Loading...
HomeMy WebLinkAboutItem 16 - Additional InformationTYPE LOCATION OR DESCRIPTION 1 Street & Utilities E Street (I-5 Ramps to F Street) 2 Street & Utilities E Street (Lagoon Drive to G Street) - Rehabilitation 3 Street & Utilities F Street (Bay Blvd to E St) - Grading, drainage & utilities only 4 Street & Utilities F Street (NW) and Gunpowder Point Drive Relocation to access Living Coast Discovery Center 5 Street & Utilities E Street (G Street to H Street) 6 Street & Utilities G Street Connection to UTAS Gate 66 7 Street & Utilities H Street (Marina Parkway to E Street) 8 Street & Utilities H Street (Bay Blvd to Marina Parkway, excluding 2014 street improvements) 9 Street & Utilities H-3 Utility Corridor (existing Marina Parkway) 10 Parks & Open Space S-2 Sweetwater Signature Park (partial) 11 Parks & Open Space SP-3 Living Coast Discovery Center Parking Relocation 12 Parks & Open Space SP-1 Sweetwater Buffer (partial) 13 Parks & Open Space SP-2 Seasonal Wetland (bio-retention) 14 Parks & Open Space HP-1/H-8 Harbor Park (partial) 15 Parks & Open Space HP-3 Harbor District Baywalk (partial) 16 Misc.Storm Drain Systems, in public parcels (additional improvements) 17 Misc.Pedestrian access, in public parcels (additional improvements) 18 Misc.Bayshore Bikeway Bayfront Loop (E Street to H Street) 19 Misc.Parking, in public parcels (additional improvements) 20 Misc.Fire Station 21 Misc.Centralized facilities related to energy standards 22 Misc.Adaptation improvements related to sea level rise 23 Misc.Public facilities related to NRMP 24 Misc.Mitigation for impacts from CVB projects Source Abbreviations CCDP: Coastal Commission Development Policies CCPAP: Coastal Commission Public Access Program MM: Mitigation Measure from Mitigation, Monitoring and Reporting Program NRMP: Natural Resource Management Plan PMP: Port Master Plan In accordance with Documents and laws and regulations in effect at the time of development. EXHIBIT C-1 PHASE 1A PUBLIC IMPROVEMENTS C-1-1 Additional Information Item 16 TYPE LOCATION OR DESCRIPTION 1 Street & Utilities E Street (I-5 Ramps to H Street) (additional improvements) 2 Street & Utilities F Street (Bay Blvd to E St) 3 Street & Utilities H Street (I-5 Ramps to Street A, excluding 2014 street improvements) 4 Street & Utilities Marina Parkway (H Street to J Street) 5 Street & Utilities Street A (H Street to J Street) 6 Street & Utilities Street C (Marina Parkway to H-18) 7 Street & Utilities J Street (I-5 Ramps to Marina Parkway) 8 Street & Utilities Marina Way Reconfiguration 9 Street & Utilities Street A (Otay) 10 Street & Utilities Street B (Otay) 11 Parks & Open Space S-2 Sweetwater Signature Park (additional improvements) 12 Parks & Open Space SP-1 Sweetwater Buffer (additional improvements) 13 Parks & Open Space SP-2 Seasonal Wetland (additional improvements) 14 Parks & Open Space HP-1/H-8/H-1A(N) Harbor Park (additional improvements) 15 Parks & Open Space HP-3 Harbor District Baywalk (additional improvements) 16 Parks & Open Space HP-12, HP-13, OP-3 Open Space (SDG&E and SD&AE) 17 Parks & Open Space Bayfront Park (additional improvements) 18 Parks & Open Space Marina View Park (additional improvements) 19 Parks & Open Space OP-1 Otay Park 20 Parks & Open Space OP-2 Otay Buffer 21 Misc.Storm Drain Systems, in public parcels (additional improvements) 22 Misc.Pedestrian access, in public