HomeMy WebLinkAboutOrd 2002-2884-BORDINANCE NO. 2884-B
URGENCY ORDINANCE OF THE CITY COUNCIL OF THE
CITY OF CHULA VISTA AMENDING ORDINANCE 2582 TO
ADD THE POGGI CANYON BASIN SEWER INTERCEPTOR
AS ONE OF THE FACILITIES FINANCED BY THE
TELEGRAPH CANYON SEWER PUMPED FLOWS
DEVELOPMENT IMPACT FEE AND TO CHANGE THE
NAME TO PUMPED SEWER DEVELOPMENT IMPACT FEE
WHEREAS, the City Council placed Ordinance No. 2884 on first reading on October 22,
2002 amending Ordinance No 2582, adding the Poggi Canyon Basin Sewer Interceptor as one of
the facilities financed by the Telegraph Canyon Sewer Pumped Flows Development Impact Fee
(DIF) and changing the name of the DIF to Pumped Sewer Development Impact Fee; and
WHEREAS, pursuant to Government Code Section 66017(a), the fees modified by that
ordinance will not become effective until sixty (60) days after its second reading; and
WHEREAS, development in the City located within the Pumped Flow Basin will be
applying for building permits during the interim period before the development impact fee
modification becomes effective; and
WHEREAS, Government Code Section 66017(b) authorizes the City to adopt an interim
fee as an urgency measure upon making a finding describing the current and immediate threat to
the public health, welfare and safety; and
WHEREAS, said interim measure will be effective for thirty (30) days and may be
extended twice for additional thirty (30) day periods upon subsequent action by the City Council;
and
WHEREAS, the City adopted Urgency Ordinance No. 2884-A, amending the Telegraph
Canyon Sewer Pumped Flows Development Impact Fee, which will expire thirty (30) days after
its adoption; and
WHEREAS, the Environmental Review Coordinator has reviewed the proposed project
for compliance with the California Environmental Quality Act and has determined that the
project qualifies for a statutory exemption pursuant to Section 15282(1) of the State California
Environmental Quality Act (CEQA) Guidelines. Thus, no further environmental review is
necessary; and
WHEREAS, State Law requires said Urgency Ordinance to be adopted by a four-fifths
vote.
NOW, THEREFORE, the City Council of the City of Chula Vista does ordain as follows:
SECTION 1: Finding of Urgency
That the City Council of the City of Chula Vista finds that it is necessary that its
Telegraph Canyon Sewer Pumped Flows Development Impact Fee be changed to Pumped Sewer
Development Impact Fee and go into effect immediately in order to avoid sewage spills as a
consequence of not having the option to use the Poggi Canyon Basin Sewer Interceptor to
Ordinance 2884-B
Page 2
pumped sewage flows. Immediate implementation of this fee is necessary due to the current and
immediate threat to public safety which could arise from the pumped flows remaining in the
Telegraph Canyon Trunk Sewer beyond the threshold capacity of the trunk sewer system causing
sewage spills and failure of the sewer system.
The City Council finds that the prospect of sewage spills, failure of the sewer system and
concerns about an increased charge to remaining property owners constitutes a current
immediate threat to the public, welfare and safety justifying the immediate imposition of this fee.
SECTION 2: That the Approval of Backup Plan set forth in Section 1 of Ordinance 2582, shall
be amended to read as follows:
"SECTION 1. Approval of Backup Plan.
The City Council has independently reviewed the proposed backup plan herewith
presented, finds that it is fair, reasonable and equitable to all parties, and herewith adopts
same in the form on file with the City Clerk, and on file in the office of the City
Engineer.
Also, the City Council has independently reviewed the "2002, Pumped Sewer
Development Impact Fee Engineering Study", herewith presented, finds that it is fair,
reasonable and equitable to all parties, and herewith adopts same in the form on file with
the City Clerk and on file in the office of the City Engineer."
SECTION 3: That the list of Facilities set forth in Section 2 of Ordinance 2582, shall be
amended to read as follows:
"SECTION 2: "Facilities"
The facilities which am the subject matter of the fee heroin established are fully described
in the 1993, "Backup Plan" at page 24 thereof, and the locations at which they will be
constructed are more fully described on Plates I through 14 under the section thereof
entitled "Improvement Locations"; and in the 2002, "Pumped Sewer Development
Impact Fee Engineering Study", Figure 6 Poggi Canyon Intemeptor Improvements and
Table 4, Poggi Canyon Interceptor Improvements - Required Due to Year 2005 Area of
Benefit Pumped Flows, all of which facilities may be modified by the City Council from
time to time by resolution ("Facilities"). The City Council may modify or amend the list
of projects heroin considered to be part of the Facilities by written resolution in order to
maintain compliance with the City's Capital Improvement Program or to reflect changes
in land development and estimated and actual wastewater flow."
