Loading...
HomeMy WebLinkAboutItem 6.1 - Attachment 6 - Chula Vista General Plan Amendment Justification ReportSUNBOW II, PHASE 3 Chula Vista General Plan Amendment Justification Report May 2021 APPLICANT: ACI SUNBOW, LLC Contact: Bill Hamlin 2356 Moore Street San Diego, CA 92110 619-544-9171 PREPARED FOR: LENNAR HOMES OF CALIFORNIA, INC. 16465 Via Esprillo, Suite 150 San Diego, CA 92127 Contact: David Shepherd Adopted ______________ By Resolution No. ______________ PREPARED BY: RH Consulting Group, LLC Contact: Ranie Hunter Ranie@RHConsultingGroup.com 619-823-1494 THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction & Background .................................................................................................. 2 II. Existing Site Conditions ......................................................................................................... 3 III. Proposed Amendments and Project Proposal ...................................................................... 5 A. Proposed Amendments .............................................................................................................. 5 B. Project Proposal ......................................................................................................................... 5 C. Development Schedule .............................................................................................................. 6 D. Fiscal Impact Analysis Update .................................................................................................. 6 E. Other Sunbow II, Phase 3 Entitlements ..................................................................................... 6 IV. Land Use Considerations ....................................................................................................... 7 V. Economic Considerations ....................................................................................................... 8 VI. Environmental Considerations .............................................................................................. 9 VII. Housing Development Considerations .................................................................................. 9 VIII. Infrastructure Considerations ............................................................................................. 10 IX. Public Benefit Consideration ............................................................................................... 10 X. Annexation ............................................................................................................................. 10 XI. List of Proposed General Plan Amendments ..................................................................... 10 Attachment A: Sunbow II, Phase 3 Chula Vista General Plan Consistency Analysis Attachment B: Sunbow II, Phase 3 Market and Financial Analysis of Industrial Use (HR&A 2021) Attachment C: Sunbow II, Phase 3 Fiscal Impact Analysis (DPFG 2021) THIS PAGE INTENTIONALLY LEFT BLANK Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 2 May 2021 I. Introduction & Background The City of Chula Vista authorized development of the 604.8 acre Sunbow Planned Community upon approval of the following: • Sunbow II General Development Plan (GDP) approved by Resolution No. 15427 on December 5, 1989; • Sunbow II Public Facilities Financing Plan (PFFP) approved by Resolution No. 15525 on January 24, 1990; • Sunbow II Sectional Planning Area (SPA) Plan approved by Resolution No. 15524 on February 20, 1990; • Sunbow II Planned Community District Regulations and Land Use District Map approved by Ordinance No. 2361 on February 27, 1990; • Sunbow II Design Guidelines approved by Resolution No. 15640 on May 22, 1990; • Sunbow II Tentative Subdivision Map (TSM 90-07) approved by Resolution No. 115640 on May 22, 1990; and • Sunbow II Affordable Housing Agreement approved by Resolution No. 18662 on May 13, 1997. In February 2003, the City of Chula Vista adopted the City of Chula Vista MSCP (Multi-Species Conservation Plan) Subarea Plan. At that time, development of the approved Sunbow Planned Community was underway. When the City adopted the MSCP Plan, Sunbow was not identified as a “covered project;” however, the MSCP Plan established a hardline MSCP Preserve Boundary adjacent to the Sunbow II, Phase 3 development area. Based upon the City’s MSCP Boundary data, the Applicant’s Engineer (Hunsaker & Associates) determined that within the 135.7-acre Sunbow II, Phase 3 Project Area, there are approximately 62.07 acres of land designated MSCP Preserve, the 3.9- acre Poggi Easement area and approximately 69.7 acres of development area. In 2004, 2009 and most recently in 2019, the Applicant pursued a General Plan Amendment and rezone to convert the Sunbow II, Phase 3 Industrial Park from Limited Industrial to residential land uses. In response to this request, the Chula Vista City Council approved the Community Benefit Agreement on January 7, 2020 (Adopted by Resolution 2020-003) between the Applicant and the City which would allow the Applicant to process entitlements to convert the undeveloped Sunbow II, Phase 3 site from Limited Industrial to residential uses, open space and other associated land used described below. The Community Benefit Agreement would provide funding that can be utilized by the City to facilitate the construction of high value job producing land uses within the City. Refer to Section IV. Public Benefit Considerations for additional details. On February 26, 2020, ACI Sunbow, LLC (Applicant) filed an application with the City of Chula Vista for the Sunbow II, Phase 3 Sectional Planning Area (SPA) Plan Amendment . The application included the discretionary actions necessary to implement a proposal to rezone the Sunbow II, Phase 3 Industrial Park to residential, Community Purpose Facility and other related land uses. The application also includes a proposed a minor MSCP Boundary Adjustment between the development Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 3 May 2021 area and the adjacent Chula Vista MSCP Preserve area north and west of Planning Area 23, which would result in a 0.09 acre increase to MSCP Preserve Open Space within the 135.7-acre Project Area. The Project includes the following: • Chula Vista General Plan Amendment • Sunbow II General Development Plan Amendment • Chula Vista MSCP Subarea Plan Boundary Adjustment • Sunbow II SPA Plan Amendment • Rezone • Tentative Map • Development Agreement The scope of the Project encompasses Sunbow II, Phase 3. Based upon a more precise level of engineering information currently available, including GIS mapping, the Sunbow II, Phase 3 development area acreage has been refined and encompasses 67.5 acres, which includes 44.2 acres of residential, a 0.9-acre Community Purpose Facility (CPF) site, 5.9 acres of public streets and 16.5 acres of manufactured open space slopes and basins. Approximately 4.3 acres of Poggi Creek Conservation Easement area, a 0.3-acre conserved wetland resource area and 63.61 acres of MSCP Preserve area are also within the 135.7-acre Project Area. The City of Chula Vista contracted with HR&A Advisors, Inc. to assist the Development Services Department in understanding 1) the potential impact of the proposed industrial rezoning on Chula Vista’s ability to meet the City’s long-term employment goals; and 2) whether it is reasonable to expect the Sunbow property would develop as an industrial property rather than remain vacant, if it were to retain its current industrial zoning. The Sunbow II, Phase 3 Market and Financial Analysis of Industrial Use (HR&A 2021) is provided as Attachment B to this report. The City also requested that the Applicant prepare the City’s Net Fiscal Impact Model to estimate the fiscal impacts of the Project. The Applicant retained Development Planning & Financing Group (DPFG) to prepare the City’s Net Fiscal Impact Model. The Sunbow II, Phase 3 – Fiscal Impact Analysis (DPFG 2021) is provided as Attachment C to this report. II. Existing Site Conditions The 135.7-acre Project Area is within the municipal boundaries of the City of Chula Vista. The Project Area is located within the Chula Vista General Plan (CVGP), Master Planned Communties Subarea. The current CVGP designates Sunbow II, Phase 3 as Limited Industrial (46.0 acres) and the adjacent MSCP Preserve area is designated Open Space Preserve. The Project Area is currently governed by the Planned Community District Regulations approved with the 1990 Sunbow II SPA Plan. However, 1 The proposed MSCP Preserve area also includes approximately 1.31 acres of “Mapping Correction area” and approximately 1.12 acres of MSCP Allowable Use (Basin – Future Facility). Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 4 May 2021 Sunbow II, Phase 3 Planned Community Regulations specific to the Project are provided in the Sunbow II, Phase 3 SPA Plan Amendment, Chapter 14.0. The Project Area is vacant and undeveloped. Surrounding land uses include existing Olympic Parkway and Sunbow single family homes to the north, the Otay Landfill to the south, future Otay Ranch Village 2 West to the east and existing single family homes to the west. The Project Area landform consists of undulating slopes south of existing Poggi Creek. Access to the Project Area is provided directly from Olympic Parkway, an existing 6-Lane Prime Arterial roadway, via the extension of two public streets planned through the project site. Regional access is provided via I-805 to the west and SR-125 to the east. (See Vicinity Map below) Access, surrounding land use designations and adopted and proposed Sunbow II, Phase 3 land use designations are depicted on the “General Plan Land Use Diagram” provided below. Vicinity Map Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 5 May 2021 III. Proposed Amendments and Project Proposal The Applicant proposes to amend the CVGP Land Use Diagram to change the land use designation from Limited Industrial to High Residential, Medium-High Residential and modify the limits of Open Space Preserve and Open Space land uses within the Project Area. The proposed amendments to CVGP are outlined below. A. Proposed Amendments This proposal includes amendments to the following CVGP diagrams and tables: • General Plan Land Use Diagram (Figure 5-12, Page LUT-47) – o Modify the General Plan land use designations from Limited Industrial to High Residential, Medium High Residential, Open Space and Open Space Preserve • General Plan Land Use Distribution in 2030 (Acreages), (Table 5-6, Page LUT-56) o Modify the land use acreages of Medium-High Residential, High Residential, Open Space Preserve and Open Space to reflect the Project • General Plan Land Use in 2030 (Table 5-7, Page LUT-57) o Modify the residential dwelling units within the Medium-High and High residential land uses and and acreage by land use designations to reflect the Project See Attachment B, Chula Vista General Plan Amendment Consistency Analysis for an analysis demonstrating how the proposed project is consistent with applicable CVGP Objectives and Policies. B. Project Proposal The proposed Sunbow II, Phase 3 Site Utilization Plan includes 718 multi-family attached dwelling on 44.2 acres, 63.6 acres designated MSCP Preserve and 16.5 acres comprised of manufactured slopes and basins, 5.9 acres of public streets, a 0.9-acre Community Purpose Facility (private recreation facility), a 0.3-acre conserved wetland resource and 4.3 acres of Poggi Creek Conservation Easement areas. Four distinct multi-family residential product types are proposed within the Project, including 2- and 3-story row townhomes and triplex homes served by private streets and drives. A Community Purpose Facility designed as a private recreation facility is conveniently located and is planned as a private swim club for homeowner use. The areas designated Open Space Preserve would become part of the City’s permanent MSCP Preserve. A comparison between the Sunbow II, Phase 3 land uses approved in the 2009 Sunbow II SPA Plan and the Proposed Sunbow II, Phase 3 SPA Amendment are depicted in Table 1 below: Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 6 May 2021 Table 1 – Comparison of Land Uses: 1990 Sunbow II SPA Plan to 2020 Proposed Project1 Approved Land Uses Proposed Project Land Uses Approved vs. Proposed Land Uses Land Use Acres Units Acres Units Acres Units Research & Limited Industrial 46.0 -46.0 Residential Medium High 36.6 534 +36.6 +534 Residential High 7.6 184 +7.6 +184 Community Purpose Facility 0.9 +0.9 Preserve Open Space 62.1 63.62 0 +1.5 Open Space/Other3 27.6 21.1 -6.5 Circulation 5.9 +5.9 TOTAL 135.7 135.7 718 +0.0 +718 1Acreage reflects rounding of numbers to nearest 1/10th acre and may vary slightly from calculated total. 2 Preserve Open Space includes 1.31 acres of “Mapping Correction Area.” 3 Includes manufactured slopes, basins, Poggi Creek Conservation Easement areas and conserved wetland resource area. C. Development Schedule The Project development schedule assumes entitlements are approved in mid-2021. Initial grading activities are planned to begin immediately after entitlement approvals, with build out anticipated by approximately 2028. D. Fiscal Impact Analysis Update The Applicant prepared an updated fiscal analysis for Sunbow II, Phase 3 utilizing the City’s fiscal model. The fiscal update assumes full build out 718 residential units. The results generated from the fiscal model meet the requirements of CVMC 19.09.040 and demonstrate that the Project will generate an annual fiscal surplus in Years 1 - 20 ($46,461 - $270,298) and a cumulative fiscal surplus over the first 20 years of approximately $3,218,323. (See Attachment C, Sunbow II, Phase 3 Fiscal Impact Analysis, 2020). E. Other Sunbow II, Phase 3 Entitlements Along with this proposed CVGP Amendment, the Applicant is concurrently processing the following entitlements: • Sunbow GDP Amendment; • Chula Vista MSCP Boundary Adjustment; • MSCP Minor Amendment (to address temporary off-site grading impacts); • Sunbow SPA Plan Amendment (including required SPA Appendices); • Rezone; • Tentative Map (CVT # 20-0002); and • Development Agreement Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 7 May 2021 IV. Land Use Considerations The Sunbow Industrial Park is the last remaining undeveloped portion of the Sunbow II SPA Plan . The Sunbow II, Phase 3 site was designated Limited Industrial (IL) and Open Space (OS) in the 1989 Chula Vista General Plan and the 2005 General Plan Update. In 2004 and again in 2019, the Applicant pursued revisions to the land use designation within the Sunbow II, Phase 3 area. 30 years after the Sunbow II SPA Plan was approved, and with no market interest to invest in public improvement and grading for the Sunbow Industrial Park over that same timeframe, the Applicant submitted a request to initiate a General Plan amendment and rezone to develop as a residential/commercial development. As part of the review of the GPA initiation request, the City raised questions regarding the viability of industrial uses planned for the site vs. development of office and residential land uses. In response to these issues, the Applicant prepared an Employment Analysis and Fiscal Impact Analysis. The employment analysis concluded that commercial office uses in general produce a high er number of jobs than light industrial uses. The fiscal analysis identified that a modest amount of commercial use would offset the fiscal impacts of a market rate housing development. In order to encourage development of viable employment lands in eastern Chula Vista that will also serve as a catalyst for development of a university campus, the City asked the Applicant for alternative solutions to achieve the City’s goals and address the contention that the industrial development market could not overcome the necessary construction costs of the Sunbow Industrial Business Park stie. The Community Benefits Agreement provided the City and Applicant preferred solutions. On January 7, 2020, the Chula Vista City Council approved the Community Benefit Agreement (CBA) between the City of Chula Vista and ACI Sunbow, LLC by Resolution No. 2020-003, which would allow the Applicant to process entitlements that would involve converting the undeveloped 46-acre site designated Limited Industrial to residential uses. For the City, the CBA would provide funding that can be utlized by the City to direct the construction of either a Class “A” office building that would facilitate