HomeMy WebLinkAboutReso 2016-207 RESOLUTION I�'O. 2016-207
RESOLUTIOI�' OF THE CITI' COUI�'CIL OF THE CIT1' OF
CHliLA VISTA ACCEPTI?�'G BIDS: AWARDII�'G A
COI�TTRACT FOR `�II�'DUSTRIAL BOULE\'ARD AND A�AII�'
STREET SE�'ER IMPROVEMENTS PROJECT (CIP NO.
S�i'292)" AND "BRANDY�1'II�rE AVENUE GU.ARDRAIL
INSTALLATION. ALONG THE �'ESTSIDE OF
BRAI�TDY�i'INE AVENUE FROM SONORA DRIVE SOUTH
TO SONORA DRI��E NORTH PROJECT" TO BLUE PACIFIC
EI�'GI?�TEER[I�'G & CONSTRUCTION 1N THE AA40U1�TT OF
$394J99: APPROPRIATING �210.000 FROA4 THE
AVAILABLE BALAI�'CE OF THE SE�'��ER FACILITY
REPLACEA4EI�'T FUi�'D. REDUCIi�'G THE STL389 CIP
BUDGET BY �1�0.000 II�' TRANSNET FlJ\'DS AND
APPROPRIATII�'G THE EQUI\'ALENT AMOUi�iT TO CIP
SW292: AUTHORIZII�'G THE DIRECTOR OF PUBLIC
WORKS TO EXECUTE ALL CHANGE ORDERS: AI�rD
AUTHORIZII�'G THE EXPE\'DITURE OF ALL AVAILABLE
CONTII�'GENC1' FUI�rDS IN A\� AMOIJI�'T NOT TO EXCEED
$60.000
�i'HEREAS. the purpose of the project is to replace existine sewer main alone Industrial
Boule��azd and installation of new euardrail on the N�est side of Brand���ine Avenue: and
WHEREAS. the Director of Development Services has revie���ed the proposed project for
compliance �rith the Califomia Environmental Quality Act (CEQA) and has determined that the
project qualifies for a Categorical Exemption pursuant to State CEQA Guidelines Section 1�301
Class 1 (Existine Facilities) and /or Section 1�303 Class 3 (I`'e�v Construction or Com�ersion of
Small Structures) of the California Environmental Quality Act State Guidelines; and
V�'HEREAS, on Aueust 17; 2016, the Director of Public Works recei��ed three (3) sealed
bids for the "Industrial Boulevard and Main Street Sewer Impro��ements (SW292)" and
`Brand���ine Avenue Guazdrail Installation Alone the Westside of Brand���ine Avenue from
Sonora Drive South to Sonora Dri��e North Projects '; and
WHEREAS. the follo�vine bids were recei��ed:
CONTRACTOR I BID An10UNT
V1'illkom Inc. —National Cit��, Califomia � $249,928.�0*
Blue Pacific Eneineering & Construction — San Die_o. 5394.799.00
Califomia
Just Construction. Inc. — San Die�o. Califomia $�11.440.80
*The lo���est bidder u�ithdre��� prior to a���ard.