SECTION 4: That the Territory to Which Fee is Applicable set forth in Section 3 of Ordinance
2582, shall be amended to read as follows:
"SECTION 3. Territory to Which Fee Is Applicable.
The area of the City of Chula Vista to which the fee herein established shall be applicable
is set forth as an Exhibit to the Backup Plan, entitled "Developments Subject to Pumping
(Pumped Flows Basin), Telegraph Canyon Sewer Basin, Improvement and Financing
Plan Amendment, Incorporating Pumped Flows," shown as being "Prepared: June 23,
1993" not yet revised, shall be referred to herein as the "Territory" or alternatively
"Pumped Flows Basin" and is generally described as that area to the East of the
Ordinance 2884-B
Page 3
Telegraph Canyon Sewer Basin, within the Salt Creek and Poggi Canyon Basins. This
same area is also shown in the 2002, "Pumped Sewer Development Impact Fee
Engineering Study"."
SECTION 5: That the Purpose set forth in Section 4 of Ordinance 2582, shall be amended to
read as follows:
"SECTION 4. Purpose.
By Ordinance No. 2533, the City Council approved a plan ("Gravity Basin Plan") for the
financing and construction of the sewer-related facilities necessary to serve only the
sewage transmission demands for the Equivalent Dwelling Units (EDU's) in the Gravity
Basin. The purpose of Ordinance No. 2582 and this ordinance is to provide the necessary
financing to oversize, study and monitor such sewer-related facilities in the Telegraph
Canyon Sewer Gravity Basin, as defined in Ordinance No. 2533, Section 2, Territory
("Gravity Basin"); and in the Poggi Canyon Sewer Basin, as defined in the 2002,
"Pumped Sewer Development Impact Fee Engineering Study", to accommodate sewage
flows pumped into the Telegraph and Poggi Canyon Gravity Basins from the Pumped
Flows Basin."
SECTION 6: That the Determination of Equivalent Dwelling Units set forth in Section 7 of
Ordinance 2582, shall be amended to read as follows:
"SECTION 7. Determination of Equivalent Development Units.
Each single-family detached dwelling or single-family attached dwelling shall be
considered one EDU for purposes of this fee. Each unit within a multi- family dwelling
shall be considered 0.75 EDU. Every other commercial, industrial, non-profit, public or
quasi-public, or other usage shall be charged at a rate calculated in accordance with Table
1 of the 2002, "Pumped Sewer Development Impact Fee Engineering Study.'"'
SECTION 7: That the Purpose and Use set forth in Section 9 of Ordinance 2582, shall be
amended to read as follows:
"SECTION 9. Purpose and Use of Fee.
The purpose of the fee is to pay for the planning (including preparation of the 1993,
"Backup Plan" and the 2002, "Pumped Sewer Development Impact Fee Engineering
Study"), design, study, construction, repair, maintenance, and/or financing (including the
cost of interest and other financing costs as appropriate) of the facilities, or
reimbursement to the City or, at the discretion of the City if approved in advance in
writing, other third parties for advancing costs actually incurred for planning, designing,
constructing, or financing the facilities."
SECTION 8: That the Amount of Fee; Amendment of Master Fee Schedule set forth in Section
10 of Ordinance 2582, shall be amended to read as follows:
"SECTION 10. Amount of Fee; Amendment of Master Fee Schedule.
The fee shall be calculated at the rate of $180 per EDU. Chapter XV of the Master Fee
Schedule is hereby amended to add Section B, which shall read as follows:
Ordinance 2884-B
Page 4
"B. Pumped Sewer Development Impact Fee.
This section is intended to memorialize the key provisions of Ordinance No. 2547, but
said ordinance governs over the provisions of the Master Fee Schedule. For example, in
the event of a conflict in interpretation between the Master Fee Schedule and the
ordinance, or in the event those additional rules applicable to the imposition of the fee,
the language of the ordinance governs.
a. Territory to which Fee applicable.
The area of the City of Chula Vista to which the fee herein established shall be
applicable is set forth as an Exhibit to the 1993, "Backup Plan", enftled
"Developments Subject to Pumping Pumped Flows Basin", Telegraph Canyon
Sewer Basin, Improvement and Financing Plan Amendment, Incorporating
Pumped Flows", shown as being "Prepared: June 23, 1993" not yet revised, shall
be referred to herein as the "Territory or altematively "Pumped Flows Basin" and
is generally described as that area to the East of the Telegraph Canyon Sewer
Basin, within the Salt Creek and Poggi Canyon Basins. This same area is also
shown in the 2002, "Pumped Sewer Development Impact Fee Engineering
Study".
b. Rate per EDU.
