Loading...
HomeMy WebLinkAboutReso 1985-12285 Revised i2/26985 RESOLUTION NO. 12285 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING TENTATIVE MAP FOR BONITA LONG CANYON UNITS 2 THROUGH 7, CHULA VISTA TRACT 86-3 The City Council of the City of Chula Vista does hereby resolve as follows: WHEREAS, the Developer, Bonita Long Canyon Partnership, has filed a tentative map identified as Bonita Long Canyon, CVT-86-3 and is proposing to subdivide approximately 569 acres as follows: 663 single family lots (average lot size 17,253 sq. ft.) 2 lots (for religious use), approx. 9 acres 1 community recreation lot, approx. 1.3 acres 1 park site, 11 acres 1 water tank site, 1-1/2 acres WHEREAS, after a public hearing on November 13, 1985, the Planning Commission, by a vote of 6-0 with one member absent, certified that EIR-79-2A with Addendum had been prepared in accordance with the California Environmental Quality Act of 1970, and that the information contained therein had been reviewed prior to making a decision on the project, and WHEREAS, the Planning Commission recommended that the City Council adopt a resolution approving the tentative map for Bonita Long Canyon Units 2 through 7, Chula Vista Tract 86-3, in accordance with Planning Commission Resolution PCS-86-3, and WHEREAS, after hearing all testimony at a public hearing on December 17, 1985, the City Council does hereby approve the tentative map for Bonita Long Canyon Units 2 through 7, Chula Vista Tract 86-3. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby certify that EIR-79-2A with Addendum has been prepared in accordance with the California Environmental Quality Act of 1970, and that the information contained therein has been reviewed prior to making its decision on the project. -1- BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby approve the tentative map for Bonita Long Canyon Units 2 through 7, Chula Vista Tract 86-3 in accordance with Planning Commission Resolution PCS-86-3 and subject to the following conditions: 1. The developer shall grant to the City 5.5 ft. street tree planting and maintenance easement on both sides of all internal streets 2. The developer shall acquire and grant to the City off-site drainage and sewer easements as determined by the City Engineer as determined by the City Engineer prior to the approval of the affected final map. 3. Metal beam guard rails shall be provided in the fill slopes over 10 feet in height adjacent to Corral Canyon Road and Otay Lakes Road. 4. The minimum width of any residential street should be 56 feet and the minimum width for residential collector streets should be 60 feet both as shown on Chula Vista Sign Standards #1. 5. The minimum centerline radius for a residential street in moderate terrain shall be 200 feet. Corral Canyon Road should have a minimum radius of 500 feet. Between M Street and D Street, the design of C Street should be based upon a stopping distance for a speed of 40 miles per hour. 6. The developer will need to satisfy all the requirements of the San Diego Gas and Electric within the 250 ft. easement before any grading is permitted in this area. The City has received a letter of concern from SDG&E dated September 25, 1985, in regard to grading in the new Corral Canyon Road. 7. There should be a maximum 6% street grade at intersections for each street within 50 ft. of the nearest curb line. 8. The minimum radius from the center of any cul-de-sac to the face of curb shall be 40 feet. The minimum radius to property line should be at least 50 feet. 9. Compound horizontal curbs and reverse curbs shall not be used unless approved by the City Engineer. 10. Corral Canyon Road should be superelevated as determined by the City Engineer. 11. All recommendations included in the soils report for this project should be incorporated into the project plans. 12. The developer should be responsible for dedication for right-of-way and construction of improvements in Corral Canyon Road within the project boundaries to collector street standards. Said improvements shall include but not be limited to A.C. pavement, base, monolithic curb, gutter and sidewalk, street lights, and street trees, and the right-of-way should be 84 ft. in width, or fully within the project boundaries. 13. All off-site grading and off-site improvements within private property shall require a letter of permission from the property owners allowing the work to be done. 14. Otay Lakes Road should be improved prior to the occupancy of any dwelling units within Unit #2, the Bonita Long Canyon Subdivision. The 5 ft. wide concrete sidewalk shall be constructed and 250 watt HPSV street lights shall be installed along the approximately 1,400 ft. length. The exact number will be determined by the City's Traffic Section. 15. The lot shall be so graded as to drain to the street. Drainage shall not flow over slopes. 16. The developer shall provide access for emergency vehicles between the ends of the cul-de-sac B and L as mentioned in the Conditions of Approval of the 1981 SPA plan. 17. The developer shall grant a 10 ft. minimum sewer easement for all off-site public sewers prior to the approval of the final map. 18. The maximum centerline grade for cul-de-sac street turning areas shall be 5%. 19. Grade segments in excess of 12% shall not exceed 300 ft. in length. 20. The developer shall participate in the off-site construction of Central Avenue as determined by the County of San Diego Department of Works and Chula vista City Engineer. Said participation shall occur with Unit 3 of the development. 