Loading...
HomeMy WebLinkAboutPA-12 Third Addendum 5.6Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 1 May 2019 PROJECT NAME: Otay Ranch Planning Area 12 PROJECT LOCATION: City of Chula Vista PROJECT APPLICANT: City of Chula Vista DATE : May 6, 2019 1 INTRODUCTION The Final Environmental Impact Report for the Otay Ranch Freeway Commercial Sectional Planning Area Plan Planning Area 12 (FEIR) (identified by the City of Chula Vista as EIR 02- 04) contains a comprehensive disclosure and analysis of potential environmental effects associated with the implementation of the Sectional Planning Area (SPA) Plan and Freeway Commercial (FC) site (referred to as “proposed project” or “SPA Plan”) in the City of Chula Vista (City) (City of Chula Vista 2003). The SPA Plan was developed to refine and implement the land use plans, goals and objectives of the Otay Ranch General Development Plan (GDP) for the development of Planning Area (PA) 12. In May 2015, the City approved the General Plan and Otay Ranch GDP Amendments, as well as entitlements, for the proposed modifications through approval of the First Addendum; In September 2016, a Second Addendum to the FEIR was prepared for the SPA Plan Amendments and a Tentative Map that implements the General Plan and Otay Ranch GDP. The First and Second Addenda to the FEIR modified the project to allow for the construction of 600 multi- family residential units, 15,000 square-feet of commercial space in a mixed use format, and 2.0 acres of public parkland. The FEIR, the First Addendum, and the Second Addendum are collectively referred to as the “FEIR.” This Addendum addresses proposed modifications to add 300 dwelling units to the northeastern portion of Planning Area 12, also referred to as Freeway Commercial North (FC-2). All 300 units would be added to the area east of Town Center Drive and the west portion of the FC-2 site would remain unchanged with the proposed modifications of this Addendum. This increase would result in a total of 900 dwelling units in the FC-2 site. 2 CEQA REQUIREMENTS Sections 15162 through 15164 of the CEQA guidelines discuss a lead agency’s responsibilities in handling new information that was not included in a project’s final environmental impact report (EIR). Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 2 May 2019 Section 15162 of the CEQA Guidelines provides: a. When an EIR has been certified…for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: 1. Substantial changes are proposed in the project which will require major revisions of the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the EIR was certified as complete, shows any of the following: A. The project will have one or more significant effects not discussed in the [Final] EIR; B. Significant effects previously examined will be substantially more severe than shown in the [Final] EIR; C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or D. Mitigation measures or alternatives which are considerably different from those analyzed in the [Final] EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. In the event that one of these conditions would require preparation of a subsequent EIR, but “only minor additions or changes would be necessary to make the [Final] EIR adequately apply to the project in the changed situation,” the City could choose instead to issue a supplement to the FEIR (CEQA Guidelines, § 15163, subd. (a)). Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 3 May 2019 In the alternative, where the changes or new information will result in no new impacts, or no more severe impacts than any that were disclosed in the FEIR for the proposed project, the City “shall prepare an addendum” pursuant to CEQA Guideline, § 15164. That section states that an addendum should include a “brief explanation of the decision not to prepare a subsequent EIR pursuant to § 15162,” and that the explanation needs to be supported by substantial evidence (CEQA Guidelines, § 15164, subd. (e).) The addendum need not be circulated for public review, but may simply be attached to the FEIR (Ibid.; CEQA Guideline, § 15164, subd. (c)). Thus, in the following inquiry the City considers under the standards articulated above whether each of these changed circumstances reveal or create previously undisclosed significant environmental impacts or a substantial increase in the severity of previously disclosed impacts (CEQA Guidelines, §15162, 15163, 15164, subd. (a); 15088.5, subds. [a], [b]). As the following discussion demonstrates, it is appropriate for the City to prepare this Addendum to the Final Environmental Impact Report for the Otay Ranch Freeway Commercial Sectional Planning Area Plan Planning Area 12 project, pursuant to CEQA Guideline, § 15164. 