools to diagnose, administer, monitor and repair equipment to have you up and running faster. National direct service coverage and a national footprint for CleanTouch wash solutions. 2/2016 2021-10-27 PC Agenda Page 62 of 207 64.8 ---401 68.0-ao• 72.0 20· 75.5-1 o· 30• 20' lO' ii.i--10· 79.3-20 1 7 4.3-30'71.1-40' 60' -'ot.J.1 50' .... i�� ◄O' ... 1\� Manufacturer Noise Diagram 2021-10-27 PC Agenda Page 63 of 207 2021-10-27 PC Agenda Page 64 of 207 W E W O R K H A R D E R T O P R O V I D E Y O U S O L U T I O N SWE W O R K H A R D E R T O P R O V I D E Y O U S O L U T I O N S J .E . A D A M S I N D U S T R I E S , LT D J .E . A D A M S I N D U S T R I E S , LT D W W W.J E A D A M S .C O M W W W.J E A D A M S .C O M T O L L -F R E E 8 0 0 -5 5 3 -8 8 6 1 T O L L -F R E E 8 0 0 -5 5 3 -8 8 6 1 T O L L -F R E E FA X 8 6 6 -2 5 2 -6 6 9 4TOLL-F R E E FA X 8 6 6 -2 5 2 -6 6 9 4 SUPER VAC WITH AMERICAN 2000 LOCK SYSTEM FEATURES Double ser vice doors of fer easy access to clean out compar tment and 4 filter bag system (Replacement Item #8076) SSAC 110 volt accumulating timer (Replacement Item #8712SS4) Imonex coin acceptor takes quar ters (Replacement Item #8149) Faceplate secured with Medeco cam lock (Replacement Item #8953) Coin box secured with American 2000 series lock (Replacement Item #8920-1T Drilled & Tapped) Lighted dome available in red, blue, yellow, dark green, light green, purple and white Hose: 2” x 15’, swivel cuf f and nozzle included (15’, 25’, and 50’ available in 1 1/2” or 2”) Optional coin mechs, motors, colored hoses, extra security, and clean-out containers are available Optional coin box security cover (Item #8940-1W) DECALS 9200-11 Yellow decals 9200-12 Blue decals 9200-13 Violet decals 9200-14 Black decals (standard) SUPER VAC 9250LD SHOWN WITH OPTIONAL YELLOW DOME, YELLOW HOSE, AND SERVICE DOOR SECURITY COVER COIN BOX AND AMERICAN 2000 SERIES LOCK MODEL # 9240 •2Small •• •140 20 120 9250 •2Large •• •150 20 120 9250LD •2 ••••140 20 120 9253 •3Large •• •155 30 120 VACUUM MOTORS STAINLESS STEEL DOME LIGHTED DOME COIN ACCEPTOR ETL APPROVED OPTIONAL DECAL PKG. WEIGHT AMPS REQ.VOLTAGE 2021-10-27 PC Agenda Page 65 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 Center Freq (Hz) Sound Power: RSS Corr. Factor Avg Sound Pressure 1 2 3 4 5 6 25 11.5 6.9 4.6 4.0 -0.3 2.4 9.4 3.3 1.3 31.5 14.3 -5.0 19.3 21.8 15.2 14.8 22.5 16.9 18.0 40 20.3 4.4 15.9 16.8 14.9 13.6 16.9 15.5 16.7 50 28.6 3.7 24.9 12.1 26.4 26.5 14.7 25.8 27.4 63 35.8 9.7 26.2 26.2 27.1 25.6 24.0 25.6 27.5 80 33.7 7.7 26.0 23.5 26.9 27.4 23.0 26.1 27.3 100 44.2 2.0 42.1 41.7 42.3 40.9 40.6 42.9 43.7 125 56.5 5.4 51.1 53.0 48.8 49.5 51.8 50.5 51.5 160 64.0 2.2 61.8 62.8 62.1 59.8 62.1 58.8 63.5 200 65.3 0.8 64.5 62.7 64.4 63.6 64.8 64.9 65.8 250 65.0 1.1 63.9 61.2 63.3 62.9 61.9 66.3 65.5 315 83.1 0.6 82.6 77.9 81.9 81.2 78.5 85.5 84.8 400 71.4 0.3 71.1 71.6 70.8 71.3 69.3 71.3 71.8 500 68.3 1.7 66.6 67.4 65.8 64.9 68.5 66.8 65.1 630 75.5 1.3 74.2 75.1 74.2 72.6 76.0 72.4 73.9 800 74.7 0.4 74.3 75.1 74.8 74.0 74.4 74.3 73.2 1000 77.5 0.3 77.2 77.9 77.1 77.3 76.8 77.4 76.5 1250 81.2 1.2 79.9 79.8 80.1 79.6 80.0 80.0 80.1 1600 84.5 1.5 83.0 83.3 83.5 83.4 82.3 83.3 82.3 2000 91.7 1.2 90.6 90.8 91.3 90.1 90.1 91.2 89.6 2500 89.9 2.3 87.5 87.6 87.9 87.9 86.9 87.7 87.1 3150 89.7 2.7 87.0 86.8 87.0 87.0 87.4 87.1 86.9 4000 90.2 2.7 87.5 87.5 87.4 88.1 87.9 87.3 86.9 5000 87.9 3.6 84.3 84.6 84.4 84.6 84.1 84.4 83.8 6300 85.1 4.7 80.5 80.5 80.7 80.5 80.3 80.5 80.1 8000 84.0 6.4 77.6 77.3 77.8 78.1 77.5 77.7 77.3 10000 83.7 7.5 76.3 76.4 76.0 76.9 77.2 76.6 73.9 12500 83.1 9.8 73.3 73.8 72.6 74.6 74.7 73.0 68.3 16000 73.2 13.2 60.1 60.0 60.7 60.3 59.6 59.4 60.2 20000 68.5 17.7 50.9 49.7 51.2 51.5 51.4 50.1 51.0 Overall Sound Power dBA: (Sound Power = Total Sound Pressure + Reference Sound Source (RSS) Correction Factor) 98.4 Sound Power dBA 1/3 Octave Band JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Open Nozzle Test Condition: Mic Location 1/3 Octave Band Sound Pressure (RAW) dBA 0.0 20.0 40.0 60.0 80.0 100.0 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000 6300 8000 10000 12500 16000 20000 SOUND POWER A-WEIGHT DBFREQUENCY BAND (HZ)Sound Power: dBA Sound Power: dBA Page 1 of 22021-10-27 PC Agenda Page 66 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Open Nozzle Test Condition: Sound Pressure At Distances From Unit (Sound Treated as Point Source) 98.4 Feet Meters Feet Meters 5 1.5 5 1.5 10 3.0 10 3.0 15 4.6 15 4.6 25 7.6 25 7.6 30 9.1 30 9.1 35 10.7 35 10.7 40 12.2 40 12.2 45 13.7 45 13.7 50 15.2 50 15.2 55 16.8 55 16.8 60 18.3 60 18.3 75 22.9 75 22.9 80 24.4 80 24.4 85 25.9 85 25.9 90 27.4 90 27.4 95 29.0 95 29.0 100 30.5 100 30.5 Distance Sound Power = Sound Pressure (dBA) 61.2 60.7 Sound Pressure (dBA) Distance 65.2 63.2 62.7 62.1 61.6 69.9 68.7 67.7 66.8 65.9 86.8 80.7 89.8 Half Sphere Q = 2 66.2 77.2 72.8 71.2 63.7 Quarter Sphere Q = 4 71.7 70.7 69.8 68.9 68.2 83.7 80.2 75.8 74.2 72.9 65.7 65.2 64.7 64.2 𝑳𝑳𝑷𝑷=𝑳𝑳𝒘𝒘+𝟏𝟏𝟏𝟏𝐥𝐥𝐥𝐥𝐥𝐥𝑸𝑸𝟒𝟒𝝅𝝅𝒓𝒓𝟐𝟐 Lp = Sound Pressure dBA Lw = Sound Power Q = Directivity Factor r = Distance from Source Page 2 of 22021-10-27 PC Agenda Page 67 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 Center Freq (Hz) Sound Power: RSS Corr. Factor Avg Sound Pressure 1 2 3 4 5 6 25 9.6 6.9 2.8 3.4 -0.5 3.4 4.9 3.5 -1.5 31.5 13.1 -5.0 18.1 16.3 16.5 18.7 20.5 16.8 18.0 40 19.1 4.4 14.7 13.1 14.8 13.5 15.1 16.0 15.1 50 27.1 3.7 23.4 13.0 23.5 23.2 15.4 25.9 26.4 63 37.9 9.7 28.2 28.8 27.8 28.6 28.8 26.2 28.6 80 35.9 7.7 28.2 26.6 28.1 26.9 27.3 30.7 28.3 100 47.7 2.0 45.7 43.9 46.9 42.8 46.6 45.6 46.9 125 58.1 5.4 52.7 53.9 50.0 49.7 55.1 53.6 51.2 160 64.8 2.2 62.6 63.1 64.5 63.4 59.7 58.5 63.5 200 66.0 0.8 65.2 63.4 65.5 66.6 65.0 65.1 65.2 250 66.1 1.1 65.0 64.1 66.5 63.3 64.4 66.8 63.4 315 84.3 0.6 83.8 76.6 86.8 80.4 80.4 87.8 79.4 400 74.8 0.3 74.5 75.2 74.1 74.8 72.1 75.1 74.9 500 70.8 1.7 69.2 70.8 69.3 68.9 68.9 68.5 68.1 630 77.4 1.3 76.1 76.9 75.0 74.7 76.8 77.7 74.8 800 77.9 0.4 77.5 78.1 77.8 76.8 78.2 77.4 76.4 1000 82.2 0.3 81.9 80.9 82.9 82.0 81.9 82.1 81.5 1250 85.6 1.2 84.4 83.9 84.6 84.8 83.9 84.4 84.7 1600 88.3 1.5 86.8 86.9 86.8 86.4 86.9 86.7 87.0 2000 91.2 1.2 90.0 89.4 90.3 91.1 89.9 88.5 90.6 2500 88.6 2.3 86.3 86.3 85.7 86.3 86.4 86.4 86.5 3150 89.8 2.7 87.1 87.1 86.9 87.3 87.0 87.0 87.1 4000 92.3 2.7 89.6 89.5 90.1 89.5 89.5 89.2 89.7 5000 93.1 3.6 89.5 89.7 89.4 89.8 89.0 89.6 89.5 6300 90.2 4.7 85.5 84.9 85.4 86.0 85.1 85.7 85.8 8000 87.9 6.4 81.5 80.8 81.6 82.0 81.4 81.8 81.4 10000 85.1 7.5 77.6 76.5 77.4 78.2 77.7 78.0 77.6 12500 83.1 9.8 73.3 71.8 72.5 74.0 73.4 73.7 73.8 16000 78.9 13.2 65.7 64.4 65.3 66.3 65.6 66.3 66.0 20000 75.7 17.7 58.1 54.9 57.1 58.9 58.4 58.8 59.0 Overall Sound Power dBA: (Sound Power = Total Sound Pressure + Reference Sound Source (RSS) Correction Factor) 100.3 Sound Power dBA 1/3 Octave Band JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Nozzle Half Blocked Test Condition: Mic Location 1/3 Octave Band Sound Pressure (RAW) dBA 0.0 20.0 40.0 60.0 80.0 100.0 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000 6300 8000 10000 12500 16000 20000 SOUND POWER A-WEIGHT DBFREQUENCY BAND (HZ)Sound Power: dBA Sound Power: dBA Page 1 of 22021-10-27 PC Agenda Page 68 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Nozzle Half Blocked Test Condition: Sound Pressure At Distances From Unit (Sound Treated as Point Source) 100.3 Feet Meters Feet Meters 5 1.5 5 1.5 10 3.0 10 3.0 15 4.6 15 4.6 25 7.6 25 7.6 30 9.1 30 9.1 35 10.7 35 10.7 40 12.2 40 12.2 45 13.7 45 13.7 50 15.2 50 15.2 55 16.8 55 16.8 60 18.3 60 18.3 75 22.9 75 22.9 80 24.4 80 24.4 85 25.9 85 25.9 90 27.4 90 27.4 95 29.0 95 29.0 100 30.5 100 30.5 65.6 Quarter Sphere Q = 4 73.6 72.6 71.7 70.8 70.1 85.6 82.1 77.7 76.1 74.8 67.6 67.1 66.6 66.1 91.7 Half Sphere Q = 2 68.1 79.1 74.7 73.1 63.1 62.6 Sound Pressure (dBA) Distance 67.1 65.1 64.6 64.0 63.5 71.8 70.6 69.6 68.7 67.8 88.7 82.6 Distance Sound Power = Sound Pressure (dBA) 𝑳𝑳𝑷𝑷=𝑳𝑳𝒘𝒘+𝟏𝟏𝟏𝟏𝐥𝐥𝐥𝐥𝐥𝐥𝑸𝑸𝟒𝟒𝝅𝝅𝒓𝒓𝟐𝟐 Lp = Sound Pressure dBA Lw = Sound Power Q = Directivity Factor r = Distance from Source Page 2 of 22021-10-27 PC Agenda Page 69 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 Center Freq (Hz) Sound Power: RSS Corr. Factor Avg Sound Pressure 1 2 3 4 5 6 25 8.5 6.9 1.6 2.8 -0.3 0.2 3.9 -1.3 2.1 31.5 14.4 -5.0 19.4 23.5 15.8 17.4 18.9 18.2 18.4 40 21.2 4.4 16.8 21.9 14.8 13.1 16.0 12.6 13.8 50 28.3 3.7 24.6 18.1 25.8 26.0 15.0 26.1 26.6 63 38.5 9.7 28.8 29.9 27.9 29.8 29.5 26.5 28.4 80 36.7 7.7 29.1 30.2 30.4 27.6 26.9 29.8 28.1 100 46.5 2.0 44.5 44.1 44.4 41.1 45.1 45.7 45.1 125 57.1 5.4 51.7 52.1 51.4 51.7 53.3 51.6 49.1 160 62.8 2.2 60.6 61.7 61.9 58.6 58.1 59.5 62.0 200 65.7 0.8 64.9 64.0 66.8 64.8 64.5 64.8 63.9 250 65.5 1.1 64.5 65.4 64.5 64.6 64.1 64.5 63.7 315 80.0 0.6 79.5 79.5 78.1 73.4 84.0 74.2 78.8 400 76.7 0.3 76.4 77.4 76.3 76.9 75.2 77.1 75.2 500 72.6 1.7 70.9 71.7 71.2 70.8 71.2 70.9 69.6 630 79.0 1.3 77.7 78.1 77.1 78.4 79.1 76.4 76.5 800 81.7 0.4 81.3 80.8 81.9 81.0 82.0 80.8 81.1 1000 84.3 0.3 84.0 83.7 83.5 84.3 84.0 84.6 84.0 1250 86.9 1.2 85.6 85.2 85.3 85.2 85.7 86.2 86.0 1600 89.8 1.5 88.3 87.8 88.6 88.3 87.9 88.7 88.6 2000 90.9 1.2 89.7 90.2 90.1 89.8 89.0 90.3 88.6 2500 89.6 2.3 87.2 87.7 87.1 86.6 86.7 87.5 87.6 3150 89.9 2.7 87.2 87.5 87.4 87.0 86.3 87.4 87.2 4000 90.5 2.7 87.8 88.2 87.6 87.5 87.3 88.0 88.1 5000 90.8 3.6 87.2 87.1 87.3 87.1 86.7 87.6 87.4 6300 89.2 4.7 84.5 84.5 84.5 84.2 84.4 85.0 84.6 8000 87.4 6.4 81.0 80.3 80.9 81.1 81.0 81.6 81.0 10000 84.2 7.5 76.8 76.0 76.7 76.6 77.1 77.2 76.8 12500 81.5 9.8 71.7 70.3 71.3 71.8 72.1 72.9 71.6 16000 78.8 13.2 65.6 64.3 65.5 65.4 65.5 66.5 66.2 20000 76.2 17.7 58.5 55.1 57.8 58.1 58.6 59.3 60.5 Overall Sound Power dBA: (Sound Power = Total Sound Pressure + Reference Sound Source (RSS) Correction Factor) 99.8 Sound Power dBA 1/3 Octave Band JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Nozzle 3/4 Blocked Test Condition: Mic Location 1/3 Octave Band Sound Pressure (RAW) dBA 0.0 20.0 40.0 60.0 80.0 100.0 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000 6300 8000 10000 12500 16000 20000 SOUND POWER A-WEIGHT DBFREQUENCY BAND (HZ)Sound Power: dBA Sound Power: dBA Page 1 of 22021-10-27 PC Agenda Page 70 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Nozzle 3/4 Blocked Test Condition: Sound Pressure At Distances From Unit (Sound Treated as Point Source) 99.8 Feet Meters Feet Meters 5 1.5 5 1.5 10 3.0 10 3.0 15 4.6 15 4.6 25 7.6 25 7.6 30 9.1 30 9.1 35 10.7 35 10.7 40 12.2 40 12.2 45 13.7 45 13.7 50 15.2 50 15.2 55 16.8 55 16.8 60 18.3 60 18.3 75 22.9 75 22.9 80 24.4 80 24.4 85 25.9 85 25.9 90 27.4 90 27.4 95 29.0 95 29.0 100 30.5 100 30.5 Distance Sound Power = Sound Pressure (dBA) 62.5 62.1 Sound Pressure (dBA) Distance 66.5 64.6 64.0 63.5 63.0 71.2 70.1 69.0 68.1 67.3 88.1 82.1 91.1 Half Sphere Q = 2 67.6 78.6 74.1 72.6 65.1 Quarter Sphere Q = 4 73.1 72.0 71.1 70.3 69.5 85.1 81.6 77.1 75.6 74.2 67.0 66.5 66.0 65.6 𝑳𝑳𝑷𝑷=𝑳𝑳𝒘𝒘+𝟏𝟏𝟏𝟏𝐥𝐥𝐥𝐥𝐥𝐥𝑸𝑸𝟒𝟒𝝅𝝅𝒓𝒓𝟐𝟐 Lp = Sound Pressure dBA Lw = Sound Power Q = Directivity Factor r = Distance from Source Page 2 of 22021-10-27 PC Agenda Page 71 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 Center Freq (Hz) Sound Power: RSS Corr. Factor Avg Sound Pressure 1 2 3 4 5 6 25 6.3 6.9 -0.6 1.3 -1.0 -2.4 0.5 -2.7 -0.5 31.5 9.4 -5.0 14.4 16.4 10.0 15.0 16.6 12.6 12.2 40 17.8 4.4 13.4 15.5 13.5 12.6 13.1 12.4 12.4 50 27.5 3.7 23.8 14.8 24.3 26.1 16.0 24.6 25.9 63 39.0 9.7 29.3 28.7 26.3 26.9 27.6 25.7 34.0 80 37.0 7.7 29.3 27.3 29.6 28.6 25.3 31.1 31.3 100 46.6 2.0 44.6 46.5 43.4 42.2 44.5 45.8 43.5 125 56.2 5.4 50.8 52.4 51.4 48.3 50.9 51.4 49.6 160 62.4 2.2 60.2 59.8 60.5 60.1 58.3 58.7 62.5 200 66.6 0.8 65.8 64.1 66.8 66.4 66.2 65.7 64.9 250 66.0 1.1 64.9 65.2 64.0 65.3 64.6 64.7 65.3 315 79.7 0.6 79.2 81.6 81.1 77.6 72.5 78.8 78.5 400 80.9 0.3 80.6 82.4 81.2 79.7 78.5 81.3 79.3 500 76.7 1.7 75.0 75.6 75.6 74.5 75.0 74.9 74.5 630 83.4 1.3 82.1 82.0 82.3 82.4 83.2 82.4 79.9 800 84.9 0.4 84.5 84.5 85.3 84.3 85.2 84.1 83.2 1000 86.8 0.3 86.5 87.1 85.8 85.7 86.6 87.0 86.4 1250 89.2 1.2 87.9 88.1 88.2 87.6 88.0 87.4 88.3 1600 91.9 1.5 90.4 90.3 90.9 90.7 89.9 90.4 90.0 2000 93.0 1.2 91.8 91.9 91.7 90.4 91.5 91.1 93.7 2500 91.6 2.3 89.2 90.4 89.4 88.6 88.7 88.9 89.0 3150 91.6 2.7 88.8 89.3 88.9 88.6 88.1 89.0 89.0 4000 91.4 2.7 88.6 88.9 88.8 88.7 88.1 88.7 88.7 5000 90.8 3.6 87.2 87.0 87.2 87.7 86.7 87.3 87.4 6300 90.1 4.7 85.4 85.0 85.3 85.7 85.1 85.6 85.6 8000 88.0 6.4 81.6 81.1 81.1 81.7 81.3 82.0 82.2 10000 84.7 7.5 77.2 76.2 76.8 77.0 76.9 78.4 77.8 12500 82.2 9.8 72.4 71.3 71.4 71.8 72.1 74.5 72.6 16000 80.0 13.2 66.8 65.0 65.7 66.3 66.5 68.1 68.4 20000 78.0 17.7 60.3 55.8 58.0 59.6 59.6 62.3 62.8 Overall Sound Power dBA: (Sound Power = Total Sound Pressure + Reference Sound Source (RSS) Correction Factor) 101.3 Sound Power dBA 1/3 Octave Band JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Nozzle Fully Blocked Test Condition: Mic Location 1/3 Octave Band Sound Pressure (RAW) dBA 0.0 20.0 40.0 60.0 80.0 100.0 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000 6300 8000 10000 12500 16000 20000 SOUND POWER A-WEIGHT DBFREQUENCY BAND (HZ)Sound Power: dBA Sound Power: dBA Page 1 of 22021-10-27 PC Agenda Page 72 of 207 Sound Power and Narrow Band Report Customer:JE Adams Volts 120 Date:4/23/2019 Frequency 60 Hz Mtr Model Q6600-092T (3 mtrs)By:Jonathan Johnson Unit:9235-3 Test Method:ASTM F1334 JE Adams Unit 9235 3 Motor Unit with Q6600-092T Motors. Large Steel Dome (No Foam) Inlet In Room Nozzle Fully Blocked Test Condition: Sound Pressure At Distances From Unit (Sound Treated as Point Source) 101.3 Feet Meters Feet Meters 5 1.5 5 1.5 10 3.0 10 3.0 15 4.6 15 4.6 25 7.6 25 7.6 30 9.1 30 9.1 35 10.7 35 10.7 40 12.2 40 12.2 45 13.7 45 13.7 50 15.2 50 15.2 55 16.8 55 16.8 60 18.3 60 18.3 75 22.9 75 22.9 80 24.4 80 24.4 85 25.9 85 25.9 90 27.4 90 27.4 95 29.0 95 29.0 100 30.5 100 30.5 Distance Sound Power = Sound Pressure (dBA) 64.0 63.6 Sound Pressure (dBA) Distance 68.0 66.1 65.5 65.0 64.5 72.7 71.6 70.5 69.6 68.8 89.6 83.6 92.6 Half Sphere Q = 2 69.1 80.1 75.6 74.1 66.6 Quarter Sphere Q = 4 74.6 73.5 72.6 71.8 71.0 86.6 83.1 78.7 77.1 75.7 68.5 68.0 67.5 67.1 𝑳𝑳𝑷𝑷=𝑳𝑳𝒘𝒘+𝟏𝟏𝟏𝟏𝐥𝐥𝐥𝐥𝐥𝐥𝑸𝑸𝟒𝟒𝝅𝝅𝒓𝒓𝟐𝟐 Lp = Sound Pressure dBA Lw = Sound Power Q = Directivity Factor r = Distance from Source Page 2 of 22021-10-27 PC Agenda Page 73 of 207 2021-10-27 PC Agenda Page 74 of 207 2021-10-27 PC Agenda Page 75 of 207 2021-10-27 PC Agenda Page 76 of 207 2021-10-27 PC Agenda Page 77 of 207 2021-10-27 PC Agenda Page 78 of 207 2021-10-27 PC Agenda Page 79 of 207 2021-10-27 PC Agenda Page 80 of 207 www.hussmann.com Proto-Aire Outdoor Protocol Environmental Benefits Compared to Traditional Rack Systems. - Better energy efficiency reduces use of fossil fuels, reduces air pollution. - Significantly smaller refrigerant charge reduces use of HFCs. - Significantly lower refrigerant leak rate. 2021-10-27 PC Agenda Page 81 of 207 proto-AIrE Outdoor Small Footprint Protocol Solution. Several condenser sizes. Proto-Aire is sized based on the compressor load and the heat of rejection requirements for the compressors. The largest condenser can support up to 450 MBH at a 20˚F TD. Features and options. - Weatherproof outdoor enclosure. - Factory installed suction filters and liquid driers. - Optional factory-installed gas defrost valves and winter control. - Optional Polyfin and Electrofin coil coating. - Optional oversized receiver with heat tape and insulation. - Optional hail guards and rain doors. All standard Protocol options. Since the Proto-Aire builds upon the Protocol frame, all standard Protocol mechanical and electrical options are available with Proto-Aire. Proto-Aire environmental advantages. - Significant reduction in refrigerant charge. - Significant reduction in greenhouse gas emissions. - Better energy efficiency in virtually all applications. - Less copper refrigerant piping. - Fewer braze joints for fewer leaks. Other advantages. - Easy to install. - No machine room needed. - Lower installation costs. - Decreases or eliminates the need for EPRs. - Compact footprint. Proto-Aire is a compact footprint outdoor Protocol unit with an integrated air-cooled condenser and weatherproof skins. Units can be installed outside next to the store or on the roof. This allows for more flexibility with Protocol store designs and reduces space requirements for equipment inside the store. Sustainable Solutions. Protocol is the most widely used refrigeration system directly addressing today’s environmental concerns. We are using the phrase “Sustainable Solutions” to underscore Protocol’s important role in helping address environmental issues. Hussmann is committed to developing advanced technologies that reduce the use of HFCs and improve energy efficiency. Protocol is just one of many alternatives we offer to promote sustainable solutions. 2021-10-27 PC Agenda Page 82 of 207 Enabling excellence in food retailing. Proto-Aire dimensions. NOTE: We reserve the right to change or revise specifications and product design in connection with any feature of our products. Such changes do not entitle the buyer to corresponding changes, improvements, additions, or replacements for equipment previously sold or shipped. For additional resources, contact your representative or visit www.hussmann.com. L H D Weight Nomenclature (in) (in) (in) (lb) 3 and 4 Fan 128 56.5 42 2800 6 Fan (Super) 185 56.5 42 3700 2021-10-27 PC Agenda Page 83 of 207 Hussman Proto-Air 3280 Condenser Units 0.5 Horse Power Variable Drive Cooling Fan Noise Spectrum RPM 63 125 250 500 1000 2000 4000 A 850 80.6 83.6 79.6 76.6 74.6 69.6 65.5 79.3 1150 90.6 93.6 89.6 86.6 54.6 79.6 75.6 87.6 Source: Electroinic communicatrion between Hussmann and HELIX Environmental Planning 1/3 Octave Spectrum (dB) 2021-10-27 PC Agenda Page 84 of 207                                           This page intentionally left blank    2021-10-27 PC Agenda Page 85 of 207 Page 1 Technical Memorandum TO:Steve Laub, Land Solutions Inc. FROM: Phuong Nguyen, PE; Chen Ryan Associates Cristian Belmudez; Chen Ryan Associates DATE: May 18, 2021 RE:Village 8 West Parcel B Gas Station – Parking Analysis The purpose of this technical memorandum is to document the results of a parking analysis conducted for the Village 8 West Parcel B Gas Station (Proposed Project). The parking analysis documented in the subsequent sections of this memorandum determines the minimum number of parking spaces that the Proposed Project should provide. Background The Proposed Project is part of the Village 8 West development, currently under construction in the City of Chula Vista. The Proposed Project will reside on “Parcel B”, which is located on the northwest corner of the planned intersection of Main Street West and La Media Parkway South. It plans to construct a 12-pump gas station with 4,200 square feet (SF) of convenience store uses, a drive-through carwash, as well as three coin-operated vacuum bays1.Figure 1 displays the Proposed Project’s regional location, while Figure 2 provides the site plan. Since the City of Chula Vista Municipal Code (CVMC) does not provide specific parking requirements for a gas station with a convenience store or a drive-through carwash, a parking analysis at similar sites was conducted to determine the minimum number of parking spaces that the Proposed Project should be required to provide. In coordination with City of Chula Vista staff, three existing gas stations were selected for observation based on their similarities to the Proposed Project. Each of the selected gas stations include the following: (1) drive-through carwash, (2) vacuum bays similar to the Proposed Project, and (3) a convenience store (or similar retail component). The following three gas stations were selected for observation, and their respective locations are displayed in Figure 3: ·Gas Station #1 –2115 Olympic Parkway, Chula Vista, CA 91915 – This gas station includes a 3,100 SF convenience store that operates 24/7. The 12 gas pumps and drive-through carwash also operate 24/7. There are 12 standard parking spaces, three ADA parking spaces, and two vacuum parking spaces available at this location. 1 This type of vacuum bay requires users to insert coins into a slot machine or by paying inside the convenience store. This is different from vacuum bays with unlimited uses, which do not require users to pay per use and are more likely to expect a higher number of users when compared to coin-operated vacuum bays. 2021-10-27 PC Agenda Page 86 of 207 ·|}94 ·|}54 ·|}905 §¨¦805 ·|}125 §¨¦5 County of San Diego City of Coronado City of Imperial Beach City of Lemon Grove City of National City County of San Diego N Figur e 1 Proposed Project Regional Location HomeFed Cor poration V8W Parcel B Gas Station Technical Memorandum 0 21 Miles Proposed Projec t City of Chula Vista ^ 2021-10-27 PC Agenda Page 87 of 207 HomeFed Corporation V8W Parcel B Gas StationTechnical MemorandumFigure 2Project Site PlanLOT26LAMEDIAPKWY.SOUTHGASPUMPCANOPYUNDERGROUNDTANKP=456.8FF=457.3H-007H-006S-001S-005S-008TRASHEVH-010EVS-011C-013S-017LAMEDIAPKWY.NORTH4,160SF4,200SF1,420SFCONVENIENCESTORECARWASHAPERMANENTTURNAROUND*N2021-10-27 PC Agenda Page 88 of 207 !( !( !( ·|}125Birch RdEast l akePkyHunte PkyE Palomar StHeritage RdE H S tL a Me dia R d Proctor Valley Rd O tayLakesR dOlympic PkyTelegraph Canyon RdGas Station #2 Gas Station #3 Gas Station #1 N Figur e 3 Gas Station Location HomeFed Cor poration V8W Parcel B Gas Station Technical Memorandum !(Gas Station Location 0 10.5 Miles Proposed Projec t ^ 2021-10-27 PC Agenda Page 89 of 207 HomeFed Corporation V8W Parcel B Gas Station Technical Memorandum Page 5 ·Gas Station #2 – 2210 Otay Lakes Road, Chula Vista, CA 91915 – This gas station includes a 2,600 SF convenience store that operates 24/7. The 12 gas pumps and drive-through carwash also operate 24/7. There are 12 standard parking spaces, one ADA parking space, and two vacuum parking spaces available at this location. ·Gas Station #3 – 1382 E Palomar Street, Chula Vista, CA 91910 – This gas station includes a 2,600 SF convenience store that operates from 5:30 AM to 12:00 AM. The eight gas pumps and drive- through carwash operate 24/7. There are six standard parking spaces, one ADA parking space, and two vacuum parking spaces available at this location. Due to the COVID-19 pandemic, current daily travel patterns do not reflect traffic conditions prior to COVID- 19. However, a downtrend in COVID-19 cases throughout San Diego County was observed at the beginning of January 2021. Therefore, with the approval of the City, it was deemed appropriate to conduct field observations between January 13, 2021 and January 23, 2021. Data Collection Field observations were conducted between January 13 and January 23, 2021. For each gas station, during one weekday and one weekend day, data was collected for twelve hours from 7:00 AM to 7:00 PM. Field staff manually counted the number of vehicles that parked and summarized the data at 15-minute intervals. Each vehicle was observed to park at a gas pump, vacuum bay, or parking space designated for retail. Additionally, the driver of each parked vehicle was observed to note the purpose of their visit, including mixed-uses such as washing their car after pumping gas. The full list of observed uses – gas, retail, vacuum, or carwash and any combination of these four – is provided in Attachment A. Other field observations included in this data collection effort include the following: ·Hours of operation ·Available parking spaces ·Number of gas pumps ·Quantity of retail space (SF) ·Queue length of vehicles utilizing carwash Based on field observations, drivers used the on-site parking spaces located in front of the retail area exclusively for retail purposes. In other words, drivers that parked their vehicles at these spaces were observed using the gas station only to visit the convenience store. Therefore, the parking analysis in the following section focuses only on the parking demand associated with the retail components of each observed gas station. Parking Analysis The parking requirement for the retail component was calculated based on the square footage of the retail space. Parking rates were calculated at 15-minute intervals for the two observation days at each of the three gas stations. Parking rates were calculated using the following equation: Parking Rate = Parking Demand Retail Space 2021-10-27 PC Agenda Page 90 of 207 HomeFed Corporation V8W Parcel B Gas Station Technical Memorandum Page 6 Table 1 provides a summary of the calculated average parking rates and maximum parking rates experienced at each gas station. Table 1 Parking Rates for Retail Uses at a Gas Station Location Average Parking Rates (parking spaces/1,000 SF) Maximum Parking Rates (parking spaces/1,000 SF) Weekday Weekend Weekday Weekend Gas Station #1 2.2 2.1 3.5 3.2 Gas Station #2 2.0 1.4 3.5 3.1 Gas Station #3 1.0 1.0 2.3 2.3 Note: Maximum parking rate is the parking rate that occurred when a gas station experienced the highest demand for parking during the period of observation (weekday or weekend day). As shown in Table 1, parking rates for Gas Station #3 were observed to be much lower when compared to Gas Station #1 and Gas Station #2. Therefore, as a conservative approach, data from Gas Station #3 was excluded from the parking rate calculations. Additionally, the maximum parking rates, ranging from 3.1 to 3.5 parking spaces per 1,000 SF of retail space, were significantly greater than the average parking rates, which ranged from 1.4 to 2.2 parking spaces per 1,000 SF of retail space. It should be noted that the maximum parking rates occurred infrequently and, except for one occasion, parking rates of 3.1 or more did not occur consecutively.Figure 4 displays the frequency in which a parking rate occurred at Gas Station #1 or Gas Station #2 during a weekday or weekend day. Figure 4 Frequency of Parking Rates As shown in Figure 4, parking rates of 3.1 or more only occur 17 of the 192 total periods of observation, or approximately 8.8% of the time. In contrast, the most common parking rate was 2.3 and approximately 77% (148 out of 192) of the time the parking rates did not exceed this. Given this information, it was deemed necessary to reduce the effect outlier data would have on the minimum parking requirement. As 10 2 8 9 7 19 7 41 45 12 6 9 2 9 6 0 5 10 15 20 25 30 35 40 45 50 0 0.4 0.8 1.2 1.3 1.5 1.6 1.9 2.3 2.6 2.7 2.9 3.1 3.2 3.5Frequency Parking Utilization (# of spaces / 1,000 SF retail) 2021-10-27 PC Agenda Page 91 of 207 HomeFed Corporation V8W Parcel B Gas Station Technical Memorandum Page 7 such, in coordination with City Staff, the 85th percentile parking rate was calculated and used as the minimum parking requirement. The 85th percentile parking rate is the parking rate where 85 percent of all the data points fall beneath, which results in 163.2 out of the 192 total periods of observation. This results in a parking rate that is greater than the average without being skewed heavily by outlier data points. This approach resulted in a minimum parking requirement of 2.7 parking spaces per 1,000 SF of retail space. This parking requirement exceeds the average parking rates shown in Table 1. Based on this calculated minimum parking rate and the square footage of the retail space (4,200 SF), the Proposed Project is required to provide a minimum of 11 parking spaces. Parking analysis calculations are provided in Attachment A. Carwash Queue Analysis Based on the Proposed Project site plan, the available storage length for vehicles to queue prior to entering the carwash is 127 feet or approximately five vehicles (25 ft/vehicle). Based on the field observation (shown in Appendix A), the maximum number of vehicles observed using carwash within a 15-minute period were three vehicles. Thus, the total available storage length would exceed the maximum demand observed in the field. The Proposed Project will also install a “Do Not Block” sign at the southern driveway to further prevent vehicles from queueing at the driveway which could potentially block access to the site or cause queue spillback along La Media Parkway South. Finally, it is important to note that the carwash operator will meet and confer with the City should any unanticipated queuing issues result from the project that affect public streets. Conclusion The Proposed Project should provide a minimum of 11 parking spaces to be consistent with the parking ratio of 2.7 parking spaces per 1,000 SF of retail space, which was determined based on counts and observations at similar uses. In addition, based on field observation of similar sites, vehicle queuing for carwash will not spill onto La Media Parkway South. 