HomeMy WebLinkAboutReso 2003-298RESOLUTION NO. 2003-298
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA APPROVING THE DEFERRAL OF
ASSESSMENTS AND ESTABLISHING THE RATE OF
INTEREST AND FINANCING PERIOD APPLIED TO
DEFERRALS FOR ASSESSMENT DISTRICT 2001-3
WHEREAS, on June 18, 2002, pursuant to Chapter 27 of the Improvement Act of 1911
(the "Block Act") and Article XIIID of the Constitution of California ("Article XIIID"), Council
adopted Resolution No. 2002-208 awarding a contract in the amount of $15,870 to Portillo
Construction for the construction of sidewalk improvements on D Street between Third Avenue
and Landis Avenue; and
¢WHEREAS, the work is now complete and improvements have been accepted by the
Ci Manager; and
WHEREAS, the City funded a portion of the project cost to construct the sidewalks from
a grant received from the San Diego Association of Governments (SANDAG) under the
Transportation Development ACt (TDA); and
WHEREAS, the remaining construction cost of $2,950 are to be assessed to the property
owners; and
WHEREAS, staff has completed the accounting of the expenditures and apportionment to
property owners as shown in the attached Engineer's Report (Exhibit "A"); and
WHEREAS, the following amounts will be assessed to each property owner and are
based only on construction costs for the driveway aprons:
Address Parcel No. Preliminary Reduction l~nal
Amount Amount Assessment
A~nount
305 D Street 566-030-30 $ 6,961.00 ($ 5,638.63) $1,322.37
311 D Street 566-030-54 $ 5,850.00 ($ 4,974.35) $ 875.65
317 D Street 566-030-25 $ 5,969.00 ($ 5,216.62) $ 752.38
321 D Street 566-030-23 $ 979.00 ($ 979.00) $ 0
PROPERTY
OWNERS' TOTAL
$19,759.00 ($16,808.60) $2,950.00
WHEREAS, upon confirmation of the final assessments, property owners will have the
option of paying any portion of the assessments during the 30-day payoff period; and
WHEREAS, if assessments are not fully paid during the 30-day payoff period, in
accordance with Section 5895 of the Streets and Highways Code, the City will charge interest at
the rate of 5% per annum for a period of ten (10) years; and
Resolution 2003-298
Page 2
WHEREAS, property ovn~ers may pay the balance of their assessments at any time
during the 30-day repayment period without penalty; and
WHEREAS, this period will commence following recordation of the final district
boundary map and when Notices of Assessment are mailed to property owners.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula
Vista does hereby approve the deferral of assessments and establishing the rate of interest and
financing period applied to deferrals for Assessment District 2001.
Presented by
Approved as to form by
Ann Moore
CityAttomey
Resolution 2003-298
Page 3
PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista,
California, this 15th day of July, 2003, by the following vote:
ATTEST:
Councilmembers:
Councilmembers:
Councilmembers:
AYES:
NAYS:
ABSENT:
Davis, McCann, Rindone, Salas and Padilla
None
None
Su~an Bigelow, City Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO )
CITY OF CHULA VISTA )
I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing
Resolution No. 2003-298 was duly passed, approved, and adopted by the City Council at a
regular meeting of the Chula Vista City Council held on the 15th day of July, 2003.
Ex:cuted this 15th day of July, 2003.
Susan Bigelow, City Clerk
ENGINEER'S REPORT
D STREET SIDEWALK IMPROVEMENTS
19! 1 ACT
ASSESSMENT DISTRICT
AD 2001-3
MAY 29, 2003
Backeround
D Street between Third and Fourth Avenues in Chula Vista is a residential street with an
80-foot width of right-of-way. Existing improvements include pavement and curb in
fi'ont of all properties; however, several properties do not have sidewalks. On the north
side of D Street, the only properties which do not have sidewalk improvements are a
~ortion of 321 D Street, as well as 317, 311 and 305 D Street. In September 2001 these
four property owners submitted a petition to the City requesting the initiation of
>roceedings to form an assessment district in accordance with the Improvement Act of
1911. This district would finance the construction of the missing sidewalk improvements
on the north side olD Street.