high quality job enhancement uses along the SR-125 corridor on City or non-profit owned land or a commercial/academic building that can facilitate either an academic or private-sector market-rate project to advance the vision of the University Innovation District (such as enabling the development of an Institute for International Studies), or some other notable project at the City’s discretion. The City of Chula Vista contracted with HR&A Advisors, Inc. to assist the Development Services Department in understanding the potential economic implications of the proposed General Plan Amendment. HR&A Advisors Inc. prepared the Sunbow II, Phase Market and Fiscal Analysis of Industrial Use (2021). The analyses included the following conclusions: “Chula Vista currently has enough developable land to accommodate projected industrial demand with a surplus of 190 to 311 acres of vacant developable industrial land remaining after 2050.” “With a FAR of approximately 0.38, tied to the blended average between standard industrial and flex spaces in the region, this analysis indicates that the city will need 118 and 239 acres to accommodate future industrial growth. Based on the city’s current industrial land uses and Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 8 May 2021 zoned capacity, Figure 15 shows that, after accounting for future industrial demand, the city would still have at least 190 acres of additional, undeveloped industrial lands. If rezoning of the Site is approved, between 147 and 268 net acres of land zoned for industrial use are likely to remain in Chula Vista.” The HR&A analyses also resulted in the following conclusions regarding the viability of the Planning Area 23 site developing as an industrial use: “Significant topographical variation on the site is a barrier to industrial development due to the expense and time associated with grading and site development preparation.” “Based on an analysis of recent land sales and the lack of developer or end-use interest over the past 20 years, industrial development on the Site is unlikely to be financial feasible.” Under the proposed land uses, Sunbow II, Phase 3 is designed to help satisfy the increasing demands for attainable work-force homes and move-up home buyers. The amended Sunbow II, Phase 3 land use plan provides four distinct multi-family product types with 15 unique floor plans. Connections to existing bicyle and pedestrian facilities, specifically the Chula Vista Regional Trail and dedicated bike lanes along Olympic Parkway, are also planned. The on-site pedestrian pathways connect a series of passive and active recreational areas and provide pleasant and convenient walking routes throughout the residential neighborhoods. A centrally located private recreation facility will provide a gathering area and meet the social and recreational needs of the residents. The proposed land use plan is compatible with adjacent residential land uses within the existing Sunbow Planned Community and creates a unique theme and experience for its residents and visitors. The Project is designed as a residential enclave featuring contemporary architectural styles. Architecture will include a variety of distinct and unique combinations of elevations and colors. The landscape design compliments the contemporary architectural styling of the community while providing a series of open space amenities to serve the active and passive recreational needs of the community. The landscape evolves from a naturalized aesthetic at the edges to a drought tolerant gardenesque tyling in the central streetscape and green spaces. A buffer that serves as the fuel modification area is planned at the perimeter of the development area and along the development edge adjacent to the on-site MSCP Preserve areas. Walls and landscape materials will provide visual softening and screening from adjacent properties. Impacts to adjacent development are not anticipated. V. Economic Considerations The Applicant prepared an updated fiscal analysis for Sunbow II, Phase 3 utilizing the City’s fiscal model. The fiscal update assumes build out 718 residential units. The results generated from the fiscal model meet the requirements of CVMC 19.09.040 and demonstrate that the Project will generate an annual fiscal surplus in Years 1 - 20 ($46,461 - $270,298) and a cumulative fiscal surplus over the first 20 years of approximately $3,218,323. (See Sunbow II, Phase 3 Fiscal Impact Analysis, 2021). Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 9 May 2021 The Community Benefits Agreement provides the City with an opportunity to facilitate economic growth by the Applicant providing $8.0 million (“Job Enhancement Funds”) in support funding for the development of a Class “A” office building within the SR-125 corridor. The construction of such office spaces would provide a catalyst for development that could generate high -quality jobs in locations currently suitable for construction. In addition to payment of the $8.0 million Job Enhancement Funds, the City would also receive Park Benefit Fees (approximately $11.06 million) for park and recreation amentities that can be used by the City to acquire and/or develop parkland, as the City determines appropriate and in the best interest of the City. VI. Environmental Considerations An Environmental Impact Report (EIR) was prepared for the Sunbow II, Phase 2 SPA Plan Amendment. The following technical reports were prepared for the EIR to determine potential environmental impacts associated with the Project and to evaluate potential impacts of the adjacent Otay Landfill on proposed residential development within Planning Area 23:. See Sunbow II, Phase 3 SPA Amendment EIR for additional details. • Memorandum (Appendix B) and Health Risk Assessment (Dudek 2020) • Sunbow II, Phase 3 – Noise Impact Analysis (Dudek 2020) • Sunbow II, Phase 3 SPA Amendment – Biological Impact Analysis Report (Merkel 2021) • Sunbow II, Phase 3 SPA Amendment - Functional Equivalency Analysis for MSCP Boundary Line Adjustment and Facility Siting Criteria Report (Merkel 2020) • Habitat Restoration and Sensitive Species Mitigation Plan for the Sunbow II, Phase 2 SPA Plan Amendment (Merkel 2020) • Sunbow II, Phase 3 Geotechnical Investigation (GEOCON, Inc. 2020) • Priority Development Project (PDP) Storm Water Quality Management Plan for the Sunbow II, Phase 3 Tentative Map (Hunsaker 2020) • Drainage Study for Sunbow II, Phase 3 (Hunsaker 2021) • Traffic Impact Analysis for Sunbow II, Phase 3 (Linscott, Law & Greenspan 2021) • Overview of Water Service for Sunbow II, Phase 3 (Dexter Wilson Engineering 2020) • Sewer System Evaluation for Sunbow II, Phase 3 (Dexter Wilson Engineering 2020) • Sunbow II, Phase 3 SPA Amendment Water Conservation Plan Updated (SPA Plan Appendix E) (Dexter Wilson Engineering 2020) • Cultural and Paleontological Resources Report for Sunbow II, Phase 3 (Dudek 2020) • Sunbow II, Phase 3 Fiscal Impact Analysis (DPFG 2021) • Sunbow II, Phase 3 Market and Financial Analysis of Industrial Use (HR&A Advisors, Inc. 2021) VII. Housing Development Considerations Sunbow II, Phase 3 is designed to help satisfy the increasing demand for attainable work-force homes and move-up home buyers. The amended Sunbow II, Phase 3 land use plan provides four distinct multi-family product types with 15 unique floor plans. A centrally located private recreation facility will provide a gathering area and meet the social and recreational needs of the residents.The Sunbow Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 10 May 2021 II, Phase 3 Project is subject to the City of Chula Vista Balanced Community Affordable Housing Policies. This obligation is addressed in the Sunbow II, Phase 3 Balanced Communities Affordable Housing Agreement and Development Agreement. VIII. Infrastructure Considerations The City approved the Sunbow II Public Facility Finance Plan (PFFP) by Resolution No. 15524 on February 20, 1990 that outlines the infrastructure, services and facilities needed to serve the Sunbow Planned Community, consistent with the City’s Growth Management Program. The Supplemental PFFP (2021) addresses traffic, police, fire and emergency medical services, schools, libraries, parks, trails and open space, water, sewer, drainage, air quality, civic center corporation and other public faciities to ensure the Project provides the infrastructure necessary to serve Sunbow II, Phase 3. IX. Public Benefit Consideration The Community Benefits Agreement provides the City with the ability to facilitate development within the SR-125 corridor or the University Innovation District in the academic, high technology and innovation fields that produce opportunities for high paying jobs for the residents of Chula Vista. The Applicant’s commitments to providing $8.0 million in Job Enhancement Funds, will allow the City to realize significant economic, social, and other benefits. These public benefits will advance the interests and meet the needs of Chula Vista’s residents and visitors to a significantly greater extent than the vacant land under the current entitlements and absent the Community Benefits Agreement. In addition to payment of the $8.0 million Job Enhancement Funds, the City would also receive Park Benefit Fees (approximately $11.03 million) for park and recreation amentities that can be used by the City to acquire and/or develop parkland, as the City determines appropriate and in the best interest of the City. The Applicant has also entered into a Development Agreement with the City of Chula Vista that memorializes the commitments in the Community Benefits Agreements and how the Community Purpose Facility and affordable housing obligations are satisfied, among other things. X. Annexation No annexations actions are planned for the Project. XI. List of Proposed General Plan Amendments With the proposed amendments, the Project will remain consistent with the Chula Vista General Plan land use, transportation, economic development, housing, public facilities and services, environmental and growth management objectives and policies. This section provides a list of proposed amendments by CVGP page number. Proposed revisions to CVGP diagrams and tables are provided below. Chapter 5 – Land Use and Transportation Element • General Plan Land Use Diagram (Figure 5-12, Page LUT-47) – o Modify the General Plan land use designation with Planning Area 23 from Limited Industrial to Medium High and High Residential Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 11 May 2021 o Modify the limits of development for the Medium High and High Residential, Open Space and Open Space Preserve land use boundaries per the MSCP Boundary Adjustment • General Plan Land Use Distribution in 2030 (Acreages), (Table 5-6, Page LUT-56) o Modify the Medium High, High, Limited Industrial and Open Space and Open Space Preserve acreages to reflect the Project • General Plan Land Use in 2030 (Table 5-7, Page LUT-57) o Modify the residential dwelling units within the Medium High and High land use designations to reflect the project Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 12 May 2021 ADOPTED - GENERAL PLAN LAND USE DIAGRAM, FIGURE 5-12 (PAGE LUT-47) Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 13 May 2021 PROPOSED - REVISION TO - GENERAL PLAN LAND USE DIAGRAM, FIGURE 5-12 (PAGE LUT-47) Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 14 May 2021 EXISTING TABLE 5-6: GENERAL PLAN LAND USE DISTRIBUTION IN 2030 (ACREAGES) General Plan Land Use Designation Total General Plan Area Bayfront Northwest Southwest East East Chula Vista Subareas Unincorporated Sweetwater Subareas Unincorporated Otay Ranch Subareas Residential Low 6,977 - 64 - 1,560 2,453 2,900 Low Medium 8,010 - 1,354 1,401 4,737 307 211 Medium 1,604 - 187 288 1,025 32 72 Medium High 665 - 143 113 312 - 97 High 525 - 124 253 148 - - Urban Core 84 - 84 - - - - Bayfront High 14 14 - - - - - Commercial Retail 826 - 115 202 477 32 - Visitor 148 135 11 2 - - - Professional & Admin. 160 13 61 7 67 12 - Mixed Use Mixed Use Residential 933 - 174 98 611 - 50 Mixed Use Commercial 135 25 37 58 15 - - Mixed Use Transit Focus Area 122 - 83 39 - - - Industrial Limited Industrial 1,885 62 116 384 1,107 - 216 Regional Technology Park 85 - - - 85 - - General Industrial 175 175 - - - - - Public, Quasi Public and Open Space Public, Quasi Public 2,901 55 225 321 1,880 381 39 Parks and Recreation 978 74 73 106 606 88 31 Open Space 7,305 100 215 617 3,578 1,101 1,694 Open Space Preserve 16,926 362 18 97 4,582 1,997 9,870 Open Space - Active Recreation 375 8 44 - 323 - - Water 2,672 1,498 - - - 9 1,165 Special Planning Area Eastern Urban Center 266 - - - 266 - Resort 230 - - - - 230 Town Center 85 - - - 85 - Other² 4,606 99 866 829 2,343 408 61 Total Acres 58,692 2,620 3,994 4,815 23,807 6,820 16,636 Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 15 May 2021 PROPOSED TABLE 5-6: GENERAL PLAN LAND USE DISTRIBUTION IN 2030 (ACREAGES) (Proposed changes shown in red) General Plan Land Use Designation Total General Plan Area Bayfront Northwest Southwest East East Chula Vista Subareas Unincorporated Sweetwater Subareas Unincorporated Otay Ranch Subareas Residential Low 6,977 - 64 - 1,560 2,453 2,900 Low Medium 8,010 - 1,354 1,401 4,737 307 211 Medium 1,604 - 187 288 1,025 32 72 Medium High 708 - 143 113 355 - 97 High 537 - 124 253 160 - - Urban Core 84 - 84 - - - - Bayfront High 14 14 - - - - - Commercial Retail 826 - 115 202 477 32 - Visitor 148 135 11 2 - - - Professional & Admin. 160 13 61 7 67 12 - Mixed Use Mixed Use Residential 933 - 174 98 611 - 50 Mixed Use Commercial 135 25 37 58 15 - - Mixed Use Transit Focus Area 122 - 83 39 - - - Industrial Limited Industrial 1,839 62 116 384 1,061 - 216 Regional Technology Park 85 - - - 85 - - General Industrial 175 175 - - - - - Public, Quasi Public and Open Space Public, Quasi Public 2,901 55 225 321 1,880 381 39 Parks and Recreation 978 74 73 106 606 88 31 Open Space 7,299 100 215 617 3,572 1,101 1,694 Open Space Preserve 16,927 362 18 97 4,583 1,997 9,870 Open Space - Active Recreation 375 8 44 - 323 - - Water 2,672 1,498 - - - 9 1,165 Special Planning Area Eastern Urban Center 266 - - - 266 - Resort 230 - - - - 230 Town Center 85 - - - 85 - Other² 4,606 99 866 829 2,343 408 61 Total Acres 58,696 2,620 3,994 4,815 23,811 6,820 16,636 Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 16 May 2021 EXISTING TABLE 5-7: GENERAL PLAN LAND USE IN 2030 General Plan Land Use Designation 2030 Acres 2030 Dwelling Units RESIDENTIAL Low 6,977 8,232 Low Medium 8,010 41,286 Medium 1,604 16,159 Medium High 665 10,314 High 525 15,382 Urban Core 84 3,830 Bayfront High 14 1,500 COMMERCIAL Retail 826 Visitor 148 Professional & Office 160 MIXED USE Mixed Use Residential 933 17,639 Mixed Use Commercial 135 Mixed Use Transit Focus Area 122 3,782 INDUSTRIAL Limited Industrial 1,885 Regional Technology Park 85 General Industrial 175 PUBLIC, QUASI PUBLIC AND OPEN SPACE Public/Quasi-Public 2,901 Parks and Recreation 978 Open Space 7,305 Open Space Preserve 16,926 Open Space - Active Recreation 375 Water 2,672 SPECIAL PLANNING AREA Eastern Urban Center 266 4,905 Resort 230 Town Center 85 1,929 OTHER* 4,606 TOTAL 58,692 124,958 * Streets, freeways, utility rights-of-way Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 17 May 2021 PROPOSED TABLE 5-7: GENERAL PLAN LAND USE IN 2030 (Proposed amendments shown in red) General Plan Land Use Designation 2030 Acres 2030 Dwelling Units RESIDENTIAL Low 6,977 8,232 Low Medium 8,010 41,286 Medium 1,604 16,159 Medium High 708 10,848 High 537 15,566 Urban Core 84 3,830 Bayfront High 14 1,500 COMMERCIAL Retail 826 Visitor 148 Professional & Office 160 MIXED USE Mixed Use Residential 933 17,639 Mixed Use Commercial 135 Mixed Use Transit Focus Area 122 3,782 INDUSTRIAL Limited Industrial 1,839 Regional Technology Park 85 General Industrial 175 PUBLIC, QUASI PUBLIC AND OPEN SPACE Public/Quasi-Public 2,901 Parks and Recreation 978 Open Space 7,299 Open Space Preserve 16,927 Open Space - Active Recreation 375 Water 2,672 SPECIAL PLANNING AREA Eastern Urban Center 266 4,905 Resort 230 Town Center 85 1,929 OTHER* 4,606 TOTAL 58,696 125,676 * Streets, freeways, utility rights-of-way Sunbow II, Phase 3 Chula Vista General Plan Amendment Report Page 18 May 2021 THIS PAGE INTENTIONALLY LEFT BLANK ATTACHMENT A SUNBOW II, PHASE 3 SPA PLAN AMENDMENT CHULA VISTA GENERAL PLAN CONSISTENCY ANALYSIS 1 Sunbow II, Phase 3 General Plan Consistency Analysis Chula Vista General Plan Applicable