HomeMy WebLinkAboutItem 2 - Staff Report
Item: __2____
Meeting Date: 1/22/20
ITEM TITLE: A. Public Hearing: CUP19-0020; Consideration of a Conditional Use
Permit to allow the use of the Marriott Springhill Suites-Eastlake hotel
with 179 guest rooms and associated recreation area on a 2.75-acre site
located at the corner of Fenton Street and Showroom Place. Applicant:
Spectrum Development Group, Inc.
Resolution of the City of Chula Vista Planning Commission approving a
Conditional Use Permit CUP19-0020 to allow the use of the Marriott
Springhill Suites-Eastlake hotel with 179 guest rooms and associated
recreation area on a 2.75-acre site located at the corner of Fenton Street
and Showroom Place.
B. Public Hearing: DR19-0029; Design Review consideration of a 5-story,
127,628 sq. ft. Marriott Springhill Suites-Eastlake hotel with 179 guest
rooms and associated recreation area on a 2.75-acre site located at the
corner of Fenton Street and Showroom Place. Applicant: Spectrum
Development Group, Inc.
Resolution of the City of Chula Vista Planning Commission approving a
Design Review Permit DR19-0029 to construct a 5-story, 127,628 sq. ft.
Marriott Springhill Suites-Eastlake hotel with 179 guest rooms and
associated recreation area on a 2.75-acre site located at the corner of Fenton
Street and Showroom Place.
SUBMITTED BY: Caroline Young, Associate Planner
REVIEWED BY: Kelly Broughton, Director of Development Services
INTRODUCTION
The Applicant has submitted a Design Review and Conditional Use Permit application for
approval of the noted project. The site is vacant and located at the corner of Fenton Street and
Showroom Place within the Planned Community, Eastlake III, Business Center BC-4 area (see
Locator Map, Attachment 1).
ENVIRONMENTAL REVIEW
The Director of Development Services has reviewed the proposed project for compliance with
the California Environmental Quality Act (CEQA) and has determined that the project was
adequately covered in previously adopted Mitigated Negative Declaration (IS-00-03), for the
DR19-0029/CUP19-0020 Page No. 2
Planned Community, Eastlake III Sectional Planning Area (SPA) Plan, and also qualifies for a
Categorical Exemption pursuant to In-Fill Development Projects, Section 15332 of the State
CEQA Guidelines. Therefore, no further environmental review or documentation is required.
RECOMMENDATION:
That the Planning Commission adopt Resolution CUP19-0020 and Resolution DR19-0029
approving the project, based on the findings and subject to the conditions contained therein.
DISCUSSION:
Project Site Characteristics:
The 2.75-acre vacant project site is located at the corner of Fenton Street and Showroom Place in
the northwestern portion of the Planned Community, Eastlake III, Business Center BC-4, located
on a parcel north of Fenton Street and east of Showroom Place. The site is bordered on the south,
east and west by commercial retail and business offices, and an RV storage yard to the north
(Attachment 1, Locator Map).
Summary of Surrounding Land Uses
General Plan Zoning Current Land Use
Site: Limited Industrial PC, Business Center (BC-4) Vacant
South: Limited Industrial PC, Business Center (BC-4) Medical/Dental Offices
North: Limited Industrial PC, Business Center (BC-4) RV Storage
East: Limited Industrial PC, Business Center (BC-4) Business Offices
West: Commercial Retail PC, Village Center & Coml Dist. (VC-5) Commercial Retail
Project Description
The overall proposal consists of a 5-story, 127,628 sq. ft. Marriott Springhill Suites-Eastlake
hotel with 179 guest rooms and associated recreation area on a 2.75-acre site. The building will
be 68-ft. in height.
The first floor consists of the main entrance, lobby, lounge and bar area, buffet, guest rooms,
game room, three (3) meeting rooms, and staff offices. The rest of the hotel floor area consists
primarily of remaining guest rooms with a fitness center on the second floor and guest laundry
on the third floor. The guest rooms include 4 hospitality suites and 175 studio bedrooms. The
proposed floor plans for all rooms include: a living room, restroom, and one or two beds. For the
hospitality units, a separate bedroom, dining, bar, and patio area is provided.
The proposed modern contemporary style architecture incorporates a variety of colored stucco,
stone veneer, aluminum material used at the front entrance roof overhang and also below the
window sills, and a flat roof with varying heights. Required parking is provided onsite with 187
parking spaces (see Attachment 5, Project Plans).
