HomeMy WebLinkAboutPlanning Comm Rpts./2002/07/10 AGENDA PLANNING COMMISSION MEETING Chula Vista, California 6:00 p.m Wednesday, July 10, 2002 Council Chambers 276 Fourth Avenue, Chula Vista,CA CALL TO ORDER ROLL CALL/MOTIONS TO EXCUSE PLEDGE OF ALLEGIANCE and MOMENT OF SILENCE APPROVAL OF MINUTES: June 12, 2002 INTRODUCTORY REMARKS ORAL COMMUNICATIONS Opportunity for members of the public to speak to the Planning Commission on any subject matter within the Commission's jurisdiction but not an item on today's agenda. Each speaker's presentation may not exceed three minutes. 1. PUBLIC HEARING: ZAV 02-06; Appeal of the Zoning Administrator's decision of January 23, 2002 to deny a request to exceed the maximum floor area ration and to encroach into the required erear and side yard setbacks of the R2T Zone. Applicant: Conrado Cabal bag. Staff recommends public hearing be opened and continued to the July 24, 2002 Planning Commission meeting, 2. PUBLIC HEARING: Auld Golf Course wireless facility Staff recommends public hearing be opened and continued to the July 24, 2002 Planning Commission meeting, 3. PUBLIC HEARING: Wireless Ordinance Staff recommends public hearing be opened and continued to the July 24, 2002 Planning Commission meeting, 4. PUBLIC HEARING: SUPS 02-24 & ZAV 02-05; Special Use Permit for an automobile sales lot, and a zone variance for 1.) a 420 sf sales office to be located on the rear property line where a 10-foot setback is required, and 2.) a reduction in the landscape setback to 10 feet Planning Commission - 2- July 10, 2002 along the frontage (Broadway and Silvas Street) where the requirement is 15 feet per the Montgomery Specific Plan. Staff recommends public hearing be opened and continued to the July 24, 2002 Planning Commission meeting, 5. PUBLIC HEARING: PCC 02-42; Conditional Use Permit proposal for a detached, 926 square foot garage with a 920 second accessory dwelling unit above in a Single-Family Residence (R-1) zone. The project would be situated behind an existing single-family dwelling located at 250 K Street. The second-story unit is in compliance with State government code regulations 65852.2(b)(1 )(A)(-(I) for cities without adopted accessory second unit ordinances. Staff recommends public hearing be opened and continued to the July 24, 2002 Planning Commission meeting, 6. ACTION ITEM: Consideration of a resolution of denial for wireless facility at 455 Quail Court (Applicant: Verizon Wireless) Project Manager: Kim Vander Bie, 7. ACTION ITEM: Consideration of a resolution of denial for PCC 02-13; Conditional Use Permit to permit an existing second dwelling unit as an accessory second dwelling unit behind the primary single-family residence, at 736 Church Avenue. Applicant: Daniel Contreras Project Manager: John Schmitz, Principal Planner 8. ACTION ITEM: Acceptance of report and recommendation concerning the proposed fourth amendment to the Redevelopment Plan for the Southwest Redevelopment Project, and determining its conformity to the City's General Plan. Project Manager: Miguel Tapia, Sr, Community Development Specialist 9. PUBLIC HEARING: a) GPA 02-07; Amendment to the City of Chula Vista General Plan to change the land use designation of approximately 16.4 acres at southeast corner of Eastlake Parkway and SR-125 freeway future alignment. Planning Commission July 10, 2002 b) PCM 01-15; Amendments to the Eastlake II General Development Plan and Eastlake II Planned Community Districts Regulations and Land use Districts Map. Also, adopt a new Sectional Planning Area (SPA) plan and associated regulatory documents for the 68.1 acres to be known as the "Village Center North Supplemental SPA". - 3 - Project Manager: Stan Donn, Associate Planner 10. PUBLIC HEARING: PCC 02-15; Conditional Use Permittoestablish a dwelling group by adding a second single-family dwelling on a lot that contains an existing single-family dwelling in a Single-Family Residence (R-1) zone located at 108 Corte Maria Avenue. Project Manager: Michael Walker, Associate Planner 11. PUBLIC HEARING: PCM-02-24; Consideration of amendments to the Eastlake III Sectional Planning Area (SPA) Plan, Otay Ranch Village Six Sectional Planning Area (SPA) Plan, and Otay Ranch Village Eleven Sectional Planning Area (SPA) Plan, to incorporate Section 11.7 Air Quality Improvement Plan into each of the Sectional Planning Area (SPA) Plans Project Manager: Mary Venables, Associate Planner DIRECTOR'S REPORT: COMMISSION COMMENTS: COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT The City of Chula Vista, in complying with the American with Disabilities Act (ADA), requests individuals who require special accommodations to access, attend, and/or participate in a City meeting, activity, or service, request such accommodations at least forty-eight hours in advance for meetings, and five days for scheduled services and activities, Please contact Diana Vargas for specific information at (619) 691-5101 or Telecommunications Devices for the Deaf (TOO) at 585-5647, California Relay Service is also available for the hearing impaired, PLANNING COMMISSION AGENDA STATEMENT Item Meeting Date 07/10/02 ITEM TITLE: Consideration ofthe following applications filed by The EastLake Company for 68.1 acres at the northwest and northeast corners of Otay Lakes Road and EastLake Parkway within the EastLake II Planned Community: a) GP A 02-07: Amendment to the City of Chula Vista General Plan to change the land use designation of approximately 16.4 acres at southeast corner of EastLake Parkway and SR-125 freeway future alignment. b) PCM 01-15: Amendments to the EastLake II General Development Plan and EastLake II Planned Community Districts Regulations and Land Use Districts Map, Also, adopt a new Sectional Planning Area (SPA) plan and associated regulatory documents for the 68,1 acres to be known as the "Village Center North Supplemental SPA". The applicant, EastLake Development Company, has submitted applications to: 1) amend the City's General Plan to change the land use designation of approximately 16.4 acres at southeast corner of EastLake Parkway and the future SR-125 freeway from Retail Commercial to Research and Limited Manufacturing; 2) amend the EastLake II General Development Plan to change the land use designation of 16.4 acres at the southeast corner of East Lake Parkway and SR-125 freeway (future alignment) from Public Quasi-public to Research and Limited Manufacturing; 14.2 acres on the west side of EastLake Parkway from Public/Quasi-public to Commercial Retail; and 2.0 acres at the southeast corner of Fenton Street and EastLake Parkway from Research and Limited Manufacturing to Professional & Administrative Commercial; and 3) amend the EastLake II Planned Community District Regulations to accommodate the changes in land use. The applicant is also requesting approval of a new Sectional Planning Area (SPA) plan and associated regulatory documents for the 68,1 acres to be known as the Village Center North Supplemental SPA. The new SP A contains Design Guidelines, Public Facilities Finance Plan, Water Conservation and Air Quality Improvement Plans, The Environmental Review Coordinator has detennined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because mitigation measures have been incorporated and agreed to by the project proponent, A Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program were prepared, which must be considered by the Planning Commission prior to a decision on the project (Attaclunent 3), RECOMMENDATION: I. Adopt attached Resolution GP A 02-07/PCM 01-15, recommending that the City council adopt the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (lS-OI- 042) issued for the Project. Page No.2, Item: Meetio2 Date: 07/10/02 2, Adopt attached Resolution GPA 02-07/PCM 01-15, recommending that the City Council approve the proposed amendments to the General Plan and EastLake II General Development Plan and Planned Community District Regulations and Land Use Districts Map, Also, adopt the new Sectional Planning Area (SPA) plan to be known as the EastLake Village Center North Supplemental SPA, BACKGROUND: In 1992, the City Council approved amendments to the EastLake II General Development Plan and EastLake I Sectional Planning Area (SPA) plan to accommodate a 485,000 sq. ft. medical center complex at the northwest comer of Otay Lakes Road and Fenton Street within a planning area of EastLake known as the "EastLake I Activity Center." This Activity Center, which replaced the original commerciall residential mixed-use concept envisioned in the original SPA, incorporates three major components: I) a neighborhood shopping center (south of Otay Lakes Road); 2) a mixed-use entertainment and service oriented village center (east and west side of EastLake Parkway); and 3) a major hospital/ medical center (see Figure 1), The neighborhood commercial center, which existed at that time, is within the EastLake Greens SPA, and, consequently, developed and administered under that SPA. Although this component of the Activity Center was approved under separate design guidelines, its functional and aesthetical relationship to the northern Activity Center components was significant. This component of the Activity Center was used as an existing urban design reference, To properly guide the Activity Center development, in 1992, the City Council also approved the "EastLake I Activity Center Precise Plan Guidelines" for the above mentioned medical center mixed- use concept. These design guidelines established specific urban design, landscaping and functional goals and objectives to insure the integration of all aspects of the Activity Center into the surrounding industrial and the overall EastLake planned community. The Kaiser medical center project was never built and the property was re-acquired by The EastLake Company who is proposing to re-define the northern portion of the Activity Center (north ofOtay Lakes Road) into three separate and independent parcels tied together with other surrounding properties/uses by urban design features and amenities. The new concept is outlined more specifically in a new supplemental Sectional Planning Area (SPA) plan and associated regulatory documents prepared for this planning area, This new Supplemental SPA plan, which includes specific design guidelines for each parcel, will replace the previously adopted Activity Center Precise Plan Guidelines and all other associated regulatory documents, Page No.3, Item: Meetin2 Date: 07/10/02 DISCUSSION: I. Existing Site Characteristics The Project involves 68.1 in two separate sites: a 54. I-acre site located at the northwest comer of EastLake Parkway and Otay Lakes Road, hereafter referred to as the Western Parcel, and 13.6 acres at the northeast comer of EastLake Parkway and Otay Lakes Road, hereafter referred to as the Eastern Parcel (see Locator). Western Parcel The western parcel is presently vacant and has been mass graded in conjunction with the EastLake I mass-grading program, and recently re-graded under an approved remedial grading permit. After the most recent grading, the site is divided into two level building pads with an elevation difference of approximately 20 feet. The lower pad, which is approximately 38.1 acres, drains from the northeast to southwest to an existing detention basin located at the southwest comer ofthe site. The northerly 16.4 acres drains west to a catch basin located at the southwest, then piped to the above mentioned detention basin. The surrounding land uses include: I) the future SR-125 freeway alignment to the west; 2) the Business Center I to the north and east across EastLake Parkway; and 3) the Von's Shopping Center to the south across Otay Lakes Road. Access to this site is provided along all surrounding streets (see Locator). Eastern Parcel The Eastern Parcel is located on the east side of East Lake Parkway between Otay Lakes Road and Fenton Street. This site is approximately 13.6 acres, inclusive of an existing 4.0-acre church at the east end; the parcel is vacant. As with the Western Parcel, this site was graded as part ofthe original EastLake I mass grading program. The Church site is approximately 5 feet above the remainder site and has direct access from Otay Lakes Road to the south. The site is surrounded by Fenton Street and industrial uses to the north, EastLake Parkway to the west; Otay Lakes Road to the south and Research and Limited Manufacturing uses to the east. Access to the site is provided along all surrounding streets (see Locator). Page No.4, Item: Meetin2 Date: 07/10/02 2. Existing General Plan, SPA Land Use Designations and land use General Plan CV Municipal Code PC District Land Existing Land Use Zoning Use Designation Western Parcel Site Commercial Retail PC, Planned Village Center Vacant Connuunity North Industrial Research PC, Planned Business Center Industrial, EastLake & Manufacturing Connuunity Parkway South Connuercial Retail PC, Planned Open Space, Village Otay Lakes Road, & Open Space Connuunity Center Von's commercial center East Industrial Research PC, Planned Business Center, Vacant, EastLake & Manufacturing, Connuunity Village Center Parkway Residential Low- Medium West Open Space PC, Planned Open Space Vacant, Future SR- Community 125 Freeway Eastern Parcel Site Conunercial PC, Planned Village Center, Vacant Professional & Connuunity Business Center, Administrative Open Space North Industrial Research PC, Planned Business Center, Industrial, Fenton & Manufacturing Connuunity Open Space Street South Residential Low- PC, Planned Residential Residential, Otay Medium Connuunity Condominium Lakes Road East Commercial PC, Planned Business Center Vacant, Industrial Professional & Connuunity Administrative West Connuercial Retail PC, Planned Village Center Vacant, EastLake Connuunity Parkway 3. Project Description The proposed project includes amendments to the City's General Plan, the EastLake II General Development Plan, EastLake I Sectional Planning Area Plan, and the EastLake II Planned Community District Regulations and Land Use Districts Map. The proposed amendments are more specifically described in the following paragraphs by individual parcel. Page No.5, Item: Meetin2 Date: 07/10/02 General Plan Amendments: Western Parcel: Change 16.4 acres at the northerly portion of the site from Commercial Retail to Research and Limited Manufacturing (See Figure 2). Eastern Parcel: No General Plan Amendments are proposed for this site. EastLake II General Development Plan Amendments: Western Parcel: Change 16.4 acres at the northerly portion from PQ, Public/Quasi-public to IR, Research and Limited Manufacturing (see Figure 3). Eastern Parcel: Change the northerly 2.0 acres from BC-I, Business Center and OS-7, Open Space to VC-2, Village Center Land Use designation (See Figure 3). EastLake II Planned District Regnlations - Land Use Districts Map Amendments: Western Parcel: Change the northerly 16.4 acres from VC-I, Village Center to BC-3, Business Center- Core District land use designation (see Figure 4). Eastern Parcel: Change 2 acres at the southeast comer of East Lake Parkway and Fenton Street from BC-I, Business Center - Manufacturing District to VC-2, Village Center (Professional and Administrative/Limited Retail), and 2 acres along the eastern edge of the subject site from OS-2, Open Space, to Village Center (Professional and Administrative/Limited Retail) (see Figure 4). EastLake II Planned District Regulations - Text Amendments: In addition to various, minor clean-up type amendments, the project includes the following text amendments: Section III, Permitted Uses - Village Center: Replace the definitions of the permitted, not permitted, CUP, etc symbols in Sections III. I , Permitted Uses - Village Center and Section III.4; Permitted uses- Commercial Districts and Section IV.I Permitted and Conditional Uses - Business Center. The new definitions clarify more specifically the required planning process for land use listed in the Permitted Uses Table. Page No.6, Item: Meetin2 Date: 07/10/02 Change the Eating and drinking establishments pennitted land use to allow restaurants, coffee shops and delicatessens with outdoor seating, subject to Site Plan and Architectural review. Include Bank/Financial Institution with drive-thru as an allowable use; and delete the SIze requirement for Furniture and Hardware stores from (<10,000 sf), to be at any size. Redefine the permitted land uses in VC-2 to promote a Professional and Administrative land use with Jimited commercial uses. Section III .2. Property Development Standards - Village Center District: Incorporate Property development standards, including building setbacks, building height for the VC-I and VC-2 Land Use Districts Section IV Business Districts: Introduce a new BC-3 land use district with its corresponding land use district intent section, list of permitted and conditional use permitted, and corresponding Property Development Standards. Section( s) I.3.A Special Purpose Land Use Districts and V.2 Permitted and Conditional uses: Ouasi- public facilities (PO): Delete the future urban column fTom the permitted land use table. Section VIII.2 Schedule of Off-street Parking Requirements: Modify the off-street parking requirements for Planned shopping centers to allow for outdoor garden related retail areas and restaurant outdoor seating without providing additional parking (see Attachment 5, PC Regulations tab). EastLake I Sectional Planning Area Plan (SPA) - Site Utilization Plan Amendments: Western Parcel: Merge the southern 14.2 acres of the 30.6-acre parcel identified as MC-lin the Site Utilization Plan into the southerly adjacent VC-I parcel. Also, create a new parcel identified as E-IO with the remaining 16.4 acres of the MC-I parcel (see Figure 5). Eastern Parcel: Merge 2-acres at the southeast comer of EastLake Parkway and Fenton Street (identified in the adopted Site utilization plan as E-IO) and 2- acres along the eastern edge of the subject property (identified in the adopted Site UtiJization Plan as OS-12, Open Space) into the southerly adjacent YC-2 parcel (See Figure 5) to expand the existing VC-2 parcel from 10 to 13.6 acre s (According to the previous calculations, it should be 14.1 acres, but the new figure is based on more precise measuring of the existing parcels). Page No.7, Item: Meetin2 Date: 07/10/02 EastLake I Sectional Planning Area SPA plan - Text Amendments: The proposed amendments reflect the change in urban design concept for the portion ofthe EastLake I Activity Center known as the Village Center North. In order to simplify the amendment to the adopted EastLake I SPA, the proposed SPA plan amendments are reflected in a separate supplemental document to be known as as the EastLake I, Village Center North Supplemental SPA (see Attachment 5). The new SPA plan contains Design Guidelines, Public Facilities Financing Plan (PFFP), Air Quality Improvement Plan (AQIP), Water Conservation Plan (WCP), which are supplemental to the ones found in the EastLake I SPA plan. ANAL YSIS: General Plan Amendment: The proposed amendments to the General Plan consist primarily of changing the previously adopted land use designation associated with the Kaiser Medical Center project to accommodate the new Village Center concept proposed by The EastLake Company. As indicated above, the requested General Plan amendment consist of changing 16.4 acres at the northern portion of the site from Commercial Retail to Research and Limited Manufacturing. The topographical difference of approximately 20 feet with the southerly adjacent portion ofthe site and the parcel orientation towards the business center to the north, are the basis to support the requested amendment. The proposed land use change will provide an additional 16.4 acres of Industrial Research and Limited Manufacturing for employment type uses within the EastLake Community. EastLake II General Development Plan Amendment: Western Parcel: The proposed amendments to the General Development Plan consist of changing the previously adopted land use designation associated with the Kaiser Medical Center project to accommodate the new Village Center concept proposed by the EastLake Company. As mentioned above, the orientation and configuration of the northerly 16.4 acres is substantially more suitable for employment land use and therefore more compatible with the EastLake Business Center to the north and east. The remaining 14.4 acres currently designated for Public Quasi-public and proposed to be changed to Commercial Retail, will be added to the Commercial Retail parcel directly to the south to crate a 38 . I-acre commercial retail site. The combined acreage will allow the site to be developed as a major commercial center to serve EastLake residents and the city as a whole. Eastern Parcel: The requested GDP amendment for this site involves changing the northerly 2 acres land use designation from Research and limited Manufacturing to Professional and Administrative Page No.8, Item: Meetin2 Date: 07/10/02 Commercial. The land use change provides additional land area to accommodate a cohesive office commercial development envisioned for this parcel in the new Supplemental SPA. With the conversion of the 16.4 acres on the western Parcel to Research and Limited Manufacturing, the acreage designated for employment in the EastLake Plarmed Community, will increase by 14.4 acres. This added acreage will contribute substantially to achieve the city's economic development goals and objectives. EastLake I Supplemental EastLake Village Center North SPA Plan: EastLake I SPA Plan: The EastLake Village Center North, which is referred to as the EastLake I Activity Center in the adopted SPA plan, is located within the EastLake I SPA and functions as the town center for the EastLake Planned Community, intended to serve the business center within the SPA and the EastLake Planned Community as a whole. This Activity Center concept features three major components: I) a neighborhood shopping center; 2) a mixed-use entertainment and service oriented village center; and 3) a major hospital! medical center (see Figure I). This Activity Center replaced the original commercial/residential mixed-use concept envisioned in the original EastLake I SPA. To properly guide the above-mentioned EastLake I Activity Center development, in 1992, the City Council approved the "EastLake I Activity Center Precise Plan Guidelines". The Design Guidelines established specific urban design parameters, land use features and landscaping and functional goals to insure the integration of all aspects ofthe Activity Center into the EastLake I SPA and the overall planned community (see Figure 6). However, this concept, which was based on the Kaiser Medical Center project as the major anchor, was never built due to Kaiser Permanente Medical Group's decision not to build an additional hospital in San Diego County. Thus, the property was re-acquired by the EastLake Company who is proposing to re-define the northern portion of the Activity Center (north of Otay Lakes Road) into three separate and independent parcels tied together by their relationship and interface with other surrounding properties and uses. This new concept continues to be an increment of the overall EastLake Plarmed Community and it should be, to a large extent, a continuation of the existing development in design and policy regulations. The new concept is more specifically outlined in a new Supplemental SPA plan. This new Supplemental SPA defines the development parameters, including the land use designation, Urban Design Criteria Circulation, public facilities, Water Conservation Plan, Air Quality Improvement Plan and other necessary components to ensure the proper integration of the Village Center North into the existing surrounding Residential, commercial and industrial uses. The following paragraphs describe in more detail some of the EastLake Village Center North Supplemental SPA plan components. Page No.9, Item: Meetin2 Date: 07/10/02 Land Use: Under the adopted EastLake II General Development Plan, PQ, Public Quasi-public, the EastLake Village Center North was envisioned to contain a major medical center complex with a support commercial, entertainment and civic uses, which resulted in a well integrated mixed-use project illustrated in the latter adopted precise plan for the subject property. The new land use composition is intended to create three separate parcels, each with a distinctive target land use designation, but tied together by common urban design features and urban design guidelines. The land uses have been crafted to provide independent development parameters and guidelines, but complementing each other as the area is fully developed. Circulation: The EastLake Village Center North will be served by two major streets: EastLake Parkway and Otay Lakes Road. The western parcel's main access is along Otay Lakes Road with secondary access points along EastLake Parkway. Otay Lakes Road, which is a 6-lane Prime Arterial road will be widened to seven lanes to accommodate a queuing lane for the future SR-125 freeway on-ramp and acceleration and de-acceleration lanes for the commercial center site (Western Parcel) EastLake Parkway will also be widened to five lanes to accommodate the required turning lanes at the intersection with Otay Lakes Road (see Attachment 5, SPA Plan tab). Regional access will be provided primarily by 1-805 located approximately 5 miles to the west, and eventually by the future SR-125, immediately adjacent to the west. Required improvements installation timing and financing mechanism are discussed in the Village Center North Public FaciJities Finance Plan (see Figure 7). Design Guidelines: The EastLake Village Center Design Guidelines reflects the physical appearance for the type of development envisioned such as a research and manufacturing facility within the northerly 16.4 acres (E-l 0), a commercial center within the southerly 38.lacres (VC-I), and a professional administrative complex with minor retail uses within the easterly 13.6 acres (VC-2). The Design Guidelines stipulate design parameters that pertain to site planning, landscape architecture, architecture and signage for the 68. I-acre project site- westerly and easterly parcels, and serve to provide appropriate design criteria in the review of proposed developments for the respective areas of the project. In addition, the EastLake Village Center Design Guidelines feature design elements such as trail nodes along EastLake Parkway Thematic Corridor Trail System, which consist oftextured paving, seating/rest areas and canopy trees. The proposed trail system also considers potential for future transit faciJities. These elements are intended to promote pedestrian activity. The urban design elements presented in the EastLake Village Center Design Guidelines promote a well-designed commercial center, which will serve as a landmark "Gateway" to the EastLake Planned Community. The EastLake Village Center Design Guidelines replaces the EastLake I Activity Center Precise Plan Guidelines. However, applicable elements of the Precise Plan, such as a Park & Ride facility, pedestrian oriented trail system, landscaping and signage, water features and community open space Page No. 10, Item: Meetin2 Date: 07/10/02 areas such as courtyards, patios, pergolas, and trellises to encourage pedestrian interaction have been retained and incorporated within the EastLake Village Center Design Guidelines. The Design Guidelines contain illustrations and guidelines to implement the design ideas presented therein. Some of the urban design guidelines include land use diversity, site development character and conceptual building/parking/open space relationships within the project. Because of the importance of unifying themes and designs over an extended period oftime until full build out, the Design Guidelines will be utilized to ensure overall consistency while allowing for flexibility on the part of the Design Review Committee at the detailed site plan level. Village Center North Supplemental Public Facilities Finance Plan: The proposed Public Facilities Financing Plan (PFFP) has been prepared by City consultants based on water, sewer, traffic, drainage, biology and other technical studies. As required by the City's Growth Management Ordinance, the proposed EastLake Village Center North Supplemental PFFP analyzes the impact ofthe project on public facilities and services and identifies the required public facilities and services needed to serve the project to maintain consistency with the City's Quality of Life Threshold Standards. The PFFP describes in detail the cost, financing mechanism and timing for constructing public facilities. The public facilities needed to serve the project will be guaranteed by placing conditions of approval on the tentative parcel map, payment of DIF fees at the building permit stage, and/or utilizing Community Facilities Districts to finance or maintain the public facility. Transportation: The City's Traffic Threshold Standard specifies that a Level of Service (LOS) of C or better, as measured by average travel speeds on the arterial roads, shall be maintained with an exception that during peak hours LOS D can occur for no more than two hours of the day or LOS E for one hour. The EastLake Village Center North project is calculated to generate a total of 36,356 daily project trips. Since no specific development is proposed on parcel E-I 0 or VC-2 at this time, an assumption by the traffic consultant was made as to future traffic generation for these parcels and included in the traffic model. Street improvements required to serve the project include a new westbound lane on Otay Lakes Road from EastLake Parkway to SR-125 and traffic signals and intersection widening at driveway entrances to the shopping center and at street intersections such as EastLake Parkway and Otay Lakes Road and EastLake Parkway and Fenton Street and Miller Drive. The applicant will also be conditioned to provide fair share funding for cumulative impacts that will necessitate the future widening of Olympic Parkway from SR-125 to EastLake Parkway and Otay Lakes Road from Telegraph Canyon Road to "H" Street. Page No. 11, Item: Meetin2 Date: 07/10/02 With the construction of the project level street improvements and the cumulative level street improvements, the City's Quality of Life Threshold Standards will be maintained at a Level of Service of C in the morning peak hour and at a Level of Service ofB in the evening peak hour. Based on the Traffic Impact Analysis prepared for the EastLake Village Center North project by the City's traffic consultant, Linscott, Law & Greenspan, dated May 8, 2002, threshold compliance will be maintained with implementation ofthe street improvements identified in the report and with the payment of transportation DIF fees listed above. The EastLake Village Center North project will be conditioned to pay Transportation DIF fees ($6,240 per EDU), Interim SR-125 fees ($820 per EDU) and Traffic Signal Fees ($23.00 per vehicle trip generated per day) at the rate in effect at the time building pennits are issued for the project. Drainage: The 68.I-acre site lies within the Telegraph Canyon Drainage Basin. This basin is served by improved concrete drainage channels that run parallel to Telegraph Canyon Road. On-site, runoff is contained on-site within a detention basin to reduce the impact of a I OO-year flood on downstream facilities. The project will be conditioned to provide for the conveyance of storm water flows in accordance with City standards, policies and requirements. Sedimentation basins, on-site erosion protection, urban runoff treatment, and ongoing maintenance will be provided as a condition of the project. Water: The Otay Water District will provide water service for EastLake Village Center North project. Annexation into Improvement District 22 will be required prior to water service being provided. The Otay Water District has facilities in the vicinity of the project that can provide water service. The District will also provide recycled water to the project for landscape irrigation and other uses. The total projected potable water demand for the Village Center North project is approximately 0.114 million gallons per day. The commercial fire flow is 5,000-gpm flow for 5 hours, which meets the City's requirements. The necessary area-wide water improvements to serve the project have been constructed. Sufficient water capacity and infrastructure exist to serve the EastLake Village Center North project. Sewer: Sewer service to the project site is provided by the City of Chula Vista. The project will connect to the existing i5-inch diameter Telegraph Canyon Trunk Sewer in Otay Lakes Road either directly or via a sewer line located in EastLake Parkway. The trunk sewer facilities will accommodate sewage flows from the project and other uses in the basin. The City holds capacity rights of 19.843 mgd in the San Diego Metropolitan Sewerage System and has 5.581 mgd remaining available capacity in the Metro Sewer System. The sewer service charges Page No. 12, Item: Meetin2 Date: 07/10/02 for this development will be assessed based on the quantity and quality of effluent that will be generated from the site. The sewer analysis determined that the land uses ofthe proposed project would result in a reduction in sewage flow from those plarmed in previous studies. Because of the reduction in flows, the planned improvements to the Telegraph Canyon Trunk Sewer will accommodate project flows. Fire: Development of the EastLake Village Center North project is not anticipated to change the need for fire service in the area. Interim Fire Station #6, located at 975 Lane Avenue in EastLake Business Center I would be the primary station to serve the project. In the long term, Fire Station No.6 will be relocated to East "H" Street and Mount Miguel Road and Fire Station #8 will be constructed in EastLake Woods. Schools. Libraries and Parks: The proposed project will not generate an increase in dwelling units or population in the project area. Therefore, the development will not result in a need for new schools, libraries or parks. However, the applicant will have to pay school fees at the rate in effect at the time building permits are issued. EastLake II Planned Community District Regulations Amendments: The EastLake II Planned Community District Regulations function as the zoning regulations for the project. The PC District Regulations provide standards and regulations to guide the development of the project. These regulations are applied in conjunction with the EastLake Village Center North Design Guidelines to ensure the uses within the project are compatible and well designed. The EastLake II Planned Community District Regulations adopted originally in 1985 and amended in 1992 to allow the Kaiser medical center project, cover all of EastLake Hills, Shores, Business Center and the Greens and Trails. This amendment only affects the commercial and industrial uses, which occur in the EastLake Village Center North portion of the EastLake project. The amendments essentially consist of fine-tuning the allowable uses in the Village Center North parcels to reflect the proposed uses for the shopping center and professional and commercial development on VC-2. Since BC-3 is being created as a new land use district (formerly part ofVC- I) allowable land uses are being added to the regulations to reflect the City's intent to encourage medical facilities and uses on BC-3. In addition, the property development standards have been improved to reflect setbacks from Otay Lakes Road and EastLake Parkway as well as future SR-125. New property development standards have been included for BC-3. The off-site parking requirements for planned shopping centers of 5 spaces per 1,000 square feet of building area for all uses except for outdoor garden areas and dining patios has been added to regulations. The remaining provisions of the EastLake II Plarmed Community District Regulations remain unchanged. Page No. 13, Item: Meetin2 Date: 07/10/02 Water Conservation Plan: The City's Growth Management Ordinance requires the preparation ofa Water Conservation Plan for all projects. The reduction in water usage from the previously approved Kaiser Hospital project (.421 mgd) as compared to the proposed EastLake Village Center North project (.122 mgd), equates to .299 mgd savings, which is approximately 71 %. Numerous features have been included in the proposed project to minimize the use of water during the construction and operation of the project. The estimate potable water consumption with conservation measures is .067 mgd or a45% savings as compared to no conservation. The water conservation measures incorporated into the project are mandated fixtures and devices such as showerheads, lavatory faucets, sink faucets, metering faucets in public restrooms, flushometer valves, commercial water closets, urinals and irrigation oflandscaping with recycled water. Non-mandated measures include hot water pipe insulation and pressure reducing valves. The EastLake Village Center North Water Conservation Plan demonstrates the value in incorporating all feasible water conservation measures in the buildings and irrigation systems for commercial development. The implementation of these measures will contribute to preserving a valuable natural resource. Air Quality Improvement Plan (AQIP): An Air Quality Improvement Plan was prepared for the project in accordance with Federal and State requirements; and the City's General Plan Growth Management Element (OME) to meet federal and state air quality standards. To implement the GME, the City's Growth Management Program requires that major commercial/industrial projects prepare Air Quality Improvement Plans for all Sectional Planning Area (SP A) Plans. The AQIP includes an assessment of how the project has been designed to reduce emissions as well as identify appropriate mitigation measures. The design concepts described and implemented in this AIQP for the Village Center North SPA are essentially the same as those identified in a pilot study recently conducted by the city to develop meaningful air quality improvement measures. Numerous features have been included in the project and surrounding EastLake Community to minimize air quality impacts from construction and operation ofthe EastLake Village Center North Supplemental SPA Plan. The AQIP outlines project- level features that will assist in reducing air quality impacts (see Attachment 5, SPA Binder Tab). CONCLUSION: For the reasons mentioned above, staff recommends approval ofthe project subject to the conditions listed in the attached draft City Council Resolution. Page No. 14, Item: Meetin2 Date: 07/10/02 Attachments 1. Planning Commission Resolution 2. Draft City Council Resolution & Ordinance 3. Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) 4. Figures 5. Village Center North Supplemental SPA-Binder 6. Ownership Disclosure Form J:\Planning\LUIS\Vi1lage Ctr. North\VILLAGE eTR REPORTS AND RESOS\PCM 01.15 ELK VCN PC Agenda 26 June 02.doc RESOLUTION NO. GPA-02-07/PCM-01-15 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL ADOPT THE MITIGATED NEGATIVE DECLARATION IS-01-042 AND MITIGATION MONITORING AND REPORTING PROGRAM, APPROVE AMENDMENTS TO THE CITY'S GENERAL PLAN, EASTLAKE II GENERAL DEVELOPMENT PLAN, EASTLAKE II PLANNED COMMUNITY DISTRICT REGULATIONS AND LAND USE DISTRICTS MAP. ALSO, ADOPT A NEW SECTIONAL PLANNlNG AREA SPA PLAN AND ASSOCIA TE REGULATORY DOCUMENT S FOR 68.1 ACRES AT THE NORTHEAST AND NORTHWEST CORNER OF OTAY LAKES ROAD AND EASTLAKE P ARKW A Y. WHEREAS, on February 23, 2001, a duly verified application was filed with the City of Chula Vista Planning Department by The EastLake Company ("Developer"), requesting approval of amendments to the City's General Plan, EastLake II General Development plan and EastLake II Planned Community District Regulations. The Developer also requested approval of a new Sectional Planning Area (SPA) plan and associated regulatory documents, including design guidelines, public Facilities Finance Plan, Air Quality Improvement plan and Water Conservation plan for 68.1 acres located at the northeast and northwest comer ofOtay Lakes Road and EastLake Parkway ("Project); and, WHEREAS, the area ofland which is subject matter of this Resolution is diagrammatically represented in Exhibit "A" and commonly known as portion of the Eastlake I Activity Center, and for the purpose of general description herein consists of approximately 68.1 acres located at the northeast and northwest comers of Otay Lakes Road and EastLake Parkway within the EastLake Planned Community ("Project Site"); and, WHEREAS, the Environmental Review Coordinator determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because mitigation measures have been incorporated and agreed to by the project proponent. A Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program were prepared which must be considered by the Planning Commission prior to a decision on the project; and, WHEREAS, the Planning Commission finds that the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-OI-042) has been prepared in accordance with the requirements ofthe California Environmental Quality Act (CEQA), and the Environmental Review Procedures of the City ofChula Vista; and, WHEREAS, the Planning Commission finds that the Project environmental impacts will be mitigated by adoption of the Mitigation Measures described in the Mitigated Negative Declaration, and contained in the Mitigation Monitoring and Reporting Program, and that the Mitigation Monitoring and Reporting Program is designed to ensure that during Project implementation, the permittee/Project applicant, and any other responsible parties implement the project components and comply with the mitigation Monitoring Program; and, WHEREAS the Planning Commission having received certain evidence on July 10,2002, as set forth in the record of its proceedings herein by reference as is set forth in full, made certain findings, as set forth in their recommending Resolution GPA 02-07/PCM-01-15 herein, and recommended that the City Council approve the Project based on certain terms and conditions; and, WHEREAS, the Plauning Director set the time and place for a hearing on the Project, and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and it mailing to property owners and within 500 feet of the exterior boundaries of the property, at least 10 days prior to the hearing; and, WHEREAS, the hearing was held at the time and place as advertised, namely 6:00 p.m., June 7,2000, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed. NOW, THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION recommcnds that the City Council adopt the attached Draft City Council Resolution and Ordinance approving the Project in accordance with the findings and subject to the conditions contained therein. BE IT FURTHER RESOLVED THAT a copy of this resolution be transmitted to the City Council. PASSED AND APPROVED BY THE PLANNING COMMISSION OF THE CITY OF CHULA VISTA, CALIFORNIA, this lOth day of July, 2002, by the following vote, to-wit: AYES: NOES: ABSENT: Kevin O'Neil, Chairperson ATTEST: Diana Vargas, Secretary J:\Planning\LUIS\Vi11age Crr. North\VILLAGE CTR REPORTS AND RESOS\PCM-OI-15 PCRESO.doc I~ 7J l'r to ~ rlli3t r , t \ ~ 111111111111111111111 .' J I I I I I I II , 1111 , ,,,- III 1=1 H 1111 'T" ~ I f=H\\1I1I1 _ I '" ';!' 11111lir i=~ - l\\\\lIr w ~ I ~~ I ffi w '~~ !'"', :J/ ~'" ,,'h ~ ~>< ' ~::0.~ ;:<>::::: u lY' ~ lla~ 1\ /~ 0; y ~~'J 1'1 ~ y l\. / /~ / I~ ~ I~ '" II; ~~.~ ~ / 7n~QjL~~_ L\ ~ 6~ ~ ROLLING HILLS RANCH / ~ d~~ ~ W !f1 tMfrJ :<L9 \ "'--- f- t'\ "- <.1/, "lL.l) '~Il ~ ~ EASTlAKE \ !if ___ BUSINESS ~ I !!i' }- CENTER ~ l~ '/ ~:::::::---- l' I EXISTING H CHURCH I L--l-:::= ~ <<r:';::- r.;,~...r;P- \ "" EASTLAKE HIGH SCHOOL _~=M ,yW~\ lliU'~ 4 ~~1j~ ~ PROHCT~~ .~ '---.:J! LOCATION ~ ~ t:= ,~ ~~\~~G :- t;} " ,I~ 1~~t2~tnj =1 CJ ~~ n \ II \ y- rf::.ZiH v- 1\ "h' ~EASTLAKE GREENS \. ,(~ I Dll ~ ~~~ F~ ; ~ : IT. VON'S CENTER ~ C HULA VISTA PLANNING AND BUILDING DE PARTM E NT LOCATOR PROJECT C) APPLICANT: EASTLAKE DEVELOPMENT CO. PROJECT Northeast and Northwest Corner of EXHIBIT A ADDRESS: Otay Lakes Road and Eastlake Parkway SCALE: FILE NUMBER: NORTH No Scale GDP-02-07, PCM-01-15 C:\DAIFILE\locators\GDP0207, PCM0115.cdr OS/29/02 z -< ~ =-- ~ ~ ~ z ~ c ~ ~ 00. o =-- o ~ =-- e (/) 0 0)- '""~~ I.:i ,-:,:""C (J 10 0) Z Zr-- 10-- '"" ;: Q)'- . < ..q::: "": ~.~ g> < -<~ ~Zr-- ... ...z~ ~ ~~Q c.o _ --.J .~ U uO <= ""' ~ ~::E' ..