HomeMy WebLinkAboutItem 16 - Additional InformationTYPE LOCATION OR DESCRIPTION
1 Street & Utilities E Street (I-5 Ramps to F Street)
2 Street & Utilities E Street (Lagoon Drive to G Street) - Rehabilitation
3 Street & Utilities F Street (Bay Blvd to E St) - Grading, drainage & utilities only
4 Street & Utilities F Street (NW) and Gunpowder Point Drive Relocation to access
Living Coast Discovery Center
5 Street & Utilities E Street (G Street to H Street)
6 Street & Utilities G Street Connection to UTAS Gate 66
7 Street & Utilities H Street (Marina Parkway to E Street)
8 Street & Utilities H Street (Bay Blvd to Marina Parkway, excluding 2014 street
improvements)
9 Street & Utilities H-3 Utility Corridor (existing Marina Parkway)
10 Parks & Open Space S-2 Sweetwater Signature Park (partial)
11 Parks & Open Space SP-3 Living Coast Discovery Center Parking Relocation
12 Parks & Open Space SP-1 Sweetwater Buffer (partial)
13 Parks & Open Space SP-2 Seasonal Wetland (bio-retention)
14 Parks & Open Space HP-1/H-8 Harbor Park (partial)
15 Parks & Open Space HP-3 Harbor District Baywalk (partial)
16 Misc.Storm Drain Systems, in public parcels (additional improvements)
17 Misc.Pedestrian access, in public parcels (additional improvements)
18 Misc.Bayshore Bikeway Bayfront Loop (E Street to H Street)
19 Misc.Parking, in public parcels (additional improvements)
20 Misc.Fire Station
21 Misc.Centralized facilities related to energy standards
22 Misc.Adaptation improvements related to sea level rise
23 Misc.Public facilities related to NRMP
24 Misc.Mitigation for impacts from CVB projects
Source Abbreviations
CCDP: Coastal Commission Development Policies
CCPAP: Coastal Commission Public Access Program
MM: Mitigation Measure from Mitigation, Monitoring and Reporting Program
NRMP: Natural Resource Management Plan
PMP: Port Master Plan
In accordance with Documents and laws and regulations in effect at the time of development.
EXHIBIT C-1
PHASE 1A PUBLIC IMPROVEMENTS
C-1-1
Additional Information
Item 16
TYPE LOCATION OR DESCRIPTION
1 Street & Utilities E Street (I-5 Ramps to H Street) (additional improvements)
2 Street & Utilities F Street (Bay Blvd to E St)
3 Street & Utilities H Street (I-5 Ramps to Street A, excluding 2014 street
improvements)
4 Street & Utilities Marina Parkway (H Street to J Street)
5 Street & Utilities Street A (H Street to J Street)
6 Street & Utilities Street C (Marina Parkway to H-18)
7 Street & Utilities J Street (I-5 Ramps to Marina Parkway)
8 Street & Utilities Marina Way Reconfiguration
9 Street & Utilities Street A (Otay)
10 Street & Utilities Street B (Otay)
11 Parks & Open Space S-2 Sweetwater Signature Park (additional improvements)
12 Parks & Open Space SP-1 Sweetwater Buffer (additional improvements)
13 Parks & Open Space SP-2 Seasonal Wetland (additional improvements)
14 Parks & Open Space HP-1/H-8/H-1A(N) Harbor Park (additional improvements)
15 Parks & Open Space HP-3 Harbor District Baywalk (additional improvements)
16 Parks & Open Space HP-12, HP-13, OP-3 Open Space (SDG&E and SD&AE)
17 Parks & Open Space Bayfront Park (additional improvements)
18 Parks & Open Space Marina View Park (additional improvements)
19 Parks & Open Space OP-1 Otay Park
20 Parks & Open Space OP-2 Otay Buffer
21 Misc.Storm Drain Systems, in public parcels (additional improvements)
22 Misc.Pedestrian access, in public parcels (additional improvements)