3 PROJECT LOCATION AND REGIONAL SETTING Otay Ranch lies within the East Planning Area of the City of Chula Vista. The East Planning Area is bordered by Interstate 805 (I-805) to the west, San Miguel Mountain and State Route 54 to the north, the Otay Reservoir and the Jamul foothills to the east, and the Otay River Valley to the south. The SPA Plan is located in the northeastern portion of the Otay Valley Parcel of the 22,899- acre Otay Ranch GDP project area (Figures 1 and 2). The project site, which comprises the FC North portion of PA 12 in the adopted Otay Ranch GDP, is located east of State Route 125, west of Eastlake Parkway, south of Olympic Parkway, and north of Birch Road. The project area is characterized by flat mesa tops and rolling hills including a sloping canyon located in the central portion of the project site, which heads west towards Poggi Canyon. Site elevation ranges from approximately 560 feet above mean sea level (amsl) to approximately 640 feet amsl. The site was previously used for agricultural uses and livestock grazing. The site contains a small system of dirt roads and cattle trails, as well as inactive agricultural fields and non-native grasslands. The project site is surrounded by other Otay Ranch development areas including Village 6 to the west, Village 11 to the east, a portion of the existing Eastlake community to the north and northeast, Village 7 to the southwest, and the EUC to the south of Birch Road. Eastlake High School and a commercial area are located north of the project site and the Arco Olympic Training Center is located east of the project site, immediately adjacent to Otay Lake. The proposed modifications Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 4 May 2019 are located in the northern portion of PA 12, which is identified as FC-2 in the FEIR. FC-1 is fully developed as the Otay Ranch Town Center. 4 PROPOSED MODIFICATIONS This Addendum addresses the proposed SPA Plan Amendment and Freeway Commercial North Master Precise Plan for the northern portion of Freeway Commercial to allow for a density increase of 300 dwelling units. All 300 units would be added to the area east of Town Center Drive and the west portion of the FC-2 site would remain unchanged with the proposed modifications of this Addendum, as shown on Figure 3. This increase would result in a total of 900 dwelling units in the FC-2 site. The additional units would be designed as a mid-rise style building, consisting of residential units and ground-floor retail which would wrap around an above-grade parking structure. This design feature would eliminate the need for large areas of surface parking lots and allow for an enhanced pedestrian-oriented design. It would also provide accessible parking for occupants as the residential units and ground-floor retail space would surround the parking structure. With this density increase proposed by this Addendum, the proposed modifications would also increase the maximum building height to 84 feet and 8 inches above-grade. With the addition of 300 dwelling units, the project’s overall residential density would be 33.7 dwelling units per acre (du/ac), which is consistent with the City’s General Plan. Residential densities would range from the lowest of 13.8 du/ac to 26 du/ac to 55.6 du/ac (or up to 58.4 at full buildout of 900 units). All additional residential units would be constructed on the existing footprint of the project site. The proposed density increase of 300 dwelling units would also require the addition of 2.35 acres of parkland, 30 additional affordable housing units as part of the total 300 proposed, and 3.24 acres of net useable land for Community Purpose Facilities off-site consistent with Chula Vista Municipal Code Section 19.48.025. The proposed modifications would not require an expansion of the project site from that studied in the FEIR, and would not substantially change trip distribution patterns. No additional significant impacts beyond those previously analyzed in the FEIR, or substantial increases in any identified significant impacts are anticipated; however, the proposed modification represents new information that was not available at the time that the FEIR was certified. Therefore, the City has prepared this addendum pursuant to CEQA § 15162 to disclose minor changes in the proposed project, and minor changes in some of the environmental effects as a result of proposed modifications. Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 5 May 2019 5 IDENTIFICATION OF ENVIRONMENTAL EFFECTS The following environmental analysis provided in Section 6.0 supports a determination that approval and implementation of the proposed density increase to the FC-2 site on PA 12 would not result in any additional significant environmental effects beyond those previously analyzed under the FEIR for the proposed project. 6 ANALYSIS Aesthetics/Landform Alterations Impacts to aesthetics are addressed in Section 5.2 of the FEIR. As analyzed in the FEIR, the SPA Plan would not obstruct a scenic vista and no scenic resources are visible from nearby roadways, including Olympic Parkway, which is not a designated scenic highway, but is considered a “scenic corridor” as designated by the City of Chula Vista General Plan. The FEIR included an undulating landscaped buffer at the project frontage along Olympic Parkway as a project design feature; however, this feature was included in order to minimize impacts to visual quality resulting from the predominantly large-scale commercial development that was originally proposed. Those areas are now designated and proposed for residential and hotel uses. As such, the current proposal would offer more attractive urban scenes, and an undulating landscaped buffer is no longer necessary. Moreover, the adopted SPA Plan includes design development standards to minimize impacts to visual quality. The proposed modification would add an additional 300 residential units to the portion of the FC-2 site east of Town Center Drive. This would result in a larger scale and massing of development approved for this portion of the project site under the FEIR, primarily attributed to taller residential buildings. However, the aesthetic nature of the residential development within these areas would not be substantially different. The additional units would be designed as a mid- rise style building, consisting of residential units and ground-floor retail which would wrap around an above-grade parking structure. This design feature would eliminate the need for large areas of surface parking lots. Therefore, the proposed modifications would not result in any significant impacts to scenic vistas or resources. The FEIR identified significant impacts resulting from additional light and glare to the area as the proposed project would introduce new land uses to a currently undeveloped site. The proposed modifications would introduce similar light and glare elements to the area; however, the project site boundaries would remain as analyzed previously and no new light and glare impacts beyond Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 6 May 2019 those identified in the FEIR would occur. Therefore, no new mitigation would be required beyond mitigation measures 5.2-1 through 5.2-9 as identified in the FEIR. Although the proposed modifications would result in additional residential units, the modification would maintain all previously analyzed design standards and architectural considerations. Therefore, the proposed modifications would not result in new substantial or significant impacts beyond those previously analyzed in the FEIR. Air Quality Impacts to air quality are addressed in Section 5.4 of the FEIR. An air quality technical report was prepared for the proposed modifications by Scientific Resources Associated (SRA 2017). The air quality technical report analyzed air quality impacts from the proposed modifications. Information provided in the air quality technical report was compared against the analysis in the FEIR for a determination of overall net impacts resulting from the proposed modifications. Construction emissions would not exceed those levels identified in the FEIR, with the exception of construction VOCs (SRA 2017). However, all pollutants, including construction VOC emissions, would remain below all significance thresholds for criteria air pollutants and thus would not result in a significant impact to air quality (SRA 2017). All operational emissions would be lower than levels identified in the FEIR (SRA 2017). The site would be watered at least three times daily to control fugitive dust emissions, and vehicle