Loading...
HomeMy WebLinkAboutReso 2020-113RESOLUTION NO. 2020-113 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA AMENDING THE INFRASTRUCTURE, FACILITIES, AND EQUIPMENT EXPENDITURE PLAN; AMENDING THE FISCAL YEAR 2019/20 CIP PROGRAM BUDGET BY ESTABLISHING NEW CIP PROJECTS, “CORRUGATED METAL PIPE EMERGENCY REPAIR (MEASURE P)” (DRN0216), “FIRE STATION PLYMOVENT EXHAUST (MEASURE P)” (GGV0251), “FIRE STATION #1 REPAIR/REPLACE (MEASURE P)” (GGV0252), AND “FIRE STATION ALERTING SYSTEM (MEASURE P)” (GGV0253); AND MAKING VARIOUS AMENDMENTS TO THE FY2019/20 CIP PROGRAM BUDGETS AND APPROPRIATING FUNDS THEREFOR WHEREAS, on November 8, 2016, the voters of the City of Chula Vista approved Measure P authorizing a one-half cent sales tax on retail sales within the City for a period of ten (10) years; and WHEREAS, per Chula Vista Municipal Code (CVMC) section 3.33.160.A, all revenue generated by the tax shall be accounted for in the General Fund as a separate line item and will then be transferred to a General Fund subfund entitled “Measure ‘P’ Sales Tax Fund”; and WHEREAS, staff has created the 2016 Measure P Sales Tax Fund (Fund 201) for the purpose of accounting for all revenues and expenditures of Measure P monies; and WHEREAS, the Measure P Infrastructure, Facilities, and Equipment Expenditure Plan (“Expenditure Plan”) has been and continues to be updated to reflect the ratification of Measure P and the expenditures pursuant thereto; and WHEREAS, per CVMC section 3.33.160.D, the function of the Measure P Citizen Oversight Commission shall be to review and report on City compliance with the terms of that Chapter and the spending guidelines contained in the City Council Intended Infrastructure, Facilities and Equipment Expenditure Plan and each Measure P Spending Plan presented and approved by the City Council, thereafter; and WHEREAS, segments of existing Corrugated Metal Pipe (CMP) within the City’s storm drain system that are pending rehabilitation are in jeopardy of potential failure from any significant rain event; and WHEREAS, historically, a significant rain event can drastically deteriorate CMP and abruptly change the recognized status of not being an imminent threat of failure to becoming an unforeseen failure. Such failures could create sink holes that have the potential to cause damage to public and private property and endanger the health, safety, and general welfare of the community; and DocuSign Envelope ID: E31123B7-3C2F-4351-A65A-A6513E00E9AD Resolution No. 2020-113 Page No. 2 WHEREAS, the City has recently encountered multiple CMP failure locations that have been addressed by Construction Change Orders (CCOs) through current CIP projects in construction with similar scopes and available contingency funds. This is a method, however, that cannot be relied upon confidently to address CMP failure issues as they may arise; and WHEREAS, staff has determined amending the Expenditure Plan to transfer funds from GGV0247 to DRN0216 to complete the emergency storm drain repairs is compliant with the Measure P guidelines to accelerate the repair and replacement of critical assets; and WHEREAS, the proposed “Corrugated Metal Pipe Emergency Repair” (DRN0216) CIP project will be dedicated to addressing future emergency CMP failures. By having a funded CIP project readily available, emergency failures can be addressed directly by this project; and WHEREAS, due to the varied nature of CMP rehabilitation work, all failure locations will be procured on a time and materials basis or through competitive bidding. City staff will determine the best option after consideration of relevant factors for each failure, including but not limited to severity of risks, timing to complete the project, and costs; and WHEREAS, staff intends to procure these construction contracts pursuant to Chula Vista Municipal Code (CVMC) section 2.56.100 or other contract award procedures as authorized by the CVMC. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that it does hereby (1) amend the Infrastructure, Facilities, and Equipment Expenditure Plan, (2) amend the FY 2019/20 Capital Improvement Program budget by establishing new CIP projects DRN0216, GGV0251, GGV0252, and GGV0253, and (3) amend the FY 2019/20 Capital Improvement Program budgets for the following appropriations: Summary of CIP Program Budget Amendments PROJECT PROJECT DESCRIPTION AMOUNT GGV0247 Loma Verde Aquatic and Rec Ph I (Measure P)(400,000)$ DRN0216 Corrugated Metal Pipe Emergency Repair (Measure P)400,000$ GGV0242 Fire Station 2 Fueling Tank Replacement (Measure P)(344,340)$ GGV0251 Fire Station Plymovent Exhaust (Measure P)100,000$ GGV0252 Fire Station 1 Repair/Replacement (Measure P)244,340$ GGV0243 Fire Station 2 Fueling Tank Replacement Phase II (Measure P)(561,548)$ GGV0253 Fire Station Alerting System (Measure P)561,548$ PRK0333 Max Field/Loma Verde Assessibiltity Study (Measure P)20,000$ PRK0326 Park Infrastructure (Measure P)41,062$ DRN0205 CMP Rehab in ROW FY17/18 (200,000)$ DRN0211 CMP Rehab Outside ROW Phase II (Measure P)200,000$ TOTAL CIP PROGRAM ADJUSTMENTS 61,062$ DocuSign Envelope ID: E31123B7-3C2F-4351-A65A-A6513E00E9AD Resolution No. 2020-113 Page No. 3 Presented by Approved as to form by William S. Valle Glen R. Googins Director of Engineering & Capital Projects City Attorney PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 26th day of May 2020 by the following vote: AYES: Councilmembers: Diaz, Galvez, McCann, Padilla, and Casillas Salas NAYS: Councilmembers: None ABSENT: Councilmembers: None Mary Casillas Salas, Mayor ATTEST: Kerry K. Bigelow, MMC, City Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Kerry K. Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2020-113 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 26th day of May 2020. Executed this 26th day of May 2020. Kerry K. Bigelow, MMC, City Clerk DocuSign Envelope ID: E31123B7-3C2F-4351-A65A-A6513E00E9AD