Resolution No. 2016-207
Page No. 2
WHEREAS, a mistake occurred in the apparent low bid submitted by Willkom Inc.; and
WHEREAS, the mistake made the bid materially different than Willkom Inc. intended it
to be; and
WHEREAS; the apparent ]ow bid by Willkom Inc. was retracted based upon a
mathematical discrepancy made in their bid; and
WHEREAS, follo��ing the retraction of the Willkom Inc. bid, the bid from Blue Pacific
Engineering & Construction became the low bid; and
WHEREAS, Blue Pacific Engineering & Construction is currently an active licensed
Class "A" — General Engineering Contractor (License No. 824455) and has performed similar
work in the City with satisfactory performance; and
WHEREAS, in the City Council Policy No. 574-01, the maximum aggregated contract
increase that maybe approved by the Director of Public Works for the SW292 project is
$30,635.93; and
WHEREAS, approval of the resolution would increase the Director of Public Works
authority to approve change orders as necessary, without further City Council approval, in an
amount not to exceed the contingency amount of $60,000 (approximately 15% of the contract);
and
WHEREAS, the transfer and appropriation of $210,000 from the Sewer Facility
Replacement Fund and $150,000 from the TRANSNET fund STL389 into SW292 is
recommended in order to provide sufficient funds for construction costs associated with this
project; and
WHEREAS, a breakdown of construction cosYs is as follows:
FUNDS REQUIRED FOR CONSTRUCTION
A. Contract Amount $394,799.00
B. Contingency (Approximately 1�% of Contract) $60.000.00
C. Construction Inspection; Design and Land Survey StaffCosts $118,856.00
D. Material Testing $]7,000.00
TOTAL FUNDS REQUIRED FOR CONSTRUCTION �590,655.00
Resolution No. 2016-207
Paee No. 3
Fuodiug Source
Sewer Faciliri� Replacement Fund (SW292) �230,6».00
Sew�er Facilin� Replacement Fund (Appropriation) I �210,000.00
7ransNet Fund (Transfer from STL389) �1�0,000.00
Total Funding 5�90,6�5.00
NOVI%. THEREFORE. BE IT RESOLVED that the Cit�� Council of the Cit�� of Chula
Vista does hereby appropriate �Z10.000 from the Se�rer Facilin� Replacement Fund and reduce
the CIP STL389 budeet b� �1�0,000 in Trans\'et Funds and appropriate the equivalent amount
to CIP SV�'292 to co��er the Construction Inspection, Desien, Land Surve�ing staff costs, and
material testing associated ���ith this project.
BE IT FURTHER RESOLVED b�� the Cin= Council of the Citv of Chula Vista. that it
does hereb�� accept bids; a��azd a contract for ��Industrial Boule��ard •and Main Street Se���er
Impro��ements (S��1'292)" and "Brand��vine Avenue Guardrail Installation Alone the Westside of
Brand«�Tine A��enue from Sonora Dm�e South to Sonora Dm�e North Projects" to Blue Pacific
Engineering & Construction in the amount of$394;799, in the form presented, ���ith such minor
modifications as may be required or approved bv the City Attome}�, a cop�� of ���hich shall be
kept on file in the Office of the Cit}� Clerk.
BE IT FURTHER RESOLVED b� the Cirv Council of the Cit1� of Chula Vista. that it
does hereby authorize and direct the Cit�� Manaeer or his authorized representati��e to ezecute the
contract.
BE IT FURTHER RESOLVED that the Cit�� Council of the Citv of Chula Vista does
hereb�� ���aive Council Policy No. �74-01 and authorize the Director of Public �\rorks to approve
change orders: as necessan�; and e�pend all a��ailable contingenc�� funds in an amount not to
exceed �60.000.
Presented b}� Approved as to form b��
/�� � ,,� �-,�:
Richard A. opkins Cglen R. Gooeins �
Director of Public orks Cicy�t�me��
Resolution No. 2016-207
Page No. 4
PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista,
Califomia, this l lth day of October 2016 by the following vote:
AYES: Councilmembers: Aguilar, Bensoussan, McCann, Miesen, and Salas
NAYS: Councilmembers: None
ABSENT: Councilmembers: None
�
Mary las, Mayor
ATTEST:
,��, �,�,�-
Donn�, C C; City Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO )
CITY OF CHULA VISTA )
I, Donna R. Norris, Citv Clerk of Chula Vista, California, do hereby certify that the foregoine
Resolution No. 2016-207 was duly passed, approved, and adopted by the City Council at a
regular meeting of the Chula Vista City Council held on the 11 th day of October 2016.
Executed this 11 th day of October 2016.
��� !/✓
Donna R. Norns, C�iry Clerk