Objectives/Policies The following is a consistency analysis of the applicable Chula Vista General Plan Objectives and Policies. OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS LAND USE AND TRANSPORTATION Objective – LUT 1: Provide a balance of residential and non-residential development throughout the City that achieves a vibrant development pattern, enhances the character of the City, and meets the present and future needs of all residents and businesses. LUT 1.1 Ensure that land uses develop in accordance with the Land Use Diagram and Zoning Code in an effort to attain land use compatibility. The Sunbow GDP and Chula Vista General Plan designate Sunbow II, Phase 3 as Limited Industrial and Open Space. Further, the Sunbow SPA Plan adopted in 1990 also designated Planning Area 23 as an Industrial Park. The Sunbow Planned Community is built-out, with the exception of Planning Area 23. The Applicant unsuccessfully marketed Planning Area 23 as an Industrial Park. In response to the Applicant’s request for a General Plan Amendment Authorization, the Applicant and the City entered into a Community Benefits Agreement on January 7, 2020 (Adopted by Resolution No. 2020-003) which provided economic benefits to the City and also allowed the Applicant to process an application to change the land use designation to High and Medium-High Residential Upon approval of the Sunbow SPA Amendment and PC District Regulations and establishes zoning districts would be in accordance with the amended General Plan Land Use Diagram. The City of Chula Vista contracted with HR&A Advisors, Inc. to prepare the Sunbow II Phase 3 Market and Financial Anlaysis of Industrial Use (March 26, 2021) (HR&A Analysis), that analyzes the potential implications of rezoning Planning Area 23 from industrial to residential land uses (HR&A Analysis, provided as an attachment to the Fiscal Impact Analysis). The HR&A Analysis also analyzed the feasibility of developing Planning Area 23 portion of Sunbow II, Phase 3 as an Industrial Park. The HR&A Analysis concluded that the City would need approximately 118 to 239 acres of industrially zoned land to meet the calculated demand for 1.9 million to 3.8 million square feet of industrial space in Chula Vista by 2050. Given that the City’s inventory of industrially zoned land is estimated at approximately 428 acres, the HR&A Analysis concluded that, if the proposed project is approved, the City would have between 190 and 311 acres of vacant industrially zoned land remaining after 2050. 2 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS The HR&A Analysis analyzed the feasibility of developing Planning Area 23 as a industrial site and concluded that, due to the high cost to develop Planning Area 23, industrial development is “unlikely to be financially feasible.” The current proposal for a residential enclave is compatible with the existing Sunbow residential development north of Olympic Parkway. (See Sunbow II, Phase 3 Land Use Context Exhibit). LUT 1.2 Coordinate planning and redevelopment activities and resources to balance land uses, amenities, and civic facilities in order to sustain or improve the quality of life. The project will offer residential, a private recreation facility and shared passive open space areas designed to meet the daily recreational needs of residents. LUT 1.4 Seek to achieve an improved balance between jobs and housing in Chula Vista. The project provides housing in close proximity to the major employment centers in Chula Vista, Otay Mesa and downtown San Diego. LUT 1.5 Endeavor to create a mixture of employment opportunities for citizens’ at all economic levels. As provided for in the Community Benefits Agreement (CBA) and the Development Agreement (DA) between the Applicant and the City of Chula Vista the Applicant would deposit $8M with the City “Job Enhancement Funds” to be utilized as seed funding for the construction of either: a Class “A” office building that would facilitate high quality job enhancement uses along the SR-125 corridor or a commercial/academic building that can facilitate either an academic or private-sector market-rate project to advance the vision of the University Innovation District Master Plan (such as enabling the development of an Institute for International Studies), or some other notable project at the City’s discretion which will create high value jobs for all income levels. LUT 1.6 Attract and maintain land uses that generate revenue for the City of Chula Vista, while maintaining a balance of other community needs, such as housing, jobs, open space, and public facilities. The Sunbow II, Phase 3 Fiscal Impact Analysis prepared for the Project demonstrates that the Project complies with LUT 1.6 and CVMC Section 19.09.040.H.3 in that it produces net positive revenue to the City of Chula Vista over the 20-year timeframe. Revenues range from an annual fiscal surplus in Years 1 - 20 ($46,461 - $270,928) and a $3,218,323 cumulative fiscal surplus over the first 20 years of approximately. The project provides a balance of residential development and the preservation of 63.6 acres of land designated as part of the City’s MSCP Preserve. The Community Benefits Agreement and the Development Agreement provides the City with an opportunity to facilitate economic growth by the Applicant providing $8.0 million (“Job Enhancement Funds”) in support funding for the development of a Class “A” office building within the SR-125 corridor. The construction of such office spaces would provide a catalyst for development that could generate high-quality jobs in locations currently suitable for construction. In addition to payment of the $8.0 million Job Enhancement Funds, the City would also receive Park Benefit Fees (approximately $11.03 million) for park and recreation amenities that can be used by the City to acquire 3 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS and/or develop parkland, as the City determines appropriate and in the best interest of the City. The Project includes an MSCP Boundary adjustment that would result in an increase of 0.09 acres of MSCP Open Space Preserve areas for a total of 63.6 acres of MSCP Open Space Preserve within the Project Area. Also see Response to LUT 1.1 above. LUT 1.7 Provide high-quality public facilities, services, and other amenities within close proximity to residents. The project proposes a community recreation area centrally located to serve Project residents. The facility includes a swimming pool, multi-use hardcourt area, level lawn area, outdoor gathering and dining space, a children’s play area and clubhouse. In addition, the Project distributes small active and passive recreation areas throughout the community conveniently located to serve the residents. The Project provides an enhanced pedestrian walkway along the on-site public streets to connect to the Chula Vista Regional Trail located along Olympic Parkway as well as the dedicated bike lanes along Olympic Parkway. The CBA provides for the payment of a Park Benefit Fee, equal to the PAD fees that would have otherwise been due pursuant to Chula Vista Municipal Code (CVMC) Chapter 17.10, of approximately $11.03 million based on 2019 PAD fees (the final amount will be determined based on the number of residential units built and the PAD fee rates in effect as of the effective date of the Development Agreement) The Park Benefit Fee will satisfy the Owner’s park obligations for the project and may be utilized by the City to acquire or develop parkland, as the City determines appropriate and in the best interest of the overall City. LUT 1.8 Pursue higher density residential categories and retail demand that are not being met within the City. The Project’s residential land uses are in the ‘High” and “Medium-High” residential category consistent with this objective. The existing The Plaza at Sunbow commercial center includes a full-service grocery store, drug store, banks, a gas station, restaurants, and other commercial uses intended to serve the entire Sunbow Planned Community. There were no other retail uses anticipated in the Chula Vista General Plan, Sunbow GDP or the Sunbow SPA Plan. Though the Project does include retail land uses, it is planned to provide much needed housing and help meet the City’s housing demands identified in the SANDAG Housing Needs Assessment Report. In addition, through payment of the Job Enhancement Funds, the project provides economic stimulus funding per the CBA that benefits the entire City of Chula Vista. LUT 1.9 Provide opportunities for development of housing that respond to diverse community needs in terms of density, size, location, and cost. The Project provides for-sale housing to meet the needs of a diverse community. Densities range from 13.3 to 24.1 units per acre and products provide a range of bedroom typologies for singles, couples, and families. Some homes will have private rear yards, while the highest density 4 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS product type will have a private balcony. Product types are focused on providing attainable housing as well as meeting the need for move-up home buyers. Though the Project will not include any on-site affordable housing, it will include a Chula Vista Balanced Affordable Housing Agreement in conformance with the City’s Balanced Community Affordable Housing policy. LUT 1.10 Maintain an adequate supply of land designated and zoned for residential use at appropriate densities to meet housing needs, consistent with the objective of maintaining a balance of land uses. The Project supports the creation of new housing as articulated in the Housing Element. The Project will provide 718 new housing units for the current and future residents of Chula Vista which, combined with the CBA Job Enhancement Funds financial stimulus, ensures a jobs/housing balance in the City of Chula Vista. LUT 1.13 Maintain neighborhood and community shopping centers of sizes and at locations that offer both choice and convenience for shoppers and residents, while sustaining a strong retail base for the City. Retail uses are provided within the Sunbow Planned Community and other proximate sites. The existing “Plaza at Sunbow” commercial/retail center includes a full-service grocery store, drug store, banks, a gas station, restaurants, and other commercial uses intended to serve the entire Sunbow Planned Community. There were no other retail uses anticipated in the Chula Vista General Plan, Sunbow GDP or the Sunbow SPA Plan for the Sunbow Planned Community. The project will not impact the availability or sustainability of existing retail shopping centers. In fact, the increased population resulting from the Project will increase use of the existing Plaza at Sunbow Shopping Center, thereby enhancing the viability of this existing neighborhood shopping center. LUT 1.15 Allow office uses that are associated with complementary commercial service businesses in commercial service areas. The Applicant’s contribution of the $8M Job Enhancement Fund financial stimulus will increase the ability of the City to assist and attract employers to grow their operations in the City of Chula Vista thus resulting in varied office and commercial uses and future job creation. These public benefits will advance the interests and meet the needs of Chula Vista’s residents and visitors to a significantly greater extent than the vacant land under the current entitlements and absent the Community Benefits Agreement. LUT 1.17 Encourage the development of cultural and performing arts nodes in different areas throughout the City, each with a specific non - competing focus, such as viewing performances or works of art, and learning about, creating, or purchasing art. In conjunction with the CBA, the project will provide Park Benefit Fees which may be utilized by the City to support programming within the City’s public park system to encourage a diversity of uses, which may include art shows and cultural festivals. Objective – LUT 3: Direct the urban design and form of new development and redevelopment in a manner that blends with and enhances Chula Vista’s character and qualities, both physical and social. LUT 3.1 Adopt urban design guidelines and/or other development regulations for all Districts or Focused Areas of Change as presented in Sections LUT 8.0 - 10.0 of the Land Use and Transportation Element, as necessary, to ensure that new development or redevelopment recognizes and enhances the character and The Sunbow II, Phase 3 SPA Plan Amendment includes Planned Community District Regulations as well as Landscape and Design Guidelines to ensure new development recognizes and enhances the character and identity of adjacent areas. The architectural theme for the Project is a modern interpretation of the existing architecture within the Sunbow Planned Community. In 5 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS identity of adjacent areas, consistent with this General Plan’s Vision. addition, the proposed Planned Community District Regulations are equal to or greater than the existing Sunbow SPA regulations design guidelines and will be appropriately implemented to ensure the proposed residential enclave has its own identity. LUT 3.2 Any such urban design guidelines and/or other development regulations shall be consistent with other, related policies and provisions in this General Plan, including Sections 7.3 through 7.6. The Sunbow SPA Plan Amendment includes Planned Community District Regulations as well as Landscape and Design Guidelines consistent with the policies and provisions of the General Plan. Objective – LUT 5: Designate opportunities for mixed use areas with higher density housing that is near shopping, jobs, and transit in appropriate locations throughout the City. LUT 5.1 Promote mixed use development, where appropriate, to ensure a pedestrian-friendly environment that has opportunities for housing; jobs; childcare; shopping; entertainment; parks; and recreation in close proximity to one another. Because of its location, the Project is not an appropriate location for mixed use development and is not designated for mixed use development in the General Plan. However, the existing Sunbow Planned Community provides a variety of land uses, including housing, child care, a school, public parks and shopping areas. See Figure 1, Aerial Context. LUT 5.2 Encourage new development that is organized around compact, walkable, mixed use neighborhoods and districts in order to conserve open space resources, minimize infrastructure costs, and reduce reliance on the automobile. Based on the Project specific VMT analysis using a proxy site, the Project would exceed the VMT threshold. Several quantifiable Transportation Demand Management (TDM) strategies can be used to mitigate a project’s VMT impacts. TDM strategies can be quantified using methodologies described in Quantifying Green House Gas Mitigation Measures published by the California Air Pollution Control Officers Association (CAPCOA) in 2010. While many of the CAPCOA Measures were considered applicable to the Project, the “Land Use / Location – Increased Density” measure was selected to reduce the Project’s VMT impact. The calculations provided in the CAPCOA methodology for the recommended measure produces a VMT reduction based on the number of dwelling units per acre. Based on the Project’s proposed density of 16.3 units per acre, the VMT reduction is 8.0%. This measure exceeds the Project’s 1.4% VMT impact and is therefore considered sufficient to reduce the Project’s VMT and avoid a significant impact. The following strategies are recommended to further reduce the number of automobile trips generated by residents of the Project and the distance that the residents drive: • Provide Ride Share coordination services thru the Project’s Home Owner’s Association to match residents interested in carpooling. • Coordinate with near-by schools and / or the Project’s Home Owner’s Association to match residents interested in carpooling to / from schools. • Provide on-site transit opportunities information. • Encourage bicycling by providing on-site bicycle infrastructure such as bike racks. 