23 Misc.Bayshore Bikeway Bayfront Loop (additional improvements)
24 Misc.Parking, in public parcels (additional improvements)
25 Misc.H-18 Collector Parking
26 Misc.H Street Pier
27 Misc.Navigation channel realignment
28 Misc.HW-3 Harbor improvements
29 Misc.HW-1 and HW-4 Marina redevelopment
30 Misc.Centralized facilities related to energy standards
31 Misc.Adaptation improvements related to sea level rise
32 Misc.Public facilities related to NRMP
33 Misc.Mitigation for impacts from CVB projects
34 Misc.J Street & I-5 Northbound Ramp
35 Misc.J Street and Bay Boulevard
36 Misc.H Street (I-5 Ramps to Broadway)
37 Misc.H Street at Woodlawn Avenue
EXHIBIT C-2
PUBLIC IMPROVEMENTS - ULTIMATE, EXCLUDING PHASE 1A
C-2-1
Additional Information
Item 16
TYPE LOCATION OR DESCRIPTION
EXHIBIT C-2
PUBLIC IMPROVEMENTS - ULTIMATE, EXCLUDING PHASE 1A
38 BFDIF I-5-1: I-5/ E Street NB off-ramp restriping add lane
39 BFDIF I-5-2: I-5/ E Street/ Bay Blvd SD off-ramp restriping add lane
40 BFDIF I-5-4: E Street bridge widening over I-5
41 BFDIF I-5-5: F Street bridge widening over I-5
42 BFDIF I-5-6: I-5/ H Street NB off-ramp restriping add lane
43 BFDIF I-5-7: I-5/ H Street SB off-ramp restriping add lane
44 BFDIF I-5-8: H Street bridge widening over I-5
45 BFDIF I-5-9: I-5/ J Street NB off-ramp restriping add lane
46 BFDIF I-5-11: L Street bridge widening over I-5
47 BFDIF I-5-12: I-5/ Bay Blvd (south of L St.) SB on/off ramps traffic
signal
48 BFDIF I-5-13: I-5/ Industrial Blvd NB on/off ramps traffic signal
49 BFDIF I-5-14: I-5/ Palomar Street bridge widening
50 BFDIF I-5-16: I-5/ Main Street bridge widening
51 BFDIF I-5-17: I-5 HOV & Managed Lanes from SR-905 to SR-54
52 BFDIF RAS-5: E Street LRT grade separation (underpass LRT option)
53 BFDIF RAS-6: H Street LRT grade separation (underpass LRT option)
54 BFDIF RAS-9: H Street widening to 6-lanes from I-5 to Broadway
55 BFDIF BP-1: Bayshore Bikeway (bike path) between E & F Streets
56 BFDIF BP-9: Bayshore Bikeway (bike path) between F & H Streets
Source Abbreviations
BFDIF: Bayfront Transportation Development Impact Fee
CCDP: Coastal Commission Development Policies
CCPAP: Coastal Commission Public Access Program
MM: Mitigation Measure from Mitigation, Monitoring and Reporting Program
NRMP: Natural Resource Management Plan
PMP: Port Master Plan
In accordance with Documents and laws and regulations in effect at the time of development.
C-2-2
Additional Information
Item 16
LOCATION DESCRIPTION
1 F Street Sweetwater District sewer pump station and sewer
lines. New meter to South Metro Interceptor.
2 E Street Sewer lines
3 G Street Connection Sewer lines
4 H Street Sewer lines
5 H-3 Utility Corridor Sewer lines
6 G Street Sewer Pump Station Upgrade and improvements, including force main and
emergency storage
EXHIBIT E-1
PUBLIC SEWER IMPROVEMENTS - PHASE 1A
3
Additional Information
Item 16
LOCATION DESCRIPTION
1 Marina Parkway
Extend sewer line in H-3 utility corridor across H
Street. Relocate and upgrade pump station #11 and
sewer lines.
2 Street A Sewer lines
3 J Street Sewer lines, junction structure and upgrade
4 Marina Way Upgrade pump station #12 and relocate sewer lines
5 Street A (Otay)Sewer line
6 Street B (Otay)Sewer lines, pump station and connection to South
EXHIBIT E-2
PUBLIC SEWER IMPROVEMENTS - ULTIMATE, WITHOUT PHASE 1A
4
Additional Information
Item 16