HomeMy WebLinkAbout2020-09-24 ZA Hearing Agenda Packet
Item: _______
Meeting Date: 09/24/20
PUBLIC HEARING DR19-0026: Consideration of the development of a one-story 3,062
square-foot 7-11 Convenience Store and gas station on a .81 acre vacant site located at
the corner of Main Street & Fourth Ave.
PUBLIC HEARING CUP19-0017: Consideration to allow the use of a 7-11 Gas Station
in conjunction with the convenience store on a 0.81 acres site located on a vacant
parcel at corner of Main Street & Fourth Ave.
SUBMITTED BY Caroline Young, Associate Planner
INTRODUCTION
On August 19, 2019, that Applicant filed applications for a permit to construct a one-
story 3,062 square-foot 7-11 Convenience Store and gas station on a .81 acre vacant
site located at the corner of Main Street & Fourth Avenue (See Attachment 1, Locator
Map).
All property owners within 500 feet of the subject property were given notice of the
application and no public comments were received.
ENVIRONMENTAL REVIEW
The Director of Development Services has reviewed the Project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project
qualifies for a categorical exemption pursuant to Section 15332 of the State CEQA
Guidelines. Thus, no further environmental review is required.
RECOMMENDATION
Approve the application for the Design Review and Conditional Use permit to construct
a one-story 3,062 square-foot 7-11 Convenience Store and gas station based on the
information contained in the application, this report, and Notice of Decisions.
DISCUSSION
Project Site Characteristics:
The 0.81-acre project site is a vacant parcel associated with the Otay River Business
Park Development subdivision. This parcel is located at the corner of Main Street and
Fourth Avenue within the current overall property of the subdivision. Lots are currently
being subdivided to provide individual lots to future tenants.
DR19-0026/CUP19-0017Page No. 2
The topography of the site is essentially flat and surrounded by the existing commercial,
industrial uses, as well as multi-family homes located to the north across Main Street.
Project Description:
The project consists of a3,062square-foot 7-11ConvenienceStoreand gas stationon
a .81 acres site located on a vacant parcel at corner of Main Street & Fourth Avenue.
The use of a gas station as part of the convenience store will be considered through the
Conditional Use Permit. A total of four (4) gas pumps will be provided with an overheard
canopy.
CONCLUSION
Based on the information contained in the application and notice of decisions, staff
recommends the Zoning Administrator approve applications DR19-0026 and CUP19-
0017.
ATTACHMENTS
1 Locator Map
2 DR19-0026 Notice of Decision
3 CUP19-0017 Notice of Decision
TR
EMONT
ST
TR
EMON
T ST
MONT
GOME
RY ST
ZE
NITH S
T
MAIN ST
PROJECT
LOCATION
C
ity
o
f C
hu
la
Vi
st
a
C
ity
of
S
an
Di
eg
o
DIVMB!WJTUB!EFWFMPQNFOU!TFSWJDFT!EFQBSUNFOU
PROJECT DESCRIPTION:
PROJECT
LOCATOR
7-Eleven, Inc.
APPLICANT:
DESIGN REVIEW/CONDITIONAL USE PERMIT
PROJECT
Project Summary: Proposed one-story 3,062 sq. ft. of a "7-Eleven"
Corner of Fourth Av. & Main St.
ADDRESS:
convenience store & (4) fuel pumps and associated improvements.
SCALE:
FILE NUMBER:
DR19-0026
No Scale
Related cases: CUP19-0017
NORTH
L:\\Gabe Files\\Arcmap Locator Template\\Locators\\DR190026.ai.9.16.20
ATTACHMENT 1
DRAFT
ZONING ADMINISTRATOR
NOTICE OF DECISION
Date: September 24, 2020
Applicant: 7-Eleven, Inc
Case No.: DR19-0026
Address: Corner of Main Street & Fourth Ave (APN 629-030-04-00)
Project Planner: Caroline Young
Notice is hereby given that on September 24, 2020, the Zoning Administrator considered
Design Review (DR) application DR19-0026, filed by 7-Eleven, Inc The
Applicant requests approval of the construction of a one-story 3,062 square-foot 7-11
Convenience Store and gas station on a .81 acres site. The Project is located on a vacant
parcel at corner of Main Street & Fourth Ave Otay River
Business Park Development LLC PA1 in
the Otay River Business Park Specific Plan and has a General Plan designation of
Limited Industrial (ILP). The Project is more specifically described as follows:
The Project is the construction of a one-story 3,062 square-foot 7-11 Convenience Store
and gas station on a .81 acres site. The use of a gas station as part of the convenience
store will be considered through a Conditional Use Permit (CUP19-0017). A total of four
(4) gas pumps will be provided with an overheard canopy.
The 7-11 convenience store will incorporate enhanced architectural features such as
towers at each corner of the building, columns, awnings, flat roof, and building colors
that are consistent with the design standard for the subdivision. The exterior of the
building will be painted with two contrasting colors to provide interest. The colors of the
building will be Snowfalland hatura Graywith a Iron Ore for the trim
along the building and roofline. Columns will be painted with a popular Grey color to
further provide contrast from the building colors. Several green colored awnings will
be provided on three sides of the building elevation.
The gas station canopy will be 17-ft. in height and will cover a total of four (4) gas
pumps. The gas station canopy will have the 7-11 logo and colors displayed across the
canopy that match the colors of the convenience store building. The floor plan of the
convivence store will consist of a sales area and restrooms for customers, as well as walk
in coolers, office, storage, and a cashier area for employees. Required parking is provided
on site with seventeen (17) off-street parking spaces.
Notice of Decision DR19-0026
Page 2
The following Project Data Table shows the development regulations along with the
Aproposal to meet said requirements:
l Number: 629-030-04-00
Current Zoning: PA1
General Plan Designation: Limited Industrial (ILP)
Lot Area: 0.81-acres
PARKING REQUIRED: PARKING PROPOSED:
Parking spaces, broken down as follows: Standard Spaces: 15
1 parking space per 200 sq. ft. Handicapped:1
3,062 sq. ft. /200 sq. ft.=16 Electric Vehicle:1
Total: 16 Total = 17
SETBACKS/HEIGHT REQUIRED: SETBACKS/HEIGHT
PROPOSED:
Front: 10 feet 105 feet
Interior Side: 0 feet 82 feet
Exterior Side: 10 feet 13 feet
Rear: 0 feet 9 feet
Height: 50 feet 24 feet (Building), 17 feet (Canopy)
The Director of Development Services has reviewed the Project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project
qualifies for a categorical exemption pursuant to Section 15332 of the State CEQA
Guidelines. Thus, no further environmental review is required.