6 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS LUT 5.3 Authorize and encourage mixed use development in focus areas, including high- density residential housing, neighborhood- serving commercial, and office uses. The CVGP did not identify Sunbow II, Phase 3 as an area that could support mixed use development. The project features high and medium-high density residential development; however, mixed-use development is not feasible in this location. The Sunbow Planned Community includes a mix of housing, neighborhood-serving commercial and office uses intended to serve the entire Sunbow Planned Community, including the Sunbow II, Phase 3 development area. The Applicant’s contribution of the $8M Job Enhancement Fund financial stimulus will increase the ability of the City to assist and attract employers to grow their operations in the City of Chula Vista thus resulting in varied office and commercial uses and future job creation. These public benefits will advance the interests and meet the needs of Chula Vista’s residents and visitors to a significantly greater extent than the vacant land under the current entitlements and absent the Community Benefits Agreement LUT 5.4 Develop the following areas as mixed use centers: Urban Core; Palomar Trolley Station; EUC; and Otay Ranch Village Cores and Town Centers. The Sunbow II, Phase 3 project is not within the Urban Core, Palomar Trolley Station, EUC or Otay Ranch Village Cores and Town Centers identified in the General Plan for mixed use development and therefore is not subject to LUT 5.4. However, the Applicant entered into a CBA with the City which provides an opportunity to facilitate economic growth by providing $8.0 million in funding for development of a Class “A” office building within the SR- 125 corridor or the construction of facilities for academic, institutional, and innovation-related businesses within the University Innovation District. The City is interested in facilitating the creation of high-quality jobs and economic growth within the City by providing opportunities that target and attract industries and businesses that contribute to diversification and stabilization of the local economy. Facilitating such economic growth by encouraging the development of spaces that can be used by high technology and manufacturing businesses within the SR-125 corridor or academic, institutional, and innovation-related businesses within the University Innovation District is a potential solution. The construction of such spaces would provide a catalyst for development that could generate high- quality jobs in locations currently suitable for construction. Through implementation of the CBA, the office uses typically found in an urban mixed-use setting can be realized. LUT 5.11 Endeavor to reduce the number of peak hour automobile trips by supporting increased services near workplaces. The project includes Transportation Demand Management features including: ▪ Provide Ride Share coordination services thru the Project’s Home Owner’s Association to match residents interested in carpooling. 7 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS ▪ Coordinate with near-by schools and / or the Project’s Home Owner’s Association to match residents interested in carpooling to / from schools. ▪ Provide on-site transit opportunities information. ▪ Encourage bicycling by providing on-site bicycle infrastructure such as bike racks. LUT 5.13 Higher density residential and mixed use residential/commercial development should be designed to: create a pleasant walking environment to encourage pedestrian activity; maximize transit usage; provide opportunities for residents to conduct routine errands close to their residence; integrate with surrounding uses to become a part of the neighborhood rather than an isolated project; use architectural elements or themes from the surrounding neighborhood; and provide appropriate transition between land use designations to minimize neighbor compatibility conflicts The project is not identified in the General Plan for mixed use residential/commercial development. The architectural theme for the Project is a modern interpretation of the existing architecture within the Sunbow Planned Community. In addition, the proposed Planned Community District Regulations are equal to or greater than the existing Sunbow SPA regulations and design guidelines and will be appropriately implemented to ensure the proposed residential enclave has its own identity. The project is set back from Olympic Parkway approximately 500’ and provides additional buffers to surrounding land uses at the project perimeter. Given the project is intended to provide housing at attainable levels for various employment sectors, the provision of a shuttle service by the project is not feasible. The project is designed to provide a pedestrian network of walkways connecting neighborhoods and the centrally located private recreation site. In addition, the project provides two direct connections to the existing Chula Vista Regional Trail and bike lanes along Olympic Parkway at two fully signalized intersections. The internal public streets (Streets A & B) are designed to include an enhanced 6’ sidewalk along one side, with expanded landscaped parkways on both sides. Objective- LUT 6: Ensure adjacent land uses are compatible with one another. LUT 6.1 Ensure, through adherence to design guidelines and zoning standards, that the design review process guarantees excellence in design and that new construction and alterations to existing buildings are compatible with the best character elements of the area. The Sunbow SPA Plan Amendment includes Planned Community District Regulations as well as Landscape and Residential Design Guidelines to ensure new development recognizes and enhances the character and identity of adjacent areas. All residential development is subject to the City’s Design Review process. LUT 6.2 Require that proposed development plans and projects consider and minimize project impacts upon surrounding neighborhoods. The project includes PC District Regulations and Landscape and Residential Design Guidelines to ensure the project is compatible with surrounding residential development. The project is set back from Olympic Parkway approximately 500’ and provides additional buffers between surrounding land uses. LUT 6.3 Require that the design of new residential, commercial, or public developments is sensitive to the character of existing neighborhoods through consideration of access, compatible building design and massing, and building height transitions, while maintaining the goals and values set forth in the The project is on an undeveloped site with no abutting residential development. The project includes PC District Regulations and Landscape and Residential Design Guidelines to ensure the project is compatible with future residential development planned east of the site. The project is set back from Olympic Parkway approximately 500’ and provides additional buffers between surrounding 8 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS General Plan. Within transit focus areas, design provisions should include requirements for a minimum building step back of 15 feet for every 35 feet in height, for edges abutting residential uses. land uses. All homes will have a separation from the landfill. The landfill operation is significantly below the top of the slope on the southern project boundary. Fuel modification zones, slope landscaping and wall designs will ensure the homes closest to the landfill property are buffered sufficiently. Objective LUT 7: Appropriate transitions should be provided between land uses. LUT 7.2 Require new or expanded uses to provide mitigation or buffers between existing uses where significant adverse impacts could occur. The project is buffered from existing development on the west and north by over 63.6 acres of MSCP open space and Olympic Parkway and the east and south by a planned buffer/fuel modification area. In addition, home sites within Planning Areas 23 are 50-feet below the adjacent landfill. See above response to LUT 6.3. LUT 7.4 Require landscape and/or open space buffers to maintain a naturalized or softer edge for proposed private development directly adjacent to natural and public open space areas. The project includes a series of graded and revegetated slopes and water quality basins at the edge of development designed to buffer development from the adjacent MSCP Preserve areas, while maintaining a softer edge between the land uses. Objective – LUT 8: Strengthen and sustain Chula Vista's image as a unique place by maintaining, enhancing, and creating physical features that distinguish Chula Vista's neighborhoods, communities, and public spaces, and enhance its image as a pedestrian-oriented and livable community. LUT 8.1 Develop a program to enhance the identity of special districts and neighborhoods to create variety and interest in the built environment, including such items as signage, monuments, landscaping, and street improvements. Sunbow II, Phase 3 is a residential enclave featuring contemporary architectural styles. The community is planned to include four unique multi-family attached product types with 15 distinct floor plans. Architecture will include a variety of distinct and unique combinations of elevations and colors. The Sunbow SPA Plan Amendment includes Planned Community District Regulations as well as Landscape and Residential Design Guidelines which provide guidance for the development of high-quality architecture, landscape, and street improvements. LUT 8.2 Emphasize certain land uses and activities, such as cultural arts; entertainment; specialty retail; or commercial recreation, to enhance or create the identity of specialized districts or Focus Areas in the City. The project does not include the land uses identified in LUT 8.2; however, by providing the Park Benefit Fees, the project supports programming within the City’s public park system to encourage a diversity of uses, which may include art shows and cultural festivals as well as commercial recreation opportunities. LUT 8.3 Ensure that buildings are appropriate to their context and designed to be compatible with surrounding uses and enhance the desired character of their District. The Sunbow SPA Amendment includes residential architectural guidelines and establishes an architectural theme to be implemented within Sunbow II, Phase 3. All residential development within the project is subject to the City’s Design Review process. LUT 8.4 Encourage and require, where feasible, the incorporation of publicly accessible urban open spaces, including: parks; courtyards; water features; gardens; passageways; paseos; and plazas, into public improvements and private projects. The Community Benefit Agreement between the City and the Applicant includes a provision for the waiver of the Project PAD fees and the payment of a Park Benefit Fee, equal to the PAD fees that would otherwise have been due pursuant to Chula Vista Municipal Code (CVMC) Chapter 17.10. As of the writing of this report, the Park Benefit Fee is anticipated to total $11.03 million. The final Park Benefit Fee amount will be determined based on the number of 9 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS residential units constructed and the PAD fee rates in effect as of the effective date of the Development Agreement The Park Benefit Fee will satisfy the Project’s park obligations. The Park Benefit Fees may be utilized by the City to acquire and/or develop parkland, as the City determines appropriate and in the best interest of the City. LUT 8.5 Prepare urban design guidelines that help to create pedestrian-oriented development by providing: • Varied and articulated building facades; • Visual (first floor clear glass windows) and physical access for pedestrians; • Pedestrian circulation among parcels; uses; transit stops; and public or publicly accessible spaces; • Human scale design elements; • Ground floor residential and commercial entries that face and engage the street; and • Pedestrian-oriented streetscape amenities. The Sunbow II, Phase 3 SPA Amendment is not designed in an urban setting to warrant the preparation of “urban design guidelines;” however the SPA Plan amendment includes residential architectural and landscape guidelines and establishes an architectural theme to be implemented within Sunbow II, Phase 3. The project does not include mixed-use development and therefore several of the guidelines in LUT 8.5 are not applicable to the project. LUT 8.6 Develop a master plan for artwork in public places that would identify the types of art desired and establish appropriate settings for the display of art, including within public rights-of-way and landscape medians. LUT 8.6 is a City-wide objective; however, by providing the Park Benefit Fees, the project supports programming within the City’s public park which may include public art displays. LUT 8.7 Ensure that vacant parcels and parcels with unsightly storage uses, such as auto salvage yards, are appropriately screened from the street to reduce their negative visual effects. Because of its location and natural open spaces that buffer the project from Olympic Parkway, negative visual impacts are minimal. The EIR for the project includes a visual simulation that demonstrates the project is not be impacted by unsightly uses on adjacent parcels. The visual simulation clearly demonstrates the slope landscaping and walls adequately buffer the project from any negative visual effects. Objective – LUT 10: Create attractive street environments that complement private and public properties, crea te attractive public rights-of-way, and provide visual interest for residents and visitors. LUT 10.2 Landscape designs and standards shall include a coordinated street furniture palette, including waste containers and benches, to be implemented throughout the community at appropriate locations. The Sunbow II, Phase 3 SPA Plan Amendment includes Landscape Design Guidelines which will ensure implementation of a coordinated design for the community. The design and location of street furniture, if any, will be determined during preparation of the Landscape Master Plan and further refined during the Design Review Process, when the passive and active recreation designs are prepared. The Project does not propose sheltered seating; however, the TIA for the project includes TDM strategies to encourage ridesharing and carpooling amongst residents. LUT 10.3 Provide well-designed, comfortable bus stops throughout the City. See Figure 1, Aerial Context for the location of existing bus stops near the Project. The Applicant will work with the City and MTS to encourage the establishment of a local bus stop closer to the Project; however, the Applicant has no control over the location, timing or feasibility of adding a local bus stop. If bus stops are added, bus shelters would be 10 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS designed consistent with MTS and City of Chula Vista standards. LUT 10.4 Prior to the approval of projects that include walls that back onto roadways, the city shall require that the design achieves a uniform appearance from the street. The walls shall be uniform in height, use of materials, and color, but also incorporate elements, such as pilasters, that add visual interest. A Fence and Wall Plan will be provided as part of the Project’s Landscape Master Plan, consistent with City policies. LUT 10.5 Require under grounding of utilities on private property and develop a priority based program of utility under grounding along public rights- of-way. All new utilities will be undergrounded, consistent with this objective, except as required by utility providers. However, the Applicant will coordinate with the City and utility providers to place above-ground appurtenances in the least intrusive locations. LUT 10.6 Study the locational requirements of utility, traffic control, and other cabinets and hardware located in the public rights-of-way to determine alternative locations for these items in less obtrusive areas of the street environment. The location of utility facilities in the public realm is designed to minimize intrusion into the street environment and avoid conflicts with entry monuments and landscaping, to the greatest extent feasible. The Applicant is not proposing any entry monuments at this time. See response to LUT 10.5 regarding coordinating utility appurtenance locations. Objective – LUT 11: Ensure that buildings and related site improvements for public and private development are well - designed and compatible with surrounding properties and districts. LUT 11.1 Promote development that creates and enhances positive spatial attributes of major public streets, open spaces, cityscape, mountain and bay sight lines, and important gateways into the City. The project maintains and is sensitive to the design elements of Olympic Parkway and the East Orange Avenue Master Plan. LUT 11.2 Promote and place a high priority on quality architecture, landscape, and site design to enhance the image of Chula Vista, and create a vital and attractive environment for businesses, residents, and visitors. Sunbow II, Phase 3 is a residential enclave featuring contemporary architectural styles. Architecture will include a variety of distinct and unique combinations of elevations and colors. The Sunbow SPA Plan Amendment includes Planned Community District Regulations as well as Landscape and Residential Design Guidelines which provide guidance for the development of high-quality architecture, landscape, and street improvements. LUT 11.4 Actively promote architectural and design excellence in buildings, open space, and urban design. Sunbow II, Phase 3 is a residential enclave featuring contemporary architectural styles. Architecture will include a variety of distinct and unique combinations of elevations and colors designed by respected and creative architects and design professionals. LUT 11.5 Require a design review process for all public and private discretionary projects (which includes architectural, site plan, landscape and signage design) to review and evaluate projects prior to issuance of building permits to determine their compliance with the objectives and specific requirements of the City's Design Manual, General Plan, and appropriate zone or Area Development Plans. Design Review is required in the Sunbow II, Phase 3 SPA Plan Amendment. 