HomeMy WebLinkAbout2019/09/24 Item D - PresentationPresentation to Chula Vista City
Council
Schematic Design for Harbor Park and
Sweetwater Park at Chula Vista Bayfront
September 24, 2019
Background
•May 2010: Final EIR for the Bayfront Master Plan approved
•August 2012: Port Master Plan Amendment certified
•July 2016: Agreement with KTUA/Petersen Studio for CVB
Park Design
•April 2018: Disposition and Development Agreement (DDA)
with RIDA for Resort Hotel and Convention
Center
•August 2018: Start Schematic Design and Outreach for Harbor
and Sweetwater Park
Sweetwater and Harbor Park
Harbor Park Presentation
Sweetwater and Harbor Park
HARBOR PARK KTUA /PETERSEN STUDIO
HARBOR PARK
PETERSEN STUDIO
Presentation to Chula Vista City Council
September 24, 2019
HARBOR PARK KTUA /PETERSEN STUDIO
BROADWAY
H ST STATIONE ST STATIONE STREETF STREETH STREETJ STREETL STREETHARBOR PARK
E STREET
WILDLIFE
REFUGE
DISCOVERY
CENTER
INTERSTATE 5
CHULA VISTA
MARINA
N N
SWEETWATER PARK
RESORT HOTEL
CONV. CENTER
RV RESORT
• Active and Vibrant Waterfront Destination
• Reconnects City of CV and Region to the Bay
• Diverse Amenities and Experiences
• Robust Programming of Events and Activities
• Unparalleled Regional Waterfront Destination
• Supports the Ongoing Revitalization of CVBD
• Leverage Bay as a Natural Destination
• Multiple Opportunities to Interact with the Bay
• Over 216 Dedicated Parking Stalls
• Implemented in Phases –$19.5 Million Ph. 1
HARBOR PARK
25 ACRES
BOAT
WORKS
N
HARBOR PARK KTUA /PETERSEN STUDIO PROGRAM SURVEYCOMMUNITY MEETING #1
HARBOR PARK KTUA /PETERSEN STUDIO
TOTAL VOTES:
improved accessible beach
boardwalk / deck
waterfront promenade
0 100 200 300 400 500
walking / running loop
restrooms
picnic / BBQ
multi-use lawn
shade structures
cafe / restaurant
inviting night lighting
festivals
performances / concerts
farmers markets / seasonal
HIGHEST COMMUNITY PRIORITIES
821 COMMUNITY SURVEY RESPONSES
HARBOR PARK KTUA /PETERSEN STUDIO
BEACH AND
WATER RECREATION
MARINA
`
MARINE
GROUP
BOAT
WORKS
FAMILY / PLAY
HOTEL
CIVIC PARK
MULTI-USE LAWN /
PLAZA
N
PROGRAM ZONES
HARBOR PARK KTUA /PETERSEN STUDIO
OPT 4 -BOOMERANG
FULL BUILDOUT
OPT 3 –COVES
FULL BUILDOUT
OPT 2 –RIPPLE
FULL BUILDOUT
OPT 1 –BOW
FULL BUILDOUT
DESIGN OPTIONSCOMMUNITY MEETING #2
HARBOR PARK KTUA /PETERSEN STUDIO
HILL
LAWN
3.2 AC
PLAY
HUB
BEACH
3 AC
LAWN
BOAT LAUNCH
(NON-MOTORIZED)
TERRACED
HEADLAND
TERRACED
HEADLAND
FTN
‘H’ STREET PIER
POCKET MARSH
EXISTING PIER
MARINE GROUP
BOAT WORKS
AERIAL LOOKING SOUTHEAST –FULL BUILDOUT
CAFE
RENTAL
SYNTHESIS PLAN
HARBOR PARK KTUA /PETERSEN STUDIO PLAY AND PICNIC IN GARDEN CONTEXT
HARBOR PARK KTUA /PETERSEN STUDIO INTERACTIVE FOUNTAIN, GREAT LAWN, AND ‘H’ STREET PIER
