HomeMy WebLinkAboutItem 2 - Attachment 3 - Issues and Responses Bonita Glen Apartments Issues and Responses DR17-0040 Issue Response 1 Parking along Bonita Glen Drive: A Code Enforcement case has been opened in Residents expressed concerns that the response to this. The use of off-site parking is apartment complex across the street was not the reason for the case; it is due to part of the reason there was no off-site property owners charging the apartment parking available for the project along residents for on-site parking. Therefore, the Bonita Glen Drive. residents park on the street to avoid paying for on-site parking.The original design review conditions of approval specifically prohibit charging for parking. The Code Enforcement case will resolve charging renters for parking and the apartment complex will then provide parking within the complex to prevent an overflow onto the public street. In addition, parking studies show that the new project will have adequate on-site parking for the expected parking demand that it generates. 2 Residents expressed concerns with the Staff reviewed the concern and has traffic light at E Street and Bonita Road. implemented revised westbound LT signal With the increase in the number of timing to allow for a longer left turn duration vehicles from the proposed apartments, onto southbound Bonita Glen Drive. The stop residents are concerned that the left turn bar will also be moved further west to allow onto Bonita Glen Drive will not be able for more stacking room and should be done to accommodate vehicles on the street soon. The extension of the left turn pocket and coming off the freeway. would be for city to do as a future capital improvement project. 3 Residents expressed concerns about The project will provide sidewalk and street pedestrian traffic along Bonita Glen Dr. lights for the entire project frontage along There is no sidewalk or street lights Bonita Glen Drive. Walking paths through the under current conditions. project will also be open to the public to further improve pedestrian connectivity. 4 Residents expressed concerns regarding Staff explained that paving on behalf of the the increased number of vehicles and the City is expected to occur in 2019 due to the impact to existing roadways, especially new Measure P sales tax. This job is out for along the unpaved segment of Bonita construction bids now and paving schedule Glen Drive, such as speeding, pedestrian will be provided by contractor by May. mobility and safety as well as The developer's traffic engineer response to commercial trucks use. road capacity stated that the road allowed for 7,000 vehicle trips per day, and current use remains at 3,000 vehicle trips per day with a proposed impact of 1,000 vehicle trips leaving 1 Attachment 3 Bonita Glen Apartments Issues and Responses DR17-0040 Issue Response the roads with more than enough to accommodate the proposed apartment's additional vehicle trips. Similarly, there is capacity within the County's roads of Pepper Tree Road &Vista Drive for project trips. 5 Why is Density Bonus and affordable Under State Density Bonus Law (California housing being used on this project? Government Code Section 65915), a project that sets aside a certain number of units for either very low or low income residents is entitled to certain incentives to assist in the production and maintenance of such affordable units. Such waivers and incentives requested by the Applicant are the reduced parking standards and a waiver of the height limitations. The City is required to implement State Density Bonus Law and has adopted CVMC Chapter 19.90 in compliance. 6 Is the park used as an environmental A park is not to be used as a buffer but as a buffer? Who will be responsible for public amenity. The park will also be owned maintenance of a park? and maintained privately, and will be open to the public. 7 What is the status of areas owned by the The County requested that the applicant county? upgrade the segment of Vista Drive that is adjacent to the project site. The applicant will upgrade the road to the appropriate County standard. The County would like the City to consider annexing this segment of road through a future annexation process. 2 Attachment 3