2021-10-27 PC Agenda Page 92 of 207 HomeFed Corporation V8W Parcel B Gas Station Technical Memorandum Attachments Attachment A Data Collection and Parking Analysis 2021-10-27 PC Agenda Page 93 of 207 Location Standard 12 Retail SF 3100 Date Retail 24 hours ADA 3 Gas Pumps 12 Analyst Carwash 24 hours Vaccum 2 Peak Hours 16:00 - 19:00 Time G-O G+R R+W W-O V-O R-O Air Total Vehicles Retail Associated Parking Parking Rate (Space/ksf) 7:00 3 2 0 0 0 7 0 12 7 2.3 7:15 7 2 0 0 0 4 0 13 4 1.3 7:30 5 2 1 1 0 5 1 15 6 1.9 7:45 5 4 0 0 0 6 0 15 6 1.9 8:00 12 3 0 0 0 4 3 22 4 1.3 8:15 5 0 0 0 0 5 0 10 5 1.6 8:30 11 2 0 0 0 4 0 17 4 1.3 8:45 12 3 0 0 0 6 0 21 6 1.9 9:00 12 4 0 0 0 4 1 21 4 1.3 9:15 4 1 0 2 0 5 1 13 5 1.6 9:30 8 1 0 1 0 6 1 17 6 1.9 9:45 6 4 0 0 1 8 0 19 8 2.6 10:00 9 3 0 0 0 6 1 19 6 1.9 10:15 12 1 0 1 0 9 1 24 9 2.9 10:30 13 4 0 0 0 5 1 23 5 1.6 10:45 10 1 0 1 1 7 1 21 7 2.3 11:00 8 2 0 0 0 6 0 16 6 1.9 11:15 0 0 0 0 0 0 0 0 0 0 11:30 9 1 0 1 0 4 0 15 4 1.3 11:45 11 3 0 0 0 7 1 22 7 2.3 12:00 12 2 1 2 1 8 1 27 9 2.9 12:15 14 3 0 1 0 7 0 25 7 2.3 12:30 12 3 0 0 0 7 1 23 7 2.3 12:45 14 4 0 1 1 8 0 28 8 2.6 13:00 11 2 1 1 0 9 2 26 10 3.2 13:15 12 3 0 0 0 7 2 24 7 2.3 13:30 9 2 0 1 0 8 0 20 8 2.6 13:45 12 2 0 1 0 6 0 21 6 1.9 14:00 12 2 0 1 0 6 1 22 6 1.9 14:15 12 1 0 2 0 10 1 26 10 3.2 14:30 12 5 0 0 0 6 0 23 6 1.9 14:45 12 2 0 2 0 10 1 27 10 3.2 15:00 16 3 0 2 0 8 0 29 8 2.6 15:15 15 5 0 0 2 6 0 28 6 1.9 15:30 12 2 0 0 0 7 2 23 7 2.3 15:45 12 3 0 2 0 8 0 25 8 2.6 16:00 19 2 0 2 0 11 1 35 11 3.5 16:15 15 2 0 0 0 11 0 28 11 3.5 16:30 12 1 0 1 0 8 2 24 8 2.6 16:45 13 2 0 2 0 7 0 24 7 2.3 17:00 21 3 0 1 1 7 0 33 7 2.3 17:15 19 4 0 0 1 11 0 35 11 3.5 17:30 13 2 0 0 2 7 1 25 7 2.3 17:45 16 4 0 0 0 10 1 31 10 3.2 18:00 17 2 0 0 0 8 0 27 8 2.6 18:15 14 0 0 0 0 11 1 26 11 3.5 18:30 12 2 0 0 0 7 0 21 7 2.3 18:45 17 2 0 0 0 9 1 29 9 2.9 2115 Olympic Pkwy, Chula Vista, CA 91915 1/13/2021 Alexsander Rivera Aguilar Hours of Operation Parking Spaces Notes other items that may affect parking here such as a Redbox etc: 4 people put gas and while the gas fueling the car, they went to starbucks nearby @ 7:15,7:30,8:45,9:15 Other 2021-10-27 PC Agenda Page 94 of 207 Location Standard 12 Retail SF 3100 Date Retail 24 hours ADA 2 Gas Pumps 12 Analyst Carwash 24 hours Vaccum 2 Peak Hours 11:30-14:30 Time G-O G+R G+R+W G+W R+W W-O V-O G+V R-O Air Total Vehicles Retail Associated Parking Parking Rate (Space / ksf) 7:00 10 1 0 1 0 0 0 0 4 0 16 4 1.3 7:15 8 3 0 1 0 0 0 0 4 0 16 4 1.3 7:30 6 4 0 0 1 1 0 0 6 1 19 7 2.3 7:45 11 2 0 0 0 1 0 0 6 0 20 6 1.9 8:00 13 2 0 1 0 2 0 0 6 0 24 6 1.9 8:15 13 1 0 0 0 1 1 0 10 2 28 10 3.2 8:30 12 1 0 2 2 1 0 0 6 1 25 8 2.6 8:45 12 2 0 1 0 4 0 0 6 3 28 6 1.9 9:00 12 3 0 0 0 2 1 0 6 3 27 6 1.9 9:15 13 2 0 1 0 0 0 0 9 1 26 9 2.9 9:30 19 3 0 1 0 0 0 0 5 2 30 5 1.6 9:45 11 3 0 0 1 2 0 0 4 1 22 5 1.6 10:00 10 1 0 0 1 1 0 0 6 1 20 7 2.3 10:15 20 2 0 0 0 1 1 0 8 1 33 8 2.6 10:30 18 2 0 0 0 2 1 0 8 1 32 8 2.6 10:45 15 3 0 0 0 0 1 0 5 0 24 5 1.6 11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 16 3 0 0 0 3 0 0 10 0 32 10 3.2 11:45 17 2 1 0 1 3 1 0 7 1 33 8 2.6 12:00 17 2 0 1 0 3 1 0 7 1 32 7 2.3 12:15 22 4 0 0 0 1 1 0 7 0 35 7 2.3 12:30 17 2 0 0 0 1 0 0 10 1 31 10 3.2 12:45 17 3 0 0 0 2 2 0 7 1 32 7 2.3 13:00 16 2 0 0 0 2 0 1 6 0 27 6 1.9 13:15 14 2 0 0 0 2 0 0 8 0 26 8 2.6 13:30 23 2 0 0 0 1 0 0 9 0 35 9 2.9 13:45 20 1 0 0 0 1 1 0 7 0 30 7 2.3 14:00 17 3 0 0 0 1 0 0 5 0 26 5 1.6 14:15 12 3 0 1 0 2 1 0 7 1 27 7 2.3 14:30 15 2 0 0 0 0 0 0 9 0 26 9 2.9 14:45 17 2 0 0 0 1 0 0 7 1 28 7 2.3 15:00 17 1 0 0 0 0 0 0 7 1 26 7 2.3 15:15 15 3 0 0 0 1 0 0 7 0 26 7 2.3 15:30 17 3 0 0 0 2 0 0 6 1 29 6 1.9 15:45 19 1 0 0 0 0 0 0 7 1 28 7 2.3 16:00 18 2 0 0 0 1 0 0 6 0 27 6 1.9 16:15 17 1 0 2 1 2 0 0 9 0 32 10 3.2 16:30 16 2 0 0 0 0 0 0 7 1 26 7 2.3 16:45 16 3 0 0 0 1 0 0 9 1 30 9 2.9 17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 17:15 0 0 0 0 0 0 0 0 0 0 0 0 0 17:30 11 3 0 0 0 0 0 0 7 1 22 7 2.3 17:45 17 2 0 0 0 1 0 0 9 1 30 9 2.9 18:00 15 2 0 1 0 1 1 0 6 2 28 6 1.9 18:15 15 1 0 0 0 2 0 0 9 0 27 9 2.9 18:30 15 3 0 1 1 0 0 0 9 3 32 10 3.2 18:45 12 2 0 1 0 0 0 0 6 2 23 6 1.9 2115 Olympic Pkwy, Chula Vista, CA 91915 1/16/2021 Alexsander Rivera Aguilar Notes other items that may affect parking here such as a Redbox etc: 2 people put gas and while the gas fueling the car, they went to starbucks nearby @ 7:00,8:15 1 person used the gas station to clean their windows @ 7:45 W+V: 15:30 Parking Spaces Other Hours of Operation 2021-10-27 PC Agenda Page 95 of 207 Location Standard 12 Retail SF 2600 Date Retail 24 hours ADA 1 Gas Pumps 12 Analyst Carwash 24 hours Vaccum 2 Peak Hours 14:30-17:30 Time G-O G+R G+R+W G+W R+W W-O V-O G+V R-O Air Total Vehicles Retail Associated Parking Parking Rate (Space / ksf) 7:00 5 2 0 0 0 1 1 0 5 0 14 5 1.9 7:15 4 0 0 0 0 0 0 0 6 0 10 6 2.3 7:30 6 4 0 1 0 0 1 0 5 0 17 5 1.9 7:45 8 1 0 0 0 0 0 0 6 2 17 6 2.3 8:00 8 2 0 0 0 1 0 0 5 0 16 5 1.9 8:15 8 2 0 0 0 0 0 0 6 0 16 6 2.3 8:30 8 0 0 0 0 2 0 0 7 1 18 7 2.7 8:45 11 2 0 0 0 1 0 0 5 0 19 5 1.9 9:00 4 2 0 0 0 2 0 0 4 0 12 4 1.5 9:15 3 0 0 0 0 0 0 0 6 1 10 6 2.3 9:30 8 3 0 0 0 1 0 0 4 0 16 4 1.5 9:45 5 0 1 1 0 1 0 0 3 0 11 3 1.2 10:00 5 3 0 0 0 2 0 0 4 0 14 4 1.5 10:15 8 1 0 1 0 1 0 0 5 0 16 5 1.9 10:30 9 4 0 1 0 2 0 1 4 1 22 4 1.5 10:45 6 2 0 1 0 1 0 0 6 0 16 6 2.3 11:00 10 1 0 1 0 1 0 0 4 0 17 4 1.5 11:15 5 3 0 1 0 0 0 0 3 0 12 3 1.2 11:30 8 1 0 0 0 1 0 0 2 1 13 2 0.8 11:45 9 0 0 0 0 1 0 0 5 0 15 5 1.9 12:00 12 1 0 1 0 2 0 0 9 0 25 9 3.5 12:15 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 6 1 0 0 0 1 1 0 6 0 15 6 2.3 12:45 8 2 0 0 0 2 0 0 5 0 17 5 1.9 13:00 11 1 0 1 0 0 0 0 6 0 19 6 2.3 13:15 10 1 0 2 0 1 0 0 7 0 21 7 2.7 13:30 8 3 0 0 0 2 0 0 7 1 21 7 2.7 13:45 10 1 0 0 0 2 0 0 5 0 18 5 1.9 14:00 11 1 0 0 0 2 0 0 5 0 19 5 1.9 14:15 6 1 0 1 0 1 0 0 2 0 11 2 0.8 14:30 11 1 0 0 0 1 0 0 6 1 20 6 2.3 14:45 11 4 0 0 1 1 0 0 2 0 19 3 1.2 15:00 11 1 0 1 0 0 0 0 6 2 21 6 2.3 15:15 12 1 1 1 0 1 0 0 4 0 20 4 1.5 15:30 12 1 0 0 0 2 0 0 8 3 26 8 3.1 15:45 14 1 0 2 0 1 0 0 2 0 20 2 0.8 16:00 7 2 0 1 0 3 0 1 9 0 23 9 3.5 16:15 13 3 0 0 0 2 0 0 5 1 24 5 1.9 16:30 12 0 0 2 0 3 0 0 6 0 23 6 2.3 16:45 11 0 0 0 0 0 0 0 6 1 18 6 2.3 17:00 13 2 0 0 1 2 0 0 5 0 23 6 2.3 17:15 12 2 0 0 0 0 0 0 6 0 20 6 2.3 17:30 9 2 0 0 1 1 0 0 6 0 19 7 2.7 17:45 12 2 0 0 0 1 0 0 5 1 21 5 1.9 18:00 12 1 0 0 0 0 0 0 6 1 20 6 2.3 18:15 12 3 0 0 0 1 1 0 6 0 23 6 2.3 18:30 7 0 0 0 0 0 1 0 6 0 14 6 2.3 18:45 12 3 0 0 1 0 0 0 6 2 24 7 2.7 Parking Spaces Other 2210 Otay Lakes Rd, Chula Vista, CA 91915 Hours of Operation 1/14/2021 Alexsander Rivera Aguilar 2021-10-27 PC Agenda Page 96 of 207 Location Standard 12 Retail SF 2600 Date Retail 24 hours ADA 1 Gas Pumps 12 Analyst Carwash 24 hours Vaccum 2 Peak Hours 11:30-14:30 Time G-O G+R G+R+W G+W R+W W-O V-O G+V R-O Air Total Vehicles Retail Associated Parking Parking Rate (Space / ksf) 7:00 4 1 0 0 0 1 0 0 2 1 9 2 0.8 7:15 4 1 0 0 0 0 0 0 1 0 6 1 0.4 7:30 6 3 0 0 0 2 0 0 3 1 15 3 1.2 7:45 3 2 0 0 0 0 0 0 4 0 9 4 1.5 8:00 2 1 1 0 0 0 0 0 3 0 7 3 1.2 8:15 7 1 0 0 0 1 0 0 4 0 13 4 1.5 8:30 5 1 0 0 0 0 0 0 3 0 9 3 1.2 8:45 5 0 0 1 0 1 0 0 4 0 11 4 1.5 9:00 9 0 1 0 0 0 0 0 6 1 17 6 2.3 9:15 9 2 0 0 0 3 0 0 3 0 17 3 1.2 9:30 16 2 0 0 0 0 0 0 4 0 22 4 1.5 9:45 12 0 0 1 1 0 0 0 5 0 19 6 2.3 10:00 11 3 0 0 1 0 0 0 6 0 21 7 2.7 10:15 8 2 1 1 0 0 0 0 5 0 17 5 1.9 10:30 12 3 0 0 1 1 0 0 3 0 20 4 1.5 10:45 7 2 0 0 0 2 0 0 5 1 17 5 1.9 11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 13 2 0 0 0 2 0 0 5 0 22 5 1.9 11:45 12 5 0 0 0 4 0 0 5 0 26 5 1.9 12:00 11 1 0 0 0 1 0 0 4 0 17 4 1.5 12:15 7 1 1 0 1 1 0 1 7 1 20 8 3.1 12:30 10 1 0 1 0 0 0 0 4 0 16 4 1.5 12:45 9 1 1 0 0 1 0 0 4 1 17 4 1.5 13:00 14 1 0 0 0 0 0 0 4 0 19 4 1.5 13:15 11 3 0 0 1 1 0 0 5 2 23 6 2.3 13:30 12 1 0 0 1 1 1 0 4 0 20 5 1.9 13:45 6 0 0 0 0 2 1 0 1 1 11 1 0.4 14:00 8 1 0 0 0 1 0 0 2 0 12 2 0.8 14:15 13 0 0 0 0 1 0 0 4 1 19 4 1.5 14:30 6 0 0 0 0 4 0 0 5 0 15 5 1.9 14:45 7 2 0 1 0 1 0 0 6 0 17 6 2.3 15:00 6 2 0 0 0 0 0 0 5 1 14 5 1.9 15:15 12 0 0 0 0 0 0 0 4 2 18 4 1.5 15:30 7 2 0 0 0 1 0 0 3 0 13 3 1.2 15:45 0 0 0 0 0 0 0 0 0 0 0 0 0 16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 16:15 9 1 0 0 0 5 0 0 6 2 23 6 2.3 16:30 7 1 0 1 1 2 0 0 4 0 16 5 1.9 16:45 10 1 0 0 0 0 0 0 3 0 14 3 1.2 17:00 9 0 0 0 0 0 0 0 4 0 13 4 1.5 17:15 10 1 0 0 1 1 0 0 1 0 14 2 0.8 17:30 12 1 0 0 0 0 0 0 5 0 18 5 1.9 17:45 3 2 0 0 0 0 0 0 2 0 7 2 0.8 18:00 6 2 0 0 0 0 0 0 5 0 13 5 1.9 18:15 7 1 0 0 0 0 0 0 2 1 11 2 0.8 18:30 6 1 0 1 0 0 0 0 5 0 13 5 1.9 18:45 12 3 0 0 0 2 0 0 4 0 21 4 1.5 Parking Spaces Other 2210 Otay Lakes Rd, Chula Vista, CA 91915 Hours of Operation 1/17/2021 Alexsander Rivera Aguilar Notes other items that may affect parking here such as a Redbox etc: W+V: 16:45 @ 16:45, there was a queue of 3 cars for the car wash a large group of motorcyclist from 9:30-10:00 2021-10-27 PC Agenda Page 97 of 207 Location Standard 6 Retail SF 2600 Date Retail 5:30AM-12:00 AM ADA 1 Gas Pumps 8 Analyst Carwash 24/7 Vaccum 2 Peak Hours 16:00 - 19:00 Time G-O G+R W-O V-O R-O Air Total Vehicles Retail Associated Parking Parking Rate (Space / ksf) 7:00 7 0 0 0 3 0 10 3 1.2 7:15 6 2 0 0 3 0 11 3 1.2 7:30 7 1 0 0 2 0 10 2 0.8 7:45 5 1 0 0 0 0 6 0 0 8:00 5 1 0 0 0 1 7 0 0 8:15 6 2 0 0 3 0 11 3 1.2 8:30 4 2 0 0 3 0 9 3 1.2 8:45 3 2 0 0 3 0 8 3 1.2 9:00 5 2 0 0 1 0 8 1 0.4 9:15 6 0 0 0 1 0 7 1 0.4 9:30 4 1 0 0 2 1 8 2 0.8 9:45 5 1 0 0 2 0 8 2 0.8 10:00 6 0 0 0 3 1 10 3 1.2 10:15 6 0 0 0 1 0 7 1 0.4 10:30 7 1 0 0 2 0 10 2 0.8 10:45 9 2 0 0 3 0 14 3 1.2 11:00 4 2 0 0 1 0 7 1 0.4 11:15 7 2 0 0 3 0 12 3 1.2 11:30 0 0 0 0 0 0 0 0 0 11:45 0 0 0 0 0 0 0 0 0 12:00 7 2 0 0 4 0 13 4 1.5 12:15 9 1 0 0 2 0 12 2 0.8 12:30 10 2 0 0 2 0 14 2 0.8 12:45 6 0 0 0 2 0 8 2 0.8 13:00 9 1 0 0 2 0 12 2 0.8 13:15 7 1 0 0 2 0 10 2 0.8 13:30 8 3 0 0 3 2 16 3 1.2 13:45 8 0 0 0 2 0 10 2 0.8 14:00 6 1 0 0 3 0 10 3 1.2 14:15 12 1 0 0 3 0 16 3 1.2 14:30 11 2 0 1 2 0 16 2 0.8 14:45 9 0 0 0 3 1 13 3 1.2 15:00 9 2 0 0 4 2 17 4 1.5 15:15 13 1 0 0 3 0 17 3 1.2 15:30 12 2 0 0 5 0 19 5 1.9 15:45 10 2 0 0 2 1 15 2 0.8 16:00 9 2 0 0 3 0 14 3 1.2 16:15 12 2 0 0 3 1 18 3 1.2 16:30 12 1 0 0 4 1 18 4 1.5 16:45 11 1 0 0 4 1 17 4 1.5 17:00 9 1 0 0 5 0 15 5 1.9 17:15 12 1 0 0 4 0 17 4 1.5 17:30 11 0 0 0 5 3 19 5 1.9 17:45 9 1 0 0 6 3 19 6 2.3 18:00 10 2 1 0 5 2 20 5 1.9 18:15 10 1 0 0 4 0 15 4 1.5 18:30 7 0 0 0 4 1 12 4 1.5 18:45 9 2 0 0 3 0 14 3 1.2 Parking Spaces Other Hours of Operation1382 E Palomar St, Chula Vista, CA 91910 1/19/2021 Alexsander Rivera Aguilar Notes other items that may affect parking here such as a Redbox etc: in Apendix Amazon: 1 Redbox:2 Occupying Space for Long Period: 7:15-7:45, 7:15-8:45, 7:45-15:45, 9:45-11:00 2021-10-27 PC Agenda Page 98 of 207 Location Standard 6 Retail SF 2600 Date Retail 5:30AM-12:00 AM ADA 1 Gas Pumps 8 Analyst Carwash 24/7 Vaccum 1 Peak Hours 14:30 - 18:00 Time G-O G+R W-O V-O R-O Air Total Vehicles Retail Associated Parking Parking Rate (Space / ksf) 7:00 6 0 0 0 1 0 7 1 0.4 7:15 0 0 0 0 1 0 1 1 0.4 7:30 4 1 0 0 1 0 6 1 0.4 7:45 2 2 0 0 0 0 4 0 0 8:00 5 2 0 0 2 0 9 2 0.8 8:15 4 1 0 0 1 0 6 1 0.4 8:30 4 0 0 0 1 1 6 1 0.4 8:45 1 2 0 0 2 1 6 2 0.8 9:00 6 1 0 0 2 0 9 2 0.8 9:15 6 1 0 0 3 1 11 3 1.2 9:30 5 0 0 0 1 0 6 1 0.4 9:45 6 1 0 0 1 0 8 1 0.4 10:00 6 0 0 0 0 1 7 0 0 10:15 6 1 0 0 2 0 9 2 0.8 10:30 8 2 1 0 2 1 14 2 0.8 10:45 6 1 0 0 3 1 11 3 1.2 11:00 0 0 0 0 0 0 0 0 0 11:15 0 0 0 0 0 0 0 0 0 11:30 10 1 0 0 4 0 15 4 1.5 11:45 5 2 0 0 4 1 12 4 1.5 12:00 10 2 0 0 2 0 14 2 0.8 12:15 7 3 0 0 3 0 13 3 1.2 12:30 11 3 0 1 2 1 18 2 0.8 12:45 12 2 0 0 4 0 18 4 1.5 13:00 9 2 0 0 4 0 15 4 1.5 13:15 8 2 0 0 2 0 12 2 0.8 13:30 10 3 0 0 6 0 19 6 2.3 13:45 6 1 0 0 2 1 10 2 0.8 14:00 5 1 0 0 2 0 8 2 0.8 14:15 7 1 0 0 1 0 9 1 0.4 14:30 9 3 0 0 5 0 17 5 1.9 14:45 6 1 0 0 4 0 11 4 1.5 15:00 7 1 0 0 3 0 11 3 1.2 15:15 6 1 0 0 4 0 11 4 1.5 15:30 0 0 0 0 0 0 0 0 0 15:45 0 0 0 0 0 0 0 0 0 16:00 9 1 0 0 6 4 20 6 2.3 16:15 9 3 0 0 5 0 17 5 1.9 16:30 11 3 0 0 3 1 18 3 1.2 16:45 8 1 0 0 5 0 14 5 1.9 17:00 10 3 0 0 3 0 16 3 1.2 17:15 6 1 0 0 2 0 9 2 0.8 17:30 5 0 0 0 3 0 8 3 1.2 17:45 7 1 0 0 5 0 13 5 1.9 18:00 6 4 0 0 5 0 15 5 1.9 18:15 6 2 0 1 3 0 12 3 1.2 18:30 6 2 0 0 3 0 11 3 1.2 18:45 6 1 0 0 5 0 12 5 1.9 Parking Spaces Other 1382 E Palomar St, Chula Vista, CA 91910 Hours of Operation 1/23/2021 Alexsander Rivera Aguilar Notes other items that may affect parking here such as a Redbox etc: Amazon box: 1 Occupying Space for Long Period: 7:00-13:00, 7:45-10:30, 12:00-17:15, 12:00-13:00, 13:30-14:00 Truck (2spaces), 14:30-15:15 2021-10-27 PC Agenda Page 99 of 207 Weekday Weekend Weekday Weekend Gas Station 1 2.3 2.1 3.5 3.2 Gas Station 2 2.0 1.5 3.5 3.1 Gas Station 3 1.1 1.0 2.3 2.3 Average 1.8 1.5 3.1 2.9 All 3 Gas Stations 1 and 2 only Project Size Maximum Average Rate 3.1 - Parking Required 13 - Average Rate 2.3 - Parking Required 10 - 85th Percentile Range 2.6 2.7 Parking Required 11 12 Parking Rates Frequency 0 10 0.4 2 0.8 8 1.2 9 1.3 7 1.5 19 1.6 7 1.9 41 2.3 45 2.6 12 2.7 6 2.9 9 3.1 2 3.2 9 3.5 6 Total 192 Average Max 4200 0 5 10 15 20 25 30 35 40 45 50 0 0.4 0.8 1.2 1.3 1.5 1.6 1.9 2.3 2.6 2.7 2.9 3.1 3.2 3.5 Parking Rate Frequency 2021-10-27 PC Agenda Page 100 of 207 Attachment 5 Page 1 Exhibit 9.1 - Village 8 West Design Review Compliance Checklist Has the project complied with all of the submittal requirements for Design Review (Chapter 9)? Building Height: Is the building height consistent with the Transect Standards (Chapter 3)? Building Setback: Is the building setback from the street consistent with the Transect Standards (Chapter 3)? Building Use: Are the proposed uses within the building consistent with the permitted land uses for the transect (Chapter 3)? Intensity: Is the intensity consistent with the Site Utilization Plan (SPA Plan) and the latest Intensity Monitoring Tables (Appendix J)? Intensity Transfer: Will an Intensity Transfer be required? If so, has the Zoning Administrator approved the transfer? Parking: Does the building provide adequate parking spaces for the intended uses, based on (circle one): a. A shared or managed parking program previously approved; b. An adequate shared or managed parking program submitted with the application; c. Conventional City parking standards; or, d. Building Type Standards (Chapter 3) Parking circulation design: Is the design of parking circulation, gates, backup spacing, turning radii, and stacking distances adequate for the intended use(s)? Parking Space Sizes: Are the parking space sizes adequate for the use(s) intended?  On Street Parking: If on street parking is being used to satisfy part of the parking requirement, have these spaces been used for a previously approved project? N/A  Parking Structure: If a parking structure is proposed that fronts on the street, has the street level been designed to enhance a pedestrian’s experience by (circle all that apply): N/A a. Appearance softened with landscaping; b. Street level shops or uses other than parking structure; c. Architecturally treated to provide an attractive finished look or art wall; or, d. Other acceptable technique. Loading Areas: Are the loading areas designed to minimize disruption to pedestrian and vehicular traffic? Trash: Are trash receptacles adequately located out of or screened from public view?  Encroachments: If encroachments into the public right-of-way are being proposed, do these encroachments create any unacceptable public risks that are not addressed by the application? Has an encroachment permit been submitted? N/A  Parks: Is the project consistent with the park requirements? N/A  Affordable Housing: Is the project consistent the Village 8 West SPA Affordable Housing Plan? N/A Subdivision: Does the project comply with the Conditions of Approval for the subdivision? 2021-10-27 PC Agenda Page 101 of 207 Attachment 5 Page 2 Landscaping: Does the project comply with the landscape requirements and the Village 8 West Landscape Master Plan (See Section 9.3.6), and Town Center Master Precise Plan (See Section 9.3.7), as applicable? Lighting: Does the lighting plan describe the location, type, and shielding required to minimize impacts to adjoining properties (See Section 4.2.5)? Architecture: Is the architectural design consistent with the community design requirements for each Transect (Chapter 4)? Pedestrian System: Does the project integrate with the pedestrian system? Property Ownership: Does the project require approval from other property owners and has this approval been submitted (Chapter 9)?  Recommendation: Has a recommendation for approval, modification or denial of the proposed project been provided from the Master Developer (Chapter 9)? Monitoring Tables: Have the Monitoring Tables been provided as required (Chapter 9)? Design Review: Does the project require Design Review by the Planning Commission or Zoning Administrator (Chapter 9)? Water Quality: Do the plans demonstrate consistency with any applicable approved on-site Best Management Practices (BMPs) and Low Impact Development (LID) design strategies in conformance with the City’s Storm Water Manual? February 2020 9-11 2021-10-27 PC Agenda Page 102 of 207 Intensity Transfer 2021: Approved Commercial Square Footage Allocation 2021-10-27 PC Agenda Page 103 of 207 RESOLUTION NO. CUP20-0018 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION APPROVING CONDITIONAL USE PERMIT, CUP20- 0018, TO ALLOW A CONVENIENCE STORE WITH ALCOHOL SALES, A GAS STATION, AND A CARWASH ON A 1.2-ACRE SITE LOCATED NORTH OF THE LA MEDIA PARKWAY AND MAIN STREET COUPLET IN OTAY RANCH VILLAGE 8 WEST WHEREAS, on September 2, 2020, a duly verified application for a Conditional Use Permit for a Convenience Store, Gas Station and Car Wash (the “Project”) was filed with the City of Chula Vista Development Services Department by Land Solutions, Inc. (the “Applicant”); and WHEREAS, pursuant to the Village 8 West Sectional Planning Area (SPA) Plan, a Conditional Use Permit is required for a convenience store selling alcohol, for a gas station, and for a car wash in the Town Center (TC) zone; and WHEREAS, the application requests approval of a Conditional Use Permit to allow the use of convenience store selling alcohol, a gas station and a car wash on a 1.2-acre site in the Village 8 West Town Center; and WHEREAS, the area of land which is the subject of the resolution is a 1.2-acre vacant parcel located along the northern edge of the La Media Parkway and Main Street couplet, identified as Assessor Parcel Number (APN) 644-071-2000 (Project Site); and WHEREAS, The Director of Development Services has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the Project was adequately covered in previously certified Final Environmental Impact Report (FEIR 10 -03) (SCH #2010062093) for the Otay Ranch Sectional Planning Area SPA Plan - Village 8 West. Thus, no further environmental review or documentation is required; and WHEREAS, in accordance with Table 9.1 Summary of Discretionary Review, the Zoning Administrator has reviewed the Project and recommends approval by the Planning Commission; and WHEREAS, the hearing was held at the time and place as advertised, before the Planning Commission, and the hearing was thereafter closed. NOW, THEREFORE, BE IT RESOLVED by the City of Chula Vista Planning Commission, that it hereby makes the following findings: 1. That the proposed use at this location is necessary or desirable to provide a service or facility that will contribute to the general well -being of the neighborhood or the community. The proposed use is desirable in this location because it provides necessary automobile- oriented services at the junction of two high-volume roads travelled by the business community and residents. Locating this use within the community will contribute to the general well-being of the community by increasing convenience to business and residential users and reducing vehicle-miles driven for people in need of gasoline, car wash, and other automobile -oriented services. 2021-10-27 PC Agenda Page 104 of 207 Resolution No. CUP20-0018 Page 2 2. That such use will not, under the circumstances of the particular case, be detrimental to the health, safety or general welfare of persons residing or working in the vicinity or injurious to property or improvements in the vicinity. The proposed use has been reviewed by City staff and appropriate conditions have been attached to ensure that health, safety, and general welfare are not endangered. Fuel storage tanks and pumps will comply with all State and Federal laws regulating such facilities for environmental safety. The proposed development has been found to be consistent with the requirements of Chula Vista Municipal Code (CVMC) 19.58.280 for Service Stations, including requirements that it not cause traffic hazards or undue congestion, that it be located on proper ty abutting the intersection of major or collector streets (La Media Parkway and Main Street), will not be a nuisance to residences or other surrounding uses (it is located on a property designated in the Otay Ranch Village 8 West SPA Plan for commercial services), and landscaped in accordance with the Master Landscape Plan for Village 8 West. 3. That the proposed use will comply with the regulations and conditions specified in this code for such use. The proposed development is regulated by the Otay Ranch Village 8 West SPA and the Village 8 West Town Center Master Precise Plan, both of which designate it as Parcel B of the TC - Town Center, which allows automobile related uses, including convenience markets with alcohol sales, gas stations, and car washes, with approval of a Conditional Use Permit. The proposed uses have been reviewed and determined to comply with all applicable development regulations of the Village 8 West SPA Plan, the Master Precise Plan, and the Master Landscape Plan. 4. That the granting of this Conditional Use Permit will not adversely affect the General Plan of the City or the adopted plan of any governmental agency. The proposed development has been reviewed against the City General Plan, the Otay Ranch Village 8 West SPA Plan, the Landscape Master Plan, and the Village 8 West Town Center Master Precise Plan and has been found to be consistent with all applicable regulations and requirements. The Project implements those plans, which designate the property for Town Center development, including a wide mixture of uses, such as automobile-related and supportive accessory uses to serve the neighborhood and community and will not adversely affect the General Plan of the City of Chula Vista or the adopted plan of any governmental agency BE IT FURTHER RESOLVED that the Planning Commission, based on the findings above, hereby approves the Conditional Use Permit subject to the following conditions: I. The following shall be accomplished to the satisfaction of the Director of Development Services, or designee, prior to issuance of Building Permits, unless otherwise specified: 2021-10-27 PC Agenda Page 105 of 207 Resolution No. CUP20-0018 Page 3 Planning Division 1. The Project Site shall be developed and maintained in accordance with the approved plans CUP20- 0018, which include a Site Plan, Civil Plans, Architecture Plans, and Landscape Plans on file in the Development Services Department, Planning Division, the conditions contained herein, and Chula Vista Municipal Code (the “Municipal Code” or “CVMC”) Title 19. 2. Prior to the issuance of the first Building Permit, the Applicant shall pay all applicable fees, including any unpaid balances of permit processing fees for deposit account DDA-0739. 3. The colors and materials specified on the Building Plans must be consistent with the colors and materials shown on the Project plans approved by the Planning Commission. 4. A graffiti resistant treatment shall be specified for all wall and building surfaces. This shall be noted for any Building and Wall Plans. Additionally, the Project shall conform to CVMC Section 9.20.055 regarding graffiti control. 5. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets. Such screening shall be architecturally integrated with the building design. 6. All ground mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping. 7. All exterior lighting shall include shielding to remove any glare from the adjacent property. Details for said lighting shall be included in the Architectural Plans and shall be reviewed and approved prior to the issuance of the first Building Permit. 8. The Applicant shall obtain approval of a Sign Permit for each sign. Signs shall comply with all applicable requirements of the Municipal Code or the Applicant shall be required to submit a Planned Sign Program for Planning Commission review and approval. 9. The Project shall comply with all mitigation measures specified in the Mitigation Monitoring and Reporting Program for the Final Environmental Impact Report (FEIR 10-03) (SCH #2010062093) for the Otay Ranch Sectional Planning Area SPA Plan - Village 8 West. 10. Prior to the approval of the first Building Permit, the designated noise consultant shall verify on the Building Plans that construction of the carwash will incorporate the features and equipment as specified in the approved Noise Study (prepared by Helix Environmental Planning on May 2021) or equipment with equivalent or lower noise specifications. This measure shall ensure that no nuisance noise is generated as a result of the operation of this facility. 11. Prior to final inspection, a final noise inspection will be conducted to verify that all equipment is consistent with the equipment cited in the noise study prepared by Helix Environmental Planning on May 2021 or with equipment with equivalent or lower noise specifications. 2021-10-27 PC Agenda Page 106 of 207 Resolution No. CUP20-0018 Page 4 12. Hours of operation for the carwash shall be limited to: a. Weekdays: (7am to 10pm) b. Weekends: (7am to 10pm) Land Development Division/Landscape Architecture Division 13. Car washes are considered one of the industries regulated by the Metropolitan Industrial Was te Program, since they are required to pre-treat their wastes before discharging to the Sewerage System. These businesses are required to apply for an Industrial Waste Discharge Permit which is regulated by the City of San Diego, Metropolitan Industrial Wastewater Control Program. Applications for a permit should be obtained from Metropolitan Industrial Wastewater Control Program, 9192 Topaz Way, San Diego, CA 92123-1119, Telephone: (858) 654-4100, Fax: (858) 654-4110. Prior to first Building Permit issuance, the Applicant shall provide proof of approved permit from the City of San Diego, Metropolitan Industrial Wastewater Control Program. 14. The Applicant shall agree to not protest formation or inclusion in a maintenance district or zone for the maintenance of landscape medians, scenic corridors along streets and public parks, within or adjacent to the subject subdivision. 15. All driveways shall conform to the City of Chula Vista’s sight distance requirements in accordance with Section 12.12.120 of the Municipal Code and Chula Vista standard drawing RWY-05 (Sight Distance Requirements). Also, landscaping, street furniture, or signs shall not obstruct the visibility of the driver at the street intersections or driveways. 16. The proposed Fire Access shall meet H-20 Loading requirements or shall be designed for a Traffic Index (T.I.) of 5. 17. Prior to issuance of Grading, Construction, and Building Permits, the Applicant shall document on applicable plans compliance with the requirements pertaining to Best Management Practices (BMPs). The Applicant shall develop and implement post construction BMPs in accordance with the most recent regulations at the time of Grading and Building Permit issuance. 18. The Applicant shall provide the City with proof of Pad Certification prior to issuance of any Building Permit within the Project. 