speeds would not exceed 15 miles per hour, per FEIR mitigation measure 5.4-2. In addition, low- VOC paints would be utilized during architectural coatings. With incorporation of these design features, construction emissions were estimated to be below construction emissions estimated in the FEIR. The FEIR also identified mitigation measures 5.4-1 and 5.4-2, which reflect dust control measures and measures to reduce VOC and NOx emissions. Therefore, no new significant sources of construction or operational air emissions or health risk impacts beyond those identified in the FEIR would occur with implementation of the proposed modifications to the proposed project. Biological Resources Impacts to biological resources are addressed in Section 5.8 of the FEIR. As indicated in the FEIR, no sensitive habitat or wetlands occur on the project site, and there is a low potential for sensitive plant species to occur on site and no sensitive plant species were observed at the time of surveying. Sensitive animal species observed on site include golden eagles and tricolored blackbirds; Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 7 May 2019 however, no nesting activity or suitable habitat for these species were observed. The proposed modifications would not exceed previously established boundaries for project development as approved in the SPA Plan and the proposed modifications would be subject to mitigation as provided in Section 5.8. Therefore, no new or increased levels of impacts to biological resources would result from implementation of the proposed modifications beyond those previously analyzed in the FEIR. Water Resources and Water Quality Impacts to water quality are addressed in Section 5.10 of the FEIR. SPA-level water quality technical reports were completed for the proposed project as analyzed in the FEIR. The proposed modifications would continue to comply with all applicable rules and regulations including compliance with NPDES permit requirements for urban runoff and storm water discharge. Best Management Practices (BMPs) for design, treatment and monitoring for storm water quality would be implemented as delineated in the FEIR with respect to municipal and construction permits. Project drainage and storm water quality reports, prepared in compliance with local, state, and federal regulations, would be updated to reflect changes in development of the project site as a result of the proposed modifications. Compliance with all applicable rules and regulations governing water quality as well as implementation of all mitigation measures outlined in Section 5.10 of the FEIR would ensure no additional impacts to water quality beyond those previously analyzed would occur as a result of the proposed modifications. Noise The PA-12 East Addendum to the Prior Noise Study (noise study) (Dudek 2018) concludes that the future noise levels from traffic would exceed the City’s maximum exterior noise level criterion of 65 dBA CNEL at open space areas and first-floor balconies for residences along the northern and eastern boundaries of the FC-2 site facing Olympic Parkway. Additionally, the exterior noise levels for second-floor balconies located at the intersection of Olympic Parkway and Promenade Street would exceed the City’s maximum exterior noise level criterion. The Otay Ranch GDP has policies in place to require appropriate sound attenuation project features for all required residential open space and public open space areas that are exposed to a noise level of 65 dBA CNEL or greater. Consistent with these policies, balconies planned on these residential units that are counted toward any open space requirements would incorporate appropriate sound attenuating project features around the perimeter of the balconies. Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 8 May 2019 Further, the ground-floor level exterior common areas within the line-of-sight of Olympic Parkway and Eastlake Parkway would require noise attenuation in the form of noise barriers. Noise barriers would be extended along Eastlake Parkway for the Parklet and along the portion of Olympic Parkway adjacent to the Northern Patio Amenity Area. Consistent with Mitigation Measure 5.5-1 of the approved EIR (City of Chula Vista 2002), and to comply with the City and State’s 45 dB CNEL interior noise standard, the following measures is required: a. Prior to the approval of site development plans, the applicant shall submit a supplemental