Loading...
HomeMy WebLinkAboutReso 1986-12361 Revised 1/31/86 RESOLUTION NO. 12361 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING "INFORMAL" BIDS AND AWARDING CONTRACT FOR BALL FIELD FENCING AT RIENSTRA PARK The City Council of the City of Chula Vista does hereby resolve as follows: WHEREAS, Section 1009 of the City Charter authorizes Council to let contracts without advertising for bids if the project is less than $25,000 after the City Manager or his designated agent has secured competitive prices from interested contractors, and WHEREAS, the following informal bids were submitted to the Purchasing Agent on November 26, 1985 for removal of existing fences at Rienstra Sports Complex and the furnishing of new fence material as per specifications: Alcem Fence ~17,000 South Bay Fence 23,230 Viking Fence No Bid WHEREAS, the low bid by Alcem Fence is considered to be a competitive bid and staff recommends awarding the contract to said company. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept the informal bids for the removal of existing fences at Rienstra Sports Complex and the furnishing of new material as per specifications to Alcem Fence in the amount of $17,000. Presented by Aphid as to form by Manuel Mollined~, Director of Thomas J. Harron, City Parks and Recreation Attorney 1204a ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this. 4th doy o~ February 19 86 , by the following vote, to--wit: AYES: Councilmembers NcCand.1iss, Co.x, Moore, Scott NAYES: Counc~ 1members None ABSTAIN: Counc~ 1members None ABSENT: Counc~ 1members Ma.ica.tm -~ Mayo~Uof ~e City of Chula Vista ~" ' y Clerk J ~ STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) I, JENNIE M. FULASZ, CMC, CITY CLERK of the City of Chulo Vista, California, DO HEREBY CERTIFY that the above and foregoing is o full, true and correct copy of RESOLUTION NO. '1236'1 ,ond that the some has not been amended or repealed. DATED (seal) City Clerk CC-660 Attachment "A" CITY OF CHULA VISTA SPECIFICATIONS FOR BALL FIELD FENCING I. FENCING - replace fences as per Plan (C-i) at Rienstra Spor~ Complex. II. SCOPE OF WORK This work includes furnishing and installing new fencing at the Rienstra Sports Complex Little League Fields #1, #2 and #3. The contract unit price paid for fencing shall include removal and disposal of existing chain link fence, including pouring of new concrete footings, poles and necessary hardware, and installing new fabric per plan as shown on sheet C-1. Construction shall conform to Section 206-6 and 304-3 of the Standard Specifications (Green Book). III. MATERIALS A. Fabric - nine gauge galvanized fabric wire woven in a 2" mesh. B. Fabric Ties - galvanized steel wire of manufacturer's recommended gauge. Use ties every twelve (12) inches for line posts, and every eighteen (18) inches for top rails and braces. C. Fittin~ - all fittings shall be malleable iron, hot-dip galvanized. D.Bottom Tension Wire - for fence shall be #7 gauge galvanized steel wire. E. End Post/Corner Post - 1. 2-7/~'O.D. galvanize~ set in three (3) feet of concrete. F. Line Post 1. For fences four (4) feet and twelve (12) feet, to be 2~/8" O.D., set in three (3) feet of concrete - space ten (10) feet on center. 2. For fences eighteen (18) feet, to be 2-7/8" O.D., set in four (4) feet of concrete - space ten (10) feet on center. G. Gates - as per specifications in Plan (C-i). Gates post - 2-7/8" O.D., set in three (3) feet of concrete. Gates constructed with 1-5/9" O.D. frame with welded connections. IV. INSTALLATION Fence pos~and fabric material shall be located as indicated on plans. Exact location of gates to be shown to contractor prior to installation. Ail fabric shall be mounted on the side of the posts towards the playing field. Set all posts in concrete base, depth as per specified with diameter of footing equaling four (4) times outside diameter of post. Top surface shall be formed to a dome shape, placed 1" above finished ground surface to shed water. INSTALLATION (Cont'd.) All corners, terminal and line posts shall be capped with manufacturer's standard post tops. Top of gate posts and frame shall be provided with tack weld in place. Provide and install all fittings required for the proper installation and operation of the gates. V. CLEAN-UP Upon completion of the work, the entire site of operation shall be cleared of equipment, unused material, rubbish, so as to present a clean and neat appearance. VI. INSPECTION Final inspection for approval and acceptance shall be made by the City. Verbal notice requesting this inspection shall be submitted at least forty-eight (48).hours before anticipated date. 9~30~85 erh