The proposed Project is consistent with the development regulations of the Chula Vista
Municipal Code, and the Otay River Business Park Specific Plan.
The Zoning Administrator, under the provisions of Section 19.14.582.C of the Chula
Vista Municipal Code, has conditionally approved the Project subject to the following
findings and conditions:
Tha
General Plan, Title 19 of the Municipal Code, and the Chula Vista Design
Manual.
The Project is consistent with the City of Plan, Title 19 of the
Municipal Code, and the Otay River Business Park Specific Plan. The building will
incorporate the design features including towers at each corner of the building,
columns, awnings, flat roof, and building colors that are consistent with the design
standard for the subdivision. Parking is provided for staff and customers on the site. A
trash enclosure will be constructed to meet code regulations. Street improvements
including curb, gutter, and sidewalk will be provided along Main Street and Fourth
Avenue.
Notice of Decision DR19-0026
Page 3
The design features of the proposed development are consistent with, and are a
cost-effective method of satisfying, the City of Chula Vistas Otay River Business
Park Specific Plan.
The Projedesign features are a cost-effective method of satisfying, the Otay River
Business Park Specific Plan. The landscape plan proposes landscape areas along both
Main Street and Fourth Avenue. Water efficient plants and water efficient irrigation
system will be established to reduce the overall maintenance cost of the Project.
I.The following shall be accomplished to the satisfaction of the Director of
Development Services, prior to issuance of building permits, unless otherwise
specified:
Development Services Department:
1. Prior to approval by the City of Chula Vista for the use of the subject property in
reliance on this approval, the Applicant/Representative and Property Owner shall
execute this document by making a true copy of this letter of approval and signing
both this original Notice of Decision and the copy on the lines provided below, said
execution indicating that the Applicant/Representative and Property Owner have
each read, understood and agreed to the conditions contained herein, and will
implement same. Upon execution, the true copy with original signatures shall be
returned to the Development Services Department. Failure to return the signed true
copy of this document within 30 Days of the effective date herein shall indicate the
Applicant/Representative and hat the Project, and
corresponding application for building/grading permits and/or business license, be
held in abeyance without approval.
_______________________________________ ___________
Signature of Applicant/Authorized Representative Date
_______________________________________
Print Name
_______________________________________ ___________
Signature of Property Owner/representative Date
_______________________________________
Print Name
Notice of Decision DR19-0026
Page 4
2. Prior to, or in conjunction with the issuance of the first building permit, the
Applicant shall pay all applicable fees, including any unpaid balances of application
processing fees for deposit account DDA-0515.
3. The colors and materials specified on the building plans shall be consistent with the
colors and materials shown on the site plan and elevations approved by the Zoning
Administrator on September 24, 2020.
4. A graffiti resistant treatment shall be specified for all wall and building surfaces and
noted on any building and wall plans. Additionally, the Project shall conform to
CVMC Section 9.20.055 regarding graffiti control. The Applicant shall remove all
graffiti on a regular basis. The Applicant shall place a note to this effect on the
building permit plans.
5. All roof appurtenances, including air conditioners and other roof mounted
equipment and/or projections shall be shielded from view, and the sound buffered
from adjacent properties and streets as required by the Director of Development
Services. Such screening shall be architecturally integrated with the building design
and constructed to the satisfaction of the Director of Development Services.
6. All ground mounted utility appurtenances such as transformers, AC condensers, etc.,
shall be located out of public view and adequately screened through the use of a
combination of concrete or masonry walls, berming, and/or landscaping to the
satisfaction of the Director of Development Services.
7. The Applicant shall obtain approval of a sign permit for each sign by the
Development Services Department. Signs shall comply with all applicable
requirements of the Municipal Code.
Land Development Division/Landscape Architecture Division:
8. Project to comply with Tentative Map conditions of Resolution No. 2018-041
9. The Applicant shall comply with all requirements and guidelines of the City of
Chula Vista Municipal Code; the Chula Vista Subdivision Manual; City of Chula
Vista Design and Construction Standards; the Development Storm Water Manual
for Development & Redevelopment Projects; the City of Chula Vista Grading
Ordinance No. 1797; the State of California Subdivision Map Act.
Notice of Decision DR19-0026
Page 5
10. The following fees will be required based on the Final Building Plans submitted (see
link below to Development Checklist for more information):
http://www.chulavistaca.gov/home/showdocument?id=8129
a. Sewer Connection and Capacity Fees
b. Traffic Signal Fees.
c. Public Facilities Development Impact Fees (PFDIF)
11.
requirements in accordance with Section 12.12.120 of the Municipal Code. Also,
landscaping, street furniture, or signs shall not obstruct the visibility of driver at
the street intersections or driveways.
12. Prior to the approval of the building plans, Applicant shall execute a Storm Water
Facilities Maintenance Agreement with the City for the maintenance of the
proposed BMPs for the site.
13. The applicant shall be required to obtain a Construction Permit from the Land
Development Section of the Department of Development Services. A
Construction Permit is required to perform the following work in -
of-way, which may include, but is not limited to:
a. Installation of a driveway(s) meeting design standards as shown in Chula
Vista standard detail GSI-01. Dedication of R/W as needed in order for
driveway to comply with American Disability Act (ADA) requirements.
b. Utilities Trenching and Restoration shall be installed in accordance with
Chula Vista Standard Drawing GSI-03.
14. Separate permits for other public utilities (gas, electric, water, cable, telephone)
shall be required, as necessary.
15. The construction and completion of all improvements and release requirements
shall be secured in accordance with Section 18.16.180 of the Municipal Code.
16. The onsite sewer and storm drain system shall be private. All sewer laterals and
storm drains shall be privately maintained from each building unit to the City-
maintained public facilities.
17. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall
be designed to meet the City of Chula Vista Design Standards, ADA Standards,
and Title 24 standards, as applicable.
18. Any private facilities (if applicable) within public right-of-way or City easement
will require an Encroachment Permit prior to Improvement Plan or Building
Permit approval.
Notice of Decision DR19-0026
Page 6
19. The Applicant shall submit landscape and irrigation (L&I) plans in accordance
rdinance (LWCO) (CVMC
20.12).
Fire Department Conditions:
20. The Applicant shall apply for required building permits and comply with
applicable codes and requirements, including but not limited to: the current
California edition of Building Code (CBC), Fire Code (CFC), and Mechanical
Code.
