HomeMy WebLinkAboutItem 3 - Staff Report
Item: ___3____
Meeting Date: 1/23/18
ITEM TITLE: A. Public Hearing: DR18-0009; Design Review consideration of a two-
story, 39,367 sq. ft. building for the Veterans Affairs Outpatient Clinic on
approximately 1.05 acres located at 341 & 353 H Street. Applicant:
Gateway Chula Vista 3, LLC
Resolution of the City of Chula Vista Planning Commission approving a
Design Review Permit, DR18-0009 to construct a two-story, 39,367 sq. ft.
building for the Veterans Affairs Outpatient Clinic on approximately 1.05
acres located at 341 & 353 H Street.
SUBMITTED BY: Caroline Young, Associate Planner
REVIEWED BY: Kelly Broughton, Director of Development Services
INTRODUCTION
On May 17, 2018, the Applicant submitted a Design Review permit for approval of a two-story,
39,367 sq. ft. building for the Veterans Affairs Outpatient Clinic (Project). The use, as proposed,
will serve a regional market demand, in addition to the demand of Chula Vista residents. The site
is currently vacant with construction underway for a previously approved expansion of the
existing parking structure located in the rear of the property (see Locator Map, Attachment 1).
ENVIRONMENTAL REVIEW
The Development Services Director has reviewed the proposed project for compliance with the
California Environmental Quality Act (CEQA) and has determined that the Project was
adequately covered in previously adopted Mitigated Negative Declaration (IS-99-24), for the
Gateway Chula Vista Redevelopment Project Specific Plan. Thus, no further environmental
review is required.
RECOMMENDATION:
That the Planning Commission adopt Resolution DR18-0009 approving the Project, based on the
findings and subject to the conditions contained therein.
DISCUSSION:
Project Site Characteristics:
The 1.05-acre project site is located in the northwestern portion of Chula Vista. The site is
relatively flat and surrounded by apartments to the west and north, commercial retail to the east,
DR18-0009 Page No. 2
and commercial office to the south (Attachment 1, Locator Map).
Summary of Surrounding Land Uses
General Plan Zoning Current Land Use
Site: Transit Focus Area Urban Core, UC-2 Vacant
South: Public Quasi Commercial Office, CO Sweetwater Authority Office
Commercial Office Urban Core, UC-5 Citibank Office
North: Transit Focus Area Urban Core, UC-2 Apartments
East: Transit Focus Area Urban Core, UC-2 Gateway Plaza
West: Transit Focus Area Urban Core, UC-2 Apartments
Project Description
The proposal includes the construction of a two-story, 39,367 sq. ft. building for the Veterans
Affairs Outpatient Clinic. The first floor includes several reception/check-in areas for mental
health, lab/pathology, audiology/eye & specialty. Rooms are provided for consultation, exam,
lab, testing, shot clinic, and other associated medical rooms to provide assistance to the patients.
Several staff offices and a breakroom are also provided. The second floor includes additional
waiting areas, consultations and exam rooms, administration offices, and a breakroom.
A four-story, 92,748 sq. ft. parking garage for Veterans Affairs Outpatient Clinic is currently
under construction in the rear of the site. This parking structure was previously approved as part
of the Gateway Chula Vista Redevelopment Project Specific Plan. The parking structure will be
a continuation of the existing 5-story parking structure location adjacent to the site, except it will
only be 4 stories. A total of 240 parking spaces will be provided, exclusively for the Veterans
Affairs Outpatient clinic.
Architecture
The modern style architecture design incorporates textural and natural materials with five
different stucco colors ranging from light to dark colors, flat roof, aluminum awnings, and glass.
The different colors are “Pure white,” “Passive,” “Roycroft Mist Gray,” Rookwood Clay”, and
“Peppercorn.” A clear anodized aluminum arcadia will be provided as an awning for the second
floor windows. A Basaltina Nero Arizona Tile Semi Polished material will be provided as a
wainscot to further enhance the front entrance. The entrance also has a raised architectural roof
feature and a popped out metal frame.
Pedestrian/Vehicle Access
There are several vehicle and pedestrian access ways on and off the site. The main pedestrian
link is provided off of H Street at the Project’s main entrance. Another pedestrian link is
provided via a pedestrian path between the proposed building and an adjacent building to the
east. This pedestrian path leads to the parking garage in the rear of the site.
Enhanced paving is provided at the main entrance along H Street. Vehicles can access the site
through two driveways: one along H Street leading directly to the parking structure in the rear;
and one via the internal driveway from the Third Avenue entrance to the parking structure on the
adjacent site.
DR18-0009 Page No. 3
Compliance with Development Standards
The following Project Data Table shows the development regulations along with the Applicant’s
proposal to meet said requirements:
Assessor’s Parcel Number: 568-450-61-00, 62
Current Zoning: Gateway Chula Vista Redevelopment Project
Specific Plan
General Plan Designation: Transit Focus Area
Lot Area: 1.05 acres
PARKING REQUIRED: PARKING PROPOSED:
Parking spaces, broken down as follows:
Parking Structure:
Commercial Office: Handicapped= 17 spaces
1 per 300 sq. ft. Regular= 92 spaces
Compact= 131 spaces
Total: 132 parking spaces Total: 240 parking spaces
SETBACKS/HEIGHT REQUIRED: SETBACKS/HEIGHT PROPOSED:
Front: 5 feet from R.O.W 16 feet from R.O.W
Side: 0 feet &10 feet (abutting residential) 20 feet & 45 feet (abutting residential)
Rear: 0 feet & 10 feet (abutting residential) 160 feet
Height: 100 feet 44 feet
ANALYSIS:
Compliance with Chula Vista Municipal Code and Gateway Chula Vista Redevelopment
Project Specific Plan Design Guidelines
Site Planning and Building Placement/Orientation
The Gateway Chula Vista Redevelopment Project Specific Plan Design Guidelines includes
guidelines and standards for commercial uses. The design guidelines promote: Avoid
unarticulated box-like buildings, to create architectural variety, and to promote a pedestrian
scale at street level. At least one primary entrance fronting on H Street shall be required for
each building.