Fhe City currently has a policy regarding participation in 1911 Block Act proceedings.
According to this policy, the City will provide all engineering, inspection and
administrative services at no cost to the property owners. Additionally, it is the City's
responsibility to relocate all existing public improvements which would be in conflict
with the new improvements, including utilities. These costs have not been included in
the Engineer's Report, because they will not be assessed to the property owners.
Subsequent to the construction of the improvements, the City obtained funding for the
construction of the sidewalks from the San Diego Association of Governments
(SANDAG). Therefore, the only cost that will be assessed to the property owners is the
cost of constructing the driveway aprons.
Overall Design and Cost Estimate
The project area and general location of improvements are shown on the Assessment
Diagram for Assessment District 2001-3, D Street. The properties which will benefit
from these improvements and are a part of the district are as follows:
Address
317 D Street
311 D Street
305 D Street
Parcel Number
566-030-25-00
566-030-54-00
566-030-30-00
Improvements included within this district consist of driveway aprons that provide a
transition between the street and the driveways. The improvements which will not be
assessed to property owners include a 5-foot wide sidewalk from the existing sidewalk
ending in front of 521 D Street to the curb return on Third Avenue north of D Street, as
well as a sidewalk ramp on the northwest comer of Third Avenue and D Street.
Originally, 321 D Street (APN 566-030-23-00) was included within the boundaries of
this district. However, a new driveway apron at this address was not included as part of
the construction work for this project, since the existing sidewalk ended east of the
existing driveway. Therefore, this property will not be assessed for any district costs and
will thus be excluded from the district,
The total estimated construction cost was $23,233.00, including the City's share. The
amount allocated to the property owners was estimated at $19,759.00. The latter amount
was used to calculate the property owners' ballot amounts. The lowest bid for this
project was $15,870.00, as shown on Table 1. This amount was subsequently reduced to
$10,705.50, due to an adjustment in contract quantities. After subtracting the amount of
the grant received from SANDAG for sidewalk constmction, the remaining amount to be
assessed to the property owners is $2950.40.
Method of Apoortionment
Costs must be apportioned to each property in proportion to the benefit received by that
property. In apportioning the cost of street improvements, it can generally be assumed
that the property adjacent to the improvements will receive the direct benefit. The
adjacent properties would be most likely to use the improvements, particularly with
respect to driveway aprons.
The City has obtained funding from SANDAG for most of the cost items included in the
contractor's bid, including removal and replacement of improvements, construction of a
4" PCC sidewalk and the pedestrian ramp at the comer of D Street and Third Avenue.
The only cost item that will be included in the assessment district is the 6" PCC
driveway. Based on the revised total quantity of 965.1 SF calculated by the City's
construction inspector, the total cost is $3,860.40. However, some of this amount relates
to the portion of sidewalk that runs through the driveway apron. This section was
estimated to cost $1,910.00 and was subtracted from the above figure to give a total of
$2950.40. This amount was not included in the grant and needs to be assessed to the
property owners.
The breakdown of construction costs among the three properties and the City is shown on
Table 2. For each property, the square footage of the driveway apron was individually
calculated based on both the measurements taken by the City's inspector during
construction in August 2002 and measurements made by the Assessment Engineer in
May 2003. The difference between the dimensions measured on both occasions was 0.20
feet at the most, which is within the expected accuracy of the measuring devices. The
areas calculated were then multiplied by $4.00, the unit cost for the 6" PCC driveways.
The total amount thus calculated for these costs totaled $2973.68 for all three properties.
There is a difference of $23.28 between this and $2950.40, the construction cost not
covered by the grant. Since this difference is less than one percent, it was decided that
the easiest way to reconcile these numbers would be to proportion out the difference
among the three properties.
The amounts to be assessed to the property owners based on the final construction costs
can thus be compared to the mounts estimated in the Preliminary Engineer's Report as
follows:
Assessor's Parcel No. Preliminary Assessment Final Assessment
566-030-30-00 $6,961.00 $1,322.37
566-030-54-00 $5,850.00 $ 875.65
566-030-25-00 $5,969.00 $ 752.38
566-030-23-00 $ 979.00 $ 0
TOTAL $19,759.00 $2,950.40
The Preliminary Assessment amounts were included on the ballots submitted to the
property owners and tallied in accordance with Mticle XIIID of the California
Constitution. Since the Final Assessment amounts are all lower than the Preliminary
Assessment amounts, no additional ballot process is necessary.