II. The following on-going conditions shall apply to the Project as long as it relies upon
this approval.
1. The Applicant shall maintain the Project in accordance with the approved plans
for DR19-0026, approved on September 24, 2020, which include site plan and
architectural elevations on file in the Development Planning Division, the
conditions contained herein, and Title 19.
2. Approval of this request shall not waive compliance with all sections of Title 19
of the Municipal Code, and all other applicable City Ordinances in effect at the
time of building permit issuance.
3. The Applicant/Representative and Property Owner shall and does hereby agree to
indemnify, protect, defend and hold harmless City, its City Council members,
officers, employees and representatives, from and against any and all liabilities,
losses, damages, demands, claims and costs, including court
fess (collectively, liabilities) incurred by the City arising, directly or indirectly,
Design Review approval, (b)
approval or issuance of any other permit or action, whether discretionary or non-
discretionary, in connection with the use contemplated herein, and
Applicant/operator shall acknowledge their agreement to this provision by
executing a copy of this Design Review approval where indicated below. The
Applicant/Representative nce with this provision is
an express condition of this permit and shall be binding on any, and all of
4. This Design Review approval shall become void and ineffective if not utilized
within thirty-six (36) months from the effective date thereof, in accordance with
Section 19.14.600 of the Municipal Code, unless an extension application is
submitted within 30-days of the expiration date of September 24, 2023.
Notice of Decision DR19-0026
Page 7
APPROVED BY ZONING ADMINISTRATOR OF THE CITY OF CHULA VISTA,
CALIFORNIA, this 24th day of September 2020.
Scott D. Donaghe
Zoning Administrator
Zoning Administrator
NOTICE OF DECISION
Date: September 24, 2020
Applicant: 7-Eleven, Inc
Case No.: CUP19-0007
Address: Corner of Main Street & Fourth Ave (APN 629-030-04-00)
Project Planner: Caroline Young
Notice is hereby given that on September 24, 2020, the Zoning Administrator considered
Conditional Use Permit (CUP) application CUP19-0007, filed by 7-Eleven, Inc
The Applicant requests to allow the use of a 7-11 Gas Station in conjunction with the
convenience store on a 0.81 acres site. The Project is located on a vacant parcel at the corner of
Main Street & Fourth Ave Otay River Business Park
Development LLC PA1 in the Otay River
Business Park Specific Plan and has a General Plan designation of Limited Industrial (ILP). The
Project is more specifically described as follows:
The Project would allow for the use of a 7-11 Gas Station in conjunction with the convenience
store on a 0.81 acres site. The applicant, 7-11 will be constructing a one-story 3,062 square-foot
7-11 Convenience Store that will be adjacent to the gas station. A total of four (4) gas pumps will
be provided with an overheard canopy.
The Director of Development Services has reviewed the Project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project qualifies for a
categorical exemption pursuant to Section 15332 of the State CEQA Guidelines. Thus, no
further environmental review is required.
The Zoning Administrator, under the provisions of Section 19.14.030.A of the Chula Vista
Municipal Code (CVMC), has conditionally approved said request based upon the following
findings of facts as required by CVMC Section 19.14.080.
1. That the proposed use at this location is necessary or desirable and will contribute to
the general well being of the neighborhood or the community.
The proposed use of a gas station will provide a necessary amenity to the surrounding
residential neighborhood. This use will allow residents to have another option to obtain gas
for their vehicles. The gas station is for public use and will also contribute to the general
well-being of the neighborhood and community.
ZA Notice of Decision CUP19-0007 Page 2
2. That such use will not under the circumstances of the particular case be detrimental to
the health, safety or general welfare of persons residing or working in the vicinity or
injurious to property or improvements in the vicinity.
The proposed use will not be detrimental to the health, safety or general welfare of the residents
or to property or improvements in the area. The characteristics of the proposed use and its
operation will not be detrimental since the Project is located within an industrial zone, and is
largely surrounded by an apartment complex to the north, and commercial, and industrial uses to
the south, east, and west. The use will be subject to meeting all health, safety and general
welfare standards and regulations set forth by the City of Chula Vista.
3. That the proposed use will comply with the regulations and conditions specified in the
code for such use.
The granting of this Conditional Use Permit requires the Applicant and Property Owner to
satisfy the conditions of approval and to comply with all applicable regulations and standards
specified in the Chula Vista Municipal Code, California Building, Fire Code, and other
applicable codes, for such use. Furthermore, the conditions of this Conditional Use Permit
are approximately in proportion to the nature and extent of the impact created by the Project
in that the conditions imposed are directly related to, and of a nature and scope related to the
size and impact of the Project. The Project will comply with all regulations and conditions
specified in the Zoning Code for uses established under CUP19-0007.
4. That the granting of this Conditional Use Permit will not adversely affect the General
Plan of the City or the adopted plan of any government agency.
The General Plan designates the site as Limited Industrial (ILP). The PA1 zone is consistent
with the General Plan designation. The use of a gas station is allowed through a Conditional
Use Permit. Thus, the Project is consistent with the General Plan land use Limited Industrial
(ILP) designation and will not adversely affect implementation of the General Plan.
Approval of CUP19-0007 is conditioned upon the following:
I.Within 60 days or prior to the issuance of any building permit, the applicant shall
satisfy the following requirements:
1. The Property owner and the Applicant shall execute this document by making a true copy
of this Notice of Decision and signing both this original notice and the copy on the lines
provided below, said execution indicating that the Property Owner and Applicant have
each read, understood and agreed to the conditions contained herein, and will implement
same. Upon execution, the true copy with original signatures shall be returned to the
Development Services Department. Failure to return the signed true copy of this
document, within 30 days, to the Development Services Department shall indicate the
Property Owner/AProject, and the corresponding applications
for building permits and/or a business license, be held in abeyance without approval.
ZA Notice of Decision CUP19-0007 Page 3
_______________________________________ ___________
Signature of Applicant/Authorized Representative Date
_______________________________________
Print Name
_______________________________________ ___________
Signature of Property Owner/representative Date
_______________________________________
Print Name
Development Planning Division Conditions:
2. The hours of operation shall be seven days a week, 24 hours a day.
Land Development/Landscape Architecture Division Conditions:
3. Project to comply with Tentative Map conditions of Resolution No. 2018-041
4. The Applicant shall comply with all requirements and guidelines of the City of Chula Vista
Municipal Code; the Chula Vista Subdivision Manual; City of Chula Vista Design and
Construction Standards; the Development Storm Water Manual for Development &
Redevelopment Projects; the City of Chula Vista Grading Ordinance No. 1797; the State of
California Subdivision Map Act.