21. The developer may request the reimbursement district be formed for these improvements which lie outside the subdivision boundary and provide benefit to other properties. It should be the developer's responsibility to submit to the City for approval a plan indicating improvements to be included, properties to be assessed, and method of assessment for said district. 22. The developer shall participate in the construction of downstream sewer facilities as needed to ensure adequate capacity for sewage flows from the ultimate development within the Long Canyon Sewer Basin. 23. In conjunction with development of Unit 2, the developer shall be responsible for off-site improvements of Otay Lakes Road northwest of this project to the extent of widening the east side to the ultimate width of 48 ft. from centerline and the construction of improvements per City Drawing #T599. Benefitting properties under Condition 21 shall be limited to those which front upon this unit. 24. The developer shall enter a Development Agreement with the City wherein the developer agrees to the following (prior to approval of the first final map): a. To pay his fair share of the cost of public improvements to be provided under the public financing plan and development agreement. b. Not to protest the establishment of a facilities benefit assessment district. 25. As specified in the Condition of the SPA plan, the developer shall be responsible for constructing a turn-key park totalling 6.5 acres in size. The park site shall be developed to the satisfaction of the City's Parks and Recreation Director and shall be completed with Phase III Subdivision Map development. It should be noted that a minimum one year maintenance program will be required of the applicant in conjunction with the park construction. Ail PAD fees normally required will waived. In addition, RCT fees may be waived in an amount equal to $57,500 subject to the review of the proposed construction for the restroom building, backstop, and par course, as indicated to be included with this park development. As noted in the SPA plan, fees previously paid both PAD and RCT fees for Phase I now under construction will be included in this total program for consideration of waiver and credit towards the park construction. 26. A minimum distance of the rear 25 ft. of each lot abutting the open space shall be evaluated for the need for fire retardant plants and irrigation systems. Said area may increase in size based upon final decision of the City subject to consultation with the City Fire Marshal. 27. The requirement for undergrounding of the 69 KV line within the 250 ft. SDG&E right-of-way shall be waived. 28. The applicant shall file CC&R's to prohibit the resubdivision or reparcelling of lots within any given phase. 29. The development standards submitted by the applicant and adopted with the SPA plan shall constitute the basic height and bulk regulations to be utilized for construction within the Bonita Long Canyon subdivision. 30. Prior to construction of the water tank within the development, a landscaping plan should be submitted to the City Planning Department for approval. 31. A decorative block wall shall be installed for those lots backing up to Corral Canyon Road. Said wall to be coordinated with the design proposed for the adjacent EastLake Subdivision. Note: The wall should be located within the common open space area so as to provide for the retention and maintenance of said wall by the open space district. 32. Bollards shall be installed at the end of Acacia Street on the subject property and designed in such a manner as to allow for pedestrian and equestrian access but to preclude general vehicular access. Said design shall include reflectors facing Acacia to satisfy traffic safety needs. 33. Street C shall be modified to provide a connection to the adjacent County area identified as TM 3750 subject to working with the County to provide the necessary connection; however, there shall be no direct vehicular access to Acacia Avenue. Note: Should this connection prove to be infeasible, the developer shall provide access for emergency vehicles between the ends of cul-de-sac Street B and L. 34. The developer shall include in the development standards and record in the CC&Rs stipulation that individual property owners shall secure approval from the appropriate city departments prior to any grading of areas located on any individual parcel which interfaces with the common open areas dedicated on this map. Said grading plan shall be submitted to the City and approved in accordance with the adopted standards. 35. The developer shall dedicate all open space areas as identified on the tentative subdivision map and request the formation of open space maintenance district to cover the maintenance of said dedicated areas. Note: The district shall be established prior to the recordation of the final map. The neighborhood park area shall not be included within the maintenance district responsibilities since it will be part of the City's overall park maintenance program. Landscaping review of all native areas shall be required for consideration of a final landscape palette to be approved by the City's Landscape Architect. 36. The City's standard split-rail fence design shall be used where fencing is required by the City Engineer adjacent to public right-of-way areas for safety purposes adjacent to the sidewalk. 