The fee shall be calculated at the rate of $180 per EDU, which rate shall be
adjusted from time to time by the City Council.
c. EDU calculation
Each single-family detached dwelling or single-family attached dwelling shall be
considered one EDU for purposes of this fee. Each unit within a multi-family
dwelling shall be considered 0.75 EDU. Every other commercial, industrial, non-
profit, public or quasi-public, or other usage shall be charged at a rate calculated
in accordance with Table 1 of the 2002, "Pumped Sewer Development Impact Fee
Engineering Study".
d. When Payable.
The fee shall be paid in cash not later than immediately prior to the issuance of a
building permit, except that a Letter of Credit Procedure is permitted for this fee
in the adopting ordinance, as same may, from time to time, be amended.
The City Council intends to review the amount of the fee annually or from time to time.
The City Council may, at such reviews, adjust the amount of this fee as necessary to
assure construction and operation of the facilities, the reasons for which adjustments may
include, but are limited to, the following: changes in the costs of the facilities as may be
reflected by such index as the Council deems appropriate, such as the Engineering-News
Record Construction Index; changes in the type, size, location or cost of the facilities to
be financed by the fee; changes in land use on approved tentative maps or Specific Plan
Amendments; other sound engineering, financing and planning information.
Adjustments to the above fee may be made by resolution amending the Master Fee
Schedule."
Ordinance 2884-B
Page 5
SECTION 9: That the Authority for Accounting and Expenditures set forth in Section 11 of
Ordinance 2582, shall be amended to read as follows:
"SECTION 11. Authority for Accouming and Expenditures.
The Telegraph Canyon Sewer Basin Pumped Flows Developmem Impact Fee Fund
(TCSBPF DIF) will be henceforth referred to as Pumped Sewer Development Impact Fee
(PS DIF). The proceeds collected from the imposition of the fee (PS DIF) shall be
deposited into a public facility financing fund ("Pumped Sewer Development Impact Fee
Fund" or alternatively herein "Fund" or "PS DIF Fund") and such proceeds shall be
expended only for the purposes set forth in this ordinance.
The Director of Finance is authorized to establish various accounts within the fund for the
facilities identified in this ordinance and to periodically make expenditures from the fund
for the purposes set forth herein in accordance with the facilities phasing plan or capital
improvement plan adopted by the City Council."
SECTION 10: That the Findings set forth in Section 13 of Ordinance 2582, shall be amended to
read as follows:
"SECTION 13. Findings.
The City Council finds that collection of the fees established by this ordinance at the time
of the building permit is necessary to ensure that funds will be available for the
construction of facilities concurrent with the need for these facilities and to ensure
certainty in the capital facilities budgeting for growth impacted public facilities.
The City Council finds that developers of land within the City should be required to
mitigate the burden created by development through the construction or improvement of
sewer facilities within the boundaries of the development and either the construction or
improvement of sewer facilities outside the boundaries of the development which are
needed to provide service to the development in accordance with City standards or the
payment of a fee to finance a development's appropriate portion of the total cost of the
sewer facilities; and
The City Council finds that the legislative findings and determinations set forth in
Ordinance 2582 continue to be true and correct; and
The City Council finds, after consideration of the evidence presented to it, including the
2002, Pumped Sewer Development Impact Fee Engineering Study, prepared by PBS&J,
that the inclusion of the Poggi Canyon Basin Sewer Interceptor as one of the facilities to
be financed by the development impact fee and the change of the Telegraph Canyon
Sewer Pumped Flows Development Impact Fee to Pumped Sewer Development Impact
Fee are necessary in order to assure adequate sewer service to the Pumped Flow Basin;
and
The City Council finds, based on the evidence presented at the meeting and the various
reports and information received by the City Council in the ordinary course of its
business, that the imposition of the Pumped Sewer Development Impact Fee on all
development in the Pumped Flow Basin for which building permits have not been issued
is necessary in order to protect the public health, safety and welfare; and
Ordinance 2884-B
Page 6
The City Council finds that the amount of the amended fees levied by this ordinance does
not exceed the estimated cost of providing the sewer service to the developments within
the Pumped Flow Basin; and
The City Council finds that it is appropriate to re-evaluate the development impact fee to
reflect the findings of the 2002, Pumped Sewer Development Impact Fee Engineering
Study and the inclusion of the Poggi Canyon Basin Sewer Interceptor as another
alternative to diversion of the pumped flows from the Pumped Flow Basin; and
The City Council finds it is necessary to ensure the option to pumped flows to the Poggi
Canyon Basin Sewer Interceptor before the threshold capacity limits are exceeded in the
Telegraph Canyon Trunk Sewer and to ensure the timely payment to adequately fund
ongoing and future sewer improvements, flow monitoring and studies required in the
Telegraph Canyon Trunk Sewer and Poggi Canyon Basin Sewer Interceptor triggered by
the pumped sewer flows."
