HomeMy WebLinkAboutReso 2002-189 RESOLUTION NO. 2002-189 RESOLUTION OF THE CITY COUNCIL OF ~ CITY OF CHULA VISTA ADOPTING POLICY OPTION 3 AS THE PROJECT ALIGNMENT FOR THE CONSTRUCTION OF THE SALT CREEK GRAVITY SEWER INTERCEPTOR WHEREAS, the Salt Creek Gravity Sewer Interceptor ("Project") is being designed to convey wastewater flows from developments within the Salt Creek Basin, in eastern Chula Vista and also provide additional capacity to the existing wastewater collection system in southern Chula Vista; and WHEREAS, the Salt Creek Sewer has been envisioned in a series of planning documents for the City of Chula Vista including the City General Plan (GP), the Otay Ranch General Development Plan (GDP), the Multiple Species Conservation Program Subregional Plan, and the Draft Multiple Species Conservation Plan City of Chula Vista Subarea Plan; and WHEREAS, an analysis has been completed of four possible alignments for the trunk sewer termed "Policy Options 1 through 4", and these alignments were all completely analyzed at a project-level; and WHEREAS, staff recommends Policy Option 3 which consists of a dual pipe system, with no permanent access road, within the same alignment and disturbance area as Policy Option 1; and WHEREAS, this option provides for the conveyance of flows within an efficient gravity system and allows for the decommissioning of the existing pump stations hence resulting in the significant cost savings accruing from the elimination of maintenance and operation costs of the existing pump stations; and WHEREAS, Policy Option 3 system would allow for adequate time to determine an approach to the repair/maintenance that best avoids impacts to sensitive resources in the area, such as accessing the pipe in the non-breeding season for sensitive bird species along routes determined to be least sensitive thus eliminating permanent impacts to sensitive resources associated with a maintenance access road; and WHEREAS, the Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project was covered in a previously adopted environmental impact report, Salt Creek Intemeptor Sewer Environment Impact Report (EIR) 01-03. The Environmental Review Coordinator has determined that only minor technical changes or additions to this document are necessary to address the proposed minor change to the sewer alignment and that none of the conditions described in Section 15162 of the State CEQA Guidelines calling for the preparation of a subsequent document have occurred; therefore, the Environmental Review Coordinator has prepared an addendum to the final EIR for the Salt Creek Interceptor Sewer (EIR 01-03); and WHEREAS, under this option, the entire construction corridor would be revegetated with natural vegetation. NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Chula Vista has hereby considered the addendum to the final Salt Creek Interceptor Sewer (EIR 01-03). Resolution 2002-189 Page 2 BE IT FURTHER RESOLVED the City Council of the City of Chula Vista does hereby adopt Policy Option 3 as the project alignment for the construction of the Salt Creek Gravity Sewer Interceptor. Presented by Approved as to form by JoVan P. Lippitt [ Johi~vl. Kaheny C~ Pfiblic Works Director ~ Attorney PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 4th day of June, 2002, by the following vote: AYES: Councilmembers: Davis, Padilla, Rindone, Salas and Horton NAYS: Councilmembers: None ABSENT: Councilmembers: None Shirley Hot, n, Mayor ATTEST: Susan Bigelow, City ClerlV STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Susan Bigelow, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2002-189 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 4th day of June, 2002. Executed this 4th day of June, 2002. Susan Bigelow, City Clerkh