19. The infrastructure fronting the site shall be constructed and fully operational before the Final Building Inspection, all to the satisfaction of the Director of the Development Services Department. 20. The Applicant shall obtain a Construction Permit for private utility connections to the public mains prior to Building Permit issuance. This may be accommodated by either processing a construction change to the Master Developer’s Improvement Plans or by applying for a separate Construction Permit. 21. The Applicant shall obtain a Construction Permit to construct the private driveways and associated signage and striping in the City’s right-of-way, prior to issuance of any Building Permit. This may be accommodated by processing a construction change to the Master Developer’s Improvement Plans. 2021-10-27 PC Agenda Page 107 of 207 Resolution No. CUP20-0018 Page 5 22. Before issuance of the first Building Permit, the Applicant shall provide a “Will Serve” letter from Otay Water District. 23. The following fees may be adjusted based on the final Building Plans submitted: a. Sewer Connection and Capacity Fees b. Traffic Signal Fees c. Public Facilities Development Impact Fees (PFDIF) d. Eastern Transportation Development Impact Fees (ETDIF) e. Other Engineering Fees as applicable per the Master Fee Schedule. 24. Prior to the approval of the first Building Permit, the Applicant shall submit duplicate copies of the Project plans in digital format, such as (DXF) graphic file, on a CD or through e-mail based on California State Plane Coordinate System (NAD 83, Zone 6) in accordance with the City’s Guidelines for Digital Submittal. DXF file shall include a utility plan showing any and all proposed sewer or storm drain on site. 25. The Applicant shall obtain a Land Development Permit prior to beginning any earthwork activities at the site and before issuance of Building Permits in accordance with Municipal Code Chapter 15.04. The Applicant shall submit Grading Plans in conformance with the City’s Subdivision Manual and the City’s Development Storm Water Manual requirements, including, but not limited to the following: a. Grading Plans shall be prepared by a registered Civil Engineer and approved by the City Engineer. b. Drainage Study and Geotechnical/Soils Investigations are required with the first submittal of Grading Plans. The Drainage Study shall calculate the Pre-Development and Post- Development flows and show how downstream properties and storm drain facilities are impacted. Design shall incorporate detention of storm water runoff if Post-Development flows exceed Pre-Development flows; analysis shall include flows from 2 yr., 10 yr., and 50 yr. return frequency storms. c. Drainage Study shall also demonstrate that no property damage will occur during the 100- year storm event. d. Drainage Study shall show any offsite flows. e. All onsite drainage facilities shall be private. f. Any offsite work will require Letters of Permission from the property owner(s). 26. All construction sites are required to implement Construction BMPs in accordance with the performance standards outlined in Appendix K of the BMP Design Manual. In general: a. For projects disturbing one (1) acre or more this requires coverage under and compliance with the Construction General Permit (CGP), the construction BMPs must be identified in a Storm Water Pollution Prevention Plan (SWPPP). 27. A complete and accurate Notice-of-Intent (NOI) must be filed with the State Water Resources Control Board (SWRCB) for a project covered under the General Permit for Storm Water Discharges Associated with Construction Activity (CGP). A copy of the acknowledgement from the SWRCB that a NOI has been received for this Project shall be filed with the City of Chula Vista 2021-10-27 PC Agenda Page 108 of 207 Resolution No. CUP20-0018 Page 6 when received. Further, a copy of the completed NOI from the SWRCB showing the Permit Number for this Project shall be filed with the City of Chula Vista when received. 28. The Applicant shall enter into a Storm Water Management Facilities Maintenance Agreement to perpetually maintain all permanent BMPs located within the Project prior to issuance of any Grading, Construction or Building Permits, whichever occurs first. 29. The Applicant shall submit a detailed Operation & Maintenance (O&M) plan for all permanent BMPs as required by the City to preserve the intended pollution control and/or flow control performance of the BMP. Upon completion of construction of BMPs/Project, the Applicant shall update/finalize O&M Plan to reflect constructed structural BMPs with as-built plans and baseline photos. 30. The Project shall comply with the requirements of the National Pollutant Discharge Eliminat ion System (NPDES) General Permit for Storm Water Dischargers Associate with Industrial Activities (IGP) Order 2014-0057-DWQ. 31. Improvement Plans in conformance with the City’s Subdivision Manual and a Construction Permit will be required prior to issuance of any Building Permits. The Improvement Plan shall include but not be limited to: a. Removal and replacement of any broken or damaged curb, gutter, and sidewalk per SDRSD G-2, and G-7 along the project’s frontage to the satisfaction of the City Engineer. Sidewalk shall be designed and constructed with proper transitions to existing conditions. b. Installation of driveways meeting design standards as shown in Chula Vista standard detail CVCS-1A. Dedication of R/W as needed for the driveway to comply with American Disability Act (ADA) requirements. c. Utilities Trenching and Restoration per CVCS-3&4. 32. Separate permits for other public utilities (gas, electric, water, cable, telephone) shall be required, as necessary. 33. The construction and completion of all improvements and release requirements shall be secured in accordance with CVMC Section 18.16.180. 34. The onsite sewer and storm drain system shall be private. All sewer laterals and storm drains shall be privately maintained from each building unit to the City-maintained public facilities. 35. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall be designed to meet the City of Chula Vista Design Standards, Americans with Disabilities Act (ADA) Standards, and Title 24 standards, as applicable. 36. Any private facilities within the public right-of-way or City easement will require an Encroachment Permit prior to Improvement Plan or Building Permit approval. 37. Prior to the second submittal of the Building Permit plan set, the Applicant shall su bmit to the Landscape Architecture Division, complete Landscape Improvement Plans for review and approval by the Director of Development Services or designee. Said plans shall conform to the following City Documents: 2021-10-27 PC Agenda Page 109 of 207 Resolution No. CUP20-0018 Page 7 a. Landscape Water Conservation Ordinance (LWCO), Chapter 20.12 of the Chula Vista Municipal Code b. City of Chula Vista Landscape Manual c. Shade Tree Policy (576-19) 38. Prior to Final Building Inspection for the Project, the Applicant shall have installed Landscape Improvements per the approved Landscape Improvement Plans to the satisfaction of the Director of Development Services or designee. Fire Department 39. The Applicant shall apply for required Building Permits. Permits shall comply with applicable codes and requirements, including but not limited to the current edition of the Building Code (CBC) & Fire Code (CFC), as amended by the City of Chula Vista. 40. Plans for the design and construction of private underground fire service utilities shall be submitted to the Development Services Department in the form of Private Site Improvement Plans or as part of the Architectural Building Permit Plans. 41. For 4,200 square feet of Type V-B construction, this Project will require a fire flow of 1,750 gallons per minute for a 2-hour duration at 20 PSI. 42. Based upon the required fire flow for the Type V-B construction type, a minimum of 1 fire hydrant is required to serve this Project. 43. Fire Hydrants shall be located and spaced in accordance with California Fire Code, Appendix C. Based upon the required fire flow for this Project, fire hydrants shall be located with an average spacing of 500 feet. The maximum distance from any point along a fire apparatus access road to a fire hydrant shall not exceed 250 feet. Existing or new public fire hydrants can be considered to meet spacing requirements and minimum number of hydrants. 44. Where a portion of the building is more than 400 feet from a fire hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the building, on -site fire hydrants and/or improvements to the existing public water main shall be made. II. The following on-going conditions shall apply to the Project Site as long as it relies on this approval: 1. The site shall be developed and maintained in accordance with the approved plans, which include Site Plans, Floor Plan, Elevation Plan, Landscape Plan on file in the Development Services Department, the conditions contained herein, and Title 19. 2. Approval of the Conditional Use Permit shall not waive compliance with any sections of Title 19 of the Municipal Code, nor any other applicable laws and regulations in effect at the time of building permit issuance. 3. The Property Owner and Applicant shall and do agree to indemnify, protect, defend and hold harmless City, its City Council members, Planning Commission members, officers, employees 2021-10-27 PC Agenda Page 110 of 207 Resolution No. CUP20-0018 Page 8 and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney’s fees (collectively, liabilities) incurred by the City arising, directly or indirectly, from (a) City’s approval and issuance of this Conditional Use Permit, (b) City’s approval or issuance of any other permit or action, whether discretionary or non-discretionary, in connection with the use contemplated on the Project Site and (c) any environmental determinations for the Project. The Property Owner and Applicant shall acknowledge their agreement to this provision by executing a copy of this Conditional Use Permit where indicated below. The Property Owner’s and Applicant’s compliance with this provision shall be binding on any and all of the Property Owner’s and Applicant’s succe ssors and assigns. 4. This Conditional Use Permit shall become void and ineffective if not utilized within three years from the effective date thereof, in accordance with Section 19.14.260 of the Municipal Code. Failure to comply with any conditions of approval shall cause this permit to be reviewed by the City for additional conditions or revocation. III. GOVERNMENT CODE SECTION 66020(d)(1) NOTICE Pursuant to Government Code Section 66020(d) (1), NOTICE IS HEREBY GIVEN that the 90 day period to protest the imposition of any impact fee, dedication, reservation, or other exaction described in this resolution begins on the effective date of this resolution and any such protest must be in a manner that complies with Government Code Section 66020(a) and failure to timely follow this procedure will bar any subsequent legal action to attack, review, set aside, void or annul imposition. The right to protest the fees, dedications, reservations, or other exactions does not apply to planning, zoning, grading, or other similar application processing fees or service fees in connection with this project; and it does not apply to any fees, dedication, reservations, or other exactions which have been given notice similar to this, nor does it revive challenges to any fees for which the statute of limitations has previously expired. IV. EXECUTION OF RESOLUTION OF APPROVAL The Property Owner and Applicant shall execute this document signing on the lines provided below, indicating that the Property Owner and Applicant have each read, understood and agreed to the conditions contained herein, and will implement same. Upon execution, this document shall be signed and returned to the City’s Development Services Department. ________________________________ ____________________________ Signature of Property Owner Date ________________________________ ____________________________ Printed Name of Property Owner Date ________________________________ ____________________________ Signature of Applicant Date 2021-10-27 PC Agenda Page 111 of 207 Resolution No. CUP20-0018 Page 9 ________________________________ ____________________________ Printed Name of Applicant Date V. CONSEQUENCE OF FAILURE OF CONDITIONS If any of the foregoing conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted, deny, or further condition issuance of all future building permits, deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted, institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. Failure to satisfy the conditions of this permit may also result in the imposition of civil or criminal penalties. VI. INVALIDITY; AUTOMATIC REVOCATION It is the intention of the Planning Commission that its adoption of this Resolution is dependent upon the enforceability of each and every term, provision and condition herein stated; and that in the event that any one or more terms, provisions or conditions are determined by a Court of competent jurisdiction to be invalid, illegal or unenforceable, this resolution and the permit shall be deemed to be automatically revoked and of no further force and effect. 2021-10-27 PC Agenda Page 112 of 207 Resolution No. CUP20-0018 Page 10 PASSED AND APPROVED BY THE PLANNING COMMISSION OF THE CITY OF CHULA VISTA, CALIFORNIA, this _____ day of ____________ 2021, by the following vote, to-wit: ______________________________ Max Zaker, Chair ATTEST: _____________________________ Patricia Salvacion, Secretary Presented by: Approved as to form by: Tiffany Allen Glen R. Googins Director of Development Services City Attorney 2021-10-27 PC Agenda Page 113 of 207 RESOLUTION NO. DR20-0018 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION APPROVING A DESIGN REVIEW PERMIT, DR20- 0018, FOR A CONVENIENCE STORE, A GAS STATION, AND A CARWASH ON A 1.2-ACRE SITE LOCATED NORTH OF THE LA MEDIA PARKWAY AND MAIN STREET COUPLET IN OTAY RANCH VILLAGE 8 WEST WHEREAS, on September 2, 2020, a duly verified application for a Design Review Permit for a Convenience Store, Gas Station and Car Wash (the “Project”) was filed with the City of Chula Vista Development Services Department by Land Solutions, Inc. (the “Applicant”); and WHEREAS, pursuant to the Village 8 West Sectional Planning Area (SPA) Plan, Minor Design Review (Administrative) is required for projects that include 20,000 square feet or less of non-residential building area or 200 or fewer multifamily residential dwelling units. Minor Design Review requires approval by the Zoning Administrator; however, the City of Chula Vista’s consolidated review process requires concurrent related projects to be processed together at the highest applicable level of approval; and WHEREAS, Conditional Use Permit, CUP21-0018, is being processed concurrently with the Project and requires Planning Commission approval and so the Project will also be considered by Planning Commission; and WHEREAS, the area of land which is the subject of the resolution is a 1.2-acre vacant parcel located along the northern edge of the La Media Parkway and Main Street couplet, identified as Assessor Parcel Number (APN) 644-071-2000 (Project Site); and WHEREAS, The Director of Development Services has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the Project was adequately covered in previously certified Final Environmental Impact Report (FEIR 10-03) (SCH #2010062093) for the Otay Ranch Sectional SPA Plan - Village 8 West. Thus, no further environmental review or documentation is required; and WHEREAS, the hearing was held at the time and place as advertised, before the Planning Commission, and the hearing was thereafter closed. NOW, THEREFORE, BE IT RESOLVED by the City of Chula Vista Planning Commission, that it hereby makes the following findings: 1. That the proposed development will be consistent with the Village 8 West SPA Plan, the Landscape Master Plan, and the Master Precise Plan for the Town Center. The Project is consistent with the Otay Ranch Village 8 West SPA Plan, the Landscape Master Plan, and the Master Precise Plan (MMP) for the Town Center, in accordance with Section 9.3.2(A) of the SPA. The Project is consistent with the uses and development regulations in the SPA plan. The southern building is built close to the property line and is designed in a Contemporary European style. The Project provides convenient community services and ample parking and access. The landscape design provides color and screening for the future mixed-use development to the east. All plant material selected is of a type know to be successful in the areas climatic and soil conditions. Mandatory Elements required in the MPP are included, such as orientation of a 2021-10-27 PC Agenda Page 114 of 207 Resolution No. DR20-0018 Page 2 convenience store pedestrian entrance toward Main Street to activate the pedestrian corridor and the Town Square edge. 2. The design features of the proposed development are consistent with, and are a cost-effective method of satisfying, the Otay Ranch Village 8 West SPA Plan, Landscape Master Plan, and Master Precise Plan requirements. The Project’s design features are a cost-effective method of satisfying the Otay Ranch Village 8 West SPA Plan, Landscape Master Plan, and MMP. The Town Center Arterials have been designed as urban couplets and extend through the heart of the Town Center a s Main Street and La Media Parkway. The Project’s location, at the north end of the couplet, provides convenient community services for residents and visitors. Irrigation for the site shall utilize underground sprinkler systems, including low flow spray heads and sub-grade drip irrigation, in compliance with the City of Chula Vista landscape Water Ordinance, Chapter 20.12 of the Chula Vista Municipal Code. The irrigation system shall also utilize water saving devices including flow-sensing, rain-sensing devices and automatic control systems that either interface with CIMIS data or on-site weather sensors. A 3" layer of organic mulch will be used where possible to reduce moisture loss. Pedestrian and vehicular circulation routes are well-defined and designed to be intuitive and easily discernible for appropriate and functional maneuverability and activity levels, in accordance with the MPP design guidelines. Elements are included such as planter walls, seat walls, metal awnings (for shade), and entryways to provide visual interest, functionality, and architectural relief along the public frontage. BE IT FURTHER RESOLVED that the Planning Commission, based on the findings above, hereby approves the Design Review Permit subject to the following conditions: I. The following shall be accomplished to the satisfaction of the Director of Development Services, or designee, prior to issuance of Building Permits, unless otherwise specified: Planning/Environmental Division 1. The Project Site shall be developed and maintained in accordance with the approved plans DR20- 0018, which include a Site Plan, Landscape Plans, Floor Plan, and Elevation Plan on file in the Development Services Department, Planning Division, the conditions contained herein, and Chula Vista Municipal Code (the “Municipal Code” or “CVMC”) Title 19. 2. Prior to the issuance of the first Building Permit, the Applicant shall pay all applicable fees, including any unpaid balances of permit processing fees for deposit account DDA-0738. 3. The colors and materials specified on the Building Plans must be consistent with the colors and materials shown on the Project plans approved by the Planning Commission. 4. A graffiti resistant treatment shall be specified for all wall and building surfaces. This shall be noted for any Building and Wall Plans. Additionally, the Project shall conform to CVMC Section 9.20.055 regarding graffiti control. 2021-10-27 PC Agenda Page 115 of 207 Resolution No. DR20-0018 Page 3 5. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets. Such screening shall be architecturally integrated with the building design. 6. All ground mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping. 7. All exterior lighting shall include shielding to remove any glare from the adjacent property. Details for said lighting shall be included in the Architectural Plans and shall be reviewed and approved prior to the issuance of the first Building Permit. 8. The Applicant shall obtain approval of a Sign Permit for each sign. Signs shall comply with all applicable requirements of the Municipal Code or the Applicant shall be required to submit a Planned Sign Program for Planning Commission review and approval. 9. The Project shall comply with all mitigation measures specified in the Mitigation Monitoring and Reporting Program for the Final Environmental Impact Report (FEIR 10-03) (SCH #2010062093) for the Otay Ranch Sectional Planning Area SPA Plan - Village 8 West. 10. Prior to the approval of the first Building Permit, the designated noise consultant shall verify on the Building Plans that construction of the carwash will incorporate the features and equipment as specified in the approved Noise Study (prepared by Helix Environmental Planning on May 2021) or equipment with equivalent or lower noise specifications. This measure shall ensure that no nuisance noise is generated as a result of the operation of this facility. 11. Prior to final inspection, a final noise inspection will be conducted to verify that all equipment is consistent with the equipment cited in the noise study prepared by Helix Environmental Planning on May 2021 or with equipment with equivalent or lower noise specifications. 12. Hours of operation for the carwash shall be limited to: a. Weekdays: (7 a.m. to 10 p.m.) b. Weekends: (7 a.m. to 10 p.m.) Land Development Division/Landscape Architecture Division 13. Car washes are considered one of the industries regulated by the Metropolitan Industrial Waste Program, since they are required to pre-treat their wastes before discharging to the Sewerage System. These businesses are required to apply for an Industrial Waste Discharge Permit which is regulated by the City of San Diego, Metropolitan Industrial Wastewater Control Program. Applications for a permit should be obtained from Metropolitan Industrial Wastewater Control Program, 9192 Topaz Way, San Diego, CA 92123-1119, Telephone: (858) 654-4100, Fax: (858) 654-4110. Prior to first Building Permit issuance, the Applicant shall provide proof of approved permit from the City of San Diego, Metropolitan Industrial Wastewater Control Program. 14. The Applicant shall agree to not protest formation or inclusion in a maintenance district or zone for the maintenance of landscape medians, scenic corridors along streets and public parks, within or adjacent to the subject subdivision. 2021-10-27 PC Agenda Page 116 of 207 Resolution No. DR20-0018 Page 4 15. All driveways shall conform to the City of Chula Vista’s sight distance requirements in accordance with Section 12.12.120 of the Municipal Code and Chula Vista standard drawing RWY-05 (Sight Distance Requirements). Also, landscaping, street furniture, or signs shall not obstruct the visibility of the driver at the street intersections or driveways. 16. The proposed Fire Access shall meet H-20 Loading requirements or shall be designed for a Traffic Index (T.I.) of 5. 17. Prior to issuance of Grading, Construction, and Building Permits, the Applicant shall document on applicable plans compliance with the requirements pertaining to Best Management Practices (BMPs). The Applicant shall develop and implement post construction BMPs in accordance with the most recent regulations at the time of Grading and Building Permit issuance. 18. The Applicant shall provide the City with proof of Pad Certification prior to issuance of any Building Permit within the Project. 19. The infrastructure fronting the site shall be constructed and fully operational before the Final Building Inspection, all to the satisfaction of the Director of the Development Services Department. 20. The Applicant shall obtain a Construction Permit for private utility connections to the public mains prior to Building Permit issuance. This may be accommodated by either processing a construction change to the Master Developer’s Improvement Plans or by applying for a separate Construction Permit. 21. The Applicant shall obtain a Construction Permit to construct the private driveways and associated signage and striping in the City’s right-of-way, prior to issuance of any Building Permit. This may be accommodated by processing a construction change to the Master Developer’s Improvement Plans. 22. Before issuance of the first Building Permit, the Applicant shall provide a “Will Serve” letter from Otay Water District. 23. The following fees may be adjusted based on the final Building Plans submitted: a. Sewer Connection and Capacity Fees b. Traffic Signal Fees c. Public Facilities Development Impact Fees (PFDIF) d. Eastern Transportation Development Impact Fees (ETDIF) e. Other Engineering Fees as applicable per the Master Fee Schedule. 24. Prior to the approval of the first Building Permit, the Applicant shall submit duplicate copies of the Project plans in digital format, such as (DXF) graphic file, on a CD or through e-mail based on California State Plane Coordinate System (NAD 83, Zone 6) in accordance with the City’s Guidelines for Digital Submittal. DXF file shall include a utility plan showing any and all proposed sewer or storm drain on site. 25. The Applicant shall obtain a Land Development Permit prior to beginning any earthwork activities at the site and before issuance of Building Permits in accordance with Municipal Code Chapter 15.04. The Applicant shall submit Grading Plans in conformance with the City’s Subdivision 2021-10-27 PC Agenda Page 117 of 207 Resolution No. DR20-0018 Page 5 Manual and the City’s Development Storm Water Manual requirements, including, but not limited to the following: a. Grading Plans shall be prepared by a registered Civil Engineer and approved by the City Engineer. b. Drainage Study and Geotechnical/Soils Investigations are required with the first submittal of Grading Plans. The Drainage Study shall calculate the Pre-Development and Post- Development flows and show how downstream properties and storm drain facilities ar e impacted. Design shall incorporate detention of storm water runoff if Post-Development flows exceed Pre-Development flows; analysis shall include flows from 2 yr., 10 yr., and 50 yr. return frequency storms. c. Drainage Study shall also demonstrate that no property damage will occur during the 100- year storm event. d. Drainage Study shall show any offsite flows. e. All onsite drainage facilities shall be private. f. Any offsite work will require Letters of Permission from the property owner(s). 26. All construction sites are required to implement Construction BMPs in accordance with the performance standards outlined in Appendix K of the BMP Design Manual. In general: a. For projects disturbing one (1) acre or more this requires coverage under and compliance with the Construction General Permit (CGP), the construction BMPs must be identified in a Storm Water Pollution Prevention Plan (SWPPP). 27. A complete and accurate Notice-of-Intent (NOI) must be filed with the State Water Resources Control Board (SWRCB) for a project covered under the General Permit for Storm Water Discharges Associated with Construction Activity (CGP). A copy of the acknowledgement from the SWRCB that a NOI has been received for this Project shall be filed with the City of Chula Vista when received. Further, a copy of the completed NOI from the SWRCB showing the Permit Number for this Project shall be filed with the City of Chula Vista when received. 28. The Applicant shall enter into a Storm Water Management Facilities Maintenance Agreement to perpetually maintain all permanent BMPs located within the Project prior to issuance of any Grading, Construction or Building Permits, whichever occurs first. 29. The Applicant shall submit a detailed Operation & Maintenance (O&M) plan for all permanent BMPs as required by the City to preserve the intended pollution control and/or flow control performance of the BMP. Upon completion of construction of BMPs/Project, the Applicant shall update/finalize O&M Plan to reflect constructed structural BMPs with as-built plans and baseline photos. 