- .!!! "C .a ~ ~oo""' ;:u~~ Q) ~ c: (J "'-< "'0000 ~I~ ~~~ o>O)roJ!! ::;::... ::;::"'z E--~",I"< ::;::~ oo<""'~ ~Z' C:E..c::J ::;::1"<'" ~",...z ~~ 5~ 10 E (J c: 8~ 00::;:: ~oo::;::< ~~~ ..c: .....10 ug:~ ~~::s::;:: z:?j~ ()oro:2: ~<~ ' () ~ u ~ <tEQ) I D I Il.o~ C)..... ...... ~ E-- ..... ~ ..... = ~ ~ ATTACHMENT 2 Draft City Council Resolution & Ordinance RESOLUTION RESOLUTION OF THE CITY OF CHULA VISTA CITY COUNCIL RECOMMENDING THAT THE CITY COUNCIL ADOPT THE MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND REPORTING PROGRAM IS-OI-042; APPROVE AMENDMENTS TO THE CITY'S GENERAL PLAN, EASTLAKE II GENERAL DEVELOPMENT PLAN, EASTLAKE II PLANNED COMMUNITY DISTRICT REGULATIONS AND LAND USE DISTRICTS MAP. ALSO, ADOPT A NEW SECTIONAL PLANNING AREA SPA PLAN AND ASSOCIATED REGULATORY DOCUMENTS FOR 68.1 ACRES AT THE NORTHEAST AND NORTHWEST CORNERS OF OT A Y LAKE ROAD AND EASTLAKE P ARKW A Y. I RECITALS A Project Site WHEREAS, the areas ofland which are the subject of this Resolution are diagranunatically represented in Exhibit A and hereto incorporated herein by this Resolution, and commonly known as EastLake I Activity Center, and for the purpose of general description herein consist of 54.5 acres at the northwest comer and 13.6 acres at the northeast comer of Otay Lakes Road and EastLake Parkway within the EastLake Planned Community ("Project Site")' and , , B. Project; Application for Discretionary Approvals WHEREAS, duly verified application was filed with the City of Chula Vista Planning Department on February 23, 2001 by The EastIake Company ("Developer") requesting amendments to the City's General Plan, EastLake II General Development plan, Eastlake II Planned Community District Regulations. The Developer also requested approval of a new Sectional Planning Area (SPA) plan and associated regulatory documents, including design guidelines, Public Facilities Finance Plan, Air Quality Improvement Plan and Water Conservation Plan for 68.1 acres located at the northeast and northwest comer of Otay Lakes Road and EastLake Parkway ("Project); and, C Prior Discretionary Approvals WHEREAS, prior discretionary action of the development of the EastLake I portion of the Project Site has been the subject matter of prior General Development Plan and Sectional Planning Area (SPA) plan, EastLake II General Development Plan, Planned Community District Regulations and Land Use District Map amendments, EastLake II Planned Community District Regulations, resulting in the current land use designations, all previously approved by City Council Resolution No. 16702 and Ordinance No. 2522 on July 6, 1992; 2) a prior Development Agreement Between the City of Chula Vista and the Kaiser Foundation Hospitals previously approved by City Council Ordinance 2522 on July 6, 1992 ; and, D. Planning Commission Record of Application WHEREAS, the Planning Commission held an advertised public hearing on the Project on July 10, 2002 and voted to forward a recommendation to the City Council on the Proj ect; and, WHEREAS, the proceedings and all evidence introduce before the Planning Commission at the public hearing on this project held on July 10, 2002 and the minutes and resolution resulting there from, are hereby incorporated into the record of this proceedings; and, E. City Council Record of Application WHEREAS, the City Clerk set the time and place for the hearing on the Project application and notices of said hearings, together with its purposes given by its publication in a newspaper of general circulation in the city, and its mailing to property owners within 500 ft. of the exterior boundaries of the Project Sites at least ten days prior to the hearing. NOW THEREFORE BE IT RESOLVED that the City Council hereby find, determine and resolve as follows: II. CERTIFICATION OF COMPLIANCE WITH CEQA The City Council does hereby find that the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-OI-042) has been prepared in accordance with requirements of the California Environmental Quality Act (CEQA), the State CEQA Guidelines and the Environmental Review Procedures of the City of Chula Vista, and hereby adopts the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-OI-042). III. INDEPENDENT JUDGMENT OF CITY COUNCIL The City Council does hereby find that in the exercise of their independent review and judgment, the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-OI-042) in the form presented has been prepared in accordance with requirements of the California Environmental Quality Act and the Environmental Review Procedures of the City ofChula Vista and hereby adopt same. IV. APPROVAL OF GENERAL PLAN AMENDMENT The Chula Vista General Plan Land Use Diagram is hereby amended as set forth and diagrammatically represented in Exhibit "B," a copy of which is on file in the office of the 2 City Clerk, known as Document , to change the land use designation of 16.4 acres at the northeast comer of EastLake Parkway and the future SR-125 freeway rrom Commercial Retail to Research and Limited Manufacturing. V. GENERAL PLAN INTERNAL CONSISTENCY The City Council hereby finds and determines that the General Plan consistency is internally consistent and shall remain internally consistent following the amendments thereon in this Resolution. VI. GENERAL DEVELOPMENT PLAN FINDINGS THE PROPOSED DEVELOPMENT AS DESCRIBED BY THE GENERAL DEVELOPMENT PLAN IS IN CONFORMITY WITH THE PROVISIONS OF THE CHULA VISTA GENERAL PLAN, AS AMENDED. The proposed amendments to the EastLake II General Development Plan reflects the land use, circulation system and public facilities that are consistent with the City's General Plan as proposed to be amended. PLANNED COMMUNITY CAN BE INITIATED BY ESTABLISHMENT OF SPECIFIC USES OR SECTIONAL PLANNING AREA PLANS WITHIN TWO YEARS OF THE ESTABLISHMENT OF THE PLANNED COMMUNITY ZONE. A sectional Planning Area Plan has been previously established for the Project Site, and a new Supplemental Sectional Planning Area plan, which is a continuation of the EastLake I SPA plan policies and development regulations, is included with the proposed project. IN THE CASE OF PROPOSED RESIDENTIAL DEVELOPMENT, THAT SUCH DEVELOPMENT WILL CONSTITUTE A RESIDENTIAL ENVIRONMENT OF SUSTAINED DESlRABLITY AND STABILITY; AND THAT IT WILL BE IN HARMONY WITH OR PROVIDE COMPATIBLE VARIETY TO THE CHARACTER OF THE SURROUNDING AREA; AND THAT THE SITES PROPOSED FOR PUBLIC FACILITIES, SUCH AS SCHOOLS, PLAYGROUNDS AND PARKS ARE ADEQUATE TO SERVE THE ANTICIPATED POLPULATION AND APPEAR ACCEPTABLE TO THE PUBLIC AUTHORITIES HAVING JURISDICTION THEREOF. The project does not involve residential development. VII. ADOPTION OF AMENDED GENERAL DEVELOPMENT PLAN In light of the findings above, the amended EastLake II General Development Plan is hereby approved and adopted in the form presented to the City Council and on file in the office of the City Clerk. 3 VIII. SPA FINDINGS/ APPROVAL A. THE SECTIONAL PLANNING AREA (SPA) PLANS (AS AMENDED) ARE IN CONFORMITY WITH THE EASTLAKE II GENERAL DEVELOPMENT PLAN AND THE CHULA VISTA GENERAL PLAN. The new Village Center North SPA Plan reflect the land use, circulation system and public facilities that are consistent with the EastLake II General Development Plan and the City ofChula Vista General Plan as proposed to be amended. B. THE SECTIONAL PLANNING AREA PLANS WILL PROMOTE THE ORDERLY SEQUENTIALIZED DEVELOPMENT OF THE INVOLVED SECTIONAL PLANNING AREAS. The new SPA plan includes a Supplemental Public Facilities Finance Plan that outlines the required inrrastructure to serve the Project, the timing of installation and the financing mechanisms to promote the orderly sequentialized development of the Project. C. THE EASTLAKE SECTIONAL PLANNING AREA (SPA) PLANS, AS AMENDED, WILL NOT ADVERSELY AFFECT ADJACENT LAND USE, RESIDENTIAL ENJOYMENT, CIRCULATION OR ENVIRONMENTAL QUALITY. The Land uses within the EastLake I Village Center Supplemental SPA plan represent the circulation system and overall land use intent as previously envisioned in the EastLake II General Development Plan. Thus, the new SPA will not adversely affect the adjacent land uses, residential enjoyment, circulation or environmental quality of the surrounding uses. D. IN THE CASE OF PROPOSED INDUSTRIAL AND RESEARCH USES, THAT SUCH DEVELOPMENT WILL BE APPROPRIATE IN AREA, LOCATION, AND OVERALL DESIGN AND DEVELOPMENT STANDARDS ARE SUCH AS TO CREATE A RESEARCH OR INDUSTRIAL ENVIRONMENT OF SUSTAINED DESIRABILITY AND STABILITY; AND, THAT SUCH DEVELOPMENT WILL MEET PERFORMANCE STANDARDS ESTABLISHED BY THIS TITLE. The orientation and configuration of the northerly 16.4 acres is substantially more suitable for employment land use and more compatible with the EastLake Business Center to the north and east. Thus, changing the previously adopted land use designation rrom Public Quasi-Public to Research and Limited Manufacturing is appropriate in area, and will not affect the surrounding areas. This added 4 acreage will contribute substantially to achieve the city's economic development goals and objectives. E. IN THE CASE OF INSTITUTIONAL, RECREATIONAL, AND OTHER SIMILAR NONRESIDENTIAL USES, THAT SUCH DEVELOPMENT WILL BE APPROPRIATE IN AREA, LOCATION AND OVER-ALL PLANNING TO THE PURPOSE PROPOSED, AND THAT SURROUNDING AREAS ARE PROTECTED FROM ANY ADVERSE EFFECTS FROM SUCH DEVELOPMENT. The orientation and configuration of the northerly 16.4 acres is substantially more suitable for employment land use and more compatible with the EastLake Business Center to the north and east. Thus, changing the previously adopted land use designation from Public Quasi- public to Research and Limited Manufacturing is appropriate in area, and will not affect the surrounding areas. This added acreage will contribute substantially to achieve the city's economic development goals and objectives. F. THE STREET AND THOROUGHFARES PROPOSED ARE SUITABLE AND ADEQUATE TO CARRY THE ANTICIPATED TRAFFIC THEREON. The Project Site will be served by two major streets: EastLake Parkway and Otay Lakes Road. The western parcel's main access is along Otay Lakes Road with secondary access points along EastLake Parkway. Otay Lakes Road, which is a 6- lane Prime Arterial road will be widened to seven lanes to accommodate a queuing lane for the future SR-125 freeway on-ramp and acceleration and de- acceleration lanes for the commercial center site (Western Parcel). EastLake Parkway will also be widened to five lanes to accommodate the required turning lanes at the intersection with Otay Lakes Road. Regional access will be provided primarily by 1-805 located approximately 5 miles to the west, and eventually by the future SR-125, immediately adjacent to the west. Required improvements installation timing and financing mechanism are discussed in the Village Center North Public Facilities Finance Plan. Thus, the streets proposed to serve the Project Site are suitable and adequate to carry the anticipated traffic thereon. G. ANY PROPOSED COMMERCIAL DEVELOPMENT CAN BE JUSTIFIED ECONOMICALLY AT THE LOCATION (S) PROPOSED AND WILL PROVIDE ADEQUATE COMMERCIAL FACILITIES OF THE TYPES NEEDED AT SUCH PROPOSED LOCATION (S). The proposed amendments increase the acreage designated Commercial Retail to allow for a major commercial center development to provide needed commercial 5 facilities, such as a major department store, and facilities, including restaurants and other similar uses, to complement the existing neighborhood serving commercial center. H. THE AREA SURROUNDING SAID DEVELOPMENT CAN BE PLANNED AND ZONED IN COORDINATION AND SUBSTANTIAL COMPATIBILITY WITH SAID DEVELOPMENT. The proposed amendments are consistent with the previously approved plans and regulations applicable to surrounding areas, and therefore said development can be planned and zoned in coordination and substantial compatibility with said development. BE IT FURTHER RESOLVED that in light of the findings above, the City Council does hereby approve the EastLake Greens and EastLake Trails SPA amendments and adopts the new EastLake II Sectional Planning Area SPA plan as presented in Exhibit C subject to the conditions set forth below: IX. SPA PLAN CONDITIONS OF APPROVAL 1. Provide a 50-space park and ride facility within the Western Parcel and a 10-space facility in the Eastern Parcel. The exact location, configuration, maintenance responsibility and ownership of the facility shall be defined as part of the precise plan (DRC) for each individual Parcel. ry The EastLake Company shall design and construct a bus stop, shelter, trash receptacle and bench at the location designated by the City's Transit Coordinator on Otay Lakes Road. 3. Implement the Federal and State mandated conservation measures outlined In the EastLake I Supplemental Water Conservation Plan. 4. Implement the non-mandated water conservation measures, which include I) Hot Water Pipe Insulation 2) Pressure Reducing Valves, and 3) Water Efficient/Drought Tolerant Landscaping. 5. Prior to approval of building permits for each phase of the project, the applicant shall demonstrate that air quality control measures outlined in the EastLake I Supplemental Air Quality Improvement Plan pertaining to the design, construction and operational phases of the project have been incorporated in the project design. 6. Trash collection areas shall be covered, bermed or other approved method as approved by the City Engineer to prevent runoff of polluted water across paved areas into the storm drainage systems. 6 X. CONSEQUENCE OF FAILURE OF CONDITIONS If any of the forgoing conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, and any of such conditions fail to be so implemented and maintained according to the their terms, the City shall have the right to revoke or modify all approvals herein granted, deny or further condition issuance of shall future building permits, deny, revoke or further condition all certificates of occupancy issued under the authority of approvals herein granted, instituted and prosecute litigate or compel their compliance or seek damages for their violations. No vested rights are gained by Developer or successor in interest by the City approval of this Resolution. XI. INVALIDITY; AUTOMATIC REVOCATION It is the intention of the City Council that its adoption of this Resolution is dependent upon enforceability of each and every term provision and condition herein stated; and that in the event that anyone or more terms, provisions or conditions are determined by the Court of competent jurisdiction to be invalid, illegal or unenforceable, if the city so determines in its sole discretion, this resolution shall be deemed to be revoked and no further in force or in effect. Presented By: Approved as to form by: Robert A. Leiter Director of Planning John Kaheny City Attorney J:\Planning\LUIS\Vil1age Ctr. North\VILLAGE eTR REPORTS AND RESOS\PCM-OI-15CC RESQ,doc 7 _._,,__.+_ ..__._. "_~""._m,,"_,_"_"_.____"___'mu.._...._ For City Council Resolution EXHIBIT B (See Attachment 1 of the staff report, Exhibit B) ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING AMENDMENTS TO THE EASTLAKE II PLANNED COMMUNITY DISTRICT REGULATION AND LAND USE DISTRICT MAP. 1. RECITALS A. Project Site WHEREAS, the areas of land which are the subject of this Ordinance Amendment are diagrammatically represented in Exhibit A and hereto incorporated herein as Exhibit A; and for the purpose of General description herein consist of 68.1 acres at the northwest and northeast comers ofOtay Lakes Road (Project Site); and, B. Project; Application for Discretionary Approval WHEREAS, on February 23, 2001, The Eastlake Company ("Developer") filed an application requesting approval of amendments to the EastLake II Planned Community District Regulation and Land Use District Map; and, C. Prior Discretionary Approvals WHEREAS, prior discretionary action of the development of the EastLake I portion of the Project Site has been the subject matter of prior General Development Plan and Sectional Planning Area (SPA) plan, EastLake II General Development Plan, Planned Community District Regulation and Land Use District Map amendments, resulting in the current land use designations, all previously approved by City Council Resolution No. 16702 and Ordinance No. 2522 on June 30, 1992; 2) a prior Development Agreement Between the City of Chula Vista and the Kaiser Foundation Hospitals previously approved by City Council Ordinance 2522 on July 6, 1992 ; and, D. Planning Commission Record on Applications WHEREAS, the Planning Commission held an advertised public hearing on said project on July 10, 2002, and voted to recommend that the City Council approve the amendments to the EastLake II Planned Community District Regulations and Land Use Districts Map in accordance with the findings listed below. The proceedings and all evidence introduced before the Planning Commission at their public hearing on this Project held on July 10, 2002, and the minutes and resolutions resulting therefrom, are hereby incorporated into the record of this proceeding. E. City Council Record on Applications E. City Council Record on Applications WHEREAS, a duly called and noticed public hearing was held before the City Council of the City of Chula Vista on July 23, 2002 on the Discretionary Approval Application, and to receive the recommendations of the Planning Commission, and to hear public testimony with regard to same; and, F. Discretionary Approvals Resolution and Ordinance WHEREAS, at the same City Council meeting at which this Ordinance was introduced for first reading on July 23,2002, the City Council of the City ofChula Vista approved Resolution No. by which it imposed amendments on EastLake II General Development Plan, and adopted a new Supplemental Sectional Planning Area (SPA) for 68.1 acres to be known as the Village Center North Supplemental SPA, including Design Guidelines, Public Facilities Financing Plan, Supplemental Public Facilities Finance Plan, Air Quality and Water Conservation Plans. II NOW, THEREFORE, the City of Chula Vista does hereby find, determine and ordain as follows: A. FINDINGS FOR APPROVAL OF P-C PLANNED COMMUNITY ZONE The City Council hereby finds that the proposed Amendments to the Planned Community District Regulation and Land Use District Map are consistent with the City of Chula Vista General Plan, as amended, and public necessity, convenience, the general welfare and good zoning practice support the amendments. B. APPRO V AL OF PLANNED COMMUNITY ZONE The City Council does hereby approve the Planned Community District Regulation and Land Use District Map as represented in Exhibit C. III. INV ALIDITY; AUTOMATIC REVOCATION It is the intention of the City Council that its adoption of this Ordinance is dependent upon the enforceability of each and every term, provision and condition herein stated; and that in the event that anyone or more terms, provisions or conditions are determined by a Court of competent jurisdiction to be invalid, illegal or unenforceable, this resolution shall be deemed to be automatically revoked and of no further force and effect ab initio. IV. EFFECTIVE DATE This ordinance shall take effect and be in full force on the thirtieth day from and after its adoption. Presented by: Approved as to form by: Robert A. Leiter Director of Planning John Kaheny City Attorney J:\Planning\LUIS\Village Crr. North\VILLAGE CTR REPORTS AND RESOS\PCM.OI.15 CCORD.doc F or City Council Ordinance EXHIBIT A (See Attachment 1 of the staff report, Exhibit A) and EXHIBIT C (See Attachment 5 of the staff report, PC District Regulations Tab) ATTACHMENT 3 Mitigated Negative Declaration Mitigated Negative Declaration PROJECT NAME: EastLake Village Center North PROJECT LOCATION: Northwest and northeast of the EastLake Parkway/Otay Lakes Road intersection ASSESSOR'S PARCEL NO.: 595-070-27,28; 595-232-22, 23 PROJECT APPLICANT: The EastLake Company CASE NO.: Case No. IS-Ol-042 DATE: June 1],2002 A. Project Setting The proposed EastLake Yillage Center North projcct (hereinafter referred to as "the proposed project") involves approximately 68.1 acres (ac) located at the northwest and northeast comers of EastLake Parkway and Otay Lakes Road in the City of Chula Yista. Adjacent uses include: future SR-125 to the west; the retail/commercial "Yons" center to the south; vacant land and developed parcels within the EastLake Business Centcr I to the east and north. Single-family homcs (EastLake Shores) are located to the west of future SR-125. Townhomes within EastLake Grccns are locatcd to thc southeast of thc site, south of Otay Lakes Road (Figures I and 2). The site has been prcviously graded in accordance with the approved master grading plan for the EastLakc I Sectional Planning Area (SPA). Approximately 54.5 acrcs of the site (designated as YC-I (38.1 ac) and E- I 0/BC-3 (16.4 ac) is locatcd west and south of EastLake Parkway and is currcntly being graded under an approved rcrncdial grading pernlit (see Section C below). The elevation of this portion of thc sitc has bccn altercd due 10 the current grading operations. Generally. the site slopcs Irom the northeast to thc southwest toward an existing, onsite delcntion basin. Disturbed land covers the majority of the site. Non-native grassland and ornamenlal landscaping also occur onsite. The EastLakc II General Development Plan (GDP) designatcs the approximate southern half of thc site for Rctail Commcrcial (RC) use, and dcsignates the approximate northern half of the site for Public/Quasi-Public Use (PQ) (Figurc 3). The EastLake I SPA currently designates the approximate southcrn half of the sile for Yillage Center uses (i.e., retail, restauranls, offices, open space, public facility, etc.) and thc approximate northern half of the site for medical center use (Figure 4). The projcct sitc also includes approximatcly 13.6 ac. east of EastLake Parkway (designated as YC-2). The western approximately tcn acres of this site is vacant, and an existing church occupics the remaining acreagc within YC-2. Thc YC-2 site has also been previously graded undcr the aforementioned master grading plan. This portion of thc projcct site also drains from 06/11/02 the northeast to thc southwest. Non-native grassland and ornamental landscaping occurs on this portion of thc site. The EastLakc II General Dcvelopment Plan (GDP) designates the southern approximately II acres of this portion of the site as Professional and Administrative and approximately two acres of the site as Research & Limited Manufacturing. The EastLake I SPA currently designates the southern approximatcly II acres of the site for Village Center uses and the remainder of the site for Employment uses. B. Project Description The proposed project encompasses three separate land use districts (Figure 5): . Yillage Center-l (YC-l): 38.I-acres at the northwest comer of Otay Lakes Road and EastLake Parkway intendcd for retai1Jconunercial use; . Business Center-Core District (BC-3): 16.4-acres north of VC-I and west of EastLake Parkway intended as a cxtension of thc EastLakc Business Center District to the north; and . Village Center-2 (VC-2): l3.6-acres at the northeast corner of Otay Lakes Road and EastLakc Parkway intended for professional administrative and limited retail uses. The majority of thc proposcd project addresscs the futurc development of VC-l. Specifically, the proposed projecl involvcs thc development of an approximately 380,000 square foot (SF) shopping center on the YC-I portion of the project site. The site would be dividcd into approximately 12 parcels. Two of the parcels would include "big box" users, potentially Target and Lowe's, with the remaindcr of the parcels providing a variety of retail, commercial, restaurant llses. Under the proposcd amended EastLake II Planncd Community (PC) District Regulations, two uses currcntly bcing proposed for the shopping center would rcquire a Conditional Usc Pcnnit (CUP). These uses arc a car wash/gasoline station and a drive-thru restaurant. Several discretionary actions are required to implement the shopping centcr within the YC-I district. These include: . EastLake II GDP Amendment to: change 16.4 acres of Public/Quasi-Public Use to Research & Limited Manufacturing and 2.0 acres located at the northeast comer of EastLake Parkway and Fenton Street from Research & Limitcd Manufacturing to Professional & Administralive . EastLake I SPA Amendment (Supplcmcntal SPA Plan) to: o change 30.6 acrcs of Medical Ccnter-l (MC-l) use to 16.4 acres of Village Ccnter Employment (E-l 0) and 14.2 acres ofYillage Center-I (YC-I); o change pcnnitted land uses and property dcvelopment standards for VC-I (PC District Regulations); o rcpeal thc Prccise Plan and adopt new Dcsign Guidclines; o replace the cxisting Air Quality Improvemcnt Plan and Watcr Conservation Plan; and o prepare a Supplemental Public Facilities Financing Plan that addresses thc proposed proj ect. . Design Review; 2 06/11102 . Parcel Map to subdivide the VC-I site into approximately 12 separate lots for sale or lease; and . CUP pursuant to Section III.I of the proposed EastLake II Planned Community District ReguIations for the proposed gas station/car wash and drive-thru restaurant. The Applicant is also requesting the fol1owing discretionary actions that would affect future development of the BC-3 and VC-2 parcels ofthe project: BC-3 . General Plan Amcndment (GPA) to change 16.4 acres of Commercial Retail designation to Industrial Rcsearch & Limited Manufacturing; . EastLake II GDP Amcndrncnt to change 16.4 acres of Public/Quasi-Public use to Industrial Research & Limitcd Manufacturing; . EastLake I SPA Amcndmcnt (Supplemental SPA Plan) to: o change 30.6 acres of Mcdical Center-l (MC-l) use to 16.4 acres to Yillage Center Employment (E-IO) and 14.2 acres ofYil1age Center-l (YC-I); o change 16.4 acres from VC-l to BC-3 and change permitted land uses for BC-3 (PC District Regulations); o repeal the Precise Plan and adopt new Design Guidelincs; o replace the existing Air Quality Improvement PIan and Water Conservation Plan; and o preparc a Supplemental Public Facilities Financing Plan that addresses the proposed project. . Land Use District Map Amendment to change 16.4 acres of Village Center I (YC-I) to Busincss Ccnter -- Core District. No site plan is being proposed for the BC-3 parcel at this time. See Section E below for a discussion of futurc environmental evaluation pertaining to futurc development of this parcel. YC-2 . EastLake II GDP Amcndmenl to change two acres of Research & Limited Manufacturing to Professional & Administrative; . EastLake I SPA Plan Amendmcnt to: o change two acres of Employment designation to Yil1agc Center-2 (VC-2); o change two acres from Business Center-Manufacturing Park District (BC-l) and Open Space (OS-7) to Yillagc Ccntcr-2 (YC-2) and change the permilted uses and property developmcnt standards for YC-2 (PC District Regulations); o repeal the Prccise Plan and adopt ncw Design Guidelines; and o replacc the existing Air Quality Improvement Plan and Water Conservation Plan; and o prepare a Supplemenlal Public Facilities Financing Plan that addresscs the proposed project. No site plan is being proposed for the YC-2 parccl at this time. See Section E below for a discussion of future environmental evaluation pcrtaining to future development of this parceL 3 06/1 1/02 C. Prior Approvals and Environmental Documentation EastLake Master EIR A Master EIR (ErR 81-03) was completed for the 3,073-acre EastLake community in February 1982. This Master ErR considered the impacts associated with the armexation of the project site from the County of San Diego to the City of Chula Vista, as well as the potential impacts associated with the implementation of a General Plan Amendment, prezoning and General Development Plan for the future EastLake Development. EastLake I SPA Plan Supplemental EIR Subsequently in 1984, a Scctional Planning Area (SPA) Plan was developed for approximately 1,268 acres of the 3,073-acre EastLake community. This SPA plan, referred to as EastLake I, was prepared as a refinement and implementation framework for the Planned Conununity zoning previously applicd to the sile in 1982. A Supplemcntal EIR (ErR 84-01) was certified in February 1985 that addressed the EastLake I SPA Plan and two accompanying Tentative Subdivision Maps, one of which included thc subject EastLake Village Center. EastLake I SPA I'laJ1__Amg1dmcnt/Kaiser Permancnte C~hula Vista Medical Center Supplemental EIR In June 1992, a Supplcmcntal EIR (EIR 92-01) was certified for the EastLake I SPA Plan Amendment/Kaiser Permancntc Chula Vista Medical Center. EIR 92-01 specifically addressed the subject Village Center sitc. The EIR addressed an amendment to the EastLakc I General Development Plan and SPA Plan in order to: I) convert the adopted land uses in the northern portion of thc site to medical center uses; 2) delete the adopted residential land use within the site and expand the acrcagc allocated for office/retailuses; and 3) eliminate 2.0 acres from the site in order to create additional cmploymcnt uses with the EastLakc Business Center. The SPA plan amendment required the approval of the EastLake [ Public Facilities Finance Plan (PFFP) Update and the approval of an Air Quality Improvement Plan (AQIP) and Water Conservation Plan (WCP) pursuant to the City's Growth Management Program. ErR 92-01 also addressed a Conditional Use Permit/Precise Plan for the phascd constructionofJhe Kaiser Permanente Chula Vista Medical Center on the northern 30.6 acres of the subject site. The EastLake I GDP and SPA Amcndment was approved by Resolution No 16702 on June 30,1992 and provided for the following entitlcments: . 785,000 SF. 439-bed (full buildout) Mcdical Center, 485,000 SF of medical and administrative offices, 35.000 SF central plant, three parking structures to accommodate 4.271 cars. and surface parking for an additional 148 cars on northern 30.6 acres of site; 4 06/11/02 . 17.3 acres retail commercial (village center use) and 11.9 acres of open space/public facility; and . 6 acres of office/commercial, 4 acres of community purpose facility and 2 acres of employment. While GDP and SPA amendments and a CUP for thc hospital were approved, no development has occurred on the sitc to date. Olympic Parkway Disposal Sites 1'vfND In December 2001, a Mitigated Ncgativc Declaration (IS-02-009) was prcpared for the Olympic Parkway Disposal Sites. This MND addressed the temporary disposal of up to 250,000 cubic yards of material from thc grading of Olympic Parkway at lhe EastLake Village Center site. A grading permit was issued for the disposal of the material on the site. These grading activities are ongomg. D. Compliance with Zonin2 and Plans The proposed project site is within a Planned Community (PC) District. The EastLake II PC District Regulations are proposed 10 be amended as part of this project to change permitted land uses and property development standards for the Village Center-I (VC-I), Business Center-Core District (BC-3) and Yillage Center-2 (YC-2) land use districts. Amendments to the General Plan, EastLake 11 General Dcvclopment Plan and EastLake I SPA Plan are also required for the proposed projcct to comply with regulating plans. Eo Subsequcnt Environmcntal Review for YC-2 and BC-3 As stated in Section B above, the focus of this analysis is thc commcrcial development proposed for YC-l. No site plans are being proposcd for the VC-2 and BC-3 parcels at this time. Future development of these parcels would be govcrned by thc proposcd Planncd Community District Regulations am! Design Guidclincs. Specifically, the PC District Regulations set forth the developmcnt and land use standards for an property within the EastLake 11 General Development Plan area by cstablishing: setbacks; building hcights; parking requirements; landscape requiremcnts; use restrictions; animal regulations; density of development; lot size, width and depth; fencing requirements; and signing regulations. Sections III and IV of the PC District Regulations specify the types of uses that are permitted, conditionally permitted and not permitted within YC-2 and BC-3 districts. respectively. 5 0611 1102 Future site plans for the VC-2 and BC-3 parcels will be evaluated against the adopted PC District Regulations and Design Guidelines specific to these parcels. In addition, an environmental evaluation of issues related to the proposcd land uscs, such as but not limited to land use compatibility with adjacent uses, noise, and aesthetics would need 10 be conducted at the time a future site plan is proposed. In addition, the nced for any new, or cxpansion of, a public service specifically related to a proposed use (such as emergency services and disposal of medical/toxic waste related to hospital or other medical facility, disposal of biotechnical waste related to biotechnical research facilities, etc.) would need to be evaluated for environmental considerations. On the other hand, physical features of these parcels, including geology, biology, cultural and paleontological resources and drainage, have been addressed in current technical studies or prior environmental documentation, and therefore would not need further analysis. With respect to traffic, a worst-case traffic analysis has bccn prepared that assumed the highest trip-generating land uses allowed on thcse parcels. As long as the total trip generation for the three parcels (VC- I, YC-2 and BC-3) does not exceed that projectcd in the 2002 LLG traffic study for the EastLake Yillage Center North project (i.e., 36,356 average daily trips), no further traffic analysis would be required. Similarly, a worst-case scwage gencration and watcr demand analysis was conducted. Provided that the ultimate development that is proposed for the VC-2 and BC-3 parcels is in confonnancc with the PC District Regulations and Design Guidelines, no additional water or sewer analyses would bc required. F. Identification of Environmental Effects The City ofChula Vista detennined that the proposed project will have significant cnvironmental effects othcr than what has becn previously identi tied in prior environmental documentation. These effects have been mitigatcd. The preparation of an Environn1ental Impact Report will not be requircd. This Mitigated Negative Declaration has been prepared in accordance with Section 15070 of the State CEQA Guidelines. Transportation and Circulation The Transportation and Circulation analysis contained in SEIR 92-0 I has been updated with a traffic study specific to the proposed project. This study, entitled "Traffic Impact Analysis, EastLake Village Center North" prepared by Linscott, Law & Greenspan and dated May 8, 2002, addressed the traffic impacts of a 420,000 SF regional shopping >:enter and 50 park and ride spaces on the YC-I parcel, 4.30 acres ofrctail, 2.3 acres of restaurant use, 2.74 acres of medical offices on the YC-2 parcel, and a 12S-bed hospital and 78,000 SF of medical offices on the BC-3 parcel. While a site plan and rcgional shopping center on YC-I are currently being considered and are the primary subject of this analysis, no site plan has been proposed for YC-2 or BC-3 at this time. However, in ordcr to analyze a worst-case future traf'llc condition, the highcst traffic- generating allowable uses on these parcels was assmncd. The aforementioned land uscs would generatc 36,356 avcrage daily trips (ADT). This is 13,084 less average daily trips than thc traffic volumc calculated for the development currently entitled for the sitc (Kaiscr Pcrmanente Medical Center, YC-2, E-l 0, YC-I and OS-16; see Section C). 6 06/11/02 Accounting for pass-by trips (trips attracted to thc site from traffic already on the street system and passing near the site while going from one location to another), the PM peak hour trip generation would be 3,050 trips. Only the PM peak hour time frame was analyzed since this rcpresents lhe worst-case scenario. Of the PM peak hour trips, 1,558 trips (51%) would be attributed to the proposed regional shopping center on the VC-I parcel, 850 trips (28%) would be attributed to the worst-case development of the VC-2 parcel, and 642 trips (21 %) would be attributed to the worst-case development of the BC-3 parcel. Intersection (PM peak hour) and strcet scgmcnt operations (ADT) within the study area were analyzed for the following scenarios: . Existing plus Project (near term) . Year 2005 without SR-125 (short tern1, approximate opening year of the project) . Year 2005 with SR-125 (short tcrm, approximate opening year of the project) . Buildout (complete buildout of planned developments and the street nctwork in the Eastern Territories) Intersection Analysis Table I shows the PM peak hour signalized and unsignalized intersection operations for the Existing plus Project, Year 2005 without SR-125 and Year 2005 with SR-125 scenarios. All signalized intersections are calculated to operate at LOS D or bctter with projcct traffic. Based on the City of Chula Vista's Significance Criteria, two unsignalized intersections (EastLake Parkway/Miller Drive and EastLakc Parkway/Fenton Street) are calculated to operate at LOS F during the Existing plus Project, Year 2005 without SR-125 and Year 2005 with SR-125 scenaflOS. The proposed project would result in direct, but mitigable impacts on these intcrscctions in the near and short-term sccnarios. Table 2 shows the peak hour intersection operations at kcy study area signalized and unsignalized intersections with project traffic at buildout. With buildout tramc, all signalized intersections are calculated to operate at LOS D or bcttcr cxcept thc Otay Lakes RoadlMain Entrance (Vons Driveway) which is calculated to operate at LOS E. AM and PM peak hour analyses were conducted at Otay Lakes Road/EastLake Parkway intersection. This intersection was calculated to operate at LOS D in the PM peak hour and LOS E in thc AM peak hour. The unsignalized intcrscctions of EastLake Parkway/Miller Drive and EastLake ParkwayIFenton Street continuc to operate at LOS F in the buildout condition. The proposed project would rcsult in direct. but mitigabJe impacts on these intersections at buildout. Street Segments Table 3 shows the daily street segment operations for the Existing plus Project, Year 2005 without SR-125 and Year 2005 with SR-125 scenarios. In the Existing plus Project scenario, all key study arca scgments are calculated to opcratc at LOS C or better with project traffic except the segment of Telcgraph Canyon Road between Paseo Ranchero and Otay Lakes Road and EastLakc Parkway north of Miller Drive which are calculated to operate at LOS D. For Year 7 06/11102 2005 with project traffic and without SR-125, all key study area segments are calculated to operate at LOS C or better exccpt Otay Lakes Road north of East H Street (LOS F) and Otay Lakcs Road between East H Street and Telegraph Canyon Road' (LOS F). These same two segments are calculated to operate at an unacceptable LOS in the Year 2005 with SR-125 scenario. Otay Lakes Road North of East H Strcet would operate at LOS D, and Otay Lakes Road between East H Street and Telegraph Canyon Road would operate at LOS E. A near-term analysis of Telegraph Canyon Road and Otay Lakes Road segments was conducted based on the City of Chula Vista's Growth Management Ovcrsight Committee (GMOC) Traffic Monitoring Program (TMP) methodology. Only these segments were analyzed because the City's significance criteria dictatcs that if planning analysis (volume/capacity) indicates LOS D, E or F, the GMOC method shall be utilized in the short-term (0-4 years). These segments are the only roadways located within GMOC arterial street segments that are calculated to operate at LOS D or worse. While EastLake Parkway north of Miller Road would operate at LOS D in the near term, it is not a GMOC arterial. The GMOC analysis concluded that the decrease in speeds on the subject segments of Telegraph Canyon Road and Otay Lakes Road were not sufficient to reduce the levels of service below C, and lhere would be adequate arterial level of service on thesc segments in the ncar term. Based on the GMOC threshold, the proposed project would not result in significant impacts on these segments ofTelcgraph Canyon Road and Otay Lakes Road. Table 4 shows the daily strcet segment operations with projcct traffic at buildout. With buildout traflic, all street segments are calculated to opcrate at LOS C or better cxcept the following: . Otay Lakes Road, north of East H Strcet (LOS E), . Otay Lakes Road, East H Slreet to Tclegraph Canyon Road (LOS F), . Otay Lakes Road, SR-125 to the Vons drivcway (LOS F), . Otay Lakes Road, Vons driveway to EastLake Parkway (LOS E), . EastLake Parkway, south of Olympic Parkway (LOS D), and . Olympic Parkway, SR-125 to EastLake Parkway (LOS F). The proposed project would result in direct impacts on Otay Lakes Road between SR-125 and the Vons driveway and between the Vons driveway and EastLake Parkway. The proposed project would result in cumulative, but mitigable impacts on Otay Lakes Road north of H Street and between H Street and Telegraph Canyon Road, as well as Olympic Parkway from SR-125 to EastLake Parkway. The traffic impact is considered cumulative because these three segments are not adjaccnt to the project. Thc scgment of EastLake Parkway south of Olympic Parkway would operate al LOS D, however lhe adjacent intersections are calculated to operate at an acccptable level. Therefore. the proposed project would not result in a significant impact on this intcrscction. Thc LLG traffic analysis also addrcsscd site circulation including truck access. left-turn storage lengths, and intersection geometry at project driveways for VC-2 and BC-3 parcels and storage lengths of turn lanes. Potential impacts that were identified internal to the site do not represent impacts to public streets, and therefore do not require mitigation. Bascd on the site circulation/access analysis, thc currcnt storage provided in the eastbound, northbound and southbound Icft-tulll lanes at the Otay Lakes Road/EastLake Parkway intersection may not be 8 06111102 adequate to accommodate buildout traffic volumes. Similarly, at the EastLake ParkwaylFenton intersection, the southbound, westbound, and northbound left-turn lane lengths may not be adequate to accommodate buildout traffic volumes based on existing left-turn lengths. At the EastLake Parkway/Miller Drive intersection, the westbound and northbound left-turn lengths may not be adequate to accommodate buildout lraffic volumes based on the existing left-turn lane lengths. Additional storage length can be provided at these three intersections to mitigate these cumulative impacts. Air Quality The proposed project would contribute to ambient air quality during the construction and operation phases of the project. The air quality analyses in SEIR 92-01 and the Olympic Parkway Disposal Sites MND (IS-02-009) address temporary construction-related emissions pcrtaining to the grading of the site. These analyses are incorporated by reference and summarized herein. Grading and site improvements would gcnerate sufficient emissions and fugitive dust to rcsult in a short-term significant, but mitigable, impact on air quality. Mitigation measures from SEIR 92-01 pertaining to compliance with the project's Air Quality Improvement Plan (AQIP) and dust control during grading are applicable to the proposed project. Geophysical The geologic features of lhe project site were analyzed in SEIR 92-01 and updated by the "Revised Supplemental Geotechnical Investigation for EastLake Village Center North Commercial Center" by Pacific Soils Enginecring, Inc. datcd March 5, 2002. The 2002 study confirmed that the majority of thc site has been graded in the past. Onsite elevations range from 496 feet to 596 above mean sea Icvel (MSL). Existing slope gradients average between 2:1 and 50: I (horizontal to vertical). Site drainage is by sheet flow to the southwest comer of the project. The site is undcrlain by Tcrtiary sediments consisting of Oligocene-age Otay Fonnation consisting of silty sandstone to sandy siltstone. It is modcrately hard to hard and well graded. Relatively thick topsoil occurs on rcmaining natural slopes within the southwest portions ofVC- I. They consist of dark brown, clayey sand and silty sand. Alluvium is also present in VC-l primarily in the site drainagcs. Alluvial soils range in depth from one to 32 feet and consist of intcrbeddcd sands, claycy sands, sandy silts, and sandy clays. Undocumented, uncompacted artificial fill is located within the desilting basin and along the northeast comer of VC-l. These fills are estimated to range from one to 40 feet in thickncss and. consist of brown, loose to moderately dense silty sand and clayey sand. Compacted artificial fills are found throughout the site. The presence of these fiJls trace back to several previous grading activities, including the mass grading of Otay Lakcs Road and EastLake Village Centcr, the disposal of soils gencratcd from adjacent areas and construction of temporary drainage, construction of a fill for Brehm Communities, and rcgrading of thc building pads east of EastLake Parkway_ Faulting is not known to be present onsite. The nearest known fault is the La Nacion Fault zone, which is classified as potentially active (the last movement occurred prior to 11,000 years ago). This fault zone is located approximately four miles west of thc EastLakc Village Ccnter North 9 06/11102 project site. Based on the considerable distance from thc site and the lack of Recent (Holocene) activity, the La Nacion Fault is not anticipated to significantly impact the site. The closest active fault zone is Rose Canyon, which is located eleven miles west of the site. Notwithstanding, the project site is located in a seismically active area. Proposed development will be required to comply with the current and applicable Uniform Building Code (1997) and City parameters pertaining to seismic design. Minor seepage and/or groundwater was observed in numerous borings onsite. Dewatering will likely be required to effectively grade the site. Highly compressible and expansive soils also occur onsite. Remedial grading will be required to removc deleterious materials prior to site preparation. Susceptibility of lhe site to liquefaction, seiches and seismically-induced landslides is considered low. Water Quality A "Water Quality Technical Report for EaslLake Village Center" dated March 5, 2002 was prepared by Rick Engineering Company. According to the Rick Engineering study, the typical storm water pollutants that may be anticipated from a commercial development such as the proposed development include, but are not limited to oil and grease, heavy metals, and trash and dcbris. A home improvement center and relail facility, such as Lowe's and Target, may potentially generate pollutants not common to most commercial developments, including synthetic organics (e.g., pesticides, herbicides, etc.), nutrients (e.g., nitrogen and phosphorus fertilizers), and oxygen-demanding substances (e.g., decaying vegetation, animal waste). The project site is not expected to generate a large amount of sediment once buildout has becn complctcd and landscaping has been established. However, some sediment would be tracked in by cars and a small amount may be gcnerated on the site. This sediment is defined as a pollutant and may contain attached pollutants such as heavy metals. The majority of these typical pollutants would be transported by low flows occUlTing during the initial stage of a storm event. The aforementioned pollutants could enter receiving waters. The receiving water of each discharge point from thc proposcd project is Telegraph Canyon Creek. Telegraph Canyon Creek is not listed on the 1998 Clean Water Act Section 303( d) list of impaired water bodies. Discharge into an impaired water body would require enhanced Best Management Practices (BMPs). Since the pollutants of concern would not directly di.scharge into an impaired watcr body as identified on the Clean Water Act Section 303(d) list, the proposed project will be required to install and implcment standard BMPs. During the construction phase, the projecl is subject to lhe requirements of the State Water Resources Control Board (SWRCB) Order No. 99-08-DWQ National Pollulant Discharge Elimination System (NPDES) General Pem1it No. CA S000002 (GcneraJ Construction Permit) adopted on August 19, 1999 and the modifications to the General Construction Permit Order No. 2001-046 adopted by the SWRCB on April 26, 2001. For coverage by the General Construction Permit, the project Applicant is required to submit to the SWRCB a Notice of Intent (N0l) to comply with lhe Pcrmit, and develop a Storm Watcr Pollution Prevcntion Plan (SWPPP) 10 06/11/02 describing BMPs to be used during and after construction to prevent the discharge of sediment and other pollutants in storm water runoff from the site. The site inspection requirements and site-specific Storm Water Sampling and Analysis Strategy (SWSAS) required in the SWPPP will provide recommendations for storm water tcsting to evaluate the effectiveness of the BMPs. Adjustments to the BMPs will be made as necessary to maintain or improve their effectiveness. In order to terminate coverage under the General Construction Permit, the Applicant/developer must submit a Notice of Tennination fonn (NOT) and a Post-Construction Storm Water Operation and Management Plan (PCSWOMP). The PCSWOMP requires permanent BMPs be established to prevent the discharge of sediment or other pollutants in storm water runoff from the completed project. BMPs shall be implemented that spccifically prevent pollution of storm drain systems from the gas station, car wash, restaurants, parking lots, and trash collection areas. Post construction, the project is also subject to the requirements of the Municipal Storm Water Pelmit (Municipal Permit) adopted by the California Regional Water Quality Control Board, San Diego Region Order No. 2001-01, National Pollutant Discharge Elimination System (NPDES) NO.CA S0108758. The Municipal Permit requires new developments to comply with the Model Standard Urban Storm Water Mitigation Plan (SUSMP) and to consider water quality and watershed protections principles and policies in planning and design. The SUSMP requires that four types of BMPs be implemented: site design (i.e., minimizing impervious arcas and dircctly connected impervious areas, increasing rainfall infiltration, maximizing rainfall interception, and protecting slopes and cham1els), source control (i.e., public education, CC&Rs, providing covcred outdoor material and trash storage areas to prevent cxposurc to rainfall, and strcet and parking lot swccping), category specific (i.e., for parking lots incorporatc landscape areas into the drainage dcsign and construct overflow parking wilh pcrmcable paving). and trcatmcnt control (i.e., biofilters, detention basins, infiltration basins, drainage inserts, filtration). In general, sitc design, source control, and category speciJlc BMPs are non-structural; the treatment control BMPs are structural. In this case, the Applicant will be required to provide and implement BMPs that specifically prcvent pollution of stonn drain systems from the gas station, car wash. restaurants, parking lots. and trash collection areas. Based on the requirements outlined in the Model SUSMP, a BMP maintenance program will be required for the proposed project once detailed locations and treatment devices are sized during final design of each phase of lhe proposed project (VC-l, VC-2 and BC-3). When developed, the maintenance program will include an operation and maintenance (O&M) plan, an estimate of maintenance costs, a funding mechanism for financing the program, and an access/easement agreement. In addition, a Maintenance Agreement between the City and the developer will ensure the O&M of the structural BMPs. Palcontological Resources According to the "Revised Supplemental Geoteclmical Investigation for EastLake Village North Commercial Center" (March 5, 2002), the Otay Fonnation underlies the project site. Compacted artificial fill, undocumented artificial fill, topsoil and alluvium overlie portions of the bedrock. The Otay Formation exhibits high palcontological resource sensitivity. Fossils potentially buried in the undcrlying fonnation could be impacted during site preparation. The occurrence of fossils 11 06/11/02 within the covered bedrock cannot be evaluated prior to exposure. Destruction of the paleontological resources would be a significant, but mitigable, impact. Noise Site pJans for the VC-2 and BC-3 components of the site are not being proposed at this time. The noise level generated by the uses in these locations would vary depending upon the specific type of use developed at the site. If the noise level at outdoor use areas exceeds the City's noise standards, the noise impact would be considered significant. When specific land uses and site plans are prepared, an acoustical analysis will be required to assure that noise levels on- and off- site do not exceed City standards. Therefore, noise impacts associated with the VC-2 and BC-3 parcels would be potentially significant but mitigable . G. Mitigation Necessary to Avoid Significant Impacts Project-spceific mitigation measures arc required to reduce potential environmental impacts identified in this Mitigated Negative Declaration to a less than significant level. These mitigation measures arc listed below and included in the Mitigation Monitoring and Reporting Program (MMRP) includcd as Attachment A to this MND. Traffic and Circulation (Direct Impacts) L Prior to approval of the Parcel Map for VC-I, the Applicant shall construct and secure the north leg of Otay Lakes Road/Projcct DrivewayIV ons driveway intersection and provide one len-turn lane, one through/right lane, one right-turn lane, and dual eastbound left-turn Janes and corresponding signal improvements (see Figure 27 from the project traffic report altached to the MMRP). 