noise analysis acceptable to the Director of Planning and Building demonstrating that interior noise levels would not exceed 45 dB CNEL. b. A noise barrier with a minimum height of 6 feet shall be constructed along the eastern edge of the site next to Eastlake Parkway, unless that proposed open space area is not needed to meet the project’s exterior open space requirement. Figure 1 of the noise study (Dudek 2018) shows the location of the barrier. c. A noise barrier with a minimum height of 6 feet shall be constructed (as shown in Figure 1 of the noise study, Dudek 2018) to block the noise from Olympic Parkway from the Northern Patio Amenity Area. d. Building receptors A1, A4, A5, A6, A7, A8, B1, B2, B3, B4, B5, B6, and B7, as identified in the noise study (Dudek 2018) shall require Plexiglass or other clear-view panels at first- floor balconies/open space areas within the line-of-sight Olympic Parkway if the balconies/open space areas are used to satisfy the project’s open space requirement. With the additions of these noise barriers, and full compliance with the Otay Ranch GDP policies as discussed above, the proposed modifications would not exceed the City’s applicable limits established in the noise ordinance in accordance with Mitigation Measure 5.5-1 of the approved FEIR. Therefore, no new significant impacts would occur beyond what is analyzed in the FEIR. Traffic, Circulation, and Access Impacts to traffic are addressed in Section 5.3 of the FEIR. A traffic memorandum has been conducted for this Addendum in April 2019 to evaluate the potential traffic impacts associated with the proposed modifications (Chen Ryan 2019). When analyzing potential trip generation and traffic impacts, the entire FC-2 site is accounted for, with the proposed modifications. Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 9 May 2019 Under the proposed modifications, the FC-2 site would generate approximately 7,681 daily trips with the 15% transit and mixed-use reduction, a 10% transit reduction, and a 10% walk/bike mode-share reduction. The proposed modifications would generate less traffic both in daily trips and PM peak hour trips compared to the FEIR. As analyzed in the traffic memorandum, the increase in AM peak hour trips would not result in any new significant traffic impacts during the Existing Plus Project or Horizon (Year 2030) conditions (Chen Ryan 2019). Addiiontally, all project driveways, as well as the project frontage would operate at acceptable levels of services with adequate queueing storage along Town Center Drive, with the exception of the left-turn movement during the PM peak hour at Olympic Parkway/Town Center Drive (Chen Ryan 2019). However, currently installed “do not block” signage would prevent potential queueing from interfering with traffic circulation (Chen Ryan 2019). Therefore, no new significant impacts would occur beyond what is analyzed in the FEIR. Public Services and Utilities Impacts to public services and utilities are addressed in Section 5.12 of the FEIR. The following technical studies were prepared for the proposed modifications: • Otay Ranch Planning Area 12 Freeway Commercial SPA Amendment Water System Evaluation (Dexter Wilson 2017a) • Private Water System Analysis for the Otay Ranch Planning Area 12 East Residential Site (Dexter Wilson 2019a) • Sewer System Evaluation for the Otay Ranch Planning Area 12 Freeway Commercial SPA Amendment (Dexter Wilson 2017b) • Sewer System Analysis for the Otay Ranch Planning Area 12 East Residential Site (Dexter Wilson 2019b) Water Demand and Water System The proposed project water demands were included in the Otay Water District (OWD) February 2015 Water Supply Assessment and Verification (WSAV). Table 1 summarizes the projected water demands as presented in the WSAV and projected demand based on the proposed modifications. As shown, projected water demand with the proposed modifications would decrease by 13,900 gallons per day, or 16 acre-feet per year, as compared to the assumptions in the 2015 WSAV (Dexter Wilson 2017a). The reduction in demand is a result of updated water demand factors used in the OWD 2015 Water Facilities Master Plan. These Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 10 May 2019 updated water demand factors for residential development are based on actual usage data and reflect lower projected usage per unit as a result of water conservation efforts in recent years. Table 1 Proposed Project Water Demand Summary Land Use Acres Building Units Unit Demand Factor Total Demand (gpd) WSAV Water Demand (2015 WSAV) MF Residential Units — 650 255 gpd/ unit1 165,750 Hotel Rooms — 310 115 gpd/room 35,650 Commercial 3.6 — 1,785 gpd/ac 6,428 Subtotal 207,828 Proposed Modification Potable Water Demand Multi-Family Residential — 900 170 gpd/unit1,2 153,000 Hotels — 300 115 gpd/unit1 34,500 Commercial 3.6 — 1,785 gpd/ac2 6,428 Subtotal 193,928 Decreased Water Demand 13,900 Source: Dexter Wilson 2017a Notes: gpd = gallons per day 1 Assumes recycled water to be used for irrigation. 