Onsite amenities include a pool, jacuzzi, fire pit, bbq and outdoor lounge with TV, event lawn,
and a covered patio and trellis area. Vehicle and pedestrian access on and off the site is from
Showroom Place via a public driveway. Pedestrian paths are located throughout the site and
DR19-0029/CUP19-0020 Page No. 3
along the perimeter of the site within the public right of way along Showroom place and Fenton
Street. Due to the slope and grade difference along both street frontages, an Americans with
Disabilities Act (ADA) pedestrian path is located adjacent to the driveway along Showroom
Place.
Compliance with Development Standards
The following Project Data Table shows the development regulations along with the Applicant’s
proposal to meet said requirements:
Assessor’s Parcel Number: 595-710-21-00
Current Zoning: Planned Community, BC-4
General Plan Designation: Limited Industrial
Lot Area: 2.75-acres
PARKING REQUIRED: PARKING PROPOSED:
Parking spaces, broken down as follows:
1 space per unit plus 1 space for every 25 Standard parking= 132 spaces
rooms Compact parking= 47 spaces
Handicapped parking = 6 spaces
(179 units + 8=187 spaces)
Accessible EVCS parking = 2
Total: 187 parking spaces
Total: 187 parking spaces
SETBACKS/HEIGHT REQUIRED: SETBACKS/HEIGHT PROPOSED:
Front: 25 50 feet
Side: 15 71 feet
Exterior Side: 20 66 feet
Rear: 10 50 feet
Height: 35 feet* 68 feet
* Height limits for buildings within the BC-4 District may be increased to 76-ft. with approval of the Planning
Commission.
ANALYSIS:
Compliance with Eastlake III Business Center Design Guidelines
Site Planning/Building Massing and Scale/Building Details
The Eastlake Business Center Design Guidelines include guidelines and policies for the
commercial site. The proposed building layout and design features meet the intent of the
Eastlake Business Center Design Guidelines as described below.
The land use pattern for the SPA is that of a large commercial and business use area surrounded
by an enhanced slope buffer and major and minor circulation routes. The commercial and
business center uses were planned to accommodate retailers that serve a local and regional
market. The hotel use, as proposed, will serve a regional market demand, in addition to the
demand of visitors to the Chula Vista area. Currently, there are only three hotels located in the
City of Chula Vista’s Planned Community areas. The addition of a fourth hotel will meet the
current demand.
DR19-0029/CUP19-0020 Page No. 4
Eastlake III Business Center Design Guidelines
All buildings are to be functional and contemporary. Large-scale, uninterrupted walls facing a
street shall be visually reduced by human scale by mature landscaping/mounding, clustering
small-scale elements such as planter walls around the major form, creation of horizonal shadow
lines, landscaped terraces, and offset building planes and recessed areas. The Project includes
these features such as providing a modern and contemporary style building. The lot is currently
surrounded by a private landscaped easement adjacent to the site, which consists of a large
sloped area along Fenton Street and Showroom Place. A variety of landscaping, such as tree
shrubs, and vines are provided throughout the site and adjacent to the building to visually reduce
the appearance of the five-story building and provide an additional horizonal shadow line.
Various colors and building planes are also proposed along the elevation to promote the human
scale environment. The building also has a recessed front entrance with a covered canopy. The
open space area for the customers is provided adjacent to the parking lot area, further recessing
the 5-story building towards the rear of the property.
Structures should be designed to create transitions in form and scale between large buildings
and adjacent smaller buildings. The Project incorporates a variety of roof heights throughout the
building with tower elements on the corners of the building with varying vertical offsets in wall
planes. The hotel only consists of one building on the site, however it does provide a greater rear
yard setback in addition to the open space sloped area, to provide a greater transition to the
adjacent one-story commercial building to the west. Other buildings within the area consists of
one to two story structures, however, a recently constructed hotel in the area is a four-story
building. The height of the proposed building is under the maximum allowed building height of
76-ft per Planning Commission’s approval.
Simple and uniform texture patterns are encouraged to enhance the architecture of buildings.
Building materials shall complement existing materials within the development. Use of glass is
encouraged. The proposed modern contemporary style architecture incorporates a variety of
colored stucco, such as the “white picket fence” and “tea bag” brown color of the building that
will match the surrounding developments. To further accent the building, stone veneer is placed
along the front entrance to the building and along the tower elements. An aluminum material is
used at the front entrance roof overhang and also below the window sills. Glass windows are
provided throughout the building elevation.