2. Prior 10 approval of the Parccl Map for VC-l, the Applicant shall construct and secure the extcnsion of the existing southbound right-turn lane on EastLake Parkway from Otay Lakes Road to the right-in/right-out drivcway accessing VC-L The Applicant shall also provide a fourth wcstbound through lane on Olay Lakcs Road from EastLake Parkway to the project driveway such that the southbound right-turn movement is free and shall provide an island to direct thc flow of traffic unless otherwise approved by the City Engineer (see Figure 27 /Tom the project traffic report attached to the MMRP). 3. Prior to approval of the Parcel Map for VC-I, the Applicant shall constmct and secure the nccessary improvements for providing a fi.Jlly activated traffic signal at the Otay Lakes Road/EastLake Parkway interscction, including intcrcOlmect wiring, mast arms, signal heads and associated equipment, underground improvements. standards and luminaries. 4. Prior to approval of the Parcel Map for VC-I, the Applicant shall constmct and secure a fully activated traffic signal at the Fenton Slreet/EastLake Parkway intersection, including interconnect wiring, mast arms, signal heads and associated equipment, underground improvements, standards and luminaries and provide the following intersection geometry (see Figurc 27 from the projcct traffic report altachcd to the MMRP). 12 06/11/02 Northbound - Two left-turn lanes, one through lane and one shared through/right lane. Eastbound - One shared through/left and one right-turn lane. Southbound - Two left-turn lanes, one through lane and one shared through/right lane. Westbound - Two left-turn lanes and one shared through/right lanc. In addition, the Applicant shaH provide for 200 feet of storage for the planned dual southbound left-turn lanes. If only one lane is provided. a storage length of 350 feet would be necessary. 5. Prior to approval of the Parcel Map for VC-I, the Applicant shaH construct and secure a fourth westbound lane from the project driveway to the SR-125 northbound on-ramp. 6. Prior to issuancc of the first Building Permit for development within BC-3 (E-IO) and as determined by thc City Engineer, thc Applicant shaH construct and secure a fuHy activated traffic signal at the Miller Drive/EastLake Parkway intersection including interconnect wiring, mast arms, signal heads and associated equipment, underground improvements, standards and luminaries and provide thc following intersection geometry (see Figure 27 from the project traffic report attached to the MMRP): Northbound. One left-turn lanc, one through lane and one shared lhrough/right lane. Eastbound - One sharcd left/through/right lane and one right-turn lane. Southbound - One left-turn lane, one through lanc and one shared through/right lane. Westbound Onc Iclt-turn lane and one shared through/right lane. 7. Prior to thc applicable Building Pcrmit for development within the BC-3 and VC-2 parcels as dctcrmined by the City Engineer, the Applicant shall construct and sccure the applicable intersections at thc projcct access driveways as shown in Figure 27 from thc project traffic report (attachcd to the MMRP). 8. Prior to issuance of the first Building Permit for developmcnt within BC-3 (E-IO) and as detennined by thc City Engineer, the Applicant shaH construct and secure a 250-foot long northbound left-turn lane at the Miller Drive/EastLake Parkway intersection. Traffic and Circulation (Cumulative Impacts) 9. As a condition of approval of the EastLake I SPA Plan Amendment, the City of Chula Vista shall initiate and direct a General Plan Amendment to designate Olympic Parkway from SR- 125 to EastLake Parkway as an Enhanccd Prime Artcrial with eight lanes. The Applicant shall contribute a fair share toward the construction of the two additional lanes. 10. As a condition of approval of the EastLake I SPA Plan Amendmcnt. the City of Chula Vista shall initiate and direct a Gcneral Plan Amendmcnt to designatc Otay Lakes Road from SR- 125 to EastLake Parkway as an Enhanced Primc Arterial wilh seven lanes. The Applicant shall contribute a fair share toward thc construction of the additionallanc. 13 06/11102 11. Prior to issuance of Building Permits for development within VC-I, VC-2 and BC-3, the Applicant shall contribute a fair share toward widening of Otay Lakes Road from H Street to Telegraph Canyon Road to six lanes or toward intersection improvements, which provides additional capacity along Otay Lakcs Road. 12. Prior to issuance of Building Permits for development within VC-I, VC-2 and BC-3, the Applicant shall contribute a fair share toward the widening of Otay Lakes Road fTom Bonita Road to H Street to six lanes or toward an intersection improvement, which provides additional capacity along Otay Lakes Road. 13. Prior to approval of the Parccl Map for YC-I, the Applicant shall construct and secure a second southbound left-turn lane at the Eastlake Parkway/Otay Lakes Road intersection to provide the necessary left-turn storage length required. Minimum storage to be 250 feet in a single lane or in duallancs combined (see Figure 27 from the project traffic rcport attached to this MMRP) Noise 14. Prior to approval of the Final Map, Parcel Map, or Site Plan for BC-3 and VC-2 (whichever occurs first), an acoustical analysis of the proposed land uses shall be prepared and approved to detennine conformance with City standards. Paleontology 15. Prior to approval of any grading permit for VC-l, BC-3 and/or VC-2, the Applicant shall incorporate into grading plans, to the satisfaction of the City Engineer and Environmental Review Coordinator, the following: a) Prior to approval of the grading permit, the Applicant shall confirm to the City of Chula Vista that a qualified paleontologist has been retained to carry out the following mitigation program. (A qualified palcontologist is defined as an individual with a M.S. or Ph.D. in paleontology or geology who is familiar with paleontological procedures and tcehniques.) Thc paleontologist shall attcnd pregrade meetings to consult with grading and cxeavation contractors. b) During grading operations, a paleontological monitor shall be on-site at all times during the original cutting of previously undisturbed sediments of highly sensitive geologic formations (i.e., Otay Formation) to inspcct cuts for contained fossils. (A paleontological monitor is dcfined as an individual who has cxpericnce in the collection and salvage of fossil materials.) The paleontological monitor shall work under the direction of a qualified paleontologist. The monitor shall periodically (cvcry several wecks) inspect original cuts in deposits with unknown resourcc sensitivity (alluvium). 14 06111102 In the event that fossils are discovered in unknown sensitive formations, it may be necessary to increase the per-day field monitoring time. Conversely, if fossils are not discovered, the monitoring effort may be reduced. c) When fossils are discovered, the paleontologist (or paleontological monitor) shall recover them. In instances where recovcry requires an extended salvage time, the paleontologist (or paleontological monitor) shall be allowed to direct, divert, or halt grading to allow recovery of fossil remains. Where deemed appropriate by the paleontologist (or palcontological monitor), a screen washing operation for small fossil remains shall be set up. d) Prepared fossils, along with copies of all pertinent field notes, photographs, and maps, shall be deposited in a scientific institution with paleontological collections such as the San Diego Natural History Museum. A final summary report shall be completed which outlines the results of the mitigation program. This report shall include discussion of the methods used, stratigraphy exposed, fossils collected, and significance of rccovered fossils. Geology 16. Prior to approval of any grading permit for VC-I, BC-3 and/or VC-2, the grading plans shall incorporatc, to the satisfaction of the City Engineer, the geotechnical recommendations in lhe "Supplemental Geotechnical Investigation for EastLake Village Center North Commercial Center" preparcd by Pacific Soils Engineering, Inc. dated March 5, 2002, including but not limited to sitc preparation and removals, slope slabilily and rcmediation, temporary backcut stability, over excavation of building pads, subsurface drainage, construction staking and survey, settlemcnt monitoring, earthwork and design considcrations, and slope maintenance. 17. Prior to approval of the improvement plans and building permits for all phases of the project, all improvcments shall be in compliance with seismic design standards of the Uniform Building Code and requirements of local governing agencies. Water Quality 18. Prior to approval of grading/construction plans for VC-I, BC-3 and/or VC-2, the Applicant shall obtain either (a) General Construction Activity Storm Water Permit (NPDES Pernlit No. CA 0108758) from the SWRCB or (b) a municipal permit from the City ofChula Vista that is in efTcct at the timc of issuance of construction/grading permits. Such permits are required for specific (or a series of related) construction activities which exceed five acres in size and include provisions to climinatc or rcduce ofT-site discharges through implementation of the SWPPP. Specific SWPPP provisions include requirements for erosion and sediment control, as well as monitoring requirements bolh during and after construction. Pollulion control measures also requirc the lIse of best available technology, best conventional pollutant control tcchnology, and/or best managemcnt practices to prevent or reduce pollutant discharge (pursuant to SWRCB definitions and direction). 15 06111/02 The SWPPP also includes specified vehicle fueling and maintenance procedures and hazardous materials storage areas to preclude the discharge of hazardous materials used during constmction (e.g., fuels, lubricants, and solvents) and specific measures to preclude spills or contain hazardous materials, including proper handling and disposal techniques and use of temporary impervious liners to prevent soil and water contamination. 19. Prior to approval of gradinglconstmction plans, site plans, and/or building permits for VC-I, BC-3 and/or VC-2, the Applicant shall demonstrate to the satisfaction of the City Engineer compliance with all of the applicable provisions of the Municipal Code, Model SUSMP for the San Diego Region, and the City of Chula Vista SUSMP as may be adopted in the future. Thc Applicant shall incorporate into the project planning and dcsign effective post- construction BMPs and provide all necessary studies and reports demonstrating compliance with the applicable regulations and standards. BMPs shall be idcntified and implemented that specifically prevent pollulion of storm drain systcms from the gas station, car wash, restaurants, parking lots, and trash collection arcas. 20. Prior to approval of final or parcel map, and/or building pennits for VC-l, BC-3 and/or YC- 2 (as determined by the City Engincer), the Applicant shall submit and obtain approval from thc City Engineer of a maintenance program for the proposed post-construction BMPs. The maintenancc program shall include, but not be limited to: I) a manual describing the maintenance activities of said facilities, 2) an estimate of the cost of such maintenance activitics, and 3) a funding mechanism for financing the maintenance program. In addition, thc Dcvelopcr shall enter into a Maintenancc Agreement with the City to ensure the maintenance and operation of said facilities. Air Quality 21. Prior to approval of building pem1its for cach phase of the project, the Applicant shall demonstrate that air quality control measures outlined in the EastLakc I Supplemental Air Quality Improvcmenl Plan pertaining to the design, construction and operational phases of the project have been implementcd. 22 Prior to approval of any grading pcrmit for YC-l, BC-3 and/or YC-2, the following measures shall be placed as notes on all grading plans and implcmcntcd during grading of each phase of thc project: a) Minimize simultaneous opcration of multiple constmction cquipment units; b) Use low pollutant-emitting equipmcnt; c) Usc catalytic rcduction for gasoline-powered cquipment; d) Use injection timing retard for diesel-powered equipment; e) Water the grading areas a n1iniIl1Um of twice daily to minimize fugitive dust; f) Stabilizc grad cd areas as quickly as possible to minimizc fugitive dust; g) Apply chemical stabilizer or pave the last 100 fcet of internal travel path within the construction site prior to public road entry; h) Inslall wheel washers adjacent 10 a paved apron prior to vchiclc cntry on public roads; 16 06/11/02 i) Remove any visible track-out into traveled public streets withiJi 30 minutes of occurrence; j) Wet wash the constmction access point at the end of each workday if any vehicle travel on unpaved surfaces has occurred; k) Provide sufficient perimeter erosion control to prevent washout of silty material onto public roads; I) Cover haul tmcks or maintain at least 12 inches of fTeeboard to reduce blow-off during hauling; m) Suspend all soil disturbance and travel on unpaved surfaces if winds exceed 25 mph; n) Cover/water on site stockpiles of excavated material; and . 0) Enforce a 20 mile-per-hour speed limit on unpaved I agree to implement the mitigation measures required as stated In this Section G of this Mitigated Negative Declaration. r;;j, vice !}.e-s,cle", ,- Name, Tit]c .]'<-1",,-/2.( Date 200"L- Name, Title Datc H. Consultation I. CityofChula Vista: Alex Al-Algha, Senior Civil Enginccr Lombardo DeTrinidad, Civil Engineer Jim Newton, Civil Engineer Luis Hernandez, Principal Planner Stan Donn, Associate Planner Mary Venables, Project Planncr Applicant's Agent..: Bud Gray and Associates, Bud Gray, Principal Cinti and Associates, Gary Cinti, Principal Village Center Marketplace Dcvclopcr: Colton Sudberry, Sudberry Properties Inc. 17 06/11102 2. Documents: . EastLake Master EIR (EIR 81-03), February 1982. . EastLake I SPA Plan Supplemental EIR (EIR 84-01) January 1985. . EastLake I SPA Plan AmendmentlKaiscr Permanente Chula Vista Medical Center Supplemental EIR (EIR 92-01), June 12, 1992. . Olympic Parkway Disposal Sites MND (IS-02-009), December 6,2001. . City Council Resolution No. 16702, June 30,1992. . City Ordinance No. 2522, July 6,1922. . Draft EastLake II General Development Plan Amendment, May I, 2002. . Draft Supplemental Scctional Planning Area Plan for EastLakc Village Center North, May 20, 2002. . Draft EastLakc II Planned Community District Regulations Amendment, May I, 2002 . Draft Design GuideJines for the EastLake Village Center Supplemental Sectional Planning Area, May 20, 2002. . Draft EastLake Village Centcr North Public Facilities Financc Plan, prcpared by Burkett & Wong, May 17,2002. . Revised Supplemental Geotechnical Investigation for EastLake Village Center North Commercial Center, Pacific Soils Engineering, Inc. March 5, 2002. . Watcr Quality Technical Report for EastLakc Village Center, Rick Engineering Company, March 5, 2002. . Detention Basin Analysis for EastLake Village Ccnter North, Hunsaker & Associates, March 4, 2002. . Traffic Impact Analysis for EastLakc Villagc Cenlcr North, Linscott, Law & Grccnspan, May 8, 2002. . EastLake Village Center Projcct Environmental Noisc Assessmcnt, Dudek & Associates, Inc. April 29, 2002. . Draft EastLakc I Supplemental Waler Conservation Plan, Jay Kniep Land Planning, May 10,2002. . Draft EastLake I Supplemental Air Quality Improvement Plan, Jay Knicp Land Planning, May 10, 2002. . EastLake Village Center North Water Analysis. PBS&J, February 2002. . EastLake Village Center North Sewer Analysis, PBS&J, March 2002. . Phase I Environmental Site Assessment, LD Romine and Associates, January 7, 2002. . Biological Resources Technical Report & Impact Analysis-for EastLake Village Center Project, Dudck & Associatcs, April 2002. 1. Environmental Determination I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the miligation measurcs described in this document and thc MMRP (Attachment A) have bcen addcd to thc project or agreed to by thc Applicant prior to rclcasc of this document for public review. Such mitigation measures would avoid or reduce the environmental effects of the proposed project to below significance. This Mitigatcd Negative Declaration has been prepared in accordance with Section 15070 of the 18 06/11102 Guidelines for the California Environmental Quality Act (CEQA) as amended December 2001. This report reflects the independent judgment of the City of Chula Vista. Further information regarding the enviromnental review of this project is available from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 91910. 21~~~CO~~ Environmcntal Review Coordinator Date: &;/<2/ D.;z , / 19 06/11102 '--------z I " ,..J '--, / '-- ~ L___ ---- -~-~- CAJ.lp PENDLETON FALlBROOK RA.NCHO BERNAROO >-? '7 o ,.-' "" -_riEi~ RANCHO PENASQUITOS .- lAKESIDE " o ('} M ~ 'Z SAN CAJON , ----~~~ - - SA."I DtEC;:O COUH1Y NPlNE .--................... USA ---~ -------------- ...................... LLG, I\1ay 8, 2002 o ~ 8 MILES FIGURE 1 Regional Location San Miguel Ranch ~ EastLake " ,~-)) I Hills and Shores \,. .? Salt Creek ~ ~ <5' \leY Roa~ proctor Va _... Uppet Olely Res.eorvoir j' e Bus.CtJ.1 i. ~ Bus. CfT. II ~ (I) EastLake III GDP "'-.., '+- ,?-.' il' ,.,<" o EastLake II Greens & Trails I II II II II II Village Center North Otay Ranch Draft Supplemental SPA Phm ?vJ<'IY 20, 2002 FIGURE 2 Vicinity Map c o .~ u o --' <) '" 'Q a: /') ,. If I' ~ ~ C'f) \~ \\ ~ ',' N ',0. J-I....( \. \ :::> ..\ d \ ~ \i\ :::: ~ \ \ ~ i 1 ~ .~I ~ ,f/:!c, . ~'I'--....,\-~,,,, q~~;) ---- ~ -r~-c)W\ :-~..r:;=~~~~-c-~~Q7.?;--:- ~ .~./ .~~,~ I '. ~"./ ~ ~ i i i i D... a:: " i i i , -' ',:'S;\ \0,', "\~~ y / ~ o o .. ~ _0 o , 00 """, ~~ .2-0 ~~ E ~ ~~ ~ 0 6 ~ ~~ Ob 0- ~! Q ~b " .2.$ ~ t ~ ~ "1 Ct: ~ ..'>: 0 ~ -g .g 0 G ~ II 01 0; ~ ~ ~ 0 ~~~.~01 ~ ~~ a :2 a: ~~ .~ ~ ~ ro ~ r ~ ~ m ~ ~ - ~ 0 ~ ;:; ~ N N ;: U 0 w . m ~ m . ~ ~ ~ 3 ~ ~ w N .,; ~ m N w ~ r ro ~ ~ ~ w ~ N 0 ~ ~ . . ~ 6 N ON .,; 6 g m <0 ~ N i': m ;;; . . ;; ~ ~ N ~ ~ ~ N o~ m ~ ~ - ~ N N N N N I;~ . 0 N i ! I ! i [....-'. (3 '~)'>.'i~::., -------~/ /" rn c ~ ~ t c ~:J~1 ~ ~~ ~~~] <'><1}~--o E~~~CI>~u~i -5;..i>..<:~~~lg85~ *-~~ a~ ~~~ ~r~~~~f~w~~~~~ ~"~~:~8~:" ~ ~:g~ ~~ .<:33~~rCZ:: a::U::D..O::OQ.Q.~_ I.u "ii lIJ !! an;r:~DO~~~E ~~~ ~~TIruj -' ~......: ".. w .. ~ o z < J I:: ~ ........ 0... .;..J I:: Q) S 0. o ........ Q) > Q) Q ........ ~ ..... Q) I:: Q) o "d Q) .;..J 0- o "d <C ~~~ ~-.:..:-=::...J~.:.o..:. --- ---- ~:.-~_' bS-".' --: 00-9 ~~;J.~~- - -~;~~rr--R--~--. -6~;- -- 'I:::, -_.-,- -.-;W -1-' "~" :"--SAlJ>~:: . ,..r_ O' ._n 'CREEI{ .' '. .' - r j , 'f 1-" ,. afl.OY~ ~llNC<a j :~ ~I ...-' ...- H _ ...- ....- 12--10 ~ =... """'........ - ~.-- - ~". ,,- -- -..- ~ - ""_TV,.,." ~~ t t .~.. ' - ~". , ~ .~, r , - '. ,-- ----;"' .. - - ~ "-':':~ AC>E; - , , ' , -, - - o. \, I , E-1 \ ~8 , ;~ ! "-, ,~ ' .,. ,~ u ... ... E-l OS-13 ,... '-" .,,. ACTrv'1TY CENTER "':;'-1 ~c:&r1"B'I 30.6 ~I \o'I.L<Ia:c::u.rr&! 29.2 ~ VI.J..IIa: C8fIUI 10.0 , ..."--,,.1, , 61 1 i Business Center /I i ~_..' =... 69.B VUX;E CENTER BREAKDOWN o-__~((:J"F-1)1 <1.0 ~ ,= ~,.." 10&-1G j ", =... ~, OPEN SA<\CE/ffiRKS <r=-<> 00->0 , ,. , _.-.a "'-n iCl"9t~ ~ 00-" 1_ .-.a " oo-u iOi"'9t!lP1OrlCl: , O>-u ,_ .-.a , 00-,. :(:JP'EN:P.o.a: no. =... m, - ; ~AA( .. - ---- ~..T_ --- ---'--'..- ._---'-'..- OS-l1 ----~- .::r _'....., ",_ - ----... "'" ,~",.;;::o ,. t',_ -------> .;;~-f'"~ - F 0;-;.-- ~~(~, i jBU~',..nl C.."w.- I : "~,_ , _ _~"Co.... --I ,-y. '\ 9~Jjii?K.~,,~;1\~,._. ~[( .,/L "i\~f')J;:::J~, /_\ ,f~';~"'c.~~r}y~~~:>=.:;' </"" [, \,r._,., 0_.. ',' 'y . , ~'u .,; t_tt~:\~~,',>>~j~'~~~',\,.,,'.. I["'~'~ ,. /- ,---, i ~~, '''''- j\ :;~/ , '- -'-' \. ~.' \ - SPA Key Map "~ SALT CREEK """"" ATTACHDW oe<nY .au ~ CFrA06) a:J J RNQ' ~M D ~ ~ ~" . ~" = ~.. . ,..., ., om... "U PROJECr LOCATION ''''''E --.mro De<nY w ~ .~ n. = ... ~ ---'~-~~ ---------- ---------.---- CJS.-1 CF'&I~ e.5 oo-,~ (FB\j!lPltr.Cf: t!I 0IS--17 c:F"Eto~ \D o:s.--'18 . cPEH~ 12 OS-~ : CFeoI~ 72 p.,o"qca UrHJ ll!{ .-oe; ~ ~ J\Jt'I.JE~ J.5 om... ... City of ('IlId;1 Vi"la ,11111<', :2002 FIGURE 4 Adopted SPA Plan r~1 \ I' \1- '~)t.. R&-51~~ "-,,, :%~ j .............. "d.:?' lti ~ -~0.;'>-3'0... "-~ RC-221 "~--------" ,,0&-1 \ RE-3 \'y~'" \\ --.). "'" \,-----... ''':--. /1 <~ ~ \ \ RE-3 (^W' R$-5 //., :-.. ~_Z5 II ~ -"', /y -~ '" IU4 RP.1J ~ ( ~. \ f ( -~ \ \\ J Be-2 \ ""V ').R~'\ OS~ ~..? "\ \ ~ BC-2 '1;- BC-~ Be-2 O>A ,\\ ~.l.""'- hi 1 \ ~ k c:-:--, \ BC-1' '\\ R&-5 F;"A "/.'1<"'" o~ 1~~~~Tr~~,,'Z?' ---1-:;. o::::--"'J ~~ '(CJ yr I '-J ~I \ \ BC:3 ~ ~....""\\~ BC-:;-~' \\ 0&-1 ;'/- RP-8 ~,RC-22 j RP-8 \=\\JVI'~'ffIt(rj~~-==;;;--, ,II \ 1/0&-1 -=r== 'Jlvc-' t\J:W~O$< -----, II n\"" : L ~ (~)~~~'-1 ..,'~ ,:.,; :A~:,...-- 1\1/ / RP~"';=~ / /) //~ =, 11 r<M~3 Jb' L-1.e? RP~ Ti"f<<-:.",j/ ""'--_.:::-~ ",. I I ....j' ./,( ,.J I I ~ R!'-$t. t.iII;p-n'ys /~ PA IjlI'-{>"/k~{,~:~ f )1 t'5~r~){~qOS-4 N tV;:;'/ " I Y '-~r.....,\.......~ ,,... .J lY R&-5 ~ \ ~ '\. II '\RC"\~: I '..-", I/~\~:? t~ =, '. I 05-4 \~::")I=,,>,~ OS-<; -1L=~~ ~Q L . Ik"tt-.., ~';;~(0$-4 (:;:;"~~- ~~, =, r If--t , I I'~ '...., ~J RS-5 I ............ 1/0$-4 \\""" I RS-7'-"S-1'~-\,,-";('''~ ,'" 'I '" ~25"'~'Yt--r,\ \ \------C-', ~ ....~~,..." ~,;.y J I . 'PO I \\ '0&-11 ....-, '\ \ ",- -, // l 'I - J", J ~ \~S-7, ,'\ .....,,, '\ 'J.// I:L::~\?,,'{Rc-1d~\ \ \ ! R5-5\~;~ R&-5 t~ '" ~I ~ ~,y'0$-4~ \ \ LL.--;/? '-'\\/--~- ~-~ FC "\. "" '/~~ "f::._J'C-"J!< RP-:':) =7 ! I~:\. '\'- '~"'R$-5~/~- >-'/~\ ,I ~ '\., \\ R'-'2s'<.. I RG-10"-:: ~ ~ "....... 1\ " I ..-": ""-"'-.J\.. ~,/",~ ~---- ~ ~ PIamed Concept __ c..oduo..ium _ilia! CO..<Io......." _otiaI~omiy R_otiaI ~amiIy VILLAGE CENTER & COMMERCIAL VIiIago eer- (Retail) Village Center (Pro!. Admin.ILld. Retail) een. (Retail) F_ CommerdaI PA -.aI&_ BUSINESS CENTER tij--.eer- - ~Par1< Disn;t BC-2 BusIness CenIor - ~ Smnce District BC.3 Business Center - Core District RESIDENTIAL R8!idonIiaI E_ _ SIngle Family __ Single Fomiy _PlamedConcopl R>..idoo otiaI SmaI Lot __ Co4d.AJ~1Un Draft Eastlake II Pbnn<K:I C....mnmnity Dishid Ri'~H]"ti'.'ns Mi\~' 20. 200"2 SPECIAL PURPOSE Open Spac<o SpKe Open ~ Spac<o Open Spac<o Open~ Space """'"" lM>an DisIrid ~~DMid C<<mmuniIy FVpose Fadity GHJ ~ _ Und Use DMid 0\Ie<Iay (ReIer 10 Sodon n.XJ in PC Dist ReQs) rrrrm Proposed Amendment Location FIGURE 5 Proposed Land Use Districts ~ ~ ~ ~I I ... ::i~~~~::i::'::j~ , " R~& ~~~ !~$~~g~~~ ~..~ fi"':'!!f cl ~ ~ " " Ii ~~ ~ ~ _!i ii , ! ji ~~ . . H!j ~'I ; L- .. gh ~i '7 ~~:II !h ; 1 ~ ~! UP~ ~~ U!'I hi! : ~ ~I ~'i ~~ ;~ n ~Iq"~ i J.~i!!!!I!!1 J..."..Ii'l....... -- -- .. -- - - -- ~...~'"'..."o>"f!.;;;;;~<='~ ~ z ::; ; J ~~j , , . Ij ~~J L ~ zffi ~~ co <Z ,........ << :} >0 < w' I oJ < << . ~ ~ u JU ~g w ., "> , :~ ~ >- "' ~ ~ .0 ~ <" ~ .... .u ~ "- i , 0 I 1 j '- ~--~ 0 I I:: )-000.4 CC! 'I ~ ..- '. ! 0.... II . <, . ~ i B! V r iisl'! ,...., 1;1 '111~i' .,.... . 11.1 !1m (f) - - "Cj ( v 1!1i (f) I, 0 ) I' 0. ~ :1 ' ' :'jl! 0 .... r' I!III 0.... II ' ; III!! ii,l i H - .' c=~~~";;;~~1~r.:;~ ~'''::.,-.'' ---'.----___0.__________________ ""~ -==--- ~" (((c~)1^ 0 ~ . ~ . " " ~ 0 0 .. " " . " " " " 0 . < L c o ~ u o -' t5 Q) '0 ~ (L ~ ~ 0:: 0:: :- i i i -' ! . ~ : 0 /' ~-::>'. .<0)'0 \ '. . - . ! i i i ~ ~i)~'~~i 40) , -~:~/ -:: . . o -' .!..--i"f..') ~ ,: ' i: , , ,[ ('-.. I:: ~ ~_..-. cO .~ ~ ....... 0... P::: +-> :::> I:: V if 0 8 " ,I P- " :a ~ " -' ~ 0 ,I " ....... ,. V > V :a 0 ....... cO I-< V I:: V d "0 V (/) 0 P- o I-< 0 0... Q. ,. -"'..~-. <=---- - n ./ ;.' .~: :';~:.. 'f.' " o ~ ~ ~ ~ gl~ :g~gNN;:: ~ 0; ~ -0 :5 <> ~~ ~ I'- ~ ~ "" ;:, !'?"'- ~g 6~ ~~ J~ ~-5: ~~ 0> c~ .~ . . C:~ -~ , " v, ~ " 2 " .. ~~ . > . ~o ! ~j . , o > .0 ~ II> ~I oS ;. b -:;; d g ,- . " '0 - q ~ ;>. - , a" ;;:: '1! ~ u '; ~ <:;> In '<I' ~ :; ~ n .., In N U> ~ ; :; ~ 2 <n M ~ ~I:;: ~, on M ~ II) N N N N N N ;::;; .. . . 0_ _ u 0< CC N (%) ..., ~ 0 N 0> ot>.". <l> ~ N ~ ~I~ ON ~ W o N ~ '" " " o z < J ~ c ~ ~ ~ to ~~~1 ~E~] :g~c~ ~~":~j.'.;i8i~ ~1!1~ ~;~;~v uf=..5~Q~o~ ~~!~~rLri!i~~!~~I~ ~ ~~"ill-~Ij ~uc(n::to"D. ~I- l>.i J 0<: j u~D..-OD. J Q::j U) II) , " 1 .. II II _..~ E-9 E-8 E-1 E-4 E-4 E-7 " ~ 1! E-7 . E-3 E-10 -., % , .-> IV '" t co. I SPA I ,>~" ~c'\ Key Ma~ , .~ ,......'-..:.;; \' . ~.. ..:i Village Center No. -~'.' ;"i<:~':1 SPA Location ~ ~ - . I Parcel Land Use Acres VC-1 Village Center 38.1 -.-- SPA I Boundary VC-2 Village Center 13.6 Supplemental Village E-10 ViI. Ctr. Employment 16.4 ---- Center North SPA Boundary Total 68.1 Note: This exhibit and stahstics are for the Village Center North Supplemental SPA Planning Area only. Refer to the Eastiake I Site Utiliz alion Plan for lotal SPA Plan slahstics. Draft !Supplemented SPA Plan !\lay 20, 2002 FIGURE 8 Proposed Site Utilization Plan ..."._.,~-,.. ,.~-,----_._--, ...._-_..-_.._...__._.,..._--._-_..._---~---,_.........- _._. TABLE 1 PM Peak Hour Intersection Operations INTERSECTION EXISTING EXISTING + YEAR 2005 YEAR 2005 PROJECT WITHOUT WITH SR 125 SR 125 DELAY'l LOS 1 DELAY LOS DELAY LOS' DELAY LOS Telegraph Canyon Rd/Olay Lakes Rd. 34.0 C 40.0 0 542 0 41.9 0 Otay Lakes Rd./Rutgers Ave. i 3.4 B 143 B 20.8 C 16.0 ~ D Olay Lakes Rd./SR 125 SB Ramps ONE ONE DNE ONE ONE ONE 40.4 0 Olay Lakes Rd./SR 125 NB Ramps ONE ONE DNE ONE DNE ONE 10.6 B Olay Lakes Rd./Maln Enlrarlce 130 B 43.0 D 46.0 0 495 0 Olay Lakes Rd ./Easltake Pkwy 309 C 38.0 0 41.2 0 51.6 D Easllake f'kwy./ Miller Dr. 3 WBL 4 161 C EBL 4 5 5 3 WBL 4 16.2 C Easllake Pkwy./ Fenlon St. EBL 4 5 5 Olympic Pkwy./Ed,;lIake Pkv.'Y Co b 6 fi 343 C 52.5 D Olay Lakes Rd./Lanc Ave. 199 tJ 200 C 2GB C 2/.6 C Olay Lakes Rd./Hunte Pkv.'Y 31.1 C 332 C 289 C 339 C Notes: 1 2 3 4 5 6 7 Delay - Average delay rcr vehicle in seconds: LOS - Level of Serviu'_ ONE - Does not exist UnsignaJized intersection WBL - Westbound left-turn movement; EBL - Eastbound left-turn rnovcrnent; This movement does not exist currently_ Currently not an intersection as only two legs of the intersection afC builL LOS E and F shown in Bold and Italics_ UNSIGNALIZED INTERSECTIONS SIGNALIZED INTERSECTIONS AVERAGE CONTROL DELAY LEVEL OF PER VEHICLE SERVICE 0.0 " 10_0 A 10_1 10 15_0 B 151 10 25.0 C 251 10 35.0 D 35.1 10 5D.0 E ~ 50_0 F AVERAGE CONTROL DELAY PER VEHICLE LEVEL OF SERVICE O.D 101 211 35.1 551 10 10 to to 10.0 200 350 550 800 800 A B C D E Linsf:ott, Law &. Greenspan, T\fay 8, 2002 TABLE 2 Buildout Peak Hour Intersection Operations Telegraph Canyon RdJOtay Lakes Rd. Otay Lakes RdJRutgers AVe. PM DELAY LOS 52.1 0 23.2 C 49.6 D 16.0 INTERSECTION PEAK HOUR PM Otay Lakes RdJSR 125 SB Ramps PM Olay Lakes RdJSR 125 NB Ramps Otay Lakes RdJMain Entrance (Vons Dwy) Otay Lakes RdJEastlake Pkwy PM PM AM PM WBL 3 WBR' WBL 3 WBF,4 Eastlake f'kwyJMiller Dr 2 East!ake FJkwy.lFcnton Sf. 2 Olympic I'kwyJEastlake Pkwy OldY Lakes RcULane l'we. Olay Lakes t\.d./Hunte Pkvvy. PM PM PM 51.5 D 290 C 52.0 D Notes: 1 Delay -- Average delay per vehicle in seconds: LOS -- Level of Service. 2 Unsign<Jlizcd intersection. 3 WBL -- Westbound left-turn movement; EBL -- Eastbound left-turn movement; LOS E and F shown in shaded cells in Bold and Italics. Mitigated LOS and Delay shown in BOLD. UN SIGNALIZED INTERSECTIONS SIGNALIZED INTERSECTIONS AVERAGE CONTROL DELAY PER VEHICLE LEVEL OF SERVICE AVERAGE CONTROL DELAY PER VEHICLE LEVEL OF SERVICE < 10.0 150 25.0 35.0 50.0 500 A B C D E F 0.0 101 211 351 55.1 <c to to to to 10.0 200 35.0 55.0 80.0 800 A B C D [ F 0.0 10.1 15.1 25.1 351 to to 10 10 > > Linsc:ott, Law & Greenspan, May 8, 2002 C/) c 0 .;:: 01 ... 0) .... Do. ~ 0 ~ .... ~ c 0) ~ e E-< Of) 0) ifJ B 01 0 I !:: ;;~ "., co 0'" o "'0< 0<'" <1; W >- ".,0< 0'" ~ 1-", :J"., 0<0", <1; I WI-- >-~ + e>t; Zw f=, ",0 -0< [;]0.. >-~ !::O O<J) <1;0 0..-' <1;1-- 0<1; ,------ CJ Z f= <J) X w <J) <J) <1; -' o >- <1; ;; o <t o 0: ~-- I-- Z w 2' G w <f) I- w w 0< I-- <f) m m<t cO: u .;: <! <tU .;: '0: m <f 0 0 0 0000 DO 0 0 0 0000 00 0, 0 00000 DO "' m t'-- CD ro m- N '" NNN 0;- N en o -' w '" ::> -' o > en o -' ---_."-------~-- m<( U <( <(<to<(<( w '" ::> -' o > ----------- 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 00 CO 0 0 0, 0 CO 0 0 00 <D <D N m ~ ~- " ~ 00 N ~ N N r' " N en o -' I.j Iii "'" 5~ !ti' ~ !Id: II ~~---- momrnm<(<(<( w '" ::> -' o > 00000000 00000000 r_LDNNlDonm ~ c)(")-NW-7-n6 NNV~(")("'}"'-- en o -' u <tumm<(<(<!:<C -~---------~._--- OOOOW OOOoz CD. !.O_co.CD_O LD t'--- CD L.'J ww zz 00 w '" => -' o > o o 00000000 00000000 <:0 C"J....--_ 0> I'-_N.I"-_ 1'- C=:>OJNO"T C>I'- NC'-J q--qNN...-- <D ~T --.----- c-' 0 0 0 0 0 0 0 0 0 0 CO ,=-, 0 0 0 0 0 Co' ,:::-' C=-) 0 0 0 C) 0 0 0 C} 0 c=:> 0 0 u 0 CJ '" ") (~) <0 l;") '" WJ li~' In .---- ~~- ---_.----- ~;'~ W WW ~:2r<c <C <( Z Z Z !;Ii 0 00 ~ 610 0 C;~- ~-oooz ~m_o_~o ~t'-...--N 1...--r:'>JN ~1<'i m '0: IUW zz 00 W <.-:(<(<=1::<(Z o WW zz 00 o o m m o o m "' --_.--- 0 CJ 0 0 0 0 0 0 c) C) C) l=:;> 0 0 0 CJ C) C) < CO 0 0 0 0 C' CJ C_J " 0 N 0 C"") CJ C) 0 0 en '0 ~, en li' li' .0: <( o o m o o o en ~:J 0 ~J-:=J- -" " " " ~~ :0, - ru ro ro ro ro rn rn rn rn ro rn ill ro ro rn rn CO m L m L L m L 0 ~" m " m m m ill m ru ru ill ru ill ill ill L t t t t L t t t t U t t t t t t '0: <:t <( cO: <( <( <( <( <( <( <( <( .;: <( <( <~ ru ill ill ru ill ill ill m ~ ru ru ru E o 0 E E E E E E E ~ .9....Q. E 0 E E " -rorn- " ~ " " " " "':::: ro ro rn ." -~ Q~ :::: 2 rL [L [L rL rL rL U :2 :2 rL .;:. rL [L -~--_.__.._--- D [{ U 1:.":1 0:: [{ c ;n o ill ~'g ~~ <U~ ;::m ~2 itJ<- 0.. Q)Q)~ ~D~ ~C(L ~ mer:: :>-.ro ro en Q) "'--:,..:;C::;----12 -cO:::o<.fJoc 0= QJoU) ro_::J .::i ~ f-- 2 0 ~ W ~_.:..I o "V}-S:uru--: o~q 3=.stu ((ro""'; -u>.X W {/) UJ U)...r::: 0::: .9 2:'1l aJ n::: WOI g-::?lDO~~~ ~ L-- Q) N ro "'- en q € <n ~ F"-- ~ ~ ~ Z -.Joro(i)::JD:::ororoO >- Z llJ f - fL U) > UJ ----1 I- <( Z I-- W o lL ~ ill ~ rn o~ <i ~ o~ 0:0 Z 0 0- >- i:' z '" <<~ U c ro Io: tL ;? ~ G ro wrL -1 W I-- " ii5 --------_..~- ro E o ro Cl '" :>-. D ~ Ct:>- 0.. C <( Q) ~3: ~o~~o (/)<(u:$ roo..c..... ilia: 0-0.. Q) row, O<{L~",,- VJD af<!o roWID-.J':::;- W21-~L- << <1; -' W '" 5 ~ rL D U [{ 0 ~ E CD2'>. >. cn~O> ~> c---1oiI: (L_Y .9 fu':; ()>- Q)O- C ..- ro -- <( CD ~O~ ~~~~ 00 >-::S::: VJ ~ ~-~O~wrn:;: L({)_'L........_ W ocroOl1...o__ ,-......J..c 0 ,,?:?2 >,_0(;;_ ,>~26(L(lJ~ ~ lL 0 (j) ~ s: w >- -' o = m E ~ ~ ~ ro ~ c Q ~ ~~ ~ 0' ro '" U -~ ~ rn " U D W rn 2' " ~ m ~ E w c = m ~ '" u Z ~ '" D ;; >. ~ 0 U N ro L u " ro u ro U <D " 0 ~ ~ ~ ci-iS <( err ~ TI-u ~~~~ DO ~ EN..c:: ui u~--3= ~ ~3D~ ro c c ,':::: g <1J ~ = 0.::5 <IJ -0-":0 -ii~:~~ '- ro 0 __ ru= >,"'00 -g~-'50~ roWro.D- UJl9g-_~~ >><( U"'tJ ru TI~O~~ ~<( (j) .0 0 roU)O-6C U E ---1 _S o.i- ~o5LLUC ~-'= -~ D 2=' ~ -g~~~8a ~~2W(/)VJ ~DrnO~~ <J) 0 L.. a>- ;;: "'_Q._S?U-o <V ro 2: '- C ~ E:2: (lJ 1! U') ::J::JCVU)::::CV LOe_IDO U :;,- ro 0 "-- 0 o~j~::~J ~-sg6;sZ ULLlL--1CDO ~.,,- ~ r) -q tn lC) o Z OJ o o OJ "' >> < " " " '" ~ " v ~ " " . " o u , .S " TABLE 4 Buildout Daily Segment Operations STREET SEGMENT TELEGRAPH CANYON ROAD Pasco Ranchero to Ot3Y Lakes Rd. OTAY LA.KES ROAD North of East "H" St East "H" St to Telegraph Canyon Rd Telegraph Canyon Rd. to Rutgers Rd. Rutgers RrJ. to SR 125 SR 125 to Vans D\Nj. Vans Dwy to Eastlake Pkwy. East!ake Pkwy. to Lane Ave. Lane Ave. to Hunte Pkv..y FENTON STREET East of Eastlake Pkv'lY. LA MEDIA ROAD TelegL'Iph Canyon Rei EASTLAKE PARKWAY N/O Miller Dr. Miller Dr to Fenton SI. to PalOnl;1r St F cnlon St to Otay lakes Rd. OL'JY takes f-\oad to Olympic Fkvvy. South of Olympic Pkwy. OL YMPtC PARKWAY SF~ 12:) to Eastlake Pkwy. Eastlake Phl/Y_ to Hunte Pkwy. Notes: 1. 2. ROADWAY CLASS Prime Arterial Major Arterial (4L) Major Arterial (4L) Prime Arterial Prime Arterial Prime Arterial Prime Arterial Prime Ariena! Prime Arteria! 2 Prime l'"\rterial Class I Co!\ector M:Jjor Artcrj~JI (4L) Major t\rterial (4L) Prime Arierial Major Arteria! (6L) Prime Arteria! Prime Arieria! CAPACITY AT LOS C 50,000 30.000 30.000 50.000 50,000 50,000 50.000 50.000 50,000 11.000 50.000 22.000 30.000 30.000 50,000 40.000 50.000 50.000 BUILDOUT ' Volume I LOS 34.000 A .12.000 B 33.000 A 14.000 C 28.000 A 6,000 A 8.000 A 25,000 B 26.000 A ;:~4:~~~;{:!W"5:;514:;':;~O-;~~_~ti%J;..~i&~", ;,,~~-- ~0'1l&'th-:2-~?itE~~'d.~~ Eastlake III Traffic Impact Analysis. March 2001 (and includes project traffic) Built to neither Class I Collector nor Class II Colleclor standards. Mid-point LOS C capacity betvveen the roadway classifications assumed. Levels of service D. E and F indicated in bold with shading. linscott, L:lW & Gret'n-",pan, May 8, 2002 ATTACHMENT "A" Mitigation Monitoring Reporting Program IS-O 1-042 This Mitigation Monitoring Reporting Program (MMRP) is prepared for the City ofChula Vista in conjunction with the proposed EastLake Village Center North (IS-OI-042) project. The proposed project has been cvaluated in a Mitigated Negative Declaration (MND) prepared in accordancc with the California Environmental Quality Act (CEQA) and City/State CEQA Guidelines. The legislation requires public agencies to ensure that adequate mitigation measures are implemented and monitorcd ou Mitigatcd Negative Declarations, such as IS-OI-042. The MMRP for this project ensures adequate implementation of mitigation for the following potential impacts: 1. Water Quality J As discussed in the EastLake Village Center North MND, grading, construction and operation of the proposed project would increase the potential for erosion and impacts on water quality from runoff that contains silt, oils, fuel residucs, etc. 2. Air Quality As discussed in the EastLake Village Center MND, the proposed grading of the site would gencratc construction equipmcnt emissions and airbornc particulates. In addition, particulates associated with grading cquipment (particulates from haul trucks, dirt on the truck tires, and dirt on unimproved portions of haul routes) would become airborne during hauling operations. The incremental increase in mobile emissions from site improvement would contribute to existing air quality violations on a short-ternl basis. 3. Geology As discussed in the EastLake Village Center North MND, grading of site would impact unsuitable geologic conditions. 4. Transportation As discussed in thc EastLake Village Ccntcr North MND, the project would generate sufficient volume of traffic to reduce levels of service on segments of EastLake Parkway and Otay Lakes Road. as well as several intersections on Otay Lakes Road and EastLake Parkway to unacceptable levels. 5. I'aleontologieal Resources As discussed in the EastLakc Village Center North MND. the grading of the site may impact the Otay Fonllation, which has high paleontological resource potential. (J/i ),'2002 6. Noise Site plans for the YC-2 and BC-3 parcels are not being proposed at this time. If the noise level at outdoor use areas in the parcels exceeds the City's noise standards, the noise impact would be considered significant. Due to the nature of the environmental issues identified, the Mitigation Compliance Coordinator shaH be the Environmental Review Coordinator for the City of ChuJa Vista. It shaH be the responsibility of the applicant to ensure that the conditions of the Mitigation Monitoring Reporting Program are met to the satisfaction of the Environmental Review Coordinator. Evidence in written form confirming compliance with the mitigation measures specified in the EastLake YiHage Center North MND (IS-OI-042) shaH be provided by the applicant to the Environmcntal Review Coordinator. The Environmental Review Coordinator wiH thus provide the ultimate verification that the mitigation measures have been accomplished. (11'] 1/2002 2 E ro ~ OJ o Q: OJ c .. ~ o 0- Q) 0:: -0 C ro OJ c .C ~ C o ::; c o CO .g> ~ ::?; <{ 0:: (!) o c:: a. (!) z j:::"c 0::15 oz a. w 0:: C Z <{ (!) z> i:2 '" 0'" !::j z in o '" ::?;LU Z o j::: <{ (!) E ::?; ~ " ~ E E o u ID j ro 0; 0 c. " E ro o -..;::; U C ~ :c "iij >- ot 0", c.a, ~ ~ 0: ~ '" - C '" U '" C> ~ _ 0 O.~ ",-;0 00 'E~ i=~ - <;;<1> o c Q. 0 e--':'- ~~ c " c c o 0 e...':'- '" "E ...; " E " ~ 2: ~ ~EO: ~ ~- c6 -~ g~ - o Qj (L tij e ro J:~2 _ 0 o 0 "D ";::; o ~ ::E ~ ~ " ~ > ~ e o " '" ID " o o .. '" '" .. :;; o ~ o ~ ~ ~ ci "''''z -,:: Q.) :;;" c: '" '< 0. 0. .-,: ~ - >< u G .... o 3 vi::' ~~U - '" o ~ v !--<U)-5 " v .5 U) e u.1 - OJ V ~ B '7. o - f-< ~ ~ ~ u ~ o o ~ u ~ ... 22 f-< v -~ .s ~ v II) If) ~.r::: 8::: ;:; :ti --; t:: ~ ~ ~ OJ) 0 >ugo<tE G::; <l) > ~.2 v v o...t::>..v"!"""d~"'B <.::........nt::,J::::c:'-'ro 0... ~ ~ 0 tJ) n r.I) t:: ('j ;:I IU v';:: <I) !:: ('j 2 ~.~ ~ ~ g 6 S ~"'OQoO~VD.. ~8oo.vE6B P: u .~"O ;; .2 5. ~ ~ ~ I-< 8 -: 2: .5 ~ _bP-.:::ib~ .... '+-< 13 ~ 0 ;:: '"d ~....... ~8~~=5)5~~ 6~[J')~::10MI-; a.';;~ ~~~.a; g.'i5~>->v~C:""'" ~or1>>('jc:n8..s ~ :: .::: i3 ~ o~.g U) 0 a. 013..0::: ~"'O t;<l:: E ..... P., ........ t:: r-- A:<Qv~('j8N - c: '" '< 0. 0. .-,: - >< U G .... o - g u VJ2 -5 ~ ~~.5 " v v C ~ PJ c U ;2 ~ ~ v c ..s.3 v ~ "'0 ~ J-o ~~ .s~5jv ~ j .s c: B 0""'" -5 "'d U .S 1:: ~;"; ~""d""7-B~<;;j ~I€ ~&. I-; .s 3 ~ ~ ~ 8,g ~-b W ~ ,::; v E U) bD,..q o"5<t:'O..q~ 0... I-< -:! V 5 t <t: 2 .:2 3: U ~ ro ::I p';':: If] ;:I '"d ", 0 ,,, :E ~i:j ~J3 g ~~4::.B b v ~ .~ ;..-. 0 ('j p:: ~ 8 v >.. "E 2 ::: I-< c'j ('j OJ <I) V v -S ,..D .-, ('j 0]0 ~'"9~:>;; u"'O 8 ~gg8~8j~uEe~~~ ..s b..D 8 > P.>'v a:G S.gp::: ....... 8...c........ i:: 0 r::I .0""" ""! R g: ::: "=::" o "5>,"'dVJo....... ~~r;j"""~ -8or::l.......--;;; ........!."'d o~ C';t :::: U) :=: ;:J....... :::: P....c :::: ~ <t: S r::I bJ) ~ 9 c; 0 ~ .~ ~ :3: r-- ~ 2: ~ .~ ~ ~ ~ ~ B ~ .~ .~ ~ 0 C';t C.- Q) C C ~ ;:J C';t...c 2,,;: R('j~~l::r::I...t::~oQ)o'-'J'-' ~ 2 Q) ('j "";'.;2 gp 3: ..D "'d U) u:: ~ 5 P...5 ~ ~ P.. 0 ~ ~ >' ] ~ ~ co......... r::I ton 0..""" ('j 0 2 c:: "'" ~ Cl-.. <C 0 W .C: <C -5 Cl-.. V) a.. ;:J U) ~ N c: " .'< 0. 0. .-,: ~ - >< u > ~ .... o " " "c .B~U '" o rt Q) t--<U)-5 v -5 - u > ..':;> :z '" :J ODO< :::: ('j d ~.....J .s .>~u 0_ " ~o ~ 1-0 Q) B J3 .s .8 E ~ ~ Q) --;;; :3: S eo< Q).~ ~ > ~ '" o u p..8~ .5 ~ j c~ ~ C';t~w ~ ~ ::0 u.- C';t Q) u 0 :::: ('j r::G. ~ v ..8-B o.~ " ;J ::2 ~ o;~ ~ " " " "'" .s g .... ~ o :5 '" u >:::: o " ~..c o.~ 0._ " " o " ...... .2 50. c 0. ",.-,: M M v U) " 0. " v v e .5), " '" "" ODe " " ~ <r.I ;J"" - " OJ V .s ...c ui '" --;;; .~ 5b "'d c:: .V; 5.E ..;S.2 g ~""d " " c "" " ~g-d E ...... ~ M~-g .8 a .:g ~ 0. ~ .~ .5 ..; 1:) g' e v"o S :::: B v e " > 8 .G 2 ~ 0 a.. .9 ~.5 N o o C:' '" E ro 0, e 0.. '" c "' o a. Q) a: -0 c ro '" c ~ c o :;< c o ~ ~ :;< ~ c ~ E E 0 t) "0 '" ~ ro ;; 0 Q. ~ f--- E ro 0 = t) c ~ :c .~ ,., c!: o ~ 0.0. ::;; ~ ~ ~ 0: a: u;~ ~ 0 o 0 "-u a: f--- a. ~~ c " ~ c ~ 0 ou Z .c f--- f= ~ 1:: c ~ E '" a: 0 - 0 o ._ 0:: ~~ 0 Z 0>" a. ~ c U -g'SD- W Q) 'E ~ in a: C i=~ f--- Q) ~- Q U S -E Z ~ c Q) 0 w ~ '" 0"- ~ .!;' f--- z :> ~~g a: Q) tf~2 0 -" !:: <II --' Z - II> C 0 <II '0 0 ::;; w ".. o ~ z -S~ 0 '" ~ ::;; '" f= > ~ ~ E ::;; ~ '" ~ ~ ~ ~ ~ ::;; c .g ~ g :iE c ~ .2 " ~ 0 ~ g:gz :iE::;; " '" ." p, a. -< ~ ~ x U C '- o C 3 U ~,~ - .~ 0.. b w ?;> (j ., -5 ~ ., ., C 5D C '" ., -5 Ci)"d .9 ~ "dw "d U z-. ='""0 t:: >....... u ~ "" .... <2 :=: ..c :c <2 H ci ~ .~ Q.~ 3.2~"O::: ~~~E;;j5E v; v V) ~ 0 :::1 V""d\.l...~~bD'"d ~ t::: 1.) c: t: ~ c::: ~ C'j ...c: ._ ('j "'d C'j ~u~~~~-E -55r;~E C'j r....... v; r-'...o.::: C-r:j oC:&J~gr~_"c C'j 8 v; c... _ E f] > :::::: v v e-- oC'j~~::-:g. D..~ ~ ~ u Q) g.~t:VJ~'"d .... -0 C'j 2 <1) EQ~!!Jo~ ~ ]: -~ ~ ~ ~ p: ~ g US .5 ~ ~ 'T ""d ., ., ~..c ~u ji,g ., '" E 1:: o 0 ., a. Ci)., ~ C u .2 L;:: - '" u '" " ~ ~ - ~ ., '5 u " a 5. " -5 :01) C ; .2 ~:s g@ '1) OJ <1:::: 2: 5~~~ > "'d '1) Vi 8 ;; :3 ~ g.ObO...... S 5. is: -2 .g, " o .s ., c o "d 11) ai g 5] <::; -" ~L~ :2 c Ci) CI) ..:s! 'C ::: :2 2 E bO....c: .a :::....... , O"d ]-B~ "d..c o :::: VJ r::.2~ I ~ 0 "d " I ~ c"d ::i 0 c::: O"d " .D C 0 -5rt.e ~ ., ~ o c ,., Z..23w ..c Ci) " o .s " '" " u 0 C C "d o ~ ~ ~ ~ VJ c: C[j v G-;:: ~ E~E iT g ;3 <t::;:::<t;: ~~~ "d 2 0 v ~ ?; c:: v;r-S:.! " I C"d o C "d g ~~ g " ~~ o ~ f- ~ I S:.!-g E 5 :;g ..c5 00 0 ";: (/) "d " ~ ;; v; E Ci) " :2 Ci) " o .s o"d 0'" '" '" " ~ 0 <2..i@ " " "d 0 "; <11 2 ~.~ =-E v t;]3 .;;; a -c:s:.! ~ a. .- " p,..c 0.- 4;~ u ., ~ ...... OJ) v d ~ 8 E8- ;;~Ev "'d 0 f ~ rtt;ct:s ..s ~ ~ V) i0 -d'''' ., w "d i3 "S; g 2 '" A.., .D "d :; o ~ ., C " o ., >,4'0 -a~ 0,.,., "'''' o ..c tD '" -" " '" " p, a. -< 'T ~ >< u c ., CI) '" "-< '" o C .3 U "<13 .s .~ o ~ II.) t-oVJ-B ~ ., ., '" 5D '" '" ?;> G ., -5 ., -5 8 ,., '" ~ " > ." "d U " ""0'0' g p.. u ., fiE '" ~ E o C 0 ~3<t; >:::::: u o '" C 5.{3 ~ g. c c: 8 ~ 6 ....p.~.-. .g 0.. v ~ 0... -< ~ (/) ~ -..c '1:: U" > 0 ~4'0 ,s '" o.~ '" " ::?: ~ " ~ u ~ '" "-< " E ci. S ,., ~ , '" o "d C " o .D ..c 1:: o C on '" on N o o c:' :<:; E ro ~ '" o ~ D- '" c "" ~ o 0.. Q) 0:: -0 C ro '" c g c o ~ c .Q ro '" E ~ E .. E E 0 U ." <D .. '" ;; 0 <i ~ f-- E OJ 0 .-e (,) '" ~ .c .;;; >0 ~t: o ~ c.a" :2: ~ .. ~ '" 0:: v;~ ~ 0 &8 0:: - D- ~~ o w c 0 ~ o 0 Z J: ~ i= 0> 1:: -~ ~E <I) 0:: 0 0.2 0 Z 01;; ~ ~~ c.. ~ ~ U :9ElL W " .E~ ~ aJ 0:: c: i=~ f--- " ~- a u S"E' Z u" " m 0 ~ C> 0a. ~ .. f-- Z :> Ow Q i:t: <i5 ~ ro " J:~z 0 "" t: .. oJ z iiI ~ 0 .. co :2: UJ -c'Z o~ Z ~~ 0 .. " i= " .. > ~ ~ E :2: ~ ~ ~ ~ ~ .. " ~ .2 ... 01 ~ " ~ .. .2 5 ;; ~ 0 g~z ~~ ~ " ro .'" "5. 0. <>:: x ~ ,..., u ~ ~ o - s U .2:;, ~c2u - .~ ~~.s u '" ,,~ ro ro u t: >.. ~ :..::: "'0 ~ 'E ~ 2: B ~ ~~ ~.~ ~ .S @.s g ~ ~ s..: >>ro ::!-~;:::::::~ ~ W .9 ~ ~ t;;; '-' tJ) t';t W ,:: M,~ 1) ~ __ , ~ 1-0 :> v U i:> G"t:: .s ~...... C1) 0 ........~ur.J) o B 1)""2 Q:; ~ .~.s ro.,.... ~ :.S >-> U ~ ro c.D g ~Q)-d_~ _~ E ~ [J} - 0....::: t:: .s .3 E 8 .3 ~ ~ -;;j ~~~~ ~ <8 -D ...; v v ~ .51 " ~ VJ .g u ro uS E c Q) <:"3 oJ) Q.) "0 ~ b c E c ~ U .~ 0... ro 9 '1) .~ "g. -E tJ)"S' v ro.8 0.. u"'d"O~v gB~..s.s C ro t; - .-.. 8;:) -~ s~ ...... 0 ~ '1),E "" Et:5c,..q ? .s ro E :;; ~ ~ Of) -g 1) :-g Q) .~ 8ro~>~.s -g ~ p.. g .2P 0 - ro E .........u.- ....... g ~...... "'0 v "'0 .~ -::: "'0 ~ ~ ~ c" C '" ~ '..) ,:3 c: ::I .~ >..s ~u~2_t::~ ~ ~ r.J) 2:? g Q) ... C t; ;e -is ~ ~ 0 2Ft:r:c~vE- V)._ ro ::j .__ ::;1) ..... v -0 ....c c ...... v ~ ~ ~ ] ~ ~ ~ ~ 1)~:2 v~a B:: gp g~] ~....c 0 ~..c: ro ~ .2F ~ OJ co 1) ro 1-;...... ~_~ s -:;''''' -:..c"" E b1) 1:> t: DIJ c: ;:; ,,- ,," 9 , O'l:J ,0 +=' <:::~~v<t::J::"'!' ~"""'jg;;'l)"""""" Q)"O<f)-~"2-:=: c ~ It.) E C I-< '"' 02:::20.2 I </)0...... I V1 "D~I..!::"D;g c:: 0 -0 .S':!J c:: 0 ;=I c::......;=I O"D;=IvO"D ..D c:: 0 :::: ...D c: ..so.so-5~ c; g ~ ~ g c:: %~u..J~f/J~ v ~ ~ 0"" I - '" -0 '" ~ ~ 5:;' .D'" - " ~ 0 v ;; ~~ E ro .," "5. 0. <>:: x ,..., , u ~ -0 N ~ U ro > ~ o ~ s: o voB -5 ~ ~~.s ...; v v ~ 51 ~ ~ o o " ro .~ "5. 0. <>:: ~ ,..., x U ~ ~ o ~ s: 00 ~ ~ U.- - .~ o ~ v t-<VJ~ "' v '" ro p.. ...; v v ~ 51 ~ ~ " 1:: V1 ~ 0 I-< ...... V .~ V1 p... <2 c:: ~ P.. ~ ~ .g_ .~ ...... ro p... >. () o p...<( rot..:::: D..O.I) .<"":';NQ)~~'"::; v<n3'a U -:S {: .~ b ~ ro ...... ...... .@ > ~ () I-< t) g> ~ ~ (5 v i)......"Cv -~......o ~ "2 g 2: ~"O' ::g ~ I-:' '+;< .8 ~ .~ ~ ~ ~ ~ ~ .~ ~ ;:gu\.l.."j.s ro..r:: t)--O.I)ro ::I c:o :;..... 11) t)...... ...... (""") c:: u 0::1 v _-<;:;" 3 Q) Sr-..I..;:; , W I-< U ..r:: U u .0' 0 2 v U .c G ...... ...... Q.) Q.) 0.. <.t: "=::' -S (:Q .- v ~5.-:S~ 44.-.CUV) .~ .s >- c: ~ ~ ~ 0 iJ Q.)-g ...... -..D ro ...... 11).~ Il)."';:::.s ~ D..?: .....~3...cg~>>~ ;;;......"Cu ......~,.D'" ~v2<1)oo -'8 2 v c: C G: .8 v; v '"0 ...... -B 8.~ E ~ c:: '"0 .~ S g 13 s 0.0 5 Ou () ....... ~ .8 D...- 0 ..... vC(j o~u ......vv ~~~"""vF, .g > '"0 "3 E 0 t .g > ~ r; c: ~ ~ {; .5. ~ ~ c: ~ ~ ~ r-- 00 ~ ~ d ~ .g ::E'i> " v ~ -B i> ~ .5 v >> ~ ro ..'3 3 E~ ~~ <t::~ ~ ~ -g~ " ~ O~ ..D"V "€ > o .;: ~Q N o o C' :0 E '" 0, I:' D- O> c: "" " C>. Q) 0:: -0 c: '" 0> c: ." .8 .c o :2' c: o ~ 0> "" :2' :2' <1: 0:: C> o 0:: n. C> z j::'<: 0:: ~ oz n. w 0:: CI z <1: C> z D:: o t: z o :2' z o j:: <1: C> E :2' ID --g ro ;; 0 c. ~ ~ ~ U 'C ID :c "U; >- ct o ~ 0.0- '" ID '" ~ Q) <: Q) u Q) C> !: :> Q) -'" CO ...J in '" w _ c o 0 O).~ c u "E :g i= Q) > _ c o 0 "0:';:; o :1 :S:-E ID ~ '" ID > '" ~ ~ '" ~ ID '" C g " g :i! C ID o ~ .- ~ 'itiIJ)O g~z :i!'" '" " ID E E o t.) - u;;;; o 0 CL8 - ~~ o " C 0 o 0 Ot.) - ~ ~E~ cf ~~ ~ECL ~ ~- ~-~ m _ 0CL - o Q) a. (ij~ro ff.ct.:2 '" ~ ........> o '" c~ 00 >< >< '0 c 9 U c- ~<f!O - .~ r:::~.B c;J-o '0 8 8 CDDJ)VJ c:: c:: c:: .~ :2 E ;; ~ n p:(QU ~ " ~ " 0 :::: U "bi:> ~ c:- O..JQ ~ .~ .,. :; E " ~ z o i== ~ ...J ;.0 U C(, - U Q ~ ~ U - "" "" 22 f-< ~ 2 ~ ~ (/)~..... .'::!:J ..........c c:: 0 .......0 0 (l) V> ~ ....... --<"f ~. .:..: g c:; V) <1) :::: _ ~ v, -g N 8 0 II.) ~>o ,c:u.s n ro 6 ~ 0... '(;j ~-...:r;CIJ"'CI...c :::I .- v V1 ~....c:: c: t:: u _U~2c: '+-<........0....4-<-.1 00--, >--2 ';j .c ~ ;; W-1 6 U ;g ~ 9 ...... v.... '" is:~ 0 c: ~ ] n....... n u >-J..... 'oc~g.;VJ c:: ~ .... ~..o<:: v o c:;;.;:; >> .... t:: :-e-g"dO~~ ~-gE82v.E~~ Z 0 -< v g ~ .~ n .~ ~ u - ~ b1).....1 ~_ c.. M ~ ~ .- ....... .~ .... -6 E VJ..:3"- 1') ~ - - 'D _<(p...5""'dUJ~~n ~ o C C .3 '" U ~ 2 ~'v) <t; g u " -5 c;J ~ ~ '" " ~ c: 2~ G> '" ~ '-<> o '" c:; --" uu <t; "" 9 VJC; ..........c:::: " ~ " jg~ Vi> v n ~ E ~:::I-< .sag '"-',-A: 00_ ~..c 8 > _ " 2 u ~ ~~ lJ '" - '" '0 c u " 1:: .g .g ~ ~5] g 5 ~ u ~-c, ...... n ~ ~ ~~- >< >< '0 c;Jc;J c: c: '" '" ?JJOOV1 c: c: c: 2 ~ ('j c....,!:: ..::! ;:j n ",,(QU g u i:::-- .R~cJ - .;:J ~~.s ~ " 0 ~ B .5 g ~:::: 0JQ ~ OJ - ;; ~~ .9 -< .... " " ~E8.s -~;:::::::........ C::::o...C'10 CIJ"'d...Gc: " ~ 0 :::: ~ C .;::: <5 ;:; ('j ~ <t: -".O! jO ...... ::::......... V1 v", 0.. t:: ('j ...... P.. 0 ~ ~ ~ ~ ~ ~~; ......) ~ VJ ;;; ^:$ v :s: v ro ~ t:: 0 t:: 6p;~~~ <U <U ~ a c; .........:.c: ;>..J:::: t:: ~ ro ~ <n g too......) 1-0_ .0 ~ ~ a :a -du..J:::: ro ~ co " '" O! P. Po <t; "''d X U U t:: c> ro ~ o " 9 U "<:'! -B .~ o ~ <U t-VJ-5 " " " c: .8J c: O..J c o " '" '" P. Po <t; ~ '" u (Q ,'" u' >u ~> c;J c:. '" ~ '" u (Q >< "" " NJ '" "" '0 c: 9 UC ~~u - ~ o ~ <U t-VJ-5 " " " c: 8J c: O..J <U <U" t:: ..f' .s"2~] -5~~~.B[ Mro~~;{j-d t(~.g~~ .1-0 U ~ b .8 ""d g I-< U ~.2 k,...... ..s J:Q .8 r:/J 1-0 .~ ~ <B co .8 0 .~ g ~""dz:::r::~2~2]Bo::IS..'" .~ ~.a E <U p..,.:.::: .,2 ~ .a E '" - ^5U'~ ~~]~j E~ ~~]:g ...... ~""d;><:~>'A.U~""d:;"~ 0.0> ~.;:;:;;;> 13 0.0> 4-< ~ ;;> ""' t:: ~c<jOo ~ot:: ~c<jo.8""d :Q ...... <U ~ ...... E 0.0:9 '"7 E ~ 1-0 .> ..... U ::; V)""d <u c ..... U ;:::I VJ 0 8-d ~>E~~ E"*~>E~ ;{j~u3 4-oCc.....1 ;>>-4-;05c.....1~ ..... o:s 0 t:: 0...... ..J:::: 0 ~ VJ <u.;: U ;;s ~ ~.u <U -:: C) ~~ ~ J;J ~ ~ -;; 0 ~ .8 g. ~ .: -;; 0 ~ i:: j ;:::I t::~'Ou c u;:::l c~'O...... v >, V)~...... ..J::::o-~g...... Q:)c('j .~ !:: C 01) p....;:: ('j ..... !:: t:: 01) II) t:; .9 P-. 3 5 C ~ ._~ .8 0.. 3 .5 b ~ 0 1-0 .3..... c::: 01) V) k.3.... c U) 0 bO o ~]:~ ~ ~ ~ 0 ~ 2:~ ::r:: P. g J: ""d <t. 3" t--< .5 ~ J: ""d <t. ~ .8 .5 ~ - - '" - '" co co <:::' :0 E ro ~ 0) o 0: 0) c: "" ~ o C>- Q} [( -0 c: ro 0) c: ." ..g c: o ;;; c: o ~ 0) ;e ~ E " E E 0 u " '" " ro ;; 0 ii ~ e-- E :g 0 u E " :c .~ >- c:t 0 '" c.Q. ::E ~ " <{ '" 0:: Vi;;; ~ o 0 0 "- 0 0:: ~ a. ~~ o ~ co ~ 00 ou Z .<:: - i= " t c: '~E U) 0:: 0 - 0 0._ ~ ~~ 0 z "';;; a. ~ c: U :QEil.. W " oe ~ ~ m 0:: c: t=~ - Q} ~- C U S'E Z U L " ro . <{ C> (5"- ~ .!!! - - Z :;: Ow D- o:: " -rot::'ro 0 .>: ~o:~ !:: .. ...I Z Vi c: 0 .. '0 w 0 ::E U:;: o ~ Z ~~ 0 i= " " > <{ ~ E ::E ~ " 5 ~ '" " " c: .~ ;; g iE c: .S? ~ ;;; ~ 0 ~ g~z iE" ;;; E '" .S! P- o. ~ x ~ o c: 2 U o~ .s ~ ~~.5 " -5 ...;''D U 5 > ij ~ ~ <8 '" " o.~ '" " ;:;; ij u~ u c: :oJ '" "" " -'" .g ~ '" cLj " -5 ;; ~ " " u c: .sE~ <..,...., ;3 E ~ 8 ~ ;>::::<t:: o C':j ~ P..~ ""d 0. _ c: '" c: " 2i3~ 1-.-R.-5 g D. :::I d: <r: S; ,-, - ~ - L, c ;:- (j ~ " " c: 5b " cLj " 'D "S: . 0'D ~ " o.~ B "g. " ~ .2 U " ~ ~ " .5 'D '" o ~ ~ E J;1,? j~ >>- '" >> O~ :oJ - ~ >--ai '" u 3 " -'" " ;;; ~ ""'" " ,,-5 " ,.<:; E ~~~ ""r-- ;:;; S",,, ~ """ ...r:: ro .... V) M.5 5b~ ]v~~ ~<2 ~ .; (';j 0 VJ Q.) ..... I.{) --...c ~N]g " " ~ ..oj3ro EEl- o 0 ~uB-- '" ~ ~ ~ " u .8 :::1;:; VJ~4-.< 6 ~ g "" ~ 5 -0 ~ (J) :: ::'0' 0 :%c5.z. E '" .S! P- o. ~ x C'> N U -g U ~ro > x C'> <.) 8 ~ 'D'" @u > ~ -;; o E " ~ 9 S v g 2 -5~ o ~ 0) ~ t-<VJ...sU3 ci: '" ;:- ~ ~ U ,..,....-Oi"j...c U v oS Q'~ ;;; -8 4-< ro ~ p...:..aO"'d(\) p. i3 .~ ~ ~ ro '-' VJ ro ro 2:~~@"E Cd U c:: a.. 0 c: > C':j v <..,::. ii:'""O~..og .s@'~Cd~ M ;:j ~ ::: U 8 en E r::o cd ~ tJ c:: :::I V "''D'D ~ @,2 U):; u vi ~ <U 0 "'0 V) VJ ;> @ ;:; 8.. e v u 0 0.. ::: go.g.~ ~ o -;; 6r8 0." 0.'" ~o:: ~ .~ C;VJ d: 0 'T - E '" .S! P- o. ~ . x ~~ """"'mO("'.l u0:00 c(l1;;> ~ o ;; " ~..a "S: 0 " 0 ~u ~ -;; o "'d t:: g ~ ~ u "0 <!.}~ t::..... ..s .~ "SiJ"; o H II.) C c: !--<VJ.s~~ ;:- (j c: 2 ~ '0 ";; ~~ -- +-' ' ro ~C':j "g::;; ~ 'i:: Q.) ~ -B ~ Po...... 0 2 0.0;:::::""'0 .S f1 V)~.!:: "'0:"::: c:: > 8g;~JjCJ) "" 0. _ >-. ~ bJ)"'d.t:: c: v c:: c:: ::<: >-ro.s:.aro.3 u'ON~~;E o c:; u ~.5 1) O..J 5 > .8 gp-5 .... .... - ~ ..: ~o.01)>.q z;;;;:,-...- o 8 @ g G .9 ~ r") e- 1) "2 ..J .0_ ' o..s 0 ;:o:26~'o8 u > ~ <8 en - r-- " OJ) '" "" ~ ;; " 3:.a " ~ ;; 0 " 0 ~u '" o o <::' '" E ro ~ '" o 0:: '" c "" <5 c. Q) Cl: -0 C ro '" c B .c o ~ c o ~ ~ ~ 0 to ~ E E 0 U '0 ~ ~ ro ;; 0 "ii ~ - E ro 0 .~ u 5 ~ :a .;;; >0 ct:: o ~ 0.0, :;: ~ ~ <( '" a:: v; v; C) o c 0 "- 0 a:: --"- 0.. ~~ c ^ c c C) o 0 Z ~ i= -" ~ t c ~ E '" a:: 0 - 0 o ._ &c: ~ 0 z "''' 0- 0.. ~ c U ~EJl W '" 'E~ - ~ a:: c t=~ '" ~- D U c- - E Z o L '" ro 0 <( '" 0"- C) .!;! - Z '> ~~ 0. a: '" ro L ro 0 -" J:ci:2 t: '" ..J Z - U> C 0 '" '0 0 :;: W "0:';:; o ~ Z oCt: 0 - .- ~ ~ " ~ i= > <( C) E :;: 0 ~ , 0 ~ ~ " C 0 :g '" ~ " C ~ o ~ ~~O g'~Z :iE" " " 43 ~ ].~ ~ ....~O V) :~.~ I-< .~ '- ~ _ 0 t: 0 _ E.'" en R.Q-51 Of) Of) . tJ)U 0.5 ~::?: c: '1)"0 ;?;:...... ('j ~.r::i::..sg :2-oo-v- 0.0...... ~ 2 (:j ~ ,..... ('j 1) 0...__ ~ F Q.,..!:; '"0 ('j ......... - ...... Q) ;:j ....... '"d::;..... '"0 .: 'c: ~ (5 ~ :~ ~ 3.- ___ ('1 v ." -;:::",,-';:j.- > ;:::: ::; t:: cr' ::: ~~ ~ ~ ~ ~ ('j i:: ~....... . ro R ('j .q 'Tj E "'0 _ u - '1) ('j (l) c; ~ $3 .5 8J ;::: e o..-~ ~ 0 ~ p... ..-t. > t:: 5.-0 ';:;' "d ~ " ~ ~ ~ "5 ~::g ~"'d-;;I-< ~ t:: ..r::: OJ) - ('j <J') -B ~ ~.~ ~ ~ ~ co..... . v 0....... h 11.) 0 ~ vi ~gt:c:o o5.28g ~~ -; .9 I-< I-< U 0.. U) 'i:: o'01~ ~8 Si;2 f-< = c: o8__:tS "2 i3 U1 E ~ c:: (t) 'g (!) ('j or; 0"''''0 u ~ P..-...... "";.< ('j ..r:::..2 bD~ 0...,",,;:; u ~ c: S~~o.('j rj -g ....!;V) u 0.0..0 ~ ~ ~ '51>.5 8 p. b1)........ .91-o~ ~..s] 8 .g ;a .~ ..... .8 i3: c: VJ c tJ) 0 c:: o '1) ::: 0...... 0- ~ E >> -0 --~ :5 ('j ___ Il.) c: ro"'d'"O 0....,::: ~ OJ).g 0..';; ;; ('j 0 ~ C'3 -< ;.;:::; ~ ~ .~ .~ ~ :; _9 .~ 3Eo.c::~~~"B ';:j 'tjj........ ~ >, VJ I-< ,0 ('j 0 ~"O vt::b1)>.........<+-.. u 0.0::::20-0'"0 o (!) en II) v 11.) CO..o ~J5 v.s~.s ;::: - U 4-; ...... B (IJ .5 :..0 r; 0 '-' c:: "'d f=$ ~ r;; ~ 0 Db ;:.: c: ~ 0 u .~ CJ) 0 III 5 .~ ~ 8 "e: ~o E E." e;:::::.- .... ::;Ov~ 50 oE-5~..suE :D '- o '" tI) " ;> -;;; ~ " u " '" .;:::......... g.-V) ~..2 ~~ 00{;; ~ 5 5 .S: .B'".-a tI) " 0 ..3 !::: E 0'0 "'2 IV ~ g.91= ~ t o'"d '" " ..c ~ [-"" 23 ~ 3 -;;; ;:::t; "..c ';:; ~ E S " o E u " :;;'c S 3 o c ~"" "" c ~ ;:j E ~ .;:; ;:j "E .~ S ~~~E OhIVV;~ o ~ 0 o c ft.q c ~ v.::: 51 ~ 9 .~ <'3 >-. ~ ~ P-.;:::: ;:j ~ "d " U I]) .~ '"@ 8 ::::"898 <'3.;::: .t>.I) 0 ::; I]) .C U') cr'p.o~ 00 " tI) ~ 0.. " ".D ~ >> .s v r;I r;I v ~:9 ~ E ~ r;I IV ~ t ~8t;::..s@ 8..... ~~ IV <II <II~ V ~ t>.I) :.a ;::::: , >-. ~ o ~ v.~ ~ ...... p.. <II 0 r;I <'3 OJ t..... ..:2 E ~ ~ g ~ ..s ~ 0 E ..s OJ r;I U OJ ~.5~v.s .s '@ .9 .g ]~ i:: ~ g t>.I) ~ Q) ;::::: C.5 S ~~~Bii] ..s 6 ;3.;::: ~ ~ -~UO"""";:; E::;~Eg~ N co co c::> ~ - :a E ro ~ 0> o ~ D- O> C +0 o 0- Q) 0:: -0 C ro 0> c ~ c o ::2: c Q ro ~ ::2: :E <( 0:: ~ o 0:: a. ~ z i=.!: 0:: 15 oz a. w 0:: CI Z <( ~ z::; t2 .. 0-'" !:: ~ z Vi o ro :E W Z o i= <( ~ E :E ~ c ~ E E o u ""CI "* ,; 0 a. E ~ o ]j U E ~ :c "Vi >. ct o ~ c.a. ~ ~ '" ~ .. ~ c .. U .. OJ ..'!1 _ c o 0 0;:: c ~ "E" t= ; > - v;V:i oe 0.0 ~ m_ e. c e o 0 ~ ~ E-' " E . ~ 2::ii -8>~O: ~ m_ e - -S ~ S~ e.--.--- (; ill 0- r\) 2 ro ~6.L _ c o 0 -0:;:; o ~ -S~ . ~ :; . > ~ ~ 5 ~ ~ ~ :; c o " ~ 0> ~ :; c . o ~ :;=::) . ~ ~ 0 g~z :E~ ~ " sg 'i:J V o ~ slJ " ~ " '" ~ -S "5h ~ "OC OJ 0 .s ~ - ~ ~ 5 .8 o V..5 .~ ~ . "" ~ s " 0 " ~'::'.s <J:) ~ \-0 :-;::: c.o Q.) ~ 0 > ~ - 0 <E ,9 ~ C C ~ V 0 ::::: ....c:: ~ r:j ;s 8.. ~ u 00. " '" n "" '" r.n~"@ >> .5'1.:' ~c~c: ....co toe .s ,..., t;:: "5 ~ g .~ ;;j E 's ~ c; "0 a ~ < :.a bD ~ ~]3~~~~ ~~~~~~"~u~~ ......... 0.0 U ~.;:::: (.;j:g U f.I]..... V) =' v.::: "'\:j <I).!?':p ~~eo~.~t~ 'g.g.~~~2gb..2."Cfr.n "'\:j~~~~~ o\-o.-o~~._gu"'\:j OJ C 0 U 0. 0 c; ....c:: 0.0 E ..;:::: ~ 8:<;:: ..... VI C ~];>~~~ ~E.2~~8E=:~ ~R~@~~.~ .~]~~B]]~]B u\-oo\-oe~~~~~r:ju.~ ~t~_~ CO"""" > 1.)"'1-0 O.nc-::r:: 00" r:j,::,~~Uo.U~~B~.~~]~o.E~~ ~ .~ ~ ::::""0 1-1 go r.n ~ 0 u 0.0 \-0 r.n :; IU V U V) ...... D.O...... t'1 ~ ~ bJ) v ~ C .'::: 0 a t:: U') \-o....c:: Vl ~ 'ao_ov_c~._~r.n-r:jou~-:-;:::~ [~~i~J~~!~ll~~i~~jl ~2%~rJ)2~f.I]u5~~.~~~~~"> ~ Cd ::: th.9 g ;3 9 ~ co.o g c ro <n ~ 8 @~~] ~~~ ~ll~1a ~"~ ~~ ~~ ~ o '" N o C> <::! ;0 E OJ ~ CJ) o 0: CJ) E o Q. (l) 0:: -0 c: OJ CJ) c: '''' ~ c: o ::;; c: .2 ro OJ ;.e ::;; :E <( D:: C) o D:: Q. C) z i= ..c: D:: -g oz Q. lU D:: o Z <( C) z a: o t: z o :E z o i= <( C) E :E ~ '" c: '" u '" OJ '" :> '" "" '" ...J - en '" W c ~ o ~ :;::::J . .. '" 0 2~z :E::E '" c ~ E E o " ~ -g rn ;; 0 Q. '" E ro o ~ u 'c - ~ :c 'iij >. ct: o ~ c.o. '" ~ '" _ c o .2 "''' c u "E ~ i= w > V;U; 00 "-8 - ~- o. c 0 o 0 00 - ~ Eo--" ~ E " ~ ~~ ~E(L CD - ~- c6 '~ ro w 0"- - Ow 0- (i):::ro tf&:2 _ c o 0 -0';:: o ~ 5!-E ~ ~ ::E ~ > '" ~ '; '" .. ~ ::E c 9 :; :~ ::E 1'1 '" ,~ 0- 0. <t: . H ~ QN ~u ;;j > >< --' r", uu >co ~ o c: .g uc (!) t.S .,.... .s .~ u o r3 cu f-V)-5 ~ " " c: 50 c: 0C1 . ,. '-' o .... o ~ '-' H U c:<3 > .~ g ~ .... 5';: c; 'i:: -0 <B] .q'~ .~'g B ~ .~ ~ u ] ~ ~.~] g,~,s S,S:~ gp ~ 0..'0 g -;; U ~ ~ sgfC:Xg"'co..2 "'0 __ 0 '" ,_ t:: (I) u e -g "B ..:: ..2 i <E .8 '~ w~ g ~ .... V N ..-". Q) V) ,- 0 ~ ('j 25 .;; -5 .~ ..2 'U U c... N ,~ (/) <-) c.J :>. or:'~~g:;~~ roU_....,bIj O>>ot;J)ii3~~2 ...... <1) ~ ro t'3 H ...c: c:_ 0. '" p.o~......~>~.-:=. g.::o ('j ..; p.., 'U 0. "'0 :::: .... v 0....::.::: (1) 2 ('j & Q) ~ ('j ~.... ~ C") c:;- :::: V) .......:J v '"'Cj ~ U. 0 "w:: t; E . :: U C Q) ('j v u P-.CJS~.swu.s '" ~ &...... "'O'""'d o::S :::::::: ......... u ('j ro rn,.;,.: '" bJ)"::'::: ~- g -g.5 b ('j ,..0 o.~ :s > >. t;J) .s ....c: o .... :::: II) t: E "',- c: <U S::9 .Q ~ .... 0.'- - '2 E..5 u bi) ('j v t....; g .8 c....... 0 VJ ~ ~ ci >=: :::: - -= 0 0 0 "8 ('j .::: ;::: u 0 ~.~ ~ v E a. "'d ro b()...... ~E~8o P" 1.) (1) ";;;j E '1) .... .... ...... v ......-clo",o<:;: '(i; c: 2; v ...... .8 ('j u ~ C ~~ ];.::::::~~ ~..D.E.D c: ::: .s .s ;::::I ;::::I en V) V) V) 1'1 '" ,~ 0- 0. <t: . r00N >< uu'iJu Go::J~> '0 c: g uc .B~G o Cd 0 t---<r./J-5 ~ .0 H " H 0.> 0 c: ~ ..... ~ C'JH c: - cur:1 CI) -c1(;i S a) Q ~ u ~..... ..... ~ ~ ~..c: ~ bJ) c: ~ 8'''''' 1=:.1=1 - ~ !7 0. ~ t:.@ .~ ~ ~ 8 J2 ~ E E oS c: '2 0 ~ 1) '0 ~;::J bJ) ~5tjE.s3 lI) 0.. ~ 04-< ..s 'D ,~ .... u 0 4--. c: _ (i tJ) 0 ~-5"(;2]~ :s 'D .2 '0 ] 5 E ....., ;:! ,,, E (;i V) (;j Vi ~ 1) S ~ V1 Q :; ~o.E~~2" 1=1 0. '" ~ -1) 1-0 o ~ ....... c -c1 -c1 ::ogf~u~~ 51 ::: ::'2,: 8 8 1) g .Vi .9 _ 0. V1"2 v -€S c: E 5 .~ u ?f ['- - o 0.> CI) '" D. cO "" ~ o is ,~ :0 c: 0.. ~ o ~'D 2 c: u '" . o.>C'JC'J 5~ .~ "d..... ;:j: t::~~ "'~'"" N o o C' ~ '" E '" 0, o ~ D.- O> c: t o C- Q) GO: -0 c: '" 0> c: .;:; g .c o ~ c: o ~ 0> :2 :1 c ~ E E o u ." ID ID rn ;; 0 <i ~ - E :g 0 u C ID :a "Vi ;>. ct: o ~ c,o.. ::E ~ ID <( '" GO: -;;;V) " o c 0 0.. 0 0 D:: - a. "'~ c w c c " " 0 00 Z ..c: - i= '" t _c ~ E '" D:: 0 0.2 0 z COrn ~ ~~ a. ~ C" .gE[L W Q) 'E !E co D:: C i=~ - Q) "'- e u "'"E Z ." " Q) ro 0 <( 0> i5n. " .!;! ~ z '> ~~ g i'i: Q) &&2 0 '" !:: '" ...J Z - '" c 0 '" cO ::E w u:.;::: o ~ z .s~ 0 ~ ~ i= ::EID > <( " E ::E ~ ~ ~ " ~ ~ ~ ::E c .~ OJ ~ ::E c '" o ~ '';:;:J . ~ ~ 0 g~z :E::E " '" ,g 0. 0. <t; ~C') ~ N 0 x uu "" u cP1 c > '" ~ ~ ~C')o N - X uu,," u ~ >P1c > ~ '" " on '" 0.. ~ o c 3 U ,2;' <l)..8 - .s.::1 u ~~~ " " " c Db c cu >< "" .... ...J <<: ;:0 CI e>: '" ..... < ::: :3 '" C';t ~ ~ p..c': ~~..o> .: G.g <U ~ n 0...... uP-. 1-<--' '-5 P.. 2 CI) 0 ..2 " o.~CU(:qU .t::<(c:Ou,- '" v 0 p-. ,.J 0 t::...cuZJ-<.o :3 -.-~~ Q b:o ~ e .<;:: VJ 0 ~ .8 SJ g E ~ ~ <l) "O~'1)v"""'......a 8 I-< 0 P-. E r! .;:: bl}O____1-<OC:: ,+-<~<'3.B...:=o] o>=:~~~...;:..... c:1 ro 1) ~ Q().",::: ~ rro...G IF) ~ is U' .",:: ~ r-- !:: u ...... (l) t: 00 iU 0,,) p.ro t::..80 o..~ g. ~ 'C:; CI) 0 --< (J) ....... ::'3 c::: o U .D C <!' 9-.- ..., 0:; u ;:: ;2 Q> -< !:: "i: .... ~ u 0 ::1 ~ .......,2v;<(?: E-5 .e<i " ~ ~ '" <U ~ J'l~U ...... '"'CI n ....... E .B 0.> o '1) t<3 ~ ~ o.u c:::...c: .... "'d ::'3 u....... (\) ;::3 ;:j 0 v .~ (/) ~ ~ '"i: .~ <l)..c: ~ ~ u E '" :.ci " ~ '" a.~ r.n bJ) U .~ t::t;:: ...... -a ..... '> ~ ~""8 Ol)o.", '" ~ c g ~.g u"" u 5 ~ 5 "'"3 en c or C o " 0 u ~ u ~ o " ~ u V) "0 U) c: l;j ~ ~ @ ~ 8 '0 (l) bJ) ~ ~ (1) EO::; c::: ro v..c p.., ~ ~ -c: 1) o tJ) UJ ":;' <n ::I a :;gp..;;,:ft"3'""Oo t:: I-, P-. k........'fi b o..t::p... OOt:: .......... v t: .D 0 VI V) ~ '"d t:: r.n U "S: ~CI)..2 0...... t:: 8 8 v ~ u 5 0 Po..c -5 .::: ~ E '.;:j <1) U 4-0 VJ V iU..2 ]~ ~.~~-~~ u 11) 0 .>~ ~ 0:) . .5.~ 'c;; M c: -o~.....2-g~3 g'OEP-.~::::u uvEP-.cgg N <..) v ~.3 _ - V;~]-;S <3 23 ~ ::: M _ [/) k) E 8 ~ <2 i; 0 <::: ~ "'-;; .~P1 @~u ~ 0 C ~ >-.- v ~ bIlO>;> OC.A)UJ 0-55.2 ~2EE E-bo~g v c.~ ~ :c 0 ~ ::s ~ <..) ~-8 .(; E 0.. v . > ~..... b(lc <'3 _~ C ~ 0 ~ v...c:..... ~oE<..)u .D c. ~ ~ .~ ~--;~.....-o c: c C -0 ~.3 a ~ c ::s c.......=! '"" IU V V1 --' rJ) .s6~8.g IU 0 <1) ..;:: I-< <..) <..) ._ .5 7n ~ ::s a v v c"'O Q.) ~..D~~-o " ~ -5 E .... -g (\) .ggf1 C.OV'O(";J u --,.r: 0 M .0 ..... '1'::1 <..) ::s tn 0 .... V V1 ...c: c ~ '1'::1 '1'::1 ~.~ 0. ~ ~ ~ 0."0 C ~ 0.0 C '1'::1 ~ 0 ~ ('j c..:: -g ~ v;::......::sVJ~V}-o~v t.:::::S~VJE~...aV15. .u -g v c; ('j ::s g ~ 0 v <..) ~ .C ~ u..... v...... ~ 2 0.) ~ i; ~ 2".a ~ VJp.bJ}~::So..(";J~V v IU 8 S -~ 0 .C ~ ] ]5S~~""'~""'V1 <..),..V1og~6c;;:j::Sd ::::C:~-o""""~ V}3o ..... E.~ 8 VJ en 8. c ..;:: ~ .C; 11 ~ 01) ~ g ~ g..S ~~E~~~]-gE~ ~ c: V1 IU .g !.;::: ~ ~ c"E :> ('j ::s 01) <..) .0 - 0.0 ro 0 ;:> t.D 0 ~ 2 ~ .c: ~ I-< U U)c:""8,.:::.....~;;_o.... 1U~i3~~-oc~E~ .-c ::! ('j._ 0 c: 0 ;:; [--< '-' ....c "'0 u ('j u ...c ~ ~ N o o C:! ;0 E ro 0, o Q: '" C +J o 0- OJ a:: -0 c ro '" c ~ c o ::::;; c o ~ '" :-e . c ~ E E 0 U '0 ID ID ro ;; 0 a. . - E ro 0 ~ U .c ~ :c .~ >- ct: o ~ c.a. :;; . ~ <( '" a:: v;~ C> 00 0 "-u a:: - e.. a~ C. C C C> o 0 OU Z "" - i= ~ t c E~ a:: 0 - 0 ~ E . o ._ ~ i5.12 0 z "''' e.. ~ c 0 .g~1l W Q) 'E~ CD - a:: c i= III - Q) > a_ a u SE Z u ~ Q) ~tf <( 0> C> .!!! - z :> ~~g D: Q) J:~~ 0 '" !:: '" ...J Z U; c 0 '" '0 0 :;; W "C~ o ~ Z :::;.E 0 ~ " :E ~ i= > <( C> E :;; . ~ 0 . ~ ~ :E c 2 ro '" ~ :E c o ~ :;:j 0 ~ . g'~z :;iE:E ::::;; " ~ .;,: "0. 0. ~ - ~ ON ~u @> >< '" uu GO') - ~ ON =Ou ;;> >< - '" uu ~(:::) '- o " .g u ~<i'1 .s .~ o 'c;:; (l) [-<<n-:S ..; ~ ~ " .Cb " P1 c cJ VJ r; .n c.s OJ '::::: I:: ...c: """ ......s (1)'" <"3 r./) ::D u .8 Q U u5 .s c: c: P.. i5 i'1 <1) '""d.9 I ('j g"E '""d .~ 9 c: ~ i7;.::::: v .s (J.) .9 V) ~ ;..::: .g <J..) 1-0 U 0............ 0.'"0-0 P"'(l) 0 Q.) o.c 'E" _~ ',zp'-u 0.0 c: 0 <;;; o.;J E ~ Vs ::::~~-ou uP.(\) ~ "" ('j -0 1-0 <U c: 0 V) t:~, ~ -<r: .s ~ ~ ~ (':j 0.> u '""d 0 - uC: <0 e-z'";j bf)c:~"'~-;5; cQ.j'o'::'"OS...Do~v8('jE""""-["j 0- -o=:: Ou ,~>,gt::~~ ~...... 0 3 b ~ N _ _ ~ ~ .- v > b .<2 "'0 c: -"d M I ~ ~ _ c: 0 V) _ c: g ~ c: c:: U U ..... 0... 0 VJ ~ bJ) 1-0 c: ';:j ('"j............ ('j ;.a >..2 .- CD <"3 ...c: 'r;; 0. 0 - '""d ~ ....... en" ('j 1-0 ~ 3= ~.~ c... VI v '"0 E ::I <u 0 B! '0 M _0 ~ OJ 3 0 ~ c: '""d ;; ~ ~ ~ 0. if) _ ........-0 ~~C:tI)(':j;:2r./)~v'-"""C'jc.o o ~__~ @"'::::;,~:J~ @iJ-.i:;;jC:c.o..... ...... "' r~~~~~o...Dv~~~ >' r';J .:a.....6 v v. P: ~ ~ -: - ~ ..!--; ~ 2 u 2 E'::;.s ~ -< "2 ro e ~ ~ ~ E C3. 0.1I1 E 0 0 1-<'- v d c: 0.. - >-. 0 VJ~ 0. ~ U lI) ,0 > ...r:: M .2 ~ g. c; I-< <"3J:: v g;:~t-<P..0;:j ~~e':; ~ E"> 0 :g"i23 ~ ~ u u g ~ -5 ,.,<fJ <..:: E ;:; .Q ~ ....s DO >- .J) 0 3 v <fJ;.;s -s >-'-< 0 ~ .8 -...... c:2;::Jr......J:JO'c:2-=~v<JJ<fJ P: c.S ~ u..J o..VJ 0..2 0. 8 <JJ ::: p::J ~ ~ 2 ~ - " " .~ "0. 0. ~ - >< ~ '" 0 uu;;:' > (:Q I:: ~ " N u > >< """<MO uu;;:' Gro 8 N u > '0 " ,g UC iU ~..... -B .~ u o ~ v t-<<fJ.s ..; " " " Cb " P1 s ~ oM 0..8 v ;:,0 ~8v..o c: > c; ro .;:: -0 ro......~>~bhr-:::: MiU 0:,0_80 "'5 <I)~U ro ::0 p. 5. u5..o iU ..~ ;:;; E :::: ...... P-. p... ~..c: -= t:: v ro ~ ro ~ ;:s ~ ~:-;:: It) u r') I::.S ;:;; (I) :::I I:: g E ~ U 'Db.8 :::: :::: u l) '+-< 'C:; P,o:Jt.S-g iU o.s.;::~ E o ......~ >--"d ,5 'B ~ ~ .... I ..... c: ro 2 (:j iU '+-< u rtuGroEt;~~OS; .:: > ro c: '" <JJ 4-< ~"""~E4-<o~g.,go o <E ;,.g ~ ~ MO...... E:g ~ ~ ..0 <fJ ~ (3...... u U o '"Oc;c:o.o.rorolt) ...... "g g..c:'bh"O It) --- iU -:E 0.. iU...... <I) c: It) u""" U 4-< o..o..~"""~(3C: c:o ~~E;:;;>--.o.g~alt) _ s v .~ ,= 0 It) ~ iU ~ ~ o:=! '"0 p. u P. E "~ E ~ v i::...... <fJ 0.. iU iU'C:; S 'C:; Vi ;;o....E~<r::.s-:EE:=:EiU o '" '" ~ bI) ~ 0. " '" Ii g ;.;s 8 u5 c8"g~ ~ E..s 3 iU '0 rJ) c: -B ~ '2 E c:; iU '"0 ~ ~ ~ ~ 'C; U tJ) 1'3 rJ) rJ) 8805'0 P-. c: 0 .... CD iU - .... <3 S g ~ c';:: ~ co;! t5..... ro c: c: iU U ~ 2E::::CJo.. co;! c: co;! -B 0 ___'r;; ~ ..s "'0 r<> 8 ...... -;:; ~ "'0 IV CJ ;$ It) g.s g...... u ~~gf~5s[j =:'0 II) CJ .~ g Q ~ t5 u ::: iU tn.@ ro<..::-5<r::8 '" o o <:::' :?; E ro ~ 0> o ~ D- O> C +' (:; C. OJ 0:: -0 c ro 0> c ;g c o ;;;: c .Q m 0> ~ ~ E " E E 0 t.) "0 " " rn ;; 0 i'i ~ - E ro 0 ~ t.) eo " :c 'in >- ct: o ~ "'"- :E ~ " <t '" 0:: <0-;'; C> o 0 0 "- 0 0 0:: - Il. ~~ o. c 0 C> " 0 00 Z .c - i= '" 1:: _c .~ E U1 0:: 0 0.2 tf2:@ 0 Z "'m Il. ~ c u ~~CL W CD 'E~ <D - 0:: c i=~ ~ CD ~- Q U ~-~ z CD ro 0 <t 0> c;"- C> .!!! r-- Z :;: o~ 0. a: {ij ~ (\J CD J:Q":': 0 "" t: .. ..J Z in c 0 .. co :E UJ "t:I -z o ~ z =:-E 0 " ~ :; " i= > <t C> E :E ~ " ~ ~ ~ " :; c .2 rn g ':E c .2 ~ rn ~ 0 ~ g~z ':E:; ;;;: E oj .;< p. c. 0,; >< ,~ <( )5 N Uu-iJ0 GI=Q;;;> ~ ~ DJ)"o :::: :::: c: 1) g S - a ~ U ('"j 0 c: v <.2 - u.g ~ .~ ~ 8 ~ -'" OJ oj " <- o [':: ::J 0,; ;:J o e: 0,; ~ <1) ..... II) V) ~<.s~ 2c;i3r1S.2 -"'sEbOP. ....... [J'J OJ;::--< .~ B "0 E '2 g ~ t:: (oj ..b OJ....... 03 g,~::::p..~'~e --< 0 p.. IV J-o S 0.0 P. U ;:j p.. (\) .S P'cC/) :::: P..~ v ~.............. ro 0 0.. ~ 1) g ~ 0:: ] .5 ro...s cr' ('j..... ('"j ..... 4-0 0-> !::: >;:3 ~ :::: v O~C';I{,I)EO] -;; '0' ~ U3 OJ U v > I-o...r::: v > ::::1 > o O"..........r:::OE] D.. ~ 2 P. ..... 0........ ; .Ei..... ~ ....... (oj ,~ ~ ...... ~ 0 u -..........v UI!.) o 0 ~ IJ.) CliO' ~~~3~S05. J:.g,~ga~.s - N " oj .;< p. c. 0,; ~ >< ~~ ('") 0 N uu:Ou 2:0),@> ..; o rn c ~T3 "; 0 " 0 ""u . c; '0 ::2'i:: :::: ;;:; tU B v ~ .s~g.~.~ o ~ 1) c:: >=: r-<I).sLl)~ . " 0-'; oS >~ '0 ..... <I)"'d II.) <2 e :::: <I) ;:::I ro.2 "j3 ~ d P- c:: !\) M...r::: OJ 8""'" U c. c." bIJbIJ" bO.S :::: 4-< .8 3: ~ 0 "tj 0 t';! tJ) ~ :::: to.S 00,2 .- ~ 2 II.) -;; I-< ('j .s c: b1) <- 0 00 o N [J'J c: -;; U E'~ 5> c:""d I-< I-< V) "0 p., 0 ('j Q) ~::a '""d t:: c " OJ .8 ('j g E u ..... M...-. 1) IJ) 9u' P-.p.0' '- v ~ ..... p.. CO...o ~ 0.. N N ..; o g 3'0 .~ > c; '" 0 ""u -0 ]. ] ~ B ~ "3 ~ 0 .~ ~ ~ E~8.. ?' '0 8.- o s~ "R" s ~ .~ g.~ ~ s ~ ..... ';:::1 <IJ I-< .;::......~ :::;2 ro cr'ro 0 ..... V) U 1) .~ OJ b.O 4=. .s.g.a P'::::b.O~"8 '1)0"' o :J.5 4=. ~ ro .::; <IJ tn ~.~ t:: Z ;q..... rn g v EO:::'" v .M ~ '1) a '1).~ '-'V 8..8 '1) :::: Po I u:::: 1-0 ;g ..... C .g a gp ~ ro -a g. so:: ~.8-g ~ '1) :J 1-0 ~ ~ ~ ...... :::::::::.~ :::: 1-0.8 ro .~ _3 8. >. i.g "E ~.s bb NU~<;O~'1)...t:: !\) 2 b ~ 8 .2 8 .... ,8 .~ .~";;;~ u.&........&BZ'E 5 V1 ~ g. ~ g. ~ .ra s 2u:::J:::Jo:::Jv:>---::::IVI ~ :D'U s v '" " bIJ oj p.. co co -: ~"O .g is c~2 '1) v ro U -5 ~ --g ~~ '1) ~ 8 0 :J ;;. ...... ..... p. 2.~ ~ .... c -,..D :::: 0 8 ~ :J ~ ?--> 1-0 .z O"'.ro t1 V1V.....O..f3':::: ;::J ~ [...... ro '1) ~.ov8~~ .F; ~ ;;..i:: ~.~ _ V) ro p. V) ~ .;::,,,_ b <1) ro'1) ~" .'" 3 > ..8 .~ g ~ v ,8 .~ 5 B ~ ~ b E -8 .5 g ~ .~ :5 2' 'O!:: ..... E2:v~~2 2~~ 8..s ~ <;:;' bi) :2 N co co 1:' ;0 E 1" 0> o 0:: 0> C -- ~ o 0- " OC -0 C ro 0> c ] c o ::;;: c o :g 0> ;e ::;;: ~ 1: ~ E E 0 (,) "C ID ~ '" ;; 0 0. ~ f-- E ~ 0 (,) E ~ :0 -ifi >- C1:: o ~ <>Q. ::E ~ ~ <( 0: a:: ';;)v:; C> o c 0 '" 0 U a:: f-- c.. m~ c ~ c c C> o 0 DU Z J: f-- i= ~ t c E~ c:: 0 -0 L E ~ 0._ ~~:ii 0 z 0>1; .0- c.. ~ CO ~Eo.. W Q) .E~ "' - a:: c ~g f-- Q) m_ e u 06 .~ z " roID <( 0> 0'" C> ~ f-- Z :> o (i) D- ei:: Q) [U e ('J 0 "" J:~::2 '" !::: --' z - en c 0 '" '0 0 :;: W "C:o::; o ~ z 5~ 0 ID ~ ::; ~ i= > <( C> E :;: ~ e " ~ . ~ ::; c 2 1; .g ~ c e .2 1; " ~ ci gmz ~::; " E ~ DI) .s " -0 " '0 0 :0 C .. '0 " ;;; -;:; Ie: " c ..c " c -;:; " " N '0 0 0.- 0 > 0. 6 '" .5 0 - i::: > '" U D -;:; > ] '" 0 Ie: " t: 0 > on '" . Ie: c '" u .... 0. " 0 0 ~ ~ " N >< 0 0 ~ '0 ;;; Ie: '0 0) '0 .5 ~ -;;; 0 0) .... ~ ..a 2 ;;; :0 '0 " 0) 0) -ici .C c 0) 0 0) '" u " 0) " :: " u ~ 0. '" u > " 0) x " t: ~ ;;; ~ ~ 0 C >, ~ u 0) 0) ~ ;, 6 c c " 2' 6 " u ~ P- " " u " '0 C " .;; " " '0 "" 0 U u 6 E " 0 u '" 0 6 ~ .D C u "I: Ie: M C E 2 ';: 0 5 >, ~ " ;;; ;;; 0) 0) :: " " 0. .... :s '2 ~ '" "- :s ~ '0 ..c 0 '6 2' ~ .s c "" ~ " ~ '" ~ ;;; vi ';: 0 ~ " '" "" 0 " " " u 0 u .~ u .D u c 6 u > ~ "" u 0 5 0 "" 0 "" >,8 " "" ..c u ~ ~ '0 . -.s ~ ~ v ~ C 0 ~ C 0) ..c " .... <to " 2' N " V " " '3 -;;; '" '" 0) u ..c u ~ ~ ~ '" ~ Ie: '" ~ " .... '" 0) C ~ v '0 0 ..'0 '0 ~ -;;; '0 > ~ v '" 0 0 1: ..c CD" 0 0) 0 0 .~ t: ~ 4-. > ~ ~ ~ .8 (l) > ~ C u > 0 '" " ~ 0 0) '" 0 " ~ " 6 :0 " v > > '0 > ..c '3 "- > -E u '0 0. 0 0 '" 0 u ~ 0. 0 ;;; "- 0 " u '" C C ~ ~ 0 :: '" " c 6 c c ~ 0. 0 0 " 0. "- ~ U ..c (/] " U '" " ~ ~ :;;- - E ? 0' '" o DI) '" 0. N o o C" ~ '0 -" s ~ 'Y-r BC-3 " "EASTLAKE PKlrY .}.-- J;~ ...-- --D t P- !- -... y ---. , \ ffJr1'OJ< S1 ~~ \Y VC-2 ~ ... ~ EASTLAKE VILLAGE CENTER NORTH (VC-l) "4~ ~~ ,p \Y ) ~ --D -- MAIN ENTRANCE '- ~ (: )),'- ( \lI>) S -..-..V 01j."'~ ~ ':::{ VONS DRIVEWAY LEGEND @ ~ Traffic ::;ignol -0-" - STOP Sign FREE - Free Right-turn ~ REV. 03/D6/02 NO SCAlE FlG2627-1114.DWG 11 NSCOTT lAW & GREENSPAN Figure 27 RECOMMENDED INTERSECTION GEOMETRY -70- FAc:T1 Ak'F VIII U::F ('TNTFR NnRT~ ~ "" r. I "-' 1= ~ J:> <:: ATTACHMENT 4 Figures ..____ ".__._. .,_,.~...~"_ __..' w_o... ..~.._._ _ __ ...___.._.___......_,~.....,_ _ "_~._~,_.~._._ ___.___~~_. EASTLAKE I ACTIVITY CENTER EASTLAKE BUSINESS CENTER HOSPITAL I MEDICAL CENTER II , ! / ' / I .--- .i .. I I \ /--4 L~J~L._-=~ '\ "".".~ :........~ton__tr.e~ ~l. .r-. . ~ i . ~._"'\F1 :1:1 .-II~- '------J L __//~. : J~\ . :' ........ ,. .. :. >~\ 1111 if ........ -: =- ......... f .... /~ " -. IF · ,,-1 / ; f . . VILLAGE CENTER : f"'. " : !! VILLAGE CENTER : : EAST .... f.:: MIXED-USE E .. · /'.. if ENTERTAINMENT / SERVICE . . ,I. II' ... . i ,!. :i . . . ,.. " e · EXISTING · / ,: \. .:~, ;. CHURCH . ,1 !. ] I / --1 ...~.......................... .........~ ..: _ Otay lakes Road f-- ~ '. 1 r-....~....~.~......_~ ,.- \\ / : : ! I I . . . / / / ; NEIGHBORHOOD : r ',- / / SHOPPING ~ " -- . 9111'" f ! f , EASTLAKE z -< ,...;;j ~ ,...;;j ~ ~ z ~ ~ ~ ~ 00 o ~ o ~ ~ e N ~ ~ C - ~ (/) 0 Q)- ~~ " 1o....=="U u(OQ) ........:> Z ZE-< (0-- .... ~ Q)'- . < ..q:: ~ a:: .~ ~ < ....~ <ZI- ... ...Z~ ~ ~~O CD _...J';:: U uO <= ""' ~ ..- .!!! '0 .3 !:I:: !:I::oo"", ~U~~ Q..,~, Q) U !:: U ~.... ~",,,, ~I~ ~~~ C).... (0 (0 ~... ~~Z "",!:I::~... Q) '+- ~~ "'<""'~ ~ZI !::E.c:J ~...... ~~...z ~~ 6~ (0 E U !:: 8[;j oo~ ~"'~< ~~Q.., .c ....(0 u!:l::~ ~[;j::s~ Z~~ 00(0;2 ~< ~<c I 0 ~ u C <CEQ) I D I D..oQ:: C) .... '+- C"") ~ ~Q -~~ -00 ~~ ~~ Qe:. ~~~ ~~ 13 -g u ~:~~'I .......<0] U -g ". ~ ~.r ~1~1 ~ ~ 'a .2 ~~ ~j ~2::::;; e t::- =- ~ ~ ~ Cj ~ S-g a <J U :=1]" .2.... . .... ". ~ i!..:.,.c :i ; oj a "':&-fjJ \D""U ~ :I .....:= U ~ ~~J!:::;; dg~ ': :'~':':'~~ \. \, '. , .,~~ .~,~. , '\'itx/ "~'.'---j I~~<;~: 1:1 " ~ i ~ If) ~ a r:: ...0 1I)!;f ~:! ~I~ H :J!N~N ... ~. m "'.. I ~ n 0" "' ,; .. .. N m . . ~ .. .. - N ~ ~ - ;:; '" ,., ~ ;;\ ~o ,.... ~ ,... II) CD F:t N <0"'" lic: ~ t>i ell! ::1 al ~ i;; Ii: l!! ;s N ::: N _ N "i ... - ~ '" - 8 a_ ~~N_ -f n - .~ ~ * i "! Ii!f ~ d~ .ijH n j:::::':'.t:ili<Jj!!i~..o", ii\i ~ it i n i n ~ i H HI ! ~~ I-~'i!"ii.. "'~..'" ,,~ ~.hif; ~G.. t ~~ ~!! a::Uf!!oa. ~~ u~ EASTLAKE II LAND USE DISTRICTS MAP (PROPOSED) Change 16.4 acres from (VC-l) Village Center to (BC-3) Business Center. ,;' ~/ (""'.;::1( \ " U-....~)" R5-5 .A~ :--;:, ~~ ... ".......#'/ Ii ~oW-..,,'-~. RC-22\ Re-3.1"Y~1" \. . I~ ~"U q1.. R5-5 I. .... RP.13 I~'S:.::' __ .? \ '\, , BC-2 !11 1 \ ~ BC-2 "'i BC-;-t BC-2 RP"~ or:'Y:' \ b-~~ 9 II BC- J ~ f 'J \...i~'\ ~~ 0'1..-!!.~ -==~ RP-8 ~ RC-22 # I \ \..0'\..0 ,\\ BC-1 \ ".... ,,/ RP-8 \""" ~__ _ ~...... OM ....~~~')'~ II ~;...-- III' IRp..a#~ / / /T~ 11 f""..~3 Jb' L-1..'RP-8 ny:~-:...,.f/ ""'....._=~ I I ,It..../X, ,'"" f' '" R.....(,..."\~ 1WL...0S-4 IL..~, ',_,/ f I fRC-15}~y~~OS'" '" ... PA I Y \~~r\\ '~/l W '-1! II R5-5 "' ~ ,..II \\\RC-"I~~,J '-~ II.......~-'^\ ?J '" """ I ~_J-. \. _ RP-t rJ--.... 0S-4 ,-,r~..... ....lY]( :::hl.J1J;.,,1 "'" )~) ~'Jr~"""""~'~S-4R"'F~"i f', ,/l0S-4"RP~ ~ R5-71....!!5-~V~~.~ ~,,'''\ I 'RM-25'.,ft"pof,\ \ \~', ;-.. '.(!...~~" Y/ I dr----II" J ~ ,~\ \ \ "~' ~:\f I lilLPQ 'ICPF,<RC-loJ~:""---'\ \ \ I RS-s" ......),,( Rs-5 )05-7 :t --h-~ ~ RS-5' \ 'I /~ ..-J...: III ~ ''<"OS-4~ \ \ lL,.:/ / ''''''\,/.....--=-- <t--=:::Il Fe ~:\ \.\.' />\, ':f._F;r;t.. RP-13,) "'" rj'~:-. '\~ \.~" Rs-s""'"r=? );~~~ .1 i.. '\.\ \\ RM-25"~' r' ;;;/c.10 /. ~ "'~...... 11 XI~"'-: -::::.~-- """~ ( Change 2.0 acres from (BC-l) Business Center and (OS-7) Open Space to (VC-2) Village Center. RESIDENTIAL P. . I .... EstIIIos -I . ........ SIngle F8II1iIy ReIIliIII.... SIngle F8II1iIy ,... ." ............. ConcopI -1111'11l1li SmaI Lot Rr r' ....... COOodol....... - . .................. ConcopI - ......... Coo........... D 1" '" ... Condo....... Dwl .-..... ~8miIy " . ..... .ul-Famiy VILLAGE CENTER & COMMERCIAL VIIIge CenIIIr (Retail) IIIIogo een. (Prof. Admin./Lld. Relail) ~(Relail) F..-y Commen:I8I PA PI~r . ...... Md.....Ii..e BUSINESS CENTER tij~een.- -.-mgPark DiRicI ElC-2 __ een. - MnJIac:Iuring Senrice Dio4rict BC-3 Business Center - Core District FIGURE 4 EASTLAKE I SPA PLAN (PROPOSED) SALT CREEK I Parcel Land Use I Acres I Density I Target I Permitted Number Ranae Den;Hv DU R-16 Residential - Detached 43.6 0-5 3.9 169 R-17 Residential - Attached 20.0 5-15 11.9 237 R-18 Residential - Attached 8.5 15-25 16.9 144 Parcel Land Use I Acres Number EMPLOYMENT ISuslness Center II E-1 Employment 32.1 E-2 Employment 16.6 E-3 Employment 8.0 E-4 Employment 17.6 E-5 Employment 13.9 E-6 Employment 6.2 E-7 Employment 12.5 E-JI Employment 4.6 E-9 Employment 14.6 Total 126.1 ACTIVITY CENTER rNarth I VG-1 Village Center 38.1 VG-2 Village Center 13.6 E-10 VII. Ctr. Employment 16.4 Total 68.1 OPEN SPACE/PARKS 05-10 Open Space 3.4 05-13 Open Space 0.7 05-14 Open Space 0.5 P-4 Park 9.1 Total 13.7 Sub-total 0S-9 Open Space 0S-15 Open Space 05-17 Open Space 05-18 Open Space 05-19 Open Space Sub-total Total 72.1 6.5 1.0 1.0 3.2 7.2 18.9 91.0 Change 16.4 acres from (MC-I) Medical Center to (E-IO) Villagc Center Employment. Change 14.2 acres from (MC-I) Medical Centerto (VC-I) Village Center. 7.6 550 Note: This legend is for the EastLake Business Center I, Eastlake VIlage Center (north) and Sal Creek I only. The EastLake I SPA also includes Eastlake Shores. Eastlake Hils, and EastLake Business Center II. Village Center (south) Is within the Eastlake Greens SPA. R-16 Change 2.0 acres from (E-IO) Villagc Center Employment and (OS-12) Open Space to (VC-2) Village Center. Busincs E-1 Location FIGURE 5 EASTIAKE I ACTIVITY CENTER . CONCEPT (ADOPTED) \ , '. "'" n..._..._~......~ __tiooo> _..0..._ ., IIW Coqr" o.a .. ..,,, bPw"''\I ~__00n...._...1y ~"'''''Ojoo<Is.....,_...t._ --.c-..... .... "'-"_ J FIGURE 6 "- REGIONAL MAP San Miguel Ranch EastLake III GDP ..."~ <?'b>~ ill ,~<" o EastLake II Greens & Trails , " " " II II Village Center North Otay Ranch F1GURE 7 ATTACHMENT 5 Village Center North Supplemental SPA (Binder) ATTACHMENT 6 Ownership Disclosure Statement Appendix B THE CITY l ~HULA VISTA DISCLOSURE STATe.. -,NT You are required to file a Statement of Disclosure of certain ownership or financial interests, payments, or campaign contributions, on all matters which will require discretionary action on the part of the City Council, Planning Commission, and all other official bodies. The following information must be disclosed: 1. List the names of all persons having financial interest in the property which is the subject of the application or the contract, e.g., owner applicant, contractor. subcontractor, material supplier. ~AC:;TLA~E (OM..f'ANY J. ~. ~WELL L.b.ND CoMP^"'-,< 2. If any person' identified pursuant to (1) above is a corporation or partnership, list the names of all individuals owning more than 10% of the shares in the corporation or owning any partnership interest in the partnership. ::r. ~ . -p.,l)~WEU_ 3. If any person' identified pursuant to (1) above is non-profit organization or a trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. 4. Have you had more than $250 worth of business transacted with any member of the City staff, Boards, Commissions, Committees, and Council within the past twelve months? Yes No ...-- If yes, please indicate person(s): 5. Please identify each and every person, including any agents, employees, consultants, or independent contractors who you have assigned to represent you before the City in this matter. ~I Ll [)s-\.12.c,,^ Bl..\D f;g"" Guy A<;A,(l.D G~RY CIIo..\..I ~ILL ~113'P,lt-I 6. Have you and/or your officers or agents, in the aggregate, contributed more than $1,000 to a Councilmember in the current or preceding election period? Yes No v" If yes, state which Councilmember(s): Date: i- Z -Z"5 -D / 'f contractor/applicant (NOTE: ATTACH ADDITIONAL PAGES AS NECESSAR 81 (-:> IJ y As A ~O Print or type name of contractor/applicant * Person is defined as. "Any individual, firm, co-partnership, joint venture, association, social club, freaternal organization, corporation, estate, trust, receiver, syndicate, this and any other county, city and country, city municipality. district, or other political subdivision, or any other group or combination aCling as a unit. " PLANNING COMMISSION AGENDA STATEMENT Item: 2? Meeting Date: 07/10/02 ITEM TITLE: PLANNING COMMISSION RESOLUTION NO. RECOMMENDING ADOPTION OF NEGATIVE DECLARATION IS- 02-048, MAKING ITS REPORT AND RECOMMENDATION CONCERNING THE PROPOSED FOURTH AMENDMENT TO THE REDEVELOPMENT PLAN FOR THE SOUTHWEST REDEVELOPMENT PROJECT, AND DETERMINING ITS CONFORMITY TO THE CITY'S GENERAL PLAN BACKGROUND: The Southwest Redevelopment Plan was adopted on November 27, 1990 in order to improve deteriorated properties in the areas along Main Street, south Broadway, and south Third Avenue (see map attached). Since its adoption, the Redevelopment Plan has permitted the use of eminent domain authority to acquire property within the Southwest Redevelopment Project Area. Pursuant to the California Community Redevelopment Law and the Redevelopment Plan, the Agency's eminent domain authority is restricted to an initial 12-year time period following the effective date of the ordinance adopting the Redevelopment Plan. The Redevelopment Plan's eminent domain authority is scheduled to expire on November 27, 2002. Redevelopment Law allows the City Council to extend this time limit for an additional 12 years by amending the Redevelopment Plan. Eminent domain can be an essential adjunct to property acquisition negotiations involving redevelopment of incompatible uses, inadequately sized lots, and dilapidated buildings. The Redevelopment Agency, in the Fourth Amendment to the Redevelopment Plan, proposes extending its eminent domain authority as referred to in the attached amendment in order to continue having all of the tools necessary to effectively address redevelopment of the Southwest Redevelopment Project Area. Under City policy, the Planning Commission acts as an advisory body to the Agency on redevelopment matters relating to the Project Area. In addition, Redevelopment Law requires the Planning Commission to determine whether the Redevelopment Plan conforms to the City's General Plan. The Planning Commission would act on both matters by adopting the attached resolution. BOARDS/COMMISSIONS RECOMMENDATION: At its meeting of July I, 2002, the Resource Conservation Commission reviewed the Negative Declaration prepared for this action and recommended its adoption to the Redevelopment Agency/City Council. / RECOMMENDATION: That the Plarming Commission adopt the Resolution recommending adoption of Negative Declaration IS- 02-048, making its report and recommendation concerning the proposed Fourth Amendment. to the Redevelopment Plan for the Southwest Redevelopment Project, and determining its conformity to the City's General Plan. DISCUSSION: Attached is the proposed Fourth Amendment to the Southwest Redevelopment Plan, which shows the language that need to be added to amend the plan. The added phrase appears underlined on the third paragraph of Section 503 (page 5) of the existing Plan. Said paragraph with the proposed amendment reads as follows: "Except as otherwise provided herein, or otherwise provided by law, no eminent domain proceeding to acquire property within the Project Area shall be commenced after twelve (12) years following the date of adoption of the ordinance approving and adopting the Fourth Amendment to this Plan on September 17, 2002. Such time limitation may be extended only by amendment of this Redevelopment Plan." Although it has been sparingly used, the ability to acquire property through the use of eminent domain has been an effective tool to facilitate redevelopment of the Project Area. While the Agency does not have specific plans to use eminent domain to acquire property at this time, staff recommends preserving this authority in the event that it is necessary to complete future redevelopment projects. The proposed Fourth Amendment would extend the Agency's eminent domain authority by 12 years to 2014. As a part of the amendment process, the Agency is referring the proposal to the Planning Commission for their report and recommendation. The Planning Commission acts as an advisory body to the City Council and Agency on redevelopment matters. The attached resolution addresses two points to be reviewed by the PI arming Commission. First, the Commission is being asked to make a report and recommendation on the amendment itself. For the reasons described in this report, the continued ability to use eminent domain, as a potential redevelopment tool, will be critical to the Agency's redevelopment program in the Project Area, and staff is recommending that the Planning Conunission approve the extension of this tool. Second, the Plarming Commission is asked to affirm that the Redevelopment Plan, as amended by the proposed Amendment, continues to conform to the City's General Plan. When the Plan was originally adopted in 1990, the Planning Commission found that the Redevelopment Plan conforms to the City's General Plan, because the Redevelopment Plan uses General Plan and other applicable state and local land use policies and standards as land use controls within the Project Area. The proposed Amendment does not alter the Redevelopment Plan's land use controls (which currently conform to the City's General Plan, as it exists today or is hereafter ~ amended). Therefore the proposed Amendment is consistent, and the Redevelopment Plan as amended by the Fourth Amendment remains consistent, with the City's General Plan. Though the Planning Commission's action does not require a public hearing, a joint City Council/Agency public hearing on the Amendment will be held on Tuesday, August 6, 2002, at 4:00 p.m. (or as soon as possible thereafter) in the Council Chambers. All Project Area residents, property owners, and business owners will be mailed notice of the public hearing, which will also be published for three consecutive weeks prior to the meeting. C-\My File~\Project3\P!an Amendments & Expansion\Planning Commission Repon Em Do.doc [07/0312002 439 PM] -3 -(~~ '0<(;; l' f- Z UJ ::. a. o --' UJ > UJ o UJ<( , O:UJ I f-o: O. fiJ<( Zen;:t W t;j IUJ (9, UJ ~ (3 WI 0: 0 0: -I' tn CIJ a. << a. <( ::. <( UJ 0: <( f- (J UJ ., o 0: a.. f- z ~ UJ (J) ::. ;;; g, :5 ...J ::J UJ I > u UJ u.. CI 0 UJ 0: ~ f- U (fJ UJ ;: I f- ~ o (fJ .J: f- OJ I X UJ > <.) z w ~ < ~ z ~ """J ~ -Ii -,'."';",<..". <I( ~ o 5 :5 " Ii RESOLUTION No. RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION RECOMMENDING ADOPTION OF RESOLUTION IS-02-048, MAKING ITS REPORT AND RECOMMENDATION CONCERNING THE PROPOSED FOURTH AMENDMENT TO THE REDEVELOPMENT PLAN FOR THE SOUTHWEST REDEVELOPMENT PROJECT, AND DETERMINING ITS CONFORMITY TO THE CITY'S GENERAL PLAN WHEREAS, the City Council of the City of Chula Vista ("City Council") adopted Ordinance No. 2420 on November 27, 1990, approving and establishing the Redevelopment Plan for the Southwest Redevelopment Project, and the City Council has since amended said Redevelopment Plan on July 9, 1991 by Ordinance No. 2467, on November 6, 1994 by Ordinance No. 2612, and on August 22,2000 by Ordinance No. 2819; and, WHEREAS, in connection with the adoption of the Plan, the City of Chula Vista Planning Commission adopted Resolution No. on November 13, 1990 finding that the Plan conformed to the City of Chula Vista General Plan ("General Plan"); and. WHEREAS, the Redevelopment Agency of the City of Chula Vista ("Agency") has proposed a fourth amendment to the Redevelopment Plan for the Southwest Redevelopment Project ("Amendment") in the form attached hereto as Exhibit "A"; and, WHEREAS, the Amendment proposes to extend the time limit to commence eminent domain on Southwest Redevelopment Project Area properties; there has not been, and would not be as a result of this extension condemnation authority with respect to residential property in a residential zone; and, WHEREAS, eminent domain is a critical tool needed by the Agency to effectuate the redevelopment of blighted properties in the Project Area; and WHEREAS, eminent domain can be an essential adjunct to property acquisition negotiations involving redevelopment of incompatible uses, inadequately sized lots, and dilapidated buildings; and WHEREAS, Redevelopment Law allows the City Council to extend this time limit for an additional 12 years by amending the Redevelopment Plan. WHEREAS. Section 33346 of the California Community Redevelopment Law ("Law") provides that before the proposed Amendment is submitted to the City Council for consideration, it shall first be submitted to the Planning Commission for its report and recommendation concerning the Amendment and its conformity to the General Plan; and WHEREAS, the Planning Commission has received and reviewed the Amendment; and, WHEREAS, Negative Declaration IS-02-048 has been prepared in accordance with CEQA and Planning Commission received and reviewed said Negative Declaration; and WHEREAS, the Amendment does not propose to alter the land use controls as set forth in Section 600 of the Plan which had previously been determined to be in conformance with the General Plan. ~ NOW, THEREFORE, BE IT RESOLVED that the City of Chula Vista Planning Commission hereby: 1. Finds that the Redevelopment Plan for the Southwest Redevelopment Project, as it may be amended by the proposed Fourth Amendment, conforms to the City of Chula Vista General Plan. 2. Recommends that the City Council adopt Negative Declaration IS-02-048 and the proposed Amendment. 3. Authorizes and directs the officers, employees, staff, consultants and attorneys for the Planning Commission to take any and all actions that may be necessary to effectuate the purposes of this resolution or which are appropriate or desirable in the circumstances. In the event that prior to the adoption of the Amendment. the City Council desires to make any minor, technical, or clarifying changes to the Amendment, the Planning Commission hereby finds and determines that any such minor. technical, or clarifying changes need not be referred to it for further report and recommendation. 4. This Resolution shall constitute the report and recommendation of the Planning Commission on the Amendment to the City Council pursuant to Section 33346 of the Law. PASSED AND APPROVED BY THE CITY OF CHULA VISTA PLANNING COMMISSION this 10th day of July 2002 by the following vote to-wit. AYES: NOES: ABSENT: ABSTENTIONS: Chairperson Secretary ~ EXHIBIT "A" PROPOSED FOURTH AMENDMENT TO THE REDEVELOPMENT PLAN FOR THE SOUTHWEST REDEVELOPMENT PROJECT 7 EXHIBIT "AU PROPOSED FOURTH AMENDMENT TO THE REDEVELOPMENT PLAN FOR THE SOUTHWEST REDEVELOPMENT PROJECT f FOURTH AMENDMENT TO THE REDEVELOPMENT PLAN FOR THE MERGED SOUTHWEST REDEVELOPMENT PROJECT The Redevelopment Plan for the Merged Southwest Redevelopment Project adopted on November 27, 1990 by Ordinance No. 2420, as amended on July 9, 1991 by Ordinance No. 2467, November 6,1994 by Ordinance No. 2612, and August 22, 2000 by Ordinance No. 2819 (the "Plan"), is hereby further amended as follows: Section 503 of the Plan is hereby amended to read as follows: "I. (503) Acquisition of Real Property The Agency may acquire real property by any means authorized by law, including by gift, grant, exchange, purchase, cooperative negotiations, lease Or any other means authorized by law including eminent domain. However, for the duration of the Redevelopment Plan, the Agency shall not exercise the power of eminent domain to acquire any residential dwelling units, except with the consent of the owner, that are then being used for residential purposes, within land use designations or zoning classification areas designated for such residential purposes under the adopted Specific and General Plans of the City of Chula Vista, or as these documents may hereafter be amended by the City of Chula Vista. The Agency shall not acquire real property on which an existing building is to be continued on its present site and in its present form and use without the consent of the owner, unless: (1) such building requires structural alteration, improvement, modernization, or rehabilitation; or (2) the site or lot on which the building is situated requires modification in size, shape, or use; or (3) it is necessary to impose upon such property any of the standard restrictions and controls of the Plan and the owner fails or refuses to participate in the Plan by executing a participation agreement. Except as otherwise provided herein, or otherwise provided by law, no eminent domain proceeding to acquire property within the Project Area shall be commenced after twelve (12) years following the date of adoption of the ordinance approving and adopting the Fourth Amendment to this Plan on SCI''''111bc'l 17. 2002. Such time limitation may be extended only by amendment of this Redevelopment Plan." ~ ClMyFiles\projecu\Plan Amendments &. Exp4lUionlAmdmenllO South_I Plan.doc Negative Declaration PROJECT NAME: Southwest Redevelopment Plan Amendment To Extend Eminent Domain Authority PROJECT LOCATION: Southwest Redevelopment Project Area ASSESSOR'S PARCEL NO.: VARIOUS PROJECT APPLICANT: City of Chula Vista CASE NO.: IS-02-048 DATE: May 29, 2002 A. Project Setting The amended Southwest Redevelopment Project Area (SWRPA) boundaries, found totally within the City of Chula Vista, are illustrated on the map attached hereto and incorporated as Exhibit A. B. Project Description The project involves an amendment to the existing Amended Southwest Redevelopment Project Area Plan, dated November 1990. While the Redevelopment Plan itself does not expire until the year 2030, the power of eminent domain, which the Redevelopment Agency of the City of Chula Vista may exercise (under the provisions of the California Community Redevelopment Law) is set to expire on November 26, 2002, unless otherwise amended. The Redevelopment Agency of the City of Chula Vista, with the approval of the City Council, proposes to amend that Plan by extending the provision of eminent domain to'November 27, 2014, as allowed by California Community Redevelopment Law. Although there are no current plans to acquire additional property through the use of eminent domain, the Agency has indicated that should either a commercial or residential project be undertaken in the future, that the extension of the time limit to exercise its eminent domain powers could be crucial to the success and completion of those projects, and hence, to its overall success in removing blight from the Project Area. C. Compliance with Zoning and Plans The proposed use is consistent with the underlying zone districts and General Plan designation. D. Comments On April 29, 2002 a Notice of Initial Study was circulated to City and governmental staff. Seven Department staff members responded with no comments. /6 05/29/02 E. Identification of Environmental Effects An Initial Study conducted by the City of Chula Vista (including an attached Environmental Checklist fonn) determined that the proposed project will not have a significant environmental effect, and the preparation of an Environmental Impact Report will not be required. This Negative Declaration has been prepared in accordance with Section 15070 of the State CEQA Guidelines. F. Mitigation Necessary to A void Significant Impacts NO MITIGATION REQUIRED G. Consultation 1. City of Chula Vista: Marilyn Ponseggi, Planning Division Paul Hellman, Planning Division John Schmitz, Planning Division Jim Geering, Fire Marshall Frank Rivera, Engineering Department Joe Gamble, Landscape Architecture Division Bill Ullrich, Public Works/Operations Frank Herrera-A. Planning Division Miguel Z. Tapia, Community Development Benjamin Guerrero, Community Development 2. Documents Chula Vista General Plan (1989) and EIR (1989) Title 19, Chula Vista Municipal Code, September 1997 Redevelopment Project Area Plans Initial Study This environmental determination is based on the attached Initial Study, any comments received on the Initial Study and any comments received during the public review period for this negative declaration. The report reflects the independent judgement of the City of Chula Vista. Further information regarding the environmental review of this project is available from the Chula Vista Planning Departinent, 276 Fourth A venue, Chula Vista, CA 91910. ~]"~ Date: b Planning & Environmental Services Manager 1/ OS/29/02 - . ~ I Ii-- ~ ?; ~, \ ~ '~~ J LA' I, ~ \ \ \ ~:, ,C, ,- ~ 'lJ-. ,dJ! , _ ' " ,L ' \ ~,I~ <'Cr \\~, "~~, ::i:T'-:--;- W' '" \W -"= .... ' e:: ~'i \ \ '1\ ~ =1 '1 y-= <( ~.---- ''IO?' \)\1. YO \ \.0 I) ,;-II\.\. if> - C o v>B '} 1)\ -- \ "'; II --' W \ \ \ ~ ~ '. """~' '\ ~ ,P\i'j a\'~ g.~~\)' \.. ;illll .. 0\ i'iz~ ,~"" ,I, ' I., I 0:: zOU /. .\~'v-"-C~ \ ~~. :[~ i .1 I n::n c.. I> _-\ \ ~o ,A \ , \ Y" i =. li:m L-LJ v I-~\\ fJ~7' y.- I ':'i:I'~l I z--" '-' I "'". ,~I " I, W ----.. ,,,,,II" ,~ , \~ I A \ \ 1@ I' 11.1 , ~ I \' I I ::a: I: . , . \ \O,(JJII'" "-, " in II I! i III O-Y ~ \ \~ \ II' \ '\\-'\ \\_~ I, ~r ......i~.\ ~ \\\'-fJJ~~~'Cr\ \- \ \-I\-'I;-Ip..-.J I~ .~~~ w \ .", 'J, "', " \ '';fi D' > ;,'\ ~\ ,\ ' . ,f" I w ~ ~' \ \ \. """,,"" "1 t=r'\ : CI, I ~ \ --' I LI"J .,' - \'':. ~ t9 w " -c-" .>""'--- · 0:: \-~r~' , 1 ~.~ ~ I ~C-\CJ · \'~ l' I~ ' 1,; :::::~' \..\..--': } '""'b ~~ -J' -\W'(!;.f'/l,~ .~ ;:>0 'r' _' r-""I . 5 FREEWAY=:::' :I: Y >' '/ ' ' I-' .;--- '\ L' <- ::::I - o "'" IV) I ~ '- - L.._n - -~II .lI-J '--- - b- ------- ~ ~ --&1 '. . '- ~ I /CL ::::::.: ( h -' ==--- .... 1-- \ IJ..... ~ !!!% >0 :SEE ~~ u .....z ~ ..' .<.. I -- Case No.IS-02-048 ENVIRONMENTAL CHECKLIST FORM 1. Name of Proponent: City of Chula Vista 2. Lead Agency Name and Address: City of Chula Vista 276 Fourth A venue Chula Vista, CA 91910 3. Address and Phone Number of Proponent: 276 Fourth Avenue Chula Vista, CA 91910 (619) 691-5291 4. Name of Proposal: Fourth Amendment to the Southwest Redevelopment Plan to extend Eminent Domain Authority 5. Date of Checklist: May 30, 2002 I. LAND USE AND PLANNING. Would the proposal: a) Con!1ict with general plan designation or zoning? b) Con!1ict with applicable environmental plans or policies adopted by agencies with jurisdiction over the project? c) Affect agricultural resources or operations (e.g., impacts to soils or farmlands, or impacts from incompatible land uses)? d) Disrupt or divide the physical arrangement of an established community (including a low-income or minority community)? Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to land use. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the furure as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws with any approval from any responsible public agency would also be required. f'<<elltiaU,. Sipif)uJlt Im..,. Po!:UllialJ,. S"LpifJaDI u..... Mitipl~ N. Im..,. L= th.. Si(nirlc:aDI Im..,. o o o I!J o o o I!J o o o I!J o o o I!J The approval of this extension would not disrupt or divide the physical arrangement of an established community. 13 1 5/30/02 _..._.. - ____._ .___._.._.~_ ..---0....-. Potentially Slpil'kaDt Impad PoI:eotLaDl Sipmcaol UDI~ Mitlpled L= .... S'tplIicut imp''' N. Impact Mitigation: None II. POPULATION AND HOUSING. proposal: a) Cumulatively exceed official regional or local population projections? Would the o o o I!J b) Induce substantial growth in an area either directly or indirectly (e.g., through projects in an undeveloped area or extension of major infrastrucrure)? c) Displace existing housing, especially affordable housing? o o o I!J o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to population and housing. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its eminent domain authority and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain authority, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws with any approval from any responsible public agency would also be required. Mitigation: None III. GEOPHYSICAL. Would the proposal result in or expose people to potential impacts involving: a) Unstable earth conditions or changes in geologic 0 0 0 I!J substructures? b) Disruptions, displacements, compaction or 0 0 0 I!J overcovering of the soil? c) Change in topography or ground surface relief 0 0 0 I!J fearures? d) The destruction, covering or modification of any 0 0 0 I!J unique geologic or physical features? e) Any increase in wind or water erosion of soils, 0 0 0 I!J either on or off the site? t) Changes in deposition or erosion of beach sands, 0 0 0 I!J or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay inlet or lake? g) Exposure of people or property to geologic hazards 0 0 0 I!J such as earthquakes, landslides, mud slides, ground ('I 5/30/02 2 ~_m_'_~____~___,~_ ------_._._.~.- PocrutlaU,. SlplIkaDI imp''' Potmtlally Sipif"KIIIDI U..... Mjdpted N. Impact L= .... Si~t imp''' failure, or similar hazards? Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to ground surface or geologic conditions. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's furure acquisition of property through its eminent domain authority and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the furure as a result of the extension of eminent domain authority, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws with any approval from any responsible public agency would also be required. Mitigation: None IV . WATER. Would the proposal result in: a) Changes in absorption rates, drainage patterns, or the rate and amount of surface runoff? b) Exposure of people or property to water related hazards such as flooding or tidal waves? c) Discharge into surface waters or other alteration of surface water quality (e.g., temperarure, dissolved oxygen or turbidity)? d) Changes in the amount of surface water in any water body? e) Changes in currents, or the course of direction of water movements, in either marine or fresh waters? t) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? g) Altered direction or rate of flow of groundwater? h) Impacts to groundwater quality? i) Alterations to the course or flow of flood waters? j) Substantial reduction in the amount of water otherwise available for public water supplies? 0 0 0 I!J 0 0 0 I!J 0 0 0 I!J o o o I!J o o o I!J o o o I!J 0 0 0 181 0 0 0 I!J 0 0 0 I!J 0 0 0 I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to water resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its eminent domain authority and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result 3 IS- 5/30/02 Potentiall, PotenliaD, S"rpilk'JInt Less than S'lpmC:3bt UnJess Si:gu.iftcant No Impact Mitlpl~ Impact Impact CDf the extension of eminent domain authority, would, at the time of proposal, be subject to further eenvironmental review. Said projects would also be required to comply with the City's General Plan, ZZoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City cof Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from aany responsible public agency would also be required. M:litigation: None w. AIR QUALITY. Would the proposal; a) Violate any air quality standard or contribute to an existing or projected air quality violation? b) Expose sensitive receptors to pollutants? c) Alter air movement, moisture, or temperature, or cause any change in climate, either locally or regionally? d) Creaie objectionable odors? e) Create a substantial increase in stationary or non- stationary sources of air emissions or the deterioration of ambient air quality? o o o I!J o I!J o o o o o I!J o o I!J o o o I!J o CComments: TThe proposed project only extends the Redevelopment Agency's existing eminent domain authority. The eextension of existing eminent domain authority will not result in any direct physical changes to the eenvironment; therefore, the proposed project will not result in any significant impacts to Air Quality. Ilndirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future ;:acquisition of property through its eminent domain authority and subsequent development are too sspeculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result cof the extension of eminent domain authority, would, at the time of proposal, be subject to further eenvironmental review. Said projects would also be required to comply with the City's General Plan, ZZoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City cof Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from aany responsible public agency would also be required. !\Mitigation: None 'VI. TRANSPORTATION/CIRCULATION. Would the proposal result in: . a) Increased vehicle trips or traffic congestion? b) Hazards to safety from design features (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? c) Inadequate emergency access or access to nearby uses? d) Insufficient parking capacity on-site or off-site? e) Hazards or barriers for pedestrians or bicyclists? 4 1& o o I!J o o o o I!J o I!J o o o o o I!J o o o I!J 5/30/02 PoteDdaUy PolentbDy Si~ficaDt Less tban SipU.ODt U..... Si:aific:aDC N. Impact Mitig20tecl Impact Impact t) 0 0 0 I!J Conflicts with adopted policies supporting alternative transportation (e.g. bus turnouts, bicycle racks)? g) Rail, waterborne or air traffic impacts? 0 0 0 I!J h) A "large project" under the Congestion 0 0 0 I!J Management Program? (An equivalent of 2400 or more average daily vehic1e trips or 200 or more peak-hour vehic1e trips.) Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to the city's transportation or circulation system. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its eminent domain authority and subsequent develppment are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain authority, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None VII. BIOLOGICAL RESOURCES. Would rhe proposal result in impacts 10: a) Endangered, sensitive species, species of concern 0 0 0 I!J or species that are candidates for listing? b) Locally designated species (e.g., heritage trees)? 0 0 0 I!J c) Locally designated natural communities (e.g., oak 0 0 0 I!J forest, coastal habitat, etc.)? d) Wetland habitat (e.g., marsh, riparian and vernal 0 0 0 I!J pool)? e) Wildlife dispersal or migration corridors? 0 0 0 I!J t) Affect regional habitat preservation planning 0 0 0 I!J efforts? Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to biological resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its eminent domain authority and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain authority, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, 5 (7 5/30/02 Potentially Pote.atially S'apifkut Less (han SiplrKaDt UDkss Sipificant No Impact MitiGated Impact Impact Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible pubJic agency would also be required. Mitigation: None V1II. ENERGY AND MINERAL RESOURCES. Would the proposal: a) Conflict with adopted energy conservation plans? b) Use non-renewable resources in a wasteful and inefficient manner? c) If the site is designated for mineral resource protection, will this project impact this protection? o o o I!J o o o I!J o o o I!J Comments: The proposed proj~ct only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to energy or mineral resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None IX. HAZARDS. Would rhe proposal involve: a) A risk of accidental explosion or release of hazardous substances (including, but not limited to: petroleum products, pesticides, chemicals or radiation)? b) Possible interference with an emergency response plan or emergency evacuation plan? c) The creation of any health hazard or potential health hazard? d) Exposure of people to existing sources of potential health hazards? e) Increased fire hazard m areas with flammable brush, grass, or trees? o o o I!J 0 0 0 I!J 0 0 0 t8! 0 0 0 I!J 0 0 0 I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not resulf--in any creation or exposure of humans or 6 1([ 5/30/02 Potfllll.lDy PotealbU,. SigniJk2Dt Less than SiguiflC1Dl Uakss Sip-meant No lrop3ct Milipled Impact Impact animal species to hazardous situations. Indirect physical changes resulting in land use impacts as a resuJt of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and aU applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None X. NOISE. Would the proposal result in: a) Increases in existing noise levels? o o o I!J b) Exposure of people to severe noise levels? o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant noise impacts. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and aU applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with aU applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None XI. PUBLIC SERVICES. Would the proposal have an effecr upon, or result in a need for new or altered government services in any of the following areas: a) Fire protection? 0 0 0 I!J b) Police protection? 0 0 0 I!J c) Schools? 0 0 0 I!J d) Maintenance of public facilities, including roads? 0 0 0 I!J e) Other governmental services? 0 0 0 I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to public services. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the furure as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further 7 19 5/30/02 PolenlbDy PotmtiaUl Signltkaat Less thaD SigDifJCant liDless Signilkant No Impact Mitlgated Impact Impact environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. No new or altered governmental services will be required for this project. Mitigation: None XII. Thresholds. Will the proposal adversely impact rhe City's Threshold Standards? As described below, the proposed project does not significantly impact any of the seven Threshold Standards. o o o I!J a) Fire/EMS o o o I!J The Threshold Standards requires that fire and medical units must be able to respond to calls within 7 minutes or less in 85 % of the cases and within 5 minutes or less in 75 % of the cases. Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to fire rescue or emergency medical services. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None b) Police o o o I!J The Threshold Standards require that police units must respond to 84 % of Priority I calls within 7 minutes or less and maintain an average response time to all Priority I cans of 4.5 minutes or less. Police units must respond to 62.10% of Priority 2 calls within 7 minutes or less and maintain an average response time to all Priority 2 calls of 7 minutes or less. Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to police services. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances and regulations and procedures of the DLO 8 5/30/02 Potentla!]1 Polnltiall1 Sipmaaa~ Less Ih.an Sicnilkaat Vaiess SipillicanC No Jmpact Mitlpled Jmpact Impact City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None c) Traffic o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to the city's traffic system. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the furure as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None d) Parks/Recreation o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to parks or recreational resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Local Coastal Plan, Zoning Ordinance and all applicable codes, conditions, ordinances and regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None e) Drainage o o o I!J The Threshold Standards require that storm water flows and volumes not exceed City Engineering Standards. Individual projects will provide necessary improvements consistent with the Drainage Master Plan(s) and City Engineering Standards. Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to city's drainage 9 C)-( 5/30/02 PoteutiaUy PotelltWJy Sipifk.all.t Less thaD SipWKant UII.kss Si~iJic.ant No Impact Mitiealtd Impact Impact system. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None t) Sewer o o o I!J The Threshold Standards require that sewage flows and volumes not exceed City Engineering Standards. Individual projects will provide necessary improvements consistent with Sewer Master Plants) and City Engineering Standards. Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to the city's sewer resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. No sewer facilities or services are required to serve this project. Therefore, no conflict with the City's threshold is anticipated. !\1itigation: None g) Water o o o I!J The Threshold Standards require that adequate storage, treatment, and transmission facilities are constructed concurrently with planned growth and those water quality standards are not jeopardized during growth and construction. Applicants may also be required to participate in whatever water conservation or fee off-set program the City of Chula Vista has in effect at the time of building permit issuance. Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to water resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances and regulations and procedures of the 10 ~r2- 5/30/02 PotutbDy Potcnt.iaDy SIpifican( Less than Signmcant Unless Sip1iIkaDI No Impact Mjligalnl Impact IDlpact City of Chula Vista. Compliance with aH applicable federal, state and local laws and with any approval from any responsible public agency would also be required. No water service is required for this project. Therefore, no conflict with the City's threshold is anticipated. Mitigation: None XIII. UTILITIES AND SERVICE SYSTEMS. Would the proposal result in a need for new systems, or substantial alterations to the following wilities: a) Power or natural gas? 0 0 0 I!J b) Communications systems? 0 0 0 I!J c) Local or regional water treatment or distribution 0 0 0 I!J facilities? d) Sewer or septic tanks? 0 0 0 I!J e) Storm water drainage? 0 0 0 I!J t) Solid waste disposal? 0 0 0 I!J Comments: The proposed projec! only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to utility and service systems. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedlJres of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. The proposed project would not require new systems to be installed, or alterations of existing utilities. Mitigation: None XIV. AESTHETICS. Would the proposal: a) Obstruct any scenic vista or view open to the public or will the proposal result in the creation of an aesthetically offensive site open to public view? b) Cause the destruction or modification of a scenic route? o o o I!J o o o I!J c) Have a demonstrable negative aesthetic effect? o o o I!J d) Create added light or glare sources that could increase the level of sky glow in an area or cause this project to fail to comply with Section 19.66.100 of the Chula Vista Municipal Code, Title 19? o o o I!J 11 ;0 5/30/02 e) Reduce an additional amount of spill light? PottDliaU, Sipiftc.anl llnpact Pot~tbU1 SipirlOnl u."" Mitigated N. Impact Less than Significant Impact o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to aesthetic resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's furure acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Local Coastal Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Jltlitigation: None XV. CULTURAL RESOURCES. Would the proposal: a) Will the proposal result in the alteration of or the destruction or a prehistoric or historic archaeological site? b) Will the proposal result in adverse physical or aesthetic effects to a prehistoric or historic building, structure or object? c) Does the proposal have the potential to cause a physical change that would affect unique ethnic cultural values? d) Will the proposal restrict existing religious or sacred uses within the potential impact area? e) Is the area identified on the City's General Plan EIR as an area of high potential for archeological resources? o o o I!J o o o I!J o o o I!J o o o I!J o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to cultural resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None ;;2 V 12 5/30/02 XVI. PALEONTOLOGICAL RESOURCES. Will the proposal result in the aIreration of or the destruction of paleontological resources? PoteDtIally PotnltbU,. Sip;JncaD' Less thaD SlpirtalPI Unless SipiIiC.aD1 N. Impact Miliplt'd Impact Impact 0 0 0 I!J Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts to paleontological resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None XVII. RECREATION. Would the proposal; a) Increase the demand for neighborhood or regional 0 0 0 I!J parks or other recreational facilities? b) Affect existing recreational opporTUnities? 0 0 0 I!J c) Interfere with recreation parks & recreation plans 0 0 0 I!J or programs? Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant impacts '"to recreational resources. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain power, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval from any responsible public agency would also be required. Mitigation: None XVIII. MANDATORY FINDINGS OF SIGNIFICANCE: See Negative Declaration for mandatory findings of significance. If an EIR is needed, this section should be completed. a) Does the project have the potential to degrade the 0 quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining 13c:2S-- o o I!J 5/30/02 PottJlWlU,. Signlf"tcnt Impact poteJltiaU,. Sipif\c:aJlt UJlless Mitipted Less !haD Siplf"talJlt Impact No Impo" levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods or California history or prehistory? Comments: The proposed project only extends the Redevelopment Agency's existing eminent domain authority. The extension of existing eminent domain power win not result in any direct physical changes to the environment; therefore, the proposed project win not result in any significant impacts to sensitive plant or animal communities. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's furure acquisition of property through its power of eminent domain and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain authority, would, at the time of proposal, be subject to further environmental review. Said project would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with all applicable federal, state and local laws and with any approval "from any responsible public agency would also be required. Mitigation: None b) Does the project have the potential to achieve short-term, to the disadvantage of long-term, environmental goals? o o o I!J Comments: Extending the existing eminent domain authority of the city would not significantly affect the long-term environmental goals of the City of Chula Vista. c) Does the project have impacts that are individuany limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable furure projects.) o o o I!J Comments: The proposed project only extends the Redevelopment Agency's existing power of eminent domain. The extension of existing eminent domain authority will not result in any direct physical changes to the environment; therefore, the proposed project will not result in any significant cumulative impacts. Indirect physical changes resulting in land use impacts as a result of the Redevelopment Agency's future acquisition of property through its eminent domain authority and subsequent development are too speculative to analyze at this time. Any redevelopment projects, which may occur in the future as a result of the extension of eminent domain authority, would, at the time of proposal, be subject to further environmental review. Said projects would also be required to comply with the City's General Plan, Zoning Ordinance and all applicable codes, conditions, ordinances, regulations and procedures of the City of Chula Vista. Compliance with an applicable federal, state and local laws and with any approval from any responsible public agency would also be required. 14 c2(, 5/30/02 Pottl1tbD, SiplUtcaot imp''' PoCtDtbUy SipW"K2l1t U..... Mitipted 1=..... Siplificant Impact N. Impact Mitigation: None d) Does the project have environmental effects that will cause substantial adverse effects on human beings, either directly or indirectly? o o o I!J Comments: No substantial significant effects on human beings would result from extending the ~ity's existing eminent domain authority. XIX. PROJECT REVISIONS OR MJTIGATION MEASURES: NONE REOUIRED XX. AGREEMENT TO IMPLEMENT MJTIGATION MEASURES NO MJTIGATION MEASURES REQUIRED XXI. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: NONE CHECKED The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" or "Potentially Significant Unless Mitigated, n as indicated by the checklist on the following pages. 0 Land Use and Planning o Transportation/Circulation 0 Public Services 0 Population and Housing 0 Biological Resources 0 Utilities and Service Systems 0 Geophysical 0 Energy and Mineral Resources 0 Aesthetics 0 Water 0 Hazards 0 Cultural Resources o Air Quality 0 Noise 0 Recreation o Paleontology 0 Mandatory Findings of Significance 15 cJ-l 5/30/02 XXII. DETERMINATION: On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, · and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, 0 there wil1 not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an 0 ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a significant effect(s) on the environment, but at 0 least one effect: I) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, if the effect is a "potential1y significant impacts" or "potential1y significant unless mitigated." An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because al1 potentially significant effects 0 (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project. An addendum has been prepared to provide a record of this detennination. J)4~ Signarure Date May 29. 2002 Brian Hunter Planning & Environmental Services Manager City of Chula Vista ~g 5/30/02 16 PLANNING COMMISSION AGENDA STATEMENT Item q Meeting Date 07it0i02 ITEM TITLE: Consideration ofthe following applications filed by The EastLake Company for 68.1 acres at the northwest and northeast comers of Otay Lakes Road and EastLake Parkway within the EastLake II Planned Community: a) GPA 02-07: Amendment to the City of Chula Vista General Plan to change the land use designation of approximately 16.4 acres at southeast comer of EastLake Parkway and SR-125 freeway future alignment. b) PCM 01-15: Amendments to the EastLake II General Development Plan and EastLake II Planned Community Districts Regulations and Land Use Districts Map. Also, adopt a new Sectional Planning Area (SP A) plan and associated regulatory documents for the 68.1 acres to be known as the "Village Center North Supplemental SPA". The applicant, EastLake Development Company, has submitted applications to: I) amend the City's General Plan to change the land use designation of approximately 16.4 acres at southeast comer of EastLake Parkway and the future SR-125 freeway from Retail Commercial to Research and Limited Manufacturing; 2) amend the EastLake II General Development Plan to change the land use designation of 16.4 acres at the southeast comer of EastLake Parkway and SR-125 freeway (future alignment) from Public Quasi-public to Research and Limited Manufacturing; 14.2 acres on the west side of EastLake Parkway from Public/Quasi-public to Commercial Retail; and 2.0 acres at the southeast comer of Fenton Street and EastLake Parkway from Research and Limited Manufacturing to Professional & Administrative Commercial; and 3) amend the EastLake 1I Planned Community District Rcgulations to accommodate the changes in land use. The applicant is also requesting approval of a new Sectional Planning Area (SPA) plan and associated regulatory documents for the 68.1 acres to be known as the Village Center North Supplemental SPA. The new SPA contains Design Guidelines, Public Facilities Finance Plan, Water Conservation and Air Quality Improvement Plans. The Environmental Review Coordinator has determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because mitigation measures have been incorporated and agreed to by the project proponent. A Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program were prepared, which must bc considered by thc Planning Commission prior to a decision on the project (Attachment 3). RECOMMENDATION: I. Adopt attached Resolution GP A 02-07/PCM 01-15, recommending that the City council adopt thc Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-Ol- 042) issued for the Project. / Page No.2, Item: Meetin~ Date: 07/10/02 2. Adopt attached Resolution GPA 02-07/PCM 01-15, recommending that the City Council approve the proposed amendments to the General Plan and EastLake II General Development Plan and Planned Community District Regulations and Land Use Districts Map. Also, adopt the new Sectional Planning Area (SPA) plan to be known as the EastLake Village Center North Supplemental SPA. BACKGROUND: In 1992, the City Council approved amendments to the EastLake II General Development Plan and EastLake I Sectional Planning Area (SPA) plan to accommodate a 485,000 sq. ft. medical center complex at the northwest corner of Otay Lakes Road and Fenton Street within a planning area of EastLake known as the "EastLake I Activity Center." This Activity Center, which replaced the original commercial/ residential mixed-use concept envisioned in the original SPA, incorporates three major components: I) a neighborhood shopping center (south of Otay Lakes Road); 2) a mixed-use entertainment and service oriented village center (east and west side of EastLake Parkway); and 3) a major hospital/ medical center (see Figure I). The neighborhood commercial center, which existed at that time, is within the EastLake Greens SP A, and, consequently, developed and administered under that SPA. Although this component of the Activity Center was approved under separate design guidelines, its functional and aesthetical relationship to the northern Activity Center components was significant. This component of the Activity Center was used as an existing urban design reference. To properly guide the Activity Center development, in 1992, the City Council also approved the "EastLake I Activity Center Precise Plan Guidelines" for the above mentioned medical center mixed- use concept. These design guidelines established specific urban design, landscaping and functional goals and objectives to insure the integration of all aspects of the Activity Center into the surrounding industrial and the overall EastLake planned community. The Kaiser medical center project was never built and the property was re-acquired by The EastLake Company who is proposing to re-define the northern portion of the Activity Center (north ofOtay Lakes Road) into three separate and independent parcels tied together with other surrounding properties/uses by urban design features and amenities. The new concept is outlined more specifically in a new supplemental Sectional Planning Area (SPA) pIan and associated regulatory documents prepared for this planning area. This new Supplemental SPA plan, which includes specific design guidelines for each parcel, will replace the previously adopted Activity Center Precise Plan Guidelines and all othcr associated regulatory documents. ;z Page No.3, Item: Meeting Date: 07/10/02 DISCUSSION: I. Existing Site Characteristics The Project involves 68.1 in two separate sites: a 54. I-acre site located at the northwest comer of EastLake Parkway and Otay Lakes Road, hereafter referred to as the Western Parcel, and 13.6 acres at the northeast comer of EastLake Parkway and Otay Lakes Road, hereafter referred to as the Eastern Parcel (see Locator). Western Parcel The western parcel is presently vacant and has been mass graded in conjunction with the EastLake I mass-grading program, and reccntly re-graded under an approved remedial grading permit. After the most recent grading, the site is divided into two level building pads with an elevation difference of approximately 20 feet. The lower pad, which is approximately 38.1 acres, drains from the northeast to southwcst to an existing detention basin located at the southwest comer of the site. The northerly 16.4 acres drains west to a catch basin located at the southwest, then piped to the above mentioned detention basin. The surrounding land uses include: I) the future SR-125 freeway alignment to the west; 2) the Business Center I to the north and east across EastLake Parkway; and 3) the Von's Shopping Center to the south across Otay Lakes Road. Access to this site is provided along all surrounding streets (see Locator). Eastern Parcel The Eastern Parcel is located on the east side of EastLake Parkway between Otay Lakes Road and Fenton Street. This site is approximately 13.6 acres, inclusive of an existing 4.0-acre church at the east end; thc parcel is vacant. As with the Western Parcel, this site was graded as part of the original EastLake I mass grading program. The Church site is approximately 5 feet above the remainder site and has direct access from Otay Lakes Road to the south. The site is surrounded by Fenton Strect and industrial uses to the north, EastLake Parkway to the west; Otay Lakes Road to the south and Research and Limited Manufacturing uses to the east. Access to the site is provided along all surrounding streets (see Locator). 3 Page No.4, Item: Meeting Date: 07/10/02 2. Existing General Plan, SPA Land Use Designations and land use General Plan CV Municipal Code PC DistTict Land Existing Land Use Zoning Use Designation Western Parcel Site Commercial Retail PC, Planned Village Center Vacant Community North Industrial Research PC, Planned Business Center IndustTial, EastLake & Manufacturing Community Parkway South Commercial Retail PC, Planned Open Space, Village Otay Lakes Road, & Open Space Community Center Von's commercial center East Industrial Research PC, Planned Business Center, Vaeant, EastLake & Manufacturing, Community Village Center Parkway Residential Low- Medium West Open Space PC, Planned Open Space Vacant, Future SR- Community 125 Freeway Eastern Parcel Site Commercial PC, Planned V illage Center, Vaeant Professional & Community Business Center, Administrative Open Space North Industrial Research PC, Planned Business Center, IndustTial, Fenton & Manufacturing Community Open Space StTeet South Residential Low~ PC, Planned Residential Residential, Otay Medium Commnnity Condominium Lakes Road East Commercial PC, Planned Business Center Vaeant, Industrial Professional & Community Administrative West Commercial Retail PC, Planned Village Center Vacant, EastLake Community Parkway 3. Project Description The proposed project includes amendments to the City's General Plan, the EastLake II General Development Plan, EastLake I Sectional Planning Area Plan, and the EastLake II Planned Community District Regulations and Land Use Districts Map. The proposed amendments are more specifically described in the following paragraphs by individual parcel. <f Page No.5, Item: Meeting Date: 07/10/02 General Plan Amendments: Western Parcel: Change 16.4 acres at the northerly portion of the site ITom Commercial Retail to Research and Limited Manufacturing (See Figure 2). Eastern Parcel: No General Plan Amendments are proposed for this site. EastLake II General Development Plan Amendments: Western Parcel: Change 16.4 acres at the northerly portion from PQ, Public/Quasi-public to IR, Research and Limited Manufacturing (see Figure 3). Eastern Parcel: Change the northerly 2.0 acres ITom BC-l, Business Center and OS-7, Open Space to VC-2, Village Center Land Use designation (See Figure 3). EastLake II Planned District Regulations - Land Use Districts Map Amendments: Western Parcel: Change the northerly 16.4 acres from VC-l, Village Center to BC-3, Business Center- Core District land use designation (see Figure 4). Eastern Parcel: Change 2 acres at the southeast comer of East Lake Parkway and Fenton Street from BC-l, Business Center- Manufacturing District to VC-2, Village Center (Professional and Administrative/Limited Retail), and 2 acres along the eastern edge of the subject site from OS-2, Open Space, to Village Center (Professional and Administrative/Limited Retail) (see Figure 4). EastLake II Planned District Regulations - Text Amendments: In addition to various, minor clean-up type amendments, the project includes the following text amendments: Section III, Pennitted Uses - Village Center: Replace the definitions ofthe pennitted, not pennitted, CUP, etc symbols in Sections III.!, Pennitted Uses - Village Center and Section III.4; Pennitted uses- Commercial Districts and Section IV.l Permitted and Conditional Uses - Business Center. The new definitions clarifY more specifically the required planning process for land use listed in the Pennitted Uses Table. ~ Page No.6, Item: Meetin~ Date: 07/10/02 Change the Eating and drinking establishments permitted land use to allow restaurants, coffee shops and delicatessens with outdoor seating, subject to Site Plan and Architectural review. Include Bank/Financial Institution with drive-thm as an allowable use; and delete the stze requirement for Furniture and Hardware stores from (<10,000 sf), to be at any size. Redefine the permitted land uses in VC-2 to promote a Professional and Administrative land use with limited commercial uses. Section 111 .2, Propertv Development Standards - Village Center District: Incorporate Property development standards, including building setbacks, building height for the VC-l and VC-2 Land Use Districts Section IV Business Districts: Introduce a new BC-3 land use district with its corresponding land use district intent section, list of permitted and conditional use permitted, and corresponding Property Development Standards. Section(s) I.3.A Special Purpose Land Use Districts and V.2 Permitted and Conditional uses: Ouasi- Rublic facilities (PO): Delete the futurc urban column from the permitted land use table. Section VIII.2 Schedule of Off-street Parking Requirements: Modify the off-street parking requirements for Planned shopping centers to allow for outdoor garden rclated retail areas and restaurant outdoor seating without providing additional parking (see Attachment 5, PC Regulations tab). EastLake I Sectional Planning Area Plan (SPA) - Site Utilization Plan Amendments: Western Parcel: Merge the southern 14.2 acres of the 30.6-acre parcel identified as MC-l in the Site Utilization Plan into the southerly adjacent VC-l parcel. Also, create a new parcel identified as E-1O with the remaining 16.4 acres of the MC-l parcel (see Figure 5). Eastern Parcel: Mcrgc 2-acres at the southeast comer of EastLake Parkway and Fenton Street (identified in the adopted Site utilization plan as E-l 0) and 2- acres along the eastern edge of the subject property (identified in the adopted Site Utilization Plan as OS-12, Open Space) into the southerly adjacent YC-2 parcel (See Figure 5) to expand the existing VC-2 parcel from 10 to 13.6 acre s (According to the previous calculations, it should be 14.1 acres, but the new figure is based on more precise mcasuring of the existing parcels). c;, Page No.7, Item: Meetinl: Date: 07/10/02 EastLake I Sectional Planning Area SPA plan - Text Amendments: The proposed amendments reflect the change in urban design concept for the portion of the EastLake I Activity Center known as the Village Center North. In order to simplify the amendment to the adopted EastLake I SPA, the proposed SPA plan amendments are reflected in a separate supplemental document to be known as as the EastLake I, Village Center North Supplemental SPA (see Attachment 5). The new SPA plan contains Design Guidelines, Public Facilities Financing Plan (PFFP), Air Quality Improvement Plan (AQlP), Water Conservation Plan (WCP), which are supplemental to the ones found in the EastLake I SPA plan. ANALYSIS: General Plan Amendment: The proposed amendments to the General Plan consist primarily of changing the previously adopted land use designation associated with the Kaiser Medical Center project to accommodate the new Village Center concept proposed by The EastLake Company. As indicated above, the requested General Plan amendment consist of changing 16.4 acres at the northern portion of the site from Commercial Retail to Research and Limited Manufacturing. The topographical difference of approximately 20 feet with the southerly adjacent portion ofthe site and the parcel orientation towards the business center to the north, are the basis to support the requested amendment. The proposed land use change will provide an additional 16.4 acres of Industrial Research and Limited Manufacturing for employment type uses within the EastLake Community. EastLake II General Development Plan Amendment: Western Parcel: The proposed amendments to the General Development Plan consist of changing the previously adopted land use designation associated with the Kaiser Medical Center project to accommodate the new Village Center concept proposed by the EastLake Company. As mentioned above, the orientation and configuration of the northerly 16.4 acres is substantially more suitable for employment land use and therefore more compatible with the EastLake Business Center to the north and east. The remaining 14.4 acres currently designated for Public Quasi-public and proposed to be changed to Commercial Retail, will be added to the Commercial Retail parcel directly to the south to crate a 38.I-acre commercial retail site. The combined acreage will allow the site to be developed as a major commercial center (0 serve EastLake residents and the city as a whole. Eastern Parcel: The requested GDP amendment for this site involves changing the northerly 2 acres land use designation from Research and limited Manufacturing to Professional and Administrative 7 Page No.8, Item: Meeting Date: 07/10/02 Commercial. The land use change provides additional land area to accommodate a cohesive office commercial development envisioned for this parcel in the new Supplemental SPA. With the conversion of the 16.4 acres on the western Parcel to Research and Limited Manufacturing, the acreage designated for employment in the EastLake Planned Community, will increase by 14.4 acres. This added acreage will contribute substantially to achieve the city's economic development goals and objectives. EastLake I Supplemental EastLake Village Center North SPA Plan: EastLake I SPA Plan: The EastLake Village Center North, which is referred to as the EastLake I Activity Center in the adopted SPA plan, is located within the EastLake I SPA and functions as the town center for the EastLake Planned Community, intended to serve the business center within the SPA and the EastLake Planned Community as a whole. This Activity Center concept features three major components: I) a neighborhood shopping center; 2) a mixed-use entertainment and service oriented village center; and 3) a major hospital! medical center (see Figure I). This Activity Center replaced the original commercial/residential mixed-use concept envisioned in the original EastLake I SPA. To properly guide the above-mentioned EastLake I Activity Center development, in 1992, the City Council approved the "EastLake I Activity Center Precise Plan Guidelines". The Design Guidelines established specific urban design parameters, land use features and landscaping and functional goals to insure the integration of all aspects of the Activity Center into the EastLake I SP A and the overall planned community (see Figure 6). However, this concept, which was based on the Kaiser Medical Center project as the major anchor, was never built due to Kaiser Pennanente Medical Group's decision not to build an additional hospital in San Diego County. Thus, the property was re-acquired by the EastLake Company who is proposing to re-define the northern portion ofthe Activity Center (north of Otay Lakes Road) into three separate and independent parcels tied together by their relationship and interface with other surrounding properties and uses. This new concept continues to be an increment of the overall EastLake Planned Community and it should be, to a large extent, a continuation of the existing development in design and policy rcgulations. The new concept is more specifically outlined in a new Supplemental SPA plan. This new Supplemental SPA defines the development parameters, including the land use designation, Urban Design Criteria Circulation, public facilities, Water Conservation Plan, Air Quality Improvement Plan and other necessary components to ensure the proper integration of the Village Ccnter North into the existing surrounding Residential, commercial and industrial uses. Thc following paragraphs describe in more dctail some of the EastLake Village Center North Supplemental SPA plan components. 8 - -- - -.',,- -..----......-.-..---. ..- ----------------_._~ Page No.9, Item: Meetin~ Date: 07/10/02 Land Use: Under the adopted EastLake II General Development Plan, PQ, Public Quasi-public, the EastLake Village Center North was envisioned to contain a major medical center complex with a support commercial, entertainment and civic uses, which resulted in a well integrated mixed-use project illustrated in the latter adopted precise plan for the subject property. The new land use composition is intended to create three separate parcels, each with a distinctive target land use designation, but tied together by common urban design features and urban design guidelines. The land uses have been crafted to provide independent development parameters and guidelines, but complementing each other as the area is fully developed. Circulation: The EastLake Village Center North will be served by two major streets: EastLake Parkway and Otay Lakes Road. The western parcel's main access is along Otay Lakes Road with secondary access points along EastLake Parkway. Otay Lakes Road, which is a 6-lane Prime Arterial road will be widened to seven lanes to accommodate a queuing lane for the future SR-125 freeway on-ramp and acceleration and de-acceleration lanes for the commercial center site (Western Parcel) EastLake Parkway will also be widened to five lanes to accommodate the required turning lanes at the intersection with Otay Lakes Road (see Attachment 5, SPA Plan tab). Regional access will be provided primarily by 1-805 located approximately 5 miles to the west, and eventually by the future SR-125, immediately adjacent to the west. Required improvements installation timing and financing mechanism are discussed in the Village Center North Public Facilities Finance Plan (see Figure 7). Design Guidelines: The EastLakc Village Center Design Guidelines reflects the physical appearance for the type of development envisioned such as a research and manufacturing facility within the northerly 16.4 acres (E-I 0), a commercial center within the southerly 38.1 acres (VC-l), and a professional administrative complex with minor retail uses within the easterly 13.6 acres (VC-2). The Design Guidelines stipulate design parameters that pertain to site planning, landscape architecture, architecture and signage for the 68.I-acre project site- westerly and easterly parcels, and serve to provide appropriate design criteria in the review of proposed developments for the respective areas of the project. In addition, the EastLake Village Center Design Guidelines feature design elements such as trail nodes along EastLake Parkway Thematic Corridor Trail System, which consist of textured paving, seatinglrest areas and canopy trees. The proposed trail system also considers potential for future transit facilities. These elements are intended to promote pedestrian activity. The urban design elements presented in the EastLake Village Center Design Guidelines promote a well-designed commercial center, which will serve as a landmark "Gateway" to the EastLake Planned Community. The EastLake Village Center Design Guidelines replaces the EastLake I Activity Center Precise Plan Guidelines. However, applicable elements of the Precise Plan, such as a Park & Ride facility, pedestrian oriented trail system, landscaping and signage, water features and community open space cr Page No. 10, Item: Meeting Date: 07/10/02 areas such as courtyards, patios, pergolas, and trellises to encourage pedestrian interaction have been retained and incorporated within the EastLake Village Center Design Guidelines. The Design Guidelines contain illustrations and guidelines to implement the design ideas presented therein. Some of the urban design guidelines include land use diversity, site development character and conceptual building/parking/open space relationships within the project. Because of the importance of unifying themes and designs over an extended period oftime until full build out, the Design Guidelines will be utilized to ensure overall consistency while allowing for flexibility on the part of the Design Review Committee at the detailed site plan level. Village Center North Supplemental Public Facilities Finance Plan: The proposed Public Facilities Financing Plan (PFFP) has been prepared by City consultants based on water, sewer, traffic, drainage, biology and other technical studies. As required by the City's Growth Management Ordinance, the proposed EastLake Village Center North Supplemental PFFP analyzes the impact of the project on public facilities and services and identifies the required public facilities and services needed to serve the project to maintain consistency with the City's Quality of Life Threshold Standards. The PFFP describes in detail the cost, financing mechanism and timing for constructing public facilities. The public facilities needed to serve the project will be guaranteed by placing conditions of approval on the tentative parcel map, payment of DIF fees at the building permit stage, and/or utilizing Community Facilities Districts to finance or maintain the public facility. Transportation: The City's Traffic Threshold Standard specifies that a Level of Service (LOS) of C or better, as measured by average travel speeds on the arterial roads, shall be maintained with an exception that during peak hours LOS D can occur for no more than two hours of the day or LOS E for one hour. The EastLake Village Center North project is calculated to generate a total of 36,356 daily project trips. Since no specific development is proposed on parcel E-l 0 or VC-2 at this time, an assumption by the traffic consultant was made as to future traffic generation for these parcels and included in the traffic model. Street improvements required to serve the project include a new westbound lane on Otay Lakes Road from EastLake Parkway to SR-125 and traffic signals and intersection widening at driveway entrances to the shopping center and at street intersections such as EastLake Parkway and Otay Lakes Road and EastLake Parkway and Fenton Street and Miller Drive. The applicant will also be conditioned to provide fair share funding for cumulative impacts that will necessitate the future widening of Olympic Parkway from SR-125 to EastLake Parkway and Otay Lakes Road from Telegraph Canyon Road to "H" Street. (0 Page No. 11, Item: Meetin~ Date: 07/10/02 With the construction of the project level street improvements and the cumulative level street improvements, the City's Quality of Life Threshold Standards will be maintained at a Level of Service of C in the morning peak hour and at a Level of Service ofB in the evening peak hour. Based on the Traffic Impact Analysis prepared for the EastLake Village Center North project by the City's traffic consultant, Linscott, Law & Greenspan, dated May 8, 2002, threshold compliance will be maintained with implementation ofthe street improvements identified in the report and with the payment of transportation DIF fees listed above. The EastLake Village Center North project will be conditioned to pay Transportation mF fees ($6,240 per EDD) , Interim SR-125 fees ($820 per EDD) and Traffic Signal Fees ($23.00 per vehicle trip generated per day) at the rate in effect at the time building pennits are issued for the project. Drainage: The 68.l-acre site lies within the Telegraph Canyon Drainage Basin. This basin is served by improved concrete drainage channels that run parallel to Telegraph Canyon Road. On-site, runoff is contained on-site within a detention basin to reduce the impact of a 100-year flood on downstream facilities. The project will be conditioned to provide for the conveyance of stonn water flows in accordance with City standards, policies and requirements. Sedimentation basins, on-site erosion protection, urban runoff treatment, and ongoing maintenance will be provided as a condition of the project. Water: The Otay Water District will provide water service for EastLake Village Center North project. Annexation into Improvement District 22 will be required prior to water service being provided. The Otay Water District has facilities in the vicinity of the project that can provide water service. The District will also provide recycled water to the project for landscape irrigation and other uses. The total projected potable water demand for the Village Center North project is approximately 0.114 million gallons per day. The commercial fire flow is 5,000-gpm flow for 5 hours, which meets the City's requirements. The necessary area-wide water improvements to serve the project have been constructed. Sufficient water capacity and infrastructure exist to serve the EastLake Village Center North project. Sewer: Sewer service to the project site is provided by the City of Chula Vista. The project will connect to the existing 15-inch diameter Telegraph Canyon Trunk Sewer in Otay Lakes Road either directly or via a sewer line located in EastLake Parkway. The trunk sewer facilities will accommodate sewage flows from the project and other uses in the basin. The City holds capacity rights of 19.843 mgd in the San Diego Metropolitan Sewerage System and has 5.581 mgd remaining available capacity in the Metro Sewer System. The sewer service charges 1/ Page No. 12, Item: Meeting Date: 07/10/02 for this development will be assessed based on the quantity and quality of effluent that will be generated from the site. The sewer analysis determined that the land uses of the proposed project would result in a reduction in sewage flow from those planned in previous studies. Because of the reduction in flows, the planned improvements to the Telegraph Canyon Trunk Sewer will accommodate project flows. Fire: Development of the EastLake Village Center North project is not anticipated to change the need for fire service in the area. Interim Fire Station #6, located at 975 Lane Avenue in EastLake Business Center I would be the primary station to serve the project. In the long term, Fire Station No.6 will be relocated to East "H" Street and Mount Miguel Road and Fire Station #8 will be constructed in EastLake Woods. Schools, Libraries and Parks: The proposed project will not generate an increase in dwelling units or population in the project area. Therefore, the development will not result in a need for new schools, libraries or parks. However, the applicant will have to pay school fees at the rate in effect at the time building permits are issued. EastLake II Planned Community District Regulations Amendments: The EastLake II Planned Community District Regulations function as the zoning regulations for the project. Thc PC District Regulations provide standards and regulations to guide the development of the project. These regulations are applied in conjunction with the EastLake Village Center North Design Guidelines to ensure the uses within the project are compatible and well designed. The EastLake II Planned Community District Regulations adopted originally in 1985 and amended in 1992 to allow the Kaiser medical center project, cover all of EastLake Hills, Shores, Business Center and the Greens and Trails. This amendment only affects the commercial and industrial uses, which occur in the EastLake Village Center North portion of the EastLake project. The amendments essentially consist of fine-tuning the allowable uses in the Village Center North parcels to reflect the proposed uses for the shopping center and professional and commercial development on VC-2. Since BC-3 is being created as a new land use district (formerly part ofVC- I) allowable land uses are being added to the regulations to reflect the City's intent to encourage medical facilities and uses on BC-3. In addition, the property development standards have been improved to reflect setbacks from Otay Lakes Road and EastLake Parkway as well as future SR-125. New property development standards have been included for BC-3. The off-site parking requirements for planned shopping centers of 5 spaces per 1,000 square feet of building area for all uses except for outdoor garden areas and dining patios has been added to regulations. The remaining provisions of the EastLake II Planned Community District Regulations remain unchanged. /,;z -,....