HomeMy WebLinkAboutReso 2020-265RESOLUTION NO. 2020-265
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA AMENDING THE FISCAL YEAR 2020/21 CIP
PROGRAM BUDGET BY ESTABLISHING A NEW CIP
PROJECT, DRN0217 “CORRUGATED METAL PIPE REPAIR
IN THE RIGHT-OF-WAY FY2020/21”; AND APPROPRIATING
FUNDS THEREFOR
WHEREAS, the City of Chula Vista’s 2016 Drainage Asset Management Plan
identifies corrugated metal pipe (CMP) as a deteriorating drainage asset class; and
WHEREAS, failures of CMP can result in sinkholes and compromise streets and be
more disruptive to the public when located within the roadway or public right-of-way; and
WHEREAS, failures of CMP in the right-of-way can result in sinkholes and other
conditions causing safety concerns which can create the need for unanticipated and
expensive emergency repairs; and
WHEREAS, approximately 1,400 lineal feet (LF) were previously identified as being in
in critical condition; and
WHEREAS, additional CMP was inspected after verifying existing pipe material
and clearing accessibility issues; and
WHEREAS, the additional CMP inspections identified 1,800 LF in a condition of
imminent failure; and
WHEREAS, the previously identified critical CMP and newly inspected imminent
failure CMP form the basis for the new CIP project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula
Vista that it establishes a new CIP project, DRN0217 “Corrugated Metal Pipe Repair in the
Right of Way FY2020/21.”
BE IT FURTHER RESOLVED by the City Council of the City of Chula Vista that it
(1) amends the Fiscal Year 2020/21 Capital Improvement Program budget by adding the
new CIP project, DRN0217 “Corrugated Metal Pipe Repair in the Right of Way
FY2020/21”, and (2) amends the Fiscal Year 2020/21 Capital Improvement Program budgets
as follows:
DocuSign Envelope ID: 0BF39A15-B270-49B7-8A80-C21E2FE64F9D
Resolution No. 2020-265
Page No. 2
Summary of CIP Program Budget Amendments
PROJECT PROJECT DESCRIPTION
FUNDING
AMOUNT
STM0369 Bikeway Facilities Gap Project TransNet $ (285,000)
STM0380 S/W Replacement E H St TransNet $ (81,512)
STM0402 Major Pvmt Rehab FY20/21 TransNet $ (1,362,751)
STL0445 Pvmt Minor Rehab FY20/21 TransNet $ (180,478)
STL0445 Pvmt Minor Rehab FY20/21 Gas Tax $ (365,000)
STL0448 S/W Replacement Program FY21 Gas Tax $ (72,306)
STL0438 Sweetwater River Bikeway 30th St TransNet $ (124,374)
TRF0415 TCR Raised Median Impvs TransNet $ (310,103)
DRN0217 Corrugated Metal Pipe Repair in ROW FY20/21 TransNet/Gas Tax $ 2,781,524
TOTAL CIP PROGRAM ADJUSTMENTS $ -
[SIGNATURES ON THE FOLLOWING PAGE]
DocuSign Envelope ID: 0BF39A15-B270-49B7-8A80-C21E2FE64F9D
Resolution No. 2020-265
Page No. 3
Presented by Approved as to form by
William S. Valle Glen R. Googins
Director of Engineering & Capital Projects City Attorney
PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista,
California, this 3rd day of December 2020 by the following vote:
AYES: Councilmembers: Diaz, Galvez, McCann, Padilla, and Casillas Salas
NAYS: Councilmembers: None
ABSENT: Councilmembers: None
Mary Casillas Salas, Mayor
ATTEST:
Kerry K. Bigelow, MMC, City Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO )
CITY OF CHULA VISTA )
I, Kerry K. Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing
Resolution No. 2020-265 was duly passed, approved, and adopted by the City Council at a
regular meeting of the Chula Vista City Council held on the 3rd day of December 2020.
Executed this 3rd day of December 2020.
Kerry K. Bigelow, MMC, City Clerk
DocuSign Envelope ID: 0BF39A15-B270-49B7-8A80-C21E2FE64F9D