HomeMy WebLinkAboutItem 3 - Attch 5 - Revised Site Utilization TableREVISED SITE UTILIZATION TABLE
LAND USE
5F
2,9
27
USE
"
R -19B MF
4
R-18A(d)
5F
SUMMARY
11113: Type
Acreage
DUs
'LA'N
I.SUMMARY
Target Density 4'MI'RY
I r; a
U-ItTYpJ
Acreage
DUs
Target Density
Neighborhood
333
R-27 MF
8.7
,
Neighborhood
5
6,2s IND -2 IND
8.5
Land Use
R -18a
SF
09 37
Land Use
14.4
32 C4culatlon
R -19A
ISF
Single-family
7,47A Subtotal IND 1
8215
1 1
Mixed Use
SF
15.5
44 3.9
12A
so
ILL,
53
5.2 Note: industrial parcels may he developed as residential and CPF uses subject to future
34-3,8 environmental review and SPA Policies and Requirements, after landfill operations cease
4.3 at the Otay Land FIL.
2-4A
SIF
16.9
62
3.7jMU-1
MU
1.8
38
R -SA
SF
7.5
48
6A MU -2'
MU
2.4,
R-413
MF
R. -SC
SF
MH
51
4:1 MU -3
MU
4.3
90
'R -5b
R -15A
5F
2.7
16
5,9 C-1
=U
14
235
10 P-5 p 5.1
R -7A
MF
4.6
27
5..9 Subtotal MU
11-811
22.5
413
29
R48A(c)
5F
2,9
27
---
53 Industrial
R -19B MF
4
R-18A(d)
5F
10,2
60
5.9 IND -la IND
25.8
23.5 5-1 Ischool
10.3
R -25A MF
4463
43
44 IND -1b, IND
333
R-27 MF
8.7
175
04
5
6,2s IND -2 IND
8.5
96
R -18a
SF
09 37
4.2. IND -3 IND
14.4
32 C4culatlon
R -19A
ISF
6&-7,7 60 55
7,47A Subtotal IND 1
8215
1 1
R-70
SF
15.5
44 3.9
12A
so
ILL,
53
5.2 Note: industrial parcels may he developed as residential and CPF uses subject to future
34-3,8 environmental review and SPA Policies and Requirements, after landfill operations cease
4.3 at the Otay Land FIL.
R -21A SF
R-218 SF
2-23 5F
Pubtotal Mnglo-Famlly
17.7
120.7
93
644,614
5.3 Parks
5 P-1 P 1.4
P-2 P7.1
P-3 P 7.6
MuIll-Family
P -4A P 40.4
--City
R-413
MF
23A
306
16.5 P-43 P 2.4 of SD Waterline Pct
R-Sa
1,4F
11.4
95
8.3 PAC p 2,8 City ofSD Easement
'R -5b
MF
4.6
38
8.4 PAD P 1,9 V4 Dedication by JBB
R-6
MF
12.6
126
10 P-5 p 5.1
R -7A
MF
9.4
82
8.7 P-6 P 2.7'
11-811
MF
2.5
29
11.6 Subtotal Parks 70.3*
R -9A
IAF
6.9
67
75
9.8 t4ote; P-0 and P -4C can only be accepted for park credit if the City of San Diego Waterline
ME is relocated.
R-911 MF 7.1
R; 10A
MF
2
44
22 CPF"*
-F-- -
H-2013
MF
2-6
61
23,6 CMF -1 FP
1.2
R-1 1
MF
9.0
206
21 CPF-2 CPF
R-12
MF
24A
600
24.6 CPF-3 CPF
R-13
MF
101
137
112 CPFAA CPF
1.5 0 s of SPF use required
R-14
MF
9.3
16S
17.7 CPF-5 CPF
0
R -16A
MF
1.8
38
21,6 CPF- CPF
I
R -16B
NIF
017
17
23,15 CFF -8 CPF
0.5
R- 17A
MF:
L-5 5.3
-44 45
8,".5 CPF-91 CPF
9=Acreage accounted for in Ind -3
R -17(8)a
FAF
11
-84 33
10.9 Subtotal CPF
14.1 3.6 acres of non-floalFrig
final
f n�
R-170Ib) Imp
4.7
Wo -/s
�Sha b -u
- -
R -19B MF
4
-
39
9d Other
R-24 MF
15
59
23.5 5-1 Ischool
10.3
R -25A MF
14.1
33O
23.4 S-2 School
9.5
R-27 MF
8.7
175
20.2 Open Space 0S
138.2
R-28 MF-
5.2
96
18'5 Preserve 05
75.2
R-29 SMF
H 5.91
1871
32 C4culatlon
6315
103
278
26.9.Future Vey.
- - ----------
R-31 LL-
Subtotal Multl,Family
"' An additional 3.9 acres of CPF will be provided
+ Includes 10,000 sf of building area for CPF uses
1.1
202.9
within the Village
- 25
LAkitEEt
7 SPA
22.7 subtotal Other I --- 300.71
M -A 17.3 Village 2 Grand Total 765.8 4.54
A Indicates Floating CFF sites,
* Includes 46.5 acres of parkland (P-4) In V11age 4 not counted In Wlage 2 area
++P-6 can be enlarged to 3.0 acres (taking 0.29 acres from RAR(b) lot 20 if necessary to meet total parkland obligation
Attachment 5