37. The City's Planning Director shall be responsible for architectural review of the rear elevations facing Corral Canyon Road for all two-story buildings. 38. A qualified paleontologist monitor shall be present during the grading activities of any Sweetwater member soils which appear in the southwestern portion of the property. A paleontologist will have the authority to temporarily halt or divert grading in and around exposed areas that contain significant natural resources. All field notes, photographs and fossil resources will be deposited at a recognized museum or repository. Revised 12/26/85 39. An improved low flow channel shall be provided for Long Canyon flows between the retention basin outlet and the upstream end of the existing concrete low flow channel north of the subdivision boundary with development of Unit 5 of the project. The City Engineer shall have the discretion to waive this requirement based upon his analysis of the need for the low flow channel at the time of development of Unit 5. P~ented by Appr~as to form by /~eorg~e Krempl~, Director of ~ ~omas J./~f~on, City ~10;~ing ~JAtt°rneU -7- ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 17th day of December ...... 19 85 , by the following vote, to-wit: AYES: Councilmembers Cox, Moore, Scott, McCandliss NAYES: Councilmembers None ABSTAIN: Counci 1 members Malcolm ABSENT: Councitmembers None the City of Chula Vista ATTE~ STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) I, JENNIE M. FULASZ, CMC, CITY CLERK of the City of Chula Vista, California, DO HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 12285 ,and that the same has not been amended or repealed. DATED (seal) City Clerk CC-660 RESOLUTION NO. PCS-86-3 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL APPROVE THE TENTATIVE SUBDIVISION MAP FOR BONITA LONG CANYON UNITS 2 THROUGH 7, CHULA VISTA TRACT 86-3 WHEREAS, a duly verified application for a tentative subdivision map was filed with the Planning Department of the City of Chula Vista on September ll, 1985, by Bonita Long Canyon Partnership, and WHEREAS, said application requested permission to subdivide approximately 569 acres located north of East "H" Street between Otay Lakes Road and Proctor Valley Road into 668 lots, including 663 single family lots, and WHEREAS, the Planning Commission set the time and place for a hearing on said tentative subdivision map application and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and its mailing to property owners within 300 feet of the exterior boundaries of the property at least ten days prior to the hearing, and WHEREAS, the hearing was held at the time and place as advertised, namely 7:00 p.m., November 13, 198§, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed, and WHEREAS, the Comnission certified that EIR-79-2A with Addendum had been prepared in accordance with the California Environmental Quality Act of 1970, and reviewed the information contained therein prior to making a decision on the project. NOW, THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION finds as follows: Pursuant to Section 66473.5 of th~ Subdivision Map Act, Tentative Map for Chula Vista Bonita Long Canyon (reference CVT-86-3) is found to be in conformance with the various elements of the Chula Vista General Plan based on the following: 1. The site is physically suitable for the residential development and the proposal conforms to all standards established by the City for such projects. Such determination is based upon the approval of the SPA plan which is identical to the proposed tentative map. 2. The design of the subdivision will not affect the existing improvements, street service, etc. which have been designed to avoid any serious problems. The subdivision has been designed to tie into and complement existing streets and drainage systems and the sewers have been designed to handle the proposed capacities. 3. The project is in substantial conformance wi th the Chula Vista General Plan Elements as follows: a) Land Use - The proposed development is in keeping with the low density residential designation for which the applicant is requesting. b) Circulation The proposed route connections and off-site street improvements as required as Conditions of Approval will provide the necessary grid pattern to link this project to complement existing developments which abut it on all sides. c) Housing - The proposed development is designed to provide housing in the upper-middle income range and represents an extension of the existing low density Bonita Valley development. Small lot sizes located toward the south end of the project are in keeping with the existing developments adjacent to Bonita Vista High School. d) Conservation - The conservation element does not note any natural resources on the site. e) Park and Recreation Open Space - The developer is retaining over half of the area in either natural or manufactured open space and is providing an ll-acre park site adjacent to Corral Canyon Road. The park area being provided is in keeping with the formula adopted by the City of Chula Vista to satisfy the City's park needs. f) Seismic Safety - The subject property is not traversed by any known earthquake faults or traces. g) Safety - The development is located within the response time of the Chula Vista Fire Station located in Otay Lakes iI Road just south of "H" Street. The proposed phasing plans outlined in this subdivision will provide for direct access at all times as well as securing alternate entries to the project