Loading...
HomeMy WebLinkAbout2018-10-10 PC Agenda City of Chula Vista Boards & Commissions Planning Commission . In compliance with the AMERICANS WITH DISABILITIES ACT Item: __2_____ Meeting Date:10/10/18 ITEM TITLE: Public Hearing: Consideration of Design Review (DR18-0008) for a Business Park Master Site Plan within the Village 3 Master Planned Community. Resolution of the City of Chula Vista Planning Commission Approving Design Review Permit DR18-0008 for the Escaya Business Park Master Site Plan on 16.6 Net Acres within the Otay Ranch Village 3 Master Planned Community. Applicant: HomeFed Village III Master, LLC. SUBMITTED BY: Janice Kluth, AICP, Project Manager REVIEWED BY: Kelly Broughton, Director of Development Services INTRODUCTION In accordance with the Village 3 North and a Portion of Village 4 (Village 3) Sectional Planning Area (SPA) Plan, HomeFed Village III Master, LLC (Applicant), has submitted a Design Review application for approval of the Business Park Master Site Plan project located at 3256 Heritage Road , that includes the following: 1:100 scale exhibit Conceptual building locations Conceptual parking lot and drive aisle locations Vehicular and pedestrian circulation and access Master signage locations ENVIRONMENTAL REVIEW The Development Services Director has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the proposed project was adequately covered in previously adopted Final Environmental Impact Report, (EIR-13-01) thus; no further environmental review or documentation is required. RECOMMENDATION That the Planning Commission adopt Resolution DR18-0008, approving the Village 3 Business Park Master Site Plan project, based on the findings and subject to the conditions contained therein. Rev. 10/4/18 Planning Commission DR18-0008 October 10, 2018 Page -2- DISCUSSION Project Site Characteristics The 16.6 net-acre project is made up of 10 parcels located at 3256 Heritage Road (primary address) and adjacent to the Otay Landfill. Six parcels are developable, while the remaining four parcels contain slopes and landscape. The 10 parcels are contiguous and divided into two sections that are separated by a 40-foot slope: Parcels I-1a, I-1b, and I-2, as well as two landscape parcels, are at the lower elevation and share the two western Business Park driveways along Heritage Road. Parcels I-3a, I-3b, and I- 3c and two additional landscape parcels are at the higher elevation and share the two eastern Business Park driveways, including the main entry at the intersection of Avenida Escaya. See Locator Map, Attachment 1 The 10 parcels that make up the Project are vacant and have been graded by the Master Developer, HomeFed Village III Master, LLC. The following table identifies the General Plan, Land Use Designation and Existing Land Use for the project site and adjacent properties: General Plan, SPA Plan Land Use Designations and Existing land uses PC District Zoning Existing Land General Plan Designation Use Industrial Industrial (I) Vacant Project County Landfill County Landfill County Landfill North Single Family 4 (SF-4), Residential, Multi- Residential Medium, Multi-Family 1 Family, Mixed Medium High, Mixed South (RM-1), Mixed Use 1 Use (under Use (MU-1) construction) East County Landfill County Landfill County Landfill Industrial Industrial Industrial West PROJECT DESCRIPTION The Applicant proposes a Business Park Master Site Plan that addresses the conceptual locations of buildings, parking lots, drive aisles, vehicular and pedestrian circulation and access, and master signage. Site Plan Elements In accordance with the Village 3 SPA Plan, the Escaya Business Park Master Site Pan is a conceptual plan for development of the business park. Site elements depicted on the exhibit are conceptual and may be refined in conjunction with the design review process for individual buildings or groups of buildings, without necessitating revision of the plan. Pursuant to Business Rev 10/4/18 Planning Commission DR18-0008 October 10, 2018 Page -3- Park Design Guideline requirements in the Village 3 SPA Plan, architecture, lighting, walls, bicycle storage, internal courtyards and recreational areas and building signage shall be addressed on individual Design Review submittals. There are four driveway entries into the Escaya Business Park. The primary entry for the upper parcels is located at the intersection with Avenida Escaya. The driveway at this location is split into one-way entry and exit points, to match the divided entry at the Village Core. The primary driveway for the lower parcels is aligned with Santa Maya. Two additional driveways are provided they are each limited to right in/right out access. Vehicular access within the site connects the three upper parcels. A separate vehicular access connects the three lower parcels. Pedestrian access is provided from the public sidewalk along Heritage Road into the site and to each conceptual building location. Landscape Conceptual landscaping is shown throughout the site, in accordance with the approved Master Landscape Plan. More refined details will be provided with individual building design reviews. PROJECT ANALYSIS The following Project Data Table shows the development regulations along with the A proposal to meet the requirements: s: 644-061-0100 to 0600; 644-061-1400 to 1700 Current Zoning: Industrial General Plan Designation: Industrial Lot Area: 16.6 net acres Building Siting Setbacks for the buildings will comply with the Village 3 SPA plan, the Planned Community (PC) District Regulations, and the Business Park Design Guidelines. Conceptual building footprints are shown with appropriate spacing from the front and rear property lines, as well as from side property lines, providing adjacent buildings adequate sunlight for potential solar access. Landscape buffers and slopes provide screening from the public right of way. Appropriate setbacks and proper screening help protect residential and commercial uses from noise, odor, smoke, light intrusion, truck traffic and other objectionable influences incidental to Industrial/Business Park uses. Massing will comply with Lot Coverage in the PC District Regulations. Lot coverage is capped at 70%, but building height and Floor Area Ratio are to be determined by individual project design review. This Master Site Plan shows conceptual building footprints that provide sufficient open space around industrial structures to protect them from hazard and to minimize the impact of industrial operations on nearby residential or commercial districts. Connections to and through the site are illustrated on the Business Park Master Site Plan. Reciprocal ingress and egress, and conceptual circulation and parking areas show the path for Rev 10/4/18 Planning Commission DR18-0008 October 10, 2018 Page -4- vehicular movement between adjoining properties. Pedestrian access to and into the conceptual building sites is also show on the plan. CONCLUSION The proposed Escaya Business Park Master Site Plan project has been prepared pursuant to Village 3SPA Plan and Business Park Design Guidelines. The Project complies with the policies and guidelines for the Village 3 SPA Plan, Business Park Design Guidelines, and related documents. Therefore, staff recommends the Planning Commission approve Design Review Permit, DR18-0008, subject to the conditions listed in the attached Resolution. DECISION-MAKER CONFLICTS Staff has reviewed the property holdings of the Planning Commission members and has found no property holdings within 500 feet of the boundaries of the property which is the subject of this action. Consequently, this item does not present a disqualifying real property-related financial conflict of interest under California Code of Regulations Title 2, section 18702.2(a)(11), for et seq.). Staff is not independently aware, and has not been informed by any Planning Commission member, of any other fact that may constitute a basis for a decision maker conflict of interest in this matter. FISCAL IMPACT All application fees and processing costs are borne by the Applicant, resulting in no net fiscal impact to the General Fund or the Development Services Fund. Attachments 1. Locator Map 2. Planning Commission Resolution DR18-0008 3. Escaya Business Park Master Site Plan Rev 10/4/18