Architectural Theme
The Eastlake Business Center Design Guidelines do not identify a required architectural style for
the business center. The adjacent buildings within the area provide a modern contemporary
design with stucco and various design elements. The Applicant is proposing a modern
contemporary design with light to dark colors for accent walls. The building will also have a flat
roof, stone veneer accent walls, and an aluminum material to show contrast around the windows
and accent the front entrance to the hotel building. Varying building planes were added
throughout the exterior of the building to avoid a monotonous design. The project provides these
features on all sides of the building.
DR19-0029/CUP19-0020 Page No. 5
Parking
The Planned Community Business Center (BC-4) zone regulations require 1 space per unit plus 1
space for every 25 rooms for a hotel use. Therefore, the required parking is 187 spaces. The
project meets the required parking spaces by providing a total of 187 parking spaces.
Conditional Use Permit
In accordance with the Planned Community District (BC-4) Business Center zone, a Conditional
Use Permit (CUP) is required for a hotel within the BC-4 Zone. The Applicant is requesting a
CUP to comply with the Eastlake III SPA plan requirements, including specific findings as
stipulated in Chula Vista Municipal Code (CVMC) Section 19.14.080 for CUP’s. The findings
are contained within the attached Planning Commission Resolution for CUP19-0020 (see
Attachment 3).
The hotel use is consistent with and complementary to the surrounding retail commercial and
business offices. The hotel will not only provide accommodations to business professionals
visiting the Eastlake area, but also provide an amenity to the residents to accommodate their
guests. Currently, there are only three hotels on the east side of Chula Vista within the areas of
the Otay Ranch Freeway Commercial and Millenia projects, and one recently constructed in
Eastlake along Fenton Street. According to the Applicant, there is a growing need for hotels to be
located on the east side of Chula Vista. Therefore, the proposed hotel at this location will be an
asset to the surrounding properties and residential communities in the area.
Land Use Compatibility
The site is located adjacent to retail commercial to the east, business offices to the south and
west, and an RV storage yard to the north. The property’s grade is relatively flat, however, it is
bordered along the east, west, and south with a sloped private open space lot, which provides a
grade different from the adjacent properties and public streets. The site is level with the property
to the north. Along the eastern property line, the proposed building observes a 50-ft. setback
from the property line, whereas, only a 10-ft. rear setback is required in accordance with the
applicable regulations. This CUP is in compliance with the General Plan policy of providing a
hotel use for the surrounding business and residents. The proposed hotel use is appropriate for
this site and allowed under the BC-4 Zone. Approval of the project requires compliance with all
applicable codes and regulations, and all conditions must be satisfied prior to the final building
inspection or occupancy.
CONCLUSION
The proposed 5-story, 127,628 sq. ft. Marriott Springhill Suites-Eastlake hotel with 179 guest
rooms and associated recreation area is a permitted land use with a CUP in the Planned
Community, Eastlake III, Business Center BC-4 zone. The proposal complies with the policies,
guidelines and design standards for the Eastlake III SPA plan. Therefore, staff recommends the
Planning Commission approve Conditional Use Permit, CUP19-0020 and Design Review
Permit, DR19-0029 subject to the conditions listed in the attached Resolutions.
DR19-0029/CUP19-0020 Page No. 6
DECISION-MAKER CONFLICTS
Staff has reviewed the property holdings of the Planning Commission members and has found no
property holdings within 1,000 feet of the boundaries of the property which is the subject of this
action. Consequently, this item does not present a disqualifying real property-related financial
conflict of interest under California Code of Regulations Title 2, section 18702.2(a)(7) or (8), for
purposes of the Political Reform Act (Cal. Gov’t Code §87100, et seq.).
Staff is not independently aware and has not been informed by any Planning Commission
member, of any other fact that may constitute a basis for a decision-maker conflict of interest in
this matter.
FISCAL IMPACT
The application fees and processing costs are paid for by the Applicant, resulting in no net fiscal
impact to the Development Services Fund or the General Fund.
Attachments
1. Locator Map
2. Planning Commission Resolution DR19-0029
3. Planning Commission Resolution CUP19-0020
4. Disclosure Statement
5. Project Plans (flash drive)