30. The Project shall comply with the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Dischargers Associate with Industrial Activities (IGP) Order 2014-0057-DWQ. 31. Improvement Plans in conformance with the City’s Subdivision Manual and a Construction Permit will be required prior to issuance of any Building Permits. The Improvement Plan shall include but not be limited to: 2021-10-27 PC Agenda Page 118 of 207 Resolution No. DR20-0018 Page 6 a. Removal and replacement of any broken or damaged curb, gutter, and sidewalk per SDRSD G-2, and G-7 along the project’s frontage to the satisfaction of the City Engineer. Sidewalk shall be designed and constructed with proper transitions to existing conditions. b. Installation of driveways meeting design standards as shown in Chula Vista standard detail CVCS-1A. Dedication of R/W as needed for the driveway to comply with American Disability Act (ADA) requirements. c. Utilities Trenching and Restoration per CVCS-3&4. 32. Separate permits for other public utilities (gas, electric, water, cable, telephone) shall be required, as necessary. 33. The construction and completion of all improvements and release requirements shall be secured in accordance with CVMC Section 18.16.180. 34. The onsite sewer and storm drain system shall be private. All sewer laterals and storm drains shall be privately maintained from each building unit to the City-maintained public facilities. 35. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall be designed to meet the City of Chula Vista Design Standards, Americans with Disabilities Act (ADA) Standards, and Title 24 standards, as applicable. 36. Any private facilities within the public right-of-way or City easement will require an Encroachment Permit prior to Improvement Plan or Building Permit approval. 37. Prior to the second submittal of the Building Permit plan set, the Applicant shall submit to the Landscape Architecture Division, complete Landscape Improvement Plans for review and approval by the Director of Development Services or designee. Said plans shall conform to the following City Documents: a. Landscape Water Conservation Ordinance (LWCO), Chapter 20.12 of the City of Chula Vista Municipal Code b. City of Chula Vista Landscape Manual c. Shade Tree Policy (576-19) 38. Prior to Final Building Inspection for the Project, the Applicant shall have installed Landscape Improvements per the approved Landscape Improvement Plans to the satisfaction of the Director of Development Services or designee. Fire Department 39. The Applicant shall apply for required Building Permits. Permits shall comply with applicable codes and requirements, including but not limited to the current edition of the Building Code (CBC) & Fire Code (CFC), as amended by the City of Chula Vista. 40. Plans for the design and construction of private underground fire service utilities shall be submitted to the Development Services Department in the form of Private Site Improvement Plans or as part of the Architectural Building Permit Plans. 41. For 4,200 square feet of Type V-B construction, this Project will require a fire flow of 1,750 gallons per minute for a 2-hour duration at 20 PSI. 2021-10-27 PC Agenda Page 119 of 207 Resolution No. DR20-0018 Page 7 42. Based upon the required fire flow for the Type V-B construction type, a minimum of 1 fire hydrant is required to serve this Project. 43. Fire Hydrants shall be located and spaced in accordance with California Fire Code, Appendix C. Based upon the required fire flow for this Project, fire hydrants shall be located with an average spacing of 500 feet. The maximum distance from any point along a fire apparatus access road to a fire hydrant shall not exceed 250 feet. Existing or new public fire hydrants can be considered to meet spacing requirements and minimum number of hydrants. 44. Where a portion of the building is more than 400 feet from a fire hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the building, on -site fire hydrants and/or improvements to the existing public water main shall be made. II. The following on-going conditions shall apply to the Project Site as long as it relies on this approval: 1. The site shall be developed and maintained in accordance with the approved plans, which include Site Plans, Floor Plan, Elevation Plan, Landscape Plan on file in the Development Services Department, the conditions contained herein, and Title 19. 2. Approval of the Design Review Permit shall not waive compliance with any sections of Title 19 of the Municipal Code, nor any other applicable laws and regulations in effect at the time of Building Permit issuance. 3. The Property Owner and Applicant shall and do agree to indemnify, protect, defend and hold harmless City, its City Council members, Planning Commission members, officers, employees and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney’s fees (collectively, liabilities) incurred by the City arising, directly or indirectly, from (a) City’s approval and issuance of this Design Review Permit, (b) City’s approval or issuance of any other permit or action, whether discretionary or non- discretionary, in connection with the use contemplated on the Project Site and (c) any environmental determinations for the Project. The Property Owner and Applicant shall acknowledge their agreement to this provision by executing a copy of this Design Review Permit where indicated below. The Property Owner’s and Applicant’s compliance with this provision shall be binding on any and all of the Property Owner’s and Applicant’s successors and assigns. 4. This Design Review Permit shall become void and ineffective if not utilized within three years from the effective date thereof, in accordance with CVMC Section 19.14.600. III. GOVERNMENT CODE SECTION 66020(d)(1) NOTICE Pursuant to Government Code Section 66020(d) (1), NOTICE IS HEREBY GIVEN that the 90 day period to protest the imposition of any impact fee, dedication, reservation, or other exaction described in this resolution begins on the effective date of this resolution and any such protest must be in a manner that complies with Government Code Section 66020(a) and failure to timely follow this procedure will bar any subsequent legal action to attack, review, set aside, void or annul imposition. The right to protest the fees, dedications, reservations, or other exactions does not apply to planning, zoning, grading, or other similar application processing fees or service fees in connection with this project; and it does not apply to any fees, dedication, reservations, or other exactions which have been given notice similar to this, nor does it revive challenges to any fees for which the statute of limitations has previously expired. 2021-10-27 PC Agenda Page 120 of 207 Resolution No. DR20-0018 Page 8 IV. EXECUTION OF RESOLUTION OF APPROVAL The Property Owner and Applicant shall execute this document signing on the lines provided below, indicating that the Property Owner and Applicant have each read, understood and agreed to the conditions contained herein, and will implement same. Upon execution, this document shall be signed and returned to the City’s Development Services Department. ________________________________ _______________________ Signature of Property Owner Date ________________________________ _______________________ Printed Name of Property Owner Date ________________________________ _______________________ Signature of Applicant Date ________________________________ _______________________ Printed Name of Applicant Date V. CONSEQUENCE OF FAILURE OF CONDITIONS If any of the foregoing conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted, deny, or further condition issuance of all future building permits, deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted, institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. Failure to satisfy the conditions of this permit may also result in the imposition of civil or criminal penalties. VI. INVALIDITY; AUTOMATIC REVOCATION It is the intention of the Planning Commission that its adoption of this Resolution is dependent upon the enforceability of each and every term, provision and condition herein stated; and that in the event that any one or more terms, provisions or conditions are determined by a Court of competent jurisdiction to be invalid, illegal or unenforceable, this resolution and the permit shall be deemed to be automatically revoked and of no further force and effect. 2021-10-27 PC Agenda Page 121 of 207 Resolution No. DR20-0018 Page 9 PASSED AND APPROVED BY THE PLANNING COMMISSION OF THE CITY OF CHULA VISTA, CALIFORNIA, this _____ day of ____________ 2021, by the following vote, to-wit: ______________________________ Max Zaker, Chair ATTEST: ____________________________ Patricia Salvacion, Secretary Presented by: Approved as to form by: _________________________ _____________________ Tiffany Allen Glen R. Googins Director of Development Services City Attorney 2021-10-27 PC Agenda Page 122 of 207 CÔTA SHARE AND DIMENSIONVERA MEANING REAL, TRUE AND GENUINE1. THE DESIGN OF NEW BUILDINGS AND STRUCTURES WILL BE IN ACCORDANCE WITH THE FOLLOWING CITY OF CHULA VISTA’S GUIDELINES:• SECTIONAL PLANNING AREA (SPA) PLAN FOR – VILLAGE 8 WEST OTAY RANCH, CITY OF CHULA VISTA, CALIFORNIA 2. THE DESIGN INFLUENCE BEGAN WITH THE UNDERSTANDING AND INTERPRETATION OF CONTEMPORARY EUROPEAN BUILDINGS THROUGH USER EXPERIENCE AT ITS CORE THAT DEFINED AND ESTABLISHED A SENSE OF IDENTITY AND PLACE. THE USE OF AN “URBAN COUPLET”, TO DEFINE AND PROMOTE ACTIVITY, INFORMED THE BUILDING’S RELATIONSHIP TO ITS IMMEDIATE CONTEXT. SOME OF THE CHARACTER DEFINING FEATURES DESIGN PRINCIPLES OF THE BUILDINGS ARE AS FOLLOWS:• ESTABLISH AND MAINTAIN VIEWS AND VISTAS WITH SURROUNDING BUILDINGS IN THE TOWN CENTER. THE MILIEU OF TOWN SQUARE IS VISUALLY CONNECTED TO THE CENTER OF THE CONVENIENCE STORE AND EXTENDS THROUGH THE FUEL CANOPY TO THE CAR WASH BUILDING.• REINFORCEMENT ALONG THE NORTHERN EDGE OF THE TOWN SQUARE BUILDING MASS.• ESTABLISHING ALONG THE STREETSCAPE PROMOTES COMMUNITY ENGAGEMENT, INTERACTIONS, AND OPPORTUNITIES. • EASILY IDENTIFIABLE HORIZONTAL AND VERTICAL BUILDING ELEMENTS TO INFORM THE SENSE OF ARRIVAL AND PURPOSE.3. BUILDING MATERIALS • THE USE OF EXPOSED STEEL STRUCTURALLY REINFORCING AND DEFINING FORMS SUGGEST IMAGES AND PERIODS OF INDUSTRIOUS HUMAN ACHIEVEMENTS IN HISTORY.• STONE AND CEMENTITIOUS MATERIALS CONNECT ITS LONG USE WITH BUILDINGS IN EUROPEAN CITIES AND OFTEN ASSOCIATED WITH A SENSE OF PERMANENCE AND ESTABLISHMENT.• THE USE OF WOOD, TIMBER FRAMING, AND REFINED METAL DETAILING DEPICT THE HUMAN CONNECTION TO CRAFT. A SENSE OF RENEWED INTEREST AND REINTERPRETING TIMBER IN CONTEMPORARY DESIGN.4. CONSERVE ENERGY • THE BUILDING’S EAST-WEST ORIENTATION TAKES ADVANTAGE OF SUNLIGHT THROUGHOUT THE DAY.• LARGE EXPANSES OF GLAZING HARVEST DAYLIGHT AND NURTURE A HEALTHY USER EXPERIENCE.• EVALUATING BUILDING ENVELOP DESIGN WILL PROVIDE ENERGY SAVING OPPORTUNITIES. 5. COMMUNITY • THE STOREFRONT FENESTRATION ALONG MAIN STREET PROVIDES VISUAL STIMULATION AND COMMERCE.• WITH PROXIMITY OF THE CONVENIENCE STORE SERVING THE COMMUNITY, IT IS AN IMPORTANT NODE FOR USER ACTIVITIES LIKE FAMILY TRIPS TO TRANSIT ORIENTED SERVICES.CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtDC1.1DESIGN CONCEPTMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128C-STORE -PATRON VIEW (N-W CORNER)MAIN ST. -SOUTHEAST VIEWMAIN ST. -STREETSCAPE VIEWMAIN ST. -INTERSECTION VIEW (S-W CORNER)EXTERIOR TREATMENTS:• INTERIOR EXTERIOR CONNECTIVITY• FLOOR TO CEILING EXPANSES OF EXTERIOR GLAZING• EMPHASIS ON STRUCTURAL MEMBERS FRAMING VIEWS• MODULAR UNITS / HUMAN SCALE COMMUNAL SPACE / PATIO AREA TREATMENTS:• LOCAL COMMUNITY ENGAGEMENT / TRANSACTIONS• TRANSITIONAL AND OPEN AREAS FOR PATRONS• EXPERIENCE CLIMATE / PARTIAL SHELTER• SIMPLE STRUCTURE / RUSTIC COLORS AND TEXTURESINTERIOR SPACE:• EXPOSED STRUCTURE• POST AND BEAM• GLASS & STEEL INTERSECTIONS• WOOD FINISHES BUILDING INSPIRATIONS:• INTERIOR & EXTERIOR / NATURAL LIGHT• CANOPIES / TOWERS AT MAIN ENTRANCE• VERTICAL AND HORIZONTAL LINES / PROPORTIONS• MASS AND SCALE / VOLUMINOUS SPACESDesign ObjectivesNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONSSHEET INDEXDC1.1 DESIGN CONCEPTDC1.2 STREETSCAPEA1.1 BUILDING FLOOR PLANA1.2 BUILDING ROOF PLANA2.1 BUILDING ELEVATIONSA2.2 BUILDING ELEVATIONSA3.1TRASH ENCLOSURE PLAN & ELEVATIONSCA1.1 CANOPY FLOOR PLANCA2.1 CANOPY ELEVATIONSCW1.1 CARWASH & ENCLOSURE PLANSCW2.1CARWASH & ENCLOSURE ELEVATIONSCMD1.1COLOR MATERIAL BOARD2021-10-27 PC Agenda Page 123 of 207 CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtDC1.2STREETSCAPEMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:DC1.23/32" = 1'-0"1STREETSCAPE -SOUTH ELEVATIONSCALE:DC1.23/32" = 1'-0"2STREETSCAPE -EAST ELEVATIONSCALE:DC1.23/32" = 1'-0"3STREETSCAPE -WEST ELEVATIONNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONSSCALE:DC1.24LA MEDIA PKWY SOUTH ACCESSSCALE:DC1.25LA MEDIA PKWY. NORTH ACCESS2021-10-27 PC Agenda Page 124 of 207 A2.11A2.21A2.22A2.12SNEWCONVENIENCE STORE ENTRANCE ELECTRICAL & GAS CONTROLSMAIN ST. ENTRANCETO MAIN ST. INTERSECTION1299 SFSALES FLOOR101256 SFSTORAGE107177 SFWOMEN'SRESTROOM10679 SFHALL105164 SFMEN'SRESTROOM104154 SFBACKROOM108451 SFCOOLER11063 SFFREEZER11170 SFCASHIER AREA10279 SFSTAND UPOFFICE10394 SFVESTIBULE101A885 SFPATIO115STOREFRONT GLAZING12'-0" X 10'-0"STOREFRONT GLAZING20'-0" X 10'-0"STOREFRONT GLAZING36'-0" X 10'-0"STOREFRONT GLAZING20'-0" X 10'-0"STOREFRONT SLIDING DOOR 12'-0" X 10'-0"STOREFRONT GLAZ. 5'-0" X 10'-0"STOREFRONT GLAZ. 3'-0" X 10'-0"STOREFRONT GLAZ. 5'-0" X 10'-0"STOREFRONT GLAZ. 3'-0" X 10'-0"STRUCTURAL STEEL COLUMNCLERESTORY GLAZ. 6'-6" X 2'-6"CLERESTORY GLAZ. 10'-0" X 2'-6"STOREFRONT SLIDING DOOR 12'-0" X 10'-0"CLERESTORY GLAZ. 6'-6" X 2'-6"STRUCTURAL STEEL COLUMNSTRUCTURAL STEEL COLUMN101' - 3"ROOF OUTLINE ABOVE40' - 4"19' - 1"16' - 0"1' - 11"6' - 8"6' - 3"16' - 0"19' - 0"40' - 4"35' - 0"47' - 2"3' - 5"8' - 5"3' - 5"12' - 0"3' - 5"10' - 10"3' - 5"17' - 0"3' - 5"12' - 4"22' - 0"3' - 5"21' - 9"CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtA1.1BUILDING FLOORPLANMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:A1.11/4" = 1'-0"1FLOOR PLANNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONSIDSALES FLOORCASHIERSTAND UP OFFICE101MENS RESTROOM*HALLROOM NAMEO.L.F.AREA (SF)6060100-60USE / OCC.* ACCESSORY USEWOMENS RESTROOM*STORAGE/BACKROOM-300BACKROOM300OCCUPANCY TABLECAR WASH TUNNELCW EQUIPMENT ROOMELECTRICAL ROOM100300300C-STORECAR WASH102103104105106107108COOLER110FREEZER111300300120121122MERCANTILEMERCANTILEBUSINESS--MERCANTILE/STORAGEMERCANTILEBUSINESSMERCANTILE/STORAGEMERCANTILE/STORAGEMERCANTILE/STORAGEMERCANTILE/STORAGEMERCANTILE/STORAGE1393 SF70 SF79 SF164 SF79 SF177 SF256 SF154 SF857 SF245 SF157 SF451 SF63 SFBUILDING INFORMATIONBUILDING DESCRIPTION:C-STORE CONSTRUCTION TYPE:USE GROUP:ALLOWABLE AREA:GROSS AREA:SPRINKLERS:CAR WASH CONSTRUCTION TYPE:CANOPY CONSTRUCTION TYPE:USE GROUP:ALLOWABLE AREA:GROSS AREA:SPRINKLERS:USE GROUP:ALLOWABLE AREA:GROSS AREA:SPRINKLERS:M9000 SF4200 SFNOB9000 SF1420 SFNOM12500 SF4160 SFNOV-BV-BII-B2021-10-27 PC Agenda Page 125 of 207 A2.11A2.21A2.22A2.12SNEWLOCATION OF FUTURE SOLAR PANELS INTEGRATED INTO STANDING SEAM ROOFROOF TOWER DORMERROOF TOP HVAC AND CONDENSER UNITS, TYP.ROOF TOP HVAC AND CONDENSER UNITS, TYP.FASCIA SIGNAGE TOWARDS MAIN ST. INTERSECTIONBOWED CLERESTORY FENESTRATION BELOW CURVED EAVE SLOPE DOWNSLOPE DOWNSLOPE DOWNMT-01MT-02RP-01MT-02SLOPE DOWNPATIO AREA ROOF STRUCTURE BELOWMETAL AWNING AT STOREFRONT BELOWMT-02METAL AWNING AT STOREFRONT BELOWMETAL COPINGMT-01METAL COPINGCLERESTORY FENESTRATION BELOW EAVE MT-02METAL AWNING AT STOREFRONT BELOWTRANSOM GLAZING BELOW12'-0" X 12'-6"TRANSOM GLAZING BELOW12'-0" X 12'-6"22' - 1"19' - 4"54' - 2"26' - 1"8' - 3"5' - 7"3' - 0"3' - 0"8' - 2"21' - 3"5' - 2"3' - 0"3' - 0"12' - 4"68' - 8"24' - 1"25' - 9"CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtA1.2BUILDING ROOFPLANMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:A1.21/4" = 1'-0"1ROOF PLANNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 126 of 207 T.O. SLAB0"T.O. BLDSTOREFRONT10' -0"T.O. ROOF15' -8"T.O. BLD ROOF27' -7"METAL COPINGT.O. PARAPET19' -8"PATIO AREACONVENIENCE STORE MAIN ENTRANCE212RP-01ST-01WP-01WP-02MT-01ST-02WP-03P-01MT-01MT-02MT-02MT-02ST-01ST-02WP-01UNDERSIDEWP-03P-01P-02P-02P-0210' - 0"1' - 6"EQEQEQEQ11' - 0"11' - 0"L-01L-01L-02IN SOFFITL-02IN SOFFITT.O. SLAB0"T.O. BLD ROOF27' -7"T.O. PARAPET19' -8"CONVENIENCE STORE ENTRANCEMAIN STREET ENTRANCEST-01WP-02WP-01P-02ST-02RP-01MT-01P-02MT-02WP-01WP-03P-018' - 0"2' - 6"EQEQEQEQEQEQ11' - 6"L-01LEGEND:WALL PANELMFG.: JAMES HARDIEMODEL: HARDIEPANEL VERTICAL SIDINGTYPE: SELECT CEDARMILLCOLOR: SUMMER WHITEWP-01WALL PANEL / SOFFITMFG.: VITRABONDMODEL: WOODCREATECOLOR: AMERICAN PINE VB8330FINISH: "WOOD" FINISHWP-02ROOF PANELMFG.: RHEINZINK OR EQUALCOLOR: GRAPHITE GREYFINISH: REVEAL PANEL PRE-PATINARP-01GREEN WALL: GW-01MFG.: --COLOR: GREENFINISH: PLANTSGW-01WALL FINISH: WP-03MFG.: STOMODEL: STOPOWERWALLCOLOR: -FINISH: SMOOTH WP-03STONE VENEERMFG.: CORONADO STONE PRODUCTSMODEL#: DESIGNER SERIESTYPE: 6" SPLIT LIMESTONECOLOR: SUMMIT GREYST-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DEW380COLOR: WHITEFINISH: MATTEP-01METAL: CANOPYMFG.: MAPES CANOPY OR EQUALCOLOR: PREFINISHED BLACKMT-02METAL: COPINGMFG.: GENERICCOLOR: PREFINISHED BLACKMT-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DE6346COLOR: SALEM BLACKFINISH: MATTEP-02STONE CAPMFG.: CORONADO STONE PRODUCTSMODEL#: 900 SERIES SILLTYPE: #2COLOR: GREYST-02LED WALL PACKMFG.: LSI INDUSTRIESMODEL#: WPSLL -SLIM WALL PACKTYPE: LARGE LED SLIM WALL PACKCOLOR: FINISH TBDL-01LED SOFFIT LIGHTINGMFG.: LSI INDUSTRIESMODEL#: SDL4'TYPE: LED STRIP DIFFUSED LENSCOLOR: WHITE FINISHL-02LED LIGHT STRIPMFG.: GREEN LED LIGHTING SOLUTIONSMODEL#: VIVID S270TYPE: SILICONECOLOR: CUSTOM CONSERV GREENL-03METAL: HSS OR TS STEELMFG.: GENERICCOLOR: SEE PAINT FINISHESMT-03CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtA2.1BUILDINGELEVATIONSMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:A2.11/4" = 1'-0"1BUILDING -NORTH ELEVATIONSCALE:A2.11/4" = 1'-0"2BUILDING -EAST ELEVATIONNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 127 of 207 T.O. SLAB0"T.O. BLDSTOREFRONT10' -0"T.O. ROOF15' -8"T.O. BLD ROOF27' -7"LOCATION OF FUTURE SOLAR PANELS INTEGRATED INTO STANDING SEAM ROOFLOCATION FOR LOGO DISPLAYT.O. PARAPET19' -8"LOCATION FOR LOGO DISPLAYMAIN STREET ENTRANCE212RP-01ST-01WP-01WP-01WP-03P-01WP-02MT-01MT-01ST-02WP-01WP-03P-01MT-01MT-02MT-02MT-02WP-01ST-01ST-02WP-01UNDERSIDEWP-03P-01PATIO AREAP-02P-02P-0210' - 0"EQEQ10' - 0"EQEQ11' - 0"L-01L-01L-02IN SOFFITL-02IN SOFFITT.O. SLAB0"T.O. BLDSTOREFRONT10' -0"T.O. BLD ROOF27' -7"T.O. PARAPET19' -8"LOCATION OF FUTURE SOLAR PANELS INTEGRATED INTO STANDING SEAM ROOFLOCATION FOR LOGO DISPLAYST-01WP-02WP-01P-02ST-02RP-01MT-01MT-02P-02P-02P-02WP-015' - 2"5' - 2"10' - 0"10' - 0"10' - 0"11' - 0"L-01LEGEND:WALL PANELMFG.: JAMES HARDIEMODEL: HARDIEPANEL VERTICAL SIDINGTYPE: SELECT CEDARMILLCOLOR: SUMMER WHITEWP-01WALL PANEL / SOFFITMFG.: VITRABONDMODEL: WOODCREATECOLOR: AMERICAN PINE VB8330FINISH: "WOOD" FINISHWP-02ROOF PANELMFG.: RHEINZINK OR EQUALCOLOR: GRAPHITE GREYFINISH: REVEAL PANEL PRE-PATINARP-01GREEN WALL: GW-01MFG.: --COLOR: GREENFINISH: PLANTSGW-01WALL FINISH: WP-03MFG.: STOMODEL: STOPOWERWALLCOLOR: -FINISH: SMOOTH WP-03STONE VENEERMFG.: CORONADO STONE PRODUCTSMODEL#: DESIGNER SERIESTYPE: 6" SPLIT LIMESTONECOLOR: SUMMIT GREYST-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DEW380COLOR: WHITEFINISH: MATTEP-01METAL: CANOPYMFG.: MAPES CANOPY OR EQUALCOLOR: PREFINISHED BLACKMT-02METAL: COPINGMFG.: GENERICCOLOR: PREFINISHED BLACKMT-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DE6346COLOR: SALEM BLACKFINISH: MATTEP-02STONE CAPMFG.: CORONADO STONE PRODUCTSMODEL#: 900 SERIES SILLTYPE: #2COLOR: GREYST-02LED WALL PACKMFG.: LSI INDUSTRIESMODEL#: WPSLL -SLIM WALL PACKTYPE: LARGE LED SLIM WALL PACKCOLOR: FINISH TBDL-01LED SOFFIT LIGHTINGMFG.: LSI INDUSTRIESMODEL#: SDL4'TYPE: LED STRIP DIFFUSED LENSCOLOR: WHITE FINISHL-02LED LIGHT STRIPMFG.: GREEN LED LIGHTING SOLUTIONSMODEL#: VIVID S270TYPE: SILICONECOLOR: CUSTOM CONSERV GREENL-03METAL: HSS OR TS STEELMFG.: GENERICCOLOR: SEE PAINT FINISHESMT-03CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtA2.2BUILDINGELEVATIONSMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:A2.21/4" = 1'-0"1BUILDING -SOUTH ELEVATIONSCALE:A2.21/4" = 1'-0"2BUILDING -WEST ELEVATIONNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 128 of 207 A3.15A3.13SNEW246 SFTRASHENCLOSURE11625' - 0"11' - 4"A3.14A3.16ENCLOSURE POSTTYP.TRASHRECYCLEGREEN WASTEYRW27' - 0"2' - 0"25' - 0"12' - 0"CONCRETEAPRONCONCRETEPAD1' - 10"3' - 0"6' - 5"13' - 10"2"GATE CANE BOLT HOLESPIPE LINED (TYP OF 8)6'-9"x4'-8"6'-9"x4'-8"6'-9"x4'-8"GAP BETWEEN ENCLOSURE & GATESGATES HUNG INDEPENDANTLY FROM WALLS OF ENCLOSURE ON POSTSCONCRETEWALKWAYA3.15A3.13SNEWSLOPE DOWN27' - 1"14' - 6"A3.14A3.16RP-01SOLID ROOF COVERINGSTANDING SEAM METAL ROOFLEGEND:WALL PANELMFG.: JAMES HARDIEMODEL: HARDIEPANEL VERTICAL SIDINGTYPE: SELECT CEDARMILLCOLOR: SUMMER WHITEWP-01WALL PANEL / SOFFITMFG.: VITRABONDMODEL: WOODCREATECOLOR: AMERICAN PINE VB8330FINISH: "WOOD" FINISHWP-02ROOF PANELMFG.: RHEINZINK OR EQUALCOLOR: GRAPHITE GREYFINISH: REVEAL PANEL PRE-PATINARP-01GREEN WALL: GW-01MFG.: --COLOR: GREENFINISH: PLANTSGW-01WALL FINISH: WP-03MFG.: STOMODEL: STOPOWERWALLCOLOR: -FINISH: SMOOTH WP-03STONE VENEERMFG.: CORONADO STONE PRODUCTSMODEL#: DESIGNER SERIESTYPE: 6" SPLIT LIMESTONECOLOR: SUMMIT GREYST-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DEW380COLOR: WHITEFINISH: MATTEP-01METAL: CANOPYMFG.: MAPES CANOPY OR EQUALCOLOR: PREFINISHED BLACKMT-02METAL: COPINGMFG.: GENERICCOLOR: PREFINISHED BLACKMT-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DE6346COLOR: SALEM BLACKFINISH: MATTEP-02STONE CAPMFG.: CORONADO STONE PRODUCTSMODEL#: 900 SERIES SILLTYPE: #2COLOR: GREYST-02LED WALL PACKMFG.: LSI INDUSTRIESMODEL#: WPSLL -SLIM WALL PACKTYPE: LARGE LED SLIM WALL PACKCOLOR: FINISH TBDL-01LED SOFFIT LIGHTINGMFG.: LSI INDUSTRIESMODEL#: SDL4'TYPE: LED STRIP DIFFUSED LENSCOLOR: WHITE FINISHL-02LED LIGHT STRIPMFG.: GREEN LED LIGHTING SOLUTIONSMODEL#: VIVID S270TYPE: SILICONECOLOR: CUSTOM CONSERV GREENL-03METAL: HSS OR TS STEELMFG.: GENERICCOLOR: SEE PAINT FINISHESMT-03T.O. SLAB0"8' - 0"11' - 6"14' - 1"WP-01ST-02MT-01MT-03P-02RP-01CLR11' - 0"SOLID ROOF COVERINGENCLOSURE POST122T.O. SLAB0"8' - 0"14' - 1"ST-01ST-02WP-03P-01WP-01MT-01MT-03P-02RP-01T.O. SLAB0"ST-01ST-02WP-03P-01MT-01MT-03P-02RP-018' - 0"3' - 6"6' - 1"4"3' - 2"6"4' - 0"11' - 6"14' - 1"11' - 0" CLRSOLID ROOF COVERINGENCLOSURE POST122T.O. SLAB0"ST-01ST-02WP-02P-01MT-01MT-03P-02RP-01ST-01ST-02WP-03P-018' - 0"4"CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtA3.1TRASH ENCL.PLANS &ELEVATIONSMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCJCJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:A3.11/4" = 1'-0"1TRASH ENCLOSURE FLOOR PLANSCALE:A3.11/4" = 1'-0"2TRASH ENCLOSURE ROOF PLANSCALE:A3.11/4" = 1'-0"3TRASH ENCLOSURE EAST ELEVATIONSCALE:A3.11/4" = 1'-0"5TRASH ENCLOSURE SOUTH ELEVATIONSCALE:A3.11/4" = 1'-0"4TRASH ENCLOSURE WEST ELEVATIONSCALE:A3.11/4" = 1'-0"6TRASH ENCLOSURE NORTH ELEVATIONNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 129 of 207 CA2.14CA2.12CA2.13CA2.11DDEEFF554432' - 0"32' - 0"22' - 0"32' - 0"32' - 0"80' - 0" CANOPY ABOVE22' - 0"52' - 0"52' - 0" CANOPY ABOVE80' - 0" CANOPY ABOVESNEWCHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtCA1.1CANOPY FLOORPLANMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:CA1.13/16" = 1'-0"1CANOPY FLOOR PLANNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 130 of 207 CANOPY DRIVESLAB0"B.O. CANOPY18' -0"T.O. CANOPYROOF21' -8"54DISPENSER (TYP.)BOLLARDS (TYP.)DISPENSER ISLAND (TYP.)CANOPY COLUMN (TYP.)LOCATION OF FUTURE SOLAR PANELS RP-01MT-01P-02ST-01ST-02L-03CANOPY DRIVESLAB0"B.O. CANOPY18' -0"T.O. CANOPYROOF21' -8"DEFDISPENSER (TYP.)BOLLARDS (TYP.)DISPENSER ISLAND (TYP.)CANOPY COLUMN (TYP.)LOCATION OF FUTURE SOLAR PANELS RP-01MT-01P-02ST-02L-03CANOPY DRIVESLAB0"B.O. CANOPY18' -0"T.O. CANOPYROOF21' -8"DEFLOCATION OF FUTURE SOLAR PANELS DISPENSER (TYP.)BOLLARDS (TYP.)DISPENSER ISLAND (TYP.)CANOPY COLUMN (TYP.)RP-01MT-01P-02ST-02L-03CANOPY DRIVESLAB0"B.O. CANOPY18' -0"T.O. CANOPYROOF21' -8"54DISPENSER (TYP.)BOLLARDS (TYP.)DISPENSER ISLAND (TYP.)CANOPY COLUMN (TYP.)LOCATION OF FUTURE SOLAR PANELS RP-01MT-01P-02ST-01ST-02L-03LEGEND:WALL PANELMFG.: JAMES HARDIEMODEL: HARDIEPANEL VERTICAL SIDINGTYPE: SELECT CEDARMILLCOLOR: SUMMER WHITEWP-01WALL PANEL / SOFFITMFG.: VITRABONDMODEL: WOODCREATECOLOR: AMERICAN PINE VB8330FINISH: "WOOD" FINISHWP-02ROOF PANELMFG.: RHEINZINK OR EQUALCOLOR: GRAPHITE GREYFINISH: REVEAL PANEL PRE-PATINARP-01GREEN WALL: GW-01MFG.: --COLOR: GREENFINISH: PLANTSGW-01WALL FINISH: WP-03MFG.: STOMODEL: STOPOWERWALLCOLOR: -FINISH: SMOOTH WP-03STONE VENEERMFG.: CORONADO STONE PRODUCTSMODEL#: DESIGNER SERIESTYPE: 6" SPLIT LIMESTONECOLOR: SUMMIT GREYST-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DEW380COLOR: WHITEFINISH: MATTEP-01METAL: CANOPYMFG.: MAPES CANOPY OR EQUALCOLOR: PREFINISHED BLACKMT-02METAL: COPINGMFG.: GENERICCOLOR: PREFINISHED BLACKMT-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DE6346COLOR: SALEM BLACKFINISH: MATTEP-02STONE CAPMFG.: CORONADO STONE PRODUCTSMODEL#: 900 SERIES SILLTYPE: #2COLOR: GREYST-02LED WALL PACKMFG.: LSI INDUSTRIESMODEL#: WPSLL -SLIM WALL PACKTYPE: LARGE LED SLIM WALL PACKCOLOR: FINISH TBDL-01LED SOFFIT LIGHTINGMFG.: LSI INDUSTRIESMODEL#: SDL4'TYPE: LED STRIP DIFFUSED LENSCOLOR: WHITE FINISHL-02LED LIGHT STRIPMFG.: GREEN LED LIGHTING SOLUTIONSMODEL#: VIVID S270TYPE: SILICONECOLOR: CUSTOM CONSERV GREENL-03METAL: HSS OR TS STEELMFG.: GENERICCOLOR: SEE PAINT FINISHESMT-03CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtCA2.1CANOPYELEVATIONSMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:CA2.13/16" = 1'-0"1CANOPY -EAST ELEVATIONSCALE:CA2.13/16" = 1'-0"3CANOPY -NORTH ELEVATIONSCALE:CA2.13/16" = 1'-0"4CANOPY -SOUTH ELEVATIONSCALE:CA2.13/16" = 1'-0"2CANOPY -WEST ELEVATIONNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 131 of 207 CW2.12CW2.1CW2.1CW2.1534EWNS857 SFCAR WASHTUNNEL120245 SFCAR WASHEQUIPMENTROOM121157 SFCAR WASHELECTRICALROOM12258' - 5"2' - 5"5' - 0"2' - 7"9' - 0"2' - 7"16' - 7"2' - 7"9' - 0"2' - 7"5' - 0"2' - 5"24' - 2"2' - 5"1' - 10"10' - 0"4' - 10"3' - 4"9"2' - 5"2' - 5"1' - 10"10' - 0"4' - 10"3' - 4"9"2' - 5"24' - 2"CW2.12CW2.1CW2.1CW2.1534EWNSSLOPE DOWN60' - 5"27' - 0"26' - 11"29' - 9"CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtCW1.1CARWASH FLOORPLAN & ROOF PLANMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:CW1.11/4" = 1'-0"1CAR WASH FLOOR PLANSCALE:CW1.11/4" = 1'-0"2CAR WASH ROOF PLANNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 132 of 207 T.O. SLAB0"B.O. CW ROOF14' -2"T.O. C.W. SLAB-6"T.O. CW ROOF19' -8"LOCATION FOR FUTURE SIGNAGE PER SIGNAGE PROGRAM ST-01WP-01ST-02RP-01MT-02WP-03P-01CONSERV LIGHT STRIP (TYP)EQEQEQEQEQEQEQEQEQEQL-0111' - 0"8' - 0"11' - 0"T.O. SLAB0"B.O. CW ROOF14' -2"T.O. C.W. SLAB-6"B.O. CW FASCIA15' -8"T.O. CW ROOF19' -8"LOCATION FOR FUTURE SIGNAGE PER SIGNAGE PROGRAM ST-01WP-01ST-02RP-01MT-02WP-03P-01EQEQEQEQEQEQEQEQEQEQ11' - 0"T.O. SLAB0"B.O. CW ROOF14' -2"T.O. C.W. SLAB-6"T.O. CW ROOF19' -8"LOCATION FOR FUTURE SIGNAGE PER SIGNAGE PROGRAM 122WP-01RP-01MT-02WP-03P-01MT-026' - 10"11' - 6"2' - 5"10' - 0"L-01T.O. SLAB0"B.O. CW ROOF14' -2"T.O. C.W. SLAB-6"T.O. CW ROOF19' -8"LOCATION FOR FUTURE SIGNAGE PER SIGNAGE PROGRAM 212WP-01RP-01MT-02WP-03P-01MT-026' - 10"11' - 6"2' - 5"10' - 0"L-01LEGEND:WALL PANELMFG.: JAMES HARDIEMODEL: HARDIEPANEL VERTICAL SIDINGTYPE: SELECT CEDARMILLCOLOR: SUMMER WHITEWP-01WALL PANEL / SOFFITMFG.: VITRABONDMODEL: WOODCREATECOLOR: AMERICAN PINE VB8330FINISH: "WOOD" FINISHWP-02ROOF PANELMFG.: RHEINZINK OR EQUALCOLOR: GRAPHITE GREYFINISH: REVEAL PANEL PRE-PATINARP-01GREEN WALL: GW-01MFG.: --COLOR: GREENFINISH: PLANTSGW-01WALL FINISH: WP-03MFG.: STOMODEL: STOPOWERWALLCOLOR: -FINISH: SMOOTH WP-03STONE VENEERMFG.: CORONADO STONE PRODUCTSMODEL#: DESIGNER SERIESTYPE: 6" SPLIT LIMESTONECOLOR: SUMMIT