-.---.-.--....-. . .___ "_"_'_'_.___ _M.~...,_____.__ Page No. 13, Item: Meetinl: Date: 07/10/02 Water Conservation Plan: The City's Growth Management Ordinance requires the preparation of a Water Conservation Plan for all projects. The reduction in water usage from the previously approved Kaiser Hospital project (.421 mgd) as compared to the proposed EastLake Village Center North proj ect (.122 mgd), equates to .299 mgd savings, which is approximately 71 %. Numerous features have been included in the proposed project to minimize the use of water during the construction and operation ofthe project. The estimate potable water consumption with conservation measures is .067 mgd or a 45% savings as compared to no conservation. The water conservation measures incorporated into the project are mandated fixtures and devices such as showerheads, lavatory faucets, sink faucets, metering faucets in public restrooms, flushometer valves, commercial water closets, urinals and irrigation of landscaping with recycled water. Non-mandated measures include hot water pipe insulation and pressure reducing valves. The EastLake Village Center North Water Conservation Plan demonstrates the value in incorporating all feasible water conservation measures in the buildings and irrigation systems for commercial development. The implementation of these measures will contribute to preserving a valuable natural resource. Air Quality Improvement Plan (AQIP): An Air Quality Improvement Plan was prepared for the project in accordance with Federal and State requirements; and the City's General Plan Growth Management Element (GME) to meet federal and state air quality standards. To implement the GME, the City's Growth Management Program requires that major commercial/industrial projects prepare Air Quality Improvement Plans for all Sectional Planning Area (SP A) Plans. The AQIP includes an assessment of how the project has been designed to reduce emissions as well as identify appropriate mitigation measures. The design concepts described and implemented in this AIQP for the Village Center North SPA are esscntially the same as those identified in a pilot study recently conducted by the city to develop meaningful air quality improvement measures. Numerous features have been included in the project and surrounding EastLake Community to minimize air quality impacts from construction and operation of the EastLake Village Center North Supplemental SPA Plan. The AQIP outlines project- level features that will assist in reducing air quality impacts (see Attachment 5, SPA Binder Tab). CONCLUSION: For the reasons mentioned above, staff recommends approval ofthe project subject to the conditions listed in the attached draft City Council Resolution. 13 Page No. 14, Item: Meetin~ Date: 07/10/02 Attachments 1. Planning Commission Resolution 2. Draft City Council Resolution & Ordinance 3. Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) 4. Figures 5. Village Center North Supplemental SPA-Binder 6. Ownership Disclosure Form J:\Planning\LUIS\Vi1Iage Crr. North\VILLAGE CTR REPORTS AND RESOS\PCM 01-15 ELK VCN PC Agenda 26 June 02.doc d .".".~.__~. ._~"____._ ___H'_"~~__"___~_'____ ."'_.___ _.___.____.____.__________ RESOLUTION NO. GPA-02-07/PCM-Ol-15 RESOLUTION OF THE CITY OF CHULA VISTA PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL ADOPT THE MITIGATED NEGATIVE DECLARATION IS-OI-042 AND MITIGATION MONITORING AND REPORTING PROGRAM, APPROVE AMENDMENTS TO THE CITY'S GENERAL PLAN, EASTLAKE II GENERAL DEVELOPMENT PLAN, EASTLAKE II PLANNED COMMUNITY DISTRlCT REGULATIONS AND LAND USE DISTRICTS MAP. ALSO, ADOPT A NEW SECTIONAL PLANNING AREA SPA PLAN AND ASSOCIA TE REGULA TORY DOCUMENT S FOR 68.1 ACRES AT THE NORTHEAST AND NORTHWEST CORNER OF OTAY LAKES ROAD AND EASTLAKE P ARKW A Y. \VHEREAS, on February 23, 2001, a duly verified application was filed with the City of Chula Vista Planning Department by The EastLake Company ("Developer"), requesting approval of amendments to the City's General Plan, EastLake II General Development plan and EastLake II Planned Community District Regulations. The DeveJoper also requested approval of a new Sectional Planning Area (SPA) plan and associated regulatory documents, including design guidelines, public Facilities Finance Plan, Air Quality Improvement plan and Water Conservation plan for 68.1 acres located at the northeast and northwest corner ofOtay Lakes Road and EastLake Parkway ("Project); and. WHEREAS, the area ofland which is subject matter ofthis Resolution is diagrammatically represented in Exhibit "A" and commonly known as portion of the Eastlake I Activity Center, and for the purpose of general description herein consists of approximately 68. I acres located at the northeast and northwest corners of Otay Lakes Road and EastLake Parkway within the EastLake Planned Community ("Project Site"); and, WHEREAS, the Environmental Review Coordinator determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because mitigation measures have been incqrporated and agreed to by the project proponent. A Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program were prepared which must be considered by the Planning Commission prior to a decision on the project; and, WHEREAS, the Planning Commission finds that the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (1S-01-042) has been prepared in accordance with the requirements ofthe California Environmental Quality Act (CEQA), and the Environmental Review Procedures of the City ofChula Vista; and, WHEREAS, the Planning Commission finds that the Project environmental impacts will be mitigated by adoption of the Mitigation Measures described in the Mitigated Negative Declaration, and contained in the Mitigation Monitoring and Reporting Program, and that the Mitigation Monitoring and Reporting Program is designed to ensure that during Project implementation, the pern1ittee/Proj ect applicant, and any other responsible parties implement the project components and comply with the mitigation Monitoring Program; and, WHEREAS the Planning Commission having received certain evidence on July 10,2002, as set forth in the record of its proceedings herein by reference as is set forth in full, made certain findings, as set forth in their recommending Resolution GPA 02-07/PCM-01-15 herein, and recommended that the City Council approve the Project based on certain terms and conditions; and. WHEREAS, the Planning Director set the time and place for a hearing on the Project, and notice of said hearing, together with its purpose, was given by its publication in a newspaper of general circulation in the city and it mailing to property owners and within 500 feet ofthe exterior boundaries of the property, at least 10 days prior to the hearing; and, WHEREAS, the hearing was held at the time and place as advertised, namely 6:00 p.m., June 7,2000, in the Council Chambers, 276 Fourth Avenue, before the Planning Commission and said hearing was thereafter closed. NOW, THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION recommends that the City Council adopt the attached Draft City Council Resolution and Ordinance approving the Project in accordance with the findings and subject to the conditions contained therein. BE IT FURTHER RESOLVED THAT a copy of this resolution be transmitted to the City Council. PASSED AND APPROVED BY THE PLANNING COMMISSION OF THE CITY OF CHULA VISTA, CALIFORNIA, this lOth day of July, 2002, by the following vote, to-wit: AYES: NOES: ABSENT: Kevin O'Neil, Chairperson ATTEST: Diana Vargas, Secretary J:\Planning\LUISWil1age Ctr. North\VILLAGE CTR REPORTS AND RESOS\PCM-OI-15 PCRESO.doc W~~~ ~~\~I ~~ ~fi3~~ I( =. , IIIIII11111 I11I I\J 'III I II J '111111 1\ ,",LU t HI" " . rT" ~ I _ H \ \ II111 I=:~ = I '\. ~ llillJ r :=9' ~ F 'I ,II WI EIT B I ~~~ ~ ./\ ~~\~ff~ ~ It ^ ~/ ~}}JJ (:h W/ / Fit>.: E ( I ~Z<$~ '\?>>.. L ~(f ~~ ~ EASTLAKE ;0~tl.if'i"'<;~ ~ HIGH SCHOOL ~/ TT7i 8, ,n:~ lA O tIV.<< '" ,f::c. f1 I-UJ] I'7-r 1=1 H ::J '-- --<. /, --. '--\ r--- g~ ~( I ~ ~ ~ ~~ ~ ~IIL~~I! !:: illJ ~ ~ ROLLING HILLS RANCH ~ I ~2~1= ~W g,t1fIDj~'i/r- ,JJJJI L~-~ EASTLAKE \ BUSINESS ~ CENTER l~ '/~ f ~ I EXISTING I H CHURCH I 7El: \ ---- 10 f<,,~"'~ ~ ~ ~a ~~~ VON'S ( W~~iZW ~ ~NITR /~A ~~ ~ PROJECT ~:y~( !, LOCATION ~ = c ~ '\i~~c c-~ S; < \\-1 EASTLAKE GREENS "- - ~ I ~ ~ ~~~ rC "='C~~ CHULA VISTA PLANNING AND BUILDING DEPARTMENT LOCATOR PROJECT C9 APPLICANT: EASTLAKE DEVELOPMENT CO. PROJECT Northeast and Northwest Corner of EXHIBIT A ADDRESS: Otay lakes Road and Eastlake Parkway SCALE: FILE NUMBER: NORTH No Scale GDP-02-07, PCM-01-15 C:IDAIFILEllocatorsIGDP0207, PCM0115.cdr OS/29/02 "_._" ~~_,..._" 'M___' . ~ ..,.,._....., ',,'_.._m.__. . __."...,~...~".._ __.....__.._.__.___....__.~~~_.._~.,__ z < ~ ~ ~ ~ ~ z ~ ~ ~ ~ 00. o ~ o p::: ~ ZE-< <Z;r-- ..:i~c ~~. ..:iQS <z. ~~~ ~~Q ~<\.:) \.:) --'-'-"-.-- en 0 ClJ..... '-="U t) ro ClJ C'O.......... Q) 'E OJ "<I: c::._ r:::: (() _ ...J .;:: or- . ~ ""C ..a ClJ t) L t) ~'-roro ~'ClJ .... LE..c::J ro E t) L ..c: '-ro OOro~ <l:O~ Q.E~ e>e .... " z ;: ...~ ::> <= !-< Qi1uQ~ E-CI:~... c;n<!-<::> ::>~....z Q"-'~< :s~~~ o($~ ......> -<<~ ....z-< UOCl: CI:;j!-< ~[I.)[I.) ~~z ~....... OO~ u~~ ... -< - U CI: ~.J ~- ~~ 8~ ~ ~~~1~ is> ~I~~ 6~ u I D I ~ ~ ..... ~ ..... == ~ ~ ATTACHMENT 2 Draft City Council Resolution & Ordinance /1 .._ _~'_ '__ __ ..~ ___.. ______ ________"_."._..~._u."'.___._~_.._..",..._,_. __ _~_....,__..__"._,.__.. '". ~____,,_.___,_. RESOLUTION RESOLUTION OF THE CITY OF CHULA VISTA CITY COUNCIL RECOMMENDING THAT THE CITY COUNCIL ADOPT THE MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND REPORTING PROGRAM IS-01-042; APPROVE AMENDMENTS TO THE CITY'S GENERAL PLAN, EASTLAKE II GENERAL DEVELOPMENT PLAN, EASTLAKE II PLANNED COMMUNITY DISTRICT REGULATIONS AND LAND USE DISTRICTS MAP. ALSO, ADOPT A NEW SECTIONAL PLANNING AREA SPA PLAN AND ASSOCIATED REGULATORY DOCUMENTS FOR 68.1 ACRES AT THE NORTHEAST AND NORTHWEST CORNERS OF OTAY LAKE ROAD AND EASTLAKE PARKWAY. I RECITALS A Project Site WHEREAS, the areas ofland which are the subject of this Resolution are diagrammatically represented in Exhibit A and hereto incorporated herein by this Resolution, and commonly known as EastLake I Activity Center, and for the purpose of general description herein consist of 54.5 acres at the northwest comer and 13.6 acres at the northeast comer ofOtay Lakes Road and EastLake Parkway within the EastLake Planned Community ("Project Site")' and , , B. Project; Application for Discretionary Approvals WHEREAS, duly verified application was filed with the City of Chula Vista Planning Department on February 23, 2001 by The Eastlake Company ("Developer") requesting amendments to the City's General Plan, EastLake II General Development plan, Eastlake II Planned Community District Regulations. The Developer also requested approval of a new Sectional Planning Area (SPA) plan and associated regulatory documents, including design guidelines, public Facilities Finance Plan, Air Quality Improvement Plan and Water Conservation Plan for 68.1 acres located at the northeast and northwest comer of Otay Lakes Road and EastLake Parkway ("Project); and, C Prior Discrctionary Approvals WHEREAS, prior discretionary action of the development of the EastLake I portion of the Project Site has been the subject matter of prior General Development Plan and Sectional Planning Area (SPA) plan, EastLake II General Development Plan, Planned Community District Regulations and Land Use District Map amendments, EastLake II Planned Community District Regulations, resulting in the current land use designations, all previously approved by City Council Resolution No. 16702 and Ordinance No. 2522 on July 6, 1992; 2) a prior Development Agreement Between the City of Chula Vista and the 020 Kaiser Foundation Hospitals previously approved by City Council Ordinance 2522 on July 6, 1992 ; and, D. Planning Commission Record of Application WHEREAS, the Planning Commission held an advertised public hearing on the Project on July 10,2002 and votcd to forward a recommendation to the City Council on the Project; and, WHEREAS, the proceedings and all evidence introduce before the Planning Commission at the pubJic hearing on this project held on July 10, 2002 and the minutes and resolution resulting there trom, are hereby incorporated into the record of this proceedings; and, E. City Council Record of Application WHEREAS, the City Clerk set the time and place for the hearing on the Project application and notices of said hearings, together with its purposes given by its publication in a newspaper of general circulation in the city, and its mailing to property owners within 500 ft. ofthe exterior boundaries of the Project Sites at least ten days prior to the hearing. NOW THEREFORE BE IT RESOLVED that the City Council hereby find, detennine and resolve as follows: II. CERTIFICATION OF COMPLIANCE WITH CEQA The City Council does hereby find that the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-Ol-042) has been prepared in accordance with requirements of the California Envirorunental Quality Act (CEQA), the State CEQA Guidelines and the Environmental Review Procedures of the City of Chula Vista, and hcreby adopts the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (lS-Ol-042). III. INDEPENDENT JUDGEMENT OF CITY COUNCIL The City Council does hereby find that in the exercise of their independent review and judgment, the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (lS-01-042) in the fonn presented has been prepared in accordance with requirements of the California Environmental Quality Act and the Environmental Review Procedures ofthe City ofChula Vista and hereby adopt same. IV. APPROVAL OF GENERAL PLAN AMENDMENT The Chula Vista General Plan Land Use Diagram is hereby amended as set forth and diagrammatically represented in Exhibit "B," a copy of which is on file in the office of the 2 <:>2/ City Clerk, known as Document , to change the land use designation of 16.4 acres at the northeast comer of EastLake Parkway and the future SR-125 freeway from Commercial Retail to Research and Limited Manufacturing. V. GENERAL PLAN INTERNAL CONSISTENCY The City Council hereby finds and determines that the General Plan consistency is internally consistent and shall remain internally consistent following the amendments thereon in this Resolution. VI. GENERAL DEVELOPMENT PLAN FINDINGS THE PROPOSED DEVELOPMENT AS DESCRIBED BY THE GENERAL DEVELOPMENT PLAN IS IN CONFORMITY WITH THE PROVISIONS OF THE CHULA VISTA GENERAL PLAN, AS AMENDED. The proposed amendments to the EastLake [] General Development Plan reflects the land use, circulation system and public facilities that are consistent with the City's General Plan as proposed to be amended. PLANNED COMMUNITY CAN BE INITIATED BY ESTABLISHMENT OF SPECIFIC USES OR SECTIONAL PLANNING AREA PLANS WITHIN TWO YEARS OF THE ESTABLISHMENT OF THE PLANNED COMMUNITY ZONE. A sectional Planning Area Plan has been previously established for the Project Site, and a new Supplemental Sectional Planning Area plan, which is a continuation of the EastLake I SPA plan policies and development regulations, is included with the proposed project. IN THE CASE OF PROPOSED RESIDENTIAL DEVELOPMENT, THAT SUCH DEVELOPMENT WILL CONSTITUTE A RESIDENTIAL ENVIRONMENT OF SUSTAINED DESlRABLITY AND STABILITY; AND THAT IT WILL BE IN HARMONY WITH OR PROVIDE COMPATIBLE VARIETY TO THE CHARACTER OF THE SURROUNDING AREA; AND THAT THE SITES PROPOSED FOR PUBLIC FACILITIES, SUCH AS SCHOOLS, PLAYGROUNDS AND PARKS ARE ADEQUATE TO SERVE THE ANTICIPATED POLPULATION AND APPEAR ACCEPTABLE TO THE PUBLIC AUTHORITIES HAVING JURISDICTION THEREOF. The project does not involve residential development. VII. ADOPTION OF AMENDED GENERAL DEVELOPMENT PLAN In light of the findings above, the amended EastLake II General Development Plan is hereby approved and adopted in the form presented to the City Council and on file in the office of the City Clerk. 3 ~ VIII. SPA FINDINGS/ APPROVAL A. THE SECTIONAL PLANNING AREA (SPA) PLANS (AS AMENDED) ARE IN CONFORMITY WITH THE EASTLAKE II GENERAL DEVELOPMENT PLAN AND THE CHULA VISTA GENERAL PLAN. The new Village Center North SPA Plan reflect the land use, circulation system and public facilities that are consistent with the EastLake II General Development Plan and the City ofChula Vista General Plan as proposed to be amended. B. THE SECTIONAL PLANNING AREA PLANS WILL PROMOTE THE ORDERLY SEQUENTIALIZED DEVELOPMENT OF THE INVOLVED SECTIONAL PLANNING AREAS. The new SPA plan includes a Supplemental Public Facilities Finance Plan that outlines the required inrrastructure to serve the Project, the timing of installation and the financing mechanisms to promote the orderly sequentialized development of the Project. C. THE EASTLAKE SECTIONAL PLANNING AREA (SPA) PLANS, AS AMENDED, WILL NOT ADVERSELY AFFECT ADJACENT LAND USE, RESIDENTIAL ENJOYMENT, CIRCULATION OR ENVIRONMENTAL QUALITY. The Land uses within the EastLake I Village Center Supplemental SPA plan rcprcscnt the circulation system and overall land use intent as previously envisioned in the EastLake II General Development Plan. Thus, the new SPA will not adversely affect the adjacent land uses, residential enjoyment, circulation or environmental quality of the surrounding uses. D. IN THE CASE OF PROPOSED INDUSTRIAL AND RESEARCH USES, THAT SUCH DEVELOPMENT WILL BE APPROPRIATE IN AREA, LOCATION, AND OVERALL DESIGN AND DEVELOPMENT STANDARDS ARE SUCH AS TO CREATE A RESEARCH OR INDUSTRIAL ENVIRONMENT OF SUSTAINED DESIRABILITY AND STABILITY; AND, THAT SUCH DEVELOPMENT WILL MEET PERFORMANCE STANDARDS ESTABLISHED BY THIS TITLE. The orientation and configuration of the northerly 16.4 acres is substantially more suitable for employment land use and more compatible with the EastLake Business Center to the north and east. Thus, changing the previously adopted land use designation from Public Quasi-Public to Research and Limited Manufacturing is appropriate in area, and will not affect the surrounding areas. This added 4 ~3 acreage will contribute substantially to achieve the city's economic development goals and objectives. E. IN THE CASE OF INSTITUTIONAL, RECREATIONAL, AND OTHER SIMILAR NONRESIDENTIAL USES, THAT SUCH DEVELOPMENT WILL BE APPROPRIATE IN AREA, LOCATION AND OVER-ALL PLANNING TO THE PURPOSE PROPOSED, AND THAT SURROUNDING AREAS ARE PROTECTED FROM ANY ADVERSE EFFECTS FROM SUCH DEVELOPMENT. The orientation and configuration of the northerly 16.4 acres is substantially more suitable for employment land use and more compatible with the EastLake Business Center to the north and east. Thus, changing the previously adopted land use designation from Public Quasi- public to Research and Limited Manufacturing is appropriatc in arca, and will not affect the surrounding areas. This added acrcage will contribute substantially to achieve the city's economic dcvclopment goals and objectives. F. THE STREET AND THOROUGHFARES PROPOSED ARE SUITABLE AND ADEQUATE TO CARRY THE ANTICIPATED TRAFFIC THEREON. The Project Site will be served by two major streets: EastLake Parkway and Otay Lakes Road. The western parcel's main access is along Otay Lakes Road with secondary access points along EastLake Parkway. Otay Lakes Road, which is a 6- lane Prime Arterial road will be widened to seven lanes to accommodate a queuing lane for the future SR-125 fTeeway on-ramp and acceleration and de- acceleration lanes for the commercial center site (Western Parcel). EastLake Parkway will also be widened to five lanes to accommodate the required turning lanes at the intersection with Otay Lakes Road. Regional access will be provided primarily by 1-805 located approximately 5 miles to the west, and eventually by the future SR-125, immediately adjacent to the west. Required improvements installation timing and financing mechanism are discussed in the Village Center North Public Facilities Finance Plan. Thus, the streets proposed to serve the Projcct Site are suitable and adequate to carry the anticipatcd traffic thereon. G. ANY PROPOSED COMMERCIAL DEVELOPMENT CAN BE JUSTIFIED ECONOMICALLY AT THE LOCATION (S) PROPOSED AND WILL PROVIDE ADEQUATE COMMERCIAL FACILITIES OF THE TYPES NEEDED AT SUCH PROPOSED LOCATION (S). The proposed amendments increase the acreage designated Commercial Retail to allow for a major commercial center development to provide needed commercial 5 02.~ facilities, such as a major department store, and facilities, including restaurants and other similar uses, to complement the existing neighborhood serving commercial center. H. THE AREA SURROUNDING SAID DEVELOPMENT CAN BE PLANNED AND ZONED IN COORDINATION AND SUBSTANTIAL COMPATIBILITY WITH SAID DEVELOPMENT. The proposed amendments are consistent with the previously approved plans and regulations applicable to surrounding areas, and therefore said development can be planned and zoned in coordination and substantial compatibility with said development. BE IT FURTHER RESOLVED that in light of the findings above, the City Council does hereby approve the EastLake Greens and EastLake Trails SPA amendments and adopts the new EastLake II Sectional Planning Area SPA plan as presented in Exhibit C subject to the conditions set forth below: IX. SPA PLAN CONDITIONS OF APPROVAL 1. Provide a SO-space park and ride facility within the Western Parcel and a IO-space facility in the Eastern Parcel. The exact location, configuration, maintenance responsibility and ownership of the facility shall be defined as part of the precise plan (DRC) for each individual Parcel. 2. The EastLake Company shall design and construct a bus stop, shelter, trash receptacle and bench at the location designated by the City's Transit Coordinator on Otay Lakes Road. 3. Implement the Federal and State mandated conservation measures outlined In the EastLake I Supplemental Water Conservation Plan. 4. Implement the non-mandated water conservation measures, which include I) Hot Water Pipe Insulation 2) Pressure Reducing Valves, and 3) Water EfficientJDrought Tolerant Landscaping. 5. Prior to approval of building permits for each phase of the project, the applicant shall demonstrate that air quality control measures outlined in the EastLake I Supplemental Air Quality Improvement Plan pertaining to the design, construction and operational phases of the project have been incorporated in the project design. 6. Trash collection areas shall be covered, bermed or other approved method as approved by the City Engineer to prevent runoff of polluted water across paved areas into the storm drainage systems. 6 02.s- X. CONSEQUENCE OF FAILURE OF CONDITIONS If any of the forgoing conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, and any of such conditions fail to be so implemented and maintained according to the their terms, the City shall have the right to revoke or modify all approvals herein granted, deny or further condition issuance of shall future building permits, deny, revoke or further condition all certificates of occupancy issued under the authority of approvals herein granted, instituted and prosecute litigate or compel their compliance or seek damages for their violations. No vested rights are gained by Developer or successor in interest by the City approval ofthis Resolution. XI. INVALIDITY; AUTOMATIC REVOCATION It is the intcntion of the City Council that its adoption of this Resolution is dependent upon enforceability of each and every term provision and condition herein stated; and that in the event that anyone or more terms, provisions or conditions are determined by the Court of competent jurisdiction to be invalid, illegal or unenforceable, if the city so determines in its sole discretion, this resolution shall be deemed to be revoked and no further in force or in effect. Presented By: Approved as (0 form by: Robert A. Leiter Director of Planning John Kaheny City Attorney J:\Planning\LUIS\Vil1age Or. Nortn\VILLACiE CTR REPORTS AND RESOS\PCM-Ol-15CC RES0.doc 7 c2.c:, For City Council Resolution EXHIBIT B (See Attachment 1 of the staff report, Exhibit B) r27 __,_, ._,~_u '._._____._ _ _ .___~.,___.___,__..___.__. __'__'_ ..._.____~___._.__.__ ORDlNANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING AMENDMENTS TO THE EASTLAKE If PLANNED COMMUNITY DISTRICT REGULATIONS AND LAND USE DISTRICTS MAP. J. RECITALS A. Project Site WHEREAS, the areas of land which are the subject of this Ordinance Amendment are diagrammatically represented in Exhibit A and hereto incorporated herein as Exhibit A; and for the purpose of General description herein consist of 68.1 acres at the northwest and northeast corners ofOtay Lakes Road (Project Site); and, B. Project; Application for Discretionary Approval WHEREAS, on February 23, 2001, The Eastlake Company ("Developer") filed an application requesting approval of amendments to the EastLake II Planned Community District Regulations and Land Use District Map; and, C. Prior Discretionary Approvals WHEREAS, prior discretionary action of the development of the EastLake I portion of the Project Site has been the subject matter of prior General Development Plan and Sectional Planning Area (SPA) plan, EastLake ]] General Development Plan, Planned Community District Regulations and Land Use District Map amendments, EastLake II Plmmed Community District Regulations, resulting in the current land use designations, all previously approved by City Council Resolution No. 16702 and Ordinance No. 2522 on June 30, 1992; 2) a prior Development Agreement Between the City of Chula Vista and the Kaiser Foundation Hospitals previously approved by City Council Ordinance 2522 on July 6, 1992 ; and, D. Planning Commission Record on Applications WHEREAS, thc Planning Commission held an advertised public hearing on said project on July 10, 2002, and voted to recommend that the City Council approve the amcndments to the EastLake II Planned Community District Regulations and Land Use Districts Map in accordance with the findings listed below. The proceedings and all cvidence introduced before the Planning Commission at their public hearing on this Projcct hcld on July 10, 2002, and the minutes and resolutions resulting therefrom, are hereby incorporated into the record of this proceeding. r28' E. City Council Record on Applications WHEREAS, a duly called and noticed public hearing was held before the City Council of the City ofChula Vista on July 23, 2002 on the Discretionary Approval Application, and to receive the recommendations of the Planning Commission, and to hear public testimony with regard to same; and, F. Discretionary Approvals Resolution and Ordinance WHEREAS, at the same City Council meeting at which this Ordinance was introduced for first reading on July 23, 2002, the City Council of the City of Chula Vista approved Resolution No. by which it imposed amendments on EastLake II General Development Plan, and adopted a new Supplemental Sectional Planning Area (SPA) for 68.1 acres to be known as the Village Center North Supplemental SPA, including Design Guidelines, Public Facilities Financing Plan, Supplemental Public Facilities Finance Plan, Air Quality and Water Conservation Plans. II NOW, THEREFORE, the City of Chula Vista does hereby find, determine and ordain as follows: A. CERTIFICATION OF COMPLIANCE WITH CEQA The City Council does hereby find that the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-Ol-042) has been prepared in accordance with requirements of the California Environmental Quality Act (CEQA), the State CEQA Guidelines and the Environmental Review Procedures of the City of Chula Vista, and hereby adopts the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-0l-042). B. INDEPENDENT JUDGEMENT OF CITY COUNCIL The City Council does hereby find that in the exercise of their independent review and judgment, the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (IS-Ol-042) in the form presented has been prepared in accordance with requirements of the California Environmental Quality Act and the Environmental Review Procedures of the City of Chula Vista and hereby adopt same. C. FINDINGS FOR APPROVAL OF P-C PLANNED COMMUNITY ZONE The City Council hereby finds that the proposed Amendments to the Planned Community District Regulations and Land Use Districts Map are consistent with the City of Chula Vista General Plan, as amended, and public necessity, convenience, the general welfare and good zoning practice support the amendments. d-..'1 D. APPROVAL OF PLANNED COMMUNITY ZONE The City Council does hereby approve the Planned Community District Regulation and Land Use District Map as represented in Exhibit C. III. INVALIDITY; AUTOMATIC REVOCATION It is the intention of the City Council that its adoption of this Ordinance is dependent upon the enforceability of each and every term, provision and condition herein stated; and that in the event that anyone or more terms, provisions or conditions are determined by a Court of competent jurisdiction to be invalid, illegal or unenforceable, this resolution shall be deemed to be automatically revoked and of no further force and effect ah initio. IV. EFFECTIVE DATE This ordinance shall take effect and be in full force on the thirtieth day rrom and after its adoption. Prcsented by: Approved as to form by: Robert A. Leiter Director of Planning John Kaheny City Attorney J:\Planning\LUIS\Village Ctr. North\VILLAGE CTR REPORTS AND RESOS\PCM-OI-15 CCORD.doc 30 F or City Council Ordinance EXHIBIT A (See Attachment 1 of the staff report, Exhibit A) and EXHIBIT C (See Attachment 5 of the staff report, PC District Regulations Tab) :3! ...."~ _'_'_'~'_._'~'_'_'_' . "'_ ________.-m____ __ _______._____. ATTACHMENT 3 Mitigated Negative Declaration 3.( ,- ,-."." ,--,-,~"",--,-,--,,-""" ,.,- ...'. ~.._- .,.._""",_'.,~'--' ".,--"-_. '.-...""--~'-'- ._.--_.. --.-------_. Mitigated Negative Declaration PROJECT NAME: EastLake ViIJage Center North PROJECT LOCATION: Northwest and northeast of the EastLake Parkway/Otay Lakes Road intersection ASSESSOR'S PARCEL NO.: 595-070-27,28; 595-232-22, 23 PROJECT APPLICANT: The EastLake Company CASE NO.: Case No. IS-O 1-042 DATE: June 11,2002 A. Project Sctting The proposed EastLake Village Center North project (hereinaftcr referred to as "the proposed project") involves approximately 68.1 acres (ac) located at the northwest and northeast comers of EastLake Parkway and Otay Lakes Road in the City of Chula Vista. Adjacent uses incJude: future SR-125 to the west; the retail/commercial "Vons" center to the south; vacant land and developed parcels within the EastLake Business Center I to the cast and north. Single-family homes (EastLake Shores) are located to the west of future SR-125. Townhomes within EastLake Greens are located to the southeast of the site, south of Otay Lakes Road (Figures I and 2). The site has been previously graded in accordance with the approved master grading plan for the EastLake I Sectional Planning Area (SPA). ApproximatcJy 54.5 acres of the site (designated as VC-I (38.1 ac) and E-lO/BC-3 (16.4 ac) is located west and south of EastLake Parkway and is currently being graded under an approved remcdial grading permit (see Section C below). The elevation of this portion of the site has been altered due to the current grading operations. Generally, the site slopes from the northeast to the southwest toward an existing, onsite detention basin. Disturbed land covers the majority of the site. Non-native grassland and ornamental landscaping also occur on site. The EastLake II General Development Plan (CjDP) designates tlie approximate southern half of the site for Retail Commercial (RC) use, and designates the approximate northern half of the site for Public/Quasi-Public Use (PQ) (Figure 3). The EastLake I SPA currently designates the approximate southern half of the site for Yillage Center uses (i.e., retail, restaurants, offices, open space, public facility, etc.) and the approximate northern half of the site for medical center use (Figure 4). The project site also includes approximately 13.6 ac. east of EastLake Parkway (designated as YC-2). The westem approximately ten acres of this site is vacant, and an existing church occupies the remaining acreage within YC-2. The YC-2 site has also been previously graded under the af(Jrcmentioned master grading plan. This portion of the project site also drains from 06/lI/02 33 the northeast to the southwest. Non-native grassland and ornamental landscaping occurs on this portion of the site. The EastLake II (,cneral Dcvelopment Plan (GDP) designates the southern approximately II acres of this portion of the sitc as Professional and Administrative and approximately two acres of the site as Research & Limited Manufacturing. The EastLake I SPA currently designatcs the southern approximately 11 acres of the site for Village Center uses and the remainder of the site for Employment uses. B. Project Description The proposed project encompasses three separate land use districts (Figure 5): . Village Center-l (YC-I): 38.l-acres at the northwest corner of Otay Lakes Road and EastLake Parkway intended for retail/commercial use; . Business Center-Core District (BC-3): l6.4-acres north of YC-l and west of EastLake Parkway intended as a extension of the EastLake Business Center District to the north; and . Village Ccnter-2 (YC-2): 13.6-acres at the northeast corner of Otay Lakes Road and EastLake Parkway intended for professional administrative and limited retail uses. The majority of the proposed project addresses the future developmcnt of YC-l. Specifically, the proposed project involves the development of an approximately 380,000 square foot (SF) shopping center on the YC-l portion of the project site. The site would be divided into approximately 12 parcels. Two of the parcels would include "big box" users, potentially Target and Lowe's, with the remaindcr of the parcels providing a variety of retail, commercial, restaurant uscs. Under the proposed amended EastLake II Planned Community (PC) District Regulations, two uses currently being proposed for the shopping center would require a Conditional Use Permit (CUP). These uses are a car wash/gasoline station and a drive-thru restaurant. Several discretionary actions are required to implement the shopping eenter within the YC-l district. These include: . EastLake II GDP Amendment to: change 16.4 acres of Public/Quasi-Public Use to Research & Limited Manufacturing and 2.0 acres located at the northeast corner of EastLake Parkway and Fenton Street from Research & Limited Manufacturing to Professional & Administrative . EastLake I SPA Amendment (Supplemental SPA Plan) to: o change 30.6 acres of Medical Center-l (MC-l) use to 16.4 acres of Village Center Employment (E-I 0) and 14.2 acres of Yillage Center-I (YC-l); o change peI111itted land uses and property development standards for YC-I (PC District Regulations); o repeal Ihe Precise Plan and adopt new Design Guidelines; () replace the existing Air Quality Improvement Plan and Water Conservation Plan; and () prepare a Supplemental Public Facilities Financing Plan that addresses the proposed proj ect. . Design Review; 2 06/11102 ~y _. ._,___~_,__ .."___.______u . Parcel Map to subdivide the VC-I site into approximately 12 scparate lots for sale or lease; and . CUP pursuant to Section III. I of the proposed EastLake II Planned Community District Regulations for the proposed gas station/car wash and drive-thru restaurant. The Applicant is also requesting the fol1owing discretionary actions that would affect future development of the BC-3 and VC-2 parcels of the project: BC-3 . General Plan Amendment (GP A) to change 16.4 acres of Commercial Retail designation to Industrial Research 8.: Limited ManuElcturing; . EastLake 11 GDP Amendmcnt to change 16.4 acres of Public/Quasi-Pub]ic use to Industrial Research 8.: Limited Manufacturing; . EastLake I SPA Amendment (Supplemental SPA Plan) to: o change 30.6 acres of Medical Center-I (MC-l) use to 16.4 acres to Vil1age Center Employment (E-l 0) and 14.2 acres of Vil1age Center-l (VC-I); o changc ]6.4 acres from VC-I to BC-3 and change pennitted land uses for BC-3 (PC District Regulations); o repeal the Precise Plan and adopt new Design Guidelines; o replace the cxisting Air Quality Improvement PIan and Water Conservation Plan; and o prepare a Supplemental Public Facilities Financing Plan that addresses the proposed project. . Land Use District Map Amendmcnt to change 16.4 acres of Vil1age Center I (VC-I) to Business Center - Core District. No site plan is being proposed for the I3C-3 parcel at this time. See Section E below for a discussion of future environmental evaluation pertaining to future development of this parcel. VC-2 . EastLake 11 GDP Amendment to change two acres of Research 8.: Limited Manufacturing to Professional 8.: Administrative; . EastLake I SPA Plan Amendment to: o change two aercs of Employment designation to Vil1age Center-2 (VC-2); o change two acres from Business Center-Manufacturing Park District (BC-I) and Open Space (OS-7) to Vil1age Center-2 (VC-2) and change the permitted uses and property development standards for VC-2 (PC District Regulations); CJ repeal the Precise Plan and adopt new Design Guidelines; and o replace the existing Air Quality Improvement Plan and Water Conscrvation Plan; and o prepare a Supplemental Public Facilities Financing Plan that addresses the proposed project. No site plan is being proposed for the VC-2 parcel at this time. See Section E below for a discussion of future environmental evaluation pertaining to futurc development of this parcel. 3 06/1 1/02 -:3J" C. Prior Approvals and Environmental Documentation EastLake Master EIR A Master EIR (EIR 81-03) was completed for the 3,073-acre EastLake community in February 1982. This Master EIR considered the impacts associated with the armexation of the project site from the County of San Diego to the City of Chula Vista, as well as the potential impacts associated with the implementation of a General Plan Amendment, prezoning and Genera] Deve]opment Plan for the future EastLake Deve]opment. EastLake I SPA Plan Supplemental ElR Subsequently in 1984, a Sectional Planning Area (SPA) Plan was developed for approximately 1,268 acres of the 3,073-acre EastLake community. This SPA plan, referred to as EastLake I, was preparcd as a refinemcnt and implementation framework for the Plmmed Community zoning previously applied to the site in 1982. A Supplemental EIR (EIR 84-01) was certified in February 1985 that addressed the EastLake I SPA Plan and two accompanying Tentative Subdivision Maps, one of which included the subject EastLake Village Center. EastLake I SPA Plan Amendm"lltJ](aiserPennanente Chula \fista Medical Center Supplemental EIR In June 1992, a Supplemental ElR (EIR 92-(1) was certified for the EastLake I SPA Plan Amendment/Kaiser Pennanente Chula Vista Medical Center. ElR 92-01 specifically addressed the subject Village Center site. The EIR addressed an amendment to the EastLake I Genera] Deve]opment Plan and SP;\ Plan in order to: I) convert the adopted land uses in the northern portion ofthe site to medical center uses; 2) delete the adopted residential land use within the site and expand the acreage allocated for office/retail uses; and 3) eliminate 2.0 acres from the site in order to create additional emp]oymcnt uses with the EastLake Business Center. The SPA plan amendment required the approval of the EastLake ] Public Facilities Finance Plan (PFFP) Update and the approval of an Air Quality Improvement Plan (AQIP) and Water Conservation Plan (WCP) pursuant to the City's Growth Management Program. EIR 92-01 also addressed a Conditional Use Pennit/Precise Plan for the phased constnictionofJhe Kaiser Pennanente Chula Vista Medical Center on the northern 30.6 acres of the subject site. The EastLake I GDP and SP;\ Amendment was approved by Resolution No 16702 on June 30, 1992 and provided for the following entitlements: . 785,000 SF, 439-bed (full buildout) Medical Center, 485,000 SF of medica] and administrative onices, 35,000 SF ccntral plant, three parking stmctures to accommodate 4,271 cars, and surface parking for an additional 148 cars on northern 30.6 acres of site; 4 06111/02 3? ..__._...._ -----"_---"._"0' ..," ___-->-<__.~.._ _ _____._..~ '____0_____"'_"'0__ .0.. .o_.~_~-.-..____~__o_______ . 17.3 acres retail commercial (viII age center use) and 11.9 acres of open space/public facility; and . 6 acres of office/commercial, 4 acres of community purpose facility and 2 acres of employment. While GDP and SPA amendments and a CUP for the hospital were approved, no development has occurred on the site to date. Olympic Parkway Disposal SitesMND In December 200 I, a Mitigated Negative Declaration (lS-02-009) was prepared for the Olympic Parkway Disposal Sites. This tvlND addressed the temporary disposal of up to 250,000 cubic yards of material from the grading of Olympic Parkway at the EastLake Village Center site. A grading pennit was issued for the disposal of the material on the site. These grading activities are ongomg. D. Compliance with Zoning and Plans The proposed project site is within a Planned Community (PC) District. The EastLake II PC District Regulations arc proposed to be amended as part of this project to change permitted land uses and property development standards for the Village Ccntcr-I (YC-I), Business Center-Core District (BC-3) and Village Ccnter-2 (VC-2) land use districts. Amendments to the General Plan, EastLake II General Development Plan and EastLake I SPA Plan are also required for the proposed project to comply with regulating plans. E. Subsequent Environmeutal Review for VC-2 and BC-3 As stated in Section B above, the focus of this analysis is the commercial development proposed for VC-l. No site plans are being proposed for the VC-2 and BC-3 parcels at this time. Future development of these parcels would be governed by the proposed Planned Community District Regulations and Design Guidelincs. Specifically. the PC District Regulations set forth the development and land use standards for all property within the EastLake II General Development Plan area by establishing: setbacks; building heights; parking requirements; landscape requiremcnts; use restrictions; animal regulations; density of development; lot size, width and depth; fencing requirements; and signing regulations. Sections III and IV of the PC District Regulations specify the types of uses that are pennitted, conditionally permitted and not permit1ed within VC-2 and BC-3 districts, respectively. 