J:~ENGINEER~ASMTDISTLFINAL ENGINEER'S REPORT.DOC
4
ASSESSMENT DIAGRAM
ASSESSMENT DISTRICT 2001-3
1911 ACT IMPROVEMENT DISTRICT
CITY OF CHULA VISTA, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA
300 BLOCK D STREET
317 D ST
305 D ST
311
I HEREBY CERTIFY THAT THE WITHIN MAP SHOWING
PROPOSED BOUNDARIES OF THE ASSESSMENT DISTRICT,
CITY OF CHULA VISTA, COUNTY OF SAN DIEGO, STATE OF
CALIFORNIA, WAS APPROVED BY THE CITY COUNCIL OF
THE CITY AT A REGULAR MEETING THEREOF, HELD ON
THE DAY OF ,20 , BY
RES6LUTION NO.
LEGEND
I/////1
PROPOSED ASSESSMENT
DISTRICT BOUNDARY
AREA OFIMPROVEMENT
CITY CLERK, CITY OF CHULA VISTA
FILED IN THE OFFICE OF THE CITY CLERK OF THE CITY OF
CHULA VISTA THIS DAY OF ,20___
RECORDED IN THE OFFICE OF THE STREET
SUPERINTENDENT OF THE CITY OF CHULA
VISTA THIS DAY OF
20
CITY CLERK, CITY OF CHULA VISTA
FILED THIS DAY OF ,20
IN BOOK AT PAGE OF MAP OF ASSESSMENT
DISTRICTS IN THE OFFICE OF THE COUNTY RECORDER
OF THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA.
COUNTY RECORDER, COUNTY OFSAN DIEGO
STREET SUPERINTENDENT
REFERENCE IS HEREBY MADE TO THE COUNTY
OF SAN DIEGO, STATE OF CALIFORNIA ASSESSO
PARCEL MAPS FOR DETAILED DIMENSIONS OF
INDIVIDUAL PARCELS.
'TABLE 1
PORTILLO CONSTRUCTION
ORIGINAL BID ON D STREET IMPROVEMENTS
4" PCC Sidewalk 1220 SF $3.50
6" PCC Driveways 1100 SF $4.00
Pedestrian Ramp (SDRSD G-27 1 EA $1000
Type A)
Remove and Replace 4" PCC 200 SF $5.00
Slabwork
Remove and Replace 6" PCC 400 SF $5.50
Slabwork
Remove and Replace PCC Curb 120 LF $25.00
and Gutter (6" or 8")
TOTAL
$4,270
$4,400
$1,000
$1,000
$2,200
$3,00O
$15,870
TABLE 2
D STREET APPORTIONMENT CALCULATIONS
DRIVEWAY APRONS
305 D Street; APN 566-030-30-00
12.8' x 20.2' +26.5' =- 298.9 SF
2
1.7' x 20.2' ~ 38.4SF
333.2 SF
333.2 SFx $4.00/SF = $1332.80
311 D Street; APN 566-030-54-00
12.7' x 18.9' + 12.5' = 199.39 SF
2
1.7' x 12.5' = 21.25 SF
222.85 SF
220.64 SF x $4.00/SF = $882.56
317 D Street; APN 566-030-25-00
12.7' x 17.0' + 10.5' = 174.63 SF
2
1.3' x 11.5' = 14.95 SF
189.58 SF
189.58 SF x $4.00/SF = $758.32
Reconciliation with Grant Fundin~
$1332.80
$ 882.56
$ 758.32
$2973.68
$2973.68 - $2950.40 (construction cost - grant) -- $23.28
Reduction to calculated amounts: $23.28/$2973.68 -- 0.007829 multiplier
305 D Street: $1322.37
307 D Street: $ 875.65
311 D Street: $ 752.38
J:~ENGINEER~ASMTDIST~D STREET~TABLE 2 APPORTIONMENT.DOC