11 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS Objective – LUT 16: Integrate land use and transportation planning and related facilities. LUT 16.1 Promote the development of well-planned communities that will tend to be self- supportive and, thus, reduce the length of vehicular trips, reduce dependency on the automobile, and encourage the use of other modes of travel. The project includes Transportation Demand Management features, including: ▪ Provide Ride Share coordination services thru the Project’s Home Owner’s Association to match residents interested in carpooling. ▪ Coordinate with near-by schools and / or the Project’s Home Owner’s Association to match residents interested in carpooling to / from schools. ▪ Provide on-site transit opportunities information. ▪ Encourage bicycling by providing on-site bicycle infrastructure such as bike racks. However, the TIA conservatively did not apply any VMT reductions with implementation of the TDM measures. The project also provides direct connections to the existing Chula Vista Regional Trail and bike lanes along Olymp ic Parkway. In addition to the TDM measures described above, the project will provide connections to the Chula Vista regional trail and bike lane. LUT 16.2 Ensure that new development and community activity centers have adequate transportation and pedestrian facilities. The project is designed to provide a pedestrian connection between neighborhoods and the centrally located private recreation site. The internal public streets (Streets A & B) are designed to include an enhanced 6’ sidewalk along one side, with expanded landscaped parkways on both sides. In addition, the project provides direct connections to the existing Chula Vista Regional Trail and bike lanes along Olympic Parkway at two fully signalized intersections. The project will pay its fair share of the Eastern TDIF Fees as required to fund transportation and pedestrian facilities that are part of the TDIF program. LUT 16.3 Provide direct and convenient access to public transit stops within residential, commercial, and industrial areas. The project provides direct connections to the existing Chula Vista Regional Trail and bike lanes along Olympic Parkway as well as the MTS transit stop located at Olympic Parkway and Brandywine Avenue approximately ½ mile west of the project (Refer to Figure 1, Aerial Context). Objective – LUT 17: Plan and coordinate development to be compatible and supportive of planned transit. LUT 17.1 Designate sufficient land at appropriate densities to support planned transit and require that development be transit-oriented, as appropriate to its proximity to transit facilities. The project is not a transit-oriented development. However, the Traffic Impact Analysis prepared for the Project included several quantifiable Transportation Demand Management (TDM) strategies which can be used to mitigate a project’s VMT impacts. TDM strategies can be quantified using methodologies described in Quantifying Green House Gas Mitigation Measures published by the California Air Pollution Control Officers Association (CAPCOA) in 2010, including increased density and a VMT Reduction Analysis. In addition, the following strategies are recommended to further reduce the number of 12 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS automobile trips generated by residents of the Project and the distance that the residents drive: ▪ Provide Ride Share coordination services thru the Project’s Home Owner’s Association to match residents interested in carpooling. ▪ Coordinate with near-by schools and / or the Project’s Home Owner’s Association to match residents interested in carpooling to / from schools. ▪ Provide on-site transit opportunities information. ▪ Encourage bicycling by providing on-site bicycle infrastructure such as bike racks. The Applicant will work with the City and MTS to encourage the establishment of a local bus stop closer to the Project; however, the Applicant has no control over the location, timing, or feasibility of adding a local bus stop. LUT 17.4 Require developers to consult and coordinate with SANDAG and the City to ensure that development is compatible with and supports the planned implementation of public transit. The Applicant will work with the City and MTS to encourage the establishment of a local bus stop closer to the Project and/or a future MTS transit shuttle; however, the Applicant has no control over the location, timing or feasibility of adding a local bus stop or providing an MTS shuttle to serve the Project. Objective LUT 18: Reduce traffic demand through Transportation Demand Management (TDM) strategies, increased use of transit, bicycles, walking, and other trip reduction measures. LUT 18.1 Support and encourage the use of public transit. The project includes Transportation Demand Management measures to facilitate ride sharing, transit ridership, school carpooling to reduce reliance on the automobile and peak hour trips. See response to LUT 17.1 above. The project also provides direct connections to the existing Chula Vista Regional Trail along and bike lanes along Olympic Parkway at two fully signalized intersections LUT 18.2 Provide an efficient and effective paratransit service for elderly and handicapped persons unable to use conventional transit service. This is the responsibility of MTS, the public transit service provider. See Figure 1, Aerial Context for the locations of MTS local bus stops. LUT 18.3 Provide and enhance all feasible alternatives to the automobile, such as bicycling and walking, and encourage public transit ridership on existing and future transit routes. The project is located to take advantage of tran sit, walking and cycling to reduce vehicular trips. The internal public streets (Streets A & B) are designed to include an enhanced 6’ sidewalk along one side, with expanded landscaped parkways on both sides. In addition, the project provides direct connections to the existing Chula Vista Regional Trail and bike lanes along Olympic Parkway at two fully signalized intersections. The MTS local bus stop is located at Olympic Parkway and Brandywine Avenue approximately ½ mile west of the project (Refer to Figure 1, Aerial Context). See response to LUT 17.1 above for TDM measures included in the Traffic Impact Analysis. 13 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS LUT 18.4 Use master planning techniques in new development and redevelopment projects to enable effective use of public transit. The project includes Transportation Demand Management measures to facilitate ride sharing, transit ridership, school carpooling to reduce reliance on the automobile and peak hour trips. The project also provides direct connections to the existing Chula Vista Regional Trail along and bike lanes along Olympic Parkway at two fully signalized intersections. See response to LUT 17.1 above for TDM measures included in the Traffic Impact Analysis. LUT 18.5 Implement TDM strategies, such as carpooling, vanpooling, and flexible work hours that encourage alternatives to driving alone during peak periods. The Traffic Impact Analysis prepared for the Project included several quantifiable Transportation Demand Management (TDM) strategies which can be used to mitigate a project’s VMT impacts. response to LUT 17.1 above for TDM measures included in the Traffic Impact Analysis. LUT 18.6 Encourage employer-based TDM strategies, such as: employee transportation allowances; preferential parking for rideshare vehicles; workplace-based carpool programs; and shuttle services. The Project does not include any employment land uses that would facilities implementation of the measures identified in LUT 18.6. However, the Traffic Impact Analysis prepared for the Project included several quantifiable Transportation Demand Management (TDM) strategies which can be used to mitigate a project’s VMT impacts. response to LUT 17.1 above for TDM measures. LUT 18.7 Support the location of private “telework” centers. The Project includes a private club house as a part of the common recreation area for the residents use, as designated in the Sunbow II, Phase 3 SPA Plan Amendment. This facility could be utilized for a private telework center if the residents express an interest in such a facility. The feasibility and interest to be determined by the Homeowners Association. LUT 18.8 Encourage establishment of park-and-ride facilities near or at transit stations, as appropriate to the area's character and surrounding land uses. The Project is not “near” or “at transit stations,” therefore, LUT 18.8 does not apply to the Project. However, the Traffic Impact Analysis prepared for the Project included several quantifiable Transportation Demand Management (TDM) strategies which can be used to mitigate a project’s VMT impacts. response to LUT 17.1 above for TDM measures included in the Traffic Impact Analysis Objective LUT 20: Make transit-friendly roads a top consideration in land use and development design. LUT 20.1 Incorporate transit-friendly and pedestrian- friendly elements into roadway design standards, such as signal priority for transit and adequate sidewalk widths for pedestrians. The Project does not include any transit routes or roadways that accommodate transit. However, the project includes a network of sidewalks connecting residential neighborhoods to the existing Chula Vista Regional Trail located adjacent to Olympic Parkway and the MTS local bus stop located west of the project. Objective LUT 23: Promote the use of non-polluting and renewable alternatives for mobility through a system of bicycle and pedestrian paths and trails that are safe, attractive and convenient forms of transportation. LUT 23.1 Encourage the use of bicycles and walking as alternatives to driving. The project provides a system of pedestrian walkways and paseos connecting the residential neighborhoods to two connections to the existing Chula Vista Regional Trail and bike lanes along Olympic Parkway. See response to LUT- 18.3 above. 14 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS LUT 23.2 Foster the development of a system of inter- connecting bicycle routes throughout the City and region. The project provides a system of pedestrian walkways and paseos connecting the residential neighborhoods to two connections to the existing Chula Vista Greenbelt Trail and bike lanes along Olympic Parkway, which connects to the City’s network of bike lanes. LUT 23.3 Preserve, restore, or provide the opportunity for a cyclist to ride a bicycle to virtually any chosen destination, in order to make the bicycle a viable transportation alternative. The project provides a system of pedestrian walkways and paseos connecting the residential neighborhoods to two connections to the existing Chula Vista Regional Trail and bike lanes along Olympic Parkway, which connects to the City’s network of bike lanes. LUT 23.4 Link major residential areas with principal trip destinations, such as schools; parks; community centers; and shopping centers. The project is part of the larger Sunbow Planned Community that provides parks, shopping, and an elementary school close to the project. Refer to Figure 1, Aerial Context, for the locations and travel times from the project to schools, shopping, and public parks in the vicinity of the Project. LUT 23.5 Provide linkages between bicycle facilities that utilize circulation element alignments and open space corridors. The project connects to the existing bike lanes along Olympic Parkway, designated a Scenic Corridor in the General Plan. LUT 23.6 In addition to using open space corridors, off- street bicycle trails should use flood control and utility easements. The trails shall be designed to minimize interaction with automobile cross traffic. The Project does not include any of the features described in LUT 23.6. However, the Project provides two points of access to the bike lanes along Olympic Parkway that are designated “Cycle Track (Class IV)” in the City’s Active Transportation Plan. This Plan includes both on- and off- street trails. LUT 23.7 Provide bicycle support facilities at all major bicycle usage locations. The Project does not include a “major bicycle usage location;” however, the Project will include bicycle storage at the common recreation area. All homes within the Project will include 2-car garages which could also be utilized by homeowners for bicycle storage. LUT 23.10 Promote the system of trails envisioned within the Chula Vista Greenbelt. The project connects to the existing Chula Vista Regional Trail along Olympic Parkway which connects to the Chula Vista Greenbelt Trail system. LUT 23.11 Implement recommendations of the City's Bikeway Master Plan and Greenbelt Master Plan. See response to LUT 23.6 above regarding the City’s Active Transportation Plan. The Project provides two pedestrian connections to the existing Chula Vista Regional Trail, as recommended by the City’s Greenbelt Master Plan. These connections link the Project to the City-wide system of trails and bike facilities. LUT 23.12 Provide opportunities for use of personal mobility devices. The walkways and paseo planned within the Project area adequately sized to accommodate personal mobility devices. LUT 23.13 New overpasses and interchanges should be designed to accommodate bicycles and pedestrians. No new overpasses, interchanges or pedestrian bridges are planned for the Project. The Project will contribute its fair share through the payment of the Eastern TDIF to fund transportation facilities included in the TDIF program, which may include both pedestrian and bicycle facilities. LUT 23.14 Require new development projects to provide internal bikeway systems with connections to the citywide bicycle networks. Bicycles share the roadway with automobiles on the internal streets, which have very low traffic volumes. The Project is designed to provide connections to the existing bike lanes in Olympic Parkway at two signalized intersections. The internal streets (Streets A & B) are designed as Modified 15 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS Class III Collectors, which, per City standards, do not require dedicated bike lanes. Objective LUT 61: Create balanced communities that can provide a high quality of life for residents. LUT 61.1 Adhere to the regulations established in existing GDPs and SPAs. The propose includes a proposal to amend the Sunbow GDP and Sunbow SPA Plan to address the proposed land use change for Planning Area 23. Therefore, the proposed project is not consistent with the regulations established in the existing GDPs and SPAs. The proposed amendments would establish regulations which would guide development of the Sunbow II, Phase 3 area and upon approval by the City Council, the Project would adhere to the amended regulations and meet