GREYST-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DEW380COLOR: WHITEFINISH: MATTEP-01METAL: CANOPYMFG.: MAPES CANOPY OR EQUALCOLOR: PREFINISHED BLACKMT-02METAL: COPINGMFG.: GENERICCOLOR: PREFINISHED BLACKMT-01PAINT FINISHMFG.: DUNN EDWARDSMODEL: DE6346COLOR: SALEM BLACKFINISH: MATTEP-02STONE CAPMFG.: CORONADO STONE PRODUCTSMODEL#: 900 SERIES SILLTYPE: #2COLOR: GREYST-02LED WALL PACKMFG.: LSI INDUSTRIESMODEL#: WPSLL -SLIM WALL PACKTYPE: LARGE LED SLIM WALL PACKCOLOR: FINISH TBDL-01LED SOFFIT LIGHTINGMFG.: LSI INDUSTRIESMODEL#: SDL4'TYPE: LED STRIP DIFFUSED LENSCOLOR: WHITE FINISHL-02LED LIGHT STRIPMFG.: GREEN LED LIGHTING SOLUTIONSMODEL#: VIVID S270TYPE: SILICONECOLOR: CUSTOM CONSERV GREENL-03METAL: HSS OR TS STEELMFG.: GENERICCOLOR: SEE PAINT FINISHESMT-03CHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtCW2.1CARWASHELEVATIONSMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128SCALE:CW2.11/4" = 1'-0"4CAR WASH WEST ELEVATIONSCALE:CW2.11/4" = 1'-0"5CAR WASH EAST ELEVATIONSCALE:CW2.11/4" = 1'-0"2CAR WASH SOUTH ELEVATIONSCALE:CW2.11/4" = 1'-0"3CAR WASH NORTH ELEVATIONNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 133 of 207 (RP-01) ROOF METAL PANELMANUFACTURE: RHEINZINK MODEL#: -TYPE: STANDING SEAMCOLOR: GRAPHITE GREY(L-03) LIGHT FIXTUREMANUFACTURE: GREEN LED LIGHTING FIXTUREMODEL#: VIVID S270FINISH: SILICONECOLOR: CUSTOM CONSERV GREEN(ST-01) STONE VENEER MANUFACTURE: CORONADO STONE PRODUCTSMODEL#: DESIGNER SERIESTYPE: 6" SPLIT LIMESTONECOLOR: SUMMIT GREY(P-01) PAINT FINISH MANUFACTURE: DUNN EDWARDS MODEL#: DEW380FINISH: -MATTECOLOR: WHITE(WP-01) WALL PANEL MANUFACTURE: JAMES HARDIEMODEL#: HARDIEPANEL VERTICAL SIDINGTYPE: SELECT CEDARMILLCOLOR: SUMMER WHITE(WP-02) WALL/SOFFIT PANEL MANUFACTURE: VITRABONDMODEL#: WOODCREATE TYPE: -COLOR: AMERICAN PINE VB8330(WP-03) WALL FINISH MANUFACTURE: STO MODEL#: STOPOWERWALL W/ STO CRACK DEFENSEFINISH: FINECOLOR: -(P-02) PAINT FINISH MANUFACTURE: DUNN EDWARDS MODEL#: DE6343FINISH: MATTECOLOR: SALEM BLACK(ST-02) STONE CAPMANUFACTURE: CORONADO STONE PRODUCTSMODEL#: 900 SERIES SILLTYPE: #2COLOR: GREY(MT-01) METAL COPINGMANUFACTURE: GENERICMODEL#: -TYPE: PREFINISHED METAL COPINGCOLOR: BLACK(MT-02) METAL CANOPY/AWNINGMANUFACTURE: MAPES CANOPY OR EQUALMODEL#: -TYPE: PREFINISHED METAL CANOPYCOLOR: BLACK(L-01) LIGHT FIXTURE MANUFACTURE: LSI INDUSTRIESMODEL#: WPSLL -SLIM WALL PACKFINISH: TBDTYPE: LARGE LED SLIM WALL PACK(L-02) LIGHT FIXTURE MANUFACTURE: LSI INDUSTRIESMODEL#: SDL4'FINISH: -WHITETYPE: LED STRIP DIFFUSED LENSCHECKED BY:DRAWN BY:DATE:DESIGNED BY:SITE ADDRESS:FG PM:MEP PM:CONSULTANT PM:PROJECT NO.CONFIDENTIALITY STATEMENT:DEVELOPMENT INFORMATION:DRAWING TITLE:THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE COPIED, DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE TO OTHERS OR USED TO ANY EXTENT EXCEPT AS EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, SHALL BE HELD TO THE FOREGOING RESTRICTIONS.SHEET No.:C:\Users\jchang\Documents\_Revit Projects\16502\16502-Moller_R20_CHANG_200.rvtCMD1.1COLOR MATERIALBOARDMOLLER RETAIL, INC.PROPOSED C-STORE,CARWASH & CANOPY06/28/2020JCWTJCLA MEDIA PKWY& MAIN STREET WESTCHULA VISTA, CA16502CONSERV 6128STOREFRONT SYSTEMSOLAR PANELSSTORMWATER HARVESTING TANKINTEGRATED SOLAR PANELSWOOD FRAME CONNECTIONSCONCEPTUAL DETAILSMATERIAL AND FINISH LEGENDNo. DATE DESCRIPTION1 07/15/2020 CLIENT REVISIONS2 08/13/2020 PLANNING REVISIONS3 02/16/2021 PLANNING REVISIONS2021-10-27 PC Agenda Page 134 of 207 2 5 2 5 252525252525STOPONLY O N L YSTOP LOT 26LOT BLOT 3LOT ALOT 1LA MEDIA PKWY. SOUTHGAS PUMPCANOPYP=456.8FF=457.3EVEVLA MEDI A PKWY. NORTHMAIN ST WEST4,160 SF4,200 SF1,420 SFCONVENIENCESTORECAR WASHP E R M A N E N T T U R N A R O U N D LOT 23*CONSERVE 6128CONDITIONAL USE PERMIT &CITY OF CHULA VISTA, CALIFORNIAPREPARED BY:16OFSHEETNO.REVISIONSDATEBYVICINITY MAPR-1GENERAL NOTESGENERAL DESIGN NOTESLOCATION MAPLEGENDKEY MAPHUNSAKER& ASSOCIATESCITY OF CHULA VISTA, CALIFORNIACONSERVE 6128DR20-0018805125Otay Ranch BdyOtay Ranch BdyNMAIN STREETLAPKWYMEDIAOWNERSITEPUBLIC UTILITIESSHEET INDEXEARTHWORK/GRADING QUANTITIESSOURCE OF TOPOGRAPHY‘BENCHMARK:LEGAL DESCRIPTIONASSESSORS PARCEL NUMBERDESIGN REVIEW SITE PLAN FOR:DEVELOPER/APPLICANTSITE LOCATIONCONDITIONAL USE PERMIT &DESIGN REVIEW SITE PLAN FOR:TITLE SHEET2021-10-27 PC Agenda Page 135 of 207 PROPOSED MAIN STREET WESTPROPOSED LA MEDIA PARKWAY (NORTH BOUND)PROPOSED LA MEDIA PARKWAY (SOUTH BOUND)PER DWG NO. 14012-05PER DWG NO. 14012-05PER DWG NO. 14012-05CONCRETE STEPSAND HANDRAIL DETAILPROPOSED PERMANENT TURNAROUNDPER DWG NO. 14012-06A26OFSHEETPREPARED BY:HUNSAKER& ASSOCIATESPROPOSED & EXISTING STREET SECTIONSDR20-0018CONSERVE 6128CONDITIONAL USE PERMIT &CITY OF CHULA VISTA, CALIFORNIADESIGN REVIEW SITE PLAN FOR:2021-10-27 PC Agenda Page 136 of 207 PARKINGNOPARKINGNOPARKINGNOLOT 26 LOT B LOT 3LOT A LOT 4 LOT 1 LA MEDIA PKWY. SOUTH GAS PUMP CANOPY UNDERGROUND TANK P=456.8FF=457.3H-007 H-006 S-001 S-005 S-008 TRASHEV H-010 EV S-011 C -0 1 3 S -0 1 7 L A M E D IA P K W Y . N O R T H MAIN ST WEST4,160 SF 4,200 SF 1,420 SF CONVENIENCE STORE CAR WASH A PERMANENTTURNAROUNDLOT 23 *3 6 OF SHEETPREPARED BY: HUNSAKER& ASSOCIATES PROPOSED SITE PLAN DR20-0018 CONSERVE 6128 CONDITIONAL USE PERMIT & CITY OF CHULA VISTA, CALIFORNIA DESIGN REVIEW SITE PLAN FOR: 2021-10-27 PC Agenda Page 137 of 207 2 5 2 5 252525252525STOPONLYONLYSTOP LOT 26LOT BLOT 3LOT ALOT 4LOT 1LA MEDIA PKWY. SOUTHGAS PUMPCANOPYP=456.8FF=457.3H-007H-006S-001S-005S-008EVH-010EVS-011C-013S-017LA MEDIA PKWY. NORTHMAIN ST WEST4,160 SF4,200 SF1,420 SFCONVENIENCESTORECAR WASHP E R M A N E N TTURNAROUN D LOT 23*46OFSHEETPREPARED BY:HUNSAKER& ASSOCIATESFIRE TRUCK TURNING MOVEMENTSDR20-0018CITY OF CHULA VISTA FIRE TRUCKWIDTH: 9.83TRACK: 6.83LOCK TO LOCK TIME: 6.00STEERING ANGLE: 45.00LEGENDPATHFRONT TIRESVEHICLE BODYEXISTING FIRE HYDRANTBUILDING TYPE & TOTAL SQUARE FOOTAGE:ADDRESSING:THE BUILDING(S) SHALL BE ADDRESSED IN ACCORDANCEWITH THE FOLLOWING CRITERIA:• 0 – 50FT FROM THE BUILDING TO THE FACE OF THECURB = 6-INCHES IN HEIGHT WITH A 1-INCH STROKE• 51 – 150FT FROM THE BUILDING TO THE FACE OF THECURB = 10-INCHES IN HEIGHT WITH A 1 ½ -INCH STROKE• 151FT FROM THE BUILDING TO THE FACE OF THE CURB= 16-INCHES IN HEIGHT WITH A 2-INCH STROKECONSERVE 6128CONDITIONAL USE PERMIT &CITY OF CHULA VISTA, CALIFORNIADESIGN REVIEW SITE PLAN FOR:2021-10-27 PC Agenda Page 138 of 207 2 5 2 5 252525252525STOPONLYONLYSTOP LOT 26LOT BLOT 3LOT ALOT 4LOT 1LA MEDIA PKWY. SOUTHGAS PUMPCANOPYP=456.8FF=457.3H-007H-006S-001S-005S-008EVH-010EVS-011C-013S-017LA MEDIA PKWY. NORTHMAIN ST WEST4,160 SF4,200 SF1,420 SFCONVENIENCESTORECAR WASHP E R M A N E N TTURNAROUN D LOT 23*56OFSHEETPREPARED BY:HUNSAKER& ASSOCIATESGAS TRUCK TURNING MOVEMENTSDR20-0018GAS DELIVERY TANKER WB - 50TRACTOR WIDTH: 8.0TRAILOR TRACK: 8.5LOCK TO LOCK TIME: 6.00STEERING ANGLE: 17.7LEGENDPATHFRONT TIRESVEHICLE BODYCONSERVE 6128CONDITIONAL USE PERMIT &CITY OF CHULA VISTA, CALIFORNIADESIGN REVIEW SITE PLAN FOR:TRAILOR WIDTH: 8.5TRACTOR TRACK: 8.0ARTICULATING ANGLE: 70.0UNDERGROUND TANKS2021-10-27 PC Agenda Page 139 of 207 2021-10-27 PC Agenda Page 140 of 207 P-2 B C G1 H1-A H1-B VAN 2525252525252525STOP ONLYAHEADAHEADSIGNALSIGNALONL Y STOPPARCEL GPARCEL FPARCEL 'A'PARCEL HPARCEL 'C' MAIN S T W E S TLA MEDIA PKWY. SOUTHBLDG.P=456.8FF=457.3EVEVLA MED IA PKWY . NOR TH T1 CONSERV 6128 Location Map OWNER HOMEFED CORPORATION 1903 WRIGHT PL. #220 CARLSBAD, CA 92008 - PROJECT DESCRIPTION CONSERV GAS STATION W/ CONVENIENCE STORE AND CAR WASH LANDSCAPED AREAS TOTAL SITE AREA:55,541 SF TOTAL LANDSCAPED AREA:13,450 SF ACRES (LANDSCAPED AREA):0.31 acres (24%) OTAY RANCH, VILLAGE 8 SHEET INDEX T1 COVER SHEET & DESIGN OBJECTIVES LANDSCAPE PLANS L1 LANDSCAPE SITE PLAN & PLANT LEGEN D L2 LANDSCAPE ELEVATION & DETAIL L3 LANDSCAPE ELEVATION & DETAIL L4 LANDSCAPE ELEVATION & DETAIL L5 LANDSCAPE HYDROZONE MAP CIVIL ENGINEER HUNSAKER & ASSOCIATES 9707 WAPLES STREET SAN DIEGO, CA 92121 858.558.4500 LANDSCAPE ARCHITECT TRIBUTARY LA, INC. 2725 JEFFERSON STREET, SUITE 14 CARLSBAD, CA 92008 760.434.9300 GOVERNING MUNICIPALITY THE CITY OF CHULA VISTA 276 FOURTH AVENUE CHULA VISTA, CA 91910 619.691.5031 0'100'200'50' N.T.S. Site Map Design Objectives 1.All new landscaping will be in accordance with the following documents: City of Chula Vista's guidelines: ●The Otay Ranch – Village 8 Landscape Master Plan ●The City of Chula Vista Landscape Water Conservation Ordinance ●The City of Chula Vista Grading Ordinance ●Village 8 West Master Precise Plan 2.The design theme of "Contemporary European with an Agrarian influence" is established in the architectural elevations and features. These architectural elements shall be considered and enhanced with plantings of this character, which may include: -Selecting trees that will provide filtered shade while maintaining a semi-transparent view of the architectural features -Creating a series of horizontal planes through canopy trees, shrub forms and accent colors to reflect the architectural forms -The use of vertical elements, such as narrow trees, decorative fencing and light features, to contrast the long architectural planes while maintaining the project's geometry. 3.All plant material selected for use will be of a type know to be successful in the area or in similar climatic and soil conditions. 4.The plant palette listed provides a list of plant material to select from when designing the landscape for this project. However, substitutions may be required due to availability, conditions related to the soils test results or other influences. 5.A soil test by a qualified agronomist shall further influence plant materials and installation techniques. All soils will be fertilized, amended, and tilled to conform to recommendations made by a soils testing laboratory and or landscape architect to promote healthy and vigorous plant growth. 6.Color from plant foliage, bark, or flowers will be utilized to create a friendly, warm, and visually exciting landscape environment. Thematic color schemes will be utilized in developing project identity.LA MEDIAPARKWAYLA MEDIA PARKWAYMAIN S T R E E T W E S T MAIN S T R E E T E A S T PROJECT SITE: CONSERV 6128 MAY 19, 2021 CONSERV 6128 OTAY RANCH VILLAGE 8 - COTA VERABY: MOLLER RETAIL, INC. Tributary LA, Inc. Landscape Architecture and Planning PROJECT SITE: CONSERV 6128 APPLICANT MOLLER RETAIL, INC. 6591 COLLINS DRIVE, SUITE E11 MOORPARK, CA 93021 - Irrigation & Water Conservation Notes 1.Prior to the approval of the building permit, a landscape documentation package shall be submitted to the City of Chula Vista that demonstrates that the landscape associated with this application complies with the City of Chula Vista landscape Water Ordinance, Chapter 20.12 of the Municipal Code. The title sheet of the drawings shall contain a signed statement from the landscape architect as follows: I am familiar with and agree to comply with the requirements for the landscape plans as in Chapter 20.12 of the Municipal Code. I have prepared this plan in compliance with those regulations. I certify that the plan implements the regulations to provide efficient landscape water use. 2.Irrigation for the site shall utilize underground sprinkler systems; including low flow spray heads and sub-grade drip irrigation, in compliance with the City of Chula Vista landscape Water Ordinance, Chapter 20.12 of the Municipal Code. 3.The irrigation system shall also utilize water saving devices including flow-sensing, rain-sensing devices and automatic control systems that either interface with CIMIS data or on-site weather sensors. 4.A 3" layer of organic mulch will be used where possible to reduce moisture loss. 2021-10-27 PC Agenda Page 141 of 207 2021-10-27 PC Agenda Page 142 of 207 GABION WALL PLANTER(30"H X 36" SQ.) W/ DWARF CITRUS TREE L2 MAY 19, 2021 CONSERV 6128 OTAY RANCH VILLAGE 8 - COTA VERABY: MOLLER RETAIL, INC. Tributary LA, Inc. Landscape Architecture and Planning CONVENIENCE STORE - NORTH ELEVATION CONVENIENCE STORE - WEST ELEVATION GABION WALL SEAT WALL (90"L X 24"W X 24"H) GABION WALL PLANTER(30"H X 36" SQ.) W/ DWARF CITRUS TREEGABION WALL SEAT WALL (90"L X 24"W X 24"H) 7'-6"7'-6"24"24"30"30"30"30"30"30"30"30" GABION WALL PLANTER(30"H X 36" SQ.) ON NORTH BUILDING FACE GABION WALL PLANTER(30"H X 36" SQ.) ON SOUTH BUILDING FACE GABION WALL PLANTER & SEAT WALL 7'-6"24"30"30" ELEVATIONS & ENLARGEMENTS CORTEN STEEL FRAME TUMBLED STONE FILL (COLOR TO COMPLIMENT ARCHITECTURAL FINISHES) 2021-10-27 PC Agenda Page 143 of 207 CC ELEVATIONS & ENLARGEMENTS L3 GEOMETRIC VINE TRELLIS MAY 19, 2021 CONSERV 6128 OTAY RANCH VILLAGE 8 - COTA VERABY: MOLLER RETAIL, INC. Tributary LA, Inc. Landscape Architecture and Planning GABION WALL PLANTER(30"H X 30" SQ.) W/ DWARF CITRUS TREE GABION WALL PLANTER(30"H X 36" SQ.) W/ DWARF CITRUS TREE CONVENIENCE STORE - SOUTH ELEVATION CONVENIENCE STORE - EAST ELEVATION GEOMETRIC VINE TRELLIS W/ FLOWERING VINES GEOMETRIC VINE TRELLIS W/ FLOWERING VINES GABION WALL PLANTER(30"H X 30" SQ.) W/ DWARF CITRUS TREE COLUMNAR SHRUBS & HEDGES 30"30"30"30"30"30"30"30"9'-8"9'-4"5'-6"4'-8"HEIGHT VARIES (5'-6" - 9'-6")WIDTH VARIES (3'-9" - 5'-6")8" (TYP)8" (TYP)METAL FINISH TO MATCH ARCHITECTURAL TRIM CLIMBING, FLOWERING VINES 2021-10-27 PC Agenda Page 144 of 207 ELEVATIONS & ENLARGEMENTS L4 MAY 19, 2021 CONSERV 6128 OTAY RANCH VILLAGE 8 - COTA VERABY: MOLLER RETAIL, INC. Tributary LA, Inc. Landscape Architecture and Planning CAR WASH - EAST ELEVATION PROJECT SIGNAGE - ELEVATION LA MEDIA PARKWAY (NORTH & SOUTH) 9'-0" COLUMNAR ACCENT PLANTING 6'-0"BOARD FORM CONCRETE SIGN WALL FLOATING ACCENT METAL - WRAP ON 3 SIDES 2021-10-27 PC Agenda Page 145 of 207 25252525STOPONLYONLYSTOPMAIN ST WESTLA MEDIA PKWY. SOUTH BLDG. P=456.8 FF=457.3 EV EV LA ME D I A P K W Y . N O R T H HYDROZONE MAP L5 MAY 19, 2021 CONSERV 6128 OTAY RANCH VILLAGE 8 - COTA VERABY: MOLLER RETAIL, INC. Tributary LA, Inc. Landscape Architecture and Planning 0'20'40'10' Irrigation & Water Conservation Notes 1.Prior to the approval of the building permit, a landscape documentation package shall be submitted to the City of Chula Vista that demonstrates that the landscape associated with this application complies with the City of Chula Vista landscape Water Ordinance, Chapter 20.12 of the Municipal Code. The title sheet of the drawings shall contain a signed statement from the landscape architect as follows: I am familiar with and agree to comply with the requirements for the landscape plans as in Chapter 20.12 of the Municipal Code. I have prepared this plan in compliance with those regulations. I certify that the plan implements the regulations to provide efficient landscape water use. 2.Irrigation for the site shall utilize underground sprinkler systems; including low flow spray heads and sub-grade drip irrigation, in compliance with the City of Chula Vista landscape Water Ordinance, Chapter 20.12 of the Municipal Code. 3.The irrigation system shall also utilize water saving devices including flow-sensing, rain-sensing devices and automatic control systems that either interface with CIMIS data or on-site weather sensors. 4.A 3" layer of organic mulch will be used where possible to reduce moisture loss. LEGEND Drip-Line System Full Sun Exposure Flat or Mild Slope Crop Coefficient: 0.3 Area: 5,264 SF MAWA: 96,732 ETWU: 79,615 ORNAMENTAL PLANTING Total Maximum Applied Water Allowance (MAWA): 156,813 Total Estimated Total Water Use (ETWU): 156,745 Drip-Line System South and West Exposure Flat or Mild Slope Crop Coefficient:0.4 Area: 2,174 SF MAWA: 25,477 ETWU: 27,958 ENHANCED ENTRY PLANTING Drip-Line System Full Sun Exposure Flat or Mild Slope Crop Coefficient: 0.4 Area: 2,831 SF MAWA: 33,168 ETWU: 36,399 GENERAL PLANTING, PARTIAL SHADE Drip-Line System Partial to predominantly Shade Flat or Mild Slope Crop Coefficient: 0.5 Area: 1,803 SF MAWA: 21,125 ETWU: 28,978 SLOPES- WEST EXPOSURE Drip-Line System Full Sun Exposure 2:1 Slope Crop Coefficient: 0.3 Area: 1,406 SF MAWA: 16,481 ETWU: 13.565 GABION PLANTERS - NORTH EXPOSURE Drip-Line System Partial to predominantly Shade No Slope Crop Coefficient: 0.3 Area: 9 SF MAWA: 105 ETWU: 87 BUILDING FRONTAGE GABION PLANTERS - SOUTH EXPOSURE Drip-Line System Full Sun Exposure No Slope Crop Coefficient: 0.3 Area: 16 SF MAWA: 185 ETWU: 152 CAR W A S H CONVENIENCE STORE CAR WASH DRIVEWAY 2021-10-27 PC Agenda Page 146 of 207 v . 0 0 1 P a g e | 1 October 27, 2021 ITEM TITLE Design Review Permit for GenProp Backhouse, LLC, a four-story multifamily residential building on a 0.28- acre site. Location: Southwest corner of Church Avenue and Davidson Street. Environmental Notice: The project was adequately covered in the previously adopted final Environmental Impact Report FEIR 06-01 prepared for the Chula Vista Urban Core and certified by the City Council in May 2007. Thus, no further environmental review is required. Recommended Action Conduct a public hearing and adopt Resolution No. DR20-0019 approving the project, based on the findings and subject to the conditions contained therein. SUMMARY The applicant, GenProp Backhouse, LLC applied for a Design Review Permit for the development of a 36,528 square-foot, four story, multifamily residential building at the southwest corner of Church Avenue and Davidson Street. The first floor of the building will be reserved for 25 tuck-under parking spaces for the proposed 31units. The 31 one-bedroom units will be evenly distributed among the second, third and fourth floors of the building. The project will include open space in the form of balconies and an outdoor roof deck, above the fourth floor, totaling 6,393 square feet of on-site open space. HOUSING IMPACT STATEMENT The proposed project will increase housing within the Western portion of the City of Chula Vista by adding 31 market rate residential units to the housing stock. The City of Chula Vista has a citywide Balanced Communities Policy for all residential developments of 50-units or more. The Balanced Communities Policy is applied to projects so as not to overburden areas of the community with high concentrations of low-income housing. Due to the location and size of this proposed project, the Balanced Communities Policy does not apply. ENVIRONMENTAL REVIEW The Director of Development Services has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the proposed project was adequately covered in 2021-10-27 PC Agenda Page 147 of 207 P a g e | 2 the previously adopted Final Environmental Impact Report FEIR 06-01 prepared for the Chula Vista Urban Core and certified by the City Council in May 2007. Thus, no further environmental review is required. DISCUSSION Project Site Characteristics: The 0.28-acre subject property is located at the southwest corner of Church Avenue and Davidson Street, developed with a 30-space private parking lot with no other structures on the property. To the west of the site is an alley that runs parallel to Church Avenue and perpendicular to Davidson Street. The alley provides one-way circulation to the south. The site is surrounded by a variety of commercial uses, medical/professional offices, and residential uses. In addition, the project site is within walking distance to public transportation as Bus Route 929 runs along Third Avenue and Bus Route 705 runs along E Street. The site is also located within the Downtown Parking District, which extends from E Street to H Street along Del Mar Avenue and Garret Avenue. A project within the parking district area may opt to provide up to 50% of the required off-site parking in the form of in-lieu parking fees instead of 100% on-site. Project Description The proposed project consists of developing a 36,528 square foot, four-story multifamily dwelling with 31- units distributed among the second through fourth floors and 25 parking spaces on the ground floor. The project will provide 1,865 square feet of landscaping and 6,393 square feet of open space throughout the building in the form of balconies and a roof deck on top of the fourth floor. Each balcony counts toward open space and will provide a minimum dimension of 60 square feet for a total of 2,500 square feet and a common area roof deck of 3,893 square feet. The project will provide 31 one-bedroom units ranging from 660 square feet to 704 square feet. The building façade will front along Church Avenue with ingress and egress to the first-floor parking garage from the alley. Project Architecture The proposed project features a modern architectural design that is eclectic and exemplifies and contributes to the vibrancy of the Third Avenue Village. The architecture fits the Third Avenue setting of historic structures as well as the newly proposed and existing building designs. The building mass is articulated by horizontal and vertical plane variations, including balconies, which provide variety and interest and are highlighted by accent colors and materials that break up the roof line. The building façades will support a variety of building materials and colors, including cement plaster, concrete, metal, stucco, and laminate glass. As proposed, the project is consistent with the overall design, form and scale and fits within the guidelines of the Urban Core Specific Plan’s Village District. 2021-10-27 PC Agenda Page 148 of 207 P a g e | 3 Land Use and Zoning Current Use General Plan UCSP (Zoning) Site Private Parking Lot Mixed Use Residential V1 East Village North Public Parking Lot Mixed Use Residential V1 East Village East Triplex & Duplex Mixed Use Residential V1 East Village South Duplex Mixed Use Residential V1 East Village West Commercial Retail Mixed Use Residential V2 Village Parking The proposed project is located within the Urban Core Specific Plan with a V-1 District designation which requires residential projects be developed with a parking ratio of 1.5 parking spaces per residential unit, plus 1 guest parking space for every 10 units. The proposed project is 31-units and required to provide 50 parking spaces. The Urban Core Specific Plan allows projects an option to provide 50% of the required parking on- site, and the rest can be provided off-site in private and/or public parking lots within 500 feet of the project site. The Downtown Parking District also allows proposed developments within the downtown area the option to pay an in-lieu fee for up to 50% of the required parking spaces not provided on-site. The project will provide 25 on-site parking spaces on the ground floor of the building. The 25 required off-site parking spaces will be satisfied by paying the in-lieu fee. The fee will contribute to the construction of additional future parking throughout the Downtown Parking District. The proposed project also results in the loss of 30 private parking spaces. A study of the Downtown Parking District is currently underway (the “Downtown Parking Study”). The Downtown Parking Study will inventory all current parking in the district, project parking demand at buildout, and provide recommendations to address any shortfalls in parking supply that may be identified. The Downtown Parking Study is expected to be completed and presented to the City Council in early 2022. Development Standards The proposed residential development has been evaluated using the Urban Core Specific Plan’s development standards and regulations. Table One reflects the required standards of the zone and the proposed project features: TABLE 1: Development Standards and Regulations Development Standard V1 East Village Zoning Project Proposal Building Height 18 ft. Min.; 45 ft. Max. 45 feet 2021-10-27 PC Agenda Page 149 of 207 P a g e | 4 Development Standard V1 East Village Zoning Project Proposal Building Setbacks: East (Front): North Side: South Side: West (Rear): 0 feet 0 feet 0 Feet 0 Feet 0 Feet 4.8 Feet 0 Feet 0 Feet Floor Area Ratio (FAR) 2.0 Max. 1.93 Street Wall Frontage 50% Min. 50% Required Parking 50 spaces 25 on-site spaces, including 2 # accessible spaces 25 off-site spaces paid in-lieu Required Open Space 6,200 sq. ft. 6,393 sq. ft. Landscaping 15% of site 15.1% Urban Core Specific Plan The proposed project has been reviewed and evaluated based on the development standards of the Urban Core Specific Plan, and the design guidelines listed in the V-1 East Village District as well as consistency with the City of Chula Vista’s General Plan. The following is an analysis of the project based on the applicable policies of the Urban Core Specific Plan. Land Use The proposed project is consistent with the vision, objectives and policies of the General Plan and the development standards and design guidelines of the Urban Core Specific Plan. The project will redevelop an existing public parking lot and provide additional residential units to the City’s downtown area with convenient access to commercial shopping and dining as well as public transit. There are two bus routes within the area, Bus Route 929 along Third Avenue and Bus Route 705 along E Street with bus stops within walking distance of the proposed project. The proposed project will add residential development with potential consumers to a vibrant Third Avenue with a variety of goods and services for the local community. The proposed project is consistent with the Urban Core Specific Plan development regulations related to land use, building height, floor area ratio, setbacks, parking, landscaping, and open space. As shown in the table above, the Project meets all the regulations of the Urban Core Specific Plan. The proposed project also complies with the General Plan by providing 31 dwelling units in an area designated to provide between 28- 60 dwelling units per acre. 2021-10-27 PC Agenda Page 150 of 207 P a g e | 5 Site Planning and Building Placement/Orientation/Building Architecture The project was analyzed based on the design guidelines established in the Urban Core Specific Plan. The following is a set of design standards related to Site Planning, Building Placement and Building Architecture applicable to the proposed project followed by a statement indicating how the project is consistent with those guidelines. “The first floor of any new building should be built at (or very close to) the front property line, parallel to the street. Buildings should also be placed on the setback line along alleys. “Create continuous pedestrian activity along public sidewalks in an uninterrupted sequence by minimizing gaps between buildings.” “Locate rear parking lot and structure entries on side streets or alleys in order to minimize pedestrian/vehicular conflicts along Third Avenue and F Street.” The project will provide a four-story multifamily residential development with tuck under parking on the ground floor for 25 parking spaces with access via the alley. The project will provide a zero setback along the western and southern portions of the building. The project will have 50% street wall frontage along Church Avenue as the pedestrian entryway to the building. The building façade along Church Avenue will provide a continuous span of visual interest and include streetscape improvements with pedestrian connectivity by adding pedestrian lighting, benches, and bike racks along the frontage of the building on Church Avenue. Building Architecture “The characteristic proportion (relationship of height to width) of existing façades should be reflected in new infill development.” “Building façades should be detailed in such a way as to make them appear smaller in scale. The smaller scale can be achieved through vertical and horizontal articulation such as: breaks in the surface of the wall, placement of window and door openings, and placement of bay windows, balconies, awnings, and canopies.” The proposed project features a modern architectural design reflecting the existing architectural style of current buildings in the project vicinity. The project mainly draws inspiration from the modern structures along Church Avenue and Third Avenue. The building mass is articulated with horizontal and vertical plane offsets along Church Avenue and Davidson Street to include windows, doors, and balconies to add variety and interest. This is highlighted in the architectural design with accent colors and materials, including stucco, wood siding and laminate glass. The project will be a pedestrian oriented design to include streetscape improvements, such as pedestrian lighting, benches, and trees along Church Avenue. Floor Area Ratio/Building Height/Setbacks The proposed project is consistent with the development standards for Floor Area Ratio (FAR), height and setbacks. The subject site currently has an area of approximately 12,380 square feet. The Urban Core Specific Plan allows the V-1 District a maximum FAR of 2.0 and the proposed project will have an FAR of 1.9. Regarding height and setbacks, the project will be a maximum height of 45-feet as required within the V-1 2021-10-27 PC Agenda Page 151 of 207 P a g e | 6 District and meet the zero-setback requirement. The project also complies with the required zero-setback along 50% of the street wall frontage on Church Avenue. Open Space and Landscaping The Urban Core Specific Plan V-1 District requires that the open space within the district be calculated at 200 square feet per unit. This requirement refers to any areas with minimum dimensions of 60 square feet (6’ x 10’) and devoted to the following common, private, or public uses: patio, balcony, deck and any area providing passive or active recreational/leisure use or facility. The project adheres to the development standards and requirements within the Urban Core Specific Plan and Chula Vista Design Guidelines. The project will provide 31-units for a total open space requirement of 6,200 square feet and will exceed its requirement by 193 square feet. The project will provide a variation of open space throughout the project, such as providing balconies on the second, third and fourth floors as well as a common area 3,893 square foot roof deck above the fourth floor available to the residents. Additionally, the project will provide a total landscape area of 1,865 square feet which exceeds the minimum 15% requirement within the Chula Vista Design Guidelines. Site Distance Waiver As proposed, the structure of the new building would restrict the minimum required sight line distance standards for cross traffic at the intersection of Church Avenue and Davidson Street. To comply with Chula Vista Municipal Code Section 12.12.120, the applicant applied for a waiver, pursuant to City Design Standard RWY-05, by proposing to convert a side street stop-controlled intersection to a four-way stop controlled intersection. This will provide additional safety at the intersection for all users crossing the street and alleviate any sight distance issues by requiring all users to make a complete stop (Attachment 5). Conclusion Based on the analysis of the proposed project, staff recommends that the Planning Commission approve the proposed project subject to the conditions contained in the resolution. The proposed project will enhance the current neighborhood with the redevelopment of the existing surface parking lot to a four-story, multifamily residential building. The project site will contribute to the revitalization of the neighborhood and provide convenient access to Third Avenue’s commercial retail and nearby public transportation. The site will be developed with a project that is consistent with the vision, objectives and policies of the General Plan and meets the requirements and guidelines of the Urban Core Specific Plan. DECISION-MAKER CONFLICT Staff has reviewed the property holdings of the Planning Commission members and has found no property holdings within 1,000 feet of the boundaries of the property which is the subject of this action. Consequently, this item does not present a disqualifying real property-related financial conflict of interest under California Code of Regulations Title 2, section 18702.2(a)(7) or (8), for purposes of the Political Reform Act (Cal. Gov’t Code §87100, et seq.). Staff is not independently aware and has not been informed by any Planning Commission member, of any other fact that may constitute a basis for a decision-maker conflict of interest in this matter. 