parcels (additional improvements) 23 Misc.Bayshore Bikeway Bayfront Loop (additional improvements) 24 Misc.Parking, in public parcels (additional improvements) 25 Misc.H-18 Collector Parking 26 Misc.H Street Pier 27 Misc.Navigation channel realignment 28 Misc.HW-3 Harbor improvements 29 Misc.HW-1 and HW-4 Marina redevelopment 30 Misc.Centralized facilities related to energy standards 31 Misc.Adaptation improvements related to sea level rise 32 Misc.Public facilities related to NRMP 33 Misc.Mitigation for impacts from CVB projects 34 Misc.J Street & I-5 Northbound Ramp 35 Misc.J Street and Bay Boulevard 36 Misc.H Street (I-5 Ramps to Broadway) 37 Misc.H Street at Woodlawn Avenue EXHIBIT C-2 PUBLIC IMPROVEMENTS - ULTIMATE, EXCLUDING PHASE 1A C-2-1 Additional Information Item 16 TYPE LOCATION OR DESCRIPTION EXHIBIT C-2 PUBLIC IMPROVEMENTS - ULTIMATE, EXCLUDING PHASE 1A 38 BFDIF I-5-1: I-5/ E Street NB off-ramp restriping add lane 39 BFDIF I-5-2: I-5/ E Street/ Bay Blvd SD off-ramp restriping add lane 40 BFDIF I-5-4: E Street bridge widening over I-5 41 BFDIF I-5-5: F Street bridge widening over I-5 42 BFDIF I-5-6: I-5/ H Street NB off-ramp restriping add lane 43 BFDIF I-5-7: I-5/ H Street SB off-ramp restriping add lane 44 BFDIF I-5-8: H Street bridge widening over I-5 45 BFDIF I-5-9: I-5/ J Street NB off-ramp restriping add lane 46 BFDIF I-5-11: L Street bridge widening over I-5 47 BFDIF I-5-12: I-5/ Bay Blvd (south of L St.) SB on/off ramps traffic signal 48 BFDIF I-5-13: I-5/ Industrial Blvd NB on/off ramps traffic signal 49 BFDIF I-5-14: I-5/ Palomar Street bridge widening 50 BFDIF I-5-16: I-5/ Main Street bridge widening 51 BFDIF I-5-17: I-5 HOV & Managed Lanes from SR-905 to SR-54 52 BFDIF RAS-5: E Street LRT grade separation (underpass LRT option) 53 BFDIF RAS-6: H Street LRT grade separation (underpass LRT option) 54 BFDIF RAS-9: H Street widening to 6-lanes from I-5 to Broadway 55 BFDIF BP-1: Bayshore Bikeway (bike path) between E & F Streets 56 BFDIF BP-9: Bayshore Bikeway (bike path) between F & H Streets Source Abbreviations BFDIF: Bayfront Transportation Development Impact Fee CCDP: Coastal Commission Development Policies CCPAP: Coastal Commission Public Access Program MM: Mitigation Measure from Mitigation, Monitoring and Reporting Program NRMP: Natural Resource Management Plan PMP: Port Master Plan In accordance with Documents and laws and regulations in effect at the time of development. C-2-2 Additional Information Item 16 LOCATION DESCRIPTION 1 F Street Sweetwater District sewer pump station and sewer lines. New meter to South Metro Interceptor. 2 E Street Sewer lines 3 G Street Connection Sewer lines 4 H Street Sewer lines 5 H-3 Utility Corridor Sewer lines 6 G Street Sewer Pump Station Upgrade and improvements, including force main and emergency storage EXHIBIT E-1 PUBLIC SEWER IMPROVEMENTS - PHASE 1A 3 Additional Information Item 16 LOCATION DESCRIPTION 1 Marina Parkway Extend sewer line in H-3 utility corridor across H Street. Relocate and upgrade pump station #11 and sewer lines. 2 Street A Sewer lines 3 J Street Sewer lines, junction structure and upgrade 4 Marina Way Upgrade pump station #12 and relocate sewer lines 5 Street A (Otay)Sewer line 6 Street B (Otay)Sewer lines, pump station and connection to South EXHIBIT E-2 PUBLIC SEWER IMPROVEMENTS - ULTIMATE, WITHOUT PHASE 1A 4 Additional Information Item 16