with the completion of the final phases. h) Noise Those portions of the development which are adjacent to the major road will have walls provided to reduce sound attenuation. Proposed units will meet the standards specified in the Unified Building Code for noise criteria. -2- i) Scenic Highway Site does not abut a scenic route or gateway entry, however, the combination of wall and landscaping proposed along Corral Canyon Road will tie in with the adjacent EastLake to provide an attractive linkage to the Bonita area. j) Bike Routes - The proposed project does not require any special provisions for bicycle travel. Standards adopted by the Chula Vista Engineering Dept. provide for bicycle lanes along major street routes. k) Public Buildings -Public buildings are neither proposed nor required on the project site. BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION recommends that City Council approve the tentative subdivision map for Bonita Long Canyon Units 2 through 7, Chula Vista Tract 86-3 subject to the following conditions: 1. The developer shall grant to the City 5.5 ft. street tree planting and maintenance easement on both sides of all internal streets 2. The developer shall acquire and grant to the City off-site drainage and sewer easements as determined by the City Engineer as determined by the City Engineer prior to the approval of the affected final map. 3. Metal beam guard rails shall be provided in the fill slopes over l0 feet in height adjacent to-Corral Canyon Road and Otay Lakes Road. ~ 4. The minimum width of any residential street should be 56 feet and the minimum width for residential collector streets should be 60 feet both as shown on Chula Vista Sign Standards #1. 5. The minimum centerline radius for a residential street in moderate terrain shall be 200 feet. Corral Canyon Road should have a minimum radius of 500 feet. B'etween M Street and D Street, the design of C Street should be based upon a stopping distance for a speed of 40 mi~es per hour. 6. The developer will need to satisfy all the requirements of the San Diego Gas and Electric within the 250 ft. easement before any grading is permitted in this area. The City has received a letter of concern from SDG&E dated September 25, 1985, in regard to grading in the new Corral Canyon Road. 7. There should be a maximum 6% street grade at intersections for each street within 50 ft. of the nearest curb line. 3 8. The minimum radius from the center of any cul-de-sac to the face of curb shall be 40 feet. The minimum radius to property line should be at least 50 feet. 9. Compound horizontal curbs and reverse curbs shall not be used unless approved by the City Engineer. 10. Corral Canyon Road should be superelevated as determined by the City Engineer. ll. All recommendations included in the soils report for this project should be incorporated into the project plans. 12. The developer should be responsible for dedication for right-of-way and construction of improvements in Corral Canyon Road within the project boundaries to collector street standards. Said improvements shall include but not be limited to A.C. pavement, base, monolithic curb, gutter and sidewalk, street lights, and street trees, and the right-of-way should be 84 ft. in width, or fully within the project boundaries. 13. All off-site grading and off-site improvements within private property shall require a letter of permission from the property owners allowing the work to be done. 14. Otay Lakes Road should be improved prior to the occupancy of any dwelling units within Unit #2, the Bonita Long Canyon Subdivision. The § ft. wide concrete sidewalk shall be constructed and 250 watt HPSV-street lights shall be installed along the approximately 1,400 ft. length. The exact number will be determined by the City's Traffic Section. 15. The lot shall be so graded as to drain to the street. Drainage shall not flow over slopes. 16. The developer shall provide access for emergency vehicles between the ends of the cul-de-sac B and L as mentioned in the Conditions of Approval of the 1981 SPA plan. 17. The developer shall grant a .10 ft. minimum sewer easement for all off-site public sewers prior to the approval of the final map. 18. The maximum centerline grade for cul-de-sac street turning areas shall be 5%. 19. Grade segments in excess of 12% shall not exceed 300 ft. in length. -4- 20. The developer shall participate in the off-site construction of Central Avenue as determined by the County of San Diego Department of Works and Chula Vista City Engineer. Said participation shall occur with Unit $ of the development. 21. The developer may request the reimbursement district be formed for these improvements which lie outside the subdivision boundary and provide benefit to other properties. It should be the developer's responsibility to submit to the City for approval a plan indicating improvements to be included, properties to be assessed, and method of assessment for said district. 22. The developer shall participate in the construction of downstream sewer facilities as needed to ensure adequate capacity for sewage flows from the ultimate development within the Long Canyon Sewer Basin. 