the intent of LUT 61.1. The Applicant entered into a Community Benefit Agreement which provides the City with an opportunity to facilitate economic growth by the Applicant providing $8.0 million (“Job Enhancement Funds”) in support funding for the development of a Class “A” office building within the SR-125 corridor. The construction of such office spaces may occur within the Eastern Urban Center or within the University Innovation District/Regional Technology Park and would provide a catalyst for development that could generate high-quality jobs in locations currently suitable for construction. LUT 61.2 Future SPAs shall focus on creating a vibrant sense of community, a vigorous economy, and a healthy environment. Sunbow II, Phase 3 is a residential enclave featuring contemporary architectural styles. The Sunbow II, Phase 3 SPA Plan Amendment includes Planned Community District Regulations as well as Landscape and Residential Design Guidelines which provide guidance for the development of a vibrant community with high-quality architecture, landscape, and street improvements. Streets are designed to encourage walking within the neighborhoods. Connections to the existing Chula Vista Regional Trail and bike lanes in Olympic Parkway are provided via two signalized intersections promote walking and biking. The Project is designed to promote health and wellness with a well-designed common recreation area designed to meet the active recreation needs of the residents, as it includes a pool, children’s playground, multi-use hard court facility, turf area for open play and areas for social gathering. In addition, active and passive recreation areas are distributed throughout the community to provide for casual play and gathering. The Fiscal Impact Analysis prepared by the project demonstrates that the project produces net positive revenue to the City of Chula Vista over the 20-year timeframe. Revenues range from an annual fiscal surplus in Years 1 - 20 ($46.461 - $270,928) and a cumulative fiscal surplus over the first 20 years of approximately $3,218,323. This fiscal surplus supports ongoing funding for municipal services, ensuring a safe and healthy community. The 16 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS additional residents generated from the Project will support local business and invigorate the local economy. Also see Response to LUT 1.1 above. LUT 61.3 Require all future community identification signs and monuments to recognize communities as part of the City of Chula Vista. The project does not currently include monument identification signs. However, if there is an opportunity to include a monument sign at the entrances to the Project, then the Applicant will include such a proposal on the Landscape Master Plan. Objective LUT 62: Require development to consider and plan for careful use of natural and man -made resources and services, and maximize opportunities for conservation while minimizing waste. LUT 62.1 Require developments within the East Planning Area to provide resource management plans for water; air quality; recycling; solid waste management; and energy. The project is not within the General Plan East Planning Area; however, the project includes a Water Conservation Plan and Air Quality Improvement Plan, must comply with the City’s Landscape Water Ordinance, and sets aside 63.6 acres in permanent open space within the project area. The project must also comply with all required recycling programs implemented in the City. The Project includes approximately 63.6 acres designated MSCP Open Space Preserve in the City’s MSCP Plan. There are 19.2 acres of recorded and proposed unrecorded easements associated with Poggi Creek within the Project Area including the Recorded Conservation Easement (9.719 acres), the Proposed Unrecorded Conservation Easement (5.569 acres), the Proposed Unrecorded Poggi Creek Easement (4.338 acres). Of the 19.6 acres of recorded and proposed easements within the Project Area, approximately 12.53 acres are within the proposed Chula Vista MSCP boundary. The project will comply with all requirements in the air quality improvement plan, water conservation plan and energy conservation plan prepared for the Project. In addition, the project will comply with all City of Chula Vista conservation requirements. Objective LUT 63: Provide efficient multi-modal access and connections to and between activity centers. LUT 63.1 Provide roads, transit service, bike routes, and pedestrian pathways that connect activity centers to their surrounding neighborhoods, adjacent villages, and each other, such that access is safe and convenient for residents and visitors. The project provides connections to existing roads, bike lanes and trails. See Figure 1, Aerial Context for the distance to surrounding public parks, public schools, retail centers, bus stops and adjacent neighborhoods. An easement is provided on the Tentative Map, reserving the right-of-way for a future pedestrian connection to the adjacent Otay Ranch Village 2 West area. Objective LUT 69: Create and maintain unique, stable, and well-designed communities that are master planned to guide development activities LUT 69.1 The policies and regulations within GDP and SPA Plans that are specific to each community shall continue to guide the completion of development activities. After marketing the project for over 30 years as an industrial park, the Applicant entered into a CBA with the City which provides an opportunity to facilitate economic growth by providing $8.0 million in funding for development of a 17 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS Class “A” office building within the SR-125 corridor or the construction of facilities for academic, institutional, and innovation-related businesses within the University Innovation District. The City is interested in facilitating the creation of high-quality jobs and economic growth within the City by providing opportunities that target and attract industries and businesses that contribute to diversification and stabilization of the local economy. Facilitating such economic growth by encouraging the development of spaces that can be used by high technology and manufacturing businesses within the SR-125 corridor or academic, institutional, and innovation-related businesses within the University Innovation District is a potential solution. The construction of such spaces would provide a catalyst for development that could generate high -quality jobs in locations currently suitable for construction. The proposed Sunbow II, Phase 3 SPA Amendment and Sunbow GDP amendment include policies and regulations to guide the development of the Sunbow II, Phase 3 project, through completion. The Sunbow II, Phase 3 area is connected to the larger Sunbow Planned Community along Olympic Parkway, which forms the northern boundary of the project site. Planned Community design guidelines specific to this community will guide development quality and character. Objective LUT 73: Promote alternative modes of transportation, which are intended to encourage a healthy lifestyle and reduce reliance on the automobile, and support the viability of transit through land use distribution and design. LUT 73.1 Provide for walking and biking on streets designed to link neighborhoods, activity centers, and community destinations. The project provides an internal network of pedestrian walkways and paseos and also connects to the existing Chula Vista Regional Trail system in Olympic Parkway. The internal public streets (Streets A & B) are designed to include an enhanced 6’ sidewalk along one side, with expanded parkways on both sides, creating a pleasant pedestrian experience. See Figure 1, Aerial Context for the relationships between the Project and surrounding neighborhoods, activity centers and destinations. An easement is provided on the Tentative Map, reserv ing the right-of-way for a future pedestrian connection to the adjacent Otay Ranch Village 2 West area. Objective – LUT 74: Accommodate land uses that diversify the economic base within Otay Ranch and the surrounding south San Diego County region. LUT 74.1 Provide sufficient land and infrastructure to accommodate commercial and industrial uses. The University Innovation District/Regional Technology Park SPA Plan provides for development of approximately 10.1M square feet of university and regional technologies uses, while the Eastern Urban Center SPA Plan provides for 18 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS development of approximately 3.8M sf of commercial/mixed use development on 75.9 acres. The City is interested in facilitating the creation of high- quality jobs and economic growth within the City by providing opportunities that target and attract industries and businesses that contribute to diversification and stabilization of the local economy. Facilitating such economic growth by encouraging the development of spaces that can be used by high technology and manufacturing businesses within the SR-125 corridor or academic, institutional, and innovation-related businesses within the University Innovation District is a potential solution. The construction of such spaces would provide a catalyst for development that could generate high -quality jobs in locations currently suitable for construction. The Applicant entered into a CBA with the City which provides an opportunity to facilitate economic growth by providing $8.0 million in support funding for development of a Class “A” office building within the SR-125 corridor or the construction of facilities for academic, institutional, and innovation-related businesses within the University Innovation District. Also see Response to LUT 1.1 above. LUT 74.2 Promote additional business and higher paid employment opportunities for residents of Chula Vista. The Applicant entered into a CBA with the City which provides an opportunity to facilitate economic growth by providing $8.0 million in support funding for development of a Class “A” office building within the SR-125 corridor or the construction of facilities for academic, institutional, and innovation-related businesses within the University Innovation District. The public benefits derived from implementation of the CBA will advance the interests and meet the needs of Chula Vista’s residents and visitors to a significantly greater extent than the vacant land under the current entitlements and absent the Community Benefits Agreement. Implementation of the CBA provisions will promote additional and higher paid employment opportunities for residents of Chula Vista, consistent with GP Objective LUT 74.2 Objective - LUT 79: Establish appropriate land uses adjacent to the Otay Landfill and Wolf Canyon that reflect the unique land use and landform characteristics of these areas. LUT 79.5 Limit land uses adjacent to Otay Landfill to open space and limited industrial uses or business parks. The Applicant’s consultant, Dudek, prepared the “Air Quality and Greenhouse Gas Emissions Analysis Technical Report for the Sunbow II, Phase 3 Project,” which also includes a Landfill Health Risk Assessment (HRA). The HRA was performed to assess the potential health risks of the proximate Otay Landfill to future sensitive receptors (residents) of the Project. The HRA was performed to estimate the Maximum Individual Cancer Risk, the Chronic Hazard Index and the Acute Hazard Index for the residential 19 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS receptors as a result of emissions impacts from Otay Landfill operations. As required by the 2019 Title 24 Building Code and the 2019 California Green Building Standards Code standards, the Project would include installation of MERV 13-rated air filtration in all HVAC systems. The MERV 13-rated air filters remove 90% of particles and therefore would reduce the Maximum Individual Cancer Risk – Residential to 7.7 in 1 million, which would be less than the CEQA threshold of 10 in 1 million. These impact level would also be less than the SDAPCD significance threshold. Further, following closure of the Otay Landfill in 2030, the cancer risk impact for the Landfill would be reduced to 6.61 in 1 million and the chronic health risk and acute health risk would also be further reduced. A Nuisance Analysis was also prepared by Dudek for the Project to evaluate the potential impact of odors and fugitive dust emitted from the Otay Landfill on future residents of the Project. AERMOD was used to model odor and fugitive dust emissions from the landfill, with methodology consistent with the HRA. The nuisance analysis found that future residents of the Project would not experience odors in excess of odor detection thresholds and are not likely to be impacted by landfill operations. Similarly, the dust analysis showed that concentrations of dust from landfill operations would not exceed thresholds established by the California Occupational Health and Safety Administration. As such, impacts from odor and dust to future residents from landfill operations would be less than significant. Geosyntec prepared a technical memorandum summarizing the results of the “limited soil vapor investigation” conducted on the Project site. The limited soil vapor investigation included the collection and laboratory analysis of samples collected. The soil vapor investigation concluded methane was not detected at measurable concentrations during the investigation and there is no apparent unacceptable risk to future residential site occupants due to methane and/or VOC-impacted soil vapors. Also see Response to LUT 1.1 above. Objective LUT 92: Establish a high-quality business park that is oriented to accommodates high technology businesses conducting research and light industrial/manufacturing activities that provide job opportunities for residents of Otay Ranch, Chula Vista, and the greater south San Diego County region. LUT 92.1 Promote research and development uses associated with light manufacturing businesses by adopting GDP and SPA level policies and Planned Community District regulations that provide regulations and standards that See Responses to LUT 1.1 and LUT-74.1 above. 