2 Based on 2015 Water Facilities Master Plan (OWD). The recommended water system was outlined in the 2002 Sub Area Master Plan for the proposed project and included in the OWD 2015 Water Facilities Master Plan. As shown in Table 1, the projected water demand for the proposed modifications is lower than what was estimated in the 2015 WSAV report. Thus, impacts on water supply due to implementation of the proposed modifications have been adequately evaluated and do not require any changes or updates (Dexter Wilson 2017a). The sizing of the existing 16-inch water line in Olympic Parkway, 20-inch line in Eastlake Parkway, and proposed 12-inch line in Town Center Drive are adequate to support the proposed modifications and, therefore, no changes to the proposed project water system as analyzed in the FEIR are necessary as a result of the proposed modifications (Dexter Wilson 2017a). Additionally, the proposed modifications would comply with the City of Chula Vista Guidelines for water conservation, including the use of recycled water for landscaping and implementation of additional water conservation measures such as hot water pipe insulation, pressure reducing valves, and water efficient dishwashers. As such, the proposed modifications would not result in any new significant environmental effects beyond those previously analyzed under the FEIR for the proposed project. Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 11 May 2019 Regarding recycled water use, the proposed modification would use recycled water for irrigation of the park site and common areas associated with the commercial and residential sites. Table 2 shows the average recycled water demand associated with the proposed modifications. Table 2 Proposed Modifications Projected Recycled Water Demand Land Use Quantity Recycled Water Factor Net Recycled Acreage Unit Rate Average Demand Multi-Family Residential 900 units 15% — 30 gpd/unit1 27,000 Commercial 4.0 acres 10% 0.4 1,900 gpd/ac1 760 Park 2.0 acres 100% 2.0 1,900 gpd/ac1 3,800 Total 31,560 gpd Source: Dexter Wilson 2017a Notes: gpd = gallons per day 1 Based on OWD 2015 Water Facilities Master Plan. As shown in Table 2, the estimated average recycled water demand for the proposed modifications is 31,560 gallons per day, or 35.4 acre-feet per year, which would not necessitate changes to the approved recycled water system (Dexter Wilson 2017a). As such, the proposed modifications would not result in any new significant environmental effects beyond those previously analyzed under the FEIR for the proposed project. Wastewater Demand and Wastewater System The August 2004 approved SPA plan provided projected wastewater flows. Table 3 shows a comparison between projected wastewater flows for the proposed project and wastewater flows based on the land uses of the proposed modifications. Table 3 Proposed Modifications Wastewater Flow Summary Land Use Acres Building Units Generation Factor Average Flow (gpd) Originally Approved Wastewater Flow Commercial 34.5 — 2,500 gpd/ac 86,250 Proposed Modification Wastewater Flow Multi-Family Residential — 900 182 gpd/unit 163,800 Hotels — 300 76 gpd/unit1 22,800 Park 2.0 — 410 gpd/ac 820 Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 12 May 2019 Table 3 Proposed Modifications Wastewater Flow Summary Land Use Acres Building Units Generation Factor Average Flow (gpd) Commercial 1.4 — 1,401 gpd/ac 1,960 Subtotal 189,380 Increased Wastewater Flow 103,130 Increased Wastewater EDUs2 448 Source: Dexter Wilson 2017b Notes: gpd = gallons per day, EDU = equivalent dwelling unit 1 Based on 0.33 EDU per room. 2 Based on 230 gpd/EDU. The Poggi Canyon Basin Gravity Sewer Development Impact Fee Update (DIF report) was completed in April 2009, which projected wastewater flows associated with the Poggi Canyon Interceptor. Table 4 shows a comparison of wastewater flows associated with the