5. The following fees will be required based on the Final Building Plans submitted (see link
below to Development Checklist for more information):
http://www.chulavistaca.gov/home/showdocument?id=8129
a. Sewer Connection and Capacity Fees
b. Traffic Signal Fees.
c. Public Facilities Development Impact Fees (PFDIF)
6. All drivewa
accordance with Section 12.12.120 of the Municipal Code. Also, landscaping, street
furniture, or signs shall not obstruct the visibility of driver at the street intersections or
driveways.
ZA Notice of Decision CUP19-0007 Page 4
7. Prior to the approval of the building plans, Applicant shall execute a Storm Water
Facilities Maintenance Agreement with the City for the maintenance of the proposed
BMPs for the site.
8. The applicant shall be required to obtain a Construction Permit from the Land
Development Section of the Department of Development Services. A Construction
s right-of-way, which may
include, but is not limited to:
a. Installation of a driveway(s) meeting design standards as shown in Chula Vista
standard detail GSI-01. Dedication of R/W as needed in order for driveway to
comply with American Disability Act (ADA) requirements.
b. Utilities Trenching and Restoration shall be installed in accordance with Chula
Vista Standard Drawing GSI-03.
9. Separate permits for other public utilities (gas, electric, water, cable, telephone) shall be
required, as necessary.
10. The construction and completion of all improvements and release requirements shall be
secured in accordance with Section 18.16.180 of the Municipal Code.
11. The onsite sewer and storm drain system shall be private. All sewer laterals and storm
drains shall be privately maintained from each building unit to the City-maintained public
facilities.
12. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall be
designed to meet the City of Chula Vista Design Standards, ADA Standards, and Title 24
standards, as applicable.
13. Any private facilities (if applicable) within public right-of-way or City easement will
require an Encroachment Permit prior to Improvement Plan or Building Permit approval.
14. The Applicant shall submit landscape and irrigation (L&I) plans in accordance with the
scape Water Conservation Ordinance (LWCO) (CVMC 20.12).
Fire Department Conditions:
15. The Applicant shall apply for required building permits and comply with applicable
codes and requirements, including but not limited to: the current California edition of
Building Code (CBC), Fire Code (CFC), and Mechanical Code.
ZA Notice of Decision CUP19-0007 Page 5
II. The following on-going conditions shall apply to the subject property as long as it relies
upon this approval.
1. The Applicant shall maintain the Project in accordance with the plans for CUP19-0007
approved on September 24, 2020, on file in the Development Planning Division, the
conditions contained herein, and Title 19.
2. The Zoning Administrator shall have the authority to approve modifications to the site in
accordance with Municipal Code regulations.
3. Approval of this Conditional Use Permit shall not waive compliance with all sections
of Title 19 of the Municipal Code, and all other applicable City Ordinances in effect at
the time of building permit issuance.
4. The Applicant and Property Owner shall and does hereby agree to indemnify, protect,
defend and hold harmless City, its City Council members, officers, employees and
representatives, from and against any and all liabilities, losses, damages, demands, claims
and costs, including court cosllectively, liabilities) incurred by
the City arising, dire
other permit or action,
whether discretionary or non-discretionary, in connection with the use contemplated
herein, and the Applicant and Property Owner shall acknowledge their agreement to this
provision by executing a copy of this Conditional Use Permit where indicated below.
The Applicant and ce with this provision is an express
condition of this Conditional Use Permit and shall be binding on any and all of the
Applicant and Property Owner successors and assigns.
5. If any of the foregoing conditions fail to occur, or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted, deny, or further condition issuance of all
future building permits, deny, revoke, or further condition all certificates of occupancy
issued under the authority of approvals herein granted, institute and prosecute litigation to
compel their compliance with said conditions or seek damages for their violation. The
Applicant and Property Owner or a successor in interest gains no vested rights by the
APPROVED BY ZONING ADMINISTRATOR OF THE CITY OF CHULA VISTA,
th
CALIFORNIA, this 24 day of September 2020.
Scott D. Donaghe
Zoning Administrator
Item: _______
Meeting Date: 09/24/20
PUBLIC HEARING DR19-0007: Consideration of a one-story 3,887 square-foot
automated carwash building with vacuum stations on a 0.93 acre vacant site located at
th
the corner of Main Street & 7 Street.
PUBLIC HEARING CUP19-0004: Consideration to allow the use of a one-story 3,887
square-foot automated carwash building with vacuum stations on a 0.93 acre vacant
th
site located at the corner of Main Street & 7 Street.
SUBMITTED BY Caroline Young, Associate Planner
INTRODUCTION
On April 9, 2019, that Applicant filed applications for a permit to construct a one-story
3,887 square-foot automated carwash building with vacuum stations on a 0.93 acre
th
vacant site located at the corner of Main Street & 7 Street (See Attachment 1, Locator
Map).
All property owners within 500 feet of the subject property were given notice of the
application and no public comments were received.
ENVIRONMENTAL REVIEW
The Director of Development Services has reviewed the Project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project
qualifies for a categorical exemption pursuant to Section 15332 of the State CEQA
Guidelines. Thus, no further environmental review is required.
RECOMMENDATION
Approve the application for the Design Review and Conditional Use Permit to construct
a one-story 3,887 square-foot automated carwash building with vacuum stations based
on the information contained in the applications, this report, and notice of decisions.
DISCUSSION
Project Site Characteristics:
The 0.93-acre project site is a vacant parcel associated with the Otay River Business
Park Development subdivision. This parcel is located at the corner of Main Street and
th
7 Avenue within the current overall property of the subdivision. Lots are currently being
subdivided to provide individual lots to future tenants.
DR19-0026/CUP19-0017Page No. 2
The topography of the site is essentially flat and surrounded by the existing commercial,
th
industrial uses, as well as multi-family homes located to the west across 7 Avenue,
and a single-family home to the north across Main Street.
Project Description:
The project consists of a one-story 3,887 square-foot automated carwash building with
vacuum stations located within the parking lot. The proposed building consists of a 111-
ft. carwash tunnel with and blowers at the end of the carwash tunnel to dry the vehicles.