2021-10-27 PC Agenda Page 152 of 207 P a g e | 7 FISCAL IMPACT The application fees and processing costs are paid for by the Applicant, resulting in no net fiscal impact to the Development Services Fund or the General Fund. ATTACHMENTS 1. Locator Map 2. Project Plans 3. Material Board 4. Sight Vision Waiver 5. Development Processing Agreement 6. Resolution DR20-0019 Staff Contact: Tiffany Allen, Director of Development Services Oscar Romero, Senior Planner 2021-10-27 PC Agenda Page 153 of 207 2021-10-27 PC Agenda Page 154 of 207 SHEET INDEX SILVERGATE DEVELOPMENT DESIGN REVIEW SET JAKE REYNOLDS 4960 N. HARBOR DRIVE #200 SAN DIEGO, CA 92106 (619) 625-1260 x107 These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:12:26 PM 9/15/2021 3:12:26 PMG0.00 TITLE SHEET CHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 DR20-0019 PROJECT DATA PROJECT DIRECTORY PROJECT LOCATION TRUE NORTH VICINITY MAP Owner/Developer BACKHOUSE, LLC 4960 North Harbor Drive Suite 200 San Diego, CA 92106 Contact: Jake Reynolds Email: jdr@silvergatedevelopment Tel: (619) 625-1260 x107 Architect The Brown Studio 1144 North Coast Highway 101 Leucadia, CA 92024 Contact: Logan Anderson, AIA Email: logan@thebrownstudio.com Tel: (619) 807-0640 Civil Engineer 4C Engineering + Geomatics 4960 North Harbor Drive Suite 200 San Diego, CA 92106 Contact: Dolvin Buchanan Email: dolvin@4c.engineering Tel: (619) 663-8352 Landscape Weiland Design Group 28924 Old Town Front Street, Suite 202 Temecula, CA 92590 Contact: Kim Lonigro Email: klonigro@w-d-g.com Tel: 844-WEILAND, xt 701 Structural Engineer Patterson Engineering, Inc. 928 Fort Stockton Drive Suite 201 San Diego, CA 92103 Contact: Curtis Patterson Email: curtis@pattersoneng.com Tel: (858) 605-0937 MEP Engineer Fard Engineers Inc 3550 Camino Del Rio N Suite 204 San Diego, CA 92108 Contact: Zack Sarhan Email: zack@fard.com Tel: (415) 842-9225 CODES IN EFFECT: -CHULA VISTA URBAN CORE SPECIFIC PLAN -CHULA VISTA BUILDING STANDARDS CODE (TITLE 15 OF THE CHULA VISTA MUNICIPAL CODE (CVMC)) -2019 CALIFORNIA BUILDING STANDARDS CODES, TITLE 24 OF THE CALIFORNIA CODE OF REQULATIONS (13 PARTS): PART 1: CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE PART 2: CALIFORNIA BUILDING CODE, VOL. 1 PART 2: CALIFORNIA BUILDING CODE, VOL. 2 PART 2.5: CALIFORNIA RESIDENTIAL CODE PART 3: CALIFORNIA ELECTRICAL CODE PART 4: CALIFORNIA MECHANICAL CODE PART 5: CALIFORNIA PLUMBING CODE PART 6: CALIFORNIA ENERGY CODE PART 7: (No Longer Published in Title 24. See Title 8, CCR) PART 8: CALIFORNIA HISTORICAL BUILDING CODE PART 9: CALIFORNIA FIRE CODE PART 10: CALIFORNIA EXISTING BUILDING CODE PART 11: CALIFORNIA GREEN BUILDING STANDARDS CODE PART 12: CALIFORNIA REFENCED STANDARDS CODE PROJECT NAME: BACKHOUSE APARTMENTS PROJECT LOCATION: SOUTHWEST CORNER OF CHURCH AVE & DAVIDSON ST CHULA VISTA, CA 91910 SCOPE OF WORK: CONSTRUCTION OF 31 UNIT APARTMENT AND 25 PARKING OPEN GARAGE AND ASSOCIATED PLANTING AND SITE WORK SITE INFORMATION: A.P.N.: 568-161-25-00 LEGAL DESCRIPTION: LOTS 22 AND 23 OF DYER TRACT, ACCORDING TO MAP THEREOF NO. 1871, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID SAN DIEGO COUNTY, DEC 23, 1925 ACRES: 0.28 (12,380 S.F.) CHULA VISTA FIRE MARSHAL'S HOSE LAY REQUIREMENTS: MAX. DISTANCE TO ANY POINT OF THE BUILDING FROM THE FIRE LANE = 150', SIDE YARD EXEMPT THIS PROJECT IS NOT WITHIN A NOISE CRITICAL AREA (CNEL CONTOUR OF 60 DB) AS SHOWN ON THE GENERAL PLAN DEFERRED SPRINKLER SYSTEM, FIRE ALARM SUBMITTAL ITEMS:SYSTEM SUBMITTAL DOCUMENTS FOR DEFERRED ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED DOCUMENTS HAVE BEEN REVIEWED AND THAT THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE DEFERRED ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. 1. PROJECT TO BE PRIVATELY FUNDED. 2. CBC 705.3 BUILDING ON THE SAME LOT. TWO OR MORE BUILDINGS ON THE SAME LOT SHALL BE CONSIDERED AS PORTIONS OF ONE BUILDING IF THE AGGREGATE AREA OF SUCH BUILDINGS IS WITHIN THE LIMITS SPECIFIED IN CHAPTER 5 FOR A SINGLE BUILDING. WHERE THE BUILDINGS CONTAIN DIFFERENT OCCUPANCY GROUPS, THE AREA SHALL BE ALLOWED FOR THE MOST RESTRICTIVE OCCUPANCY OR CONSTRUCTION. ALL OF THE BUILDINGS ON THE PROJECT TO BE CONSIDERED PORTIONS OF (1) AGGREGATE BUILDING. 3. CBC 508.3 NONSEPARATED OCCUPANCIES: BUILDINGS THAT COMPLY WITH THIS SECTION SHALL BE CONSIDERED AS NON SEPARATED OCCUPANCIES. 4. CBC 508.3.3 SEPARATION: NO SEPARATION IS REQUIRED BETWEEN NON SEPARATED OCCUPANCIES, EXCEPTION2. GROUP R-1, R-2,R-2.1, R-3 DWELLING UNITS AND SLEEPING UNITS SHALL BE SEPARATED FROM OTHER DWELLING OR SLEEPING UNITS AND FROM OTHER OCCUPANCIES CONTIGUOUS TO THEM IN ACCORDANCE WITH REQUIREMENTS OF SECTION 420. FIRE PARTITIONS CALIFORNIA BUILDING CODE 2019 Total Gross Project Area: 36,528 SF Total Gross Building Area: 23,855 SF Total Occupant Load: Building 118 Occupants (1/200gross) Roof Deck 120 Occupants (15net) Principal Classification: R-2 (Residential) Other Classifications: S-2 (Parking Garage) Occupancy Separation: 1 HR (R-2/S-2) 1 HR (Between Dwellings) Construction Type: Vb (R-2) Ib (S-2) Sprinkler System: NFPA-13 Ch 5 Requirements S2 (Ib) Table 504.3 S/S = 180ft Table 504.4 S-2/S = 12stories Table 506.2 S-2/S1 = 316,000sf R2 (Vb) Table 504.3 R-2/S(w/o) = 60ft Table 504.4 R-2/S(w/o) = 3stories Table 506.2 R-2/S1 = 21,000sf P = 494.25 lf F = N (122.56'), E (99.00') & W (99.00') = 320.56 lf W = 30 lf = 0.64 lf = [F/P - 0.25] X W/30 lf = [320.56/494.25 - 0.25] x 30/30 lf = [0.64] x 1 Sa = 2 Aa=[At + (NS X lf)] x Sa Aa(Vb) = [21000 + (7000 x 0.64)] x 2 Aa(Vb) = [25480] x 2 Aa(Vb) = 50,960 50,960 > 36,528 ok CHULA VISTA URBAN CORE SPECIFIC PLAN -ZONE - V1 EAST VILLAGE -FLOOR AREA RATIO (MIN./MAX.): 1.0 / 2.0 -FLOOR AREA RATIO PROVIDED: 23,855 SF ÷ 12,380 SF = 1.93 -MIN. STREET WALL FRONTAGE: 50% MIN. -STREET WALL FRONTAGE PROVIDED: SITE LINE REQT'S AT CORNER OF CHURCH AND DAVIDSON REDUCES LENGTH OF POTENTIAL FRONTAGE, NUMBERS BELOW REFLECT PERCENTAGE BASED ON AVAILABLE P/L LENGTH CHURCH AVE:43' ÷ 86' = 50.0% DAVIDSON ST:113.8' ÷ 123.8' = 91.9% -LANDSCAPE (MIN.): 15% (12,380 SF) = 1,857 SF -LANDSCAPE PROVIDED: 1,919 SF ÷ 12,380 SF = 15.5% -BUILDING HEIGHT (MIN./MAX.): 18'-0" / 45'-0" -BUILDING HEIGHTS PROVIDED: 44' -SETBACKS: 0' ON ALL SIDES -SETBACKS PROVIDED: 0' -BUILDING STEPBACK: NOT MANDATORY -OPEN SPACE REQ'T: 200SF/Dwelling Unit = 6,200 SF -OPEN SPACE PROVIDED: 6,393 SF -PARKING REGULATIONS: MIN. 1.5 SPACES PER 1 DWELLING UNIT = 47 MIN. 1 GUEST SPACE PER 10 DWELLING UNITS = 3 # OF 1 BEDROOM UNITS ON SITE = 31 UNITS TOTAL # OF SPACES REQUIRED = 50 SPACES TOTAL # OF SPACES PROVIDED = 25 SPACES TOTAL # OF SPACES PURCHASED = 25 SPACES ONSITE MIN.= 50%, PROVIDED 50% MIN. # OF ACCESSIBLE SPACES REQUIRED = 1 SPACE MIN. # OF ACCESSIBLE SPACES PROVIDED = 2 SPACE PARKING SPACES TO BE ASSIGNED PROJECT AREAS GROSS PROJECT AREAS LEVEL NAME AREA L1 L1 GROSS BLDG 1,123 SF L1 PARKING GARAGE 9,383 SF 10,506 SF L2 L2 GROSS BLDG 8,704 SF 8,704 SF L3 L3 GROSS BLDG 8,704 SF 8,704 SF L4 L4 GROSS BLDG 5,324 SF L4 ROOF DECK 3,289 SF 8,614 SF 36,528 SF GROSS BUILDING AREAS LEVEL NAME AREA L1 L1 GROSS BLDG 1,123 SF 1,123 SF L2 L2 GROSS BLDG 8,704 SF 8,704 SF L3 L3 GROSS BLDG 8,704 SF 8,704 SF L4 L4 GROSS BLDG 5,324 SF 5,324 SF 23,855 SF 0 GENERAL G0.00 TITLE SHEET G0.02 OPEN SPACE + LANDSCAPE AREA DIAGRAMS 1 CIVIL C-1.0 EXISTING CONDITIONS C-2.0 GRADING AND UTILITIES C-3.0 TRAFFIC AND DETAILS 2 LANDSCAPE LC-01 GROUND FLOOR LC-02 SECOND FLOOR LC-03 THIRD FLOOR LC-04 FOURTH FLOOR 3 ARCHITECTURE A1.00 SITE PLAN A1.03 TRASH ENCLOSURE DRAWINGS A1.04 ELEVATOR DRAWINGS A2.00 LEVEL 1 FLOOR PLAN A2.02 LEVEL 2 FLOOR PLAN A2.04 LEVEL 3 FLOOR PLAN A2.06 LEVEL 4 FLOOR PLAN A2.08 ROOF PLAN A2.10 UNIT A1 DRAWINGS A2.11 UNIT A2 DRAWINGS A2.12 UNIT A3 DRAWINGS A2.13 UNIT B1 DRAWINGS A2.14 UNIT B2 DRAWINGS A2.15 UNIT B3 DRAWINGS A3.00 BUILDING PERSPECTIVES A3.01 BUILDING ELEVATIONS A3.02 BUILDING ELEVATIONS A4.00 BUILDING SECTIONS SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 155 of 207 192 SF L2 PRIVATE BALCONY 609 SF L2 PRIVATE PATIO 666 SF L2 PRIVATE BALCONY 78"72"19.28.090.C REQUIRES A MINIMUM DIMENSION OF 6FT (72in) 96 SF L2 PRIVATE BALCONY 68"72"99 SF L2 PRIVATE BALCONY72"72"192 SF L3 PRIVATE BALCONY 77 SF L3 PRIVATE BALCONY 7.0'11.2' 19.28.090.C REQUIRES A MINIMUM DIMENSION OF 6FT (72in) 96 SF L3 PRIVATE BALCONY 87 SF L3 PRIVATE BALCONY 192 SF L4 PRIVATE BALCONY 3,893 SF L4 ROOF DECK 96 SF L4 PRIVATE BALCONY 99 SF L4 PRIVATE BALCONY 659 SF BIO-RETENTION POND 154 SF L1 LANDSCAPE AREA 96 SF L1 LANDSCAPE AREA 30 SF L2 LANDSCAPE AREA 32 SF L2 LANDSCAPE AREA 30 SF L3 LANDSCAPE AREA 32 SF L3 LANDSCAPE AREA 966 SF L4 LANDSCAPE AREA 45 SF L4 LANDSCAPE AREA 88 SF L4 LANDSCAPE AREA 87 SF L4 LANDSCAPE AREA 45 SF L4 LANDSCAPE AREA = PRIVATE PATIO = PRIVATE BALCONY = ROOF DECK = LANDSCAPE AREA These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:39:44 PM 9/15/2021 2:39:44 PMG0.02 OPEN SPACE + LANDSCAPE AREA DIAGRAMS CHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 NAME AREA L2 PRIVATE BALCONY 195 SF L2 PRIVATE PATIO 609 SF L2 PRIVATE BALCONY 858 SF 1,662 SF L3 PRIVATE BALCONY 183 SF L3 PRIVATE BALCONY 269 SF 452 SF L4 PRIVATE BALCONY 195 SF L4 PRIVATE BALCONY 192 SF L4 ROOF DECK 3,893 SF 4,280 SF TOTAL OPEN SPACE 6,393 SF 1/16" = 1'-0" L1 OPEN SPACE DIAGRAM1 1/16" = 1'-0" L2 OPEN SPACE DIAGRAM2 1/16" = 1'-0" L3 OPEN SPACE DIAGRAM3 1/16" = 1'-0" L4 OPEN SPACE DIAGRAM4 NAME AREA L4 LANDSCAPE AREA Not Placed L4 LANDSCAPE AREA Not Placed Area Not Placed 0 SF BIO-RETENTION POND 659 SF L1 LANDSCAPE AREA 154 SF L1 LANDSCAPE AREA 96 SF 908 SF L2 LANDSCAPE AREA 32 SF L2 LANDSCAPE AREA 30 SF 62 SF L3 LANDSCAPE AREA 32 SF L3 LANDSCAPE AREA 30 SF 62 SF L4 LANDSCAPE AREA 966 SF L4 LANDSCAPE AREA 45 SF L4 LANDSCAPE AREA 88 SF L4 LANDSCAPE AREA 87 SF L4 LANDSCAPE AREA 45 SF 1,230 SF 2,262 SF LOT AREA:12,380SF REQ'D AREA (15%):1,857SF PROVIDED:1,865SF 1,865 ÷ 12,380 =15.1% LANDSCAPE AREA CALCULATIONS 1/16" = 1'-0" L1 LANDSCAPE AREA DIAGRAM5 1/16" = 1'-0" L2 LANDSCAPE AREA DIAGRAMS6 1/16" = 1'-0" L3 LANDSCAPE AREA DIAGRAM7 1/16" = 1'-0" L4 LANDSCAPE AREA DIAGRAM8 OPEN SPACE LEGEND REQ'D AREA:31 UNITS * 200SF/UNIT = 6,200SF PROVIDED:6,393SF OPEN SPACE CALCULATION LANDSCAPE LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 156 of 207 UP UP MMT +81.2' +82.0' 1 0 .0 '8 .7 '1 0 .0 '1 0 .0 '9 .0 '1 0 .0 '1 0 .0 '9 .0 '1 0 .0 '1 0 .0 '8 .7 '1 0 .0 '1 0 .0 '8 .7 '1 0 .0 'ELEC F.C. ELEV (TYP) 8.5' 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 D A V ID S O N CHURCHLINE OF BALCONY ABOVELINE OF BLDG ABOVE(E) POWER POLEREPLACE EXISTINGO.H. ARM TO BE ASSHOWN IN SECTIONTHIS SHEET(E ) W A T E R M E T E R (R E L O C A T E ) D O M E S T I C B A C K F L O W S LINE OF BLDG ABOVELINE OF WALL ABOVE(2 ) P E D E S T A L M A I L B O X E SPARTIAL HEIGHTCONCRETE WALLSFULL HEIGHTCONCRETE WALLSH A T C H I N D I C A T E S R I G H T O F W A Y W O R K M A I N E N T R Y C O N C R E T E S I D E W A L K L A N D S C A P E D P A R K W A Y F I R E B A C K F L O W E X I S T I N G R E S I D E N C E E X I S T I N G R E S I D E N C EEXISTING COMMERCIAL BUILDING60" ØCONCRETE PAVING CONCRETE PAVING 19.0'24.0'19.0'RAISED PLANTERLANDSCAPINGLANDSCAPINGC R O S S W A L K R A M P T R A V E L D I S T A N C E = 6 6 .0 'A T -G R A D E P L A N T E R (T Y P F O R P L A N T E R S A L O N G C H U R C H ) P I V O T H I N G E D F A B R I C A T E D G A R A G E D O O R P I V O T H I N G E D F A B R I C A T E D G A R A G E D O O R MECH R E Q 'D T R A N S F O R M E R W O R K A R E A 6 "Ø C O N C B O L L A R D 1 0 .0 '8 .0 '9 .0 'EVCS PARKING SPACE WHEEL STOP, TYPPROPERTY LINE, TYPP /L P /L P /L P /LP/LP/LP/LP/LP/LP/LP/LP/LP /L P /L P /L P /L 2 A1.00 T E L E C O M M U N I C A T I O N S P O I N T O F E N T R Y (M P O E ) 4 Y R 4 Y T W A T E R M E T E R S16.0'13' - 0"21' - 6"3 0 .0 '20.0' 1 0 .0 '(N) POWERPOLE(N) POWERPOLECONCRETESIDEWALKCONCRETESIDEWALKL I N E O F W A L L A B O V E 3.5'9.5'7.5'29.5' 4 .1 '3 4 .2 'A1.03 1 4.8' 6 .0' 7 2 ° 1 0 ' 1 4 " 1 2 3 .8 0 'N E 17° 38' 22"100.00'NW7 2 ° 1 0 ' 1 4 " 1 2 3 .8 0 'S W 17° 38' 22"100.00'SE15.0'28.0' SIGNAGE: BULK TRASH COLLECTION AREA BY APPT. ONLY. ASK MANAGER FOR SCHEDULE 4 0 0 C F B U L K T R A S H (N ) S T R E E T L I G H T (N ) S T R E E T L I G H T S T R E E T F R O N T A G E D I M E N S I O N (1 5 +2 8 =4 3 )TOP OF WALLMOUNTEDBENCHES (x2)0 s f (0 %) O F Q U A L I F Y I N G O P E N I N G S 1 ,0 2 4 s f O F G R O U N D L E V E L W A L L A R E A 1 7 9 s f (2 0 %) O F Q U A L I F Y I N G O P E N I N G S 9 0 1 s f O F G R O U N D L E V E L W A L L A R E A 249sf (32%) OF QUALIFYING OPENINGS772sf OF GROUND LEVEL WALL AREATRANSFORMER &TRANSFORMER PADA1.05 1 P/L = PROPERTY LINE L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" 5.5' 13.5' 4.0'PROPERTY LINE7.4' 70" 44" BMP PLANTER BMP PLANTER WALL (JUST INSIDE P/L)These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:27:01 PM 9/15/2021 2:27:01 PMA1.00 SITE PLAN CHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/8" = 1'-0" SITE PLAN1 SITE PLAN NOTES 1. WHEN SHOWN IN SITE PLAN, ALL DIMENSIONS ARE TO FACE OF FINISH TO PROPERTY LINES, IMAGINARY LINES, SETBACKS, ETC., U.N.O. 2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 3. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. 4. SEE BUILDING PLANS FOR ALL OTHER NOTES AND DIMENSIONS NOT SHOWN HERE. 5. SEE ACCESSIBILITY NOTES AND DETAILS FOR ACCESSIBILITY INFORMATION. 6. SEE CIVIL AND LANDSCAPE FOR ADDITIONAL INFORMATION. 7. SEE CIVIL FOR GROUND LEVEL FINISH FLOOR ELEVATIONS. 8. ANY OFF-SITE IMPROVEMENTS SHOWN ARE FOR REFERENCE ONLY. SEE CIVIL AND LANDSCAPE IMPROVEMENT PLANS. SITE PLAN LEGEND 1/8" = 1'-0" POWER POLE SECTION2 GARAGE VENTILATION CALCULATION NORTH: (50+50+79) ÷ 901 = 20% EAST: (117+132) ÷ 772 = 32% SOUTH: (0) ÷ 1,024 = 0% WEST: (169+253) ÷ 999 = 42% TOTAL GARAGE WALL AREA: (N)901 + (E)772 + (S)1,024 + (W)999 = 3,696 [(50+50+79) + (117+132) + (169+253)] = 850 850 ÷ 3,696 = 23.0% SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 157 of 207 HSS4X4 COL, SSD HEAVY DUTY HINGE TRASH ENCLOSURE GATE, SEE DOOR SCHEDULE CONCRETE WALL PER PLAN L2 93' -0" ALLEY 81' -0"7' - 4"7' - 0"A1.03 5 A1.03 610' - 8"METAL TRASH DOORS STEEL COLUMN DOOR SUPPORT M-10 ? CANE BOLT HARDWARE ATTACHED TO FRAMING OF TRASH ENCLOSURE GATES PADLOCKED DEADBOLT HARDWARE @ EXTERIOR PROVIDE METAL SLEEVED CANE BOLT HOLE IN CONCRETE BELOW A 6 20' - 0"7' - 4" 10.0'10.0'12' - 0"12' - 0"ALLEY CENTERLINEVERIFY EXISTING FLAT CONCRETE PAD (24' x 12' MIN) 12' - 0"18' - 8"PROVIDE METAL SLEEVED CANE BOLT HOLES FOR BOTH OPEN & CLOSED GATE POSITIONS 4YR 4YT 6' - 0"9' - 4" 1' - 4" 9' - 0" 0' - 4" 4 A1.03 4 A1.03 DEFLECTORS AT BASE OF CHUTES, TYP CONCRETE CURB WHEEL STOPS, TYP @ ALL THREE WALLS 83"57"83"57" L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" A B 2HR CHUTE ENCLOSURE A B 6 TRASH CHUTE RECYCLE CHUTE 6' - 0"8' - 0"6' - 0"STORAGE COMM. 4 A1.03 4 A1.03 These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:28:17 PM 9/15/2021 2:28:17 PMA1.03 TRASH ENCLOSURE DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 TRASH ENCLOSURE NOTES FIRE DOOR @ BOTTOM OF THE CHUTE: A FUSIBLE LINK HELD SLIDING GATE PLACED AT AN 15 DEG ANGLE SWEEPS IN EVEN IF FIRE AND TEMPERATURE RISES TO 68 DEG C. THE GATE IS 1.5 HR 250° FIRE RATING. MANUAL CUT OFF DOORS ARE ALSO AVAILABLE AUTOMATIC BRUSH CLEANING SYSTEM A CYLINDRICAL HOUSING WITH REPLACEABLE STIFF NYLON BRUSHES IS AUTOMATICALLY LOWERED AND RAISED BY A GEARED ELECTRIC MOTOR. THE NYLON BRUSHES SCRAPE AND CLEAN THE INTERNAL SURFACE AS THEY MOVE DOWN AND UP THE CHUTE. THE WATER SUPPLY FOR FLUSHING THE CHUTE, THE ELECTRIC MOTOR AND THE BUILT IN SAFETY OVERLOADS, ARE ALL INDIVIDUALLY CONTROLLED BY A ROBUST ELECTRIC LOGIC CONTROL. THE BRISTLES ARE REPLACEABLE EASILY. ELECTRICAL REQUIREMENTS & TECHNICAL SPECIFICATIONS 1 HP, 3 PHASE, 5A SS WIRE ROPE MIN. 6MM THICK BRISTLES: MADE FROM PA 66, NYLON DEAD WEIGHT APPROX 5 KGS CENTRAL CLEANING SHOWER & OPTIONAL DISINFECTANT & SANITIZER SYSTEM CENTRAL 120 DEG SOLID CONE PROFILE DISCHARGE SPRINKLER PROVIDED ABOVE THE LAST INTAKE LEVEL, PLACED STRATEGICALLY TO PROVIDE FULL CIRCULAR COVERAGE. AN OPTIONAL DISINFECTANT & SANIITIZER SYSTEM IS DESIGNED TO GIVE MANUAL OR AUTOMATIC FLUSHING, SANITIZING AND DISINFECTION OF THE INTERNAL SURFACE OF THE KLEANCHUTE. IT MAY BE FITTED AT THE TOP OR CHUTE ROOM WITH ELECTRONIC SOLENOID VALVE CONTROLS, AS PART OF AN AUTOMATIC OR MANUAL CLEANING SYSTEM. A LOW MAINTENANCE PROPORTIONED VALVE SYSTEM PROVIDES A AUTO FLOW OF DISINFECTANT INTO THE CLEANING WATER EVERY CLEANING CYCLE. NOZZLES CAN BE VARIED & EASILY REPLACED TO SUIT VOLUME OF DISINFECTANT TO BE PROVIDED IN THE WATER FLOW. ELECTRICAL REQUIREMENTS & TECHNICAL SPECIFICATIONS CLEANING SPRINKLER 120 DEG CONE 1/2" IPS, 15 LPM, MINIMUM 1/2 BAR PRESSURE AT ALL LEVELS WATER SUPPLY 1/2 BAR HEADER TANK PRESSURE, AT LEAST 1800 MM ABOVE SPRAY HEAD. EACH FLOOR LEVEL SPRINKLERS ALSO NEED 1/2 BAR WATER PRESSURE. SOLENOIDS VALVE 1/2" - ELECTRICAL SINGLE PHASE FIRE SPRINKER 1/2" IPS, 68°C (165°F). WEATHERING COWL, INSECT SCREEN, VENTILATION WITH EXHAUST FAN A REDUCED DIAMETER VENTILATION SECTION ACCOMMODATING AND EXHAUST FAN AT THE CHUTE REDUCTION LEVEL OF HIGH RPM. THE EXHAUST FAN CAN BE TIMED TO OPERATE ONLY AT FIXED INTERVALS TO CONTROL NOISE AS WELL AS POWER WASTAGE. A PRIME REQUIREMENT FOR EFFECTIVE MECHCANICAL EXHAUST VENTILATION IS THE PROVISION OF FRESH INTAKE AIR AT THE BOTTOM FLOOR. ELECTRICAL REQUIREMENTS & TECHNICAL SPECIFICATIONS AIR DISPLACEMENT 200M3/HOUR. EXHAUST FAN MOTOR, CLASS H TROPICALIZED CONTINUOUSLY RATED, 1300 RPM. COMPONENTS: VENTILATION SECTION: AUTOMATIC BRUSH UNIT SANITIZER & DISINFECTANT EXHAUST FAN WEATHER COWL BIRD / INSECT SCREEN CENTRAL CLEANING FLOOR & INTAKE SECTION: INTAKE DOORS & HOPPERS USER ELECTRONIC CONTROL INTAKE THROAT SECTION CONNECTING PIPES FIRE SPRINKLERS DISCHARGE SECTION: FIRE DISCHARGE GATE BI-SORTER / TRI SORTER CENTRAL CONTROL PANEL ODOR CONTROL UNIT WALL ENCLOSURE: FIRE REGULATIONS STIPULATE THAT WHEN WITHIN THE BUILDING THEY SHOULD BE ENCLOSED WITHIN A 2 HR. FIRE RATED SHAFT. MATERIAL OF CONSTRUCTION: SS 304. HOT-DIP GALVANIZE ANGLE FRAMEWORK. CHUTE THICKNESS & COATINGS: MINIMUM THICKNESS OF 1.5 MM (16 GAUGE). SOUND DAMPENING COATS A MINIMUM DFT OF CHUTE THICKNESS. INTAKE HOPPER DOORS: DOORS SHOULD BE UL LISTED AND CARRY 1.5 HOURS FIRE RATING MINIMUM. DOORS SHOULD BE SELF CLOSING ON RELEASE & LATCHING SHOULD BE POSITIVE. SHAPE OF CHUTE: CIRCULAR CROSS SECTION. CHUTE SHOULD BE PERFECTLY VERTICAL WITH NO OFFSETS. SIZE OF CHUTE: NFPA PRESCRIBES CHUTES TO BE A MINIMUM 24" WIDE. TRASH CALCULATION 31 3" = 1'-0" TRASH GATE HINGE5 3/8" = 1'-0" TRASH ENCLOSURE WEST ELEVATION3 3" = 1'-0" TRASH GATE CANE BOLT6 USE A 4YARD BIN FOR TRASH & 4YARD BIN FOR RECYCLE, PICKUP x2/WK NOTES: • LANDSCAPING COMPANY REQUIRED TO RECYCLE YARD WASTE AND THEREFORE ELIMINATE NEED TO PROVIDE AREA FOR YARD WASTE CANS • BULK TRASH COLLECTION ARE BY APPOINTMENT ONLY. SEE MANAGER FOR SCHEDULE X 0.4 = 10.23 T = 10.23 R = 10.23 T = 10.23 R ÷ 8 ÷ 8 = 1 TRASH = 1 RECYCLE 3/8" = 1'-0" L1 TRASH ENCLOSURE PLAN1 1/2" = 1'-0" TRASH CHUTE SECTION4 3/8" = 1'-0" L2 TRASH CHUTE PLAN2 (LEVELS 3 & 4 SIMILAR) SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 158 of 207 12 N O Q 1' - 4" 3' - 2"6' - 10"84" 6 0 " Ø 8' - 4" 0' - 6" 0' - 6" 8' - 10"5' - 0" 3 A1.04 3 A1.04 4 A1.04 4 A1.04 12 N O Q 8' - 10"5' - 0" 6 0 " Ø 8' - 4" 0' - 6" 0' - 6" 84" 3 A1.04 3 A1.04 4 A1.04 4 A1.04 ELECTROMAGNETIC SMOKE DOOR, TYP @ L2, L3, L4 L1 82' -0" L2 93' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" 12 2HR ELEVATOR SHAFT L1 82' -0" L2 93' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" N O Q 2HR ELEVATOR SHAFT12' - 1" REQ'D CLEARThese drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:29:15 PM 9/15/2021 2:29:15 PMA1.04 ELEVATOR DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/2" = 1'-0" ELEVATOR PLAN - LEVEL 11 1/2" = 1'-0" ELEVATOR PLAN - LEVEL 22 ELEVATOR NOTES 1. ELEVATOR TO COMPLY WITH CBC §1009.4.1 1/4" = 1'-0" ELEVATOR SECTION AA3 1/4" = 1'-0" ELEVATOR SECTION BB4 (LEVELS 3 & 4 SIMILAR) SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 159 of 207 UP UP = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE A B 1 12 R 8 6 +81.2' +82.0' N O Q 4 5 4YR 4YT ELEC F.C. ELEV(TYP)8.5'6 0 " Ø CONCRETE PAVING CONCRETE PAVING 24.0'TRAVEL DISTANCE = 66.0' MECH 17' - 4" 2' - 0" 24' - 0"20' - 0"16' - 0"20' - 0"1' - 10"12' - 4"1' - 10"1' - 6"7' - 8"1' - 8"7' - 8"1' - 6"3' - 10"16' - 4"3' - 10"3' - 8"5' - 2" 5' - 8" 10' - 10"29' - 4"29' - 4"28' - 8"8' - 10" 5' - 0" 7' - 4"29' - 8"29' - 8"42' - 4"4' - 0" 3' - 4" 3' - 0" 4' - 0" 1' - 6"4' - 3" 4' - 5" 4' - 5" 4' - 3"16' - 0"STAIR #1 (2HR) STAIR #2 (2HR) A A4.00dr A A4.00dr B A4.00dr B A4.00dr 9' - 4"1' - 4"28' - 0"2' - 4" 15' - 4"15' - 0"17' - 4"G0.03 3 G0.03 1 D1 D1 D7 D3 D4 D4 D1 D7 XFRMR7' - 4" 8' - 0"These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:32:06 PM 9/15/2021 2:32:06 PMA2.00 LEVEL 1 FLOOR PLANCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 DRAWING NOTES 1. WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE, CENTERLINE OF COLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, TYP, UON 2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 3. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. 4. SEE SITE PLAN FOR OVERALL SITE DIMENSIONS AND NOTES NOT SHOWN. 5. WINDOW TYPES AND LOCATIONS SHALL BE AS PER BUILDING PLANS, NOT ENLARGED PLANS. 6. SEE ENLARGED PLANS FOR DIMENSIONS, TAGS, KEYNOTES, NOTES, ETC. NOT SHOWN. 7. REFER TO CIVIL FOR LEVEL ONE FINISH FLOOR ELEVATIONS. 8. SEE REFLECTED CEILING PLANS FOR LOCATIONS AND DIMENSIONS OF SOFFITED AREAS. 9. PROVIDE AND INSTALL 2X FLAT WOOD BLOCKING OR 16GA METAL STRAPPING FOR ALL BATH ACCESSORIES, HANDRAILS, CABINETS, TOWEL BARS, WALL MOUNTED FIXTURES AND ANY OTHER ITEMS ATTACHED TO WALLS. 10. AT AREAS OF TRANSITION BETWEEN DIFFERENT WALL ASSEMBLIES, CONTINUE THICKEST LAYER OF SUBSTRATE OR FINISH TO PROVIDE A FLUSH FINISHED SURFACE IN ALL DIRECTIONS TO NEAREST PERPENDICULAR SURFACE (WALL, CEILING, ETC.), TYP, UON 11. ALL BLOCKOUTS IN SLABS, WALLS, FOOTINGS AND P.T. SLABS WHERE OCCUR SHALL BE COORDINATED AND PROVIDED, EVEN IF NOT SPECIFICALLY SHOWN ON DRAWINGS. 12. WHERE OCCURS, DECKS AND BALCONIES SHALL HAVE A DESIGN SLOPE OF A MINIMUM OF ONE-FOURTH UNIT VERTICAL IN 12 UNITS HORIZONTAL (2-PERCENT SLOPE) FOR DRAINAGE. 13. OCCUPIABLE SPACES, HABITABLE SPACES AND CORRIDORS SHALL HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET 6 INCHES. BATHROOMS, TOILET ROOMS, KITCHENS, STORAGE ROOMS AND LAUNDRY ROOMS SHALL BE PERMITTED TO HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET. (CBC §1208.2) 14. DOOR JAMBS ARE LOCATED 4" FROM PERPENDICULAR WALL, TYP, UON 15. FOR TRASH ENCLOSURES, THE AREA SHOULD BE IDENTIFIED FOR THE RECYCLING PAPER, CORRUGATED CARDBOARD, GLASS, PLASTICS, ORGANIC WASTE AND METAL. [CALGREEN 5.410.1] FLOOR PLAN LEGEND FLOOR PLAN KEYNOTES ID DESCRIPTION 01 RECESS-MOUNTED FIRE EXTINGUISHER CABINET 02 TRASH/RECYCLING CHUTE. CHUTE INTAKE DOORS TO BE AUTOMATIC CLOSING AND DISCHARGE WITH POSITIVE LATCHING, TO REMAIN LATCHED AND CLOSED PER CBC 716.5.9.1.1 90 MIN RATED WITH 30 MIN TEMP. RISE TO 250 DEG. F., UL LABELED PER UL10B. FULL DIA. VENT EXTENDING 36" ABOVE ROOF WITH HINGED METAL SAFETY CAP 05 24" TALL PREFABRICATED FIBERGLASS PLANTER BOX 3/16" = 1'-0" LEVEL 1 FLOOR PLAN1 SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 160 of 207 DN UP DWDWDW DWMWMW UP DNMWQUEENQUEENDWMWDWMWDWMWDWMWDW MWMWDWDOUBLEDOUBLE MWDW DOUBLEMWDWDOUBLE MWA A B 1 1212 R OPEN ABOVE OPEN ABOVE OPEN ABOVE OPEN ABOVE 3' - 6"8 66 10' - 0"21' - 8"18' - 4"12' - 0"28' - 0"6' - 0"M D E 9' - 4" 15' - 10"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 6" F G H 22' - 0"22' - 0"22' - 0"22' - 0"21' - 0"8' - 10" I J K L N O P Q 33 4 7 5 99 10 22 11 10' - 0"29' - 0"11' - 0"29' - 4"20' - 0"7' - 0" 3' - 0"4' - 4" 6' - 8" 13' - 4"7' - 0" 3' - 0"3' - 2"0' - 2"A1 A2 A2 A2 A2 A2 A3 B3B2B2B2 B1 D2 U1U1U1U1U1U1U1 U1U1U1U1 U1 W05 W03 W01 U2 W06 W04 U2 W06W04 U2 W04 U2 W04 U2 U4 U4 U5 W02 W02 W06 W06 W06 W06 W06 U4 U3 U4 U6 U4 U3 U4 U6 W06 W06 W06 W06 W06 W06 U4 U4 U5 FUR WALL FOR GWB 01 017' - 6" 5' - 0" 7' - 6"6' - 0"COMMSTORAGE6' - 0"STAIR #1 (2HR) STAIR #2 (2HR) A A4.00dr A A4.00dr B A4.00dr B A4.00dr 7' - 6"9' - 6"A6.02 5 A6.02 6 D5 D5 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 D8 A6.00 1 A6.00 2 A6.00 4 A6.00 2 A6.00 1 A6.00 3 5' - 8" 0' - 4"3' - 0"32' - 0"U2 U2 U2 U2 U2 U2 U2 W06W06W06W06W06W06W06 W06W06 A6.09 9 D1 A2.13 1 A2.14 1 A2.15 1 A2.12 1 A2.11 1 A2.10 1 27" 18" 36" W07 U4 U4 U5 U5 U4 U4 U3 U4 U4 U5 U3 U3 U4 U3 U4 U6 U3 = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE 1. WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE, CENTERLINE OF COLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, (UON) 2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 3. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. 4. SEE SITE PLAN FOR OVERALL SITE DIMENSIONS AND NOTES NOT SHOWN. 5. ALL GRID LINES INDICATE CENTER OF STRUCTURAL WALL OR FACE OF STRUCTURAL MATERIAL, (UON) 6. WINDOW/DOOR TYPES AND LOCATIONS SHALL BE AS PER BUILDING PLANS, NOT ENLARGED PLANS. 7. SEE ENLARGED PLANS FOR DIMENSIONS, TAGS, KEYNOTES, NOTES, ETC. NOT SHOWN. 8. REFER TO CIVIL AND STRUCTURAL FOR LEVEL ONE FINISH FLOOR ELEVATIONS. 9. SEE FINISH SCHEDULES FOR TYPICAL FINISHES, (UON) 10. SEE REFLECTED CEILING PLANS FOR LOCATIONS AND DIMENSIONS OF SOFFITED AREAS. 11. PROVIDE AND INSTALL 2X FLAT WOOD BLOCKING OR 16GA METAL STRAPPING FOR ALL BATH ACCESSORIES, HANDRAILS, CABINETS, TOWEL BARS, WALL MOUNTED FIXTURES AND ANY OTHER ITEMS ATTACHED TO WALLS. 12. ALL CHANGES IN FLOOR MATERIALS OCCUR AT CENTERLINE OF DOOR OR FRAMED OPENINGS UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 13. AT AREAS OF TRANSITION BETWEEN DIFFERENT WALL ASSEMBLIES, CONTINUE THICKEST LAYER OF SUBSTRATE OR FINISH TO PROVIDE A FLUSH FINISHED SURFACE IN ALL DIRECTIONS TO NEAREST PER- PENDICULAR SURFACE (WALL, CEILING, ETC.), (UON) 14. PROVIDE BATT INSULATION AT INTERIOR WALLS FOR ACOUSTIC PURPOSES AT CORRIDORS, BATHROOMS, LAUNDRY ROOMS AND PARTY WALLS WHERE OCCURS, (UON) 15. ALL BLOCKOUTS IN SLABS, WALLS, FOOTINGS AND P.T. SLABS (WHERE OCCURS) SHALL BE COORDINATED AND PROVIDED, EVEN IF NOT SPECIFICALLY SHOWN ON DRAWINGS. 16. WHERE OCCURS, DECKS AND BALCONIES SHALL HAVE A DESIGN SLOPE OF A MINIMUM OF ONE-FOURTH UNIT VERTICAL IN 12 UNITS HORIZONTAL (2-PERCENT SLOPE) FOR DRAINAGE. 17. OCCUPIABLE SPACES, HABITABLE SPACES AND CORRIDORS SHALL HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET 6 INCHES. BATHROOMS, TOILET ROOMS, KITCHENS, STORAGE ROOMS AND LAUNDRY ROOMS SHALL BE PERMITTED TO HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET. 18. DOOR JAMBS ARE LOCATED 4" FROM PERPENDICULAR WALL, (UON) OPEN ABOVE OPEN ABOVE OPEN ABOVE OPEN ABOVE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:33:25 PM 9/15/2021 2:33:25 PMA2.02 LEVEL 2 FLOOR PLANCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 DRAWING NOTES LEVEL 2 TOTAL OCCUPANT LOAD: 43 OCCUPANTS (1/200GROSS) TOTAL # OF DWELLING UNITS: 12 UNITS PRINCIPAL CLASSIFICATION: R-2 (RESIDENTIAL) OCCUPANCY SEPARATION: 1 HR (BETWEEN DWELLINGS) CONSTRUCTION TYPE: Vb (R-2) FIRE RESISTIVE CONSTRUCTION (Vb): 1 HR EXT. BEARING WALLS 0 HR INT. NON-BEARING WALLS 1 HR FLOOR/CEILING ASSEMBLIES 1 HR ROOF/CEILING ASSEMBLIES 2 HR SHAFT ENCLOSURES 1 HR CORRIDOR WALLS 1 HR DEMISING WALLS # OF EXITS REQUIRED: 2 EXITS # OF EXITS PROVIDED: 2 EXITS 3/16" = 1'-0" LEVEL 2 FLOOR PLAN1 FLOOR PLAN LEGEND FLOOR PLAN KEYNOTES ID DESCRIPTION 01 RECESS-MOUNTED FIRE EXTINGUISHER CABINET 02 TRASH/RECYCLING CHUTE. CHUTE INTAKE DOORS TO BE AUTOMATIC CLOSING AND DISCHARGE WITH POSITIVE LATCHING, TO REMAIN LATCHED AND CLOSED PER CBC 716.5.9.1.1 90 MIN RATED WITH 30 MIN TEMP. RISE TO 250 DEG. F., UL LABELED PER UL10B. FULL DIA. VENT EXTENDING 36" ABOVE ROOF WITH HINGED METAL SAFETY CAP 05 24" TALL PREFABRICATED FIBERGLASS PLANTER BOX L2 GROSS BLDG 8,704 SF 8,704 SF 1" = 20'-0" LEVEL 2 DRAINAGE PLAN2 SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 161 of 207 DNUP UP DN DWMW DW MWDWMW DW MWDWMW DW MWDW MWDW MWDWDOUBLE MWMWDW DOUBLEMWDWDOUBLE DWMW DOUBLEA A B 1 12 R 8 66 M FF-1 C D E F G H I J K L N O P Q 33 4 77 5 9 1010 22 1111 A1 A2 A2 A2 A2 A2 A3 B3B2B2B2 B1 3' - 6"10' - 0"21' - 8"18' - 4"12' - 0"28' - 0"6' - 0"9' - 4" 15' - 10"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 6" 22' - 0"22' - 0"22' - 0"22' - 0"21' - 0"8' - 10" 5' - 0"10' - 0"29' - 0"11' - 0"29' - 4"20' - 0"7' - 0" 3' - 6" 20' - 0" 5' - 6" 4' - 4" 6' - 8" 13' - 4"7' - 0" 3' - 0"3' - 2"0' - 2"COMM6' - 0"7' - 6"5' - 0"7' - 6"STORAGESTAIR #1 (2HR) STAIR #2 (2HR) A A4.00dr A A4.00dr B A4.00dr B A4.00dr6' - 0"OPEN ABOVE OPEN ABOVE OPEN ABOVE OPEN ABOVE A6.02 7 A6.02 8 4"U1 U1 U1U1U1U1U1U1U1 U1 U1 U1 D2 W05 W03 W01 W02 W04 W04W04W04 D5 D5 W06 W06 W06 W06 W06 W06 W06 W06 W06 W06 W06 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 D8 U2 U2 U2 U2 U2 U2 U2 A6.09 9 D1 W06 W06 W06 W06 W06 W06 W06 U2 W06 W06 U2 U2 W06 W06 U2 W02 W07 U3 U4 U4 U5 U4 U4 U5 U5 U3 U4 U4 U4 U5 U3 U3 U4 U5 U4 1. WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE, CENTERLINE OF COLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, (UON) 2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 3. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. 4. SEE SITE PLAN FOR OVERALL SITE DIMENSIONS AND NOTES NOT SHOWN. 5. ALL GRID LINES INDICATE CENTER OF STRUCTURAL WALL OR FACE OF STRUCTURAL MATERIAL, (UON) 6. WINDOW/DOOR TYPES AND LOCATIONS SHALL BE AS PER BUILDING PLANS, NOT ENLARGED PLANS. 7. SEE ENLARGED PLANS FOR DIMENSIONS, TAGS, KEYNOTES, NOTES, ETC. NOT SHOWN. 8. REFER TO CIVIL AND STRUCTURAL FOR LEVEL ONE FINISH FLOOR ELEVATIONS. 9. SEE FINISH SCHEDULES FOR TYPICAL FINISHES, (UON) 10. SEE REFLECTED CEILING PLANS FOR LOCATIONS AND DIMENSIONS OF SOFFITED AREAS. 11. PROVIDE AND INSTALL 2X FLAT WOOD BLOCKING OR 16GA METAL STRAPPING FOR ALL BATH ACCESSORIES, HANDRAILS, CABINETS, TOWEL BARS, WALL MOUNTED FIXTURES AND ANY OTHER ITEMS ATTACHED TO WALLS. 12. ALL CHANGES IN FLOOR MATERIALS OCCUR AT CENTERLINE OF DOOR OR FRAMED OPENINGS UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 13. AT AREAS OF TRANSITION BETWEEN DIFFERENT WALL ASSEMBLIES, CONTINUE THICKEST LAYER OF SUBSTRATE OR FINISH TO PROVIDE A FLUSH FINISHED SURFACE IN ALL DIRECTIONS TO NEAREST PER- PENDICULAR SURFACE (WALL, CEILING, ETC.), (UON) 14. PROVIDE BATT INSULATION AT INTERIOR WALLS FOR ACOUSTIC PURPOSES AT CORRIDORS, BATHROOMS, LAUNDRY ROOMS AND PARTY WALLS WHERE OCCURS, (UON) 15. ALL BLOCKOUTS IN SLABS, WALLS, FOOTINGS AND P.T. SLABS (WHERE OCCURS) SHALL BE COORDINATED AND PROVIDED, EVEN IF NOT SPECIFICALLY SHOWN ON DRAWINGS. 16. WHERE OCCURS, DECKS AND BALCONIES SHALL HAVE A DESIGN SLOPE OF A MINIMUM OF ONE-FOURTH UNIT VERTICAL IN 12 UNITS HORIZONTAL (2-PERCENT SLOPE) FOR DRAINAGE. 17. OCCUPIABLE SPACES, HABITABLE SPACES AND CORRIDORS SHALL HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET 6 INCHES. BATHROOMS, TOILET ROOMS, KITCHENS, STORAGE ROOMS AND LAUNDRY ROOMS SHALL BE PERMITTED TO HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET. 18. DOOR JAMBS ARE LOCATED 4" FROM PERPENDICULAR WALL, (UON) = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE OPEN ABOVE OPEN ABOVE OPEN ABOVE OPEN ABOVE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:36:20 PM 9/15/2021 2:36:20 PMA2.04 LEVEL 3 FLOOR PLANCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 3/16" = 1'-0" LEVEL 3 FLOOR PLAN1 DRAWING NOTES FLOOR PLAN LEGEND LEVEL 3 TOTAL OCCUPANT LOAD: 43 OCCUPANTS (1/200GROSS) TOTAL # OF DWELLING UNITS: 12 UNITS PRINCIPAL CLASSIFICATION: R-2 (RESIDENTIAL) OCCUPANCY SEPARATION: 1 HR (BETWEEN DWELLINGS) CONSTRUCTION TYPE: Vb (R-2) FIRE RESISTIVE CONSTRUCTION (Vb): 1 HR EXT. BEARING WALLS 0 HR INT. NON-BEARING WALLS 1 HR FLOOR/CEILING ASSEMBLIES 1 HR ROOF/CEILING ASSEMBLIES 2 HR SHAFT ENCLOSURES 1 HR CORRIDOR WALLS 1 HR DEMISING WALLS # OF EXITS REQUIRED: 2 EXITS # OF EXITS PROVIDED: 2 EXITS L3 GROSS BLDG 8,704 SF 8,704 SF 1" = 20'-0" LEVEL 3 DRAINAGE PLAN2 SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 162 of 207 DN QUEENQUEENDWMW DW MWDWMW DW MWDWMW DW MWDW MWA B 1 12 R 8 6 M MACHINE ROOM OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW E F H J L N O P Q 3 4 7 5 99 1010 2 11113' - 0"29' - 0"11' - 0"29' - 4"20' - 0"10' - 8" 6' - 0" 3' - 4"4' - 4" 6' - 8" 13' - 4" 9' - 4" 15' - 10"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 6"10' - 0"21' - 8"7' - 4" 11' - 0" 12' - 0"34' - 0"3' - 0" 7' - 0"4' - 0" 3' - 0"6' - 0"0' - 2" 3' - 2" A1 A2 A2 A2 A2 A2 A3 COMM6' - 0"8' - 0"6' - 0"STORAGESTAIR #1 (2HR) STAIR #2 (2HR) A A4.00dr A A4.00dr B A4.00dr B A4.00dr ROOF DECK (AREA = 2,517sf OLF = 15net OL = 120) U1U1U1U1U1U1U1 D2 W05 W03 W01 D5 D5 D5 W06 W06 W06 W06 W06 W06 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 U4 U3 U4 U6 D8 01 02 (NEED A MIN. OF 10" OF ELEV. CHANGE FOR DRAINAGE)43' - 0"U2 U2 U2 U2 U2 U2 U2 A6.09 9 D1 12' - 0"11' - 0"W06 W06 W06 W06 W06 W06 W06 1. WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE, CENTERLINE OF COLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, (UON) 2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 3. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. 4. SEE SITE PLAN FOR OVERALL SITE DIMENSIONS AND NOTES NOT SHOWN. 5. ALL GRID LINES INDICATE CENTER OF STRUCTURAL WALL OR FACE OF STRUCTURAL MATERIAL, (UON) 6. WINDOW/DOOR TYPES AND LOCATIONS SHALL BE AS PER BUILDING PLANS, NOT ENLARGED PLANS. 7. SEE ENLARGED PLANS FOR DIMENSIONS, TAGS, KEYNOTES, NOTES, ETC. NOT SHOWN. 8. REFER TO CIVIL AND STRUCTURAL FOR LEVEL ONE FINISH FLOOR ELEVATIONS. 9. SEE FINISH SCHEDULES FOR TYPICAL FINISHES, (UON) 10. SEE REFLECTED CEILING PLANS FOR LOCATIONS AND DIMENSIONS OF SOFFITED AREAS. 11. PROVIDE AND INSTALL 2X FLAT WOOD BLOCKING OR 16GA METAL STRAPPING FOR ALL BATH ACCESSORIES, HANDRAILS, CABINETS, TOWEL BARS, WALL MOUNTED FIXTURES AND ANY OTHER ITEMS ATTACHED TO WALLS. 12. ALL CHANGES IN FLOOR MATERIALS OCCUR AT CENTERLINE OF DOOR OR FRAMED OPENINGS UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 13. AT AREAS OF TRANSITION BETWEEN DIFFERENT WALL ASSEMBLIES, CONTINUE THICKEST LAYER OF SUBSTRATE OR FINISH TO PROVIDE A FLUSH FINISHED SURFACE IN ALL DIRECTIONS TO NEAREST PER- PENDICULAR SURFACE (WALL, CEILING, ETC.), (UON) 14. PROVIDE BATT INSULATION AT INTERIOR WALLS FOR ACOUSTIC PURPOSES AT CORRIDORS, BATHROOMS, LAUNDRY ROOMS AND PARTY WALLS WHERE OCCURS, (UON) 15. ALL BLOCKOUTS IN SLABS, WALLS, FOOTINGS AND P.T. SLABS (WHERE OCCURS) SHALL BE COORDINATED AND PROVIDED, EVEN IF NOT SPECIFICALLY SHOWN ON DRAWINGS. 16. WHERE OCCURS, DECKS AND BALCONIES SHALL HAVE A DESIGN SLOPE OF A MINIMUM OF ONE-FOURTH UNIT VERTICAL IN 12 UNITS HORIZONTAL (2-PERCENT SLOPE) FOR DRAINAGE. 17. OCCUPIABLE SPACES, HABITABLE SPACES AND CORRIDORS SHALL HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET 6 INCHES. BATHROOMS, TOILET ROOMS, KITCHENS, STORAGE ROOMS AND LAUNDRY ROOMS SHALL BE PERMITTED TO HAVE A CEILING HEIGHT OF NOT LESS THAN 7 FEET. 18. DOOR JAMBS ARE LOCATED 4" FROM PERPENDICULAR WALL, (UON) = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW 9' - 6"9' - 6"These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:39:03 PM 9/15/2021 2:39:03 PMA2.06 LEVEL 4 FLOOR PLANCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 DRAWING NOTES 3/16" = 1'-0" LEVEL 4 FLOOR PLAN1 FLOOR PLAN LEGEND L4 GROSS BLDG 5,324 SF 5,324 SF LEVEL 4 TOTAL OCCUPANT LOAD:43 OCCUPANTS (1/200GROSS) TOTAL # OF DWELLING UNITS: 12 UNITS PRINCIPAL CLASSIFICATION: R-2 (RESIDENTIAL) OCCUPANCY SEPARATION: 1 HR (BETWEEN DWELLINGS) CONSTRUCTION TYPE: Vb (R-2) FIRE RESISTIVE CONSTRUCTION (Vb): 1 HR EXT. BEARING WALLS 0 HR INT. NON-BEARING WALLS 1 HR FLOOR/CEILING ASSEMBLIES 1 HR ROOF/CEILING ASSEMBLIES 2 HR SHAFT ENCLOSURES 1 HR CORRIDOR WALLS 1 HR DEMISING WALLS # OF EXITS REQUIRED: 2 EXITS # OF EXITS PROVIDED: 2 EXITS 1" = 20'-0" LEVEL 4 DRAINAGE PLAN2 SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 163 of 207 1/4" / 1'-0"1/4" / 1'-0"1/4" / 1'-0"DECK DRAIN, ROUTE TO IN-WALL DOWNSPOUT, TYP ROOF CRICKET, TYP AREA DEDICATED TO ROOF MOUNTED MECHANICAL EQUIPMENT, (SEE NOTE #5)7 5/8" / 1'-0"ROOF DECK (BELOW) 1/4:12 DRAINAGE DIRECTIONAL ARROW THROUGH-WALL SCUPPER CRICKET, TYP31' - 6 1/2"9' - 10"20' - 0"20' - 0"10' - 0" = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE 1. WHEN SHOWN IN PLAN, ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CONCRETE, CENTERLINE OF COLUMNS, OR CENTERLINE OF WALL ASSEMBLIES, (UON) 2. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 3. ALL CLEAR DIMENSIONS ARE NOT TO BE ADJUSTED WITHOUT APPROVAL OF THE ARCHITECT. 4. SEE PLUMBING DRAWINGS FOR ROOF DRAINS THAT CONNECT UNDER- GROUND TO STORM DRAIN SYSTEM. 5. NO APPLIANCES, MECHANICAL EQUIPMENT, FANS, ROOF HATCH OPENINGS OR OTHER COMPONENTS THAT REQUIRE SERVICE SHALL BE LOCATED WITHIN 10-FEET OF A ROOF EDGE WITHOUT A 42" PARAPET OR GUARDRAIL MINIMUM. GUARDS ARE NOT REQUIRED WHERE THE OWNER PROVIDES PERMANENT FALL ARREST/RESTRAINT ANCHORAGE CONNECTOR DEVICES IN COMPLIANCE WITH ANSI/ASSE Z 359.1. 6. PROVIDE SCREENING ON ALL SIDES OF ALL ROOF MOUNTED EQUIPMENT. BUILDING IS LOCATED IN CLIMATE ZONE 7. NON-TRUSS ROOFS AND PROJECTIONS ARE UNVENTED PER CBC 1203.3.These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:26:19 PM 9/15/2021 3:26:19 PMA2.08 ROOF PLAN CHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 3/16" = 1'-0" ROOF PLAN1 DRAWING NOTES ROOF PLAN LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 164 of 207 DWMW B B 11 66 E E 33 44 77 22 OPEN ABOVE 15' - 10" A1 A2.10 A B A2.10 C D40' - 0"11' - 6" 4' - 0" 5' - 2" 2' - 2"ADD RC CHANNELS ON INT. FACE FOR GWB @ CONC17' - 2"6' - 0"5' - 6"4' - 0"7' - 4"2' - 8"14' - 6"6' - 0"0' - 2"5' - 10" 5' - 6" 4' - 6" 10' - 6" 5' - 4" 6' - 10" 3' - 8" 3' - 1" 2' - 3" 8' - 2" 3' - 8" 4' - 0" 16" B B 11 66 E E 33 44 77 22 +7'-6" +8'-0" +9'-0" (TYP) FIBER-CEMENT 2' - 0"2' - 0"4' - 0"1' - 4" SP L2 93' -0"36"18"30"12"6"42"36"24 1/4"1 1/2"33" SOFFIT +6.0' WF-1 WF-1 WF-1 12"30"36"25"3/4"32 1/4"3/4" L2 93' -0"12"30"18"36"6"SOFFIT TO BURNERS24" CLRCF-1 CF-1 ? 12 3/4" 30" 30" 18" L2 93' -0" WF-1 WF-1 72"36"12" 48" CF-1 L2 93' -0"72"80"WF-1 WF-1 = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:16:55 PM 9/15/2021 3:16:55 PMA2.10 UNIT A1 DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/4" = 1'-0" UNIT A1 FLOOR PLAN1 1/4" = 1'-0" UNIT A1 REFLECTED CEILING PLAN2 1/2" = 1'-0" A1 KITCHEN ELEVATIONA 1/2" = 1'-0" A1 KITCHEN ELEVATIONB 1/2" = 1'-0" A1 BATHROOM ELEVATIONC 1/2" = 1'-0" A1 BATHROOM ELEVATIOND A KITCHEN PERSPECTIVE3 UNIT TYPE A1 660 SF FLOOR PLAN LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 165 of 207 MWDW MW11 66 E E F F 33 44 77 22 OPEN ABOVE 16' - 0" A2 11' - 0"40' - 0"6' - 0"0' - 2"16' - 0" 2' - 3" 7' - 3" 6' - 6"6' - 0"5' - 6"4' - 0"7' - 4"17' - 2"40' - 0"16' - 0" A2.11 A B A2.11 C D 4' - 6" 5' - 6" 6' - 0"2' - 8"2' - 2"5' - 2"11 66 E E F F 33 44 77 22 +7'-6" +8'-0" +9'-0" (TYP) SP 2' - 0"2' - 0" +8'-0" +8'-0" U14' - 0"1' - 4" L2 93' -0" SOFFIT WF-1 L2 93' -0" SOFFIT 90"WF-1 WF-1 WF-1 L2 93' -0" L2 93' -0" WF-1 = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:17:07 PM 9/15/2021 3:17:07 PMA2.11 UNIT A2 DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/4" = 1'-0" UNIT A2 FLOOR PLAN1 1/4" = 1'-0" UNIT A1 REFLECTED CEILING PLAN2 1/2" = 1'-0" A2 KITCHEN ELEVATIONA 1/2" = 1'-0" A2 KITCHEN ELEVATIONB 1/2" = 1'-0" A2 BATHROOM ELEVAITONC 1/2" = 1'-0" A2 BATHROOM ELEVAITOND A KITCHEN PERSPECTIVE3 UNIT TYPE A2 640 SF FLOOR PLAN LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 166 of 207 MWDW MW11 R R 66 M M P P 33 44 77 55 22 16' - 6" A3 40' - 0"11' - 0"40' - 0"6' - 0"0' - 2"8' - 0"3' - 0"12' - 0"28' - 0"0' - 8"4' - 0"1' - 4"11' - 0"4' - 0"3' - 6"5' - 2"2' - 2"8' - 11"3' - 9"4' - 6"4' - 6" 5' - 6" 4' - 6" 2' - 0" 18' - 2" 2' - 3" 3' - 11" 12' - 0" 4' - 0" 2' - 4" 10' - 2" 1' - 8" A2.12 A B A2.12 C D 9' - 0"2' - 8"11 R R 66 M M P P 33 44 77 55 22 +7'-6" +8'-0" +9'-0" (TYP)4' - 0"2' - 0"2' - 0"2' - 0" 1' - 4" SP L2 93' -0" SOFFIT SOFFIT L2 93' -0" SOFFITWF-1 WF-1 L2 93' -0" L2 93' -0" WF-1 = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:17:37 PM 9/15/2021 3:17:37 PMA2.12 UNIT A3 DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/4" = 1'-0" UNIT A3 FLOOR PLAN1 1/4" = 1'-0" UNIT A3 REFLECTED CEILING PLAN2 1/2" = 1'-0" A3 KITCHEN ELEVATIONA 1/2" = 1'-0" A3 KITCHEN ELEVATIONB 1/2" = 1'-0" A3 BATHROOM ELEVATIONC 1/2" = 1'-0" A3 BATHROOM ELEVATIOND A3 KITCHEN PERSPECTIVE3 UNIT TYPE A3 660 SF FLOOR PLAN LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 167 of 207 DWMWDOUBLEA A 1212 66 D D 77 99 1010 1111 OPEN ABOVE 22' - 0"10' - 0"29' - 0"11' - 0"7' - 0"3' - 0"10' - 6"7' - 8"10' - 10"4' - 4"6' - 8"B1 10' - 10" 3' - 11" 5' - 0" 2' - 3"3' - 6"3' - 6"3' - 0"29' - 0"5' - 9"3' - 6"7' - 0"2' - 6"5' - 2"9' - 0" 4' - 0" 3' - 0" 6' - 0" 13' - 0"9' - 0" 11' - 0"11' - 0"10' - 6"7' - 8"4' - 4"6' - 6"A2.13A B A2.13 C DSTORAGE 3' - 9" 2' - 3" A A 1212 66 D D 77 99 1010 1111 +8'-0" +9'-0" (TYP) +7'-6"24"24"24"24"1' - 4"SPL2 93' -0" SOFFIT 30"18"36"18" 36" 24 1/2" 16"6"30"54"WF-1 WF-1 WF-1 L2 93' -0"6"30"18"36"24"WF-1 CF-1 WF-1 33"18 3/4"30"30"12 3/4" 18" 30" 18" L2 93' -0"34"WF-1 WF-1 48"40"L2 93' -0"80"WF-1 WF-1 = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:17:46 PM 9/15/2021 3:17:46 PMA2.13 UNIT B1 DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/4" = 1'-0" UNIT B1 FLOOR PLAN1 1/4" = 1'-0" UNIT B1 REFLECTED CEILING PLAN2 B1 KITCHEN PERSPECTIVE3 1/2" = 1'-0" B1 KITCHEN ELEVATIONA 1/2" = 1'-0" B1 KITCHEN ELEVATIONB 1/2" = 1'-0" B1 BATHROOM ELEVATIONC 1/2" = 1'-0" B1 BATHROOM ELEVATIOND UNIT TYPE B1 638 SF FLOOR PLAN LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 168 of 207 MWDWDOUBLE 1212 66 D D G G 77 99 1010 1111 22' - 0"10' - 0"29' - 0"11' - 0"B2 3' - 6"3' - 6"3' - 0"10' - 6"2' - 6"5' - 2"10' - 10"5' - 9"OPEN ABOVE 7' - 0"13' - 6"4' - 0"3' - 8"4' - 0"6' - 10"3' - 6"3' - 6"32' - 0"13' - 6" 3' - 0" 5' - 6" 22' - 0" A2.14 C D A2.14 A 6' - 4" 5' - 6" 7' - 6" 2' - 8" B 3' - 3" 2' - 3"9' - 0" 4' - 6" 1' - 0"2' - 0" 10' - 6" 4' - 0" 7' - 6" 1212 66 D D G G 77 99 1010 1111 +8'-0" +9'-0" (TYP) +7'-6"SUB24"60"72"42"EQ EQ 31" +8'-0" 1' - 4"24"L2 93' -0" 55" 6"Ø 4"Ø = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE L2 93' -0" 15" BREADBOARD 15" BREADBOARD L2 93' -0"8' - 0"L2 93' -0" WF-1 These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:18:05 PM 9/15/2021 3:18:05 PMA2.14 UNIT B2 DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/4" = 1'-0" UNIT B2 FLOOR PLAN1 1/4" = 1'-0" UNIT B2 REFLECTED CEILING PLAN2 B2 KITCHEN PERSPECTIVE3 1/2" = 1'-0" B2 KITCHEN ELEVATIONA UNIT TYPE B2 704 SF FLOOR PLAN LEGEND 1/2" = 1'-0" B2 KITCHEN ELEVATIONB 1/2" = 1'-0" B2 BATHROOM ELEVATIONC 1/2" = 1'-0" B2 BATHROOM ELEVATIOND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 169 of 207 DW QUEENMW1212 66 K K N N 77 1010 1111 21' - 0" B3 01 OPEN ABOVE 2' - 8" 7' - 6" 5' - 6" 5' - 4"7' - 0"32' - 0"11' - 0"3' - 6"3' - 6"13' - 6"4' - 0"3' - 8"4' - 4"6' - 6"5' - 9"13' - 6"7' - 8"10' - 10"2' - 6"5' - 2"6' - 8" 4' - 2" 10' - 2" 2' - 8" A2.15 B C A2.15 A 21' - 0" 5' - 6" 3' - 0" 12' - 6" 4' - 0" 8' - 6"2' - 3" 3' - 3" 1212 66 K K N N 77 1010 1111 +8'-0" +9'-0" (TYP) +7'-6" +8'-0" 1' - 4"60"72"42"31"24"24"EQ EQ SUBL2 93' -0"36" 18" SOFFIT WF-1 WF-1 L2 93' -0" WF-1 WF-1 L2 93' -0" WF-1 WF-1 = NON-RATED WALL = 1HR WALL = 2HR WALL 1t = DOOR TAG, SEE DOOR SCHEDULE, SHEET _______ = WINDOW TAG, SEE WINDOW SCHEDULE, SHEET _______1t = WALL TAG, SEE WALL ASSEMBLIES, SHEET _______1i = BUILT-UP TRAFFIC COATING FOR DRAINAGE These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:18:22 PM 9/15/2021 3:18:22 PMA2.15 UNIT B3 DRAWINGSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 1/4" = 1'-0" UNIT B3 FLOOR PLAN1 1/4" = 1'-0" UNIT B3 REFLECTED CEILING PLAN2 B3 KITCHEN PERSPECTIVE3 1/2" = 1'-0" B3 KITCHEN ELEVATIONA 1/2" = 1'-0" B3 BATHROOM ELEVATIONB 1/2" = 1'-0" B3 BATHROOM ELEVATIONCUNIT TYPE B3 672 SF FLOOR PLAN LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 170 of 207 These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:32:11 PM 9/15/2021 3:32:11 PMA3.00 BUILDING PERSPECTIVESCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 SOUTHEAST PERSPECTIVE1 NORTHEAST PERSPECTIVE2 SOUTHWEST PERSPECTIVE3 NORTHWEST PERSPECTIVE4 SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 171 of 207 L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" M-3 M-6 M-6 M-6 M-344' - 0"M-8 M-6 M-6 M-5 M-5 M-5 M-1 PROPERTY LINEPROPERTY LINE10' - 6" 10' - 6" 9' - 0"12' - 0"L1 82' -0" L2 93' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" M-5 M-5 M-11 M-3 M-7 M-6 M-10 STUCCO SCREED, TYP M-42' - 0"46' - 0"ELEVATOR TOWER TO EXCEED MAX. HEIGHT PER UCSP ALLOWANCE M-11PROPERTY LINEPROPERTY LINEM-11 M-11 M-11 OPEN OPEN OPEN 11' - 0"MAILBOXESM-7 M-9 L1 82' -0" L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" TOTAL AREA 238SF OPENINGS AREA 924SF TOTAL AREA 3,794SF OPENINGS AREA 48SF = UNLIMITED OPENINGS PER §705.8.1, EXCEPTION 1.1 = BUILDING WALL PLANE (25' TO LESS THAN 30') = BUILDING WALL PLANE (20' TO LESS THAN 25') 60 60 94 TOTAL AREA 1,010SF These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 3:44:51 PM 9/15/2021 3:44:51 PMA3.01 BUILDING ELEVATIONSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 3/16" = 1'-0" NORTH ELEVATION1 3/16" = 1'-0" EAST ELEVATION2 ID DESCRIPTION PATTERN COLOR FINISH REMARKS M-1 8X8X16 CMU RUNNING BOND NATURAL PRECISION BLOCK M-2 8X8X16 CMU RUNNING BOND NATURAL PRECISION BLOCK PLANT WITH IVY M-3 8X8X8 CMU STACKED BOND NATURAL PRECISION BLOCK M-4 CONCRETE 12" BOARD FORMS NATURAL M-5 CEMENT PLASTER WHITE 20/30 SAND M-6 CEMENT PLASTER GRAY 20/30 SAND M-7 TEXTURED FIBER-CEMENT PANELS BROWN M-8 PAINTED FIBER-CEMENT BOARD CAVIAR SW 6990 MATTE M-9 COLORED TEMPERED GLASS SEAFOAM TRANSLUSC ENT M-10 PAINTED STEEL CAVIAR SW 6990 MATTE M-11 PAINTED SHEET METAL CAVIAR SW 6990 MATTE M-12 METAL MESH SCREEN 2" x 2" CAVIAR SW 6990 SATIN ELEVATION NOTES <ELEVATION NOTES> MATERIAL LEGEND ALLOWABLE UNPROTECTED OPENINGS CALCULATIONS: DISTANCE MEASURED FROM CENTERLINE OF DAVIDSON PER CBC AT GRADE PARKING LEVEL UNLIMITED UNPROTECTED OPENINGS ALLOWED PER §705.8.1, EXCEPTION 1.1 STAIR #2 TOWER 20' TO LESS THAN 25', MAX ALLOWABLE UNPROTECTED OPENINGS = NO LIMIT UNITS AT LEVELS 2-4 25' TO LESS THAN 30', MAX ALLOWABLE UNPROTECTED OPENINGS = NO LIMIT ALLOWABLE UNPROTECTED OPENINGS CALCULATIONS: DISTANCE MEASURED FROM CENTERLINE OF CHURCH PER CBC AT GRADE PARKING LEVEL UNLIMITED UNPROTECTED OPENINGS ALLOWED PER §705.8.1, EXCEPTION 1.1 STAIR #1 TOWER 30' OR GREATER, MAX ALLOWABLE UNPROTECTED OPENINGS = NO LIMIT UNITS AT LEVELS 2-4 30' OR GREATER, MAX ALLOWABLE UNPROTECTED OPENINGS = NO LIMIT SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 172 of 207 L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" M-1 M-5 M-7 M-11 M-1 M-5 M-5 M-1 M-12 M-10 PROPERTY LINEPROPERTY LINEM-6 W07 W02 W02W07 D4 L1 82' -0" L2 93' -0" ALLEY 81' -0"9' - 0"10' - 6"10' - 6"11' - 0"L3 103' -6" L4 114' -0" ROOF 123' -0" M-2 M-4 M-6 M-5 M-5 572SF OF OPENINGS = 19.2% OPENINGS AREA2,922SF OF WALL AREA (10FT > 5FT)M-8 M-6 M-5 M-9 M-10 M-5 48' - 0"PROPERTY LINEPROPERTY LINEL1 82' -0" L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0"9' - 0"10' - 6"10' - 6"11' - 0"TOTAL AREA 2,777SF OPENINGS AREA 572SF TOTAL AREA 1,590SF = BUILDING WALL PLANE (5' TO LESS THAN 10') = BUILDING WALL PLANE (0' TO LESS THAN 3') L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" TOTAL AREA 2,526SF OPENINGS AREA 588SF = UNLIMITED OPENINGS PER §705.8.1, EXCEPTION 1.1 = BUILDING WALL PLANE (10' TO LESS THAN 15') 169 253 TOTAL AREA 999SFThese drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:51:44 PM 9/15/2021 2:51:44 PMA3.02 BUILDING ELEVATIONSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 3/16" = 1'-0" WEST ELEVATION2 3/16" = 1'-0" SOUTH ELEVATION1 ID DESCRIPTION PATTERN COLOR FINISH REMARKS M-1 8X8X16 CMU RUNNING BOND NATURAL PRECISION BLOCK M-2 8X8X16 CMU RUNNING BOND NATURAL PRECISION BLOCK PLANT WITH IVY M-3 8X8X8 CMU STACKED BOND NATURAL PRECISION BLOCK M-4 CONCRETE 12" BOARD FORMS NATURAL M-5 CEMENT PLASTER WHITE 20/30 SAND M-6 CEMENT PLASTER GRAY 20/30 SAND M-7 TEXTURED FIBER-CEMENT PANELS BROWN M-8 PAINTED FIBER-CEMENT BOARD CAVIAR SW 6990 MATTE M-9 COLORED TEMPERED GLASS SEAFOAM TRANSLUSC ENT M-10 PAINTED STEEL CAVIAR SW 6990 MATTE M-11 PAINTED SHEET METAL CAVIAR SW 6990 MATTE M-12 METAL MESH SCREEN 2" x 2" CAVIAR SW 6990 SATIN ELEVATION NOTES <ELEVATION NOTES> MATERIAL LEGEND ALLOWABLE UNPROTECTED OPENINGS CALCULATIONS: DISTANCE MEASURED FROM SOUTH PROPERTY LINE PER CBC 0 TO LESS THAN 3', MAX ALLOWABLE UNPROTECTED OPENINGS = NOT PERMITTED TOTAL FACADE SF (0 TO LESS THAN 3') = 1,590SF TOTAL SF OF OPENINGS = 0SF 5' TO LESS THAN 10', MAX ALLOWABLE OPENINGS = 25% TOTAL FACADE SF (5' TO LESS THAN 10') = 2,777SF TOTAL SF OF OPENINGS = 572SF (572 ÷ 2,777 = 20.6% < 25%) ALLOWABLE UNPROTECTED OPENINGS CALCULATIONS: DISTANCE MEASURED FROM CENTERLINE OF ALLEY PER CBC AT GRADE PARKING LEVEL UNLIMITED UNPROTECTED OPENINGS ALLOWED PER §705.8.1, EXCEPTION 1.1 10' TO LESS THAN 15', MAX ALLOWABLE UNPROTECTED OPENINGS = 45% TOTAL FACADE SF (10' TO LESS THAN 15') = 2,526SF TOTAL SF OF OPENINGS = 588SF (588 ÷ 2,526 = 23.3% < 45%) SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 173 of 207 L1 82' -0" L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" A B RMEFHJLNP 15' - 10"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 6"9' - 8"L1 82' -0" L2 93' -0" ALLEY 81' -0" L3 103' -6" L4 114' -0" ROOF 123' -0" 12 63 7 10 2 11 = 1HR FLOOR/WALL ASSEMBLY = 2HR FLOOR/WALL ASSEMBLY = NON-RATED FLOOR/WALL ASSEMBLY These drawings, associated specifications, related project documetns, and other instruments of service are the property of the designer and consultants−of−record; they shall neither be executed nor used for any other work except by specific agreement with the designer. (C) 2019 THE BROWN STUDIO INC.SHEET NUMBER SHEET TITLE THE BROWN STUDIO INC. 1 1 4 4 N C o a s t H w y 1 0 1 E n c i n i t a s C A 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 www.thebrownstudio.com STAMP DEVELOPER BUILDING PERMIT DATES 9/15/2021 2:59:37 PM 9/15/2021 2:59:37 PMA4.00dr BUILDING SECTIONSCHULA VISTA, CALIFORNIASUB1 JUNE 25, 2021 3/16" = 1'-0" SECTION AAA 3/16" = 1'-0" SECTION BBB BUILDING SECTION NOTES 1.<INSERT NOTES> ID DESCRIPTION PATTERN COLOR FINISH REMARKS M-1 8X8X16 CMU RUNNING BOND NATURAL PRECISION BLOCK M-2 8X8X16 CMU RUNNING BOND NATURAL PRECISION BLOCK PLANT WITH IVY M-3 8X8X8 CMU STACKED BOND NATURAL PRECISION BLOCK M-4 CONCRETE 12" BOARD FORMS NATURAL M-5 CEMENT PLASTER WHITE 20/30 SAND M-6 CEMENT PLASTER GRAY 20/30 SAND M-7 TEXTURED FIBER-CEMENT PANELS BROWN M-8 PAINTED FIBER-CEMENT BOARD CAVIAR SW 6990 MATTE M-9 COLORED TEMPERED GLASS SEAFOAM TRANSLUSC ENT M-10 PAINTED STEEL CAVIAR SW 6990 MATTE M-11 PAINTED SHEET METAL CAVIAR SW 6990 MATTE M-12 METAL MESH SCREEN 2" x 2" CAVIAR SW 6990 SATIN MATERIAL LEGEND BUILDING SECTIONS LEGEND SUB4 SEP 15, 2021 2021-10-27 PC Agenda Page 174 of 207 SEPTEMBER 20, 2021 MATERIAL BOARD 2021-10-27 PC Agenda Page 175 of 207 CHURCH & DAVIDSON CHULA VISTA, CA SEPTEMBER 20, ‘211 1 4 4 N C O A S T H W Y 1 0 1 E N C I N I T A S, C A , 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 M A T E R I A L B O A R D LIGHT FRENCH GRAY STUCCO MEDIUM FRENCH GRAY STUCCO 12” BOARD FORMED CAST-IN-PLACE CON- CRETE WALLS 8X8 STACKED BOND CMU WALLS 8X16 RUNNING BOND CMU WALLS WOOD-LOOKING SIDING BLACK PAINTED METAL / FIBER-CEMENT BLACK PANITED METAL MESH SCREENS WITH PAINTED METAL FRAMES SEAFOAM LAMINATE GLASS BLACK PAINTED STEEL VERTICAL PICKET RAILING FRONT ELEVATIONS | PROPOSED BUILDING FACADE COMPONENTS 2021-10-27 PC Agenda Page 176 of 207 CHURCH & DAVIDSON CHULA VISTA, CA SEPTEMBER 20, ‘211 1 4 4 N C O A S T H W Y 1 0 1 E N C I N I T A S, C A , 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 M A T E R I A L B O A R D 2021-10-27 PC Agenda Page 177 of 207 CHURCH & DAVIDSON CHULA VISTA, CA SEPTEMBER 20, ‘211 1 4 4 N C O A S T H W Y 1 0 1 E N C I N I T A S, C A , 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 M A T E R I A L B O A R D 2021-10-27 PC Agenda Page 178 of 207 CHURCH & DAVIDSON CHULA VISTA, CA SEPTEMBER 20, ‘211 1 4 4 N C O A S T H W Y 1 0 1 E N C I N I T A S, C A , 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 M A T E R I A L B O A R D 2021-10-27 PC Agenda Page 179 of 207 CHURCH & DAVIDSON CHULA VISTA, CA SEPTEMBER 20, ‘211 1 4 4 N C O A S T H W Y 1 0 1 E N C I N I T A S, C A , 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 M A T E R I A L B O A R D 2021-10-27 PC Agenda Page 180 of 207 CHURCH & DAVIDSON CHULA VISTA, CA SEPTEMBER 20, ‘211 1 4 4 N C O A S T H W Y 1 0 1 E N C I N I T A S, C A , 9 2 0 2 4 6 1 9 . 5 7 7 . 