20 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS encourage the locating of high technology uses and industries. LUT 92.3 Allow ancillary professional office and limited service businesses as secondary uses where such uses are necessary to support the primary research and development and light manufacturing uses. These secondary uses should not compete with the EUC and adjoining areas that are intended as the preferred location for these support uses. See Responses to LUT 1.1 and LUT-74.1 above. Objective LUT 93: Provide opportunities to develop new research institutions, industries, and businesses that capitalize upon the intellectual capital and research activities of the university. LUT 93.1 Proactively attract the development of incubator industries and research institutions that may be induced by the presence of a university campus. See Responses to LUT 1.1 and LUT-74 above. ECONOMIC DEVELOPMENT Objective – ED 1: Provide a diverse economic base for the City of Chula Vista. ED 1.2 Provide sufficient tracts of land at a variety of sizes available for industrial and commercial uses in order to provide a stable economic base. After marketing the Project for over 30 years as an industrial park, the Applicant entered into a CBA with the City which provides an opportunity to facilitate economic growth by providing $8.0 million in support funding for development of a Class “A” office building within the SR- 125 corridor or the construction of facilities for academ ic, institutional, and innovation-related businesses within the University Innovation District. The University Innovation District/Regional Technology Park SPA Plan provides for development of approximately 10.1M square feet of university and regional technologies uses, while the Eastern Urban Center SPA Plan provides for development of approximately 3.8M sf of commercial/mixed use development on 75.9 acres. The City is interested in facilitating the creation of high-quality jobs and economic growth within the City by providing opportunities that target and attract industries and businesses that contribute to diversification and stabilization of the local economy. Facilitating such economic growth by encouraging the development of spaces that can be used by high technology and manufacturing businesses within the SR-125 corridor or academic, institutional, and innovation-related businesses within the University Innovation District is a potential solution. The construction of such spaces would provide a catalyst for development that could generate high- quality jobs in locations currently suitable for construction. The CBA also anticipated the conversion of the Planning Area 23 site to residential. The Fiscal Impact Analysis prepared by the project demonstrates that the project produces net positive revenue to the City of Chula Vista 21 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS over the 20-year timeframe. Revenues range from an annual fiscal surplus in Years 1 - 20 ($46,461 - $270,928) and a cumulative fiscal surplus over the first 20 years of approximately $3,218,323, which supports stable economic base. Also see Response to LUT 1.1 above ED 1.3 Encourage the preservation and expansion of existing industrial uses in areas designated as industrial. See Responses to LUT 1.1 and ED 1.2 above. ED 1.4 Increase the supply of land for non-retail employment through the designation of land to accommodate a regional technology park; a future business park; industrial or business park space; and development of a university campus. See Response to LUT 1.1 and ED 1.2 above. ED 1.5 Consider fiscal impact implications of General Plan amendments that propose changes to industrial and commercial lands. A fiscal impact analysis prepared for the project demonstrates that the project results in net positive revenue to the City’s General Fund. See Responses to LUT 1.1 and ED 1.2 above. Objective ED 2: Maintain a variety of job and housing opportunities to improve Chula Vista's jobs/housing balance. ED 2.2 Facilitate increased employment densities near transit stations and routes. The Project is not located near a transit station or route and does not include any employment generating land uses. However, the Applicant entered into a CBA with the City of Chula Vista which includes the payment of $8M in Job Enhancement Funds. These funds will facilitate increate employment densities in either the Eastern Urban Center or University Innovation District, both served by transit stations and routes. Also see Response to LUT 1.1 above. ED 2.3 Pursue a diverse supply of housing types and costs, as well as a diverse supply of jobs with varying income potential, to balance local job and housing opportunities. The project provides for-sale multi-family housing in a range of bedroom typologies for singles, couples and families and will comply with the City’s Balanced Housing Policy by preserving off-site affordable housing units within the Sunbow Planned Community. The Project does not include low-income affordable housing. However, the Applicant must comply with the City’s Balanced Community Affordable Housing Policy. The Applicant will enter into a Balanced Community Affordable Housing Agreement and City which will address how the Project meets its affordable housing obligation. Objective ED 4: Become a center for applied technology innovation ED 4.1 Publicize the economic and social benefits of industry, emphasizing the health of the Chula Vista economy, the “high-tech” dimensions of industry, and the community value of well- paying, high-benefit industrial employment. The responsibility to meet the intent of ED 4.1 lies with the City of Chula Vista. However, the Applicant entered into a CBA with the City of Chula Vista which includes the payment of $8M in Job Enhancement Funds. The Job Enhancement Funds may be utilized by the City of Chula 22 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS Vista to meet the intent of ED 4.1. Also, see Responses to LUT 1.1 and ED 2.1 above. ED 4.2 Maintain land sufficient for the long-term location of an approximately 85-acre Regional Technology Park in eastern Chula Vista. The project does not impact the City’s ability to maintain the land designated in the University Innovation District/Regional Technology Park (UID/RTP) SPA Plan. Through implementation of the CBA, the Applicant enhances the feasibility of constructing office uses within the UID/RTP. Also see Response to LUT 1.1 above. ED 4.4 Continue to recruit and promote the establishment of a university campus, as well as research and development facilities that promote technology. As the owner of the site identified for a future University, the City may continue to recruit and promote the establishment of a university campus and regional technology park. The payment of $8M for the Job Enhancement Fund enhances the City’s efforts. See response to ED 2.1 above. Objective ED 7: Develop a strong land use and transportation link between the downtown urban core, bayfront, southwestern, and eastern areas of the City to support economic development throughout. ED 7.4 Develop activities in eastern Chula Vista that will attract residents citywide. The Applicant entered into a CBA which provides for the payment of a Park Benefit Fee, equal to the PAD fees that would have otherwise been due pursuant to Chula Vista Municipal Code (CVMC) Chapter 17.10, of approximately $11.03 million based on 2019 PAD fees (the final amount will be determined based on the number of residential units built and the PAD fee rates in effect as of the effective date of the Development Agreement). The Park Benefit Fee will satisfy the Owner’s park obligations for the project and may be utilized by the City to acquire or develop parkland, as the City determines appropriate and in the best interest of the overall City [emphasis added]. The City may utilize these fees to enhance public parks in eastern Chula Vista and attract park-users city-wide. The City has the opportunity to develop activities in eastern Chula Vista that will attract residents citywide through the Applicant’s payment of the Park Benefit Fee. ENVIRONMENTAL Objective E 1: Conserve Chula Vista’s sensitive biological resources. E 1.1 Implement the Chula Vista MSCP Subarea Plan. The project designates 63.6 acres of Preserve open space within the project site to be conveyed to the City for permanent preservation and maintenance, consistent with the City of Chula Vista MSCP Subarea Plan. Objective E2: Protect and improve water quality within surface water bodies and groundwater resources within and downstream of Chula Vista. E 2.4 Ensure compliance with current federal and state water quality regulations, including the implementation of applicable NPDES requirements and the City's Pollution Prevention Policy. The wter quality studies prepared for the project comply with the respective City, federal and state regulations. 23 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS E 2.5 Encourage and facilitate construction and land development techniques that minimize water quality impacts from urban development. The project is designed with water quality/hydro- modification basins that mitigation impacts to water quality to be less than significant. Objective E 3: Minimize the impacts of growth and development on water supply resources through the efficient use and conservation of water by residents, businesses, and City government. E 3.2 Promote the use of low water demand landscaping and drought tolerant plant materials in both existing and new development. The project utilizes water conserving fixtures and low water/drought tolerant landscaping. E 3.3; Where safe and feasible, promote and facilitate the continued use of recycled water in new developments, and explore opportunities for the use of recycled water in redevelopment projects. The Overview of Water Service for Sunbow II, Phase 2 analyzed the facilities required and the demand for recycled water needed to serve the Project. The report estimated that the Project would utilize approximately 24,510 gallon of recycled water per day to irrigate open space slope and recreation areas. The Project design incorporates the infrastructure to serve the Project with recycled water Objective – E 6: Improve local air quality by minimizing the production and emission of air pollutants and to xic air contaminants and limit the exposure of people to such pollutants. E 6.1 Encourage compact development featuring a mix of uses that locate residential areas within reasonable walking distance to jobs, services, and transit. The Project is designed to cluster residential land uses within the development area identified in the adopted Sunbow II SPA Plan and Sunbow GDP, meeting the intent of implementing compact development. Sunbow II, Phase 3 was not identified in the General Plan as a suitable location for mixed use development. The Project is located approximately ½ mile from an existing MTS local bus stop, approximately 1 mile from shopping and a public park and several miles from the closet employment center. See Figure 1, Aerial Context. E 6.2 Promote and facilitate transit system improvements in order to increase transit use and reduce dependency on the automobile. The Project does not include a transit stop or station. The Project includes the TDM measures described in the response to LUT 17.1 above. These TDM measures are designed to increase transit use and reduce dependency on the automobile E 6.10 The siting of new sensitive receptors within 500 feet of highways resulting from development or redevelopment projects shall require the preparation of a health risk assessment as part of the CEQA review of the project. Attendant health risks identified in the Health Risk Assessment (HRA) shall be feasibly mitigated to the maximum extent practicable, in accordance with CEQA, in order to help ensure that applicable federal and state standards are not exceeded. The Project is not within 500 feet of a highway; therefore, a health risk assessment is not needed to assess impacts associated with a highway. However, A Health Risk Assessment was prepared for the project based on proximity to the Otay Landfill. See response to LUT 79.5 above. Objective E 7: Promote energy conservation through the efficient use of energy and through the development of local, non- fossil fuel-based renewable sources of energy. E 7.1 Promote development of regulations and building design standards that maximize energy efficiency through appropriate site and The project will comply with the latest Title 24 Energy requirements. 24 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS building design and through the use of energy - efficient materials, equipment, and appliances. Objective E 8: Minimize the amount of solid waste generated within the General Plan area that requires landfill disposal. E 8.1 Promote efforts to reduce waste, minimize the need for additional landfills, and provide economically and environmentally sound resource recovery, management, and disposal facilities. The project will comply with all City of Chula Recycling requirements and recycling will be incorporated into all components of the project. As discussed in the Air Quality/Green House Gas Emission Analysis and associated HRA prepared for the Project, the Otay Landfill is anticipated to close in 2030. Beyond providing for the recycling of waste to reduce waste and minimize the need for additional landfills, the Applicant is not responsible for development of economically, environmental sound resource recovery, management, and disposal facilities. This is a regional issue to be addressed by multi jurisdictions and is beyond the Applicant’s control E 8.3 Implement source reduction strategies, including curbside recycling, use of small collection facilities for recycling, and composting Recycling will be incorporated into all components of the project. Objective E 10: Protect important paleontological resources and support and encourage public education and awareness of such resources. E 10.1 Continue to assess and mitigate the potential impacts of private development and public facilities and infrastructure to paleontological resources in accordance with the CEQA. A Cultural/Paleontological Report was prepared for the project Environmental Impact Report which includes mitigation measures related to paleontological resources in accordance with the CEQA. Objective E 14: Minimize the risk of injury, loss of life, and property damage associated with geologic hazards. E 14.1 To the maximum extent practicable, protect against injury, loss of life, and major property damage through engineering analyses of potential seismic hazards, appropriate engineering design, and the stringent enforcement of all applicable regulations and standards. A Geotechnical Investigation Report was prepared for the project EIR. The project will be designed in compliance with the latest subdivision and building codes. E 14.2 Prohibit the subdivision, grading, or development of lands subject to potential geologic hazards in the absence of adequate evidence demonstrating that such development would not be adversely affected by such hazards and would not adversely affect surrounding properties. The Geotechnical Investigation for Sunbow II, Phase 3 was prepared by GEOCON, Inc. and determined that the Project is not located in an area of geological hazards and is suitable for development. See response to LUT 79.5 regarding the Soil Vapor Investigation prepared for the Project. E 14.3 Require site-specific geotechnical investigations for proposals within areas subject to potential geologic hazards; and ensure implementation of all measures deemed necessary by the City Engineer and/or Building Official to avoid or adequately mitigate such hazards. The Geotechnical Investigation for Sunbow II, Phase 3 was prepared by GEOCON, Inc. and determined that the Project is not located in an area of geological hazards and is suitable for development. See response to LUT 79.5 regarding the Soil Vapor Investigation prepared for the Project. Objective E 15 - Minimize the risk of injury and property damage associated with flood hazards. 25 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS E 15.1 Prohibit proposals to subdivide, grade, or develop lands that are subject to potential flood hazards, unless adequate evidence is provided that demonstrates that such proposals would not be adversely affected by potential flood hazards and that such proposals would not adversely affect surrounding properties. Require site-specific hydrological investigations for proposals within areas subject to potential flood hazards; and implement all measures deemed necessary by the City Engineer to avoid or adequately mitigate potential flood hazards. The Drainage Study for Sunbow II, Phase 3 TM was prepared by Hunsaker & Associates. The study analyzed the pre- and post- development flows and demonstrates that runoff generated by the Project will not exceed pre-project peak flow rates, and runoff velocities will be dissipated by rock rip rap at storm drain outfalls. The Project has been designed to honor pre-project watershed basins and outfall locations. Considering the limitations which result from Subdivision layout and design, minor exchanges in watershed areas occur but are minimized to the maximum extent practicable. Since the project site is located outside any FEMA floodplain zones, there is no requirement for a Letter of Map Revision. The Study shows there is no adverse impact from the proposed development after the attenuation because there is reduction in flows. Objective E19: Maintain the ability to establish hazardous waste storage, collection, treatment, disposal, and transfer facilities to serve the needs of Chula Vista industry and businesses within appropriate locations of the City, while ensuring adequate protection of the community. E19.1 • A Health Risk Assessment as described in the Chula Vista Zoning Code • All facilities shall be a minimum 1,000 feet from any residential zone; residence; school; hospital; hotel; motel; or other similar land use. See response to LUT 79.5 above. Objective E 21: Protect people from excessive noise through careful land use planning and the incorporation of appropriate mitigation techniques. E 21.1 Apply the exterior land use-noise compatibility guidelines listed in Table 9-2 of this Environmental Element to new development, where applicable, and in light of project- specific considerations. The Noise Technical Report for Sunbow II, Phase 3 was prepared as part of the EIR and the Project will implement the associated recommendations to ensure compliance with E 21.1. E 21.2 Where applicable, the assessment and mitigation of interior noise levels shall adhere to the applicable requirements of the California Building Code with local