There are also restrooms, vending machines, office space, and an equipment room for
the carwash. Customers may access the site through two driveways on Main Street or
th
7 Avenue and loop around to the eastern portion of the site to the pay stations.
Customers will select their desired carwash selection, pay for the carwash, and then
proceed to drive their vehicle through the carwash tunnel. Customers do not exit their
vehicles. They also have the option to use a vacuum station to vacuum their vehicles. A
canopy extending the full length of the parking spaces provides shade for the vacuum
stations.
CONCLUSION
Based on the information contained in the application and notice of decisions, staff
recommends the Zoning Administrator approve applications DR19-0007 and CUP19-
0004.
ATTACHMENTS
1 Locator Map
2 DR19-0007 Notice of Decision
3 CUP19-0004 Notice of Decision
TR
EMONT
ST
TR
EMON
T ST
MONT
GOME
RY ST
ZE
NITH S
T
MAIN ST
PROJECT
LOCATION
C
ity
o
f C
hu
la
Vi
st
a
C
ity
of
S
an
Di
eg
o
DIVMB!WJTUB!EFWFMPQNFOU!TFSWJDFT!EFQBSUNFOU
PROJECT DESCRIPTION:
PROJECT
LOCATOR
Super Star Carwash
APPLICANT:
DESIGN REVIEW/CONDITIONAL USE PERMIT
PROJECT
Project Summary: Proposed self-service carwash "Super Star
Corner of 7th St. & Main St.
ADDRESS:
Carwash" and associated improvements. Located at 1720 Fourth
Avenue.
SCALE:
FILE NUMBER:
DR19-0007
No Scale
Related cases: CUP19-0004
NORTH
L:\\Gabe Files\\Arcmap Locator Template\\Locators\\DR190007.ai.9.16.20
ATTACHMENT 1
DRAFT
ZONING ADMINISTRATOR
NOTICE OF DECISION
Date: September 24, 2020
Applicant: Superstar Carwash
Case No.: DR19-0007
Address: Corner of Main Street & 7th Street (APN 629-030-04-00)
Project Planner: Caroline Young
Notice is hereby given that on September 24, 2020, the Zoning Administrator considered
Design Review (DR) application DR19-0007, filed by Superstar Carwash
The Applicant requests approval of the construction of a one-story 3,887 square-foot
automated carwash building with vacuum stations on a 0.93 acre site. The Project is
located on a vacant parcel at the corner of Main Street & 7th Street
owned by Otay River Business Park Development LLC
Site is zoned PA1 in the Otay River Business Park Specific Plan and has a General Plan
designation of Limited Industrial (ILP). The Project is more specifically described as
follows:
The Project is requesting to construct allow a one-story 3,887 square-foot automated
carwash building with vacuum stations located within the parking lot. The proposed
building consists of a 111-ft. carwash tunnel with blowers at the end of the carwash
tunnel to dry the vehicles. There are also restrooms, vending machines, office space, and
an equipment room for the carwash. Customers may access the site through two
th
driveways on Main Street or 7 Avenue and loop around to the eastern portion of the site
to the pay stations. Customers will select their desired carwash selection, pay for the
carwash, and then proceed to drive their vehicle through the carwash tunnel. Customers
do not exit their vehicles. They also have the option to use a vacuum station to vacuum
their vehicles. A canopy extending the full length of the parking spaces provides shade
for the vacuum stations.
The carwash building will incorporate enhanced architectural features such as tower
features, columns, metal awnings, flat roof, wainscot, and building colors that are
consistent with the design standards for the subdivision. The exterior of the building will
be painted with two contrasting colors to provide interest. The colors of the building will
be Snowfalland Champagnewith a Grizzly Greylor for the trim along the
building. A Tuscan Sun color will be provided around the roofline. The columns and
tower features will be painted with a Grizzle Grey, Snowfall, and Chelsea Grey
color to further provide contrast from the building colors. Several red colored metal
awnings will be provided on two sides of the building elevation. Window trim will also
have a pomegranate color to provide an additional accent color to the building.
Notice of Decision DR19-0007
Page 2
The vacuum canopies will be painted red to match the accent color on the building. The
vacuum canopies will be 11-ft. in height and will placed within the parking lot. Required
parking is provided on site with twenty-eight (28) off-street parking spaces.
The following Project Data Table shows the development regulations along with the
Aproposal to meet said requirements:
l Number: 629-030-04-00
Current Zoning: PA1
General Plan Designation: Limited Industrial (ILP)
Lot Area: 0.81-acres
PARKING REQUIRED: PARKING PROPOSED:
Parking spaces, broken down as follows:
Handicapped= 1 space
One parking space per 200 sq. ft. Regular spaces=27
3,887sq. ft. /200=20 spaces
Total: 20 parking spaces
Total: 28 parking spaces
SETBACKS/HEIGHT REQUIRED: SETBACKS/HEIGHT
PROPOSED:
Front: 10 feet 16 feet
Interior Side: 0 feet 45 feet
Exterior Side: 10 feet 44 feet
Rear: 0 feet 134 feet
Height: 50 feet 28 feet (Building), 11 feet (Canopy)
The Director of Development Services has reviewed the Project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project
qualifies for a categorical exemption pursuant to Section 15332 of the State CEQA
Guidelines. Thus, no further environmental review is required.
The proposed Project is consistent with the development regulations of the Chula Vista
Municipal Code, and the Otay River Business Park Specific Plan.
The Zoning Administrator, under the provisions of Section 19.14.582.C of the Chula
Vista Municipal Code, has conditionally approved the Project subject to the following
findings and conditions:
General Plan, Title 19 of the Municipal Code, and the Chula Vista Design
Manual.
The Project is consistent with
Municipal Code, and the Otay River Business Park Specific Plan. The building will
incorporate design features including towers at each corner of the building, columns,
Notice of Decision DR19-0007
Page 3
awnings, flat roof, and building colors that are consistent with the design standard for
the subdivision. Parking is provided for staff and customers on the site. A trash
enclosure will be constructed to meet code regulations. Street improvements
including curb, gutter, and sidewalk will be provided along Main Street and 7th
Street.
The design features of the proposed development are consistent with, and are a
cost-effective method of satisfying, the City of Chula Vistas Otay River Business
Park Specific Plan.
The Projectdesign features are a cost-effective method of satisfying, the Otay River
Business Park Specific Plan. The landscape plan proposes landscape areas along both
Main Street and 7th Street. Water efficient plants and water efficient irrigation system
will be established to reduce the overall maintenance cost of the Project.