5 06/] 1/02 "7 Future site plans for the YC-2 and BC-3 parcels will be evaluated against the adopted PC District Regulations and Design Guidelincs specific to these parcels. In addition, an environmental evaluation of issues related to the proposed land uses, such as but not limited to land use compatibility with adjacent uses, noise, and aesthetics would need to be conducted at the time a future site plan is proposed. In addition, the need for any new, or expansion of, a public service specifically related to a proposed use (such as emergency services and disposal of medical/toxic waste related to hospital or other medical facility, disposal of biotechnical waste related to biotechnical research facilities, etc.) would need to be evaluated for environmental considerations. On the other hand, physical features of these parcels, including geology, biology, cultural and paleontological resources and drainage, have been addressed in current technical studies or prior environmental documentation, and therefore would not need further analysis. With respect to traffic, a worst-case traffic analysis has been prepared that assumed the highest trip-generating land uses allowed on these parcels. As long as the total trip generation for the three parcels (VC- I, VC-2 andI3C-3) does not exceed that projected in the 2002 LLG traffic study for the EastLake Yillage Center North project (i.e., 36,356 average daily trips), no further traffic analysis would be required. Similarly, a worst-case sewage generation and water demand analysis was conducted. Provided that the ultimate development that is proposed for the YC-2 and BC-3 parcels is in confonnanee with the PC District Regulations and Design Guidelines, no additional water or sewer analyses would be required. F. Identification of Environmental Effects The City of Chula Vista determined that the proposed project will have significant environmental effects other than what has been previously identificd in prior environmental documentation. These effects have been mitigated. The preparation of an Environmcntal Impact Report will not be required. This Mitigated Negative Declaration has becn prepared in accordance with Section 15070 of the State CEQA Guidelines. Ir"llSportation a'ld.C)rculation The Transportation and Circulation analysis contained in SEIR 92-01 has been updated with a traffic study specific to the proposed project. This study, entitled "Traffic Impact Analysis, EastLake Village Center North" prepared by Linscott, Law & Greenspan and dated May 8, 2002, addressed the traffic impacts of a 420,000 SF regional shopping .center and 50 park and ride spaces on the YC-l parcel, 4.30 acres of retail, 2.3 acres of restaurant use, 2.74 acres of medical offices on the YC-2 parcel, and" 125-bed hospital and 78,000 SF of medical offices on the BC-3 parcel. While a site plan and regional shopping center on VC-l are currently being considered and are the primary subject of this analysis, no site plan has been proposed for YC-2 or BC-3 at this timc. Howevcr, in order to analyze a worst-case future traffic condition, thc highest traffic- generating allowahle lISCS on these parcels was assllmed. The aforcmentioned land uscs would generate 36,356 average daily trips (ADT). This is 13,084 lcss average daily trips than the traffic volume calculated for the development currently entitled for the site (Kaiser Pennanentc Medical Center, YC-2, E-l 0, YC- I and OS-16; see Section C). 6 38 06/11/02 Accounting for pass-by trips (trips attracted to the site from traffic already on the street system and passing near the site while going from one location to another), the PM peak hour trip generation would be 3,050 trips. Only the PM peak hour time frame was analyzed since this represents the worst-case scenario. Of the PM peak hour trips, 1,558 trips (51%) would be attributed to the proposed regional shopping center on the VC-l parcel, 850 trips (28%) would be attributed to the worst-case development of the VC-2 parcel, and 642 trips (21%) would be attributed to the worst-case development of the BC-3 parcel. Intersection (PM peak hour) and street segment operations (AOT) within the study area were analyzed for the following scenarios: . Existing plus Project (near tenn) . Year 2005 without SR-125 (short tenn, approximate opening year of the project) . Year 2005 with SR-125 (short tenn, approximate opening year of the project) . Buildout (complete buildout of plmmed developments and the street network in the Eastern Territories) Inrersection Analysis Table I shows the PM peak hour signalized and unsignalized intersection operations for the Existing plus Project, Year 2005 without SR-125 and Year 2005 with SR-125 scenarios. An signalized intersections are calculated to operate at LOS D or better with project traffic. Based on the City of Chula Vista's Significance Criteria, two lInsignalized intersections (EastLake Parkway!1'vlil1cr Orive and EastLake Parkway/Fenton Strcct) are calcubtcd to operate at LOS F during the Existing pIlls Project, Year 2005 without SR-125 and Year 2005 with SR-125 scenanos. The proposed project would result in direct, but mitigablc impacts on these intersections in the near and short-tcnn scenarios. Table 2 shows the peak hour interscction opcrations at key study area signalized and unsignalized intersections with project traffic at buildout. With buildout traffic, an signalized intersections are calculated to opcrate at LOS D or better except the Otay Lakes Road/Main Entrance (Yons Oriveway) which is calculated to operate at LOS E. AM and PM peak hour analyses were conducted at Otay Lakes Road/EastLake Parkway intersection. This intersection was calculated to operate at LOS 0 in the PM peak hour and LOS E in the Ml peak hour. The unsignalized intersections of EastLake Parkway/Miner Orive and EastLake Parkway/Fenton Street continue to operate at LOS F in the buildout condition. The proposed project would result in direct, but mitigable impacts on these intcrsections at buildout. Street Segments Table 3 shows the daily street segment operations for the Existing plus Project, Year 2005 without SR-125 and Year 2005 with SR-125 scenarios. In the Existing plus Projeet scenario, all key study area segments are calculated to operate at LOS C or better with project traffic except the segment of Telegraph Canyon Road betwecn Paseo Ranchero and Otay Lakcs Road and EastLake Parkway north of Miller Drive which are calculated to operate at LOS O. For Year ; 06/11/02 3'7 2005 with project traffic and without SR-125, all key study area segments are calculated to operate at LOS C or better except Otay Lakes Road north of East H Street (LOS F) and Otay Lakes Road between East H Street and Telegraph Canyon Road '(LOS F). These same two segments are calculated to operate at an unacceptable LOS in the Year 2005 with SR-125 scenario. Otay Lakes Road North of East H Street would operate at LOS D, and Otay Lakes Road between East H Street and Telegraph Canyon Road would operate at LOS E. A near-tenn analysis of Telegraph Canyon Road and Otay Lakes Road segments was conducted based on the City of Chu]a Vista's Growth Management Oversight Committee (GMOC) Traffic Monitoring Program (TMP) methodology. Only these segments were analyzed because the City's significance criteria dictates that if planning analysis (voJume/capacity) indicates LOS D, E or F, the GMOC method shall be utilized in the short-term (0-4 years). These segments are the only roadways located within GMOC arterial street segments that are calculated to operate at LOS D or worse. While EastLake Parkway north of Miller Road would operate at LOS D in the near ternl, it is not a GMOC at1erial. The GMOC analysis concluded that the decrease in speeds on the subject segments of Telegraph Canyon Road and Otay Lakes Road were not sufficient to reduce the levels of service below C, and there would be adequate arterial level of service on these segments in the near term. Based on the GMOC threshold, the proposed project would not result in significant impacts on these segments ofTelcgraph Canyon Road and Otay Lakes Road. Table 4 shows the daily street segment operations with project traffic at buildout. With buildout traffic, all street segments are calculated to operate at LOS C or better except the following: . Otay Lakes Road, north of East H Street (LOS E), . Otay Lakes Road, East H Street to Telegraph Canyon Road (LOS F), . Otay Lakes Road, SR-125 to the Vons driveway (LOS F), . Otay Lakes Road, Yons driveway to EastLake Parkway (LOS E), . EastLake Parkway, south of Olympic Parkway (LOS D), and . Olympic Parkway, SR-125 to EastLake Parkway (LOS F). The proposed project would result in direct impacts on Otay Lakes Road between SR-125 and the Vons driveway and between the Yons driveway and EastLake Parkway. The proposed project would result in cumulative, but mitigable impacts on Otay Lakes Road north ofH Street and between H Street and Telegraph Canyon Road, as well as Olympic Parkway from SR-125 to EastLake Parkway. The traffic impact is considered cumulative because these three segments are not adjacent to the project. The segment of EastLake Parkway south of Olympic Parkway wOllld operate at LOS D, however the adjacent intersections are calculated to operate at an aeccptable level. Therefore, the proposed project would not result in a significant impact on this intersection. The LLG trattic analysis also addressed site circulation including truck access, left-turn storage lengths, and intersection geometry at project drlvc\vays for VC-2 and BC-3 parcels and storage lengths of tum lanes. Potential impacts that were identified internal to the site do not represent impacts to public streets, and therefore do not require mitigation. Based on the site circulation/access analysis, the current storage provided in the eastbound, northbound and southbound left-turn lanes at the Otay Lakes Road/EastLake Parkway intersection may not be 8 06111/02 l.fO . ___.. .__.__._.._ . _,_,,- ..._"",.. _._,._-..__, ~. ..' ~ ._._..___.,. _ ,_ ""'_ .n.___..,,___.....__.'" _____.____.~_. adequate to accommodate buildout traffic volumes. Similarly, at the EastLake ParkwaylFenton intersection, the southbound, westbound, and northbound left-turn lane lengths may not be adequate to accommodate buildout traffic volumes based on existing left-turn lengths. At the EastLake Parkway/Miller Drive intersection, the westbound and northbound left-turn lengths may not be adequate to accommodate buildout traffic volumes based on the existing left-turn lane lengths. Additional storage length can be provided at these three intersections to mitigate these cumulative impacts. Air Quality The proposed project would contribute to ambient air quality during the construction and operation phases of the project. The air quality analyses in SEIR 92-01 and the Olympic Parkway Disposal Sites MND (lS-02-009) address temporary construction-related cmissions pertaining to the grading of the site. These analyses are incorporated by reference and summarized herein. Grading and site improvements would generate sufficient emissions and fugitive dust to result in a short-tcnn significant, but mitigable, impact on air quality. Mitigation measures from SEIR 92-01 pertaining to compliance with the project's Air Quality Improvement Plan (AQIP) and dust control during grading are applicable to the proposed project. Geophysica! The geologic features of the project site were analyzed in SEIR 92-01 and updated by the "Revised Supplemental Geoteehnical Investigation for EastLake Village Center North Commercial Center" by Pacific Soils Engineering, Inc. dated March 5, 2002. The 2002 study confirmed that the majority of the site has been graded in the past. Onsite elevations range from 496 feet to 596 above mean sea level (MSL). Existing slope gradients average between 2: I and SO: I (horizontal to vertical). Site drainage is by sheet flow to the southwest comer of the project. The site is underlain by TeI1iary sediments consisting of Oligocene-age Otay Fom1ation consisting of silty sandstone to sandy siltstone. 11 is moderately hard to hard and well graded. Relatively thick topsoil occurs on remaining natural slopes within the southwest portions ofVC- I. They consist of dark brown, clayey sand and silty sand. Alluvium is also present in VC-I primarily in the site drainages. Alluvial soils range in depth from one to 32 feet and consist of interbeddcd sands, clayey sands, sandy silts, and sandy clays. Undocumented, uncompacted artificial lill is located within the desilting basin and along the northeast comer of VC-l. These fills are estimated to range from one to 40 feet in thickness and- consist of brown, loose to moderately dense silty sand and clayey sand. Compacted artificial fills are found throughout the site. The presence of these fills trace back to several previous grading activities, including the mass grading of Otay Lakes Road and EastLake Village Center, the disposal of soils generated from adjacent areas and construction of temporary drainage, construction of a fill for Brelun Communities, and regrading of the building pads east of EastLake Parkway. Faulting is not known to be present onsitc. The nearest known fault is the La Nacion Fault zone, which is classified as potentially active (the last movemcnt occurred prior to 11,000 years ago). This fault zone is located approxinwtely four miles wcst of the EastLake Village Center North ') 06/11/02 '1-1 -.- _.-....-<_.--_.._--_.-._~_.- project site. Based on the considerable distance from the site and the lack of Recent (Holocene) activity, the La Nacion Fault is not anticipated to significantly impact the site. The closest active fault zone is Rose Canyon, which is located eleven miles west of the site. Notwithstanding, the project site is located in a scismically active area. Proposed development will be required to comply with the current and applicable Uniform Building Code (1997) and City parameters pertaining to seismic design. Minor seepage and/or groundwater was observed in numerous borings onsite. Dewatering will likely be required to effectively grade the site. Highly compressible and expansive soils also occur onsite. Remedial grading will be required to remove deleterious materials prior to site preparation. Susceptibility of the site to liquefaction, seiches and seismical1y-induced landslides is considered low. Water Quality A "Water Quality Teclmical Report for EastLake Village Center" dated Mareh 5, 2002 was prepared by Rick Engineering Company. According to the Rick Engineering study, the typical storm water pollutants that may be anticipated from a commereial development such as the proposed development include, but are not limited to oil and grease, heavy metals, and trash and debris. A home improvement center and retail facility, such as Lowe's and Target, may potentially generate pol1utants not common to most commercial developments, including synthetic organics (e.g., pesticides, herbicides, etc.), nutrients (e.g., nitrogen and phosphoms fertilizers), and oxygen-demanding substances (e.g., decaying vegetation, animal waste). The project site is not expected to generate a large amount of sediment once buildout has been completed and landscaping has been established. However, some sediment would be tracked in by cars and a small amount may be generated on the site. This sediment is defined as a pollutant and may contain attached pollutants such as heavy metals. The majority of these typical pollutants would be transported by low flows occurring during the initial stage of a storm event. The aforementioned pollutants could enter receiving waters. The receiving water of each discharge point from the proposed project is Telegraph Canyon Creek. Tclegraph Canyon Creek is not listed on the 1998 Clean Water Aet Section 303(d) list of impaired water bodies. Discharge into an impaired water body would rcquire enhanced Best Management Practices (BIvIPs). Sinee the pollutants of concern would not directly discharge into an impaired water body as identified on the Clean Water Act Section 303(d) list, the proposed project will be rcquired to install and implement standard 8MPs. During the construction phase, the project is subject to the requirements of the State Water Resourees Control Board (SWRCB) Order No. 99-08-DWQ National Pollutant Discharge .Elimination System (NPDES) General Pennit No CA S000002 (General Construction Pcnnit) adopted on August 19, 1999 and the modifications to the General Constmction Permit Order No. 2001 -046 adopted by the SWRCB on April 26, 2001. For coverage by the General Construction Pennit, the project Applicant is required to submit to the SWRCB a Notice of Intent (NOI) to comply with the Pennit, and develop a Storm Water Pollution Prevention Plan (SWPPP) 10 06/11/02 lI.t. .- describing BMPs to be used during and after construction to prevent the discharge of sediment and other pol1utants in storm water runoff from the site. The site inspection requirements and site-specific Storm Water Sampling and Analysis Strategy (SWSAS) required in the SWPPP will provide recommendations for storm water testing to evaluate the cffectiveness of the BMPs. Adjustments to the BMPs wil1 be made as nccessary to maintain or improve their effcctiveness. In order to terminate coverage under the General Construction Permit, the Applicant/developer must submit a Notice of Termination form (NOT) and a Post-Construction Storm Water Operation and Management Plan (PCSWOMP). The PCSWOMP requires permanent BMPs be established to prevent the discharge of sediment or other pollutants in storm water runoff from the completed project. BMPs shal1 be implemented that spccifical1y prevent pol1ution of storm drain systems from the gas station, car wash, restaurants, parking lots, and trash col1ection areas. Post construction, the project is also subject to the requirements of the Municipal Storm Water Permit (Municipal Permit) adopted by the Califomia Regional Water Quality Control Board, San Diego Region Order No. 2001-01, National Pollutant Discharge Elimination System (NPDES) No.CA SOI08758. The Municipal Permit requires new developments to comply with the Model Standard Urban Stonn Water Mitigation Plan (SUSMP) and to consider water quality and watershed protections principles and policies in planning and design. The SUSMP requircs that four typcs of BMPs be implemented: site design (i.e., mmlmlzmg impervious arcas and directly cOllliectcd impervious areas, increasing rainfal1 infiltration, maximizing rainfal1 interception, and protecting slopes and channels), source control (i.e., public education, CC&Rs, providing covered outdoor material and trash storage areas to prevent cxposure to rainfal1, and street and parking lot sweeping), category specific (i.e., for parking lots -- incorporate landscape areas into the drainage design and construct overflow parking with pen1Jeable paving), and treatment control (i.e., hiotilters, detention basins, infiltration basins, drainage inserts, filtration). In general, site design, source control, and category specific BMPs arc non-structural; the treatment control BMPs are structural. In this case, the Applicant will be required to provide and implement 13MPs that specifically prevent pol1ufion of storm drain systems from the gas station, car wash, restaurants, parking lots, and trash col1ection areas. Based on the requirements outlined in the Model SLJSMP, a I3MP maintenance program will be required for the proposed project once detailed locations and treatment devices are sized during final dcsign of each phase of the proposed projecf (VC-l, YC-2 and BC-3). When developed, the maintenance program wil1 include an operation and maintenance (O&M) plan, an estimate of maintenance costs, a funding mechanism for financing thc program, and an access/casement agreement. In addition, a Maintenance Agrccment between thc City and the dcveJoper wil1 ensurc the O&M of the structural BMPs. P a I eont 0 I ogi c aII~eso ure es According to the "Revised Supplemental Geotechnical Investigation for EastLake Village North Commercial Center" (March 5, 2(02), the Otay Fonnation underlies the project site. Compacted artificial fill, undocumented artillcial fill, topsoil and alluvium overlie portions of the bedrock. The Otay Formation exhibits high paleontologica] resource sensitivity. Fossils potentially buned in the underlying fOll1latlon could be impacted during site preparation. The occurrence of fossils 11 06/J1/02 <13 within the covered bedrock cannot be evaluated prior to exposure. Destruction of the paleontological resources would be a significant, but mitigable, impact. Noise Site plans for the YC-2 and BC-3 components of the site are not being proposed at this time. The noise level generated by the uses in these locations would vary depending upon the specific type of use developed at the site. If the noise level at outdoor use areas exceeds the City's noise standards, the noise impact would be considered significant. When specific land uses and site plans are prepared, an acoustical analysis will be required to assure that noise levels on- and off- site do not exceed City standards. Therefore, noise impacts associated with the YC-2 and BC-3 parcels would be potentially significant but mitigable . G. Mitigation Necessary to Avoid Significant Impacts Projcct-spccific mitigation measures are required to reduce potential envirolUllental impacts identified in this Mitigated Negative Declaration to a less than significant level. Thcse mitigation measures are listed below and included in the Mitigation Monitoring and Reporting Program (MMRP) included as Attachment A to this MND. Traffic and Circulation (Direct ill/pacts) 1. Prior to approval of the Parcel Map for YC-], the Applicant shall construct and secure the north leg of Otay Lakes Road/Project Driveway/Vons driveway intersection and provide one left-tum lane, onc through/right lane, one right-tum lane, and dual eastbound left-tum lanes aIllI corresponding signal improvements (see Figurc 27 from the project traffic report attached to the MMRP). 2. Prior to approval of the Parcel Map for YC-l, the Applicant shall construct and secure the extension of the existing southbound right-tum lane on EastLake Parkway from Otay Lakes Road to the right-in/right-out driveway accessing YC-l. The Applicant shall also provide a fourth westbound through lane on Otay Lakes Road from EastLake Parkway to the project driveway such that the southbound right-turn movement is free and shall provide an island to direct the flow of traffic unless otherwise approved by the City Engineer (see Figure 27 from the project tranic report attached to the MMRP). 3. Prior to approval of the Parcel Map for VC-l, the Applicant shall constmct and secure the necessary improvements fiJr providlIlg a fully activated traffic signal at the Otay Lakes Road/EastLake Parkway intersection, including interconnect wiring, mast arms, signal heads ;lnd associated cquiplllcnt, underground ilnprovements, standards and IU111inaries. 4. Prior 10 approval of the Parcel Map for VC-l, the Applicant shall construct and secure a fully Z1ctivated traffic signal at the Fenton StreetlEastLake Parkway intersection, including interconnect wiring, mast arms, signal heads and associated equipment, underground improvements, standards and luminaries and provide the following intersection geometry (see Figure 27 from the project traffic report attached to the MMRP). 12 06/1 1102 '-1'1' Northbound - Two left-turn lanes, one through lane and one shared through/right lane. Eastbound - One shared through/left and one right-turn lane. Southbound - Two left-turn lanes, one through lane and one shared through/right lane. Westbound - Two left-turn lanes and one shared through/right lane. In addition, the AppJicant shall provide for 200 feet of storage for the planned dual southbound left-turn lanes. If only one lane is provided, a storage length of 350 feet would be nccessary. 5. Prior to approval of the Parcel Map for YC-l, the AppJicant shall construct and secure a fourth westbound lane from the project driveway to the SR-125 northbound on-ramp. 6. Prior to issuance of the first Building Pennit for development within BC-3 (E-IO) and as determined by the City Engineer, the Applicant shall construct and secure a fully activated traffic signal at the Miller Drive/EastLake Parkway intersection including interconnect wiring, mast arnlS, signal heads and associated equipment, underground improvements, standards and luminaries and provide the following intersection geometry (see Figure 27 from the project traffic report attached to the MMRP): Northbound Eastbound --. Southbound \Vestbound - One left-turn lane, one through lane and one shared through/right lane. One shared left/through/right lane and one right-turn lane. One left-turn lane, one through lane and one shared through/right lane. One left-turn lane and one shared through/right lane. 7. Prior to the appJicable Building Permit for development within the BC-3 and YC-2 parcels as detennined by the City Engineer, the Applicant shall construct and secure the applicable intersections at the project access driveways as shown in Figure 27 from the project traffic report (attached to the MMRP). 8. Prior to issuance of the first Building Pennit for development within BC-3 (E-lO) and as deternlined by the City Engineer, the Applicant shall construct and secure a 250-foot long northbound left-turn lane at the Miller Drive/EastLakc Parkway intersection. Traffic and Circulatioll (Cumulative Impacrs) 9. As a condition of approval of the EastLake I SPA Plan Amendment, the City ofChula Vista shall initiate and dircct a General Plan Amendment to designate Olympic Parkway from SR- 125 to EastLake Parkway as an Enhanced Prime Arterial with eight lanes. The AppJicant shall contribute a fair share toward the construction of the two additional lanes. 10. As a condition of approval of the ['astLake I SPA Plan Amendment, thc City ofChula Vista shall initiate and direct a C;eneral Plan Amendment to designate Otay Lakes Road from SR- 125 to [astLake Parkway as an Enhanced Prime Arterial with seven lanes. The Applicant shall contnbute a I'm share toward the construction of the additional lane. 13 06/11102 r,.<j 11. Prior to issuance of Building Pennits for development within VC-l, VC-2 and BC-3, the Applicant shall contribute a fair share toward widening ofOtay Lakes Road fTom H Street to Telegraph Canyon Road to six lanes or toward intersection improvements, which provides additional capacity along Otay Lakes Road. 12. Prior to issuance of Building Pennits for development within YC-l, YC-2 and BC-3, the Applicant shall contribute a fair share toward the widening of Otay Lakes Road fTom Bonita Road to H Street to six lanes or toward an intersection improvement, which provides additional capacity along Otay Lakes Road. 13. Prior to approval of the Parcel Map for YC-l, the Applicant shall construct and secure a second southbound len-turn lane at the Eastlake Parkway/Otay Lakes Road intersection to provide the necessary left-turn storage length required. Minimum storage to be 250 feet in a single lane or in dual lanes combined (see Figure 27 from the project traffic report attached to this MMRP) Noise 14. Prior to approval of the Final Map, Parcel Map, or Site Plan for BC-3 and YC-2 (whichever occurs first), an acoustical analysis of the proposed land uses shall be prepared and approved to deterrninc conformance with City standards. Paleontology 15. Prior to approval of any grading pennit for YC-l, BC-3 andlor YC-2, the Applicant shall incorporate into grading plans, to the satisfaction of the City Engineer and Environmental Review Coordinator, the following: a) Prior to approval of the grading permit, the Applicant shall confinn to the City of Chula Vista that a qualified paleontologist has been retained to carry out the following mitigation program. (A qualified paleontologist is defined as an individual with a M.S. or Ph.D. in paleontology or geology who is familiar with paleontological procedurcs and techniques.) The paleontologist shall attend prcgrade meetings to consult with grading and excavation contractors. b) During grading operations, a paleontological monitor .hall be on-site at all times during the original cutting of previously undisturbed sediments of highly sensitive geologic formations (i.e., Otay Fornlation) to inspect cuts for containcd fossils. (A paleontological monitor is defined as an individual who has experience in the collection and salvage of fossil materials.) The paleontological monitor shall work under the direction of a qualified paleontologist. The monitor shall periodically (every several weeks) inspect original cuts in deposits with unknown resource scnsitivity (alluvium). 14 06/11/02 % In thc cvent that fossils arc discovered in unknown scnsitive formations, it may be neccssary to increase thc per-day ficld monitoring timc. Convcrsely, if fossils are not discovercd, the monitoring cffort may bc reduccd. c) When fossils arc discovered, thc palcontologist (or palcontological monitor) shall rccovcr them. In instanccs whcrc rccovcry requires an extend cd salvage time, the paleontologist (or paleontological monitor) shall be allowed to dircct, divert, or halt grading to aU ow recovery of fossil remains. Where deemed appropriate by the paleontologist (or paleontological monitor), a screen washing operation for small fossil rcmains shall bc set up. d) Prepared fossils, along with copies of all pertincnt field notes, photographs, and maps, shall bc deposited in a scicntific institution with paleontological collcctions such as the San Diego Natural History Muscum. A final summary report shall be compJcted which outlines thc rcsults of the mitigation program, This report shaU include discussion of thc methods used, stratigraphy exposed, fossils coUected, and significance of recovcrcd fossils. Geology 16. Prior to approval of any grading permit for VC-l, BC-3 and/or VC-2, thc grading plans shall incorporate, to the satisfaction of the City Engineer, the geotechnical rccommendations in the "Supplemental Geotechnical Invcstigation for EastLake Villagc Center North Conunercial Center" prepared by Pacific Soils Engineering, Inc. dated March 5, 2002, including but not limited to sitc prcparation and removals, slope stability and remcdiation, temporary backcut stability, ovcr excavation of building pads, subsurf'lcc drainage, constmction staking and survcy, settlement monitoring, earthwork and design cunsiderations, and slope maintenance, 17. Prior to approval of the improvement plans amI building permits for aU phases of the project, all improvements shall be in compliance with seismic design standards of the Uniform Building Code and requirements oflocal governing agencies. Water Quality 18. Prior to approval of grading/construction plans for VC-l, BC-3 and/or VC-2, the Applicant shall obtain either (a) General Constmction Activity Storm Water Permit (NPDES Permit No. CA 0108758) from the SWRCB or (b) a municipal permit fTOm the City ofChuJa Vista that is in efIect at the time of issuance of constructioil/grading permits. Such pemlits are required for speci fie (or a serics of related) construction activitics which exceed five acrcs in size and include provisions to eliminate or reduce off~site discharges through implementation of the SWPPP. Specific SWPPP provisions include requirements for erosion and sediment control, as well as monitoring requirements both during and after construction. Pollution control measures also require the use of hest available tcclmology, best conventional pollutant control technology, and/or best management practices to prevent or reduce pollutant discharge (pursuant to S\VRCB detlnilions and direction). IS 06/1 ]/()2 f{.7 The SWPPP also includes specified vehiclc fueling and maintenance procedures and hazardous matcrials storagc areas to preclude the discharge of hazardous materials used during construction (e.g., fuels, lubricants, and solvents) and specific measures to preclude spills or contain hazardous materials, including propcr handling and disposal techniques and use oftcmporary impervious liners to prcvcnt soil and water contamination. 19. Prior to approval of grading/construction plans, site plans, and/or building permits for VC-l, 8C-3 and/or VC-2, the Applicant shall demonstrate to the satisfaction of the City Engineer compliancc with all of the applicablc provisions of thc Municipal Code, Model SUSMP for the San Diego Region, and the City of ChuJa Vista SUSMP as may be adopt cd in the future. Thc Applicant shall incorporate into the project planning and design effective post- construction BMPs and provide all neccssary studics and reports demonstrating compliance with thc applicable regulations and standards. I3MPs shall be idcntified and implemented that specifically prcvcnt pollution of stonn drain systems from the gas station, car wash, restaurants, parking lots, and trash collection areas. 20. Prior to approval of tinal or parcel map, and/or building pennits for VC-l, 8C-3 and/or VC- 2 (as determined by thc City Engineer), the Applicant shall submit and obtain approval from the City Engineer of a maintenance program for the proposed post-construction BMPs. The maintenance program shall include, but not be limited to: 1) a manual describing the maintenance activitics of said facilitics, 2) an estimatc of thc cost of such maintenance activities, and 3) a funding mechanism for financing the maintenance program. In addition, the Developer shall enter into a Maintenance Agrecment with the City to ensure the maintcnance and operation of said facilities. Air Qualiry 21. Prior to approval of building pcrmits for cach phase of the project, the Applicant shall demonstrate that air quality control measurcs outlined in the EastLake [ Supplemental Air Quality Improvement Plan pertaining to the design, construction and operational phases of the project have been implemented. 22. Prior to approval of any grading permit for VC-l, 8C-3 and/or VC-2, the following mcasures shall be placed as notcs on all grading plans and implemcnted during grading of each phase of the project: a) Minimize simultaneous operation of multiple construction equipment units; b) Use low pollutant-emitting equipment; c) Use catalytic reduction for gasoline-powered equipment; d) Use injection timing retard for diesel-powered equipment; e) Water the grading areas a minilllUIl1 of twice daily to IniniInize fugitive dust; J) Stabilize graded areas as quickly as possible to minimize fugitive dust; g) Apply chemical stabilizer or pave the last 100 feet of internal travel path within the construction site prior to public road entry; h) Install wheel washers adjacent to a paved apron prior to vehicle entry on public roads; 16 0611 1/02 w i) Remove any visible track-out into traveled public streets withiri 30 minutes of occurrence; j) Wet wash the construction access point at the end of each workday if any vehicle travel on unpaved surfaces has occurred; k) Provide sufficient perimeter erosion control to prevent washout of silty material onto public roads; I) Cover haul trucks or maintain at least 12 inches of freeboard to reduce blow-off during hauling; m) Suspend aH soil disturbance and travel on unpaved surfaces if winds exceed 25 mph; n) Cover/water onsite stockpiles of excavated material; and . 0) Enforce a 20 mile-per-hour speed limit on unpaved I agree to implement the mitigation measures required as stated JD this Section G of this Mitigated Negative Declaration. --c;;'/o- .1,</29L"""" , Name, Title __Jvv,,- 1lot "Z.ao~ Date - - ---- --- ---------. Name, Title Date H. Consultation I. Citv J}/j:']jula Vista: Alex AI-Algha, Senior Civil Engineer Lombardo DeTrinidad, Civil Engineer Jim Newton, Civil Engineer Luis Hemandez, Principal Planner Stan Donn, Associate Planner Mary Venables, Project Planner ~plicant's_6gent: Bud Gray and Associates, Bud Gray, Principal Cinti and Associates, Gary Cinti, Principal Yillagec=enter MaLketpJa~:e Dc_veloper: Colton Sudberry, Sudberry Properties Inc. 17 06/1 1102 <fJ1 2. Documents: --- . EastLake Master ElR (EIR 81-03), Febmary 1982. . EastLake 1 SPA Plan Supplemental E1R (E1R 84-01) January 1985. . EastLake 1 SPA Plan Amendment/Kaiser Perrnanente Chub Vista Medical Center Supplemental EIR (EIR 92-01), June 12, 1992. . Olympic Parkway Disposal Sites MND (IS-02-009), December 6, 200 I. . City Council Resolution No. 16702, June 30, 1992. . City Ordinance No. 2522, July 6, 1922. . Draft EastLake 1I General Development Plan Amendment, May I, 2002. . Draft Supplemental Sectional Planning Area Plan for EastLake Village Center North, May 20, 2002. . Draft EastLake 1I Planned Community District Regulations Amendment, May 1,2002 . Draft Design Guidelines for the EastLake Village Center Supplemental Sectional Planning Area, May 20, 2002. . Draft East Lake Village Center North Public Facilities Finance Plan, prepared by Burkctt & Wong, May 17,2002. . Revised Supplemental Geoteclmical Investigation for EastLake Village Center North Commercial Center, Pacific Soils Engineering, Inc. March 5, 2002. . Water Quality Technical Report for EastLake Village Center, Rick Engineering Company, March 5, 2002. . Detention Basin Analysis for EastLake Village Center North, Hunsaker & Associates, March 4, 2002. . Tramc Impact Analysis for EastLake Village Centcr N0I1h, Linscott, Law & Greenspan, May 8, 2002. . EastLake Village Centcr Project Environmental Noise Assessment, Dudek & Associates, Inc. April 29, 2002. . Draft EastLake I Supplemental Water Conservation Plan, Jay Kniep Land Planning, May 10, 2002. . Drafi EastLake I Supplemental Air Quality Improvement Plan, Jay Kniep Land Planning, May 10,2002. . EastLake Village Center North Water Analysis, PBS&J, febmary 2002. . EastLake Village Center North Sewer Analysis, PBS&J, March 2002. . Phase I Environmental Site Assessment, LD Romine and Associates, January 7, 2002. . Biological Resources Technical Report & Impact Analysis -for EastLake Village Center Project, Dudek & Associates, April 2002. 1. Environmental Determination I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described in this document and the MMRP (Attachment A) have becn added to the project or agreed to by the Applicant prior to release of this document for public review. Such mitigation measures would avoid or reduce the environmental effects of the proposed project to below significance. This Mitigated Negative Declaration has been prepared in accordance with Section 15070 of the 18 06/11/02 SZ> Guidelines for the Califomia Environmental Quality Act (CEQA) as amended December 2001. This report reflects the independent judgment of the City of Chula Vista. Further information regarding the environmental review of this project is available from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 91910. ?23J~/O~_~ Marilyn R. F. Ponseggi Environmental Review Coordinator Date: ~RO=;/ D,;:z 19 06/1 1102 S7 ,- I /) ----z "", " -~--------------- ____~_R:IVERsID( COUNTY SAN DlEc:O cc;u;m: ",,"p PENDLETON RAIJO"'- .~ "7 o 2 ,....!.:) - DEL IJ.AR RANCHO PENASQUrTDS ...6"/ ----- - - "~ .~, lAKESIDE " s>mrr -r.'. N J1NE o o \.c1 "" SAN CAtON ~~ ~ ~~-------- - - <reo>, ~ ~ 8 o - ~._._--- .--.,.,.---. - -----_._------_.~----- MILES LU;, !ILl}" 8, 1002 FIGURE 1 Regional Location Q San Miguel Ranch ~ EastLake 11 \.\~~ I Hills and Shores \' / Salt Creek ~ ~U' R3d Pfoc\Of VaUe~ ~ .",. I upper Oley Ra~ Bus.Ctr.1 ~ S Bus. Or. n....::: ~ EastLake III GDP lakes Road ..'I>~ <:?~\'+-- R'c ,~"" o EastLake II Greens & Trails I II II II II II ..' ~J~ \~ )-::; 00, ",~ Olay Ranch t() o Q) Village Center North Dr..-ut Sl1ppk:rut'"utal SPA Plan tby 20, 2002 FIGURE 2 Vicinity Map 53 ,- .._.__......~-_..._.._._-_._.__._-.-_._._._-_._-_.- . c o .~ u o -' U <!J '~ 0.. '1') " II ,. C0 ~ ~ ::> () ....... ~ ~. ~ ~ ct: " i i i -' ! . , . 0 , L._',-' , , " ?/ . <"f"'-" .1. '\ \/- / ~ ~ ~ " Q - > , ~ ~ m :' r ~ ro . 0 ~ ;:: D ~ ~ ~ N v 0 ro . m ~ ro . ~ " 3 ~ " ro N w ~ -. ro ~ ro ~ T m ~ ,- ~ ro ~ ~ 0 - . ~ 0 ~ ON ~ 5i 0 i': ~ ~ ~ f1 t t; m '" . ';' ~ :g .0 1 ~;;. N . -j'"."i 0.. " ; /' ~ ,. ~::' Q Q ~~ I"J :: S ~~ <') ": E-t ~ ~ "'"' N ~g o ~ :'!:2 J~ ~~ 2.6 .~ ~~ 0'3 . c J,;; Oi 1I. '? ~ ~~-~ co g '-) o G.~ cl ~ ~ 0. 0 0 '" " C, -" ., 0 0 "1 n ci cO 0' ~ 0 ~ . o ...J " ~ ~ E ~ _ <: 3:>" ~ 4~ gO<:~ ~~<:Iro" <D~""~,,,q~.~~ -2'7::.':!::~q~O~-ou:; ~TI ;::;-o~-<:c:'<;h o~~-=:; !laOC _ ~ _-J ~ ~ ~ F~-2< ~ ~ ~ <>3 ~~ ~ ~ ~ ql ,:. 5 -b .<: '" 0 III ~ ~ "" '" :0 -" 0 c f :;: ;> co", 0> '" 0; It> 0 a> a ::> Ii; .., 0 !18~:I;I~ j i[FE~r~D I ~ ~~ . ~----. i ~.?~ : "...--. ...... w m ~ D Z < ~ 5"1( I:: ro ........ P-. -I-> I:: <1) 8 0- o ........ <1) >- <1) Q ........ ro H <1) I:: <1) o '0 <1) -I-> 0- o '0 ~ ----... ,..,. . .~. -c...... ...::.-=--=:":_L_~~'. ACTMTY CENTER '~.~~~~;~~"_ -: CJS-g ,-::'~~~ 'c.'.~ - - '60--,,41 B"t"~~~AL-fLW 'CREEK .' -.....::....---~r- , '. .. ---..',::, R-16c. l ." -- _r': - r ~ , ! ,. " BvPLOYfvENT ~ IN<) USE i AcrES i 00. - I ) If-I~::u... !E-2 ~ .... E--:Ji ~ 8.0 E----<t~11_. IE--e ~ ':!.A .... """""-' U E-r~I2..1I E......~<t-. E......~I<t-a E--'O~2...0 ~~_rr-_ ,., -~- ..... ~'" ,r~ -..~ - - , , , 1-- -;;;.::-'~ - ~ , ""-'- ~8 ;~ Co~ ! E-1 \ E-1 OS-13 ""~ m. _.~,------ c:.- -..... fw:J. ~ 1) I ~I ~1'....10&--1~ I <t-o! n, ". \ \ \1 \\ -=7; \ eJ ! i Busines-s Center 1/ i ~-~. we-, '""'"'-<DnB' 30_6 ~, "'"-"I<DnB' 19.2 "'"' "'"-"I<DnB' 10_0 "".. &9,8 , ..-:-,-......, , VI.L'GE CENTER BREAKDOWN ""~ ~, OPEN SF1\CE/A'\RKS w:c~ , ce-~ , """..... " ","" 1C7'&t~ ~ "'"" I""""'" " ce-Q i (J'DI ..-a: J "'"~ ''''''''''''''' , 00-" :~"IJ.CE.. n,1I """ ~, ~ ~"AI<< ., - ~---- ~ :::.::=:: ---'--,..- -----...-..,..- -___Li_ =:r _- __ "'_ - SAIT CREEK PROJECr LOCATION ,~{::;::< -. ('.- ------> :>-r--- - t", ~u "'>~\itu~jf}mC_' :'~--, '\ ~~.\Lt~,..-.,,~i;~ -','_' ')Y. f , // (>o-t'=',r:::;~.p~~ I ""', ) ( j~~~~~~~;;:0,.';;;?>~-~:,-.", ~'.' - /~V ,';{ 'if ~,~~-~>--~~., "- "l ," ._, I" '> ' O( ,>f'~--\'-~ "_i, -- 1..:..: i'ri:\ ~/ ,', ~\ i~,ll '\,'<'~" "~;~"''>~~ ~'.' - ~r:-~ ""}",___/</ '; - -,__i ".- \- \ - SPA Key Map ..~ /,,- -'-'-- --~ "'-'<>L ><> ATTAOft>W re.urY ~ tn'AOma::1 ~ '0Kn ~ """'"' w ~~ ~" ~q D ~ <O.J.8 ~1~ = A 1~~ ~ =~ r.u ~ ,~ ". = ~. - = -- """'= ~= ~ ><> H >VnA" ~ ~, --'-----.--,. --._---- ---~------,-,---"- "'" ","" ~" ","q """ =~ """"""'- """"""'" """"""" """"""'" """ """" ~ w w U '2 ~ City of Chu1.1 Vi'1<-I ,I unf', 20()~? FIGURE 4 Adopted SPA Plan '%"" ,~I \ II \l-'~~, RS-5 _J~~ " " ::::: ~ /' "-"-""'E/ I~ . -~~~.....~ RC-22 I "~~ ,,0S-1 \ RU \'yi.:;" " ..... \\ -~ ---- \ ~ '~="~ ('.. :1t \ \ RE-3 ~4-! Rs-5 Ii'- :-.. ,\-" 'I \ ( ,/", -~ I. RP-'3.'~ ( ~ ~\ \ f ~~ \ "\, J BC-2 \ "f',~1 '1,.,~,\ OS~ ~# '\ ~~ Be 2 '-'i;=--;;Z;-j BC-2 "'" ,\\ "",",.1."'" h 1 \ ~ " BC.1 .. '\\ ~S-5 Rs-5 ...,;.(. 05-4 f. ~~j-~~........ 9 h~ ~ \\ ;,7 _ Tr-.... ---< - _-_", ) y, I ~~ II BCrn ~~~\\tc- BC-:;-~' ~ O$-1 ~ RP--8 ~ RC--22 I! \ \ ~ ~ Uac I \ 'I 0S-1 'J VC., '; ~~= ~', II n\-', : /"\ (~)0::~~'--') ';'~ j:'; ~ */' 1\1' I RP~~./ / //~ =, 11 r='1-~3 N L-~-:? RP~ rrrf~-:':d/ . {",,---,<:::::-~ ~ I J ......./ ( /x /'..J I I ~ RJ.~~p..n YS ~~ PA 111/Z.~5-4 '~-;;Ii'<~-:::' j I r-~rs.){.r---=-qOS" tV;::" " I Y ,--r---\I './ J f"-J --It ,Y RS-5 J \ ~ "II I\RC" \~~ I L--' I "",,-\~-^\ t~ os., '. I IL_ J~ -..J 05-6 ,_ ~ RP-< I D . 0$-4 "-Jr~___ ~v_~--L m:--1$ Ik"tI--., ~~-;,I(0S-41~,~- 7<'-\J~ os-, J~ I 'F=-, ' ,,' '~~ I ~ r....., II OS-'o \I,.. :~S-7 RS-~ \~~X "~ RS-5,{f"".. I '" , I " ..... '~ -..:~? I I .~25'.y'.tPQf\\ \~ .,- ',.... \'......~'\::\.R1'-O~~~ I II' --/I',} ~ '~s..-7\ \ '\ ....."", // \ I:L PO I'CPF'<.RC-,a~......-------., \ 1 I RS-S ') '-?,:'< RS-5 /=7 :t - ---h- ~ /~ R$-5' \ 'I / 0/f:\.'\ ..-1_---' ql ~ ,Y,os.~ \ \ LL..--:./ k -\\/---__~ r~-::::El FC ~ '" >~'\ \.)'-J'C-2k. Rp.13 ) =, ~ !~, '-0 ,'( ,,-..L:..~ ~ " /~~ ;1 ~..:,\ '" ',.....,Rs--s-r-~ /:;'/ i!-v, ,1i1 ,\" \\ R~25'<'" I~C.'O....-: " <::,/'" "" II ,'" I ----- ......"'--...J\.... o'S-)?~ -....::::.. ~ .--:..---- --_::::.--- V1Iage c...-- (Retail) v.age Centef (Prof. Admjn.lLld. Retail) CenIet (Retail) F_ Commercial PA F',.-.......&~ BUSINESS CENTER tiJ~ c...--. MinJ!acUing Pari< 0is1rict BC-2 ~ Cent... ~ S<<vi= [);ibid BC~3 Business Center. Core District RESIDENTIAl R~E_ Reoidonti3I S<<>gIe Family __ Single Family _PIIw-.-1~ _ SmaI Lot _ CocooJ~-'urn ~......~Concept __ Cu.d..,dt*-rn ~4IaI(;QI""",..",", _~FamiIy R..w..&I M1A-FamiIy VILlAGE CENTER'" COMMERCIAl D~"f' I':~"I!");,, II rtann.,..-l Ce>m""",i!y Dis-hid R,-~I1"tinn;;. M,...-:>0.:''OO'2 SPECIAl PURPOSE 5pac<t ~ ()pen 5pac<t Space ()pen Space ()pen ~ ()pen 5pac<t FuI>xe Urt>an District P<tic ~ Dis)id eomm.rity PI6po>se F ""*y GH) ~ House Und Use Dist-id o.May IR"">< 10 s..don ".30 in PC Disl Re<p) ITIIIJ] Proposed Amendment Location FIGURE 5 Proposed Land Use Districts ~?- ~ " ~ :q: ~ ~""I- "' R:JII ... ~e. R: ';;i a. ~.!! ~- ~ ~ ,~ u..: LL ~~~~~~::i~~:;j~~::i::; ~~",_~",~~O,,-~~~RR '" "'..."':.......~::1 ~~~,~;~~ A<--' :&\_ I :3 - !i ." '! 2 ;, 1 " i~' ~~ ~ ~ .;1 'j ~ I II j fc -I ~~!!~ .; H~I!! ~'I I ~ I: I <:( ~..~gl"~ ~~ z,O! o!!, p t' ~ i i: ~ ;qq! ~~ Utili!!i i <I'; .~~~H'~!" . .~J H h~i in. ~..~~h,;",;$tt~ -." ." ~~.-: .~..~..~ ..., ~ '" o;.~;e;;;;:;; i2~" /~~. ~;;; ~, ,:_:.;,~;~-"-""- -- " !I' ~1~~ ~..)r:.'~Ut:,,~i:'=o.' if> t\}rJY~' - :;; I' -r'~" .. 8 !J , c '<::.-~~ '~"'. -..' "'- ~" "\-:" '~ "''G~' ,-,', ',-'-' /> (( 57 v ~ ':!1~ az << '0 U)'!c z oJ' __ J JO . ~g ~ ~ ~~ S ",:0 . I ~0 ~ -I . i . ! w Z I 'I " !~ i · ~ 1 i ~ Iii' i ;;/j ~ b ~~~h !'A 1m!! ~J, -, iW I !i;' J It ...1 :'.Ij !!~' !Iii, ~ H:i ~ ill Iii .j.! m 1..,1 zffi :h ~I ~ ~ . I <>~:.. ~ ~ o E ~ ~ ~ . ' g- ~-:'. , ,0 ~. ~ ~ . ,w 1 EN -g ::2'~ ;,f) ~ ~ CD ~ ~ ::J o ~ ~ ........ I ~ !-. 2 s:::: C\S .--< P-. Q) ->-J ...... if) 'D Q) If) o 0. o !-. P-. .'--, rn ~.__.~ --' ! i i i i ?..,-~ . ..~. l-............. c o 0; u o -' '!", i.i'. Ii - u Q) '0 ~ D- ~ " \\ ~ .....~ ~ ~\ :::> \\ \ ~ "\ ~ ~ \ \ ~ \ \ ! 1 if ~v;j.~~~ 5 u / ~_ LL ~f"." ~~~\1.j ~- ~/.'LJ~ ~. ~ ~ --- "7\' ......<L---r-.-----.-.--."!I r~-;- C;" . ~.~-- T.~"-~/ '" '---,~ );":- .. -- , (~ / 1-' o : '.-~ <{ / "--";,. _~I a.... ~I \,,/ ", , ..~ 1. ~ ,-<. ~f> '" o ^--~~-~ ...c'-~ -~~ c.. ~ ~ 0:: 0:: ~. i ; \ I 0:: 0:: J o rg ...,. ~ ...,. ~I= ~ u . "' V C> Ir! <t m <") CD <") -<f <%I <'> ~ <;0 - ~ ,- ~ 0 c _ o D ~~ n . C .;-, b ~ ;?~ C C ~ ~~ '" (;:: . C "~ C~ ~~ . . ;;~ -::..io, S!""> . . c:~ "'<> . c V, ~ OJ Cc '? - "'"'i ~ ~~ ... ~u <5 " , ~ ~ n > 0 ~ g ~ ?, ~ .c . " . . ~ t 'H ~ 0;': 6\;: en ~ ~ ;() _ :g ~I'" ~ ~ N N N N ~ 0 ro ~ ~ .., <") - - '" r-- '" M N ~ ;:::. :: ~ --' '- . c; J);~~; -'4_~ ' --~// -~-: go v c: ~ ~~~u .. E~ uc; '0",,1 ~E~~ :g-:.~,,~ ...;:_ u "'f"'~ o._2c ~~;~~i~~~j~ ~j~:~ --SS:L~:I "'C~~~"'a&<J)-"'OIX ~:tjo-oc"''--'>~'''~'''''':O~oc ~' 0 0 ~ .. ~ ~ ~: !" ; <P ~ : : ~ ~ j-'~:!.I_:Ja::u..o..a:oo..o..::Z:z i[j~EH ~[~~@~ITI~FrJJ c < . 0: '" ~ o o z < J 5"8' c ro .-< p... +-J C (]) S 0.. o .-< (]) :> (]) Q .-< ro I-. (]) C (]) o '"d (]) (f) o 0.. o I-. p... .--' I Parcel VC-1 VC-2 E-10 Total . \ , ..., 1 .1 II H )-.J.__ E-9 E-8 : E-1 E-4 E-4 E-7 . E-7 E-10 VC-1 ~ -> N <1' t: -::- .1 SPA I --::_~'\.'.'..I Key M.a.: ~.- , . ..-u .. .. ,'C.--'- -==-=-.,. __ \" >.:";"::-;~i Village Center No. ~ '; , .,"!" .:"_ ;-/ SPA Location , ~ ~ j Land Use Village Center Village Center ViI. Ctr. Employment Acres 38.1 13.6 16.4 68.1 ---- .......... . . _ SPA I Boundary Supplemental Village Center North SPA Boundary Note: This exhibir and stahshcs are for the ViI/age Center North Supplemental SPA Planning Area only Refer to the EastLake I Site UMiz alion Plan lor total SPA Plan stahstics Dr'lft SllpplellleJJLll SP..\ I'l<'1n r-.1ay 20, 2002 FIGURE 8 Proposed Site Utilization Plan 57 TABLE 1 PM Peak Hour Intersection Operations INTERSECTION EXISTING EXISTING + YEAR 2005 YEAR 2005 PROJECT WITHOUT WITH SR 125 SR 125 DELAY F DELAY f LOS' DELAY r- L05- DELAY r LOS Telegraph Canyon Rd/Otay Lakes Rd 340 C 40.0 0 542 0 419 0 Olay Lakes Rd/Rulgers Ave. 134 8 H3 8 20.8 C 16.0 n D Olay Lakes Rd/Sr, 125 S8 Ramps ONE DNE ONE ONE ONE ONE 404 0 Olay Lakes Rd/SR 125 NB Ramps ONE DNE DNE DNE DNE DNE 10.6 B Olay Lakes l?d/Main Fnlrance 13.0 B 430 D 460 0 495 D Olay Lakes r,d IEastlake Pkwy 30.'1 C 380 D 41.2 D 51.6 D Fastlake Pkwyl Miller Dr. 3 WBL 4 161 C EBL ' ., " F astlake F'kwyl F enloll Sl 3 WBL' 162 C EE3L' 5 , Olympic Pk'v\ry.![~3s!lake Ph,,-'y c, c G " 3.13 C 52.5 D OldY lakes KcULane !