HomeMy WebLinkAbout2018-06-06 SC PACKET - Revised
SPECIAL MEETING OF THE SAFETY COMMISSION
OF THE CITY OF CHULA VISTA
June 6, 2018 Chula Vista City Hall
6:00 p.m. Executive Conference Room 103
276 Fourth Avenue, Building A
Chula Vista, CA
CALL TO ORDER
ROLL CALL
Commissioners Cervantes, DeMarco, Jackson, Marroquin, Marshall, Munoz, and Chair Hidinger
PLEDGE OF ALLEGIANCE TO THE FLAG
OPENING STATEMENT
PUBLIC COMMENTS
Persons speaking during Public Comments may address the Commission on any subject matter within
the Commission’s jurisdiction that is not listed as an item on the agenda. State law generally prohibits
the Commission from discussing or taking action on any issue not included on the agenda, but, if
appropriate, the Commission may schedule the topic for future discussion or refer the matter to staff.
Comments are limited to three minutes.
1. APPROVAL OF MINUTES OF FEBRUARY 7, 2018
2 PEDESTRIAN AND BIKEWAYS SAFETY PROGRAMS – CIP UPDATE
3. UPDATE ON PUBLIC SAFETY ADVISORY COMMITTEE
OTHER BUSINESS
4. CHAIR/VICE CHAIR ELECTIONS
5. COMMISSIONERS’ COMMENTS
6. STAFF COMMENTS
ADJOURNMENT to the regular meeting on August 1, 2018 at 6:00 p.m. in the Council Chambers. Chula Vista,
California.
Materials provided to the Safety Commission related to any open-session item on this agenda are available for
public review at the Engineering Dept. located at 276 Fourth Avenue, Building B, Chula Vista during normal
business hours.
In compliance with the
AMERICANS WITH DISABILITIES ACT
The City of Chula Vista requests individuals who require special accommodations to access, attend, and/or
participate in a City meeting, activity, or service, contact the Human Resources Department at (619) 691-5041
(California Relay Service is available for the hearing impaired by dialing 711) at least forty-eight hours in advance
of the meeting.
City of Chula Vista Boards & Commissions
Safety Commission
UNOFFICIAL MINUTES
MINUTES OF A REGULAR MEETING
OF THE CHULA VISTA SAFETY COMMISSION
Council Chambers
February 7, 2018 City Hall – Building A
6:00 p.m. 276 Fourth Avenue
CALL TO ORDER
Meeting called to order at 6:00 p.m.
ROLL CALL
Present: Chair Hidinger, Commissioners Cervantes, DeMarco, Jackson (arrived at 6:08 pm)
Marroquin, Marshall, and Munoz
Absent: None.
Staff present: Principal Civil Engineer, Frank Rivera; Principal Traffic Engineer, Eddie Flores; and
Recording Secretary, Florence Picardal
PLEDGE OF ALLEGIANCE
Pledge of Allegiance was led by Chair Hidinger.
OPENING STATEMENT
Opening statement read by Chair Hidinger.
PUBLIC COMMENTS
None.
1. APPROVAL OF MINUTES OF JANUARY 3, 2018
Motion made by Commissioner Marroquin and seconded by Commissioner Munoz to approve the minutes of
January 3, 2018. MOTION PASSED 6-0-1 (Jackson absent-arrived at 6:08 pm).
2. PRESENTATION ON DOCKLESS BIKE SERVICE FROM MR. ZACK BARTLETT, LIME BIKES SAN DIEGO
GENERAL MANAGER
Principal Civil Engineer Rivera introduced Zack Bartlett, San Diego General Manager of Lime Bikes. Mr.
Bartlett gave a short presentation. Lime Bikes currently has bike sharing services in National City and
Imperial Beach. In the new future, an item will be docketed on the City Council agenda to approve a dockless
bike-sharing service program in Chula Vista.
3. RESOLUTION OF THE SAFETY COMMISSION OF THE CITY OF CHULA VISTA RECOMMENDING
APPROVAL OF THE F STREET PROMENADE STREETSCAPE MASTER PLAN BY CITY COUNCIL
Mark Caro, Landscape Architect/Project Manager with the Development Services Dept. introduced Rick
Barrett, Director San Diego Operations with MIG (urban design firm). Mr. Barrett gave a short presentation.
Staff Recommendation: Safety Commission adopt the resolution.
The F Street Streetscape Master Plan proposes distinct recommendations for improvements that will
enhance the street as a safer corridor from Third Avenue to Bay Boulevard without sacrificing levels of service
and vehicle operations. The many proposed improvements, such as reduced travel lanes, a protected 12-foot
wide multi-use path, high-visibility crosswalks and mid-block crossings, bulb-outs, pedestrian lighting, street
trees and parkway planting areas, interpretive and wayfinding signage with public art, expansion of the public
realm with the development of plazas throughout the corridor and by capitalizing on the unused railroad
Safety Commission Minutes
February 7, 2018 Page 2
UNOFFICIAL MINUTES
bridge over I-5, and the undergrounding of overhead utilities will enhance the neighborhood and provide an
attractive and desirable linkage between historic village of downtown Chula Vista and the forthcoming
Bayfront development.
The Master Plan improves mobility for all modes of transportation in this complete streets plan. Ultimate
implementation of the plan will take many years to be constructed over many phases of construction. With
the adoption of the Master Plan, the City would be able to apply for and obtain grant funding for the
recommended improvements.
Public hearing opened.
1. Skii Fleeton, Chula Vista resident representing Bike Walk Chula Vista and SDC Bike Coalition spoke in
support of the staff’s recommendation.