4 6 1 0 M A T E R I A L B O A R D 2021-10-27 PC Agenda Page 181 of 207 www.IntersectingMetrics.com PO Box 1956, La Mesa, CA 91944 June 9, 2021 William S. Valle Director/City Engineer City of Chula Vista 276 Fourth Avenue Chula Vista, CA 91910 Regarding: Backhouse Apartments – Sight Distance Waiver Request Dear Mr. Valle, The Backhouse Apartments Development (the “Proposed Project”), which is located on the southwest corner of the Davidson Street and Church Avenue intersection (the “Intersection”), is formally requesting a waiver from the sight distance requirements outlined in the City of Chula Vista Design and Construction Standards RWY-05 and the Vision Clearance - Intersection Requirements in Section 12.12.120 of the Chula Vista Municipal Code. The City’s sight distance requirements are outlined in the Roadway Section of the City’s Design and Construction Standard Drawings 2017 (RWY-05), which are provided in Attachment A. Two separate standards are provided within this section, one for general roadways and the other for roadways under 40 feet wide. Church Avenue is currently 36 feet wide north of the Intersection and 44 feet wide directly south of the Intersection. However, the Proposed Project will reduce the width of Church Avenue from 44 feet wide to 36 feet wide, curb-to-curb, along its frontage. The existing public right-of-way width will not change but this will allow the Proposed Project to align the sidewalk and curb north and south of Davidson Street. Davidson Street is currently 24 feet wide curb-to-curb. Since both roadways will be under 40 feet wide, the sight vision clearance area identified on sheet 3 of 3 of the RWY-05 standard is typically prescribed. Despite meeting the development standards prescribed in the Village District (V-1) of the Chula Vista Urban Core Specific Plan, the Proposed Project encroaches on the sight vision clearance area prescribed in RWY- 05, and Municipal Code Section 12.12.120, at the southwest corner of the Intersection. Modifying the Proposed Project building to avoid the sight vison clearance area would render the project infeasible. A stopping sight distance analysis at the Intersection was performed based on the City’s minimum stopping sight distance requirements (RWY-05) for general roadways (i.e. roadways over 40 feet in width). Stopping sight distance is generally used for signalized intersections or all-way stop controlled intersections, while corner sight distance is used for side street stop controlled or uncontrolled intersections. Thus, if minimum stopping sight distance can be met at the intersection, then the corner sight distance impacts can be mitigated by converting the intersection from side-street stop control to all-way stop control. Since the implementation of an all-way stop sign will require vehicles on Church Street to stop, the stopping sight distances at the northbound and southbound Church Street approaches of the intersection were evaluated. Neither Church Avenue nor Davidson Street have posted speed limits. Additionally, neither roadway is classified within the City of Chula Vista Mobility Element. Both roadways are currently constructed as residential roadways, as per Section 3-400 of the City of Chula Vista’s Subdivision Manual. However, it should be noted that no parking is provided along Davidson Street, so the total curb-to-curb width of the roadway is 24 feet instead of 36 feet. As per Table 3-401.11 of the Subdivision Manual, the design speed 2021-10-27 PC Agenda Page 182 of 207 EF BoushraSalem for 2021-10-27 PC Agenda Page 183 of 207 Attachment A Design and Constriction Standard Drawings 2017 (RWY-05) 2021-10-27 PC Agenda Page 184 of 207 2021-10-27 PC Agenda Page 185 of 207 2021-10-27 PC Agenda Page 186 of 207 2021-10-27 PC Agenda Page 187 of 207 Attachment B Sight Distance Analysis 2021-10-27 PC Agenda Page 188 of 207 UP +82. 0 ' T D O N O T E N T E R JOB NO.: DATE: SCALE: SHEET: BACKHOUSE APARTMENTS 2021-10-27 PC Agenda Page 189 of 207 JOB NO.: DATE: SCALE: SHEET: BACKHOUSE APARTMENTS 2021-10-27 PC Agenda Page 190 of 207 2021-10-27 PC Agenda Page 191 of 207 2021-10-27 PC Agenda Page 192 of 207 2021-10-27 PC Agenda Page 193 of 207 RESOLUTION NO. DR20-0019 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION APPROVING DESIGN REVIEW PERMIT DR20-0019, GENPROP BACKHOUSE, LLC, TO DEVELOP A 4-STORY, 31-UNIT RESIDENTIAL APARTMENT BUILDING WITH 25 ON-SITE PARKING SPACES ON A 0.28 ACRE SITE AT THE SOUTHWEST CORNER OF CHURCH AVENUE AND DAVIDSON STREET WHEREAS, on October 9, 2020, a duly verified application for a Design Review Permit was filed with the City of Chula Vista Development Services Department by GenProp Backhouse, LLC (the “Applicant”); and WHEREAS, the application requests approval of a Design Review Permit to develop the site at the southwest corner of Church Avenue and Davidson Street with a 4-story, 31-unit multifamily apartment building, including 25 on-site parking spaces, landscaping, open space, and associated access (the “Project”); and WHEREAS, the Director of Development Services has reviewed the Project for compliance with the California Environmental Quality Act (CEQA) and has determined that the Project was adequately covered in the previously adopted Final Environmental Impact Report FEIR 06-01 prepared for the Chula Vista Urban Core Specific Plan and certified by the City Council in May 2007. Thus, no further environmental review is required; and WHEREAS, the Director of Development Services set the time and place for a hearing on the Design Review Permit application, and notice of the hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the City and its mailing to property owners and residents within 500 feet of the exterior boundaries of the property at least 10 days prior to the hearing; and WHEREAS, the hearing was held at the time and place as advertised in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and the hearing was thereafter closed. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of Chula Vista that it hereby makes the following findings: That the proposed Project is consistent with the development regulations and design guidelines of the Urban Core Specific Plan and other applicable regulations contained in the Chula Vista Municipal Code. The proposed Project is consistent with the vision, objectives and policies of the General Plan and the land use development standards and regulations of the Urban Core Specific Plan. The Project will redevelop an existing private parking lot and provide 31 additional residential units within the City’s downtown area with convenient access to public transit. The Project will contribute an additional multi-family housing type to local residents, who 2021-10-27 PC Agenda Page 194 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 2 would enhance the downtown ambiance by supporting the local commercial businesses which provide a variety of goods and services. Accessibility to public transit would also contribute regionally by connecting the project residents with access to other parts of the City and region. The Project is also consistent with the Urban Core Specific Plan development regulations related to land use. The Project will have a maximum building height of 45-feet, a floor area ratio of 1.9, and meet the required setbacks including building wall frontage of 50% along Church Avenue, as well as include 25 on-site parking spaces and 25 off-site parking spaces to be paid via an in-lieu fee. The Project will also exceed the minimum requirement for landscaping and open space by providing 15.1% landscaping and 6,393 square feet of open space. That the proposed Project is consistent with the design requirements and recommendations contained in Chapter VII - Design Guidelines of the Urban Core Specific Plan. The proposed project architecture features a modern architectural design that is eclectic and contributes to the Third Avenue Village. The architecture draws inspiration from the newly developed modern structures as well as the historic structures along Third Avenue and Church Street, and fits within the architectural styles of the existing buildings. The building mass is articulated by horizontal and vertical plane offsets, including balconies, which provide variety and interest and are highlighted by accent colors and materials that break up the roof line. The building facades will support a variety of building materials and colors, including cement plaster, concrete, metal, stucco and laminate glass. The overall design, form and scale of the building fit within the guidelines of the Urban Core Specific Plan’s Village District and compliment development in downtown Chula Vista. BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION, BASED ON THE FINDINGS ABOVE, hereby approves the Design Review Permit subject to the following conditions: I. The following shall be accomplished to the satisfaction of the Director of Development Services, or designee, prior to issuance of Building Permits, unless otherwise specified: Planning Division 1. The site shall be developed and maintained in accordance with the approved plans, which include site plans, building elevations, floor plans, landscape plans, and other on file in the Planning Division, the conditions contained herein, the Urban Core Specific Plan and Chula Vista Municipal Code (CVMC) Title 19. 2. Prior to, or in conjunction with the issuance of the first Building Permit, the Applicant shall pay all applicable fees, including any unpaid balances of permit processing fees for deposit account DDA0740. 3. Prior to, or in conjunction with the issuance of the first Building Permit, the Applicant shall pay the In-Lieu-Parking Fee for 25 off-site parking spaces. The In-Lieu fee rate per space shall be pursuant to the rate in effect at the time of payment. 2021-10-27 PC Agenda Page 195 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 3 4. Prior to the issuance of the first Building Permit, the colors and materials specified on the building plans must be consistent with the colors and materials shown on the site plan and materials board approved by the Planning Commission. 5. A graffiti resistant treatment shall be specified for all wall and building surfaces. This shall be noted for any building and wall plans and shall be reviewed and approved prior to the issuance of the first Building Permit. Additionally, the project shall conform to CVMC Section 9.20.055 regarding graffiti control. 6. All roof-mounted appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets. Such screening shall be architecturally integrated with the building design. 7. All ground mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of walls and/or landscaping. 8. All exterior lighting shall include shielding to remove any glare from adjacent residents. Details for said lighting shall be included in the architectural plans and shall be reviewed and approved prior to the issuance of the first Building Permit. 9. The Project shall operate in compliance with the Performance Standards, CVMC Chapters 19.66 and Performance Standards and Noise Control, Chapter 19.68. 10. The Applicant shall obtain approval of a sign permit for each sign. Signs shall comply with all applicable requirements of the CVMC and Design Guidelines of the Urban Core Specific Plan. Building Division 11. The Applicant shall include a note on the cover sheet of the construction drawings indicating this Project will comply with 2019 California Building Code, 2019 California Fire Code, 2019 California Mechanical Code, 2019 California Plumbing Code, 2019 California Electrical Code, 2019 California Energy Code, and 2019 California Green Standards Code as adopted and amended by the State of California and the City of Chula Vista. 12. The Project shall be designed by an Architect or Engineer licensed by the State of California. [California Business and Professional Code 5536.1, 6735]. Land Development Division A. GENERAL COMMENTS AND FEES: 2021-10-27 PC Agenda Page 196 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 4 13. The following fees per City of Chula Vista Master Fee Schedule will be required based on the final Building Plans submittal: a. Sewer Connection and Capacity Fees b. Traffic Signal Fees c. Public Facilities Development Impact Fees (PFDIF) d. Western Transportation Development Impact Fees (WTDIF) e. Other Engineering Fees as applicable per attached Master Fee Schedule. http://www.chulavistaca.gov/home/showdocument?id=8129 14. Additional deposits or fees in accordance with the City Subdivision Manual, and Master Fee Schedule will be required for the submittal of the following items: a. Improvement Plans/Construction Permit 15. Prior to the approval of any Planning Entitlement, the owner/applicant shall submit duplicate copies of all commercial, industrial or multifamily Projects in digital format, such as (DXF) graphic file, on a CD or through e-mail based on California State Plane Coordinate System (NAD 83, Zone 6) in accordance with the City’s Guidelines for Digital Submittal. DXF file shall include a utility plan showing any and all proposed sewer or storm drain on site. B. STORM WATER MANAGEMENT CONDITIONS: 16. The Project shall comply with all requirements of the MS4 Permit and City of Chula Vista Best Management Practice (BMP) Design Manual, December 2015 and as amended (the “BMP Design Manual”) for both construction and post-construction phases of the project. Prior to Planning approval, documentation shall be provided, to the satisfaction of the City Engineer, to demonstrate such compliance. A copy of the BMP Design Manual is available on the City of Chula Vista website at: http://www.chulavistaca.gov/departments/public-works/services/storm-water-pollution- prevention/documents-and-reports. 17. The owner shall enter into a Storm Water Management Facilities Maintenance Agreement to perpetually maintain all permanent BMPs located within the project prior to issuance of any construction or Building Permits, whichever occurs first. 18. The Applicant must ensure that all roof drain is directed toward the proposed Biofiltration basin per the Storm Water Quality Management Plan (‘SWQMP”) located along the northerly property frontage. 19. All construction sites are required to implement Construction BMPs in accordance with the performance standards outlined in Appendix K of the BMP Design Manual. 2021-10-27 PC Agenda Page 197 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 5 C. PUBLIC IMPROVEMENTS CONDITIONS: 20. Prior to issuance of a Building Permit, a Construction Permit is required for any work in the public right-of-way. Improvement Plans must be submitted for review and processing with Land Development division in conformance with the City’s Subdivision Manual. The Improvement Plan shall include but not be limited to: a. Installation of new curb, gutter & sidewalk along Church Ave per SDRSD G-7. b. Removal and replacement of any broken or damaged curb, gutter, and sidewalk along the project’s frontages on Davidson Street per SDRSD G-3 to the satisfaction of the City Engineer. c. Removal and replacement of existing pedestrian ramp on the corner of Church Ave and Davison St per Chula Vista Construction Standard GSI-08. Dedication of R/W as needed in order for pedestrian ramp to comply with American Disability Act (ADA) requirements. d. Installation of a sewer cleanout is required at the connection of the 6” sewer lateral to the main public sewer line. e. Installation of the proposed sewer laterals per SDRSD SS-01. f. Utilities Trenching and Restoration per Chula Vista Construction Standard GSI-03. g. The proposed closure of existing driveways along Church Ave shall be replaced with curb, gutter, and sidewalk per SDRSD G-02 and G-07. h. Relocation of existing utilities, as determined by the City Engineer. i. Reconstruct the alley apron with ADA accessible ramps and reconstruct the existing concrete paving within the alley. The extent of alley paving shall be determined with the submittal of an Improvement Plan. j. Installation of Private Street Trees and private Street Lights, in order to comply with the Urban Core street theme for Church Avenue & Davidson Street. A minimum of 5 feet walkway or sidewalk shall be provided around tree grates in order comply with ADA requirements. An Encroachment Agreement is required for said private improvements. 21. Prior to issuance of a Building Permit, a Construction permit is required for any work in the public right-of-way, as approved by the City Engineer. The construction and completion of all improvements and release requirements shall be secured in accordance with CVMC Chapter 18.17. 22. Prior to issuance of a Construction Permit, a separate utility permit is required from the utility owners as necessary for all other public utilities (gas, electric, water, cable, telephone, etc.). 2021-10-27 PC Agenda Page 198 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 6 23. An Encroachment Agreement is required prior to issuance of a Building Permit for any private facilities (if applicable) within Public right-of-way or City easement. D. PRIVATE ONSITE IMPROVEMENTS CONDITIONS: 24. The onsite sewer and storm drain system shall be private. All sewer laterals and storm drains shall be privately maintained from each building unit to the City-maintained public facilities. 25. The Public Works Operations Section will need to inspect any existing sewer laterals and connections that are to be used by the new development. Laterals and connections may need replacement as a result of this inspection. 26. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall be designed to meet the City of Chula Vista Design Standards, Americans with Disabilities Act (ADA) Standards, and Title 24 standards, as applicable. Landscape Architecture Division 27. Prior to the second submittal of the Building Permit set, the Applicant shall submit a complete set of Landscape Improvement plans for review and approval by the Director of Development Services or designee. For further information about submitting Landscape Improvement plans see the following link. https://www.chulavistaca.gov/departments/development-services/landscape-architecture Said plans shall conform to the following City documents: a. Landscape Water Conservation Ordinance (LWCO), CVMC Chapter 20.12 b. City of Chula Vista Landscape Manual c. Shade Tree Policy (576-19) 28. New dwelling units are subject to Parkland Acquisition and Development (PAD) fees in accordance with CVMC Chapter 17.10. Prior to final inspection, payment of the PAD fee per dwelling unit is required in accordance with CVMC Section 17.10.100. 29. Prior to the issuance of the Building Permit, the Applicant shall obtain City approval of the Project’s Improvement Plans showing the relocation of all utilities within the City’s public right-of-way to resolve any conflicts with proposed improvements to the satisfaction of the Director of Development Services or designee. 30. Prior to the final building inspection, the Applicant shall have installed Landscape Improvements per approved Landscape Improvement Plans to the satisfaction of the Director of Development Services or designee. 2021-10-27 PC Agenda Page 199 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 7 Fire Department 31. The Applicant shall apply for required Building Permits. Permits shall comply with applicable codes and requirements, including but not limited to: the current California edition of Building Code (CBC), Fire Code (CFC), Mechanical Code, and Residential Code as adopted and amended by the State of California and the City of Chula Vista. Environmental Services Division 32. The Applicant shall develop and submit a “Recycling and Solid Waste Management Plan” to the Conservation Coordinator for review and approval as a part of the Building Permit process. The Applicant shall contract with the City’s franchise hauler throughout the construction and occupancy phase of the Project. The “Recycling and Solid Waste Management Plan” features should be identified on the Building Plans. II. The following on-going conditions shall apply to the project site as long as it relies on this approval: 33. The site shall be developed and maintained in accordance with the approved plans, which include Site Plans, Floor Plans, and Elevation Plans on file in the Planning Division, the Conditions contained herein, and CVMC Title 19. 34. The Applicant shall install all landscaping and hardscape improvements in accordance with the approved Landscape Plan. 35. Approval of the Design Review Permit shall not waive compliance with any sections of CVMC Title 19, nor any other applicable laws and regulations in effect at the time of Building Permit issuance. 36. The Property Owner and Applicant shall and do agree to indemnify, protect, defend and hold harmless City, its City Council members, Planning Commission members, officers, employees and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney’s fees (collectively, liabilities) incurred by the City arising, directly or indirectly, from (a) City’s approval and issuance of this Design Review Permit; (b) the City’s determination on any Project environmental review and (c) City’s approval or issuance of any other permit or action, whether discretionary or non-discretionary, in connection with the use contemplated on the Project Site. The Property Owner and Applicant shall acknowledge their agreement to this provision by executing a copy of this Design Review Permit where indicated below. The Property Owner’s and Applicant’s compliance with this provision shall be binding on any and all of the Property Owner’s and Applicant’s successors and assigns. 37. This Design Review Permit shall become void and ineffective if not utilized within three years from the effective date thereof, in accordance with CVMC Section 19.14.600 2021-10-27 PC Agenda Page 200 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 8 III. GOVERNMENT CODE SECTION 66020(d)(1) NOTICE Pursuant to Government Code Section 66020(d) (1), NOTICE IS HEREBY GIVEN that the 90 day period to protest the imposition of any impact fee, dedication, reservation, or other exaction described in this resolution begins on the effective date of this resolution and any such protest must be in a manner that complies with Government Code Section 66020(a) and failure to timely follow this procedure will bar any subsequent legal action to attack, review, set aside, void or annul imposition. The right to protest the fees, dedications, reservations, or other exactions does not apply to planning, zoning, grading, or other similar application processing fees or service fees in connection with this project; and it does not apply to any fees, dedication, reservations, or other exactions which have been given notice similar to this, nor does it revive challenges to any fees for which the statute of limitations has previously expired. IV. EXECUTION OF RESOLUTION OF APPROVAL The Property Owner and Applicant shall execute this document signing on the lines provided below, indicating that the Property Owner and Applicant have each read, understood and agreed to the conditions contained herein, and will implement same. Upon execution, this document shall be signed and returned to the City’s Development Services Department. ________________________________ _______________________ Signature of Property Owner Date ________________________________ Printed Name of Property Owner ________________________________ _______________________ Signature of Applicant Date ________________________________ Printed Name of Applicant 2021-10-27 PC Agenda Page 201 of 207 Planning Commission Resolution DR20-0019 October 27, 2021 Page 9 V. CONSEQUENCE OF FAILURE OF CONDITIONS If any of the foregoing conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted, deny, or further condition issuance of all future building permits, deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted, institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. Failure to satisfy the conditions of this permit may also result in the imposition of civil or criminal penalties. VI. INVALIDITY; AUTOMATIC REVOCATION It is the intention of the Planning Commission that its adoption of this Resolution is dependent upon the enforceability of each and every term, provision and condition herein stated; and that in the event that any one or more terms, provisions or conditions are determined by a Court of competent jurisdiction to be invalid, illegal or unenforceable, this resolution and the permit shall be deemed to be automatically revoked and of no further force and effect. PASSED AND APPROVED BY THE PLANNING COMMISSION OF THE CITY OF CHULA VISTA, CALIFORNIA, this _____day of ____________ _______, by the following vote, to-wit: AYES: NOES: ABSENT: ABSTAIN: ___________________________ Max Zaker, Chair ATTEST: _______________________ Patricia Salvacion, Secretary Presented by: Approved as to form by: _________________________ _____________________ Tiffany Allen Glen R. Googins Director of Development Services City Attorney 2021-10-27 PC Agenda Page 202 of 207 1 SPECIAL MEETING OF THE PLANNING COMMISSION Meeting Minutes July 28, 2021, 6:00 p.m. Civic Center Branch Library Conference Room 365 F St, Chula Vista Present: Commissioner Burroughs, Commissioner Milburn, Commissioner Nava, Commissioner Torres, Chair Zaker, Commissioner Gutierrez Absent: Vice Chair De La Rosa Also Present: Director Development Services Allen, Secretary Salvacion Others Present Glen Googins, City Attorney, Laura Black, Development Services Assistant Director, Stacey Kurz, Senior Project Coordinator _____________________________________________________________________ 1. CALL TO ORDER A special meeting of the Planning Commission of the City of Chula Vista was called to order at 6:00 p.m. at the Chula Vista Public Library, Civic Center Branch, Library Auditorium. 2. ROLL CALL Secretary Salvacion called the roll. Commissioner De La Rosa requested an excused absence. 3. PLEDGE OF ALLEGIANCE TO THE FLAG AND MOMENT OF SILENCE 2021-10-27 PC Agenda Page 203 of 207 2 Commissioner Gutierrez led the Pledge of Allegiance. 4. PUBLIC COMMENTS None. 5. PUBLIC HEARINGS Notice of the hearing was given in accordance with legal requirements , and the hearing was held on the date and no earlier than specified in the notice. 5.1 PROPOSED AMENDMENTS TO THE CHULA VISTA GENERAL PLAN, THE SUNBOW II GENERAL DEVELOPMENT PLAN, AND THE SUNBOW II SECTIONAL PLANNING AREA PLAN Five public comments were received in opposition of the item: Theresa Acerro Michael McCabe Neal Silvia Barbara Bacho-Taylor Carlos Tarantino Two members of the public spoke at the meeting in opposition of the item: Bracken Ellis Joanne Springer Moved by Torres Seconded by Gabe Gutierrez, Chair To deny the proposed amendments to the City's General Plan, the Sunbow II General Development Plan, and the Sunbow II Sectional Planning Area Plan to rezone a vacant 135.7 acre parcel from industrial to residential use, resulting in 718 new residential units within the Sunbow II Phase 3 planned community (the "Project"). Yes (6): Burroughs, Milburn, Nava, Torres, Zaker, and Gabe Gutierrez, Chair Carried (6 to 0) 6. ACTION ITEMS 2021-10-27 PC Agenda Page 204 of 207 3 6.1 APPROVAL OF MEETING MINUTES Moved by Gabe Gutierrez, Chair Seconded by Burroughs Approve the minutes of July 14, 2021. Yes (6): Burroughs, Milburn, Nava, Torres, Zaker, and Gabe Gutierrez, Chair Carried (6 to 0) 6.2 WRITTEN COMMUNICATIONS Moved by Gabe Gutierrez, Chair Seconded by Milburn Commission excuse the absence of Commissioner Nava for the meeting of July 14, 2021. Yes (6): Burroughs, Milburn, Nava, Torres, Zaker, and Gabe Gutierrez, Chair Carried (6 to 0) OTHER BUSINESS 7. STAFF COMMENTS Development Services Director, Tiffany Allen, mentioned that a revised version of the Annual Activities Report was distributed to the commission which included status updates of the projects mentioned. 8. CHAIR'S COMMENTS The Commission accepted the Annual Activities Report. 9. COMMISSIONERS' COMMENTS The Commission expressed additional time to review to make informed decisions on projects such as those involving changes in the General Plan. 10. ADJOURNMENT The meeting was adjourned at 8:07 p.m. Minutes prepared by: Patricia Salvacion, Planning Commission Secretary 2021-10-27 PC Agenda Page 205 of 207 4 _________________________ Patricia Salvacion, Secretary 2021-10-27 PC Agenda Page 206 of 207 2021-10-27 PC Agenda Page 207 of 207