The proposed features throughout the site meet the intent of the design guidelines. The Project
provides a 16-ft. front setback from the right-of-way to maintain a wide pedestrian sidewalk and
includes street trees along H Street. The two-story building promotes a pedestrian scale at the
street level. In accordance with the Gateway Chula Vista Redevelopment Project Specific Plan, a
six-story building was envisioned for this property. The Applicant is only proposing a two-story
building in order to enhance the pedestrian scale and create a greater transition between the
Project and the adjacent two-story apartment building to the west.
The only public entrance to the building is off of H Street. The entrance is enhanced by a wide
recessed entryway with enhanced landscaping through street trees, planter boxes, benches,
pedestrian lights, and flag poles. The entrance also has a raised architectural roof feature and a
popped out metal frame. The proposed colors and materials complement the adjacent
commercial retail and office building for a cohesive design.
DR18-0009 Page No. 4
Building Design
The Gateway Chula Vista Redevelopment Project Specific Plan Design Guidelines promote: The
street level facades shall be highly articulated with architectural detailing, storefront design,
arcades and awnings. The design shall maintain architectural rhythm and storefront diversity.
Entrances shall be designed to integrate storefronts, signage and window display into the overall
fabric on the building form.
The Project’s architecture is consistent with the policies of the Gateway Chula Vista
Redevelopment Project Specific Plan Design Guidelines. The proposed modern style architecture
includes five different colors ranging from light to dark colored stucco, such as “Pure white,”
“Passive,” “Roycroft Mist Gray,” Rookwood Clay,” and “Peppercorn” which provides contrast
to avoid a blank wall. A clear anodized aluminum arcadia will be provided as an awning for the
second floor windows. The building mass is articulated by horizontal and vertical plane offsets,
which provide variety and interest and are highlighted by accent colors and materials that break
up the building elevation. Two areas along H Street will be recessed, one at the main entrance
and the other to the west, to provide the varying wall plane offsets. A Basaltina Nero Arizona
Tile Semi Polished material will be provided as a wainscot to further enhance the front entrance.
Parking
The Gateway Chula Vista Redevelopment Project Specific Plan requires 1 space per 300 square-
feet. Therefore, the required parking for the Veterans Affairs Outpatient Clinic is 132 spaces. A
four-story, 92,748 sq. ft. parking garage for Veterans Affairs Outpatient Clinic is currently under
construction in the rear of the site. A total of 240 parking spaces are being provided within the
parking structure. The Applicant has proposed 92 regular parking spaces, 131 compact spaces,
and 17 handicapped spaces. The Project exceeds the required parking by providing 108
additional parking spaces. In accordance with the Gateway Chula Vista Redevelopment Project
Specific Plan, no more than 55% of the Projects total parking spaces shall be compact spaces. A
total of 55% of the parking spaces will be compact.
The Gateway Chula Vista Redevelopment Project Specific Plan, contains three different phases
of development, Gateway I through III. The parking structure will be a continuation of the
existing 5-story parking structure location adjacent to the site within the Gateway I and II area,
with the exception that it will only be 4-stories. The construction of the parking structure, within
the Gateway III area will complete the parking requirement for the entire Gateway Chula Vista
Redevelopment Project Specific Plan. Each of the 240 spaces within the new parking structure
will be used exclusively for the Veterans Affairs Outpatient Clinic, and labeled as such, in order
to ensure parking is provided for the clinic and not for the adjacent retail and office uses.
CONCLUSION
The proposed two-story, 39,367 sq. ft. building for the Veterans Affairs Outpatient Clinic is a
permitted land use in the Gateway Chula Vista Redevelopment Project Specific Plan. The
proposal complies with the policies, guidelines and design standards of the Gateway Chula Vista
Redevelopment Project Specific Plan, Chula Vista Municipal Code, and Landscape Manual.
Therefore, staff recommends the Planning Commission approve Design Review Permit, DR18-
0009 subject to the conditions listed in the attached Resolutions.
DR18-0009 Page No. 5
DECISION-MAKER CONFLICTS
Staff has reviewed the property holdings of the Planning Commission members and has found no
property holdings within 500 feet of the boundaries of the property which is the subject of this
action. Consequently, this item does not present a disqualifying real property-related financial
conflict of interest under California Code of Regulations Title 2, section 18705.2(a)(11), for
purposes of the Political Reform Act (Cal. Gov’t Code §87100, et seq.).
Staff is not independently aware, and has not been informed by any Planning Commission
member, of any other fact that may constitute a basis for a decision maker conflict of interest in
this matter.
FISCAL IMPACT
The application fees and processing costs are borne by the Applicant, resulting in no net fiscal
impact to the General Fund or the Development Services Fund.
Attachments
1. Locator Map
2. Planning Commission Resolution DR18-0009
3. Disclosure Statement
4. Project Plan (Flash Drive)