Public hearing closed.
Motion made by Commissioner Marroquin and seconded by Commissioner Cervantes to adopt a resolution
recommending approval of the F Street Promenade Streetscape Master Plan by City Council. MOTION
PASSED 7-0.
4. PEDESTRIAN AND BIKEWAYS SAFETY PROGRAMS – CIP UPDATE
Principal Civil Engineer Rivera gave a brief presentation.
4. POLICE DEPARTMENT TRAFFIC ACCIDENTS
There was no representative from the Police Department. .
5. UPDATE ON PUBLIC SAFETY ADVISORY COMMITTEE
Commissioner Marroquin stated this month’s meeting was cancelled.
OTHER BUSINESS
6. COMMISSIONERS’ COMMENTS
Commissioner Jackson asked about the possibility of a right-turn arrow on Olympic Parkway coming out of
the shopping center (second request).
Commissioner Marroquin congratulated Principal Traffic Engineer Flores on being awarded the grade of
Fellow member by the Institute of Transportation Engineers (ITE).
Commissioner Cervantes asked for an update on AV vehicles.
Commissioner Marroquin asked about the timeline for the connection of Main Street to the Eastlake area.
Principal Civil Engineer Rivera stated that the project is developer driven and would probably take between 5-
10 years.
Safety Commission Minutes
February 7, 2018 Page 3
UNOFFICIAL MINUTES
7. STAFF COMMENTS
Principal Traffic Engineer Flores gave an update on autonomous vehicles (AV) and connected (e.g. Tesla)
vehicles.
ADJOURNMENT at 7:17 p.m. to the regular meeting on March 7, 2017 at 6:00 p.m. in the Council Chambers.
Chula Vista, California.
Respectfully submitted,
Florence Picardal, Recording Secretary
J:\Engineer\TRAFFIC\SAFETY COMMISSION\2018\2018-02\02-07-18 MINUTES.doc
ITEM 2
BIKEWAYS AND PEDESTRIAN - CIP IMPROVEMENT PROJECTS AND PROGRAMS
UPDATED – JUNE 1, 2018
PROJECT NAME/DESCRIPTION CIP NO. STATUS
EAST NAPLES STREET & OLEANDER AVENUE;
ORANGE AVENUE & HILLTOP DRIVE; CROSS GUTTER
AND ADA PED RAMPS CONST.
STL-359 & STL-382 IN DESIGN.
TRAFFIC SIGNAL MODIFICATIONS AT FOUR
INTERSECTIONS: 4TH AND J, HILLTOP AND L, 3RD AND
H, AND 3RD AND I.
TF-388 IN CONSTRUCTION. ESTIMATED COMPLETION BY JULY
2018.
RAISED MEDIANS IMPROVEMENTS TF-397 IN CONSTRUCTION
F STREET PROMENADE STUDY
BAY BLVD –THIRD AVENUE
STL-412 FEB. 7, 2018 SAFETY COMMISSION. CITY COUNCIL IN
MARCH 2018. BICYCLE & PEDESTRIAN CORRIDOR
IMPROVEMENT STUDY. SANDAG GRANT. PROGRESSING.
BIKES LANES ON BROADWAY INSTALLATION PHASE I
(C STREET TO G STREET)
STM-384 IN DESIGN. EXPECTED COMPLETION BY END OF
2018/EARLY 2019 DEPENDING ON WEATHER AND
CALTRANS REVIEW.
SIGN REFLECTIVITY REPLACEMENT TF-391 IN CONSTRUCTION.
WILLOW STREET BRIDGE WIDENING STL-261
STL-384
BRIDGE CONSTRUCTION ON-GOING. SIDEWALKS AND
BIKE LANES WILL BE INSTALLED.
KELLOGG AND HAZEL G COOK ELEMENTARY
SCHOOLS PEDESTRIAN IMPROVEMENTS
STL-410 & TF-384 IN DESIGN. CONSTRUCTRION EXPECTED TO BEGIN IN
FALL 2018.
PALOMAR STREET AND ORANGE AVENUE TRAFFIC
SIGNAL AND SIDEWALK IMPROVEMENTS
STL-420 IN CONSTRUCTION.
SOUTH BAY BUS RAPID TRANSIT (BRT) IN CONSTRUCTION. SERVICE BEGINS IN 2019.
PEDESTRIAN CROSSWALK ENHANCEMENT AT
UNCONTROLLED INTERSECTIONS
TF-394 IN CONSTRUCTION.
HERITAGE ROAD WIDENING AND BRIDGE
IMPROVEMENT
STM-386, STM-388
& STM-389
UNDER DESIGN. ADVERTISE IN 2019. SIDEWALKS AND
BIKE LANES WILL BE INSTALLED.
MODIFICATION OF TRAFFIC SIGNAL AND
PEDESTRIAN FACILITY ALONG PALOMAR STREET,
FROM INDUSTRIAL BOULEVARD TO BROADWAY
TF-390 CONSTRUCTION CONTRACT AWARDED. BEGIN
CONSTRUCTION SUMMER 2018.
ADA CURB RAMPS STL-405 & STL-415 IN CONSTRUCTION.
PEDESTRIAN/BICYCLE MULTI-MODAL PLAN STL-404 CONSULTANT NEGOTIATION PROCESS IN PROGRESS.
AWARD THIS SUMMER.
LADDER CROSSWALKS AT CONTROLLED
INTERSECTIONS
TRF-413 FY 2019
PED IMPROVEMENT AT MIDBLOCK LOCATIONS TRF-411 FY 2019. INCLUDES IMPROVEMENTS AT CASTLE PARK
MIDDLE,