proposed modifications and projected flows as presented in the DIF report. Table 4 Proposed Modifications and Poggi Basin Wastewater Flow Summary Description Quantity Unit Flow Factor Average Flow, gpd EDUs1 2009 DIF Study C-1 30.4 ac 2,500 gdp/ac 76,000 330.4 C-2 8.2 ac 2,500 gdp/ac 20,500 89.1 Subtotal 2009 DIF Study 420 Proposed Modifications Multi-Family Residential 900 units 182 gpd/unit 163,800 712.2 Hotels 300 units 76 gpd/unit 22,800 99.1 Park 2.0 acre 410 gpd/ac 820 3.6 Commercial 1.4 acre 1,401 gpd/ac 1,960 8.5 Subtotal Proposed Modifications 823 Increase 403 Source: Dexter Wilson 2017b Notes: gpd = gallons per day 1 Based on 230 gpd/EDU. 2009 DIF Study was based on 265 gpd/EDU. The proposed on-site wastewater system would consist of gravity sewer lines that would convey flow to the Poggi Canyon Interceptor in Olympic Parkway. Based on the average flow presented in Table 3 and a peak factor of 2.22 from the City Subdivision Manual, the projected peak flow for the proposed modifications is 0.42 million gallons per day. An 8-inch gravity sewer line with a minimum slope of 1.0% is adequate to convey this projected total flow. Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 13 May 2019 Additionally, the proposed modifications do not require additional reaches of the Poggi Interceptor to be upgraded in the future. Therefore, although the proposed modifications would exceed the units anticipated in the 2009 Poggi DIF report, the limits of the required DIF improvements remain the same. Further, the proposed modifications would be required to update the Poggi DIF study as a condition of approval (Dexter Wilson 2017b). The project is consistent with FEIR Mitigation Measures 5.12-11 through 5.12-13, which require the applicant to demonstrate adequate capacity in the Poggi Canyon sewer line. As demonstrated above, there is adequate sewer capacity. Also, when the proposed project comes forward for approval, it will be conditioned to pay sewer fees and connect to the sewer system. As such, the proposed modifications would not result in any new significant environmental effects beyond those previously analyzed under the FEIR for the proposed project. Police Protection, Fire Protection and Emergency Medical Services, Schools, Libraries, and Parks As described in Section 5.12 of the FEIR, police, fire and emergency medical, library, and school facilities would be financed as part of the required Public Facilities Financing Plan (PFFP). The project’s PFFP would be modified to reflect the changes in land uses within the site resulting from the proposed residential development to provide adequate public facilities impact fees. Chula Vista Municipal Code Section 19.80.030 (Controlled Residential Development) is intended to ensure that new development would not degrade existing public services and facilities below acceptable standards for schools and other public services. The PFFP prepared in conjunction with the preparation of a SPA Plan for a project is intended to ensure development of the project is consistent with the overall goals and policies of the General Plan and would not degrade public services. Section 19.09 also requires a PFFP and the demonstration that public services meet the growth management ordinance quality of life threshold standards. The PFFP would ensure funding for any needed expansion of services and that public services would be provided commensurate with development and demand. Pursuant to Government Code Section 65996, the payment of these fees by a developer serves to fully mitigate all potential project impacts on school facilities to less than significant levels. Consistent with mitigation required by the FEIR, all required school fees would be paid prior to issuance of building permits. The PFFP would address any development impact fee requirements to ensure funding for any needed expansion of public services facilities, including police and fire facilities, parks, and libraries, commensurate with development and demand. Any resulting increase in public facilities space, such as schools or libraries, would be minor, likely located within already developed or developing areas of the vicinity, and would not result in an adverse physical impact on the environment, consistent with the City’s CEQA thresholds. The proposed modifications includes an increase of 300 residential units. The proposed modifications would require Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 14 May 2019 an additional approximate 2.35 acres of parkland, which would be met through payment of Park Benefit Fees. As such, the proposed modifications would not result in any new significant environmental effects beyond those previously analyzed under the FEIR for the proposed project. 