HARBOR PARK KTUA /PETERSEN STUDIO LAWN EVENTS AND ACTIVITIES
HARBOR PARK KTUA /PETERSEN STUDIO WATERFRONT PROMENADE
HARBOR PARK KTUA /PETERSEN STUDIO WATERFRONT PROMENADE
HARBOR PARK KTUA /PETERSEN STUDIO DIVERSIFIED SHORELINE FROM ‘H’ STREET PIER
HARBOR PARK KTUA /PETERSEN STUDIO POCKET MARSH WITH RIPRAP EDGE
HARBOR PARK KTUA /PETERSEN STUDIO BEACH COVE WITH TERRACED HEADLAND
HARBOR PARK KTUA /PETERSEN STUDIO BEACH ACTIVITIES
HARBOR PARK KTUA /PETERSEN STUDIO
C
A
F
E
BEACH COVE WITH CAFÉ AND BOAT RENTAL
HARBOR PARK KTUA /PETERSEN STUDIO CAFÉ AND BOAT RENTAL
HARBOR PARK KTUA /PETERSEN STUDIO GARDENS AT BEACH LAWN
HARBOR PARK KTUA /PETERSEN STUDIO 50% SCHEMATIC DESIGN
FULL BUILDOUT
HARBOR PARK KTUA /PETERSEN STUDIO
SWEETWATER PARK
NORTH END BEACH AND TERRACED SHORELINE
EXISTING BAYSIDE PARK TO REMAIN
TEMPORARY PARK IMPROVEMENTS
PHASE 1 PARK IMPROVEMENTS
PHASE 1 IMPROVEMENTS -$19.5M
BOAT WORKS
EXISTING PIER
HARBOR PARK KTUA /PETERSEN STUDIO
TEMP MEADOWTEMP LAWN
TEMP LAWN
POCKET MARSH
TERRACED
HEADLAND
TERRACED
HEADLAND
BOAT LAUNCH
EXISTING PIER
NORTH END BEACH AND TERRACED SHORELINE
TEMP LAWN
PHASE 1 IMPROVEMENTS -$19.5M
SWEETWATER PARK
BEACH
BOAT WORKS
HARBOR PARK KTUA /PETERSEN STUDIO
PLAY
BEACH
‘H’ STREET PIER
CAFÉ
FTN
LAWN
HUB
HILL
50% SCHEMATIC DESIGN
FULL BUILDOUT
LAWN
POCKET MARSH
BOAT LAUNCH
EXISTING PIER
SWEETWATER PARK
BOAT WORKS
TERRACED
HEADLAND
TERRACED
HEADLAND
HARBOR PARK KTUA /PETERSEN STUDIO
HOTEL TOWER
EXISTING PIER
MARINE
GROUP
BOAT
WORKS
PARKING
H STREETE STREET
0’200’
N PARKINGPLAZA
TERRACED
HEADLAND
FOUNTAIN
HILL
GARDENS
LAWN
‘H’ STREET
PIER
PICNIC
PLAY
POCKET
MARSH
BOAT LAUNCH
RR
DROP-OFF
DROP-OFF
LAWN
3.2 AC
BEACH
3.0 AC
TERRACED
HEADLAND
CAFÉRENTAL
HUB INFO / SNACK
50% SCHEMATIC DESIGN
FULL BUILDOUT
PARKING PARKING
Sweetwater Park Presentation
Sweetwater and Harbor Park
SWEETWATER PARK
PRESENTATION TO CHULA VISTA CITY COUNCIL
SEPTEMBER 24, 2019
SWEETWATER PARK • KTUA SWEETWATER PARK - CONTEXT
S
C
A
L
E
:
1
"
=
1
0
0
'
0
5
0
1
0
0
2
0
0
N
S
E
W
• PASSIVE & NATURAL CHARACTER
• INCLUSIVE & ACCESSIBLE
• NO ORGANIZED SPECIAL EVENTS OR
ORGANIZED SPORTS
• LOW-INTENSITY, NATURE-BASED
ACTIVITY AREAS
• NATURAL & HISTORICAL
INTERPRETIVE ELEMENTS
• BAY SHORELINE & WILDLIFE REFUGE
PROTECTED FROM PARK ACTIVITY
• 216 PARK PARKING SPACES
(DEVELOPMENT REQUIREMENT)
• 100 LIVING COAST DISCOVERY
CENTER PARKING SPACES
(DEVELOPMENT REQUIREMENT)
PARK - 21 ACRES
CONNECTOR PARK - 2 ACRES
PARK BUFFER - 26 ACRES
LIVING COAST STAGING - 2 ACRES
PARK AREAS
PARK GUIDELINES
SWEETWATER PARK
SWEETWATER
PARK
HARBOR PARK
INTERSTATE 5
RV
RESORT
HOTEL/
CONVENTION
CENTER
SWEETWATER PARK • KTUA