I.The following shall be accomplished to the satisfaction of the Director of
Development Services, prior to issuance of building permits, unless otherwise
specified:
Development Services Department:
1. Prior to approval by the City of Chula Vista for the use of the subject property in
reliance on this approval, the Applicant/Representative and Property Owner shall
execute this document by making a true copy of this letter of approval and signing
both this original Notice of Decision and the copy on the lines provided below, said
execution indicating that the Applicant/Representative and Property Owner have
each read, understood and agreed to the conditions contained herein, and will
implement same. Upon execution, the true copy with original signatures shall be
returned to the Development Services Department. Failure to return the signed true
copy of this document within 30 Days of the effective date herein shall indicate the
Project, and
corresponding application for building/grading permits and/or business license, be
held in abeyance without approval.
_______________________________________ ___________
Signature of Applicant/Authorized Representative Date
_______________________________________
Print Name
_______________________________________ ___________
Signature of Property Owner/representative Date
_______________________________________
Print Name
Notice of Decision DR19-0007
Page 4
2. Prior to, or in conjunction with the issuance of the first building permit, the
Applicant shall pay all applicable fees, including any unpaid balances of application
processing fees for deposit account DDA-0424.
3. The colors and materials specified on the building plans shall be consistent with the
colors and materials shown on the site plan and elevations approved by the Zoning
Administrator on September 24, 2020.
4. A graffiti resistant treatment shall be specified for all wall and building surfaces and
noted on any building and wall plans. Additionally, the Project shall conform to
CVMC Section 9.20.055 regarding graffiti control. The Applicant shall remove all
graffiti on a regular basis. The Applicant shall place a note to this effect on the
building permit plans.
5. All roof appurtenances, including air conditioners and other roof mounted
equipment and/or projections shall be shielded from view, and the sound buffered
from adjacent properties and streets as required by the Director of Development
Services. Such screening shall be architecturally integrated with the building design
and constructed to the satisfaction of the Director of Development Services.
6. All ground mounted utility appurtenances such as transformers, AC condensers, etc.,
shall be located out of public view and adequately screened through the use of a
combination of concrete or masonry walls, berming, and/or landscaping to the
satisfaction of the Director of Development Services.
7. The Applicant shall obtain approval of a sign permit for each sign by the
Development Services Department. Signs shall comply with all applicable
requirements of the Municipal Code.
Land Development Division/Landscape Architecture Division:
8. The Applicant is required to apply for an Industrial Waste Discharge Permit
which is regulated by the City of San Diego, Metropolitan Industrial Wastewater
Control Program. Applications for a permit should be obtained from
Metropolitan Industrial Wastewater Control Program.
9. The following fees will be required based on the Final Building Plans submitted.
Please see reference to fee schedule at:
a. Sewer Connection and Capacity Fees
b. Traffic Signal Fees
c. Public Facilities Development Impact Fees (PFDIF)
d. Western Transportation Development Impact Fees (WTDIF)
e. Otay Valley Road Fee Recovery District Fees
f. Other Engineering Fees as applicable per referenced Master Fee Schedule.
Notice of Decision DR19-0007
Page 5
10. Additional deposits or fees in accordance with the City Subdivision Manual, and
Master Fee Schedule will be required for the submittal of the following items:
a. Construction Permit
b. Encroachment Permit
c. Grading Permit
11. All driveways shall conform to the istance
requirements in accordance with Section 18.32.080 of the Municipal Code. Also,
landscaping, street furniture, or signs shall not obstruct the visibility of driver at
the street intersections or driveways.
12. Proposed Fire Access Road shall meet H-20 Loading requirements or shall be
designed for a Traffic Index (T.I.) of 5.
13. Demonstrate compliance with the current California Plumbing Code, minimum
sewer grade (2%) from building to the sewer main.
14. Any private facilities, if applicable within public right-of-way or City easement
will require an Encroachment Permit prior to Improvement Plan or building
permit approval.
15. All construction sites are required to implement Construction BMPs in
accordance with the performance standards outlined in Appendix K of the BMP
Design Manual. In general:
a. For projects disturbing one (1) acre or more requires coverage under and
compliance with the Construction General Permit (CGP), the construction
BMPs must be identified in a Storm Water Pollution Prevention Plan
(SWPPP).
b. For project that qualifies for an Erosivity Waiver under the CGP, a
CSWPCP may be submitted in lieu of a SWPPP. However, if the Erosivity
Waiver expires prior to project completion, the project applicant shall
obtain a new Waste Discharge Identification number and submit a
SWPPP.
16. A complete and accurate Notice-of-Intent (NOI) must be filed with the SWRCB
for a project covered under the CGP. A copy of the acknowledgement from the
SWRCB that a NOI has been received for this project shall be filed with the City
of Chula Vista when received.
17. Projects shall comply with the requirements of the National Pollutant Discharge
Elimination System (NPDES) General Permit for Storm Water Dischargers
Associate with Industrial Activities (IGP) Order 2014-0057-DWQ.
Notice of Decision DR19-0007
Page 6
18. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall
be designed to meet the City of Chula Vista Design Standards, ADA Standards,
and Title 24 standards, as applicable.
19. Any private facilities (if applicable) within Public right-of-way or City easement
will require an Encroachment Permit prior to Improvement Plan or Building
Permit approval.
20. All utilities serving the subject property and existing utilities located within or
adjacent to the subject property shall be under grounded in accordance with the
Chula Vista Municipal Code Section. Further, all new utilities serving the subject
property shall be under grounded prior to the issuance of Building Permits.
21. The Applicant shall submit landscape and irrigation (L&I) plans in accordance
) (CVMC
20.12).
Fire Department Conditions:
22. The Applicant shall apply for required building permits and comply with
applicable codes and requirements, including but not limited to: the current
California edition of Building Code (CBC), Fire Code (CFC), and Mechanical
Code.
23. For 3,887 square feet of Type VB construction, this project will require a fire flow
of 1,500 gallons per minute for a 2-hour duration at 20 p.s.i.
24. Based upon the required fire flow for Type VB construction type, a minimum of 1
fire hydrant(s) are/is required to serve this project.
25. Fire apparatus access roads shall be provided for every facility or building and
shall extend to within 150 feet of all portions of the facility and all portions of the
exterior walls of the first story of the building as measured by an approved route
around the exterior of the building.
II. The following on-going conditions shall apply to the Project as long as it relies upon
this approval.
1. The Applicant shall maintain the Project in accordance with the approved plans
for DR19-0007, approved on September 24, 2020, which include site plan and
architectural elevations on file in the Development Planning Division, the
conditions contained herein, and Title 19.