7 CONCLUSION This document has identified all changed circumstances and new information and memorializes in detail the City’s reasoned conclusion that none of these changes create the conditions requiring the preparation of a Subsequent or Supplemental EIR pursuant to CEQA Guidelines, Sections 15162 and 15163. Pursuant to Section 15164 of the State CEQA Guidelines and based upon the above discussion, I hereby find that approval and implementation of the proposed project will result in only minor technical changes or additions, which are necessary to make the FEIR adequate under CEQA. ______________________________ __________________ Name/Title Date Attachments: Figures 1–3 Summary of Impacts and Mitigation – Otay Ranch Planning Area 12 FC SPA Plan 8 REFERENCES Chen Ryan. 2019. Otay Ranch PA 12 Freeway Commercial North – Traffic Analysis Memorandum. April 24. City of Chula Vista. 2003. Final Environmental Impact Report for the Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12. SCH # 1989010154. Dexter Wilson Engineering, Inc. 2017a. Otay Ranch Planning Area 12 Freeway Commercial SPA Amendment Water System Evaluation. September 25. Dexter Wilson Engineering, Inc. 2017b. Sewer System Evaluation for the Otay Ranch Planning Area 12 Freeway Commercial SPA Amendment. September 25. Dexter Wilson Engineering, Inc. 2019a. Private Water System Analysis for the Otay Ranch Planning Area 12 East Residential Site. February 27. Third Addendum to EIR Otay Ranch Freeway Commercial Sectional Planning Area (SPA) Plan Planning Area 12 11361 15 May 2019 Dexter Wilson Engineering, Inc. 2019b. Sewer System Analysis for the Otay Ranch Planning Area 12 East Residential Site. 2019b. February 25. Dudek. 2018. PA-12 East – Addendum to Prior Noise Study and EIR. July 3. SRA (Scientific Resources Associated). 2017. Air Quality and GHG Impacts Planning Area 12. July 19. Figures 1–3 Pacific Ocean 55 905 241 133 57 274 209 163 56 22 75 73 52 243 371 67 1 94 74 76 79 78 15 8 405 215 8055 5 MEXICOMEXICO FIGURE 1 Regional Map Otay Ranch Freeway Commercial SPA Plan - Planning Area 12 Third Addendum 015510 Miles Project Site Service Layer Credits: Copyright:' 2014 Esri P E A R B L O S S O M C T LIT T L E L A K E S T M O R N I N G D E W C T PAI NT B R U S H DR C A M I N I T O B A R T O L O C A M I N I T O F A B R I Z I O HONEYBEE ST C A M I N I T O N O V A R A P O L O P E AK DR WELLBROOKST S P R I N G S K Y S T IMPRESSIONISTDR MEANDER RD SAND D R W H I S P E R D R SALT LAKE C T MOUNTBULLIONDR C A M I N I T O D A N T E CHAILLY DR CAMINITO ZARAGOZA CAMINITOMONTA R O S A TR O U V I L L E L N LE V A N T L N CL A U D E L N BIRCH RD FI R S T S T A R D R ORION AVE MI L L E N I A A V E C A M I N I T O P O SITA N O K E S T R E L F A L L S R D E A S T L A K E P K Y CAM I N I T O A L C A L A CA N V A S D R CAMINITODELACRUZ SUTTE R B U T T E S S T HU N T E R S P O I N T E A V E B EDFORDAVE WOO D E N VA L L E Y ST VAL L E J O M I L L S S T C A MINIT O V E R A N Z A TRA IL EAS E M E N T O LY MPIC PKY C A MIN IT O S A R D IN IA TOWNCENTERDR CAMINITOSICILIA FIGURE 2 Vicinity Map Otay Ranch Freeway Commercial SPA Plan - Planning Area 12 Third Addendum SOURCE: SANGIS 2017 0 500250 Feet Project Site Otay Ranch Freeway Commercial SPA Plan - Planning Area 12 Third Addendum SOURCE: Baldwin and Sons 2018 Project Site Plan FIGURE 3 Hotel 1 (Residence Inn) Hotel 2 (Courtyard by MarrioƩ) Alay Suwerte 212 DUs aƩached MF 80 DUs aƩached MF SR - 1 2 5 Ground Floor Commercial For Rent ResidenƟal 15,000 sq. Ō. (Mixed use buildings along Town Center Drive) 152 rooms 148 rooms ƵƉƚŽϲϬϴ units 2 Acre Public Park With 2.7 acres of equivalence enhancement Ea s t l a k e P a r k w a y Tow n C e n t e r D r i v e Promenad e S t r e e t Olym p i c P a r k w a y Otay Ranch Town Center Mall Ce n t e r p a r k R o a d Su w e r t e D r i v e Luzon Lane El N i d o D r i v e Ba n a h a w W a y Su l u S e a L a n e Bo r a c a y D r i v e Alay St r e e t M a y o n R o a d Mindoro Lane BRT Lan e El N i d o D r i v e Sul u S e a L a n e Suw e r t e D r i v e Bor a c a y D r i v e El N i d o D r i v e Promenade Street Summary of Impacts and Mitigation – Otay Ranch Planning Area 12 FC SPA Plan