23. In conjunction with development of Unit 2, the developer shall be responsible for off-site improvements of Otay Lakes Road northwest of this project to the extent of widening the east side to the ultimate width of 48 ft. from centerline and the construction of improvements per City Drawing ~T599. Benefitting properties under Condition 21 shall be limited to those which front upon this unit. 24. The developer shall enter a Development Agreement with the City wherein the developer agrees to the following (prior to approval of the first final map): a. To pay his fair share of the cost of public improvements to be provided under the public financing plan and development agreement. b. Not to protest the establishment of a facilities benefit assessment district. 25. As specified in the Condition of the SPA plan, the developer shall be responsible for constructing a turn-key park totalling 6.5 acres in size. The park site shall be developed to the satisfaction of the City's Parks and Recreation Director and shall be completed with Phase III Subdivision Map development. It should be noted that a minimum one year maintenance program will be required of the applicant in conjunction with the park construction. All PAD fees normally required will waived. In addition, RCT fees may be waived in an amount equal to $57,500 subject to the review of the proposed construction for the restroom building, backstop, and par course, as indicated to be included with this park development. As noted in the SPA plan, fees previously paid both PAD and RCT fees for Phase I now under construction will be included in this total program for consideration of waiver and credit towards the park construction. -5- 26. A minimum distance of the rear 25 ft. of each lot abutting the open space shall be evaluated for the need for fire retardant plants and irrigation systems. Said area may increase in size based upon final decision of the City subject to consultation with the City Fire Marshal. 27. The requirement for undergrounding of the 69 KV line within the 250 ft. SDG&E right-of-way shall be waived. 28. The applicant shall file CC&R's to prohibit the resubdivision or reparcelling of lots within any given phase. 29. The development standards submitted by the applicant and adopted with the SPA plan shall constitute the basic height and bulk regulations to be utilized for construction within the Bonita Long Canyon subdivision. 30. Prior to construction of the water tank within the development, a landscaping plan should be submitted to the City Planning Department for approval. 31. A decorative block wall shall be installed for those lots backing up to Corral Canyon Road. Said wall to be coordinated with the design proposed for the adjacent EastLake Subdivision. Note: The wall should be located within the common open space area so as to provide for the retention and maintenance of said wall by the open space district. 32. Bollards shall be installed at the end of Acacia Street on the subject property and designed in such a manner as to allow for pedestrian and equestrian access but to preclude general vehicular access. Said design shall include reflectors facing Acacia to satisfy traffic safety needs. 33. Street C shall be modified to provide a connection to the adjacent County area identified as TM 3750 subject to working with the County to provide the necessary connection; however, there shall be no direct vehicular access to Acacia Avenue. Note: Should this connection prove to be infeasible, the developer shall provide access for emergency vehicles between the ends of cul-de-sac Street B and L. 34. The developer shall include in the development standards and record in the CC&Rs stipulation that individual property owners shall secure approval from the appropriate City departments prior to any grading of areas located on any individual parcel which interfaces with the common open areas dedicated on this map. Said grading plan shall be submitted to the City and approved in accordance with the adopted standards. 35. The developer shall dedicate all open space areas as identified on the tentative subdivision map and request the formation of open space maintenance district to cover the maintenance of said dedicated areas. Note: The district shall be established prior to the recordation of the final map. The neighborhood park area shall not be included within the maintenance district responsibilities since it will be part of the City's overall park maintenance program. Landscaping review of all native areas shall be required for consideration of a final landscape palette to be approved by the City's Landscape Architect. 36. The City's standard split-rail fence design shall be used where fencing is required by the City Engineer adjacent to public right-of-way areas for safety purposes adjacent to the sidewalk. 37. The City's Planning Director shall be responsible for architectural review of the rear elevations facing Corral Canyon Road for all two-story buildings. 38. A qualified paleontologist monitor shall be present during the grading activities of any Sweetwater member soils which appear in the southwestern portion of the property. A paleontologist will have the authority to temporarily halt or divert grading in and around exposed areas that contain significant natural resources. All field notes, photographs and fossil resources will be deposited at a recognized museum or repository. That a copy of this resolution be transmitted to the owners of the property and the City Council. PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA, this 13th day of November 1985, by the following vote, to-wit: AYES: Commissioners Carson, Tugenberg, Green, Shipe, Cannon and Grasser NOES: None Commissioner ABSENT: Guiles ~~ ~~. Cannon, Chairman ATTEST: ~-~Jth M. Smith; Secre~iry WPC 2371P