2. Approval of this request shall not waive compliance with all sections of Title 19
of the Municipal Code, and all other applicable City Ordinances in effect at the
time of building permit issuance.
Notice of Decision DR19-0007
Page 7
3. The Applicant/Representative and Property Owner shall and does hereby agree to
indemnify, protect, defend and hold harmless City, its City Council members,
officers, employees and representatives, from and against any and all liabilities,
losses, damages, dema
fess (collectively, liabilities) incurred by the City arising, directly or indirectly,
this Design Review approval, (b)
approval or issuance of any other permit or action, whether discretionary or non-
discretionary, in connection with the use contemplated herein, and
Applicant/operator shall acknowledge their agreement to this provision by
executing a copy of this Design Review approval where indicated below. The
an express condition of this permit and shall be binding on any, and all of
Applicant/Operato
4. This Design Review approval shall become void and ineffective if not utilized
within thirty-six (36) months from the effective date thereof, in accordance with
Section 19.14.600 of the Municipal Code, unless an extension application is
submitted within 30-days of the expiration date of September 24, 2023.
APPROVED BY ZONING ADMINISTRATOR OF THE CITY OF CHULA VISTA,
CALIFORNIA, this 24th day of September 2020.
Scott D. Donaghe
Zoning Administrator
DRAFT
Zoning Administrator
NOTICE OF DECISION
Date: September 24, 2020
Applicant: Superstar Carwash
Case No.: CUP19-0004
Address: Corner of Main Street & 7th Street (APN 629-030-04-00)
Project Planner: Caroline Young
Notice is hereby given that on September 24, 2020, the Zoning Administrator considered
Conditional Use Permit (CUP) application CUP19-0004, filed by Superstar Carwash
The Applicant requests to allow the use of a one-story 3,887 square-foot
automated carwash building with vacuum stations on a 0.93 acres site. The Project is located on
a vacant parcel at the corner of Main Street & 7th Street Otay
River Business Park Development LLC e Project Site is zoned PA1 in
the Otay River Business Park Specific Plan and has a General Plan designation of Limited
Industrial (ILP). The Project is more specifically described as follows:
The Project would allow for the use of a one-story 3,887 square-foot automated carwash building
with vacuum stations located within the parking lot. The proposed building consists of a 111-ft.
carwash tunnel with and blowers at the end of the carwash tunnel to dry the vehicles. There are
also restrooms, vending machines, office space, and an equipment room for the carwash.
th
Customers may access the site through two driveways on Main Street or 7 Avenue and loop
around to the eastern portion of the site to the pay stations. Customers will select their desired
carwash selection, pay for the carwash, and then proceed to drive their vehicle through the
carwash tunnel. Customers do not exit their vehicles. They also have the option to use a vacuum
station to vacuum their vehicles. A canopy extending the full length of the parking spaces
provides shade for the vacuum stations.
The Director of Development Services has reviewed the Project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project qualifies for a
categorical exemption pursuant to Section 15332 of the State CEQA Guidelines. Thus, no
further environmental review is required.
The Zoning Administrator, under the provisions of Section 19.14.030.A of the Chula Vista
Municipal Code (CVMC), has conditionally approved said request based upon the following
findings of facts as required by CVMC Section 19.14.080.
1. That the proposed use at this location is necessary or desirable and will contribute to
the general well being of the neighborhood or the community.
ZA Notice of Decision CUP19-0004 Page 2
The proposed use of a carwash will provide a necessary amenity to the surrounding
residential neighborhood. This use will allow residents to have another option to wash their
vehicles. The carwash is for public use and will also contribute to the general well-being of
the neighborhood and community. As proposed, the Project will not have any substantial
impact on surrounding development due to design considerations that include providing a
curved wall that extends beyond the carwash tunnel exit, so vehicles will exit to the south,
further reducing noise and light impacts on adjacent properties. The carwash tunnel will have
a solid roof cover to further reduce the noise. The Project is therefore in compliance with
CVMC Section 19.68.
2. That such use will not under the circumstances of the particular case be detrimental to
the health, safety or general welfare of persons residing or working in the vicinity or
injurious to property or improvements in the vicinity.
The proposed use will not be detrimental to the health, safety or general welfare of the residents
or to property or improvements in the area. The characteristics of the proposed use and its
operation will not be detrimental since the Project is located within an industrial zone, and is
surrounded by an apartment complex to the west, a single-family home and commercial use to
the north, and commercial and industrial uses to the east. Future development to the south will
alsohave commercial and industrial uses. The use will be subject to meeting all health, safety
and general welfare standards and regulations set forth by the City of Chula Vista.
3. That the proposed use will comply with the regulations and conditions specified in the
code for such use.
The granting of this Conditional Use Permit requires the Applicant and Property Owner to
satisfy the conditions of approval and to comply with all applicable regulations and standards
specified in the Chula Vista Municipal Code, California Building, Fire Code, and other
applicable codes, for such use. Furthermore, the conditions of this Conditional Use Permit
are approximately in proportion to the nature and extent of the impact created by the Project
in that the conditions imposed are directly related to, and of a nature and scope related to the
size and impact of the Project. The Project will comply with all regulations and conditions
specified in the Zoning Code for uses established under CUP19-0004.
4. That the granting of this Conditional Use Permit will not adversely affect the General
Plan of the City or the adopted plan of any government agency.
The General Plan designates the site as Limited Industrial (ILP). The PA1 zone is consistent
with the General Plan designation. The use of a carwash is allowed through a Conditional
Use Permit. Thus, the Project is consistent with the General Plan land use Limited Industrial
(ILP) designation and will not adversely affect implementation of the General Plan.
Approval of CUP19-0004 is conditioned upon the following:
I.Within 60 days or prior to the issuance of any building permit, the applicant shall
satisfy the following requirements:
ZA Notice of Decision CUP19-0004 Page 3
1. The Property owner and the Applicant shall execute this document by making a true copy
of this Notice of Decision and signing both this original notice and the copy on the lines
provided below, said execution indicating that the Property Owner and Applicant have
each read, understood and agreed to the conditions contained herein, and will implement
same. Upon execution, the true copy with original signatures shall be returned to the
Development Services Department. Failure to return the signed true copy of this
document, within 30 days, to the Development Services Department shall indicate the
Property Owner/AProject, and the corresponding applications
for building permits and/or a business license, be held in abeyance without approval.