• FOCUS ON LIFE CYCLES IN NATURE: HUMAN, SOLAR, TIDAL, GEOLOGIC
• FACILITATES MOVEMENT THROUGH PARK
• EMPHASIS ON AGE-BASED PASSIVE ACTIVITY AREAS
• PROVIDING A VISUAL CONNECTION TO THE BAY
SCALE: 1"=100'
0 50 100 200
N S
E
W
ALTERNATIVE 1 - LIFECYCLES CONCEPT
SWEETWATER PARK • KTUA ALTERNATIVE 2 - ECOTONES CONCEPT
SCALE: 1"=100'
0 50 100 200
N S
E
W
• FOCUS ON SITE-APPROPRIATE NATIVE PLANTS AND ECO-TONES
• FACILITATES CURIOSITY AND LEARNING ABOUT THE ECOLOGY OF THE BAYFRONT
• EMPHASIS ON NATURE-BASED ADVENTURE ACTIVITIES
• CREATION OF NATURAL LANDFORMS TO ACCESS VIEWS TO THE BAY
SWEETWATER PARK • KTUA WORKSHOP SURVEY
SWEETWATER PARK • KTUA PROJECT MILESTONES
PROJECT MILESTONES
SEPT. 27, 2018PUBLIC
WORKSHOP #1
MARCH 20, 2019PUBLIC
WORKSHOP #2
SWEETWATER
PARK
JAN. 10, 2019PUBLIC
WORKSHOP #2
HARBOR PARK
OCT. 4, 2018WAG
PRESENTATION #1
APRIL 18, 2019WAG
PRESENTATION #2
AUGUST 28, 2019AAC
PRESENTATION #1
BEGINNING OF NOV.PUBLIC
WORKSHOP #3
APRIL 16, 2019COASTAL
COMMISSION
REVIEW
OCT. 11, 2018BCDC
PRESENTATION #1
APRIL 18, 2019BCDC
PRESENTATION #2
SWEETWATER PARK • KTUA 50% SCHEMATIC DESIGN CONCEPT
SCALE: 1"=100'
0 50 100 200
N S
E
WLAGOON DR
IVE
MA
R
I
N
A
P
A
R
K
W
A
Y
MARINE
BOATWORKS
SAN DIEGO
BAY
SAN DIEGO
BAY NATIONAL
WILDLIFE REFUGE
RV
RESORT
SWEETWATER PARK • KTUA 50% SCHEMATIC DESIGN CONCEPT
SCALE: 1"=100'
0 50 100 200
N S
E
WLAGOON DR
IVE
MA
R
I
N
A
P
A
R
K
W
A
Y
MARINE
BOATWORKS
SAN DIEGO
BAY
SAN DIEGO
BAY NATIONAL
WILDLIFE REFUGE
RV
RESORT
OUTER BUFFER
(FUTURE PHASE NIC)
SWEETWATER
PROMENADE (NIC)
LIVING COAST
DISCOVERY
CENTER LOOP
& LOT
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - PARK ENTRY
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - RESTROOM & GROUP EDUCATION RING
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - SEASONAL CHANNEL
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - MEADOW ARRIVAL PLAZA
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - NATURE PLAYGROUND
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - DUNE BOARDWALK & ADVENTURE PLAY
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - MAP PLAZA & OVERLOOK
SWEETWATER PARK • KTUA SCHEMATIC RENDERING - INTERPRETIVE CHANNEL PLATFORM
SWEETWATER PARK • KTUA NEXT STEPS
NEXT STEPS
EARLY 2020COMPLETE 100%
SCHEMATIC DESIGN
PACKAGE
COINCIDE WITH HOTEL COMPLETIONPROJECT
COMPLETION
BEGINNING OF NOV.PUBLIC
WORKSHOP #3
DECEMBER, 2019PROP 68 GRANT
DETERMINATION
TO BE DETERMINEDCOMPLETE
CONSTRUCTION
DOCUMENTS
& BEGIN
CONSTRUCTION
EARLY 2020CEQA DETERMINATION &
PROCESS CDP
Next Steps:
•Third Public Workshop: November 2019
•Complete Schematic Design, CEQA Review, and
Issue Coastal Development Permit: Early 2020
Sweetwater and Harbor Park