SECTION 11: That the Mandatory Oversizing of Facility; Duty to Tender Reimbursement Offer
set forth in Section 15 of Ordinance 2582, shall be amended to read as follows:
"SECTION 15. Mandatory Oversizing of Facility; Duty to Tender Reimbursement Offer.
Whenever a developer of a development project in the Territory of the Pumped Flows
Basin is required as a condition of approval of an entitlement (e.g., General Plan
Amendment, Pre-zoning, General Development Plan, SPA Plan, etc.) to cause a portion
of the sewer system which is the subject matter of a facilities enhancement planned for
improvement under the Gravity Basin Plan to be oversized under the 2002 "Pumped
Sewer Development Impact Fee Engineering Study", the City may require the developer
to install the facilities according to design specifications approved by the City, that being
with the supplemental size or capacity in order to accommodate estimated ultimate flow
as indicated in the Basin Plan and subsequent amendments. If such a requirement is
imposed, the City shall first grant credits against the developer's obligation to pay the fee,
and, as to any excess, offer to reimburse the developer from the fund either in cash or
over time as fees are collected, at the option of the City, for costs incurred by the
developer for the design and construction of the facility not to exceed the estimated cost
of that particular facility as included in the calculation and updating of the fee, and in an
amount agreed to in advance of their expenditure in writing by the City. The City may
update the fee calculation, as City deems appropriate prior to making such offer. This
duty to extend credits or offer reimbursement shall be independent of the developer's
obligation to pay the fee."
SECTION 12: That the Assessment District set forth in Section 20 of Ordinance 2582, shall be
amended to read as follows:
"SECTION 20. Assessment District.
If any assessment or special taxing district is established to design, construct and pay for
any or all of the facilities ("Work Alternatively Financed"), the owner or developer of a
project may apply to the City Council for reimbursement from the fund in an amount
equal to that portion of the cost included in the calculation of the fee attributable to the
Work Alternatively Financed. In this regard, the amount of the reimbursement shall be
based on the costs included in the 2002, "Pumped Sewer Development Impact Fee
Engineering Study", as amended from time to time, and therefore, will not include any
Ordinance 2884-B
Page 7
portion of the financing costs associated with the formation of the assessment or other
special taxing district."
SECTION 13: That the Time Limit for Judicial Action set forth in Section 22 of Ordinance
2582, shall be amended to read as follows:
"SECTION 22. Time Limit for Judicial Action.
Any judicial action or proceeding to attack, review, set aside, void or annul this ordinance
shall be brought within the time period as established by law after the effective date of
this ordinance. In accordance with Government Code Section 66020 (d) (1), the ninety-
day approval period to which parties may protest begins upon the effective date of this
ordinance."
SECTION 14: That the CEQA Findings for Statutory Exemption set forth in Section 23 of
Ordinance 2582, shall be amended to read as follows:
"SECTION 23. CEQA Findings for Statutory Exemption.
The City Council does hereby find that the fee heroin imposed is for the purpose of
obtaining funds for capital projects necessary to maintain service within existing service
areas. The Council finds that the proposed facilities are in existing rights-of-way parallel
to or replacing existing sewer lines. Therefore, the City finds that the adoption of this
ordinance is statutorily exempt under the provisions of CEQA Guidelines Section 15282
(1).-
SECTION 15: Expiration of this ordinance.
This ordinance shall be of no further force and effect thirty (30) days after its adoption.
SECTION 16: Time Limit for Protest and Judicial Action.
Any judicial action or proceeding to attack, review, set aside, void or annul this ordinance
shall be brought with the time period as established by law.
In accordance with Government Code Section 66020(d)(1), the ninety-day approval
period in which parties may protest begins upon the effective date of this ordinance.
SECTION 17: Effective Date.
This ordinance shall become effective immediately upon four-fifths vote.
Ordinance 2884-B
Page 8
Presented by
Approved as to form by
jo p~. Lippi~tt~/~~--~
Public Works Director
heny
~ity Attorney
PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista,
California, this 19th day of November, 2002, by the following vote:
AYES:
Councilmembers:
Davis, Padilla, Rindone, Salas, and Horton
NAYS: Councilmembers: None
ABSENT: Councilmembers: None
ATI'EST:
Shirley.~I~orto~/~
Susan Bigelow, City Clerl~
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO )
CITY OF CHULA VISTA )
I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing
Ordinance No. 2884-B was passed as an urgency measure on the 19th day of November, 2002.
Executed this 19th day of November, 2002.