_______________________________________ ___________
Signature of Applicant/Authorized Representative Date
_______________________________________
Print Name
_______________________________________ ___________
Signature of Property Owner/representative Date
_______________________________________
Print Name
Development Planning Division Conditions:
2. The hours of operation shall be seven days a week from 7:00 a.m. to 9:00 p.m.
3. The Zoning Administrator shall have the authority to approve modifications to the hours
of operation in accordance with Municipal Code regulations.
Land Development/Landscape Architecture Division Conditions:
4. The Applicant is required to apply for an Industrial Waste Discharge Permit which is
regulated by the City of San Diego, Metropolitan Industrial Wastewater Control
Program. Applications for a permit should be obtained from Metropolitan Industrial
Wastewater Control Program.
5. The following fees will be required based on the Final Building Plans submitted.
Please see reference to fee schedule at:
a. Sewer Connection and Capacity Fees
ZA Notice of Decision CUP19-0004 Page 4
b. Traffic Signal Fees
c. Public Facilities Development Impact Fees (PFDIF)
d. Western Transportation Development Impact Fees (WTDIF)
e. Otay Valley Road Fee Recovery District Fees
f. Other Engineering Fees as applicable per referenced Master Fee Schedule.
6. Additional deposits or fees in accordance with the City Subdivision Manual, and Master
Fee Schedule will be required for the submittal of the following items:
a. Construction Permit
b. Encroachment Permit
c. Grading Permit
7. All driveways shall conforistance requirements in
accordance with Section 18.32.080 of the Municipal Code. Also, landscaping, street
furniture, or signs shall not obstruct the visibility of driver at the street intersections or
driveways.
8. Proposed Fire Access Road shall meet H-20 Loading requirements or shall be designed
for a Traffic Index (T.I.) of 5.
9. Demonstrate compliance with the current California Plumbing Code, minimum sewer
grade (2%) from building to the sewer main.
10. Any private facilities, if applicable within public right-of-way or City easement will
require an Encroachment Permit prior to Improvement Plan or building permit approval.
11. All construction sites are required to implement Construction BMPs in accordance with
the performance standards outlined in Appendix K of the BMP Design Manual. In
general:
a. For projects disturbing one (1) acre or more requires coverage under and
compliance with the Construction General Permit (CGP), the construction BMPs
must be identified in a Storm Water Pollution Prevention Plan (SWPPP).
b. For project that qualifies for an Erosivity Waiver under the CGP, a CSWPCP may
be submitted in lieu of a SWPPP. However, if the Erosivity Waiver expires prior
to project completion, the project applicant shall obtain a new Waste Discharge
Identification number and submit a SWPPP.
12. A complete and accurate Notice-of-Intent (NOI) must be filed with the SWRCB for
project covered under the CGP. A copy of the acknowledgement from the SWRCB that
a NOI has been received for this project shall be filed with the City of Chula Vista when
received.
13. Projects shall comply with the requirements of the National Pollutant Discharge
Elimination System (NPDES) General Permit for Storm Water Dischargers Associate
with Industrial Activities (IGP) Order 2014-0057-DWQ.
ZA Notice of Decision CUP19-0004 Page 5
14. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall be
designed to meet the City of Chula Vista Design Standards, ADA Standards, and Title 24
standards, as applicable.
15. Any private facilities (if applicable) within Public right-of-way or City easement will
require an Encroachment Permit prior to Improvement Plan or Building Permit approval.
16. All utilities serving the subject property and existing utilities located within or adjacent
to the subject property shall be under grounded in accordance with the Chula Vista
Municipal Code Section. Further, all new utilities serving the subject property shall be
under grounded prior to the issuance of Building Permits.
17. The Applicant shall submit landscape and irrigation (L&I) plans in accordance with the
ce (LWCO) (CVMC 20.12).
Fire Department Conditions:
18. The Applicant shall apply for required building permits and comply with applicable
codes and requirements, including but not limited to: the current California edition of
Building Code (CBC), Fire Code (CFC), and Mechanical Code.
19. For 3,887 square feet of Type VB construction, this project will require a fire flow of
1,500 gallons per minute for a 2-hour duration at 20 p.s.i.
20. Based upon the required fire flow for Type VB construction type, a minimum of 1 fire
hydrant(s) are/is required to serve this project.
21. Fire apparatus access roads shall be provided for every facility or building and shall
extend to within 150 feet of all portions of the facility and all portions of the exterior
walls of the first story of the building as measured by an approved route around the
exterior of the building.
II. The following on-going conditions shall apply to the subject property as long as it relies
upon this approval.
22. The Applicant shall maintain the Project in accordance with the plans for CUP19-0004
approved on September 24, 2020, on file in the Development Planning Division, the
conditions contained herein, and Title 19.
23. The Zoning Administrator shall have the authority to approve modifications to the site in
accordance with Municipal Code regulations.
24. Approval of this Conditional Use Permit shall not waive compliance with all sections of
Title 19 of the Municipal Code, and all other applicable City Ordinances in effect at the
time of building permit issuance.
ZA Notice of Decision CUP19-0004 Page 6
25. The Applicant and Property Owner shall and does hereby agree to indemnify, protect,
defend and hold harmless City, its City Council members, officers, employees and
representatives, from and against any and all liabilities, losses, damages, demands,
incurred by the City arising, direproval and issuance
of this Conditional Use approval or issuance of any other permit or
action, whether discretionary or non-discretionary, in connection with the use
contemplated herein, and the Applicant and Property Owner shall acknowledge their
agreement to this provision by executing a copy of this Conditional Use Permit where
indicated below. The Applicant
an express condition of this Conditional Use Permit and shall be binding on any and all
of the Applicant and Property Owner successors and assigns.
26. If any of the foregoing conditions fail to occur, or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to
revoke or modify all approvals herein granted, deny, or further condition issuance of all
future building permits, deny, revoke, or further condition all certificates of occupancy
issued under the authority of approvals herein granted, institute and prosecute litigation
to compel their compliance with said conditions or seek damages for their violation. The
Applicant and Property Owner or a successor in interest gains no vested rights by the
se Permit.
APPROVED BY ZONING ADMINISTRATOR OF THE CITY OF CHULA VISTA,
th
CALIFORNIA, this 24 day of September 2020.
Scott D. Donaghe
Zoning Administrator
Page 1 of 8
AttachmenttoAgendaFileNo. 2020-0104
Page 2 of 8
Page 3 of 8
Page 4 of 8
Page 5 of 8
Page 6 of 8
Page 7 of 8
Page 8 of 8