Loading...
HomeMy WebLinkAboutItem 2 - DR19-0006/MPA19-0015 Memorandum DATE: JUNE 10, 2020 TO: CHAIR GUTIERREZ AND MEMBERS OF THE PLANNING COMMISISON FROM: JEFF STEICHEN, PROJECT MANAGER/ASSOCIATE PLANNER VIA: KELLY BROUGHTON, DIRECTOR OF DEVELOPMENT SERVICES SUBJECT: DR19-0006/MPA19-0015 REQUESTING DESIGN REVIEW AND COASTAL DEVELOPMENT PERMIT APPROVAL The above referenced item is a request for a Design Review and Coastal Development Permit to allow for the combined 17,180 square-foot expansion of two existing buildings on a 3.91 acre subcomponent (“Parcel N”) of the approximately 40 acre Collins Aerospace/Rohr Campus located at 850 Lagoon Drive (APN 571-330-29). Because the requested square-footage expansion is less than 20,000 square-feet, the Design Review Permit would normally be approved/ by the action of the Zoning Administrator. Due to the location of the project site within the Coastal Zone, the request also includes a Coastal Development Permit, which pursuant to Section 19.83.009 of the CVMC, requires a Public Hearing. While the recent orders to allow for virtual public hearings in response to COVID-19 (California Governor’s Executive Order N-29-20 and the City of Chula Vista Director of Emergency Services Order 002-B-2020) allow for virtual public hearings to take place, they only address public hearings before the Planning Commission and City Council. Because no provision was provided for conducting a virtual Zoning Administrator public hearing, and pursuant to Section 19.14.050 of the CVMC it became necessary for this project to be elevated to the Planning Commission level in order to allow for the required public hearing to be conducted remotely. The Project proposes the expansion of two existing on-site manufacturing buildings. Existing Building 115 is currently 6,048 square-feet. There is proposed expansion of 2,752 and 1,256 square feet for total of 4,008 square-foot expansion. Existing Building 118 is currently 10,490 square-feet. The expansion will consist of three components totaling 12,348 square feet. Buildings 115 and 118 are being expanded to include relocated processes from other buildings within the Collins Aerospace/Rohr campus. Several buildings are being sold to accommodate sold to accommodate their new workflow and, as a result, the activities remaining in those buildings are being consolidated into Buildings 115 and 118. These new expansions will contain lab and storage areas to facilitate their aerospace parts testing activities. The Project has been designed so that all of the expansion areas of Buildings 115 and 118 are designed to be architecturally compatible with the existing building and include upgraded building materials. A parking analysis was conducted which indicates more than adequate existing on-site parking is available to accommodate the proposed expansion. The analysis indicates a total of 1,231 parking spaces are available with only 1,037 total parking spaces required. Attached is Planning Commission Resolution which describes the required findings for granting of the requested Design Review and Coastal Development Permits. Attachments: 1. Locator Map 2. Planning Commission Resolution 3. Project Site Plan 4. Project Plan Set