amendments and other applicable established City standards. The Project will comply with the requirements of the building code to reduce interior noise levels to 45db or lower. E 21.3 Promote the use of available technologies in building construction to improve noise attenuation capacities. The Project will comply with the requirements of the building code to reduce interior noise levels to 45db or lower. Objective E 22: Protect the community from the effects of transportation noise. E 22.3 Employ traffic calming measures, where appropriate, such as narrow roadways and on- street parking, in commercial and mixed use districts. Access to the project is provided at two fully signalized intersections with Olympic Parkway. two Modified Class III collectors provide internal access and intersect at a planned roundabout to slow traffic. On-street parking and parkway landscaping are planned to function as additional traffic calming measures. E 22.4 Encourage walking; biking; carpooling; use of public transit; and other alternative modes of The Project includes a TDM which includes ridesharing, carpooling and school carpooling strategies. In addition, 26 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS transportation to minimize vehicular use and associated traffic noise. the project includes two fully signalized intersections that connect to the existing bike lanes and Chula Vista Regional Trail along Olympic parkway. See responses to LUT 17.1 and 18.3 above. E 22.5 Require projects to construct appropriate mitigation measures in order to attenuate existing and projected traffic noise levels, in accordance with applicable standards, including the exterior land use/noise compatibility guidelines listed in Table 9-2 of this Environmental Element. The Noise Technical Report for Sunbow II, Phase 3 was prepared as part of the EIR and the Project will implement the associated recommendations to ensure compliance with E 22.5. Objective E 23: Provide fair treatment for people of all races, cultures, and income levels with respect to development, adoption, implementation, and enforcement of environmental laws, regulations, and policies. E23.3 Do not site industrial facilities/uses that pose a significant hazard to human health & safety in proximity to schools or residential dwellings The Project does not propose to site industrial facilities as part of the Project. However, due to the proximity to the Otay Landfill, the Project prepared an HRA and Nuisance Study. See response to LUT 79.5 E23.4 Build new schools and residential dwellings with sufficient separation and buffering from industrial facilities and uses that pose a significant hazard to human health and safety. The Project is designed to provide sufficient separation between the Otay Landfill and future industrial land uses within Village 2 West through the use of manufactured slopes, perimeter walls, etc. See response to LUT 79.5 for additional information regarding the Health Risk Assessment and Nuisance Analysis prepared for the Project. GROWTH MANAGEMENT Objective GM 1: Concurrent public facilities and services. GM 1.9 Require that all major development projects prepare a PFFP that articulates infrastructure and public facilities requirements and costs and funding mechanisms. An addendum to the Sunbow PFFP has been prepared for the project. Objective GM 2: Provide adequate and sustainable fiscal base. GM 2.1 Achieve and maintain a balance of land uses within the City that assures residential development is complemented by expanded local employment opportunities, retail and commercial services, and recreation and entertainment venues; and that the City-wide mix of land uses provides fiscal balance between those that produce revenues and those that require public expenditures. A Fiscal Impact Analysis has been prepared which demonstrates a net positive benefit to the City’s General Fund. See response to ED 1.2 that demonstrates compliance with GM 2.1. GM 2.2 Require a fiscal impact analysis to be conducted for major development projects that documents the project’s effects upon the City operating budget over time. A Fiscal Impact Analysis has been prepared which demonstrates a net positive benefit to the City’s General Fund. See response to ED 1.2 that demonstrates compliance with GM 2.2. Objective GM 3: Create and preserve vital neighborhoods. GM 3.3 Assure that all new and infill development within existing urban areas pays its proportional share of the cost for urban The project is subject to the City’s Development Impact Fee Program and State requirements to fund educational facilities. 27 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS infrastructure and public facilities required to maintain the Threshold Standards, as adopted for its area of impact. GM 3.8 Encourage the creation of vibrant and varied neighborhoods and a diversity of housing types, including, housing affordable to a range of income groups, consistent with housing element objectives. The project provides for-sale housing in a range of bedroom typologies for singles, couples, and families. The Project does not include low-income affordable housing. However, the Applicant must comply with the City’s Balanced Community Affordable Housing Policy. The Applicant will enter into a Balanced Community Affordable Housing Agreement with the City which will address how the Project meets its affordable housing obligation. HOUSING ELEMENT Objective H 2: Promote efficient use of water and energy through adopted standards and incentive -based policies to conserve limited resources and reduce long-term operational costs of housing. H 2.1 Encourage the efficient use and conservation of water by residents. The Project will be subject to the water conservation requirements of the California Building Code and City of Chula Vista ordinances. H 2.2 Promote the efficient use of energy. The Project will be subject to the energy conservation requirements of the California Building Code and City of Chula Vista ordinances. Objective H 4: Minimize impacts on housing choice within each of the four geographic planning areas, especially to very low-and low-income residents, that result from conversion or demolition of rental housing units. H 4.1 Promote an equitable distribution of housing types (e.g., multi-family rental and owner occupied housing) based upon identified needs within the Northwest, Southwest, and East Planning Areas to provide a range of housing opportunities for all income levels. The larger Sunbow Planned Community provides a wide range of housing types, including single family, multi- family and affordable housing. The project provides higher density for-sale housing in a range of bedroom typologies for singles, couples and families and will comply with the City’s Balanced Communities Affordable Housing Policy. The Applicant will enter into a Balanced Community Affordable Housing Agreement with the City which will address how the Project meets its affordable housing obligation. Objective H 5: Encourage the provision of a wide range of housing choices by location, type of unit, and price level, in particular the establishment of permanent affordable housing for low-and moderate-income households. H 5.1 Balanced Communities-Affordable Housing: Require newly constructed residential developments to provide a portion of their development affordable to low-and moderate- income households. The project will comply with the City’s Balanced Communities Affordable Housing Policy. The Applicant will enter into a Balanced Community Affordable Housing Agreement with the City which will address how the Project meets its affordable housing obligation. H 5.2 Encourage the development of sufficient and suitable new rental housing opportunities within each of the City’s four geographic Planning Areas, particularly for very low -and low-income households. The project will comply with the City’s Balanced Communities Affordable Housing Policy. The Applicant will enter into a Balanced Community Affordable Housing Agreement with the City which will address how the Project meets its affordable housing obligation. Objective H 7: Facilitate the creation, maintenance, preservation and conservation of affordable housing for lower and moderate-income households through comprehensive planning documents and processes, and the provision of financial assistance and other incentives. 28 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS H 7.1 Ensure Chula Vista’s plans and policies addressing housing, such as the Zoning Ordinance, Sectional Planning Area Plans, and Specific Plans, encourage a variety of housing product that responds to variations in income level, the changing live/work patterns of residents and the needs of the City’s diverse population. The Project provides higher density for-sale housing in a range of bedroom typologies for singles, couples and families and will comply with the City’s Balanced Communities Affordable Housing Policy. The Applicant will enter into a Balanced Community Affordable Housing Agreement with the City which will address how the Project meets its affordable housing obligation. Objective H 8: Ensure the availability of housing opportunities to persons regardless of race, color, ancestry, national origin, religion, sex, disability, marital status, and familial status, source of income or sexual orientation. H 8.1 Ensure equal housing opportunities to prevent housing discrimination in the local housing market. The Project is committed to equal opportunity in housing. PUBLIC FACILITIES AND SERVICES Objective – PFS 1: Ensure adequate and reliable water, sewer, and drainage service and facilities. PFS 1.4 For new development, require on-site detention of storm water flows such that, where practical, existing downstream structures will not be overloaded. Slow runoff and maximize on-site infiltration of runoff. The Project has prepared hydrology studies and will implement the recommendations of the analysis to protect downstream structures and properties. Objective PFS 2: Increase efficiencies in water use, wastewater generation and its re-use, and handling of storm water runoff throughout the City through use of alternative technologies. PFS 2.2 As part of project construction and design, assure that drainage facilities in new development incorporate storm water runoff and sediment control, including state-of-the-art technologies, where appropriate. The Project has prepared hydrology studies and will implement the recommendations of the analysis to control sediment and runoff. PFS 2.3 In designing water, wastewater, and drainage facilities, limit the disruption of natural landforms and water bodies. Encourage the use of natural channels that simulate natural drainage ways while protecting property. The Project has prepared hydrology studies and will implement the recommendations of the analysis to control sediment and runoff and has been designed to incorporate the existing Poggi Creek drainage channel. Objective PFS 5: Maintain sufficient levels of fire protection, emergency medical service and police services to protect public safety and property. PFS 5.1 Continue to adequately equip and staff the Fire Department to ensure that established service standards for emergency calls are met. The Project will contribute its fair share to the City Development Impact Fee Program. PFS 5.6 Encourage crime watch programs in all neighborhoods. The Project will coordinate with the Chula Vista Police Department to implement a crime watch program. PFS 5.7 Prior to approval of any discretionary projects, ensure that construction is phased with provision of police and fire protection services such that services are provided prior to or concurrent with need. The Project is subject to the City’s Growth Management Ordinance to ensure adequate City services are available to serve the development. The Applicant prepared a Fire Protection Plan to evaluate fire protection services needed to serve the Project. Objective PFS 6: Provide adequate fire and police protection services to newly developing and redeveloping areas of the City. 29 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS PFS 6.1 Continue to require new development and redevelopment projects to demonstrate adequate access for fire and police vehicles. The Project has been reviewed and complies with the access requirements for police and fire services. PFS 6.2 Require new development and redevelopment projects to demonstrate adequate water pressure to new buildings. A water supply study has been reviewed and approved by the Otay Water District demonstrating adequate supply and pressure for the proposed uses. PFS 6.3 Encourage CPTED techniques in new development and redevelopment projects. The Project includes physical design to for adequate lighting, signage, and defensible space. Objective PFS 15: Provide new park and recreation facilities for residents of new development, City-wide. PFS 15.1 Continue to pursue a City-wide standard for the provision of developed parkland for new development projects of three acres per estimated one thousand new residents. The Applicant entered into a CBA which provides for the payment of a Park Benefit Fee, equal to the PAD fees that would have otherwise been due pursuant to Chula Vista Municipal Code (CVMC) Chapter 17.10, of approximately $11.03 million based on the 2019 PAD fees (the final amount will be determined based on the number of residential units built and the PAD fee rates in effect as of the effective date of the Development Ageement). The Park Benefit Fee will satisfy the Owner’s park obligations for the Project and may be utilized by the City to acquire or develop parkland, as the City determines appropriate and in the best interest of the overall City. Objective PFS 19: Provide art and culture programs, childcare facilities and health and human services that enhance the quality of life in Chula Vista. PFS 19.10 Continue to require community purpose facility acreage, in accordance with the Municipal Code, for the provision of childcare and other social service facilities. The SPA Plan includes an approximate 0.9-acre site designated CPF, planned as a private recreation facilities to be owned and managed by the Master Homeowners Association. Consistent with CVMC Section 19.48.040(B)(6), the site meets the minimum size and slope requirements, is compatible with the surrounding residential land uses and includes the following required amenities: • Swimming Pool • Club House • Pool House • One multi-purpose hard court • Children play area • Community gathering place • An outdoor cooking facility • Level Lawn area The proposed 0.9-acre CPF site is consistent with CVMC Section 19.48.404(b)(6), in that it does not comprise more than 35 percent of the overall CPF acreage required for the Project Area (3.2 acres x 35% = 1.1 acres), the CPF site meets the minimum one-half acre size requirement and satisfies the minimum development criteria outlined in CVMC 19.48.025(H). 30 OBJECTIVE/ POLICY OBJECTIVE/POLICY TEXT CONSISTENCY ANALYSIS The Applicant has entered into a Development Agreement with the City, which addresses how the remaining 2.3 acre CPF obligation is satisfied. Objective PFS 20: Develop a cultural arts center in Chula Vista. PFS 20.3 Encourage the installation of art pieces in publicly owned spaces and require developers to pay fees or provide art pieces that serve to enhance an individual project and contribute to the appearance and vitality of the development. The Project does not include any publicly owned spaces. The City does not have a current fee to support the installation of public art. However, the intent of PFS-20.3 may be met by the City as they exercise their discretion to utilize the Park Benefit Fee, of approximately $11.03 million based on 2019 PAD fees (the final amount will be determined based on the number of residential units built and the PAD fee rates in effect as of the effective date of the Development Agreement). The Park Benefit Fee will satisfy the Owner’s park obligations for the project and may be utilized by the City to acquire and/or develop parkland, as the City determines appropriate and in the best interest of the overall City. The City may utilize these funds to provide opportunities for public art within public parks. 1 Figure 1: Aerial Context ATTACHMENT B SUNBOW II, PHASE 3 SPA PLAN MARKET AND FINANCIAL ANALYSIS OF INDUSTRIAL USE (HR&A 2021) ATTACHMENT C SUNBOW II, PHASE 3 FISCAL IMPACT ANALYSIS (DPFG 2021)