\ve. 199 13 lUO C 7G8 C 27.6 C O(;JY Lakes Rd IHunte Pkwy 311 C 332 C 289 C 33.9 C Noles' 1 DeJay - Average del.=JY ref vehicle in ~;cconc1s: LOS- l e'.'~( of Ser"\'ice 2 DNE - Does not exist 3 Unsignalized intersection 4 WBl -- Wf'slbounu leH-lum movement; F Rt -. r~JslbO(Jnd Id1-lIm] rnovE'ITlcnt; 5 This movement does not exist currently 6 Currently no! ,HI intersection as only r.vo legs at the inler,;ec!ion are built 7 LOS E and F shown in Bold and Italics. UNSIGNAL17EO INTERSECTIONS SIGNALIZED INTERSECTIONS AVERAGE CONTROL DELAY PER VEHICLE LEVEL OF SERVICE AVERAGE CONTROL DELAY peR VEHICLE LEVEL OF SERVICE 00 10.1 151 2:).' 3:; 1 10 to to to 100 150 25.0 35.0 50.0 500 A [J C D E F 00 10.1 211 35.' 551 In to 10 to 100 200 350 55.0 A B C [) E 800 800 Linscott, Law &. Grpf'n.<;pan, l\L-I}' 8, 2002 ~ TABLE 2 Buildout Peak Hour Intersection Operations Telegraph Canyon Rd 10lay Lakes Rd c'M DELAY LOS 52.1 D 232 C 49.6 D 16.0 B INTERSECTION PEAK HOUR Olay Lakes I,d/Rulgers Ave 10M 01ay Lakes Rd/SR 125 SB Rarnps PM Olay L"kes Rd/SR 125 NB Rarnps Olay Lakes Rd IMalll Enlrance (Vons Dwy.) 013Y lakes I,d /Eastldkc Pkwy. I'M I'M ~~'>"~">.~... ,c.""" ~~. .,~.'.. ,.., :"- _-"''''~~;ffi:M~~~69'8'17i"-,,,~~J. - -""""-/%::::'::&;$ ~!:t'_ k4! -if~ii0c$]i~g!t{;;",,"~=,.5L -"'_,~';;jj~~~ ~y= Easllake Pkwy/M,lIer Dr 2 AM PM WBL 3 WBR' WGL 3 WBR' Eastlake Pkwy/renton SL 2 Olyrnp'c c'k"y/Easllake Pk"y Oby I dkp':; Rd/Lanc /\vc_ OldY Lakes Rd (f Junto Fikvvy I'M 51.5 D 290 C 52_0 D I'M I'M --~'-'----- Notes 1 Delay -- IWcra~JC delay per vc~hiclc in scumds; 10;::; -- I evel of Sefvlce :2 Unsignalized Intersection. 3 WBL -- Westbound left-turn movement, f~BL -- Fastbound left-turn movcment; LOS E and F shown in shaded cells in Bold and italics Mlti~13tcd LOS and Delay shown irl BOLD. UNSIGNAlIZED INTERSECTIONS SIGNALIZED INTERSECTIONS AVERAGE CONTROL DELAY PER VEHICLE l EVa DE SERVICE AVERAGE CONTROL DELAY PER VEHICLE LEVEL OF SERVICE 00 - 10.0 101 10 15 () 151 Irl ?~d) 25.1 ICJ 350 35.1 10 50,0 500 A fJ C D lc F 00 10 1 21.1 35.1 ~)5_1 - to 10 to to 10.0 200 35.0 55.0 800 800 A G C o E F LiO$coH, L1W & Grt'en.<;pan, 1\1<13' 8, 2002 0( I "' f- a 3:N ~ on L~ 0 '" 0 ill '" cr: " cr: </) => <>: ~ a w > >- "' on cr: a 0 </) ~ 0 f-N N::Jon cr:ON W <(I " Wf- => >-- ~ S a > "' + a C>~ ~ z~ _w f-~ w </)0 " -cr: ['JCL => ~ a > "' en a C co ~ 0 z ',= f= ~ </) w ... X " Q) w => ~ ..., 0.. a W 0 > ..... ..... >-. ~ C f- " Q) ,,</) -.< a <( 0 f-; OJ) Q. _J Q) <( f-- iJJ " <~ i:;' </) ~ U) <c( 0 --' u >- <~ s: to <~ 0 cr: u o o o <n " u o o o o <n U <( <1: '1: U <,~ <:[ OJ <:i ----,~----- 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 GCl 0 0 00 "'- 00 0 0 <n 0> c- O> co CD N N N NN " N ---_._~- U <( .C( <(0 <c( <( OJ <( 0 0 0 0 0 0 0 00 0 0 0 0 0 00 0 0 0 0 0 00 0 0 0.0_ 'D N 0> 0, V c- oo N - N N - 'T N ~~ ;6"1 ~ ~ .~ ;clJ ~1 ~ ie'" .0/'",--- -------*':1" ,----...--- ~~ w WUJ Q1<( 0 <.:[ Z Z Z ~ - '0 00 ~~ -_._~- 8'--8- ~g'g g-~ ~{~ CD OJ ~m_o_r---_o OD In ~~ ~~ ~ ~$ momcom<(..-..{<:::( C>OOO c:>QOO N "'!..lD. 0_ n0.lro~ '-.J '::tM0") 00 00 "'''' r:0 C~ o C> 00 t'--_ lO ~'J OJ NN --- u <( U en m <1": <.( <.f <.t m <::( 0> ---"----- <( <-t w W Il) <( .{ <[ <( L, Z Z D [1 0 0 0 0 0 III Ul W 0 0 C> 0 Z Z Z co <n m "'0 0 0 <n c- m \0 --- - c:> 0 C> c--' 0 0 0 0 0 0 CJ C) C) c-' co 0 0 0 0 0 0 C) '0 '" m c- N c- ,- 0> m 'D 0 m c, CJ v 0 ,- '0 ~,t _T '" ,~ -, 'T N N ,- - -- - C) C-' l~-' U C~) 0 CJ c:> C-' C1 (:.-' C) CJ C") CJ 0 0 C) C) < , C, c:> C, 0 CJ C) '-) - , CJ C:) C) 0 C) 0 , c , c:> C) 0 " 0 " , CJ , C) r=-) C) 0 0 0 ,.~ " , < , < , C) C! ( ~) c.) c, , , ,~ C) U C c:-.> CJ CJ ,; C') " J I;) In In lO ,n \n (') C') ,n " C) C.' 'D l{', , ., m m m '" m m m m m L c c ill L L 0< ill "' m m m Q' Q' 10 1'::: t 1:_~ t' 10 t t t <1. ,-J.:: <( <J.:: ,C( <t <-t .1C "-l " m m m m m m ~ 0 co E E E E E E m ro~ -L: L L L: L 0, 0- ct [L [L 0~ CL " ~ -, ~ ~~! 'T " (.D U " m ro co m 0 ill c m m m U t t c' L .-t <1.- <( <t m m L ~ ill m 1O't: <:{<J.: " m E E -- -- - ------ ---- U 1:) <:, (L CL rL c i" ~ 0 m -,~, m C ..:::::. , ru , , m () C:r:: ~_: m L 0 , V W <( c g [L '-f S 0 :? CL m m .Y L Of D C0 CJ 0: 0 N .Y C lL ~ ~CL >, " OJ W Z _0 U) m , ;: J 2 y <n c (L 0 ~ .2 C fl 0 2 0 '" ~.U) m " f- >- :r: f- ~ lU m W Z m <t c S c -'" :r: .Y W L 0 0 '0 0 .9 ::: ,- m Q <( u cr: ~ U ~, " g W " c ru -, ,C W ~ f- " W U) 0 cr: S ,', 0- cr m U) I <n o. S m '" W 0:: w a , f- CL " :r ~ ~ en 0 j <-f: </) a ;2 0 m N '" m <t L cn ~ GJ ~ --' t ~ "' 2)r- " ~ C Z ;;; co m 0 m G' :::) cr: ~O m m 0 m W n >- " n) , rr if) lLl ,0 f- Ul --' <( Z UJ ,- W f- a CL L e, 10 <( m E U') 1-. Q) 1-. U') Q._9~ E ~ ro ~~ ~'S! ;:: ~ U..2.2: Q...2 [L[l L [L -' en m E o m rL i' -" [L (1 c) U [( n "' L "' >- >. >- if) -" 0 " " ~ m -1 -" .Y C .2 lL [L .Y ~q >, D >- [L '" u '" c m 0 <>: .Y "' ill 0 0 ~ m x (L CL E 0> ~ S ..C;; >-" ~ ~ 0 cr m ~ '" m <( U1 m lJ) -Y a w 0 c " CL a w 0 -1 L " () >- .' ~ ;;; C ro :0 [L m m ~ 0 z S " lL 0 UJ U' >- --' 0 D CL>- cq s:,< LS:::: ~(3crD O.L~ru a::: (l :::: ~ l1/-s :=! OJ ~ ~- OQJ~O ~~~z .t '1C _.J ill -----~--- i/o..:t D Q' E ~ ~ ~ m '0 c " :'J ,~ in ~ U- m '" <:) " ~ m U ~ D m co 6" ~ Ci m ~ cS m c D 'D ~ m U }. ,~- ill D 0 2":- u L' " m L 0 m " u 'D U ,,- U) U ~ - , m u, 0 C <:( S 9- D 0 U "' m :-~ m_ L '"0 ~ E ('.j '" ~ n ~ " 0 ~ :r= c m ~ D D m c c , ~ 0 m " 0 0 " = 0 -g 0 ~ " M " U .Y -- " m a " m = 2:'~ <5 D ~ U c m " 0 '" LU ro "' = m co u c ~ ro - ~ ,,<>: " D m [j 0 U E U z ro :'[<>: "' 0 0 m m 0 '6 c " E -' c 0 :i; " g '" CL U c ro ~ D m ~ " D D C " " co m ro ro U u 0 c C LU n cr: " m ~ " ro D ro 6 " x ;;; 0 ill ro " " 0 0 0 0 >- ill ru ~ W c m E ::' ill ,s ~ ~ ~ " " " m .L'- a c a 0 u > ro c, 0 - m -:! g o ~ '0 u, >,~ " > -- 0 " - z u u, n ~ Cl 0 " ~r- o Z NMcC '"' o o '"' cii e, ro " " " Po "' " v v '" ~ " " -' U.) <D ;; o .5 -' TABLE 4 Buildout Daily Segment Operations STREET SEGMENT TELEGRAPH CANYON ROAD Paseo Ranchero to Olay Lakes F~d_ OTAY LAKES ROAD North of East "'H" St Fast "H" Sf. to Telegraph Canyon Rd Telegraph Canyon Rd. to F<:utgers Rd Rutgers Rd. to SR 125 SR 125 10 Vons [)vvy. Vans Dwy_ to E,btlake f-'k",vy [~~stlake rkVVV. to Lzmc Ave. Lane Ave. 10 Hunte Pk",ry FENTON STREEcT F:1st of Eastlake Ph...'Y. LA MEDIA ROAD fclegraph C;:Jnyon Rei to PZ310nnr SL EAS1LAKE PARKWAY N/O Miller Dr t.;1i1lcr Dr to F ullon St r Pflton SL to O\ay l,'Jkes V<d Olay Lakes F:~o;]d to UIYrTlpic !-,I<vvy South of Olympic Pkvvy. OLYMPIC PARKWAY Sf~ 175 to r:.1~,tl;]ke Pk"'lY. Eas!\akc Pk\vy> 10 Hunte PkvvY Notes: 1 2 ROADWAY CLASS Prime Arieridl Major Arterial (4L) Major Arterial (4L) Prime Arteria! Prime Arierial Prime I\rterial Prime Arteria! Prime Alterld[ Prime Arterial Prime AIierial Class I Collector MdJCH Arleric-j! (4L) I\bjCH /\rleria! (4L) Prime Ar!crlal r,bjor AItcrial (CL) PI inw Adcri:J1 Prime f\fteri;::JI -------------- CAPACITY AT LOS C 50,000 30,000 30,000 50,000 50,000 50,000 50,000 50,000 50,000 17,000 50,000 22,000 :;0,000 30,000 SO,OOO 40,000 50,000 :,0,000 BUILDOU1' Volume r-L~ 34,000 A 42,000 B 33.000 A 14,000 C 2(\,000 A 6,000 B,Oan 75,000 ~"stl~ke III Traffic Impact Analysis. March 2001 (and includes project traffic) "Llllt to fllClther Class I Collector nor Class II Collector standards, Mid-point LOS C capacrty between the roadway classifications assumed levels uf service D, E and F indicated in bold with shading Lin":'coO, Lnv A:. G-rtTBSpJJI, !\lay S, 2002 "3 ATTACHMENT "A" Mitigation Monitoring Reporting Program lS-O 1-042 This Mitigation Monitoring Reporting Program (MMRP) is prepared for the City ofChula Vista in conjunction with the proposed EastLake ViII age Center North (IS-Ol-042) project The proposed project has been evaluated in a Mitigated Ncgative Declaration (MND) prepared in accordance with the California Environmental Quality Act (CEQA) and City/State CEQA Guidelines. The legislation requircs pubJic agencics to ensure that adequate mitigation measures are implemented and monitored on Mitigated Negative Declarations, such as IS-Ol-042. The MMRP for this project ensures adequate implementation of mitigation for the following potential impacts: 1. Water Quality J As discussed in the EastLake VilIage Centcr North MND, grading, construction and operation of the proposed project would increase the potential for erosion and impacts on watcr quaJity from runoff that contains silt, oils, fuel residucs, ctc. 2. Air Quality As discussed in thc EastLake VilIage Center MND, the proposed grading of the site would gencrate construction equipment emissions and airborne particulates. In addition, particulates associated with grading equipment (particulates from haul trucks, dirt on the truck tires, and dirt on unimproved portions of haul routes) would become airborne during hauling operations. The incrcrncnL:d increase in Inobile emissions from site improverDcnt would contribute to existing air quality violations on a short-term basis. 3. Geology As discllsscd in the EastLake VilIage Centcr North MND, grading of site would impact unsuitable geologic conditions. 4. Transportation As discussed in the EastLakc VilIage Center North MND, the project would generate sufficient volume of traffic to reduce levels of service on segments of EastLake Parkway and Otay Lakes Road, as well as several intcrsections on Otay Lakes Road and EastLake Parkway to unacceptable levcls. 5. Paleontological Resources As discllssed in the EastLake Village Center North MND, the grading of the sitc may impact the (Hay Formation. which has high paleontological resource potential. (),II.2C)(j;> 4>f 6. Noise Site plans for the VC-2 and BC-3 parcels are not being proposed at this time. If the noise level at outdoor use areas in the parcels exceeds the City's noise standards, the noise impact would be considered significant. Due to the nature of the environmental issues identilied, the Mitigation Compliance Coordinator shall be the Environmental Review Coordinator for the City of Chula Vista. It shall be the responsibility of the applicant to ensure that the conditions of the Mitigation Monitoring Reporting Program are met to the satisfaction of the Environmental Review Coordinator. Evidence in written fonn conlinning compliance with the mitigation measures specilied in the EastLake Village Center North MND (IS-Ol-042) shall be provided by the applicant to the Environmental Review Coordinator. The Environmental Review Coordinator will thus provide the ultimate veri fication that the mitigation measures have been accomplished. 6/11/2002 2 ~s- E ~ 0) e D- O) :5 (; 0. (I) oc "0 c ro 0) c g c o :2' c o <ii 0) -~ :2' ::;;: <1: a:: c> o a:: 0.. c> Z j::"" a::~ oz 0.. ~ W ~ a:: c ot:) Z <1: c>_ z5 ~ Q) 0"'" t:j Z u; o '" ::;;:w Z o j:: <1: c> t: ::;;: ~ c '" E E o u Q) OJ '" w --g ro ;; 0 a. VJ ~ ~ ~ u " w :c ~ >- ct:: o ~ 0.0. ~ w '" _ c 0.2 "'0; c " 'E !E t= III > u;~ &8 e----- ~- c . c c o 0 00 e----- ~ E ....; , E w ct c: ~ 0- gE~ m e----- ~- -6'~ ro w 0" I---- ~~ ~ ~~~ _ c o 0 ,,:;:;; o ~ ~~ ".. > ---~ __"__ u g ~ .~ ~ 0 O>~Z -;:; (!) iE" ~ ~ ~ ~ ~ .. " c o ~ 0> :~ " I-- u .. ~ e- z: o ~ I-< .-,: .... ;:J U .~ ~ U Q ". .-,: U t;:: '" d I-< ~ u '" 0. 3 _6: ". c ~ .:d 0. 0. .-,: - - >< o c ,~ o 13 u 2:- -5 '-;; u ~~.s w UJ -5~ '-:.9 , ~ U 0 > c: w c8-5 w g-~ ~ ~ ~ ~;2 l'1 r; 0. .s g ,~ ~ o 5 " u >:=: 2 ~ 0.-;;; 0. ~ S ~ w -"' ~ c o--J .?, rI >, c:j u ('j ?: -0. c5 rJ D..,....... ::: ~o-3 -- - ~ v ~ ~J) UJ E ~ <.n.2~ 5c >~ "w ~ C ~ 0 " " ;;.. u c: ;' r:1 0 u 0- ";2 2';:; 0. c ~ g o u 0::: c; ~ '" e c 2 :i5'@ DO <'3 ;::: VJ w " C C 0"" ~ w ~-" ~ - UJo w:~ v v v-" ~ u ~~ '" t C ~ E ~ w 0. S ~ ~ u g.s ~ g " c: U ?:!) '1) VJ 2' ~J) P-. ].e o ~ 0. C ,^ 0 w ~ t: ,....... 0' 'J r-j c ~ ,g 0. 0. ~ - - >< o > ~ E "" ? -'" ~~ "" ..a c: UJ=' =' 0 0-8 ~ ~ ...c: rI - W ~--;; o =' " ~" ~ ~ - "" ~ o .g u -5 'f; ~ ~ 2;' U " -5 ~ " w C ~ UJ p;- c<: 2: /: C .s g Q)~v~ .-:~ -5f-oC:j~ , ~ g .9 __ 06 ~ -5 ~ ,~ u:.<: u" ('j......... 4:: >~gl'1~~~2r1('j o.s~~.>:s- E....... ~-b ......... Q) c: t/) bIJ...c: 0'5 J::: ~ 0... ~ 2 'I) 9 t ,.t:: ::1.~ :s- ~ u ~;;':::1 "'d <.n .... 0 ~ I!) ~ 1 V ,0 c<3 >. c: ~ <.n__u.......oroo '1) ~ >, 0 ('j P::: ?: 8 v u;:2 ...... ('j r:I V vJ <U 'l) ..s ~;:;-oO.......>'uQ)>> 0... c: ('j -" ~ t: 0 u -5gg~~2j~aE~ '.. './) ~...:: ::: 0... >, 11) -c....... ....0<"10'.22 ~8g~'~~c5o.~v >-:::: VJ ~::: t:: ~ t:: "'''...;<: 0, ~ 0 ~ ...... _" 2 ~ ~ - ,~ ~ H ~ 0.."U; ::::: n ';:: ,..C Q) ......, "'d :'.: H 0..::::;;A-.~~~0r'C:~ 238~-~3~:;g~o - ~.)~~...:: gp3~'.2 ~ ~ ti....c:: ';J) ,- 0.. 0"":'::: .... :.- ~ p...= ":! UJ 0.. ~ 5 2 c: 0... < :J 'J] c:::: <C ...... 0... en p.. ::: --------.., -.-- -- - n_ r" - ---- -- 0~ "" ~ " " _S t: UJo " 0. "-' 10: ?;ou 08 ~ 1j b ~ ;:; ~" .0'0' " ~ " 0. > W '" 2-5~ ~E~ n 0 :2 ,~4':: en ~.s " 0 '" - .SO '2 ~-" ~ 1j ~ ~ d ---- ---_-..- c ~ ,g 0. 0. <<: " -5 '" " UJ ~ 0. - >< U G ~ o s U "<:3 -5 ;2 rS~.s " " " C .~ UJ ?;o o - " DOC C " ..Q -6 r.n :2 -2] n ~ 0 <1) '" OJ)~.5 ~ .~ c: <oj d '" - :.a ~ ,3 5b "'d ~ ';: >>......,.ti) ~ 6 0.s~v}?.2 b-.O ~ ~ ,... H Q) B t:: 2!J"'d ~.s5<oj~@ ~~~~3-d Q)(;~8....~ E;b~t.fj2-g ~ 'v; ::" S 8 ~ 00:;"'0.'" b-.:5 ~ -~ :; v1 E<oj<ojug~ - t: d <1) "'d ~ C"'d ~ 2,B V ~Bw..Jon> ij ;;::a ~ u 0 u .;:: ("'j <1) S; 0- gg~5';'j5 o > ~ " <2-5 " g.;; ~ ~ 1)~ u " ;:; ro 0. ~ " u -55 ~ ;'J o 13 " u >:::: o ~ ~-" o.~ ;;.~ 2 ~ g 2: o.~ cr, n o o r::' 'D Mitigation Monitoring and Reporting Program MITIGATION MONITORING AND REPORTING PROGRAM EastLake Village Center North Mitigation Mitigation Measures Method of Timing of Responsible Completed Comments Measure Verification Verification Party Initials Date No. Final or Gracing Bng.PefmN I During Post Parcel Permit Imprvmt. I Cons(. Const. Map Plans 4 ' Prior to approval of the Parcel Map for VC -1, the To the X Applicant .Applicant shall construct and secure a fully activated traffic signal at the Fenton satisfaction of he City StreedEastLake Parkway intersection, including Engineer. I interconnect wiring, mast arms, signal heads and associated equipment, underground improvements.. standards and luminaries and provide the following intersection geometry (see Figure 27 from the project traffic report attached to this MMRP): Northbound— Two left -rum lanes, one through lane and one shared through/right lane. l Eastbound — One shared through left and one right -tum lane. Southbound — Two left -mm lanes, one through lane and one shared through inght lane. Westbound — Two left -turn lanes and one shared throughlright lane. In addition, the Applicant shall provide for 200 feet of storage for the planned dual southbound left-rum lanes. If only one lane is provided, a storage length of 350 feet would be necessary. 5 Prior to approval of the Parcel Map for VC -1, the To the X Applicant Applicant shall construct and secure a fourth satisfaction of w' estbound lane from the project driveway to the the City (VC -1) SR -125 northbound on -ramp. Engineer. 6/11,2002 Page - 4 E ro 0, 0 a: 0> :3 " "- '" OC u c ro 0> c g c 0 2 c 0 "' ro 0> :~ 2 ::;: <( ex: ~ 0 ex: 11.. ~ Z J:: i= t ex: 0 0 Z 11.. ~ W '" ex: C 0 '" U Z '" <( 0> ~ !:'1 - z :> ex: '" 0 -'" !::: .. ...J Z i;) 0 .. ::;: w Z 0 i= <( ~ E ::;: .. c ~ E E o u ~ -g co ;; 0 <i E ~ o ~ U C ~ :a .v) >. ct o~ "-"- ~ ~ De -" 00 o~ " " 'E~ i= Q) > ~-- _ " o 0 ,,:;:: o ~ -5~ ~ ~ '" ~ > " ~ o ~ z ~ ~ ~ 0 g~z ",'" -.--- I--- ",VJ o 0 "-3 - ~~ o " c C 00 00 - COo gE '" &: ~~ ~ED- CD - ~- ~ .~ , . 0"- - ~~g ti~~ .. i" ~ .. ~ ~ :E " o "' ~ '" "' '" ----- " " ." P- c. -< >< m o ~ ~ 0 S2 ~ u G' 0 -5 "" u :: " w 0 ;:; 0 " f-' ~ .c W -- u c 8 V) g J=: 3B;o-.E~' ~~ ~ ":::"'0 <';I '1> V ~ b ~V)~2~WE~o.>o ~~ :; .~ ;; _.9- ~ S ~ .9 8-5 u~ ~ 8-] St5. "'0 ~ ..::.: -cJ: 3::0 ~'" -;::: 0 '-< ~. C"J B 1) ~ :: ;::> ~~~a~""- r- ~J1.~2 ~ 0 G~;:S g~ 'v; '-' ;?2 <';I f.L1 ~ 0 ..... 2('(w ~ Q3 ~ ~ ~.B~~ IJ.)Uc;::>:::- EvN:E ...c~ '~...... b.Q--g v-g (!).~~ ':::r'CVJo~('j>>""'~ or'Q)'"d_J1-a<.l)2o~ '1> ~.s 8 -2 -g ~ 0..0: S ;:!3 ~UQ)C::'"d-o ~ ~~'g] g~~ ;;.~-5 ~ E ~ C - 3 ~ ~ ~ S :3 g. -~ 0 (-;I u ~) ~ M I;' '(:j a-t:v--;;~V)-5Ee ~~~~.~)oE~~2~ c.... -0''0 v. V) _ n _ _ U} ~ ~ <2 _.----- "" --..---. -- " " " P- c. -< >< m o ~ " N " 0 " > " " ~ P- c. -< >< ~ m o ~ '0 " " oq ~~- _ ~ u ~~.s .c o v " Wi " w ~ o W " 0.. ~ o ~ vq ~ ~ - _ ;2 U o ';:j v t-<VJ-E .c v v " Wi " w o D ,...c: ~ ...c: 2 t:JJ ~ t;J) C'j g :c g ~ .s .~ .s v v~:2 IJ.)g5 3-= g:> 3;9 "...c 0 V -'- '" ~ .2P l:! t::: b.Q V H .......... ~ _.J:: ~ ---':C: 2 ;:.- E WJv EME 2g~ 152 <1::.9 2 Q)C:::-2~ ~CJjg~~';3d 82~E~~~~ ljOC:20_0~ I 'rJ I V) ~~1-;b2~~ ;::1o-g;::::1~3 ~"2g~.2co 5~~~~~~ ;/:5!r..l..J nV12~ " t ~ n 0 ,q ~ v~ ;:jg. _ ;:; ~ P. v.> I-< ~ ,2 t5.~ fe 'g 0. CI) ~ ~(l)~u<'3 ~~<]I-< '~u.s.g>~ CI)"d(l)~~ci t:: > ~ u 'i:: u c'-:: .s g - s (l)" ~'P.." (l) .0 <'3 ~4-;~u P-. ::: ~ P. ~ '0' - a I-< , <<=-. (l) gp ~ "51 ~ ~ p. ~,g ~.s ~ ;gu~.s~.5 ~~b1c-j~,S ;jo:\b(l) U 6~~<(03 ~ OJ 0:\ (l)'- ~,~ ~ U ;:::I c:: ~..sU u 2 2~.scP_~'~~ {1 c-5~ ~~2~ RU~ E .,g.-5 C,..c:N2:0~(l)C-9 0. 3" ];, n ~ e.~ ~ ~ ..s ('j ~ OJ g- 'Zucn~~;;c:E0~~ .s v c:: g .g ~ 2 ~ v " E -g ~ [ ~ g uS] ~ [,~ g g w 2ovuuc_2~FU.D-U .....vv ~3~oYv ?> o>vnvot::_?.......n-c J:~~~S--s;~O,:~~~go - -- ----~~ P8 .L: on ;:: .2 ~p 2 "'" c- >-. " ~ ~ " 0.. 00 '" co co C' - ~ E i:' C>> e D- C>> ~ (; 0- '" cr: D C ro C>> c ~ c o 2 c o '" ro C>> "..;:::;, ~I ! ::;: <t a: ~ o a: D- ~ Z j::"" a: 15 oz a.. UJ a: Q z <t ~ z;;; 0:: '" 0-" t:j z V; o ro ::;:UJ Z o j:: <t ~ E ::;: ~ c " E E o u <D -g ro 0; 0 a. ~ ~ u ~ - ~ D ~ '" ct Om "-0. ~ " '" ~ '" - C '" U '" C>> ro _ c o .2 "''' c u E~ i= Q) > ~ -- (h(h o c 0. 0 --"-- ~~ c ~ c c o 0 ~ ~ E~ " E ~ cfc:~ c.- ~E~ '"--- ~- ::::E u" ro " 00. ~ ~BQ cu ~ ro c ro, u::1l""- - 1---- --I-- c " o c ~ " - rn ~ 0 g'~z ~~ '0 g "'0 -z 2~ -:>- <D c :;0; ~ " '; ~ . <D :;0 C o .~ 0> 2 :;0 -._-- " ~ <..-> o '"' c~ 00 1---- x x g u .fi~ '" rS~ - '(; "D"D '+-< C c: o '"' ro gfbD2 : ~ ~ ,,- - '"' " '"' ;:;:~U .:::;, o .s t; '- v 0 - - - u C!J~ ~Q v > " " E " S % o - I-< ...: ....< ;::, u c: - u (:) :r, ...: u - '" '" ;2 I-< 8 ~ ~ ;j g~Eo V) 1) c: E: ~58.5 ~ U)~]~ E: 1) V) C o ~ "2 :2 '1:: ~ ('j -0 >.--;3'~ 2 ~ w p....... ~ c: 0... ~ -i:: M <(, 0 ('j V) 11) U p-'('"j.L:J:; ~ >,!-< - '...... U 0.. ~ V o V ~ E ~ ~ ;;; ~ E-o>-'~C:~C: -g"dOd:~3~ ,g ::::: v tt.) -~~,; ~ ~ gJ'd B:::: V) 'J) c::~W3 -< p. ~~c v v; v -" " E j~-g _ > v ~ Cj E w..:!;::;--< .50~ '...... ',,-, P-. o 0_ ('j .2:' ~ > v 2 U 5 g;~ u '"' - ro g -i3 ~ c ~ 0 ;; 0 c:... r.I C ~ ..:: <e( G' 2 ~"3 ~ g -;;; - -5 .... :g .~ ,E n "" "!' v -'---'--- - 3 ,n 4--<> o " 0"3 ~.r: uu x x --.~---- "C__ __1--_ '(; g u 2:' .F ,~ u - '" ?:~-5 -- '"' 0 v ~ v 2 5 ~ CIJ~ Cia "D"D C " " " ~) gf ~ 2.ry g ,,~ " " " D:rou -< p. ::~c: v -;:;; v -" '"' E j~~ -:n> Q) M ~ E ~ ;:j <( ~s::c _U~ 4-< '+-0 0... 00_ c;j i:> e > v o U c ~ v Et~ lJ " - '"' ''0 i:: v g~ -a ;:=; ~ E u<f. oJ:! ;;:::1.. ~ 1) ~ '0 1<.D C 2~c V) <U 0 ru ~5u.s ~3::~'o {/} -0 ~ C ~ OJ '-' g (3 g c: u ,~ ~ B 2 " ~ ~ -0 ,,' !3.. ~ n....... Q.. 0 o c:: -< U p:::; ('j '1) '1) lJ) lJ)...c:..c: Q) {'j '"..:::: ~ >-. r- '-' ~-:~~~ - ;:;.~ e: 0 t: ;OP:~:;:;~ ;;2V1)~rj o~~~~g ~ ~~ u; '-< _ V1 en ;:;...;:; ~~w~'~~ 2 --~------ c ~ ----- (b'i c " '" P- o. -< - x -N-o uu ~ c> <'1 -- o ~ vi:::' ~~u - .;2 ~~.B ~ 2 "8 ~ t) ~ r'( ~ 2 2 ......u ...... ..2p:j2U) 0 1E-g~~~ E;:~oe: ~ U' ;:: ~ ~ ~""dX gf>~ro8~ -a'""7v~- :-;::u~~-g ~>~..:.:o c.....e:'"6j~ 0;38>--.13 ~ .'; 0 >. e:.-'" ~6;;; ~E~'OU g E -a tol)...c 0..0 c:: ~ 22~2~ oVo.Vv ~o.~o J:-o-<1::3"~ ~ - c '"' '" P- o. < "' o Q:) ,N XU' >u ~> '- o '"' V V " ;D C '" c g UQ ~~O - .;2 rS~~ v V""'d c: -5 .s g .g M"8~ u lJ) -ci ,0 ~ V ~ {'j U ~ ~ ~ 0 I--< ~ 2.a V -;; >~cS o.ee: [] .~E~ ] ~ ~ a .g ~ {'j ~,'0 0 ......... ~ .;::,.....) IJ.) ': ..... ~ t: ~ ~ >--. P.. U -~ -a ~ .... .8 t.fJ> '--< {'j ;.> vi" 0 -5 ~ {'j 0 2 c: t.fJ ~ '""7 ~ P::: ..... '1) c: .----< U ;:j ~ 0 E..s ~ > ~..:.: 1) ~~,--<ci:=:jj 2 .f' 0 .s 0 >--. x E~g~u{'j;;; ...... -" {'j 6 0 - {'j ,~ c: .- '--< ....... g~~E~~~ u c: 0 0.. ('j c: ..... ~o"""~~2UJ .----< I--< '1) - QJ::r:: ~ =g ~ ~ ~~ 2 _._u____ N ~ ~ "D "' g. u Q:) <D v CIJ '"' P. '"' v v " ;D C LL1 q u '"' 0. '"' u ~ v :3 > o _ ~"D D." ~ 0 -u'" .2 ~ ~Jj '"' ~..J v 8 ~ vo ? C1) ~ " ,,"0 ,,~ ~_.2 N o o N :0 E '" OJ 0 a: OJ c 0.= 0 Q. Q) n:: D C ro 0> C CO g C 0 :;; C 0 ~ 0> 0.= 2 :::;: <( 0:: C) 0 0:: a. C) z .J:: f= t 0:: 0 0 z a. ~ w " - 0:: c 0 " U Z " <( 0> C) ~ Z :> 0:: " 0 -'" !::: '" --' Z U; 0 '" :::;: w z Q I- <( C) E :::;: ~ c ~ E E o u u w ro .') 0 ~ <i ~ f-- E 2 0 u c ~ .c "in >- ct o .. "-0.. ~ ~ 0: _ c o .~ "''' c " .E~ i= Q) > c;;~ ~3 f------ ~- " " c " o 0 00 f------ ~ E-' , E " ~~~ 0- ~E(L m f------ ~- -6~ ~~ f-- ~ ~ g c ro"S u::o..."'" f------ _ c o 0 -0-':::: o ~ :5:;:: Q) .C " ~ > ~ ~ ~ ~ ~ .. ~ " c o ~ '" ~ " c ~ o ~ :;::; :::J .. ~ 0 g>~z ~" --- " " ~ 0. 0. -< -.--- - >< J G '- o c 3 u c' ~ ,2 U - '" o M v t----v,";:: ~ v v " .;ij ciJ v V '"0 It) .s -~ -d B 8 p..~~~~ vEO"'gfr--~ ~ c:: ~.,....., N ..j.g..c: OJ"} It) ~ ~uM<'j~;2 l-LI (1) ~ .5 o.o...r::; v~~t)~~ Q)~.s5~~~:;; ~ 8 ~s:;~~ P.. .8(',1-00 ~ V" v " _ t/1 E ...0 13 {"j EV2,S6~ 2 ~ 00 Aj<.t::51ug. -.- ~ {"j V).... ~>'>,q~u S .... - ('j ~ O~VJ6-~ -;>..~, ~ b C'j ~ :::> ::I ~~g-oF.j ;; .F S c: 2 CL. _ .2" 0 0.. .s '-:-0 U i3 > ~ ~ <2 " v g.;; _ u L. v ~ u .s5 '" :e o 0 c; u >;=: o " o..~ 0. " E 3 '(:j'"O V .. " 0 .c;~ -0 " " o -D -D 2 5:; c....'-': S; ---- -.- (r, - c .. ,~ 0. 0. -< >< m U] ~("j >< rr\ N 0;2U ~H> '- o c S o .st3 o ;2 OJ ;::: r--~..sU5 ci: .. ~ ~ -0 ~ It) 2 ~..s .. u '" P-<,2 0 p:, ~ ;2 .. ~ ~ :SN~ U" g> <oj ~u~ OJ g.g .-EM:3 '008 Hp::jro > ..... c:: 2'.8 {"j ""d o.c::'---"~ 0.. cj '/J- W~C:~'E ;3,-~~8 ogUJ~g. L CL. Q g Q.. 'f - -- ~ N o :> ~ ~ ~ ~ g o 3: -a ::: :: 0 <:.) 0 ~u c <] '0-5 @ ~ '0 v v u :;; " 0." ~ E 0.0 v'" ...0 g M U -D ~ ~ V ~ " w c E H v 'D ;:: '3-2 > (":j 2-0 2ts .. ~ ,---- c .. ,~ 0. 0. -< , >< ~~ ~...., 0 N 00';30 >rog> v '" .. 0. c- '...... H o u c: .g ~ ~ ~ ~ ~ 8 _ 'fJ ~ > rS~.sw~ :3 ;C; c 3~ "; 0 v 0 ~u c <] , " .s :s: u .~ ~ ~ .~ 0::: ,'{::j~ "g Cd ~ ~ v~-B B 0......... 0 a b1}C....O 5 ~ VJ- ;:: "'d :..::: c: > ~ 0.. ('j J:: 6b 0.. p.. w "2' >-. <r:: M~ s ~ 5 ;;.~ >- '-" --' "'d I-o..s 0'oN~~2 o I t:J) c: c;j U q b1~ ...J 6> '2 :::: ..... o H 1-0.- ~ 1-0- ~ p.. 0 'lJ >-. q Z g.:o ~ _:::" '2 223e.~~ ...J~'O-So ;:c:265>C;G "-,----- - o > ~ c8 c, o o c:' ~ ~ ~ " 70 E OJ CD o ~ D- O> :5 ~ o "- w a:: " c OJ 0> C .'" ~ c o ::;; c o ~ 0> ;e ::;; ::;: <( a:: (9 o a:: c.. (9 z i=5 a:: " oz c.. W a:: o z <( (9 z :> a:: '" 0"'" t:~ z V; o '" ::;:w z o i= <( (9 E ::;: L-____ ~ '" ~ c '" U '" 0> '" " $ o ~ - ~ ~ ~ 0 g~z ;E::; - ~ c ~ E E o t.> " .& ~ ~ ;; 0 C. E ~ o 2 t.> C - ~ :c "in >. ct: o ~ 0.0- ~ $ 0:: _ c o 0 e>>:g co "E ~ .- $ f-> v; '" o e ~ 0 u f--- m_ e ~ c e o 0 ~.^~ ~ E-' c E ~ &:c:~ a- gE[L ~ m_ e - -6 t o 0 \..? [L ~ ~~g C m"S U::[L""-.- _ c o 0 1:J ";::; o ~ 5:; $ ~ ::; $ > ~ E ~ ~ ~ $ ::; c .2 " 0> " ::; - .-- ~- e----- - Q ~ g Q ~ "3 ] ('j -r::: :~ :: 6 V) Of).~ P-. - - 4-. ~ .~ 5 '6 E 0 <-' E .:2 (/) ~ -g -;:; ~,q';b 5. .s0U):f ~ ~ ~ o.oU ..2 ~ V 0 ::: ..... t'j ~~c:-2~-5 ~g~<-2c; ~ ,- ('j 1) 0.._ -.SEo...s"Eg """'-6"E;t.:::'2 o 0 ~ 0 _ .::: ~u-;>,g-o S~~ t v5 >--.. -c cr" i3 $ g 2:: ('j.2 V) 2B~"E~~ i3~3~6b::: c:: o..-~ ...... 0 c;::: a.....-:(> ~ b.~ -~ n "0 C bD :') C "';:J;..c; " SD .2 Kj V) ~ ~ ~ Ol) .. -0 0 gug~~~ - ...... 0 0 u o 0... 1.1 U ~ gJ"H -;::j S ~_ ...... 0 0. V) (3 o 't,1 <U ::2_ u >,0-" bD- r----- ...... c: o8~~Q o c: E ~ ...... O:c >- c: OJ ::J It.> C'J 2 -;:; .9"' -g u _ 0. cO ,. X ('j....c:...2 ...... <U 0..::: 0 ~Ov S~Eb.~ - (; "'2 ..... C';I (/) u "",..D u u C'3 ..... '-"J...... Q) ";:0"..... "D1).5:-:1 p., "".......... ..s ...... 5; ~ .3..8 9 .g :a.~ .... 0 ~ :::: ::: bD 0 ~ ;> o :c :j .3 ...... 0 (tl ~_g~8'2"*-5 o........~U)go...> ('j -;;.2 ~ ~ <( :..a g~ ~:~ ~::.5 ~ ~ o...e u... Vi ;:; H lI) ~ V) >-, 0 V) ~ t!: t;1) >. ,;3 4-. ('j P-.o::::GO-o"E o tV .......~ ~ c: g'=3=:v'8~ -0(; 0'---":::"'0 2...r:: ~ l/) ~ 0 :2 0l)~5E3U 1)1} 0 bJ} (\) ...... q ~ .....~~<2- c:: ::: 0 ::: ~ V) "a ~ 0 v""d ..... 5 ;2 o E.-5 ~ ,.2 u t:: ~ .D -~-- --- 71 ~ ~~ 1) 0 ~ ;;P'd g 6 ;> y............... ~ .00 E c o ~ 0 20.-oE ('j C Q) ~ c:: 0 -5 c o ~ I- r-' n v u 0."0 ..s II.) c - ~ 8f=:..c 1;~o _ U) 3: -,; .5 c 1)~ ~v:; E 9 " o " " u C " t: v - 0.;2 X 0 v ~ u " 0. U) ~ .:: 0 C ~-'" -;:; C v ;::! ~--'E :s -B ;::! 8 ~ > ~ ~ ~ ~ U):;;U)~ .s 0 o c e-_q ~ II.) -0 ;;- 0;> - 1.> II.) _ ~ ro ';: ~ tS 0.,- ;::! ~ "0 " u Q).~ ~ t: I;:: -0 t:: I- _ 0 _ ;::! ('j c .::P 0 ~" ~ cr'O-.o~ " ".D 5 v ~ ~ ..!:J ~ 6 "'0 >,~ ..... ~ <'3 V ~ e ~ ;~; ~ ~ '" 'V ~ bIJ ..a C I >,:::: o t: 0; C Q) .;::: p.. U) 0 ~ '"' ~ ('j i= v II) r-' ~c-B~o o <-8 ~ 0 E 2v~U~ :~ u v - ~ ~ .5 ~ -g c:: ~ 2 tJ) t: ~ t:: c-S ;;--d Q) 3: ~ 0 ~ v .sS~2~~ ~uo.......v E;::!~Eg~ 00 v bD '"' 0.. N o o N .::ZS E ro 0, o Q: '" C -+0 :s Cl. <D n:: C> c ro '" c B c o :2' c Q ro '" ~ :2' ::;: ~ a:: C> o a:: a. C> Z 1-'<: a:: ~ 02 a. W a:: o Z ~ C> Z5 a:: '" O~ t:...J Zu; o '" ::;:W Z o i= ~ C> E ::;: ~ c ~ E E 0. () " 2 ~ ro ;; 0 <i E ~ o ~ () i" ~ .c "if) >. ct: 0. . 0. a. ~ ~ 0: ~ '" ~ C '" U '" OJ '" ~ _ C 0. 0. 0):; c u 'E~ i= QJ > ~'^ ~ 5 "-0 ~ c ~ c c 00. 00 ~ ~ g E '" rf 2: ~ 0- gE~ CD r----- cD ~_ ~ "E o L ro . (.:50... -_._~-- ~~g C '" ~ lLo...~ _ C 0. 0. ,,:;::;; 0. 3 :5~ Qj ";: " ~ > ~ ~ ~ ~ . ~ " C 0. "; c> :~ " --- - c ~ 0. L " 0 . ~ 0. c>roz := Q) ~:2: -- ,; 2 .~ a ~ o <U E.<: - 3 ~ ~ ~ - Cl) u ,j B @ e 8 ~ <U C C > 0 ~ 0. <U C ~ -;:j- _ 0. - -a ~ E <U 0 <U ~'::'.-s r.t'J ~ ho ......... ~ Q) tJ) 0 5 ,0 --0 u ....... C ~ co 0 ~o~ , c;; .- ;:S c. Vi u ---p- '" ~ o ] ~ t~ ..... 0 Q) >>.<;::'0:;; Q.)......... ;::. .......D t:: v:J ~~~~(lJE<2 > "51 tf <8 .g rt ~ ~ ~ .~ '0 g. _~ g ""d ......"'0 C'D.. Me ~ Cl) ~ 0 v 0 "'do....... > g.04.=.< ~~"dO""d"8~ .......nv~Q)Os r;o..~HE~"(:5P. I-< 0 ~ IJ.) ('j I-< ::I C:O-:=:OP..V"Q:; ro~~...sv.... a. V) '" (/) v d Il) 0 0 <1) ~ "t:iJ..D ...... '--" bJ} :; 0 ---< .2 ~ 'Vi.:::..D 0"'- cj ........ - - Q.) .3...c: tJ)::; ':.I)...c: ~ .... r::: VJ.5 .3 ~-;:;; c,21:''g VJE 3; tJ) Q) - 0 '- c:: c: t::.5 62.;;U)~2~cj U Q) ;2 ::; E ~ E Q) -E c: ....c-; c: 0.. 2; 1) ------------ r.t'J r; ^ ;;;Q.9tB...c: -5.8 ~ E .S u ro C ro-oa~--<~ 50~ ........ c:.:...r::::::: .......~ ~ ~.5 ~ ~] -~ ~ ~ .~ ...... ....c: u r.t'J ~ Q.) ~ :3 ~";:;) g.g.t.;:; c: ;;1o.~U1S""d U bh -g g 2: E.";::: .5 ~ ~ .soOJ~c86~~-d 3 -0 '0 _ 2 (\) ~ ...c: v Q) t>J).g. ~ 8 .~ ~ .::: t .s u gU)c:C;;::C-':;oov~~ -O-u ...r:::VJa.Eo_ roo'254~V)~~vu~ tl"J C ...... 0 -1 t::;;;; ...c: <I) 0 -........;;:;-~o.u~,.....-<.,..., V);::: 0 0 Z D...... ~ '>-< .~ V) v P.. C ~ 11.) 0 f---< 0 '0 c2t.:::.uoo.......r:: C -o'"6'"O~~(:'::;Eg ~_~~ 2ia E] ~~ P..E('j~c:~ o~ ~Q)...c:~ci_:;~...;:: c... 0... CJ"1 '5 VJ V) 0 ......... v " " ~ " --cf> <U 0 ~ u 8.~ x~ <U 0 co -----~ 7.J.. -- a- " on '" "" N Co Co N <3 E OJ 0, 2 Q. 0> c i:: o D- ID cr: " c OJ 0> C 'c g c o 2 c o ~ 0> :e 2 ::;; <( 0:: t:) o 0:: 0. t:) z i= :5 0:: (; o Z 0. UJ 0:: o z <( t:) _ z;; cr: " 0'" t::~ z Vi o '" ::;;w z o i= <( t:) E ::;; L---__. ~ c . E E o <.) ~ 2] c " U " (J) '" '" -g ro ;; 0 c. ~ 2 l) 'c ~ . :0 "ii) >- ct: o ~ "-"- ~ . '" _ c 0.2 "''' c u 'E ~ f:: a> > -0; :g g "-0 ~ "'- c . c c o 0 00 ~ ~ ~E'" c'f 2: ~ 0- ~~(L m ~ Q- -6~ ~& ~ ~~g ~~:o: _ c o 0 -0:;:; o ~ ~~ ::E . > ~ . (; ~ ~ . :; c o " '" '" ::E ---~ c . o " ;:;:] . ~ ~ 0 ~~z ~::E >- C,) o ...J o 0 ~r) t...1 :.-. U C,) ~ OJ ,~.... -~ c '" .~ D.. to. -< x ~ co 00 >00 " on "'gU <'1> '- ---- ~-'-'--~'--_.__._'-~ --- ~ o ~ ;:; "c:: .s ~ ~~-5 ,.; " " c 8J c '" c U . (; ::: '....... c ~ ,g ~ o ~ ...... C ,,-< ~ .....' ~ ?P <U U-g1]g ~.98~ o rJ ..... 0 ~] 0 ~ ",uZ,,- o ~ ..... ;:) C'I 2: 0 ~ ('j g ...s v c-: c... N o lJJ.) >-> v U..D if) '2.2 1) ~...c tJji3~~2 OJ E R~ Ji..s~>~.-::::. "'o_..:o...vo..."E ~ g.~..... 'r.i E7S:fJ~~"CI 8 ~I)'v ~ ~ u ::::w-Swu..s - o > ~ ,..8 (.j {i @ ~ " ~~ .e C1) a. '0 J:: U) c:: -0::: 0 ",-0 ~;:: u _ we ;::':' v :'2 rJ"-::: d '- ~ o '" ~ -;;0- 6> 2 P-o ;;-'tJ 2 ;:; co ~ .. ci) c ~ '0 ~ ::: c - - " ij'.D ",UJ C 'i3 -" u ::: g,...... "d-o 0::1 :::;::: ...... u ('j rJ V>..:G ..,) bJ)'::':: ~g-g5o ro.DO'...'><:~ 6> '-;> tJj 13...c: E ~.9 ~ ;; Q) (; ~ .CJ " .... 0.'- - i@EE0 ci2'ob .~ ~ ..... g 'r.i := g u .... ("j ('j iii p. --a ;;.. bJ) v II.) r:I r:I .... E ~ 5 v o.v~('j~ ~~ v-o~ VJ c:: > ~ 2 ("j 0 ~ ~ -o>'i::-:'~ ~ ~...s 3 ..... - 'J) E.D..D..o - ~ ~ ~ --- --~ --- c '" .~ D.. to. -< -. . ON ::au ~> x - co u0 Go:! - o g v g c .s '1a 0 o ~ 1) 1--< rf) -5 ..;'0 " ~ " 8 ::: ~ gf .!:: "'0 UJ C v :9 u ";:; ;; OJ c ~ E C; _~~~<2 v __ ~ ;::: E E .... v'O,.g~ > 0.. 0) --;:; t.1) 0 ~ ~...::: u ~ p. en (3':: --S "'0 ;::: ~ u 04--< 2;:;::::o.5~o o ~n~H~ E ............. ;:2 1.> oc2~r;E r:: ~ c:;; ~ ~ 0> ~ U1 C ;::I t: ...... ~ v' 0.. v 5 V) ~ ~o..E~-c E~~~~~ ~ 2 r=: v U ~~ ~~8 ~ -g-;; '" ~ c '" D.. u .~.s ::: - 0..:::: UJ .c - E " > o bn " to. ..CJ ~ '" :2 :3 " "S ~ c o '-' >:c ~ ~J ~ ~ ~ " ~-u -_...__._~-- c - ------- .-.- 7.3 ~ ~ 0 -" ~ ~ 0 o ;:; ?; 0) " .~ Q :D-u Z 8 co " UJ '" ~ -u c '" UJ c :9 :; co .& ~ " o ~ n co co ~ ~ E l" CJ) o 0:: CJ) :5 ~ o D- O) 0:: -0 C '" CJ) c g c o :2 c o 7,i CJ) ;.0::: :2 :;: <t c:: ~ o c:: 0.. ~ Z j::-'= c::15 oz 0.. W c:: o z <t ~ z Q2 o t: z o :;: z o j:: <t Q t: :;: ~ c ~ E E o u ~ -g ro 0; 0 a. 13 ~ () .E ~ Q) C 0) u Q) CJ) '" ;; Q) -'" ~f--- V> '" w ~ .0 ;;;,., ct o ~ "-<>. ~ ~ 0: _ c o 0 OI'~ C u 'E~ i=~ _ c o 0 -0:;:; o ~ ~~ ,.~ > ~ ~ ~ ~ ~ ~ ,. c o ~ '" ~ ,. c ~ o " '';:; ::J ~ ~ 0 .g~z ~,. - :;;U'i o 0 "3 I-- "'~ o ~ c 0 " 0 ~ ~ ~EU) ~~~ ~~n: ro- r-- ~- -6~ , . 0" - ~BQ , ~ , 0'" u::D-- - c ~ ~ 0. 0. -< -~ '0 ~ N U 0 >< U 'i3 U G D:) " ~ > ~ CO ~ N >< U U 'i3 <-J ~ D:) " ~ ? u -~ CD ~ 0. ,~ 0 " " ~ 0 ~ U U u J3 " -5 ~ u ;n 0 ;;; " " f--< ~ -5 CD >< f-> ::1 -<: ::> C- o:: '" f-> .-,: ~ ~ c:: .'3 ~C c::'g.D~5 c::~gv,-,ro'+-< .3:":: <..) P-. ......:; 0 u 0... 2 (/) O....c: v 2 o.v;~~u v ..... <t. c:: 0 U '+-< ~ l3~uA-.Z~ 0 ~ 8.....~_'--'~c~ -;n~ 2 ~VJ06 SU~t::~vv ~>vv---SE '- '- CJ P-. E 6. ..=: M__? ~~ t; 0 0 ~ '0;2 ~<l::~~ ;:j .... ~ ~ r<j -5 -- ;:; 20vE~ o...~ ,- So g. 2 (/) 0 o .D c'-< ..... U 0 ~ u 0> - ~_~ u 0 p-',2--:",<(Z :f:-' 10: " ~ .~ ;j E E " " 0." '5~ ~ 0 t/) ~ ~ u ~ -~ ~ u ~ 0.2- ""0 C::r.:: -g G d ~&g "2 ~ c: g <-8 g ~ ~ ~ ~ 2 .:J. - -.-: 3 ~ 3 ;;; h ~~ _ u fl_c:: 2 ';2 E ~ 10: o " u > "" "d u u o >< u ..c -'" ..c ~ ~ .e o c; u ~ ~ u VI c:: 1..'::: ~ ] "g a v...c 0.. ~ ""t/) .9;:j ;; VJ 0 p-. cr c:: ~ P-. ~ S -::: p.... v ~<.n2':-"'d ;;. ~(/) ::I o ...... <1) U 0..] -B ::: c: ~~'O~E B"O c:: S-a u v 0 ~ OJ c:: ;:; ..... > V) ..... V} t1 0 "'0 ]ScQ.@ ~ 0 " tV V EO"'..... N U Q) P-.. S v;~P..~ 2 c::~EV;v ---~-~--_..- ~ u 0 "' ~ ~r; VJ -s r; n r; ~ ~ CD ~ v ::: ~ ~ - ~ 6. ~~ <3 2-g~ ~ .D 0 d '/J 0 8 c c: " 0 e " ,,- :::0 5-0. 10: " '~.s - 0 g ~ ::; 23 E u 7'f _ ~ D:) >>ou CD_~ >'2 ~ :> bJ) 0 >? 2...8 A) (/) ou5.8 ..a H 0 -;:: ~o:;ro o ~ ,g ~ ::0 0 u ;:j ~ u 8-= '8 ~ 0.. 0 . > ro..... bJ)~ M ~ t::: i:1 0 :::: O..c: ..... ~ 0 E u U .D p... ~ -~ ~ ~o ~ ~""d ~ s:: s:: ~""d ~g~r;J-g :j '6....~ c:3 .5~"'o~ c ~ :7.g ~ ;3 .... '... ::; "-' P g C v~;2""d'-= ~ .D ;:j ~ ..g -- " ~ .s '6 '- ] ~gf~ ~4-<r;J ::s .;::: "0 H go 0 O::sV)OHO~ ] [~-g~~:g '6 V} 0 ~ ro C1..8 -g ou ~"""::SvJvJ"dr;J~ ;:j~VJc~.2(1)o.. -g~~i32g~o U ro _ .... u..... v...... 8 (\) E..D ~..:i'~ ~ p.. tlJ) ro ;:I p..-~"5 v 8~~:2~2~ s:: ..... ::s Qj vJ ~ ___ (I) ro VJ 0 ;:I v E ro ::s 5~"d'-<-<~VJCi23 'i::~~ "'::sP-.r: ~r;~~b.O~o~~8 --;; E H ..c: ~ 2"d '-' Q..-..... t:l."08'Os::u~-g5~ 2::S::(I)<1),g4:~M>-,C r3;:1t:J)uU-b.O~O ::SUjo'-;:Iv_!::,-u VJ c ""2 ~ ~ 5}'r;::: g, ;.: ~ r3 '.) ~ c: ~ "--' c~~~o'.:.c::o"'~~ , ",--<...c:: u u '.~ u..r:: ..... .-> " "0 :.a " > "d " ~ u " 0. ~ ~ " "0 " "0 5 ----------- N o o r' ;;s E i" 0> o 0: 0> C "" (; co. OJ 0:: D C '" 0> C ." ..g C o :2: c o ~ 0> :~ :2: ::;: ~ 0:: (9 o 0:: Q. (9 Z f='<: 0::15 OZ Q. UJ 0:: o Z ~ (9 Z 0:: o !::: z o ::;: z o f= ~ (9 E ::;: . c ~ E E o u ~ -g ro ;; 0 c. ~ ~ U E ~ J5 'ii) >- 01:: o ~ "-a. . ~ '" ~ 2 c '" U '" rn ro :> '" -'" ro ...J Vi ro W _ 0 o 0 C)~ o u .~ ~ >- ~ > _ 0 o 0 .,:;:; o ~ :S:; ~ - :;0 ~ > . ~ ~ . ~ ~ :;0 o o j; :~ :;0 o ~ o _ .- ~ ~ 11'1 ci g~z :iE:;O - Vi"'; o C "- 0 ---'='- rn~ c ^ c C o 0 aU - ~ E-' ~ E w &,c:~ 0- .g~Q. iii - rn_ ",,"r:: DC 25&: - ~~g C ""5 u::Q.- c ~ ." "0. 0. ~ .. c ~ .~ "0. 0. ~ .. ~ ,~ ~ - M .C; 0 N N >< U U :;:; U >< U U -a U C " G " 0:1 ~ > 0:1 ~ > . C; - - 'c. N N >< U U -a U C 0:1 " > ~ ~ - bD ~ . C; N 0. C'. >< U U :;:; U C 0:1 " > " . '- '- 0 0 .S " " g " ;:; C ~ ;:; q " " " " ""' U 9 " ""' " -B .~ CD -B .~ u 5iJ 0 ~ " " 0 ;-; " " f-< ~ -B w f-< ~ -B w </) c; q~ (U c:..c; <1) - - .s C'j </) ::0 u::: o.."E ~ O-c B c i3 >>-~ - .s Q) 5 B8:~]:]]~E 5--<-51:~ ~nO VJcu........-vg~e- g ~ 0'0] M>,8 ~r}g-;;:::~g~ SUg [oV)~ "'0 > ,..:.,._ - WJ n . :: ..... tf) 3: ~ ~ P.. "Vj UJ__? ~v ::; 0 ::>: <C;;2 '/1 ~ .."... :; (/) :;~~2;U):=; _ v V) r'lSo..-51:g E..... - ~, 3 '~ ,8 > ~ ~sP-'~f-- ,g ~ 2: ;:: Q) '::1J>V)02~ r:: 2 ~ '----.. L.IJ 0.. 'J'] Q ,.2 ~ > 2u 0. 0:1 " g. - g 2 U 8 ...... > 0 :3 E p>2 ~ --- ---- o - " " " P.. P- oet: ~ ." c u ..(3.s .<0 ("j c: I-.o"d - :2.2.g~~ (I,) 0.. c: c: "0 ~E~vrE c: 0 VJ E U-o.2::2 bl) c: 0.. V) E r1 ;:: '0 ~ 2 8 r:: U ~g~gg2 O~ ~ :=; ':j n ,~~ gcn c: if t;:; 0 VI 0 ~ .....;:::: 0.. en- c: ~ ~, t:!} t ~ v U '......; o-g:3>~~ 0.. u v ~ ..... n ~ ~= ~ ~ 0.. ;2g.~_t.'::1~ ;:; ~.cj c </)~~'~E~ -S.::;p..U~E 2 :2:u V) Vi 'J"] 3 C!) E;- :;; ~ , ~ o 0. " :: u n ,~ Q) 'Q)~ " 0 CD~ ~ 0.. ~'" '" " ;2 ~ ;;0. ~;;: -0:1 2 " n 9 0..0 u 5 ~ ~ a:.::: 0.8 ~ u ..d~ ~ 0 " u 3: ...r:: ~ g ----- 6 ~ 6~ 0<2 0 ""u <.t:: ...D c: u S 0 .......0 " ~ > "";; ro..c ,.-.., ~>-bbf-<C: N 0:. _6 _ 0 0 '5 V1~ ro.-a 0.. 0..,,""';...D o.~ E c: '- 0... ........ ~....c:- _ rt <I.) ro Q)""'" Q)...... OJ c:: u..e:::."'O -ca)-- ~ r-: c::...... ;; co ::j t:: U ;:;UbB-8C:C:0.D~ (i,"'" _...D CD 0 c: ....... '"d '- ........ w 0 _s B ...... g .~ o--;G'2ro2~OJ....... cj U C ['j E .... -;;; '"d 0 r:::> cj '2 ~ r.tJ ,~ '- ~ E ,~ 0 E ;:! ~ 'oc2~,.DO~tn~~ -;:;'J)1;'~Eo2EB 6 E -g -;; t:: 0.. 0.. ['j ('j 5.': s~~"E ~:::-~ g.~EcW-jo~E@ qc:2::c1c-o..O"~" _ u_ OJv~ ~ 2:3.g~u P.C ~ c:: ~ :=I '.1"1 0.. 1) 1) ;:; E ~ n P:: .D -~ <( -5 ..... E....... E ._n____.___.__ o n 7) d' .~ :.a 8 ~ OJ .8 ~ ~ :~ g 2..s v <1)"[) ~VJ ~-5~ .~ 2 E ;:j OJ '"d ;:: 2 ~ ~ :; c:; n U !)l) ('j VJ V) E E 2 0 c: 4-< P. c: <U 0 ..c co CD ..... .2 c:::o ~ c: u '- ........... c::: Q) c'';:: ~-g('j~u-" o c: v t) ,2 Q) <u 0- ~('jc~-so 3r');;;~-5--g ~ '"CI E ...- ('Ij _ c::: ~ & 3: Q) ....... ('j ~ 0 ..... u o VI CJ)-- c: ~ Q) ~ :; ~ E .: H ::: U <u <u <u ~ ~ c:: a Q) '2 v; u gv 6lJ;; '1) ('j t.:: --5 <( E N o o f:' :0 E OJ 0, 0 ~ D- O> ~ c " +' ~ (; E D. E Q) 0. C( (j -0 C OJ 0> C 'C g ~ c 1J '" 0 ~ 2 ;; 0 c C. ~ - 0 E ~ ~ 0. (j C 0> :-=: ~ 2 :a 'in >- 0," 0. ~ 0.0- ::E ~ ~ <{ '" C( v;~ ~ 0 6:8 C( - a. m~ c. c c ~ " 0 00 Z .<: - i= '" ~ _c ~ E ~ C( 0 0.2 ~ 2: ~ 0 Z 0>", a. ~ c u ~~o:: w ~ '1' 'E iD C( c i= Q) - Q) > m_ 0 U '=E Z u, Q) ~~ <{ 0> ~ ..!:! f-- z :> ~~ g a: Q) ro- O .><: ~Q.2: !::: j '---- - Z VI 0 OJ _c W 0. 0. ::E .,:::; Z 0. :} 5~ 0 ~ ~ ::E~ i= > <{ ~ E ::E ~ ~ >; ~ ~ ~ ::E c .2 '" :~ ::E --- . '._-- o ~ 0. ~ '';:; ~ ~ ~ 0 ,g>:gz ~::?; - -~ " '" .~ P. 0. ..; " '" ~ P. 0. ..; - ~ ~ 0 '" 0 N >< 0 :a 0 C (!) c > '" - ~ ~ - ,"'-, 0 r< '" >< 0 0 :a 0 G (!) c > ~ ~ '-" '" p.. - -- ~ ~ '- ~ 0 .':tl) ;2 " 0 " " - v c; C ;; i3 0 3 ~ ;; E ;;; .'" ~ ;;; u " c; c: ~ E u .f~ ~ " c -" ,5 v g "2 v <E U .~ "0 ~ .;: C ~ -5 ;0 0.. ~ > > c; ~ u 51 > > 0 0 v c: v 0 0 ;;; v c: c v 0 I- ~ -5 Q '" p:: U I- -5 co co p:: U ~ ~ - ~ o ;.. I- ~ "" ..; ~ o p:: -0: .c: u ~ c'3 Q) \-< <1) V) Q) ~:<.s~ ..8-;;~-;;s.2 ~ ..c E ~ ~= ~ en 0 S '2 g-a t:: @ ...... (l) - 0 ~ ~udo..-e-":::C::: ..:::: 0 p., 1) r:: ~ C1) 0.. v ;::I 0.. IU t:: .5 Q.. i:-(J) o...~ :2~.:.:-;;og. :; (!) g J.i 0::] :: o::J -5 v ('j ....... Q r:: "-< ....;. ..... >:::! E :::: Q) o ~ or; ~ E .S ~ -;:j '0' ~ u.) :> 0 v 6o.-5v2g~ o.Q) 0'::: g.r:-- ~-5Esr::ov '+-< ~ >-< u v go<n"2 ciO' '- Q) (3::: c.p 0.. 2 ~ 2 - v 0 c... 0.. -0 0 i:':' n _ VJ "-' 0-' v ,-. "0"0 - "'U__ - N L~,__ ~ -5 ~ o ..... V)""1::j v c8 ~ c: ~ _ ~ :::..c E ~ ~ ~ 11) s --- u o...W)o..C'j ~ ~ .8~ .a (; ~ t.O ('j - ...... ,.... MQ ~':::: >>,-:::::""g c:: Q) n ..... ('j.s c: t:.O ~ 0'-" ON V) c: I Q) ;:::: UC;-@ > c: 0-;; >{; -;;; > o ~ ~ 0.0 ~<a o c - '" ~] '" " .", ~ 8 E ...... ,.r-) ~ ~ ~ 20 Q..G.~ p:ro15E6.. r' n _U' ~ g- "3 E "0 ~ v ~ i5 8- E ~ 0...;'::: 5 ~ ~ &r ~ 2 OJ) ...... ::1 .9 <E ~ 'i:: E c: o ~ E g ~ r:: v -0 s-..... ::I ~;:j C"'d u 8 CL) c: :u :j ...... ~ c: -.g ~ g 8.. >, N U ~ g E ~ 3 .- 8 (1) v ?:3~~ '0 c ~ ;C; ~ v 0. o " :D-U 7(,:, '-" c .~ " '" i:: u v v &"S' 3 ~ g-:3 "0 ~ ~ ~ " o <;>- "if ~ ~ 'i3 v u E ~ o E ~ " '" S;s~ ::: 8 "~ E"O " v cT ~"f ~ ~ So U) ~ <2 2 tJ) v H " N "0 ~~~ ..... D1J.... DiJ 5 ~ s v E :: 2"~ p. (l) >-.:-::: "; ';:3 -::: ~ g-;S .g US ~ .8 "0 ~ '" ~ "0 V '2 v ~ ~ ~ o 0. o o - ;;; ..'"'! ~ v ..;3-5 ~ _5 3...5 b "~ ~"' V) v ';:3 ~ ~ 0- V 13 Q:) "5 ~ ~ ";1- b ,2 3 ~ u "g E ~ (l) (l) E -{j"~ :9 2:> '0 E 8: v 2~~ ~ ]:;:"0 "'g c: v 2 v ~ u -0 0..:.::: '" "'.D 8 8 5- -~ ...... c: :0 e 0 " u ;>, o."'to o~d - " ~ C> ~ (l) "~1:: .a "~ ~ ~ en ::: .9 cO:; S ~ 0 -0 :::";:; E ;; en "8 0 " ~ ~ 8 ..s g. ~~ - n o o ~ - :0 E '" 0, o 0: '" C +0 " C1. Q) a:: " c '" '" c ~ c o ::;;: c 2 ro '" :e. ::;;: ::;: <{ a:: C) o a:: a. C) 2 i="" a:: 16 02 a. W a:: o 2 <( C)_ 2;; a:: " 0-" t:j 2 in o to ::;:W 2 o i= <{ C) E ::;: ~, ~ c ~ E E o () v " ro )!! 0 ~ Q. ~ E rn o :;::; l.) 'c ~ :0 .ii) >. 0", o rn "'''' ~ ~ '" ~ " C " u " '" '" _ 0 o 0 a)~ o u E~ i= Q) > _ 0 o 0 -o;':j o ~ ~~ " v > - ~ v;~ &:8 ~ rn~ c w c c " 0 00 ~ ~ ~ E (fl ~ i3.~ gi==Q CD ~ rn_ c6 -~ " W ('.5[L ~8 Cl ro ' ro ~o:~ ~ ~ " ~ rn v " C o jii 0> :~ " o ~ o " Z::I . rn ~ 0 2~z :E" - -- " " 9 ,g '"' .s <3 " " 0 '': ." -C " ;; " b .D " " .c " " " " " N "0 0 D- ;; 0 " > 0 D- ~ E > '" :t: " > g 0 b u 0 '" g " ~ 0 > ~ u , ~ D- " " '" ~ '" N x ,2 0 ~ 0 0 w ~ b "0 " "0 "5 ~ w 2 ~ ;; -" "0 " ~ " " " .c .D " " 0 " u " "0 u " " u > " " " 5 " '" x ~ D- " '" to ~ ;; '" u " " -" ~ 0 E >, " E .~ " " ~ -" " " " " "0 ~ D- " Q '" D ;; "0 -" ~ u u ~ ~' '" ~ g co ::; '= 0 E .D " U c', ~ ;3 ~ ~ 9 >, ~ " ~ ~ 2 ~ v ~ '"' " '" .c D-~ 0 "0 ~ '= 'i'- :s ~ "0 0 ;; '" ~ -" ~ ~ J:i ~ -" ~ " 0 ~ " ;; " " ~ " ~ u 0 u U 0 U " E u > ~ cB '0 0 g .D 0 '" 0 cB ~ " c:: .c u ~ '- 02 >, " ~ ~ ~ " ~ ~ 0 ~ " " .c ;;; ~ '" "3 J: ;;; " ;;; N " '" ~ u .c u -~ ~ -;;; H ~ v " ~ '" "0 '" ~ . ~ "'d "'d ~ '" "0 > ~ v '" " v v " .c 0 '"''' " g " v 0 ,g to ~ ~ > 12 ~ ~ c: v > '>. u > E " 0 '" " ~ " " ....::: 0.. ('j V " ~ '" " , > "0 > .c > <3 " .D u "0 D- e " '" 0 u " ~ D- o ;; D- o< " u "' " " ~ 0 5 '" " " E " " 0. 0 u " D- o. ~ U .c VJ " U '" " C2 E ' , - ~ - " 0 ~~_..__.- '" .,. v '"' '" D. N o o !:! 77 ~- ~/ -{\ ...-- ~ r )\\'-,> t } S --.--' \\ ( )~ ~~ -... '" ~'(i J S ~ ~r BC-3 EASTLAKE PKIIY ~" ~"'- -----------------~ W EASTLAKE VILLAGE CENTER NORTH (VC-l) ..H ~"'- --- ,p \y ~ VC--2 ~ --< ~ -- -- ---- LEGEND @ - Traffic Signal LJ - STOP Sign FREE - Free Right-turn ~ REV. 03/06/02 NO SCALE FlG2627 -1114_DWG ~ JoJ r. I IoJ J:: s:: t> c Figure 27 RECOMMENDED INTERSECTION GEOMETRY - -" (1-- >C~C;T1 hkT VIII M-:>C r>ct-JTfCp NnPTI-I 78' ATTACHMENT 4 Figures 7"[ II i I I i i / --- EASTLAKE I ACTIVITY CENTER / I J ! / /- I~,~~ / ~'"='T'--~~'~ . . ~...' I j" .....,#~ot I = ~~';~v> . / ! ;\.. II = ~~, / ~ HOSPITAL I . '" = MEDICAL CENTER / l r .' I~II / I \ .___--i L~J~~ / , : "-;....,-.= ,....~~ton_~~ F\~\ / ..C~ '---.J L /~'" .. J'\ ,: ~........ -_/ ~ .. ;: .,~\ /: Ii ......~ --= __ ......... I g /~ .. -. -=-. . \) / " ! f . " VILLAGE CENTER · P (,,: if VILLAGE CENTER : = EAST · .... ,.:: MIXED-USE E " · /,,, if ENTERTAINMENT I SERVICE III . /,' If : I .... . , ! . ,: . .. . i" :: : . EXISTING. ,/ " IJ. .':; i I II ! CHURCH: I ~ ................................. ............~ ~ · --. Otay Lakes Road f- '" '1 ~~~....~.,........._~ jr-- , \\. ." I \ . ' I II. " i 1/' : NEIGHBORHOOD : r ,:>-- ~;/; "" SHOPPING -- -: J --- - / ,.. CENTER' .,. ! .. (EXISTING) ~'I' ... / ... ...// .. ~ CO~~NITY ..... .... /' .. ..+ /' .~+ / EASTLAKE BUSINESS CENTER ,I EASTLAKE GREENS NEIGHBORHOOD FIGURE 1 go ~ ..... ~ d ~ N I D I =rG) ;;oO"'C ~ CD 3)> ~ en 0 I ~>t"J ~~I~ ~n::: ~ z >"::1("') ~8 S:~OO ~~Z >::",t:i t:i:=Oo OJ ..., 3 :::r "'CIt"Jt"J ::0:: :J 0 3 OJ IZ~ z....t'1c: ""':: c::::r :J C:""'>'" ...."'1:: ~~ 1\Y Zt'1 ~:: iirOJCDcc o~t"' "'1t'1:=o"", ",,,,t'1 o :J 0 CD ~~"'CI >t:i("')~ t""t'1 ~ "","':-:I :-:I c a. m" ~ ~ ::c> ~....("') ("') :J. r - ()) ot"Jt"' c: f(ot"" 0.... .....:JZ> "",z> .... c5 3';;0 ~ > ~ ....>t"" t"" . -. CD OJ ~z ~~ .-+ .-+ Z CDOJO ~ a.=.::"" .-+CD o en e 6'1 ~ ~ o ~ o rLl t.'!'j ~ ~ t.'!'j Z t.'!'j ~ ~ ~ ~ > ':l r- -: ""'9':;" . \1!\ )" /.1rt\,." ::' ;o~: .;1Jl;'2-:<;.'--_.._~.: --- '-'''~'h "'U;;: ..~ D:I: (.~ I ~ A ~ \ ~ , \ ., \ .0; \"\ . ' \\ \\ ~ Q C ~ w < . 0'; q;~ 9~ , " ,,, .~ . ~ .~ ~* ~~ ~" o~ , 0 ~. " . "" ~~ 50 :::9 .. ~" 5;;;- 2-~ ~b ~~ :; ~ ~~ . . ~~ "" 2 , . . . * I f~I' fffimi t: z 3:: "'0 "'0 0 ;:u "'0 "";:u ;:u I 3:: 3:: r- r- € g-s-~g~ ~ 2.:! ::cg:;2.~ ~ :i:lo"'n~go::~;;; 0:,:::::r"3:0. 1II-.go~'Or~.~~ ~"d5'3~c:.. ~~:=~!i1~3""~~-5~:-'~ ~!.;tjlll3:go3~ :::::::!:g e.~&g. ~~~!!. ~oo~a.."'" g:;: ii'3 e. !~~~ . &;i' II: ..... ~ ::I.' ..... , ~ ~ ~I~ ~I- ~ 0 :,..t.> ~ ~ ~ (0) UO o:.n to.,) ~ ~ -...1 c:D C) ...... N WW~~ ~ ~ ; ~ (.) Co N Co '" ~~(.o)OO~t.> 00(.)(0:'" Co 0 ::! U; ~I:g ~ n * .---. {~;t,\ \;~t \ "'. \ ;;: , I )/ ,iI-- --' 11 ~ C ~ o c .. m " " n~ "0 0- -- \):.-. /(<.-_._-- '.~!..."_ I 0 .1 "~"!'<.!~ fit "~I i i ()~("\I ';1:Jf::3~. n~ ~on ~~l ~.~ n D ~~.;Z _I '0 - i:" ;. tt>: ~ _6 ~r;'a . . ~ . o Q ~ n o g~ ,--' --.... ~..., 'f' -:...., .'/ ........ /;~~. , - .---- ;;: o - \ ~ i . E~&2 ~';1:Ja'S " ~ .,-0:1 ::J n =:: " ~ 0'- r S-tJ ~ e s ~ ~ e. p..~.'" tjq~~ . s';' tt> ~.=: 0 ;: 0" e ""g ~._':;>' ;0: ~ ~~ ~~~ c;,) Stj~ ~~~ C5~~ enOI-l tr:p-.::l 1-1 ~~ ~ ';;I Q ~ 1f~~&l ~.b ';1:J S ~~h I!!-g ~ to >.,~o r:~'l3 ~~r.~ ~.~h p "" EASTLAKE II LAND USE DISTRICTS MAP (PROPOSED) r~r \ I' \to '~~" RS-S . ..dt ~ ~, ~~ ... '- '- .....-d7 lti . -~NsJ>--. .....~( RG-221 .'f--....._~' \ RE-3 \'y:.{.~"" 'U ~~ .' ,,>W I/, ~'I~t: 'I OS-I ~ RP.8 ~ RG-22 j \ \/d;@,;, ,'-, ,\\ ;.// ", /. RP-8 \0$.3 " ,\it€C:2 ~_ .."::'..... 0$-2 \ 'I OS-I VC-l 'x ~~o... .........., II :'\J/ :\ ..:;;.,(~)~-~ )'~ ;:.; ~~~ 1\1 f I RP~~ '/ / /T~ Chang.,} 6.4 acres from 05-, 11f 05-,~3 J ~J k~-1I' RP-8 'ir:..'<-;'~/j/ . l"".........--==-~ (VC-I) Village Center I J .....',..".fj( /-t I: ~ R~RP." ~ to (BC-3) Business Center. /' 111/...05--4 1J"c.~lf-... ',-,,/..., : I IRG-IS},.~-,./~-==--qOS-4 ~~/ ,PA I Y \_~r-,\f\ ,~/ I ~..J \.....111' 71 RS-S ') ~ '" \\RC-" RS-7 I \....1 ~~:J"' '. II \ I~-...J 05-6 IIRP....~ :?D 0$-3 . ) 05-4 ';~'r~'- -l";-~ RP~RC-15 . 1I.c...It-"\ ~'"",,~......?~OS-4 ~;1'~::.{"r-\i 05-, r' If---1I , , -l'~:-. ~ I 5 R'^ ' "~, II 0S-4 \\RP~ ! RS-7\ RS-7" ''''~::{ ~;>. RS-~",,.. ',I FU ~2~" 1~-r,\ \ \~" r-- ,-<!...~,RP-" ..'W~ I , PQ I \' \ OS-ti "-, \ \ \., k' /..; \ 1'1 I", I ~ \~S-7\ \, '" '\:,~/ I:LPQ J~~(RC-1(f,~\ \ 11 RS-S'} '-),~ RS-S /,"'7 ru ill --\ ~V ~~ RS-S \,,:: /;riR&, /~- r~- ~" ,OS-4~~ ..)'-L//? -..- ,~...., .- ~::::I!l FC ~ ',,, ...>11\ ~_..J'C-l!-( RP-13 ,,) 05-1 !I'~~ ~ ~" RS-5~r=""'~ ~,~~\ ,I i1 ", \\ RM-2S"~' r RC-10.#" ... <yA' '':....... 11 >~ --< \. '"" --.:,..-- ---~ ( Change 2.0 acres from (BC-I) Business Center and (OS-7) Open Space to (VC-2) Village Center. RESIDENTIAL R-.. Estates ~ SIngle Family ResIdential Single Family _ Planned ConI:epI ~..... SmaI LeI R_ Condominium R4IIidt.oIii<I PIamed Concept RwIdo...... Condominium ReoIde..... CondominIum R_ Multl-FamiIy _ Multl-Family VILLAGE CENTER & COMMERCIAL 1 VI1IIIge Center (Relail) Village een.. (Prof. Admin./Ltd Retail) Center (Retail) F_~ SPECIAL PURPOSE Open Space Open Space Open Space Open Space Open Space Open Space Open Space FuIure Urbon DistricI NIic 0uIIsi-NIIIc DisIrict Community ""'- F~ GH) Gt8I House Land Use DisIrict Overlay (Refor lEI SectIon 11.30 in PC Dist. Regs) PA Pi_' ."0,.. & Mlw~bGtive BUSINESS CENTER ~Business Center - M8nufacI!rt!g Park DisIrict BC-2 Business Center - --.-09 Service DIsIrict BC.3 Business Center - Core District 8"3 FIGURE 4 EASTLAKE I SPA PLAN (PROPOSED) Parcel Land Use I Acres Number EMPLOYMENT (Business Center n E-1 Employment 32.1 E-2 Employment 16.6 E-3 Employment 8.0 E-4 Employment 176 E-5 Employment 13.9 E-6 Employment 6.2 E-7 Employment 12.5 E-8 Employment 4.6 E-9 Employment 14.6 Total 126.1 ACTIVITY CENTER (North) I VC-1 Village Center 38.1 VC-2 Village Center 13.6 E-10 Vii. Ctr. Employment 16.4 Total 681 OPEN SPACE/PARKS I 05-10 Open Space 3.4 05-13 Open Space 0.7 05-14 Open Space 0.5 P-4 Park 9.1 Total SALT CREEK I Parcel Number R-16 Residential- Detached R-17 Residential- Attached R-18 Residential- Attached Sub-total 05-9 Open Space 05-15 Open Space 05-17 Open Space 0S-18 Open Space 05-19 Open Space Sub-total Total R-16 Change 2.0 acres fro'" (E-! 0) Village Center E"'ploy",ent and (05-12) Open Space to (VC-2) Villag<: Center. E-8 E-7 0>" E-7 Change 16.4 acres fro", (MG-l) Medical Center to (E-I0) Villag<: Center Employment. Change 14.2 acres fro", (MC-l) Medical Center to (VC-l) Villag<: Center. 13.7 Location fh Permitted DU 169 237 144 550 Land Use 436 20.0 8.5 72.1 6.5 1.0 1.0 3.2 7.2 18.9 91.0 Note: This legend is for the Eastlake Business Center I, Eastlake ViUage Cenler (north) and San Creek I only. The Eastlake I SPA also includes Eastlake Shores, Eastlake Hils. and Eastlake Business Center II. Village Center (south) Is within the Eastlake Greens SPA. 8"<(- FIGURE 5 EASTLAKE I ACTIVITY CENTER CONCEPT (ADOPTED) \ \ \ '. / ~ ~ ~R ,...._"._~...,'<~- -..........,"""""".._... 0.0<'" ~,~~~:::=,~~"." Rop..-..............' ~._... l..~ -,~...."...._....... ) gS- FIGURE 6 REGIONAL MAP San Miguel Ranch ~ EastLake II \..~-1> I Hills and Shores \,. ./ Salt Creek ~~6' Otay Ranch \Ja~~ Roa~ Proctor _ .. Upper Q\ay Reservoir i1 if Bus. CIr. I ~ '?. Bus. Ctr.lt....:. ctI EastLake 1/1 GDP , " " " II 11 Village Center North FIGURE 7 g-~ ATTACHMENT 5 Village Center North Supplemental SPA (Binder) 8') ATTACHMENT 6 Ownership Disclosure Statement ~~ THE CITY l '::HULA VISTA DISCLOSURE STATEc,. ...:NT You are required to file a Statement of Disclosure of certain ownership or financial interests, payments, or campaign contributions, on all matters which will require discretionary action on the part of the City Council, Planning Commission, and all other official bodies. The following information must be disclosed: 1. List the names of all persons having financial interest in the property which is the subject of the application or the contract, e.g., owner applicant, contractor, subcontractor, material supplier. II-\-E.JA~TLA~E (OW\flANY 5_ C-. ~WELL L~ND CcMPAf..l'{ 2. If any person* identified pursuant to (1) above is a corporation or partnership, list the names of all individuals owning more than 10% of the shares in the corporation or owning any partnership interest in the partnership. .:T: (;, . ~05""F.iU_ 3. If any person* identified pursuant to (1) above is non-profit organization or a trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. 4. Have you had more than $250 worth of business transacted with any member of the City staff, Boards, Commissions, Committees, and Council within the past twelve months? Yes No .......-- If yes, please indicate person(s): 5. Please identify each and every person, including any agents, employees, consultants, or independent contractors who you have assigned to represent you before the City in this matter. -~, LL CDS-K2.EN\. BUD ~gA" Guy A~Al2.C> G~RY (., ~TI ~, LL l'ikt. I "BP,I t-l 6 Have you and/or your officers or agents, in the aggregate, contributed more than $1,000 to a Councilmember in the current or preceding election period? Yes No v"". If yes, state which Councilmember(s): (NOTE: ATTACH ADDITIONAL PAGES AS NECESSARY contractor/applicant Date: 'I- 2 -2"j -6/ 'f. (...::> U Y As A 12-0 Print or type name of contractor/applicant * Person is dejined as 'Any individual, firm, co~partncrship, join! ventu.re, association, social club, freaternal organization corporation. estale, (ruST, receiver, syndicate, this and any other county, city and country, city muniCipality, di.\"trict, or other political subdivision, or any other group or combination acting as a unit' Y,